HomeMy WebLinkAboutStony River Final Report Village End Use Effic Measures 2008 Village End Use Energy Efficiency Measures Program
AEA Grant # 2195234 Administered by Alaska Building Science Network
Stony River Final Report
Community Summary
6 community buildings received energy efficiency upgrades as follows:
Village Office, Stony River Inn – Summer Rental, Church, Main School Bldg, Generator Room, School Gym
Retrofits Completed: October 2007 – December 2008
Village-Wide Lighting Retrofit Summary:
• Retrofitted 105 light fixtures with electronic ballasts & T8 lamps
• Installed 49 compact fluorescent light bulbs
• Installed 21 T5 linear fluorescent fixtures in the School Gym
• Pre-retrofit energy use for all lighting: 19.142 Kilowatts
• Post-retrofit energy use for all lighting: 10.119 Kilowatts
• Energy savings projection: 9.023 Kilowatts
• Pre-retrofit to post retrofit energy reduction: 47%
• Estimated Annual Savings:
kWh Rate (as of 11/19/08): $0.85 Fuel Cost (FY 2007 Ave): $3.15
Comparative Comparative
Hours Per Day/ Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
Locally Estimated $12,487.94 1829.91 $5,764.23
4 Hours/day $7,660.53 1122.53 $3,535.97
7 Hours/day $13,405.90 1964.43 $6,187.95
10 Hours/day $19,151.30 2806.33 $8,839.93
• Total project cost for all measures: $ 37,775
• Simple Payback (lighting measures only, using 7 hours/day lighting use run-time): 2.82 years
• Total village wide in-kind contribution: $7,873.00 (extended grant capacity by 20.8%)
2
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report West Region – Stony River
Stony River Traditional Council Owned Buildings
2 buildings owned by the Stony River Traditional Council received energy efficient lighting upgrades as follows:
Village Office, Stony River Inn – Summer Rental
• Lighting upgrades completed in Oct 2007
• Retrofitted 11 light fixtures with electronic ballasts & T8 lamps
• Installed 44 compact fluorescent light bulbs
• Pre-retrofit energy use for all lighting: 3.994 Kilowatts
• Post-retrofit energy use for all lighting: 1.349 Kilowatts
• Energy savings projection: 2.645 Kilowatts
• Pre-retrofit to post retrofit energy reduction: 66%
• Estimated Annual Savings:
Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided
250 Days Per Year Savings Use (gal) Diesel Costs
Locally Estimated $3,069.81 449.83 $1,416.98
4 Hours/day $2,245.61 329.06 $1,036.53
7 Hours/day $3,929.81 575.85 $1,813.93
10 Hours/day $5,614.01 822.65 $2,591.33
3
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report West Region – Stony River
Village Office
Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 1 CFL-14 W 19 CFL-20 W 6 CFL-23 W 8 • Pre-retrofit energy use: 2154 watts
• Post-retrofit energy use: 617 watts
• Energy savings projection: 1537 watts
• Pre-retrofit to post retrofit energy reduction: 71%
• Estimated annual savings: Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs 1800 Hours/year (Est.) $2,348.84 344.19 $1,084.19
4 Hours/day $1,304.91 191.21 $602.33
7 Hours/day $2,283.60 334.63 $1,054.07
10 Hours/day $3,262.28 478.04 $1,505.82
Stony River Inn - Summer Rental
Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 10 CFL-20 W 4 CFL-27 W 2 • Pre-retrofit energy use: 1340 watts
• Post-retrofit energy use: 604 watts
• Energy savings projection: 736 watts
• Pre-retrofit to post retrofit energy reduction: 55%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs 800 Hours/year (Est.) $499.89 73.25 $230.74
4 Hours/day $624.86 91.56 $288.43
7 Hours/day $1,093.51 160.24 $504.75
10 Hours/day $1,562.16 228.91 $721.07
4
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report West Region – Stony River
Church
Materials Installed Quantity CFL-20 W 1 CFL-27 W 4 • Pre-retrofit energy use: 500 watts
• Post-retrofit energy use: 128 watts
• Energy savings projection: 372 watts
• Pre-retrofit to post retrofit energy reduction: 74%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs
700 Hours/year (Est.) $221.08 32.40 $102.05
4 Hours/day $315.83 46.28 $145.78
7 Hours/day $552.70 80.99 $255.12
10 Hours/day $789.57 115.70 $364.45
5
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report West Region – Stony River
Kuspuk School District Owned Buildings
3 buildings owned by the Kuspuk School District received energy efficient lighting upgrades as follows:
Main School Bldg, Generator Room, School Gym
• Lighting upgrades completed in October 2007 & December 2008
• Retrofitted 94 light fixtures with electronic ballasts & T8 lamps
• Installed 5 compact fluorescent light bulbs
• Installed 21 T5 linear fluorescent fixtures
• Pre-retrofit energy use for all lighting: 15.148 Kilowatts
• Post-retrofit energy use for all lighting: 8.77 Kilowatts
• Energy savings projection: 6.378 Kilowatts
• Pre-retrofit to post retrofit energy reduction: 42%
• Estimated Annual Savings:
Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided
250 Days Per Year Savings Use (gal) Diesel Costs
Locally Estimated $9,418.13 1,380.08 $4,347.25
4 Hours/day $5,414.92 793.47 $2,499.44
7 Hours/day $9,476.11 1,388.58 $4,374.02
10 Hours/day $13,537.3 1,983.68 $6,248.59
6
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report West Region – Stony River
Main School Bldg
School maintenance
worker retrofits a fixture.
Electronic ballast and T-8, 25 watt lighting retrofits save
energy while improving light levels in school classrooms
and hallways for a better learning environment.
Materials Installed Quantity 2-lamp electronic ballast, (2) 25 watt T8 lamps 29 2-lamp electronic ballast, (2) 32 watt T8 lamps 10 3-lamp fixture, (2) 2-lamp electronic ballasts (3) 25 53
CFL-27 W 1
• Pre-retrofit energy use: 9540 watts
• Post-retrofit energy use: 5806 watts
• Energy savings projection: 3734 watts
• Pre-retrofit to post retrofit energy reduction: 39%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs 1800 Hours/year (Est.) $5,706.30 836.17 $2,633.93
4 Hours/day $3,170.17 464.54 $1,463.30
7 Hours/day $5,547.79 812.94 $2,560.77
10 Hours/day $7,925.42 1161.35 $3,658.24
Generator Room
Materials Installed Quantity 2-lamp electronic ballast, (2) 32 watt T8 lamps 2 CFL-27 W 4
• Pre-retrofit energy use: 568 watts
• Post-retrofit energy use: 228 watts
• Energy savings projection: 340 watts
• Pre-retrofit to post retrofit energy reduction: 60%
• Estimated annual savings: Comparative Comparative
Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs 1000 Hours/year (Est.) $288.66 42.30 $133.24
4 Hours/day $288.66 42.30 $133.24
7 Hours/day $505.16 74.02 $233.17
10 Hours/day $721.65 105.75 $333.10
7
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’07-’08 Final Report West Region – Stony River
School Gym
T-5 fixtures save energy while
improving light levels in large spaces.
Materials Installed Quantity
T5 fixture, electronic ballast, (2) 54 watt T5 HO 15 T5 fixture, electronic ballast, (3) 54 watt T5 HO 6
• Pre-retrofit energ y use: 5040 watts
• Post-retrofit energy use: 2736 watts
• Energy savings projection: 2304 watts
• Pre-retrofit to post retrofit energy reduction: 46%
• Estimated annual savings: Comparative Comparative Hours Per Day / Electrical Avoided Diesel Avoided Diesel
250 Days Per Year Savings Use (gal) Costs 1750 Hours/year (Est.) $3,423.17 501.61 $1,580.08
4 Hours/day $1,956.10 286.64 $902.90
7 Hours/day $3,423.17 501.61 $1,580.08
10 Hours/day $4,890.24 716.59 $2,257.25
Stony River - Alaska Building Science Network - T5 Lighting Upgrade Details
These retrofits were completed in Dec, 2008.
School
Gym
Length
(feet)
Width
(feet)
Ceiling
Height
(feet)
Type of
Existing
Fixture
# of
Existing
Fixtures
Existing
Fixture
Wattage
Total
Existing
Wattage
Existing
Foot-
candles
New
Foot-
Candles
# of
New
Fixtures
New
fixtures
New
Fixture
Wattage
Total
New
Wattage
56 39 low 16'
high 24'
HPS
150
watt
160 0 15
T-5
2
lamps
114 1710
HPS
250
watt
260 0 6
T-5
3
lamps
171 1026
Other
School
Gym
(A)
40 126 5,040
T-5
6
lamps
342 0
Other
School
Gym
(B)
0
Other
fixtures
(A)
0
Total Existing Watts 5,040 Total New Watts 2,736
Percent Savings Pre to Post Retrofit: 45.71%
Savings & Payback Calculation for Gym: 1750 New watts / old watts
Assume 1750 hrs / year for 250 days/year of use
Full cost of electricity: $0.85 /kWh
Watts of existing lighting: 5,040
New wattage for T5 fixtures: 2,736
Calculation: (Watts) x (hrs/year) / (1000w/kw) x (cost of electricity) = (cost / year)
Existing Cost: $7,488
Retrofitted Cost: $4,065 T5 Materials costs $ 3,585
Annual Savings: $3,423 T5 shipping costs $ 540
Material & shipping cost of Gym retrofit: $4,125
Simple Payback: Materials cost / annual savings 1.21 years (for retrofit to pay for itself in materials)
Stony River, In-Kind Contribution Tracking Record - ABSN Energy Efficiency Projects:
In-Kind Item Dates
Hours
Contri-
buted
Hourly
Wage
Value /
Amount Notes
Staff time for project contact,
introduction, and review of intro
materials (Number of entities x 1
hour each)
3 $15.00 $45.00 list number of entities
Staff time for Attending
teleconference (TC/IRA) 1 $15.00 $15.00
list # of staff and wages if possible
($15/hr is an average wage designated
for village entity staff).
Staff time for Attending
teleconference (School) 1 $15.00 $15.00 "
Conservative village office
administrative percentage of total
project cost less ABSN Admin %.
Total project cost = $37,775/village -
(our admin percentage , (around 12%)
Approx: $4,533) = $33,242 x 5.5% =
$1,828 (this 5.5% village admin cost
estimate is spread across all entities
we work with for the course of the
grant for completing all energy
efficiency measures. These are
primarily for cumulative, otherwise
unaccounted time expense for village-
based project support.
Feb,
'07
through
$1,828.00
Each time we call, email, or fax a village
entity, someone has to receive the
communication, review and/or forward the
information, follow-up on requests, etc.
Whether it is to set-up a teleconference,
verify maintenance staff participation in
lighting or boiler trainings, set-up in-kind
lodging and transportation, lighting trainings,
track a shipment, verify completion of
lighting in a given building, ship lamps and
ballasts out of the village, request a labor
reimbursement agreement, or invoice etc,
etc. Village expenses for phone charges,
copying and fax costs, office supplies, etc
are part of this amount.
Lodging for ABSN Field
Managers - 1st assessment
site visit
3-29
through
3-30-
07
$120.00
Transportation and fuel costs -
1st assessment site-visit
3-29
through
3-30-
08
Lodging for ABSN Field
Managers - 2nd site visit
10-8
through
10-10-
07
$180.00
Transportation and fuel costs
during 2nd Site-visit
10-8
through
10-10-
07
$135.00
KSD cert. electrician maint
labor for T5 retrofits $4,500.00
Comparable estimate - In-kind labor,
provided by school district - includes
airfare & per diem and lodging.
Kuspuk SD maint labor for T8
and cfl retrofits in school
facilities
Oct '07 69 $15.00 $1,035.00
Our tally sheet labor estimate for
retrofitting 94 linear fluorescent and
5 cfl light fixtures is 69 hours @
$15/hr
TOTAL $7,873.00