HomeMy WebLinkAboutFort Yukon Flats School District Preliminary Fesability Assessment for High Efficiency Low Emmission Wood Heating AWEDTG 04-25-2008Preliminary Feasibility Assessment for High
Efficiency, Low Emission Wood Heating
In Fort Yukon, Alaska
Prepared for:
Samson Peter
Yukon Flats School District
Carrie Supik
University of Alaska Fairbanks, Yukon Flats Center
Ben Stevens and Bruce Thomas
Council of Athabascan Tribal Governments
Prepared by:
Daniel Parrent,
Wood Utilization Specialist
Juneau Economic Development Council
Submitted April 25, 2008
Notice
This Preliminary Feasibility Assessment for High Efficiency, Low Emission Wood Heating was prepared by
Daniel Parrent, Wood Utilization Specialist, Juneau Economic Development Council for Samson Peter (Yukon
Flats School District), Carrie Supik,(UAF Yukon Flats Center), and Ben Stevens (Council of Athabascan Tribal
Governments) Fort Yukon, AK. This report does not necessarily represent the views of the Juneau Economic
Development Council (JEDC). JEDC, its Board, employees, contractors, and subcontractors make no
warranty, express or implied, and assume no legal liability for the information in this report; nor does any party
represent that the use of this information will not infringe upon privately owned rights. This report has not been
approved or disapproved by JEDC nor has JEDC passed upon the accuracy or adequacy of the information in
this report.
Funding for this report was provided by USDA Forest Service, Alaska Region,
Office of State and Private Forestry
2
Table of Contents
Abstract
Section 1. Executive Summary
1.1 Goals and Objectives
1.2 Evaluation Criteria, Project Scale, Operating Standards, General Observations
1.3 Assessment Summary and Recommended Actions
1.3.1 UAF Yukon Flats Center
1.3.2 Vocational Education Center and Dormitory
1.3.3 CATG Regional Health Clinic
1.3.4 Fort Yukon School and Gymnasium
Section 2. Evaluation Criteria, Implementation, Wood Heating Systems
2.1 Evaluation Criteria
2.2 Successful Implementation
2.3 Classes of Wood Heating Systems
Section 3. The Nature of Wood Fuels
3.1 Wood Fuel Forms and Current Utilization
3.2 Heating Value of Wood
Section 4. Wood-Fueled Heating Systems
4.1 Low Efficiency High Emission Cordwood Boilers
4.2 High Efficiency Low Emission Cordwood Boilers
4.3 Bulk Fuel Boiler Systems
Section 5. Selecting the Appropriate System
5.1 Comparative Costs of Fuels
5.2(a) Cost per MMBtu Sensitivity – Cordwood
5.2(b) Cost per MMBtu Sensitivity – Bulk Fuels
5.3 Determining Demand
5.4 Summary of Findings and Potential Savings
Section 6. Economic Feasibility of Cordwood Systems
6.1 Initial Investment Cost Estimates
6.2 Operating Parameters of HELE Cordwood Boilers
6.3 Hypothetical OM&R Cost Estimates
6.4 Calculation of Financial Metrics
6.5 Simple Payback Period for HELE Cordwood Boilers
6.6 Present Value, Net Present Value and Internal Rate of Return Values for Various HELE
Cordwood Boiler Installation Options
6.7 Life Cycle Cost Analysis
Section 7. Economic Feasibility of Bulk Fuel Systems
7.1 Capital Cost Components
7.2 Generic OM&R Cost Allowances
7.3 Calculation of Financial Metrics
7.4 Simple Payback Period for Generic Bulk Fuel Boilers
7.5 Present Value, Net Present Value and Internal Rate of Return Values for Bulk Fuel Boilers
Section 8. Conclusions
8.1 Cordwood Systems
8.2 Bulk Fuel Systems
Footnotes
3
Appendices
Appendix A AWEDTG Evaluation Criteria
Appendix B Recoverable Heating Value Determination
Appendix C List of Abbreviations and Acronyms
Appendix D Wood Fuel Properties
Appendix E Financial Metrics
Appendix F Operational Parameters of HELE Cordwood Boilers
Appendix G Calculation of Present Value, Net Present Value and Internal Rate of Return
Appendix H Garn Boiler Specifications
List of Tables and Figures
Table 4-1 HELE Cordwood Boiler Suppliers
Table 4-2 Emissions from Wood Heating Appliances
Table 4-3 Bulk Fuel Boiler System Vendors
Table 4-4 Bulk Fuel Boilers in Alaska
Table 5-1 Comparative Cost of Fuel Oil vs. Wood Fuels
Figure 5-1 Effect of White Spruce Cordwood Price on Cost of Delivered Heat
Figure 5-2 Effect of White Spruce Bulk Fuel Price on Cost of Delivered Heat
Table 5-2 Reported Annual Fuel Oil Consumption, Fort Yukon, AK
Table 5-3 Estimate of Heat Required in Coldest 24-Hour Period
Table 5-4 Estimate of Total Wood Consumption, Comparative Costs and Potential Savings
Table 6-1 Initial Investment Cost Scenarios for Hypothetical HELE Cordwood Systems
Table 6-2 Labor/Cost Estimates for HELE Cordwood Systems
Table 6-3 Summary of Total Annual Non-fuel OM&R Cost Estimates
Table 6-4 Simple Payback Period Analysis for HELE Cordwood Boilers
Table 6-5 PV, NPV and IRR Values for Various HELE Cordwood Boiler Options
Table 6-6 Estimated Life Cycle Costs of Cordwood System Alternatives
Table 7-1 Initial Investment Cost Components for Bulk Fuel Systems
Table 7-2 Darby, MT Public School Wood Chip Boiler Costs
Table 7-3 Characteristics of Biomass Boiler Projects
Table 7-4 Cost Breakdown for the Least Expensive Wood Chip Boiler System Installed in a New Free-
Standing Building
Table 7-5 Total OM&R Cost Allowances for a Bulk Fuel System
Table 7-6a Simple Payback Period Analysis for Bulk Fuel Heating Systems (VEC or Clinic)
Table 7-6b Simple Payback Period Analysis for Bulk Fuel Heating Systems (School/gym)
Table 7-7a PV, NPV and IRR Values for Bulk Fuel Systems (VEC or Clinic)
Table 7-7b PV, NPV and IRR Values for Bulk Fuel Systems (School/gym)
4
Key words: HELE, LEHE, bulk fuel, cordwood
ABSTRACT
The potential for heating various facilities in Fort Yukon, Alaska with high efficiency, low
emission (HELE) wood-fired boilers is evaluated for the Yukon Flats School District, the UAF
Yukon Flats Center and the Council of Athabascan Tribal Governments.
Early in 2007, organizations were invited to submit a Statement of Interest (SOI) to the Alaska
Wood Energy Development Task Group (AWEDTG). Task Group representatives reviewed all the
SOIs and selected projects for further review based on selection criteria presented in Appendix A.
Several AWEDTG representatives visited Fort Yukon during the summer of 2007 and information
was obtained for the various facilities. Preliminary assessments were made and challenges
identified. Potential wood energy systems were considered for the projects using AWEDTG,
USDA and AEA objectives for energy efficiency and emissions. Preliminary findings are reported.
SECTION 1. EXECUTIVE SUMMARY
1.1 Goals and Objectives
• Identify facilities in Fort Yukon as potential candidates for heating with wood
• Evaluate the suitability of the facilities and sites for siting a wood-fired boiler
• Assess the type(s) and availability of wood fuel(s)
• Size and estimate the capital costs of suitable wood-fired system(s)
• Estimate the annual operation and maintenance costs of a wood-fired system
• Estimate the potential economic benefits from installing a wood-fired heating system
1.2 Evaluation Criteria, Project Scale, Operating Parameters, General Observations
• This project meets the AWEDTG objectives for petroleum fuel displacement, use of
hazardous forest fuels or forest treatment/processing residues, sustainability of the wood
supply, community support, and project implementation, operation and maintenance.
• Given fuel oil consumption estimates of 8,500, 18,000, 20,000 and 30,000 gallons per
year, these projects would be considered medium to large in terms of their relative scales.
• Medium and large energy consumers have the best potential for feasibly implementing a
wood-fired heating system. Where preliminary feasibility assessments indicate positive
financial metrics, detailed engineering analyses are usually warranted.
• Cordwood systems are generally appropriate for applications where the maximum heating
demand ranges from 100,000 to 1,000,000 Btu per hour. “Bulk fuel” systems are generally
applicable for situations where the heating demand exceeds 1 million Btu per hour.
However, these are general guidelines; local conditions can exert a strong influence on the
best system choice.
• Efficiency and emissions standards for Outdoor Wood Boilers (OWB) changed in 2006,
which could increase costs for small systems
5
1.3 Assessment Summary and Recommended Actions
Four facilities are considered in this report: UAF Yukon Flats Center, Vocational Education Center
(and adjacent dormitory), new CATG Regional Health Clinic and Fort Yukon School and
Gymnasium.
1.3.1. UAF Yukon Flats Center
• Overview. The UAF Yukon Flats Center (YFC) reportedly occupies approximately
7,100 square feet in two sections. The original log structure, built in 1980 and renovated in
2005, occupies about 3,600 square feet and the new addition (conventional frame
construction), built in 2005, occupies about 3,500 square feet. Heat is provided by two
new Weil-McLain Gold A/B-WGO-9 boilers, each rated at 257 MBH (net) with a
maximum firing rate of 2.55 gallons per hour (each). Domestic hot water is supplied by a
separate, oil-fired Bock 50ES water heater with a maximum firing rate of 1.0 gallons per
hour. Heat is distributed via hot water baseboard heat exchangers.
• Fuel Consumption. The UAF Yukon Flats Center reportedly consumes approximately
8,500 gallons of #1 fuel oil per year.
• Potential Savings. At the projected price of about $5.00 per gallon, the UAF YFC spends
approximately $42,500 per year for fuel oil. The HELE cordwood fuel equivalent of 8,500
gallons of #1 fuel oil is approximately 100 cords, and at $225 per cord represents a potential
annual fuel cost savings of $20,000 (debt service and non-fuel OM&R costs notwithstand-
ing). The bulk fuel equivalent of 8,500 gallons of fuel oil is approximately 170 tons, and at
$100/ton represents a potential annual fuel cost savings of $25,500 (debt service and non-fuel
OM&R costs notwithstanding).
• Required boiler capacity. The estimated required boiler capacity (RBC) to heat the UAF
YFC is approximately 284,395 Btu/hr during the coldest 24-hour period.
• Recommended action regarding a cordwood system. Given the initial assumptions and
cost estimates for the alternatives presented in this report, this project appears to be
reasonably viable. Further consideration is warranted. (See Section 6)
• Recommended action regarding a bulk fuel wood system. Given the relatively small
heating demand and the probable costs of the project, a “bulk fuel” system is not cost-
effective for the UAF Yukon Flats Center.
1.3.2. Vocational Education Center and Dormitory
• Overview. The Vocational Education Center (VEC) occupies approximately 9,000
square feet and is in reportedly fair to good condition. Heat is provided by two old (1982?)
Burnham V-35 boilers, each rated at 209 MBH (net) with a maximum firing rate of 2.1
gallons per hour (each). These boilers appear to be ready for replacement. Adjacent to the
VEC is a student dormitory, approximately 2,000 to 2,500 square feet in size. Heat is
provided by a single Burnham boiler rated at 124 MBH with a firing rate of 1.05 gallons
per hour. Domestic hot water is supplied by separate electric water heaters in each
building. There are also a couple detached “out-buildings”; one that serves as the VEC
mechanical/boiler room and the other that serves as the Ceramics Shop.
• Fuel Consumption. The Vocational Education Center reportedly consumes approximately
16,000 gallons of #1 fuel oil per year, which seems excessive. Given its modest footprint
6
of 9,000 square feet and comparing its fuel use with fuel consumption at the other facilities
under study, it may be appropriate to conduct a formal energy audit of this facility.
Invoking good energy conservation measures should be a priority. The student dormitory
reportedly consumes 2,000 gallons of fuel oil per year.
• Potential Savings. At the projected price of about $5.00 per gallon, the VEC (and
dormitory) spends approximately $90,000 per year for fuel oil. The HELE cordwood fuel
equivalent of 18,000 gallons of #1 fuel oil is approximately 210 cords, and at $225 per cord
represents a potential annual fuel cost savings of $42,750 (debt service and non-fuel OM&R
costs notwithstanding). The bulk fuel equivalent of 18,000 gallons of fuel oil is
approximately 360 tons, and at $100/ton represents a potential annual fuel cost savings of
$54,000 (debt service and non-fuel OM&R costs notwithstanding).
• Required boiler capacity. The estimated required boiler capacity (RBC) to heat the VEC and
Dormitory is approximately 601,489 Btu/hr during the coldest 24-hour period.
• Recommended action regarding a cordwood system. Given the initial assumptions and
cost estimates for the alternatives presented in this report, this project appears to be viable.
Further consideration is warranted. (See Section 6)
• Recommended action regarding a bulk fuel wood system. Given the heating demand and the
probable costs of the project, a “bulk fuel” system is probably not cost-effective for the
Vocational Education Center and dormitory. (See Section 7)
1.3.3. CATG Regional Health Clinic
• Overview. The new Council of Athabascan Tribal Governments (CATG) Regional
Health Clinic (RHC) occupies approximately 15,000 square feet. Construction was
completed in mid-2007. Heat is provided by two new Weil-McLain 1080 boilers, each
rated at 965 MBH (net) with a maximum firing rate of 9.6 gallons per hour (each). The
boiler room is located in the mezzanine above the ground floor at the rear of the building.
The mechanical room is located in the mezzanine near the front of the building. Heat is
distributed via hot air heated by hot water-to-air heat exchangers. A heat recovery
ventilation (HRV) system is installed.
• Fuel Consumption. The actual annual fuel consumption at the CATG RHC is unknown,
since the facility is new. An engineer’s estimate put the number at 20,000 gallons of #1
fuel oil per year.
• Potential Savings. At the projected price of about $5.00 per gallon, the CATG RHC will
spend approximately $100,000 per year for fuel oil. The HELE cordwood fuel equivalent of
20,000 gallons of #1 fuel oil is approximately 234 cords, and at $225 per cord represents a
potential annual fuel cost savings of $47,350 (debt service and non-fuel OM&R costs
notwithstanding). The bulk fuel equivalent of 20,000 gallons of fuel oil is approximately 400
tons, and at $100/ton represents a potential annual fuel cost savings of $60,000 (debt service
and non-fuel OM&R costs notwithstanding).
• Required boiler capacity. The estimated required boiler capacity (RBC) to heat the CATG
RHC is approximately 668,245 Btu/hr during the coldest 24-hour period.
• Recommended action regarding a cordwood system. Given the initial assumptions and
cost estimates for the alternatives presented in this report, this project appears to be viable.
Further consideration is warranted. (See Section 6)
7
• Recommended action regarding a bulk fuel wood system. Given the heating demand and the
probable costs of the project, a “bulk fuel” system is probably not cost-effective for the
CATG Clinic. (See Section 7)
1.3.4. Fort Yukon School and Gymnasium
NOTE: Although the school and gymnasium are separate buildings, each with its own
heating system, given their proximate location, the potential staging area behind the gym,
and the pre-existing, 30’ x 44’ garage-type storage building, the most likely scenario
would be to install a single wood fired heating system, consisting of one or more boilers, to
serve both buildings.
• Overview. The Fort Yukon School occupies approximately 34,000 square feet and
provides instruction for approximately 130 students. Heat is provided by two Burnham
PF-511 boilers, each rated at 1,545 MBH (net) with maximum firing rates of 15.6 gallons
per hour (each). Heat is distributed via a hot water loop. The building and boilers appear
to be in good condition and well-maintained.
The Fort Yukon Gymnasium occupies approximately 10,000 square feet and underwent
extensive remodeling/renovation in 2007. Heat is provided by two new Burnham V904A
boilers, each rated at 420 MBH (net) with maximum firing rates of 4.2 gallons per hour
(each). Heat is distributed hydronically, via a hot water baseboard and radiator-type heat
exchangers.
• Fuel Consumption. The Fort Yukon School is reported to consume approximately 17,000
gallons of #1 fuel oil per year, and the Fort Yukon Gymnasium is reported to consume
approximately 13,000 gallons of #1 fuel oil per year.
• Potential Savings. At the projected price of about $5.00 per gallon, the Fort Yukon School
and Gymnasium will spend approximately $150,000 per year for fuel oil. The HELE
cordwood fuel equivalent of 30,000 gallons of #1 fuel oil is approximately 350 cords, and at
$225 per cord represents a potential annual fuel cost savings of $71,250 (debt service and
non-fuel OM&R costs notwithstanding). The bulk fuel equivalent of 30,000 gallons of fuel
oil is approximately 600 tons, and at $100/ton represents a potential annual fuel cost savings
of $90,000 (debt service and non-fuel OM&R costs notwithstanding).
• Required boiler capacity. The estimated required boiler capacity (RBC) to heat the Fort
Yukon School and Gymnasium is approximately 1,002,000 Btu/hr during the coldest 24-hour
period.
• Recommended action regarding a cordwood system. Given the initial assumptions and
cost estimates for the alternatives presented in this report, this project appears to be viable.
Further consideration is warranted. (See Section 6)
• Recommended action regarding a bulk fuel wood system. Given the heating demand and the
probable costs of the project, a “bulk fuel” system is probably not cost-effective for the Fort
Yukon School and Gymnasium. (See Section 7)
8
SECTION 2. EVALUATION CRITERIA, IMPLEMENTATION, WOOD HEATING SYSTEMS
The approach being taken by the Alaska Wood Energy Development Task Group (AWEDTG)
regarding biomass energy heating projects follows the recommendations of the Biomass Energy
Resource Center (BERC), which advises that, “[T]he most cost-effective approach to studying the
feasibility for a biomass energy project is to approach the study in stages.” Further, BERC advises
“not spending too much time, effort, or money on a full feasibility study before discovering whether
the potential project makes basic economic sense” and suggests, “[U]ndertaking a pre-feasibility
study . . . a basic assessment, not yet at the engineering level, to determine the project's apparent
cost-effectiveness”. [Biomass Energy Resource Center, Montpelier, Vermont. www.biomasscenter.org]
2.1 Evaluation Criteria
The AWEDTG selected projects for evaluation based on criteria listed in Appendix A. The Fort
Yukon projects meet the AWEDTG criteria for potential petroleum fuel displacement, use of forest
residues for public benefit, sustainability of the wood supply, community support, and the ability to
implement, operate and maintain the project.
In the case of a cordwood boiler system, the potential to supply wood from local forests appears
adequate and matches the application. Currently, “bulk fuel” in the form of sawmill and/or
processing residues is non-existent. Any bulk fuel heating system would be reliant upon forest-
derived whole tree chips.
One of the objectives of the AWEDTG is to support projects that would use energy-efficient and
clean burning wood heating systems, i.e., high efficiency, low emission (HELE) systems.
2.2 Successful Implementation
In general, four aspects of project implementation have been important to wood energy projects in
the past: 1) a project “champion”, 2) clear identification of a sponsoring agency/entity, 3)
dedication of and commitment by facility personnel, and 4) a reliable and consistent supply of fuel.
In situations where several organizations are responsible for different community services, it must
be clear which organization would sponsor and/or implement a wood-burning project. (NOTE:
This is not necessarily the case with the projects in Fort Yukon but this issue should be addressed.)
With manual systems, boiler stoking and/or maintenance is required for approximately 5-15
minutes per boiler several times a day (depending on the heating demand), and dedicating
personnel for the operation is critical to realizing savings from wood fuel use. Bulk fuel systems,
although automated, also have a daily labor requirement. For this report, it is assumed that new
personnel would be hired or existing personnel would be assigned as necessary, and that “boiler
duties” would be included in the responsibilities and/or job description of facility personnel.
The forest industry infrastructure in/around Fort Yukon is very limited. However, for this report, it
is assumed that wood supplies are sufficient to meet the demand.
2.3 Classes of Wood Heating Systems
There are, basically, two classes of wood heating systems: manual cordwood systems and
automated “bulk fuel” systems. Cordwood systems are generally appropriate for applications
where the maximum heating demand ranges from 100,000 to 1,000,000 Btu per hour, although
smaller and larger applications are possible. “Bulk fuel” systems are systems that burn wood chips,
sawdust, bark/hog fuel, shavings, pellets, etc. They are generally applicable for situations where the
9
heating demand exceeds 1 million Btu per hour, although local conditions, especially fuel
availability, can exert strong influences on the feasibility of a bulk fuel system.
Usually, an automated bulk fuel boiler is tied-in directly with the existing oil-fired system. With a
cordwood system, glycol from the existing oil-fired boiler system would be circulated through a
heat exchanger at the wood boiler ahead of the existing oil boiler. A bulk fuel system is usually
designed to replace 100% of the fuel oil used in the oil-fired boiler, and although it is possible for a
cordwood system to be similarly designed, they are usually intended as a supplement, albeit a large
supplement, to an oil-fired system. In either case, the existing oil-fired system would remain in
place and be available for peak demand or backup in the event of downtime in the wood system.
SECTION 3. THE NATURE OF WOOD FUELS
3.1 Wood Fuel Forms and Current Utilization
Currently, wood fuels in Fort Yukon will generally be in the form of cordwood. There is also a
chance that whole tree chips might be developed as a fuel in the future, if they can be produced at a
reasonable cost. There are no significant supplies of sawmill residues in the area, and there is no
local supply of bulk pellets. Residential use of cordwood has increased significantly in the past 18
months due to sharply higher fuel oil costs. Given that higher demand, prices for firewood have
gone up accordingly.
3.2 Heating Value of Wood
Wood is a unique fuel whose heating value is quite variable, depending on species of wood, moisture
content, and other factors. There are also several recognized ‘heating values’: high heating value
(HHV), gross heating value (GHV), recoverable heating value (RHV), and deliverable heating value
(DHV) that may be assigned to wood at various stages in the calculations.
For this report, white spruce cordwood at 30 percent moisture content (MC30) and white spruce
bulk fuel at 40 percent moisture content (MC40), calculated on the wet weight basis (also called
green weight basis), are used as benchmarks. [It should be noted that other species are also
present, including black spruce, birch, cottonwood/poplar, willow and aspen. And although white
spruce is used as the “benchmark”, any species of wood may be burned in either cordwood or bulk
fuel systems; the most critical factor being moisture content, not species.]
The HHV of white spruce at 0% moisture content (MC0) is 8,890 Btu/lb1. The GHV at 30%
moisture content (MC30) is 6,223 Btu/lb, and the GHV at 40% moisture content (MC40) is 5,334
Btu/lb.
The RHV for white spruce cordwood (MC30) is calculated at 12.22 million Btu per cord, and the
DHV, which is a function of boiler efficiency (assumed to be 75%), is 9.165 million Btu per cord.
The delivered heating value of 1 cord of white spruce cordwood (MC30) equals the delivered
heating value of 85.5 gallons of #1 fuel oil when the wood is burned at 75% conversion efficiency.
The RHV for white spruce bulk fuel (MC40) is calculated at 7.65 million Btu per ton, and the
DHV, which is a function of boiler efficiency (assumed to be 70%), is 5.355 million Btu per ton.
The delivered heating value of 1 ton of white spruce bulk fuel (MC40) equals the delivered heating
value of 50 gallons of #1 fuel oil when the wood is burned at 70% conversion efficiency.
A more thorough discussion of the heating value of wood can be found in Appendix B and
Appendix D.
10
SECTION 4. WOOD-FUELED HEATING SYSTEMS
4.1 Low Efficiency High Emission (LEHE) Cordwood Boilers
Outdoor wood boilers (OWBs) are relatively low-cost and can save fuel but most have been
criticized for low efficiency and smoky operation. These could be called low efficiency, high
emission (LEHE) systems and there are dozens of manufacturers. The State of New York
instituted a moratorium in 2006 on new LEHE OWB installations due to concerns over emissions
and air quality5. Other states are also considering regulations6,7,8,9. But since there are no standards
for OWBs (wood-fired boilers and furnaces were exempted from the 1988 EPA regulations10),
OWB ratings are inconsistent and can be misleading. Standard procedures for evaluating wood
boilers do not exist, but test data from New York, Michigan and elsewhere showed a wide range of
apparent [in]efficiencies and emissions among OWBs.
In 2006, a committee was formed under the American Society for Testing and Materials (ASTM)
to develop a standard test protocol for OWBs11. The standards included uniform procedures for
determining performance and emissions. Subsequently, the ASTM committee sponsored tests of
three common outdoor wood boilers using the new procedures. The results showed efficiencies as
low as 25% and emissions more than nine times the standard for industrial boilers. Obviously,
these results were deemed unsatisfactory and new boiler standards were called for.
In a news release dated January 29, 200712, the U.S. Environmental Protection Agency announced
a new voluntary partnership agreement with 10 major OWB manufacturers to make cleaner-
burning appliances. The new phase-one standard calls for emissions not to exceed 0.60 pounds of
particulate emissions per million Btu of heat input. The phase-two standard, which will follow 2
years after phase-one, will limit emissions to 0.30 pounds per million Btus of heat delivered,
thereby creating an efficiency standard as well.
To address local and state concerns over regulating OWB installations, the Northeast States for
Coordinated Air Use Management (NeSCAUM), and EPA have developed model regulations that
recommend OWB installation specifications, clean fuel standards and owner/operator training.
(http://www.epa.gov/woodheaters/ and http://www.nescaum.org/topics/outdoor-hydronic-heaters)
Implementation of the new standard will improve air quality and boiler efficiency but will also
increase costs as manufacturers modify their designs, fabrication and marketing to adjust to the
new standards. As a result, some low-end models will no longer be available.
4.2 High Efficiency Low Emission (HELE) Cordwood Boilers
In contrast to low efficiency, high emission cordwood boilers there are a few units that can
correctly be considered high efficiency, low emission (HELE). These systems are designed to burn
cordwood fuel cleanly and efficiently.
Table 4-1 lists four HELE cordwood boiler suppliers, two of which have units operating in Alaska.
HS Tarm/Tarm USA has a number of residential units operating in Alaska, and a Garn boiler
manufactured by Dectra Corporation is used in Dot Lake, AK to heat several homes and the
washeteria, replacing 7,000 gallons per year (gpy) of #2 fuel oil.14 Two Garn boilers were recently
installed in Tanana, AK (on the Yukon River) to provide heat to the washeteria and water plant,
and two were installed near Kasilof on the Kenai Peninsula.
11
Table 4-1. HELE Cordwood Boiler Suppliers
Btu/hr ratings Supplier
EKO-Line 85,000 to 275,000 New Horizon Corp
www.newhorizoncorp.com
Tarm 100,000 to 198,000 HS Tarm/Tarm USA
www.tarmusa.com/wood-gasification.asp
Greenwood 100,000 to 300,000 Greenwood
www.GreenwoodFurnace.com
Garn 350,000 to 950,000 Dectra Corp.
www.dectra.net/garn
Note: Listing of any manufacturer, distributor or service provider does not constitute an endorsement.
Table 4-2 shows the results for a Garn WHS 1350 boiler that was tested at 157,000 to 173,000
Btu/hr using the new ASTM testing procedures, compared with EPA standards for wood stoves and
boilers. It is important to remember that wood fired boilers are not entirely smokeless; even very
efficient wood boilers may smoke for a few minutes on startup.4,15
Table 4-2. Emissions from Wood Heating Appliances
Appliance Emissions (grams/1,000 Btu delivered)
EPA Certified Non Catalytic Stove 0.500
EPA Certified Catalytic Stove 0.250
EPA Industrial Boiler (many states) 0.225
GARN WHS 1350 Boiler* 0.179
Source: Intertek Testing Services, Michigan, March 2006.
Note: *With dry oak cordwood; average efficiency of 75.4% based upon the high heating value (HHV) of wood
4.3 Bulk Fuel Boiler Systems
Commercial bulk fuel systems are generally efficient and meet typical federal and state air quality
standards. They have been around for a long time and there is little new technological ground to
break when installing one. Efficient bulk fuel boilers typically convert 70% of the energy in the
wood fuel to hot water or low pressure steam when the fuel moisture is 40% moisture content
(MC40) or less.
Most vendors provide systems that can burn various bulk fuels (wood chips, sawdust, wood pellets
and hog fuel), but each system, generally, has to be designed around the predominant fuel form. A
system designed to burn clean chips will not necessarily operate well on a diet of hog fuel, for
example. And most vendors will emphasize the need for good quality wood fuel as well as a
consistent source, i.e., fuel with consistent size and moisture content from a common source is
considerably more desirable than variations in chip size and/or moisture content from numerous
suppliers. Table 4-3 presents a partial list of bulk fuel boiler system vendors.
12
Table 4-3. Bulk Fuel Boiler System Vendors
Decton Iron Works, Inc
Butler, WI
(800) 246-1478
www.decton.com
New Horizon Corp.
Sutton, WV
(877) 202-5070
www.newhorizoncorp.com
Messersmith Manufacturing, Inc.
Bark River, MI
(906) 466-9010
www.burnchips.com
JMR Industrial Contractors
Columbus, MS
(662) 240-1247
www.jmric.com
Chiptec Wood Energy Systems
South Burlington, VT
(800) 244-4146
www.chiptec.com
Note: Listing of any manufacturer, distributor or
service provider does not constitute an endorsement
Bulk fuel systems are available in a range of sizes between 300,000 and 60,000,000 Btu/hr.
However, the majority of the installations range from 1 MMBtu/hr to 20 MMBtu/hr. Large energy
consumers (i.e., consuming at least 40,000 gallons of fuel oil per year) have the best potential for
installing bulk fuel boilers and may warrant detailed engineering analysis. Bulk fuel systems with
their storage and automated fuel handling conveyances are generally not cost-effective for smaller
applications.
Although there are several delivery options, bulk fuel (chips, sawdust, bark, shavings, etc.) is best
delivered in self-unloading tractor-trailer vans that hold about 22 to 24 tons of material. A facility
replacing 20,000 gallons of #1 fuel oil with white spruce bulk fuel (MC40) would use an estimated
400 tons per year, or about 16 to 20 tractor-trailer loads.
There are three known bulk fuel boilers in Alaska (Table 4-4), all of which are installed at
sawmills. The most recent was installed near Copper Center in 2007. A 4 MMBtu/hr wood chip
gasifier is under construction at the Craig Aquatic Center to replace the equivalent of 36,000
gallons of fuel oil per year. It is similar in size to boilers recently installed in several Montana
schools. Bulk fuel systems are discussed in greater detail in Section 7.
Table 4-4. Bulk Fuel Boilers in Alaska
Installation Boiler
Horsepower* MMBtu/hr Heating
Degree Days** Supplier
Craig Aquatic Center
Craig, AK 120 4 7,209a Chiptek
Icy Straits Lumber & Milling
Hoonah, AK 72 2.4 8,496b Decton
Regal Enterprises
Copper Center, AK N/A N/A 13,486c Decton
Logging & Milling Associates
Delta Junction, AK N/A 2 12,897d Decton
13
Table 4-4 Footnotes:
* Heat delivered as hot water or steam. 1 Boiler Horsepower = 33,475 Btu/hr or 34.5 pounds of water at a temperature of
100°C (212°F) into steam at 212°F
** assumes base temperature = 65o F
a NOAA, July 1, 2005 through June 30, 2006, Ketchikan data
b NOAA, July 1, 2005 through June 30, 2006, Average of Juneau and Yakutat data
c NOAA, July 1, 2005 through June 30, 2006, Gulkana data
d NOAA, July 1, 2005 through June 30, 2006, Big Delta data:
ftp://ftp.cpc.ncep.noaa.gov/htdocs/products/analysis_monitoring/cdus/degree_days/archives/Heating%20degree%20Days/Monthly%20City/2006/jun%202006.txt
SECTION 5. SELECTING THE APPROPRIATE SYSTEM
Selecting the appropriate heating system is, primarily, a function of heating demand. It is generally
not feasible to install automated bulk fuel systems in/at small facilities, and it is likely to be
impractical to install cordwood boilers at very large facilities. Other than demand, system choice
can be limited by fuel availability, fuel form, labor, financial resources, and limitations of the site.
The selection of a wood-fueled heating system has an impact on fuel economy. Potential savings
in fuel costs must be weighed against initial investment costs and ongoing operating, maintenance
and repair (OM&R) costs. Wood system costs include the initial capital costs of purchasing and
installing the equipment, non-capital costs (engineering, permitting, etc.), the cost of the fuel
storage building and boiler building (if required), the financial burden associated with loan interest,
the fuel cost, and the other costs associated with operating and maintaining the heating system,
especially labor.
5.1 Comparative Costs of Fuels
Table 5-1 compares the cost of #1 fuel oil to white spruce cordwood (MC30) and white spruce bulk
fuel (MC40). In order to make reasonable comparisons, costs are provided on a “per million Btu”
(MMBtu) basis.
Table 5-1. Comparative Cost of Fuel Oil vs. Wood Fuels
FUEL RHVa
(Btu)
Conversion
Efficiencya
DHVa
(Btu)
Price per unit
($)
Cost per MMBtu
(delivered, ($))
4.00/gal 37.313
5.00 46.642 Fuel oil, #1,
(per 1 gallon) 134,000 80% 107,200
per gallon 6.00 55.97
200/cord 21.822
225 24.55 White spruce,
(per 1 cord, MC30)
12.22
million 75% 9.165
million 250 27.278
75/ton 14.006
100 18.674 White spruce,
(per 1 ton, MC40)
7.65
million 70% 5.355
million 125 23.343
Notes:
a from Appendix D
5.2(a) Cost per MMBtu Sensitivity – Cordwood
Figure 5-1 illustrates the relationship between the price of white spruce cordwood (MC30) and the
cost of delivered heat, (the slanted line). For each $10 per cord increase in the price of cordwood,
the cost per million Btu increases by $1.091. The chart assumes that the cordwood boiler delivers
14
75% of the RHV energy in the cordwood to useful heat and that oil is converted to heat at 80%
efficiency. The dashed lines represent #1 fuel oil at $4.00, $5.00 and $6.00 per gallon ($37.313,
$46.642 and $55.97 per million Btu respectively).
At high efficiency, heat from white spruce cordwood (MC30) at $427.47 per cord is equal to the
cost of #1 fuel oil at $5.00 per gallon (i.e., $46.642 per MMBtu), before considering the cost of the
equipment and operation, maintenance and repair (OM&R) costs. At 75% efficiency and $225 per
cord, a high-efficiency cordwood boiler will deliver heat at about 52.6% of the cost of #1 fuel oil at
$5.00 per gallon ($24.55 versus $46.642 per MMBtu). Figure 5-1 indicates that, at a given
efficiency, savings increase significantly with decreases in the delivered price of cordwood and/or
with increases in the price of fuel oil.
Cost ($) per MMBtu as a Function of
Cordwood Cost
0.00
10.00
20.00
30.00
40.00
50.00
60.00
50 100 150 200 250 300 350 400 450 500
Cordwood cost, $ per cordCost ($) per MMBtu
Fuel Oil at $6.00 per gallon
Fuel Oil at $5.00 per gallon
Fuel Oil at $4.00 per gallon
Figure 5-1. Effect of White Spruce Cordwood Price on Cost of Delivered Heat
5.2(b) Cost per MMBtu Sensitivity – Bulk Fuels
Figure 5-2 illustrates the relationship between the price of white spruce bulk fuel (MC40) and the
cost of delivered heat, (the slanted line). For each $10 per ton increase in the price of bulk fuel, the
cost per million Btu increases by about $1.867. The chart assumes that the bulk fuel boiler
converts 70% of the RHV energy in the wood to useful heat and that fuel oil is converted to heat at
80% efficiency. The dashed lines represent #1 fuel oil at $4.00, $5.00 and $6.00 per gallon
($37.313, $46.642 and $55.97 per million Btu respectively).
15
At high efficiency, heat from white spruce bulk fuel (MC40) at $249.77 per ton is equal to the cost
of oil at $5.00 per gallon, before considering the investment and OM&R costs. At 70% efficiency
and $100/ton, an efficient bulk fuel boiler will deliver heat at about 40% of the cost of fuel oil at
$5.00 per gallon ($18.674 versus $46.642 per MMBtu), before considering the cost of the
equipment and OM&R. Figure 5-2 shows that, at a given efficiency, savings increase significantly
with decreases in the delivered price of bulk fuel and/or with increases in the price of fuel oil.
Cost ($) per MMBtu as a Function of
Bulk Fuel Cost
0.000
10.000
20.000
30.000
40.000
50.000
60.000
50 75 100 125 150 175 200 225 250 275
Bulk fuel cost, $ per tonCost ($) per MMBtu
Fuel Oil at $6.00 per gallon
Fuel Oil at $5.00 per gallon
Fuel Oil at $4.00 per gallon
Figure 5-2. Effect of White Spruce Bulk Fuel Price on Cost of Delivered Heat
16
5.3 Determining Demand
Table 5-2 shows the reported approximate amount of fuel oil used by various facilities in Fort
Yukon, Alaska.
Table 5-2. Reported Annual Fuel Oil Consumption, Fort Yukon, AK
Reported Annual Fuel Consumption Facility Gallons Cost ($) @ $5.00/gallon
UAF Yukon Flats Center 8,500 42,500
Vocational Education Center
and dormitory 18,000 90,000
CATG Health Clinic 20,000 100,000
School and Gymnasium 30,000 150,000
TOTAL 76,500 382,500
Wood boilers, especially cordwood boilers, are often sized to displace only a portion of the heating
load since the oil system will remain in place, in standby mode, for “shoulder seasons” and peak
demand. Fuel oil consumption for the Fort Yukon facilities was compared with heating demand
based on heating degree days (HDD) to determine the required boiler capacity (RBC) for heating
only on the coldest 24-hour day (Table 5-3). While there are many factors to consider when sizing
heating systems it is clear that, in most cases, a wood system of less-than-maximum size could still
replace a substantial quantity of fuel oil.
Typically, installed oil-fired heating capacity at most sites is two-to-four times the demand for the
coldest day. Only the new Health Clinic falls within this range. The installed capacity at the
school is about 5.4 times greater than the RBC, and all the rest are less than twice the RBC.
Furthermore, it appears that the installed capacity of the boilers at the Vocational Education Center
is less than 80% of the minimum required RBC, which may, in part, explain why the building feels
cold during extremely cold periods, i.e. -50OF and less.
Manual HELE cordwood boilers equipped with special tanks for extra thermal storage can supply
heat at higher than their rated capacity for short periods. For example, while rated at 950,000
Btu/hr (heat into storage) each, a pair of Garn WHS 3200s can store up to 4.128 million Btu,
which, theoretically, would be enough to heat the VEC and dorm during the coldest 24-hour period
for nearly 7 hours (4,128,000 ÷ 601,489).
17
Table 5-3. Estimate of Heat Required in Coldest 24-Hour Period
Facility Fuel Oil Used
gal/yeara
Heating
Degree Daysd Btu/DDc Design
Tempd F
RBCe
Btu/hr
Installed
Btu/hra
UAF YFC 8,500 55,813 284,395 514,000
VEC
Dorm
VEC + Dorm
16,000
2,000
18,000
105,059
13,132
118,192
534,742
67,437
601,489
418,000
124,000
542,000
CATG RHC 20,000 131,324 668,245 1,930,000
School
Gymnasium
School + Gym
17,000
13,000
30,000
16,326
111,626
85,361
196,987
-57
568,111
434,598
1,002,000
3,090,000
840,000
3,930,000
Table 5-3 Footnotes:
a From SOI and site visit; net total Btu/hr
b NOAA, July 1, 2005 through June 30, 2006:
ftp://ftp.cpc.ncep.noaa.gov/htdocs/products/analysis_monitoring/cdus/degree_days/archives/Heating%20degree%20Days/Monthly%20City/2006/jun%202006.txt c Btu/DD= Btu/year x oil furnace conversion efficiency (0.85) /Degree Days
d Alaska Housing Manual, 4th Edition Appendix D: Climate Data for Alaska Cities, Research and Rural Development
Division, Alaska Housing Finance Corporation, 4300 Boniface Parkway, Anchorage, AK 99504, January 2000.
e RBC = Required Boiler Capacity for the coldest Day, Btu/hr= [Btu/DD x (65 F-Design Temp)+DD]/24 hrs
According to these calculations (Table 5-3), it appears that the Fort Yukon facilities could each
supply 100% of their heating needs with one or more high efficient low emission cordwood boilers.
Consultation with a qualified engineer is strongly recommended.
5.4 Summary of Findings and Potential Savings Table 5-4 summarizes the findings thus far: annual fuel oil usage, range of annual fuel oil costs, estimated annual wood fuel requirement, range of estimated annual wood fuel costs, and potential gross annual savings for the facilities in Fort Yukon. [Note: potential gross annual fuel cost savings do not consider capital costs and non-fuel operation, maintenance and repair (OM&R) costs.] Table 5-4. Estimate of Total Wood Consumption, Comparative Costs and Potential Savings Fuel Oil Used gal/yeara Annual Fuel Oil Cost (@ $ ___ /gal) Approximate Wood Requirementb Annual Wood Cost (@ $ ___ /unit) Potential Gross Annual Fuel Cost Savings ($) CORDWOOD SYSTEMS 4.00/gal 5.00/gal 6.00/gal W. spruce, MC30, CE 75% 200/cord 225/cord 250/cord Low Medium High UAF Yukon Flats Center 8,500 34,000 42,500 51,000 100 cds 20,000 22,500 25,000 9,000 20,000 31,000 VEC & dormitory 18,000 72,000 90,000 108,000 210 cds 42,000 47,250 52,500 19,500 42,750 66,000 CATG Health Clinic 20,000 80,000 100,000 120,000 235 cds 47,000 52,875 58,750 21,250 47.125 73,000 School & Gym 30,000 120,000 150,000 180,000 350 cds 70,000 78,750 87,500 35,500 71,250 110,000 Total 76,500 306,000 382,500 459,000 895 cds 179,000 201,375 223,750 82,250 181,125 280,000 BULK FUEL SYSTEMS 4.00/gal 5.00/gal 6.00/gal W. spruce, MC40, CE 70% 75/ton 100/ton 125/ton Low Medium High VEC & dormitory 18,000 72,000 90,000 108,000 360 tons 27,000 36,000 45,000 27,000 54,000 81,000 CATG Health Clinic 20,000 80,000 100,000 120,000 400 tons 30,000 40,000 50,000 30,000 60,000 90,000 School & Gym 30,000 120,000 150,000 180,000 600 tons 45,000 60,000 75,000 45,000 90,000 135,000 Total 68,000 272,000 340,000 408,000 1,360 tons 102,000 136,000 170,000 102,000 204,000 306,000 NOTES: a From Table 5-2 b From Table D-3, Fuel Oil Equivalents; 85.5 gallons per cord (MC30), 50 gallons per ton (MC40)
SECTION 6. ECONOMIC FEASIBILITY OF CORDWOOD SYSTEMS
6.1 Initial Investment Cost Estimates
DISCLAIMER: Short of having an actual Design & Engineering Report prepared by a team of architects
and/or professional engineers, actual costs for any particular system at any particular site cannot be
positively determined. Such a report is beyond the scope of this preliminary assessment. However, several
hypothetical, though hopefully realistic, system scenarios are offered as a means of comparison. Actual
costs, assumptions and “guess-timates” are identified as such, where appropriate. Recalculations of
financial metrics, given different/updated cost estimates, are relatively easy to accomplish.
Wood heating systems include the cost of the fuel storage building (if necessary), boiler building
(if necessary), boiler equipment (and shipping), plumbing and electrical connections (including
heat exchangers, pumps, fans, and electrical service to integrate with existing distribution systems),
installation, and an allowance for contingencies.
Before a true economic analysis can be performed, all of the costs (investment and OM&R) must
be identified, and this is where the services of qualified experts are necessary.
Table 6-1 (next page) presents hypothetical scenarios of initial investment costs for cordwood
systems in medium and large heating demand situations. Four scenarios are presented.
Buildings and plumbing/connections are the most significant costs besides the boiler(s). Building
costs deserve more site-specific investigation and often need to be minimized to the extent
possible. Piping from the wood-fired boiler is another area of potential cost saving. Long
plumbing runs and additional heat exchangers substantially increase project costs. The exorbitant
cost of hard copper pipe normally used in Alaska now precludes its use in most applications. If
plastic or PEX® piping is used significant cost savings may be possible.
Allowance for indirect non-capital costs such as engineering and contingency are most important
for large systems that involve extensive permitting and budget approval by public agencies. This
can increase the cost of a project by 25% to 50%. For the examples in Table 6-1, a 25%
contingency allowance was used.
NOTES:
a. With the exception of the list prices for Garn boilers, all of the figures in Table 6-1 are
gross estimates.
b. The cost estimates presented in Table 6-1 do not include the cost(s) of any upgrades or
improvements to the existing heating/heat distribution system currently in place.
20
Table 6-1. Initial Investment Cost Scenarios for Hypothetical HELE Cordwood Systems
Fuel oil consumption
(gallons per year)
8,500
(UAF YFC)
18,000
(VEC & Dorm)
20,000
(CATG RHC)
30,000
(School & Gym)
Required boiler capacity (RBC),
Btu/hr 284,395 601,489 668,245 1,002,000
Garn model (1) Garn WHS 3200 (2) WHS 3200 (2) WHS 4400 (3) WHS 4400
Rating -Btu/hr e 950,000 1,900,000 1,900,000 2,850,000 Cordwood boiler
Btu stored 2,064,000 4,128,000 5,864,000 8,796,000
Building and Equipment (B&E) Costs, $ (for discussion purposes only)
Fuel storage buildinga
(fabric bldg, gravel pad, $25 per sf)
50,000
(100 cds @ 20 sf/cd)
105,000
(210 cds @ 20 sf/cd)
117,500
(235 cds @ 20 sf/cd)
175,000
(350 cds @ 20 sf/cd)
Boiler building @ $150 per sf
(minimum footprint w/concrete pad)b
30,000
(10’x20’)
60,000
(20’x20’)
66,000
(20’x22’)
99,000
(30’x22’)
Boilers
Base pricec
Shipping to Fairbanksd
Bush delivery d
32,900
4,500
2,000
65,800
8,000
4,000
80,000f
8,000
4,800
120,000f
12,000
7,200
Plumbing and electricald 50,000 75,000 75,000 100,000
Installationd 25,000 35,000 35,000 50,000
Subtotal - B&E Costs 194,400 352,800 386,300 563,200
Contingency (25%)d 48,600 88,200 96,575 140,800
Grand Total 243,000 441,000 482,875 704,000
Notes:
a A cord occupies 128 cubic feet. If the wood is stacked 6½ feet high, the area required to store the wood is 20 square feet per cord.
b Does not allow for any fuel storage within the boiler building
c List price, Alaskan Heat Technologies, April 2008
d “guess-timate”; for illustrative purposes only
e Btu/hr into storage is extremely fuel dependent. The data provided for Garn boilers by Dectra Corp. are based on the ASTM standard of split, 16-inch oak
with 20 percent moisture content and reloading once an hour. f Published list price not available; this represents the current list price for WHS 3200 + $7,100
6.2 Operating Parameters of HELE Cordwood Boilers
A detailed discussion of the operating parameters of HELE cordwood boilers can be found in
Appendix F.
6.3 Hypothetical OM&R Cost Estimates
The primary operating cost of a cordwood boiler, other than the cost of fuel, is labor. Labor is
required to move fuel from its storage area to the boiler building, fire the boiler, clean the boiler
and dispose of ash. For purposes of this analysis, it is assumed that the boiler system will be
operated every day for 210 days (30 weeks) per year between mid-September and mid-April.
Table 6-2 presents labor/cost estimates for various HELE cordwood systems. A detailed analysis of
labor requirement estimates can be found in Appendix F.
21
Table 6-2. Labor/Cost Estimates for HELE Cordwood Systems
System (1) WHS 3200 (2) WHS 3200
(combined capacity)
(2) WHS 4400
(combined capacity)
(3) WHS 4400
(combined capacity)
Total Daily labor (hrs/yr)a
(hrs/day X 210 days/yr) 70.35 147.84 206.85 271.74
Total Periodic labor (hrs/yr)b
(hrs/wk X 30 wks/yr) 50.0 105.0 117.6 175.2
Total Annual labor (hrs/yr)b 20 40 40 60
Total labor (hrs/yr) 140.35 292.84 364.45 506.94
Total annual labor cost ($/yr)
(total hrs x $20) 2,807.00 5,856.80 7,289.00 10,138.80
Notes:
a From Table F-2
b From Appendix F
There is also an electrical cost component to the boiler operation. An electric fan creates the
induced draft that contributes to boiler efficiency. The cost of operating circulation pumps and/or
blowers would be about the same as it would be with the oil-fired boiler or furnaces in the existing
heating system.
Lastly there is the cost of wear items, such as fire brick, door gaskets, water treatment chemicals,
etc. For this example, a value of $1,000 per boiler is used.
Table 6-3. Summary of Total Annual Non-Fuel OM&R Cost Estimates
Cost/Allowance ($)
Item (1) WHS 3200 (2) WHS 3200
(combined capacity)
(2) WHS 4400
(combined capacity)
(3) WHS 4400
(combined capacity)
Labor 2,807.00 5,856.80 7,289.00 10,138.80
Electricitya 445.18 935.55 1,047.18 1,562.79
Maintenance/Repairs 1,000.00 2,000.00 2,000.00 3,000.00
Total non-fuel OM&R ($) 4,252.18 8,792.35 10,336.18 14,701.59
Notes:
a Electrical cost based on a formula of horsepower x kWh rate x operating time
6.4 Calculation of Financial Metrics
Biomass heating projects are viable when, over the long run, the annual fuel cost savings generated
by converting to biomass are greater than the cost of the new biomass boiler system plus the
additional operation, maintenance and repair (OM&R) costs associated with a biomass boiler
(compared to those of a fossil fuel boiler or furnace).
Converting from an existing boiler to a wood biomass boiler (or retrofitting/integrating a biomass
boiler with an existing boiler system) requires a greater initial investment and higher annual
OM&R costs than for an equivalent oil or gas system alone. However, in a viable project, the
22
savings in fuel costs (wood vs. fossil fuel) will pay for the initial investment and cover the
additional OM&R costs in a relatively short period of time. After the initial investment is paid off,
the project continues to save money (avoided fuel cost) for the life of the boiler. Since inflation
rates for fossil fuels are typically higher than inflation rates for wood fuel, increasing inflation rates
result in greater fuel cost savings and thus greater project viability.17
The potential economic viability of a given project depends not only on the relative costs and cost
savings, but also on the financial objectives and expectations of the facility owner. For this reason,
the impact of selected factors on potential project viability is presented using the following metrics:
Simple Payback Period
Present Value (PV)
Net Present Value (NPV)
Internal Rate of Return (IRR)
Life Cycle Cost (LCC)
Total initial investment costs include all of the capital and non-capital costs required to design,
purchase, construct and install a biomass boiler system in an existing facility with an existing
furnace or boiler system.
A more detailed discussion of Simple Payback Period, Present Value, Net Present Value and
Internal Rate of Return can be found in Appendix E.
6.5 Simple Payback Period for HELE Cordwood Boilers
Table 6-4 presents a Simple Payback Period analysis for hypothetical multiple HELE cordwood
boiler installations.
Table 6-4. Simple Payback Period Analysis for HELE Cordwood Boilers
(1) WHS 3200 (2) WHS 3200
(combined capacity)
(2) WHS 4400
(combined capacity)
(3) WHS 4400
(combined capacity)
Fuel oil cost,
$ per year @ $5.00 per gallon
42,500
(8,500 gal)
90,000
(18,000 gal)
100,000
(20,000 gal)
150,000
(30,000 gal)
Cordwood cost
$ per year @ $225per cord
22,500
(100cd)
47,250
(210cd)
52,875
(235cd)
78,750
(350cd)
Annual Fuel Cost Savings, $/yr 20,000 42,750 47,125 71,250
Total Investment Costs b, $ 243,000 441,000 482,875 704,000
Simple Paybackc, yrs 12.15 9.33 10.25 9.88
Annual, Non-fuel OM&R costsa 4,252 8,792 10,336 14,702
Net Annual Savings ($)
(Annual Cash Flow) 15,748 33,958 36,789 56,548
Notes:
a From Table 6-3
b From Table 6-1
c Total Investment Costs divided by Annual Fuel Cost Savings
6.6 Present Value (PV), Net Present Value (NPV) and Internal Rate or Return (IRR)
Values for Various HELE Cordwood Boiler Installation Options
Table 6-5 presents PV, NPV and IRR values for hypothetical various HELE cordwood boiler
installations.
23
Table 6-5. PV, NPV and IRR Values for Various HELE Cordwood Boilers Options
(1) WHS 3200 (2) WHS 3200
(combined capacity)
(2) WHS 4400
(combined capacity)
(3) WHS 4400
(combined capacity)
Discount Ratea (%) 3
Time, “t”, (years) 20
Initial Investment ($)b 243,000 441,000 482,875 704,000
Annual Cash Flow($)c
(Net Annual Savings) 15,748 33,958 36,789 56,548
Present Value
(of expected cash flows, $ at “t” years) 234,290 505,209 547,327 841,291
Net Present Value ($ at “t” years) -8,710 64,209 64,452 137,291
Internal Rate of Return
(% at “t” years) 2.61 4.52 4.40 5.01
See Note # _ below 1 2 3 4
Notes:
a real discount (excluding general price inflation) as set forth by US Department of Energy, as found in NIST publication NISTIR 85-3273-22, Energy
Price Indices and Discount Factors for Life Cycle Cost Analysis
b From Table 6-1
c Equals annual cost of fuel oil minus annual cost of wood minus annual non-fuel OM&R costs (i.e., Net Annual Savings)
Note #1. With a real discount rate of 3.00% and after a span of 20 years, the projected cash flows are worth $234,290
today (PV), which is less than the initial investment of $243,000. The resulting NPV of the project is -$8,710, which
means that the project, given the stated assumptions and cost estimates, will not achieve the stated return [i.e., 3%] at the
end of 20 years. However, the NPV is only slightly negative and the internal rate of return is positive (2.61%), and given
that this report is only a pre-feasibility assessment, this option could “pencil out” given “real” numbers.
Note #2. With a real discount rate of 3.00% and after a span of 20 years, the projected cash flows are worth $505,209
today (PV), which is greater than the initial investment of $441,000. The resulting NPV of the project is $64,209 and the
project achieves an internal rate of return of 4.52% at the end of 20 years. Given the assumptions and cost estimates, this
alternative appears financially and operationally feasible.
Note #3. With a real discount rate of 3.00% and after a span of 20 years, the projected cash flows are worth $547,327
today (PV), which is greater than the initial investment of $482,875. The resulting NPV of the project is $64,452 and the
project achieves an internal rate of return of 4.4% at the end of 20 years. Given the assumptions and cost estimates, this
alternative appears financially and operationally feasible.
Note #4. With a real discount rate of 3.00% and after a span of 20 years, the projected cash flows are worth $841,291
today (PV), which is greater than the initial investment of $704,000. The resulting NPV of the project is $137,291 and
the project achieves an internal rate of return of 5.01% at the end of 20 years. Given the assumptions and cost estimates,
this alternative appears financially and operationally feasible. It should also be noted that the initial investment cost
estimate includes $99,000 (plus a 25% contingency allowance) for a boiler building. Given that there appears to be an
adequate structure already in place, significant savings may be achieved. By reducing the initial investment cost by
$123,750, the NPV and IRR become $261,041, and 7.41% respectively (PV doesn’t change).
24
6.7 Life Cycle Cost Analysis – Fort Yukon School and Gymnasium
The National Institute of Standards and Technology (NIST) Handbook 135, 1995 edition, defines
Life Cycle Cost (LCC) as “the total discounted dollar cost of owning, operating, maintaining, and
disposing of a building or a building system” over a period of time. Life Cycle Cost Analysis
(LCCA) is an economic evaluation technique that determines the total cost of owning and
operating a facility over a period of time. Alaska Statute 14.11.013 directs the Department of
Education and Early Development (EED) to review school capital projects to ensure they are in the
best interest of the state, and AS 14.11.014 stipulates the development of criteria to achieve cost
effective school construction.19
While a full-blown life cycle cost analysis is beyond the scope of this preliminary feasibility
assessment, an attempt is made to address some of the major items and run a rudimentary LCCA
using the Alaska EED LCCA Handbook and spreadsheet.
According to the EED LCCA Handbook, the life cycle cost equation can be broken down into three
variables: the costs of ownership, the period of time over which the costs are incurred
(recommended period is 20 years), and the discount rate that is applied to future costs to equate
them to present costs.
There are two major cost categories: initial expenses and future expenses. Initial expenses are all
costs incurred prior to occupation (or use) of a facility, and future expenses are all costs incurred
upon occupation (or use) of a facility. Future expenses are further categorized as operation costs,
maintenance and repair costs, replacement costs, and residual value. A comprehensive list of
items in each of these categories is included in the EED LCCA Handbook.
The discount rate is defined as, “the rate of interest reflecting the investor’s time value of money”,
or, the interest rate that would make an investor indifferent as to whether s/he received payment
now or a greater payment at some time in the future. NIST takes the definition a step further by
separating it into two types: real discount rates and nominal discount rates. The real discount rate
excludes the rate of inflation and the nominal discount rate includes the rate of inflation.19 The
EED LCCA Handbook and spreadsheet focuses on the use of real discount rates in the LCC
analysis.
To establish a standard discount rate for use in the LCCA, EED adopted the US Department of
Energy’s (DOE) real discount rate. This rate is updated and published annually in the Energy Price
Indices and Discount Factors for Life Cycle Cost Analysis – Annual Supplement to NIST
Handbook 135 (www1.eere.energy.gov). The DOE discount and inflation rates for 2008 are as
follows:
Real rate (excluding general price inflation) 3.0%
Nominal rate (including general price inflation) 4.9%
Implied long term average rate of inflation 1.8%
Other LCCA terms
Constant dollars: dollars of uniform purchasing power tied to a reference year and exclusive of
general price inflation or deflation
Current dollars: dollars of non-uniform purchasing power, including general price inflation or
deflation, in which actual prices are stated
Present value: the time equivalent value of past, present or future cash flows as of the beginning of
the base year.
25
NOTE: When using the real discount rate in present value calculations, costs must be expressed in
constant dollars. When using the nominal discount rate in present value calculations, costs must be
expressed in current dollars. In practice, the use of constant dollars simplifies LCCA, and any
change in the value of money over time will be accounted for by the real discount rate.
LCCA Assumptions
As stated earlier, it is beyond the scope of this pre-feasibility assessment to go into a detailed life
cycle cost analysis. However, a limited LCCA is presented here for purposes of discussion and
comparison.
Time is assumed to be 20 years, as recommended by EED
The real discount rate is 3%
Initial expenses as per Table 6.1
Future expenses as per Table 6.3
Replacement costs – not addressed
Residual value – not addressed
Cordwood Boiler Alternatives
Alternative 1 represents the existing oil-fired boiler systems. The initial investment was assumed
to be $50,000. The operation costs included 30,000 gallons of #1 fuel oil at $5.00 per gallon and
40 hours of labor per year at $20 per hour. The annual maintenance and repairs costs were
assumed to be $1,000 and no allowances were made for replacement costs or residual value.
NOTE: The value of the existing boiler system ($50,000), the amount and cost of labor (40 hours,
$800), and maintenance and repair costs ($1,000) are fictitious, but are held constant for
comparative purposes as appropriate.
Alternative 2 represents the existing oil-fired boiler systems, which would remain in place, plus the
installation of three Garn WHS 4400 wood fired boilers. The initial investment was assumed to
be $754,000, which includes the hypothetical value of the existing oil-fired boilers (valued at
$50,000 as per Alternative 1) plus the initial investment cost of the Garn boiler system ($704,000,
as per Table 6-1). The operation costs include 350 cords of fuelwood at $225 per cord and 506.94
hours of labor per year at $20 per hour (as per Table 6-2). The annual utility, maintenance and
repair costs were assumed to be $4,652.79 (as per Table 6-3) for the system and no allowances
were made for replacement costs or residual value.
The hypothetical EED LCCA results for the Fort Yukon School and gymnasium cordwood boiler
alternative are presented in Table 6-6.
26
Table 6-6. Estimated Life Cycle Costs of Cordwood System Alternative
Alternative 1
(existing boilers)
Alternative 2
(existing boilers plus HELE
cordwood boilers)
Initial Investment Cost $50,000 $754,000
Operations Cost $2,243,523 $1,322,441
Maintenance & Repair Cost $14,877 $69,222
Replacement Cost $0 $0
Residual Value $0 $0
Total Life Cycle Cost 2,308,401 2,145,663
SECTION 7. ECONOMIC FEASIBILITY OF BULK FUEL SYSTEMS
NOTE: Given the relatively small demand at the UAF Yukon Flats Center (i.e., 8,500 gpy), an
analysis of bulk fuel systems was not prepared for that facility. The analysis for the VEC/dormitory
and Health Clinic was combined (i.e., 19,000 gpy), since the two facilities are relatively close,
demand-wise. A separate analysis was done for the School/gym.
A typical bulk fuel boiler system includes bulk fuel storage, a boiler building, wood-fuel handling
systems, combustion chamber, boiler, ash removal, cyclone, exhaust stack and electronic controls.
The variables in this list of system components include the use of silos of various sizes for wood
fuel storage, chip storage areas of various sizes, boiler buildings of various sizes, automated versus
manual ash removal and cyclones for particulate removal.17
7.1 Capital Cost Components
As indicated, bulk fuel systems are larger, more complex and typically more costly to install and
integrate with existing boiler and distribution systems. Before a true economic analysis can be
performed, all of the costs (capital, non-capital and OM&R) must be identified, and this is where
the services of architects and professional engineers are necessary.
Table 7-1 outlines the various general components for a hypothetical, small bulk fuel system;
however it is beyond the scope of this report to offer estimates of individual costs for those
components. As an alternative, a range of likely total costs is presented and analyzed for
comparative purposes.
27
Table 7-1. Initial Investment Cost Components for Bulk Fuel Systems
Facility VEC or Clinic School/gym
Capital Costs: Building and Equipment (B&E)
Fuel storage building ?
Material handling system ?
Boiler building ?
Boiler: base price
shipping ?
Plumbing/connections ?
Electrical systems ?
Installation ?
Non-capital Costs
Engineering , Contingency, Permitting, etc.?
Initial Investment Total ($) $750,000 to $2,000,000
The investment cost of bulk fuel systems can range from $500,000 to over $2 million, with about
$350,000 to $900,000 in equipment costs alone. Fuel handling and boiler equipment for an 8
MMBtu/hr (300 BHP) system was recently quoted to a school in the northeast USA for $900,000.
The cost of a boiler and fuel handling equipment for a 3 to 4 MMBtu/hr system is about $350,000
to $500,000. The 2.4 MMBtu/hr system in Hoonah was installed at a sawmill for about $250,000,
but an existing building was used and there were significant economies in fuel preparation, storage
and handling that would be unacceptable in a non-industrial, institutional setting. Fuel and boiler
equipment for a 1 MMBtu per hour system is estimated at $250,000 to $300,000 (buildings are
extra). Several schools in New England have been able to use existing buildings or boiler rooms to
house new equipment and realize substantial savings, but recent school projects in Montana were
all installed in new buildings.4
The Craig Schools and Aquatic Center project in Craig, AK was originally estimated at less than $1
million to replace propane and fuel oil equivalent to 36,000 gallons of fuel oil, but the results of a
January 2007 bid opening brought the cost to $1.85 million, not including probable cost overruns.
The fuel storage and boiler building, and system integration costs for the pool and two schools
increased the project costs.
Table 7-2 shows the total costs for the 2004-5 Darby School (Darby, MT) project at $1,001,000 including
$268,000 for repairs and upgrades to the pre-existing heating system. Integration with any pre-existing
system will likely require repairs and rework that must be included in the wood system cost. Adding the
indirect costs of engineering, permits, etc. to the equipment cost put the total cost at Darby between
$716,000 and $766,000 for the 3 million Btu/hr system to replace 47,000 gallons of fuel oil per year.
Since the boiler was installed at Darby, building and equipment costs have increased from 10% to 25%.
A new budget price for the Darby system might be closer to $800,000 excluding the cost of repairs to the
existing system.4
28
Table 7-2. Darby, MT Public School Wood Chip Boiler Costs a
Boiler Capacity 3 MMBtu/hr
Fuel Oil Displaced 47,000 gallons
Heating Degree Days 7,186
System Costs:
Building, Fuel Handling $ 230,500
Boiler and Stack $ 285,500
Boiler system subtotal $ 516,000
Piping, integration $ 95,000
Other repairs, improvements $ 268,000
Total, Direct Costs $ 879,000
Engineering, permits, indirect $ 122,000
Total Cost $1,001,000
a Biomass Energy Resource Center, 2005 4
The following is an excerpt from the Montana Biomass Boiler Market Assessment17:
“To date, CTA [CTA Architects and Engineers, Billings, MT] has evaluated more than 200
buildings throughout the northwestern United States and designed 13 biomass boiler projects, six of
which are now operational. Selected characteristics of these projects, including total project cost,
are presented in Table 1 [7-3]. As can be seen from Table 1 [7-3], total costs for these projects do
not correlate directly with boiler size. The least expensive biomass projects completed to date cost
$455,000 (not including additional equipment and site improvements made by the school district)
for a wood chip system in Thompson Falls, Montana. The least expensive wood pellet system is
projected to cost $269,000 in Burns, Oregon. The general breakdown of costs for these two projects
is presented in Tables 2 [7-4] and 3.”
NOTE: Information related to wood pellet systems was not included in this report as wood
pellets are not available as a bulk fuel in Alaska.
29
Table 7-3. Characteristics of Biomass Boiler Projects17
Facility
Name Location Boiler Size
(MMBtu/hr output) Project Type
Wood
Fuel
Type
Total
Project
Cost
Thompson
Falls School
District
Thompson
Falls, MT 1.6 MMBtu Stand-alone boiler building
tied to existing steam system Chips $ 455,000
Glacier High
School
Kalispell,
MT 7 MMBtu
New facility with integrated
wood chip and natural gas
hot water system
Chips $ 480,000
Victor School
District Victor, MT 2.6 MMBtu Stand-alone boiler building
tied to existing steam system Chips $ 615,000
Philipsburg
School District
Philipsburg,
MT 3.87 MMBtu
Stand-alone boiler building
tied to existing hot water
system
Chips $ 684,000
Darby School
District Darby, MT 3 MMBtu
Stand-alone boiler building
tied to existing steam & hot
water system
Chips $ 970,000
City of Craig Craig, AK 4 MMBtu
Stand-alone boiler building
tied to existing hot water
systems
Chips $1,400,000
Univ. MT
Western Dillon, MT 14 MMBtu Addition to existing steam
system Chips $1,400,000
Table 7-4. Cost Breakdown for the Least Expensive Wood Chip Boiler System Installed in a
New Free-Standing Building 17
System Component Cost % of Total
Wood Boiler System Equipment $136,000 30%
Building $170,000 38%
Mechanical/Electrical $100,000 22%
Mechanical Integration $15,000 3%
Fees, Permits, Printing, Etc. $34,000 7%
Total* $455,000* 100%
* not including additional equipment and site improvements made by the school district
7.2 Generic OM&R Cost Allowances
The primary operating cost is fuel. The estimated bulk fuel costs for Fort Yukon facilities are
presented in Table 5-4. Other O&M costs would include labor, electricity and maintenance and
repair costs. For purposes of this analysis, it is assumed that the boiler will operate every day for
210 days (30 weeks) per year between mid-September and mid-April.
NOTE: “Turn-down ratios” for bulk fuel boilers are quite restricted; they rarely operate very well
at less than 40 percent of capacity. Therefore, a large bulk fuel system could not be used very
effectively during the shoulder seasons, and a small bulk fuel system might fail to deliver enough
heat during peak demand periods.
30
Daily labor would consist of monitoring the system and performing daily inspections as prescribed
by the system manufacturer. It is assumed that the average daily labor requirement is ½ hour. An
additional 1 hour per week is allocated to perform routine maintenance tasks. Therefore, the total
annual labor requirement is (210 x 0.5) + 30 = 135 hours per year. At $20 per hour, the annual
labor cost would be $2,700.
There is also an electrical cost component to the boiler operation. Typically, electrically-powered
conveyors of various sorts are used to move fuel from its place of storage to a metering bin and into
the boiler. There are also numerous other electrical systems that operate various pumps, fans, etc.
The Darby High School system in Darby, MT, which burned 755 tons of bulk fuel in 2005, used
electricity in the amount of $2,03518, however the actual kWh or cost per kWh were not reported.
Another report17 proffered an average electricity cost for Montana of $0.086 per kWh. If that rate
is true for Darby, then the electrical consumption would have been about 23,663 kWh. The VEC
or Clinic are projected to use about 380 tons of bulk fuel (about 50.3 percent of the amount used at
Darby). If it is valid to apportion the electrical usage based on bulk fuel consumption, then the
VEC or Clinic would use about 11,832 kWh per year. At $0.50 per kWh, the annual electrical
consumption would be about $5,916. Using the same formulas, the School/gym would use about
18,800 kWh per year at a cost of about $9,400.
Lastly, there is the cost of maintenance and repair. Bulk fuel systems with their conveyors, fans,
bearings, motors, etc. have more wear parts. An arbitrary allowance of $5,000 is made to cover
these costs.
Total annual operating, maintenance and repair cost estimates for a bulk fuel boiler at the Fort
Yukon VEC or Clinic and School/gym summarized in Table 8-2
Table 7-5. Total OM&R Cost Allowances for a Bulk Fuel System
Item Cost/Allowance
VEC or Clinic
(19,000 gpy, 380 tons )
School/gym
(30,000 gpy, 600 tons)
Non-Fuel OM&R
Labor ($) 2,700 2,700
Electricity ($) 5,955 9,400
Maintenance ($) 5,000 5,000
Total, non-fuel OM&R 13,655 17,100
Wood fuel ($) 38,000 60,000
Total OM&R ($) 51,655 77,100
7.3 Calculation of Financial Metrics
A discussion of Simple Payback Period can be found in Appendix E.
A discussion of Present Value can be found in Appendix E.
A discussion of Net Present Value can be found in Appendix E.
A discussion of Internal Rate of Return can be found in Appendix E.
31
7.4 Simple Payback Period for Generic Bulk Fuel Boilers
Tables 7-6a and 7-6b present Simple Payback Period analysis for a range of initial investment cost
estimates for generic bulk fuel boiler systems at the VEC/Clinic and School/Gym.
Table 7-6a. Simple Payback Period Analysis for Bulk Fuel Heating Systems
VEC/dorm or CATG Clinic
(19,000 gpy; 380 tons/yr)
Fuel oil cost
($ per year @ $5.00 per gallon 95,000
Bulk wood fuel
($ per year @ $100 per ton) 38,000
Annual Fuel Cost Savings ($) 57,000
Total Investment Costs ($) 750,000 1,000,000 1,250,000 1,500,000 1,750,000 2,000,000
Simple Payback (yrs)a 13.16 17.54 21.93 26.32 30.7 35.09
a Simple Payback equals Total Investment Costs divided by Annual Fuel Cost Savings
Table 7-6b. Simple Payback Period Analysis for Bulk Fuel Heating Systems
Fort Yukon School & Gym
(30,000 gpy; 600 tons/yr)
Fuel oil cost
($ per year @ $5.00 per gallon 150,000
Bulk wood fuel
($ per year @ $100 per ton) 60,000
Annual Fuel Cost Savings ($) 90,000
Total Investment Costs ($) 750,000 1,000,000 1,250,000 1,500,000 1,750,000 2,000,000
Simple Payback (yrs)a 8.33 11.11 13.89 16.67 19.44 22.22
a Simple Payback equals Total Investment Costs divided by Annual Fuel Cost Savings
While simple payback has its limitations in terms of project evaluations, one of the conclusions of
the Montana Biomass Boiler Market Assessment was that viable projects had simple payback
periods of 10 years or less.17
7.5 Present Value (PV), Net Present Value (NPV) and Internal Rate of Return (IRR)
Values for Bulk Fuel Boilers
Tables 7-7a and 7-7b present PV, NPV and IRR values for hypothetical bulk fuel boilers at the
VEC/Clinic and School/Gym.
32
Table 7-7a. PV, NPV and IRR Values for Bulk Fuel Systems
(VEC/dorm or CATG Clinic)
Discount Rate 3
Time, “t”, (years) 20
Initial Investment ($)a 750,000 1,000,000 1,250,000 1,500,000 1,750,000 2,000,000
Annual Cash Flow ($)b 43,345
Present Value (of expected cash
flows), ($ at “t” years) 644,864
Net Present Value ($ at “t” years) -105,136 -355,136 -605,136 -855,136 -1,105,136 -1,355,136
Internal Rate of Return (%) 1.42 -1.32 -3.26 -4.74 -5.92 -6.91
Notes:
a from Table 7-6
b Equals annual cost of fuel oil minus annual cost of wood minus annual non-fuel OM&R costs
Table 7-7b. PV, NPV and IRR Values for Bulk Fuel Systems
(Fort Yukon School and Gymnasium)
Discount Rate 3
Time, “t”, (years) 20
Initial Investment ($)a 750,000 1,000,000 1,250,000 1,500,000 1,750,000 2,000,000
Annual Cash Flow ($)b 72,900
Present Value (of expected cash
flows), ($ at “t” years) 1,084,568
Net Present Value ($ at “t” years) 334,568 84,568 -165,432 -415,432 -665,432 -915,432
Internal Rate of Return (%) 7.38 3.90 1.51 -0.27 -1.68 -2.84
Notes:
a from Table 7-6
b Equals annual cost of fuel oil minus annual cost of wood minus annual non-fuel OM&R costs
SECTION 8. CONCLUSIONS
This report discusses conditions found “on the ground” at various facilities in Fort Yukon, Alaska,
and attempts to demonstrate, by use of realistic, though hypothetical examples, the feasibility of
installing high efficiency, low emission cordwood or bulk fuel wood boilers to heat these facilities.
The facilities in Fort Yukon consist of several distinct entities and are described in greater detail in
Section 1.3.
1. UAF Yukon Flats Center (YFC)
2. Vocational Education Center (VEC) and student dormitory
3. CATG Regional Health Clinic
4. School and Gymnasium
33
In terms of sites, the School/gym, VEC/dormitory, and the UAF Yukon Flats Center do not appear
to present any geo-physical constraints for the construction of a wood-fired heating plant. In fact,
each site appears to be quite favorable.
The same cannot be said for the CATG Clinic however. It appears that the Clinic site was brought
up to grade with a considerable amount of fill. Native vegetation occupies the ground to the right
and rear of the Clinic, while the ground slopes down 6 to 10 feet to a dirt roadway on the left; a
parking lot occupies the ground in front of the building. Future site development plans include
duplexes and elder housing in the area to the right, and an ambulance garage in the rear.
Complicating the project a bit more perhaps is the fact that the boiler and mechanical rooms are
located in the building mezzanine above the main floor of the clinic. None of this necessarily
precludes the installation of a wood-fired heating system; however site development and
installation costs could hurt the economics of the project.
8.1 Cordwood Systems
Each of the facilities under consideration could be heated with a HELE cordwood boiler system
consisting of one or more large cordwood boilers. None of the facilities is too small and none is
too large, although the UAF Yukon Flats Center is close to being to too small and the School/gym
is close to being too large.
Typically, the greater the fuel oil replacement the better the cost-effectiveness and that is generally
the case in Fort Yukon with the UAF YFC showing the weakest economic metrics and the
School/gymnasium showing the strongest metrics. However, all of these metrics are predicated on
two assumptions: 1) that sufficient volumes of wood can be provided at a reasonable cost and 2) that
someone will tend the boilers. Failure on either count will compromise the success of the project.
8.2 Bulk Fuel System
It appears that none of the facilities under consideration are large enough to warrant installing a
bulk fuel system, given the probable cost of such an installation and the availability and cost of
bulk wood fuel.