Loading...
HomeMy WebLinkAboutKipnuk Village End Use Energy Efficiency Measures Program Final Report 2010 Village End Use Energy Efficiency Measures Program AEA Grant # 2195234 Administered by Alaska Building Science Network Kipnuk Final Report Community Summary 17 community buildings and 6 teacher-housing units received energy efficiency upgrades as follows: Kanganak Building, Brown Shop, Bunkhouse, Food Warehouse, Light Plant, VPSO (Old Clinic), Water Plant, Kugkaktlik Limited Offices, Grocery Store, Hardware Store, Storage Building, School Smurf Houses 1 & 2, Teacher Housing & Site Admin, Teacher Housing East, Teacher Housing Middle, Teacher Housing West, 8th Grade Classroom, Old Building Shop, School Light Plant, Moravian Church, Mission House, Sunday School Retrofits Completed: Primary lighting retrofits completed in January, 2009 Village-Wide Lighting Retrofit Summary: • Retrofitted 295 light fixtures with electronic ballasts & T8 lamps • Installed 121 compact fluorescent light bulbs • Pre-retrofit energy use for all lighting: 43.99 Kilowatts • Post-retrofit energy use for all lighting: 18.41 Kilowatts • Energy savings projection: 25.58 Kilowatts • Pre-retrofit to post retrofit energy reduction: 58% • Estimated Annual Savings: kWh Rate (FY 2009 AVE): $0.65 Fuel Cost (FY 2009 Ave): $4.74 Comparative Comparative Hours Per Day/ 250 Electrical Avoided Diesel Avoided Diesel Days Per Year Savings Use (gal) Costs Locally Estimated Use $29,200 3941 $18,683 4 Hours/day $16,697 2253 $10,683 7 Hours/day $29,220 3944 $18,696 10 Hours/day $41,743 5634 $26,708 • Total project cost for all measures: $46,000 • Simple Payback (lighting measures only, using 7 hours/day lighting use run-time): 1.57 years • Total village wide in-kind contribution: $ 5,908 (expanded grant capacity by 13%) 2 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report West Region – Kipnuk Kipnuk Village Council Owned Buildings 7 buildings owned by the Kipnuk Village Council received energy efficient lighting upgrades as follows: Kanganak Building, Brown Shop, Bunkhouse, Food Warehouse, Light Plant, VPSO (Old Clinic), Water Plant • Lighting upgrades completed in: January 2009 • Retrofitted 213 light fixtures with electronic ballasts & T8 lamps • Installed 13 compact fluorescent light bulbs • Pre-retrofit energy use for all lighting: 28.391 Kilowatts • Post-retrofit energy use for all lighting: 13.142 Kilowatts • Energy savings projection: 15.249 Kilowatts • Pre-retrofit to post retrofit energy reduction: 54% • Estimated Annual Savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided 250 Days Per Year Savings Use (gal) Diesel Costs Locally Estimated $18,498.20 2497.01 $11,835.80 4 Hours/day $9,953.02 1343.52 $6,368.30 7 Hours/day $17,417.70 2351.17 $11,144.50 10 Hours/day $24,882.50 3358.81 $15,920.70 3 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report West Region – Kipnuk Kanganak Building Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 35 3-lamp electronic ballast, (2) 25 watt T8 lamps 16 3-lamp electronic ballast, (3) 25 watt T8 lamps 86 CFL-20 W 3 • Pre-retrofit energy use: 20553 watts • Post-retrofit energy use: 8866 watts • Energy savings projection: 11687 watts • Pre-retrofit to post retrofit energy reduction: 57% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $7,628.10 1029.69 $4,880.74 7 Hours/day $13,349.10 1801.96 $8,541.29 10 Hours/day $19,070.20 2574.23 $12,201.80 2000 Hours/year (Est.) $15,256.20 2059.38 $9,761.48 Note: Reduced 86 4-lamp fixtures to 3-lamp fixtures and 19 4-lamp fixtures to 2-lamp fixtures. Brown Shop Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 9 • Pre-retrofit energy use: 744 watts • Post-retrofit energy use: 414 watts • Energy savings projection: 330 watts • Pre-retrofit to post retrofit energy reduction: 44% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $215.39 29.07 $137.81 7 Hours/day $376.93 50.88 $241.18 10 Hours/day $538.48 72.69 $344.54 1200 Hours/year (Est.) $258.47 34.89 $165.38 4 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report West Region – Kipnuk Bunkhouse Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 13 3-lamp electronic ballast, (2) 25 watt T8 lamps 1 3-lamp electronic ballast, (3) 25 watt T8 lamps 2 • Pre-retrofit energy use: 1932 watts • Post-retrofit energy use: 798 watts • Energy savings projection: 1134 watts • Pre-retrofit to post retrofit energy reduction: 59% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $740.16 99.91 $473.58 7 Hours/day $1,295.28 174.85 $828.77 10 Hours/day $1,850.40 249.78 $1,183.96 1375 Hours/year (Est.) $1,017.72 137.38 $651.18 Note: Reduced two, 4-lamp fixtures to 3-lamp fixtures, and reduced five, 4-lamp fixtures to 2-lamp fixtures. Food Warehouse Building Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 10 CFL-27 W 8 • Pre-retrofit energy use: 1640 watts • Post-retrofit energy use: 676 watts • Energy savings projection: 964 watts • Pre-retrofit to post retrofit energy reduction: 59% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $629.20 84.93 $402.59 7 Hours/day $1,101.10 148.63 $704.53 10 Hours/day $1,573.01 212.33 $1,006.47 1000 Hours/year (Est.) $629.20 84.93 $402.59 5 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report West Region – Kipnuk Light Plant Materials Installed Quantity 2-lamp electronic ballast, (2) 32 watt T8 lamps 18 • Pre-retrofit energy use: 1512 watts • Post-retrofit energy use: 1080 watts • Energy savings projection: 432 watts • Pre-retrofit to post retrofit energy reduction: 29% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $281.97 38.06 $180.41 7 Hours/day $493.44 66.61 $315.72 10 Hours/day $704.92 95.15 $451.03 2000 Hours/year (Est.) $563.93 76.12 $360.82 VPSO (Old Clinic) Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 6 CFL-20 W 2 • Pre-retrofit energy use: 582 watts • Post-retrofit energy use: 316 watts • Energy savings projection: 266 watts • Pre-retrofit to post retrofit energy reduction: 46% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $173.62 23.44 $111.09 7 Hours/day $303.83 41.01 $194.40 10 Hours/day $434.05 58.59 $277.72 1500 Hours/year (Est.) $260.43 35.15 $166.63 6 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report West Region – Kipnuk Water Plant Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 2 2-lamp electronic ballast, (2) 32 watt T8 lamps 15 • Pre-retrofit energy use: 1428 watts • Post-retrofit energy use: 992 watts • Energy savings projection: 436 watts • Pre-retrofit to post retrofit energy reduction: 31% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $284.58 38.41 $182.08 7 Hours/day $498.01 67.22 $318.64 10 Hours/day $711.44 96.04 $455.21 1800 Hours/year (Est.) $512.24 69.15 $327.75 7 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report West Region – Kipnuk Kugkaktlik Limited Owned Buildings 4 buildings owned by the Kugkaktlik Limited received energy efficient lighting upgrades as follows: Kugkaktlik Limited Offices, Grocery Store, Hardware Store, Storage Building • Lighting upgrades completed in January, 2009 • Retrofitted 37 light fixtures with electronic ballasts & T8 lamps • Installed 1 compact fluorescent light bulbs • Pre-retrofit energy use for all lighting: 3.208 Kilowatts • Post-retrofit energy use for all lighting: 1.289 Kilowatts • Energy savings projection: 1.919 Kilowatts • Pre-retrofit to post retrofit energy reduction: 60% • Estimated Annual Savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided 250 Days Per Year Savings Use (gal) Diesel Costs Locally Estimated $3,156.37 426.07 $2,019.56 4 Hours/day $1,252.53 169.07 $801.41 7 Hours/day $2,191.93 295.88 $1,402.48 10 Hours/day $3,131.33 422.69 $2,003.54 8 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report West Region – Kipnuk Kugkaktlik Limited Offices Materials Installed Quantity 2-lamp electronic ballast, (1) 25 watt T8 lamp 10 • Pre-retrofit energy use: 840 watts • Post-retrofit energy use: 260 watts • Energy savings projection: 580 watts • Pre-retrofit to post retrofit energy reduction: 69% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $378.57 51.10 $242.22 7 Hours/day $662.49 89.43 $423.89 10 Hours/day $946.42 127.75 $605.55 1920 Hours/year (Est.) $726.85 98.11 $465.06 Note: Reduced ten 2-lamp fixtures to 1-lamp fixtures. Grocery Store Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 13 • Pre-retrofit energy use: 1092 watts • Post-retrofit energy use: 598 watts • Energy savings projection: 494 watts • Pre-retrofit to post retrofit energy reduction: 45% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $322.43 43.52 $206.30 7 Hours/day $564.26 76.17 $361.03 10 Hours/day $806.08 108.81 $515.76 3480 Hours/year (Est.) $1,122.07 151.46 $717.94 9 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report West Region – Kipnuk Hardware Store Materials Installed Quantity 2-lamp electronic ballast, (1) 25 watt T8 lamp 12 • Pre-retrofit energy use: 1008 watts • Post-retrofit energy use: 312 watts • Energy savings projection: 696 watts • Pre-retrofit to post retrofit energy reduction: 69% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $454.28 61.32 $290.66 7 Hours/day $794.99 107.31 $508.66 10 Hours/day $1,135.70 153.30 $726.66 2664 Hours/year (Est.) $1,210.20 163.36 $774.33 Storage Building Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 2 CFL-27 W 1 • Pre-retrofit energy use: 268 watts • Post-retrofit energy use: 119 watts • Energy savings projection: 149 watts • Pre-retrofit to post retrofit energy reduction: 56% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $97.25 13.13 $62.23 7 Hours/day $170.19 22.97 $108.89 10 Hours/day $243.13 32.82 $155.56 1000 Hours/year (Est.) $97.25 13.13 $62.23 10 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report West Region – Kipnuk Lower Kuskokwim School District Owned Buildings Above Photos taken by the Kipnuk School Photography Club 3 buildings and 6 teacher housing units owned by Lower Kuskokwim School District received energy efficient lighting upgrades as follows: Chief Paul Memorial School School Smurf Houses 1 & 2, Teacher Housing & Site Admin, Teacher Housing East, Teacher Housing Middle, Teacher Housing West, 8th Grade Classroom, Old Building Shop, School Light Plant, • Lighting upgrades completed in: January 2009 • Retrofitted 32 light fixtures with electronic ballasts & T8 lamps • Installed 89 compact fluorescent light bulbs • Pre-retrofit energy use for all lighting: 9.854 Kilowatts • Post-retrofit energy use for all lighting: 2.958 Kilowatts • Energy savings projection: 6.896 Kilowatts • Pre-retrofit to post retrofit energy reduction: 70% • Estimated Annual Savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided 250 Days Per Year Savings Use (gal) Diesel Costs Locally Estimated $6,590.85 889.68 $4,217.07 4 Hours/day $4,501.02 607.58 $2,879.92 7 Hours/day $7,876.78 1063.26 $5,039.85 10 Hours/day $11,252.50 1518.94 $7,199.79 11 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report West Region – Kipnuk School Smurf Houses 1 & 2 Materials Installed Quantity 2-lamp electronic ballast, (1) 32 watt T8 lamp 4 2-lamp electronic ballast, (2) 25 watt T8 lamps 5 CFL-11 W 5 CFL-14 W 1 CFL-20 W 3 CFL-23 W 5 CFL-27 W 1 2-lamp electronic ballast, (1) 32 watt T8 lamp 4 2-lamp electronic ballast, (2) 25 watt T8 lamps 5 • Pre-retrofit energy use: 1719 watts • Post-retrofit energy use: 633 watts • Energy savings projection: 1086 watts • Pre-retrofit to post retrofit energy reduction: 63% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $708.83 95.68 $453.54 7 Hours/day $1,240.46 167.44 $793.69 10 Hours/day $1,772.08 239.21 $1,133.84 1375 Hours/year (Est.) $974.64 131.56 $623.61 Teacher Housing Site Admin Building Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 2 CFL-11 W 5 CFL-14 W 26 • Pre-retrofit energy use: 2893 watts • Post-retrofit energy use: 511 watts • Energy savings projection: 2382 watts • Pre-retrofit to post retrofit energy reduction: 82% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $1,554.73 209.87 $994.77 7 Hours/day $2,720.78 367.27 $1,740.85 10 Hours/day $3,886.83 524.67 $2,486.93 2000 Hours/year (Est.) $3,109.46 419.74 $1,989.55 12 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report West Region – Kipnuk Teacher Housing East Materials Installed Quantity 2-lamp electronic ballast, (1) 32 watt T8 lamp 3 CFL-14 W 6 CFL-20 W 7 CFL-23 W 1 • Pre-retrofit energy use: 1198 watts • Post-retrofit energy use: 346 watts • Energy savings projection: 852 watts • Pre-retrofit to post retrofit energy reduction: 71% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $556.10 75.07 $355.81 7 Hours/day $973.18 131.37 $622.67 10 Hours/day $1,390.25 187.67 $889.53 1375 Hours/year (Est.) $764.64 103.22 $489.24 Teacher Housing Middle Materials Installed Quantity 2-lamp electronic ballast, (1) 32 watt T8 lamp 1 CFL-14 W 8 CFL-20 W 1 CFL-23 W 3 CFL-27 W 1 • Pre-retrofit energy use: 1041 watts • Post-retrofit energy use: 261 watts • Energy savings projection: 780 watts • Pre-retrofit to post retrofit energy reduction: 75% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $509.11 68.72 $325.74 7 Hours/day $890.94 120.26 $570.05 10 Hours/day $1,272.77 171.81 $814.36 1375 Hours/year (Est.) $700.02 94.49 $447.90 13 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report West Region – Kipnuk Teacher Housing West Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 3 CFL-20 W 1 • Pre-retrofit energy use: 327 watts • Post-retrofit energy use: 158 watts • Energy savings projection: 169 watts • Pre-retrofit to post retrofit energy reduction: 52% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $110.31 14.89 $70.58 7 Hours/day $193.04 26.06 $123.51 10 Hours/day $275.77 37.22 $176.44 1375 Hours/year (Est.) $151.67 20.47 $97.04 8th Grade Classroom Above Photos taken by the Kipnuk School Photography Club Materials Installed Quantity CFL-27 W 3 • Pre-retrofit energy use: 300 watts • Post-retrofit energy use: 81 watts • Energy savings projection: 219 watts • Pre-retrofit to post retrofit energy reduction: 73% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $142.94 19.30 $91.46 7 Hours/day $250.15 33.77 $160.05 10 Hours/day $357.35 48.24 $228.65 1800 Hours/year (Est.) $257.29 34.73 $164.63 14 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report West Region – Kipnuk Old Building Shop Above Photos taken by the Kipnuk School Photography Club Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 14 • Pre-retrofit energy use: 1176 watts • Post-retrofit energy use: 644 watts • Energy savings projection: 532 watts • Pre-retrofit to post retrofit energy reduction: 45% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $347.24 46.87 $222.17 7 Hours/day $607.66 82.03 $388.81 10 Hours/day $868.09 117.18 $555.44 1000 Hours/year (Est.) $347.24 46.87 $222.17 School Light Plant Materials Installed Quantity CFL-27 W 12 • Pre-retrofit energy use: 1200 watts • Post-retrofit energy use: 324 watts • Energy savings projection: 876 watts • Pre-retrofit to post retrofit energy reduction: 73% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $571.77 77.18 $365.84 7 Hours/day $1,000.59 135.07 $640.21 10 Hours/day $1,429.41 192.95 $914.59 500 Hours/year (Est.) $285.88 38.59 $182.92 15 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report West Region – Kipnuk Moravian Church Owned Buildings 3 buildings owned by the Moravian Church received energy efficient lighting upgrades as follows: Moravian Church, Mission House, Sunday School • Lighting upgrades completed in January, 2009 • Retrofitted13 light fixtures with electronic ballasts & t8 lamps • Installed 18 compact fluorescent light bulbs • Pre-retrofit energy use for all lighting: 2.542 Kilowatts • Post-retrofit energy use for all lighting: 1.024 Kilowatts • Energy savings projection: 1.518 Kilowatts • Pre-retrofit to post retrofit energy reduction: 60% • Estimated Annual Savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided 250 Days Per Year Savings Use (gal) Diesel Costs Locally Estimated $955.14 128.93 $611.14 4 Hours/day $990.80 133.74 $633.95 7 Hours/day $1,733.90 234.05 $1,109.41 10 Hours/day $2,477.00 334.36 $1,584.87 16 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report West Region – Kipnuk Moravian Church Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 10 CFL-20 W 3 CFL-23 W 1 • Pre-retrofit energy use: 1240 watts • Post-retrofit energy use: 543 watts • Energy savings projection: 697 watts • Pre-retrofit to post retrofit energy reduction: 56% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $454.93 61.41 $291.08 7 Hours/day $796.13 107.47 $509.39 10 Hours/day $1,137.33 153.52 $727.70 800 Hours/year (Est.) $363.95 49.13 $232.87 Mission House Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 2 CFL-20 W 3 CFL-27 W 4 • Pre-retrofit energy use: 693 watts • Post-retrofit energy use: 260 watts • Energy savings projection: 433 watts • Pre-retrofit to post retrofit energy reduction: 62% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $282.62 38.15 $180.83 7 Hours/day $494.58 66.76 $316.45 10 Hours/day $706.55 95.37 $452.07 1375 Hours/year (Est.) $388.60 52.46 $248.64 17 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report West Region – Kipnuk Sunday School Building Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 1 CFL-20 W 2 CFL-27 W 5 • Pre-retrofit energy use: 609 watts • Post-retrofit energy use: 221 watts • Energy savings projection: 388 watts • Pre-retrofit to post retrofit energy reduction: 64% • Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal) Costs 4 Hours/day $253.25 34.19 $162.04 7 Hours/day $443.18 59.82 $283.56 10 Hours/day $633.12 85.46 $405.09 800 Hours/year (Est.) $202.60 27.35 $129.63