HomeMy WebLinkAboutBuckland Village End Use Energy Efficiency Measures Grant 2195225 2006Village End Use Energy Efficiency Measures Program ’05 – ’06
AEA Grant # 2195225 Administered by Alaska Building Science Network
Buckland Final Report
Community Summary
8 Community buildings and 12 teacher housing units received energy efficiency
upgrades October ’06 - June ’07
City Building, City Shop, Community Building, Washeteria, City Bunk House, IRA Office, IRA
Store, Buckland School gym, 12 Teacher Housing Units
Village-Wide Lighting Retrofit Summary:
• Retrofitted 180 light fixtures village-wide with electronic ballasts and T8 lamps
• Installed: 137 compact fluorescent light bulbs village-wide
• T5 Light fixtures were installed in School Gym
• Pre-retrofit energy use for all lighting: 44,377 watts
• Post-retrofit energy use for all lighting: 23,833 watts
• Energy savings projection: 20,544 watts (20.54 kW)
• Pre-retrofit to post retrofit energy reduction: 46 %
• Estimated Annual Savings:
Hours Per Day / 250
Days Per Year
Electrical
Savings
Avoided Diesel
Use
Avoided
Diesel Costs
4 Hours $8,834 1,438 Gallons $3,508
7 Hours $15,459 2,516 Gallons $6,139
10 Hours $22,085 3,594 Gallons $8,770
• Total project cost for village lighting: $ 38,235
• Simple mean payback*: 2.47 Years
• Total village wide in-kind contribution: $ 9,466.50
*(Payback figured on total grant funds, using lighting savings only – based on 250 days/yr & 7 hrs/day).
Additional Energy Efficiency Measures:
(Budget Expense: $8,714 – splits expense for Selawik School heating system retofit).
• Boiler training for 4 local maintenance staff
• Cleaning and energy efficiency tuning for City community building boiler
• Outdoor temp boiler controls installed for community building boiler system
• Programmable thermostats installed in 4 locations
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’05-‘06 Final Report – NW/SW Regions – Buckland
2
Buckland City Owned Buildings
Energy efficient lighting upgrades were completed in five buildings owned by the City of
Buckland
City Owned Buildings - Lighting Retrofit Summary:
• Lighting upgrades completed in October, 2006
• Retrofitted 77 linear fluorescent fixtures with T8 lamps and electronic ballasts
• Installed: 13 compact fluorescent light bulbs
• Pre-retrofit energy use for all lighting: 11,602 watts
• Post-retrofit energy use for all lighting: 8,317 watts
• Energy savings projection: 3,285 watts (3.29 kW)
• Pre-retrofit to post retrofit energy reduction: 28 %
• Estimated Annual Savings:
Hours Per Day / 250
Days Per Year
Electrical
Savings
Avoided Diesel
Use
Avoided
Diesel Costs
4 Hours $1,413 230 Gallons $561
7 Hours $2,472 402 Gallons $982
10 Hours $3,531 575 Gallons $1,402
City Building
Buckland City Offices Village Maintenance Staff Retrofitting T8
fixtures
Materials Installed
2-Lamp
Ballasts
32w
lamps
4-Lamp
Ballasts
32w
lamps
2-Lamp
Ballasts
25w
lamps
2-Lamp
Fixtures
3-lamp
ballasts
25w
lamps
4-Lamp
Fixtures
3-lamp
ballasts
25w
lamps
4-Lamp
Ballasts
25w
lamps
13w
CFL
20w
CFL
25w
CFL
City Offices 2 23 0 0 0 0 1 0 0
• Pre-retrofit energy use: 3,996 watts
• Post-retrofit energy use: 2,893 watts
• Energy savings projection: 1,103 watts (1.10 Kw)
• Pre-retrofit to post retrofit energy reduction: 28 %
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’05-‘06 Final Report – NW/SW Regions – Buckland
3
• Estimated Annual Savings:
Hours Per Day / 250
Days Per Year
Electrical
Savings
Avoided Diesel
Use
Avoided
Diesel Costs
4 Hours $474 77 Gallons $188
7 Hours $830 135 Gallons $330
10 Hours $1,186 193 Gallons $471
City Shop
Materials Installed
2-Lamp
Ballasts
32w
lamps
4-Lamp
Ballasts
32w
lamps
2-Lamp
Ballasts
25w
lamps
2-Lamp
Fixtures
3-lamp
ballasts
25w
lamps
4-Lamp
Fixtures
3-lamp
ballasts
25w
lamps
4-Lamp
Ballasts
25w
lamps
13w
CFL
20w
CFL
25w
CFL
City Shop 0 3 0 0 0 0 0 0 0
• Pre-retrofit energy use: 492 watts
• Post-retrofit energy use: 360 watts
• Energy savings projection: 132 (.13 Kw)
• Pre-retrofit to post retrofit energy reduction: 27 %
• Estimated Annual Savings:
Hours Per Day / 250
Days Per Year
Electrical
Savings
Avoided Diesel
Use
Avoided
Diesel Costs
4 Hours $57 9 Gallons $23
7 Hours $99 16 Gallons $39
10 Hours $142 23 Gallons $56
Buckland Community Building
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’05-‘06 Final Report – NW/SW Regions – Buckland
4
Materials Installed
2-Lamp
Ballasts
32w
lamps
4-Lamp
Ballasts
32w
lamps
2-Lamp
Ballasts
25w
lamps
2-Lamp
Fixtures
3-lamp
ballasts
25w
lamps
4-Lamp
Fixtures
3-lamp
ballasts
25w
lamps
4-Lamp
Ballasts
25w
lamps
13w
CFL
20w
CFL
25w
CFL
4 7 0 0 0 0 0 0 0
• Pre-retrofit energy use: 1,476 watts
• Post-retrofit energy use: 1,080 watts
• Energy savings projection: 396 watts (.40 Kw)
• Pre-retrofit to post retrofit energy reduction: 27 %
• Estimated Annual Savings:
Hours Per Day / 250
Days Per Year
Electrical
Savings
Avoided Diesel
Use
Avoided
Diesel Costs
4 Hours $170 28 Gallons $68
7 Hours $298 48 Gallons $118
10 Hours $426 69 Gallons $169
Washeteria
Materials Installed
2-Lamp
Ballasts
32w
lamps
4-Lamp
Ballasts
32w
lamps
2-Lamp
Ballasts
25w
lamps
2-Lamp
Fixtures
3-lamp
ballasts
25w
lamps
4-Lamp
Fixtures
3-lamp
ballasts
25w
lamps
4-Lamp
Ballast
s 25w
lamps
13w
CFL
20w
CFL
25w
CFL
Washeteria 13 8 0 0 0 0 8 0 0
• Pre-retrofit energy use: 2,858 watts
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’05-‘06 Final Report – NW/SW Regions – Buckland
5
• Post-retrofit energy use: 1,844 watts
• Energy savings projection: 1,014 watts (1.01 Kw)
• Pre-retrofit to post retrofit energy reduction: 35 %
• Estimated Annual Savings:
Hours Per Day / 250
Days Per Year
Electrical
Savings
Avoided Diesel
Use
Avoided
Diesel Costs
4 Hours $436 71 Gallons $173
7 Hours $763 124 Gallons $303
10 Hours $1,090 177 Gallons $433
Bunk House
Materials
Installed
2-Lamp
Ballasts
32w
lamps
4-Lamp
Ballasts
32w
lamps
2-Lamp
Ballasts
25w
lamps
2-Lamp
Fixtures
3-lamp
ballasts
25w
lamps
4-Lamp
Fixtures
3-lamp
ballasts
25w
lamps
4-Lamp
Ballasts
25w
lamps
13w
CFL
20w
CFL
25w
CFL
Bunk House 0 17 0 0 0 0 0 0 4
• Pre-retrofit energy use: 2,780 watts
• Post-retrofit energy use: 2,140 watts
• Energy savings projection: 640 watts (.64 Kw)
• Pre-retrofit to post retrofit energy reduction: 23 %
• Estimated Annual Savings:
Hours Per Day / 250
Days Per Year
Electrical
Savings
Avoided Diesel
Use
Avoided
Diesel Costs
4 Hours $275 45 Gallons $109
7 Hours $482 78 Gallons $191
10 Hours $688 112 Gallons $273
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’05-‘06 Final Report – NW/SW Regions – Buckland
6
Buckland IRA Owned Buildings
Energy efficient lighting upgrades were completed in two buildings owned by the Buckland
IRA Council.
IRA Owned Buildings - Lighting Retrofit Summary:
• Lighting upgrades completed in October, 2006
• Retrofitted 48 linear fluorescent fixtures with T8 lamps and electronic ballasts
• Installed: 2 compact fluorescent light bulbs
• Pre-retrofit energy use for all lighting: 9,496 watts
• Post-retrofit energy use for all lighting: 6,147 watts
• Energy savings projection: 3,349 watts (3.35 kW)
• Pre-retrofit to post retrofit energy reduction: 35 %
• Estimated Annual Savings:
Hours Per Day / 250
Days Per Year
Electrical
Savings
Avoided Diesel
Use
Avoided
Diesel Costs
4 Hours $1,440 234 Gallons $572
7 Hours $2,520 410 Gallons $1,001
10 Hours $3,600 586 Gallons $1,430
IRA Office
IRA maint staff reading power for
light fixture wattage test
T8 retrofits in IRA Meeting Hall
Materials
Installed
2-Lamp
Ballast
s 32w
lamps
4-Lamp
Ballasts
(3) 32w
lamps
2-Lamp
Ballasts
25w
lamps
2-Lamp
Fixtures
3-lamp
ballasts
25w
lamps
4-Lamp
Ballasts
25w
lamps
13w
CFL
20w
CFL 25w CFL
IRA Office 22 0 0 0 0 0 0 1
• Pre-retrofit energy use: 1,904 watts
• Post-retrofit energy use: 1,345 watts
• Energy savings projection: 559 watts (.56 Kw)
• Pre-retrofit to post retrofit energy reduction: 29 %
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’05-‘06 Final Report – NW/SW Regions – Buckland
7
• Estimated Annual Savings:
Hours Per Day / 250
Days Per Year
Electrical
Savings
Avoided Diesel
Use
Avoided
Diesel Costs
4 Hours $240 39 Gallons $95
7 Hours $421 68 Gallons $167
10 Hours $601 98 Gallons $239
IRA Store
Materials
Installed
2-Lamp
Ballasts
32w
lamps
4-Lamp
Ballasts
(3) 32w
lamps
2-Lamp
Ballasts
25w
lamps
2-Lamp
Fixtures
3-lamp
ballasts
25w
lamps
4-Lamp
Fixtures
3-lamp
ballasts
25w
lamps
4-Lamp
Ballasts
25w
lamps
13w
CFL
20w
CFL
25w
CFL
IRA
Store 0 48 0 0 0 0 0 0 2
• Pre-retrofit energy use: 7,592 watts
• Post-retrofit energy use: 4,802 watts
• Energy savings projection: 2,790 watts (2.79 Kw)
• Pre-retrofit to post retrofit energy reduction: 37 %
• Estimated Annual Savings:
Hours Per Day / 250
Days Per Year
Electrical
Savings
Avoided Diesel
Use
Avoided
Diesel Costs
4 Hours $1,200 195 Gallons $476
7 Hours $2,099 342 Gallons $834
10 Hours $2,999 488 Gallons $1,191
Notes: Significant savings achieved through de-lamping existing dual ballast 4-lamp fixtures.
We replaced this system with a single 4-lamp ballast using only 3, 32 watt lamps per fixture.
Pre to post energy use per fixture went from 164 watts down to 99 watts.
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’05-‘06 Final Report – NW/SW Regions – Buckland
8
Buckland School Owned Buildings
Energy efficient lighting upgrades were completed in 12 teacher housing units. T5 light
fixtures will be installed in the Buckland school gym in June, 2007.
School Owned Buildings - Lighting Retrofit Summary:
• Lighting upgrades completed in October, 2006
• Retrofitted 33 linear fluorescent fixtures with T8 lamps and electronic ballasts
• Installed: 121 compact fluorescent light bulbs
• T5 lighting fixtures were installed in the School Gym
• Pre-retrofit energy use for all lighting: 23,279 watts
• Post-retrofit energy use for all lighting: 9,369 watts
• Energy savings projection: 13,910 watts (13.91 kW)
• Pre-retrofit to post retrofit energy reduction: 60 %
• Estimated Annual Savings:
Hours Per Day / 250
Days Per Year
Electrical
Savings
Avoided Diesel
Use
Avoided
Diesel Costs
4 Hours $5,981 973 Gallons $2,375
7 Hours $10,467 1,703 Gallons $4,156
10 Hours $14,953 2,434 Gallons $5,938
Teacher Housing
Materials
Installed
2-Lamp
Ballasts
32w
lamps
2-Lamp
Ballasts
25w
lamps
4-Lamp
Ballasts
25w
lamps
13w
CFL
23w
CFL
25w
CFL
Teacher
Housing 0 30 3 62 32 27
• Pre-retrofit energy use: 11,334 watts
• Post-retrofit energy use: 3,897 watts
• Energy savings projection: 7,437 watts (7.44 Kw)
• Pre-retrofit to post retrofit energy reduction: 66 %
• Estimated Annual Savings:
Hours Per Day / 250
Days Per Year
Electrical
Savings
Avoided Diesel
Use
Avoided
Diesel Costs
4 Hours $3,198 520 Gallons $1,270
7 Hours $5,596 911 Gallons $2,222
10 Hours $7,995 1,301 Gallons $3,175
Notes: For ceiling heights of 8’ or less we have found 25w T8 lamps with standard electronic
ballasts can replace whatever magnetic ballast and T12 lamp combination exists – while
providing great savings and plenty of light.
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’05-‘06 Final Report – NW/SW Regions – Buckland
9
High Output T5 Lighting Upgrades for the Buckland Gym
Existing 400 watt Multi-vapor
lighting in the Buckland Gym
Estimated Annual Savings:
Hours Per Day / 250
Days Per Year
Electrical
Savings
Avoided Diesel
Use
Avoided
Diesel Costs
4 Hours $2,783 453 Gallons $1,105
7 Hours $4,871 793 Gallons $1,934
10 Hours $6,958 1,132 Gallons $2,763
Notes: It’s always good news when we find a gym that has 400 watt multi-vapor bulbs for
existing lighting. T5 lighting can produce huge savings and better quality light over these
existing systems. The Buckland school gym existing lighting is also supplemented by 8’
fluorescent light fixtures. When the new T5 fixtures are installed during the summer recess of
’07, the new energy use will be reduced by 54% overall. Switching options will provide
opportunity to achieve even more savings by choosing to power partial lighting. The following
page details this lighting upgrade that will be installed entirely by in-kind labor provided by the
Northwest Arctic Borough School district.
10 Buckland School, T5 Lighting Upgrade Details - ABSN Energy Efficiency Projects '05-'06 These retrofits will be completed in June, 2007, per Northwest Arctic Borough School District Maintenance. Buckland Gym Length (feet) Width (feet) Ceiling Hieght (feet) # of Existing Fixtures Existing Fixture Wattage Total Existing Wattage Existing Foot-candles New Foot-Candles # of New Fixtures lamps / fixture New Fixture Wattage Total New Wattage Gym 97 63 32 23 415 9,545 27 44 16 6 342 5,472 12 200 2,400 New T5 wattage = 57 watts / lamp, which includes ballast wattage Total Existing Watts 11,945 Total New wattage for gym = 54% savings Savings & Payback Calculation for Gym: Assume 1800 hrs / year for 250 days/year of use Full cost of electricity: $0.50 /kWh Watts of existing lighting: 11,945 New wattage for T5 fixtures: 5,472 Calculation: (Watts) x (hrs/year) / (1000w/kw) x (cost of electricity) = (cost / year) Existing Cost: $10,751 Retrofitted Cost: $4,925 Annual Savings: $ $5,826 Material & shipping cost of Gym retrofit: $4,109.25 Simple Payback: Materials cost / annual savings = 0.71 years (for retrofit to pay for itself in materials) Alaska Building Science Network – Village End Use Energy Efficiency Program – ’05-‘06 Final Report – NW/SW Regions – Buckland
11
Alaska Building Science Network – Village End Use Energy Efficiency Program – ’05-‘06 Final Report – NW/SW Regions – Buckland
Buckland Energy Efficiency Boiler Maintenance and Training activities
Charlie Deer’s Buckland Boiler
Training
Class training with
Bacharak Kit
From Dec 5 – 7, 2006, ABSN’s boiler specialist Charlie Deer gave a two-day course to five
village maintenance staff on boiler energy efficiency and maintenance. Following the course,
Charlie spent another full day working with the maintenance staff on heating system energy
efficiency and retrofit activities.
During the 16-hour course Charlie instructed the Buckland maintenance staff in the
fundamentals of boiler and fuel energy efficiency. This training benefit to the grant came
through an in-kind contribution of $2,100 provided by ABSN. Training topics covered: fuel,
proper heating system sizing, testing boiler efficiency with a flu gas analyzer kit, cleaning and
tuning boilers for energy efficiency, control options and proper control function, burner and
nozzle components and function, outdoor temperature boiler controls, programmable
thermostats, etc.
Additional Heating Energy Efficiency Activities
The following is a trip report excerpt by Charlie Deer - detailing his energy efficiency heating
training and maintenance activities with Buckland maintenance staff:
“I had the class visit the clinic as their maintenance man was one of the students. He had
one boiler down and we were able to trouble shoot it to find the problem but he did not have
authority to fix anything. It was a good experience for the class. As many of the over
engineered, over built buildings being built in rural Alaska, the circulating pump was running
24/7 and the building was over heating. The maintenance man programmed a thermostat
for one of the zones in the clinic and will install it as soon as he can get permission from
Kotzebue. We replaced two thermostats in the city building with seven day, programmable,
ones. There was no more opening the windows to control the heat. The maintenance staff
wire brushed the boiler in the community building and tuned up the burner using the FGA Kit
provided by AEA. We installed an out side reset to control the boiler temperature and save
fuel. Maintenance staff also installed two programmable thermostats in the community
building.”
12 Buckland, In-Kind Contribution Tracking Record - ABSN Energy Efficiency Projects: Village entities worked with: Tribe, City, School District. In-Kind Item Dates Hours Contri-buted Hourly Wage Value / Amount Notes Staff time for project contact, introduction, and reviewof intro materials (Number of entities x 1 hour each) 3 $15.00 $45.00 # of entities we worked with in the village is indicated in the Hrs contributed column. $15 / hr is our generic estimated average wage for local village staff: Tribal Administrators, City Clerks, etc. Staff time for Attending teleconference village-wide 4.5 $15.00 $67.50 Hrs contributed column indicates length of telecon multiplied by # of village telecon participants Tribal Maint. Staff time to assist Field Manager on building assessments - 1st site visit 3 $12.00 $36.00 list hrs of in-kind staff assisting FM on building assessments. CityMaint. Staff time to assist Field Manager on building assessments - 1st site visit 5 $12.00 $60.00 School Maint. Staff time to assist Field Manager on building assessments - 1st site visit 3 $12.00 $36.00 Maint. Staff time to attend ABSN training 6 $12.00 $72.00 Hrs contributed column indicates length of training multiplied by # of in-kind training participants Village office administrative percentage of total project cost less ABSN Admin %. Total project cost = $38,235/village - (our admin percentage , (around 9%) Approx: $3,440) = $34,795 x 5% = $1,740 (this 5% village admin cost estimate is spread across all entities we work with for the course of the grant for completing all energy efficiency measures. These are primarily for cumulative, otherwise unaccounted time expense for project support. Jan '05 - Jan '07 $1,740.00 Each time we call, email, or fax a village entity, someone has to receive the communication, review and/or foward the information, follow-up on requests, etc. Wether it is to set-up a teleconference, verify maintenance staff participation in lighting or boiler trainings, set-up in-kind lodging and transportation, lighting trainings, track a shipment, verify completion of lighting in a given building, ship lamps and ballasts out of the village, request a labor reimbursement agreement, or invoice etc, etc. Village expenses for phone charges, copying and fax costs, office supplies, etc are part of this ammount. Lodging for ABSN Field Managers - 1st & 2nd site visits June '05 $360.00 6 nights x $60/night Transportation and fuel costs - 1st assessmenet site-visit June '05 $300.00 6 days x $50/day City of Buckland In-kind labor for lighting upgrades, spring '06 30 15 $450.00 Total fixtures were around 160 which translates to around 98 hours. But they only could produce back-up and invoicing for about 60 hours, so ~ 30 were in-kind Buckland School T5s June '07 $4,700.00 Job to complete sumer '07 l- Estimate total inkind from NWABSD: $4,700 Buckland School Teacher Housing lighting upgrades June '07 $1,600.00 Job to complete sumer '07 l- Estimate total inkind from NWABSD: $2,000 TOTAL $9,466.50 Alaska Building Science Network – Village End Use Energy Efficiency Program – ’05-‘06 Final Report – NW/SW Regions – Buckland