HomeMy WebLinkAboutPedro Bay Final Report Village End Use Effic Measures 2008 Village End Use Energy Efficiency Measures Program
AEA Grant # 2195225 Administered by Alaska Building Science Network
Pedro Bay Final Report
Community Summary
5 community buildings and 3 teacher housing units received energy efficiency upgrades as follows:
PHOB Tribal Building, Lodge / Rental, Shop / Butler Building, Church, School Gym
Retrofits Completed: October 2008 – December 2008
Village-Wide Lighting Retrofit Summary:
• Installed 142 compact fluorescent light bulbs
• Retrofitted 81 light fixtures with electronic ballasts & T8 lamps
• Installed 15 T5 linear fluorescent fixtures in the School Gym
• Pre-retrofit energy use for all lighting: 19.756 Kilowatts
• Post-retrofit energy use for all lighting: 9.335 Kilowatts
• Energy savings projection: 10.421 Kilowatts
• Pre-retrofit to post retrofit energy reduction: 53%
• Estimated Annual Savings:
kWh Rate (as of 10/01/08): $0.91 Fuel Cost (FY 2007 Ave): $4.05
Comparative Comparative
Hours Per Day/ Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $9,483.11 755.69 $3,060.55
7 Hours/day $16,595.4 1322.46 $5,355.97
10 Hours/day $23,707.7 1889.23 $7,651.39
• Total project cost for all measures: $ 37,775
• Simple Payback (lighting measures only, using 7 hours/day lighting use run-time): 2.28 years
• Total village wide in-kind contribution: $ 6,764.92 (extended grant capacity by 17.9 %)
Additional Energy Efficiency Measures:
PHOB Tribal Building - attic air sealing and insulation measure
One programmable thermostat installed in PHOB Tribal building.
2
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report NW/SW Region – Pedro Bay
Pedro Bay Village Council Owned Buildings
3 buildings owned by the Pedro Bay Village Council received energy efficient lighting upgrades as follows :
PHOB Tribal Building, Lodge / Rental, Shop / Butler Building
• Lighting upgrades completed in December 2008
• Retrofitted 77 light fixtures with electronic ballasts & T8 lamps
• Installed 112 compact fluorescent light bulbs
• Pre-retrofit energy use for all lighting: 13.836 Kilowatts
• Post-retrofit energy use for all lighting: 6.889 Kilowatts
• Energy savings projection: 6.947 Kilowatts
• Pre-retrofit to post retrofit energy reduction: 50%
• Estimated Annual Savings:
Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided
250 Days Per Year Savings Use (gal) Diesel Costs
4 Hours/day $6,321.77 503.77 $2,040.27
7 Hours/day $11,063.1 881.60 $3,570.48
10 Hours/day $15,804.4 1259.43 $5,100.68
3
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report NW/SW Region – Pedro Bay
PHOB Tribal Building
Lighting retrofits save energy while improving light levels in hallways and office spaces for a better working environment.
Materials Installed Quantity
2-lamp electronic ballast, (2) 25 watt T8 lamps 30 2-lamp electronic ballast, (2) 32 watt T8 lamps 7 4-lamp fixture (2) 2-lamp ballasts (4) 25 watt T8 24 CFL-11 W 4 CFL-14 W 15 CFL-27 W 4 CFL-9 W 16 • Pre-retrofit energy use: 8328 watts
• Post-retrofit energy use: 4544 watts
• Energy savings projection: 3784 watts
• Pre-retrofit to post retrofit energy reduction: 45%
• Estimated annual savings: Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
2000 Hours/year (Est.) $6,886.88 548.80 $2,222.65
4 Hours/day $3,443.44 274.40 $1,111.33
7 Hours/day $6,026.02 480.20 $1,944.82
10 Hours/day $8,608.60 686.00 $2,778.32
Kiska Shugak and Gillie Reeb install compact fluorescent light bulbs and retrofit fluorescent
fixtures with energy efficient electronic ballasts and T-8 lamps.
4
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report NW/SW Region – Pedro Bay
PHOB Tribal Building – Attic Air Sealing Measure
Air sealing: Caulking was used on ceiling penetrations to prevent air leakage
(heat loss) and transfer of moisture into the attic space.
PHOB Tribal Building Building attic: 28’ x 60’ (1680 sq. ft. plus an additional 300 sq. ft. for eve insulation).
Existing insulation consisted of R30 fiberglass bats laid over ceiling joists on 24” inch centers.
Materials provided: 26 bales of R30 fiberglass insulation 24” x 48” bats (80 sq ft per bale), tyvek suits, dust/P100
particle respirators, 12 tubes of siliconized, paintable caulking and caulking guns.
Existing layer of R30 insulation bats were laid
perpendicular to truss members – allowing
large voids between ceiling and insulation bats
Existing layer of R30 – reinstalled
parallel with truss members with
carefully adjusted, tight seams
Work Completed:
Before installing insulation bats, a local maintenance crew air sealed by caulking around ceiling pe netrations
wherever possible. Existing layer of R30 insulation was laid perpendicular to truss members which maintained
large voids between sheet rocked ceiling and insulation bats, thus diminishing insulation R value. After a brief
training on insulation safety and installation procedures, local maintenance staff removed existing layer of R30
insulation and re-laid it parallel with truss members.
Pedro Bay Village Council maint. staff
David Sanner works on insulation retrofit New layer of R30 insulation installed carefully over existing layer of R30
5
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report NW/SW Region – Pedro Bay
PHOB Tribal Building – Attic Insulation Measure (Cont’d)
The local crew then installed the new layer of R30 insulation bats perpendicular to the 1 st layer to bridge seams
between insulation bats. This double layer method will add to thermal retention by reducing heat transfer through
seams of existing insulation. Attic insulation R-value doubled from R30 to R60. Air sealing the attic and correctly
installing greater levels of insulation will substantially reduce heat loss for the PHOB building. From recent
AKWarm runs, at fuel prices of at least $6.00 / gallon which was current for the fall of 2008, payback on air sealing
and adding attic insulation would come in at 2 to 4 years.
Completed installation – two layers of
R30 fiberglass insulation
R60 insulation custom-cut and
taped to attic access cover.
Insulation covered access hatch will fit snuggly
into insulation field forming a uniform R60 layer.
Attic access hatch sealed closed to prevent
air leakage and heat transfer into attic space.
R3.2 per inch x 18”
yields a total of ~ R60
The following section details insulation measure procedures for adding fiberglass bats. This is excerpt from
ABSN’s: Attic Insulation and Air Sealing Procedure and Release Form which is read and signed by each village
maint staff person working with fiberglass bat insulation measures.
_________________________________________________________________________________________
Safety Protocols:
ABSN provides the following safety equipment which shall be worn by each worker involved in installing attic
insulation:
Respirator face masks with nose/mouth, flexible rubber seal and P-100 particle filter cartridges.
Wrap-around safety goggles for full eye protection from exposure to fiberglass fibers.
Tyvek suits with hoods.
Gloves (cloth and rubber).
6
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report NW/SW Region – Pedro Bay
Quality Control Rules of Thumb:
Spray foam, and/or caulking for air-seal around electrical boxes, wiring and other ceiling penetrations will
be done wherever possible - before installing insulation. Appropriate color, quantity and placement of
caulking will be applied to result in a professional seal and finish.
Insulation will make light contact with ceiling (not roof).
A 2" - 3" gap, of air space will be allowed between insulation and roof - especially at eve for proper
ventilation and cooling of roof.
Insulation will not be compressed, and will be worked to allow full expansion of its loft.
There will be no gaps between bats of insulation or between insulation and framing members.
There will be no surface level changes among same R-value bats of insulation,
Insulation will be cut and worked to fit snugly around framing members.
Insulation will be cut and worked to fit around electrical wiring, cable an d vacuum lines - and to make light
contact with ceiling sheet rock and vapor barrier.
Insulation level will be continuous across attic access hatch. This will be accomplished by taping bats of
insulation on the hatch-cover without compressing insulation.
Access hatches will be caulked shut for air sealing.
These rules of thumb are important, because a sloppy insulation job that results in 3% voids or gaps
between fiberglass bats looses 30% of its insulation capacity! For example R -30 can end up R-20 or less if
care is not taken for quality installation.
_________________________________________________________________________________________
Pedro Bay Council Tribal Administrator John Balke in March 2009:
"It seems like the heater is coming on a lot less, and it seems warmer in here during the cold spells. I can't
imagine that it wouldn't help, knowing what we had in there and knowing what we have now.”
Pedro Bay Village Council Maintenance Crew:
Kiska Shugak, David Sanner, Allen Wasuli,
Pedro Bay Village Council
Maintenance Crew Mascot
Our mascot knew the value
of good insulation
7
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report NW/SW Region – Pedro Bay
Lodge / Rental
Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 3 2-lamp electronic ballast, (2) 32 watt T8 lamps 3 CFL-11 W 10 CFL-14 W 18 CFL-20 W 14 CFL-27 W 5 • Pre-retrofit energy use: 3179 watts
• Post-retrofit energy use: 1098 watts
• Energy savings projection: 2081 watts
• Pre-retrofit to post retrofit energy reduction: 65%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
4 Hours/day $1,893.71 150.91 $611.17
7 Hours/day $3,313.99 264.09 $1,069.55
10 Hours/day $4,734.28 377.27 $1,527.93
Shop / Butler Building
Materials Installed Quantity 3-lamp electronic ballast, (2) 32 watt T8 lamps 6 4-lamp fixture 2, 3-lamp ballasts & (4) 32 watt T8 4 • Pre-retrofit energy use: 1084 watts
• Post-retrofit energy use: 910 watts
• Energy savings projection: 174 watts
• Pre-retrofit to post retrofit energy reduction: 16%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
1200 Hours/year (Est.) $190.01 15.14 $61.32
4 Hours/day $158.34 12.62 $51.10
7 Hours/day $277.10 22.08 $89.43
10 Hours/day $395.85 31.54 $127.76
8
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report NW/SW Region – Pedro Bay
New Church
9 -watt compact fluorescent light bulbs
replace 15-watt incandescent lights.
Materials Installed Quantity
CFL-14 W 17 CFL-27 W 1 CFL-9 W 8 • Pre-retrofit energy use: 1245 watts
• Post-retrofit energy use: 337 watts
• Energy savings projection: 908 watts
• Pre-retrofit to post retrofit energy reduction: 73%
• Estimated annual savings: Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
900 Hours/year (Est.) $743.65 59.26 $240.00
4 Hours/day $826.28 65.84 $266.67
7 Hours/day $1,445.99 115.23 $466.68
10 Hours/day $2,065.70 164.61 $666.68
Notes: The church in Pedro Bay was maintained through volunteer labor with no maintenance funds coming from
outside the community. This is the criteria used to determine if a church qualifies for energy upgrad es to
community buildings.
9
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report NW/SW Region – Pedro Bay
Lake & Peninsula Borough School Owned Buildings
1 building and 3 teacher housing units owned by the Lake & Peninsula Borough School District received energy
efficient lighting upgrades as follows:
Dena'ina School Gym, Teacher Housing #1, Teacher Housing #3, Interim Teacher Housing
• Lighting upgrades completed in November 2008
• Retrofitted 4 light fixtures with electronic ballasts & T8 lamps
• Installed 30 compact fluorescent light bulbs
• Installed 15 T5 linear fluorescent fixtures
• Pre-retrofit energy use for all lighting: 5.92 Kilowatts
• Post-retrofit energy use for all lighting: 2.446 Kilowatts
• Energy savings projection: 3.474 Kilowatts
• Pre-retrofit to post retrofit energy reduction: 59%
• Estimated Annual Savings:
Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided
250 Days Per Year Savings Use (gal) Diesel Costs
Locally Estimated $5,062.24 403.40 $1,633.77
4 Hours/day $3,161.34 251.92 $1,020.28
7 Hours/day $5,532.35 440.86 $1,785.49
10 Hours/day $7,903.35 629.80 $2,550.71
10
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report NW/SW Region – Pedro Bay
Interim Teacher Housing (Middle)
Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 2 CFL-14 W 4 CFL-20 W 2
• Pre-retrofit energy use: 516 watts
• Post-retrofit energy use: 190 watts
• Energy savings projection: 326 watts
• Pre-retrofit to post retrofit energy reduction: 63%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
900 Hours/year (Est.) $266.99 21.28 $86.17
4 Hours/day $296.66 23.64 $95.74
7 Hours/day $519.16 41.37 $167.55
10 Hours/day $741.65 59.10 $239.36
Teacher Housing #1
Compact fluorescent light bulbs are a great strategy for reducing wattage use in teacher housing units.
Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 1 CFL-11 W 5 CFL-20 W 2 CFL-23 W 1 CFL-27 W 4
• Pre-retrofit energy use: 752 watts
• Post-retrofit energy use: 273 watts
• Energy savings projection: 479 watts
• Pre-retrofit to post retrofit energy reduction: 64%
• Estimated annual savings: Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
1500 Hours/year (Est.) $653.84 52.10 $211.02
4 Hours/day $435.89 34.74 $140.68
7 Hours/day $762.81 60.79 $246.19
10 Hours/day $1,089.73 86.84 $351.70
11
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report NW/SW Region – Pedro Bay
Teacher Housing #3
Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 1 CFL-11 W 5 CFL-20 W 2 CFL-23 W 1 CFL-27 W 4 • Pre-retrofit energy use: 752 watts
• Post-retrofit energy use: 273 watts
• Energy savings projection: 479 watts
• Pre-retrofit to post retrofit energy reduction: 64%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
1500 Hours/year (Est.) $653.84 52.10 $211.02
4 Hours/day $435.89 34.74 $140.68
7 Hours/day $762.81 60.79 $246.19
10 Hours/day $1,089.73 86.84 $351.70
School Gym
T-5 lighting upgrades save energy and increase light levels in gymnasium. For additional savings Pedro Bay L&PSD staff
generally switch on only half the T5 light fixtures, reducing energy use beyond the reported 56%.
Materials Installed Quantity T5 fixture, electronic ballast, (2) 54 watt T5 HO 15
• Pre-retrofit energy use: 3900 watts
• Post-retrofit energy use: 1710 watts
• Energy savings projection: 2190 watts
• Pre-retrofit to post retrofit energy reduction: 56%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
1750 Hours/year (Est.) $3,487.58 277.92 $1,125.57
4 Hours/day $1,992.90 158.81 $643.18
7 Hours/day $3,487.58 277.92 $1,125.57
10 Hours/day $4,982.25 397.03 $1,607.96
Pedro Bay - Alaska Building Science Network - T5 Lighting Upgrade Details
These retrofits were completed in January 2008.
Pedro Bay
Gym
Length
(feet)
Width
(feet)
Ceiling
Height
(feet)
Type of
Existing
Fixture
# of
Existing
Fixtures
Existing
Fixture
Wattage
Total
Existing
Wattage
Existing
Foot-
candles
New
Foot-
Candles
# of
New
Fixtures
New
fixtures
New
Fixture
Wattage
Total
New
Wattage
64 45.5 21
HPS
150
watt
160 0 38 15
T-5
2
lamps
114 1710
Color shade of
walls
HPS
250
watt
15 260 3,900
T-5
3
lamps
171 0
Color shade of
floor
Multi-
Vapor
400 watt
415 0
T-5
4
lamps
228 0
Total Existing
Watts 3,900 Total New Watts 1710
Percent Savings Pre to Post Retrofit: 56.15%
Savings & Payback Calculation for Gym: 1750 New watts / old watts
Assume 1750 hrs / year for 250 days/year of use neg 1 (New watts / Old watts x 100 - 100) / 100
Full cost of electricity: $ 0.91 /kWh # Lamps Lumins/
lamp
Total
Lumins
Av. Foot-
candles
Watts of existing lighting: 3,900 30 5000 150000 30
New wattage for T5 fixtures: 1,710 38 5000 190000 38.01
Calculation: (Watts) x (hrs/year) / (1000w/kw) x (cost of electricity) = (cost / year) 40000
Existing Cost: $6,211 26.7% of 150,000 lumins 40050
Retrofitted Cost: $2,723 T5 Materials costs $ 2,654 8.01
Annual Savings: $3,488 T5 shipping costs $ 300
Material & shipping cost of Gym retrofit: $2,954
Simple Payback: Materials cost / annual savings = 0.85 years (for retrofit to pay for itself in materials)
Pedro Bay, In-Kind Contribution Tracking Record - ABSN Energy Efficiency Projects:
In-Kind Item Dates
Hours
Contri
-buted
Hourly
Wage
Value /
Amount Notes
Staff time for project contact,
introduction, and review of intro
materials (Number of entities x 1
hour each)
fall '07 2 $15.00 $ 30.00 list number of entities
Staff time for Attending
teleconference (TC/IRA)
8/24/2
007 4 $15.00 $ 60.00
list # of staff and wages if possible
($15/hr is an average wage designated
for village entity staff).
Conservative village office
administrative percentage of
total project cost less ABSN
Admin %. Total project cost =
$37,775/village - (our admin
percentage , (around 12%)
Approx: $4,533) = $33,242 x
5.5% = $1,828 (this 5.5% village
admin cost estimate is spread
across all entities we work with
for the course of the grant for
completing all energy efficiency
measures. These are primarily
for cumulative, otherwise
unaccounted time expense for
village- based project support.
Feb,
'07
throug
h end
of
grant
work
$1,828.00
Each time we call, email, or fax a
village entity, someone has to receive
the communication, review and/or
forward the information, follow-up on
requests, etc. Whether it is to set-up a
teleconference, verify maintenance
staff participation in lighting or boiler
trainings, set-up in-kind lodging and
transportation, lighting trainings, track
a shipment, verify completion of
lighting in a given building, ship lamps
and ballasts out of the village, request
a labor reimbursement agreement, or
invoice etc, etc. Village expenses for
phone charges, copying and fax costs,
office supplies, etc are part of this
amount.
School T5s, etc . . 12-07
& 1-08 $4,666.92
Vince's 1-25-08 email: 60 man/hours @
$35.00/hr = $2100.00
$140.00 per diem
$1200.00 travel
$500.00 shipping (King Salmon to Pedro
Bay)
$200.00 misc parts
$526.92 replaced 3 of the 7 fixtures lost.
Teacher Housing lighting - local
Lake and Pen SD labor hours
12-07
& 1-08 10 18 $ 180.00 Estimate 10 hours x $18/hr
TOTAL $6,764.92