Loading...
HomeSearchMy WebLinkAboutAEEC-CPL Landfill Gas CHP Project 25% Design Submittal - Jun 2019 - REF Grant 7014012AEEC-CPL Landfill Gas CHP Project Collection and Control System Conceptual Design - Jun 2019 - REF Grant 7014012Five Mile Creek Hydroelectric Project Reconnaissance Trip Report - Oct 2019 - REF Grant 7091226Five Mile Creek Hydroelectric Project Scope of Work - Apr 2019 - REF Grant 7091226Haines Borough Biomass Project Final Design - Apr 2019 - REF Grant 7071021Haines Central Wood Heating Project Final Design Package - Apr 2019 - REF Grant 2195373Hoonah-IPEC Hydro Project Water Supply Creek Feasibility Study - Dec 2019 - REF Grant 7030019Kotzebue Wind to Heat Project Thermal Source Alternative Analysis - Apr 2019 - REF Grant 7014015REF 2019 status report Electronic round 12 3.18.19Thayer Lake Hydroelectric Project Conceptual Design Report - Dec 2019 - REF Grants 7040038, 7050825Thayer Lake Hydropower Project Final Business Plan - Sep 2019 - REF Grants 7040038, 7050825