ENERGY AUDIT – FINAL REPORT
FAIRBANKS PUBLIC WORKS
2121 Peger Road
Fairbanks, Alaska
Prepared for:
Mr. Phil Sanders
City of Fairbanks
Prepared by:
David C. Lanning PE, CEA
Douglas Dusek CEA
Stephanie Young EIT, CEAIT
July 23, 2012
Acknowledgment: "This material is based upon work supported by the Department of
Energy under Award Number DE-EE0000095.”
ENVIRONMENTAL ENGINEERING, HEALTH & SAFETY
Anch: 3105 Lakeshore Dr. Ste 106A, 99517 907.222.2445 Fax: 222.0915
Fairbanks: 2400 College Road, 99709 907.452.5688 Fax: 452.5694
Juneau: 4402 Thane Road, 99801 907.586.6813 Fax: 586.6819
info@nortechengr.com www.nortechengr.com
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
i
TABLE OF CONTENTS
1.0 EXECUTIVE SUMMARY ................................................................................................. 1
2.0 INTRODUCTION ............................................................................................................. 4
2.1 Building Use ......................................................................................................... 4
2.2 Building Occupancy and Schedules ..................................................................... 4
2.3 Building Description ............................................................................................. 4
3.0 BENCHMARKING 2010 UTILITY DATA ......................................................................... 6
3.1 Total Energy Use and Cost of 2010 ..................................................................... 7
3.2 Energy Utilization Index of 2010 ........................................................................... 8
3.3 Cost Utilization Index of 2010............................................................................... 9
3.4 Seasonal Energy Use Patterns .......................................................................... 10
3.5 Future Energy Monitoring ................................................................................... 11
4.0 MODELING ENERGY CONSUMPTION ........................................................................ 12
4.1 Understanding How AkWarm Models Energy Consumption ............................... 13
4.2 AkWarm Calculated Savings for the Fairbanks Public Works ............................. 14
4.3 Additional Modeling Methods ............................................................................. 15
5.0 BUILDING OPERATION AND MAINTENANCE (O & M) .............................................. 16
5.1 Operations and Maintenance ............................................................................. 16
5.2 Commissioning .................................................................................................. 16
5.3 Building Specific Recommendations .................................................................. 16
Energy Audit – Final Report
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
ii
APPENDICES
Appendix A Recommended Energy Efficiency Measures .......................................... 18
Appendix B Energy Efficiency Measures that are NOT Recommended ..................... 22
Appendix C Significant Equipment List ...................................................................... 23
Appendix D Local Utility Rate Structure ..................................................................... 24
Appendix E Analysis Methodology ............................................................................ 26
Appendix F Audit Limitations ..................................................................................... 27
Appendix G References ............................................................................................. 28
Appendix H Typical Energy Use and Cost – Fairbanks and Anchorage ..................... 29
Appendix I Typical Energy Use and Cost – Continental U.S. ................................... 30
Appendix J List of Conversion Factors and Energy Units .......................................... 31
Appendix K List of Acronyms, Abbreviations, and Definitions .................................... 32
Appendix L Building Floor Plan ................................................................................. 33
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
1
1.0 EXECUTIVE SUMMARY
NORTECH has completed an ASHRAE Level II Energy Audit of the Fairbanks Public Works, a
44,600 square foot facility in the City of Fairbanks. The audit began with benchmarking which
resulted in a calculation of the energy consumption per square foot. A site inspection was
completed on August 16, 2011 to obtain information about the lighting, heating, ventilation,
cooling and other building energy uses. The existing usage data and current systems were then
used to develop a building energy consumption model using AkWarm.
Once the model was calibrated, a number of Energy Efficiency Measures (EEMs) were
developed from review of the data and observations. EEMs were evaluated and ranked on the
basis of both energy savings and cost using a Savings/Investment Ratio (SIR). While these
modeling techniques were successful in verifying that many of the EEMs would save energy,
not all of the identified EEMs were considered cost effective based on the hardware, installation,
and energy costs at the time of this audit.
While the need for a major retrofit can typically be identified by an energy audit, upgrading
specific systems often requires collecting additional data and engineering and design efforts that
are beyond the scope of the Level II energy audit. The necessity and amount of design effort
and cost will vary depending on the scope of the specific EEMs planned and the sophistication
and capability of the entire design team, including the building owners and operators. During
the budgeting process for any major retrofit identified in this report, the building owner should
add administrative and supplemental design costs to cover the individual needs of their own
organization and the overall retrofit project.
The recommended EEMs for the Fairbanks Public Works are summarized in the table below.
Additional discussion of the modeling process can be found in Section 3. Details of each
individual EEM can be found in Appendix A of this report. A summary of EEMs that were
evaluated but are not currently recommended is located in Appendix B.
PRIORITY LIST – ENERGY EFFICIENCY MEASURES (EEMs)
Rank Feature/
Location Improvement Description
Estimated
Annual
Energy
Savings
Estimated
Installed
Cost
Savings to
Investment
Ratio, SIR
Simple
Payback
(Years)
1
Setback
Thermostat:
Garages/shops
Implement a Heating
Temperature Unoccupied
Setback for the Garages/shops
and office spaces.
$11,242
$80,000
(for DDC
components)
1.8 7.1
2 Ventilation
Add run-around heat recovery
to the Main building exhaust in
the Warm storage area, to
supply preheat for AHU.
Replace Pneumatic Controls
With DDC install VOC and CO
sensors in shops and CO2
sensors in offices
$7,846
$20,000
(Heat
Recovery)
$50,000
(toward
DDC)
1.5 8.9
3
Lighting - Power
Retrofit: Entire
building
Replace with corresponding
LED replacements $15,762 $159,000 1.4 10
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
2
PRIORITY LIST – ENERGY EFFICIENCY MEASURES (EEMs)
Rank Feature/
Location Improvement Description
Estimated
Annual
Energy
Savings
Estimated
Installed
Cost
Savings to
Investment
Ratio, SIR
Simple
Payback
(Years)
4 HVAC And DHW
Replace Furnaces with more
efficient modulating gas
models. Fix Q.Dots to reduce
heating load
$3,438
$30,000
(furnaces)
$20,000
(DDC)
1.2 14
TOTAL, cost-effective measures $38,200 $359,000 1.4 9.4
Savings in the setback thermostat and the HVAC retrofits can only be achieved through the
installation of the DDC system as suggested in the ventilation retrofit.
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
3
Modeled Building Energy Cost Breakdown
The above charts are a graphical representation of the modeled energy usage for Fairbanks
Public Works. The greatest portions of energy cost for the building are lighting and envelope air
losses. Detailed can be found in Appendix A.
The energy cost by end use breakdown was provided by AkWarm based on the field inspection
and does not indicate that all individual fixtures and appliances were directly measured. The
current energy costs are shown above on the left hand pie graph and the projected energy
costs, assuming use of the recommended EEMs, are shown on the right.
The chart breaks down energy usage by cost into the following categories:
• Envelope Air Losses—the cost to provide heated fresh air to occupants, air leakage, heat lost in
air through the chimneys and exhaust fans, heat lost to wind and other similar losses.
• Envelope
o Ceiling—quantified heat loss transferred through the ceiling portion of the envelope.
o Window—quantified heat loss through the window portion of the envelope.
o Wall/Door—quantified heat loss through the wall and door portions of the envelope.
o Floor—quantified heat loss through the floor portion of the envelope.
• Water Heating—energy cost to provide domestic hot water.
• Fans—energy cost to run ventilation, and exhaust fans.
• Lighting—energy cost to light the building.
• Refrigeration—energy costs to provide refrigerated goods for the occupants.
• Other Electrical—includes energy costs not listed above including cooking loads, laundry loads,
other plug loads and electronics.
Envelope
Air Losses
$51,198
31%
Ceiling
$8,277
5%
Window
$3,062
2% Wall/Door
$15,880
10%
Floor
$10,686
7%
Water
Heating
$4,542
3%
Exhaust
Fans
$3,259
2%
Lighting
$52,403
32%
Refriger-
ation
$792
0%
Space
Cooling
$3,299
2%
Other
Electrical
$9,822
6%
Clothes
Drying
$380
0%
Existing Building Energy Cost
Breakdown Total Cost $ 163,601
Envelope
Air Losses
$41,846
26%
Ceiling
$7,687
5%
Window
$2,669
2%
Wall/Door
$14,472
9% Floor
$9,924
6%
Water
Heating
$4,542
3%
Ventilation
Fans
$2,420
1%
Lighting
$30,544
19%
Refriger-
ation
$792
0%
Space
Cooling
$1,738
1%
Other
Electrical
$9,822
6%
Clothes
Drying
$380
0%
Lighting
Savings
$21,858
13%
Other
EEM
Savings
$14,906
9%
Retrofit Building Energy Cost
Breakdown Total Cost $126,837
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
4
2.0 INTRODUCTION
NORTECH contracted with The Alaska Housing Finance Corporation to perform ASHRAE
Level II Energy Audits for publically owned buildings in Alaska. This report presents the findings
of the utility benchmarking, modeling analysis, and the recommended building modifications,
and building use changes that are expected to save energy and money.
The report is organized into sections covering:
• description of the facility,
• the building’s historic energy usage (benchmarking),
• estimating energy use through energy use modeling,
• evaluation of potential energy efficiency or efficiency improvements, and
• recommendations for energy efficiency with estimates of the costs and savings.
2.1 Building Use
Fairbanks Public Works houses the offices and equipment associated with the maintenance and
repair of City infrastructure and equipment.
2.2 Building Occupancy and Schedules
The building is typically occupied by 20-30 people from 7:00 am to 5:00 pm year round.
Typically the daily schedule is slightly longer in the summer and shorter in the winter.
2.3 Building Description
The building, constructed in 1978, is a steel-framed, slab-on-grade building, with a two story
office area, two large shops and a warm storage garage.
Building Envelope
Building Envelope: Walls
Wall Type Description Insulation Notes
Above-grade walls Wood-framed with 2x8 studs
spaced 16-inches on center. R--25 fiberglass batt. ---
Below-grade walls 8-inch concrete walls None ---
Building Envelope: Floors
Floor Type Description Insulation Notes
Floor Concrete slab
3-inches perimeter
insulation to 2-foot
depth
---
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
5
Heating and Ventilation Systems
Heat is supplied to the building by two oil-fired boilers and two oil-fired furnaces. The furnaces
supply the shops at the east and south ends, the large boiler supplies the office area and the
small boiler supplies the warm storage garage on the north end.
Both of the furnaces are paired with a Q-dot, passive heat recovery unit.
All of the systems are controlled by a pneumatic control system that maintenance personnel say
they cannot keep in operation.
Air Conditioning System
Air conditioning is supplied to the office area during the summer months by a rooftop air
conditioning unit.
Energy Management
The Q-dot units provide passive heat recovery and the lighting has been mostly upgraded to
LED both of which help reduce energy usage. No other energy management systems are in
place.
Lighting Systems
Lighting in the building is varied. Even though it was understood that a global LED tube lighting
replacement was completed the audit found T12 (1.5-inch diameter, 4-foot) bulbs in ceiling
mounted fixtures around the building. In addition, compact fluorescent and incandescent bulbs
were still found in some storage areas and as task lighting and high pressure sodium and metal
halide pendants light the shop.
Domestic Hot Water
Domestic Hot Water (DHW) is supplied by an oil-fired hot water heater. Hot water circulates to
the building.
Building Envelope: Roof
Roof Type Description Insulation Notes
All Roofs Vented, cathedral roof framed
with wood trusses. R-30 fiberglass batt ---
Building Envelope: Doors and Windows
Door and Window
Type Description Estimated
R-Value Notes
Man Doors Commercial style, metal doors 3.6 ---
Garage doors Sectional metal garage doors 3.0 ---
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
6
3.0 BENCHMARKING 2010 UTILITY DATA
Benchmarking building energy use consists of obtaining and then analyzing two years of energy
bills. The original utility bills are necessary to determine the raw usage and charges as well as
to evaluate the utility’s rate structure. The metered usage of electrical and natural gas
consumption is measured monthly, but heating oil, propane, wood, and other energy sources
are normally billed upon delivery and provide similar information. During benchmarking,
information is compiled in a way that standardizes the units of energy and creates energy use
and billing rate information statistics for the building on a square foot basis. The objectives of
benchmarking are:
• to understand patterns of use,
• to understand building operational characteristics,
• for comparison with other similar facilities in Alaska and across the country, and
• to offer insight in to potential energy savings.
The results of the benchmarking, including the energy use statistics and comparisons to other
areas, are discussed in the following sections.
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
7
3.1 Total Energy Use and Cost of 2010
The energy use profiles below show the energy and cost breakdowns for the Fairbanks Public
Works. The total 2010 energy use for the building was 6,240 mmBTU and the total cost was
$175,721. These charts show the portion of use for a fuel type and the portion of its cost.
The above charts indicate that the highest portion of energy use is for oil and the highest portion
of cost is for electricity. Fuel oil consumption correlates directly to space heating and domestic
hot water while electrical use can correlate to lighting systems, plug loads, and HVAC
equipment. The energy type with the highest cost often provides the most opportunity for
savings.
Electric
1,976
32%
Oil
4,164
68%
Energy Use Total (mmBTU)
Electric
$99,091
56%
Oil
$76,630
44%
Energy Cost Total ($)
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
8
3.2 Energy Utilization Index of 2010
The primary benchmarking statistic is the Energy Utilization Index (EUI). The EUI is calculated
from the utility bills and provides a snapshot of the quantity of energy actually used by the
building on a square foot and annual basis. The calculation converts the total energy use for
the year from all sources in the building, such as heating fuel and electrical usage, into British
Thermal Units (BTUs). This total annual usage is then divided by the number of square feet of
the building. The EUI units are BTUs per square foot per year.
The benchmark analysis found that the Fairbanks Public Works has an EUI of 138,000 BTUs
per square foot per year.
The EUI is useful in comparing this building’s energy use to that of other similar buildings in
Alaska and in the Continental United States. The EUI can be compared to average energy use
in 2003 found in a study by the U.S. Energy Information Administration of commercial buildings
(abbreviated CBECS, 2006). That report found an overall average energy use of about 90,000
BTUs per square foot per year while studying about 6,000 commercial buildings of all sizes,
types, and uses that were located all over the Continental U.S. (see Table C3 in Appendix I).
In a recent and unpublished state-wide benchmarking study sponsored by the Alaska Housing
Finance Corporation, schools in Fairbanks averaged 62,000 BTUs per square foot and schools
in Anchorage averaged 123,000 BTUs per square foot annual energy use. The chart below
shows the Fairbanks Public Works relative to these values. These findings are discussed further
in Appendix H.
138000
62,000
123,000
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
Btu/ Sq. Ft Annual Energy Use Index (Total Energy/ SF)
Fairbanks Public Works Fairbanks Schools Anchorage Schools
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
9
3.3 Cost Utilization Index of 2010
Another useful benchmarking statistic is the Cost Utilization Index (CUI), which is the cost for
energy used in the building on a square foot basis per year. The CUI is calculated from the cost
for utilities for a year period. The CUI permits comparison of buildings on total energy cost even
though they may be located in areas with differing energy costs and differing heating and/or
cooling climates. The cost of energy, including heating oil, natural gas, and electricity, can vary
greatly over time and geographic location and can be higher in Alaska than other parts of the
country.
The CUI for Fairbanks Public Works is about $ 3.94 per square foot per year. This is based on
utility costs from 2010 and the following rates:
Electricity at $ 0.17 / kWh ($ 4.98 / Therm)
# 2 Fuel Oil at $ 2.59 / gallon ($ 1.85/ Therm)
The Department of Energy Administration study, mentioned in the previous section (CBECS,
2006) found an average cost of $2.52 per square foot in 2003 for 4,400 buildings in the
Continental U.S (Tables C4 and C13 of CBDES, 2006). Schools in Fairbanks have an average
cost for energy of $2.42 per square foot while Anchorage schools average $2.11 per square
foot. The chart below shows the Fairbanks Public Works relative to these values. More details
are included in Appendix H.
$3.94
$2.42
$2.11
$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
$3.00
$3.50
$4.00
$4.50
$/Sq. Ft Annual Energy Cost Index (Total Cost/ SF)
Fairbanks Public Works Fairbanks Schools
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
10
3.4 Seasonal Energy Use Patterns
Energy consumption is often highly correlated with seasonal climate and usage variations. The
graphs below show the electric and fuel consumption of this building over the course of two
years. The lowest monthly use is called the baseline use. The electric baseline often reflects
year round lighting. The clear relation of increased energy usage during periods of cold weather
can be seen in the months with higher usage.
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
Jan-09Mar-09May-09Jul-09Sep-09Nov-09Jan-10Mar-10May-10Jul-10Sep-10Nov-10Jan-11Mar-11May-11KWH Electrical Consumption
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
Jan-09Mar-09May-09Jul-09Sep-09Nov-09Jan-10Mar-10May-10Jul-10Sep-10Nov-10Jan-11Mar-11May-11Gallons Fuel Oil Deliveries
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
11
3.5 Future Energy Monitoring
Energy accounting is the process of tracking energy consumption and costs. It is important for
the building owner or manager to monitor and record both the energy usage and cost each
month. Comparing trends over time can assist in pinpointing major sources of energy usage and
aid in finding effective energy efficiency measures. There are two basic methods of energy
accounting: manual and automatic. Manual tracking of energy usage may already be performed
by an administrative assistant: however if the records are not scrutinized for energy use, then
the data is merely a financial accounting. Digital energy tracking systems can be installed. They
display and record real-time energy usage and accumulated energy use and cost. There are
several types which have all of the information accessible via Ethernet browser.
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
12
4.0 MODELING ENERGY CONSUMPTION
After benchmarking of a building is complete and the site visit has identified the specific systems
in the building, a number of different methods are available for quantifying the overall energy
consumption and to model the energy use. These range from relatively simple spreadsheets to
commercially available modeling software capable of handling complex building systems.
NORTECH has used several of these programs and uses the worksheets and software that
best matches the complexity of the building and specific energy use that is being evaluated.
Modeling of an energy efficiency measure (EEM) requires an estimate of the current energy
used by the specific feature, the estimated energy use of the proposed EEM and its installed
cost. EEMs can range from a single simple upgrade, such as light bulb type or type of motor, to
reprogramming of the controls on more complex systems. While the need for a major retrofit
can typically be identified by an energy audit, the specific system upgrades often require
collecting additional data and engineering and design efforts that are beyond the scope of the
Level II energy audit.
Based on the field inspection results and discussions with the building owners/operators,
auditors developed potential EEMs for the facility. Common EEMs that could apply to almost
every older building include:
• Reduce the envelope heat losses through:
o increased building insulation, and
o better windows and doors
• Reduce temperature difference between inside and outside using setback thermostats
• Upgrade inefficient:
o lights,
o motors,
o refrigeration units, and
o other appliances
• Reduce running time of lights/appliances through:
o motion sensors,
o on/off timers,
o light sensors, and
o other automatic/programmable systems
The objective of the following sections is to describe how the overall energy use of the building
was modeled and the potential for energy savings. The specific EEMs that provide these overall
energy savings are detailed in Appendix A of this report. While the energy savings of an EEM is
unlikely to change significantly over time, the cost savings of an EEM is highly dependent on the
current energy price and can vary significantly over time. An EEM that is not currently
recommended based on price may be more attractive at a later date or with higher energy
prices.
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
13
4.1 Understanding How AkWarm Models Energy Consumption
NORTECH used the AkWarm model for evaluating the overall energy consumption at Fairbanks
Public Works. The AkWarm program was developed by the Alaska Housing Finance
Corporation (AHFC) to model residential energy use. The original AkWarm is the modeling
engine behind the successful residential energy upgrade program that AHFC has operated for a
number of years. In the past few years, AHFC has developed a version of this model for
commercial buildings.
Energy use in buildings is modeled by calculating energy losses and consumption, such as:
• Heat lost through the building envelope components, including windows, doors, walls,
ceilings, crawlspaces, and foundations. These heat losses are computed for each
component based on the area, heat resistance (R-value), and the difference between
the inside temperature and the outside temperature. AkWarm has a library of
temperature profiles for villages and cities in Alaska.
• Window orientation, such as the fact that south facing windows can add heat in the
winter but north-facing windows do not.
• Inefficiencies of the heating system, including the imperfect conversion of fuel oil or
natural gas due to heat loss in exhaust gases, incomplete combustion, excess air, etc.
Some electricity is also consumed in moving the heat around a building through
pumping.
• Inefficiencies of the cooling system, if one exists, due to various imperfections in a
mechanical system and the required energy to move the heat around.
• Lighting requirements and inefficiencies in the conversion of electricity to light; ultimately
all of the power used for lighting is converted to heat. While the heat may be useful in
the winter, it often isn’t useful in the summer when cooling may be required to remove
the excess heat. Lights are modeled by wattage and operational hours.
• Use and inefficiencies in refrigeration, compressor cooling, and heat pumps. Some units
are more efficient than others. Electricity is required to move the heat from inside a
compartment to outside it. Again, this is a function of the R-Value and the temperature
difference between the inside and outside of the unit.
• Plug loads such as computers, printers, mini-fridges, microwaves, portable heaters,
monitors, etc. These can be a significant part of the overall electricity consumption of
the building, as well as contributing to heat production.
• The schedule of operation for lights, plug loads, motors, etc. is a critical component of
how much energy is used.
AkWarm adds up these heat losses and the internal heat gains based on individual unit usage
schedules. These estimated heat and electrical usages are compared to actual use on both a
yearly and seasonal basis. If the AkWarm model is within 5 % to 10% of the most recent 12
months usage identified during benchmarking, the model is considered accurate enough to
make predictions of energy savings for possible EEMs.
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
14
4.2 AkWarm Calculated Savings for the Fairbanks Public Works
Based on the field inspection results and discussions with the building owners/operators,
auditors developed potential EEMs for the facility. These EEMs are then entered into AkWarm
to determine if the EEM saves energy and is cost effective (i.e. will pay for itself). AkWarm
calculates the energy and money saved by each EEM and calculates the length of time for the
savings in reduced energy consumption to pay for the installation of the EEM. AkWarm makes
recommendations based on the Savings/Investment Ratio (SIR), which is defined as ratio of the
savings generated over the life of the EEM divided by the installed cost. Higher SIR values are
better and any SIR above one is considered acceptable. If the SIR of an EEM is below one, the
energy savings will not pay for the cost of the EEM and the EEM is not recommended.
Preferred EEMs are listed by AkWarm in order of the highest SIR.
A summary of the savings from the recommended EEMs are listed in this table.
Description Space
Heating
Space
Cooling
Water
Heating Lighting Refrigeration Other
Electrical
Clothes
Drying
Service
Fees Total
Existing
Building $90,549 $3,289 $4,542 $52,403 $792 $9,822 $380 $3,259 $165,037
With All
Proposed
Retrofits
$76,597 $1,738 $4,542 $30,544 $792 $9,822 $380 $2,420 $126,837
Savings $13,951 $1,551 $0 $21,858 $0 $0 $0 $839 $38,200
Savings in these categories represent the overall savings for the building, and reflect any added
cost that might occur because of a retrofit. For example, installing more efficient lights will
increase the heating load and creating or lowering an unoccupied setback temperature will
increase hot water heat losses and cost.
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
15
4.3 Additional Modeling Methods
The AkWarm program effectively models wood-framed and other buildings with standard
heating systems and relatively simple HVAC systems. AkWarm models of more complicated
mechanical systems are sometimes poor due to a number of simplifying assumptions and
limited input of some variables. Furthermore, AKWarm is unable to model complex HVAC
systems such as variable frequency motors, variable air volume (VAV) systems, those with
significant digital or pneumatic controls or significant heat recovery capacity. In addition, some
other building methods and occupancies are outside AkWarm capabilities.
This report section is included in order to identify benefits from modifications to those more
complex systems or changes in occupant behavior that cannot be addressed in AkWarm.
The Fairbanks Public Works was calibrated within NORTECH standards in AKWarm. Retrofits
did not require additional outside calculations.
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
16
5.0 BUILDING OPERATION AND MAINTENANCE (O & M)
5.1 Operations and Maintenance
A well-implemented operation and maintenance (O & M) plan is often the driving force behind
energy savings. Such a plan includes preserving institutional knowledge, directing preventative
maintenance, and scheduling regular inspections of each piece of HVAC equipment within the
building. Routine maintenance includes the timely replacement of filters, belts and pulleys, the
proper greasing of bearings and other details such as topping off the glycol tanks. Additional
benefits to a maintenance plan are decreased down time for malfunctioning equipment, early
indications of problems, prevention of exacerbated maintenance issues, and early detection of
overloading/overheating issues. A good maintenance person knows the building’s equipment
well enough to spot and repair minor malfunctions before they become major retrofits.
Operations and Maintenance staff implementing a properly designed O & M plan will:
• Track and document
o Renovations and repairs,
o Utility bills and fuel consumption, and
o System performance.
• Keep available for reference
o A current Building Operating Plan including an inventory of installed systems,
o The most recent available as-built drawings,
o Reference manuals for all installed parts and systems, and
o An up-to-date inventory of on-hand replacement parts.
• Provide training and continuing education for maintenance personnel.
• Plan for commissioning and re-commissioning at appropriate intervals.
5.2 Commissioning
Commissioning of a building is the verification that the HVAC systems perform within the design
or usage ranges of the Building Operating Plan. This process ideally, though seldom, occurs as
the last phase in construction. HVAC system operation parameters degrade from ideal over time
due to incorrect maintenance, improper replacement pumps, changes in facility tenants or
usage, changes in schedules, and changes in energy costs or loads. Ideally, re-commissioning
of a building should occur every five to ten years. This ensures that the HVAC system meets
the potentially variable use with the most efficient means.
5.3 Building Specific Recommendations
Fairbanks Public is well maintained. Mechanical areas are well kept and with the exception of
the pneumatic controls the systems are currently functioning properly. Some general
recommendations for improvements to the City of Fairbanks maintenance program will be made
in a separate report.
An Indoor Air Quality (IAQ) assessment of carbon monoxide (CO) and volatiles of concern
(VOCs) should be conducted to establish a baseline for repairs.
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
17
APPENDICES
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
18
Appendix A Recommended Energy Efficiency Measures
A number of Energy Efficiency Measures (EEMs) are available to reduce the energy use and
overall operating cost for the facility. The EEMs listed below are those recommended by
AkWarm based on the calculated savings/investment ration (SIR) as described in Appendix E.
AkWarm also provides a breakeven cost, which is the maximum initial cost of the EEM that will
still return a SIR of one or greater.
This section describes each recommended EEM and identifies the potential energy savings and
installation costs. This also details the calculation of breakeven costs, simple payback, and the
SIR for each recommendation. The recommended EEMs are grouped together generally by the
overall end use that will be impacted.
A.1 Temperature Control
The old pneumatic control system is no longer functioning and should be replaced. A Direct
Digital Control (DDC) system should be installed and programmed to create unoccupied
setbacks in the building as well as better control of the HVAC systems. Programmable
thermostats allow for automatic temperature setback, which reduce usage more reliably than
manual setbacks. Reduction of the nighttime temperature set points will decrease the energy
usage. See HVAC recommendations for additional DDC information and additional costs.
Rank Building Space Recommendation
1 Garages/shops
Implement a Heating Temperature
Unoccupied Setback to 55.0 deg F for the
Garages/shops space.
Installation Cost $50,000 Estimated Life of Measure (yr) 15 Energy Savings (/yr) $8,863
Breakeven Cost $120,020 Savings-to-Investment Ratio 2.4 Simple Payback (yr) 6
Rank Building Space Recommendation
1 Offices
Implement a Heating Temperature
Unoccupied Setback to 60.0 deg F for the
Offices space.
Installation Cost $30,000 Estimated Life of Measure (yr) 15 Energy Savings (/yr) $2,431
Breakeven Cost $32,899 Savings-to-Investment Ratio 1.1 Simple Payback (yr) 12
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
19
A.2 Electrical Loads
A.2.1 Lighting
The electricity used by lighting eventually ends up as heat in the building. In areas where
electricity is more expensive than other forms of energy, or in areas where the summer
temperatures require cooling; this additional heat can be both wasteful and costly. Converting
to more efficient lighting reduces cooling loads in the summer and allows the user to control
heat input in the winter. The conversion from T12 (one and a half inch fluorescent bulbs) to T8
(one inch), T5 (5/8 inch), Compact Fluorescent Lights (CFL), or LED bulbs provides a significant
increase in efficiency. LED bulbs can be directly placed in existing fixtures. The LED bulb
bypasses the ballast altogether, which removes the often irritating, “buzzing” noise that
magnetic ballasts tend to make.
Rank Location Existing Condition Recommendation
3 Misc. T12 40W
88 FLUOR (2) T12 4' F40T12 40W
Standard StdElectronic with Manual
Switching
Replace with 88 LED (2) 17W
Module StdElectronic
Installation Cost $11,000 Estimated Life of Measure (yr) 17 Energy Savings (/yr) $2,903
Breakeven Cost $37,597 Savings-to-Investment Ratio 3.4 Simple Payback (yr) 4
Rank Location Existing Condition Recommendation
3 Misc. T12 96W
113 FLUOR (2) T12 8' F96T12/HO 95W
Energy-Saver Magnetic with Manual
Switching
Replace with 113 LED 115W
Module StdElectronic
Installation Cost $85,000 Estimated Life of Measure (yr) 17 Energy Savings (/yr) $7,555
Breakeven Cost $91,842 Savings-to-Investment Ratio 1.1 Simple Payback (yr) 11
Rank Location Existing Condition Recommendation
3 Shop Metal Halide 28 MH 1000 Watt Magnetic with Manual
Switching
Replace with 28 LED 100W
Module StdElectronic
Installation Cost $20,000 Estimated Life of Measure (yr) 14 Energy Savings (/yr) $2,071
Breakeven Cost $20,778 Savings-to-Investment Ratio 1.0 Simple Payback (yr) 10
Rank Location Existing Condition Recommendation
8 HPS Shop Lights 59 HPS 400 Watt Magnetic with Manual
Switching
Replace with 59 LED 100W
Module StdElectronic
Installation Cost $43,000 Estimated Life of Measure (yr) 17 Energy Savings (/yr) $3,233
Breakeven Cost $36,734 Savings-to-Investment Ratio 0.9 Simple Payback (yr) 13
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
20
A.2.2 Other Electrical Loads
Plug loads in the building consist of mainly necessary equipment; therefore recommendations
are not made in this area.
A.3 Building Envelope: Recommendations for change
A.3.1 Exterior Walls
Upgrades to the exterior walls are not economical at this time.
A.3.2 Foundation and/or Crawlspace
Adding insulation to the foundation is not economical at this time.
A.3.3 Roofing and Ceiling
Adding insulation to the foundation is not economical at this time.
A.3.4 Windows
Replacing the existing windows is not economical at this time.
A.3.5 Doors
The existing doors appear to be in good condition. Replacing them is not economical at this
time.
A.4 Building Heating System / Air Conditioning
A.4.1 Heating, Heat Distribution, and Ventilation
The pneumatic controls for the HVAC system are not functioning properly. The existing oil-fired
furnaces cannot modulate the firing rate, and are inefficient. The pneumatic system should be
replaced with a DDC system (see Temperature Settings and Ventilation Sections). The furnaces
should be replaced with more efficient natural gas-fired furnaces. The best alternative would be
to install modulating, condensing furnaces. However this may be less economical if the heat
exchanger components of the existing furnaces are still in good condition and just replacing the
burner is possible. The estimate below is to replace the furnace gun with a more efficient gas-
fired gun and fan motors with VFD motors. Secondly, the option to replace the furnaces entirely
with condensing units should be considered.
Rank Recommendation
6 Replace Furnaces with more efficient, modulating, natural gas units.
Repair Qdot control and reduce cooling load
Installation Cost $50,000 Estimated Life of Measure (yr) 20 Energy Savings (/yr) $3,927
Breakeven Cost $54,106 Savings-to-Investment Ratio 1.1 Simple Payback (yr) 15
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
21
A.4.2 Air Conditioning
When the new DDC system is installed, options for reducing the cooling load such as
economizer cooling using ventilation should be explored. This option will reduce electricity
demand from the air conditioning system.
A.4.3 Exhaust Fans
The main building exhaust fan has no heat recovery system. A heat recovery run around that
supplies the nearby AHU should be installed. In addition to the DDC system upgrade, demand
controlled ventilation should be instituted based on monitoring of Carbon Dioxide (CO2), Carbon
Monoxide (CO) and other Volatiles of Concern (VOCs).
Some occupants report air quality issues in the office area. During the retrofit care should be
taken to ensure that the office area has a positive air pressure relative to the outdoors while the
shop areas have a lower, more neutral air pressure to prevent driving contaminants into the
offices.
A.4.4 Air Changes and Air Tightening
No other EEMs are recommended in this area because of the difficulty of quantifying the
amount of leaking air and the savings. However, using the ventilation system to pressurize the
building and an infra-red camera during the winter, the location of significant leaks can be
determined and repaired.
Rank Recommendation
2 Add Heat recovery run around to the Main building exhaust in the Warm storage area. Supply Preheat
for AHU. Replace Pneumatic Controls With DDC install VOC and CO sensors in shops and CO2
sensors in office VAVs
Installation Cost $70,000 Estimated Life of Measure (yr) 15 Energy Savings (/yr) $7,846
Breakeven Cost $104,807 Savings-to-Investment Ratio 1.5 Simple Payback (yr) 9
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
22
Appendix B Energy Efficiency Measures that are NOT Recommended
As indicated in other sections of the report, a number of potential EEMs were identified that
were determined to be NOT cost effective by the AkWarm model. These EEMs are not
currently recommended on the basis of energy savings alone because each may only save a
small amount of energy, have a high capital cost, or be expensive to install. While each of
these EEMs is not cost effective at this time, future changes in building use such as longer
operating hours, higher energy prices, new fixtures or hardware on the market, and decreases
in installation effort may make any of these EEMs cost effective in the future. These potential
EEMs should be reviewed periodically to identify any changes to these factors that would
warrant re-evaluation.
Although these upgrades are not currently cost effective on an energy cost basis, the fixtures,
hardware, controls, or operational changes described in these EEMs should be considered
when replacing an existing fixture or unit for other reasons. For example, replacing an existing
window with a triple-pane window may not be cost effective based only on energy use, but if a
window is going to be replaced for some other reason, then the basis for a decision is only the
incremental cost of upgrading from a less efficient replacement window to a more efficient
replacement window. That incremental cost difference will have a significantly shorter payback,
especially since the installation costs are likely to be the same for both units.
The following measures were not found to be cost-effective:
Rank Feature/
Location Improvement Description
Estimated
Annual
Energy
Savings
Estimated
Installed
Cost
Savings to
Investment
Ratio, SIR
Simple
Payback
(Years)
5 Garage Door:
Garage
Replace existing garage doors
with R-7, 2" polyurethane core
replacement door.
$3,431 $131,617 0.62 38
6 Window/Skylight:
House
Replace existing window with
U-0.22 vinyl window $1,963 $56,359 0.60 29
7 Window/Skylight:
House
Replace existing window with
U-0.30 vinyl window $6 $201 0.55 32
8 Above-Grade
Wall: House
Install R-30 rigid foam board to
exterior and cover with T1-11
siding or equivalent.
$3,303 $340,367 0.23 100
9 Cathedral
Ceiling: House
Fill empty 2x12 cavity with 12"
dense-pack blown-in cellulose
insulation, density at least 3.5
lb/ft3.
$3,977 $591,127 0.16 150
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
23
Appendix C Significant Equipment List
HVAC Equipment
Equipment Manufacturer Model
No. Fuel Type H.P. Estimated
Efficiency Notes
Boiler
(Warehouse) Weil McLain 988 #2 Fuel Oil --- 80% ---
Boiler (Warm
Storage) Burnham V905A #2 Fuel Oil --- 82% ---
Furnace --- --- #2 Fuel Oil 7.5 76% Two Units
Heat Recovery
Unit Qdot --- --- --- --- Two Units (paired with
furnaces)
AHUs --- --- electric 5 --- Two Units serve Warm
Storage and Main Building
Circulation
Pumps Grundfos Varies electric Varies --- Five Units
Hydronic
Heaters Varies Varies electric Varies --- Seven Units
Lighting
Location Lighting Type Bulb Type Quantity KWH/YR Cost/YR
Warm Storage Fluorescent 8' 96W T12 113 149,119 $ 25,350
Shop High Pressure
Sodium 400W 59 41,701 7,089
Misc T12 Fixtures Fluorescent T12 88 33,400 5,678
Can Fixtures Halls LED T12 10W 73 4,651
Shop Metal Halide 1000W 14 24,222 4,118
Corridor and
Security Lighting LED 17W 45 16,402 2,788
Offices LED 17W 135 10,512 1,787
Exterior LED 25W 60 9,120 1,550
Exit Signs Fluorescent CFL 10 1,333 227
Men’s Room Fluorescent T5 1 558 95
CFL Lighting CFL 20 5 109 18
Energy Consumption calculated by AkWarm based on wattage, schedule and a $ 0.17 per KWH electric rate.
Plug Loads
Equipment Location Manufacturer KWH/YR Cost/YR
Head bolt Heaters Outdoors --- 47,801 $ 8,126
Elevator Motor --- --- 4,223 718
(2) Refrigerators Cafeteria --- 2,400 408
(2) Soda Machines Cafeteria --- 2,000 340
Coffee Makers Kitchen Bunn 1,548 263
(4) Microwaves Main Hall Varies 996 169
Energy Consumption calculated by AkWarm based on wattage, schedule and a $ 0.17 per KWH electric rate.
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
24
Appendix D Local Utility Rate Structure
The information in this section was provided directly from the local utility or gathered from the
local utility’s publicly available information at the time of the audit. All language used in this
section was provided by the local utility and believed to be current at the time of the audit.
Energy use terms, specific fees, and other specific information are subject to change. Updated
rate structure information should be gathered from the utility during future discussion of rates,
rate structures and utility pricing agreements.
Golden Valley Electrical Association Rate Structure:
GS-2 Large General Service Rate Structure (GVEA)
Rate Component Unit Charge
Customer Charge $30.00
Utility Charge $0.04843 per kWh
Demand Charge $11.06 per KW
Cost of Fuel $0.12527 per kWh
Regulatory Cost Charge (RCC) $0.000492 per kWh
2010 Average Rate
(Fairbanks Public Works) $0.17 per kWh
GVEA offers five different rates to its members, depending on the classification of the service
provided. The rates are divided into two categories: Residential and General Service (GS).
Eighty-five percent of the electric services on GVEA's system are single-family dwellings,
classified under the Residential rate. The four General Service rates apply to small and large
power users that do not qualify for the Residential rate.
The General Service rates break down as follows:
GS-1 General Service Services under 50 kilowatts (kW) of demand per billing cycle
GS-2(S) Large General Service
Secondary Services 50 kW and higher of demand per billing cycle
GS-2(P) Large General Service
Primary Services at primary voltage
GS-3 Industrial Service Services at transmission voltage
Customer Charge
A flat fee that covers costs for meter reading, billing and customer service.
Utility Charge (kWh charge)
This charge is multiplied by the number of kilowatt-hours (kWh) used in a monthly billing period.
It covers the costs to maintain power plants and substations, interest on loans as well as wires,
power poles and transformers.
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
25
Fuel and Purchased Power
This charge is based on a combination of forecasted and actual power costs. The monthly
charge allows Golden Valley to pass on increases and decreases in fuel and energy purchases
to our members. It is calculated quarterly and multiplied by the kilowatt-hours used each month.
Demand Charge
GS2 and GS3 rates for business and industry include a demand charge per kilowatt. Demand is
the maximum rate of delivery of electric energy during the month, measured in kilowatts and
registered as the highest average rate of energy used over and fifteen-minute period during the
month.
Regulatory Charge
This charge of .000492 per kWh is set by the Regulatory Commission of Alaska (RCA). Since
November 1, 1992, the Regulatory Commission of Alaska has been funded by a Regulatory
Charge to the utilities it regulates rather than through the State general fund. The charge,
labeled "Regulatory Cost Charge." on your bill, is set by the RCA, and applies to all retail
kilowatt-hours sold by regulated electric utilities in Alaska.
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
26
Appendix E Analysis Methodology
Data collected was processed using AkWarm energy use software to estimate current energy
consumption by end usage and calculate energy savings for each of the proposed energy
efficiency measures (EEMs). In addition, separate analysis may have been conducted to
evaluate EEMs that AkWarm cannot effectively model to evaluate potential reductions in annual
energy consumption. Analyses were conducted under the direct supervision of a Certified
Energy Auditor, Certified Energy Manager, or a Professional Engineer.
EEMs are evaluated based on building use, maintenance and processes, local climate
conditions, building construction type, function, operational schedule and existing conditions.
Energy savings are calculated based on industry standard methods and engineering
estimations. Each model created in AkWarm is carefully compared to existing utility usage
obtained from utility bills. The AkWarm analysis provides a number of tools for assessing the
cost effectiveness of various improvement options. The primary assessment value used in this
audit report is the Savings/Investment Ratio (SIR). The SIR is a method of cost analysis that
compares the total cost savings through reduced energy consumption to the total cost of a
project over its assumed lifespan, including both the construction cost and ongoing maintenance
and operating costs. Other measurement methods include Simple Payback, which is defined as
the length of time it takes for the savings to equal the total installed cost and Breakeven Cost,
which is defined as the highest cost that would yield a Savings/Investment Ratio of one.
EEMs are recommended by AkWarm in order of cost-effectiveness. AkWarm first calculates
individual SIRs for each EEM, and then ranks the EEMs by SIR, with higher SIRs at the top of
the list. An individual EEM must have a SIR greater than or equal to one in order to be
recommended by AkWarm . Next AkWarm modifies the building model to include the installation
of the first EEM and then re-simulates the energy use. Then the remaining EEMs are re-
evaluated and ranked again. AkWarm goes through this iterative process until all suggested
EEMs have been evaluated.
Under this iterative review process, the savings for each recommended EEM is calculated
based on the implementation of the other, more cost effective EEMs first. Therefore, the
implementation of one EEM affects the savings of other EEMs that are recommended later.
The savings from any one individual EEM may be relatively higher if the individual EEM is
implemented without the other recommended EEMs. For example, implementing a reduced
operating schedule for inefficient lighting may result in relatively higher savings than
implementing the same reduced operating schedule for newly installed lighting that is more
efficient. If multiple EEMs are recommended, AkWarm calculates a combined savings.
Inclusion of recommendations for energy savings outside the capability of AkWarm will impact
the actual savings from the AkWarm projections. This will almost certainly result in lower
energy savings and monetary savings from AkWarm recommendations. The reality is that only
so much energy is consumed in a building. Energy savings from one EEM reduces the amount
of energy that can be saved from additional EEMs. For example, installation of a lower wattage
light bulb does not save energy or money if the bulb is never turned on because of a schedule
or operational change at the facility.
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
27
Appendix F Audit Limitations
The results of this audit are dependent on the input data provided and can only act as an
approximation. In some instances, several EEMs or installation methods may achieve the
identified potential savings. Actual savings will depend on the EEM selected, the price of
energy, and the final installation and implementation methodology. Competent tradesmen and
professional engineers may be required to design, install, or otherwise implement some of the
recommended EEMs. This document is an energy use audit report and is not intended as a
final design document, operation, and maintenance manual, or to take the place of any
document provided by a manufacturer or installer of any device described in this report.
Cost savings are calculated based on estimated initial costs for each EEM. Estimated costs
include labor and equipment for the full up-front investment required to implement the EEM.
The listed installation costs within the report are conceptual budgetary estimates and should not
be used as design estimates. The estimated costs are derived from Means Cost Data, industry
publications, local contractors and equipment suppliers, and the professional judgment of the
CEA writing the report and based on the conditions at the time of the audit.
Cost and energy savings are approximations and are not guaranteed.
Additional significant energy savings can usually be found with more detailed auditing
techniques that include actual measurements of electrical use, temperatures in the building and
HVAC ductwork, intake and exhaust temperatures, motor runtime and scheduling, and infrared,
air leakage to name just a few. Implementation of these techniques is the difference between a
Level III Energy Audit and the Level II Audit that has been conducted.
Disclaimer: "This report was prepared as an account of work sponsored by an agency of the
United States Government. Neither the United States Government nor any agency thereof, nor
any of their employees, makes any warranty, express or implied, or assumes any legal liability
or responsibility for the accuracy, completeness, or usefulness of any information, apparatus,
product, or process disclosed, or represents that its use would not infringe privately owned
rights. Reference herein to any specific commercial product, process, or service by trade name,
trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement,
recommendation, or favoring by the United States Government or any agency thereof. The
views and opinions of authors expressed herein do not necessarily state or reflect those of the
United States Government or any agency thereof."
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
28
Appendix G References
Although not all documents listed below are specifically referenced in this report, each contains
information and insights considered valuable to most buildings.
Alaska Department of Education and Early Development; Education Support Services/Facilities.
(1999). Alaska School Facilities Preventative Maintenance Handbook. Juneau, AK:
Alaska Department of Education and Early Development.
Alaska Housing Finance Corportation. (2010). Retrofit Energy Assessment for Loans. AHFC.
ASHRAE. (1997). 1997 ASHRAE Handbook: Fundamentals. Atlanta, GA: ASHRAE.
ASHRAE. (2007). ASHRAE Standard 105-2007 Expressing and Comparing Building Energy
Performance. Retrieved from ASHRAE: www.ashrae.org
ASHRAE. (2007). ASHRAE Standard 90.1-2007 Energy Standards for buildings Except Low-
Rise Residential Buildings. Retrieved from ASHRAE: www.ashrae.org
ASHRAE. (2010). ASHRAE Standard 62.1-2010 Ventilaton for Acceptable Indoor Air Quality.
Retrieved from ASHRAE: www.ashrae.org
ASHRAE. (2010). ASHRAE Standard 62.2-2010 Ventilation and Acceptable Indoor Air Quality in
Low Rise Residential Buildings. Retrieved from ASHRAE: www.ashrae.org
ASHRAE RP-669 and SP-56. (2004). Procedures for Commercial Building Energy Audits.
Atlanta, GA: ASHRAE.
Coad, W. J. (1982). Energy Engineering and Management for Building Systems. Scarborough,
Ontario, Canada: Van Nostrand Reinhold Company.
Daley, D. T. (2008). The Little Black Book of Reliability Management. New York, NY: Industrial
Press, Inc.
Federal Energy Management Program. (2004, March 3). Demand Controlled Ventilation Using
CO2 Sensors. Retrieved 2011, from US DOE Energy Efficiency and Renewable Energy:
http://www.eere.energy.gov/femp/pdfs/fta_co2.pdf
Federal Energy Management Program. (2006, April 26). Low-Energy Building Design
Guidelines. Retrieved 2011, from Department of Energy; Federal Energy Management
Program: http://www.eren.doe.gov/femp/
Institute, E. a. (2004). Variable Speed Pumping: A Guide to Successful Applications. Oxford,
UK: Elsevier Advanced Technology.
International Code Council. (2009). International Energy Conservation Code. Country Club Hills,
IL: International Code Council, Inc.
Leach, M., Lobato, C., Hirsch, A., Pless, S., & Torcellini, P. (2010, September). Technical
Support Document: Strategies for 50% Energy Savings in Large Office Buildings.
Retrieved 2011, from National Renewable Energy Laboratory:
http://www.nrel.gov/docs/fy10osti/49213.pdf
Thumann, P.E., C.E.M., A., Younger, C.E.M., W. J., & Niehus, P.E., C.E.M., T. (2010).
Handbook of Energy Audits Eighth Edition. Lilburn, GA: The Fairmont Press, Inc.
U.S. Energy Information Administration. (2006). Commercial Building Energy Consumption
Survey (CBECS). Retrieved 2011, from Energy Information Administration:
http://www.eia.gov/emeu/cbecs/
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
29
Appendix H Typical Energy Use and Cost – Fairbanks and Anchorage
This report provides data on typical energy costs and use on selected building in Fairbanks and
Anchorage, Alaska for comparative purposes only. The values provided by the US Energy
Information Administration CBECS study included a broader range of building types for the
Continental U.S. are not necessarily good comparatives for buildings and conditions in Alaska.
An assortment of values from CBECS may be found in Appendix I.
The Alaska data described in this report came from a benchmarking study NORTECH and other
Technical Services Providers (TSPs) completed on publicly owned buildings in Alaska under
contract with AHFC. This study acquired actual utility data for municipal buildings and schools
in Alaska for the two recent full years. The utility data included costs and quantities including
fuel oil, electricity, propane, wood, steam, and all other energy source usage. This resulted in a
database of approximately 900 buildings. During the course of the benchmarking study, the
comparisons made to the CBECS data appeared to be inappropriate for various reasons.
Therefore, this energy use audit report references the average energy use and energy cost of
Anchorage and Fairbanks buildings as described below.
The Alaska benchmarking data was evaluated in order to find valid comparison data. Buildings
with major energy use information missing were eliminated from the data pool. After detailed
scrutiny of the data, the most complete information was provided to NORTECH by the
Fairbanks North Star Borough School District (FNSBSD) and the Anchorage School District
(ASD). The data sets from these two sources included both the actual educational facilities as
well as the district administrative buildings and these are grouped together in this report as
Fairbanks and Anchorage schools. These two sources of information, being the most complete
and reasonable in-state information, have been used to identify an average annual energy
usage for Fairbanks and for Anchorage in order to provide a comparison for other facilities in
Alaska.
Several factors may limit the comparison of a specific facility to these regional indicators. In
Fairbanks, the FNSBSD generally uses number two fuel oil for heating needs and electricity is
provided by Golden Valley Electric Association (GVEA). GVEA produces electricity from a coal
fired generation plant with additional oil generation upon demand. A few of the FNSBSD
buildings in this selection utilize district steam and hot water. The FNSBSD has recently (the
last ten years) invested significantly in envelope and other efficiency upgrades to reduce their
operating costs. Therefore a reader should be aware that this selection of Fairbanks buildings
has energy use at or below average for the entire Alaska benchmarking database.
Heating in Anchorage is through natural gas from the nearby natural gas fields. Electricity is
also provided using natural gas. As the source is nearby and the infrastructure for delivery is in
place, energy costs are relatively low in the area. As a result, the ASD buildings have lower
energy costs, but higher energy use, than the average for the entire benchmarking database.
These special circumstances should be considered when comparing the typical annual energy
use for particular buildings.
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
30
Appendix I Typical Energy Use and Cost – Continental U.S.
Released: Dec 2006
Next CBECS will be conducted in 2007
Table C3. Consumption and Gross Energy Intensity for Sum of Major Fuels for Non-Mall Buildings, 2003
All Buildings* Sum of Major Fuel Consumption
Number of
Buildings
(thousand)
Floor
space
(million
square
feet)
Floor space
per Building
(thousand
square feet)
Total
(trillion
BTU)
per
Building
(million
BTU)
per
Square Foot
(thousand
BTU)
per
Worker
(million
BTU)
All Buildings* 4,645 64,783 13.9 5,820 1,253 89.8 79.9
Building Floor space (Square Feet)
1,001 to 5,000 2,552 6,789 2.7 672 263 98.9 67.6
5,001 to 10,000 889 6,585 7.4 516 580 78.3 68.7
10,001 to 25,000 738 11,535 15.6 776 1,052 67.3 72.0
25,001 to 50,000 241 8,668 35.9 673 2,790 77.6 75.8
50,001 to 100,000 129 9,057 70.4 759 5,901 83.8 90.0
100,001 to 200,000 65 9,064 138.8 934 14,300 103.0 80.3
200,001 to 500,000 25 7,176 289.0 725 29,189 101.0 105.3
Over 500,000 7 5,908 896.1 766 116,216 129.7 87.6
Principal Building Activity
Education 386 9,874 25.6 820 2,125 83.1 65.7
Food Sales 226 1,255 5.6 251 1,110 199.7 175.2
Food Service 297 1,654 5.6 427 1,436 258.3 136.5
Health Care 129 3,163 24.6 594 4,612 187.7 94.0
Inpatient 8 1,905 241.4 475 60,152 249.2 127.7
Outpatient 121 1,258 10.4 119 985 94.6 45.8
Lodging 142 5,096 35.8 510 3,578 100.0 207.5
Retail (Other Than Mall) 443 4,317 9.7 319 720 73.9 92.1
Office 824 12,208 14.8 1,134 1,376 92.9 40.3
Public Assembly 277 3,939 14.2 370 1,338 93.9 154.5
Public Order and Safety 71 1,090 15.5 126 1,791 115.8 93.7
Religious Worship 370 3,754 10.1 163 440 43.5 95.6
Service 622 4,050 6.5 312 501 77.0 85.0
Warehouse and Storage 597 10,078 16.9 456 764 45.2 104.3
Other 79 1,738 21.9 286 3,600 164.4 157.1
Vacant 182 2,567 14.1 54 294 20.9 832.1
This report references the Commercial Buildings Energy Consumption Survey (CBECS), published by the U.S.
Energy Information Administration in 2006. Initially this report was expected to compare the annual energy
consumption of the building to average national energy usage as documented below. However, a direct comparison
between one specific building and the groups of buildings outlined below yielded confusing results. Instead, this
report uses a comparative analysis on Fairbanks and Anchorage data as described in Appendix F. An abbreviated
excerpt from CBECS on commercial buildings in the Continental U.S. is below.
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
31
Appendix J List of Conversion Factors and Energy Units
1 British Thermal Unit is the energy required to raise one pound of water one degree F°
1 Watt is approximately 3.412 BTU/hr
1 horsepower is approximately 2,544 BTU/hr
1 horsepower is approximately 746 Watts
1 "ton of cooling” is approximately 12,000 BTU/hr, the amount of power required to
melt one short ton of ice in 24 hours
1 Therm = 100,000 BTU
1 KBTU = 1,000 BTU
1 KWH = 3413 BTU
1 KW = 3413 BTU/Hr
1 Boiler HP = 33,400 BTU/Hr
1 Pound Steam = approximately 1000 BTU
1 CCF of natural gas = approximately 1 Therm
1 inch H2O = 250 Pascal (Pa) = 0.443 pounds/square inch (psi)
1 atmosphere (atm) = 10,1000 Pascal (Pa)
BTU British Thermal Unit
CCF 100 Cubic Feet
CFM Cubic Feet per Minute
GPM Gallons per minute
HP Horsepower
Hz Hertz
kg Kilogram (1,000 grams)
kV Kilovolt (1,000 volts)
kVA Kilovolt-Amp
kVAR Kilovolt-Amp Reactive
KW Kilowatt (1,000 watts)
KWH Kilowatt Hour
V Volt
W Watt
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
32
Appendix K List of Acronyms, Abbreviations, and Definitions
ACH Air Changes per Hour
AFUE Annual Fuel Utilization Efficiency
Air Economizer A duct, damper, and automatic control system that
allows a cooling system to supply outside air to reduce
or eliminate the need for mechanical cooling.
Ambient Temperature Average temperature of the surrounding air
Ballast A device used with an electric discharge lamp to cause
the lamp to start and operate under the proper circuit
conditions of voltage, current, electrode heat, etc.
CO2 Carbon Dioxide
CUI Cost Utilization Index
CDD Cooling Degree Days
DDC Direct Digital Control
EEM Energy Efficiency Measure
EER Energy Efficient Ratio
EUI Energy Utilization Index
FLUOR Fluorescent
Grade The finished ground level adjoining a building at the
exterior walls
HDD Heating Degree Days
HVAC Heating, Ventilation, and Air-Conditioning
INCAN Incandescent
NPV Net Present Value
R-value Thermal resistance measured in BTU/Hr-SF-̊F (Higher
value means better insulation)
SCFM Standard Cubic Feet per Minute
Savings to Investment Ratio (SIR) Savings over the life of the EEM divided by Investment
capital cost. Savings includes the total discounted dollar
savings considered over the life of the improvement.
Investment in the SIR calculation includes the labor and
materials required to install the measure.
Set Point Target temperature that a control system operates the
heating and cooling system
Simple payback A cost analysis method whereby the investment cost of
an EEM is divided by the first year’s savings of the EEM
to give the number of years required to recover the cost
of the investment.
ACH Air Changes per Hour
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
33
Appendix L Building Floor Plan
Lower Level Floor Plan Provided by City of Fairbanks.
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
34
West Side Upper Floor Plan Provided by City of Fairbanks.
Energy Audit
Fairbanks Public Works
Fairbanks, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-100 Doyon Fairbanks Region\50-102 FAI Public Works 1 - Main, 2121 Peger\Reports\Final\2012.07.17 Final
AHFC Report V2 FAI Fairbanks Public Works.Docx
35
East Side Upper Floor Plan Provided by City of Fairbanks.