Loading...
HomeMy WebLinkAboutVW Draft Beneficiary Mitigation Plan Public Comment Form 04-1-2018-VWVolkswagen Environmental Mitigation Trust Page 1 of 2 State of Alaska Draft Beneficiary Mitigation Plan (DBMP) Public Comment Form The DBMP describes how the State proposes to distribute its $8.125 million Trust allocation to fund projects within 10 Eligible Mitigation Actions (EMAs), as described in Appendix C of the DBMP: 1. Class 8 local freight trucks and port drayage trucks 2. Class 4-8 school bus/shuttle/transit buses 3. Freight switcher locomotives 4. Ferries/tugboats 5. Shore power for ocean going vessels 6. Class 4-7 local freight trucks 7. Airport ground support equipment 8. Forklifts and port cargo handling equipment 9. Light duty ZEV supply equipment (limited to 15% of funds) 10. Voluntary match for Diesel Emission Reduction Act (DERA) projects AEA is seeking public input on the DBMP. We want to hear from you! *Name: _____________________________________ *Affiliation: ___________________________________ *Email: ________________________________________ *City: _____________________________________ Street address (optional): ________________________________ Zip code (optional): ___________________ * Required 1. The DBMP proposes to allocate total funding as summarized below. Please indicate if you agree or disagree with allocating these levels of funding for the specified purposes/recipients. Strongly Agree Agree Neutral Disagree Strongly Disagree 58% of funds allocated through competitive solicitation open to all applicants (government and non- government) for (EMAs 1-8 and EMA 10) 1 2 3 4 5 12% of funds allocated for state and local government sponsored projects (EMAs 1-8 and EMA 10 (non-prime power)) 1 2 3 4 5 15% of funds allocated for Diesel Emissions Reduction Act (DERA) projects, primarily diesel prime power in rural Alaska power houses (EMA 10) 1 2 3 4 5 15% of funds allocated for Electric Vehicle infrastructure (i.e., charging stations) (EMA 9) 1 2 3 4 5 PERSONAL INFORMATION QUESTIONS State of Alaska Draft Beneficiary Mitigation Plan (DBMP) Public Comment Form Page 2 of 2 2. Please rank the following criteria from 1 to 5, in order of importance. Most Important Very Important Important Somewhat Important Least Important Project is in a NOx emission priority area 1 2 3 4 5 Project cost-effectively reduces NOx emissions (tons/$) 1 2 3 4 5 Project has voluntary match funds 1 2 3 4 5 Project is located in an air quality priority area 1 2 3 4 5 Project is being developed by an applicant with experience 1 2 3 4 5 3. Do you favor an open competitive process for selecting projects? Circle one: ( Y / N ) 4a. Do you favor a set aside for specific projects or sectors? Circle one: ( Y / N ) 4b. If yes, please indicate low, medium or high priority sectors: (circle one, per line item) Low Medium High Locomotive: L M H Marine Vessels: L M H Rural Powerhouses: L M H School buses: L M H Electric Vehicle Infrastructure (charging stations): L M H Public Transportation: L M H Freight trucks: L M H Construction equipment: L M H Airport ground support equipment/Port Cargo handling equipment: L M H 5a. Do you think there should be a maximum amount of funding any single project should receive? Circle one: ( Y / N ) 5b. If yes, what should the maximum limit be? __________________________________________ Additional Comments: