Loading...
HomeMy WebLinkAboutCIRI-ANC-CAEC ASD Bus Garage 2012-EE ENERGY AUDIT FINAL REPORT Anchorage School District Student Transportation 3580 E Tudor Rd Anchorage, AK 99516 p (907) 343-7104 AkWarm ID No. CIRI-ANC-CAEC-01 800 F Street Anchorage, AK 99501 p (907) 276-6664 f (907) 276-5042 Contact: Walter Heins, PE, CCP, CxA, CEA 32215 Lakefront Dr. Soldotna, Alaska 99669 p (907) 260-5311 Contact: Jerry P. Herring, PE, CEA ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 i AkWarm No. CIRI-ANC-CAEC-01 Contents I. Executive Summary .................................................................................................................. 1  II. Introduction .............................................................................................................................. 5  III. Energy Audit Process ............................................................................................................. 6  IV. Method of Analysis ................................................................................................................. 7  V. Building Description ................................................................................................................ 8  V.I ARCHITECTURAL DESCRIPTION ............................................................................................................................ 8  V.II MECHANICAL DESCRIPTION ............................................................................................................................... 9  V.III ELECTRICAL DESCRIPTION ................................................................................................................................ 9  V.IV PORTABLE BUILDING DESCRIPTION ................................................................................................................ 10  VI. Historic Energy Consumption and Cost............................................................................. 11  VI.I ELECTRICAL CONSUMPTION DATA ................................................................................................................... 11  VI.II NATURAL GAS CONSUMPTION DATA .............................................................................................................. 11  VI.III OVERALL ENERGY CONSUMPTION DATA ....................................................................................................... 11  VII. Equipment Inventory and Photo Survey .......................................................................... 13  VIII. Energy Conservation Measures ....................................................................................... 14  VIII.I STUDENT TRANSPORTATION ECMS ............................................................................................................... 14  VIII.II PORTABLE BUILDING ECMS ......................................................................................................................... 18  VIII.III ADMINISTRATIVE CONTROLS FOR ENERGY CONSERVATION AND OPTIMIZATION ....................................... 20  Appendices Appendix A – Energy Benchmark Data Appendix B – AkWarm Commercial Reports Appendix C – Major Equipment List Appendix D – Energy Conservation Measures Appendix E – Site Visit Photos Appendix F – Thermographic Photos ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 ii AkWarm No. CIRI-ANC-CAEC-01 Abbreviations AHFC Alaska Housing & Finance Corporation ARRA American Recovery & Reinvestment Act ASD Anchorage School District ASHRAE American Society of Heating, Refrigeration, and Air-Conditioning Engineers BTU British Thermal Unit CCF One Hundred Cubic Feet CFM Cubic Feet per Minute DDC Direct Digital Control ECI Energy Cost Index ECM Energy Conservation Measure EPDM Ethylene Propylene Diene Monomer EUI Energy Utilization Index F Fahrenheit HP horsepower HPS High Pressure Sodium HVAC Heating, Ventilating, and Air-Conditioning IPLC Integrated Power & Load Circuit kWh kilowatt-hour LED Light-Emitting Diode O&M Operations & Maintenance sf square feet SIR Savings-to-Investment Ratio V Volts W Watts ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 iii AkWarm No. CIRI-ANC-CAEC-01 List of Figures 1. Energy Audit Clients 2. Energy Benchmark Data 3. Anchorage, AK – Google Maps 4. ASD Student Transportation – Google Maps List of Tables 1. Recommended Energy Conservation Measures Student Transportation 2. Recommended Energy Conservation Measures Portable Building 3. Energy Cost and Consumption Data ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 iv AkWarm No. CIRI-ANC-CAEC-01 REPORT DISCLAIMER Privacy The information contained within this report, including any attachment(s), was produced under contract to Alaska Housing Finance Corporation (AHFC). IGAs are the property of the State of Alaska, and may be incorporated into AkWarm-C, the Alaska Retrofit Information System (ARIS), or other state and/or public information systems. AkWarm-C is a building energy modeling software developed under contract by AHFC. Limitations of Study This energy audit is intended to identify and recommend potential areas of energy savings, estimate the value of the savings, and provide an opinion of the costs to implement the recommendations. This audit meets the criteria of a Level 2 Investment Grade Audit (IGA) per the American Society of Heating, Refrigeration, Air-conditioning Engineers (ASHRAE) and the Association of Energy Engineers (AEE), and is valid for one year. The life of the IGA may be extended on a case-by-case basis, at the discretion of AHFC. In preparing this report, the preparers acted with the standard of care prevalent in this region for this type of work. All results are dependent on the quality of input data provided. Not all data could be verified and no destructive testing or investigations were undertaken. Some data may have been incomplete. This report is not intended to be a final design document. Any modifications or changes made to a building to realize the savings must be designed and implemented by licensed, experienced professionals in their fields. Lighting upgrades should undergo a thorough lighting analysis to assure that the upgrades will comply with State of Alaska Statutes as well as Illuminating Engineering Society (IES) recommendations. All liabilities for upgrades, including but not limited to safety, design, and performance are incumbent upon the professional(s) who prepare the design. Coffman Engineers, Inc (CEI) and Central Alaska Engineering Company (CAEC) bear no responsibility for work performed as a result of this report. Financial ratios may vary from those forecasted due to the uncertainty of the final installed design, configuration, equipment selected, installation costs, related additional work, or the operating schedules and maintenance provided by the owner. Furthermore, many ECMs are interactive, so implementation of one ECM may impact the performance of another ECM. CEI and CAEC accept no liability for financial loss due to ECMs that fail to meet the forecasted financial ratios. The economic analyses for the ECMs relating to lighting improvements are based solely on energy savings. Additional benefits may be realized in reduced maintenance cost, deferred maintenance, and improved lighting quality. The new generation lighting systems have significantly longer life leading to long term labor savings, especially in high areas like Gyms and exterior parking lots. Lighting upgrades displace re-lamping costs for any fixtures whose lamps would otherwise be nearing the end of their lifecycle. This reduces maintenance costs for 3-7 years after the upgrade. An overall improvement in lighting quality, quantified by numerous studies, improves the performance of students and workers in the built environment. New lighting systems can be designed to address all of the above benefits. US Government Disclaimer: This material is based upon work supported by the Department of Energy under Award Number DE-EE0000095. This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 1 AkWarm No. CIRI-ANC-CAEC-01 I. Executive Summary This report presents the findings of an energy audit conducted at ASD Student Transportation and associated portable buildings as part of a contract for: Alaska Housing Finance Corporation Contact: Rebekah Luhrs 4300 Boniface Parkway Anchorage, AK 99510 Email: rluhrs@ahfc.us Anchorage School District Contact: Calvin Mundt 1301 Labar Street Anchorage, AK 99515-3517 Email: mundt_calvin@asdk12.org Fig. 1 – Energy Audit Clients This audit was performed using American Recovery and Reinvestment Act (ARRA) funds to promote the use of innovation and technology to solve energy and environmental problems in a way that improves the State of Alaska’s economy. This can be achieved through the wiser and more efficient use of energy. The average January 2009-December 2010 documented annual utility costs at this facility are as follows: Electricity $ 86,170 Natural Gas $ 17,206 Total $103,375 January 2009-December 2010 Energy Utilization Index (EUI) = 328.7 kBtu/sf January 2009-December 2010 Energy Cost Index = 7.83 $/sf Fig. 2 – Energy Benchmark Data Energy Conservation Measures (ECMs) calculated to be cost effective are shown below in the Executive Summary Table with the energy analyst’s best opinion of probable cost, savings, and investment returns. Be aware that the measures are not additive because of the interrelation of several of the measures. The cost of each measure for this level of auditing is ± 30% until detailed engineering, specifications, and hard proposals are obtained. See section VIII for detailed descriptions of all cost effective ECMs. ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 2 AkWarm No. CIRI-ANC-CAEC-01 Table 1 Recommended Energy Conservation Measures Student Transportation Executive Summary – Recommended Energy Conservation Measures (ECMs) ASD Student Transportation (ST) Rank Feature Recommendation Annual Energy Savings Installed Cost SIR Payback (Years) ST-0a Refrigerators Replace Refrigerators older than 5 years old - - - <10 years ST-1b Boiler Shutdown Shutdown boiler during summer months $175 $0 ∞ 0 ST-2 Setback Thermostat: Garage and Bus Maintenance Implement a Heating Temperature Unoccupied Setback to 60.0 deg F for the Garage and Bus Maintenance space. $1,600 $1,000 20.36 0.6 ST-3 Setback Thermostat: Offices Implement a Heating Temperature Unoccupied Setback to 60.0 deg F for the Offices space. $941 $1,000 11.97 1.1 ST-4 Other Electrical: Head Bolt Outlet Heaters Add new Integrated Power and Load Control Head Bolt Outlet Receptacles $28,157 $40,200 8.60 1.4 ST-5 Ventilation Install new high efficiency restroom and breakroom fan motors that are controlled based on occupancy and timer. $264 $1,800 1.83 6.8 ST-6 Air Tightening Perform air sealing to reduce air leakage by 20%. $1,567 $8,000 1.76 5.1 ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 3 AkWarm No. CIRI-ANC-CAEC-01 Executive Summary – Recommended Energy Conservation Measures (ECMs) ASD Student Transportation (ST) Rank Feature Recommendation Annual Energy Savings Installed Cost SIR Payback (Years) ST-7 Lighting: Garage Replace with 45 FLUOR (4) T8 4' F32T8 32W Standard (2) Program StdElectronic and 22 FLUOR (3) T5 45.2" F54W/T5 HO Standard (2) StdElectronic $1,569 $15,550 1.55 9.9 ST-8 Lighting: Exterior Replace the Exterior High Pressure Sodium Light Fixtures with LED Light Fixtures $2,768 $27,900 1.52 10.1 ST-9 Lighting: Office and Restrooms Replace with 37 FLUOR (4) T8 4' F32T8 32W Standard (2) Program StdElectronic, 33 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic and Add new Occupancy Sensors $1,581 $17,550 1.39 11.1 ST-10 Below- (part or all) Grade Wall: Lower Concrete Wall/R-5.6 Install R-20 rigid foam board to interior or exterior side of wall. Does not include cost of coverings. $763 $13,028 1.29 17.1 Notes: a Due to advances in refrigerators in the previous 5 years, new Energy Star refrigerators are much more efficient and result in viable energy savings. b ECM item was modeled with separate AkWarm model and as a result, the item is not an additive measure and is not included in the final totals. ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 4 AkWarm No. CIRI-ANC-CAEC-01 Table 2 Recommended Energy Conservation Measures Portable Building Executive Summary – Recommended Energy Conservation Measures (ECMs) Portable Building (PB) Rank Feature Recommendation Annual Energy Savings Installed Cost SIR Payback (Years) PB-1 Setback Thermostat: Portable Building Implement a Heating Temperature Unoccupied Setback to 60.0 deg F for the Portable Building $1,180 $1,000 14.48 0.8 PB-2 Exposed Floor: Portable Building - Floor Install R-21 dense pack insulation in cantilevered floor $221 $960 4.77 4.3 PB-3 Above-Grade Wall: Portable Building - 2x4 Stud Wall Install R-25 rigid foam board to exterior and cover with T1-11 siding or equivalent. $1,660 $12,293 2.79 7.4 PB-4 Cathedral Ceiling: Portable Building - Cold Roof Add R-19 dense-pack to existing insulation. $253 $1,943 2.69 7.7 PB-5 Exterior Door: Portable Building - Doors Remove existing door and install standard pre-hung U-0.16 insulated door, including hardware. $77 $781 2.03 10.2 PB-6 Air Tightening Perform air sealing to reduce air leakage by 30%. $96 $700 1.20 7.3 ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 5 AkWarm No. CIRI-ANC-CAEC-01 II. Introduction This energy audit was conducted for the 13,206 square foot (sf) ASD Student Transportation building consisting of 12,246 sf of administrative offices and a maintenance garage, and a 960 sf portable building that is used as a training room. The energy audit was conducted in order to evaluate areas and equipment where utility savings relative to a baseline can be realized with a reasonable project financial ratios and payback. Fig. 3 – Anchorage, Alaska – Google Maps Fig. 4 – ASD Student Transportation – Google Maps ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 6 AkWarm No. CIRI-ANC-CAEC-01 III. Energy Audit Process Prior to visiting the Student Transportation building, the first task was to collect and review two years of utility data for electricity and natural gas usage. This information was used to analyze operational characteristics, calculate energy benchmarks for comparison to industry averages, estimate savings potential and establish a baseline to monitor the effectiveness of implemented energy conservation measures. A spreadsheet was used to enter, sum, and calculate benchmarks and to graph energy use information (see Appendix A). The primary benchmark calculation used for comparison and baseline data is the Energy Utilization Index, or EUI (see Section VI). After gathering the utility data and calculating the EUI, the next step in the audit process was to review the architectural and engineering drawings to develop a building profile which documented building age, type, usage, and major energy consuming equipment or systems such as lighting, Heating, Ventilating, and Air Conditioning (HVAC), water heating, refrigeration, snow-melt, etc. The building profile is utilized to generate, and answer, all possible questions regarding the facility’s energy usage. These questions were then compared to the energy usage profiles developed during the utility data gathering step. After this information was gathered, the next step in the process was the physical site investigation (site visit). The site visit was completed on September 24, 2011, and was spent inspecting the actual systems and answering specific questions from the preliminary review. Our on-site contact during the investigation was Mr. Jay Adams the ASD Student Transportation building manager1. Occupancy schedules, O&M practices, building energy management program, and other information that has an impact on energy consumption were obtained. After the site visit, the energy audit includes an evaluation of the information gathered, researching possible conservation opportunities, organizing the audit into a comprehensive report, and making ECM recommendations for mechanical, electrical, and building envelope improvements. 1 Mr. Jay Adams, (907) 244-4214 (mobile), (907) 742-1213 (office) ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 7 AkWarm No. CIRI-ANC-CAEC-01 IV. Method of Analysis Having completed the preliminary audit tasks noted in Section III, Coffman Engineers, Inc., (CEI) conducted a site survey. The site survey provides critical input in deciphering where energy opportunities exist within a facility. The audit team walked the entire site to inventory and investigate the building envelope and major equipment, including: HVAC, water heating, lighting, and equipment located in the garages, breakrooms, and offices. An understanding of how the equipment is used is determined during the audit. The collected data was entered into AkWarm Commercial™ software, an energy calculating program for buildings. The data was processed by AkWarm to model a baseline from which ECMs could be considered. The model was compared to actual utility costs to ensure the quality of baseline and proposed energy modeling performed by AkWarm. The recommended ECMs focus on building envelope, HVAC, lighting, water heating, and other electrical measures that will reduce annual energy consumption. ECMs are evaluated based on building use and processes, local climate conditions, building construction type, function, operational schedule, existing conditions, and foreseen future plans. When new equipment is proposed, energy consumption is calculated based on the manufacturer’s cataloged information. Energy savings are calculated by AkWarm. Implementation of more than one ECM often affects the savings of other ECMs. The savings may in some cases be relatively higher for an ECM implemented individually than when that ECM is just one of multiple recommended ECMs. For example, implementing reduced operating schedules of inefficient lighting systems may result in a given savings. Also implementing a more efficient lighting system will add to the savings, but less than the efficient lighting would alone because there is less energy to be saved when the lights are on a reduced operating schedule. Thus, if multiple ECM’s are recommended, the combined savings are calculated and identified appropriately in groups. In Appendix D, Energy Conservation Measures, the simple lifetime calculation is shown for each ECM, which is based on the typical life of the equipment being replaced or altered. The energy savings are extrapolated throughout the simple lifetime of the ECM. The total energy savings is calculated as the total lifetime multiplied by the yearly energy savings. The cost savings and installation costs are used to calculate simple payback2 and the Savings to Investment Ratio3 (SIR). These are listed in Appendix D and summarized in the Executive Summary Table of this report. The SIR is calculated as a ratio by dividing the break even cost by the initial installed cost. Cost savings is calculated based on the historical energy costs for the building. Installation costs include labor and equipment to evaluate the initial investment required to implement an ECM. These are applied to each recommendation with simple paybacks calculated. The energy analyst’s opinions of probable cost are garnered from RS Means Cost Data, other industry publications, and local contractors and suppliers. In addition, where applicable, maintenance cost savings are estimated and applied to the net savings. 2 The simple payback is based on the years that it takes for the net savings to payback the net installation cost (Cost divided by Savings). 3 Savings to Investment Ratio (SIR): Break Even Cost divided by initial installed cost, where Break-Even Cost is how much can be spent and still have the measure be cost effective; it equals the Present Value (PV) of Savings over the life of the measure minus PV of maintenance costs. ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 8 AkWarm No. CIRI-ANC-CAEC-01 V. Building Description The ASD Student Transportation facility is a single story 12,246 sf building comprised of both maintenance garage and office space. Two portable buildings are located on the premises, however only one is directly connected to the main electrical supply for the building. The Student Transportation Building was constructed in 1969 and has had an entry remodel in 1976 and a roof remodel in 2010. Another renovation took place when the school district bought longer buses, where two of the garage bays were lengthened to accommodate the new buses. This renovation was completed prior to the roof remodel in 2010. The office space of the building is regularly occupied by a total of eight people from 8am to 5pm everyday from Monday to Friday with slightly extended hours during the school year. The garage space is occupied by a total of 10 people working in one of two shifts everyday from Monday to Friday during the school year. One shift runs from 2:30am to 11am and the other runs from 9am to 5:30pm. The garage schedule moves to a single shift working 6am to 4:30pm from Monday to Friday during the summer. V.I Architectural Description Exterior walls of the building consist of a concrete block wall section below a stud wall construction. The concrete portion is constructed of 2 core concrete blocks with 2”x2” furring strips on 16” centers and insulated with 1-1/2” rigid insulation, on the interior side. The average height of the concrete block portion is 7’-2” and the estimated R-value is R-5.6. There is an 18’ long section on the east side of the building where the concrete portion of the wall is 9’ high which forms the exterior wall of the mechanical room. The stud wall portion is constructed with 2”x4” wood studs on 16” centers insulated with R-13 fiberglass batt. This portion of the wall has siding without plywood sheathing and features a vapor barrier on the interior face of the fiberglass insulation. The average height of the stud wall portion is 11’-11” except around the office area where it is only 4’-4” high. The estimated R-value is R-13. There is a total of 9,961 sf of total exterior wall area. Floor construction for the bus garage is slab-on-grade. The perimeter of the slab has 1” thick rigid edge insulation (R-3.6) that extends to 4 feet below grade. There is 12,246 sf of floor area. The roof construction of the building is an EPDM roofing membrane covering rigid insulation on top of a vapor barrier on plywood decking. According to the roof remodel architectural drawings, the rigid insulation of the roof is a two layer rigid insulation with an average R-value of R-32. A small section of the roof over the office space features tapered two-layer, rigid insulation with an average R-value of R-30. The approximate roof area with tapered insulation is 590 sf. The 2010 roof remodel included structural upgrades to the roof over the office space to handle snow drift loads with structural overframing. This overframing features two-layer, rigid insulation with an approximate R-value of R-38.5 with an approximate area of 606 sf. There are 10 south facing windows in the building and 15 windows on the west and north sides of the building for a total of 25 windows. The windows are wood-framed, two pane, glass windows with a 0.25” air filled pane space. The wood frames around the windows on all sides of the building were observed to have large air leakages and did not appear to seal well. The South facing window area is 141 sf and windows facing all other directions total 212 sf. The building has several different types of exterior man doors and overhead garage doors. The man door located on the South face of the building is an older style insulated metal door estimated at R-1.8. The man door located on the East face of the building is a metal double door with a vent on one side. It is estimated to have foam insulation and provides access to the mechanical room. There is an insulated metal man door and an insulated metal entry door with a half light window located on the West face of the building. The nine overhead garage doors located on the East face of the building appear to be new ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 9 AkWarm No. CIRI-ANC-CAEC-01 and well maintained. Several of these doors have half light windows, man doors, and/or exhaust holes. There are two overhead garage doors located on the West face of the building that also appear to be new and well maintained. V.II Mechanical Description The building is heated with a dual fuel gas-oil boiler and three gas fired unit heaters. The dual fuel Weil- McLain boiler delivers heat to perimeter hydronic baseboards and five small unit heaters. The boiler is a series 888 with 1,082,000 BTU/hr input rating. It typically runs on natural gas, but also has an onsite heating oil storage with a 25 gallon day tank in order to utilize heating oil during an emergency. The boiler is controlled with a Honeywell 7800 series boiler control and was installed in 2006 as part of an emergency preparedness project. Currently, the boiler operates all year long. No mechanical cooling is provided for any equipment in the building. There is an air handling unit in the office space that is un-used because it creates a draft effect for the employees. Mechanical ventilation for the office space is provided by an exhaust fan servicing the break room and another servicing the restrooms. The break room exhaust fan is estimated to be powered by a 1/12 horsepower motor moving 100 CFM of air. The restroom exhaust fan is a Neptune model RF-40 and is powered by a 1/12 horsepower motor moving 400 CFM of air. Both exhaust fan motors are estimated to be 60% efficient and operate constantly during occupancy schedules. Office windows may be opened to provide additional ventilation and temperature control per employee preference. Mechanical ventilation for the garage area is provided by an exhaust fan servicing the welding room and another servicing the bus washing area. The welding room exhaust fan is a Loren Cook model 14CV17D powered by a 1 horsepower motor moving 1700 CFM of air. It operates approximately 3 hours/week. The washing area exhaust fan is powered by a 1.5 horsepower motor moving 3200 CFM of air. It operates approximately 2 hours/week. Both exhaust fan motors are estimated to be 60% efficient. There are several garage doors located in the garage space that are operated as part of routine business. These provide additional ventilation to the space. Building hot water is provided by a gas-fired, standard updraft hot water heater with a standing pilot light. It is an A.O. Smith model BTR400A10 and is approximately 8 years old. The hot water heater has a 399,000 BTU/hr input rating with a 100 gallon capacity tank. The building energy management and control system utilizes a pneumatic compressor and control lines to operate the baseboard heating in the office space. Pneumatic systems are considered archaic due to the vast improvements in monitoring, control and operating efficiencies available from the modern genre of electronic control systems. A Siemens Apogee Direct Digital Control (DDC) system controls the boiler and its associated pumps as well as the hydronic unit heaters. It uses outdoor air temperature as a reset for the boiler. V.III Electrical Description The Student Transportation building is served by 120/208 Volt (V), 3-phase, 4-wire, underground electrical service by the Chugach Electric Association. The building has a standby generator to serve critical loads in the event of a utility power outage. Lighting in the office spaces, corridors, and restrooms is provided by manually controlled light fixtures comprised of two fluorescent 4’ long T12 lamps with magnetic ballasts. Several of the fluorescent light fixtures used to light the offices are wired as night lights and are always on. In the garage area, lighting is provided by a mixture of manually controlled high bay and 4' fluorescent T12 wrap around light fixtures. The high bay light fixtures consist of metal halide and 8' fluorescent high output T12 light fixtures. ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 10 AkWarm No. CIRI-ANC-CAEC-01 Exterior lighting consists of 150W and 750W pole mounted high pressure sodium (HPS) light fixtures illuminating the parking areas, 100W HPS canopy lights illuminating the bus ports, HPS wall packs lighting the areas adjacent to the building, and a 150W HPS canopy light illuminating the entrance to the portable building. The exterior light fixtures are controlled by a photo switch turning the lights off during the day. The other significant electrical load for this facility is the receptacles in the outdoor bus parking area. There are approximately 134 parking stalls. Each stall has a duplex receptacle that serves the trickle charger and block heaters for the school buses and other fleet vehicles. There are no controls in place to limit the power usage of these loads. V.IV Portable Building Description There are two portable buildings located adjacent to Student Transportation. Power for one of the portables is drawn from the main electric breaker at the building. The other portable is independently connected to the power grid. The portable is constructed of 2x4 wood stud wall at 16” on-center with R- 11 fiberglass batt insulation in between the studs. The exterior face of the wall is T1-11 siding with drywall on the interior side of the wall. Interior and exterior wall height is nine feet under the roof eaves, and the end-walls vary in height from nine feet at the eaves to 11 feet at the roof peak in the center of the end wall. The portable has 1,280 sq ft of exterior wall area. The portable has an above grade floor resting on sleepers. Plywood skirting protects the sleepers and floor construction from weather. The floor construction is plywood flooring resting on 2x8 wood joists. It is estimated that the floor has R-13 fiberglass batt insulation. The portable has 960 sq ft of floor area. The portable is covered by a cold roof, with shingles covering plywood decking. It is estimated that the roof insulation is R-13 fiberglass batt insulation. The portable has approximately 1,012 sq ft of roof area. There are four single glass pane, wood framed windows on the portable with an estimated R-value of R- 1.1. There are two insulated metal doors with an estimated R-value of R-1.7. The portable is heated with 11 electric resistance perimeter baseboards rated at 2,000W each. The electric baseboard temperature set point is controlled by a dial thermostat on each individual baseboard. This makes it easy for the electric baseboards to be left on at higher temperatures than is required. Due to the need to keep these buildings moveable and due to combustion safety issues, the Anchorage School District states its desire to keep all portable buildings on electric heat and not utilize natural gas heating at this time. The lighting in the portable is 2 lamp, 4ft long, T-12 light fixtures with magnetic ballasts. Due to the low operational use of the portable and low run time of the lights (15 hrs/week) retrofitting the T-12 light fixtures with T-8 lamps is not cost effective, at this time. In the future, this lighting retrofit will be cost effective if the portable lighting is utilized more hours during the week. Due to the fact that only one on-site portable is connected to the main electrical breaker at the Student Transportation building, only one AkWarm model was created to model this portable building. ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 11 AkWarm No. CIRI-ANC-CAEC-01 VI. Historic Energy Consumption and Cost Tables provided in Appendix A, Energy Benchmark Data Report, represent the electric and natural gas energy usage for the surveyed facility from January 2009 to December 2010. Chugach Electric provides the electricity and Enstar Natural Gas provides the natural gas to the building. Both utilities bill under their commercial rate schedules. VI.I Electrical Consumption Data The electric utility costs consist of several components: a fixed monthly customer charge, an energy usage charge, fuel surcharge, taxes, and a demand charge. The energy usage and fuel surcharge are based on the customer's usage as measured in kilowatt-hours (kWh). The usage (kWh) is determined by load wattage divided by 1,000, times hours running. For example; a 1,000 watt space heater operating for one hour will use 1 kWh of electricity as would ten, 100 watt lamps operating for one hour or one, 100W lamp operating for 10 hours. One kWh is equivalent to 3,413 BTU. VI.II Natural Gas Consumption Data The natural gas supplier bills for consumption in CCF of natural gas; where one CCF equals 100 cubic feet of natural gas. The average heating value of natural gas in 1,000 BTUs per cubic foot, making 1 CCF equal to 100,000 BTUs (also called one “Therm”). VI.III Overall Energy Consumption Data The overall cost for energy use is calculated by dividing the total cost by the total usage. Based on the electric and natural gas utility data provided, the average cost for the energy and consumption calculations at the surveyed facility are summarized in the table below. Table 3 Energy Cost and Consumption Data Energy Cost and Consumption Data 2009 2010 Average Electric Rate $0.12 /kWh $0.10 /kWh $0.11 /kWh Natural Gas Rate $1.03 /CCF $0.96 /CCF $1.00 /CCF Total Cost $115,865 $90,885 $103,095.24 ECI $8.77 /sf $6.88 /sf $7.83 /sf Electric EUI 204.1 kBtu/sf 192.3 kBtu/sf 198.2 kBtu/sf Natural Gas EUI 133.7 kBtu/sf 127.2 kBtu/sf 130.5 kBtu/sf Building EUI 337.8 kBtu/sf 319.5 kBtu/sf 328.7 kBtu/sf The Energy Cost Index (ECI) is derived by dividing the annual cost by the building square footage. The building square footage was calculated to be approximately 13,206 square feet. This area includes the 12,246 sf ASD Student Transportation building and the 960 sf portable building. The annual EUI is expressed in Thousands of British Thermal Units per Square Foot (kBtu/sf) and can be used to compare energy consumption of similar building types or to track consumption from year to year in the same building. The EUI is calculated by converting annual consumption of all fuels used to Btu’s and then dividing by the area (gross conditioned square footage) of the building. EUI is a good indicator of the relative potential for energy savings. A comparatively low EUI indicates less potential for large energy savings. Building architectural, mechanical, and electrical drawings were obtained and utilized to ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 12 AkWarm No. CIRI-ANC-CAEC-01 calculate and verify the gross area of the facility. The gross area was confirmed on the physical site investigation. ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 13 AkWarm No. CIRI-ANC-CAEC-01 VII. Equipment Inventory and Photo Survey Following the completion of the field survey a detailed equipment list was created and is attached as Appendix C. The major equipment listed are considered to be the major energy consuming equipment in the building whose replacement could yield substantial energy savings. An approximate age was assigned to the equipment if a manufactured date was not shown on the equipment’s nameplate. As listed in the 2011 ASHRAE Handbook for HVAC Applications, Chapter 37, Table 4, the service life for the equipment along with the remaining useful life in accordance to the ASHRAE standard are also noted in the equipment list. Where there are zero (0) years remaining in the estimated useful life of a piece of equipment, this is an indication that maintenance costs are likely on the rise and more efficient replacement equipment is available which will lower the operating costs of the unit. Maintenance costs should also fall with the replacement. Additionally, photos of various equipment and the building construction were taken during the site visit. Several photos are included in Appendix E. ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 14 AkWarm No. CIRI-ANC-CAEC-01 VIII. Energy Conservation Measures The following ECMs described here have been calculated by AkWarm Commercial and considered by the energy audit team as viable projects. ECMs provided below are considered to have viable financial ratios (SIR>1) or to add value to the building or building operational profiles. For a full list of ECMs considered and calculated by the energy audit team, including ECMs not recommended at this time, please see Appendix D. VIII.I Student Transportation ECMs ECM# ST-0 – Replace residential & light commercial refrigerators/freezers older than 5 years old Annual Energy Savings Installed Cost SIR Payback (years) ---<10 years Due to advances in refrigerators in the previous five years, new Energy Star residential-type and light commercial-type refrigerators and freezers are much more efficient and result in viable energy savings. Built-in refrigerators and freezers should be evaluated independently. Replacing existing refrigerators, which are older than five years old, with new energy star models will typically have paybacks of less than 10 years. ECM # ST-1– Shutdown Boiler during Summer Months Annual Energy Savings Installed Cost SIR Payback (years) $175 $0 ∞0 The dual fuel, gas-oil, boiler in the building operates year-round, even during the summer when limited heating needs are required. By turning off the boiler from June to the end of August, energy savings can be achieved. ASD has had trouble with older generation grooved joint couplings when subjected to cyclic heating and cooling from seasonal shutdowns. However, due to the fact that the hydronic piping in the Student Transportation building does not contain grooved-joint couplings, leaks should not be an issue when the boiler is shut down seasonally. The saving-to-investment ratio is infinite and payback is zero, as no capital cost is required. ECM # ST-2 – Set back Thermostat: Garage Space Annual Energy Savings Installed Cost SIR Payback (years) $1,600 $1,000 20.36 0.6 Significant energy savings exist by reducing the room temperature of the garage space during unoccupied times. Reducing the temperature of the garage space to 60F during unoccupied times will save approximately $1,600 annually, with an estimated installed cost of $1,000. Additional annual energy savings could be achieved by further reducing the temperature of the garage space to 50F during unoccupied times. See item ST-1 in appendix D for more information. ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 15 AkWarm No. CIRI-ANC-CAEC-01 ECM# ST-3 – Set back Thermostat: Office Space Annual Energy Savings Installed Cost SIR Payback (years) $941 $1,000 11.97 1.1 Significant energy savings exist by reducing the room temperature of the office space during unoccupied times. Reducing the temperature of the office space to 60F during unoccupied times will save approximately $941 annually, with an estimated installed cost of $1,000. Additional annual energy savings could be achieved by further reducing the temperature of the office space to 50F during unoccupied times. See item ST-2 in appendix D for more information. ECM# ST-4 – Install Integrated Power and Load Control Head Bolt Outlet Receptacles Annual Energy Savings Installed Cost SIR Payback (years) $28,157 $40,200 8.60 1.4 There are approximately 134 outdoor parking stalls. Each stall has a duplex receptacle that serves the trickle charger and block heaters for school buses and other fleet vehicles. Currently, there are no controls in place to limit the power usage of these loads, so the head bolt outlet heater operates the entire time that the vehicle is plugged in. This load a large percentage of the facility's total electrical usage. Integrated power and load control (IPLC) outlet receptacles may be installed in addition to the existing receptacles to provide timer and thermostat control of the head bolt heaters. The existing receptacles will remain to provide power for the trickle chargers that the busses use to maintain the charge on their batteries. These receptacles can switch on and off throughout the entire duration that a vehicle is plugged in with a frequency based on outside temperature; turning off once the temperature exceeds 40 degrees F and varies on-time from 10% at 40degrees F to 100% at -4 degrees F. Though the settings are adjustable, the listed default settings have been optimized for diesel fleet vehicles in Canada. Additionally, this ECM is scalable and may be implemented in a few stalls at a time as funds become available. See item ST-3 in appendix D for more information. ECM # ST-5– Upgrade Exhaust Fans for Restrooms and Break room Annual Energy Savings Installed Cost SIR Payback (years) $264 $1,800 1.83 6.8 Significant savings exist by upgrading the fan motors and controlling the run time of the restroom and break room fans. Currently, the existing fans operate continuously. Replacing the old fan motors with new, high-efficiency, motors will save electricity consumption. Also, adding occupancy and timer control to these exhaust fans will allow them to shut off during times when they are not needed. This will reduce the amount of heated air leaving the building envelope and therefore reduce the natural gas and electricity needed to heat incoming air. See item ST-8 in appendix D for more information. ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 16 AkWarm No. CIRI-ANC-CAEC-01 ECM# ST-6 - Air Tightening Annual Energy Savings Installed Cost SIR Payback (years) $1,567 $8,000 1.76 5.1 Air infiltration into Student Transportation can be reduced by tightening the building envelope with air sealing improvements. This in turn will reduce the heating load required by the building and reduce the amount of natural gas being burned by the boilers. While a blower door test was not completed, it is anticipated that air leakage is occurring through old weather stripping around doors, window frames, and wall and roof penetrations. Methods to decrease the infiltration into the building include: sealing around the windows and doors with caulking and insulation, adding new weather stripping to doors, providing gaskets to all exterior cover plates and sealing all roof and wall penetrations. See item ST-9 in appendix D for more information. ECM # ST-7 – Upgrade the Lighting Systems in the Garage Spaces Annual Energy Savings Installed Cost SIR Payback (years) $1,569 $15,550 1.55 9.9 Upgrading the lighting in the warehouse would include replacing the 4’ wrap around fluorescent T12 light fixtures with T8 light fixtures. Additionally the metal halide and T12 fluorescent high bay light fixtures may be replaced with fluorescent T5HO high bay light fixtures. This description is for a compilation of several ECM’s that are intended to be implemented at the same time, however due to constraints with the AKWarm modeling software the different lighting configurations were modeled separately. See measures ST-6, ST-10, ST-11, ST-14, ST-25, and ST-36 in appendix D for details of individual measures. ECM # ST-8 – Upgrade Exterior Lighting Annual Energy Savings Installed Cost SIR Payback (years) $2,768 $27,900 1.52 10.1 Pole mounted HPS light fixtures are used to light the parking areas around the ASD Bus Garage building, wall pack and canopy light fixtures are used to light the building entrances and adjacent areas, and the bus ports are lit by small canopy HPS lights. These existing HPS light fixtures may be replaced with LED fixtures that would provide significant energy savings and may also increase the safety of the parking area because of better color rendering qualities offered by LED sources. This description is for a compilation of several ECM’s that are intended to be implemented at the same time, however due to constraints with the AKWarm modeling software the different lighting configurations were modeled separately. See measures ST-4, ST-5, ST-12, ST-16, ST-23, ST-26, and ST- 30 in appendix D for details of individual measures. Note – AkWarm measures with SIRs less than one were included in this compiled annual energy savings, installed cost, SIR, and payback of this since they should be upgraded congruently . ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 17 AkWarm No. CIRI-ANC-CAEC-01 ECM # ST-9 – Upgrade the Office and Restroom Lighting and Control Systems Annual Energy Savings Installed Cost SIR Payback (years) $1,581 $17,550 1.39 11.1 Upgrading the lighting in the restrooms, office spaces, and corridors includes replacing and retrofitting approximately 109 4' fluorescent T12 light fixtures with T8 light fixtures equipped with program start electronic ballasts. Approximately 12 occupancy sensors could be used to control approximately 79 fixtures in the smaller offices and conference areas for additional savings. The remaining 30 fixtures would be controlled with the existing manual switches because they illuminate common use areas that would be difficult to control with occupancy sensors. This description is for a compilation of several ECM’s that are intended to be implemented at the same time, however due to constraints with the AKWarm modeling software the different lighting configurations were modeled separately. See measures ST-7, ST-13, ST-18, and ST-20 in appendix D for details of individual measures. ECM # ST-10 – Install R-20 Insulation to Concrete Portion of Exterior Walls Annual Energy Savings Installed Cost SIR Payback (years) $763 $13,028 1.29 17.1 Due to the Concrete block construction and poor insulation of the lower portion of the exterior walls, the current effective insulation value is R-5.6. It is recommended that an additional layer of R-20 rigid foam insulation be added to the concrete portion of all exterior walls. This type of rigid insulation can be added to either the interior or exterior side of the wall, however since furring strips already exist on the interior face it is recommended that the insulation be attached to there. Significant savings can be achieved by increasing the insulation value of the lower portion of the walls of the building envelope. This description is a compilation of several ECM’s that are intended to be implemented at the same time, however due to constraints with the AKWarm modeling software the different insulation configurations were modeled separately. See measures ST-15 and ST-17 in appendix D for details of individual measures. Note – AkWarm measures with SIRs less than one were included in this compiled annual energy savings, installed cost, SIR, and payback of this since they should be upgraded congruently. ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 18 AkWarm No. CIRI-ANC-CAEC-01 VIII.II Portable Building ECMs ECM #PB-1 – Setback Thermostat Annual Energy Savings Installed Cost SIR Payback (years) $1,180 $1,000 14.48 0.8 Significant energy savings exist by reducing the room temperature of the portable building during unoccupied times. However, due to the fact that the portable building has eleven perimeter electric baseboard heaters, each with individual dial thermostats, it is difficult to obtain a desired set point in the portable building. As a result, the temperature in the portable is typically much higher than required, 65F or warmer. Also, the temperature cannot be set back during unoccupied times. It is recommended that a central programmable thermostat be installed in the portable building that can turn the perimeter electric baseboards on or off to control occupied and unoccupied temperature set points. Reducing the portable temperature from 65F to 60F during unoccupied times will save $1,180 annually in electricity bills. See item PB-1 in Appendix D for more information. ECM #PB-2 – Add Insulation to Portable Floor Annual Energy Savings Installed Cost SIR Payback (years) $221 $960 4.77 4.3 The Portable has an above grade floor resting on sleepers which are protected from the weather by plywood skirting. The floor is estimated to have R-13 fiberglass batt insulation. Installing additional insulation to the floor of the portable will reduce heat loss and reduce electricity consumption. It is recommended to install dense pack insulation with an approximate R-value of R-21 in the cantilevered floor of the portable. See item PB-2 in Appendix D for more information. ECM #PB-3 – Increase Insulation in Portable Exterior Wall Annual Energy Savings Installed Cost SIR Payback (years) $1,660 $12,293 2.79 7.4 Significant energy savings exist by increasing the R-value of the exterior portable walls. The portable is constructed of 2x4 wood stud wall at 16” on-center with R-11 fiberglass batt insulation in between the studs. The exterior face of the wall is T1-11 siding with drywall on the interior side of the wall. Installing rigid foam board insulation to the exterior face with an approximate R-value of R-25 and covering the insulation with T1-11 siding will save $1,660 per year. See item PB-3 in Appendix D for more information. ECM #PB-4 – Add Roof Insulation Annual Energy Savings Installed Cost SIR Payback (years) $253 $1,943 2.69 7.7 Adding additional R-19 fiberglass batt insulation to the roof of the portable to make an R-38 roof may be feasible during the next scheduled roof replacement. Installing an additional layer of R-19 insulation will save approximately $253 per year, with an installed cost of $1,943 if completed in combination with the roof replacement. See item PB-4 in Appendix D for more information. ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 19 AkWarm No. CIRI-ANC-CAEC-01 ECM #PB-5 – Replace Exterior Doors Annual Energy Savings Installed Cost SIR Payback (years) $77 $781 2.03 10.2 The portable building has two poorly insulated (R-1.7) metal doors. It is recommended that both doors be removed and replaced with new R-6.25 minimum (U-0.16) insulated doors. The new doors should have proper weather stripping on them to reduce air infiltration. See item PB-5 in Appendix D for more information. ECM #PB-6– Seal Building Envelope and Reduce Infiltration by 30% Annual Energy Savings Installed Cost SIR Payback (years) $96 $700 1.20 7.3 By tightening the portable building envelope with air sealing improvements, infiltration into the portable will be reduced. This in turn will reduce the heating load and reduce the amount of electricity being used by the electric heaters. While a blower door test was not completed, it is anticipated that air leakage is occurring around old weather stripping around doors, window frames, and wall and roof penetrations. Methods to decrease the infiltration into the portable include: sealing around the windows and doors with caulking and insulation, adding new weather stripping to doors, providing gaskets to all exterior cover plates and sealing all roof and wall penetrations. See item PB-6 in Appendix D for more information. ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 20 AkWarm No. CIRI-ANC-CAEC-01 VIII.III Administrative Controls for Energy Conservation and Optimization While the intent of many energy conservation measures is to increase the efficiency of fuel-burning and electrical equipment, an important factor of energy consumption lies in the operational profiles which control the equipment usage. Such profiles can be managed by administrative controls and departmental leadership. They determine how and when fuel-burning and electrical equipment are used, and therefore have a greater impact on energy savings potential than simply equipment upgrades alone. Significant energy cost savings can be realized when ECMs are combined with efficient-minded operational profiles. Operational profiles may be outlined by organization policy or developed naturally or historically. These profiles include, but are not limited to: operating schedules, equipment setpoints and control strategies, maintenance schedules, and site and equipment selection. Optimization of operational profiles can be accomplished by numerous methods so long as the intent is reduction in energy-using equipment runtime. Due to the numerous methods of optimization, energy cost savings solely as a result of operational optimization are difficult to predict. Quantification, however, is easy to accomplish by metering energy usage during and/or after implementation of energy-saving operational profiles and ECMs. Shown below are some examples which have proven successful for other organizations. Optimization of site selection includes scheduling and location of events. If several buildings in a given neighborhood are all lightly used after regularly occupied hours, energy savings can be found when after- hours events are consolidated and held within the most energy efficient buildings available for use. As a result, unoccupied buildings could be shut down to the greatest extent possible to reduce energy consumption. Two operational behaviors which can be combined with equipment upgrades are operating schedules and equipment control strategies including setpoints. Occupancy and daylight sensors can be programmed to automatically shut off or dim lighting when rooms are unoccupied or sufficiently lit from the sun. Operating schedules can be optimized to run equipment only during regular or high-occupancy periods. Also, through a central control system, or with digital programmable thermostats, temperature setpoints can be reduced during low-occupancy hours to maximize savings. In addition, sporadically used equipment can be shut down during unoccupied hours to further save energy. In general, having equipment operating in areas where no occupants are present is inefficient, and presents an opportunity for energy savings. Operational profiles can also be implemented to take advantage of no- or low-cost ECMs. Examples include heating plant optimizations (boiler section cleaning, boiler flush-through cleaning) and tighter controls of equipment setbacks and shutdowns (unoccupied zones equipment shutdown, easier access to and finer control of equipment for after-hours control). In a large facility management program, implementation of these measures across many or all sites will realize dramatic savings due to the quantity of equipment involved. Changes to building operational profiles can only be realized while simultaneously addressing health, safety, user comfort, and user requirements first. It is impractical to expect users to occupy a building or implement operational behaviors which do not meet such considerations. That said, it is quite practical for management groups to implement administrative controls which reduce losses brought about by excess and sub-optimum usage. ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 Appendix A Energy Benchmark Data First Name Last Name Middle Name Phone Tawny Klebesadel m 343‐7104 State Zip AK   Monday‐ Friday Saturday Sunday Holidays 09:00‐05:00          Average # of  Occupants  During               Renovations Date ASD Transportation Center Other REAL Preliminary Benchmark Data Form PART I – FACILITY INFORMATION Facility Owner MOA Building Name/ Identifier Building Usage Building Square Footage Date Municipal Government/Subdivision 13,206 Year Built Facility Address Building Type City Facility Owned By   03/14/11 1 Gas Meter Elec Service 2 - ASD Transport Building - No Demand Charges Mixed Community Population Facility City 1979 Facility Zip kLEBESADELtm@CI.ANCHORAGE.AK.US 3580 E Tudor Rd Anchorage Elec Service 1 - ASD Bus Barn - Demand Charges 261,500 99516 Email Anchorage Details Mailing Address Primary  Operating  Hours Contact Person PART II – ENERGY SOURCES  Heating Oil  Electricity  Natural Gas   Propane  Wood  Coal  $ /gallon  $ / kWh  $ / CCF  $ / gal  $ / cord  $ / ton Other energy  sources?        Bus Garage = 12,245 SF 1. Please check every energy source you use in the table below.  If known, please enter the base rate you pay  for the energy source. Relo 1 = 960 SF 2. Provide utilities bills for the most recent two‐year period  for each energy source  you use. Relo 2 = 1872. Not connected to ASD Bus Barn electrical breaker, therefore not included in total area. ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. AkWarm No. CIRI-ANC-CAEC-01 Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 ASD Transportation Center Buiding Size Input (sf) =13,206 2009 Natural Gas Consumption (Therms)17,656.00 2009 Natural Gas Cost ($)18,249 2009 Electric Consumption (kWh)789,744 2009 Electric Cost ($)97,616 2009 Total Energy Use (kBtu)4,460,996 2009 Total Energy Cost ($)115,865 Annual Energy Use Intensity (EUI) 2009 Natural Gas (kBtu/sf) 133.7 2009 Electricity (kBtu/sf)204.1 2009 Energy Utilization Index (kBtu/sf)337.8 Annual Energy Cost Index (ECI) 2009 Natural Gas Cost Index ($/sf)1.38 2009 Electric Cost Index ($/sf)7.39 2009 Energy Cost Index ($/sf)8.77 2010 Natural Gas Consumption (Therms)16,800.00 2010 Natural Gas Cost ($)16,162 2010 Electric Consumption (kWh)744,125 2010 Electric Cost ($)74,723 2010 Total Energy Use (kBtu)4,219,699 2010 Total Energy Cost ($)90,885 Annual Energy Use Intensity (EUI) 2010 Natural Gas (kBtu/sf)127.2 2010 Electricity (kBtu/sf)192.3 2010 Energy Utilization Index (kBtu/sf)319.5 Annual Energy Cost Index (ECI) 2010 Natural Gas Cost Index ($/sf)1.22 2010 Electric Cost Index ($/sf)5.66 20010 Energy Cost Index ($/sf)6.88 Note: 1 kWh = 3,413 Btu's 1 Therm = 100,000 Btu's 1 CF ≈ 1,000 Btu's ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 ASD Transportation CenterNatural GasBtus/CCF =100,000Provider Customer #Month Start Date End Date Billing Days Consumption (CCF) Consumption (Therms) Demand Use Natural Gas Cost ($) Unit Cost ($/Therm) Demand Cost ($)Enstar NGC270 Jan‐09 01/14/09 02/16/093329112,911$2,978$1.02Enstar NGC270 Feb‐09 02/16/09 03/16/092822232,223$2,286$1.03Enstar NGC270 Mar‐09 03/16/09 04/17/093222192,219$2,291$1.03Enstar NGC270 Apr‐09 04/17/09 05/15/092816081,608$1,676$1.04Enstar NGC270 May‐09 05/15/09 06/17/0933794794$861$1.08Enstar NGC270 Jun‐09 06/17/09 07/17/0930374374$436$1.17Enstar NGC270 Jul‐09 07/17/09 08/18/0932294294$360$1.22Enstar NGC270 Aug‐09 08/18/09 09/16/0929495495$561$1.13Enstar NGC270 Sep‐09 09/16/09 10/14/0928903903$974$1.08Enstar NGC270 Oct‐09 10/14/09 11/13/093013871,387$1,460$1.05Enstar NGC270 Nov‐09 11/13/09 12/14/093120462,046$2,116$1.03Enstar NGC270 Dec‐09 12/14/09 01/15/103224022,402$2,250$0.94Enstar NGC270 Jan‐10 01/15/10 02/12/102823512,351$2,012$0.86Enstar NGC270 Feb‐10 02/12/10 03/15/103119781,978$1,697$0.86Enstar NGC270 Mar‐10 03/15/10 04/16/103218001,800$1,560$0.87Enstar NGC270 Apr‐10 04/16/10 05/13/102714141,414$1,250$0.88Enstar NGC270 May‐10 05/13/10 06/15/1033987987$894$0.91$$Enstar NGC270 Jun‐10 06/15/10 07/14/10 29 583 583$552$0.95Enstar NGC270 Jul‐10 07/14/10 08/17/10 34 466 466 $594 $1.27Enstar NGC270 Aug‐10 08/17/10 09/16/10 30 496 496 $746 $1.50Enstar NGC270 Sep‐10 09/16/10 10/15/10 29 834 834 $1,034 $1.24Enstar NGC270 Oct‐10 10/15/10 11/12/10 28 1342 1,342 $1,467 $1.09Enstar NGC270 Nov‐10 11/12/10 12/13/10 31 1930 1,930 $1,908 $0.99Enstar NGC270 Dec‐10 12/13/10 01/18/11 36 2619 2,619 $2,448 $0.93Jan ‐ 09 to Dec ‐ 09 total:17,65617,6560.00$18,249$0Jan ‐ 10 to Dec ‐ 10 total:16,80016,8000.00$16,162$0$1.03$0.96Jan ‐ 09 to Dec ‐ 09 avg:Jan ‐ 10 to Dec ‐ 10 avg:ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 $1,500 $2,000 $2,500 $3,000 $3,500 1,5002,0002,5003,0003,500Natural Gas Cost ($)Natural Gas Consumption (Therms)ASD Bus Garage ‐Natural Gas Consumption (Therms) vs. Natural Gas Cost ($)Natural Gas Consumption (Therms)Natural Gas Cost ($)$0 $500 $1,000 05001,000Jan‐09 Mar‐09 May‐09 Jul‐09 Sep‐09 Nov‐09 Jan‐10 Mar‐10 May‐10 Jul‐10 Sep‐10 Nov‐10NDate (Mon ‐Yr)ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 ASD Transportation CenterElectricityBtus/kWh =3,413Provider Customer #Month Start Date End Date Billing Days Consumption (kWh) Consumption (Therms) Demand Use Electric Cost ($) Unit Cost ($/kWh) Demand Cost ($)CEAJan‐09929173,171151.00                          $13,058$0.14CEAFeb‐09803262,742151.00                          $11,195$0.14CEAMar‐09863372,947148.00                          $11,614$0.13CEAApr‐09746602,548148.00                          $9,976$0.13CEAMay‐09501941,713146.00                          $7,111$0.14CEAJun‐0928397969128.00                          $3,708$0.13CEAJul‐092520786055.00                  $3,071$0.12CEAAug‐09326301,11481.00                            $4,014$0.12CEASep‐09512821,750139.00                          $5,981$0.12CEAOct‐09786022,683144.00                          $8,586$0.11CEANov‐09898573,067160.00                          $9,621$0.11CEADec‐09993353,390160.00                          $9,681$0.10CEAJan‐10974193,325162.00                          $9,352$0.10CEAFeb‐10831562,838162.00                          $7,953$0.10CEAMar‐10889353,035154.00                          $8,906$0.10CEAApr‐10741242,530152.00                          $7,595$0.10CEAMay‐10545981,863137.00                          $6,002$0.11CEAJun‐1028233964128 00$3 106$0 11CEAJun1028233964128.00                        $3,106$0.11CEAJul‐102266977452.00                            $2,387$0.11CEAAug‐102711992668.00                            $2,891$0.11CEASep‐10346651,18382.00                            $3,648$0.11CEAOct‐10583421,991139.00                          $5,928$0.10CEANov‐10806152,751154.00                          $7,884$0.10CEADec‐10942503,217154.00                          $9,071$0.10Jan ‐ 09 to Dec ‐ 09 total:78974426,9541611.00$97,616Jan ‐ 10 to Dec ‐ 10 total:74412525,3971544.00$74,723$0.12$0.10Jan ‐ 09 to Dec ‐ 09 avg:Jan ‐ 10 to Dec ‐ 10 avg:ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 $6,000 $8,000 $10,000 $12,000 $14,000 400006000080000100000120000Electric Cost ($)Electric Consumption (kWh)ASD Bus Garage ‐Electric Consumption (kWh) vs. Electric Cost ($)Electric Consumption (kWh)Electric Cost ($)$0 $2,000 $4,000 020000Jan‐09 Mar‐09 May‐09 Jul‐09 Sep‐09 Nov‐09 Jan‐10 Mar‐10 May‐10 Jul‐10 Sep‐10 Nov‐10Date (Mon ‐Yr)ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 Appendix B AkWarm Commercial Reports ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 ENERGY AUDIT REPORT – PROJECT SUMMARY – Created 12/05/2011 11:01AM General Project Information PROJECT INFORMATION AUDITOR INFORMATION Building: Anchorage School District Bus Garage Auditor Company: Coffman Engineers, Inc. Address: 3580 E Tudor Rd Auditor Name: Walter Heins, PE, CCP, CxA, CEA City: Anchorage Auditor Address: 800 F Street Anchorage, AK 99501 Client Name: Tawny Klebesadel Client Address: Anchorage, AK Auditor Phone: (907) 276-6664 Auditor FAX: (907) 276-5042 Client Phone: (907) 343-7104 Auditor Comment: Client FAX: Design Data Building Area: 12,246 square feet Design Heating Load: Design Loss at Space: 623,692 Btu/hour with Distribution Losses: 623,692 Btu/hour Plant Input Rating assuming 82.0% Plant Efficiency and 25% Safety Margin: 950,749 Btu/hour Note: Additional Capacity should be added for DHW load, if served. Typical Occupancy: 18 people Design Indoor Temperature: 68.6 deg F (building average) Actual City: Anchorage Design Outdoor Temperature: -18 deg F Weather/Fuel City: Anchorage Heating Degree Days: 10,816 deg F-days Utility Information Electric Utility: Chugach Electric - Commercial – Sm Natural Gas Provider: Enstar Natural Gas – Commercial – Sm Average Annual Cost/kWh: $0.110/kWh Average Annual Cost/ccf: $1.000/ccf ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 Annual Energy Cost Estimate Description Space Heating Space Cooling Water Heating Lighting Other Electrical Cooking Clothes Drying Vent Fans Service Fees Total Cost Existing Building $18,788 $0 $963 $17,486 $68,913 $0 $0 $234 $0 $106,384 With Proposed Retrofits $12,728 $0 $963 $10,539 $40,756 $0 $0 $85 $0 $65,072 SAVINGS $6,060 $0 $0 $6,946 $28,157 $0 $0 $149 $0 $41,312 ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 Appendix C Major Equipment List ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 MAJOR EQUIPMENT INVENTORY TAG LOCATION FUNCTION MAKE MODEL TYPE CAPACITY EFFICIENCY MOTOR SIZE ASHRAE SERVICE LIFE (YEARS) ESTIMATED REMAINING USEFUL LIFE (YEARS) B‐1 MECH RM BUILDING HEATING WEIL‐MCLAIN 888 CAST IRON DUAL‐FUEL 1082 MBH ≈ 65%   30 25                         P‐1A MECH RM HEATING WATER CIRC ARMSTRONG 4300 IMPELLER 120GPM 50’ ≈ 86.5% 3 10 5 P‐1B MECH RM HEATING WATER CIRC ARMSTRONG 4300 IMPELLER 120GPM 50’ ≈ 86.5% 3 10 5                         EF‐1 RESTROOM TOILET EXHAUST NEPTUNE RF‐40   400 CFM ≈ 60% 1/12 25 1 EF‐  BREAK ROOM BREAK ROOM EXHAUST         400 CFM ≈ 60% 1/12 25 1 EF‐4 WELDING ROOM WELDING EXHAUST LOREN COOK 14CV17D   1700 CFM ≈ 60% 1 25 1 EF‐5 WASH AREA WASH AREA EXHAUST 3200      3200 CFM ≈ 60% 1.5 25 1  ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 Appendix D Energy Conservation Measures ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 The following tables consist of raw output data from the AkWarm Commercial program used to model energy costs and calculate energy savings and financial ratios. These tables represent all of the energy conservation measures calculated and considered by the energy audit team. However, ECMs included in the Executive Summary and Section VIII are recommended by the energy audit team due to their viable financial ratios (SIR>1) or due to their value added. PRIORITY LIST – BUS GARAGE - RECOMMENDED ENERGY CONSERVATION MEASURES Rank Feature Recommendation Annual Energy Savings Installed Cost SIR Payback (Years) ST-0a Refrigerators Replace Refrigerators older than 5 years old - - - <10 years ST-00c Boiler Shutdown Shutdown boiler during summer months $175 $0 ∞0 ST-1 Setback Thermostat: Garage and Bus Maintenance Implement a Heating Temperature Unoccupied Setback to 60.0 deg F for the Garage and Bus Maintenance space. $1,600 $1,000 20.36 0.6 ST-2 Setback Thermostat: Offices Implement a Heating Temperature Unoccupied Setback to 60.0 deg F for the Offices space. $941 $1,000 11.97 1.1 ST-3 Other Electrical: Head Bolt Outlet Heaters Add new Clock Timer or Other Scheduling Control $28,157 $40,200 8.60 1.4 ST-4 Lighting: Exterior Replace with 2 LED 17W Module StdElectronic $76 $125 5.31 1.6 ST-5 Lighting: Exterior Replace with 8 LED 115W Module StdElectronic $605 $2,400 3.88 4 ST-6 Lighting: Garage Replace with 7 FLUOR (4) T8 4' F32T8 32W Standard (2) Program StdElectronic $211 $1,050 3.09 5 ST-7 b Lighting: Large Office Replace with 20 FLUOR (4) T8 4' F32T8 32W Standard (2) Program StdElectronic $472 $3,000 2.42 6.4 ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 PRIORITY LIST – BUS GARAGE - RECOMMENDED ENERGY CONSERVATION MEASURES Rank Feature Recommendation Annual Energy Savings Installed Cost SIR Payback (Years) ST-8 Ventilation Install new high efficiency restroom and breakroom fan motors that are controlled based on occupancy and timer. $264 $1,800 1.83 6.8 ST-9 Air Tightening Perform air sealing to reduce air leakage by 20%. $1,567 $8,000 1.76 5.1 ST-10 Lighting: Garage Replace with 3 FLUOR (3) T5 45.2" F54W/T5 HO Standard (2) StdElectronic $126 $1,200 1.62 9.5 ST-11 Lighting: Garage Replace with 38 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic $572 $5,700 1.54 10 ST-12 Lighting: Exterior Replace with LED 72W Module StdElectronic $46 $500 1.43 10.8 ST-13 b Lighting: Small Volume Office Replace with 21 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic and Add new Occupancy Sensor $346 $3,750 1.42 10.8 ST-14 Lighting: Garage Replace with 19 FLUOR (6) T5 45.2" F54W/T5 HO Standard (2) StdElectronic $660 $7,600 1.34 11.5 ST-15 Below- (part or all) Grade Wall: East Mech Room/Concrete/R- 5.6 Install R-20 rigid foam board to interior or exterior side of wall. Does not include cost of coverings. $45 $753 1.31 16.9 ST-16 Lighting: Exterior Replace with 10 LED 4W Module StdElectronic $2,117 $25,000 1.30 11.8 ST-17 Below- (part or all) Grade Wall: Lower Concrete Wall/R- 5.6 Install R-20 rigid foam board to interior or exterior side of wall. Does not include cost of coverings. $718 $12,275 1.29 17.1 ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 PRIORITY LIST – BUS GARAGE - RECOMMENDED ENERGY CONSERVATION MEASURES Rank Feature Recommendation Annual Energy Savings Installed Cost SIR Payback (Years) ST-18 b Lighting: Large Office Replace with 6 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic $71 $900 1.21 12.7 ST-19 b Lighting: Restroom Replace with 8 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic and Add new Occupancy Sensor $132 $1,800 1.13 13.7 ST-20 b Lighting: Small Volume Office Replace with 17 FLUOR (4) T8 4' F32T8 32W Standard (2) Program StdElectronic and Add new Occupancy Sensor $560 $8,100 1.06 14.5 ST-21 Exterior Door: South Face Remove existing door and install standard pre-hung U- 0.16 insulated door, including hardware. $16 $410 0.87 25.5 ST-22 HVAC And DHW Install control valves to reduce flow to hydronic unit heaters based on thermostat set point $154 $3,000 0.83 19.5 ST-23 Lighting: Exterior Replace with 21 LED 50W Module StdElectronic $675 $12,600 0.82 18.7 ST-24 Exterior Door: West Face - Entry Door Remove existing door and install standard pre-hung U- 0.16 insulated door, including hardware. $12 $410 0.66 33.4 ST-25 Lighting: Garage Replace with 6 FLUOR (3) T5 45.2" F54W/T5 HO Standard (2) StdElectronic $100 $2,400 0.64 24.1 ST-26 Lighting: Exterior Replace with 2 LED 72W Module StdElectronic $40 $1,000 0.62 25 ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 PRIORITY LIST – BUS GARAGE - RECOMMENDED ENERGY CONSERVATION MEASURES Rank Feature Recommendation Annual Energy Savings Installed Cost SIR Payback (Years) ST-27 Exterior Door: East Face - Mech Room Door Remove existing door and install standard pre-hung U- 0.16 insulated door, including hardware. $22 $891 0.56 39.6 ST-28 Exterior Door: West Face - Exterior Remove existing door and install standard pre-hung U- 0.16 insulated door, including hardware. $10 $410 0.56 39.6 ST-29 Above-Grade Wall: Upper Wall/R-13 Install R-10 rigid foam board to exterior and cover with T1-11 siding or equivalent. $551 $32,171 0.38 58.4 ST-30 Lighting: Exterior Replace with 4 LED 80W Module StdElectronic $168 $14,700 0.18 87.4 ST-31 Window/Skylight: North Face Replace existing window with U-0.30 vinyl window $49 $4,553 0.17 93.4 ST-32 Window/Skylight: West Face Replace existing window with U-0.30 vinyl window $56 $5,203 0.17 93.6 ST-33 Cathedral Ceiling: Roof Install R-5 rigid board insulation. No cost included for covering insulation. $140 $18,489 0.17 132 ST-34 Window/Skylight: South Face Replace existing window with U-0.30 vinyl window $64 $6,504 0.16 102.2 ST-35 Lighting: Utility Replace with 5 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic $2 $750 0.04 345.3 ST-36 Lighting: Garage Replace with 5 FLUOR (6) T5 45.2" F54W/T5 HO Standard (2) StdElectronic -$34 $2,000 -0.26 -59.2 TOTAL $41,312 $231,644 2.33 5.6 a Due to advances in refrigerators in the previous 5 years, new Energy Star refrigerators are much more efficient and result in viable energy savings. ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 b This item is intended to be implemented once the existing instant start ballasts fail and require replacement, negating the cost of installing new ballasts. c ECM item was modeled with separate AkWarm model and as a result, the item is not an additive measure and is not included in the final totals. ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 PRIORITY LIST – PORTABLE BUILDING - RECOMMENDED ENERGY CONSERVATION MEASURES Rank Feature Recommendation Annual Energy Savings Installed Cost SIR Payback (Years) PB-1 Setback Thermostat: Portable Building Implement a Heating Temperature Unoccupied Setback to 60.0 deg F for the Portable Building space. $1,180 $1,000 14.48 0.8 PB-2 Exposed Floor: Portable Building - Floor Install R-21 densepack insulation in cantilevered floor $221 $960 4.77 4.3 PB-3 Above-Grade Wall: Portable Building - 2x4 Stud Wall Install R-25 rigid foam board to exterior and cover with T1-11 siding or equivalent. $1,660 $12,293 2.79 7.4 PB-4 Cathedral Ceiling: Portable Building - Cold Roof Add R-19 dense-pack to existing insulation. $253 $1,943 2.69 7.7 PB-5 Exterior Door: Portable Building - Doors Remove existing door and install standard pre-hung U- 0.16 insulated door, including hardware. $77 $781 2.03 10.2 PB-6 Air Tightening Perform air sealing to reduce air leakage by 30%. $96 $700 1.20 7.3 PB-7 Window/Skylight: Portable Building - Single Pane Windows Replace existing window with U-0.35 wood window $145 $3,270 0.68 22.6 PB-8 Lighting: Flourescent Lighting Replace with 11 FLUOR (4) T8 4' F32T8 32W Standard (2) Program StdElectronic and Add new Occupancy Sensor $100 $2,350 0.65 23.5 TOTAL $3,731 $23,296 2.78 6.2 ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 ENERGY AUDIT REPORT – ENERGY EFFICIENT RECOMMENDATIONS 1. Building Envelope Insulation Rank Location Existing Type/R-Value Recommendation Type/R- Value Installed Cost Annual Energy Savings 14 Below- (part or all) Grade Wall: East Mech Room/Concrete/ R-5.6 Wall Type: Strapped Masonry Insul. Sheathing: None Masonry Wall: Concrete block, 2 core Framed Wall: 2 x 2, 16" on center XPS (Blue/Pink Foam), 1.12 inches Modeled R-Value: 7.2 Install R-20 rigid foam board to interior or exterior side of wall. Does not include cost of coverings. $753 $45 15 Below- (part or all) Grade Wall: Lower Concrete Wall/R-5.6 Wall Type: Strapped Masonry Insul. Sheathing: None Masonry Wall: Concrete block, 2 core Framed Wall: 2 x 2, 16" on center XPS (Blue/Pink Foam), 1.12 inches Modeled R-Value: 7.2 Install R-20 rigid foam board to interior or exterior side of wall. Does not include cost of coverings. $12,275 $718 25 Above-Grade Wall: Upper Wall/R-13 Wall Type: Single Stud Siding Configuration: Just Siding Insul. Sheathing: None Structural Wall: 2 x 4, 16 inches on center R-13 Batt:FG or RW, 3.5 inches Window and door headers: Not Insulated Insulation Quality: Damaged Modeled R-Value: 10.9 Install R-10 rigid foam board to exterior and cover with T1-11 siding or equivalent. $32,171 $552 29 Cathedral Ceiling: Roof Framing Type: I-Beam (TJI) Framing Spacing: 24 inches Insulated Sheathing: XPS (Blue/Pink Foam), 6.4 inches Bottom Insulation Layer: None Top Insulation Layer: None Modeled R-Value: 35.3 Install R-5 rigid board insulation. No cost included for covering insulation. $18,489 $140 ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 Exterior Doors – Replacement Rank Location Size/Type/Condition Recommendation Installed Cost Annual Energy Savings 19 Exterior Door: South Face Door Type: Metal 1-3/4", paper honeycomb core Modeled R-Value: 1.8 Remove existing door and install standard pre- hung U-0.16 insulated door, including hardware. $410 $16 22 Exterior Door: West Face - Entry Door Door Type: Metal/FG half lite Modeled R-Value: 2.2 Remove existing door and install standard pre- hung U-0.16 insulated door, including hardware. $410 $12 23 Exterior Door: East Face - Mech Room Door Door Type: Metal - urethane, no therm. break Modeled R-Value: 2.5 Remove existing door and install standard pre- hung U-0.16 insulated door, including hardware. $891 $23 24 Exterior Door: West Face - Exterior Door Type: Metal - urethane, no therm. break Modeled R-Value: 2.5 Remove existing door and install standard pre- hung U-0.16 insulated door, including hardware. $410 $10 ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 Windows and Glass Doors – Replacement Rank Location Size/Type/Condition Recommendation Installed Cost Annual Energy Savings 27 Window/Skylight : North Face Glass: Double, glass Frame: Wood\Vinyl Spacing Between Layers: Quarter Inch Gas Fill Type: Air Modeled U-Value: 0.56 Solar Heat Gain Coefficient: 0.46 Replace existing window with U-0.30 vinyl window $4,553 $49 28 Window/Skylight : West Face Glass: Double, glass Frame: Wood\Vinyl Spacing Between Layers: Quarter Inch Gas Fill Type: Air Modeled U-Value: 0.56 Solar Heat Gain Coefficient: 0.46 Replace existing window with U-0.30 vinyl window $5,203 $56 30 Window/Skylight : South Face Glass: Double, glass Frame: Wood\Vinyl Spacing Between Layers: Quarter Inch Gas Fill Type: Air Modeled U-Value: 0.56 Solar Heat Gain Coefficient: 0.46 Replace existing window with U-0.30 vinyl window $6,504 $64 Air Leakage Rank Location Estimated Air Leakage Recommended Air Leakage Target Installed Cost Annual Energy Savings 9 Air Tightness estimated as: 2.08 cfm/ft2 of above-grade shell area at 75 Pascals Perform air sealing to reduce air leakage by 20%. $8,000 $1,576 ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 2. Mechanical Equipment Mechanical Rank Recommendation Installed Cost Annual Energy Savings 20 Install control valves to reduce flow to hydronic unit heaters based on thermostat set point $3,000 $154 Setback Thermostat Rank Location Size/Type/Condition Recommendation Installed Cost Annual Energy Savings 1 Garage and Bus Maintenance Existing Unoccupied Heating Setpoint: 68.0 deg F Implement a Heating Temperature Unoccupied Setback to 60.0 deg F for the Garage and Bus Maintenance space. $1,000 $1,606 2 Offices Existing Unoccupied Heating Setpoint: 70.0 deg F Implement a Heating Temperature Unoccupied Setback to 60.0 deg F for the Offices space. $1,000 $944 Ventilation Rank Recommendation Cost Annual Energy Savings 6 Install new high efficiency restroom and breakroom fan motors that are controlled based on occupancy and timer. $1,800 $263 ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 3. Appliances and Lighting Lighting Fixtures and Controls Rank Location Existing Recommended Installed Cost Annual Energy Savings 4 Garage 7 FLUOR (4) T12 4' F40T12 40W Standard (2) Magnetic with Manual Switching Replace with 7 FLUOR (4) T8 4' F32T8 32W Standard (2) Program StdElectronic $1,050 $211 5 Large Office 20 FLUOR (4) T12 4' F40T12 40W Standard (2) Magnetic with Manual Switching Replace with 20 FLUOR (4) T8 4' F32T8 32W Standard (2) Program StdElectronic $3,000 $472 7 Exterior HPS 150 Watt Magnetic with Manual Switching Replace with LED 72W Module StdElectronic $400 $46 8 Exterior 2 HPS 150 Watt Magnetic with Manual Switching Replace with 2 LED 72W Module StdElectronic $800 $93 10 Garage 3 MH 250 Watt Magnetic with Manual Switching Replace with 3 FLUOR (3) T5 45.2" F54W/T5 HO Standard (2) StdElectronic $1,200 $126 11 Garage 38 FLUOR (2) T12 4' F40T12 40W Standard Magnetic with Manual Switching Replace with 38 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic $5,700 $572 12 Small Volume Office 21 FLUOR (2) T12 4' F40T12 40W Standard Magnetic with Manual Switching Replace with 21 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic and Add new Occupancy Sensor $3,750 $346 13 Garage 19 MH 400 Watt Magnetic with Manual Switching Replace with 19 FLUOR (6) T5 45.2" F54W/T5 HO Standard (2) StdElectronic $7,600 $660 ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 Lighting Fixtures and Controls Rank Location Existing Recommended Installed Cost Annual Energy Savings 16 Large Office 6 FLUOR (2) T12 4' F40T12 40W Standard Magnetic with Manual Switching Replace with 6 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic $900 $71 17 Restroom 8 FLUOR (2) T12 4' F40T12 40W Standard Magnetic with Manual Switching Replace with 8 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic and Add new Occupancy Sensor $1,800 $132 18 Small Volume Office 17 FLUOR (4) T12 4' F40T12 40W Standard (2) Magnetic with Manual Switching Replace with 17 FLUOR (4) T8 4' F32T8 32W Standard (2) Program StdElectronic and Add new Occupancy Sensor $8,100 $560 21 Exterior 21 HPS 100 Watt Magnetic with Manual Switching Replace with 21 LED 50W Module StdElectronic $12,600 $675 26 Exterior 4 HPS 150 Watt Magnetic with Manual Switching Replace with 4 LED 80W Module StdElectronic $14,700 $168 31 Utility 5 FLUOR (2) T12 4' F40T12 40W Standard Magnetic with Manual Switching Replace with 5 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic $750 $2 32 Garage 5 FLUOR (3) T12 8' F96T12/HO 110W Standard (2) Magnetic with Manual Switching Replace with 5 FLUOR (6) T5 45.2" F54W/T5 HO Standard (2) StdElectronic $2,000 -$34 33 Garage 6 FLUOR (2) T12 8' F96T12/HO 110W Standard Magnetic with Manual Switching Replace with 6 FLUOR (4) T5 45.2" F54W/T5 HO Standard (2) StdElectronic $2,400 -$46 ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 Other Electrical Equipment Rank Location Existing Recommended Installed Cost Annual Energy Savings 3 Head Bolt Outlet Heaters 134 Head Bolt Heater Receptacles with Manual Switching Add new Clock Timer or Other Scheduling Control $40,200 $28,157 ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 Appendix E Site Visit Photos ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 1. Main Entrance 2. Garage Entrance 3. Boiler Room 4. Domestic Hot Water Heater and Pumps located in boiler room ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 5. Insulation damage located on west upper wall of garage area next to mezzanine ladder 6. Hydronic Unit Heater located in garage area 7. Roof Vents 8. Boiler Day Tank located in boiler room 9. Exhaust Fans located in fan room above boiler room 10. Gas-fired Unit Heater located in vehicle washing bay ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 11. Portable Building 12. Portable Building Baseboard Heater 13. Portable Building Thermostat 14. Air Compressor for Pneumatic Controls located in fan room ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 Appendix F Thermographic Photos ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 Coffman Engineers made miscellaneous thermographic images of the ASD Bus Garage building using a FLIR T300 Infrared Camera. This is not a thermographic study, rather photographs to illustrate easy-to- identify heat losses. 1. Optical Image, NW Corner. Thermal Image below is indicated by the white border. 2. Thermographic Image, NW Corner. Temperatures indicated by color scale on right. Yellow indicates heat leakage. The outside temperature was about +35°F. Questionable weather stripping along door seam. Heat loss at windows is expected. Questionable insulation at window framing. ASD Student Transportation Final Energy Audit Report Coffman Engineers, Inc. 6/11/2012 AkWarm No. CIRI-ANC-CAEC-01 3. Optical Image, NW Corner. Thermal Image below is indicated by the white border. 4. Optical Image, Portable. Thermal Image below is indicated by the white border. 5. Thermographic image, Front Door. Possible insulation damage indicated by arrow. 6. Thermal Image, heat lost through plywood skirting could be mitigated by additional insulation. 7. Optical Image, East Side garage man door. Thermal Image right is indicated by the white border. 8. Thermal Image, East Side Garage Man Door. Yellow indicates heat leakage through door seam. End of Report