ENERGY AUDIT – FINAL REPORT
GILA AUTO SHOP
1845 Challenger Road
Galena, Alaska
Prepared for:
Mr. Chris Reitan
PO Box 266
Galena, Alaska
Prepared by:
David Lanning PE, CEA
Jeremy Spargur EIT, CEAIT
July 12, 2012
Acknowledgment: “This material is based upon work supported by the Department of
Energy under Award Number DE-EE0000095”
ENVIRONMENTAL ENGINEERING, HEALTH & SAFETY
Anch: 3105 Lakeshore Dr. Ste 106A, 99517 907.222.2445 Fax: 222.0915
Fairbanks: 2400 College Road, 99709 907.452.5688 Fax: 452.5694
Juneau: 4402 Thane Road, 99801 907.586.6813 Fax: 586.6819
info@nortechengr.com www.nortechengr.com
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final
AHFC Report GAL Auto Shop.Docx
i
TABLE OF CONTENTS
1.0 EXECUTIVE SUMMARY .................................................................................................. 1
2.0 INTRODUCTION ............................................................................................................... 4
2.1 Building Use .......................................................................................................... 4
2.2 Building Occupancy and Schedules ...................................................................... 4
2.3 Building Description ............................................................................................... 4
3.0 BENCHMARKING 2010 UTILITY DATA .......................................................................... 7
3.1 Total Energy Use and Cost of 2010 ...................................................................... 8
3.2 Energy Utilization Index of 2010 ............................................................................ 9
3.3 Cost Utilization Index of 2010 .............................................................................. 10
3.4 Seasonal Energy Use Patterns ........................................................................... 11
3.5 Future Energy Monitoring .................................................................................... 12
4.0 MODELING ENERGY CONSUMPTION ......................................................................... 13
4.1 Understanding How AkWarm Models Energy Consumption ............................... 14
4.2 AkWarm Calculated Savings for the GILA Auto Shop ......................................... 15
4.3 Additional Modeling Methods .............................................................................. 16
5.0 BUILDING OPERATION AND MAINTENANCE (O & M) .............................................. 17
5.1 Operations and Maintenance .............................................................................. 17
5.2 Commissioning .................................................................................................... 17
5.3 Building Specific Recommendations ................................................................... 17
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final
AHFC Report GAL Auto Shop.Docx
ii
APPENDICES
Appendix A Recommended Energy Efficiency Measures ........................................... 19
Appendix B Energy Efficiency Measures that are NOT Recommended ..................... 23
Appendix C Significant Equipment List ....................................................................... 24
Appendix D Local Utility Rate Structure ...................................................................... 25
Appendix E Analysis Methodology .............................................................................. 26
Appendix F Audit Limitations ...................................................................................... 27
Appendix G References .............................................................................................. 28
Appendix H Typical Energy Use and Cost – Fairbanks and Anchorage ..................... 29
Appendix I Typical Energy Use and Cost – Continental U.S. .................................... 30
Appendix J List of Conversion Factors and Energy Units .......................................... 31
Appendix K List of Acronyms, Abbreviations, and Definitions .................................... 32
Appendix L Building Floor Plan .................................................................................. 33
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
1
1.0 EXECUTIVE SUMMARY
NORTECH has completed an ASHRAE Level II Energy Audit of the GILA Auto Shop, an 8,125
square foot facility. The audit began with benchmarking which resulted in a calculation of the
energy consumption per square foot. A site inspection was completed on January 13, 2012 to
obtain information about the lighting, heating, ventilation, cooling and other building energy
uses. The existing usage data and current systems were then used to develop a building
energy consumption model using AkWarm.
Once the model was calibrated, a number of Energy Efficiency Measures (EEMs) were
developed from review of the data and observations. EEMs were evaluated and ranked on the
basis of both energy savings and cost using a Savings/Investment Ratio (SIR). While these
modeling techniques were successful in verifying that many of the EEMs would save energy,
not all of the identified EEMs were considered cost effective based on the hardware, installation,
and energy costs at the time of this audit.
While the need for a major retrofit can typically be identified by an energy audit, upgrading
specific systems often requires collecting additional data and engineering and design efforts that
are beyond the scope of the Level II energy audit. The necessity and amount of design effort
and cost will vary depending on the scope of the specific EEMs planned and the sophistication
and capability of the entire design team, including the building owners and operators. During
the budgeting process for any major retrofit identified in this report, the building owner should
add administrative and supplemental design costs to cover the individual needs of their own
organization and the overall retrofit project.
The following table, from AkWarm, is a summary of the recommended EEMs for the GILA Auto
Shop. Additional discussion of the modeling process can be found in Section 3. Details of each
individual EEM can be found in Appendix A of this report. A summary of EEMs that were
evaluated but are not currently recommended is located in Appendix B.
PRIORITY LIST – ENERGY EFFICIENCY MEASURES (EEMs)
Rank Feature/
Location Improvement Description
Estimated
Annual
Energy
Savings
Estimated
Installed
Cost
Savings to
Investment
Ratio, SIR
Simple
Payback
(Years)
1
Setback
Thermostat:
Garage
Implement a Heating
Temperature Unoccupied
Setback to 62.0 deg F for the
Garage space.
$3,489 $1,200 37 0.3
2 HVAC And DHW
Replace pumps with Emerson
motors with variable speed
magna pumps
$4,559 $15,000 4.4 3.3
3 Garage Door:
Garage
Add R-5 insulating blanket to
garage door $381 $1,646 3.0 4.3
4 Lighting
Replace with FLUOR (2) T8 4'
F32T8 25W Energy-Saver
Instant EfficMagnetic
$309 $1,251 1.6 4.1
TOTAL, cost-effective measures in AkWarm $8,739 $19,097 6.1 2.2
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
2
PRIORITY LIST – ENERGY EFFICIENCY MEASURES (EEMs)
Rank Feature/
Location Improvement Description
Estimated
Annual
Energy
Savings
Estimated
Installed
Cost
Savings to
Investment
Ratio, SIR
Simple
Payback
(Years)
5 Slab insulation
Install 2’ or R-10 rigid board
insulation around the perimeter
of the slab
$906 $4971 3.0 5.5
TOTAL, cost-effective measures outside AkWarm $906 $4971 3.0 5.5
Total, ALL measures $9,645 $24,068 5.5 4.0
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
3
Modeled Building Energy Cost Breakdown
The above charts are a graphical representation of the modeled energy usage for the GILA Auto
Shop. The greatest portions of energy cost for the building envelope air losses and lighting.
Detailed improvements can be found in Appendix A.
The energy cost by end use breakdown was provided by AkWarm based on the field inspection
and does not indicate that all individual fixtures and appliances were directly measured. The
current energy costs are shown above on the left hand pie graph and the projected energy
costs, assuming use of the recommended EEMs, are shown on the right.
The chart breaks down energy usage by cost into the following categories:
Envelope Air Losses—the cost to provide heated fresh air to occupants, air leakage, heat lost in
air through the chimneys and exhaust fans, heat lost to wind and other similar losses.
Envelope
o Ceiling—quantified heat loss transferred through the ceiling portion of the envelope.
o Window—quantified heat loss through the window portion of the envelope.
o Wall/Door—quantified heat loss through the wall and door portions of the envelope.
o Floor—quantified heat loss through the floor portion of the envelope.
Water Heating—energy cost to provide domestic hot water.
Fans—energy cost to run ventilation, and exhaust fans.
Lighting—energy cost to light the building.
Refrigeration—energy costs to provide refrigerated goods for the occupants.
Other Electrical—includes energy costs not listed above including cooking loads, laundry loads,
other plug loads and electronics.
Envelope
Air Losses
$20,768
59%
Ceiling
$1,174
3%
Window
$352
1%
Wall/Door
$2,464
7%
Floor
$3,169
9%
Water
Heating
$525
1%
Fans
$18
0%
Lighting
$4,843
14%
Refriger-
ation
$732
2%
Other
Electrical
$1,309
4%
Existing Building Energy Cost
$35,354
Envelope
Air Losses
$14,649
41%
Ceiling
$909
3%
Window
$227
1%Wall/Door
$1,364
4%
Floor
$1,486
4%
Water
Heating
$525
1%
Fans
$18
0%
Lighting
$4,501
13%
Refriger-
ation
$732
2%
Other
Electrical
$1,309
4%
EEM
Savings
$9,624
27%
Retrofit Building Energy Cost
$25,730
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
4
2.0 INTRODUCTION
NORTECH contracted with the Alaska Housing Finance Corporation to perform ASHRAE
Level II Energy Audits for publically owned buildings in Alaska. This report presents the findings
of the utility benchmarking, modeling analysis, and the recommended building modifications,
and building use changes that are expected to save energy and money.
The report is organized into sections covering:
description of the facility,
the building’s historic energy usage (benchmarking),
estimating energy use through energy use modeling,
evaluation of potential energy efficiency or efficiency improvements, and
recommendations for energy efficiency with estimates of the costs and savings.
2.1 Building Use
The GILA Auto Shop provides automotive repair education to the students of the Galena Interior
Learning Academy. The building is also used to park the school bus.
2.2 Building Occupancy and Schedules
Approximately 16 students and one instructor occupy this building during the school year from 8
am – 5 pm Monday through Friday.
2.3 Building Description
The original portion of the building is the garage portion and was built in 1959. The garage is a
metal framed building that sits on a concrete slab on grade. The walls and ceiling have been
additionally insulated with spay on foam. A two-story, wood-framed classroom addition was later
added to the east side of the building.
Building Envelope
Building Envelope: Walls
Wall Type Description Insulation Notes
Shop walls Metal-framed with 2x6 studs R-19 fiberglass batt.
~6” foam insulation ~R-55
Addition walls Wood-framed 2x6 R-19 fiberglass batt. Signs of ghosting, mold
at windows
Building Envelope: Floors
Floor Type Description Insulation Notes
On grade floor Un-insulated slab None -
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
5
Heating and Ventilation Systems
The Auto Shop utilizes a steam to glycol heat exchanger to heat the building. Glycol is pumped
to four different zones in the building:
Slab heat in the shop
Unit heaters in the shop and storage areas
Office baseboards
Domestic water
The only form of mechanical ventilation in this building comes from bathroom exhaust fans.
However, it appeared that an air handling unit was going to be installed with the addition, but
was never completed.
Air Conditioning System
The building is not equipped with an air conditioning system.
Energy Management
The building is not equipped with an energy management system.
Building Envelope: Roof
Roof Type Description Insulation Notes
Shop Roof Hot metal-framed roof R-19 fiberglass batt.
~6” foam insulation ~R-55
Addition Roof Wood-framed attic Two layers R-19
fiberglass batt -
Building Envelope: Doors and Windows
Door and Window
Type Description Estimated
R-Value Notes
Man door 1 Insulated half-lite metal door 2.6 19 SF
Man door 2 Insulated flush metal door 2.7 45 SF
Garage door 1 1 3/8” insulated sectional door 2.6 135 SF
Garage door 2 2” insulated sectional door 3.0 313 SF
Window 1 Double pane, vinyl, not south,
>3/8” air gap 2.0 152 SF
Window 2 Double pane, vinyl, south, >3/8”
air gap 2.0 19 SF
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
6
Lighting Systems
The Auto Shop has three different forms of lighting:
Ceiling mounted fluorescent fixtures containing T8 (1” diameter, 4’ long) lamps and T12
(1 ½” diameter, 4’ long) lamps.
LED Exit lights
High bay fixtures in the shop containing 350 watt metal halide lamps
Domestic Hot Water
Domestic hot water is provided by an indirect fired water heater with a 26 gallon storage
capacity.
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
7
3.0 BENCHMARKING 2010 UTILITY DATA
Benchmarking building energy use consists of obtaining and then analyzing two years of energy
bills. The original utility bills are necessary to determine the raw usage, and charges as well as
to evaluate the utility’s rate structure. The metered usage of electrical and natural gas
consumption is measured monthly, but heating oil, propane, wood, and other energy sources
are normally billed upon delivery and provide similar information. During benchmarking,
information is compiled in a way that standardizes the units of energy and creates energy use
and billing rate information statistics for the building on a square foot basis. The objectives of
benchmarking are:
to understand patterns of use,
to understand building operational characteristics,
for comparison with other similar facilities in Alaska and across the country, and
to offer insight in to potential energy savings.
The results of the benchmarking, including the energy use statistics and comparisons to other
areas, are discussed in the following sections.
The electric information in the following sections was provided by the School District. This
information does not match the AkWarm model. After creating a model using schedules and
information gathered on site during the audit, we determined that the electric bills cannot be
accurate. In order for the building to be lit and heated, significantly higher electricity usage is
required.
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
8
3.1 Total Energy Use and Cost of 2010
The energy use profiles below show the energy use and cost breakdowns for the GILA Auto
Shop based on the provided data. The total annual energy usage in 2010 was 1280 mmBTUs
and cost was $21,740. These charts show the portion of use for a fuel type and the portion of its
cost.
The above charts indicate that the highest portion of energy use is for steam and the highest
portion of cost is for steam. Steam consumption correlates directly to space heating and
domestic hot water while electrical use can correlate to lighting systems, plug loads, and HVAC
equipment. The energy type with the highest cost often provides the most opportunity for
savings.
Electric
68
5%
Steam
1212
95%
Energy Use Total (mmBTU)
Electric
$6,763
31%
Steam
$14,957
69%
Energy Cost Total ($)
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
9
3.2 Energy Utilization Index of 2010
The primary benchmarking statistic is the Energy Utilization Index (EUI). The EUI is calculated
from the utility bills and provides a simple snapshot of the quantity of energy actually used by
the building on a square foot and annual basis. The calculation converts the total energy use
for the year from all sources in the building, such as heating fuel and electrical usage, into
British Thermal Units (BTUs). This total annual usage is then divided by the number of square
feet of the building. The EUI units are BTUs per square foot per year.
The benchmark analysis found that the GILA Auto Shop has an EUI of 158,000 BTUs per
square foot per year based on the provided data.
The EUI is useful in comparing this building’s energy use to that of other similar buildings in
Alaska and in the Continental United States. The EUI can be compared to average energy use
in 2003 found in a study by the U.S. Energy Information Administration of commercial buildings
(abbreviated CBECS, 2006). That report found an overall average energy use of about 90,000
BTUs per square foot per year while studying about 6,000 commercial buildings of all sizes,
types, and uses that were located all over the Continental U.S. (see Table C3 in Appendix I).
In a recent and unpublished state-wide benchmarking study sponsored by the Alaska Housing
Finance Corporation, schools in Fairbanks averaged 62,000 BTUs per square foot and schools
in Anchorage averaged 123,000 BTUs per square foot annual energy use. The chart below
shows the GILA Auto Shop relative to these values. These findings are discussed further in
Appendix H.
158,000
62,000
123,000
0
20000
40000
60000
80000
100000
120000
140000
160000
180000
Btu/ Sq. FtAnnual Energy Utilization Index (Total Energy/ SF)
GILA Auto Shop Fairbanks Schools Anchorage Schools
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
10
3.3 Cost Utilization Index of 2010
Another benchmarking statistic that is useful is the Cost Utilization Index (CUI), which is the cost
for energy used in the building on a square foot basis per year. The CUI is calculated from the
cost for utilities for a year period based on the provided data. The CUI permits comparison of
buildings on total energy cost even though they may be located in areas with differing energy
costs and differing heating and/or cooling climates. The cost of energy, including heating oil,
natural gas, and electricity, can vary greatly over time and geographic location and can be
higher in Alaska than other parts of the country.
The CUI for GILA Auto Shop is about $2.67/SF. This is based on utility costs from 2010 and the
following rates:
Electricity at $ 0.34 / kWh ($ 9.96 / Therm)
Steam at $12.34 / thousand pounds ($ 1.23 / Therm)
Compare #1 Fuel Oil at $ 5.43 / gallon ($ 4.11 / Therm)
The Department of Energy Administration study, mentioned in the previous section (CBECS,
2006) found an average cost of $2.52 per square foot in 2003 for 4,400 buildings in the
Continental U.S (Tables C4 and C13 of CBDES, 2006). Schools in Fairbanks have an average
cost for energy of $2.42 per square foot while Anchorage schools average $2.11 per square
foot. The chart below shows the GILA Auto Shop relative to these values. More details are
included in Appendix H.
$2.67
$2.42
$2.11
$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
$3.00
Annual Energy Cost Utilization Index (Total Cost/ SF)
GILA Auto Shop Fairbanks Schools Anchorage Schools
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
11
3.4 Seasonal Energy Use Patterns
Energy consumption is often highly correlated with seasonal climate and usage variations. The
graphs below show the electric and fuel consumption of this building over the course of two
years. The lowest monthly use is called the baseline use. The electric baseline often reflects
year round lighting consumption while the heating fuel baseline often reflects year round hot
water usage. The clear relation of increased energy usage during periods of cold weather can
be seen in the months with higher usage.
The AkWarm modeling calculated electric use to be much higher than data provided indicates.
The graph below shows the difference between the modeled year and the electric bills provided.
It is believe that there may be a metering problem or the information has been apportioned
incorrectly.
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
Oct-09Dec-09Feb-10Apr-10Jun-10Aug-10Oct-10Dec-10Feb-11Apr-11Jun-11KWHElectrical Consumption
GILA Auto Shop AkWarm Estimate
0
500
1,000
1,500
2,000
2,500
0
50
100
150
200
250
Oct-09Dec-09Feb-10Apr-10Jun-10Aug-10Oct-10Dec-10Feb-11Apr-11ThermsThousand Pounds of SteamSteam Consumption
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
12
3.5 Future Energy Monitoring
Energy accounting is the process of tracking energy consumption and costs. It is important for
the building owner or manager to monitor and record both the energy usage and cost each
month. Comparing trends over time can assist in pinpointing major sources of energy usage and
aid in finding effective energy efficiency measures. There are two basic methods of energy
accounting: manual and automatic. Manual tracking of energy usage may already be performed
by an administrative assistant: however if the records are not scrutinized for energy use, then
the data is merely a financial accounting. Digital energy tracking systems can be installed. They
display and record real-time energy usage and accumulated energy use and cost. There are
several types which have all of the information accessible via Ethernet browser.
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
13
4.0 MODELING ENERGY CONSUMPTION
After benchmarking of a building is complete and the site visit has identified the specific systems
in the building, a number of different methods are available for quantifying the overall energy
consumption and to model the energy use. These range from relatively simple spreadsheets to
commercially available modeling software capable of handling complex building systems.
NORTECH has used several of these programs and uses the worksheets and software that
best matches the complexity of the building and specific energy use that is being evaluated.
Modeling of an energy efficiency measure (EEM) requires an estimate of the current energy
used by the specific feature, the estimated energy use of the proposed EEM and its installed
cost. EEMs can range from a single simple upgrade, such as light bulb type or type of motor, to
reprogramming of the controls on more complex systems. While the need for a major retrofit
can typically be identified by an energy audit, the specific system upgrades often require
collecting additional data and engineering and design efforts that are beyond the scope of the
Level II energy audit.
Based on the field inspection results and discussions with the building owners/operators,
auditors developed potential EEMs for the facility. Common EEMs that could apply to almost
every older building include:
Reduce the envelope heat losses through:
o increased building insulation, and
o better windows and doors
Reduce temperature difference between inside and outside using setback thermostats
Upgrade inefficient:
o lights,
o motors,
o refrigeration units, and
o other appliances
Reduce running time of lights/appliances through:
o motion sensors,
o on/off timers,
o light sensors, and
o other automatic/programmable systems
The objective of the following sections is to describe how the overall energy use of the building
was modeled and the potential for energy savings. The specific EEMs that provide these overall
energy savings are detailed in Appendix A of this report. While the energy savings of an EEM is
unlikely to change significantly over time, the cost savings of an EEM is highly dependent on the
current energy price and can vary significantly over time. An EEM that is not currently
recommended based on price may be more attractive at a later date or with higher energy
prices.
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
14
4.1 Understanding How AkWarm Models Energy Consumption
NORTECH used the AkWarm model for evaluating the overall energy consumption at GILA
Auto Shop. The AkWarm program was developed by the Alaska Housing Finance Corporation
(AHFC) to model residential energy use. The original AkWarm is the modeling engine behind
the successful residential energy upgrade program that AHFC has operated for a number of
years. In the past few years, AHFC has developed a version of this model for commercial
buildings.
Energy use in buildings is modeled by calculating energy losses and consumption, such as:
• Heat lost through the building envelope components, including windows, doors,
walls, ceilings, crawlspaces, and foundations. These heat losses are computed for
each component based on the area, heat resistance (R-value), and the difference
between the inside temperature and the outside temperature. AkWarm has a library
of temperature profiles for villages and cities in Alaska.
• Window orientation, such as the fact that south facing windows can add heat in the
winter but north-facing windows do not.
• Inefficiencies of the heating system, including the imperfect conversion of fuel oil or
natural gas due to heat loss in exhaust gases, incomplete combustion, excess air,
etc. Some electricity is also consumed in moving the heat around a building through
pumping.
• Inefficiencies of the cooling system, if one exists, due to various imperfections in a
mechanical system and the required energy to move the heat around.
• Lighting requirements and inefficiencies in the conversion of electricity to light;
ultimately all of the power used for lighting is converted to heat. While the heat may
be useful in the winter, it often isn’t useful in the summer when cooling may be
required to remove the excess heat. Lights are modeled by wattage and operational
hours.
• Use and inefficiencies in refrigeration, compressor cooling, and heat pumps. Some
units are more efficient than others. Electricity is required to move the heat from
inside a compartment to outside it. Again, this is a function of the R-Value and the
temperature difference between the inside and outside of the unit.
• Plug loads such as computers, printers, mini-fridges, microwaves, portable heaters,
monitors, etc. These can be a significant part of the overall electricity consumption
of the building, as well as contributing to heat production.
• The schedule of operation for lights, plug loads, motors, etc. is a critical component
of how much energy is used.
AkWarm adds up these heat losses and the internal heat gains based on individual unit usage
schedules. These estimated heat and electrical usages are compared to actual use on both a
yearly and seasonal basis. If the AkWarm model is within 5 % to 10% of the most recent 12
months usage identified during benchmarking, the model is considered accurate enough to
make predictions of energy savings for possible EEMs.
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
15
4.2 AkWarm Calculated Savings for the GILA Auto Shop
Based on the field inspection results and discussions with the building owners/operators,
auditors developed potential EEMs for the facility. These EEMs are then entered into AkWarm
to determine if the EEM saves energy and is cost effective (i.e. will pay for itself). AkWarm
calculates the energy and money saved by each EEM and calculates the length of time for the
savings in reduced energy consumption to pay for the installation of the EEM. AkWarm makes
recommendations based on the Savings/Investment Ratio (SIR), which is defined as ratio of the
savings generated over the life of the EEM divided by the installed cost. Higher SIR values are
better and any SIR above one is considered acceptable. If the SIR of an EEM is below one, the
energy savings will not pay for the cost of the EEM and the EEM is not recommended.
Preferred EEMs are listed by AkWarm in order of the highest SIR.
A summary of the savings based on the modeled electric use from the recommended EEMs are
listed in this table.
Description Space
Heating
Water
Heating Lighting Refrigeration Other
Electrical
Clothes
Drying
Ventilation
Fans
Total
Cost
Existing
Building $27,927 $525 $4,843 $732 $1,233 $76 $18 $35,354
With All
Proposed
Retrofits
$18,645 $525 $4,501 $732 $1,233 $76 $18 $25,730
Savings $9,282 $0 $342 $0 $0 $0 $0 $9,624
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
16
4.3 Additional Modeling Methods
The AkWarm program effectively models wood-framed and other buildings with standard
heating systems and relatively simple HVAC systems. AkWarm models of more complicated
mechanical systems are sometimes poor due to a number of simplifying assumptions and
limited input of some variables. Furthermore, AKWarm is unable to model complex HVAC
systems such as variable frequency motors, variable air volume (VAV) systems, those with
significant digital or pneumatic controls or significant heat recovery capacity. In addition, some
other building methods and occupancies are outside AkWarm capabilities.
This report section is included in order to identify benefits from modifications to those more
complex systems or changes in occupant behavior that cannot be addressed in AkWarm.
The model was calibrated as accurately as possible under the assumption that the building is
considered very leaky. The garage doors open frequently throughout the day even on the
coldest days, weather stripping is worn and cracks exist around windows. All of these factors
lead to the conclusion that some large portion of the heating costs come from heating outside
air.
Additionally, modeling a building with in-floor slab heat does not adequately portray the savings
achieved by insulating the slab edge. Heat loss through a heated slab is higher than heat loss
through an unheated slab at room temperature. Calculations made outside AkWarm indicate
that the savings can be much higher and the retrofit should be given more consideration. The
retrofit will also become more economical in the future as the cost of heating continues to rise.
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
17
5.0 BUILDING OPERATION AND MAINTENANCE (O & M)
5.1 Operations and Maintenance
A well-implemented operation and maintenance (O & M) plan is often the driving force behind
energy savings. Such a plan includes preserving institutional knowledge, directing preventative
maintenance, and scheduling regular inspections of each piece of HVAC equipment within the
building. Routine maintenance includes the timely replacement of filters, belts and pulleys, the
proper greasing of bearings and other details such as topping off the glycol tanks. Additional
benefits to a maintenance plan are decreased down time for malfunctioning equipment, early
indications of problems, prevention of exacerbated maintenance issues, and early detection of
overloading/overheating issues. A good maintenance person knows the building’s equipment
well enough to spot and repair minor malfunctions before they become major retrofits.
Operations and Maintenance staff implementing a properly designed O & M plan will:
Track and document
o Renovations and repairs,
o Utility bills and fuel consumption, and
o System performance.
Keep available for reference
o A current Building Operating Plan including an inventory of installed systems,
o The most recent available as-built drawings,
o Reference manuals for all installed parts and systems, and
o An up-to-date inventory of on-hand replacement parts.
Provide training and continuing education for maintenance personnel.
Plan for commissioning and re-commissioning at appropriate intervals.
5.2 Commissioning
Commissioning of a building is the verification that the HVAC systems perform within the design
or usage ranges of the Building Operating Plan. This process ideally, though seldom, occurs as
the last phase in construction. HVAC system operation parameters degrade from ideal over time
due to incorrect maintenance, improper replacement pumps, changes in facility tenants or
usage, changes in schedules, and changes in energy costs or loads. Ideally, re-commissioning
of a building should occur every five to ten years. This ensures that the HVAC system meets
the potentially variable use with the most efficient means.
5.3 Building Specific Recommendations
The building has several issues pertaining to energy efficiency that should be addressed that
cannot be quantified adequately such as:
Improving the weather stripping around doors and windows
Installing an air handling unit to improve air quality in the classroom section
Repairing damaged windows
The classroom addition has significant ghosting on the walls indicative of cold studs allowing
moisture to condense and dust and smoke from the shop to be attracted to it.
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
18
APPENDICES
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
19
Appendix A Recommended Energy Efficiency Measures
A number of Energy Efficiency Measures (EEMs) are available to reduce the energy use and
overall operating cost for the facility. The EEMs listed below are those recommended by
AkWarm based on the calculated savings/investment ration (SIR) as described in Appendix E.
AkWarm also provides a breakeven cost, which is the maximum initial cost of the EEM that will
still return a SIR of one or greater.
This section describes each recommended EEM and identifies the potential energy savings and
installation costs. This also details the calculation of breakeven costs, simple payback, and the
SIR for each recommendation. The recommended EEMs are grouped together generally by the
overall end use that will be impacted.
A.1 Temperature Control
Programmable thermostats should be installed and programmed in the GILA Auto Shop.
Programmable thermostats allow for automatic temperature setback, which reduce usage more
reliably than manual setbacks. Reduction of the unoccupied temperature set point in the Auto
Shop will decrease the energy usage.
A lot of energy is used to heat the shop space in the form of electricity for pumps to circulate
and fans and steam to transfer the heat. Decreasing the unoccupied temperature set point will
decrease the electrical consumption significantly as well as the steam consumption.
Rank Building Space Recommendation
1 Garage
Implement a Heating Temperature
Unoccupied Setback to 62.0 deg F for the
Garage space.
Installation Cost $1,200 Estimated Life of Measure (yr.) 15 Energy Savings (/yr.) $3,489
Breakeven Cost $44,080 Savings-to-Investment Ratio 37 Simple Payback (yr.) 0
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
20
A.2 Electrical Loads
A.2.1 Lighting
The electricity used by lighting eventually ends up as heat in the building. In areas where
electricity is more expensive than other forms of energy, or in areas where the summer
temperatures require cooling; this additional heat can be both wasteful and costly. Converting
to more efficient lighting reduces cooling loads in the summer and allows the user to control
heat input in the winter. The conversion from T12 (one and a half inch fluorescent bulbs) to T8
(one inch), T5 (5/8 inch), Compact Fluorescent Lights (CFL), or LED bulbs provides a significant
increase in efficiency. LED bulbs can be directly placed in existing fixtures. The LED bulb
bypasses the ballast altogether, which removes the often irritating, “buzzing” noise that
magnetic ballasts tend to make.
Decreasing the electrical consumption due to lighting by replacing the 32 watt T8 lamps with 25
watt T8 lamps is cost effective in certain areas of the building. Other locations of the building are
not used often enough to warrant replacing them. The shop is composed of high bay fixtures
containing 350 metal halide lamps. Replacing these fixtures with high bay fluorescent fixtures is
not cost effective at this time.
A.2.2 Other Electrical Loads
No EEMs are recommended in this category.
Rank Location Existing Condition Recommendation
4 Front Entry
FLUOR (2) T12 F40T12 40W U-Tube
Standard EfficMagnetic with Manual
Switching
Replace with FLUOR (2) T8 4'
F32T8 25W Energy-Saver
Instant EfficMagnetic
Installation Cost $55 Estimated Life of Measure (yr.) 7 Energy Savings (/yr.) $26
Breakeven Cost $160 Savings-to-Investment Ratio 2.9 Simple Payback (yr.) 2
Rank Location Existing Condition Recommendation
4 Classroom, Hallway
11 FLUOR (3) T8 4' F32T8 32W Standard
(2) Instant StdElectronic with Manual
Switching
Replace with 11 FLUOR (3) T8
4' F32T8 25W Energy-Saver (2)
Instant StdElectronic
Installation Cost $666 Estimated Life of Measure (yr.) 7 Energy Savings (/yr.) $162
Breakeven Cost $997 Savings-to-Investment Ratio 1.5 Simple Payback (yr.) 4
Rank Location Existing Condition Recommendation
4 Shop Office, Shop
Mezzanine
6 FLUOR (4) T8 4' F32T8 32W Standard
(2) Instant StdElectronic with Manual
Switching
Replace with 6 FLUOR (4) T8 4'
F32T8 25W Energy-Saver (2)
Instant StdElectronic
Installation Cost $530 Estimated Life of Measure (yr.) 7 Energy Savings (/yr.) $118
Breakeven Cost $725 Savings-to-Investment Ratio 1.4 Simple Payback (yr.) 5
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
21
A.3 Building Envelope: Recommendations for change
A.3.1 Exterior Walls
No EEMs are recommended in this category. It is not cost effective at this time to increase the
insulation value of the wall.
A.3.2 Foundation and/or Crawlspace
Insulating the perimeter of the slab is a cost effective measure to save energy. Savings can
amount to over $900 per year and the SIR is near 3.
A.3.3 Roofing and Ceiling
No EEMs are recommended in this category. It is not cost effective at this time to increase the
insulation value of the ceiling.
A.3.4 Windows
No EEMs are recommended in this category. It is not cost effective at this time to replace the
windows with better insulated windows.
A.3.5 Doors
Adding an insulating blanket to each of the garage doors is a cost effective measure to save
energy.
Rank Location Existing Condition Recommendation
3 Garage Door:
Garage
Door Type: Sectional, EPS core, 2", no
thermal break
Insulating Blanket: None
Modeled R-Value: 3
Add R-5 insulating blanket to
garage door
Installation Cost $1,150 Estimated Life of Measure (yr.) 15 Energy Savings (/yr.) $250
Breakeven Cost $3,197 Savings-to-Investment Ratio 2.8 Simple Payback (yr.) 5
Rank Location Existing Condition Recommendation
3 Garage Door:
Garage
Door Type: Sectional, EPS core, 1-3/8", no
thermal break
Insulating Blanket: None
Modeled R-Value: 2.6
Add R-5 insulating blanket to
garage door
Installation Cost $496 Estimated Life of Measure (yr.) 15 Energy Savings (/yr.) $131
Breakeven Cost $1,678 Savings-to-Investment Ratio 3.4 Simple Payback (yr.) 4
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
22
A.4 Building Heating System / Air Conditioning
A.4.1 Heating and Heat Distribution
No EEMs are recommended in this category. Installing setback thermostats as described
previously will decrease the energy consumption of the mechanical equipment in this building.
A.4.2 Air Conditioning
The building is not equipped with an air conditioning system.
A.4.3 Ventilation
No EEMs are recommended in this category. The only forms of mechanical ventilation in this
building are the fans in the bathrooms. Installing an air handling unit in the mezzanine in the
shop will increase air quality in the classroom addition.
A.4.4 Air Changes and Air Tightening
Building air losses can be greatly decreased by repairing weather stripping around doors and
repairing damage around windows. A man door in the in the shop does not close properly and
requires repair or replacement.
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
23
Appendix B Energy Efficiency Measures that are NOT Recommended
As indicated in other sections of the report, a number of potential EEMs were identified that
were determined to be NOT cost effective by the AkWarm model. These EEMs are not
currently recommended on the basis of energy savings alone because each may only save a
small amount of energy, have a high capital cost, or be expensive to install. While each of
these EEMs is not cost effective at this time, future changes in building use such as longer
operating hours, higher energy prices, new fixtures or hardware on the market, and decreases
in installation effort may make any of these EEMs cost effective in the future. These potential
EEMs should be reviewed periodically to identify any changes to these factors that would
warrant re-evaluation.
Although these upgrades are not currently cost effective on an energy cost basis, the fixtures,
hardware, controls, or operational changes described in these EEMs should be considered
when replacing an existing fixture or unit for other reasons. For example, replacing an existing
window with a triple-pane window may not be cost effective based only on energy use, but if a
window is going to be replaced for some other reason, then the basis for a decision is only the
incremental cost of upgrading from a less efficient replacement window to a more efficient
replacement window. That incremental cost difference will have a significantly shorter payback,
especially since the installation costs are likely to be the same for both units.
The following measures were not found to be cost-effective:
Rank Feature/Location Improvement Description
Annual
Energy
Savings
Installed
Cost
Savings to
Investment
Ratio, SIR
Simple
Payback
(Years)
6 Exterior Door: Metal
1/2 Lite
Remove existing door and
install standard pre-hung U-
0.16 insulated door, including
hardware.
$15 $722 0.45 48
7 Exterior Door: Flush
Metal
Remove existing door and
install standard pre-hung U-
0.16 insulated door, including
hardware.
$34 $1,702 0.44 50
8 Lighting: Storage 1,
Storage 2, Storage 3
Replace with 14 FLUOR (4)
T8 4' F32T8 25W Energy-
Saver (2) Instant
StdElectronic
$68 $1,230 0.34 18
9
Lighting: West Office,
South Office, Men's
Restroom, Women's
Restroom
Replace with 17 FLUOR (4)
T8 4' F32T8 25W Energy-
Saver (2) Instant
StdElectronic
$55 $1,500 0.22 27
10 Lighting: Auto Shop
Replace with 14 FLUOR (6)
T5 45.2" F54W/T5 HO
Energy-Saver StdElectronic
$255 $9,500 0.17 37
11
Window/Skylight:
Double Wd-Vn South
>3/8, 19 SF
Install single pane storm
window on exterior $7 $765 0.15 110
12
Window/Skylight:
Double Wd-Vn Other
>3/8, 152 SF
Install single pane storm
window on exterior $55 $6,118 0.15 110
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
24
Appendix C Significant Equipment List
HVAC Equipment
Equipment Manufacturer Model No. Fuel Type Notes
Heat Exchanger Bell and Gossett BY526010048001 Steam -
Pump 1A and 1B Emerson P63C8C-3020 Electric 1 1/2 HPRedundant
set
Pump 2 Taco 006-BT4 Electric 1/40 HP
Pump 3A and 3B Emerson P63CZE-3022 Electric 3/4 HPRedundant
set
Pump 4 Taco 008-BF6 Electric 1/25 HPDHW
Pump 5 Emerson P63CZE-3022 Electric 3/4 HP
Pump 6 Taco 008-F6 Electric 1/25 HP
Pump 7 Taco 007-F5 Electric 1/25 HP
Pump 8 Taco 009-F5 Electric 1/8 HP
Unit Heaters Modine 33501 Electric 1/25 HP
Unit Heaters Modine 63501 Electric 1/12 HP
Water tank Amtrol WH96DW Indirect 26 gallons
Lighting
Location Lighting Type Bulb Type Quantity KWH/YR Cost/YR
Shop High Bay Metal Halide 14 4,419 $ 2,489
Classroom, hallway Fluorescent T8 33 1,556 876
Shop office, mezzanine Fluorescent T8 24 1,116 629
Storage 1, Storage 2,
Storage 3 Fluorescent T8 56 631 355
West Office, South
Office, Men's Restroom,
Women's Restroom
Fluorescent T8 68 510 287
Exits Exit Lights LED 4 223 126
Front Entry Fluorescent T12 U tube 2 144 81
Energy Consumption calculated by AkWarm based on wattage, schedule and a $ 0.56 per KWH electric rate.
Plug Loads
Equipment Location Manufacturer KWH/YR Cost/YR
Mini Fridges Office Varies 800 $ 451
Air compressor Storage 3 Ingersol Rand 673 379
Water fountain Hallway Elkay 500 282
Misc. Shop Tools Shop Varies 418 235
Projector Classroom n/a 417 235
Large copier/printer Hallway HP 235 132
Computer towers Classroom Varies 125 70
Computer monitors Classroom Varies 84 47
Laptop Classroom n/a 84 47
Clothes washer Shop Maytag 67 38
Microwave Office Whirlpool 52 29
Desk printers Office n/a 33 19
Energy Consumption calculated by AkWarm based on wattage, schedule and a $ 0.56 per KWH electric rate.
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
25
Appendix D Local Utility Rate Structure
The information in this section was provided directly from the local utility or gathered from the
local utility’s publicly available information at the time of the audit. All language used in this
section was provided by the local utility and believed to be current at the time of the audit.
Energy use terms, specific fees, and other specific information are subject to change. Updated
rate structure information should be gathered from the utility during future discussion of rates,
rate structures and utility pricing agreements.
Galena Electric Rate:
Electric Minimum Charge $22.53
Fuel Charge $0.3213 / kWh
Energy Charge $0.242 / kWh
Base Rate $0.5633 / kWh
Electric Minimum Charge (Customer Charge)
The customer charge is the minimum amount charged regardless of whether the customer uses
electricity during a month or not. The customer charge recovers some of the cost of reading the
meter and costs incurred from installing a transformer, meter, and service extension.
Fuel Charge
Fuel charge covers the cost of fuel and generating efficiency.
Energy Charge (Non fuel charge)
The non-fuel charge is established to recover all revenue requirements of the utility not related
to fuel.
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
26
Appendix E Analysis Methodology
Data collected was processed using AkWarm energy use software to estimate current energy
consumption by end usage and calculate energy savings for each of the proposed energy
efficiency measures (EEMs). In addition, separate analysis may have been conducted to
evaluate EEMs that AkWarm cannot effectively model to evaluate potential reductions in annual
energy consumption. Analyses were conducted under the direct supervision of a Certified
Energy Auditor, Certified Energy Manager, or a Professional Engineer.
EEMs are evaluated based on building use, maintenance and processes, local climate
conditions, building construction type, function, operational schedule and existing conditions.
Energy savings are calculated based on industry standard methods and engineering
estimations. Each model created in AkWarm is carefully compared to existing utility usage
obtained from utility bills. The AkWarm analysis provides a number of tools for assessing the
cost effectiveness of various improvement options. The primary assessment value used in this
audit report is the Savings/Investment Ratio (SIR). The SIR is a method of cost analysis that
compares the total cost savings through reduced energy consumption to the total cost of a
project over its assumed lifespan, including both the construction cost and ongoing maintenance
and operating costs. Other measurement methods include Simple Payback, which is defined as
the length of time it takes for the savings to equal the total installed cost and Breakeven Cost,
which is defined as the highest cost that would yield a Savings/Investment Ratio of one.
EEMs are recommended by AkWarm in order of cost-effectiveness. AkWarm first calculates
individual SIRs for each EEM, and then ranks the EEMs by SIR, with higher SIRs at the top of
the list. An individual EEM must have a SIR greater than or equal to one in order to be
recommended by AkWarm. Next AkWarm modifies the building model to include the installation
of the first EEM and then re-simulates the energy use. Then the remaining EEMs are re-
evaluated and ranked again. AkWarm goes through this iterative process until all suggested
EEMs have been evaluated.
Under this iterative review process, the savings for each recommended EEM is calculated
based on the implementation of the other, more cost effective EEMs first. Therefore, the
implementation of one EEM affects the savings of other EEMs that are recommended later.
The savings from any one individual EEM may be relatively higher if the individual EEM is
implemented without the other recommended EEMs. For example, implementing a reduced
operating schedule for inefficient lighting may result in relatively higher savings than
implementing the same reduced operating schedule for newly installed lighting that is more
efficient. If multiple EEMs are recommended, AkWarm calculates a combined savings.
Inclusion of recommendations for energy savings outside the capability of AkWarm will impact
the actual savings from the AkWarm projections. This will almost certainly result in lower
energy savings and monetary savings from AkWarm recommendations. The reality is that only
so much energy is consumed in a building. Energy savings from one EEM reduces the amount
of energy that can be saved from additional EEMs. For example, installation of a lower wattage
light bulb does not save energy or money if the bulb is never turned on because of a schedule
or operational change at the facility.
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
27
Appendix F Audit Limitations
The results of this audit are dependent on the input data provided and can only act as an
approximation. In some instances, several EEMs or installation methods may achieve the
identified potential savings. Actual savings will depend on the EEM selected, the price of
energy, and the final installation and implementation methodology. Competent tradesmen and
professional engineers may be required to design, install, or otherwise implement some of the
recommended EEMs. This document is an energy use audit report and is not intended as a
final design document, operation, and maintenance manual, or to take the place of any
document provided by a manufacturer or installer of any device described in this report.
Cost savings are calculated based on estimated initial costs for each EEM. Estimated costs
include labor and equipment for the full up-front investment required to implement the EEM.
The listed installation costs within the report are conceptual budgetary estimates and should not
be used as design estimates. The estimated costs are derived from Means Cost Data, industry
publications, local contractors and equipment suppliers, and the professional judgment of the
CEA writing the report and based on the conditions at the time of the audit.
Cost and energy savings are approximations and are not guaranteed.
Additional significant energy savings can usually be found with more detailed auditing
techniques that include actual measurements of electrical use, temperatures in the building and
HVAC ductwork, intake and exhaust temperatures, motor runtime and scheduling, and infrared,
air leakage to name just a few. Implementation of these techniques is the difference between a
Level III Energy Audit and the Level II Audit that has been conducted.
Disclaimer: "This report was prepared as an account of work sponsored by an agency of the
United States Government. Neither the United States Government nor any agency thereof, nor
any of their employees, makes any warranty, express or implied, or assumes any legal liability
or responsibility for the accuracy, completeness, or usefulness of any information, apparatus,
product, or process disclosed, or represents that its use would not infringe privately owned
rights. Reference herein to any specific commercial product, process, or service by trade name,
trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement,
recommendation, or favoring by the United States Government or any agency thereof. The
views and opinions of authors expressed herein do not necessarily state or reflect those of the
United States Government or any agency thereof."
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
28
Appendix G References
Although not all documents listed below are specifically referenced in this report, each contains
information and insights considered valuable to most buildings.
Alaska Department of Education and Early Development; Education Support Services/Facilities.
(1999). Alaska School Facilities Preventative Maintenance Handbook. Juneau, AK:
Alaska Department of Education and Early Development.
Alaska Housing Finance Corportation. (2010). Retrofit Energy Assessment for Loans. AHFC.
ASHRAE. (1997). 1997 ASHRAE Handbook: Fundamentals. Atlanta, GA: ASHRAE.
ASHRAE. (2007). ASHRAE Standard 105-2007 Expressing and Comparing Building Energy
Performance. Retrieved from ASHRAE: www.ashrae.org
ASHRAE. (2007). ASHRAE Standard 90.1-2007 Energy Standards for buildings Except Low-
Rise Residential Buildings. Retrieved from ASHRAE: www.ashrae.org
ASHRAE. (2010). ASHRAE Standard 62.1-2010 Ventilaton for Acceptable Indoor Air Quality.
Retrieved from ASHRAE: www.ashrae.org
ASHRAE. (2010). ASHRAE Standard 62.2-2010 Ventilation and Acceptable Indoor Air Quality in
Low Rise Residential Buildings. Retrieved from ASHRAE: www.ashrae.org
ASHRAE RP-669 and SP-56. (2004). Procedures for Commercial Building Energy Audits.
Atlanta, GA: ASHRAE.
Coad, W. J. (1982). Energy Engineering and Management for Building Systems. Scarborough,
Ontario, Canada: Van Nostrand Reinhold Company.
Daley, D. T. (2008). The Little Black Book of Reliability Management. New York, NY: Industrial
Press, Inc.
Federal Energy Management Program. (2004, March 3). Demand Controlled Ventilation Using
CO2 Sensors. Retrieved 2011, from US DOE Energy Efficiency and Renewable Energy:
http://www.eere.energy.gov/femp/pdfs/fta_co2.pdf
Federal Energy Management Program. (2006, April 26). Low-Energy Building Design
Guidelines. Retrieved 2011, from Department of Energy; Federal Energy Management
Program: http://www.eren.doe.gov/femp/
Institute, E. a. (2004). Variable Speed Pumping: A Guide to Successful Applications. Oxford,
UK: Elsevier Advanced Technology.
International Code Council. (2009). International Energy Conservation Code. Country Club Hills,
IL: International Code Council, Inc.
Leach, M., Lobato, C., Hirsch, A., Pless, S., & Torcellini, P. (2010, September). Technical
Support Document: Strategies for 50% Energy Savings in Large Office Buildings.
Retrieved 2011, from National Renewable Energy Laboratory:
http://www.nrel.gov/docs/fy10osti/49213.pdf
Thumann, P.E., C.E.M., A., Younger, C.E.M., W. J., & Niehus, P.E., C.E.M., T. (2010).
Handbook of Energy Audits Eighth Edition. Lilburn, GA: The Fairmont Press, Inc.
U.S. Energy Information Administration. (2006). Commercial Building Energy Consumption
Survey (CBECS). Retrieved 2011, from Energy Information Administration:
http://www.eia.gov/emeu/cbecs/
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
29
Appendix H Typical Energy Use and Cost – Fairbanks and Anchorage
This report provides data on typical energy costs and use on selected building in Fairbanks and
Anchorage, Alaska for comparative purposes only. The values provided by the US Energy
Information Administration CBECS study included a broader range of building types for the
Continental U.S. are not necessarily good comparatives for buildings and conditions in Alaska.
An assortment of values from CBECS may be found in Appendix I.
The Alaska data described in this report came from a benchmarking study NORTECH and other
Technical Services Providers (TSPs) completed on publicly owned buildings in Alaska under
contract with AHFC. This study acquired actual utility data for municipal buildings and schools
in Alaska for the two recent full years. The utility data included costs and quantities including
fuel oil, electricity, propane, wood, steam, and all other energy source usage. This resulted in a
database of approximately 900 buildings. During the course of the benchmarking study, the
comparisons made to the CBECS data appeared to be inappropriate for various reasons.
Therefore, this energy use audit report references the average energy use and energy cost of
Anchorage and Fairbanks buildings as described below.
The Alaska benchmarking data was evaluated in order to find valid comparison data. Buildings
with major energy use information missing were eliminated from the data pool. After detailed
scrutiny of the data, the most complete information was provided to NORTECH by the
Fairbanks North Star Borough School District (FNSBSD) and the Anchorage School District
(ASD). The data sets from these two sources included both the actual educational facilities as
well as the district administrative buildings and these are grouped together in this report as
Fairbanks and Anchorage schools. These two sources of information, being the most complete
and reasonable in-state information, have been used to identify an average annual energy
usage for Fairbanks and for Anchorage in order to provide a comparison for other facilities in
Alaska.
Several factors may limit the comparison of a specific facility to these regional indicators. In
Fairbanks, the FNSBSD generally uses number two fuel oil for heating needs and electricity is
provided by Golden Valley Electric Association (GVEA). GVEA produces electricity from a coal
fired generation plant with additional oil generation upon demand. A few of the FNSBSD
buildings in this selection utilize district steam and hot water. The FNSBSD has recently (the
last ten years) invested significantly in envelope and other efficiency upgrades to reduce their
operating costs. Therefore a reader should be aware that this selection of Fairbanks buildings
has energy use at or below average for the entire Alaska benchmarking database.
Heating in Anchorage is through natural gas from the nearby natural gas fields. Electricity is
also provided using natural gas. As the source is nearby and the infrastructure for delivery is in
place, energy costs are relatively low in the area. As a result, the ASD buildings have lower
energy costs, but higher energy use, than the average for the entire benchmarking database.
These special circumstances should be considered when comparing the typical annual energy
use for particular buildings.
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
30
Appendix I Typical Energy Use and Cost – Continental U.S.
Released: Dec 2006
Next CBECS will be conducted in 2007
Table C3. Consumption and Gross Energy Intensity for Sum of Major Fuels for Non-Mall Buildings, 2003
All Buildings* Sum of Major Fuel Consumption
Number of
Buildings
(thousand)
Floor
space
(million
square
feet)
Floor space
per Building
(thousand
square feet)
Total
(trillion
BTU)
per
Building
(million
BTU)
per
Square Foot
(thousand
BTU)
per
Worker
(million
BTU)
All Buildings* 4,645 64,783 13.9 5,820 1,253 89.8 79.9
Building Floor space (Square Feet)
1,001 to 5,000 2,552 6,789 2.7 672 263 98.9 67.6
5,001 to 10,000 889 6,585 7.4 516 580 78.3 68.7
10,001 to 25,000 738 11,535 15.6 776 1,052 67.3 72.0
25,001 to 50,000 241 8,668 35.9 673 2,790 77.6 75.8
50,001 to 100,000 129 9,057 70.4 759 5,901 83.8 90.0
100,001 to 200,000 65 9,064 138.8 934 14,300 103.0 80.3
200,001 to 500,000 25 7,176 289.0 725 29,189 101.0 105.3
Over 500,000 7 5,908 896.1 766 116,216 129.7 87.6
Principal Building Activity
Education 386 9,874 25.6 820 2,125 83.1 65.7
Food Sales 226 1,255 5.6 251 1,110 199.7 175.2
Food Service 297 1,654 5.6 427 1,436 258.3 136.5
Health Care 129 3,163 24.6 594 4,612 187.7 94.0
Inpatient 8 1,905 241.4 475 60,152 249.2 127.7
Outpatient 121 1,258 10.4 119 985 94.6 45.8
Lodging 142 5,096 35.8 510 3,578 100.0 207.5
Retail (Other Than Mall) 443 4,317 9.7 319 720 73.9 92.1
Office 824 12,208 14.8 1,134 1,376 92.9 40.3
Public Assembly 277 3,939 14.2 370 1,338 93.9 154.5
Public Order and Safety 71 1,090 15.5 126 1,791 115.8 93.7
Religious Worship 370 3,754 10.1 163 440 43.5 95.6
Service 622 4,050 6.5 312 501 77.0 85.0
Warehouse and Storage 597 10,078 16.9 456 764 45.2 104.3
Other 79 1,738 21.9 286 3,600 164.4 157.1
Vacant 182 2,567 14.1 54 294 20.9 832.1
This report references the Commercial Buildings Energy Consumption Survey (CBECS), published by the U.S.
Energy Information Administration in 2006. Initially this report was expected to compare the annual energy
consumption of the building to average national energy usage as documented below. However, a direct comparison
between one specific building and the groups of buildings outlined below yielded confusing results. Instead, this
report uses a comparative analysis on Fairbanks and Anchorage data as described in Appendix F. An abbreviated
excerpt from CBECS on commercial buildings in the Continental U.S. is below.
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
31
Appendix J List of Conversion Factors and Energy Units
1 British Thermal Unit is the energy required to raise one pound of water one degree F°
1 Watt is approximately 3.412 BTU/hr.
1 horsepower is approximately 2,544 BTU/hr.
1 horsepower is approximately 746 Watts
1 "ton of cooling” is approximately 12,000 BTU/hr., the amount of power required
to melt one short ton of ice in 24 hours
1 Therm = 100,000 BTU
1 KBTU = 1,000 BTU
1 KWH = 3413 BTU
1 KW = 3413 BTU/Hr.
1 Boiler HP = 33,400 BTU/Hr.
1 Pound Steam = approximately 1000 BTU
1 CCF of natural gas = approximately 1 Therm
1 inch H2O = 250 Pascal (Pa) = 0.443 pounds/square inch (psi)
1 atmosphere (atm) = 10,1000 Pascal (Pa)
BTU British Thermal Unit
CCF 100 Cubic Feet
CFM Cubic Feet per Minute
GPM Gallons per minute
HP Horsepower
Hz Hertz
kg Kilogram (1,000 grams)
kV Kilovolt (1,000 volts)
kVA Kilovolt-Amp
kVAR Kilovolt-Amp Reactive
KW Kilowatt (1,000 watts)
KWH Kilowatt Hour
V Volt
W Watt
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
32
Appendix K List of Acronyms, Abbreviations, and Definitions
ACH Air Changes per Hour
AFUE Annual Fuel Utilization Efficiency
Air Economizer A duct, damper, and automatic control system that
allows a cooling system to supply outside air to reduce
or eliminate the need for mechanical cooling.
Ambient Temperature Average temperature of the surrounding air
Ballast A device used with an electric discharge lamp to cause
the lamp to start and operate under the proper circuit
conditions of voltage, current, electrode heat, etc.
CO2 Carbon Dioxide
CUI Cost Utilization Index
CDD Cooling Degree Days
DDC Direct Digital Control
EEM Energy Efficiency Measure
EER Energy Efficient Ratio
EUI Energy Utilization Index
FLUOR Fluorescent
Grade The finished ground level adjoining a building at the
exterior walls
HDD Heating Degree Days
HVAC Heating, Ventilation, and Air-Conditioning
INCAN Incandescent
NPV Net Present Value
R-value Thermal resistance measured in BTU/Hr.-SF-̊F (Higher
value means better insulation)
SCFM Standard Cubic Feet per Minute
Savings to Investment Ratio (SIR) Savings over the life of the EEM divided by Investment
capital cost. Savings includes the total discounted dollar
savings considered over the life of the improvement.
Investment in the SIR calculation includes the labor and
materials required to install the measure.
Set Point Target temperature that a control system operates the
heating and cooling system
Simple payback A cost analysis method whereby the investment cost of
an EEM is divided by the first year’s savings of the EEM
to give the number of years required to recover the cost
of the investment.
Energy Audit – Final Report
GILA Auto Shop
Galena, Alaska
F:\00-Jobs\2011\2602 F - AHFC Grade Audits\50-300 Doyon Other Region\50-370 Galena City SD\50-379 GILA GM Auto Shop\Reports\Final\2012.07.12 Final AHFC
Report GAL Auto Shop.Docx
33
Appendix L Building Floor Plan
Drawings from on-site fire escape plans 106’ Second Floor