HomeMy WebLinkAboutStevens Village Village End Use Energy Efficiency Measures Program Final Report 2010 Village End Use Energy Efficiency Measures Program
AEA Grant # 2195294 Administered by Alaska Building Science Network
Stevens Village Final Report
Community Summary
8 community buildings received energy efficiency upgrades in:
Washeteria & Water Plant, Community Hall, Clinic & IRA Offices, Storage (Old VPSO), School, School Gym,
Generator Shed, Sewer Lift Station
Retrofits Completed: April 2009
Village-Wide Lighting Retrofit Summary:
• Retrofitted 213 light fixtures with electronic ballasts & T8 lamps
• Installed 40 compact fluorescent light bulbs
• Installed 8 T5 linear fluorescent fixtures in the School Gym
• Pre-retrofit energy use for all lighting: 27.527 Kilowatts
• Post-retrofit energy use for all lighting: 15.037 Kilowatts
• Energy savings projection: 12.490 Kilowatts
• Pre-retrofit to post retrofit energy reduction: 45%
• Estimated Annual Savings:
kWh Rate (FY 2009 AVE): $1.07 Fuel Cost (FY 2009 Ave): $5.16
Comparative Comparative
Hours Per Day/ 250 Electrical Avoided Diesel Avoided Diesel
Days Per Year Savings Use (gal) Costs
Locally Estimated Use $21,070.62 1803.31 $9,305.09
4 Hours/day $13,364.30 1143.77 $5,901.87
7 Hours/day $23,387.53 2001.60 $10,328.2
10 Hours/day $33,410.75 2859.43 $14,754.6
• Total project cost for all measures: $34,500
• Simple Payback (lighting measures only, using 7 hours/day lighting use run-time): 1.48
• Total village wide in-kind contribution: $10,609.78
2
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report Interior Region – Steven’s Village
Stevens Village IRA Council Owned Buildings
Transporting lighting supplies to next
building.
4 buildings owned by the Stevens Village IRA Council received energy efficient lighting upgrades as follows:
Washeteria & Water Plant, Community Hall, Clinic & IRA Offices, Storage (Old VPSO)
• Lighting upgrades completed in March 2009
• Retrofitted 92 light fixtures with electronic ballasts & T8 lamps
• Installed 16 compact fluorescent light bulbs
• Pre-retrofit energy use for all lighting: 12.594 Kilowatts
• Post-retrofit energy use for all lighting: 6.863 Kilowatts
• Energy savings projection: 5.731 Kilowatts
• Pre-retrofit to post retrofit energy reduction: 46%
• Estimated Annual Savings:
Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided
250 Days Per Year Savings Use (gal) Diesel Costs
Locally Estimated $9,661.54 826.87 $4,266.67
4 Hours/day $6,132.17 524.82 $2,708.05
7 Hours/day $10,731.3 918.43 $4,739.10
10 Hours/day $15,330.4 1312.04 $6,770.14
3
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report Interior Region – Steven’s Village
Washeteria & Water Plant
Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 7 4-lamp electronic ballast, (3) 25 watt T8 lamps 11 4-lamp fixture (2) 2-lamp ballasts (4) 25 watt T8 19 CFL-20 W 11 CFL-23 W 2 • Pre-retrofit energy use: 6165 watts
• Post-retrofit energy use: 3161 watts
• Energy savings projection: 3004 watts
• Pre-retrofit to post retrofit energy reduction: 49%
• Estimated annual savings: Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $3,214.28 275.09 $1,419.47
7 Hours/day $5,624.99 481.41 $2,484.08
10 Hours/day $8,035.70 687.73 $3,548.68
1248 Hours/year (Est.) $4,011.42 343.31 $1,771.50
Note: Three fixtures reduced from 4-lamp to 2-lamp fixture, while eleven 4-lamp fixtures de-lamped to
operate 3-lamps each for additional savings.
Community Hall
Materials Installed Quantity 4-lamp electronic ballast, (4) 25 watt T8 lamps 14
• Pre-retrofit energy use: 2016 watts
• Post-retrofit energy use: 1260 watts
• Energy savings projection: 756 watts
• Pre-retrofit to post retrofit energy reduction: 38%
• Estimated annual savings: Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $808.92 69.23 $357.23
7 Hours/day $1,415.61 121.15 $625.15
10 Hours/day $2,022.30 173.08 $893.08
2080 Hours/year (Est.) $1,682.55 144.00 $743.04
4
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report Interior Region – Steven’s Village
Clinic & IRA Offices
Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 14 3-lamp electronic ballast, (2) 25 watt T8 lamps 7 4-lamp electronic ballast, (3) 25 watt T8 lamps 9 4-lamp electronic ballast, (4) 25 watt T8 lamps 5 CFL-11 W 3 • Pre-retrofit energy use: 3981 watts
• Post-retrofit energy use: 2166 watts
• Energy savings projection: 1815 watts
• Pre-retrofit to post retrofit energy reduction: 46%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $1,942.05 166.21 $857.64
7 Hours/day $3,398.59 290.87 $1,500.87
10 Hours/day $4,855.13 415.52 $2,144.09
2000 Hours/year (Est.) $3,884.10 332.42 $1,715.27
Note: Nine 4-lamp fixtures were de-lamped operating three lamps each for additional savings.
Storage (Old VPSO)
Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 6
• Pre-retrofit energy use: 432 watts
• Post-retrofit energy use: 276 watts
• Energy savings projection: 156 watts
• Pre-retrofit to post retrofit energy reduction: 36%
• Estimated annual savings: Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $166.92 14.29 $73.71
7 Hours/day $292.11 25.00 $129.00
10 Hours/day $417.30 35.71 $184.29
500 Hours/year (Est.) $83.46 7.14 $36.86
5
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report Interior Region – Steven’s Village
Yukon Flats School District Owned Buildings
4 buildings owned by the Yukon Flats School District received energy efficient lighting upgrades as follo ws:
Stevens Village School, School Gym, Generator Shed, Sewer Lift Station
• Lighting upgrades completed in March 2009
• Retrofitted 121 light fixtures with electronic ballasts & t8 lamps
• Installed 24 compact fluorescent light bulbs
• Installed 8 T5 linear fluorescent fixtures
• Pre-retrofit energy use for all lighting: 14.933 Kilowatts
• Post-retrofit energy use for all lighting: 8.174 Kilowatts
• Energy savings projection: 6.759 Kilowatts
• Pre-retrofit to post retrofit energy reduction: 45%
• Estimated Annual Savings:
Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided
250 Days Per Year Savings Use (gal) Diesel Costs
Locally Estimated $11,409.0 976.44 $5,038.42
4 Hours/day $7,232.13 618.96 $3,193.81
7 Hours/day $12,656.2 1083.17 $5,589.17
10 Hours/day $18,080.3 1547.39 $7,984.53
6
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report Interior Region – Steven’s Village
School
Stevens Village School
Lighting retrofits save energy while
improving light quality in classrooms,
hallways & gym.
Lighting motion sensor switch
installed in school laundry room.
Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 114 3-lamp electronic ballast, (3) 25 watt T8 lamps 1 4-lamp electronic ballast, (4) 25 watt T8 lamps 3 8-Lamp Fixture, (2) 4-Lamp electronic ballast, (6) 1 CFL-20 W 12 CFL-27 W 1
motion detector switch 1
• Pre-retrofit energy use: 10169 watts
• Post-retrofit energy use: 6005 watts
• Energy savings projection: 4164 watts
• Pre-retrofit to post retrofit energy reduction: 41%
• Estimated annual savings: Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $4,455.48 381.32 $1,967.60
7 Hours/day $7,797.09 667.31 $3,443.31
10 Hours/day $11,138.7 953.30 $4,919.01
1800 Hours/year (Est.) $8,019.86 686.37 $3,541.69
Note: One 4-lamp fixture reduced to a 2-lamp fixture and a second 4-lamp fixture reduced to a 3-lamp
fixture. for additional savings.
7
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report Interior Region – Steven’s Village
Generator Shed
Materials Installed Quantity CFL-23 W 11 • Pre-retrofit energy use: 1300 watts
• Post-retrofit energy use: 253 watts
• Energy savings projection: 1047 watts
• Pre-retrofit to post retrofit energy reduction: 81%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $1,120.29 95.88 $494.74
7 Hours/day $1,960.51 167.79 $865.79
10 Hours/day $2,800.73 239.70 $1,236.84
500 Hours/year (Est.) $560.15 47.94 $247.37
Sewer Lift Station Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 2
• Pre-retrofit energy use: 144 watts
• Post-retrofit energy use: 92 watts
• Energy savings projection: 52 watts
• Pre-retrofit to post retrofit energy reduction: 36%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $55.64 4.76 $24.57
7 Hours/day $97.37 8.33 $43.00
10 Hours/day $139.10 11.90 $61.43
500 Hours/year (Est.) $27.82 2.38 $12.29
8
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report Interior Region – Steven’s Village
School Gym
T-5 fluorescent lights installed in
school gym.
Materials Installed Quantity T5 fixture, electronic ballast, (4) 54 watt T5 HO 8
• Pre-retrofit energy use: 3320 watts
• Post-retrofit energy use: 1824 watts
• Energy savings projection: 1496 watts
• Pre-retrofit to post retrofit energy reduction: 45%
• Estimated annual savings: Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $1,600.72 137.00 $706.90
7 Hours/day $2,801.26 239.74 $1,237.08
10 Hours/day $4,001.80 342.49 $1,767.25
1750 Hours/year (Est.) $2,801.26 239.74 $1,237.08
Note: Eight (415 watt) Multi-Vapor fixtures were replaced with eight 114 watt T5 fluorescent fixtures.
ABSN T5 Fluorescent Lighting plans are designed to increase light levels throughout the space (when all fixtures are switched
on) - in comparison with previous existing light output. Existing switching controls are retained - allowing users to choose the
appropriate number of light fixtures/rows of light fixtures needed for various use patterns. In many cases building staff will
choose not to use all fixtures available, thereby achieving further electric al savings than what is shown above. ABSN T5 lighting
plans employ 54-watt, high output T5 lamps with a color-rendering index (CRI) of 85, which improves light quality. Existing light
fixtures in rural high ceiling areas typically have a CRI ranging from 30 to 70. The T5 retrofits boost CRI which greatly improves
light quality, resulting in objects appearing much closer to their true color as seen under sunlight. This increased light qu ality can
result in less light needed to illuminate a given space. As a n added advantage, building owners also appreciate the “instant-on”
function of T5 lighting compared with long wait periods for older HID fixtures to come on. With the waiting period eliminated,
building owners have indicated they are more likely to keep lighting off until needed.
9
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report Interior Region – Steven’s Village
Stevens Village - Alaska Building Science Network - T5 Lighting Upgrade Details
These retrofits were completed in April, 2009.
Stevens
Village Gym
Length
(feet)
Width
(feet)
Ceiling
Height
(feet)
Type of
Existing
Fixture
# of
Existing
Fixtures
Existing
Fixture
Wattage
Total
Existing
Wattage
Existing
Foot-
candles
New
Foot-
Candles
# of
New
Fixtures
New
fixtures
New
Fixture
Wattage
Total
New
Wattage
50 36.5 25
HPS
150
watt
160 0 8 to13
T-5
2
lamps
114 0
Color shade
of walls light
wall
height
(feet)
HPS
250
watt
260 0
T-5
3
lamps
171 0
Color shade
of floor light 20
Multi-
Vapor
400 watt
8 415 3,320 8
T-5
4
lamps
228 1824
Total Existing Watts 3,320 Total New Watts 1824
Percent Savings Pre to Post Retrofit: 45.06%
Savings & Payback Calculation for Gym: 1750 New watts / old watts
Assume 1750 hrs / year for 250 days/year of use neg 1 (New watts / Old watts x 100 - 100) / 100
Full cost of electricity: $1.07 /kWh
Watts of existing lighting: 3,320
New wattage for T5 fixtures: 1,824
Calculation: (Watts) x (hrs/year) / (1000w/kw) x (cost of electricity) = (cost / year)
Existing Cost: $6,217
Retrofitted Cost: $3,415 T5 Materials costs $ 1,639.12
Annual Savings: $ $2,801 T5 shipping costs $ 138.53
Material & shipping cost of Gym retrofit: $ 1,777.65
Simple Payback: Materials cost / annual savings = .63 years (for retrofit to pay for itself in materials)
10
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’08-’10 Final Report Interior Region – Steven’s Village
Stevens Village, In-Kind Contribution Tracking Record - ABSN Energy Efficiency Projects:
In-Kind Item Dates
Hours
Contri-
buted
Hourly
Wage
Value /
Amount Notes
Staff time for project contact,
intro & review intro materials 2.0 $20.00 $ 40.00 Number of entities x 1 hour each
Staff time for Attending
teleconference (TC/IRA) 2.0 $20.00 $ 40.00
list # of staff $15/hr is an average
wage designated for village entity
staff
Staff time for Attending
teleconference (School) 1.0 $20.00 $ 20.00 "
Maint. Staff time to accompany
Field Manager on building
assessments - 1st site visit
12/2,
12/3,
12/4/08
8.0 $15.00 $ 120.00
YFSD maintenance worker
William Tritt assisted with
assessments of school and IRA
Council buildings.
Conservative village office
administrative percentage of total
project cost less ABSN Admin %.
Total project cost = $34,500/village -
(our admin percentage , (around 12%)
Approx: $4,200) = $30,300 x 5.5% =
$1,666 (this 5.5% village admin cost
estimate is spread across all entities
we work with for the course of the
grant for completing all energy
efficiency measures. These are
primarily for cumulative, otherwise
unaccounted time expense for village-
based project support.
Feb, '07
through $1,666.00
Each time we call, email, or fax a village
entity, someone has to receive the
communication, review and/or forward
the information, follow-up on requests,
etc. Whether it is to set-up a
teleconference, verify maintenance staff
participation in lighting or boiler trainings,
set-up in-kind lodging and transportation,
lighting trainings, track a shipment, verify
completion of lighting in a given building,
ship lamps and ballasts out of the village,
request a labor reimbursement
agreement, or invoice etc. Village
expenses for phone charges, copying
and fax costs, office supplies, etc. are
part of this amount.
Lodging for ABSN Field
Managers - 1st site visit
12/2-
12/4/08 3.0 $100 FM stay at school-4days @
$25/day
Transportation and fuel costs -
1st assessment site-visit 12/2-4/08 3.0 $200 YFSD William Tritt -4 days @
$50/day.
Lodging for ABSN Field
Managers - 2nd site visit
3/9-
3/13/2009 4.0 $100 FM stay at school-4days @
$25/day
Transportation and fuel costs
during 2nd Site-visit $200 YFSD William Tritt -school truck
4 days @ $50/day.
Mr. Pritchard School T5 Work $1,200.00 YFSD providing electrician
Mr. Pritchard T5 Air Ticket $ 226.00 YFSD providing electrician
Troy Simon T5 Work $ 551.39
Andrew Brattrud T5 Work $ 952.00
Workman's Comp $2,929.39 Employer expense
Troy Simon's Hours working
on school classroom and
hallway retrofits
49.0 $15 $ 735.00 YFSD is providing maintenance
labor In-kind-contact
William Tritt's hours working
on school classroom and
hallway retrofits
51.5 $15 $ 772.50 YFSD is providing maintenance
labor In-kind-contact
Andrew Brattrud hours working
on school classroom and
hallway retrofits
50.5 $15 $ 757.50 YFSD is providing maintenance
labor In-kind-contact
TOTAL $10,609.78
The capacity of ABSN’s scope of work was greatly increased by the response of local communities to work in partnership with
ABSN and provide in-kind services of project coordination, paid labor for lighting retrofits, transportation and lodging for ABSN
field staff, and other valuable contributions. This allowed ABSN and the community of Steven’s Village to deliver 31% more
energy savings measures beyond the original grant funding.