HomeMy WebLinkAboutShishmaref 2012-VEEP1 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref Village Energy Efficiency Program AEA VEEP Grant # 7520001 Administered by Alaska Building Science Network Shishmaref Final Report Grant Amount: $150,000 Community Summary 18 community buildings and teacher housing units received energy efficient lighting, weatherization and heating upgrades as follows: City Office,City Shop, Clinic, Fire Hall,Water Pump House, Washeteria/Water Treatment Plant, IRA Community Hall, IRA Office,IRA Tannery,BSSD Teacher Housing Blue Tri-Plex,BSSD Metal Shop,BSSD Portable Classroom #1,BSSD Teacher Housing Trailer,BSSD Teacher Housing White House,BSSD Wood Shop, SNC Office, Lutheran Church, Parsonage Retrofits Completed: December 2011 Village-Wide Energy Efficient Lighting, Weatherization and Heating Retrofit Summary: • Projected Annual Electrical Savings (kWh):32,883 • Projected Annual Electrical Cost Savings:$19,4701,2 • Projected Annual Heating Fuel Savings (gallons):2,491 • Projected Annual Fuel Cost Savings:$14,3233 • Total Projected Annual Energy Cost Savings:$33,793 • Total village wide In-kind contribution:$11,200 • Total project cost including In-kind contribution: $161,200 • Simple Payback (including In-kind contributions):4.77 years Additional Energy Efficiency Measures: 1 kWh Rate [used to calculate electrical cost savings] for Lighting Measures (State of AK -AEA PCE Program Report FY 2011 avg):$0.59 2 kWh Rate [used to calculate electrical cost savings] for Weatherization & Heating Measures (AkWarm Library): $0.59 3 #2 Heating Fuel Rate [used to calculate heating fuel savings] (AkWarm Library): $5.75/gal 2 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref CITY OF SHISHMAREF OWNED BUILDINGS City Office Weatherization/Heating Retrofit Summary: • Installed four programmable thermostats, including village staff training. • Adjusted and tuned downstairs furnace for optimum efficiency. • Annual energy savings projection:132 gallons • Estimated Annual Heating Fuel Cost Savings:$759 3 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref City Shop Lighting Retrofit Summary: Materials Installed Quantity Fluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 14 Fluorescent 4-lamp electronic ballast, (4) 25 watt T8 lamps 2 Fluorescent 8 ft retro-kit, 4-Lamp electronic ballast, (4) 25 watt 15 • Pre-retrofit energy use:5.152 Kilowatts • Post-retrofit energy use:2.624 Kilowatts • Energy savings projection:2.528 Kilowatts • Pre-retrofit to post retrofit energy reduction:49% • Estimated Annual Savings:kWh Saved: 4,424 Comparative Comparative Hours Per Day /Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal)Costs 4 Hours/day $1,496.83 178.03 $683.63 7 Hours/day $2,619.45 311.55 $1,196.35 10 Hours/day $3,742.07 445.07 $1,709.07 1200 Hours/year (Est.)$1,796.19 213.63 $820.35 4 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref Clinic Lighting Retrofit Summary: Materials Installed Quantity Fluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 27 CFL-19W 2 CFL-23 W 1 • Pre-retrofit energy use:2.124 Kilowatts • Post-retrofit energy use:1.303 Kilowatts • Energy savings projection:0.821 Kilowatts • Pre-retrofit to post retrofit energy reduction:39% • Estimated Annual Savings:kWh Saved: 1,437 Comparative Comparative Hours Per Day /Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal)Costs 4 Hours/day $486.11 57.82 $222.02 7 Hours/day $850.70 101.18 $388.53 10 Hours/day $1,215.29 144.54 $555.04 2000 Hours/year (Est.)$972.23 115.63 $444.03 5 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref Fire Hall Lighting Retrofit Summary: Materials Installed Quantity Fluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 29 CFL-14 W 2 • Pre-retrofit energy use:2.586 Kilowatts • Post-retrofit energy use:1.362 Kilowatts • Energy savings projection:1.224 Kilowatts • Pre-retrofit to post retrofit energy reduction:47% • Estimated Annual Savings:kWh Saved: 2,142 Comparative Comparative Hours Per Day /Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal)Costs 4 Hours/day $724.73 86.20 $331.00 7 Hours/day $1,268.28 150.85 $579.25 10 Hours/day $1,811.83 215.49 $827.49 1200 Hours/year (Est.)$869.68 103.44 $397.20 6 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref Water Pump House Lighting Retrofit Summary: Materials Installed Quantity Fluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 7 • Pre-retrofit energy use:0.588 Kilowatts • Post-retrofit energy use:0.322 Kilowatts • Energy savings projection:0.266 Kilowatts • Pre-retrofit to post retrofit energy reduction:45% • Estimated annual savings:kWh Saved: 466 Comparative Comparative Hours Per Day /Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal)Costs 4 Hours/day $157.50 18.73 $71.93 7 Hours/day $275.62 32.78 $125.88 10 Hours/day $393.75 46.83 $179.83 500 Hours/year (Est.)$78.75 9.37 $35.97 7 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref Washeteria/Water Treatment Plant Lighting Retrofit Summary: Materials Installed Quantity Fluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 12 Fluorescent 4-lamp electronic ballast, (4) 25 watt T8 lamps 2 CFL-14 W 8 • Pre-retrofit energy use:1.824 Kilowatts • Post-retrofit energy use:0.844 Kilowatts • Energy savings projection:0.980 Kilowatts • Pre-retrofit to post retrofit energy reduction:54% • Estimated Annual Savings:kWh Saved: 1,715 Comparative Comparative Hours Per Day /Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal)Costs 4 Hours/day $580.26 69.01 $265.01 7 Hours/day $1,015.45 120.77 $463.77 10 Hours/day $1,450.65 172.54 $662.54 2400 Hours/year (Est.)$1,392.62 165.63 $636.03 8 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref SHISHMAREF IRA OWNED BUILDINGS IRA Community Hall Total Building Savings All Measures: • Projected Annual Electrical Savings (kWh):3,129 • Projected Annual Electrical Cost Savings:$1,853 • Projected Annual Heating Fuel Savings (gallons):741 • Projected Annual Fuel Cost Savings:$4,261 • Total Projected Annual Energy Cost Savings:$6,114 Lighting Retrofit Summary: Materials Installed Quantity Fluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 45 Fluorescent 4-lamp electronic ballast, (4) 25 watt T8 lamps 1 • Pre-retrofit energy use:3.948 Kilowatts • Post-retrofit energy use:2.160 Kilowatts • Energy savings projection:1.788 Kilowatts • Pre-retrofit to post retrofit energy reduction:45% • Estimated Annual Savings:kWh Saved: 3,129 Comparative Comparative Hours Per Day /Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal)Costs 4 Hours/day $1,058.67 125.92 $483.52 7 Hours/day $1,852.68 220.35 $846.15 10 Hours/day $2,646.69 314.79 $1,208.79 2000 Hours/year (Est.)$2,117.35 251.83 $967.03 9 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref IRA Community Hall Weatherization/Heating Retrofit Summary: • Replaced existing boiler with new energy efficient boiler. • Installed four programmable thermostats, including village staff training. • Annual energy savings projection:741 gallons • Estimated Annual Heating Fuel Cost Savings:$4,261 10 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref IRA Office Total Building Savings All Measures: • Projected Annual Electrical Savings (kWh):417 • Projected Annual Electrical Cost Savings:$247 • Projected Annual Heating Fuel Savings (gallons):104 • Projected Annual Fuel Cost Savings:$598 • Total Projected Annual Energy Cost Savings:$845 Lighting Retrofit Summary: Materials Installed Quantity Fluorescent 2-lamp electronic ballast, (1) 25 watt T8 lamp 2 Fluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 8 • Pre-retrofit energy use:0.658 Kilowatts • Post-retrofit energy use:0.420 Kilowatts • Energy savings projection:0.238 Kilowatts •Pre-retrofit to post retrofit energy reduction:36% • Estimated Annual Savings:kWh Saved: 417 Comparative Comparative Hours Per Day /Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal)Costs 4 Hours/day $140.92 16.76 $64.36 7 Hours/day $246.61 29.33 $112.63 10 Hours/day $352.30 41.90 $160.90 2000 Hours/year (Est.)$281.84 33.52 $128.72 11 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref IRA Office Weatherization Retrofit Summary: •Air sealed building to reduce air leakage. • Added R-25 loose-fill blow-in fiberglass insulation in attic. • Annual energy savings projection:104 gallons • Estimated Annual Heating Fuel Cost Savings:$845 IRA Tannery Weatherization Retrofit Summary: • Air sealed building to reduce air leakage. • Added R-30 loose-fill blow-in fiberglass insulation in attic. • Annual energy savings projection:306 gallons • Estimated Annual Heating Fuel Cost Savings:$1,760 12 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref BERING STRAITS SCHOOL DISTRICT OWNED BUILDINGS Teacher Housing Blue Tri-Plex Total Building Savings All Measures: • Projected Annual Electrical Savings (kWh):3,367 • Projected Annual Electrical Cost Savings:$1,994 • Projected Annual Heating Fuel Savings (gallons):918 • Projected Annual Fuel Cost Savings:$5,279 • Total Projected Annual Energy Cost Savings:$7,273 Lighting Retrofit Summary: Materials Installed Quantity Fluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 7 Fluorescent 4-lamp electronic ballast, (4) 25 watt T8 lamps 1 CFL-14 W 15 CFL-19W 13 CFL-23 W 5 CFL-9 W 2 • Pre-retrofit energy use:2.926 Kilowatts • Post-retrofit energy use:1.002 Kilowatts • Energy savings projection:1.924 Kilowatts • Pre-retrofit to post retrofit energy reduction:66% • Estimated Annual Savings:kWh Saved: 3,367 Comparative Comparative Hours Per Day /Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal)Costs 4 Hours/day $1,139.20 135.49 $520.29 7 Hours/day $1,993.60 237.11 $910.51 10 Hours/day $2,848.00 338.73 $1,300.73 1375 Hours/year (Est.)$1,566.40 186.30 $715.40 13 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref Teacher Housing Blue Tri-Plex Weatherization Retrofit Summary: • Air sealed building to reduce air leakage. • Added R-38 loose-fill insulation in attic with standard truss. • Annual energy savings projection:918 gallons • Estimated Annual Heating Fuel Cost Savings:$5,279 14 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref Metal Shop Lighting Retrofit Summary: Materials Installed Quantity Fluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 8 Fluorescent 4-lamp electronic ballast, (4) 25 watt T8 lamps 4 • Pre-retrofit energy use:1.344 Kilowatts •Post-retrofit energy use:0.728 Kilowatts • Energy savings projection:0.616 Kilowatts • Pre-retrofit to post retrofit energy reduction:46% • Estimated Annual Savings:kWh Saved: 1,078 Comparative Comparative Hours Per Day /Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal)Costs 4 Hours/day $364.73 43.38 $166.58 7 Hours/day $638.28 75.92 $291.52 10 Hours/day $911.83 108.45 $416.45 500 Hours/year (Est.)$182.37 21.69 $83.29 15 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref Portable Classroom #1 Lighting Retrofit Summary: Materials Installed Quantity Fluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 2 Fluorescent 4-lamp electronic ballast, (4) 25 watt T8 lamps 14 CFL-19W 1 • Pre-retrofit energy use:2.580 Kilowatts • Post-retrofit energy use:1.371 Kilowatts • Energy savings projection:1.209 Kilowatts • Pre-retrofit to post retrofit energy reduction:47% • Estimated Annual Savings:kWh Saved:2,116 Comparative Comparative Hours Per Day /Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal)Costs 4 Hours/day $715.85 85.14 $326.94 7 Hours/day $1,252.74 149.00 $572.15 10 Hours/day $1,789.62 212.85 $817.35 1800 Hours/year (Est.)$1,288.53 153.25 $588.49 16 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref Teacher Housing Trailer Total Building Savings All Measures: • Projected Annual Electrical Savings (kWh):1,230 • Projected Annual Electrical Cost Savings:$728 • Projected Annual Heating Fuel Savings (gallons):43 • Projected Annual Fuel Cost Savings:$247 • Total Projected Annual Energy Cost Savings:$975 Lighting Retrofit Summary: Materials Installed Quantity Fluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 1 CFL-14 W 1 CFL-19W 7 CFL-23 W 1 • Pre-retrofit energy use:0.919 Kilowatts • Post-retrofit energy use:0.216 Kilowatts • Energy savings projection:0.703 Kilowatts • Pre-retrofit to post retrofit energy reduction:76% • Estimated Annual Savings:kWh Saved:1,230 Comparative Comparative Hours Per Day /Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal)Costs 4 Hours/day $416.25 49.51 $190.11 7 Hours/day $728.43 86.64 $332.69 10 Hours/day $1,040.62 123.77 $475.27 1375 Hours/year (Est.)$572.34 68.07 $261.40 17 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref Teacher Housing Trailer Weatherization Retrofit Summary: • Air sealed building to reduce air leakage. • Annual energy savings projection:43 gallons • Estimated Annual Heating Fuel Cost Savings:$247 18 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref Teacher Housing White House Total Building Savings All Measures: • Projected Annual Electrical Savings (kWh):599 • Projected Annual Electrical Cost Savings:$354 • Projected Annual Heating Fuel Savings (gallons):246 • Projected Annual Fuel Cost Savings:$1,415 • Total Projected Annual Energy Cost Savings:$1,769 Lighting Retrofit Summary: Materials Installed Quantity Fluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 1 CFL-14 W 1 CFL-19W 1 CFL-23 W 1 • Pre-retrofit energy use:0.444 Kilowatts • Post-retrofit energy use:0.102 Kilowatts • Energy savings projection:0.342 Kilowatts • Pre-retrofit to post retrofit energy reduction:77% • Estimated Annual Savings:kWh Saved: 599 Comparative Comparative Hours Per Day /Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal)Costs 4 Hours/day $202.50 24.08 $92.48 7 Hours/day $354.37 42.15 $161.85 10 Hours/day $506.25 60.21 $231.21 1375 Hours/year (Est.)$278.44 33.12 $127.17 19 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref Teacher Housing White House Weatherization Retrofit Summary: • Air sealed building to reduce air leakage. • Added 14” of loose-fill fiberglass insulation. • Annual energy savings projection:246 gallons • Estimated Annual Heating Fuel Cost Savings:$1,415 20 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref Wood Shop Lighting Retrofit Summary: Materials Installed Quantity Fluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 22 CFL-23 W 4 • Pre-retrofit energy use:2.133 Kilowatts • Post-retrofit energy use:1.104 Kilowatts • Energy savings projection:1.029 Kilowatts • Pre-retrofit to post retrofit energy reduction:48% • Estimated Annual Savings:kWh Saved: 1,801 Comparative Comparative Hours Per Day /Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal)Costs 4 Hours/day $609.27 72.46 $278.26 7 Hours/day $1,066.22 126.81 $486.96 10 Hours/day $1,523.18 181.16 $695.66 500 Hours/year (Est.)$304.64 36.23 $139.13 21 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref SHISHMAREF NATIVE CORPORATION OWNED BUILDINGS * SNC Office Lighting Retrofit Summary: Materials Installed Quantity Fluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 19 • Pre-retrofit energy use:1.596 Kilowatts • Post-retrofit energy use:0.874 Kilowatts • Energy savings projection:0.722 Kilowatts • Pre-retrofit to post retrofit energy reduction:45% • Estimated Annual Savings:kWh Saved:1,264 Comparative Comparative Hours Per Day /Electrical Avoided Diesel Avoided 250 Days Per Year Savings Use (gal)Diesel Costs Locally Estimated $854.99 101.69 $390.49 4 Hours/day $427.50 50.85 $195.25 7 Hours/day $748.12 88.98 $341.68 10 Hours/day $1,068.74 127.11 $488.11 *Note:Shishmaref Native Corporation opted to purchase materials and provide labor In-kind to complete energy efficiency retrofits for the SNC Office. To further maximize the value of the VEEP & EECBG, Alaska Building Science Network provided energy audits of various community buildings not included under VEEP/EECBG funding upon local request, while providing technical support and training as needed to complete upgrades. 22 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref SHISHMAREF LUTHERAN CHURCH OWNED BUILDINGS* Lutheran Church Lighting Retrofit Summary: Materials Installed Quantity Fluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 33 Fluorescent 4-lamp electronic ballast, (4) 25 watt T8 lamps 29 CFL-19W 2 • Pre-retrofit energy use:7.764 Kilowatts • Post-retrofit energy use:4.166 Kilowatts •Energy savings projection:3.598 Kilowatts • Pre-retrofit to post retrofit energy reduction:46% • Estimated Annual Savings:kWh Saved: 6,297 Comparative Comparative Hours Per Day /Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal)Costs 4 Hours/day $2,130.38 253.38 $972.98 7 Hours/day $3,728.16 443.42 $1,702.72 10 Hours/day $5,325.94 633.45 $2,432.45 800 Hours/year (Est.)$1,704.30 202.70 $778.38 *Note:Shishmaref Lutheran Church opted to purchase materials and provide labor In-kind to complete energy efficiency retrofits for the Lutheran Church &Parsonage. To further maximize the value of the VEEP & EECBG, Alaska Building Science Network provided energy audits of various community buildings not included under VEEP/EECBG funding upon local request, while providing technical support and training as needed to complete upgrades. 23 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref Parsonage Lighting Retrofit Summary: Materials Installed Quantity Fluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 17 Fluorescent 4-lamp electronic ballast, (4) 25 watt T8 lamps 2 • Pre-retrofit energy use:1.764 Kilowatts • Post-retrofit energy use:0.962 Kilowatts • Energy savings projection:0.802 Kilowatts • Pre-retrofit to post retrofit energy reduction:45% • Estimated Annual Savings:kWh Saved:1,404 Comparative Comparative Hours Per Day /Electrical Avoided Diesel Avoided Diesel 250 Days Per Year Savings Use (gal)Costs 4 Hours/day $474.86 56.48 $216.88 7 Hours/day $831.01 98.84 $379.54 10 Hours/day $1,187.16 141.20 $542.20 1375 Hours/year (Est.)$652.94 77.66 $298.21 *Note:Shishmaref Lutheran Church opted to purchase materials and provide labor In-kind to complete energy efficiency retrofits for the Lutheran Church &Parsonage. To further maximize the value of the VEEP & EECBG, Alaska Building Science Network provided energy audits of various community buildings not included under VEEP/EECBG funding upon local request, while providing technical support and training as needed to complete upgrades. 24 Alaska Building Science Network –Village Energy Efficiency Program –’10-’12 Final Report –Shishmaref In-Kind Item Dates Hours Contri- buted Hourly Wage Value / Amount Notes Staff time for project contact, introduction & review of intro materials 5 $20.00 $100.00 Number of entities x 1 hour each Staff time for Attending teleconference 3 $20.00 $60.00 City time Staff time for Attending teleconference 2 $20.00 $40.00 TC/IRA time Staff time for Attending teleconference 2 $20.00 $40.00 School time Maint. Staff time to accompany Field Manager on building assessment 1/31-2/5/11 3 25 $75.00 Arthur Sheldon - Water Operator, City  Maint. Staff time to accompany Field Manager on building assessment 1/31-2/5/11 3 25 $75.00 Howard Weyioanna - Council Member, City Maint. Staff time to accompany Field Manager on building assessment 1/31-2/5/11 6 25 $150.00 Dolly Eningowuk - Assistant Clerk (utility data summary & general assistance), City Maint. Staff time to accompany Field Manager on building assessment 1/31-2/5/11 2 25 $50.00 Fred Eningowuk - Administrator, Tribe Maint. Staff time to accompany Field Manager on building assessment 1/31-2/5/11 6 25 $150.00 Jon Kokeok - Maintenance, BSSD Maint. Staff time to accompany Field Manager on building assessment 1/31-2/5/11 2 25 $50.00 Patrick & Rafael - Maintenance, City Maint. Staff time to accompany Field Manager on building assessment 1/31-2/5/11 1 25 $25.00 Archie - Tannery Operator, Tribe Conservative village office administrative percentage of total project cost less ABSN Admin %. Total project cost = $150,000/village - (our admin percentage, (around 14%) Approx: $21,000) = $129,000 x 4% = $5,160 (this 4% village admin cost estimate is spread across all entities we work with for the course of the grant for completing all energy efficiency measures. These are for cumulative, otherwise unaccounted time expense for village- based project support. Aug '10 through Completion $5,160.00 Each time we call, email, or fax a village entity, someone receives the communication, reviews and/or forwards the information, follows-up on requests, etc. Whether it is to set-up a teleconference, verify maintenance staff participation in lighting or boiler trainings, set-up in-kind lodging and transportation, lighting trainings, track a shipment, verify completion of lighting in a given building, ship lamps and ballasts out of the village for recycling, request a labor reimbursement agreement, or invoice etc. Village expenses for phone charges, copying and fax costs, office supplies, etc. are part of this amount. Lodging for ABSN Field Managers - Assessment Visit 1/31-2/5/11 5 nights $70 ea.$700.00 Lodging at Shishmaref School for Paul Cotter & Dan Lung - Assessment Site Visit Lodging for ABSN Field Managers - Lx Upgrade Visit 12/11- 12/17/11 5 nights $70 ea.$1,190.00 Lodging at Shishmaref School for Todd Lance (5 nights), Dan Lung (6 nights), & Anna Hilbruner (6 nights) - Lx Upgrade Visit Transportation and fuel costs - Lx Upgrade Visit 12/11- 12/17/11 5 days $50/day $250.00 Use of Snowmachine & sled - Lx Upgrade Visit, School City front-end loader to move backhaul to airstrip plus operator time $500.00 Use of Front-end loader, Operator's time - Lx Upgrade Visit, City Shishmaref Lutheran Church: Materials, Labor, & Shipping - Lx Upgrade Visit 12/11- 12/17/11 $2,165.26 All materials, labor, and shipping costs covered for lighting upgrades to the Shishmaref Lutheran Church Shishmaref Native Corporation: Materials, Labor, & Shipping - Lx Upgrade Visit 12/11- 12/17/11 $419.40 All materials, labor, and shipping costs covered for lighting upgrades to the Shishmaref Native Corporation TOTAL $11,199.66 Shishmaref, In-Kind Contribution Tracking Record - ABSN Energy Efficiency Projects: