Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
1982 Water quality annual report
Access plannign study 1982
Acres Feasibilty Study Report Vol 6 Cost Estimates 1982
Aircraft support Helicopter and fixed wing 1982
AK economic projections for est electricity requirments for the railbelt Vol 9 1982
AK statistical review Vol 1 1982
Alaska energy planning studies a review of three consultant studies 1982
Alaska Interagency fire managment plan Tanana Minchumina 1982
Anchorage bowl comp devel plan 1982
Annual report on AK's mineral resources 1982
APA external review panel SHP 1982
APA Susitna Hydro Project access planning study supplement 1982
Aquatic Studies Procedures Manual Phase 2 Draft 1982
Aquatic Studies Procedures Manual Phase 2 First Ed 1982
Biological ecological invest on the black bear creek system 1982
Book Watana Dam devil canyon production rates est 1982
Browne Hydro Alternative for the Railbelt Vol 15 1982
Calculations for Impervious core Gradation study 1982
Camp operations 1982
Candidate electric energy tech for future app in the Railbelt Vol 4 1982
Candidate electric energy tech for future application in the railbelt Vol 3 1982
Chakachamna Hydro Alternatives for the railbelt Vol 14 1982
Chakachamna Hydro project interim feasibility Vol 1 1983
Coal fired steam electric power plant alt for the railbelt Vol 12 1982
Coal Gasification Combined Cycle Power Plant Alternative for the Railbelt Vol 17 1982
Community meeting public input for the railbelt Vol 10 1982
Comprehensive assessment of recreational values and use patterns 1982
Computerized geographic info system talkeetna and beluga subbasins 1982
Cook inlet regional salmon enchancement plan 1981 to 2000 pub 1982
Daily flow statistics of AK streams 1982
Data index by habitat area est 1982
Design Manual for the long term earthquake monitoring system 1982
Development of a plan to complete access to watana 1982
Draft Susitna Application list of deficiencies Exhibit E 1982
Effects of hydro discharge fluctuation on salmon and steelhead 1982
Engineering and design Ice Engineering 1982
Enviromental Studies Artic Enviromental info and data center woodward 1982
Enviromental Studies land use analysis navigational use 1982
Enviromental studies Subtaks 7.06 cultural resources investigation Phase 1 1982
Enviromental studies subtask 7.05 Phase 1 report 1982
Enviromental studies Subtask 7.12 plant ecology est 1982
Enviromental sudies subtask 7.06 Appendix E 1982
Enviromental summer studies for the Endicott development Vol 6 1982
Exhibit E schedules outlines and guidelines 1982
Existing generating facilities and planned additons for the railbelt Vol 6 1982
Experiments on thermal req for growth and food converstion efficency 1982
Factors influencing behavior and sightability of moose in denali 1982
Feasibility report comp biblio Vol 1 and Vol 2 1982
Feasibility report Vol 1 Engineering and economic aspects 1982
Feasibility report Vol 1 First draft sections 1-8 1982
Feasibility report Vol 6 Appendix C cost estimates 1982
Field Reconn reservoir area timber report 1982
Fish and wildlife mitigation policy rev 1982
Fish responses to temp to assess effects of thermal discharge 1982
Fisheries mitigation options revised 1982
Freshwater habitat relationships dolly varden 1982
Freshwater habitat relationships round whitefish 1982
Generation planning studies close out report 1982
Glacial Lake studies 1982
Hydraulic and ice studies 1982
Intertie newsletter March 1982
Kootenai river hydro direct testimony Vol 1 1982
Lake Comance Dissolved Nitrogen Study 1982
Land status report ciri lands village reconveyances part 1 1982
Land status report ciri lands village reconveyances part 2 1982
Liard river hydro studies info bulletin no 4 1982
List of Supp Information and Clarification needs Draft Susitna App Exhibit E 1982
Low Water Boat Nav susitna river at Mile 128 1982
Minutes of exhibit E preview workshop 1982
Natural gas fired combined cycle power plant alt for the railbelt Vol 13 1982
Nelchina yearling moose mortality study Vol 2 1982
North Aleutian shelf statewide and regional demographic and economic systems impact analysis 1982
Panel meeting report 7 1982
Patterns of use of the nelchina caribou herd 1982
Peace River 1981-1982 Ice Observation Report 1982
Peregrine Falcon Surveys of selected areas along the upper Tanana and Sagvanirktok rivers 1982
Phase 1 Big game studies Vol 4 Caribou 1982
Phase 1 final big game studies Vol 2 Moose 1982
Phase 1 final report big game studies Vol 3 moose 1982
Phase 1 final report big game studies Vol 6 black and brown bear 1982
Phase 2 basic data report Vol 4 Appendices A to C 1982
Phase 2 Basic data report Vol 4 aquatic habitat and instream flow 1982
Phase 2 FY83 aquatic study budget proposal 1982
Phase 2 synopsis of the 1982 aquatic studies and analysis
Placer mining wastewater settling pond demonstration project 1982
Plant ecology phase 1 report 1982
Porcessed climatic data Oct 1981 through Sep 1982 Vol 1
Potential effects of two alt hydo devel on the fishery resources of the lower tazima 1982
Potential for industrial devel in the railbelt region of AK 1982
Prelim results of reservoir temp and instream ice runs est 1982
Preliminary assessment of access by Spawning Salmon to side slough habitat above Talkeetna 1982
Preliminary railbelt electric energy plans Vol 5 1982
Prepatation of FERC license exhibits 1982
Prevention of golden eagle electrocution 1982
Processed climatic data may 1982 to sep 1982 Vol 7 sherman station 1982
Processed climatic data Oct 1981 to Sep 1982 Vol 2 Denali station 1982
Processed climatic data Oct 1981 to Sep 1982 Vol 4 Kosina Creek Station 1982
Processed Climatic Data Vol 5 Watana Station 1982
Proposed mitigation for Susitna River Fish stocks 1982
Railbelt elec power alt study evaluation of railbelt elect energy plans comment draft 1982
Railbelt Electric Power Alt Study Fossil Fuel Avail and price forecasts Vol 7 1982
Railbelt Electric Power Alternatives Over Under (AREEP Version) Model User's Manual Vol 11 1982
Railbelt Electric Power Alternatives study: Eval of Railbelt electric energy plans Vol 1 1982
RED: The railbelt electricity demand model Vol 8 1982
Reservoir bank erosion caused and influenced by ice cover 1982
Reservoir Sedimentation 1982
Review and testimonies on acres feasibility report 1982
Revision of Preliminary Classification for Vegetation of AK 1982
Reviwed and corrected literature search upper cook inlet 1982
River Morphology 1982
River Morphology Apendix B.9 1982
Sediment discharge data for selected sites in the susitna 1981 to 1982
Selection of electric energy generation alt foe consideration the railbelt Vol 2 1982
SHP Access plan recommendation report 1982
Simulation of fish movements in a large hydro elec reservoir 1982
Slope stubility and erosion studies closeout report 1982
Slough hydrology interim report 1982
Snow surveys and water supply outlook for AK 1982
Statewide Harvest study 1981 to 1982
Subtask 5.04 closeout report eval of arch dam at devil canyon 1982
Subtask 7.05 socioeconomic analysis phase 1 report 1982
Subtask 7.07 land use analysis phase 1 report 1982
Subtask 7.08 recreation planning phase 1 report 1982
Subtask 7.10 aqautic studies procedures manual phase 1 appendices 1 to 8 1982
Subtask 7.10 aqautic studies procedures manual phase 1 final 1982
Subtask 7.10 Final draft report 1982
Subtask 7.10 phase 1 final draft stock separation 1982
Subtask 7.11 birds and non game mammals baseline studies 1982
Subtask 7.11 birds and non game mammals phase 1 1982
Subtask 7.11 furbearers phase 1 report 1982
Subtask 7.12 plant ecology studies Phase 1 final report 1982
Subtask 7.14 access road analysis 1982
Subtask 8.02 closeout report electric system studies 1982
Summer 1982 seismic surveys program relict channels and damsite 1982
Susita Hydro Borrow site D and relict channel summ of lab test data 1982
Susita Hydro FY83 proposed geotechnical exploration program 1982
Susita Hydro Hydro Aquatic Phase 2 Vol 2 1982
Susita Hydro Task 3 Processed climatic data Vol 1 Susitna glacier station 1982
Susitna 1982 Sepplement to 1980 to 1981 Geotechnical Report 1982
Susitna acess planning reevaluation of acres recom plan 1982
Susitna aerial photography and photogrametric mapping 1982
Susitna annual capital expenditures...during construction 1982
Susitna basin glacier studies Dec 1982
Susitna Big Game Studies Vol 1 Big game summary report 1982
Susitna Big Game Studies Vol 5 Wolf 1982
Susitna big game studies Vol 7 Wolverine and Vol 8 Dall sheep 1982
Susitna Ebasco Estimating package revision 3 1982
Susitna Ebasco Estimating package revision 4 1982
Susitna economic analysis package Jan 1982
Susitna Energy Production est 1982
Susitna FERC exhibit B 1982
Susitna FERC exhibit B first draft 1982
Susitna FERC exhibit C first draft 1982
Susitna FERC exhibit D first draft 1982
Susitna FERC exhibit D project financing 1982
Susitna FERC exhibit E chapter 10 1982
Susitna FERC exhibit E chapter 3 1982
Susitna FERC exhibit E chapters 1 and 2 1982
Susitna FERC exhibit E chapters 4, 5, and 6 1982
Susitna FERC exhibit E chapters 7, 8, and 9 1982
Susitna FERC exhibit G project maps 1982
Susitna FERC license application Exhibit A first draft 1982
Susitna field data collection and processing supplement 1 1982
Susitna field data collection and processing Vol 1 1982
Susitna field data collection and processing Vol 3 1982
Susitna fisheries mitigation options revised 1982
Susitna Hatchery Siting Study 1982
Susitna HEP estimate revisions feasibility study to FERC 1982
Susitna Hydro Access Planning Study supp 1982
Susitna Hydro Aquatic Phase 2 Vol 3 1982
Susitna Hydro Aquatic Phase 2 Vol 3 appendix 1982
Susitna Hydro Aquatic Studies Phase 2 Report Vol 1 1982
Susitna Hydro Aquatic Studies Phase 2 Vol 3 1982
Susitna Hydro Aquatic Studies Phase 2 Vol 4 Parts 1 and 2 1982
Susitna Hydro Aquatic Studies Phase 2 Vol 5 1982
Susitna Hydro Aquatic Studies Vol 5 1982
Susitna Hydro Aquatic Stuides Phase 2 Vol 2 Part B 1982
Susitna Hydro cost estimates 1982
Susitna Hydro Field Data Index Task 3 Hydrology revision 1982
Susitna Hydro Final report on seismic studies 1982
Susitna Hydro FY83 Proposed Geotechnical exploratory program 1982
Susitna Hydro geotechnical AAI Field Books 1980 to 1982
Susitna Hydro Nitrogen Superstation studies 1982
Susitna Hydro planning and design of EHV transmission and control systems Vol 1 1982
Susitna Hydro processed climatic data vol 2 Denali Station 1982
Susitna Hydro Project Access planning study 1982
Susitna Hydro Project External Review Board Meeting 1982
Susitna Hydro Project General File Index 1982
Susitna Hydro Project Summ Report 1982
Susitna Hydro Report on specialist consultants meeting 5 1982
Susitna Hydro Reservoir sedimentation Appendix B.8 1982
Susitna Hydro Subtask 7 Fish Ecology Instream Flow assessment 1982
Susitna Hydro Task 3 Hydrology closeout report 1982
Susitna Hydro Task 3 Tyrone River Station 1982
Susitna Hydro task 6 Design Development 1982
Susitna Hydro Task 7 enviromental 1982
Susitna Hydro Terrestrial enviromental workshop and prelim simulation model 1982
Susitna Hydro vol 4 kosina creek station 1982
Susitna Hydro Vol 6 Devil canyon station 1982
Susitna Hydrographic surveys 1982
Susitna internal review board meeting no 5 1982
Susitna Joint Venture Vol 1 Tech proposal 1982
Susitna plan of study revision 3 1982
Susitna plan of study revision 4 1982
Susitna processed climatic data June 1982 through Sep 1982 Vol 8 Eklutna lake station 1982
Susitna Processed Climatic Vol 3 Tyone River station 1982
Susitna reports by power authoriry and acres external review panels 1980 to 1982
Susitna reservoir sedimentation water clarity study 1982
Susitna river do we really need to dam it? est 1982
Susitna subtask 12.03 agency consultation 1982
Susitna subtask 2.10 access roads final 1982
Susitna subtask 2.13 marketability and disposal study for reservoir area final 1982
Susitna subtask 7.04 water resources analysis 1982
Susitna Task 11 ref report exonomic, marketing, and finacial evaluation est 1982
Susitna task 3 Hydraulit and ice stuides 1982
Susitna task 7 enviroemtnal studies draft wildlife mitigation option 1982
Susitna task 9 estimating takeoff assumptions 1982
Susitna transmission line corridor screening closeout report 1982
Susitna transmission line selected route final draft 1982
Susitna tributary stablity analysis 1982
Switching stations and substations single line diagrams final 1982
Task 11.03 close out report Susitna risk analusis april 1982
Task 12 Public and Agency participation subtask 12.03 1982
Task 3 hydrology field data index 1982
Temp prederence of juvenile arctic cisco from the AK beaufort sea 1982
Unit Costs Backup Calc Manpower Costs Cash Flows 1982
Unit Prices Backup Calc Watana Dam 1982
Unit Prices Backup Calc Watana Devil Canyon 1982
Unit Prices Backup Calculations Watana Dam 1982
Unit Prices Backup Watana Dam 1982
Unit Prices Devil Canyon 1982
Unit Prices Devil Canyon Backup Calc 1982
Watana contractors indirects 1982
Watana contruction schedule deasibility report 1982
Watana dam borrow areas haul routes 1982
Watana dam indirects feasibility report 1982
Water and energy tech and policy issues 1982
Water quality effects resulting from impoundment of the susitna river 1982
Water requirements for the fisheries resource of the nicola river B.C. 1982
Water resources data AK water year 1982
Were clovis progenitors in beringia 1982
Wildlife Utilization and the economy of nondalton 1982
Willow sub basin area plan 1982
Wind Energy Alt for the railbelt region Vol 16 1982
Winter 1981 to 1982 ice observations report 1982
Winter 1981 to 1982 ice observations report task 3 1982
Winter 1982 hammer drilling terraflex carriers
Winter temp study open file report 1982