Loading...
HomeSearchMy WebLinkAbout1982 Water quality annual reportAccess plannign study 1982Acres Feasibilty Study Report Vol 6 Cost Estimates 1982Aircraft support Helicopter and fixed wing 1982AK economic projections for est electricity requirments for the railbelt Vol 9 1982AK statistical review Vol 1 1982Alaska energy planning studies a review of three consultant studies 1982Alaska Interagency fire managment plan Tanana Minchumina 1982Anchorage bowl comp devel plan 1982Annual report on AK's mineral resources 1982APA external review panel SHP 1982APA Susitna Hydro Project access planning study supplement 1982Aquatic Studies Procedures Manual Phase 2 Draft 1982Aquatic Studies Procedures Manual Phase 2 First Ed 1982Biological ecological invest on the black bear creek system 1982Book Watana Dam devil canyon production rates est 1982Browne Hydro Alternative for the Railbelt Vol 15 1982Calculations for Impervious core Gradation study 1982Camp operations 1982Candidate electric energy tech for future app in the Railbelt Vol 4 1982Candidate electric energy tech for future application in the railbelt Vol 3 1982Chakachamna Hydro Alternatives for the railbelt Vol 14 1982Chakachamna Hydro project interim feasibility Vol 1 1983Coal fired steam electric power plant alt for the railbelt Vol 12 1982Coal Gasification Combined Cycle Power Plant Alternative for the Railbelt Vol 17 1982Community meeting public input for the railbelt Vol 10 1982Comprehensive assessment of recreational values and use patterns 1982Computerized geographic info system talkeetna and beluga subbasins 1982Cook inlet regional salmon enchancement plan 1981 to 2000 pub 1982Daily flow statistics of AK streams 1982Data index by habitat area est 1982Design Manual for the long term earthquake monitoring system 1982Development of a plan to complete access to watana 1982Draft Susitna Application list of deficiencies Exhibit E 1982Effects of hydro discharge fluctuation on salmon and steelhead 1982Engineering and design Ice Engineering 1982Enviromental Studies Artic Enviromental info and data center woodward 1982Enviromental Studies land use analysis navigational use 1982Enviromental studies Subtaks 7.06 cultural resources investigation Phase 1 1982Enviromental studies subtask 7.05 Phase 1 report 1982Enviromental studies Subtask 7.12 plant ecology est 1982Enviromental sudies subtask 7.06 Appendix E 1982Enviromental summer studies for the Endicott development Vol 6 1982Exhibit E schedules outlines and guidelines 1982Existing generating facilities and planned additons for the railbelt Vol 6 1982Experiments on thermal req for growth and food converstion efficency 1982Factors influencing behavior and sightability of moose in denali 1982Feasibility report comp biblio Vol 1 and Vol 2 1982Feasibility report Vol 1 Engineering and economic aspects 1982Feasibility report Vol 1 First draft sections 1-8 1982Feasibility report Vol 6 Appendix C cost estimates 1982Field Reconn reservoir area timber report 1982Fish and wildlife mitigation policy rev 1982Fish responses to temp to assess effects of thermal discharge 1982Fisheries mitigation options revised 1982Freshwater habitat relationships dolly varden 1982Freshwater habitat relationships round whitefish 1982Generation planning studies close out report 1982Glacial Lake studies 1982Hydraulic and ice studies 1982Intertie newsletter March 1982Kootenai river hydro direct testimony Vol 1 1982Lake Comance Dissolved Nitrogen Study 1982Land status report ciri lands village reconveyances part 1 1982Land status report ciri lands village reconveyances part 2 1982Liard river hydro studies info bulletin no 4 1982List of Supp Information and Clarification needs Draft Susitna App Exhibit E 1982Low Water Boat Nav susitna river at Mile 128 1982Minutes of exhibit E preview workshop 1982Natural gas fired combined cycle power plant alt for the railbelt Vol 13 1982Nelchina yearling moose mortality study Vol 2 1982North Aleutian shelf statewide and regional demographic and economic systems impact analysis 1982Panel meeting report 7 1982Patterns of use of the nelchina caribou herd 1982Peace River 1981-1982 Ice Observation Report 1982Peregrine Falcon Surveys of selected areas along the upper Tanana and Sagvanirktok rivers 1982Phase 1 Big game studies Vol 4 Caribou 1982Phase 1 final big game studies Vol 2 Moose 1982Phase 1 final report big game studies Vol 3 moose 1982Phase 1 final report big game studies Vol 6 black and brown bear 1982Phase 2 basic data report Vol 4 Appendices A to C 1982Phase 2 Basic data report Vol 4 aquatic habitat and instream flow 1982Phase 2 FY83 aquatic study budget proposal 1982Phase 2 synopsis of the 1982 aquatic studies and analysisPlacer mining wastewater settling pond demonstration project 1982Plant ecology phase 1 report 1982Porcessed climatic data Oct 1981 through Sep 1982 Vol 1Potential effects of two alt hydo devel on the fishery resources of the lower tazima 1982Potential for industrial devel in the railbelt region of AK 1982Prelim results of reservoir temp and instream ice runs est 1982Preliminary assessment of access by Spawning Salmon to side slough habitat above Talkeetna 1982Preliminary railbelt electric energy plans Vol 5 1982Prepatation of FERC license exhibits 1982Prevention of golden eagle electrocution 1982Processed climatic data may 1982 to sep 1982 Vol 7 sherman station 1982Processed climatic data Oct 1981 to Sep 1982 Vol 2 Denali station 1982Processed climatic data Oct 1981 to Sep 1982 Vol 4 Kosina Creek Station 1982Processed Climatic Data Vol 5 Watana Station 1982Proposed mitigation for Susitna River Fish stocks 1982Railbelt elec power alt study evaluation of railbelt elect energy plans comment draft 1982Railbelt Electric Power Alt Study Fossil Fuel Avail and price forecasts Vol 7 1982Railbelt Electric Power Alternatives Over Under (AREEP Version) Model User's Manual Vol 11 1982Railbelt Electric Power Alternatives study: Eval of Railbelt electric energy plans Vol 1 1982RED: The railbelt electricity demand model Vol 8 1982Reservoir bank erosion caused and influenced by ice cover 1982Reservoir Sedimentation 1982Review and testimonies on acres feasibility report 1982Revision of Preliminary Classification for Vegetation of AK 1982Reviwed and corrected literature search upper cook inlet 1982River Morphology 1982River Morphology Apendix B.9 1982Sediment discharge data for selected sites in the susitna 1981 to 1982Selection of electric energy generation alt foe consideration the railbelt Vol 2 1982SHP Access plan recommendation report 1982Simulation of fish movements in a large hydro elec reservoir 1982Slope stubility and erosion studies closeout report 1982Slough hydrology interim report 1982Snow surveys and water supply outlook for AK 1982Statewide Harvest study 1981 to 1982Subtask 5.04 closeout report eval of arch dam at devil canyon 1982Subtask 7.05 socioeconomic analysis phase 1 report 1982Subtask 7.07 land use analysis phase 1 report 1982Subtask 7.08 recreation planning phase 1 report 1982Subtask 7.10 aqautic studies procedures manual phase 1 appendices 1 to 8 1982Subtask 7.10 aqautic studies procedures manual phase 1 final 1982Subtask 7.10 Final draft report 1982Subtask 7.10 phase 1 final draft stock separation 1982Subtask 7.11 birds and non game mammals baseline studies 1982Subtask 7.11 birds and non game mammals phase 1 1982Subtask 7.11 furbearers phase 1 report 1982Subtask 7.12 plant ecology studies Phase 1 final report 1982Subtask 7.14 access road analysis 1982Subtask 8.02 closeout report electric system studies 1982Summer 1982 seismic surveys program relict channels and damsite 1982Susita Hydro Borrow site D and relict channel summ of lab test data 1982Susita Hydro FY83 proposed geotechnical exploration program 1982Susita Hydro Hydro Aquatic Phase 2 Vol 2 1982Susita Hydro Task 3 Processed climatic data Vol 1 Susitna glacier station 1982Susitna 1982 Sepplement to 1980 to 1981 Geotechnical Report 1982Susitna acess planning reevaluation of acres recom plan 1982Susitna aerial photography and photogrametric mapping 1982Susitna annual capital expenditures...during construction 1982Susitna basin glacier studies Dec 1982Susitna Big Game Studies Vol 1 Big game summary report 1982Susitna Big Game Studies Vol 5 Wolf 1982Susitna big game studies Vol 7 Wolverine and Vol 8 Dall sheep 1982Susitna Ebasco Estimating package revision 3 1982Susitna Ebasco Estimating package revision 4 1982Susitna economic analysis package Jan 1982Susitna Energy Production est 1982Susitna FERC exhibit B 1982Susitna FERC exhibit B first draft 1982Susitna FERC exhibit C first draft 1982Susitna FERC exhibit D first draft 1982Susitna FERC exhibit D project financing 1982Susitna FERC exhibit E chapter 10 1982Susitna FERC exhibit E chapter 3 1982Susitna FERC exhibit E chapters 1 and 2 1982Susitna FERC exhibit E chapters 4, 5, and 6 1982Susitna FERC exhibit E chapters 7, 8, and 9 1982Susitna FERC exhibit G project maps 1982Susitna FERC license application Exhibit A first draft 1982Susitna field data collection and processing supplement 1 1982Susitna field data collection and processing Vol 1 1982Susitna field data collection and processing Vol 3 1982Susitna fisheries mitigation options revised 1982Susitna Hatchery Siting Study 1982Susitna HEP estimate revisions feasibility study to FERC 1982Susitna Hydro Access Planning Study supp 1982Susitna Hydro Aquatic Phase 2 Vol 3 1982Susitna Hydro Aquatic Phase 2 Vol 3 appendix 1982Susitna Hydro Aquatic Studies Phase 2 Report Vol 1 1982Susitna Hydro Aquatic Studies Phase 2 Vol 3 1982Susitna Hydro Aquatic Studies Phase 2 Vol 4 Parts 1 and 2 1982Susitna Hydro Aquatic Studies Phase 2 Vol 5 1982Susitna Hydro Aquatic Studies Vol 5 1982Susitna Hydro Aquatic Stuides Phase 2 Vol 2 Part B 1982Susitna Hydro cost estimates 1982Susitna Hydro Field Data Index Task 3 Hydrology revision 1982Susitna Hydro Final report on seismic studies 1982Susitna Hydro FY83 Proposed Geotechnical exploratory program 1982Susitna Hydro geotechnical AAI Field Books 1980 to 1982Susitna Hydro Nitrogen Superstation studies 1982Susitna Hydro planning and design of EHV transmission and control systems Vol 1 1982Susitna Hydro processed climatic data vol 2 Denali Station 1982Susitna Hydro Project Access planning study 1982Susitna Hydro Project External Review Board Meeting 1982Susitna Hydro Project General File Index 1982Susitna Hydro Project Summ Report 1982Susitna Hydro Report on specialist consultants meeting 5 1982Susitna Hydro Reservoir sedimentation Appendix B.8 1982Susitna Hydro Subtask 7 Fish Ecology Instream Flow assessment 1982Susitna Hydro Task 3 Hydrology closeout report 1982Susitna Hydro Task 3 Tyrone River Station 1982Susitna Hydro task 6 Design Development 1982Susitna Hydro Task 7 enviromental 1982Susitna Hydro Terrestrial enviromental workshop and prelim simulation model 1982Susitna Hydro vol 4 kosina creek station 1982Susitna Hydro Vol 6 Devil canyon station 1982Susitna Hydrographic surveys 1982Susitna internal review board meeting no 5 1982Susitna Joint Venture Vol 1 Tech proposal 1982Susitna plan of study revision 3 1982Susitna plan of study revision 4 1982Susitna processed climatic data June 1982 through Sep 1982 Vol 8 Eklutna lake station 1982Susitna Processed Climatic Vol 3 Tyone River station 1982Susitna reports by power authoriry and acres external review panels 1980 to 1982Susitna reservoir sedimentation water clarity study 1982Susitna river do we really need to dam it? est 1982Susitna subtask 12.03 agency consultation 1982Susitna subtask 2.10 access roads final 1982Susitna subtask 2.13 marketability and disposal study for reservoir area final 1982Susitna subtask 7.04 water resources analysis 1982Susitna Task 11 ref report exonomic, marketing, and finacial evaluation est 1982Susitna task 3 Hydraulit and ice stuides 1982Susitna task 7 enviroemtnal studies draft wildlife mitigation option 1982Susitna task 9 estimating takeoff assumptions 1982Susitna transmission line corridor screening closeout report 1982Susitna transmission line selected route final draft 1982Susitna tributary stablity analysis 1982Switching stations and substations single line diagrams final 1982Task 11.03 close out report Susitna risk analusis april 1982Task 12 Public and Agency participation subtask 12.03 1982Task 3 hydrology field data index 1982Temp prederence of juvenile arctic cisco from the AK beaufort sea 1982Unit Costs Backup Calc Manpower Costs Cash Flows 1982Unit Prices Backup Calc Watana Dam 1982Unit Prices Backup Calc Watana Devil Canyon 1982Unit Prices Backup Calculations Watana Dam 1982Unit Prices Backup Watana Dam 1982Unit Prices Devil Canyon 1982Unit Prices Devil Canyon Backup Calc 1982Watana contractors indirects 1982Watana contruction schedule deasibility report 1982Watana dam borrow areas haul routes 1982Watana dam indirects feasibility report 1982Water and energy tech and policy issues 1982Water quality effects resulting from impoundment of the susitna river 1982Water requirements for the fisheries resource of the nicola river B.C. 1982Water resources data AK water year 1982Were clovis progenitors in beringia 1982Wildlife Utilization and the economy of nondalton 1982Willow sub basin area plan 1982Wind Energy Alt for the railbelt region Vol 16 1982Winter 1981 to 1982 ice observations report 1982Winter 1981 to 1982 ice observations report task 3 1982Winter 1982 hammer drilling terraflex carriersWinter temp study open file report 1982