Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
1982 Cultural resources survey report 1983
Acres american Inc Susitna Hydro feasbility and license study est 1983
Acres Task 6 Watana and Devil Canyon Tunnel rating calc 1983
ADFG RSA 1983
AK interagency fire management cooper basin planning area 1983
Alpine Reservoirs and Fisheries translation 1983
Annual Report 1983 Big game studies Vol 1 Big game summary report
Annual Report 1983 Big game studies Vol 2 Moose downstream
Annual Report 1983 Big game studies Vol 3 Moose upstream
Annual Report 1983 Big game studies Vol 4 caribou
Annual Report 1983 Big game studies Vol 5 Wolf
Annual Report 1983 Big game studies Vol 6 Black and Brown bear
Annual Report 1983 Big game studies Vol 7 wolverine
Annual Report 1983 Big game studies Vol 8 dall sheep
Annual Report 1983 Big game studies Vol 9 beluka whale
APA Board Meeting Board Packet Oct 14 1983
APA Susitna Hydro Project acess plan report 1983
Aquatic habitat and instream flow invest chapt 1 May through Oct 1983
Aquatic habitat and instream flow invest chapt 1 part 1 May through Oct 1983
Aquatic habitat and instream flow invest chapt 10 May through Oct 1983
Aquatic habitat and instream flow invest chapt 2 May through Oct 1983
Aquatic habitat and instream flow invest chapt 3 May through Oct 1983
Aquatic habitat and instream flow invest chapt 4 May through Oct 1983
Aquatic habitat and instream flow invest chapt 5 May through Oct 1983
Aquatic habitat and instream flow invest chapt 6 May through Oct 1983
Aquatic habitat and instream flow invest chapt 6 part 2 May through Oct 1983
Aquatic habitat and instream flow invest chapt 7 May through Oct 1983
Aquatic habitat and instream flow invest chapt 8 May through Oct 1983
Aquatic habitat and instream flow invest chapt 9 May through Oct 1983
Aquatic Studies Procedures Manual Phase 2 1983
Aquatic Studies Procedures Manual Phase 2 Final 2nd Edition 1983
Aquatic Studies Procedures Manual Phase 2 Final Draft 1983
Attachment B annoted biblio of sedimentation process est 1983
Big Game studies Vol 8 Dall sheep 1983
Big game studies Vol 9 belukha whale 1983
Bradley Lake Hydro Power Feasibility Study Vol 1 1983
Chakachamna Hydro interim feasibility assessment report Vol 1 Sections 1 through 10 1983
Classifiction, Description of Plant Coomunities in Taiga 1983
Cold regions air pollution bibiliography and summary 1983
Comments on Draft Ex E Bayha 1983
Comments on Draft Exhibit E of Susistna Hydro Project License app McVey 1983
Computerized geographic info system upper susitna 1983
Copper basin caribou use a research update 1983
Denali National scenic highway an interagency study 1983
Denali national scenic highway study supp enviromental studies 1983
Descriptive handbook optimized generation planning program 1983
Diapir Field statewide and regional econ and demographic systems impact analysis 1983
Dry creek archeology and paleoecology of a late pleistocene AK hunting camp 1983
Effects of various temp regimes on the Incubation of susitna river chum and sockeye salmon 1983
Effects of various water temp regimes on the egg and alecin incubation 1983
Effects on arctic grayling of prolonged exposure to yukon placer mining 1983
Electrifying Alaska 1983
Enviromental Impacts of alternative Dam Heights est 1983
Enviromental implications of design changes 1983
Estimates of gas reserves and undiscovered gas resources in cook inlet 1983
Evaluation of chum salmon spawning habitat in the middle Susitna 1983
Examination of Susitna river discharge and temp changes 1983
Exploring the realized niche simulated ecological mapping with a microcomputer 1983
Feasibility Estimate Wantana Dam Height Optimization 1983
Feasibility report supplment Vol 1 1983
Five year oil and gas leasing program Jan 1983
FRED Reports Upper Susitna River Salmon Enhancement Study 1983
Historical and projected oil and gas consumption 1983
Hydro power in the twentieth century AK Vol 2 1983
Hydrology of tsirku river alluvial fan near haines AK est 1983
Increased or decreased energy for moose 1983
Increases in fish mercury levels in lakes flooded by the churchill river diverson 1983
Investigation memo task 40 need for power March 1983
Kenai national wildlife refuage comp conservation plan 1983
Knik arm crossing scoping report 1983
Lower Susitna river maps 1983
Lower sustina river water surface profiles and discharge rating curves 1983
Managing water resources for AK's development 1983
Methodological Approach to Quan impact assessment for the prop Susitna Hydro project 1983
Natural gas wellhead severance taxes 1983
Navin Basin statewide and regional demographic and econ systems impacts report 78 1983
Parameter est for a class of model describ the migratory timing of chinook salmon 1983
Part 2 chapter 11 aquatic habitat and instream flow invest Mat to Oct 1983
Phase 2 Big game studies Vole 7 Wolverine 1983
Phase 2 data report winter awuatic studies Oct 1982 to May 1983
Phase 2 progress report big game studies Vol 1 Big game summ 1983
Phase 2 progress report big game studies Vol 2 moose 1983
Phase 2 Progress report Big Game studies Vol 3 Moose Upstream 1983
Phase 2 progress report big game studies Vol 4 caribou 1983
Phase 2 progress report big game studies Vol 5 wolf 1983
Phase 2 Vol 1 synopsis of the 1982 aquatic studies 1983
Potential effects of the kemano completion project on fraser river 1983
Power project development and financing in AK 1983
Prelim assessment of access by spawning salmon into portage creek 1983
R and M Consultants letter from D Beaver 1983
Railways and moose in the central interior of British columbia 1983
Report 4 access and trans corridor aquatic investigations 1983
Resident and juvenile anadromous fish investigations May to October 1983
Resident and juvenile anadromous fish investigations May to October 1983 part 2
Response to comments by Harza Ebasco on report 1983
Response to comments stream flow and temp modeling 1983
Response to FERC April 12 1983 request Appendix C
Responses to FERC letter request for information 1983
Senate state affair committee report on the susitna project additional material 1983
Senate state affairs committee report on the susitna project 1983
SHP economic and financial update Sep 1983
SHP executive summary of econ and financial update draft 1983
SHP FERC Vol 1 Exhibit A, C, D 1983
SHP posistion paper fisheries issue est 1983
Slough Hydrogeology report 1983
Statewide harvest survey 1982 data vol 24 pub 1983
Step 1 report prepartion for susitna project need for power study 1983
Stream flow and temp modeling in the Susita Basin draft 1983
Stream Flow and Temp modeling in the Susitna Basin final 1983
Subtask 7.06 cultural resources in the middle susitna river 1983
Subtask 7.12 plant ecology studies phase 2 draft 1983
Summary of APA design refinements to FERC 1983
Summary of Botanical Resources Chapt 3 of FERC app est 1983
Susista feasibility Vol 1 Section 1 though 8 1983
Susista feasibility Vol 1 Section 9 though 19 1983
Susista feasibility Vol 2 Section 1 though 4 1983
Susista feasibility Vol 2 Section 5 though 11 1983
Susista feasibility Vol 3 Plates 1983
Susista feasibility Vol 4 appendix A 1983
Susista feasibility Vol 6 appendix c 1983
Susista feasibility Vol 7 appendix D 1983
Susista FERC Vol 1 revised exhibit A, C, D 1983
Susita FERC Vol 10A exhibit E chapter 11 1983
Susitna Agency comments on draft Ex E 1983
Susitna Big Game studies Vol 6 Black and Brown bear 1983
Susitna FERC estimate watana devil canyon 1983
Susitna FERC Exh E Chp 3 Feb 1983
Susitna FERC Exh E Chp 3 Figures Feb 1983
Susitna FERC Exh E Chp 4 5 6 Feb 1983
Susitna FERC Exh E Chp 7 8 9 Feb 1983
Susitna FERC Exh E Flow Analysis July 1983
Susitna FERC exhibit F supporting design report 1983
Susitna FERC Vol 1 intial statment Exhibit A, C, D 1983
Susitna FERC Vol 10A exhibit E 1983
Susitna FERC Vol 10B exhibit E 1983
Susitna FERC Vol 10B exhibit E chapter 11 1983
Susitna FERC Vol 2 exhibit B 1983
Susitna FERC Vol 2A 1983
Susitna FERC Vol 2B 1983
Susitna FERC Vol 2C 1983
Susitna FERC Vol 3 exhibit F 1983
Susitna FERC Vol 3 exhibit F supporting desgin report 1983
Susitna FERC Vol 4 exhibit G 1983
Susitna FERC Vol 5 exhibit B 1983
Susitna FERC Vol 5A exhibit E 1983
Susitna FERC Vol 5A exhibit E.2.A 1983
Susitna FERC Vol 5A exhibit E.2.A. attachments 1983
Susitna FERC Vol 5B exhibit E 1983
Susitna FERC Vol 6A exhibit E 1983
Susitna FERC Vol 6B exhibit E 1983
Susitna FERC Vol 7 exhibit E 1983
Susitna FERC Vol 8 exhibit E 1983
Susitna FERC Vol 9 exhibit E 1983
Susitna FERC Vol 9 exhibit E chapter 10 1983
Susitna Hydro Aquatic studies Phase 2 Vol 4 1983
Susitna Hydro Economic and Financial update supp report 1983
Susitna Hydro enviromental studies subtask 7.12 plant ecology 1983
Susitna Hydro Ex E Vol 1 Chapter 2 Water use and quality est 1983
Susitna Hydro Feasibility report supplement Vol 2 Plates 1983
Susitna Hydro FERC App Vol 2B 1983
Susitna Hydro FERC comments on draft exhibit E 1983
Susitna Hydro FERC comments on draft exhibit E 2 1983
Susitna Hydro FERC Exh E Chp 2 figures Feb 1983
Susitna Hydro FERC Vol 2C 1983
Susitna Hydro FERC Vol 3 Exh F 1983
Susitna Hydro FERC Vol 4 Exh G 1983
Susitna Hydro FERC Vol 5A Exh E Chp 1 2 Feb 1983
Susitna Hydro Project FERC App Vol 1 Exh A C D 1983
Susitna Hydro Project FERC App Vol 2 Exh B 2 1983
Susitna Hydro Project FERC App Vol 2A Exh B 7 1983
Susitna Hydro Project minutes of OMB-APA meetgin April 28 1983
Susitna Hydro Project Supplemental Responses Vol 1 1983
Susitna Hydro reservoir and river sedimentation 1983
Susitna Hydro Reservoir temp sediment stuides 1983
Susitna hydro studies newsletter 1983
Susitna Hydro subtask 4.5 socioeconomic studies 1983
Susitna Hydro Supp to the feasibility report 1983
Susitna Hydro supplemental report FERC letter 1983
Susitna Hydro Task 3 Hydrology Field Data Index 1983
Susitna Hydro Transition Hydro Design Internal Memos 1983
Susitna PMF calculations 1983
Susitna project status report Feb 1983
Susitna review of FERC application 1983
Susitna River ice discussion 1983
Susitna river ice study final 1982 to 1983
Susitna River Ice Study preliminary draft 1982 to 1983
Susitna RIver presentation Douglas Lang 1983
Susitna task 11 financing options est 1983
Susitna trans system status summary Vol 1 draft 1983
Susitna trans system status summary Vol 2 draft 1983
Susitna trans system status summary Vol 3 draft 1983
Sustina hydro June 7 and 8 1983 review committee meeting
Task 42 reservoir operation studies for various downstream flow 1983
Task 5 geotechnical studies Dec 1982 to June 1983
Task 7 Vol 1 system dev and steady state analysis 1983
Upper Susitna river Salmon enhancement study 1983
Use in AK of north slope natural gas a survey of prospects and their likely impacts on an AK gas pipeline 1983
Use of moose and other wild resources in the tyonek and upper yentna 1983
Use of north slope gas for heat and electricity 1983
Use of north slope gas for heat and electricity in the railbelt 1983
Users manual optimized generation planning program 1983
Watana airstrip feasibility study phase 1 1983
Watana airstrip feasibility study phase 1 task 39 1983
Watana damsite project data copies 1983
Watana dev winter 1983 geotechnical exploration program vol 1 1983
Watana dev winter 1983 geotechnical exploration program vol 2 1983
Watana diversion tunnels calculations est 1983
Watana Inpoundment Moose Cnesus 1983
Wildlife and botanical resources impact assessment 1983
Workshop 5 water quality est 1983