Loading...
HomeMy WebLinkAboutCAC-CDV-CAEC Cordova Community Medical Center 2012-EEAUDIT REPORT Level II Energy Audit Cordova CMC Cordova, AK Submitted by: Ameresco Federal Solutions 1820 Midpark Road, Suite C Knoxville, TN 37921 Phone: 865-558-9459 Fax: 865-558-8831 www.ameresco.com August 2, 2011 Central Alaska LN i EERING COMPANY .IL AMERESCO Green . Clean • Sustainable Audit Report Ameresco Federal Solutions Page i REPORT DISCLAIMER Level II Energy Audit Cordova CMC Anchorage, AK The information contained within this report, including any attachment(s), was produced under contract to Alaska Housing Finance Corporation (AHFC). IGAs are the property of the State of Alaska, and may be incorporated into AkWarm-C, the Alaska Retrofit Information System (ARTS), or other state and/or public information systems. AkWarm-C is a building energy modeling software developed under contract by AHFC. This material is based upon work supported by the Department of Energy under Award Number DE-EE0000095. This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. Audit Report Ameresco Federal Solutions Page 1 TABLE OF CONTENTS Level II Energy Audit Cordova CMC Cordova, AK EXECUTIVE SUMMARY AND PREFACE 2 1.0 METHODOLGY 4 2.0 BUILDING DESCRIPTION 5 3.0 UTILITY AND BENCHMARKING DATA 11 4.0 ENERGY CONSERVATION OPPORTUNITIES 15 APPENDICES APPENDIX A — REALS BENCHMARKING DATA FORM A-1 APPENDIX B — ECO CALCULATIONS B-1 APPENDIX C — MAJOR EQUIPMENT SURVEY C-1 LIST OF TABLES Table ES.1: Energy Cost Summary 2010 3 Table ES.2: ECO Summary 3 Table 2.1: Envelope Summary 6 Table 3.1: Energy Performance Summary 2010 11 Table 3.2: Energy and Cost Indices 2010 11 Table 3.3: Electrical Demand Summary 2010 11 Table 3.4: Index Comparison (CBECS 2003) 12 Table 4.1: ECO Summary 15 Audit Report Ameresco Federal Solutions Page 2 EXECUTIVE SUMMARY AND PREFACE Level II Energy Audit Cordova CMC Cordova, AK This report summarizes the results of an Ameresco Federal Solutions (Ameresco) Energy Audit of the Cordova Community Medical Center (Cordova CMC) at 602 Chase Ave, Cordova, Alaska 99574. The intent of this report is to evaluate energy consumption and costs and to recommend improvements to reduce consumption and costs. The American Recovery and Reinvestment Act (ARRA) provided funding for this audit with the end goal of improving the economy by reducing state-wide energy consumption and environmental impact. Cordova CMC, Cordova, Alaska imago 2011 GeoEyR 2011 Googae Audit Report Ameresco Federal Solutions Page 3 Level II Energy Audit Cordova CMC Cordova, AK Ameresco engineers conducted an energy audit at Cordova CMC during the week of July 11, 2011. The engineers were assisted primarily by the maintenance supervisor, Ken Lobe. Mr. Lobe provided valuable assistance to the Ameresco team including providing access to mechanical areas, utility data, facility drawings, and contact with other pertinent building personnel. The purpose of the audit is to identify cost-effective system and facility modifications, adjustments, alterations, additions, and retrofits. Systems investigated during the audit included heating, ventilation, and air conditioning (HVAC), interior and exterior lighting, domestic water, motors, building envelope, and energy management control systems (EMCS). A 53,700 square foot medical facility including exam rooms, offices, labs, inpatient beds, and other treatment areas is covered by this energy audit. Table ES.1 summarizes the 2010 utility cost for this facility. Table ES.1: Energy Cost Summary 2010 Energy Type _Annual Cost Electricity Fuel Oil Total $ 109,604 $ 108,991 $ 218,595 Table ES.2 lists energy conservation opportunities (ECO) with estimated cost and savings figures. ECOs 1-3 were calculated independently, therefore some savings may overlap. All other ECOs were calculated in numerical order taking previous ECO savings into account. Savings figures are estimated based on information available at the time of the audit and conforming to the level of detail recommended by ASHRAE Level II Audit standards. Costs are estimated based on industry standard references and the contractor's previously constructed energy conservation projects. Table ES.2: ECO Summary ECO # ECO Description Annual Savings Total Cost Simple Payback 1 DDC EMCS 2 HVAC Retro-commissioning 3 Boiler Upgrade 4 Premium Efficiency Motors 5 T8 Lighting Upgrade 6 Install Occupancy Sensors 7 CFL Lighting Upgrade 8 LED Exit Sign Upgrade 9 Exterior LED Lighting 10 Weather-stripping 26,432 8,287 6,408 1,211 20,310 3,044 1,497 886 1,640 633 $ 371,385 $ 76,422 $ 119,034 $ 18,327 $ 92,004 $ 9,054 $ 1,556 $ 1,298 $ 14,889 $ 3,329 14.1 9.2 18.6 15.1 4.5 3.0 1.0 1.5 9.1 5.6 Audit Report Ameresco Federal Solutions Page 4 1.0 METHODOLGY Level II Energy Audit Cordova CMC Cordova, AK Prior to the site survey, the audit team gathered information about the site including utility data for electric and fuel oil services. This data was collected in the REAL Preliminary Benchmark Data Form attached in Appendix A. Analysis of utility data reveals operational characteristics and usage trends which help identify savings measures. Historical utility data is also useful for establishing a baseline for future savings and benchmarking Cordova CMC against similar facilities. The site survey was conducted during the week of July 11, 2011. The first step of the site survey was a review of drawings onsite to get an overview of building construction and mechanical design. The drawings were then compared to the actual facility during a two day walkthrough of the facility which included a thorough inspection of mechanical systems, lighting, envelope, domestic water fixtures, and other energy using equipment. Referencing data collected from the drawings and the walkthrough, the audit team determined a series of ECOs feasible for implementation to analysis for cost-effectiveness. These ECOs were evaluated taking into account utility data and rates, local climate conditions, operating schedules, building occupancy, and the condition of building systems and equipment. The audit team employs proven system simulation techniques to model energy upgrades. Energy consumption of new equipment is based on up-to-date data for commercially available systems. Material costs and labor hour data is calculated from RSMeans Cost Data or other industry standards. Recent quotes or costs from other Ameresco projects are used when available. Labor rates are based on Davis -Bacon prevailing wage rates for the Cordova area. Where reliable figures are available, primarily on lighting calculations with predictable burnout rates, maintenance saving are included in savings figures. Maintenance costs are not included in controls or mechanical upgrades. Avoided costs of replacement are not included in these calculations. Audit Report Ameresco Federal Solutions Page 5 2.0 BUILDING DESCRIPTION Level II Energy Audit Cordova CMC Cordova, AK O General: Cordova CMC is a medium-sized medical center with approximately eight (8) in- patient beds, x-ray and lab facilities, a single bed ER unit, a physical therapy center and an attached minor medical center, and a substance abuse center. The building was constructed in 1985-86 with a total square footage of 53,700. The typical operating hours for the clinics and administrative areas are 8:00am to 5:OOpm, Monday -Friday. In -patient areas and the ER operate 24/7 year round. The average occupancy profile is 55 people during business hours and 20 people after hours. O Building Envelope: The exterior walls are 2-inch exterior finish system over steel stud framing with R-19 batt insulation. Windows are insulated, double glazing with wooden frames and little or no tinting. Exterior doors are either hollow metal type with or without one-fourth inch (1/4") single glazing wire glass or aluminum frame with insulating glass. Two garage areas were equipped with a total of four insulated sectional doors. The metal roof is mounted over plywood sheathing on wooden truss. The roof is ventilated through the perimeter soffit with R-33 batt insulation on the attic floor above the vapor barrier. Maintenance staff did report trouble with roof leaks, but the attic insulation was in good condition. Insulation and window characteristics approach the ASHRAE Advanced Energy Design guideline for new facilities and upgrades are Audit Report Ameresco Federal Solutions Page 6 Level II Energy Audit Cordova CMC Cordova, AK not recommended. The table below summarizes the thermal resistance characteristics of building envelope components. Table 2.1: Envelope Summary Exterior Walls Roof Exterior Doors Exterior Windows 20.0 34.0 1.1-1.6 1.7 OO Air Distribution: The building has seven (7) Trane central air handling units (AHUs). AH-1 is a variable air volumes (VAV) unit with inlet guide vanes that serve 24 terminal boxes with reheat coils in the admin and medical clinic areas on the main level. AH-1 is equipped with a hot water (HW) heating coil and a chilled water (CHW) cooling coil. AH-2 is a constant volume (CV) unit with only a HW coil serving the "surgery" area. AH-3 is similar to AH-2 and serves patient rooms. AH-4 is CV with HW and CHW coils and serves the building core. AH-5 is CV with HW coil and serves the lower level. AH-6 is CV with a HW coil and serves as the makeup air unit for the kitchen exhaust hood. Terminal units for AH-2 through AH-6 are equipped with supplemental heating and cooling coils. AH-7 is CV with no coils and provides outdoor air for the mechanical room. O Ventilation and Exhaust: A common outside air (OA) plenum serves AH-1-7. Six exhaust fans (EF) are located in the attic and one on the roof. EFs 1-3 are equipped with glycol heat recovery coils which pre -heat incoming OA at the plenum. The circulating pump for the heat recovery loop was running during the visit even though OA pre -heating was not desirable. The exhaust fans are not interlocked with AHUs and seem to run 24/7. Running exhaust fans when AHUs are shutdown results in improper building pressurization which can draw moisture into the building envelope and adversely affect unoccupied temperature control. Currently AHUs also run 24/7 with OA dampers open bringing outside air into the building at all times. Improvements to the ventilation and exhaust system would include several changes. First, the system would bring in OA to satisfy ventilation requirements only during occupied hours. Additional OA would be brought into the building via an economizer cycle when OA conditions are conducive to free -cooling. EFs would be engaged to achieve a neutral or near neutral building pressure. Some medical areas have special pressurization requirements and these would be taken into account. Also, space usages have changed significantly from original designs. Over ventilation of spaces with reduced requirements is also wasteful. Addressing and correcting these issues is part of ECO 1 - DDC EMCS and ECO-2 HVAC Retro-commissioning. Audit Report Ameresco Federal Solutions Page 7 Level II Energy Audit Cordova CMC Cordova, AK O Heating: HW for heating is provided by two redundant 3766 MBH input Burnham boilers. The original burners have been replaced with Power Flame burners. Three pairs of redundant pumps provide HW circulation. The AHU HW coil loop, the duct and terminal HW coil loop, and the perimeter baseboard loop are each served by one pair of pumps. For each loop one pump is run year round to prevent system leaking. All pumps are CV with three-way valves on the majority of equipment. Initial analysis indicates that the boilers may be over sized for the actual building load. O Cooling: A 50-ton Trane chiller is installed in the mechanical room and appears to be in fair condition but is never run. Cooling is accomplished with natural ventilation from open windows and portable fans. Associated pumps were also de -energized and appeared in similar condition. O Controls: A Johnson Controls pneumatic system was originally installed and appeared to be relatively well maintained. Staff reported short cycles on the system compressor which indicates system leaks. Behavior of some terminal devices also indicated controls malfunction. The time clocks originally installed have had all scheduling pins removed due to difficulty of use and inadequate building warm-up control. Perimeter baseboards have thermostatic valves with sensors located too close to the heaters causing them to close prematurely. Maintenance personnel have started replacing baseboards in trouble areas with retrofit kits which allow for occupant adjustment. O Lighting: Interior lighting consists mainly of T12 fluorescents. Additionally, there are a moderate number of incandescent can fixtures. In several offices under -shelf T12 task lighting is present. Fixtures are controlled by single -zone switching except in larger areas, most of which have multiple circuits by zone and a few with multi -level switching of three (3) lamp fixtures. Light levels vary in the building. Most areas were within the ranges recommended by Illuminating Engineering Society (IES). A few areas had excessive lighting and might be suitable for de-lamping, most notably the rooms which were intended to be surgical areas. Most exit signs employ either incandescent or fluorescent lamps but a few signs are equipped with LEDs. Exterior lighting consists primarily of 60W incandescent down lights and some halogen floods. Parking lot pole lamps are 250W high pressure sodium (HPS). O Process Loads and Miscellaneous Equipment: Medical air and vacuum equipment are present. A small Hurst boiler provides steam for sterilization. A full service kitchen also contributed to energy consumption and heat load. Computer load is typical for a medical office setting and common rooms had a few large televisions that were on but not in use at the time of the visit. There is also an onsite laundry for soiled linens. O Domestic Water: Domestic water is used in patient room showers and lavatories as well as kitchenettes and lavatories for staff and guests. Hot water is provided indirectly from the heating Audit Report Ameresco Federal Solutions Page 8 Level II Energy Audit Cordova CMC Cordova, AK HW loop via several heat exchangers. The heat exchangers are equipped with circulating pumps connected to demand sensors. Plumbing fixtures included 1.6 gallons per flush (gpf) toilets, 1.5 gallons per minute (gpm) lavatory sinks, and 2.2 gpm showerheads. These fixtures are compliant with standard s set by the 1992 Energy Policy Act and no further upgrades are recommended at this time. Pictures of general equipment and building conditions as well as thermal images of some building features follow this section. A list of major mechanical equipment is available in Appendix C. Audit Report Ameresco Federal Solutions Page 9 Heating Water Boilers Typical AHU Heating Water Pumps Level II Energy Audit Cordova CMC Cordova, AK Equipment Photos Typical Operable Wooden Window Pneumatic Control System Attic Exhaust Fan w/Heat Recovery Audit Report Ameresco Federal Solutions Page 10 Level II Energy Audit Cordova CMC Cordova, AK Thermal imaging of the building envelope can provide information about the condition of the building envelope. The building exterior and attic were scanned using a handheld thermal imager during the site walkthrough. Some images captured during the scan are shown below. Thermal Imaging Exterior door Attic Insulation Bright yellow indicates air leakage due poor weather- stripping Uniformity of color indicates good condition Audit Report Ameresco Federal Solutions Page 11 3.0 UTILITY AND BENCHMARKING DATA Level II Energy Audit Cordova CMC Cordova, AK 3.1 Summary and Benchmarking Data Cordova Community Medical Center utilizes electricity and fuel oil services. Electricity is provided by the Cordova Electrical Cooperative. Fuel oil is supplied by Shoreside Petroleum, Inc. Fuel oil is used primarily in boilers for hydronic space heating and indirect domestic hot water (DHW) heating via heat exchangers with the boiler system. In addition to plug loads and hospital operations, electricity is used for space cooling. The tables below summarize the annual utility consumption of the site. Table 3.1: Energy Performance Summary 2010 Energy Type Total Annual Use ' Units Conversion kBtu Annual Cost Electricity Fuel Oil 585,480 43,356.72 kWh Therm 3.413 kBtu/kWh 100 kBtu/Therm 1,998,243 4,335,672 6,333,915 Table 3.2: Energy and Cost Indices 2010 Energy Utilization Index Energy Cost Index 118.0 4.07 kBtu/sqft $/sgft Table 3.3: Electrical Demand Summary 2010 Index Maximum Demand Dec 128.4 2.391 Minimum Demand August 115.2 2.145 $ 109,604 $ 108,991 $ 218,595 Benchmarking the site's energy consumption per square foot to facilities in the US Energy Information Administration's (EIA) Commercial Buildings Energy Consumption Survey (CBECS) database gives an idea of the site's energy efficiency. Benchmarking comparisons are shown in Table 3.4 below. Audit Report Ameresco Federal Solutions Page 12 Table 3.4: Index Comparison (CBECS 2003) Level II Energy Audit Cordova CMC Cordova, AK egory Total Elec Nat Gas Fuel Oil Sqft per kBtu/sqft kWh/sqft kBtu//sgft kBtu//sq i orker Cordova CMC 50,001 to 100,000 sqft Health Care Health Care - Inpatient Health Care - Outpatient CBECS Climate Zone 1 118.0 83.8 187.7 249.2 94.6 93.2 10.9 13.1 22.9 27.5 16.1 11.5 N/A 36.46 95.28 113.09 51.71 56.34 80.73 30.58 N/A N/A N/A 40.3 976 1,074 501 513 484 1,031 Cordova CMC has an energy consumption rate roughly on par with surveyed healthcare facilities as well as other buildings in CBECS climate zone 1. However, heating fuel consumption is higher than both the climate zone 1 average and the outpatient healthcare facility average. The lower -than -average density of workers at Cordova CMC compared to other healthcare facilities may explain part of the lower -than - average electric usage, but the primary difference is the lack of cooling. A chiller was installed during building construction but is never run. The need to run the boiler year round to supply the domestic hot water system may contribute to this increased usage. Maintenance staff also circulates heated water through the whole building in an attempt to reduce thermal expansion cycling in the hot water piping to prevent leaking. 3.2 Electricity Cordova CMC purchases electricity from Cordova Electrical Cooperative. The blended average FY10 rate was $0.19/kWh. For FY09 the rate was $0.22/kWh. The blended rate fluctuates monthly depending somewhat on demand but is more greatly affected by the Fuel Cost Adjustment (FCA). Cordova CEC generates electricity via both hydroelectric dams and diesel generators. The capacity of the hydroelectric dams is dependent on seasonal water flows. When water flows are higher and dam capacity is up, the FCA remains low. Otherwise, the blended rate increases. The energy rate schedule is calculated as follows: Basic Charge: $60.00/month Demand Charge: $8.40/kW Energy Charge: $0.169/kWh Fuel Cost Adjustment: Varies Cordova CMC FY09 and FY 10 usage and cost data is presented in the figure below. Audit Report Ameresco Federal Solutions Page 13 60,000 50,060 Electric Consumption (kWh) Level II Energy Audit Cordova CMC Cordova, AK Cordova Community Medical Center - Electric Consumption (kWh) vs. Electric Cost ($) Jan Feb Mar Apr May Jun Jul Aug. Date (Mon - Yr) Sep Oct Nov Der 2009 Electric Consumption (kWh) I 12010 Electric Consumption (kWh) —2009 Electric Cost ($) — 2010 Electric Cost ($) $14,006 - $12,600 - $16,000 - $8,000 - $6,000 $4,000 - $2,060 50 Electric usage does not seem to have a seasonal pattern. Since the site does not use its cooling equipment and hot water pumps are run year round, this lack of pattern seems to make sense. The cost of electricity does not track well with usage due to the large fluctuations of the FCA. 3.3 Fuel Oil Cordova CMC purchases Fuel Oil from Shoreside Petroleum, Inc. The average FY10 fuel oil cost was $2.54/Therm. The average FY09 fuel oil cost was $2.08/Therm. Unit cost has consistently increased over the past two years. Fuel oil is stored in an onsite tank with a working capacity of about 2900 gallons and is trucked to the site in 2000 gallon maximum increments. Cordova CMC FY09 and FY10 usage and cost data is presented in the figure below. Audit Report Ameresco Federal Solutions Page 14 Oil Consumption (Therms) 6,006 5,000 4,000 2,000 1,000 0 Level II Energy Audit Cordova CMC Cordova, AK Cordova Community Medical Center - Oil Consumption (Therms) vs. Oil Cost ($) An Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Date {Mon -Yrl M 2009 Oil Consumption (Therms) I 12010 Oil Consumption (Therms) —2069 Oil Cost ($) — 2010 Oil Cost ($) $14,000.00 2009 fuel oil usage has a typical seasonal pattern, but 2010 has a reduced usage from October to December. Discussion with staff seems to indicate this pattern is atypical. Cost tracks precisely with usage, but unit cost has gradually increased over time. Audit Report Ameresco Federal Solutions Page 15 4.0 ENERGY CONSERVATION OPPORTUNITIES Level II Energy Audit Cordova CMC Cordova, AK Table 4.1 summarizes the ECOs identified during the energy audit and evaluated for implementation. Potential ECOs for this report were identified based on observations made during the energy audit, a review of historical energy consumption data, building drawings, and input from maintenance personnel. These opportunities were evaluated for detailed savings, cost estimate, and life -cycle costs. A description of each energy conservation opportunity is also provided in this Section. Table 4.1: ECO Summary ECO #1l ECO Description Annual Savings Total Cost Simple Payback 1 DDC EMCS 2 HVAC Retro-commissioning 3 Boiler Upgrade 4 Premium Efficiency Motors 5 T8 Lighting Upgrade 6 Install Occupancy Sensors 7 CFL Lighting Upgrade 8 LED Exit Sign Upgrade 9 Exterior LED Lighting 10 Weather-stripping 26,432 $ 8,287 $ 6,408 $ 1,211 $ 20,310 $ 3,044 $ 1,497 $ 886 $ 1,640 $ 633 $ 371,385 76,422 119,034 18,327 92,004 9,054 1,556 1,298 14,889 3,329 14.1 9.2 18.6 15.1 4.5 3.0 1.0 1.5 9.1 5.6 ECO 1 — DDC Energy Management & Control System O Summary: Throughout the building there are pneumatic manual wall thermostats for the various HVAC zones. These indoor temperature controls are typically inaccurate due to temperature drift, age, cost of maintenance of pneumatics, and frequent need for re -calibrated. These units also do not have night time setback features. In addition, pneumatic controls do not have the ability to maintain the temperature at set -point under changing load conditions. This ECO proposes installing a EMCS with direct digital control (DDC) to effectively minimize energy demand and consumption with fully automated and centralized energy management. EMCS will permit advanced energy control strategies such as operation scheduling, optimal start/stop, night setback, economizer, and hot water temperature reset. A full DDC install also allows for elimination of the air compressor for the pneumatic system. EMCS will also result in O&M savings, improved comfort, real-time continuous monitoring, and data trending. Real-time monitoring and trends allow maintenance staff to more easily troubleshoot mechanical failures and overheating zones. Audit Report Ameresco Federal Solutions Page 16 Level II Energy Audit Cordova CMC Cordova, AK O Recommendation: This ECO is feasible as with a simple payback of 14.3 years. The simple payback period is less than the 15 year median expected life of the control system. This calculation employed a conservative estimate of savings primarily driven by scheduling savings that do not included savings from advanced controls techniques. Detailed analysis will likely increase savings. Controls costs are estimated at approximately $1,600 per point with point count based on drawings of existing pneumatic system. Maintenance savings were not included in this calculation. This ECO was calculated independently of other ECOs. Savings may overlap with ECO 2 and/or ECO 3. ECO 2 — HVAC Retro-Commissioning OO Summary: A fully functional and properly balanced HVAC system is critical for comfortable and efficient operation of a building. Improper system operation can result from a variety of causes: normal wear and tear, space end use changes, or even incomplete commissioning at initial start-up. This ECO proposes a comprehensive retro-commissioning of the control systems in each building to optimize system operations. This also covers the full Test, Adjust, and Balance of all HVAC systems. Retro-commissioning reduces operating and maintenance costs and improves energy performance and occupant comfort. • Recommendation: This ECO is feasible with a simple payback of 9.2 years. The energy cost savings justify the initial investment cost. Maintenance savings were not included in this calculation. This ECO was calculated independently of other ECOs. Savings may overlap with ECO 1 and/or ECO 3. ECO 3 — Install Higher Efficiency Boilers O Summary: This ECO proposes replacing existing hot-water heating boilers with higher energy efficiency units. The existing Burnham boilers are original to the building and are approaching the end their useful service life. Boilers employing modern technology can be installed to reduce energy consumption, improve system operations, and reduce maintenance costs. The current boilers operating have a nominal efficiency of 80% whereas current generation high efficiency oil -fired boilers reach 87% efficiency. O Recommendation: This ECO is feasible with a simple payback of 18.6 years. The simple payback period is less than the 25-year median expected life of the new boilers. Maintenance savings were not included in this calculation. This ECO was calculated independently of other ECOs. Savings may overlap with ECO 1 and/or ECO 2. ECO 4 — Premium Efficiency Motors OO Summary: This ECO proposes installing National Electrical Manufacturers Association (NEMA) premium efficiency motors to replace standard and high efficiency motors. This replacement would cover all fan and pump motors 2HP and higher as well as select few with less than 2 HP. Premium efficiency motors typically increase energy efficiency by 2 to 3%. Currently AHU fans and HW pumps run 24/7 year round. However, calculations for motors Audit Report Ameresco Federal Solutions Page 17 Level II Energy Audit Cordova CMC Cordova, AK which will be scheduled off during unoccupied periods following the installation of a DDC control system had run hours reduced appropriately. OO Recommendation: This ECO is feasible with a simple payback of 15.1 years. The simple payback period is less than the 20-year median expected life of the new motors. Maintenance savings were not included in this calculation. This ECO was calculated assuming the installation of ECO 1. If ECO 1 is not implemented, savings will increase. ECO 5 —T8 Lighting Upgrade O Summary: This ECO proposes replacing existing T12 lighting fixtures with high efficiency T8 fixtures. T12 fixtures using magnetic ballasts are highly energy inefficient. Also, T12 lamps are no long in production and will be unavailable when warehouse reserves run out. Post -light levels are generally nearly equal to that of the existing lighting systems and at minimum will meet IES guidelines for spaces renovated. O Recommendation: This ECO is feasible with a simple payback of 4.5 years. The simple payback period is less than the typical 15-year length of study period for lighting upgrades. Maintenance savings due to longer life of T8 lamps with electronic ballasts are included in this calculation. ECO 6 — Install Occupancy Sensors O Summary: This ECO proposes installing sensors to shut off lighting in unoccupied spaces. Lighting systems are often left energized in unoccupied areas. Common sensing technologies include infrared, ultrasonic, and audible sound, often combining multiple types of sensing in one unit to avoid shutting off lights in an occupied area. Potential areas for occupancy control in this facility include clinic offices, the lower level storage area, the cafeteria, the PT room, conference rooms, break areas, and utility closets. OO Recommendation: This ECO is feasible with a simple payback of 3.0 years. The simple payback period is less than the typical 15-year length of study period for lighting upgrades. This ECO was calculated assuming the installation of ECO 5. If ECO 5 is not implemented, savings will increase. ECO 7 — CFL Lighting Upgrade O Summary: This ECO proposes retrofitting the existing incandescent light bulbs with compact fluorescent bulbs. Incandescent light bulbs installed in recessed fixtures, track lighting, utility closets, and other general areas. Over 75% of the energy used by an incandescent light bulb is converted into heat and is lost. Compact fluorescent light bulbs are much more efficient and can easily replace incandescent bulbs. Post -light levels will be nearly equal to that of the existing lighting systems or to IES standards for the present space usage, whichever is lower. O Recommendation: Applied to the buildings above, this ECO is feasible as a stand-alone measure with a simple payback of 1.0 years. The simple payback period is less than the typical Audit Report Ameresco Federal Solutions Page 18 Level II Energy Audit Cordova CMC Cordova, AK 15-year length of study period for lighting upgrades. Maintenance savings due to longer life of CFL lamps are included in this calculation. ECO 8 — LED Exit Sign Upgrade • Summary: This ECO proposes replacing the existing incandescent and compact fluorescent exit signs with light emitting diode (LED) units. LED exit signs are typically 2.0 watts per unit. OO Recommendation: This ECO is feasible as a stand-alone measure with a simple payback of 1.5 years. The simple payback period is less than the typical 15-year length of study period for lighting upgrades. Maintenance savings due to longer life of LED lamps are included in this calculation. ECO 9 — Exterior LED Lighting O Summary: This ECO proposes replacing HID exterior lighting with LED lighting. New advanced LED fixtures are commercially available to replace outdoor building and roadway lights. These fixtures have similar output, longer service life, and better lumen maintenance OO Recommendation: This ECO is feasible as a stand-alone measure with a simple payback of 9.1 years. The simple payback period is less than the typical 15-year length of study period for lighting upgrades. Maintenance savings due to longer life of LED lamps are included in this calculation. ECO 10 — Weather Stripping • Summary: This ECO proposes applying weather stripping to exterior door perimeters to reduce air infiltration into the buildings. Reducing infiltration improves building performance by reducing envelope heat loss. Many building doors have existing weather stripping material which is worn or missing. Replacing this weather stripping will have significant impact. O Recommendation: This ECO is feasible with a simple payback of 5.6 years. The simple payback period is less than the typical 25-year length of study period for envelope measures. O Recommendation: Applied to the buildings above, this ECO is feasible as a stand-alone measure with a simple payback of 7.4 years. The energy cost savings justify the investment costs. APPENDIX A REALS BENCHMARKING DATA FORM •pepinwd sIieteP ON •?xi Fog=o3 Sgi\/ g< Ia 51171|k 0 |} '` ® $ , , . o go %| 3 2 ,<r<v $ z (\|&E&% ,|§�r=;2 m \ { & 2) f�{{\/\ go ;; E. 3 E co 9tLlf Co ° 3 N ro N ro N ro N ro N ro • N N N N N N N 0 0 0 0 0 0 0 0 o`c o 0 0 0 0 0 0 0 0 c.c. c.c. 0 0 0 0 0 c.c. c.c. 0 0 0 0 0 0 0 0 con o 0 0 0 0 0 0 mys�ovomz�mv)Sgcvo ' v¢ n" H m 3¢ x13) cIno 'Do y 0 0 0 N H n N ea 0,Q. nfi •3mk3�ya°o�mt e� ' H � W t0 We/3 600Z 0 CO O CO v n N N N N N N N N N N N N N N N N N N O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 = CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO • -1-1cn cn -1-1* * n n v -0 O_ _O m m z z s� °° - .v of v m cum m °o °o m m -O° a° n n ° cc g mm3 3 3 3 °-cLnng g c <i m m e n n m m • rn o� m cfl N= o o N a N c n nvnn 3 o o m m o N< rn c a R CO m c i» 3 aa) m o ca vn 3 t0 -a. � c o i» = o 0 0 m a 3 -- 0 3 a cn e o a o c '� °' ° 3 m �c S m CD 3 CFCo H N 3 3 3 .N.. < 7 m 3 v o co C N x 3 3 cm H v N N W A ✓ N N N CO 0 O - W - N 0 N 0) 0) CO s N V T l0 O W A CO N N 0 3 W o a a 7 0 um < nt N 0 O 3 ° • c 3 n 0 a m n m IT Z n n N N N N N N N N N N N N N N N N N N n 77 CC = = 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 T= C fp i 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �1 3 94o o W W s� 00-0-000mmzz o o - m m o 11 <a m m m m obi awi m °o °o m m -oo 4 n n E o c c O 0 j m m m m 3 3 3 3 °- 0- 0 0 0 0 vow, o c <i 3 3 W OW o00000000`ac 000000000`ac � � N � C�C�m m -cn 00tA= o o m m N 0 C a O O O O O O O O n O 0 0 0 0 0 0 0 0 C `� `< N 0 7 c 3 N 7 a N N N pow c)cn-inV 0rnzin ncn-I 013cD TZat 0C"'3 c �3 a 2 oi». 0 cc E = aai ▪ °o 0 i3 e 3 m aai °o a°, ° w 3$ m -a a. 3 a o �' 3 = a'4 F) N 84' al ''G 0 0 H m n. k 3 x m G 2 "„ v 0 m 'o H N Say m N w n i.4. ea 0o �� 0o `�1 � N fli 3 m 3 w m 7 N k 7 ^� a H` C .� H .� N C v N `" N N 0.k Qk-.2 1p 7 3 .� iG k yg 3 k N k 1 c A tocn to`�1• n 14 k k H 03 G N T A IV W W —. N W O W O OD CO W CO 01 l0 G1 A N N s Co W "DI 010 T A O CD CDv l0 — l0 -I O 00 V CZ A O V N N W — N A 0 CEC CEC CEC CEC CEC CEC CEC CEC CEC CEC CEC CEC CEC CEC CEC CEC CEC CEC CEC CEC CEC CEC CEC Provider CEC Customer # Nov-10 Dec-10 a 0 0 w= 0 0 May-10 Jun-10 Mar-10 Apr-10 OT-clad of-uer o ,o 0 o LO m Aug-09 Sep-09 b b <o <o Apr-09 May-09 Feb-09 Mar-09 Month Jan-09 N N I -A FA O O 9/1/2010 10/1/2010 7/1/2010 8/1/2010 5/1/2010 6/1/2010 3/1/2010 4/1/2010 N FA \ Fes, NO 0 FA FA O O N b 11 N N 10 b 8/1/2009 9/1/2009 6/1/2009 7/1/2009 4/1/2009 5/1/2009 2/1/2009 3/1/2009 Start Date 1/1/2009 Jan - 09 to Dec - 09 total: Jan - 10 to Dec -10 total: 11/30/2010 12/31/2010 9/30/2010 10/31/2010 OO V W W 1-A FANN 0 0 O 0 5/31/2010 6/30/2010 3/31/2010 4/30/2010 1/31/2010 2/28/2010 12/31/2009 aim 10/31/2009 11/30/2009 8/31/2009 9/30/2009 6/30/2009 7/31/2009 4/30/2009 5/31/2009 2/28/2009 3/31/2009 End Date 1/31/2009 W+ W F0 W+ W F0 31 31 W N 0 31 30 31 28 N 31 30 31 30 FW+ W 0 N W 0 N 00 03 W F+ 0 K 568,640 585,480 09T'0S 088'£S 46,560 49,080 47,280 51,960 51,360 46,320 51,840 48,240 45,120 43,680 48,840 46,320 48,000 48,340 47,880 48,820 48,820 47,260 44,380 A A A V W -CO CO Oi 0 0 Consumption (kWh) 47,740 0 0 A 00 O N W ,I -A ...FA CO FW N OD 1� N 01 VI V CO00 Ut 10 1,614 1,773 H I-� VI V UI 1-1 W 11-A I-s 01 V A Ol 01 1.0 I -A FA A In l0 A N O I -A 01 Ol V I -A Fs 'CO0 W CO+ 0 W FA 1,650 1,634 F� 1-1F� 01 01 01 01 O1 0 f+ 111 01 Vi W F+ -11 111 n W Vi W Consumption (Therms) 1,629 Jan - 09 to Dec - 09 avg: Jan - 30 to Dec - 10 avg: O O Demand Use $126,732 $109,604 A 0 M CO W 01 W 0 to Oo ip O N F+ CO VN to V tr 4, CO 01 $10,482 $10,350 N lA W t0 N tO O N CO i" 0 Fi O1 v N V $8,179 $8,964 (/* lA V �O o N% Ol A lR N t0 O N W N $13,258 $12,182 N N N 01 A O N Electric Cost ($) $11,770 tR to 00 Fi N t0 N H in O O W lD tn. to O O F3 N 03 0 V0 to O O F' N A V0 to O O N N N 0 $0.16 $0.23 H V0 00 N N 0 N tn. 0 N W 0 VF O F+ 1p CO tR V1. O O 01 FJ O1 l0 Rtel.6 tt/0 O O l0 10 N tV O O N N V CO $0.26 $0.28 Unit Cost ($/kWh) $0.25 so so Demand Cost ($) m m 0 Cordova Community Medical Center Electric Consumption (kWh) N O O O Electric Cost ($) 1 Cordova Community Medical Center - Electric Consumption (kWh) vs. Electric Cost ($) 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 -o 0 cro 0 0 O 0 0 0 0 0 O 0 0 CO 0 0 0 O O�1 O W 0 0 O I-i W O O 0 0 O O 03 0 0 0 O W 0 0 O O O 0 O Ul W 0 O 0 0 0 0 O 0 0 W 0 0 0 W 0 O W 0 0 CO CO m 0 01 O 0 O 0 O 0 0 O 0 W O N 0 O 0 0 0 0 0 W 00 W 0 O 0 0 0 0 0 W W 0 0 :One ot-aa003OT-eer O 0 O 00 O 00 00 b J 0 N O NJ W CO 00 0 0 Co 0 J FN+ 0 W 00 0 A r N 0 NJ ut l0 NJ NJ W 0 0 0 O 0 O r O W O 0 0 0 0 0 0 0 0 0 0 O o O c,= v 3 N N N N N N N N O O O O O O O O O O O O O O O O O O O to lO l0 tO tO tO tO tO tO t0 - N— t\ Co \ �1 to W NJW W W W W W W W W W N N O N N N N N N N N 0 0 0 0 0 0 0 0 0 0 0,33 UJUJUJUJUJUJUJUJUJUJ A A A A N N N N 00 W W Oln W 01 0 W 0 W CO10f1 001 A O l0 0 0 l0 0 01 V A A N Ut In N In W W W W W A A 0o (N0 V 00O A 0 A A 0011 V 0 0 to Co 0 V O A In V 01 Ft/V+ N N N lA (/t lA (/t lA 00 00 N N N 00 01 V V 01 V 90 - M A W 0 CO - 00 CO N O V O N V l0 V- O V O O N O V Oa N Oa N N N N N N N N I-0 N O 0 al(N0 W l00 0N alN A 0 0 0 tO W 0 tO W W UJ A 01 01 W CO a p aawOlsnD 0 0 iD 0 O K 0 0 3 D 0 0 0 3 ✓ O J N 3 0 3 0 0 O C 0 O 3 0 3 0 0/0 0 Cordova Community Medical Center O (JA - ua W) a3ea O O Oil Consumption (Therms) Oil Cost ($) 0 Jaya) uoi;dwnsuoj lip Cordova Community Medical Center - Oil Consumption (Therms) vs. Oil Cost ($) APPENDIX B ECO CALCULATIONS Energy Conservation Opportunity Analysis Cordova CMC, Cordova, AK ECO NO: ECO 1.Cordova CMC ECO Description: DDC Energy Management & Control System (Bldg Cordova CMC) Applicable Building: Cordova CMC 1. Energy & Cost Savings Summary Electric Savings kW kW$ kWh kWh$ $ - 83,096 $ 15,788 2. Installation Cost Summary O&M Cost M&V Cost Existing New $ - $ - $ - 5. Cost Estimate Description Damper Actuators Valve Actuators Programming and Commissioning Misc Electrical circuits and wiring CO Sensors New Air Handler Controllers Other Points Total Cost 7. Project Markups Sales Tax (0%): Subcontractor Contingency (0%): Subtotal: Subcontractor Overhead & Profit (26.5%) Subtotal: Fuel Oil #2 Savings Therm $ 419 $ 10,644 Total Cost I Installation Costs Savings Labor Material $ 26,432 $ 49,505 $ 280,615 Unit Qty U/M 10 10 55 20 4 7 106 $ 260,965 $ 69,156 $ 330,120 EA EA EA Point LS EA EA EA Point Unit Labor- Hrs Water Savings kGal Construction Costs $ 41,265 Trade 8.0 Mechanical 8.0 Mechanical Other 8.0 Electrician 8.0 Electrician 40.0 Electrician 1.0 Other Total Installed Cost $ 371,385 Labor Rates ($/Hr) Total Energy Savings mmBtu $ 703 $ 26,432 Sinple Payback 14.1 Years Total Labor Total Material Total M&L Cost Material Cost Cost Cost 68 $ 5,405 $ 68 $ 5,405 $ $ $ 60 $ 9,602 $ 60 $ 1,920 $ 60 $ 16,803 $ $ - $ $ 39,135 Bond (0%): Subtotal: Supervision, Inspection & Overhead (6.5%): Design Cost (6%): Total Installed Cost: $ 330,120 $ 21,458 $ 19,807 $ 371,385 410 $ 639 $ 300 $ 300 $ 785 2,300 1,600.00 8. Energy Savings a. Assumptions: 1. 30-year weather bin data for Cordova , AK applies. 2. Savings are calcualted based current equipment. Implementing ECOs which include equipment upgrades will reduced savings from this ECO. 3. Heating efficiency is 80.0% 4. Occupied heating set point is 60 degrees and unoccupied set point is 55 degrees. 5. Occupied cooling setpoint is 70 degrees, unoccupied cooling setpoint is 90 degrees. 6. Peak cooling load is 0.0 tons and cooling equipment has an combined efficiency of 0.9 kW/ton. 7. Electric Consumption costs $0.19/kWh. 8. Fuel Oil #2 costs $2.54/fherm. b. Equations: 1. Heating savings based on DDC allowing setback during unoccupied periods. See bin analysis. 2. Cooling savings based on DDC allowing setback during unoccupied periods. See bin analysis. 3. Outside air saving based on reduction in outside air fan runtime during unoccupied periods. See bin analysis. c. Calculations: Baseline Condition: Electrical Consumption (kWh)= Natural Gas Consumption (mmBtu) = Electrical Consumption Cost = Natural Gas Consumption Cost = 116,434 3,740 $ 22,122 $ 94,999 Proposed Condition: Electrical Consumption (kWh)= 33,338 Natural Gas Consumption (mmBtu) = 3,321 Electrical Consumption Cost = $ 6,334 Natural Gas Consumption Cost = $ 84,356 4,100 6,390 16,500 6,000 3,140 16,100 169,600 221,830 $ 9,505 $ 11,795 $ 16,500 $ 15,602 $ 5,060 $ 32,903 $ 169,600 $ 260,965 Savings: Electrical Consumption Savings (kWh) Natural Gas Savings (mmBtu) = Electrical Consumption Cost Savings = $ Natural Gas Cost Savings = $ Total Cost Savings = $ 83,096 419 15,788 10,644 26,432 Cordova CMC Page 1 Energy Conservation Opportunity Analysis Cordova CMC, Cordova , AK ECO NO: ECO 2.Cordova CMC ECO Description: HVACRe-Commissioning (Bldg Cordova CMC) Applicable Building: Cordova CMC 1. Energy & Cost Savings Summary Electric Savings kW kW $ $ kWh kWh $ 14,637 $ 2,781 2. Installation Cost Summary O&M Cost Existing New $ - $ 5. Cost Estimate Description Re -commissioning M&V Cost $ - Natural Gas Savings Therm $ 2,168 I $ 5,506 Water Savings kGal $ Total Cost 1 Installation Costs Construction Savings Labor Material Costs $ 8,287 $ 47,551 $ 20,379 $ 8,491 Unit Qty 1 U/M LS Unit Labor- Hrs 387 Total Energy Savings mmBtu $ 21,728 $ 8,287 Total lnstalled Sinple Cost Payback $ 76,422 9.2 Years Labor Rates Total Labor ($/Hr) Cost $ 97 $ 37,590 Total Cost $ 37,590 Material Cost $ 16,110 6. Project Markups Sales Tax (0%): $ Bond (0%): $ - Subcontractor Contingency (0%): $ - Subtotal: $ 67,931 Subtotal: $ 53,700 Supervision, Inspection & Overhead (6.5%): $ 4,415 Subcontractor Overhead & Profit (26.5%): $ 14,231 Design Cost (6%): $ 4,076 Subtotal: $ 67,931 Total Installed Cost: $ 76,422 Total Total M&L Material Cost Cost $ 16,110 $ 53,700 $ 16,110 I $ 53,700 7. Energy Savings a. Assumptions: 1. Recommission existing buildings to ensure their proper operating design. 2. US DoE "Commissioning for Federal Facilities" 3. Lawrence Berkeley National Laboratory 2005 Study, "The Cost -Effectiveness of Commissioning New and Existing Commercial Buildings: Lessons from 224 Buildings" a. Estimated costs = $0.13 - $0.45 per SF. b. Estimated energy savings = 7% - 29% of building energy consumption. 4. Project commissioning cost = $1.00/sf 5. Energy savings = 2.5% of total kWh & 5% Therm consumption. 6. Maintenance savings are not included. 7. Electrical consumption costs = $0.19/kWh. 8. Natural gas costs = $2.54/Therm. b. Equations: 1. Total Bldg SF = 53700 2. Total annual kWh consumption = 585480 3. Total annual Therm consumption = 43356.72 4. Estimated annual water consumption = 0 5. Commissioning Cost = (Total Bldg SF) x (Estimated Commissioning Cost) 6. kWh Savings = (Total kWh Consumption) x (Estimated Commissioning % Savings) 7. Fuel Savings = (Total Therm Consumption) x (Estimated Commissioning % Savings) c. Calculations: Baseline Condition: Electrical Consumption (kWh) Fuel Consumption (Therm) = Electrical Consumption Cost = Fuel Consumption Cost = 585,480 43,357 $ 111,241 $ 110,126 Proposed Condition: Electrical Consumption (kWh) = Fuel Consumption (Therm) = Electrical Consumption Cost = Fuel Consumption Cost = 570,843 41,189 $ 108,460 $ 104,620 Electrical Consumption Savings (kWh) = 14,637 Fuel Savings (Therm) = 2,168 Electrical Consumption Cost Savings = $ 2,781 Fuel Cost Savings = $ 5,506 Total Cost Savings = $ 8,287 Cordova CMC Page 1 Energy Conservation Opportunity Analysis Cordova CMC, Cordova, A% ECO NO: ECO 3.Cordova CMC ECO Description: Boiler Upgrade (Bldg Cordova CMC) Applicable Building: Cordova CMC 1. Energy & Cost Savings Summary Electric Savings kW kW$ kWh kWh$ 2. Installation Cost Summary O&M Cost Existing M&V Cost New $ - 1$ - 5. Cost Estimate Description Fuel Oil Therm 2,523 2 Savings $ 6,408 Total Cost I Installation Costs Savings Labor Material $ 6,408 $ 40,066 $ 65,743 Unit Qty U/M Unit Labor- Hrs Water Savings kGal $ Construction Costs $ 13,226 Trade Total Installed Cost $ 119,034 Total Energy Savings mmBtu $ 252 $ 6,408 Sinple Payback 18.6 Years Labor Rates Total Labor Total Material Total M&L ($/Hr) Cost Material Cost Cost Cost Burnham 4FW 450A 2 EA 170.4 Mechanical $ 68 $ 23,025 $ 25,985 $ 51,970 $ 74,995 Demolition 1 LS 128.0 Mechanical $ 68 $ 8,648 $ - $ - $ 8,648 Total Cost $ 31,672 - $ 51,970 $ 83,643 8. Project Markups Sales Tax (0%): $ - Bond (0%): $ - Subcontractor Contingency (0%): $ - Subtotal: $ 105,808 Subtotal: $ 83,643 Supervision, Inspection & Overhead (6.5%): $ 6,878 Subcontractor Overhead & Profit (26.5%): $ 22,165 Design Cost (6%): $ 6,348 Subtotal: $ 105,808 Total Installed Cost: $ 119,034 9. Energy Savings a. Assumptions: 1. 30-year weather bin data for Cordova, AK applies. Quantity I 2 Unit Replaced Burnham 4FW 450A Remaining Life 30 Year Installed 2011 1-for-1 Replacement Cost 21,654.36 New Unit High Eff Oil Fired 3. Existing boiler efficiency = 82.0% 4. Proposed boiler efficiency = 87.0% 5. Existing standby losses = 1.0% 6. Proposed standby losses = 1.0% 7. it was assumed that the annual building heating kbtu/sgft is in line with EIA regional averages. The heating load at design temperature is adjusted to 17.0% of the max output of the combined boiler system based on these averages and the heating load decreases linearly with increased outdoor air temperature. 8. Unoccupied temperature setpoint = 55°F 9. Heating setpoint = 68°F 10. Fuel Oil #2 costs = $2.54/Therm b. Equations: 1. Building Heat Load = Building Load Factor x Max Boiler Output 2. Existing mmBtu Usage = Heat Load x Bin Hrs / Existing Efficiency 3. Proposed mmBtu Usage = Heat Load x Bin Hrs / Proposed Efficiency 4. mmBtu Saved = Existing mmBtu Usage - Proposed mmBtu Usage 5. Annual Cost Savings = mmBtu Saved x mmBtu Unit Cost c. Calculations: Baseline Condition: Proposed Condition: Fuel Oil #2 Consumption (Therm) = 43,393 Fuel Oil #2 Consumption (Therm) = Fuel Oil #2 Consumption Cost= $ 110,219 Fuel Oil #2 Consumption Cost= 40,870 $ 103,811 Fuel Oil #2 Savings (Therm) = Fuel Oil #2 Cost Savings = Total Cost Savings = 2,523 $ 6,408 $ 6,408 Cordova CMC Page 1 Energy Conservation Opportunity Analysis Cordova CMC, Cordova , AK ECO NO: ECO 4.Cordova CMC ECO Description: Premium Efficiency Motors (Bldg Cordova CMC) Applicable Building: Cordova CMC 1. Energy & Cost Savings Summary Electric Savings kW kW $ kWh kWh$ 1 $ - 6,375 $ 1,211 2. Installation Cost Summary 1 O&M Cost M&V Cost Existing New $ 11 1 $ 11 1 $ Total Cost Savings Natural Gas Savings mmBtu Water Savings kcal $ Installation Costs I Construction Labor Material Costs ,594 $ 14,696 $ 2, $ 1,211 $ 1036 3. Eliminated Operation and Maintenance Cost O&M Tasks Annual PM Unit Qty 4. New Operation and Maintenance Cost O&M Tasks Annual PM 5. Cost Estimate Description Unit Qty 1 1 U/M LS U/M LS Unit Labor- Hrs 0.4 Unit Labor- Hrs 0.4 Total Installed Cost $ 18,327 Net Labor-Hrs Trade 0.4 Electrician Net Labor-Hrs Trade 0.4 Electrician Total Energy Savings mmBtu I $ 22 I $ 1,211 Labor Rates ($/Hr) $ 30 Labor Rates ($/Hr) $ 30 Sinple Payback 15.1 Years Total Labor Cost $ 11 Total Labor Cost $ 11 Material Cost Material Cost Unit Labor- Labor Rates Total Labor Total Material Total M&L Unit Qty U/M Material Cost Hrs ($/Hr) Cost Cost Cost 1 horse 3 LS 1.5 $ 60 $ 270 $ 855 $ 2,565 $ 2,835 1.5 horse 1 LS 1.5 $ 60 $ 90 $ 308 $ 308 $ 398 2 horse 2 LS 2.0 $ 60 $ 240 $ 660 $ 1,320 $ 1,560 5 horse 4 LS 2.0 $ 60 $ 480 $ 1,720 $ 6,880 $ 7,360 7.5 horse 1 LS 3.0 $ 60 $ 180 $ 545 $ 545 $ 725 Total Cost $ 1,260 - $ 11,618 $ 12,878 6. Project Markups 'Sales Tax (0%): $ - Bond (0%): $ 'Subcontractor Contingency (0%): $ Subtotal: $ 16,290 'Subtotal: $ 12,878 Supervision, Inspection & Overhead (6.5%): $ 1,059 'Subcontractor Overhead & Profit (26.5%): $ 3,413 Design Cost (6%): $ 977 'Subtotal: $ 16,290 Total Installed Cost: $ 18,327 7. Energy Savings a. Assumptions: 1. This ECO considers replacing existing motors with NEMA premium efficiency motors. b. Equations: 1. Existing/Proposed Motor Demand (kW) = (Motor HP) x (Load Factor) x (0.746 kW/HP)/ Motor Efficiency 2. Existing/Proposed Motor Consumption (kWh) = (Motor Demand) x (Diversity Factor) x (Annual Hours) 3. kW Savings = [(Baseline kW) - ( Proposed kW)] x 12 4. kWh Savings = (Baseline kWh) - ( Proposed kWh) 5. Energy Cost Savings = Energy Savings (kW or kWh) x (Energy Unit Cost) c. Calculations: Baseline Condition: Proposed Condition: Demand (kW) = 24.51 Demand (kW) = Electrical Consumption (kWh) = 144,768.12 Electrical Consumption (kWh) _ Electrical Consumption Cost = $ 27,506 Electrical Consumption Cost = 23.44 138,392.92 $ 26,295 Net Material Annual Cost Cost $ - $ 11 Total Cost $ 11 Net Material Annual Cost Cost $ - $ 11 Total Cost $ 11 Demand Savings (kW) = 1.07 Electrical Consumption Savings (kWh) = 6,375 Electrical Consumption Cost Savings = $ 1,211 Total Cost Savings = $ 1,211 Cordova CMC Page 1 Energy Conservation Opportunity Analysis Cordova CMC, Cordova, AK ECO NO: ECO 5.Cordova CMC ECO Description: T8 Lighting Upgrade (Bldg Cordova CMC) Applicable Building: Cordova CMC 1. Energy & Cost Savings Summary Electric Savings I kW kW $ kWh 217 $ - 88,907 2. Installation Cost Summary I O&M Cost M&V Cost I Existing New I $ 7,008 $ 3,591 $ - kWh $ $ 16,892 Fuel Oil 62 Savings Therm Water Savings kGa1 $ Total Cost I Installation Costs I Construction Savings Labor Material Costs $ 20,310 $ 65,268 $ 16,513 $ 10,223 Total Installed Cost $ 92,004 Total Energy Savings mmBtu $ 303 $ 16,892 Sipple Payback 4.5 Years 3. Eliminated Operation and Maintenance Cost O&M Tasks Unit Qty U/M UnitHrsbor- Net Labor-Hrs Trade Labor Rates Total Labor ($/Hr) Cost Material Cost Net Material Cost Annual Cost I Annual O&M 336 EA 0.3 100.7 Electrician $ 60 $ 6,041 $ - $ - $ 6,041 Annual PM EA - - Electrician $ 60 $ - $ - $ - $ - I Material Cost for PM LS - - - $ - $ - $ 967 $ 967 $ 967 I Total Cost $ 7,008 4. New Operation and Maintenance Cost Unit Labor- Labor Rates Total Labor Net Material O&M Tasks Unit Qty U/M Hrs Net Labor-Hrs Trade Material Cost Annual Cost ($/Hr) Cos[ Cost I Annual O&M 179 EA 0.3 53.8 Electrician $ 60 $ 3,231 $ - $ - $ 3,231 I Annual PM EA - Electrician $ 60 $ - $ - $ - $ - I Material Cost for PM LS - - $ - $ - $ 360 $ 360 $ 360 I Total Cost $ 3,591 5. Cost Estimate Description Unit Qty U/M Unit Labor- Hrs Trade Labor Rates Total Labor Total Material Total M&L Material Cost ($/fir) Cost Cost Cost Install 4ft 3 Tamp T-8 system with reflective 51 EA 2.0 Electrician $ 60 $ 6,152 $ 32 $ 1,632 $ 7,784 Install 4ft 3 lamp T-8 system 62 EA 1.5 Electrician $ 60 $ 5,507 $ 21 $ 1,271 $ 6,778 Install 4ft 2 lamp T-8 system 445 EA 1.3 Electrician $ 60 $ 35,517 $ 14 $ 6,306 $ 41,823 Install 4ft 1 lamp T-8 system 20 EA 1.2 Electrician $ 60 $ 1,404 $ 12 $ 243 $ 1,648 Install 2ft 2 lamp T-8 system 25 EA 2.0 Electrician $ 60 $ 3,016 $ 23 $ 587 $ 3,602 Misc Wiring 603 EA 0.1 - $ - $ - $ 5 $ 3,015 $ 3,015 Total Cost $ 51,595 - $ 13,054 $ 64,649 7. Project Markups Sales Tax (0%): $ - Bond (0%): $ - Subcontractor Contingency (0%): $ - Subtotal: $ 81,781 Subtotal: $ 64,649 Supervision, Inspection & Overhead (6.5%): $ 5,316 Subcontractor Overhead & Profit (26.5%): $ 17,132 Design Cost (6%): $ 4,907 Subtotal: $ 81,781 Total Installed Cost: $ 92,004 8. Energy Savings a. Assumptions: 1. Lighting listed for replacement is TI2 technology. 2. New lighting will be T8 technology. 3. Replace 51 - 4ft 4 lamp T-12 system with 51 - 4ft 3 lamp T-8 system with reflective coating. 4. Replace 62 - 4ft 3 lamp T-12 system with 62 - 4ft 3 lamp T-8 system. 5. Replace 445 - 4ft 2 lamp T-12 system with 445 - 4ft 2 lamp T-8 system. 6. Replace 20 - 4ft 1 lamp T-12 system with 20 - 4ft 1 lamp T-8 system. 7. Replace 25 - 2ft 2 lamp T-12 U system with 25 - 2ft 2 lamp T-8 system. 8. Fixtures average 4927.5 hours per year. 9. Electrical consumption costs $0.19/kWh. 10. Electrical demand costs $0/kW. b. Equations: 1. Baseline Demand (kW) =(Existing Fixture Wattage) x (Qty) x (12 months)/ (1,000) 2. Baseline Usage (kWh) - (Baseline Demand) x (Fixture Hours) 3. Proposed Demand (kW) _ (Proposed Fixture Wattage) x (Qty) x (12 months) / (1,000) 4. Proposed Usage (kWh) - (Proposed Demand) x (Fixture Hours) 5. Annual Energy Savings - (Baseline Energy Usage) - (Proposed Energy Usage) 6. Annual Cost Savings - (Energy Savings) x (Energy Cost) c. Calculations: Baseline Condition: Proposed Condition: Annual Demand (kW) = 603 Annual Demand (kW) = 387 Annual Demand (kW) = 217 Electrical Consumption (kWh) - 247,676 Electrical Consumption (kWh) - 158,769 Electrical Savings (kWh) - 88,907 Demand Cost = $ - Demand Cost = $ - Demand Cost Savings = $ - Electrical Consumption Cost - $ 47,058 Electrical Consumption Cost - $ 30,166 Electrical Cost Savings - $ 16,892 Total Cost Savings = $ 16,892 T8 Lighting Upgrade Bldg Cordova CMC Energy Conservation Opportunity Analysis Cordova CMC, Cordova , AK ECO NO: ECO 6 ECO Description: Occupancy Sensors (Bldg Cordova CMC) Applicable Building: Cordova CMC 1. Energy & Cost Savings Summary Electric Savings kW kW $ kWh $ 17,097 $ 2. Installation Cost Summary O&M Cost M&V Cost Existing New $ - $ 204 $ kWh $ 3,248 Natural Gas Savings mmBtu $ $ - Water Savings kGal $ Total Cost I Installation Costs I Construction Savings Labor Material I Costs $ 3,044 $ 3,370 $ 4,678 I $ 1,006 3. Eliminated Operation and Maintenance Cost O&M Tasks Annual PM Unit Qty 4. New Operation and Maintenance Cost O&M Tasks Unit Qty Annual PM 68 5. Cost Estimate Description U/M EA U/M EA Unit Qty U/M Unit Labor- Hrs Unit Labor- Hrs 0.1 Net Labor-Hrs Net Labor-Hrs 3.4 Unit Labor- Labor Rates Hrs ($/Hr) Total Installed Cost $ 9,054 Trade Electrician Trade Electrician Trade Total Enerp Savings mmBtu $ 58 $ 3,248 Labor Rates ($/Hr) $ 60 Labor Rates ($/Fir) $ 60 Sinple Payback 3.0 Years Total Labor Cost Total Labor Cost $ 204 Material Cost $ - Material Cost Net Material Annual Cost Cost $ - $ Total Cost $ Net Material Annual Cost Cost $ - $ 204 Total Cost $ 204 Total Labor Material Cost Total Total M&L Cost Material Cost Cost Wall Mount Passive Infrared Occ Sensor 38 EA 0.3 $ 60 Electrician $ 753 $ 34 $ 1,292 $ 2,045 Wall Mount Dual Technology Occ Sensor 3 EA 0.3 $ 60 Electrician $ 59 $ 53 $ 159 $ 218 Ceiling Mount Passive Infrared Occ Sensor 21 EA 1.1 $ 60 Electrician $ 1,440 $ 43 $ 903 $ 2,343 Ceiling Mount Dual Technology Occ Sensor 6 EA 1.1 $ 60 Electrician $ 412 $ 88 $ 528 $ 940 Comer Mount Passive Infrared Occ Sensor EA 1.1 $ 60 Electrician $ - $ 104 $ $ Misc Wiring 68 EA - $ 60 Electrician $ - $ 12 $ 816 $ 816 Total Cost $ 2,664 I $ 3,698 I $ 6,362 7. Project Markups Sales Tax (0%): $ Bond (0%): $ Subcontractor Contingency (0%): $ Subtotal: $ 8,048 Subtotal: $ 6,362 Supervision, Inspection & Overhead (6.5%): $ 523 Subcontractor Overhead & Profit (26.5%): $ 1,686 Design Cost (6%): $ 483 Subtotal: $ 8,048 Total Installed Cost: $ 9,054 8. Energy Savings a. Assumptions: 1. Spaces can have occupancy sensors installed to reduce lighting usage. 2. Passive Infared (PM) sensors are used in corridors and rooms with open floor plans. 3. Dual technology sensors are used in larger rooms and areas where occupants could potentially be shielded from the PIR on the sensor. 4. Percent savings estimates are from the Energy Management Handbook, Turner, 3rd Edition. b. Equations: 1. Baseline Usage (kWh) = (Existing Fixture Wattage) x (Qty) x (Existing Hours) / (1,000) 2. Proposed Usage (kWh) = (Existing Fixture Wattage) x (Qty) x [(Existing Hours) - (Hours Reduced)] / (1,000) 3. Annual Energy Savings = (Baseline Energy Usage) - (Proposed Energy Usage) 4. Annual Cost Savings = (Energy Savings) x (Energy Cost) c. Calculations: Baseline Condition: Electrical Consumption (kWh) = Electrical Consumption Cost = Proposed Condition: 38,813 Electrical Consumption (kWh) = $ 7,374 Electrical Consumption Cost = 21,716 Electrical Consumption Savings (kWh) = 17,097 $ 4,126 Electrical Consumption Cost Savings = $ 3,248 Total Cost Savings = $ 3,248 Install Occupancy Sensors Bldg Cordova CMC Energy Conservation Opportunity Analysis Cordova CMC, Cordova , AK ECO NO: ECO 7.Cordova CMC ECO Description: CFL Lighting Upgrade (Bldg Cordova CMC) Applicable Building: Cordova CMC 1. Energy & Cost Savings Summary Electric Savings kW kW $ kWh kWh $ 29 $ - 7,843 $ 1,490 2. Installation Cost Summary I O&M Cost I Existing I $ 360 M&V Cost New $ 353 $ Total Cost Savings $ 1,497 $ 3. Eliminated Operation and Maintenance Cost O&M Tasks I Annual 0&M I Material Cost for PM I Total Cost Unit Qty 19 1 4. New Operation and Maintenance Cost O&M Tasks I Annual O&M I Material Cost for PM I Total Cost 5. Cost Estimate Unit Qty 17 1 Fuel Oil #2 Savings Therm $ $ Water Savings kGal $ Installation Costs I Construction Labor Material Costs 1,207 $ 176 $ 173 U/M EA LS U/M EA LS Description Unit Qty U/M Unit Labor- Hrs 0.3 Unit Labor- Hrs 0.3 Unit Labor- Hrs Net Labor-Hrs 5.7 Net Labor-Hrs Trade 5.1 Total Installed Cos $ 1,556 Trade Electrician Trade Electrician Total Energy Savings mmBtu $ 27 $ 1,490 Sinple Payback 1.0 Years Labor Rates Total Labor ($/Hr) Cost $ 60 $ 343 $ - $ - Labor Rates Total Labor ($/Hr) Cost $ 60 $ 308 $ - $ - Material Cost 17 Material Cost 45 Net Material Cost Annual Cost $ - $ 343 $ 17 $ 17 $ 360 Net Material Cost Annual Cost $ - $ 308 $ 45 $ 45 $ 353 Labor Rates Total Labor Total Material Total M&L Material Cost ($/Hr) Cost Cost Cost I Install 15 W CFL 49 EA 0.3 Electrician $ 60 $ 882 $ 3 $ 126 $ 1,008 I Install 25 W CFL 3 EA 0.3 Electrician $ 60 $ 54 $ 3 $ 9 $ 63 I Install 27 W CFL 1 EA 0.3 Electrician $ 60 $ 18 $ 4 $ 4 $ 22 I Total Cost $ 954 - $ 139 $ 1,093 7. Project Markups Sales Tax (0%): $ - Bond (0%): $ Subcontractor Contingency (0%): $ - Subtotal: $ 1,383 Subtotal: $ 1,093 Supervision, Inspection & Overhead (6.5%): $ 90 Subcontractor Overhead & Profit (26.5%): $ 290 Design Cost (6%): $ 83 Subtotal: $ 1,383 Total Installed Cost: $ 1,556 8. Energy Savings a. Assumptions: 1. Lighting listed for replacement is Incandescent technology. 2. New lighting will be CFL technology. 3. Replace 49 - 60W Incandescent with 49 - 15 W CFL. 4. Replace 3 - 86W Incandescent with 3 - 25 W CFL. 5. Replace 1 - 120W Incandescent with 1 - 27 W CFL. 6. Fixtures average 3230.25 hours per year. 7. Electrical consumption costs $0.19/kWh. 8. Electrical demand costs $0/kW. b. Equations: 1. Baseline Demand (kW) _ (Existing Fixture Wattage) x (Qty) x (12 months) / (1,000) 2. Baseline Usage (kWh) - (Baseline Demand) x (Fixture Hours) 3. Proposed Demand (kW) _ (Proposed Fixture Wattage) x (Qty) x (12 months) / (1,000) 4. Proposed Usage (kWh) = (Proposed Demand) x (Fixture Hours) 5. Annual Energy Savings (Baseline Energy Usage) - (Proposed Energy Usage) 6. Annual Cost Savings - (Energy Savings) x (Energy Cost) c. Calculations: Baseline Condition: Proposed Condition: Annual Demand (kW) = 40 Annual Demand (kW) = 11 Annual Demand Savings (kW) = 29 Electrical Consumption (kWh) = 10,718 Electrical Consumption (kWh) = 2,875 Electrical Savings (kWh) = 7,843 Demand Cost = $ - Demand Cost = $ - Demand Cost Savings = $ - Electrical Consumption Cost = $ 2,036 Electrical Consumption Cost = $ 546 Electrical Cost Savings = $ 1,490 Total Cost Savings = $ 1,490 CFL Lighting Upgrade Bldg Cordova CMC Energy Conservation Opportunity Analysis Cordova CMC, Cordova , AK ECO NO: ECO 8.Cordova CMC ECO Description: LED Exit Sign Upgrade (Bldg Cordova CMC) Applicable Building: Cordova CMC 1. Energy & Cost Savings Summary Electric Savings kW kW$ kWh kWh$ 1 $ - 4,398 $ 836 2. Installation Cost Summary I O&M Cost I Existing I $ 87 M&V Cost New $ 36 $ - Fuel Oil #2 Savings Therm $ Water Savings kGal $ Total Cost I Installation Costs I Constructio Savings Labor Material n Costs $ 886 $ 433 $ 721 $ 144 3. Eliminated Operation and Maintenance Cost O&M Tasks I Annual O&M I Material Cost for PM I Total Cost Unit Qty 4 1 4. New Operation and Maintenance Cost O&M Tasks I Annual O&M I Material Cost for PM I Total Cost 5. Cost Estimate Description I Replace 20W CFL Exit I Replace 40W Inc Exit I Total Cost Unit Qty U/M EA LS U/M EA LS Unit Labor- Hrs 0.3 Unit Labor- Hrs 0.3 Net Labor- Hrs 1.1 Net Labor- Hrs 0.2 local Installed t ..a $ 1,298 Trade Electrician Trade Electrician Total Energy Savings mmBtu $ 15 $ 836 Labor Rates ($/Hr) $ 60 $ - Labor Rates ($/Hr) $ 60 $ - Sinple Payback 1.5 Years Total Labor Cost 68 Total Labor Cost $ 14 $ - Material Cost 19 Material Cost 23 Net Material Annual Cost Cost $ - $ 68 $ 19 $ 19 $ 87 Net Material Annual Cost Cost $ - $ 14 $ 23 $ 23 $ 36 Unit Labor- Labor Rates Total Labor Material Total Total M&L Unit Qty U/M Material Hrs Trade ($/Hr) Cost Cost Cost Cost 11 EA 0.3 Electrician $ 60 $ 198 $ 30 $ 330 $ 528 8 EA 0.3 Electrician $ 60 $ 144 $ 30 $ 240 $ 384 $ 342 - $ 570 $ 912 7. Project Markups Sales Tax (0%): $ - Bond (0%): $ - Subcontractor Contingency (0%): $ Subtotal: $ 1,154 Subtotal: $ 912 Supervision, Inspection & Overhead (6.5' $ 75 Subcontractor Overhead & Profit (26.5% $ 242 Design Cost (6%): $ 69 Subtotal: $ 1,154 Total Installed Cost: $ 1,298 8. Energy Savings a. Assumptions: 1. Lighting listed for replacement is incandescent or CFL technology. 2. New lighting will be LED technology. 3. Replace 11 - 20W CFL Exit with 11 - 2 W LED Exit. 4. Replace 8 - 40W Inc Exit with 8 - 2 W LED Exit. 5. Fixtures average 8760 hours per year. 6. Electrical consumption costs $0.19/kWh. 7. Electrical demand costs $0/kW. b. Equations: 1. Baseline Demand (kW) = (Existing Fixture Wattage) x (Qty) x (12 months) / (1,000) 2. Baseline Usage (kWh) = (Baseline Demand) x (Fixture Hours) 3. Proposed Demand (kW) = (Proposed Fixture Wattage) x (Qty) x (12 months) / (1,000) 4. Proposed Usage (kWh) = (Proposed Demand) x (Fixture Hours) 5. Annual Energy Savings = (Baseline Energy Usage) - (Proposed Energy Usage) 6. Annual Cost Savings = (Energy Savings) x (Energy Cost) c. Calculations: Baseline Condition: Proposed Condition: Annual Demand (kW) = 1 Annual Demand (kW) = 0 Annual Demand Savings (kW) = 1 Electrical Consumption (kWh)= 4,730 Electrical Consumption (kWh)= 333 Electrical Savings (kWh)= 4,398 Demand Cost = $ - Demand Cost = $ - Demand Cost Savings = $ - Electrical Consumption Cost = $ 899 Electrical Consumption Cost = $ 63 Electrical Cost Savings = $ 836 Total Cost Savings = $ 836 LED Exit Sign Upgrade Bldg Cordova CMC Energy Conservation Opportunity Analysis Cordova CMC, Cordova , AK ECO NO: ECO 9.Cordova CMC ECO Description: Exterior LED Lighting (Bldg Cordova CMC) Applicable Building: Cordova CMC 1. Energy & Cost Savings Summary Electric Savings kW kW$ kWh kWh$ 24 $ 8,556 $ 1,626 2. Installation Cost Summary O&M Cost M&V Cost Existing New $ 65 $ 50 $ - Fuel Oil #2 Savings Therm $ Water Savings kGal $ Total Cost I Installation Costs I Constructio Savings Labor Material n Costs $ 1,640 $ 1,913 $ 11,322 $ 1,654 3. Eliminated Operation and Maintenance Cost O&M Tasks Annual O&M Material Cost for PM Total Cost Unit Qty 2 1 4. New Operation and Maintenance Cost O&M Tasks Annual O&M Material Cost for PM Total Cost 5. Cost Estimate Description Install 93 Watt LED system Total Cost Unit Qty 0 1 Unit Qty 10 U/M EA LS U/M EA LS U/M EA Unit Labor- Hrs 0.3 Unit Labor- Hrs 0.3 Unit Labor- Hrs 2.5 Net Labor- Hrs 0.5 Net Labor- Hrs 0.1 Trade Electrician r orai Installed t ..a $ 14,889 Trade Electrician Trade Electrician Total Energy Savings mmBtu $ 29 $ 1,626 Labor Rates ($/Hr) $ 60 $ - Labor Rates ($/Hr) $ 60 $ - Labor Rates Total Labor ($/Hr) Cost $ 60 $ 1,512 $ 1,512 7. Project Markups Sales Tax (0%): $ - Bond (0%): $ - Subcontractor Contingency (0%)_ $ - Subtotal: $ 13,235 Subtotal: $ 10,462 Supervision, Inspection & Overhead (6.5 % $ 860 Subcontractor Overhead & Profit (26.5%): $ 2,773 Design Cost (6%): $ 794 Subtotal: $ 13,235 Total Installed Cost: $ 14,889 8. Energy Savings a. Assumptions: 1. Lighting listed for replacement is HID technology. 2. New lighting will be LED technology. 3. Replace 10 - 250W FIPS system with 10 - 93 Watt LED system. 4. Fixtures average 4235.5 hours per year. 5. Electrical consumption costs $0.19/kWh. b. Equations: 1. Baseline Demand (kW) = (Existing Fixture Wattage) x (Qty) x (12 months) / (1,000) 2. Baseline Usage (kWh) = (Baseline Demand) x (Fixture Hours) 3. Proposed Demand (kW) = (Proposed Fixture Wattage) x (Qty) x (12 months) / (1,000) 4. Proposed Usage (kWh) = (Proposed Demand) x (Fixture Hours) 5. Annual Energy Savings = (Baseline Energy Usage) - (Proposed Energy Usage) 6. Annual Cost Savings = (Energy Savings) x (Energy Cost) Sinple Payback 9.1 Years Total Labor Cost 32 Total Labor Cost 8 Material Cost $ 895 Material Cost 33 Material Cost $ 42 Net Material Annual Cost Cost $ $ 32 $ 33 $ 33 $ 65 Net Material Annual Cost Cost $ $ 8 $ 42 $ 42 $ 50 Total Total M&L Material Cost Cost $ 8,950 $ 10,462 $ 8,950 $ 10,462 c. Calculations: Baseline Condition: Proposed Condition: Annual Demand (kW) = 35 Annual Demand (kW) = 11 Annual Demand Savings (kW) = 24 Electrical Consumption (kWh)= 12,495 Electrical Consumption (kWh)= 3,939 Electrical Savings (kWh)= 8,556 Demand Cost = $ - Demand Cost = $ - Demand Cost Savings = $ - Electrical Consumption Cost = $ 2,374 Electrical Consumption Cost = $ 748 Electrical Cost Savings = $ 1,626 Total Cost Savings = $ 1,626 Exterior Lighting Bldg Cordova CMC Energy Conservation Opportunity Analysis ECO 10 - Weatherstripping ECO NO: ECO 10.Cordova CMC ECO Description: Weatherstripping (Bldg Cordova CMC) Applicable Building: Cordova CMC 1. Energy & Cost Savings Summary Electric Savings kW kW $ kWh kWh$ $ - $ 2. Installation Cost Summary O&M Cost Existing New 5. Cost Estimate Description M&V Cost $ - Therm Therm 249 $ 633 Total Cost I Installation Costs Savings Labor Material $ 633 $ 1,023 $ 2,118 Unit Qty U/M Unit Labor- Hrs Water Savings kGal $ Construction Costs $ 188 Trade Total Installe Cost $ 3,329 Total Energy Savings mmBtu $ 25 $ 633 Sinple Payback 5.6 Years Labor Rates Total Labor Unit Material Total Material Total M&L ($/Hr) Cost Cost Cost Cost Door Gasket Material Single Door 5 EA 1.00 Carpenter $ 54 $ 271 $ 113 $ 563 $ 835 Door Gasket Material Double Door 1 EA 1.50 Carpenter $ 54 $ 81 $ 197 $ 197 $ 278 Door Gasket Material Overhead Door 3 EA 2.50 Carpenter $ 54 $ 407 $ 271 $ 812 $ 1,219 Total Cost I $ 759 $ 1,572 $ 2,331 7. Project Markups Sales Tax (0%): $ Bond (0%): $ 192 Subcontractor Contingency (0%): $ Subtotal: $ 3,141 Subtotal: $ 2,331 Supervision, Inspection & Overhead (6.5%): $ 188 Subcontractor Overhead & Profit (26.5%): $ 618 Design Cost (6%): $ 188 Subtotal: $ 2,949 Total Installed Cost: $ 3,518 8. Energy Savings a. Assumptions: 1. Weatherstripping will be applied to door perimeter to stop air infiltration. 2. Window air infiltration is considered in a separate ECO. 3. Existing total door perimeter is 284. ft. 4. Calculations performed with RETScreen v4 a. Heating setpoint = 60 b. Cooling setpoint = 70 c. Total boiler efficiency = 80. % d. Total chiller COP = 3 e. Door Leakage Factor (in2/ft2) Non-Weatherstrinned Weatherstrinned Single Door = 0.157 Single Door = 0.114 Double Door = 0.16 Double Door = 0.114 5. Electric Demand costs $0/kW 6. Electric Consumption costs $0.19/kWh 7. Fuel Oil #2 costs $2.54/Therm b. Equations: 1. Door Leakage Area (in2) = Door Area x Door Leakage Factor 2. Specific Infiltration (CFM/in2) = [ (Stack Coefficient x AT) + (Wind Coefficient x [Wind Speed]2 )] 1/2 3. AT = Heating Setpoint Temp - Bin Temp 4. Air infiltration (CFM) = Specific infiltration x Door Leakage Area 5. Heat Loss Rate (Btu/hr) = 1.08 x Air infiltration x AT 6. Heating Load (mmBtu) = Heat Loss Rate x Bin Hours / 1,000,000 7. Energy Savings = Baseline - Proposed c. Calculations: Electric Demand Savings (kW) = - Electric Consumption Savings (kWh) = Fuel Oil #2 Savings (Therm) = 249 Electric Demand Cost Savings = $ Electric Consumption Cost Savings = $ Fuel Oil #2 Cost Savings = $ 633 Total Cost Savings = $ 633 Cordova CMC Page 1 APPENDIX C MAJOR EQUIPMENT SURVEY uai yam duaoj _qv T-0 13-0-0-0-0-0-0 co co m m m m m m m 70 70 0 D D D D D D D „„„„„„„;,mmm2222222 O 00 O Ul ? W N 2' N O (n 4, W N 1 4, W N v O Cn ? W N CD CD CD CD CD CD CD CD CD CD CD CD CD 0 CD CD CD CD CD CD CD CD CD CD CD 0 0 0 0 0 0 0 0 0 0 0 0 0 0' 0 3. 0' n' 0' 3 0 0 0 0 0 0 0 0 0 0 0 3 3 3 3 3 3 3 3 3 3 3 3 3 ~' 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 aa�eM onsauaod CO C C C v 01 CD CD o m mm 0 0 0 0' 00' spaeogese8 spaeogase8 0 0 0 0 2 2 o. o. 0 s11oa MH f1H`d > W W _C _ _C C_ ( 0 > > > > 0 1 f > C c' c' '. c) r: , 0 2 2 2 2 0 0° 0 0) c 3 = Q G G 0 01 4, �a j 3= CD 53 CD$3 _. 2 2 o. v ( 3• 2 K K K W W v v v -I -' o v v v 3 3 3 3 3 v v 0 0 0 3 3 rn O (n Zt'6-661Z-Z96 I. 176-1-6PZ-ZS6 0176-6617Z-Z96 —I—I—I—I—I—I—I v v v v v C CD CAD CD CAD CD CD 0 0 0 0 0 0 0 3 3 3 3 3 3 3 CD CDC CD CD CD CD CD l 1 0 0 0 0 0 0 3 3 3 3 3 3 3 UM CO co co co co co (D CD (D CD CD CD CD 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W 0 0 0 0 0 0 — — < < < < < < < < < < < S. CD CO W cn w cn m m R R 2 2 2 CnU)CnU)CnU)aa 77 a 77 a 77 a CD (D CD CD CD CD 2 2 cccccc 77 a 77 a 77 a CO W COCA CO CAC C C C C C C C C C 3 .7 3D .7 7 .7 7D 000000< < < < < < < 2 2 2 2 2" 2 n 2 (n Cn w w A CO CO CO CO CO - cn CD CO CO 4P CO N A cn O (n �1 up O N N v v cn cn v v O O cn cn CO O N O 00 O O O O W Cfl cn cn -0 a (n cn [Q Q [Q Q [Q Q g O O O O cn O CD O N �I O O O O N O -1 3 3 77 a 3 3 3 3 3 3 g o g 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 3 3 W W 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 2 — N N N CD CD CD CD CD CD o O o CD O CD CD CD CD CD CD CD CD CD CD CD CD CO CD CD CD CO CD CO CO CO CO CO CO O O O CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO (A O CA O (A O N N N O O O O O O O O O O O O O (A O (A O) (A O) (A Z Z 0 0 c c CD (D 0 0. co 1< CD 0 13 CD „yr IN y Z 0 rt CD cn I euauan ;uaua • in • eoiue oe