HomeMy WebLinkAboutNightmute Whole Village Retrofit Then & Now KatieConway 01-15-2015-VEEPNightmute Whole Village
Retrofit – Then and Now
January 15, 2015
By Katie Conway, Alaska Energy Authority
Executive Summary
On November 5, 2014 Alaska Energy Authority (AEA) led a multi-agency team of nine people on a return visit
to the small, southwest Alaska community of Nightmute to investigate the impacts of the Whole Village
Retrofit (WVR). The WVR was a collaborative pilot project undertaken in 2008 and 2009 with the intention to
test what would happen if all available energy cost saving resources were deployed in the same place at one
time. The Village Energy Efficiency Program (VEEP), then called the Village End Use Efficiency Measures
(VEUEM) program, implemented building envelope and lighting upgrades to thirteen community buildings.
Residential Weatherization (Wx) improved 34 homes. In addition to the energy efficiency (EE) improvements,
additional aspects of the WVR included an intertie to neighboring wind-powered Toksook Bay, a powerhouse
upgrade and downsizing (it was made a backup generator), and the installation of smart meters in all
buildings. Building efficiency improvements alone were estimated to save roughly half of pre-retrofit heating
fuel. After the work was completed in 2009 there were no follow up visits or other WVR-related
communication with Nightmute to find out if estimated savings turned out to be real savings. In light of the
increasing importance of EE as an energy cost reduction solution, especially for remote communities with
few other options, AEA decided it was time to revisit the Nightmute project to find how well the WVR model
worked, and how replicable it might be elsewhere.
Key Findings
The Whole Village Retrofit was a successful effort that seemingly met the project deliverable: energy costs
were reduced. Despite our best intentions we cannot measure the full extent to which energy costs were
reduced because of insufficient, inconsistent data so are left using a combination of estimates made upon
project completion in 2009 and anecdotes heard recently on the 2014 community visit. Our investigation of
the project’s impacts explored only the residential and non-residential building efficiency improvements, not
the other aspects of the WVR project. Following is a list of evidence-based key findings from a comprehensive
analysis of the return trip to Nightmute, conversations with external stakeholders at an October, 2014 Whole
Village Retrofit Working Group meeting, and the initial WVR VEEP project final report.
1. Energy Efficiency works. While we weren’t able to quantify savings because fuel records were
insufficient we did hear anecdotally about the significant cost savings and improved comfort due to EE
measures implemented during the WVR. Residential Weatherization and VEEP are effective tools for
reducing energy bills, improving indoor air quality (IAQ), and extending building life. Inspection of the
non-residential building efficiency improvements showed measures to be intact and performing as
intended. Likewise, Wx measures provided for Nightmute homes are continuing to provide for reduced
energy burdens and better IAQ for the residents.
2. Community partnerships are important. One of the things that worked so well about the WVR VEEP
project was early, extensive community engagement and subsequent local support for and participation
in the building efficiency improvements. VEEP’s scope of work was largely determined through a local
vetting process that included early meetings with the community at large as well as with individual
community entities. Community entities contributed cash and in-kind matches that expanded VEEP’s
scope of work by nearly half. We can infer that community entities were more willing to have skin in the
game because the projects were defined by local need. This success is a lesson in the value of facilitating
community-led, community-oriented projects.
3. Good data is hard to come by. One of the primary objectives in returning to Nightmute in 2014 was to
collect enough data that we could measure actual energy and cost savings due to the WVR.
Unfortunately, despite all our best efforts, that data simply does not exist. Direct confirmation of heating
fuel savings due to the WVR was impossible due to the lack of heating fuel records for the community
buildings. No buildings had complete heating fuel consumption data for the years before and after the
retrofits. Because of this, and the lack of any information concerning the use of the building, we have to
rely on the modeled results to estimate the energy savings. Likewise, AEA was unable to gather
electricity consumption for the years pre- and post-retrofit to validate the expected savings. Especially
with no knowledge of how the buildings were used before and after the retrofit, it would be difficult to
ascertain the true savings. Given that the building improvements, including lighting upgrades, were
generally working as intended, it is fair to assume that the estimated heat and electric savings post-
retrofit are reasonably accurate.
4. There’s always more to do. Significant energy and cost savings measures were implemented during the
WVR, and by all accounts seem to be holding up well in Nightmute’s homes and community buildings.
However, nearly all the buildings that were improved by the VEEP portion of the WVR were named as
buildings that need work done now. A similar story was heard during the residential Wx home surveys.
This is not likely symptomatic of failures with the implemented measures. Rather, given the poor starting
point of the buildings’ condition in 2008-2009, even with significant improvements, the forces of nature
continue to take their toll and sometimes measures are not adequately maintained by building
occupants. It seems there will always be more work to do to maintain or improve the energy efficiency,
and sometimes just habitability, of buildings.
5. Simultaneous projects are not necessarily beneficial. We found no discernable benefits to deploying
residential and commercial weatherization at the same time. If anything, doing these two things at the
same time could have negative consequences: competition for a limited local workforce, overwhelming
the community’s ability to house or feed visitors, and a lack of local capacity for managing multiple
projects at once are all potential risks. In Nightmute, residential weatherization and VEEP were seemingly
successful independently of one another.
6. Five years is a long time. It had been five years since the WVR had wrapped up in Nighmtute when the
team visited in November, 2014 to assess the project’s impact. Community leadership has changed
significantly. People have come and gone from the village. Homeowners and building occupants might
not remember everything accurately from what took place five years ago. While some in the community
were able to recall quite well very specific details of building work done during the Whole Village
Retrofit.
Recommendations
Findings from Nightmute can be applied to future projects to improve efficiencies in time and cost to
maximize investments made by stakeholders and contribute to greater, longer-term project success.
A. Strategic coordination. Interagency coordination and community partnerships were a core component of
the WVR. Initial WVR project partners, both external and community entities, signed a Memorandum of
Understanding (MOU) to declare commitment to the project. This was a good way to formalize and
acknowledge community participation as well as to document cost-sharing commitments from all
partners. In the future, however, it may not always be worth the time and trouble to go through the
MOA process. In other instances, it might be beneficial to align schedules related to specific types of
improvements. For instance, RurAL CAP’s Energy Wise program might be a good compliment to
Residential Wx, and perhaps there’s a way for a smaller project to merge with a larger one on a similar
timeline to maximize economies of scale. Coordination should be more an exercise of capitalizing on
opportunity rather than creating it, and components of a WVR should be spread out strategically over a
longer period of time as a sequence of energy and cost saving efforts.
B. Clear communication. Collaboration relies on good, sustained communication between all partners,
including local, regional, and state entities. Improved communication, transparency and a culture of
inclusiveness for any community-based projects could increase our ability to identify and act upon
collaborative opportunities such as cost-sharing and resource-optimizing scheduling.
C. Sustained community engagement. The Nightmute Whole Village Retrofit started with successful
community engagement which, presumably, had a positive impact on the shape and size of the project.
Five years is too long for a post-project follow up, when people might not remember as well what was
done or the impacts that work had on their lives, and when it’s too late to make small adjustments to
implemented measures to preserve their integrity instead of falling into irreversible disrepair. We should
make a point of returning to the community to assess our work a year after the project has been
completed. On a post-project inspection we could provide consumer education to building occupants or
owners on the best ways to maintain the measures implemented to ensure our investment in building
improvements is maximized and the recipient homeowners or community entities also receive maximum
benefit. Additionally, a return visit would give the implementing agencies an opportunity to evaluate the
measures implemented and perceptions of project impact from the community for quality assurance and
continual improvement of the services we deliver to the people of Alaska.
D. Facilitate consistent, accurate data collection. The lack of quality end-use energy data in rural Alaska is a
reoccurring issue. Without having a good baseline of energy use, it’s difficult to measure the impact of
any energy efficiency measure implemented as a part of a project, which makes it difficult to quantify
real savings. AEA and other agency stakeholders could develop a simple, user-friendly standardized fuel
data collection form for tracking public building heating fuel use, and mandate regular reporting of
heating fuel use, using the form, upon receipt of any agency funding. AEA could request other funding
agencies to do the same in order to institutionalize a better methodology for tracking rural community
heating fuel use. The Power Cost Equalization (PCE) program is a successful example of community
energy tracking. Because of data gathered through the PCE program we are able to infer a lot of
information about a community’s electricity use over time. If we could figure out a way to gather heating
fuel data in a similar way we would likewise have the ability to infer a lot about a community’s heating
fuel use. This is a critical next step in delivering better energy and cost saving programs to rural Alaska.
THEN: Whole Village Retrofit (WVR) 2008-2009
What was the WVR project and why was Nightmute selected to pilot this model?
The Village End Use Efficiency Measures (VEUEM) program was three years into operation (the
program began in 2005). These were mostly lighting upgrades and basic weatherization
improvements to public buildings and facilities in rural Alaska. Funding came from the Denali
Commission. VEUEM is the precursor to the Village Energy Efficiency Program (VEEP), which is a
current AEA program.
AEA and AHFC, as well as other energy efficiency implementation entities, thought it might be
interesting to see how much total energy cost savings could be realized for a community by
undertaking VEUEM simultaneously with residential Weatherization (Wx). Interest in maximizing the
value of efficiency improvements came in the wake of the highest oil price spike in world history, and
the resulting devastation to rural Alaska communities heavily reliant on expensive diesel fuel for heat
and power. Project visionaries wanted to find out what it would mean for a community if all possible
EE programs were deployed at the same time.
Nightmute was selected for the Whole Village Retrofit pilot project for several reasons:
o Good timing:
Residential Wx was already scheduled to take place during the 2008 and 2009
summer project seasons
An intertie was in the process of being constructed, linking Nightmute to Toksook
Bay and their wind generation
AVEC had Denali Commission money to improve Nightmute’s power house,
downsizing but upgrading the quality of one back-up generator
o The right size: Nightmute, at a population of just under 300 people, is a good representation
of a rural Alaska community.
Core components of developing and implementing the Nightmute WVR pilot
project:
Interagency coordination: It took six months to draft up and finalize a Memorandum of
Understanding (MOU) between the participating entities.
Community engagement: ABSN kicked off the VEEP aspect of the WVR with a community meeting to
discuss and determine project scope based on community needs and priorities
Community building energy efficiency improvements
Residential weatherization
Timeline:
Project organization began: September 2007
MOU with project partners: process began 9/2007, signed 3/2008
Contract with ABSN: already in place with AEA for VEUEM project management
Materials ordered and shipped: winter/spring 2008
Construction: began summer 2008, completed summer 2009
Buildings Improved:
Building Ownership Improvement
34 Homes Private Wx (RurAL CAP)
City office City of Nightmute Wx & Lighting (ABSN)
Community Hall City of Nightmute Wx & Lighting (ABSN)
Head Start Bldg. City of Nightmute Wx & Lighting (ABSN)
PAP/Public Safety Bldg. City of Nightmute Wx & Lighting (ABSN)
Post Office City of Nightmute Wx & Lighting (ABSN)
Water Treatment Plant City of Nightmute Lighting (ABSN)
Warm Storage Building City of Nightmute Lighting (ABSN)
NTC Office Bldg. Native Village of Nightmute Wx & Lighting (ABSN)
Umkumiut Office Bldg. Native Village of Umkumiut Wx (ABSN)
Chinuruk Village Store Chinuruk, Inc. Wx & Lighting (ABSN)
Community Church Nightmute Community Church Wx & Lighting (ABSN)
Church Housing Nightmute Community Church Wx & Lighting (ABSN)
School Gym & 4 Teacher Housing Units Lower Kuskokwim School
District
Lighting (ABSN)
Project partners and roles:
AEA – project lead
AHFC – initial coordination
AVEC – installed smart meters in every building
Chinuruk, Inc.: $34,000 match for measures to village corporation’s store
AVCP Housing Authority – planned to weatherize non-Wx eligible housing but work did not happen
Community of Nightmute – active participant in Wx work, contributed a cash/in-kind match that
increased scope of work for non-residential EE by over 45%
Denali Commission – funded smart meters, intertie and power house improvements
RurAL CAP – residential Wx implementing entity
Alaska Building Science Network – AEA contractor for commercial building EE implementation and
project management
Money invested for building EE improvements:
AEA grant implemented by ABSN: approx. $165,000
RurAL CAP Wx: $435,830
Village entity admin and coordination: $8,000
Chinuruk, Inc.: $34,000 match for measures to village corporation’s store
Nightmute Community Church: $21,700
City of Nightmute: $4,700
Umkumiut Native Village: $2,000
Nightmute Native Village: $400
Other, in-kind barge, freight, etc.: $7,800
Total community funding contribution of $75,700 expanded total program budget by 46%.
EE Work completed:
34 homes (64% of total housing) weatherized by RurAL CAP
10 community buildings weatherized and given lighting upgrades by ABSN
School lighting upgrades
4 Teacher housing units lighting upgrades
Total estimated savings from lighting upgrades:
15.68 kW of displaced electrical load
26,830 kWh per year
$14,244 per year
Estimated 4.7% of total village-wide electric consumption saved
Simple Payback: 4.62 years
Residential Wx measures implemented:
Some initial roofing and foundation repairs (critical work identified during this project and completed
out of necessity even though it was outside project scope)
Exterior rigid foam insulation installed on floors and walls
R-7.5 extruded blue or pink foam boards
Air-sealing
Blown loose-fill insulation to attics R-40
Some window and door replacements
Residential Wx estimated total savings:
Budget for materials, labor, shipping: $435,830
Total annual gallons fuel saved for all 34 homes combined: 4,575
2008 village fuel price/gallon: $7.90
Comprehensive annual dollar savings: $36,143
Average annual fuel savings per home: $1,063, or about 50%
Simple payback on project funds: 12 years
Community buildings Wx measures implemented:
Some initial roofing and foundation repairs
Exterior rigid foam insulation to parts of floors, walls or ceilings in 3 buildings
R-10 extruded blue or pink foam board
Air-sealing
Blown loose-fill insulation to attics: R45-R50
Replaced one door
Community buildings Wx estimated total savings:
Approximately 56% total fuel savings (average per building annual use went from $5,096 to $2,205)
Payback on just air sealing and attic insulation in five buildings, including ABSN and community
funds: 6.7 years, or for just the community investment a 1.6 year payback.
Projected annual fuel savings to village corporation store: $10,639 ($6.60/gallon). That’s an 8.3 year
payback calculated with both ABSN and Chinuruk financial contributions, or for just the village
corporation, a 3.2 year payback.
Total cost: $240,700 (including community contributions)
Annual gallons fuel saved (counting only nine of the ten buildings): 4,834
Annual dollar savings (at $6.60/gallon): $31,904
Simple payback on ABSN and community funds: 7.5 years (5.2 years for ABSN investment, 2 years for
Nightmute investment)
Miscellaneous information:
There was no concerted effort to maximize economies of scale with the purchase or shipping of
materials. Each program managed logistics independently of the others.
The VEEP project hired a local crew that ranged in size from 12 to 14 individuals over the course of
the two year project.
Wx employed a local crew as well, likely about 20 individuals.
AVCP Housing Authority signed on as a project partner with the intention to weatherize homes not
eligible for Rural CAP weatherization. Work did not happen.
NOW: 2014 WVR Reboot
Given the increasingly important role of energy efficiency and conservation as an energy cost reduction
strategy, especially for places that have few or no other options, AEA decided it was time to return to
Nightmute to learn how we can do better next time. Preceding the site visit AEA convened a group of
stakeholders, the WVR Working Group, to discuss the trip itinerary and anticipated outcomes. Feedback from
this group has been incorporated into the findings section.
Date of Site-Visit: November 5, 2015
Purpose of trip: To help find answers to the following questions:
1. What were the expected, perceived, and actual benefits and costs of the Whole Village Retrofit
project in Nightmute?
2. Is it worth replicating the Nightmute WVR model in other places?
3. If yes, then how do we do it?
a. What circumstances are required in order for the WVR model to be implemented?
b. What improvements can we make to the model?
c. What organizations should be involved in the collaborative process?
d. How do we align schedules to most effectively maximize economies of scale?
e. What are the barriers to successfully implementing the WVR model in other communities
and how do we overcome them?
Who went:
1. Katie Conway, AEA
2. Rebecca Garrett, AEA
3. Scott Waterman, AHFC
4. Kent Banks, RurAL CAP
5. Jack Hebert, CCHRC
6. Geoff Butler, Energy Efficiency Services
7. Tiffany Zulkosky, Nuvista
8. Brent Latham, AVCP
9. Molly Rettig, CCHRC
Schedule:
6:20 am – 7:33 am ANC to Bethel on Alaska Air
Strategy session while waiting in Bethel
9:00 am – 10:00 am Charter flight from Bethel to Nightmute
10:30 am – Noon Community meeting/listening session
Noon – 5:00 pm A: building walkthroughs, inspect implemented measures, blower door test (Geoff,
Scott)
B: door-to-door residential survey (Kent, Jack)
C: interviews with non-residential building representatives/community leadership
(Tiffany, Katie, Rebecca, Brent)
5:00 pm – 6:00 pm Charter flight from Nightmute to Bethel
6:00 pm – 8:30 pm Team dinner and debrief in Bethel (“what I learned today” roundtable)
9:35 pm – 10:40 pm Bethel to Anchorage on Alaska Air
Detailed schedule:
1. Flew Anchorage to Bethel on the 6:10 a.m. flight. Arrived Bethel, collected luggage, caught a shuttle to
the Grant Aviation hanger, checked in for the charter flight. We had a little over an hour to kill before
departing for Nightmute. Grant Aviation kindly let us use their pilot’s room to have a team meeting.
2. In our meeting we introduced ourselves and talked a bit about the day’s objectives. Jack and Kent would
do the door-to door-surveys with the help of Katy Tony, the Umkumiut tribal administrator. Scott and
Geoff would investigate the work done to commercial buildings, including several blower door tests.
Rebecca, Tiffany, Brent, and Katie would talk with community leaders about efficiency opportunities and
perceptions of the work done in 2008/2009. Molly would film various aspects of the day.
3. We departed Bethel while the sun was rising, at about 9:00 a.m., and arrived Nightmute at about 10:00.
We were met at the airstrip by several people with four-wheelers who transported us and our gear to
the community center/Bingo hall where we began preparing for the community meeting. We heard that
there had been several announcements made over the radio already that day about the meeting, and the
flyer Katie sent out the week before was hanging all over the community. To prepare for the meeting we
set out the meeting snacks we brought with us and made coffee.
4. The community meeting was well attended; there were about 30 local people there, plus our 9 person
team. Conversation started with a brief introduction from Katie Conway and then Jack Hebert. Right off
the bat we heard feedback on the Residential Wx effort from 2008/2009. There were no pauses in talking
– someone always had something to say, and most of it was about the residential efficiency projects of
the WVR. The feedback we heard about Wx was mostly negative. Kent took a lot of notes, while Jack
facilitated this part of the meeting. At one point an elder spoke out in Yupik telling people to be honest,
that there was value in us hearing the real story. The only feedback we heard about the commercial
building weatherization or lighting upgrades was in regards to the church, and it was very positive.
5. At the end of the community meeting folks in the room who were going to have their homes assessed
and be interviewed by Jack and Kent (see Appendix B) met with that pair to figure out the order in which
they’d be conducting their walk-throughs. Scott and Geoff left to begin a blower door test on the Head
Start building (See Appendix A). Katie, Rebecca, Brent, Tiffany and Molly went to talk with the Mayor and
City staff at the City Building. From there each of the three groups kept to separate agendas for the rest
of the day. The team reunited at the school at 4:00 to return to the airplane and fly back to Bethel.
6. We returned to Bethel at about 5:30/6:00, flying during sunset. After checking in for our return flight the
team debriefed over dinner at a local restaurant. We took a taxi back to the Alaska Airlines terminal at
about 8:00 for the 9:15 flight back to Anchorage.
Qualitative findings:
(This section incorporates notes from Katie Conway and Scott Waterman)
People generally had a lot more to say about the residential weatherization work done as a part of the
WVR than anything else. We heard comments at the community meeting suggesting that work on some
homes may have been less than ideal, though it’s important to remember that meeting attendees were a
self-selected sample of the whole residential Wx participant pool, as were participants of the residential
walk-through and interview by Jack and Kent. These may have been motivated to participate in the
community meeting and/or walk-through by less than desirable results from the 2008-2009 Wx. They
may not be a representative sample of community perceptions.
Commonly heard concerns regarding residential Wx included:
o Crews being forced by the Rural Cap construction manager to work too quickly at the expense of
quality work
o There wasn’t enough initial research into local weather conditions so work done was not
necessarily appropriate for Nightmute’s unique circumstances
o Not enough initial community involvement
Five years is a long time for folks to remember what was there before. Some do, but few pay close
attention to fuel bills over time. Most can compare this winter to last winter, but without records, few
can track what happened six years back compared to today. The Weatherization (Wx) program has long
experienced an element of the recipients who feel that once the home has been served, more can always
be done. When returning to a community after one or more years have passed, there is a feeling among
Wx agency folks like the “Adopt a House” mentality pervades some of the recipients.
Changes in the Wx program have eliminated most work on foundations. In prior years, much effort and
expense was incurred to repair or replace cribbing and foundation members, and raise and level the
building. This was tremendously expensive and discontinued due to costs, but the penalty is that homes
are not level, and fitting windows and doors can be problematic on shifting soils.
Quality Control - House wraps consisting of 2” rigid insulation and new T-111 siding were inconsistently
applied in Nightmute. Wind and other pressures have loosened the fasteners used to hold the new siding
on and some of the siding was not securely attached to the home. I think some real world research is
needed. In the past there have been some issues with water penetration from the exterior on homes
where insulation/siding were applied. Flashing and detailing around windows and doors is critical to
prevent water intrusion. Yet little evidence has been shown there are condensation issues when a vapor
barrier was applied on the warm side of the insulation. RuralCAP has since discontinued the use of these
wraps in most cases for Wx projects.
Ventilation and Indoor Air quality has long been a problem in rural Alaska. Homes have ventilation, but
electricity costs are high, and people often don’t want to use mechanical ventilation because of the cost
of operations. The ventilation equipment used by the Wx program is ultra-efficient using only 13 watts
per hour when in operation. This is sufficient if used for only a few hours per day. When occupants don’t
use these fans, mold can develop and clients complain. Education to homeowners is provided at the time
of installation, asking them to keep the fans on, but some homeowners see the cost to using them may
be higher than perceived benefits. This problem is exacerbated when HRV’s are installed, which is why
the simple, lower wattage fans are installed.
Local hire – Factions within a community can undermine quality in some homes. Expectations are often
unrealistic. Some people seem to think that weatherization services are for life, not the scope of the
project.
For information about the performance of measures in commercial buildings we’ll need data from the
blower door tests and with any luck, heating fuel bills. It was very hard to get information from people in
the community for a number of reasons. One, there’s been a lot of turnover within community
leadership. Folks who were involved back in 2008/2009 weren’t around on our November 5th site visit.
Also, not everyone understood what we were talking about. Not everyone was aware of all that took
place during the WVR.
Despite the lack of consistency in awareness about the WVR components or what efficiency really
means, there were some consistencies in feedback about what’s most important in ensuring success for
a project like this. First, there needs to be a lot of community involvement from the very beginning of the
project. Second, the local community needs to be more involved as a work force, actually implementing
measures. Third, the implementing agencies need to do a better job of informing the entire community
about what’s being done, why, where, how, and when. This is feedback that has relevance for a lot of our
programs, not just the potential for future WVR efforts.
Government funded projects often drop into a village like balls falling from the sky. Community leaders
and residents are often not aware of what will happen until it does. There has long been conversation
about state and federal agencies working together, which sounds great in concept. But coordinating
budget cycles, funding sources, labor, materials and myriad other parts and pieces of the game, is not
simple, or sometimes even beneficial.
There are economies of scale when a small project can be incorporated into a bigger one. Mobilization
costs, shipping costs and project costs may be reduced somewhat, but huge obstacles need to be
overcome. One of the easier ways to do this is to sub-contract the work on smaller projects to the larger
contractor, rather than bringing in additional crews. E.g. if a RuralCAP or AVCP type weatherization
project is scheduled, say at $900,000 and there are additional funds to retrofit some community
buildings of say, $100,000, subcontracting the community building work to the Wx provider would give
some definitive economies of scale, and allow for additional measures to be implemented on both
projects, for the same amount of money.
Local planning is key – coordinating community action/non-governmental organizations, state and
federal agencies is a good idea when it can work. It becomes much easier when a local planning effort
identifies what is truly needed for the community. From a local planning effort, needs and priorities can
be established. These relate to food, subsistence, energy, housing, education, jobs, infrastructure,
water/sewer, communications, social problems and more. A project dropped on them like a shiny ball
from the sky may fill some needs, and is not likely to be ignored, but it may not be the top priority for the
community at this time, and may not be in the proper sequence for future projects, i.e., an energy
efficiency project comes in before water/sewer retrofits, and much of the new insulation is torn out to
install the bathrooms.
Energy is a significant portion of budgets in every organization in rural Alaska. AHFC estimates the energy
bill for public buildings in the state exceeds $640 million annually, and about $1.4 billion for all non-
residential buildings in the state. With efficiency retrofits, a 20% savings is not hard to achieve, and with
a bit of effort, 30% or more are often possible. Add in renewable energy systems and reductions or
displacement of expensive fossil fuel can be 50% or more.
What was right about the Nightmute WVR:
o Community engagement in devising the scope of the project. By including the community early
on the scope of the commercial building piece of the WVR was expanded by almost half and
project managers ensured that work important to the community was done. This is why the
church was worked on – that’s had huge benefits for the community and they’re proud of it.
What could have been better about the WVR:
o More sensitivity to cultural/social nuances within Nightmute. Crews were asked to work faster
than they were comfortable with, and project managers were unaware of how grievances
between parties would play out in the implementation of work on houses.
o More involvement of residential participants in the work done to their own homes.
o Maybe in future efforts RurAL CAP could be a project partner to do Energy Wise hand-in-hand
with home Wx for better homeowner education.
Quantitative findings
Though we came back to Anchorage with a stack of fuel invoices from the city we were unable to
discern anything meaningful from those records due to inconsistencies and insufficient data.
AVEC records from the nine surveyed homes and community buildings did not include sufficient
information to make conclusions. Data was not supplied for time before retrofits. Without a baseline
we are unable to determine changes to energy use due to measures implemented during the WVR.
Appendix A:
Nightmute Whole Village
Retrofit Project - Follow-up
Site Visit
Commercial / Community
Building Inspection Report
11-26-14
By Geoff Butler, Energy Efficiency Services
After meeting with Nightmute leaders and residents at the Nightmute Community Hall, Geoff Butler and
Scott Waterman spent the afternoon doing brief walk-through inspections of the various commercial /
community buildings throughout the village – as many as time allowed. Photos were taken and blower door
tests were performed on three of the buildings: City Community Hall, Chinuruk Inc. Store and the Nightmute
Catholic Church. Where community building staff were available, we asked general questions about the
current state of building performance and the energy savings measures done in 2008 / 2009. Other than for
the school, no on-staff maintenance employees were available for discussions. Due to the straight forward
nature of the completed energy retrofits, we were able to assess current status of the measures without
working directly with maintenance staff.
During our walk-through inspections we did not have much opportunity to meet with building owners, but
we did have some brief conversations and I made a few follow-up calls to get some general impressions of
WVR results which I’ve reported below. We generally encountered office staff who were in their positions
for a short time and who did not have historical knowledge of their building’s energy use or performance. As
such, and due to time constraints no survey questions, fuel use data or releases were obtained. Also due to
time constraints we were not able to access the Catholic Church staff housing building, the Nightmute School
teacher housing units or the City Water Plant or Warm Storage buildings where lighting only retrofits
occurred. Considering our findings in other buildings inspected however, we are confident the energy
measures performed 5 years back were holding up well and functioning as intended
Summary of Findings:
In all buildings inspected we found the energy retrofits performed in 2008 – 2009 were substantially intact
and performing as intended. In all buildings, the lighting upgrades installed 6.5 years ago in June, 2008 were
performing very well. Excluding just a few fixtures the linear fluorescent lights were all working and putting
out adequate light levels. Lamps showed plenty of serviceable life remaining with not much graying occurring
at lamp ends. Screw in bulbs, excluding one incandescent bulb found, were all compact fluorescents as
installed in 2008, which demonstrates it is basically common knowledge at this point to avoid incandescent
lighting!
Air sealing measures including door jamb seals and threshold sweeps appeared substantially intact. The
Chinuruk Store was found to be missing door seals however, and a blower door test of this building revealed
additional air leakage presumably from building settling.
Blow-in attic insulation appeared to be performing as intended, although we did not physically explore attics.
Attic hatch covers had been caulked shut as intended at time of original work and we did not have time to cut
caulk beads and reseal hatches. We did not observe any mold spots on ceilings which could indicate voids in
blown insulation due to wind shift after installation.
If time allowed, I would have liked to access some of the attics to inspect the current condition of the blown
fiberglass insulation. As part of this WVR 5-year follow-up work, I believe it would be worthwhile to work
remotely with a City or other entity maintenance staff person to cut the caulk seal on a few attic hatches and
get up and observe the insulation condition. This follow-up work would be valuable particularly in such a
windy area as Nightmute. During the original retrofit work in ’09 we installed gable end vent covers on the
leeward sides of buildings where possible to discourage insulation wind-drift in attics. It would be good to
know how things actually have turned out in the attics 5 years later.
Two direct-vent space heaters installed in 2009 were performing as intended.
City Owned Buildings:
COMMUNITY HALL
WVR energy upgrades completed 2008 - 2009:
Lighting upgrades to linear fluorescent and screw-in bulb fixtures
Air sealing, blown fiberglass insulation in attic, exterior door sweeps / seals, installed 2” rigid foam -
ceiling of 12’ x 48’ addition, installed new Monitor direct vent space heater, installed new 110 cfm
fan on timer switch.
Walk-through inspection findings 11-5-14:
Lighting upgrades were performing as intended. Air sealing measures remained intact. Door seals
were adequate. No mold spots visible on ceiling including ceiling of addition where 2” of rigid foam
were installed under new plywood. We did however find some evidence of mold spotting on
exterior wall near ventilation fan installed in 2009. This spotting did not appear to be actively
growing and may have existed before ’08-’09 retrofits. We also found older mold spotting near floor
where things were stored against north-facing wall. Poor insulation levels in floor and exterior wall,
coupled with low airflow in that location and a single space heater with no heating distribution ducts
would encourage mold growth even at normal indoor humidity levels.
Ventilation fan installed in 2009 was found turned off. This fan control is designed to be left on so
that timer switch may be operated with the dial switch as needed. I turned the fan control on again
and checked the timer control that functioned. AEA staff provided a hygrometer during this site visit
that we elected to install in this building on the fan cover plate to show occupants relative humidity
levels and encourage use of the ventilation fan. Hygrometer readings just after the morning
community meeting were around 34% RH. Approximately 45 people attended the meeting for 1.5
hours without driving relative humidity levels beyond 34%. (35% RH is considered an ideal level for
good indoor air quality).
The Monitor space heater installed in 2009 was heating building space as intended. Front cover
housing had been removed however indicating servicing had been done or was on-going in some
capacity.
A blower door test was performed on this building with the following findings: Airflow at 50 Pascals
building depressurization (CFM50) was 822. The post retrofit blower door test done in 2009 was 840
CFM50. The difference of 18 CFM50 is not significant and could be due to changes in building
settling, or in using a different blower doorframe or a slightly different placement of the blower
doorframe. Air changes per hour at 822 CFM50 are 4.2, which is not too tight concerning indoor air
quality. The primary air leakage site identified during the blower door test was the junction, both
floor and ceiling of the original building structure and the 12’ x 48’ building addition. Although these
areas could receive additional air sealing to reduce heat-loss, if current conditions remain the same
for this building I would recommend allowing this natural air infiltration to continue for indoor air
quality concerns.
CITY OFFICE BUILDING
WVR energy upgrades completed 2008 - 2009:
Lighting upgrades to linear fluorescent and screw-in bulb fixtures
Air sealing, blown fiberglass insulation in attic, exterior door sweeps / seals, installed
Walk-through inspection findings 11-5-14:
Lighting upgrades were performing as intended. Air sealing measures appeared intact, although in
bathroom some of the original air sealing caulk was not installed properly (caulk beads were
inconsistent and did not seal some corner and trim joints. Door seals were adequate. We saw no
indication of problems with blown attic insulation. Indoor air quality was good with no indication of
condensation forming on windows or windowsills. No other moisture issues were evident.
HEAD START BUILDING
WVR energy upgrades completed 2008 - 2009:
Lighting upgrades to linear fluorescent and screw-in bulb fixtures
Air sealing, blown fiberglass insulation in attic, exterior door sweeps / seals, installed programmable
thermostat
Walk-through inspection findings 11-5-14:
Lighting upgrades were performing as intended. Air sealing measures appeared intact. Door seals
were adequate. We saw no indication of problems with blown attic insulation. Indoor air quality
was good with no indication of condensation forming on windows. No other moisture issues were
evident. Programmable thermostat was no longer in service because a new Toyo stove had been
installed to heat the building. Local resident Jane Tulik who runs the City Head Start program, said
the building was much warmer and more comfortable than before, She thought less fuel was being
used to heat the Head Start building.
PUBLIC SAVETY BUILDING
WVR energy upgrades completed 2008 - 2009:
Lighting upgrades to linear fluorescent and screw-in bulb fixtures
Air sealing, blown fiberglass insulation in attic, exterior door sweeps / seals
Walk-through inspection findings 11-5-14:
Lighting upgrades were performing as intended. Air sealing measures appeared intact. Door seals
on inside door were adequate, but outside door had sustained severe damage at the locksets and
would no longer close. We saw no indication of problems with blown attic insulation. Indoor air
quality was good with no indication of condensation forming on windows or window sills. No other
moisture issues were evident. Heating note: Building was cold. Direct-vent space heater was in
standby mode indicating no fuel. Also metal face-plate cover was removed from the space heater.
However, lights were on and it appeared a staff person had recently been in the building working at
their desk.
POST OFFICE
WVR energy upgrades completed 2008 - 2009:
Lighting upgrades to linear fluorescent and screw-in bulb fixtures
Air sealing, blown fiberglass insulation in attic, exterior door sweeps / seals, installed new Monitor
direct vent space heater, modified interior walls and airflow vents for improved heating distribution
Walk-through inspection findings 11-5-14:
Lighting upgrades were performing as intended. Air sealing measures appeared intact. Door seals
were adequate considering the aged and warped condition of the main entry door. Since we did the
energy retrofit work in ’09, the building had settled some making it difficult to close the entry door
properly against the seals. Even so, this was still a better condition then when we found it pre-
retrofit. Currently, if one pushes the door firmly shut it was possible to make a good seal. We saw
no indication of problems with blown attic insulation. Indoor air quality was good with no indication
of condensation forming on windows or windowsills. No other moisture issues were evident. New
Monitor space heater was functioning as intended. On-site staff said the building stayed nice and
warm and that she knew of no problems with the building’s performance.
WATER TREATMENT PLANT
WVR energy upgrades completed 2008 - 2009:
Lighting upgrades to linear fluorescent and screw-in bulb fixtures.
Walk-through inspection 11-5-14:
Our one-day site visit did not allow time to get to all buildings. As this building received only lighting
upgrades only we elected to skip this building and focus our time on buildings that received both
lighting and Wx measures.
Also, since findings concerning lighting in all other buildings inspected showed the upgrades were
performing well, I am confident this trend remains consistent for the Water Treatment Plant.
WARM STORAGE BUILDING
WVR energy upgrades completed 2008 - 2009:
Lighting upgrades to linear fluorescent and screw-in bulb fixtures.
Walk-through inspection 11-5-14:
Our one-day site visit did not allow time to get to all buildings. As this building received only lighting
upgrades only we elected to skip this building and focus our time on buildings that received both
lighting and Wx measures.
Also, since findings concerning lighting in all other buildings inspected showed the upgrades were
performing well, I am confident this trend remains consistent for the Warm Storage Building.
In general for the City, determining fuel savings from the WVR project for City buildings may be more
challenging than for other entities, as there are more buildings to account for and a lot of staff turnover in
the last 5 years. At the time of the WVR in ’08 – ’09, they had only an acting City Administrator at the time,
Nick Tom, who moved from the village shortly after the retrofits were completed. The current City
Administrator, Noah Laurence used to be the Traditional Council Administrator at the time of the original
project. With all the staff and leadership turnover it may be difficult to acquire consistently maintained fuel
use records.
Native Village of Nightmute Owned Building:
TRADITIONAL COUNCIL OFFICE BUILDING
WVR energy upgrades completed 2008 - 2009:
Lighting upgrades to linear fluorescent and screw-in bulb fixtures
Air sealing, exterior door sweeps / seals, blown fiberglass insulation in attic
Walk-through inspection findings 11-5-14:
Lighting upgrades were performing as intended. Air sealing measures appeared intact. Door seals
were adequate. We saw no indication of problems with blown attic insulation. Indoor air quality
was good with no indication of condensation forming on windows or windowsills. No other moisture
issues were evident.
Umkumuit Native Village Owned Building:
UMKUMUIT NATIVE VILLAGE OFFICE
This building retrofitted as part of the WVR no longer serves as UNV’s office and is currently used for
residential housing. Due to time constraints we were not able to assess the current UNV office located at the
very far edge of the village away from the air strip.
WVR energy upgrades completed 2008 - 2009:
Air sealing, blown fiberglass insulation in attic, exterior door sweeps / seals
Chinuruk Inc Owned Building:
CHINURUK CORPORATION STORE
WVR energy upgrades completed 2008 - 2009:
Lighting upgrades to linear fluorescent and screw-in bulb fixtures
Building foundation leveling and installed new metal roof for building viability (At Chinuruk expense
for materials, shipping and labor), installed 2” rigid foam to building exterior and new siding, new
plywood ceiling installed to allow air sealing, installed new insulated entry door, air sealing, blown
fiberglass insulation in attic, exterior door sweeps / seals
Walk-through inspection findings 11-5-14:
Lighting upgrades were performing as intended. Air sealing measures were mostly intact.
Concerning door seals, we found the main insulated metal door that was installed in 2009 never had
door-jamb seals and bottom sweep installed. I notified the store manager by email of this status and
suggested seals and a door sweep be installed for added energy savings. We saw no indication of
problems with blown attic insulation. Indoor air quality was good with no indication of condensation
forming on windows or window sills. No other moisture issues were evident.
A blower door test was performed on this building with the following findings: Airflow at 50 Pascals
building depressurization (CFM50) was 1,685. Air changes per hour at 50 Pascals pressure was 7.0
ACH50, which indicates substantial current air leakage. The post retrofit blower door test done in
2009 was 1,272 CFM50. The difference of 413 CFM50 showed a fairly substantial increase (approx.
25%), in building air leakage in the 5 years since air sealing had been done.
This finding reveals a potentially viable follow-up action to help air sealing measures remain viable,
particularly in areas of the state that are known for building foundation movement: It could be
economically favorable to revisit buildings that received air sealing and do blower door tests to
determine new air leakage pathways and seal those areas. This could be done with one travelling
contractor and a couple local hires from a given community. A pilot project could show numbers of
buildings and changes in air leakage to determine projected cost savings of follow-up air sealing.
Added mechanical ventilation may also be a needed follow-up program component associated with
additional air sealing.
Before the original energy retrofit projects, the old store’s foundation was in very rough shape –
requiring significant jacking and building leveling just prior to retrofits. Building settling after the
foundation work is the most likely reason for the increase in air leakage. It was also noted the
building owners had installed two fresh-80 passive air intake vents near their offices to increase
ventilation primarily as a building cooling measure. Both vents were closed during the blower door
test however and would not have contributed much to increased air leakage.
In my follow-up email to store manager Jimmy George I also suggested sealing any areas where air
leakage drafts could be felt. A primary air leakage site identified during the blower door test was the
junction, mainly along the floor of the original building structure and the freezer area addition.
Some air leakage was also present in the far back of the building in the stock storage and honey
bucket areas.
In speaking with Jimmy George he was very happy with the results of the WVR energy upgrades. He
said the retrofits really turned their building around and extended it’s useful life. He was sure it used
less fuel, but for actual fuel use records referred me to Kathy Kosbruk, Chinuruk’s long-time
bookkeeper who has been paying the fuel bills for many years. From the pre and post AKWarm runs
done during the WVR project we were expecting a very substantial fuel savings of 74% annually.
With a 25% increase in air leakage since the WVR however a more likely scenario might be around
half the fuel cost pre to post retrofit. Jimmy George also said the staff feels safer in the building
concerning indoor air quality. The old building with its leaky roof and bad foundation had mold and
moisture issues which are no longer a problem since these structural issues were remedied (at
Chinuruk Inc expense), but coordinated along with the energy retrofits in 2009.
Catholic Bishop of Northern Alaska Owned Buildings:
CATHOLIC CHURCH
WVR energy upgrades completed 2008 - 2009:
Lighting upgrades to linear fluorescent and screw-in bulb fixtures
Built drop ceiling in main hall and raised floor in attic to allow larger ceiling insulation cavity
Air sealing, blown fiberglass insulation in attic, exterior door sweeps / seals, installed 7 triple-pain
windows, installed R21 fiberglass bats and 2” rigid foam to formerly un-insulated floor, installed new
Monitor direct vent space heater, installed new 110 cfm fan on timer switch. Also did some building
foundation leveling and installed new metal roof for building viability (At CBNA’s expense for
materials, shipping and labor).
Walk-through inspection findings 11-5-14:
Lighting upgrades were performing as intended. Air sealing measures remained intact other than
attic hatch accessing east side attic storage area. Someone had broken the wood trim frame and
cold air could be felt intruding into the building. This was brought to the church administrator’s
attention. Door seals were adequate. We saw no indication of problems with blown attic insulation.
Indoor air quality was good with no indication of condensation forming on windows or windowsills.
No other moisture issues were evident.
A blower door test was performed on this building with the following findings: Airflow at 50 Pascals
building depressurization (CFM50) was 489. Air changes per hour at 50 Pascals pressure was 2.3
ACH50. This is fairly tight, and warrants mechanical ventilation during periods when several people
are in the building. The post-retrofit blower door test done in 2009 was 546 CFM50, which 2.55
ACH50. Originally I thought these numbers from 2009 were inaccurate and that the building could
not be that tight. But as it turns out, with newer blower door equipment, the building envelop was
actually tested as slightly tighter than in 2009. Nightmute Parish Administrator Jane Tulik said they
always run the ventilation fan during services and that they never have any condensation or
moisture issues.
In speaking with Jane Tulik, she said she was very happy with the results of the program. She said
they were using somewhere around half the fuel they used before the energy retrofits, and that was
for heating the building only part-time for services and community events. This is in alignment with
the fuel savings expected from the upgrades. Pre and post AKWarm runs done during the WVR
project predicted fuel savings of 68% annually for the church.
Jane confirmed the WVR energy upgrades and the associated new roof did in fact save the historic
Nightmute church built in 1946 or ’47, from becoming unusable and being condemned. She was very
pleased with how warm, useable and economical the building had become since the retrofits, stating
that more people attend church now that it is a comfortable building.
CATHOLIC CHURCH HOUSING BUILDING
WVR energy upgrades completed 2008 - 2009:
Lighting upgrades to linear fluorescent and screw-in bulb fixtures
Air sealing, blown fiberglass insulation in attic, exterior door sweeps / seals,
Walk-through inspection 11-5-14:
Again, our one-day site visit did not allow time to get to all buildings. I anticipate both the WX
upgrades and lighting upgrades completed for this building still remain effective and consistent with
findings for the other buildings inspected during our 5-year follow-up site visit.
Buildings Owned by the Lower Kuskokwim School District
NIGHTMUTE SCHOOL GYMNASIUM
WVR energy upgrades completed 2008 - 2009:
Lighting upgrades (New T5 fluorescent fixtures)
NIGHTMUTE TEACHER HOUSING UNITS #: 17, 18, 19, 20
WVR energy upgrades completed 2008 - 2009:
Lighting upgrades to linear fluorescent and screw-in bulb fixtures
Walk-through inspection 11-5-14:
We ran out of time to get into teacher housing units. Since findings for lighting retrofits in all other
buildings inspected showed the upgrades were performing well, I am confident this trend remains
consistent for the LKSD Teacher Housing Units.
Conclusion:
In terms of the commercial / community building energy retrofits I was generally very happy with what we
observed during our Nov 5th site visit. I believe the original program direction of concentrating efforts on the
best payback measures attainable through working with local labor has paid off with favorable results. If
attainable, I believe pre / post-retrofit fuel use records will affirm this.
Considering the rough shape of many commercial / community buildings in rural Alaska, considering the
often times poor existing insulation levels, lack of maintenance budgets and Wx programs for rural Alaska
commercial / community buildings, there is enormous opportunity for substantial energy and cost savings at
relatively little investment. This rural Alaska building sector offers low-hanging fruit one barely has to reach
for. With the original retrofit work done in 2008 – 2009, we estimated the fuel and electrical savings payback
periods would be substantially greater and faster than for residential energy retrofit projects which have
enjoyed regularly funded programs for decades. From what I saw while inspecting the commercial /
community buildings, I believe our original estimates for very favorable savings and payback ratios remain
sound. Energy efficiency retrofits to existing commercial / community buildings in rural Alaska should remain
an essential component for any WVR work and for building energy efficiency programs in Alaska moving
forward.
Appendix B:
Nightmute Whole Village
Retrofit Project - Follow-up
Site Visit
Residential Building
Inspection Report
11-5-14
By Kent Banks, Director Wx RurAL CAP
Residential Wx Notes from Community Listening Session
The following commented on the Wx process for their residence:
1. John George (I inspected following this session) nails coming out of siding in some areas of the home
where they must have missed the studs. There are some gaps in the insulation also.
2. Carl Mark (I inspected following this session) open area not insulated in the ceiling.
3. Mary Mathias (Not inspected) did not receive a fan and there was pre-existing rotten insulation in
the walls by the windows which was not remediated prior to doing work in the home. "They said
they would replace the insulation".
4. Simeon Agnus (I inspected following this session) kitchen light drips water.
5. Christopher George (not inspected) Roofing metal came loose on a windy day. He re-fastened. Nails
are coming out on some of the siding on the home. "Nailings on the interior plywood are coming out
in some places where they missed the truss".
6. Joseph Post (not inspected) nails coming out of the siding in some areas and off of the foundation
posts.
7. Paul Joe (I inspected following this session) nails are coming out of the siding in some areas.
8. Stanley Anthony (I inspected following this session) ventilation? Air comes in around the windows.
The living room windows are bad.
Post Inspection Notes:
In general, the Wx measures provided for Nightmute homes are continuing to provide for reduced energy
burdens and better IAQ for the residents. Please refer to the nine home inspections that were performed on
11/5/2014 for more detailed information.
Note- The movement of the homes in Nightmute caused by natural springs under the homes and shifting
rocks and soils is a factor in the failure of some of the nailing attachments for the exterior siding on the
homes. It is recommended that following a siding re-attachment process for those homes requiring such
which will be provided by RurAL CAP that the community perform attachment maintenance on an annual
basis due to the constant shifting and movement of the homes.
Survey
#
Past
Rural
Cap
empl.?
Notice
reduction in
utility costs
for electricity
since Wx?
Heating
fuel
reduction
since Wx?
Primary and
secondary
heat?
More
comfortable
in home
since Wx?
Status of
ventilation?
Sign of
moisture
damage
around
windows?
Dryer vent
cleaned?
Working
properly?
Use
Hygrometer?
Wx
improve
ments
still
working
well?
Moisture in
attic?
1 No Yes Yes
Heating
Fuel/Toyo
Stove Yes
50 CFM fan
installed and
works welll.
Fresh 80 used
in summer for
cooling.No
Cleaned
2x/year,
working
well.No.Yes.
N/A - attic
hatch sealed
during Wx,
attic not used
2 No
No - stayed
same Yes Oil/Wood Yes
50 CFM fan in
good
contition. 3 x
Fresh 80 in
good
condition No.Yes/yes.No.Yes.
N/A - attic
hatch sealed
during Wx,
attic not used
3 No Yes - a little No Wood/Oil No
50CFM Fan
was removed No
No dryer
vent used No.
No, not
happy
with the
improve
ments
Yes - attic hatch
not sealed,
homeowner
complained of
frost/moisture
in attic
4 No Yes - a little No Wood Yes
50 CFM fan
works okay,
Fresh 80 in
poor
condition No
No dryer
vent used No.Yes.
N/A - attic
hatch sealed
during Wx,
attic not used
5 Yes No Yes - a lot
Fuel oil and
Toyo Yes
50 CFM fan in
good
condition,
one Fresh 80
in good
condition no answer Yes/yes.
Have
hygrometer
but not using
it Yes.
Attic hatch not
sealed, attic
not used by
resident, no
moisture signs
in attic
6 No No - not much
Yes - a
little Oil/Wood Yes
50 CFM fan in
good
condition.
Fresh 80 in
good
condition but
not used No
Dryer vent
not used No.Yes.
N/A - attic
hatch sealed
during Wx,
attic not used
7 No no answer Yes Oil/Wood Yes
50 CFM fan in
fair condition.
Fresh 80 in
good
condition but
not used.no answer
Not
working
Hygrometer
broke Yes.
N/A - attic
hatch sealed
during Wx,
attic not used
8 No No No answer Oil/Wood No answer
50 CFM fan in
good
condition.
Two Fresh 80s
in good
condition,
used to
relieve
moisture
problems.Yes Yes/yes.
Have
hygrometer
but not using
it
no
answer
Attic hatch not
sealed, attic
not used by
resident, no
answer about
moisture in
attic
9 No no answer
Don't
know Oil/Wood no answer
don't use fan
because it's
too noisy. No
Fresh 80s No Not used No.
no
answer
Attic hatch
sealed
2014 Residential Weatherization Survey - Where do things stand now, five years later?