Loading...
HomeMy WebLinkAboutElim Petersen Creek Streamflow Records 1985ELI 002 c.2 9644/399 Alaska Power Authority LIBRARY COPY A~skaPowerAu~orio/ 1985 STREAMFLOW RECORDS PETERSEN CREEK NEAR ELIM Prepared by: DOWL ENGINEERS in Support of the Pre-Feasibility Study for Elim Hydroelectric Project November 1985 1985 STREAMFLOW RECORDS PETERSEN CREEK NEAR ELIH Prepared For: ALASKA POWER AUTHORITY Prepared Ay: DOWL ENGINEERS in Support of the Pre-Feasibility Study for Elim Hydroelectric Project November 1985 W . 0 • liD 51 9 2 0 TABLE or CONTENTS Purpose .• Location. . ........................................ . Drainage Area. Gage .•••. Reference Marks. Discharge Measurements. Rating Curve ...•.....•. ................................. Channel. Control. Remarks. ............................................ Conclusions. Appendix A Appendix B Figure 1 Figure 2 F i q ur e 3 Table APPENDICES Discharge Rating Curve Measurements Printout of Stage Data Discharge Measurements 2-Hour and Correspondinq Discharges LIST OF FIGURES Project Location Map Discharge Ratinq Curve Petersen E 1 im, Alaska 1985 Hydroqraph of Peter sen Creek LIST or TABLES Summary Petersen Stream f 1 ow Data , 1 9 8 5 Creek, Elim, Alaska Creek PAGE 2 2 3 3 4 5 5 5 6 ELIM STREAMfLOW DATA, PETERSEN CREEK Purpose: The purpose of this effort is to collect streamflow data for Petersen Creek as part of the Elim Hydroelectric Project Pre-Reconnaissance Study. Streamflow data collection began on June 1, 1984. A streamflow data report covering the last seven months of 1984 was submitted to Alaska Power Authority in June 1985. The streamflow data presently being gathered will supplement the hydrology for the pre-reconnaissance level of study conducted for this site. The stream gaging activity was discontinued and the gage was removed from the site on October 3, 1985, as per instructions of Alaska Power Authority. (Please refer to the 1985 Streamflow Monitoring Proqram, Amendment No. 5 and our letter of March 25, 1985.) A total of sixteen consecutive months of streamflow data were gathered at this site. This report constitutes our final includes a daily stream discharge staqe and discharge records for 1985 calendar year (January 1, 1985). Location: report for this site and summary table as well as two-hour periods for the 1985 through October 3, Lat. 64°35'N, Lonq. 162°24'W in NW1/4SW1/4 Sec. 36, T.10S., R.18W., on riqht bank, 300 feet upstream from the mouth, 4.5 miles southwest of Elim, Alaska (Solomon C-1 Quad). The gaqe can be reached by a skiff on Norton Sound to the mouth of Petersen Creek and by walking the remaining 300 feet to the gage location (see attached map -Figure 1). Winter access is by a snow machine over the frozen Norton Sound Iditarod Trail. Drainage Area: The drainage area is 1.49 mi2 at the gage site, and no glaciers exist within the location of the proposed selected oage site. drainage basin. The powerhouse hydropower project is at the The qaqe is an Omnidata Datapod (Model DP312) coupled with a small piezo-electric pressure transducer. The datapod is an ultra low power microprocessor controlled recorder with sev- eral advantages. The device contains a battery supply, an analog to digital converter (12-15 bits), a microprocessor, a non-volatile storaqe module and a clock with an accuracy of several minutes per month. The transducer (Enviro-Labs !>1odel PT-105V) is housed inside a cylindrical stainless steel casing which is secured to the streambed by hose clamps and a steel rebar driven into the ground. A cableway extends to the recorder on the streambank. The recorder is set to sample the pressure every five minutes. The average of the five-minute readings is recorded every two hours in a 8-bit format. Following the assembly of the datapod, a digital stage recorder was installed on May 31, 1984. Gag- ing equipment specifications were attached to the 1984 report as Appendix C. 2 7 / VICINITY MAP 0 loii~ES S 0 lJ N 0 ELIM LOCATION MAP NOT TO SCALE FIGURE I I Staff Gaqe: The staff gage is a rigid, precisely graduated, porcelain enameled iron plate securely fixed to a fence post driven into the streambed. Reference Marks: RM-1 (base). A 24-inch lonq steel rebar with an aluminum cap driven into the ground on the right bank of the creek and 25 feet upstream of the gage location: Elevation 5.11 feet, qage datum RP-1. Top of rebar (attached to transducer) Elevation 4. 73 feet, gage datum Discharae Measurements: Continuous measurements of stream discharge are obtained through collection of stage data at the gaging station. The staqe of a stream is the height of the water surface above an established datum. The stage data on Petersen Creek is collected every four hours by an Ornnidata Datapod digital recorder. In stream qaqinq procedures, staqe data is used as the independent variable in a stage-discharge relation to derive discharqes. It is, therefore, normal practice to establish a relationship (rating curve) between the stage at the qaqing station and the discharge. This relationship depends on the shape of the cross-section and the roughness o f t h e s t r e am b e d • T h e r e f o r e , t he r e 1 a t i o n s h i p h as t o b e established empirically. 3 As part of establishing the rating curve relationship, dis- charge measurements were taken at the gaging station using a Marsh-McBirney Model 201 flow current meter. The stage of the stream was also noted during discharge measurements and is provided below along with the discharge measurements. Date 0 5 /31 /8 4 1 o /0 2 I 84 0 2/2 0/8 5 06/18/85 1 0 /3 /8 5 Rating Curve: Discharge (cfs) 4. 7 5 3.35 0.88 30 5.4 7. 2 (Gage Height)-Stage (ft) [a shift of 0.1ft] 0.45 0.40 0. 30 1.95 (by 0.50 0. 60 s 1 ope- area method) The rating curve for Petersen Creek will continue to be developed as additional stage-discharge data points are col- lected. A preliminary rating curve is plotted for the period of record and is shown in Figure 2. The discharge computation sheets are provided in Appendix A. After havinq established the rating curves, discharge mea- surements were continued to enable verification, and if necessary, adjustment of the ratina curve to the actual circumstances. Deviations from the discharges read from the rating curve are caused by morphological changes of the streambed and stream icing problems. 4 1.!5 1.0 1.5 I 1.0 I .9 .• l E Ia. 'l: .6 % 0 llrJ .!54-% ... 0 :::> .4-L g .3 .2!5 . / / --- DISCHARGE IN CUBIC FEET PER SECOND / / 1 COMPUTE BY SLOPE-AD METHOD REA .2+---~--~~~~-+--------~-----+----~---+------r----+--~---+--~-+--r-------~------~----r---+-----4 .!5 .6 .7 .8 .9 1.0 1.5 2 l..5 3 4 5 6 7 8 9 10 15 20 25 30 40 FIGURE 2 Channel: The channel above the gage is cut into a contact between a crystalline limestone and a schistose marble. The left and right banks are about four to five feet high. The stream banks and slopes of the hluffs adjoining the stream are moderately vegetated with alders and mosses. Red material consists of gravels and cobbles. Some bedrock is encoun- tered below the gage site. Control: The control is a cross-section or reach of stream channel that determines the relationship between stage and discharge at that section and for some distance upstream. Permanent controls are desired for a stable stage-discharge relation- ship; however, changes (shifts) in the control occur affect- ing the relationship of stage to discharge. At low, medium, and hiqh stages, the channel will be the control for stream water levels. Remarks: Stage with exist. records for the period of monitoring are a 100 percent data recovery. No stage Because no high flows are measured durinq excellent data gaps the hiqh staqes, slope-area method is used to calculate the discharge corresponding to the hiqh stages. No significant shifts occurred in the stream control. 5 Conclusions: The hydroelectric potential of Petersen Creek in the Pre- Reconnaissance Report (December 1 9 82) was based on an average annual flow of 2. 8 c fs. Sixteen months of stream- flow data (June 1984 through September 1985) obtained at the proposed powerhouse site shows an average annual flow of 3.1 cfs (water year), about 10 percent higher than the adopted value. However, the limited streamflow data collected at this site is statistically insignificant. Nonetheless, the data does show that the following estimates used in the Pre- Reconnaissance Report are reasonable: 1) An average annual flow of 2.8 cfs adopted for the Petersen Creek compares favorably with the average flow of 3.1 cfs obtained from the limited stream- flow data. 2) As shown in the flow hydrograph (Figure 3) and Table 1, about 90 percent of the annual flow occurs May through October. This condition indi- cates that shutting down hydroplant operation dur- ing the harsh winter conditions when costly main- tenance and/or icing problems occur will not rep- resent a significant loss in the total energy production. 3) The adopted monthly flows which were used in the power and energy production estimates (see Figure 5 in the Pre-Reconnaissance Report) reflect fairly well the monthly flow distributions obtained from the limited streamflow data. 6 TABLE 1 A Sl..MotARY lT PETERSEN CREEK (ELIH, ALASKA) STREAMflOW RECORI:li fOR JANUARY 1, 1985 THROUGH OCTOBER 3, 1985 MEAN DAILY DISCHARCL IN CUBIC FEET PER SECOND 1985 Day Jan Feb Mar Apr May Jun Jul Aug Sep Oct 1 1 0 0 Oo9 1 0 3 Oo2 Oo 1 5o8 5o4 4o2 6o0 700 2 1 0 0 Oo9 Oo4 0 0 1 Oo 1 6o4 5o6 4o0 6o3 700 3 Oo9 Oo9 Oo3 Oo2 Oo 1 7 0 1 5o6 4o2 6o3 700 4 Oo9 Oo9 Oo4 Oo2 Oo 1 7o3 5o4 4o0 6o3 5 Oo9 Oo9 Oo4 Oo 1 0 0 1 7o 7 5o3 30 7 6o3 6 Oo9 Oo9 Oo3 Oo 1 0 0 1 704 5o0 3o8 6o 7 7 1 0 0 Oo9 Oo3 Oo2 Oo2 7o3 5o4 3o9 7o6 8 Oo9 Oo9 Oo3 Oo1 0 0 1 7o2 5o4 4o 1 708 9 Oo9 009 Oo3 0 0 1 Oo2 7o2 50 1 4o3 8o0 10 Oo9 Oo9 Oo3 0 0 1 0 0 1 7 0 1 5o0 4o2 7o 7 11 009 Oo9 Oo2 0 0 1 Oo 1 6o9 5o0 4o2 7o8 12 Oo9 Oo8 Oo2 0 0 1 Oo2 6o3 4o9 4o2 8o0 13 Oo9 009 Oo3 Oo 1 Oo 1 6o2 4o9 4o 1 7o8 14 Oo9 Oo9 Oo2 Oo 1 0 0 1 6o0 4o9 4o2 8o4 15 Oo9 Oo9 Oo2 Oo 1 Oo 1 5o6 4o9 4o2 805 16 Oo9 Oo9 Oo2 Oo 1 Oo 1 5o6 4o9 4o2 804 17 Oo9 Oo9 Oo3 Oo2 Oo2 5o5 4o9 4o 1 Bo3 18 Oo9 Oo9 Oo2 0 0 1 Oo2 5o2 4o9 4o2 8o2 19 Oo9 Oo9 Oo2 0 0 1 0 0 1 50 1 4o8 4o2 7o8 20 Oo9 Oo4 Oo2 0 0 1 Oo2 5o0 4o8 4o2 704 21 Oo9 Oo4 Oo2 Oo2 Oo2 4o9 4o 7 4o2 7 0 1 22 Oo9 Oo4 Oo2 0 0 1 Oo5 4o9 4o6 4o2 7 0 1 23 Oo9 Oo 7 Oo2 Oo 1 1 0 9 4o9 4o4 4o2 7 0 1 24 Oo9 Oo4 Oo2 0 0 1 3o8 4o9 4o4 4o3 7o0 25 Oo9 Oo8 Oo2 Oo 1 5o4 4o9 4o2 4o3 7o0 26 Oo9 Oo9 Oo2 0 0 1 6o 1 4.8 4o2 4o2 7o0 27 Oo9 Oo9 Oo 1 0. 1 6o 8 4o 7 4o2 4o 7 7o0 28 Oo9 1 0 2 Oo 1 Oo 1 7o4 4o9 4o2 5o0 6o9 29 Oo9 -Oo 1 0 0 1 6o 7 5o5 4o2 50 1 7o0 30 Oo9 -Oo2 Oo 1 5o 7 5o0 4o2 5o6 7o0 31 Oo9 -Oo 1 -5o8 -4o2 5o8 - Total 28 23 8o3 306 53 177 150 134 220 Mean 009 Oo8 Oo3 Oo 1 1 0 7 5o9 4o8 4o3 7 0 3 MEAN FLOW FOR THE PERIOD OF RECORD 2o9 CUBIC FEET PER SECOND 10 9 8 7 6 5 4 3 F MEAN FLOW 2.9 CFS __ _ 3 2 e (/) u.. (.) UJ (!) 1.0 Q: .Iii <f .I :X: (.) .T (/) .6 .IS 0 .5 .!I .4 .4 .3 .:5 .2 .2 ~------------L-----------~------------~------------_. ____________ ~ ____________ _. ____________ _. ____________ ~ ____________ _.,1 JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER ·~ . L;.A l; ENGINEERS 1985 HYDROGRAPH OF PETERSON CREEK ELIM, ALASKA FIGURE 3 (/) u.. (.) UJ (!) Q: <f :X: (.) (/) 0 051920 APPENDIX A DischBrge Rating Curve Measurements I~ :) I . lr ~. F'RO,JECT NA1'1E RIVER Nl\ME TRANSECT NLl E'l HI HYDROH.EC f'FU PFTFRSF.".N Cf~EU\ Gl~Gf. ::JITE ~10/0:J/85 PT STATION WIOTH <FEFT> <FEET> ::,. 00 0. 00 ., "-:1. 60 0 50 3 6. 00 0. 45 4 6. ~·0 0. 50 5 -, 00 o :'io 6 7. ~,o 0 50 7 EL 00 0. 50 8 B. !10 0 50 9 9 00 0 75 10 10.00 0 73 11 10. !10 0. 7::i 12 11 ::i(l 0 ()() S\JI'1 OF CELL D I SCHAI<GE!:J 7 ';;'7 SW·J DF CFLL AfH AS -· :J 65 MEAN VELOCITY .t. 99 DEPTH <FEET> 0 00 0. 50 0. 50 0 60 0. t,O 0 70 l 00 0. 90 0. f.,O 0. t.O 0. 50 0. 00 CUBIC FT /~:;u: SQUARE FT FT /SEC. Page 1 METER PD.l NT AVERAGE DEPTH VELOCITY VELOCITY AREA DISCHARGE <F"EET> <FT/SEC> <FT/SEC> <SG FT> <CFS> --------------------------------- 0. 60 0. 00 0. 00 0. 00 0 00 0 60 0. 70 0. 70 0.25 0. 18 0 60 180 1. 80 0 23 0. 41 0. 60 2. 40 2. 40 0. 30 0. 72 0 60 3. 40 3. 40 0. 30 1. 02 0. 60 2. 60 2. 60 0. 35 0.91 0. 60 2. 10 2. 10 0. 50 1. 05 0. 60 3. 20 3. 20 0. 45 1 44 0 60 1. /.,() 1. 60 0. 45 0. 72 0 60 1. 60 1. 60 0 45 0. 72 0. 60 0. :JO 0. 30 0. 38 0. 11 0 60 0. 00 000 0.00 0.00 :Ja, {' 1 j ! 1', PRO.JECT NA1'1E : ELIM HYDROELECTRIC P ! I ~I RIVER NAI'1E : PETERSEN CREEK TRANSECT NO. GAGE SITE-06/18/85 j I ; •' PT. STATION WIDTH DEPTH VELOCITY AREA DISCHARGE . ! <FEET> <FEET> <FEET> <FT/SEC) <SG.FT> (CFS> ----------------------------------------- 1 4.00 0.00 0.00 0.00 0.00 0.00 2 4. 50 0. 50 0.20 1. 15 0. 10 0. 11 3 5.00 0. 50 0. 50 1. 30 0.25 0.32 4 5.50 0. 50 0. 50 1. 80 0.25 0.45 5 6.00 0. 50 0.60 2.60 0.30 0. 78 6 6.50 0. 50 0. 50 1. 50 0.25 0.38 7 7.00 0. 50 0. 50 2.90 0.25 0. 73 8 7. 50 0. 50 0. 50 2.90 0.25 0.13 ' '' 9 8.00 0. 50 0. 50 3.40 0.25 0.85 10 B. 50 0. 50 0. 50 2.50 0.25 0.63 11 9.00 0.75 0.60 0.90 0.45 0.41 12 10.00 0.85 0. 50 0. 10 0. 42 0.04 13 10. 70 0. 50 0.30 0. 15 0. 15 0.02 14 11. 00 0.20 0.00 0.00 0.00 0.00 15 11. 10 0.00 0.00 0.00 0.00 0.00 '.". SUM OF CELL DISCHARGES -5.44 CUBIC FT. /SEC. SUM OF CELL AREAS = 3. 17 SGUARE FT. 1'1EAN VELOCITY = 1. 71 FT. /SEC. - 1 I .. I'. I 1 I ~ I ' y) ,)1! r·! . I ;"I r. ~~ ,,, :,I PROJECT NAME RIVER NAME TRANSECT NO. ELIM HYDROELECT PRJ PETERSEN CREEK QAQE SITE-2/20/85 PT. 1 2 3 4 , 6 7 8 STATION <FEET) 1. 50 2.00 3.00 4.00 5.00 6. 50 7. 50 8.00 SUM OF CELL DISCHARGES • SUM OF CELL AREAS • MEAN VELOCITY • WIDTH <FEET) 0.00 0. 75 1. 00 1. 00 1. 2~ 1. 25 0. 75 0.00 0.88 1. 45 0.61 DEPTH <FEET) 0.00 0.20 0.20 0.20 0.30 0.30 0.20 0.00 VELOCITY <FT/SEC) 0.00 0. 15 0.40 0. 50 0. 75 0.90 0.40 0.00 CUBIC FT. /SEC. SQUARE FT. FT. /SEC. r•agt: 1 AREA DISCHARGE (SQ. FT> (CFS) 0. 00 0. 00 0. 15 ---0.-02--- 0.20 0.08 0. 20 0. 10 0. 38 .()... atil-- 0.38 0.34 0. 15 0. 06 0, 00-----------0.-00--- PROJECT NAME RIVER NAME TRANSECT NO. PT. 1 2 3 4 5 6 7 8 9 10 11 12 NOME HYDROELECT PR PETERSEN CREEK GAGE SITE-10/2/84 STATION l.JIDTH <FEET> <FEET) ------·-~M---·-- 7. 50 0. 00 8. 00 0. 50 8 50 0. 50 9. 00 0 50 9. 50 0. 50 10. 00 0 50 10. 50 0. 50 11. 00 0. 50 11. 50 0. 50 12 00 0 50 12. 50 0 50 13 00 0. 00 SUM OF CELL DISCHARGES = 3. 35 SUM OF CELL AREAS = 2. 55 11EAN VELOC I T Y = 1. 31 • Page 1 DEPTH VELOCITY AREA DISCHARGE <FEET> <FT/SEC> <SO. FT> <CFS> ~------·-----··--------------- 0. 00 0. 00 0 00 0.00 0. 25 0 00 0. 12 0.00 0 40 0 15 020 0. 03 0 40 0 40 0 20 0. 08 0. 60 1 60 0 30 0. 48 0.80 2.60 0. 40 1 04 0 80 2 00 0 40 0. 80 0 60 1. 75 0 30 0. 52 0 40 0. 80 0. 20 0. 16 0. 40 0. 40 0. 20 0. 08 0 45 0. 70 0. 22 0. 16 0. 00 0. 00 0. 00 0. 00 CUBIC FT /SEC. SQUARE FT FT /SEC PROJECT NAl'1E RIVER NAME TRANSECT NO. ELIM HYDROELECT ~ROJ PETERSEN CREEK GAGE SlTE-05/31164 PT. STATimJ WIDTH <FEETl <FEET> -----~-..... ----- 1 12. 80 0. 00 2 13. 00 0.35 3 13. 50 0. 50 4 14. 00 0. so 5 14. 50 0. 50 6 15. 00 0. 50 7 15. 50 0. 50 8 16.00 0. 50 9 16. 50 0. 50 10 17.00 0. 50 11 17. 50 0. so 12 18.00 0.00 SUM OF CELL DISCHARGES = 4. 75 SUM OF CELL AREAS = 2. 80 MEAN VELOCITY = 1. 69 Page DEPTH VELOCITY AREA DISCHARGE ( FEETl <FT/SECl <SG. FT> <CFS> _ ........ ___ ----~---·------------------- 0 00 0.00 0.00 0.00 0.30 0. 00 0. 11 0.00 0 50 0. 15 0.25 0.04 0 60 0.85 0.30 025 0. 70 3. 40 0.35 1. 19 0 90 2. 40 0.45 1 08 0 80 2. 10 0. 40 0 84 0. 50 2. 20 0.25 0. 55 0. 50 1. 10 0.25 0 27 0 50 1. 60 0.25 0. 40 0.40 0.60 0.20 0. 12 0 00 0.00 0.00 0 00 CUBIC Fl. /SEC. SQUARE FT. FT iSEC. APPENDIX 8 Printout of Discharge Measurements 2-Hour Staqe Data and Corresponding Discharges I -· PROPOSED ELIM HYDROELECTRIC PROJECT 05i01i85 PAGE 31 PETERSEN CREEK NEAR ELIM, ALASV:A START TIME 10/03i84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS !!ll!:!::::==-=:::= ====== ~=:~:::.: ===:-=====;~ ====== -·~------=:::=:::::::::::::::::: 01/01/85 02:00 0131 06 0. 30 0. 30 0. 90 01/01/85 04:00 082 06 0. 30 0. 30 0. 90 01/01/85 06:00 Ol3:J 06 0.30 0. 30 0. 90 01/01/85 08:00 084 06 0. 30 0. 30 0. 90 01/01/85 10. 00 08!5 Of.J 0.30 0. 30 0.90 011011"85 12:00 086 06 0. 30 0.30 0. 90 01/01185 14: 00 087 06 0. 30 0. 30 0. 90 01/01/85 16:00 088 07 0.35 0.35 1.7 ..• 01101/8!5 18:00 089 06 0.30 0. 30 0. 90 01/0118'5 20:00 090 07 0.35 0 35 1.7 01/01/8~ 22:00 091 06 0. 30 0.:30 0. 90 . 01101/8~ 00: 00 092 06 0.30 0.30 0.90 DAILY AVERAGE VALUES 0.31 0. 31 1.0 01/02/1:'35 02:00 093 07 0.35 0. 35 1.7 01/02/85 04:00 094 06 0. 30 0 30 0. 90 01/02/85 06:00 095 06 0.30 0. 30 0.90 01/02/8~ 08:00 096 06 0.30 0. 30 0.90 01/02/85 10:00 097 06 0. 30 0 30 0.90 01/02/85 12:00 098 06 0. 30 0. 30 0.90 01/02/8~ 14:00 09<;> 06 0.30 0. 30 0.90 01/02/85 16:00 100 06 0.30 0. 30 0.90 01/02185 19: 00 lOt 06 0.30 0. 30 0. 90 011'02/8!5 20:00 102 Ot.J 0.30 0. 30 0.90 01/02/95 22:00 103 06 0.30 0. 30 0 90 01102/85 00: 00 104 06 0.30 0. 30 0.90 DAILY AVERAGE VALUES 0. 30 0. 30 1.0 01/03/85 02:00 105 06 0. 30 0.30 0. 90 01/03/85 04:00 106 06 0.30 0. 30 0.90 01/03/85 06:00 107 06 0. 30 0.30 0. 90 01/03/85 08:00 108 06 0.30 0. 30 0.90 '01/03/85 10: 00 109 06 0. 30 0. 30 0. 90 01/03/85 12:00 110 06 0. 30 0. 30 0. 90 01/03/85 14:00 1i1 06 0. 30 0. ~'30 0. 90 01/03/85 16:00 112 06 0. 30 0 30 0.90 01/03/85 18:00 113 06 0. 30 0.30 0.90 01103/85 20: 00 114 06 0. 30 0.30 0.90 01/03/85 22:00 115 06 0.30 0. 30 0. 90 01/03/85 00:00 1.1.6 Ob 0. 30 0. 30 0.90 DAILY AVERAGE VALUES 0. 30 0. 30 0. 90 ( ]I ii~ PROPOSED ELIH HYDROELECTRIC PROJECT 05/01/85 PAGE 32 PETERSEN CREEK NEAR EL[M, ALAS !A. A START TIME 10/03/84 02:00 I, i DEPTH STAGE DISCHG DATE TIME BYTE RAW DArA FEET FEET CFS =:e====:::= ===== ~=:-=::-:"! ====:::::::::...:::::. .. ======= -=:t:::::r.'== ===::::== 01/04/85 02:00 117 06 0.30 0. 30 0. 90 01/04/85 04:00 118 06 0.30 0. 30 0.90 01/04/85 06:00 ti9 06 0. 30 0.30 0.90 01/04/85 08·00 1 ~=w 06 0. 30 0. 30 0.90 01/04/85 10:00 1 1. 06 0. 30 0. 30 0. 90 01/04/85 12:00 12;~ Oto 0.30 0. 30 0. 90 01/04/85 14:00 L28 06 0.30 0.30 0. 90 01/04/85 16:00 12 1+ 06 0.30 0. 30 0. 90 01/04/85 18:00 <::)<; ( .. .., .... 06 0. 30 0. ;'30 0.90 01/04/85 20:00 t;,>l') 06 0. 30 0. 30 0. 90 01/04/8'5 22:00 i:J7 Ol.o 0.30 0. 30 0. 90 0:1./04/85 00: 00 128 Oo 0.30 0. 30 0.90 DAILY AVERAGE VALUES 0. 30 0. 30 0. 90 01/05/85 02:00 129 06 0. 30 0. 30 0. 90 01/05/85 04:00 DO 06 0.30 0. 30 0.90 01/05/85 06:00 Ul 06 0. 30 0. 30 0. 90 01/05/85 08:00 1:12 06 0. 30 0. 30 0.90 01/05/85 10:00 1:-33 06 0. 30 0 30 0.90 01/05/85 12:00 lJ·1-06 0. 30 0 30 0.90 01/05/85 14•00 1'35 06 0 30 0. 30 0.90 01/05/85 16•00 1 :]f., 06 0. 30 0. :'30 0. 90 01/05/85 18:00 1:37 06 0. 30 0. 30 0.90 01/05/85 20:00 t:3~1 06 0. 30 0.30 0.90 01/05/85 22.00 134' 06 0.30 0. 30 0.90 01/05/85 00:00 140 06 0.30 0.30 0. 90 DAILY AVERAGE VALUES 0. 30 0 30 0. 90 01/06/85 02:00 14i. 06 0. 30 0 30 0. 90 01/06/85 04:00 142 06 0.30 0.30 0 90 01/06/85 06:00 143 06 0. 30 030 0.90 01/06/85 08:00 144 01~1 0.30 0. ::30 0. 90 01/06/8'5 10:00 14:7 06 0.30 0.:30 0. 90 01106/85 12: 00 146 Ot-> 0. 30 (j 30 ' 0. 90 01/06/85 14:00 147 06 0.30 0. 30 0. 90 01/06/85 16.00 148 Ob 0.30 0 30 0. 90 01106/85 18: 00 149 06 0. 30 0.30 0. 90 01/06/85 20:00 150 06 0. 30 0.30 0.90 01/06/85 22:00 15t 06 0.30 0 30 0. 90 01/06/85 00:00 1%' 06 0.30 0 30 0.90 DAILY hVERAGE VALUES 0. 30 0. 30 0. 90 ~ I • l i I ; • • • I • I • • t j i i I j t l t , • j I ,:, l I l .. • • f I r. j' f ,: I il PROPOSED ELIM HYDROELECTRIC PROJECT 0'5/01/85 PAGE 33 . I i PETERSEN CREEK NEAR ELIM. ALASh!\ START TIME 10/03/84 02:00 j:! ..-;! DEPTH ·;TAGE DISCHG ' I DATE TIME BY lT RAW DAT t> FEET FEET CFI3 t· i ·I ========-= ===== ==·~.:: :==:=::::.:::::=..":-::::-:.":.:·.--: ====== ,._ ·--~·--::::::=::.:--:== i ·~ \ 01107/85 02:00 i 5::! 06 0. 30 0. 30 0.90 ol 01/07/85 04:00 1 54 06 0. 30 0. 30 0.90 l 01107/85 06: 00 1 t:; ~:; 06 0. 30 0. '30 0. 90 01/07/f-]5 08:00 1. C)6 07 0.35 0. 35 1. 7 01/07/85 10:00 1 :_::,; 06 0. 30 0. 30 0. 90 01/07/85 12:00 158 06 0.30 0. 30 0.90 '] 01107/85 14: 00 1.59 06 0. 30 0. 30 0.90 ·! 01/07/85 16:00 160 06 0. 30 0. 30 0. 90 /i 01/07/85 18:00 1fJ i_ 06 0. 30 030 0. 90 'i 01107/85 20:00 l-':>2 06 0. 30 0. 30 0.90 '~'I 01/07/85 22:00 l t:.:::1 0(, 0.30 0. 30 0 90 ! ----01/07/85 00:00 164 06 0. 30 0. 30 0. 90 L. ... DAILY AVERAGE V~_UES I 0. 30 0. 30 1.0 , I i''l 01/08/85 02:00 11)5 06 0. 30 0. 30 0. 90 !-I 01/08/8'5 04:00 11-:J.:, 06 0.30 0. 30 0.90 I 01108/85 06: 00 v,:--06 0. 30 0. 30 0. 90 ')•, i I-01/08/85 08:00 160 06 0. 30 0. 30 0.90 tJ'·' ,. 01/08/85 10:00 i -:'oQ 06 0. 30 0. 30 0. 90 ·''I [' 01/08/85 12:00 1.70 06 0. 30 0. 30 0.90 ,,,J 01/08/85 14:00 171 06 0. 30 0. 30 0.90 b~ 01/08/8'5 16:00 1 '"':2 o~~ .. 0. 30 0. 30 0.90 I. 01/08/85 18:00 1 : ~~ 06 0. 30 0 30 0. 90 I 01/08/85 20:00 174 0. 30 ~ I I 06 0. 30 0.90 [, ! 01/08/85 22:00 1 75 06 0. 30 0. :30 0.90 l::l 01/08/85 00:00 1 7 6 06 0.30 0. 30 0. 90 DAILY AVERAGE VALUES 0 30 0. 30 0. 90 I .. j I ' 01/09/85 02:00 177 01.:> 0. 30 0.:30 0.90 1''1 01109/8., 04: 00 1/'f3 06 0. 30 0. 30 0. 90 I' i '"I 01/09/85 06:00 17L; Oh 0. 30 0. 30 0.90 ~,1 01/09/85 08:00 l f;lf) 06 0.30 0.:30 0. 90 "I 01109/8~ 10: 00 j 81 06 0.30 0 30 0.90 'l 01/09/85 12:00 t E~·2 06 0. 30 0.30 0. 90 01109/SS 14: 00 1. F]:J 06 0.30 0. 30 0. 90 .. 01/09/85 16:00 184 06 0.30 0.30 0 90 " 01/09/8'5 18:00 185 06 0. 30 0. 30 0.90 01/09/8'5 20:00 106 06 0. 30 0. 30 0. 90 01/09/8'3 22:00 1B7 06 0. 30 0 30 0.90 01109/85 00: 00 1 9~3 06 0. 30 0. '30 0.90 ~~ DAILY AVERAGE VALVES 0. 30 0 30 0.90 ' ) 1':1 ; ]1 ' l j * ; ~ j I j i ; I ' J I I & J • I ' " ' .. i I PROPOSED ELIM HYDROELECTRIC PROJECT 05/01/85 PAGE 34 PETERSEN CREEK NEAR ELIM. ALAS!>:~, START TIME 10/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATt• FEET ~EET CFS ======== ===== ==~= ===-:=:==-===-"':":: :=:===== ===== ====== 01/10/85 02:00 1 f39 06 0. 30 0. 30 0.90 01/10/85 04:00 t•iO 06 0. 30 0.30 0. 90 01/10/85 06:00 191 o~, 0.30 0. 30 0. 90 01/10185 o8·oo 192 06 0. 30 0. 30 0. 90 01/10/8'5 10:00 193 06 0.30 0. 30 0. 90 01/10/85 12:00 194 06 0. 30 0.30 0. 90 01/10/85 14:00 1.95 06 0. 30 0.30 0.90 01/10/85 16:00 196 06 0. 30 0.30 0.90 01/10/85 18:00 1 Q'~ 06 0. 30 0.30 090 01/10/85 20:00 198 06 0. 30 0. 30 0.90 01/10/85 22:00 1 a~, 06 0. 30 0. 30 0. 90 ·01/10/85 00:00 200 06 0. 30 0. 30 0. 90 DArLY AVERAGE VALUES 0.30 0.30 0.90 01/11/85 02:00 201 06 0.30 0. 30 0. 90 01/11/85 04:00 20~2 06 0 .. 30 0. 30 0.90 01/11/85 06:00 203 06 0.30 0. 30 0.90 01/11/85 08: 00 2()4 06 0. 30 0. 30 0.90 01/11/85 10:00 205 06 0.30 0.30 0.90 01/11/85 12: 00 2\}6~ 06 0. 30 0.30 0.90 01/11/85 14·00 20'l 01:, 0. 30 0.30 0.90 01/11/85 16:00 208 06 0.30 0. 30 0. 90 01/11/85 18:00 2C•tf 06 0.30 0.30 0. 90 ---·'(}1/11/85 20:00 210 06 0. 30 0. 30 0. 90 01/11/85 22:00 211 06 0. 30 0. 30 0. 90 01/11/85 00:00 2l.2 06 0. 30 0.30 0.90 DAILY AVERAGE VALUES 0. 30 0.:30 0.90 02:00 21:3 06 0. 30 0. 30 0.90 04:00 214 06 0. 30 0. 30 0. 90 01/12/85 06:00 215 06 0.30 0. 30 0. 90 01112/85 08: 00 216 06 0. 30 0.30 0. 90 01/12/85 10:00 2f7 06 0. 30 0. 30 0.90 01/12/85 12:00 218 06 0.30 0. 30 0. 90 01/12/85 14:00 21q 06 0 30 0. 30 0.90 -·01/12185 16: 00 220 06 0. 30 0. 30 0.90 01/12/BS 18:00 221 06 0. 30 0.30 0.90 01/12/85 20:00 J-\,...., ... ., "'"'"' 06 0.30 0.30 0.90 01/12/85 22:00 2'"'\''J ,:,_,.,..~ 06 0. 30 0. 30 0.90 01/12/85 00:00 22.1 06 0.30 0.30 0.90 DAILY AVERAGE VALUES 0.30 0. 30 0. 90 I ' I I • I ' I i • j ' I ! i J I I t I t J I ' I i i .. l ii I ( J I PROPOSED ELIM HYDROELECTRIC PRO.~CT 05/01/85 PAGE 36 PETERSEN CREEK NEAR ELIM, ALAS!'; A START TIME 10/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BY IE RAW DA Tl1 FEET FEET CFS ·-=:==:==== ===== ==·-=:-: =====~~,~~~ ====== :::==== ====== 01/16/85 02:00 261 06 0. 30 0. 30 0.90 01/16/85 04:00 21.>2 06 0.30 0. 30 0.90 01/16/85 06:00 26:~~ 06 0. 30 0. 30 0.90 01/16/85 08:00 264 06 0. 30 0. 30 0. 90 01/16/8'5 10:00 265 06 0.30 0.30 0.90 01/16/85 12:00 266 06 0.30 0. 30 0.90 01/16/85 14:00 267 06 0. 30 0.30 0. 90 01116/85 16: 00 268 06 0.30 0.30 0.90 01116/85 18:00 269 06 0. 30 0. 30 0. 90 01/16/85 20:00 270 06 0. 30 0. 30 0.90 01/16/85 22:00 271. 06 0.30 0. 30 0. 90 01/16/85 00:00 272 06 0.30 0. 30 0. 90 DAILY AVERAGE VM_UES 0. 30 0. 30 0. 90 01117/85 02: 00 27:3 06 0.30 0. 30 0. 90 01117/85 04:00 27'"-06 0.30 0. 30 0.90 i -~ ~' 01/17/85 06:00 275 06 0.30 0 30 0.90 !}'. 01/17/85 08:00 2"16 06 0. 30 0. 30 0.90 I i 01117/85 10:00 2~"· 06 0. 30 0. 30 0. 90 i"'"·' I ' i I .... , 01/17/85 12:00 27Fl 06 0. 30 0. 30 0.90 r,~ 01117/85 14:00 27!:;> 01" 0. 30 0. 30 0. 90 ~" ,! 01/17/85 16:00 2~30 06 0. 30 0. 30 0. 90 : I ~11i 01/17/85 18:00 28t 06 0. 30 0 30 0. 90 :'\' ' 01/17/85 20:00 282 06 0.30 0. 30 0.90 I. 01/17/85 22:00 283 06 0.30 0 30 0.90 01/17/85 00:00 284 06 0. 30 0. 30 0.90 DAILY AVERAGE V~_UES 0.30 0 30 0.90 01/18/85 02:00 28~· 06 0.30 0. 30 0.90 01/18/85 04:00 286 06 0.30 0. 30 0.90 01118/85 06:00 287 06 0. 30 0. 30 0.90 01/18/85 08:00 288 Ol:~ 0. 30 0. 30 0. 90 01/18/85 10:00 209 06 0.30 0. :30 0.90 01/18/85 12:00 290 06 0.30 0. 30 0.90 01/18/85 14:00 291. 06 0. 30 0. 30 0.90 01/18/85 16:00 292 Oo 0. 30 0. 30 0.90 01/18/85 18:00 293 06 0. 30 0. 30 0.90 01/18/85 20:00 294 06 0. 30 0 30 0.90 01/18/85 22:00 295 06 0. 30 0. 30 0. 90 01/18/85 00:00 296 OcS 0. 30 IJ. 30 0. 90 DAILV /~VERAGE VALUES 0.30 0 30 0.90 \ l, l I l • • J l I i i I i l I l J l j t j t J I a l i l j i , PROPOSED ELIM HYDROELECTRIC PROJECT 05t01/85 PAGE 37 PETERSEN CREEK NEAR ELIM. ALASKA START TIME 10/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYrE RAW DATA FEET FEET CFS !l!f5":!:!::=:==: ===== ==~.-~'!":': =====·=:::::::.::--: ====== ::::::=:== ===::::.::::: 01/19/85 02:00 297 06 0.30 0.30 0.90 01/19/85 04:00 298 06 0. 30 0.30 0. 90 01/19/85 06:00 299 06 0. 30 0.30 0. 90 01/19/85 08:00 300 06 0. 30 0.30 0.90 1 01/19/85 10:00 301 06 0.30 0.'30 0.90 11------'01/19/8~ 12:00 302 06 0. 30 0. 30 0. 90 itA 01/19/85 14:00 303 06 0.30 0.30 0.90 I "· 01/19/85 16:00 304 06 0.30 0.30 0.90 If\__ 01/19/85 18: 00 305 06 0. 30 0. 30 0. 90 ~J, 01/19/85 20:00 306 06 0. 30 0.30 0.90 IIA 01/19/85 22:00 307 06 0. 30 0. 30 0. 90 ' -----ol/19/85 00:00 308 06 0. 30 0. 30 0. 90 ~~'~ DAILY INERAGE VALUES o. 30 o. 30 o. 90 f. 01/20/85 02:00 309 06 0.30 0. 30 0. 90 t·~r 01/20/85 04:00 310 06 0. 30 0. 30 0.90 A 01/20/85 06: 00 311 06 0. 30 0 30 0. 90 '-.. ---01120/8, 08: 00 312 06 0. 30 0. 30 0. 90 b,l 01/20/85 10: 00 31:3 06 0. 30 0. 30 0. 90 s,f o112018s 12: oo 314 o6 o. 30 o. 3o o. 90 ~1 01/20/85 14:00 315 06 0.30 0. 30 0.90 • 01/20/85 16:00 316 06 0.30 0. 30 0.90 01/20/85 18:00 317 06 0. 30 0. 30 0.90 ,, --01120/85 20:00 318 06 0. 30 0. 30 0. 90 ·~ 01/20/85 22:00 319 06 0.30 0.30 0. 90 1~ 01/20/85 00:00 320 06 0.30 0. 30 0. 90 :~ DAILY AVERAGE VALUES 0. 30 0. 30 0. 90 01/21/85 02:00 321 06 0. 30 0. 30 0. 90 ~~-----ot /21185 04: 00 322 06 0. 30 0. 30 0. 90 -' 01/21/85 06: 00 3;:3 06 0. 30 0. 30 0. 90 t, 01/21/85 08~00 3~~ 06 0. 30 0 ?O ?·9~ "I 01/21/85 10.00 3~5 06 0.30 o. 30 u.9u " 01/21/85 12: 00 326 06 0. 30 0. 30 0. 90 01/21/85 14:00 327 06 0.30 0.30 0.90 .. , -01/21/85 16: 00 328 06 0. 30 0. 30 0. 90 01/21/85 18:00 329 06 0. 30 0.30 0.90 01/21/85 20:00 330 06 0.30 0.30 0.90 01/21/85 22:00 331 06 0.30 0.30 0.90 01/21/85 00:00 332 06 0. 30 0. 30 0.90 :J DAILY AVERAGE VAL.UES 0. 30 0 30 0 90 ~r 1~1 \ l .. 2 ---~ . j , I I • j ' j ' j I ' l J l l . I I ; l j ( j i j • • l ~ i I ll • I f l PROPOSED ELI M HVDROEt.ECTR I C PRO .. .iEC T 05i01/85 PAGE 38 PETERSEN CREEK NEAR ELIM, ALA9< .• ~ START TIME 10/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS -======== ====== ===== =:::!=====~:::: ::n:o:==== -===== =====:= 01/22/85 02:00 33~J 06 0.30 0. 30 0. 90 01/22/85 04:00 334 06 0.30 0. 30 0.90 01/22/85 06:00 335 06 0.30 0. 30 0.90 01/22/85 08:00 3-36 06 0. 30 0. 30 0. 90 01/22/85 10:00 3:37 06 0. 30 0. 30 0.90 01/22/85 12:00 3:38 06 0. 30 0. 30 0.90 01/22/85 14:00 3:39 06 0. 30 0. 30 0. 90 01/22/85 16:00 340 06 0. 30 0. 30 0.90 01/22/85 18:00 341 06 0. 30 0. 30 0. 90 01/22/85 20:00 342 06 0. 30 0.30 0.90 01/22/85 22: 00 343 06 0. 30 0. 30 0. 90 01/22/85 00:00 344 06 0.30 0.30 0. 90 DAILY AVERAGE VALUES 0.30 0. 30 0. 90 01/23/85 02:00 345 06 0. 30 0. 30 0.90 01/23/85 04:00 346 06 0.30 0. 30 0.90 01/23/85 06:00 347 06 0.30 0.30 0. 90 . '01/23/85 08: 00 348 06 0. 30 0 30 0.90 01/23/85 10:00 349 06 0.30 0. 30 0.90 01/23/85 12:00 350 06 0. 30 0.30 0.90 01/23/85 14:00 351. 06 0.30 0.30 0. 90 01 /·23/85 16: 00 352 06 0.30 0. 30 0. 90 01/23/85 18:00 35:3 06 0. 30 0. 30 0.90 ·-.... 01/23/85 20: 00 354 01.:> 0. 30 0. ::30 0.90 01/23/85 22:00 355 06 0. 30 0. 30 0.90 01/23/85 00:00 356 06 0. 30 0.30 0.90 DAILY AVERAGE VALUES 0. 30 0. 30 0.90 01/24/85 02:00 357 06 0.30 0. 30 0.90 -()1/24/85 04: 00 358 06 0.30 0.30 0.90 01/24/85 06:00 359 06 0.30 0. 30 0.90 01/24/85 08:00 360 06 0.30 0. 30 0.90 01/24/85 10: 00 361 06 0. 30 0. 30 0. 90 01/24/85 12: 00 362 06 0.30 0. 30 0.90 01/24/85 14:00 36:3 06 0.30 0.30 0.90 01/24/85 16:00 364-06 0. 30 0.30 0. 90 01/24/85 18:00 365 06 0.30 0.30 0. 90 01/24/85 20:00 366 06 0.30 0. 30 0. 90 01/24/8~ 22:00 367 06 0. 30 0. 30 0.90 01/24/85 00:00 368 06 0.30 0.30 0.90 DAlLY AVERAGE VALUES 0.30 0.30 0. 90 ~. I j I • ' J I j i i il • I I j i ' ( I ' , ' I • • t l • j I ( 11 I PROPOSED ELIM HYDROELECTRIC PROJECT 05/01185 PAGE 39 PETERSEN CREEK NEAR ELIM, ALAS!f,~, START TIME 10/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW OAT,-, FEET FEET CFS =e======= ===== ==:.:::::= ===:::=~:::~.:::::.:: ====== ===== ___ .,. ___ ---·--·- 01/25/85 02:00 369 06 0.30 0. 30 0 90 01/25/85 04: 00 370 06 0.30 0. 30 0. 90 01/25/85 06:00 371 Ob 0. 30 0. 30 0.90 01/25/85 08:00 372 06 0. 30 0. 30 0.90 01/25/85 10:00 37:~ 06 0.30 0 30 0.90 ·o1t25!85 12: oo 374 06 0.30 0. 30 0. 90 01/25/85 14:00 375 o~, 0.30 0.30 0. 90 01/25/85 16·00 376 06 0.30 0. 30 0.90 01/25/85 18:00 ~ .... _. -t ,' 06 0.30 0. 30 0.90 01/25/85 20:00 378 06 0.30 0.30 0.90 01/25/85 22:00 379 OIJ 0.30 0. 30 0.90 01/25/8~ 00:00 3~30 06 0.30 0. 30 0.90 DAILY AVERAGE VALUES 0. 30 0. 30 0.90 01/26/85 02:00 38t 06 0.30 0. 30 0. 90 01/26/85 04:00 38~-~ 06 0.30 0.30 0. 90 01/26/85 06:00 3f3::.~ 06 0.30 0. 30 0.90 01126/85 08:00 384 06 0.30 0.30 0.90 01/26/85 10:00 385 06 0.30 0. 30 0.90 01/26/85 12:00 386 06 0.30 0.30 0.90 01/26/85 14:00 387 Of.> 0. 30 0. 30 0.90 01/26/85 16:00 388 06 0. 30 0.:30 0.90 01/26/85 18:00 3i39 06 0. 30 0.30 0.90 126/SS 20:00 390 06 0.30 0 30 0. 90 01/26/85 22:00 391 06 0. 30 0. 30 0.90 01/26/85 00:00 392 06 0.30 0. 30 0. 90 DAILY AVERAGE VALUES 0. 30 0.30 0. 90 01/27/85 02:00 3\?.3 06 0. 30 0.30 0.90 -ot/27185 o4: oo 394 06 0. 30 0. 30 0.90 01/27/85 06:00 395 06 0. 30 0. 30 0.90 01/27/85 08:00 396 06 0.30 0. 30 0.90 01/27/85 10:00 397 06 0.30 0. 30 0.90 01/27185 12:00 398 06 0. 30 0. 30 0.90 01.12718'5 14:00 :399 01.., 0.30 0. 30 0. 90 01/27/85 16:00 400 06 0. 30 0. 30 0. 90 01/27/85 18: 00 401 01.:> 0.30 0. 30 0. 90 01/27/85 20:00 402 06 0.30 0.30 0.90 01/27185 22:00 403 Ob 0.30 0.30 0.90 01/27/85 00:00 40·1-06 0.30 030 0.90 DAILY AVERAGE VN_UES 0. 30 0. 30 0. 90 . .. ~ } ' i ' • j ' ' l ' l .. l j • ' ' j i ' • ' • i j i .) I t; . I PROPOSED ELIM HYDROELECTRIC PRO-JECT 03101/85 PAGE 40 ( II~! PETERSEN CREEK NEAR EL.IM, ALAE!-(A START TIME 10/03/84 02:00 .I· DEPTH STAGE DISGHG DATE TIME BYTE RAW DAU• FEET FEET CFS ao:a~s::tt::tDs:: :::u:==== ::=."':':"':':: ~=======::!!'!... ====== ::::::::::.:::== ====:::::= 01/28/85 02:00 405 06 0.30 0.30 0.90 01/28/85 04•00 40fr 06 0.30 0. 30 0. 90 01/28/85 06:00 4!)7 06 0.30 0. 30 0. 90 01/28/85 08:00 408 06 0.30 0.30 0.90 01/28/85 10:00 409 06 0. 30 0.30 0.90 01/28/85 12:00 4i0 06 0. 30 0. 30 0. 90 01/28/85 14:00 411 06 0.30 0.30 0.90 01/28/85 16:00 41::~ 06 0. 30 0. 30 0.90 01/28/85 18: 00 413 06 0. 30 0. 30 0. 90 01/28/85 20:00 414 06 0. 30 0. 30 0. 90 01/28/85 22:00 415 06 0. 30 0. 30 0. 90 01/28/85 00:00 416 06 0.30 0. 30 0.90 DA!U' ,IWERA(fE VALUES 0.30 0.30 0.90 01/29/85 02:00 417 0~) 0. 30 0. 30 0. 90 01/29tss o4·oo 41.8 06 0.30 030 0. 90 01129/85 06·00 41.9 06 0.30 0 30 0. 90 01/29/85 08:00 420 06 0.30 0. 30 0.90 01/29/85 10:00 421 06 0.30 0.30 0.90 01/29/85 12:00 422 06 0. 30 0. 30 0. 90 01/29/85 14:00 42.3 Of.-, 0.30 0. 30 0. 90 01/29/85 16:00 424 06 0.30 0. 30 0. 90 01/29/85 18:00 425 06 0.30 0.30 0. 90 i>t/2fit'/S!5 20:00 4;2e, 06 0.30 0.30 0. 90 01/29/85 22:00 427 06 0.30 0.30 0.90 01/29/85 00:00 428 06 0. 30 0. 30 0.90 DAILY 4VERAGE VALUES 0. 30 0.30 0.90 01/30/85 02:00 42~' 06 0.30 0 30 0.90 01/30/85 04:00 4:30 06 0.30 0. 30 0. 90 01/30/85 06:00 431. 06 0.30 0. 30 0.90 01/30/85 08:00 4'"'"' ..:lr.:. 06 0.30 0. 30 0.90 01/30/85 10:00 433 06 0. 30 0. 30 0. 90 01130/85 12: 00 434 06 0.30 0.30 0.90 01/30/85 14:00 4'1<; 06 0.30 0. 30 0.90 01/30/85 16:00 4'36 06 0.30 0. 30 0. 90 01/30/85 18:00 437 06 0.30 0. 30 0.90 01/30/85 20:00 438 06 0.30 0. 30' 0.90 01/30/8'5 22:00 43'? 06 0.30 0. 30 0. 90 01/30/8'5 00:00 440 06 0. 30 0. 30 0. 90 DAILY AVERAGE VALUES 0.30 0.30 0.90 t ' I J ' j t i I j • i I j I j I t t j I • I • I j l I I i l. l t ! f -~ PROPOSED ELIM HYDROELECTRIC PROJECT 05/01/85 PAGE 41 PETERSEN CREEK NEAR ELIH, AL.ASII,A START TIME 10/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ifi:i:i:i===== ===== ==::-:::= =======~:== ====== .:::==== ====== 01/31/85 02:00 441 06 0.30 0.30 0.90 01/31/85 04:00 44;;: Oi:J 0. 30 0 30 0.90 01/31/85 06:00 443 Ob 0.30 0. 30 0.90 01/31/85 08:00 444 Ot. 0.30 0.30 0.90 01/31/85 10: 00 445 Qt. 0.30 0. 30 0.90 01131/85 12:00 446 01::. 0.30 0. 30 0.90 01/31/85 14:00 447 06 0.30 0 30 0. 90 01/31/85 16:00 448 06 0.30 0.30 0.90 01/31/85 18:00 449 06 0.30 0.30 0.90 01/31/85 20:00 450 06 0. 30 0. 30 0.90 01/31/85 22:00 451 06 0.30 0. 30 0.90 01131/85 00:00 452 0!:> 0.30 0.30 0.90 DAILY AVERAGE 'JAL.UES 0.30 0. 30 0.90 02/01/85 02:00 453 06 0.30 0. 30 0. 90 02/01/85 04:00 454 06 0.30 0.30 0.90 02/01/85 06:00 q<;c; •''"'' 06 0.30 0.30 0.90 02/01/85 08:00 456 06 0. 30 0. 30 0.90 02/01/85 10:00 457 06 0.30 0. 30 0.90 02/01/85 12:00 458 06 0.30 0. 30 0. 90 02101/85 14:00 459 06 0.30 0. 30 0.90 02/01/85 16:00 460 06 0.30 0. 30 0.90 02/01/85 18:00 461 06 0. 30 0.30 0. 90 02/01/85 20:00 462 06 0. 30 0. 30 0. 90 02/01/85 22:00 463 06 0.30 0.30 0.90 02/01/85 00:00 464 06 0.30 0.30 0. 90 DAILY I'...VERAGE VALUES 0.30 0. 30 0.90 02/02/85 02:00 465 06 0.30 0.30 0. 90 02/02/8~ 04:00 466 06 0.30 0. 30 0.90 02/02/85 06:00 467 06 0.30 0. 30 0.90 02/02/85 08:00 468 06 0. 30 0.30 0. 90 02/02/85 10:00 4~,.:;' 01., 0.30 0. 30 0. 90 02/02/8'5 12:00 4 7(1 06 0.30 0.30 0. 90 02/02/85 14:00 471 06 0. 30 0. 30 0. 90 02/02/85 16:00 472 06 0.30 0. 30 0. 90 02/02/85 18:00 47,3 06 0.30 0.30 0.90 02/02/85 20:00 474 06 0.30 0.30 0.90 02/02/85 22:00 475 06 0.30 0. 30 0.90 02/02/85 00:00 47b 06 0. 30 0.30 0.90 DAILV 4VERAGE VALUES 0.30 0. 30 0.90 . ' l & j ' I I t l ! l i. ' I t l l j l l • i d ' ' ' ~ t):r -----PROPOSED ELIM HYDROELECTRIC PROJECT 05;01/85 PAGE 42 PETERSEN CREEK NEAR ELIM. ALASf'~A START TIME 10/03/84 02:00 1.1----- DEPTH :3TAGE DISCH1i DATE TIME B'r'TE RAW DATA FEET FEET CFS ..-.:r====== ====== ===::: ====:===-::::::::: ====== ==::=cu:r. =====-= I a I 02/03/85 02:00 477 06 0.30 0.30 0.90 02/03/85 04:00 478 06 0. 30 0. 30 0.90 ~~1-02/03/~35 06: 00 479 06 0. 30 0. 30 0. 90 11 02/03/85 08:00 480 06 0. 30 0. 30 0. 90 02/03/85 10:00 481 06 0. 30 0. 30 0.90 13 --02/Q3/85 12:00 482 06 0. 30 0. 30 0. 90 ,. 02/03/85 14:00 483 06 0.30 0.30 0.90 l. 02/03/85 16:00 484 06 0. 30 0. 30 0. 90 -~-· ~ . 02/03/85 18:00 485 Of.> 0. 30 0. 30 0.90 16 17 02/03/85 20:00 486 06 0. 30 0.30 0.90 lA 02/03/85 22: 00 487 06 0. 30 0.30 0.90 ~· · -02/03/85 OOo 00 488 06 0. 30 030 0.90 DAILY AVERAGE VALUES 0.30 0.30 0.90 )I ~: 02/04/85 02:00 489 06 0. 30 0. 30 0.90 02/04/85 04:00 490 06 0. 30 0. 30 0.90 02/04/85 06:00 491 06 0. 30 0. 30 0.90 ~:-02/04/85 08:00 492 06 0.30 0. 30 0.90 I 02/04/85 10:00 493 06 0.30 0.30 0.90 bt~~ 02/04/85 12:00 494 06 0.30 0. 30 0.90 02/04/85 14:00 49'j OtJ 0. 30 0. 30 0. 90 02/04/85 16:00 496 06 0. 30 0. 30 0.90 02/04/85 18:00 497 06 0.30 0. 30 0. 90 --·-"()2/Q4/85 20: 00 498 06 0.30 0. 30 0.90 02/04/85 22:00 499 06 0. 30 0. 30 0.90 111 02/04/85 00:00 500 06 0.30 0. 30 0.90 i· DAILY AVERAGE VALUES 0. 30 0. 30 0.90 JJ 6~ 02/05/85 02:00 501 06 0. 30 0. 30 0.90 r ~~-02/05/85 04o 00 502 06 0. 30 0. 30 0. 90 -0 02/05/85 06: 00 503 06 0. 30 0. 30 0.90 i 02/05/85 08:00 504 06 0. 30 0. 30 0.90 0 02/05/85 10:00 505 06 0. 30 0. 30 0.90 "~ 02/05/85 12o 00 506 06 0. 30 0. 30 0.90 2 02/05/85 14:00 507 06 0. 30 0. 30 0. 90 ·-·02/05/85 16: 00 508 06 0. 30 0. 30 0. 90 02/05/85 18:00 509 06 0.30 0. '30 0.90 " 02/05/85 20:00 510 06 0. 30 0. 30 0.90 02/05/85 22:00 511 06 0. 30 0. :30 0. 90 02/05/85 00:00 51.::: 06 0.30 0. 30 0. 90 DAILY AVERAGE VALUES 0. 30 0.30 0. 90 J--- L ~11 S1 • L i i • j I • ' j I j i I ' ' ~ j I l i: Ill ~ • ' i I j I j I ' • I • • l ' ' '· j ~ ~ I i r--· ..... PROPOSED ELIM HYDROELECTRIC PRO-JECT 0:5.· 01/85 PAGE 43 7 PETERSEN CREEK NEAR ELIM, ALASKA START TIME 10/03/84 02:00 :I DEPTH STAGE DISCHG DATE TIME BYTE RAW DATI\ FEET FEET CFS "l!ilf:::i:=::::::::== ===== ===== =====:==:-.:;:: ====== ::::==== ---------·--- 02/06/85 02:00 513 06 0. 30 0. 30 0. 90 02/06/85 04:00 5i4 06 0.30 0. 30 0. 90 ·~ 02/06!05 06,00 515 06 0. 30 0. 30 0.90 11 02/06/85 08:00 516 06 0. 30 0.30 0.90 ,, 02/06/85 10: 00 517 06 0. 30 0. 30 0. 90 ,·--·--02/06/85 12:00 518 06 0. 30 0. 30 0. 90 " 02/06/85 14:00 519 06 0. 30 0.30 0.90 ,., 02/06/85 16:00 5 ;.~o 06 0. 30 0.:30 0. 90 I" -... 02/06/85 18:00 5,'21. 06 0. 30 0. 30 0.90 02/06/85 20:00 522 06 0. 30 0. 30 0.90 1::1-02/06/85 22:00 523 06 0.30 0. 30 0. 90 02/06/85 00:00 524 01:> 0. 30 0. 30 0.90 DAILY AVERAGE VALUES 0. 30 0. 30 0.90 02/07/85 02:00 525 06 0. 30 0. 30 0. 90 02/07/85 04:00 S;-=!6 06 0. 30 0 30 0. 90 02/07/85 06:00 527 06 0.30 0.30 0. 90 ·---·-02/07/S~ 08: 00 ~28 06 0.30 0.30 0.90 02/07/85 10:00 529 06 0. 30 0.30 0. 90 02/07/85 12:00 530 06 0.30 0. 30 0.90 02/07/85 14:00 531 06 0.30 0. 30 0.90 02/07/85 16:00 53;?. 06 0. 30 0. 30 0.90 02/07/85 18:00 533 06 0. 30 0.30 0. 90 311·----02707/85 20:00 534 06 0.30 0. 30 0.90 02/07/85 22:00 535 06 0. 30 0. 30 0. 90 ~l--· 02/07/85 00:00 536 06 0.30 0. 30 0. 90 DAILY AVERAGE VALUES 0. 30 0. 30 0.90 ~1. 02/08/85 02:00 537 06 0.30 0. 30 0. 90 -()2/08/85 04:00 538 06 0.30 0. 30 0.90 "j 02/08/85 06:00 5~jc;• 06 0. 30 0. 30 0.90 1C 02/08/85 08:00 540 06 0. 30 0. 30 0.90 02/08/8'5 10:00 541 06 0.30 0. 30 0. 90 "I 02/08/85 12:00 542 06 0. 30 0. 30 0. 90 02/08/85 14:00 543 06 0. 30 0. 30 0.90 02/08/85 16:00 544 06 0.30 0.30 0. 90 02/08/85 18:00 545 06 0.30 0. 30 0.90 02/08/85 20:00 546 06 0.30 0. 30 0.90 02/08/85 22:00 51~? 06 0.30 0 30 0.90 02/08/85 00:00 548 06 0.30 0. 30 0. 90 DAILY AVERAGE VALUES 0. 30 0. 30 0. 90 ,r---·- 0; ~1 51 .,, ~ , J a,;:;•• --8lD .. .. -lid .. .. ----.. ~J I' J ( I t Ji PROPOSED ELIM HYDROELECTRIC PROJECT 05/01/85 PAGE 44 PETERSEN CREEK NEAR ELIM, ALASKA START TIME 10/03/84 02:00 DEPTH STAGE DISCHG DATE TIME Ell'TE RAW DATI'. FEET FEET CFS ' -======== ===== ==== =======:::::=~~ ====== ===== ======= 02/09/85 02:00 549 06 0. 30 0. 30 0.90 02/09/85 04:00 550 06 0.30 0.30 0.90 02/09/85 06:00 551 06 0.30 0.30 0.90 02/09/85 08:00 552 06 0.30 0.30 0. 90 02/09/85 10:00 553 06 0. 30 0. 30 0.90 02/09185 12;00 554 06 0. 30 0. 30 0.90 02/09/85 14:00 555 06 0. 30 0.30 0.90 02/09/85 16:00 556 06 0. 30 0.30 0.90 02/09/85 18:00 557 06 0.30 0. 30 0. 90 02/09/85 20:00 558 06 0. 30 0. 30 0.90 02/09/85 22:00 559 06 0. 30 0. 30 0.90 02/09185 00:00 560 06 0.30 0.30 0. 90 DAILY AVERAGE VALUES 0.30 0. 30 0. 90 02/10185 02:00 5b1 06 0.30 0.30 0.90 02/10/85 04:00 562 06 0.30 0.30 0.90 02/10/85 06:00 563 06 0.30 0. 30 0. 90 -62/10/85 08:00 564 06 0.30 0. ;'30 0. 90 02/10/85 10:00 565 06 0.30 0. 30 0.90 02/10/85 12:00 566 06 0.30 0.30 0.90 02/10/85 14:00 567 06 0. 30 0.30 0.90 02/10/85 16:00 568 06 0.30 0. 30 0.90 02/10/85 18:00 569 06 0.30 0. 30 0.90 20:00 570 06 0. 30 0. 30 0.90 22:00 571 06 0.30 0.30 0.90 00:00 572 06 0.30 0.30 0.90 DAILY AVERAGE VALUES 0.30 0. 30 0. 90 02/11/85 02:00 573 06 0.30 0.30 0.90 02-.tt1t85 04:00 574 06 0.30 0.30 0.90 02/11/85 06:00 575 06 0.30 0.30 0.90 02/11/85 08:00 576 06 0.30 0.30 0.90 02/11/85 10:00 577 06 0.30 0.30 0.90 02/11185 12: 00 578 06 0. 30 0. 30 0. 90 02/11/85 14:00 579 06 0.30 0. 30 0.90 --·-02/11/85 16: 00 580 06 0. 30 0. 30 0.90 02/11/85 18:00 581 06 0.30 0.30 0.90 02/11/85 20:00 582 06 0.30 0.30 0.90 02/11/85 22:00 583 06 0.30 0. 30 0. 90 02/11/85 00: 00 584 06 0. 30 0.30 0.90 DAILY AVERAGE VALUES 0. 30 0. 30 0. 90 . ...... ~ d ~ -·~ .. -.. ·~ &!I ~ ' E:1 .. --- - -~1 1'1 l. I PROPOSED ELIM HYDROELECTRIC PRO,JECT 05/01/85 PAGE 45 PETERSEN CREEK NEAR ELIM, ALASI'\A START TIME 10/03/84 02:00 DEPTH ~-TAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS '!fl!l!li!f::e!!f::: :t!t:::::=ra ===;":' =======~= ·===== ===== ====== 02/12/85 02:00 58S 06 0.30 0. 30 0.90 02/12/85 04:00 5i:-16 06 0.30 0. 30 0.90 02/12/85 06:00 587 06 0.30 0. 30 0. 90 02/12/85 08:00 508 05 0.25 0. 25 0.40 02/12/85 10:00 589 06 0.30 0. 30 0.90 02/12/8~ 12:00 590 06 0.30 0.30 0.90 02/12/85 14:00 591 06 0.30 0.30 0.90 02/12/85 16:00 590.! 06 0. 30 0.30 0.90 02/12/85 18:00 593 06 0.30 0.30 0.90 02/12/85 20:00 594 05 0.25 0. 25 0.40 02/12/85 22:00 595 06 0.30 0.30 0.90 "027'12'/'8~ 00:00 596 06 0. 30 0. 30 0.90 DAILY AVERAGE VALUES 0.29 0.29 0.80 02/13/8~ 02:00 597' 06 0.30 0. 30 0.90 02/13/85 04:00 598 06 0.30 0.30 0. 90 02/13/85 06:00 599 06 0.30 0. 30 0.90 ···02/13/85 08: 00 600 06 0 .. 30 0. 30 0. 90 02/13/85 10:00 601 06 0.30 0.30 0.90 02/13/85 12:00 602 06 0. 30 0. 30 0.90 02/13/8!'5 14:00 603 06 0.30 0. 30 0.90 02/13/85 16:00 604 06 0.30 0. 30 0. 90 02/13/85 18:00 605 06 0. 30 0.30 0.90 ··· -~o:ut3te5 20: oo 606 06 0.30 0. 30 0.90 02/13/85 22:00 607 06 0.30 0. 30 0.90 0:2/13/85 00:00 608 06 0.30 0. 30 0.90 DAILY AVERAGE VALUES 0.30 0. 30 0.90 02/14/85 02:00 609 06 0. 30 0.30 0.90 -·-·02t14'/f35 04: 00 610 06 0.30 0. 30 0.90 02/14/85 06:00 611 06 0.30 0. 30 0.90 02/14/85 08:00 612 06 0.30 0.30 0.90 -··-··'02/14185 10: 00 613 06 0.30 0.30 0.90 02114/85 12:00 614 06 0.30 0.30 0.90 02/14/85 14:00 615 06 0.30 0.30 0.90 ···----o:ut4tes 16: oo 616 06 0.30 0.30 0.90 02/14/85 18:00 617 06 0.30 0.30 0.90 02/14/85 20:00 618 06 0.30 0. 30' 0.90 ' 02114/85 22: 00 61"i' 06 0.30 0. 30 0.90 02/14/85 00:00 620 06 0.30 0. 30 0.90 DAIU' AVERAGE VALUES 0. 30 0. 30 0. 90 ;r --.. -.. .. .. R;·~· r-1 ~ en ----.. K:"_) I.e• J d~---PROPGSED ELIH HYDROEL.ECTRIC PROJECT 05/01/85 PAGE 46 PETERSEN CREEl/; NEAR ELIM, ALASKA START TIME 10/03/84 02:00 ~~~-- DEPTH STAGE DISCHG DATE TIME f.IYfE RAW DAff\ FEET FEET CFS -~~--===-== ===== ==== ========= ====== ===== ==-==== 02/15/85 02:00 621 06 0.30 0.30 0.90 02/15/85 04:00 622 06 0.30 0.30 0.90 ,:1 02/15/85 06:00 623 06 0.30 0. 30 0.90 02/15/85 08:00 624 06 0.30 0. 30 0.90 02/15/85 10:00 1-'Jc; !..J~ ..... 06 0. 30 0.30 0. 90 111 02115/85 12:·00 626 06 0.30 0.30 0.90 lA 02/15/85 14:00 627 06 0.30 0.30 0.90 02/15/85 16:00 628 06 0.30 0.30 0. 90 02/15/85 18:00 629 06 0.30 0. 30 0.90 02/15/85 20:00 6:10 06 0.30 0.30 0.90 02/15/85 22:00 631 06 0.30 0.30 0.90 -<>2/15/85 00:00 632 06 0. 30 0.30 0.90 DAILY AVERAGE VALUES 0.30 0.30 0.90 02116/85 02:00 633 06 0.30 0.30 0. 90 02116/85 04:00 63~ 06 0.30 0.30 0.90 02116/8'5 06:00 6.15 06 0. 30 0.30 0.90 -o2-tt6-18-5 08:00 636 06 0. 30 0.30 0.90 02/16/85 10:00 637 06 0.30 0.30 0. 90 02/16/85 12:00 638 06 0. 30 0.30 0.90 --~-02116/85 14:00 639 06 0.30 0.30 0.90 02116185 16:00 640 06 0.30 0.30 0. 90 02/16185 18:00 641 06 0.30 0.30 0.90 lli -··0271 s·t-ss 2o: oo 642 06 0.30 0. 30 0.90 02/16/85 22:00 643 06 0. 30 0. 30 0.90 02/16/85 00:00 64•+ 06 0.30 0.30 0.90 DAILY AVERAGE VALUES 0. 30 0.30 0.90 02/17/85 02:00 645 06 0. 30 0.30 0.90 -L:l ----'02T17 t 85 04: 00 646 06 0.30 0. 30 0.90 02117/85 06:00 647 06 0.30 0. 30 0.90 02/17/85 08.00 648 06 0.30 0. 30 0.90 02/17/85 10:00 649 06 0.30 0.30 0.90 02/17/85 12:00 650 06 0.30 0.30 0.90 02/17/85 14:00 65i 06 0.30 0.30 0.90 ---··-o:tt-t7/85 16:00 652 06 0.30 0.30 0. 90 ~ 02/17/85 18:00 653 06 0.30 0. 30 0.90 ~ 02/17/85 20:00 654 06 0.30 0.30 0.90 02/17/85 22:00 655 06 0.30 0.30 0.90 02/17/85 00:00 656 06 0.30 0.30 0.90 DAILv· r...VERAGE VALUES 0.30 0. 30 0.1?0 e: ;Jr -----•• -.. -- ----.. E:l r"'J I I -I :r~-·-··"PROPOSED ELIM HYDROELE:CrRIC PRIJ.JECT 05/01/85 PAGE 47 f 111 PETERSEN CREEK NEAR El_IM, ALASI<.t\ START TIME 10/03/84 02·00 3 ·' DEPTH E.TAt}E DISCHG 61 DATE TIME BYn:?: RAW OAT'A FEET FEET CFS ·--m!IIIWIIf!lliii!llleili'l l!IIIIOI!:o!:.Z::o! ==== =======!:".:.';:.'"::. =·=i:::·· ===::::!:= ====== 02/18/85 02:00 657 06 0.30 0.30 0. 90 ~ 02i18/85 04:00 658 06 0.30 0.30 0.90 1 ----·--02/18/85 06: 00 659 06 0.30 0.30 0.90 11 . 02/18/85 08: 00 660 06 0.30 0. 30 0. 90 02/18/85 10:00 661 06 0. 30 0.30 0.90 ~~ -o2t'1:ates 12: oo 662 06 0.30 0.30 0.90 14 02/18/85 14:00 663 06 0.30 0. 30 0.90 I. 02/18/85 16:00 664 06 0. 30 0. 30 0.90 02118/85 18:00 665 06 0.30 0. 30 0.90 02/18/85 20:00 666 05 0.25 0. 25 0.40 02/18/85 22:00 667 06 0. 30 030 0.90 ----ov1etes-oo: oo 668 06 0.30 0.30 0.90 DAILY AVERAGE VALUES 0. 30 0.30 0.90 021'19/85 02: 00 669 06 0. 30 0. 30 0.90 02/19/85 04:00 670 06 0. 30 0.30 0.90 02/19/85 06:00 671 06 0.30 0.30 0.90 -· ·-02f"t-11118'5 OS: 00 672 06 0.30 0.30 0.90 02/19/85 10:00 673 06 0.30 0.30 0.90 02/19/85 12:00 674 06 0.30 0. 30 0.90 ''02119/85 14:00 67~ 06 0. 30 0. 30 0. 90 02/19/85 16:00 676 06 0.30 0. 30 0.90 02/19/85 18:00 677 06 0. 30 0.30 0.90 ----'02rt9785 20: 00 678 06 0.30 0. 30 0.90 02/19/85 22:00 6 -.c-. ' . 06 0.30 0. 30 0.90 02/19/85 00:00 680 06 0.30 0.30 0. 90 DAilY AVERAGE VAUJES 0.30 0.30 0.90 02/20/85 02:00 681 06 0.30 0.30 0.90 ---o-2120195 04: 00 682 06 0.30 0.30 0.90 -L.l 02/20/85 06:00 68~'1 06 0. 30 0.30 0. 90 02/20/85 08:00 684 06 0.30 0.30 0.90 02/20/95 10:00 6~35 o~:, 0.30 0. 30 0.90 02/20/85 12:00 60t:, 06 0.30 0. 30 0.90 02/20/85 14:00 bB7 06 0.30 0. 30 0. 90 I i I ~ ----.. [JI 1,:·--· . -PROPOSED ELIM HYDROEl.fCTRIC PR00EC1 PETERSEN CREE~ NEAR E'L I r·1, ALAS!-<. A DATE TIME BYTE RAW DATA :1-·-·-o;;;~~=; 7=~;~ =~.~-:·:::.::-·.":':::=:.::.! :-'*~:!"": ~..:':::: 1 (!6 02/~:!0/85 18: 00 .., •:}6 "'" 02/20/85 20:00 3 06 '()'2.120/85 22:00 4 06 o;,~/20/85 oo: oo 5 06 DAILY AVERAGE VALUES II _______ . 13 ( •• O~U21/85 02: 00 6 Ob 02/21/85 04:00 7 06 '02/21/95 06:00 8 06 02'/21/85 08:00 9 06 ~);:.>/21 /85 10: 00 10 06 -· ---o2I21 /85 12: 00 11 06 o::.>/21/85 14. oo 12 06 02121/85 16:00 13 06 0;'/21/85 18:00 14 06 o::;'.t21 /85 20: oo 15 ()6 02/21/85 22:00 16 ()6 ~~----·--··--o27'2l/85 00: 00 17 ot., DAILY A'·..'ERAGE VALUES ~r221e~ 02: oo 19 0/:t 02/22/95 04:00 19 06 0:::'/22/85 06: 00 20 06 ~/85-08:00 21 06 02/22/95 10:00 22 06 ' 02/22/85 12:00 23 06 J----e~t22-IS5 14: oo 24 06 o:.Y22/85 16: oo ~-~5 06 02/22/85 18:00 26 06 :1~122f8:5 20: 00 27 06 02/22/85 22:00 28 ()6 02/22/85 00:00 2~ 06 DA !LY AVERA(~F. VALUES i!i.f .. .. -.. - ----•~"~ K::J I. J 11!0~/85 PAGE SfART TIME 02120/85 16·00 DEPTH s·r IIGf:: I\ISCHG FEET FEEi CF~3 :::;:-:::-..::-::== ===:~""": :::::::::"':'::::=:=.: 0. 30 0 20 <), 40 0. 30 0. 20 0 .:tO 0.30 0 :~0 ·:; .:10 0. :..10 •:'i 20 (: 40 0. 30 '). 20 0. 40 0 30 <) 20 ·:· 40 0. 30 0 20 Q. 40 0 .,e tj 20 Ct. 40 0 30 (: 20 0. 40 0. :-!0 f...' 2(! 0. 40 0. 30 !) 20 0. 40 0.30 (1 20 0. 40 0 30 D 20 0. "-lO 0. 30 t) 20 0. 40 0. 30 0. 20 0. 40 0. 30 0 .. 20 0 . .!10 0. 30 D 20 0. itO 0. 30 0 20 0. 40 0. 30 0. 20 0 40 0. 30 0 20 0. 40 0. 30 ') 20 0. 40 0. 30 ,,··, "f' ... ' c..-· 0. 40 0. 30 0 20 0. 40 0. 30 •J. ~!0 0. 40 0. 30 (), 20 0 40 0. :JO r, ~··-,rt '.,... 1!'-.\J [' 40 0 30 ·:; 20 '), •10 0. 30 •) 20 0. 40 0. 30 0. 20 0. 40 0. 30 0 20 0. 40 0. 30 (!, 20 0 40 0. :w o :;:-o 0. <10 ' .!'.::. -----.. I J I il> PROPOSED ELIM HYD~GElE(fRlC PROJECI f-lt:TERSEN CREEK NEAR ELH'i, ALASKA DATE T!!'iE ~~:~~~~=e ===== 6 1------r,''>l-~'""185-' ·~ r;, ~ .... ., '" II I 02/23.185 o;;u23/85 fr:?/23/S5 ~··;'/2:3185 ·'~Y;~ / ~~~3/ B5 13t---,o:?:-ffl::Ys5 u 0~!/23/85 02/23/85 0.2:00 04:00 06: 00 oa·oo 10:00 12:00 -14:00 16:00 18:00 16 17 18 f':f•/23/85 20: 00 o:.u;.:3t35 22: oo .:y;;•/23/85 00:00 02/24/85 '0:?/24/85 0~'124/85 o::•/24/85 ------ui":: t l?<~t/85 02/24/85 02/.24/85 02/24/85 0::!/24/85 1)2/24/85 _,, -·-------o:;: t-2"4/85 ,! o;;;!/24/85 ~,1 J-.... t-02/25/85 , o;~/25/85 u-:.~1257'85 ~ 02/25/85 1 02/25/85 Pi ');:>/25/85 -:•:?/25/85 21 <);y;~Si85 ---··-f";l'l;U25185 02:00 04:00 06:00 08:00 10:00 12:00 14:00 16. C•O 18:00 20:00 22:00 00:00 02:00 04:00 06:00 08:00 10:00 12•00 14:00 16:00 ts·oo 02/25/85 20:00 02/::?5/85 22:00 02/::'5/85 00:00 ~: BYTf: Rf,W DATA ===-~ :.!:=·~-;:":::" ·."!" ;:"'.::: ~:!'!:' !"~ 30 ()7 31 07 32 07 33 (17 34 07 ]5 07 :~6 07 37 07 38 06 3Q 06 40 ()6 4i Oi, DAILY AVERAGE VALUES 42 or., •l3 06 44 06 45 (.!6 46 06 '-l7 06 48 o..:.., 49 (!6 ~0 0(., 51 -::·~' t·2 ()6 =·3 06 DAILY A'-jf:RA·~E VALUES 54 55 &:.,I. ""''"""· 57 58 '5<:? t·O 61 62 f:-3 64 65 06 0::16 06 07 07 07 0 "1 -' 0? 07 07 0"1 (17 DAILY AVERAGE VALUES -- DEPTH FEET ======= 0. 35 0. 35 0.35 0. 35 0. :-J5 0. 35 0. 35 0 35 0 :~<' 0. 30 0. 30 0 30 0.33 0. 30 0. 30 0 30 0. ::.10 0. 30 0. 30 0. 30 0. 30 0. 30 0 30 0. 30 0. 30 0. 30 0. :.w 0. 30 0 30 0. 35 0 35 0 ::':15 0. ::~5 0 35 0. 35 0.35 0. 35 0. 35 0. 34 ---11/0~/85 Pt-"-trdE START TIME 02/20/85 STAG:E 'F:ET ::==~ (l, 25 0 25 t.), 2~\ t) ~~5 (\ p~~ (>. 25 ,., ..... , L;, ...... r .. ... 0.25 0 20 1), 2Ct () :Jo (;. ;!(r '!), ~~J o ;.::·o 0, 20 c~ 20 () 20 0 20 0. 20 (), 20 (\ ~-:-~ •). ;:2o •) 2~j 0. 20 0, 20 o ;;:o 0 20 ·) ~!0 0 20 0 :;;:5 o. ;:s 0 25 0 ;!5 i) 25 0 25 0. 25 r:.:. 2'5 0 25 0. ;.::4 L'!SCHG rFs :..:=:::--,.:=;,::-:.:::: (l 90 () 90 0. !;>Q (' <:;tQ U. 90 0. 90 0. 90 0. 90 0. 40 <}. '10 ·) 40 •) . ...:;.o ~-i '"/"() 0. i.lO 0. 40 ij 40 () 40 \) 40 c: 40 0 40 I) 40 0 40 ·). <lQ (1 40 0. 40 :::_, •lO 0. 40 0. 40 0.40 0.~ 0~ 0.~ 0~ 0.~ 0. 90 0.~ 0. 90 0 90 000 ----EJ W'l I I 16.00 ·r------[_] fJROPOSED ELIM HYDROELE'CIRJ•: PROJECT lEI -~ .if. 1!:'.::1 -11/05/85 PAGE 3 --.. •• If''·~ I I il~----pETERSEN CREEK NEAR CLIM, t'I.LASJA:A START TIME 02/20/85 16:00 3 DEr->TH STAGE DISCHG DATE TIME 9'11!::: RAW OAT ,eo, FEET Ft=.ET CFS ":':":":!':~!!:'\':,"'·:t'!== ====== -=~!'!:!":" !""':=.::-:.::~~-::--....:~· =~~==== --·------~:~=== --n2r26/S'!'i o2:oo 66 07 0. 35 0 25 0. 90 o;V26/85 04: oo 67 (l7 0. 35 0. 25 a. 90 Q:;U26/85 06: 00 68 (l7 0. 35 0 25 (!. 90 '':)"2726/85 09:00 69 07 0. 35 0 25 0. 90 0::?/26/85 10: 00 70 \:!7 0. 35 0. 25 0 '10 02/26185 12:00 71 07 0 35 r:J. 2~t 0. 90 .3 1 ----o2T2l,/SS 14: oo 72 07 0. 35 0.25 0. 90 ,. o;;;>/26185 16: oo 73 07 0. 35 ·:::>. 25 0 QO 02/26/85 18:00 74 07 0. ~~::; 0. 25 0 90 ·~I . 02/26/95 20:00 75 07 0. 35 1) 25 () ?0 17 0~/26/85 2200 76 iJ7 0. 35 0. 25 0. 90 ·~ 02/::;.tb/85 00:00 77 07 0. 35 e 25 0.90 DAJL Y AVERAGE VALUES 0. 35 0.25 0. 90 • 1 02/27/85 o2: oo 7!3 07 0. 35 D 25 0. 90 7 ---· .... 02/27/85 04: 00 79 07 0 35 0. 25 0. 90 02/27/8'5 06•00 80 (}7 0 35 0 2:1 0. 90 08:00 81 06 0. 30 0 20 o. ~•o 10~00 82 07 0. 3~ 0 2'5 0 90 12:00 83 07 0. 35 0 25 0. 90 14:00 84 n--·I 0. 35 0. 25 0. 90 16:00 95 r_q 0 35 n ~c:;. _,. 1/:' •... C. 90 19:00 86 07 0. 25 0 2~ () 90 20:00 87 (} 7 0. 35 0. 25 () 90 80 07 0 . .35 0. 2!; 0. 90 89 07 0. 85 0. 25 0. 90 DAILY AVERAGE VALVES 0. :lS 0 2~~ C:. 90 f't:U28/85 02: 00 90 ()'' ~ I 0 35 :) .25 0. '?0 o:.?/28185 o4: oo 9! 07 {,l_ 35 0. 2~ (), 90 O':.:Y-~195 06: 00 92 07 0. 35 0 ;.~5 1_1. 90 02/28/85 08:00 '<3 (l7 0 85 •). 2!) ·J 90 02/28/85 10.00 94 07 0. 35 0 ~!5 0. 90 -~~'/29/95 '12: 00 95 07 0. 35 I) 25 o.qo ,:>;:U28/85 14· 00 96 08 0. 40 0. 30 ! 7 0~'/;'?8/85 16: 00 97 08 0 40 0 ~30 1.7 '02.t~"fi.tS5 tB· 00 98 OB 0. 40 0. 30 1 '"? • I G~U28/85 20: 00 9'-f OB 0. 40 0 3D 1.7 o:;u28t85 22· oo 100 07 0. 35 0.25 0. 90 (•?/29185 00: 00 101 08 0. 40 (\ 30 .1.7 DAILY AVEP./\OE '·h\LIJES 0 37 0 ;"~·? ' ~. ' . c.. ~-i fJI ( ------PROPUSED ELIM HYDROEl F(;FtJC >'PD.JE.CT PETERSEN CREEK NEAR ELJM. ALASKA DATE TIME BY1E RAl·l DATA '!":~e~=~=~ :::=:'1'!!:.;:::= =oe:::: !';;.!t:.:"-:-;:,:;::::;":..-.':;'l:==~ 03101/85 02:00 102 08 03/01/85 04:00 103 08 03/01/85 06: 00 104 09 f•:V01 /85 08 00 lOS (18 •.)'~i./01/85 10: 00 1()6 08 •)3/01 /85 12: 00 107 08 '03101/85 14~ 00' 109 ()7 03/01/85 16:00 109 07 03/01/85 18: 00 110 •)7 ()3/01/85 20· 00 111 07 03/01/85 22•00 112 ·.)7 00:00 113 ()7 DAIL"'r' AVERAGE VALUES 03/02/85 02:00 114 Ob -o3't02/B::I 04:oo 115 (l6 o:1to?JBS 06: oo 116 (16 03/02/85 08:00 U7 06 ----o3t02/85 10: oo 118 06 03/02/85 12:00 119 06 03/02/85 14:00 120 06 f)3.t02185 16: 00 121 06 03/02/85 18:00 122 06 20:00 1:?3 06 22:00 124 06 00:00 125 [!6 DAILY AVERAGE VALUES 02:00 126 06 04:00 1 ;;>7 06 06• 00 128 06 08:00 129 05 03/03/B~ 10:00 130 06 03/03/85 12· 00 131 (l5 (13/03/85 14· 00 1 :~2 06 ,-,::l/03/85 16: 00 13J ('6 03/03/85 1800 134 05 03/03/85 20:00 135 05 03/03/85 22 00 136 {";' .. Jc "~•3/03/85 00: 00 1 :{7 05 DAILY AVERAGE VALUES -r~J lei -.. --- - -~ E"'l I I 1 1 ./c~:-;/r~s PP,C;E 4 STARl TIME (>2/2(»18~-~ 16. (!.') DEPT!-! STt.(~E l>ISCHG FEET &: [.:!=. T ·:FS ======--==::: .. :-:= -: ... :.-:::::=~= 0. 40 (J 30 1.7 0. 40 (l 30 ' -~ 1 , I 0. 40 0. :-PJ 1 7 0. 40 (~ 30 1 7 0. 40 3() 1.7 0.40 ::-~ 3 C) i 7 0. 35 0. 25 1:' 90 0. 35 () 25 () 90 n -,.e. '-' "'w' .,.,.-CJ 25 0. 90 0 35 0 25 -::) 90 0. 35 0 25 0. 90 0. 35 (i 2::; 0 <?0 0. 38 '}. 28 1.3 0. 30 (; 20 0. 40 0. 30 (t 20 0. 40 (I 30 0 ~!() 0. 40 0. 30 0. ;20 (1, 40 0. 30 0. 20 0. 40 0. 30 •::>. 20 C.l. •lO 0. 30 0. 20 0. 40 0.30 0. 20 0. 40 0. 30 •). 20 c• ·~o 0. 30 () 20 0 40 (I 30 o ;~o 0. 40 0. 30 (l ~:o 0. 40 0. 3() ,...) :.:'.'i. \,.;. _.._ 0 40 0 30 t) 20 I) 4(1 0. 30 ·) ~~0 Cl. 40 0. 30 0 20 0. 40 0. 25 0. i 5 0. 10 0. 30 0 20 0. 40 0 ::?5 .') !.5 0. 1 0 0 30 0 ;.!(1 •) 40 0. :K• 0 20 (j 40 0 25 0 1 !:• i) 10 0. 25 () 15 0 10 o. :~o G 20 ') 40 0 ::;;c, 0 j 5 •) l 0 o ~·e (; !8 t) 'j(j ........ ~ ill -I ... --.. .. 1'=:1 PROPOSED EL!M HYDROELEL1R1C ~RUJC(l PETERSEN CREEK NEAR CL!M. AlASKA DATE TIME BV1 E RAW Dt, TA -,--::-;.::.~:::::::::-=-:::::::::::: ==~=-= =·==::.:~ ~:-:·.-.::::.-_:::"::":'::::=: 03/04/85 02:00 138 06 03/04/85 04:00 18? 06 03/04/85 06:00 140 06 ·J3/04/85 08: 00 141 06 C3/04/85 10:00 142 06 03/04/85 12:00 143 05 'D::l704/85 14:00 144 06 03/04/85 16:00 145 06 03/04/85 18:00 146 06 (13/04/85 20:00 147 06 :>3/04/85 22:00 148 06 03/04/85 00:00 149 06 DAILY AVERAGE VALUES 1)3/05/85 02: 00 150 06 03/05/85 04:00 151 Ol-, 03/05/85 06:00 15~ 0(~ 03/05/85 08:00 l ~·3 .~, ~ '1..·0 03/0'5/85 10:00 .154 06 03/05/95 12:00 t:-5' (l6 o:uos;s5 14: oo 1 :;,£, 06 :'J3/05i85 1600 1 ~ .. ; ·0::.6 03/0::'·/85 18: 00 158 (16 0:1/05/85 20:00 15'7 (l6 ·--o:VOS/85 22: 00 lbO 06 03/05/95 00.00 161 06 DAILY AVERAGF VALUES 02:00 16::' o~., 04:00 1 e.::~ (l6 05:00 164 06 08:00 165 05 1000 166 05 12'00 167 05 14:00 168 06 16:00 1 !,9 1),~ 18:00 170 06 20:00 171 06 22:00 1'72 05 00:00 173 06 DAILY Al.iEP.AGE V!\UlES ~ - DEPTH FEE:T :::-::;::=-:::'!:'::.:::.:..- 0. 30 0. 30 0. 30 0. 30 0. 30 0. 25 0. 30 0. 30 0. :::0 0. 30 0. 30 0. 30 0 30 0 30 0 30 0. 30 o. :::lo 0. 30 0. 30 0.30 0 30 0. 30 0. 30 0. 30 0. 30 0 30 0. 30 o. ::m 0. 30 0. 25 0. 25 0. 25 0. 30 0. 30 0. 30 o. :m 0.25 0. 30 0 28 ---11!05/85 PAGE START TIKE 02/20/85 STI~G:E D!SCHG FEET '2F'S --·-~-·~· ~'-~·::::::=-.; •) 20 0 .::o (), 20 0. 40 0 20 (! ~w •) 2.::! (1 40 (1 . 2D r:'. 40 0 1~ ()_ 10 C• 20 0. 40 tj 20 (J, 40 >.) 20 0 •lO 0 20 0. 40 !) 221 0. 40 ~), 20 ~-' 40 I) 2:) 1) 40 c~ 20 0. 40 -0 ;;:~ .J (1 40 0 2D ;J, 40 o. ;~o ':' .i!O (> 20 (I 40 (l. 20 I) 40 0 ;!O ,_:, 40 :.: :;::;,:::~ 0. 40 0 :::o 0 •10 ~:\ ;~o •:J •lO 0 20 0. 40 (). 2(J 0. 40 0 2() •). 40 r:1 ~.;0 (1 40 tj 20 0. 40 0. 20 I) 40 0 15 0. 10 ()_ 1 :t 0. 10 0. 15 0. 10 0. 20 ') 40 0. 2·:J •) 4(> o. ~:o (). 40 0. 20 0. 40 0. 15 0. 10 0 20 1) 40 0 18 0 30 ---16.00 --~ ... &:_) .,... ------I 1: i'iWPDSED ELI11 H'f!)kOE\LCTP!C pr~CUE"C r PI;: fERSEN CREEK NEAR EL H1, At AS,.:.A DATE: TIME ~~~~~=~== ~=::=-= 02:00 03/07/95 04:00 03107/85 0600 .. 03/07/85 08: 00 f\3/07/85 10:00 1XY07/85 12: 00 ·u:vo71S5 14: oo 03/07/85 16:00 03/07/BS 18:00 03/07/85 20:00 03/07/85 22:00 00:00 03/08/85 02•00 03/08/85 04:00 03/08/85 06:00 n:VOB/85 OB· 00 031'08/85 10:00 03/08/85 12:00 08/08/BS 14: 00 ('3/00/85 16: 00 03/08185 18:00 '.)3/08/85 20· 00 03f08/85 22:00 03/08/85 00:00 02•00 04:00 l----····-H~'<!I-A~"'R5 06: 00 08:00 03/0'1/85 10:00 (•3i09/85 12: 00 03/09/85 14:00 0:3/09/85 16 00 i)3;f-o9785 18: 00 03/09/85 20:00 03/09/85 22:00 0~/09/85 oo-oo B"'Y'lE RAI·l DAT•\ =-= ': ::~ -::::: -:::·;...: = !"= .:~ t:"" ~-:>.: 174 06 175 06 176 06 177 06 178 06 179 ot~ 180 06 .181 06 182 06 183 05 184 05 185 05 DAILY AVERAGE VALIJES 186 05 187 06 188 06 189 (16 190 06 191 06 192 06 103 (!6 194 06 195 •)6 196 05 197 05 DAILY AVERAGE W,LUES 198 06 199 06 200 05 ~01 OS 202 06 203 05 204 06 205 06 206 05 207 Ob 208 05 209 ()6 DAILY AVERAGE VALUES -.. DFPTH FEET =-===='::':"" 0. 30 0. 30 0. 30 0. 30 IJ. 30 0. :30 0 JO () 30 (). ~!() o_ ~-~:t 0. 25 0. 25 0 29 0. 25 0 30 0. 30 0 3(1 o. ~w 0. 30 0. 30 o :m 0. 30 0. 30 o. ;.~s 0. 25 0. 29 o. :~o o :•o 0. 25 0. 25 0. 30 0 25 0. 30 0 30 0. 25 0. 30 0.25 0. 30 0. 28 -El- STARr 11!0~!85 PAGE fiKE 02120/85 STA(:;F CE;[T •=:-::.:== 0.~ 0.~ 0. 20 0 20 0 20 0 20 -=~-2(1 (). 20 0.20 0 1~ 0 15 0 15 0 i9 () 1 ~~ (I 20 0 2{) .. :\. 20 0. 20 0.20 () .... (\ ... -J:'-'""' (l 20 •J. 2() -,::, _ 2Cr IJ. 15 0 15 ·) ! q 0 20 0 2D 0 15 c 15 0 20 0 15 0.20 0 20 0 15 ~ ~~ ~ ·~ 0 15 0 20 0 18 DTSC:HC: Cl=S .-.. -=~=== o •o 0. 40 0. 40 0. 40 40 0 40 0 40 0 ~0 0. 40 0 .10 0. lO (•. 10 (). 30 () 10 0 40 •). 40 ('. ~to 0. <40 •J 40 0. 40 0. 40 0. •lO "~-' ... :;.o () 10 0. 10 0 30 0. 40 0. 40 0. 10 0. 10 0. 40 0. 10 () •lO 0 ·~0 0 10 0.40 0 10 0.40 0. 30 -----El L• 16 (Ji) ur ------PROPOSED ELIH HYDRCEl.~CTRIC PROJfCT PETERSEN CREEK NEAR EL!M, ALASKA i~ 3 DATE T!ME BYTE RA\·! DATA :~·-~:~~:...~::!:~::.:e ===·~= ==::::::-:..:: !':""~:::::-:.~:.:·-:-:-.:--:":".·- 03110/85 02:00 2!0 06 03/10/85 04:00 2! 1 (!6 03/10/85 06:00 212 06 "03110/85 08.00 218 0~} 03/10185 10:00 214 06 ~3/10185 12· 00 21 ~} 06 --·T./3110/85 14: 00 216 06 •J3/101B5 16: 00 217 05 03/10/95 18:00 218 05 03riOl95 20. 00 2tq 05 03/10/85 2200 220 06 00:00 ?21 05 · DAILY 1'1\!ERAGE VALUES 03/11185 02:00 222 06 03"T11 /85 04: 00 223 C'r!l 03/11/95 06; 00 2~?4 05 03/11/85 08: 00 225 05 -·-o:;nt:t8~ 1o:oo 226 05 03/11/85 12:00 227 06 03/11185 14'00 228 06 -:13/11/9~ 16:00 22-? (1{., 03/11/85 18:00 230 (15 03/11/85 20:00 2=:!1 05 ·------o~rtttes 22:oo 2~~2 1)6 :J3/ 11185 00. 00 233 o:, DAILY AVERAGE VALUES 03/12/85 02:00 234 1)5 03/12/85 04:00 2:':15 06 --o::ttt2tS~ 06:00 236 06 o:u 12/95 09: 00 237 •_:)5 03/12/85 10:00 238 06 f}3/t21S5 12· 00 239 05 03/12/85 14:00 2>W 1)6 r)3/12/85 16:00 241 o:> ----~l12/85 18: 00 242 05 03/12/85 20:00 243 05 03/12/85 22:00 244 05 --·03/12/85 00: 00 245 03 DAILY AVERAGE VALUFS ... R"J DEPTH FEET -==~=-:'-"':":::::= 0. 30 0. 30 0. 30 0 25 0 30 0. 30 0. 30 0 25 0. ;:.:5 0. 25 0. 30 0. 25 0. 28 0. 30 0. 25 0. 25 0. ;:?5 0 ~Li ' .,_- 0. 30 0. 30 0. 30 0. 25 0.25 0. 30 0. 25 0. 27 0. 25 0. 30 0. 30 0. 25 0. 30 0. 25 0 30 o. ~~s 0. 25 0. 25 0. 25 0. 25 0. ;;? -~ --1!/05/85 PAGE -START fJME 02/20/85 16:00 STAC:E iJ I SC:HG r:·r::r..::T CFS -0"··-· -·~· -·:::.-:::~=~-== () 20 (l 40 0. 20 ~) 40 0"20 0. 40 •:' t 5 (I 1 0 (1 2(' I) <lO n ·!:1 ""' C~.,.. 0. 40 0. 20 0. 40 0. 15 0. 10 0 . .15 0. 10 0 15 0. 10 0 20 0. 40 Ct t5 0 10 0. 18 0. 30 0. 20 0. 40 0. 1 5 0. 10 0. 15 0. 10 (\ 15 r: 10 0. 15 0. 10 0 20 0. 40 0. 20 0. 40 t.) 20 {l. 40 0 15 CJ. tO () 15 'J. 10 0. 20 0. 40 >) 15 0. 10 0. 17 1> 20 0. 15 (l 10 0. 20 >) 40 •:.>. ;:o 0. <lO •} 15 0. lO (; ~!0 0. 40 (.t. i 5 f~l 10 0. 20 {J. iiO f) i 5 0. 10 (1 15 0. 10 0 1 ~; 0. 10 0 15 n. 10 0. 15 0. 10 0 i? 0. 20 ---.. ----~ I J ' ( I 1,, - • • -~· •1 a:-1 E I I I I I • t I J I J C'l 11• & .• C I 'i<fWPD:C;ED ELJM H'iDfWELt;Cif~ IC PI?U..IECT .PETERSEN CREEK NEAR Ei. H-1. AUIS~.A DATE TINE -~~==~== ::::==:!'!:= 03113/85 02:00 03/13195 04.00 03/13/95 06:00 ~)3/13/85 08: 00 (\::~/ 13/85 10: 00 ,_~:Y13/85 12:00 o:Yt3t85 14· oo 03/13/85 16:00 03Jt:::V95 18: oo \)3/ 13/95 20: 00 03/13/85 2200 'YY.t3/85 00:00 03/14/85 02:00 :CI3/14/85 04:00 03/14/85 06:00 03/14/85 08:00 03/14/85 10:00 03/14/85 12:0.::> 03/14/85 14·00 03/14/85 16:00 03/14/85 18:00 o:3J 14/85 20: oo -o:V14/85 22: 00 03/14/85 00:00 03/15/85 02:00 1)3/ 15/85 04: 00 -{)~~/15/85 06: 00 •J:1/15/B5 08:00 03/15/85 10:00 0~~/ t 5/85 12· 00 •.:>31 t !:·/85 14: C:O (13/ 15/85 16· 00 03/15/85 18:00 03/15/SS 20·00 03/15/85 22'00 o:-uts/85 oo: oo BYTf:: RA\-J OAT~\ :co::':':"":"!"' ~=:.":':~:.~~~."':. ;:.!46 05 247 Qt:., 248 OS 249 05 250 05 2~1 0!") 252 ()6 253 06 25<1 05 255 05 256 ~)6 2~~7 Ob DAILY AVERA<.iE VALUES 258 06 ~~59 05 260 05 2bt 05 262 OS 263 06 264 05 2,!:,5 05 2b(:, ot., 26'/ 05 268 05 269 05 DAILY AVERAGE VALUES 270 (tb ;;:?71 05 272 05 ;'73 06 274 06 275 0~· 2?6 05 277 ~)6 278 OS 2~·9 05 280 05 281 05 DAILY AVERAGE VALUES DEPTH FEET ~-~::::==~ 0 25 0. 30 0 25 0. 25 0. 25 0 30 0. 30 0. 30 0 ;->S 0 25 0. 30 ~) 3() () 28 0. 30 o. ;:::5 0 ''"' • r;. .... ~ 0 .. ;25 0.25 0. 30 0. 25 0 _;"~5 o. ::lo 0. 25 0. 25 0 "'"' .<:...J 0. 26 0. 30 0. 25 0.25 0. 30 0. 30 0. 2:'· 0. 25 0. 30 o ;;.•5 0. 25 0. 25 0. 25 0 27 11/•."•:",/B5 PAGE STl\!H r 1NE 02/~W/85 ib •.J·.1 STAf~E r.r-.:Er =:.";!::.-:=.~.~;:. a 15 0. 20 0. l5 0 !5 0. 15 C' 2C .. o. ;;~o 0. 20 f) i ::} ·J. 1 ~~ (J 20 ~). 20 0. if-3 ·•J 2(! ·J 15 •) i 5 0 15 0. 15 0. 20 J is t) 15 c-. .20 0 t~ 0 15 " ' <." • .. 1. J. .,./ 0 1f .. '). ;?o 1:) i !:· ~'). 1 s 0. 2() 0 2() 0 1 ::;. i) t 5 <) 20 0. 15 <). IS 0. i 5 0 1 '3 0 1.7 r\ISCHG (FS »;·=~:=~::::= 0 10 0. •lO 0. l 0 ~:t. 10 •) 10 40 0. 40 0. ~0 0. 10 0. 10 0. 40 0 40 0~ 0. 40 0 10 0 10 0 10 0 10 0 40 0. 10 (I 10 0. 40 <) 10 (J. 10 (1 10 ('. 20 (\ ... 1.0 0. 10 (\ 10 0. 40 0. 40 () 10 (• 10 i). 40 0. 10 0. 10 0. 10 0. lO 'J. 20 r J r 1 l J i__ I • • • ~-JI c I • ·' • I I( I a, 4 & f II r'r'OPOSED ELI!1 Hr'DROEU:.( rRI'.:. PPC!,..rf:.CT !">I''TEHSEN CP.EEK NEAP. EU!'-1 ALM~f-:.A DATE TIME ~:.:=:'! .";"::~~!:"'...: :.:::::::~ :::::=::!:::: 03/ll-./85 02: 00 C•::f/ 16/85 O<l: 00 (J3/16/85 06• 00 ~::~/16/95 08:00 :.13/16/85 10• 00 03/16/85 12. 00 16/85 14:00 16:00 18:00 o::tltt,/85 20: oo 03/16/85 22:00 03/16/85 00:00 ':t3/ 17/85 02: 00 '03/17/85 0400 oa/17/95 06 oo 03117/85 08: 00 03/17/85 10.00 03/17/85 12:00 03/17/85 14:00 03/17/85 16:00 03/17/85 18:00 03/17/8'5 20:00 --o3tt7185 22 oo 03/17/85 00 00 03/tf:l/85 02: 00 (•:3118/85 04. 00 '03/19/85 06:00 o:~/18/8'5 OS: 00 03/19/85 10:00 ('3/18/85 12 00 c}3!18l85 14:00 .·,3/ tB/85 16· 00 o:u 19/85 18: 00 03/18/85 20:00 '.)3/ 18/85 22 00 03/18/85 00: 00 BYTE P.A!tl DATA ::r :"" ~c.·::==~~~:-:::.-::.:~.:::~~ 2B~? 28:~ 284 285 2Pf> o~; (i5 \)5 OS '""' ,,.,,..,. 287 06 2BB 06 28'·1 ()5 290 06 291 05 292 05 2'7'3 0:3 DAILY A\.'ERAGF VALiJFS :;'94 05 2rt5 0!:• 29b 05 ~,.:q; 05 299 06 ;.'99 06 300 05 301 o£, 30~ ot, 31)3 05 304 05 305 06 DAILY A'·.lEHAC.:E VALLiES 3(!(, 307 308 309 310 05 0·.~) 05 05 {)5 311 05 312 05 21 ~'l 06 314 05 31 5 1.)!5 316 o=· 317 05 DAILY AVERAGE VALUES • • I .. I ~ I a I C.l a I DEPTH FEET ---·-----·-··--"· 0.25 0.25 0 25 0. 25 0. 25 0 30 0. 30 0 25 fJ :;:D 0 25 0 25 0 ''"' • C-,., 0 26 0 ~., • r::.....J 0. 30 0 25 025 0. 30 0. ]0 0. 25 0. 30 0 30 0 ~~5 0. 25 0 30 0 28 0. 25 0 30 0. 25 o. ;.~s 0 25 0 25 (). 25 0. 30 0. 25 0.25 o ;~s 0. ;:~5 0. ::26 t!/05/85 PAGE Q START liME 02/20/85 !6:00 STAGE FEEl =::=:::::::::::-:- •) t 5 15 \J 1 f~ r~.! j ~ ·:•. j 5 0 20 (l 20 0. 15 •· .•• 1 20 0 15 :: 1 5 ;) 1 ~ (> 1 b lJ 1 :;:, (;, 20 (: 15 <:) 15 0. 20 0. 20 0 15 0 20 (• 20 (} 1 ~;_ 0 .15 o. :;;o (t. 1 f3 () 1 ~~·· r·. -~i,..-J • • .J. t;_.,. r) 1 !:\ 0 1~> 0. 15 0 1 ~'· (; j ~ 'j .2:) 0. 15 0. 15 0 t :; 0 15 0 16 0 l SCH<} ~:rs .-:::::::::::== n. to •.) 10 (l 10 (~ 1 () (1. 10 0. 40 0. 40 0. 10 (l 40 \~ 10 0. 10 0 lO n. 20 0. 10 0 .. c..lO 0. 10 n 10 0. 40 0. 40 0. 10 (l 40 0. 40 0:). 10 0. 10 0. 40 \~) 30 i) 10 ~:t •iO (J 10 0. 10 C>. 10 ,, .1 0 :) 10 (~ 40 (l ~0 0. 10 T) 10 '1 10 [) 20 •• •• •. J I ). I j '-. ~ .,. &,. .... a.11 ·~· •• 1: I C I fl 1 . I I r·f:.:OPDSED ELIH H'r'DfWEL U m IC PPOJE1::·1 P£:: 1 ERSEN CREEK NEAR f:: I. It1, Al .. i\51t.A !)•\TF T I t-~E --·-":"!:"'!"'::-::== ==~~~== 03!19/85 02:00 o::Y 19/85 04: oo o:ut9 /85 o6: oo 02/19/85 08:00 Z:J~~/19/85 10· 00 •."rJ/19/85 12:00 0~/t~/85 14:00 03/19/85 16:00 03/19/85 18:00 03/19/85 20:00 ('t:J/19/85 22:00 03/19/85 00:00 o:u20/85 02: oo 03120/85 04:00 r>:..•/20/85 06: 00 03/20/85 08:00 03/20/85 10:00 03/20/85 12•00 03/20/85 14:00 -::13/20/85 16: 00 o:~t20/B5 ta· oo o:~/20/SS 20: 00 ··--'031'20185 22~ 00 03/20/85 00:00 (13/21 /85 02: 00 113121/85 04:00 '03'121 195 06: 00 03121/85 08:00 03/;!1/85 10· 00 :):V21 /85 12: 00 :):~/::'1 /85 14• 00 •Y,</21185 16: co ·-o3t21 /85 18" 00 03/21185 20: 00 03/21/85 22:00 t'.':J/21 /85 oo· oo BY 1 E. f-: ,-,w [';~ u; = ="1!;'"':"": :.-:-:';~ :':': .H~·~;--;,·.~'t-':' 3.18 06 319 05 3;1 0 05 :::t21 05 3;.~? (l6 3~23 1J5 324 06 3:!3 06 326 06 327 05 3l?B ('~' ~~;!'i' 05 DAILY AVERAGE VALU~S 330 3;]j 3:.1;;• 3~13 334 3:15 3~~6 3~i7 338 339 340 341 Ci6 06 ():;.~ ')6, 1)5 "'I'-! ' •• .l .... t Ob Q{, 0~;. 05 OS tJ:r DAILY AVERAGE VALUES 342 34:.; 341+ 34:> 346 347 3.118 :-149 350 351 352 35~i ,.:~:) ('f.o 06 05 05 ·~15 1)5 <)6 05 OS 05 05 DAILY AVERAGE VALUES I J DEPTH FEEf --::::·.::::::..o:~::;-1:: 0. 3(1 () ;~s 0 25 0. ?5 0. 3'.) 0. ;!5 0 30 0. 30 0 ~'[I 0. 25 o ;;>s 0. 25 0. 27 0. 30 IJ. 30 0. 0 30 0. 25 0. 2:~ 0. ::K' o. 30 /.)_ ~?5 0 25 0. 25 0 ~'5 ""'· -~··"7 F.,..t r~' <:>. ;.~s 0 :::<0 0. 30 0. 25 0. 25 0 25 0 ;.?5 o. :~o 0.25 0 25 0. 25 0. 25 0. ;:>6 . ·.~ • t 4'1 l.! /t.:'•:"·/135 PAGE START T II'1E 02/20/F35 STAt~E r-r-r-..,.. ~-· C.C, t '::::~.::::;-;:~ ·~I ~·J ·). t 5 0 1 ~'\ 0. t 5 \) ;;;-:-) 0 15 0 20 0. 20 0. 20 0. 15 ·::.' 15 :). ~. ~' ;) .1 7 c~. 20 Q 20 0 15 0. 20 0. 15 0 15 0.~ 0 20 1) ! ~~ I_:! 15 0. 15 ·~} 15 !) . 17 ·:· j ""· (1 ;.:1) (J ;!O 0 15 0 15 I) 1 5 0 1 5 o ;~o (I 15 0. i 5 0 Ei 0 15 j:) ll- !: I SCH•:;l CFS .~~·~~-: ;!:-:.:;.:::~ ') ·>C• .... 10 I:) 1 0 •) j(t ·) t.'}.i.) C'. 10 0 ·~0 (\ 40 0 40 () 10 0 10 0. 10 0. 20 o. qo 0. 40 0. 10 0.~ 0 10 0. 10 0. 40 0. ~0 0. JO 0 10 0. 10 0 10 0~ .-;. l 0 (' ~-~0 0. 40 0 10 0. 10 0 10 0 JO 40 0. 10 0. 10 n. to 0 10 (•. ;:t{) . ..,, .. , ... J r ' t .. l ( I iC' 16 \)() fi;J t. A at I I •. I I I t i 1· t &.:.& IE;;;. •:{:.: •• • J I J • I £ l I j I J PROPOSED ELIM HYDRO~LEtTRJC PROJECl -rE"!'ERSEN CREEK NEAR f;!.!M, /Joli'\SI'l.A DA!E TIME '-:"':-"".''.:':;:::::'7:::'::0:~~ :t':===.=:: ().3/22/85 02: 00 o:u221e5 04: oo 03/2;:-•/85 06: 00 :J3/22/95 08:00 03/::~2/85 10: 00 o:::Y22/95 12: oo 03/22/95 14'00 0~3/22/95 16: 00 (1]/22/85 18:00 l"l:}/22/95 20.00 03/22/95 2200 1..':3/22/85 00: 00 03/23/85 02:00 0:Y23/85 04 00 "3123/85 06.00 0~/23/95 08:00 "O:::t1':23/85 10: 00 03/23/95 12:00 03/23/85 14:00 03/23/85 16:00 03/2~1/85 18" 00 O~:t/23/85 20: 00 · -· ·o:t.t23ta~ 22: oo 03/23/85 00:00 02:00 04.00 06:00 08:00 10:00 12: 00 t4·oo 16"00 18:00 20:00 22.00 0:~!24/85 00: 00 3YlE HAW 01\TA : :!:':::::: -:.::":'~·.:;;:7.: :.:-~:::::::;:-· 354 05 3~!:> 06 3~)6 06 "":rr-• ~l:.'! o.J _,... \.· ,.} 358 OS 3~19 05 360 06 31:'-.1 05 362 06 3&·3 05 3!,4 05 :3t,5 0~) OAILY A\}ERA·~E VALVES 3.1:·6 05 3l-7 06 3b8 •)5 36"t 05 370 05 371 05 3?2 05 3?3 06 3Y4 OS ~'"J~c:;. nt::. .._} .... ..· _, 376 05 377 06 DAILY AVERAGE V~LUES 378 ')!'\ 377 <)5 39'0 05 381 05 382 05 383 05 384 06 385 06 386 06 387 05 388 05 389 05 DAILY AVERAGE VALUES DEPTH FEE1 =~=-~-:.>;.·;::: 0. 25 0 30 0. 30 0 25 0. 25 0 25 0. 30 0. 25 0 30 0. 25 0. 25 0. 25 0 ~'7 .. '1::. 0. 25 0 30 f..., :-.t;; .., "'-- 0 25 0. 25 0. 25 0. 2~1 0 30 0 25 0 25 025 0. 30 0. ;.~..tl 0 """ "-.... 0 25 0 ""' ~ • ..1 0. 25 0. 25 o ;;:·s o ao o. :~o 0. 30 0. 25 0. 25 0. 25 0. 26 STAR1 11/0~/85 PAGE TIME 02/20/85 S!"AOE r.ccr.·r =-=~:::::.:\':, 0 15 (:, 2·~} () 20 0 15 0. lS n ~~ ~ -~ 0 20 0 15 0. 20 (l ! 5 0 :t 5 ') 1 5 0. 1 ~_, 0. 15 0. 20 0 ts 0 15 0 !5 0 15 0. 15 (J 20 0 15 ~:1 1 5 0. i 5 0. 20 ~:) t ~~ 0. 1 ~; 0. t '5 0. 1 ::> 0. 1 :1 0. i 5 ') 1 5 (; ~~f) <) 20 0 20 0. 15 0 15 t) j, ~' I) 16 !:ISCHG CF~3 ~--:::::::::::~= 0. 10 0. 40 0 40 0 10 10 ~ 10 0 40 ~:.~ 10 0 ~0 0 10 o to 0. 10 n.~ 0. 1 (l D '1-0 0 . .1 () 0 1 (l 0. 10 0 10 (). 10 0 40 ·') 10 ') 10 0. 10 0. •10 r· ;;:s) {i :10 ~) 1 (l (~ 10 (! 10 \). 10 0 to 0 •10 0. •la 0 40 0 10 0. 10 0 10 (' PO 1 t6· 01.:, ' .. I .. ·.1·1· ( : 1. •• r• a~; &I •• 1.1 -c PI<OPCt:-.>ED EL IM HrL'POELt:'.Tf.: !•: PRCl-JE( -~ETERSEN CREEK NEAR ELJM, ALASKA DATE T I !'1E ... =~:'!~~=-=-= ==;:-;-:·-: 1X:ti25/85 02: 00 03/25/85 04:00 03/25/85 06:00 o:~f25tB5 oe: oo 03/:=•5i85 10: 00 03/25/85 12:00 i):J/25/85 14: 00 03/25/85 16:00 03/25/85 18:00 o~~/25185 2o: oo i);y~~5i85 22· 00 o::.v~~S/85 oo oo 03/26/85 02.00 ')3/26/85 04: 00 0:3/;;>t./85 06: 00 03/2t-, /85 OS: 00 03/26185 10:00 03/26/85 12•00 0:3/26/85 14 00 . 03/2t.·d85 16· 00 03/26/85 18:00 03/26/85 20:00 '03/26/85 22:00 03/26/85 00:00 03/27/85 02:00 03/27/85 04:00 fXY27lB5 Ob: 00 o:u;:!?/85 oe: oo -)~~/27/85 10: 00 o::v;~?/85 12: oo o:~/::;'7185 14.00 0:</27/85 16· 00 tX:V27/B5 18: 00 03/27/85 20:00 •)3/27/85 22.00 O::'Y27 /85 00 00 BVTE R~'i\.J [•Ali~ =~=·: •.·::~· .. -:~.-;·:-.::;:.:·~':'<;;:·; 390 o~; 391 ()5 3 ... ?2 (>{, 3'i3 05 3<'.;>4 06 395 05 396 o:J 397 06 3Q8 •.)5 39'1 ()5 400 05 401 :)5 DAILY AVEPAQE VALVES 402 403 4tH 405 406 407 40a 40'? 410 411 05 05 (~6 05 05 ')5 05 06 ')5 r·= .. : .. .} 412 05 413 05 DAILY AVERAGE VALUES 414 Ct5 415 05 416 05 417 05 418 05 41 '? 05 4:;.:0 05 421 06 422 05 423 OS 424 05 4i-'!5 05 DAILY AVERAGE VALUES ~ &_ I •• .I t J • f E;.;IP •. , DEPTH FEF.:l ==.".:.~:;:::: ·~:;;: 0. 25 0.25 0.30 0. 25 0. 30 0 ''"'· . r - 0 25 0 30 {) l t.~ '~! r.. ... ' o. ;;~s 0. 25 0 ;:!5 0 ;::~6 o. ;;:s 0 25 0. 30 0. 25 o ;:•5 0 . ..,., C-.J 0 25 (l. 3C" o ;:•s 0 "•"\ ·--o ;,~s 0. 25 0. ;;•6 0. ;;>5 0 ~5 0. 25 0. 2!'\ 0. 25 0 25 0. 25 0. 30 0 25 0.25 0. 25 0. ;:1 5 o. ;.•s 1 j I ~JiBS PM~E SIART ·riME 02/20/85 16 00 ST ~;{~!.= ,--t:E,. :;::::.:::; :;::;. ~;.: (J 1 ~~ :.,')' 1 5 (). 20 •.) 1 s C!. ;:~i) r::. t ~' ·) .~ 5 ,:; 2·J ·) 15 r~. 15 ,-). 1 5 -:.• 1 :; .;} 16 (1 1 ::· {1 i t:; -· J. '- 0 20 0. i :=; (1. 15 (). 15 -, • r.· ~ l. ) (t. 2·:~ (! t ~ ~· . t =~ Q. 1 ~~ :) 1 ~.> 0. 1t:, 0 15 0 15 0 15 0 15 0 15 0 15 0 15 0. 20 0. 15 0. 15 D 15 0 IS 0. tS i' I 2fHG CFS ====-= () I 0 Q ~ 0 0 •1-0 !'; 10 >) 40 >! 10 1 ;-, -- 40 ti. 10 0. 10 ~-'· 10 (j lO {) 2C~ 0. 10 0 10 0 40 0 10 0. 10 0 10 0. 10 0. 40 0. 10 0 10 0. 10 0. 10 ::-.20 •;) 10 0. t 0 10 ·') 10 0 10 0. 10 () 10 (> il-0 0. 10 0. 10 0. 10 'J 10 ·:'. 10 I. J .. J c: 1 ' ) a I lilt ., ••• a.:.:a • • a I • J t I ! ' •• ... t:~:•'l •. J tl;: I R:l .,, 11 (' J .. 1 i I rJj f'POPOSED EL IH HYDROEL['.: ff-:!C r-·ROJC:CT t 1 /C'':i/85 PAt~E 1J PETERSEN CRf:E~ t.JEAR CUt!, ALAS~. A STAR1 n riE 02/20185 t6· 00 DEPTH STAG£ [!ISCHG DATE TIME BYTr-RAl..! DATI"; FEET FEET CFS ~':~~~!!!=== ~==!:'!:~ ===::.": ."::~=·=~:!=!;:::~:=-': ==~=~= ==":!:'.\==. ,-;:::=~:::::::::=:= 03/'28/85 02:00 4~~6 05 0. 25 0 iS 0. 10 03/28/85 04:00 4P7 05 o. ;;::s 0. 15 C1. l.O 03/28/85 06:00 428 OS 0. 25 0 1S fl. 10 03/28/85 08:00 42<'? 05 0 ~.:; . "--0. 15 0 10 10'00 430 o~, 0.25 0. 15 (l 1.0 12:00 ·431 O~r 0 25 0 1 ~~ 0 1() 14:00 432 05 0.25 0. t 5 0 10 16:00 433 05 0. 25 0. i 5 0. 10 18:00 4:i4 05 0 "'"' ·"-" 0. 15 0. 10 20:00 435 05 0 25 0 15 f) 10 22. 00 436 ()5 0. 25 0 1 ~) 0. 10 00:00 437 05 0. ;::!5 0 15 0. 10 DAILY AVERAGE VALUE'S 0 25 0. :1.~ 0. 10 03/29/85 02:00 438 05 o. ;;:~s 0 1 :\ 0. 10 . 03/2'9/85 04: 00 439 06 0 30 ·:':~. 20 0. 40 03/;::!9/85 06: 00 440 05 0. ::.!5 0 . .15 •). 10 03129/85 o8·oo 441 05 0. 25 (1 15 0 10 '031'29.185 10.: 00 442 05 0. 25 0. 15 0. 10 03/29/85 12:00 443 05 0. ~.!5 0. 15 0 10 03/29/85 14:00 444 05 025 0. 15 0. 10 . 03i.29/85 16: 00 -445 :)5 0. 25 (l 15 0. tO 03/29/85 18:00 446 05 0 25 () 1 5 0. 10 03/29/85 20:00 447 05 Q r;; . c. :J (> 15 () lO 22:00 448 05 0.25 () 1 5 0. 10 00:00 449 05 0. 25 •) 15 (} 10 DAILY AVERA(:>E VALUES (J, 25 ;) 1 :· \). 10 02.00 450 05 0 25 ') i :'\ •:J. i 0 04:00 451 05 0. 25 0 15 D 10 06:00 452 06 0. 30 0 :::!0 0. 40 08:00 453 05 o. 25 0. 15 (! 10 10.00 454 Oi-, 0 30 0 20 0. ~0 f'~/30/135 12:00 455 05 C. 25 ') 15 (J 10 (J:!/30185 14: 00 45.!;, o::; 0. :715 0. 15 0. j 0 O:'i/30/95 1.:.,· 00 457 05 0 •;;:: C. ...I i) 1 ~· D lO 03/30/85 18:00 458 05 0. 25 0. i 5 0. j() 03/30/85 20:00 459 05 0 25 (1. 15 0. 10 03/30/85 22:00 4~··0 05 0 25 0. 1 !'_; 0. 10 o:-V30lB5 00: 00 4t-t 05 0. 25 (• 15 0 10 DAILY A'IEP.AOE VALUC::S 0. 2i,;, 0 16 <"';. 2C• · -. t' • I a • • I a I a J I I I l f Jl t:'ROF'OcED EllM ~,I''DRnE• ~:-'ff-11•" Pf~n ;~:r-f I . . --·' . . 'r ·-·•-~ .,, .. -, ·--"""' PFTERSEN CREEK NEAR EL H1, ALASf'A DATE TIME ~-:'=~-::~~'!:!:= ~-M-==: t:r:Y31185 02: oo 03/31/85 04:(}0 CJ3/31 /85 06: 00 0:1/31185 08:00 0:3/31/85 10: 00 o:u31 /85 12: oo -0!31'31 /85 14: 00 O:J/31/85 16.00 03/31/85 18:00 O~Y3i /85 20: 00 0~3/31/85 22:00 o:~/31/85 oo: oo 04/01/85 02:00 04/01/85 04:00 04/01/85 06:00 01'\/01/85 08: 00 -04/0i/85 10: 00 04/01/85 12:00 04/01/85 14:00 04/01185 16· 00 ()1:1/01/85 18:00 (ti\/01/85 20:00 t'l-:ttO l /85 22: 00 0•1/01/85 00: 00 02:00 04:00 J--~-,-..-4-t-A~,~.,. oe,~-oo 08:00 10:00 12:00 14:00 16 00 18:00 20:00 04/02/85 22.00 ~:>4/02/BS oo· oo BYTE. RAW .DA1A ='==~~ ==:...::::..~:;-::::;':':!~1.:;.'!:: 462 05 463 05 464 O:'r 4t,5 OS 466 05 4!,7 05 468 06 469 o:. 4l0 05 471 05 14:'2 (!5 473 ('>5 DAILY AVERAGE VALUES 474 05 475 (15 476 05 4Tl (~6 4:'8 (!o 477 05 480 O'J 481 (1!\ 482 05 48:1 05 484 05 4[~5 05 DAILY ,t.VERAGE VALUES 48b (J5 487 05 488 05 409 05 490 05 491 05 492 05 493 (>5 49"1 05 49!'t 05 496 05 497 05 DAILY AVERA~E VALUES I I I I • J I I e I lk:l I I I J f l' I t DEPTH FEET ::;;;:::;:::..'"':.:::.:.:: o. ;,;s 0, 25 0 ~,, . c..- 0. 25 0 25 0 25 o_ 30 0. 2'5 0 ;;:::_:. 0 25 0 25 0, 25 0. 25 0. 25 0. 25 0 25 0. 30 0. 3•) o. 25 0 2!} 0. 25 0. 25 0 25 0. 25 0, 25 0 ;:.:b 0 25 0. 25 0 25 0. 25 0, 25 0. 25 0 ::.:>5 (). 25 0.25 0. 25 {) -">= -. .-_..; 0. ;;!5 0, ;.~5 11/05/85 PAGE !~ GiAfn rJI'lE 02/20/85 16, OC STAt;;E ;:r-..f T ==~=-= • i 15 C>. 15 0. 15 C•. 15 0. 15 ~~-~. t 5 (t. ~~0 ::~ i ~~ 0 i :_; ,,-, ' "" .... ' ... ""' ~) i 5 (' ! s (), 1 5 0. 15 0. i 5 0. 1 <.i 0 20 0.~ 0 15 0. 15 0. !5 0. 15 0. 1~ 0. 15 0 15 ':'. t6 0 !5 0 15 0. 15 0. 15 0 15 0 15 0 i 5 0 15 0. 15 o_ 15 0 15 (' i 5 ~) l :; DISCHG (FS .::::::~-:=;:::.:::::. G . .10 0. 10 (\ 10 0 .10 () 10 ·) l 0 0. 40 (L 10 0. 10 0. 1.0 '), 10 Ci lO 0. 10 0. 10 0 10 0. 10 0. 40 0 40 0. 10 0. 10 0 10 0. 10 0 10 Q 10 0. 10 r1 20 () 10 (\, 10 (; 1 •J 0 10 0. 10 n 10 0 10 (1, 10 0 10 0. 10 0. lO 0 tO 0 10 l I • • • 1 &<J • • El IL.,I 1· 1 1· I a • • I E.l a f &. t a I I I I' I I J i I PROPOSED ELIM HYDROElCrrRIC PROJECI ll /(.i~/~35 PAGE 1 :. ~E"TERSEN CREEK NEAR CL IM, ALASI<.A STARl fiNE 02/20/85 16: Q(l DEPTH 3TAGF [1 ISC·H(;; DATE T!HE BY!E RA!.-J Dt,TA FEET fEET' CF~3 ~:'""'!!'!'::;~::;::'!.",1'::': :=::=~== ::=~!:!~ ':"::-~:·'" . .'':"::=::--..::·;;.-:;:,:::; ::==~.:.=-~ -· ·-~ ··-· --:··==="":':== /03/8'5 02:00 498 05 0 ~~= .z:....J 0. i5 (J. tO 04/0::~185 04: 00 49'? 05 0 . .;-!5 0. j 5 ''· 10 04/03185 06:00 500 05 0. 25 ') 15 0 10 011-/03/85 08:00 501 05 0. 25 I} 1 ~~ ,-, .1 0 04/03/85 10.00 sr,::t OS 0" ~~5 f:'. 15 ·:.1 t 0 ·:;4/03/8'5 12· 00 503 05 0. 25 r.) 1 ~.i r). tO !J4/03/85 14:00 50.4 Olo 0. 30 0 20 0. 40 04/03/85 16·00 505 06 () 30 (! ';.'0 0. 40 I" 04/03/8'5 18:00 506 05 0. ;'5 0, 1 :J c· 10 ,~ ----··---z;.:f/03/BS 20· 00 507 05 0. 25 0. j 5 0 10 Cl.ll/03/85 22:00 508 05 0. 25 0 15 0 lO 04/03/85 oo·oo SOQ' 05 0. 25 G I5 0 10 . DAILY AVERAGE IJAL.IJES 0. 26 0. 16 rJ. 20 04/04/85 02:00 510 05 0. 25 •:!. 15 0. 10 'i 0•1/04/85 04· 00 511 05 0. 25 C1 t 5 0. 10 04/04/85 06:00 512 05 0. 25 () 15 fl. 10 0.'1/04/85 08:00 513 06 0. 30 ') 20 0. 40 Ul57U4185 10: 00 514 06 0. 30 0. 20 lj •10 04/04/85 12:00 515 06 0. 30 0 20 0 40 04/04/95 14:00 516 05 0. 25 0. 15 ~). 10 O.lff04/95 16.00 517 05 0. ;:':5 0 15 0 10 04/04/85 18'00 518 OS 0. ;;!5 !) 1. ~~ (1 10 04/04/85 20:00 519 05 0. 25 (l 15 0. 10 311 ------o-4'.1'04185 22: ~0 520 05 0.25 () 1 5 0 10 04/04/85 00:00 521 OS 0. 25 () t 5 >). 10 DAILY AVERAGE VALUFS 0 26 0· 1b 0. 20 t).tl/05/85 02:00 ~~,., -:.e. 05 0. ~.!5 C> 15 ') 10 61 O<'J/05/85 04: 00 52:3 05 o. ;,~s 0 15 0. 10 ----·U4J'US.1'8'5 06: 00 524 05 0. 25 ij. 15 () 10 04/05/85 09:00 525 05 0. 25 0. 15 0. 10 04/05/85 10:00 52h 05 0. 25 (\ 15 0. 10 t'Fl?OS/85 12. 00 527 05 0. 25 0 i B c~ 1 o 04/05/85 14:00 5?8 05 0 .25 :J 15 0. l 0 Ort/05/85 16:00 s~·.u t";.: 05 0 25 :) 15 ~). 10 -otttos;as 1e: oo '530 05 0 25 r}, i 5 0. 10 04/05/85 20:00 531 05 0. 25 0. 15 G. 10 O•l/05/85 22: 00 532 05 0. 25 () 15 0. 10 !)4/05/85 00:00 5:~3 05 0 25 0 15 f) 10 DAILY AVERAGE VALIJES 0 25 0. i ~. 0. 10 i(,J ..... • • • I •••• •• • • • t • I I I • • •••• ._ . • ••••• •. 1 • t a J I 1 I I l J ']! PROPOSED ELIM HYDROELECfRIC PRDJLCl l1/0:~;fJ5 ~:AGE 1·~:: PETERSEN CREEK NEAR El!M, !l,L1~Sl".A STAfn T fl'!E O<:Y20/85 tb 00 DEPTH STAGE DISCHG DATE TIME BYTF RAW DATi~ FEEl FEET CFS ~=~:-:=-:=:=.::::: ==~== ==:::'::"~ =~·=~=~~~.:~-~~ ::=~== =·=.t't!=!~ ::::..::::=:=== 04·/01!:1/85 02: 00 534 ()5 0. 25 0. 1 ~ 0. 10 04/06/85 04:00 535 05 0.25 0. 1 ~) 0. 10 04/06/85 06:00 536 05 0.25 0 . .t :-0. 10 04/06/95 08:00 5:37 (15 0. 25 0 15 0. 10 04/06/85 10·00 539 05 0. 25 0 15 ("\ 10 011/06/85 12:00 539 05 0. 25 c~. 15 C•. 10 04106/85 14:00 540 05 0.25 0. 15 0. 10 04/06/85 16:00 541 05 0. 25 0. 1 :; 0. 10 04/06/85 18:00 '542 •)5 0. 25 ij 15 0. 10 ')li !Ot,/95 20: 00 51~'1 05 0. 25 0 15 0. 10 04/06/85 22:00 544 05 0.25 •). 1 5 0. 10 04/06/85 00:00 545 f)5 0. 25 0 i 5 0. 10 DAILY AVERAGE VALUES 0. 25 (1 15 0. 10 04/07/85 02:00 546 •J5 0.25 0. 15 0. 10 04/07/85 04:00 547 05 0. 25 0 1::; 0 10 04/07/85 06:00 548 (!5 0. 25 0 1:; 0. lO 04/07/85 08:00 54'/ (16 0. 30 0, 2Ct 0 40 04107/95 10:00 550 05 0. 25 0 15 0. 10 04/07/85 12:00 551 06 0. 30 0. 20 0. 40 04/07/85 14:00 5"'.'""l -c. 0~· 0 ?""> 0 15 0. 10 O't/07/85 16:00 553 05 0. 25 Ct. i 5 a 10 04/07/85 18"00 5511-05 0. 25 0. 15 0. 10 oJJt07/85 2o·oo 555 /"")" _,J 0. 25 0. 15 I") 10 .. 04107/85 22:00 556 05 0.25 0. 15 0. 10 04107/85 oo·oo 557 05 0. 25 0. 1 5 0 10 DAILY AVER/\GE VALUES 0 26 0. 16 0 20 04/08/85 02 00 558 05 0. 25 0. l5 (l 10 04/08/85 04:00 559 05 0. 25 0 15 0. 10 04108/85 06:00 560 05 0. 25 0 15 0 10 04/08/85 08:00 561 05 0 25 0 .. 15 0 lO 04/08/95 10:00 562 05 0. 25 0. 1 ~1 0. l.O 04/08/85 12:00 563 05 0 25 0 ! 5 '.) 10 i.~'4/08/85 14: 00 564 o:, 0 25 C>. 1 :' il. 10 04/08/85 16·00 565 05 0. 25 •) i 5 1>. 10 (t4/08/85 19:00 566 05 0. 25 0. 15 (J. 10 04/08/95 20.00 567 05 0. 25 () 15 0. 10 04/08/95 22:00 568 05 o. ;,:5 0 1::> 0. 10 Q.d/0!3/95 00:00 569 05 o ;;:•s 0 15 0. 10 DAILY AVERAGE VALUES 0 25 0. 15 0 10 ...... .. JI C I I a I a I •tflll I HH.1Pl1~3ED ELIM !·fi'DRDEL ECTR IC F'fWJE.C T PETERSEN CREEK NEAR ELI M, ALAS!<. A DATE TIME "!";'",'~~==-==~ !!:=:::e:== "04/"09/85 02: 00 04/09/85 04: 00 04/09/85 06:00 04/09/85 08:00 04/09/85 10:00 <).tl/09/85 12• 00 BY1E Rf,W DATA =~:~· :=::::::::'~:::":":;"!:.":~==·:'= 570 05 5"/1 05 572 05 573 05 5/'4 05 ~·75 05 ---o4t09t8~ 14:oo 576 05 04/09/85 16: 00 04/09/85 18:00 C:t/09/95 20:00 04/09/85 22:00 rJ4/09/85 00: 00 04/10185 02:00 04/10/8~ 04: 00 04/10/85 06: 00 :)l)/10/85 08:00 Dll/10/85 10:00 04/10/85 12:00 04/10/85 14:00 Otl/10/85 16:00 04/10/85 18:00 04/10/85 20. 00 04710/85 22:00 04/10/85 00:00 04/11/95 02:00 04/11/85 04:00 1rB5 06:00 04111185 o8·oo <]4/11/85 10:00 04/"11/85 12:00 04/11/85 14:00 :)4/ j 1/85 16: co .. 0#/11/85 18:00 04/11/85 20: 00 04/11/85 22: 00 04/11/95 00:00 577 05 578 05 579 1.)5 580 05 581 05 DAILY AVERAGE VALUES 58;> 05 58:3 05 584 0~ 5Coi5 Ot.., 58\~--05 587 'J:'.i 588 05 5B'7 C:5 '590 05 591 ()5 59;:> 05 593 05 DAILY AVERAGE VALUES 594 595 ~96 597 ~-i98 5¥9 600 6(!1 602 603 604 605 05 06 05 OS 05 (l5 05 05 05 05 05 05 DAILY AVERAGE \!ALUES I I I I j ,, •. ,., •• DEPTH FEET ==~=== 0. 25 0. 25 0. 25 0. 25 0. 25 0 25 0 25 0. 25 0 --.;::; . "-~ 0. 25 0. 25 0. 25 0. 25 0. 25 0. 25 0. 25 0. 30 0.25 0 25 0. 25 t). 25 0 25 0. 25 0. 25 o. ;;:.:s 0 25 0. 25 0. 30 0. 25 0. 25 0. 25 0. 25 0. 25 o ;;:.:s 0. ::!5 0. 25 0. 25 0. 25 o. ;.~s J 1 /0:)'5/85 f'AGE 1: SrART TIME 02/20/85 16·00 SlAG!: ;:s:::ET =-==== 0 15 0. 15 (> 15 0 i5 tJ i5 0 15 0 15 0 15 0 15 0. 15 0 15 0 15 0. 15 0. t :, ') l 5 r) 15 c\ 20 (I .1 5 0 i5 (1. j 5 0 t5 0 15 0. 15 0 15 0 15 0. 15 () j 5 0. 20 0 15 0 15 1) i 5 0 15 0 i 5 0 i 5 0. i 5 0. 15 0. 15 0. 15 0 15 l\I SCHG C:FS ---::::==== Q 10 0 10 0. 10 0. 10 0 10 0. 10 0 10 0 10 0 10 0. 10 0. 10 0 10 0. 10 0. 10 f). 10 fl tO () 40 0. 10 0 10 0. 10 0. 10 (!. 10 0. 10 (I 10 0 10 (J 10 ,·, 10 0 40 (I iO 0. 10 0. 10 (• 10 tl. 10 ·:) j 0 0. 10 0. 10 0. 10 n_ 10 0 10 II: I •• I. J r 1 I J l I ' .. i a I E,~•:t a. I a._t • I I rll f il 7 PPOPDSED ELIM HYDHOEtFCTRJC F·fH.JJ!::Cl --P-ETERSEN CREE~. NEAR t:t. m, ALA:3!-'.A J 6 R DI1TF TIME t""''!'."':~~=t~::em =::o:.::c:• -----{)4/12/85 02: 00 04/12/85 04:00 04/12/85 06:00 04/12/85 08:00 04/12/85 10:00 {J4/12/85 12·00 --04~12185 14:00 04/12/85 16:00 04/12/85 18:00 0-4/12/85 20:00 (14/12/85 22: 00 (}4/12/85 00:00 04/13/85 02:00 "04/13/85 04:00 04/13/85 06:00 04/13/85 08:00 --·'!}4/13/85 10: 00 04/13/85 12:00 04/13/85 14:00 04/13/S~ 16:00 04/13/85 1800 ()4/ 13/85 20: 00 j~---t"r:it-7131'8!) 22: 00 04/13/85 00:00 ·ql -t:~ t)4jj4/85 02• 00 k 0~/14/85 04:00 t ' ~-tjtt:t·t·4tB5 05: 00 " 04/14/85 08:00 I~ o~t 14/85 12: co _L 04/14/85 10 00 r.. 011/14/85 1400 1 04/14/85 16-00 1 ·-047'14/85 18:00 ~ 04/14/85 20:00 n 1-~J, 04/14/85 22:00 04/14/85 00.00 BY1F RA!~ DATA ==~-:··~ :::::":'.';.':"";::;~.-::-~:.~~ 60b 05 607 05 608 (15 &-09 OS 6 i':l 05 t-11 05 612 05 613 05 614 OS 615 05 616 05 617 05 DAILY AVERASE I!ALIJES 618 05 619 OS 620 05 621 05 6~!2 ()6 623 05 624 (l~> 6:;?5 0~ 626 05 6~?7 05 628 05 62';1 t.)5 DAILY AVERAGE VALUES 630 0~· 631 05 632 05 633 05 634 05 6::r~ (~:' 636 o~, 6::-i7 06 o::~e os 639 OS 640 05 641 05 DAlLY AVEr~AGE VALUES ,I I I I 1 DEPTH FEET ======: 0.25 rs 'IG --t:.. ... 0. 25 0. 25 0. 25 0. 25 0.25 0. 25 0 ~~~5 0.25 0. 25 0.25 0.25 0 25 0. 25 0. 25 0.25 0. :w 0 25 0. 25 0. 25 0. :;:!5 0. 25 0 25 0. 25 0 ~"'(C, . ~-- 0 25 0. 25 0. 25 0. 2e, o .:~s 0. 25 0. 25 0 30 0. :::?5 0 25 0. 25 0 25 0 25 r 1 I' I &J a I 11/05!85 PAG~ 18 fdART T lME 02/20/85 16 0(> STAGE .::t:.E T .::.:.·;;~;;.;t:.-:;.: 0. 15 0 1 ~} •). i 5 (~ ! 5 0 !5 0 1::'- •.} i 5 Cl. 15 ()_ 1 5 0 15 (>, 15 () 1 5 0. 15 0. 15 0. !5 0. 15 0. 15 0. 20 0 15 0 15 0. 15 Ct ! ~ 0. 15 0. 15 0 1::, !) 1 5 (\ 1 5 I) t 5 •). 15 0. 15 0 iS 0 15 <) 15 ij 20 0. 15 0. 15 C>. 1 ~l 0. 15 () j 5 DISCHG ·:Fs ::;:=:::::::::::::= 0. 10 0. 1 () 0 10 0. 10 (i jQ {\_ 10 0. 10 0 10 0 iO 0 10 i)_ 10 0. 10 0 10 0. 10 0. 10 0. 10 0. 10 0. 40 0. 10 0. 10 •) !.0 \1 10 0. 10 0. 10 0. 10 •J 10 0. 10 1). 10 0. 10 I)_ l 0 •) 10 0 10 (1 10 0 40 0. 10 0. 10 0. 10 n. 10 () 10 •• •• a'J C I I I I I • • I • J •• • J I I ll I I fJ PROPOSED ELIM HYDRCELEClR!C rRO~ECl ----·-··· ·-f;>""T"'n""EN CPEE" "'EA,.. r::·LTM ALt:r.!iA i I I . 10 · "''"'"" • • .... ·~ " --' ; • '-'· •• I, !10! 13 ,. I. "' " !R ) ~· DATE TIME -=-~=====~ -====== ·---e4t15/E.t5 02: 00 04/15/85 04•00 04/15i85 06:00 ~~~1~/3~ oaoo 01'1/15/85 10:00 ~.'4/15/85 12:00 ---o4t1 ~~a~ 14: oo 04/15/85 16.00 04/15/85 18:00 (14 /15/85 20• 00 04/15/85 22:00 04/1 ~./85 00: 00 04/16/85 02:00 Ott/16/85 04·00 04116/85 06:00 0lltH~/85 OS: 00 04118/85 10:00 04/16/85 12:00 04/16/85 14:00 .,4/16/95 16:00 04/16/85 18:00 <)4/ 16/85 20• 00 111 -·---er:t~t t'6..tS5 22: 00 04116/85 oo·oo J~ 04/17185 02:00 '"I t"J4117 /85 04: oo 7r-------o-tt r t7ra~ o6: oo <:'>41 17/95 08: 00 (!4/ 17/85 10: 00 '(tt:l/17/85 12· 00 O.tl/1/'/85 14:00 (>4/17/95 16:00 ? cl ---047"17 /'85 18: 00 04/17/85 20:00 •)4/17 /85 22: 00 C<t/17/85 0000 I':l'tlF P.A!.J DATA ==-::o:~ -::-:==~===~-= 642 05 643 05 644 05 b45 05 61\!, 05 647 05 64!3 05 64;1 05 650 05 6!i1 OS 652 o~, 653 05 DAILY AVERAGE VALUES 654 655 6 ~,' "'"' 6 "'..,. .. u 658 659 660 661 6!'\2 663 664 05 OS 05 05 05 (!5 (;5 05 05 05 06 665 05 DAILY AVERAGE VALUES 666 05 6£,7 o:, 668 05 669 05 670 ()5 671 06 672 •)5 673 06 674 05 675 05 676 05 677 OS DAILY AVERAGE VALUES • I I I I DE:PTH FEET ======= 0. 25 0. 25 0.::.15 0 . .2=1 0. 25 0. 25 0.25 0. 25 0 ''"'· -. t'-_, 0. 25 0.25 0. 25 0. 25 0. ;;.~5 0. 25 0 25 0. 25 0. 25 o ;:~s o_ 25 0. 25 0 25 0 25 0. 30 0. 25 ~"'\ ,-it; ..... ' .... _ ... 0 25 o. ;::s o ;~5 0 25 0 25 0. 30 0. 25 0. 30 0. 25 0. ::25 0 ""' -c."" 0. 25 0 26 I" J I I &I •• 11/05/85 PAGE 19 STARl TIME 02/20/85 16:00 STAGE FCF f =:::':."':"'"':::-::;'" 0. 15 1), 15 (} 15 (). 15 0 15 •} 15 (:, 15 0. 1 5 0 i 5 Ct .t 5 0. 15 ':) t 5 0. i 5 <::> 15 D. ! 5 0 15 0 15 0. 15 0 15 0. 15 0 15 0 15 0 15 0.~ 0. 15 () i ~ 0 i5 0 l. 5 D. 15 0 15 (), i 5 n 20 0 j 5 'J 2() 0. 1 5 0. 15 0. 15 0 15 0 i6 DISC~tt:; CFS ·-:::==-::-::::-;::::: (l, 10 0. 10 0. 10 D 10 ·:· 10 n. 1 o 0. 10 0 10 0 j(l 0. 10 0 10 0 10 0 .. 10 o_ 10 0. 10 0 10 0. 10 0. 10 0. 10 0. 10 0. 10 0 10 0. 10 0. 40 0. 10 10 ("!. i 0 .n j 0 0 10 0. 1 () 0. 10 (l iiQ 0 . .tO •) 40 0. 10 0. 10 0. 10 (J 10 0 20 •• t t I I ( ] i - j ' ' • • • • I • .I • I II II I I I I I J I J II I I 1: I a .. J I. I & I E I I I l I f. PROPOSED ELIM HYDROELECTRIC PROJECl -PETERSEN CREEK NEAR ELIM, ALASMA DATE TIME --=-~l':~~~== =:::==== 04/18185 02:00 04/18/85 04:00 04/18/85 06•00 04/18/85 08:00 C14/18/85 10: 00 04/18/85 12•00 ()4 / 18/85 14. 00 04/18/85 16:00 04/18/85 18:00 04/18/85 20:00 04/18/85 22:00 0-'1/18/85 00:00 04/19/85 02:00 04/19/85 04:00 04/19/85 06:00 04/19/85 08:00 04/19/8:5 10:00 04/19/85 12:00 04/19/85 14·00 04/19/85 16:00 ')4/19/85 18:00 "0'1/19/85 20:00 --o~tt<rl~ 22: oo 04/19/85 0000 04/20/85 02·00 t).c'l/20/85 04:00 -•""04/20/85-06: 00 04/20/85 08:00 04/20/85 10:00 04/20/85 12:00 (>4/20/85 14: 00 •)4/2'0/85 16: 00 04/20/85 18:00 (t4/20/85 20· 00 04/20/85 22:00 o.~tJ::o/85 oo· oo BYTE I~P.W DAT.C. ==-::·: :-::::-:-~.~.~ '::!!::0:.::::0::.~::-" 678 05 b?~l 05 680 05 6£' I 05 682 05 6f(3 (\5 684 05 685 05 68/-:-05 687 05 683 05 6(~':{ 05 DAILi AVERAGE VALUES 6?0 05 691 05 6?2 05 6'1'3 05 694 05 695 05 606 05 6';•7 05 693 05 69? 05 700 05 701 05 DAILY AVERAGE VALUES 702 05 70:3 o:' 704 05 705 05 706 05 70:' 05 708 05 709 05 710 05 711 05 712 05 713 OS DAIL''I" AVERAGE VALIJt::S DEPTH FEF.T =:::::=-=.:~:-;:: 0. 25 0. 25 0.25 0 2:5 0. 25 0. 25 0.25 0. 2'5 o. ;;:·s 0 25 (}, 25 o ;::~s 0 25 0 25 () ~~5 0. 25 0 25 0 ~,c ' e. .J 0.25 D 25 0 25 0. 25 0. 25 0 25 0. 25 0.25 0 25 0. 25 0. 25 0. 25 o ;;;s 0. 25 0. 25 0. 25 0. 25 0.25 0. 25 0. 25 o ::.;s !!10~/85 PAGE 20 START 1 H'lE (t2/20/85 16 00 '==;TAGE ~FET ~==-::::::. .. ~:: C• 15 0. 1 :'. () 1 5 0 lS q ! 5 0 15 0. 15 0. 15 0 15 0. 15 0 15 0. i5 0 15 0. 15 0 j 5 t.) i ~1 (:. j 5 >) i 5 0. i 5 0 15 0 15 0, j 5 0 15 tJ 15 0 1::; () 15 0. 15 0. 15 <:) 15 0. 15 0 15 0 15 0. 15 •} 1 ;:. (.; 15 0 15 0 15 •) 1 :.t ·J 15 DISCHO CFS =~=== (1 \0 (:, l 0 0 10 n 10 0 10 \'1 .. 1 0 •). tO 0. 10 0. 10 0. 10 ') to () 10 ,-! 1 (; ·~1. 10 0. 10 (t 10 0. lO (1. 10 0. 10 0. 10 0 10 0. 10 0. 10 0 10 0 10 () 10 0 10 0. 10 0. 10 0. 10 0. 10 0 10 0. 10 ~-10 0. 10 0. 10 0. 10 0 10 0 10 ' f Ji I I • I I I •J II I:J I.J PROPOSED ELIM HYDROELECTRIC PRUJErT f'ETEP.SEN CREE!o\ NEAR ELH1, Atf',SH?, DATE TIME BYTE RAI·! DATA ....'!~!:"::::::=.::::: ==~== ~:=~ !'::"::":~~~:-:: t'.''~:::::-::::.:~ 01!1/21/85 02:00 714 05 04/21/85 04:00 71::> 05 04/21/85 06:00 7i6 05 04121/85 o8·oo 717 05 04/21/85 10:00 718 05 12:00 71 ~~ 05 14:00 720 05 16:00 721 06 04/21185 18: 00 722 06 C4t21/85 20·oo 723 05 04/21/85 22:00 724 05 04/21/85 00:00 725 05 DAILY A\tERAGE '.JALIJES 04/22/85 02:00 726 05 ::J4/22/85 04' 00 7;~7 05 011/22/85 06:00 728 05 04/22/85 08·oo 729 05 o4t22/85 1o·oo 730 05 04/22/85 12•00 7:::11 05 04/22/85 14:00 732 05 . 04/22/85 16: 00 78~ 05 04/22/85 18:00 73•1 05 20:00 73:5 (l5 22:00 736 05 00:00 7:i7 05 DAILY AVERAGE VALUES 02:00 789 05 04 00 7:~9 05 06:00 740 05 08:00 741 05 10: 00 742 OS "04/23/85 12 00 743 05 04/23/85 14:00 74'1 05 (}4/23185 16· 00 745 (.l5 -0"4123/95 18:00 746 05 04/23/85 20:00 747 05 •.J4/23/85 22 00 748 OS (1 4/23/85 00: 00 74C? 05 DAILY AVERAGE VALUFS I J l J I I I I I I I I I. t I I •••• r: 1 I J ' t 11 /(.1 :~·/B5 r:·.t>JJE ;.~ l START TJME 02/20/85 16' ·}0 DEPTH STt,GE ['! SCHG F£:ET ~='LET CFS :.=:=.::':'!== :'!..:.:-~= ""::::".;;-;.':':::::::=:: 0. 25 0 i5 0. 10 0. 25 (• t 5 0. 10 0 '"1<; 'c.-() t B 0. 10 0.25 iJ 1 ~ 0 10 0.25 i) ]5 (1, 10 0. 25 0. i 5 C) 10 0.25 0 iS 0. 1 rJ 0. 30 0. 20 0. 40 0" :]f) lj 20 0. 40 0. 2~· 0. !.5 (I l.O 0. 25 0. }!'} 0 . .10 0 25 0. 15 0. 10 0 26 0. !6 0.20 0. 25 'J. 15 0. 10 0 ..., .. .... ' ,._ .. 1 ·~· 15 0. 10 0.25 0. iS 0. 10 0 25 ,:, 15 0. to 0. 25 0. 15 0. 10 0. 25 0 15 0. 10 0.25 0 15 0. tO 0. 25 0. 15 o .to 0 25 0. j 5 0. 10 0 ~,.:: '.t::,. . ..; (! ! 5 0. 10 0. 25 0. 15 0. 10 0. 25 0 15 0 10 0. 25 0 1 ~} f) 10 0. 25 I) i 5 u 10 0 25 0 i 5 (! 10 0. ;..>5 (J ! 5 0. 10 0. ;;:~5 -J. 1 ~~ 0. 10 0. 25 0. 15 0. 10 0. ::::5 0. i 5 '), 10 0. 25 0 15 (\ 10 0.25 i) i 5 f• to 0. 25 tJ 15 0. 10 0.25 0. 15 r} 10 0.25 0. 15 0. 10 0. 25 C> 1 5 '). 10 0. 25 0 15 (J t~J I I I J I J • J I I I I I , ]I PROPOSED ELIM KYDRGELECTRlC PROJECT ( il:l----PETERSEN CREE~ NEAR ELIM, Al .. t,SI'\A DATE TIME !:lVTE RA!.J n.;,f~\ ~~'!"!'':":"~=== ====-= =-:::~!,·.;.; ''::;'~··.-:::-..·:..~ :=~~-= 134124/85 02:00 750 05 04124/85 04:00 :751 ()5 04/24/85 06· 00 7~·2 ()5 04/24/85 08:00 7~·3 05 04/24/85 10:00 754 (}5 04/24/!35 12:00 /'55 05 04/24185 14:00 756 05 04/24/85 16:00 757 05 04/24/85 18:00 758 06 -04124/85' 20: 00 759 05 04/24/85 22:00 760 05 04/24/85 00:00 761 05 DAILY AVERAGE VALUES 04/25/85 02:00 762 05 "t)4/25/85 04: 00 71!<~ 05 l)l]./25/85 06: 00 764 05 ;J'l/25/85 08: 1.)0 765 OS 041257'85 10:00 766 05 04/25/85 12:00 767 05 04/25/85 14:00 768 05 '04/"'25/85 16:00 769 05 04/:.?5/95 18: 00 770 05 04/25/85 20:00 771 05 .. \)4125/85 22: 00 772 05 04/25185 00:00 77:~ 05 DAILY AVERAGE VALUFS 02:00 774 05 04:00 775 05 08:00 77b 05 08:00 777 05 10:00 778 (15 12• 00 779 05 14:00 78(! o::. 16•00 7tH OS 18:00 782 05 20: 00 783 05 22·00 784 05 04/26/85 00:00 785 05 DAILY AVERAGE VALUF.S J I 1 I I DEPTH FEET =:.=::==== 0. 25 0 25 n ~.,c: ..., . e. ..J 0. 25 0 25 0. 25 0. 25 0 25 0 :30 0. 25 !_}_ 25 0 25 0. 25 0. 25 0. 25 0. 25 0. 25 0.-25 0. 25 0. 25 0 25 0. 25 0. 25 0. 25 0. 25 0. 25 0. 25 0. 25 0. 25 0. 25 0. 25 0. 25 0. 25 0. 25 0. 25 0. 25 0. 25 () 25 0 25 & J a; I E:J a I &' . .1 • ~~ t 1 /()~>/85 f.~A~;E START T!ME 02/20/B~ STAGE DISCH~~ '~EE.i CFS =:::;::=:;_":': :.. ... :=:.:;::.::::::::= 0 j ~; 0. 1.0 ::) 1 5 0. 10 c' 1 !} o .. to (! ! 5 0 1 {} +) 15 •) t 0 i) 15 D. 10 0. 15 0. 10 0. j 5 0. 10 0 20 0. 40 0 15 0 10 •) 15 (} 10 (I 15 10 0 15 0. 10 0. 15 C. 10 0. 1 :) 0 10 0 15 0 tO C• 15 0. tO 0 15 0. 10 0 15 0. 10 ·) 15 0. 10 0 15 (1 IO •) 15 0. 10 t) 1 ~ 0 10 0. 15 0. 10 0. 15 0. 10 0 1 5 0 10 0. 1 5 0 lO 0 15 0. 10 () 15 0. 10 0. 15 0. 10 0. 15 0 10 0 . .t5 f\ 10 0 15 0. 10 0 1 s 0. 10 0. 15 i), 10 0. 1 ~/ 0. 10 0. 15 0. 10 0. 15 0. 10 0 15 0 10 .... -, \.~. ;:;·. 16:00 & J • I I I I I ul I I I II I a J I I at I t jl; 0 HOPDSED ELIM HYDROELECfRIC PROJECT -r>FTERSE:N CREEK NEAR ELm. ALASP:.A DAlE TIME BYTE Ho<\W DATA ...... '!'!:":~=~~=:::: ':'~.::::::"=~ =-==-~·-~:=::-=·::--;;:-.:=;';"'"':"!:'=:: '041~7!8'3 02:00 786 05 04/27/85 04:00 787 05 <~I 04/27/85 06:00 788 05 · 04t~7 /95 o8· oo 78q 05 ,~ (•4/27/80 !Oc 00 790 1)5 1 04/27/85 12:00 791 nc:: .... -' 13 ----~·-o.¢ t'271M 14: oo 792 05 " 04/27/85 16:00 ri3 05 " 04/27/85 18:00 794 05 "..... 04/27/85 20: 00 ?tiS 05 04/27/85 22:00 796 05 '"L---04/27/8'5 00:00 797 0~5 ·~ DAILY AVERAGE VALUES 04/28/85 02:00 798 05 04/28/85 04:00 799 05 04/29/85 06:00 800 05 04/28/85 08:00 801 05 ---·-o.ttt29 /8'5 1 0: 00 802 05 04/28/85 12:00 803 05 04/28/65 14:00 804 05 04/213/8~ 16:00 805 OS 04/28/85 18:00 806 05 04/28/85 20:00 807 05 ·-()1tJ'2S.tS5 22: 00 808 05 04/28/85 00:00 S09 ()" .., .... DAILY AVERAGE VALUES 04/2?/95 02:00 810 05 04/29/85 04:00 811 05 -'041'??'1~ ens: oo 812 05 04/29/85 08:00 813 05 04/29/85 10:00 814 05 . ('4/29/85 12: 00 815 05 ('4/29/95 14. 00 816 05 ()4/29/95 16: 00 817 05 04129/S~ 18:00 BiB 05 04/29/85 20:00 819 05 04/29/85 22: 00 8~'0 05 :I 04/::.:9/85 00:00 821 05 DAILY AVERAGE VALUES a 19 0· ~~ ~' .~- ',A, f I I I DEPTH FEET ====·-=~ 0. 25 0. 25 0.25 0. 25 0. 25 0. 25 0. 2::'· 0. 25 0 25 0 ''"' . ~-( 0. 25 0 .. .,c:: ~ t::...J 0 25 0. 25 0. 25 0. 25 0. 25 0. 25 0. 25 0. 25 025 0. 25 0 25 0. 25 0 25 0 25 0. 25 0. 25 0. 25 0. 25 0. 25 0.25 0. 25 0. 25 0 25 0. 25 0. 25 0. 25 o ::.:s I I a I R I & J START l!/0~/85 PAGE 23 llME 02/20/85 16:00 ST.tv;;s-DISCHG FEET CFS =-===-:-::"!'!:' ··~":'";==~= (l j 5 () 10 0. i 5 ·) 10 (), 15 •:1 10 0 1!"-(l 10 0. 15 0 10 0 15 (). 10 0. 15 0 10 0 .15 0. 10 •J 15 0. 10 0. 15 (' 10 0 . .t5 0. 10 0 15 0 10 0. 15 0. 10 0. 1 ~\ () 10 0. t5 () 10 0. 1 ~ 0. 10 0 .. i 5 0. 10 0 i5 {I 10 0 i5 0. 10 0. 15 0. 10 0 15 IJ. 10 0. 15 0 10 0. 15 0. 10 0. 15 0. 10 (! i5 0. 10 0 1:.:> t: 10 () 1 5 0 lO 0. 15 0. 10 0. 15 () 10 () 15 (1 '1.0 1). i 5 (i. 10 0 1:; f1. to 0. i 5 0 10 •.) t :5 (! 10 0 15 0. 10 .j 15 0. 10 0 15 0. 10 (I 15 0:) 1.0 (l t 5 ·:1 10 •• & I • J t: I I I I • . I I i I I I I • J I I • J I I f I I I l.,t ... ··~·· •"''~ •• aJ ~J t: J I j l ' 'JI r-'HOPOS>ED ELII1 HYDRDEU-'TP.I<:; PPD.ltCT l. 1 /•=·~-/85 F'A(;[ ;'4 PETERSEN CREEK NEAR EL H1, AL ASI'.A START lIt£' 02/20/85 16 0•) DEPTH STAGE 01 SCI+;} DATE TIME B'I!E HAW DATf; FEET FEET (;FS ;.>;"~c"=tr::ll:Xt:!t+:';a!: =•=== ==::..:-: ~=.:=:=,::..-:-::::;.::=:;::;.: ======== ==::..::::.:::!;:: =:::===-== 04/30/85 02:00 822 05 0. 25 i) 15 0 10 04/30/85 04:00 823 05 0. 25 CJ, 15 0. 10 04/30/85 06:00 824 05 0. 25 C! 15 0 10 04/30/85 08:00 825 05 0.25 (I 15 I) 10 04/30/85 10:00 826 05 0 25 0. l5 0 10 04/30/85 12:00 a;;::7 05 0. 25 0. 15 0. 10 04130/85 14:00 828 (!5 0 25 0. 15 0. 10 04/30/85 16: 00 82'1 06 0. 30 0 20 0. 40 04/30/85 18:00 830 o:. 0 ;'5 1J 15 () 10 04/30/85 20:00 831 nr: .._ .... , 0.25 0 ! ~; 0. 10 (14/30/85 22: 00 832 05 0 25 ~) i 5 0 . .tO 04/30/B5 oo-oo 8:•::1 05 0. 25 l'\ 4 c;:. .. ~ ..:; '-' (I_ 1.0 DAILY AVEP.AC~E VALUES fJ, 2::( •) I 5 0 iO Q!j/01/85 02:00 834 05 0. 25 0. 15 0 . .tO 0~/01/BS 04:00 e:~5 05 0. ~'5 (• i 5 ·::· 10 05/01185 06: 00 836 .::;~, 0 25 i) i 5 ()_ t 0 05/01/85 08:00 887 05 0. 25 0. 15 0. 10 05/01/85 10:00 833 05 0. 25 0. i :3 {I 10 05/01/85 12:00 83? 05 0. 2~· 0. 15 1). 10 05/01/85 14:00 840 05 0. 25 0. 15 0. 10 0!5/01/E!'S 16:00 841 05 0.25 ') 15 (J 10 05/01/85 18:00 84;;:> 05 0 25 (•. i 5 f). 10 f.•S/01/85 20: 00 843 05 o :;:~s 0. i::. 0 .tO -o-51'01/85 22:00 844 05 0. 25 0 15 0. jQ 05/01/85 00:00 845 OS 0. :;;rs 0. t 5 •) .. t 0 DAILY AVERAGE VALUES {) .. ;c: "" J!......J c'). 1 ~) (! 10 r)S/02/85 02: 00 846 05 0 25 ·~; 1 5 (I 10 04:00 847 ('~5 0 25 (! 15 () 10 06:00 848 05 0.25 (}. 15 0. l 0 08:00 849 05 0. 25 ;:) 15 0. 10 IJS/02/85 10.00 850 05 0. 25 •J 1 !:> (\ 10 :')~/02/85 12: 00 851 05 0. 25 0. 15 0 10 05/02/85 14:00 852 05 ()_ 25 ·) is ') t 0 r)~i/OiV85 16· 00 853 05 0 25 0. 15 :) 10 \)5/02/85 18: 00 854 05 (). 25 0. 1 :;:, 0. 10 iJ:J/02/85 20:00 855 05 0. 25 0. t 5 () 10 05/02/85 .2200 856 05 0. 25 0 ! 5 0. 10 0~/02/85 00:00 857 05 0. 2:-() 1 ~, o .to DAILY AVERAGE VALUES 0 ">o; <:.~ 0 15 0. 10 ll I I II II aJ a1 &t I rJI ' J. ~ ~ROPOSED ELIM HYDROEL~CTRIC PRUJECl f'ETFR!~EN CREEK NEAR El. !I'L ALAS!t.1-\ DATE TIME :: :<::::::;":':.~:::;::::-:,:=~"'! ::;::.::: DS/03/85 02:00 05/03/85 04:00 05/03/85 06:00 ·::J:'i/03/85 08: 00 :J~>/03/85 10: 00 0:?/03/85 1200 . 05/03/85 14: 00 0::>/03/85 16:00 05/03/85 18:00 ~l~/03/85 20: 00 OS/03/85 22.00 0~·/0:l/85 00: 00 05/04/85 02:00 05/(14/85 04:00 05/04/85 06:00 05/04/85 08:00 I'JS/.04/85 10: 00 05/04/85 12:00 0~/04/85 14:00 05/04/85 16·00 OS/04/85 18:00 05/04/85 20:00 --os;o4/85 22: oo 05/04/85 00:00 l?lYTt;· fU,t•l DAT !', :":::: ::.::;::::,:-_""':~'=:::::...·::-; e=,a o5 859 05 860 05 8ld 05 96? 05 863 05 864 05 et~s os 866 •:)5 867 C6 868 C·::> 969 OS DAILY AVERAGE VALUES a:;o o5 97! 05 87~: 05 873 05 874 (15 675 ()5 876 05 877 >')5 878 0:'· 877 05 880 05 881 05 DAILY AVERA,JE VALUES 882 05 883 ('5 884 05 .-he 05/05/85 02:00 05/05/85 04:00 ----o~rro5~ o.s~ oo 05/05/85 08:00 05/05/85 10:00 885 05 J( 0~10~/9'.5 12·00 IAil 05/05/95 14: 00 2 05/0~/85 16:00 J··-··-~fOS/85 18: 00 ~--. •, 05/05/85 20.00 05/05/85 22:00 0~'1/0'.5/85 00: 00 886 OS 887 05 888 05 Bin 06 890 05 891 (l5 892 05 8?3 (J~, DAILY AVERAGE VALUES I I 1 r 1 DEPTH FEE1 ;::=:::-::-::::.-;= 0. 25 0 ~>c; . .,__ 0. 25 0. 25 0.25 0. 25 0 25 0.25 0 ';'='; 0. 20 o. 25 0. 25 0.25 0 25 0. 25 0. ~5 0. 25 0. 25 0. 25 0. ;;:·5 {). 25 0. 25 0. 2=, 0. 25 0 25 0. 25 0. 25 0. 25 0. 25 0. 25 0. 25 0 ~?5 0. 25 0. 30 o. ;:s 0. 25 0. 25 o. ;)s o. ;:;•5 I I • .I ., • • .• STAR"! 11/05/85 PAGE 25 T1ME 02/20185 i6 00 STt,(~E FEtT 0. 15 0. i5 0. 15 0. 15 0 15 0 15 Q 15 0 i5 0. 15 0. 20 0 1 5 0. 15 (l 1 ~ 0 15 0. ! 5 (), t ~ 0 i :r n •c. -. J. .... ') i !:.1 0. j ~'t 0. 15 0 i '5 :). 15 0. 15 0 iS (l_ t 5 0. 15 0. 15 0. 15 0. 15 0. 15 0 15 r) i 5 0 20 0 i5 0. 15 0. 15 () 15 C•. 15 f!ISCHG CFS ·=~~.!'·:;;:::-::- 0. 10 ('; 10 0. 1 () (~. J 0 ·:) 10 o to 0. 10 \J. 10 0. 10 0. 40 0. 10 0. 10 o l.O () 10 0. 10 0 l 0 0. 10 0 10 0. 10 0. 10 C•. 10 (l 10 ('i 10 0. 10 0. 10 0. 10 C1. IO (\ 10 0. 10 0. 10 0. 10 0. 10 0. 10 0 40 0 10 0. 10 0. 10 0. 10 ') !0 •.. 1 • I • J It I I I I ' • a 1 I IT -I f & I ••• • J a .. t • • I PROPOSED ELIM HVDROELECfRTC PROJECT f'E TERSEN CREEK NEAR ELI !·L ALAS!<. A DATE TH1E ~~~:e:=.t:::==:: :."'!t:t:~== 05106/85 02:00 0~•/06/85 04: 00 ()5/06/85 06:00 05/0b/85 08:00 05/06/85 10:00 0:)5/06/85 12: 00 ()5/06/85 14-00 05/06/85 16:00 C>S/06/85 18: 00 1)5/0,!1/85 20: 00 05/06/85 22•00 •)5/06/85 00: 00 05/07/85 02:00 ,)5/07/95 04:00 05/07/85 06:00 05/07/85 08:00 05/07/85 10:00 05/07/85 12:00 05/07/85 14:00 05/07/85 16:00 05/07/85 18:00 05/07/85 20:00 '0'3f07/S5 22: 00 05/07/85 00:00 02:00 04:00 06:00 08:00 10:00 05/08/85 12•00 05/08/85 14:00 05/08/85 16.00 05108/85 18:00 05/08/85 20:00 05/08/85 22:00 1)5/08/85 00: 00 B'HE RAI.oi DAT1-'l ====~· :;::::::.:;:::~;::;-::;;::::::;:~.:: 894 05 895 05 896 05 897 05 898 05 899 (\5 900 05 901 OS 902 05 903 05 904 05 905 05 DA!L''Y' AVERAGE VALUES 906 05 907 05 9()8 05 907 05 910 05 911 06 912 05 913 OS 914 05 915 o:; 91 e, os 917 06 DAILY AVERAGE VALUES 918 05 9F< (>5 920 05 921 •J5 9::-·2 05 9~~3 ()5 ":-f24 05 9;:-~5 o:; 9~.!6 05 927 05 928 05 929 oo:; DAILY AVERAGE VALUES I I' 1 r 1 DEPTH FEET =====~=-= 0.25 0.25 0. 25 0. ~5 o. ;:.~5 0. 25 0. 25 0 25 0 ~:25 0. 25 0.25 0 25 0 25 0.25 0 25 0. 25 0. 25 0. 25 0 30 0 25 0 .. 25 0 25 0. 25 0. 25 0. 30 0. 26 0 ?5 0 25 0. 25 0. 25 0.25 0. 25 0. 2:':> 0.25 0. 25 0. 25 0.25 0. ~~5 0 ;.:'5 &I a::t .~, t 1 if~~_)/85 Pf~GE START TIME 02/20185 STAt:;IE n::eT ==:...:.== '.) 15 0 1~ 0 15 0 15 0 15 (: 15 0 15 0. 1 s 0. 15 (I 15 0 15 0. i 5 (t. 15 0. 15 0. 15 0. 15 0. 15 0. 15 0. 20 0. 1 ~j {}, t 5 0 15 (' 15 0. 15 D. 20 0. 16 0 i.:; 0. 15 0. 15 0. 15 0. 15 0 15 0 15 0 15 0 15 0 15 0. 15 0 15 0. 15 lJISCHG CFS =-~.:::.:.::::.:.::::::::= 0. 10 0. 10 0. 10 0 10 0. 10 0. 10 0. 10 0. 10 0. 10 0. 10 0 10 0. 10 0. 10 0. 10 0 10 0. 10 0. 10 0. 10 0. •lO 0. 10 o. to 0 10 0. 10 0. 10 0. 40 (l 20 0 10 0 10 0. 10 0. 10 0. 10 11 10 ,_-, 10 0. 10 0. 10 0. 10 0 10 0. 10 0. 10 •• •• •• a I I J ( j i • r·. ... ~LJ 16 o::_, ~~ J • I • I •• a I a I I • r J I 1 I I a 1 &• I a.J •• I. • I. • I J { j • ' PROPOSED ELIM HVDROELECIRIC PROJECT 11/05/95 PAGE ~-; c.' il:r·--·-·rrt=.:TERSEN CREEK NEAR EL !t-1, ALASKA SrART TIME 02/20/85 i6 00 3 DEPTH ~'='TAC,:E DISCHG DATE TIME BYTE RAW DATA FEET iFET CFS br ~~~~~~~~ ~~~~~ ::.:;.::=:::-:-~ =~.'!: :::!Z'-:t:O.:::t:-;:::0:~~ :::!::::::=: ==~=~~= -:::.~~=== 7 ---"'05/09/85 02: 00 93() 06 0. 30 0. 20 0. 40 8 05/09/85 04:00 931 06 0. 30 0. 20 0. 40 05/09/85 06:00 93;! 05 0. 25 0. 15 0. 10 D~/09/85 08:00 933 05 0. 25 0. l s 0. 10 Ill 05/09/85 10:00 931!. 05 0. 25 0. 15 0 :10 05/09/85 12: 00 93~· 06 0. 30 (} 20 0. 40 --usJ09185 14: oo 936 o~· 0. 25 Cl. 15 0. 10 ,, ~::1 " 05/09/85 16:00 937 OS 0.25 ~:.~ i 5 0. 10 05/09/85 18:00 938 05 0 25 0 15 0 10 nsto'?/85 2o:oo 93'? 05 0 25 () ! 5 0 10 05/09/85 22:00 940 05 o ;::;5 0 t 5 0. 10 0:5/09/85 00:00 941 OS 0. 25 (' 15 0. tO DAILY AVERAGE 'JALliES 0. 26 0. 16 0. 20 05/10/85 02:00 942 05 0. 25 0 15 0. 10 0~>/10/85 04: 00 943 OS 025 0. 15 0. 10 05110/85 06: 00 944 05 0 25 IJ. j 5 0 10 05/10/8~ 08:00 945 05 0. 25 0 15 0. 10 ---·,!l.tl0/'8:5 10:00 946 05 0.25 0 15 0. 10 05/10/85 12:00 947 06 0. 30 0. 2C> 0. 40 05/10/85 14:00 948 O~i 0. 25 0. 15 n 10 0!'\/'1 018:5 16: 00 94':"1 05 0. 25 0. 1:; r; 10 05/10/85 18:00 950 05 0 25 0 15 0. 10 1 05110/85 20o 00 951 05 (') ...... ~) 15 0. 10 .... If:_...} J' ·-----o5ttota5 22: oo 952 os 0. 25 0 t ~-; 0. 10 1) 05/10/85 00. 00 953 05 0. 25 C1. 15 (l. 10 111 DAILY A'·}ERAGE' V~\LU£8 o. ;;:5 ') i 5 10 .. ,., .. ,. ·-. ·--··· ' • 05/U/85 02: 00 9~•4 06 0. 30 Ct 2C> 0 40 05/11/85 04:00 955 05 0. 25 0 15 {) 10 ---osrH/85 06: oo 956 05 0. 25 0. 15 0. 10 05/11/85 08:00 957 05 0 25 (! 15 0. iO 05/li/85 10:00 958 05 0 25 0. i 5 (), 10 0')/11/85 12· 00 C',/5? 05 0. :::-~5 C• 15 (L 10 (?5/11/85 14:00 960 05 0. 25 0. 1.5 (I 10 fi:>iti/85 to·oo 961 05 0. 25 ·=-· 15 0. 10 1)5/11/B5 18:00 962 0:1 0.25 0. 15 0. 10 05/11/85 20:00 963 05 0. 25 0 15 0. 10 05/11/85 22:00 964 05 0.25 0 15 0. 10 161 r)S/11/85 00: 00 965 05 0.25 0. t5 0. 10 DAILY AVERAGE VALUES 0. 25 ()" 1 5 0 10 " ~ ~ • ... • 2 • •• ll<.l &J ll • 1: • • I I 1 I I E I •• a I a I I I I I I j a I fJ! PROPOSED ELJM HYDROElECTRIC PROJECT 11 /(t5/8=f PAGE nq t"'.,.(. .... PETERSEN CREEK NEAP. El. JM, ALf,SKA START T.I!'lE 02/20/8!.';· 16 00 DEPTH STAI.:.;E Di8CHG DATE TII'tE BYlf. RAW DATA FEET rEET CFS ~PtJ.'Qn•==== :::r:<:::::t'f.C =-==':4< ~==.,-:::.~;.:::;:..""::.;:·:;::: =.:==== :.=..:.;.:;::::::::= ~.,~=.':=== 05112185 02:00 966 05 0.25 0. 15 '.), 10 05/12/85 04:00 967 06 0. 30 0 20 (l, 40 05/12/85 06:00 968 06 0. 30 o. ~:o 0. 40 O!:>/.t2185 08:00 969 05 0. 25 0. t 5 0. lO 05-/12/85 10:00 910 06 0. 30 0. ~!0 •), 4(> •}5/ 12/85 12: 00 971 05 0 25 \.1. j 5 (! 10 05/12/85 14:00 97'2. 05 0. 25 0. 15 G. tO 05/12/85 16•00 973 05 0 ~.c: ,fC-.J i), j s (l 1.0 05/12/85 18:00 974 05 o ;~s 0 j 5 0. 10 05/12/85 20:00 975 05 025 0 t 5 (J 10 ()5/12/85 22:00 976 05 0. ;,!5 0 15 0. 10 05/12/95 00:00 977 05 0. 25 0. 1 s 0 10 DAILY AVERMlE VALUES 0. ;:16 0. 16 0. 20 05/13/85 02:00 979 05 (). 25 t). 1 ~1 0. 10 05/13/85 04:00 979 05 0. 25 0 i5 0 10 05/13/85 06:00 980 (15 0. 25 () 1 ~~ 0. 10 05/13/85 08:00 981 05 0. 25 0 15 r} 10 05/13/85 10:00 98;;~ ~)5 0. 25 0. i5 I) 10 05/13/85 12·00 983 N~ 0. 30 (l 20 0 40 05/13/85 14:00 984 OS o. 25 0. 15 0. 10 05713/95 16:00 985 05 0 25 0. 15 0. lO 05/l3/85 18:00 9Bh 05 0. 25 0 15 1), 10 05/13/85 20:00 987 05 0 25 f) .15 (\ 10 ·--0'5/1'3/SS 22: 00 988 05 0. 25 0. 15 0. 10 05/13/85 00:00 989 05 0. 25 () 1 5 (l 10 DAILY AVERAGE VALUES 0. 25 0 15 :), 10 05/14/85 02:00 990 05 0. 25 0 . .1 5 (l 10 05/14/85 04:00 991 05 0. 25 tJ. ! 5 0. 10 ·05-114 185 06 :· 00 992 05 0 25 0 15 0 10 05/14/85 08:00 9"i3 05 0. 25 0. 15 0. 10 05/14/85 10:00 994 05 0 25 0. 15 0 10 (.•':;/14/85 12: 00 995 05 0. 25 0 15 o. to 05/14/85 14:00 996 o~, 0. 25 (J 1!:> l) 10 05/14/85 16:00 997 05 0 25 0 15 f). 10 (15/14/85 18:00 999 05 0. 25 0 15 0 10 05/14/85 20:00 9~19 05 0. 25 0. 15 0. 10 ()5/14/85 22:00 000 05 0. 25 0. 1 =· 0. 10 05/.14/85 00:00 001 05 0. 25 0. 15 G. 10 DAILY AVEP./V~iE \'AL!JFS o. ;;~5 <J. 15 0 10 • • &~ .. JI ··'"" •••• IL.J •• 1. .. :1 Ill •• •••• a I •• ··~·· a I •.. 1 a I • I I • I J i i 1! I PHOPOSED ELIH HYDIWEL n:rf.; !C PPO~l[TT 11 /07,l85 PAGE 2•7 PETERSEN CREE!-l. NEAR CLJM, /',Lt,SI-<.A START TIME 02/20/85 !6•00 DEPTH ST~\GE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS :;"';·~====:-.::=::: ===:=:::::-= =:.!!-::: ;--_; ::::-.:.·:.:-::::·.;,:-,;~-:,::'..~~:::::: ::::;:::::::::::-::::.== ~===:::..· .. ... :::..'":!:=:'!':::'!': 05/15/85 02:00 002 05 0. 25 0. 15 () 10 ()5/15/85 04:00 003 05 0. 25 0 15 (1, l 0 05115/85 06:00 004 05 0.25 (l i5 (1 10 05/15/85 08:00 005 05 0. 25 ,-:_, i ~5 (1. 10 05/15/85 10:00 006 05 0. 25 ·:' 1 :3 0 10 05/.15/85 12 00 007 05 0. 25 0. 15 r: 10 0~115/85 14: 00 008 05 0 25 0. 15 0. 10 05/15/85 16:00 009 05 0.25 0 15 (l l 0 05/15/85 18:00 010 05 0. 25 0. 1 :> (l 10 0~/15/85 20:00 011 05 0. 25 0. 15 0. 10 05/15/85 22·00 012 05 0 25 0. 15 0. 10 05/15/85 00:00 013 05 0. 25 0. 15 0. 10 DAILY AVERAGE VALUES 0. 25 0 15 0. 10 05/16/85 02:00 014 05 0.25 0. 15 0. 10 0~/16/85 04:00 015 O~r 0. 25 0. l5 0. 10 05/16/85 06:00 016 05 0 25 0. 15 () 10 05/16/85 08:00 017 (~5 0.25 0 15 0. 10 05/16/85 10:00 01B 05 0.25 ') 15 0. 10 05/16/85 12:00 019 0!:, 0. 25 0. 15 0. 10 05/16/85 14:00 020 06 0. 30 0. 20 0. 40 --0~:1'16/85 16 00 o:;!t 05 0. 25 0. i 5 0. 10 0!'1/16/85 18'00 o~,..., t ·"' 05 0 25 0. i 5 0. iO 05/16/85 20:00 023 OS 0. 25 0 15 0. 10 ~/16/85 22: 00 024 05 0. 25 0 . .15 0. 10 05/16/85 00:00 025 05 0. ;:;'5 0 15 0. 10 DAILY AVERAGE VALUES 0. 25 0. j 5 0. 10 05/17/95 02:00 026 05 0. 25 ') 15 ·~ 10 05/17/85 04:00 027 06 0. 30 f}. 20 (I 40 · -o51'17/8~ 06: oo 028 05 0.25 0. 15 0. 10 0~}/ 17/85 08: 00 o:;~q 06 0. 30 0.20 0. 40 05/17/85 10:00 030 06 0. 30 0. 20 0. 40 O!i/17/9~ 12.00 031 06 0. 30 0. 20 0 40 05/17/85 14:00 032 05 0. 25 () i ~~ 0 10 0~1/ 17185 16: 00 033 05 0. 25 () 15 0. tO 0~/17/95 18:00 0::'14 05 0 25 0 15 {I 10 05/17/85 20:00 035 05 0.25 0. 15 0. 10 05/17/85 22:00 036 OS 0 25 0 15 0. 10 ')5/17/85 00:00 037 ()5 o. ;;:s 0 15 0. 10 DAILY A'-.iERAf::E VALUES 0 27 0 17 0. 20 ••• ., .. ;II -~ . ;;;. & • • I I I • I I I I I a:. a •~• ••• Ill •• I I I I I I • I i i r 1: PROPOSED ELIM HYDROEl.FCrRit PROJECT 11Jo:;;es PAGE 3C PETERSEN CREE~ NEAR EL H1, ALASKA STARr lJKE 0;?/20/85 16. (),) DEPTH STAC~E DISCHG DATE TIME BYiE RAW DATA FEET f"EET (F:; ~=-~:::::==::::= =:::~== ===::: ~":!:';'.t,:"::;~:';".!.?.;"!t".::: ='=====-___ ,_,_ :;::...:.::;:.;-:;::::.::: 05/18/85 02:00 038 06 0. 30 0. :;:o 0. 40 05/18/85 04:00 039 Ol-. 0. 30 ,-i ... , ....... ...... Z::......J 0. 40 05/18/85 06·00 040 06 0. 30 0. 20 0 40 ~:5/ 18/85 08· 00 041 05 0. 25 0 1 ~j 0 10 '.J5/l8/85 10:00 04;:~ \):,:, 0.25 0 15 c• 10 05/18/85 12:00 043 05 0. 25 •) .1 ~~ (\ ! 0 05/18/85 14:00 044 05 0. :::.!5 (I 1 :.; \) . .10 •.:'>5/18/85 16: 00 045 05 0.25 () 1 :5 0 10 05/18/85 18:00 046 05 0 25 'j 15 0. 10 .05/18/85 20:00 047 05 0. 25 0 1 :; •."!. 10 05/18/85 22:00 048 05 0. 25 Ct 15 (t tO <:•~I t 8/85 00: 00 o4c;. 05 0. 25 •) :!.5 (• 10 DAIL"i AVEP.A•;;;E:. VAlUES 0. ~~6 0 16 0, 20 05/19/85 02:00 050 05 0. 25 G. 15 0 10 :):5/1•7/85 04 00 051 05 () 2~ (\ i 5 ,., 10 05119/85 06:00 os;:! 05 o. ;:.:;5 0. 15 0 10 05/19/85 08: 00 053 t~5 0. 25 ;j i !;t 0. 10 05/1?/85 10:00 054 05 0.25 0. 15 0. 10 05/19/85 12:00 055 ()5 0. 25 0 15 0. 10 05/19/85 14:00 OS C. 05 o. 25 0 15 0. J.O 0':5/19/8, 16:00 057 05 0. ;.2:i 0. 15 0. 10 05/19/85 18:00 0:'·8 (15 0 25 0 15 0. 10 05/19/85 2000 os·.;> 05 0. 25 (), 1 5 0 10 O:'J"11'?/8' 22: 00 060 05 0. 25 0 15 0. 10 05/19/85 00:00 061 05 0 25 0. ! :1" f\ 10 DAILY AVERAGE VALUES 0. ~5 o.' 15 <) 10 02:00 o&;;o 05 0 ::!5 ~::~ i ~} ·:· 10 04:00 063 (16 0 30 0. ~i() ·) 40 06:00 064 06 0. 30 () ~'J 0. 40 08:00 Ob5 06 0 30 0 20 0. 40 05/20/85 10•00 066 06 0. 30 !:;. 20 D. •)0 Q~:/20/95 12: 00 067 05 0. ~~5 0. 15 0. 10 D~l/;:.:!0/85 14: 00 Ot-8 05 0 ~:5 ~:-~. .1 5 •) 10 05/::.:0/85 16: 00 ObCt 05 0.25 () 15 0 10 1.t5t20/S5 18: 00 070 05 0. 25 0. 15 0. 10 05/20/85 20:00 07.1 05 0. 25 0. 15 0. 10 IJS/20/85 22:00 07::! 05 0. 25 0 l. ~i 0. 10 r):'l/20/8, oo· 00 07:~ o~, 0 30 0 20 •) 40 DAILY AVERAGE VALUES 0 27 0 17 (l. 20 ~-. • I •• .,,. .,. a I I [J\ jl~-- PROPOSED ELIM HYDROELECfRIC PROJECT PETERSEN CREEIA. NEAR CL !t1 ALASKA DATE TIME BYTE RAt,.! DATA ~~===-::::== ====:: ====-:::;":':';:::::t~::~:~-= -o~/21/8~ 02:00 074 0:'· 05/21/85 04:00 075 05 o:d21J85 06: oo 076 05 o~·/21 /8~ oa· oo 077 05 Ill 05/21/85 10'00 070 nr.· . -~ 0~1/21 /85 12: 00 0?14 06 131 0'5/21/85 14:00 080 05 ,. 05/21/85 16:00 081 05 l. 05/21/95 1800 082 Ob 1 ,~ --'7'1~/21/85 20: oo 083 06 J7 05/21/85 22:00 084 06 '" 05/21/85 00 00 085 06 L ----· . . . DAILY AVERAGE VALVES i 05/22/85 02o 00 086 06 . --0~/22/8'5 04. 00 Of-l7 06 05/22/85 06:00 088 06 05/22/85 08:00 089 06 ~, --------c~ 1':22 /S~ 10: 00 090 06 05122/85 12:00 091 05 05/22/85 14:00 092 ()£, 0~122/S~ 16:00 09~ Ob 05/22/85 18:00 094 06 20:00 095 J")7 22:00 096 ()7 00:00 097 07 DAIL''I' AVER.Ai.;:E VALUES 05/23/85 02:00 098 07 05/23/85 04:00 099 07 '0!';/23IB5 06:00 100 06 ,._ L_f 05/23/85 08:00 101 06 05/23/85 10:00 102 06 0~/23/85 12:00 10'? 06 ~-l~i/23/85 14: 00 104 Ol, 2~ !•5/23/85 16: 00 105 07 , -------o·!;/23185 18: oo 106 09 OS/23/85 20:00 107 l1 05/23/85 22:00 108 11 05/23/85 00:00 109 11 DAILY AVERAGE VALUES ' .~~~ I I I I I r 1 • J Ill ~ .• . ;. a • • I I I I I I ' 11/0~/85 PAGE 3! START riME 02/20/85 16·00 DEPTH STA<;:E [lfD(H(] FEET FEET crs =-====: =-=~!":'~~ ---::-:w=:=~= 0. 25 0. t 5 (i_ 10 0 25 0. 15 0. 10 0. 25 0 15 0 10 0. 25 (: 15 () 10 0. 25 0. 1 ;:. 0. 10 0. 30 (t, 20 0. 40 0.25 i..i. 15 r,_ .tO () 25 (), l 5 0. 10 0 30 0. 2~} (J. 40 0. 30 IJ ~w 0. 40 0. 30 o ;~o () 40 0. 30 0. 20 0. 40 0. 27 1.) 17 0. 20 0. 30 (!, 20 0. 40 0. 30 0. 20 0 •lO 0. 30 (), 20 0. 40 0. 30 0. 20 0 40 0. 30 0. i?O 0 40 0. 25 0. 15 0. 10 0. 30 'J. 20 0. 40 0. 30 0 20 0 40 () :<0 0. 20 0 ~0 0. 35 0. 25 0.90 0.35 0. ~~5 0. 90 0. 35 0. 25 0. 90 0. 31 () 21 0. 50 0 35 0 25 90 o :~s 0. ~::5 0 90 0. 30 {) 20 0. 40 0. 30 (I 20 0. 40 0. 30 o. ;;:o 0. 40 0. :30 f:\ ~:CJ 0 -•iO 0. 30 (l 2(J ()_ 40 0. 35 0. ;::.::; (!_ ;;;10 0. 45 0. 35 3. 1 0 55 0. 45-4. 9 0. 55 0. 45 4. 9 0. 55 0. 45 ·~ 9 0. 39 0. 2"T 1 9 ~ .,,. I i]: •• •• a"' I &.. I a: I I I i ROPOSED ELIM HYDROEL~LIRit ~ROJEc·; PETERSEN CREEK NEAR ELIM. ALASKA DATE TIME "l"t':':r::=::n==~== =:~:=·.;::='!'!'! •}5/24/85 02: 00 iJS/24/85 04.00 05/24/85 06•00 05/24/85 08:00 D~/24/85 10: 00 •.)5/24/85 12: 00 0~'1'24185 14: 00 0'5/24/85 16:00 05/24/85 18:00 05/24/85 20:00 D~·/24/85 22: 00 ·J~/24/85 00: 00 ()5/25/85 02: 00 . 05/25/85 04: 00 05/25/85 06:00 r)!';'i/25/85 08: 00 05/25/85 10:00 05/25/85 12:00 05/25/85 14:00 05/2'5/85 16:00 05/25/85 18:00 05/25/85 20:00 o-5.1~5/85 22:00 05/25185 00:00 02:00 04:00 06:00 08: 00 05/26/85 10:00 (!~126/85 12:00 05/26185 14:00 05/;::!t~/85 16· 00 05/.::!6/85 18: 00 05/2b/85 20:00 05/26/85 22:00 C~/26/85 00:00 BYTE RAI-l DAT.~ ==:.::.:";.':'". :-;;:;:-:;:.:,_·;::-:;.:-::.::~.:::;;:;;.;; 110 j() 111 09 112 08 11 ~J 08 114 OE.f 11 !:;> 08 116 09 117 11 118 12 11'7 13 12(.1 13 12! 12 DAILY AIJERAI.;_.:E lh~!.Uf:S 122 1?3 124 125 12l-. 1;:7 128 12t? t:~o 1:31 1 ~, ..... _,., D3 j 1 tO 10 l (> .i 0 j i,) 10 L: 14 j 5 15 14 DAILY AVERAG~ VALUES 134 135 l :•{l 13:7 138 13'? lliO 141 14:::! 14~~ 144 145 13 13 1 "-' 1.;;:! 1 ~. <- 1 ,., "" 1 ,, "- 12 13 14 14 14 DAILY AVERAGE VALUFS I I I I I I &.:1 .,. ~aka a .• DEPTH FEET ===::·~=:: 0. 50 0. 45 0 40 0 40 0. 40 0 40 0. 45 0 55 0 60 0. 65 0. 65 0. 60 0 50 0. 55 0. 50 •). ::;o o. ::>o 0. 50 0. 50 0. 50 0. 60 0. 70 0. 75 0 75 0 70 0 59 0. 65 0. 65 0. 60 0. 60 0. 60 (! 60 0 60 0. 60 0. 65 0. 70 0. 70 0. 70 0. 64 11/05/85 PAGE 32 START TIME 02/20/85 16 00 STAt?f. j;'EF.T =:.....;.-;::;::.:;:= (\ 40 c: 35 (J 30 0 30 ') 30 0. 30 :} 35 0 ·~5 0. 50 0 55 •) 55 i) 50 (1 40 0. 45 0. LIO 0. 40 Q. 40 •:>. 40 0. 4(1 0 40 (l 5'J 0 60 0. 65 0. 65 G 60 (\ 4'l' f). 55 0 5~> (), 50 (J 50 0. 50 (~ :.-)0 0. ::o 0 50 0. 55 0 bO 0. 60 0. 60 0 54 D I f~C:HG CFS ...::-.:::==·= 4. 2 ~.:! ! 1.7 1.7 1.7 i.7 3. 1 ~+. 9 5. 6 6. 3 6. 3 :;:. 6 3 8 4. 9 1.1 2 4 2 4 :;:I 4 ~, . '"' 4. 2 4 2 5. 6 7.0 7. 7 7. 7 7.0 :> 4 6. 3 6. =~ 5. 6 5. 6 5. 6 5. 6 5. 6 5. 6 6. 3 ?. 0 '7 0 7 0 (., 1 la:LII •• ~ 1 ~) I I • • i J[ . . . ,. ·"'·· •~,.1 •.• ., ..• PROPm:lED ELIM HYDRCE:LFC!rnc-P!~CUECT PETERSEN CREEK NEAR ELIM, ALASKA DATE TIME BY'fF. H Al·l DA fA ~· . .:::~: ·-~·:=; ';:',~:::;.;::-::::::= ==:::·~ :".:~::;· .,::=;;;:.::.~·=·.~. 05/27/85 02:00 146 14 (}:>;~~7/85 04: 00 147 14 05/27/85 06.:00 148 13 05/27/85 08:00 14"? !3 t\5/27/85 10:00 1 ~.~a l :1 05/27/85 12:00 151 12 -OS /27 I 85 14: 00 152 13 05/27/85 16·00 153 D 05/27/85 18 00 154 i5 05/27/85 20:00 155 15 05/27/85 22:00 156 15 ost~!718S oo· oo 1 "".., ;;), 15 DAILY AVERAGE VALUES 05/28/85 02:00 158 1 5 05/28/85 04·00 15? j s 05/28/85 06:00 160 . "' ' • .1 05/28/85 08:00 161 14 . 1J5/28185 10: 00 162 14 05/29/85 12:00 163 14 05/28/85 14:00 lt-4 l4 05/29/85 16:00 1l"l5 1.4 0~/28/95 18:00 1<!-t6 ! r' ·' 0~/28/85 20:00 lb? !5 -o5t2s-/85 22: 00 1b8 j4 O~i/28./85 00: 00 1 ,,'f 15 DAILY AVERAGE VALUES 05/29/85 02:00 170 j5 05/29/85 04·00 171 14 -··-u5:t~.t8!7 06: 00 172 14 05/29/85 08:00 173 l.4 10:00 174 .1 4 12·oo 1 ., 0:: I ._1 liJ. 14:00 17,C, D 16: •JO 177 13 113:00 178 13 20·00 17? 1 =~ 05/29/85 22:00 180 13 0~>t2?tas oo· oo 181 13 DAILY AIJERAOE VALUES • I I I a ... t lit. I R_l a.;t a. ;I ll I R J IL.J I J I I DF.PTH FEET !:::"'!'::::::=~-= 0. 70 0. 70 0. 65 0. 65 0. 65 <J. 60 0. 65 0.65 0. 75 0. 75 0. 75 0. 75 0. 69 0. 75 0. 75 0. 75 0. 70 0. 70 0. 70 0. 70 0. 7CI o n:. 0 75 0. 70 0. 75 0. 73 0. 75 0 70 o. 70 0 70 0. 70 0. 70 0. 65 0. 65 0 65 0.65 0. 65 0. 65 0 68 11/05/85 PAGE 33 STARl TIME 02/20!85 !6 00 STI-.C:E DISCHG FFET CFS ~ ::~::~':': -::::-.. ...:=~-= c~. 60 7. () (!. 60 7 0 (J 55 6 2 (J, ::.s 6 J 0. =~· 6 3 •) 50 5 6 0. 5~ 6 3 o. :;s 6 3 0. 65 7. 7 0 65 7. 7 0. 65 ...., ... , f . l 0. 65 7 ? 0. 5G' 6. 8 o. ~:..s 7. l 0 .. :,5 7. 7 (l .S5 7. 7 0 60 7. 0 0. 60 7. 0 0. 60 7. 0 0 60 7 0 0 !',0 7 0 0 65 '7. 7 (), (-,5 7. 7 0. 60 7. 0 0. 65 7. 7 0. ~,3 7. 4 0. 65 7 7 c• e.~o 7. 0 0. 60 7. 0 0. 60 7. 0 0. 60 7. 0 0 60 7 0 () ::'·5 6. 3 •} 55 6. 3 0 55 6 3 0. 55 6 3 0. ~55 6. 3 (I 55 6. :1 0. 58 6 ., ' ··~· 'J ( •:_:, .... •it• .,. •~• t 1 r 1 PROPOSED ELIM HYDROELFCTRI PROJEC1 f.' I:' TERSEN CREEK NEAR EL It-1.. At ASKA DATE T!ME !':lYIF RAW DATA f'":'~~":':==t":::::::-.:=r:r .:e:~'::::-::::: ;::::::::::·· .. ::.::::::-:·:.:;:;;:.;;::;:.;.;;.;::::;;::_ 05/30/85 02:00 182 u (•5/30/85 04 00 183 1::1 05/30/85 06:00 1D4 j ") r. os.t:m/85 oe: oo 18~ 1 ;: 0~>/30/85 10: 00 18b 12 05/30/85 12:00 187 1" t:'- 05130/85 14:00 189 12 o:•/30185 16: oo 189 l2 ()5/30/85 18: 00 190 1'"' "- 05/30/85 20:00 1Q1 12 05/30/85 22:00 19:;1 1 ,, c. ~iS/30/85 00: 00 19:~ F' . &:;. DAILY AVERAGE VALUES 05/31/8.5 0200 194 12 05131/85 04:00 195 12 05/31/85 06:00 196 1.2 05/31/85 08:00 197 12 ·i)S/31/85 10: 00 199 12 05/31/85 12:00 199 12 05/31/85 14:00 200 12 (1!':17'::31/85 16: 00 201 1.2 '.)5/31/85 18:00 202 13 05/31/85 20:00 203 13 185 22:00 204 13 05/31/85 00:00 205 12 DAILY AVERAGE VALUES 06/01/85 02·00 20~" 1 ..... r. Ot./01/85 04:00 207 12 --oetouas oe: oo 20!3 12 06/01/85 08:00 209 12 06/01/85 10: 00 210 12 06/01/85 12'00 2.11 12 06/01/85 14:00 212 12 06/01/85 16:00 213 j ~. ,._ 0~/01/85 18:00 214 13 06i01/85 20:00 215 13 •;)6/01/85 22: 00 21<~ 13 06/01/85 oo·oo 217 13 DAILY AVERAGE VALUES I I ..-, 11.:~·· .. .. .. II I • 1 ( 1 I i I I 1110~/85 PAGE 3J START TH1E 02/20/85 16 00 DEPTH STAGE DISCHG FEET Ff.-E I CFS =====-= ====..:..::: ;.:·:::.~;::::;:::;::;;.:::: 0. 65 0. 55 6. 3 0. 60 0 5D 5. 6 0. 60 o ~.o 5 6 0. 60 0. :>·} 5. 6 0. 60 c~. 5(1 5. 6 0. 60 (1 50 5. 6 0. 60 0. :10 5. 6 0. 60 0. ~·0 5. 6 0. 60 \) 50 :;-, 6 0. 60 0. 50 5. 6 0. 60 0. 50 ~f. 6 0 60 0. 50 ::. ,:;, 0. 60 (l 50 5. 7 0. 60 0. 50 5. 6 0. 60 0. 50 5. 6 0 60 •) 50 5 6 0.60 0. 50 5. 6 0. 60 0. 50 5. 6 0. 60 0. 50 5.6 0. 60 0. !.\0 5. 6 0. 60 0. so 5. 6 0. 65 0 55 6 3 0. 65 (! 55 6. 3 0. 65 ·J 55 6. 3 0.60 0 50 5.6 0. 61 0 51 :.'·. 8 0 6~'} o :;o 5. 6 0. 60 1,), 5{) ~:; l-. 0. 60 0. 50 5. 6 0. 60 0 50 5. 6 0. 60 ().50 5. 6 0. 60 0 50 5. 6 0. 60 (' 50 5. 6 0. 60 0 50 5. 6 0. 65 0 55 6. 3 0.65 0. 55 6.3 0. 65 0 55 6 3 0. 65 0. 55 6 3 0 62 0. :-:r2 5. 8 -~~· I & .• -· ••• ••• .,. I I r I • 1 E':'l .. -.. &:.·1 •• I' l I I I I • • LJ) P~DPOSED ELTM HYDROELCtTPIS PROJE.CT 1 L''~'"•/8::'> PAGF J::· . PETERSEN CREEK NEAR CL Hi· /;LAS!'. A START TIME 02/20/85 16 0(1 DEPTH STAGE DlSCHG DATE TIME BYTE RAW DATA FEET FLEr r·r:· c ·-· ;;) ··"~:.=:~:;;:";..::::=.= :===== ":.:':::::.::· :;::~~:;::'::0:~;::::::=:::...:::.:· =-:::~~--==.::r: ::::=~· ... ==~-: :· ·==~== 02:00 218 13 0 65 0 55 (':) 3 06/02/85 04: 00 2iq j 3 0. 65 0 55 6 3 06/02/85 06:00 220 13 0. 65 0. 55 6 3 06/02/85 08:00 221 13 0. 65 0 55 .;;, 3 06/02/85 10·00 2~2 13 0 65 (I 55 -~). 3 06/02/85 12:00 223 12 0 60 1:1 50 s 6:.· "06702/85 14.00 224 13 0. 65 0 55 6. 3 06/02/85 16:00 225 .t 3 0.65 0. 55 6. 3 06/02/85 18:00 226 13 0. t.'5 ') 55 6 ·< 06/02/85 20:00 227 14 0. 70 0 60 7. 0 06/02/85 22:00 228 14 0 70 0. 60 ~'. 0 06/02/85 00:00 2.C?'? l :? 0. 65 (\ ::'·5 b 3 DAILY AVERAGE VALUES 0. 65 Ct ::'·5 6. 4 {)6/03/85 02: 00 230 14 0. 70 0. 60 7. 0 06/03/85 04:00 281 14 0 70 c: 60 7. 0 06/03/85 06:00 232 14 0 70 0 6(1 7. 0 06/03/85 08:00 2:~:~ 14 0. 70 0 60 7. 0 ~Ci/03/85 10:00 234 14 0. 70 0. 60 7. 0 06/08/85 12:00 23!5 14 0. 70 I) 60 7. 0 06/03/85 14:00 236 14 0. 70 •J. 60 7. 0 06/03185 16:00 237 .t 4 0. 70 (\. 60 7. 0 18:00 288 14 0. 70 0. 60 '7 0 20:00 237 ttl. 0. 70 0. 60 7. 0 22:00 240 14 0. 70 0 t>O 7.0 00:00 241 15 0. 75 •) L~5 7. 7 DAILY AVERAGE VALUES (I 70 ().' n(: 7 1 02:00 ~!.tJ~? l"' 0 75 (l. t:-5 04•00 243 14 0. 70 :). 60 70 06:00 244 14 0. 70 0. 60 7. 0 08:00 245 14 0. 70 •J. 60 7, 0 10:00 246 14 0. 70 0. 60 7, 0 ':"1;/04/85 12: 00 247 14 0 70 0 !:·0 '· 0 :1~-/04/85 14· 00 243 14 0 70 •) (,Q '7 (j Ob/04/85 16:00 24'? 14 0. 70 () 60 ·;· 0 06/04/95 18:00 250 15 0 75 () 65 "'l 7 06/04/85 20: 00 251 15 0. 75 •) 65 7. 7 06i04/85 22:00 252 15 0. 75 0. 65 7. 7 o.~/Oil/85 oo: oo 253 l. 5 0 75 0 65 ., 7 '' . DAILY AVERAGE VALUES 0 72 0. 62 7 3 --~· J ]! -~· -~· .. , .• •t e·t I' I PROPOSED El.JH HYDROEL~CfR1C PROJCCl P~TERSEN CREEK NEAR ELIM, ALASKA DA"fE TIME BYTE RAW lV;TA 'f'~'Jf'!':r';":'!'!.e!c:::!i::C ::t:=::e:=:= ::::=-:.,;;,:: w:::":""':'-~::..~=:::~-:=·!:':'•::=;;t.", Oo/05/85 02:00 254 1 5 Ol,/05/85 04: 00 255 15 06/05/85 06:00 256 1 <': _, 06/05/85 08:00 257 15 06/05/BS 10:00 258 15 06/05/85 12•00 259 15 06/05/85 14:00 260 15 06/05/85 16:00 261 15 06/05/85 18 00 26:? t ~. ·f\6/05/85 20:00 263 15 06/05/85 22:00 264 1 ~· _, 06/05/85 00:00 265 15 DAILY AVERAGE VALUES 06/06/85 02:00 266 1::" ;':)6/06/85 04: 00 2!::-7 } ·'l 06/06/85 06: (10 2&8 14 06/06/85 08:00 ;;.~~,'? 1 L~ oetOe/85 1o:oo 270 14 (.•6/06/85 12: 00 271 14 06/06/85 14:00 ...,,,.., c. J .e 15 06/0!>185 16:00 273 15 06/06/85 18:00 274 1 :; 06/06/85 20:00 ...,..,..., r~ r ""' 1 5 -e-et-o5t85 22:00 2"/6 15 06/06/85 00:00 277 15 DAILY AVERAGE VALUES 02·00 278 l 5 04:00 279 15 06:00 280 14 08:00 281 1.5 10:00 282 15 Ot;/07 /85 12· 00 283 14 (J~,/07/85 14• 00 284 15 ')~;/07/85 16: 00 285 14 06/07/85 18:00 286 14 Ob/07/85 2000 287 14 0{,/07.185 22: 00 288 lA 0.':J07 /85 00: 00 28'? 14 DAlL'J•' AVERA~E VALUES F''l ... 1 a:11 .. .. .. ••••••• a .I I I I J I j I I 1 i i(l~/85 PA(~E 36 START TIME 02/20185 16 or: DEPTH '3TAGF. DISC:Wi FEET F!:7Ef C.FS = -=~;.;:=-= ---~-~ ... ~=:;.:::::::::::::::= 0. "75 •J. t~s 7. 7 0. 75 0 l,5 -,. .... , J , I 0. 75 O.b5 7 7 0. 75 0. 65 -, 7 0. 75 (-~ ~5 7. 7 0 75 0 65 7 7 0. 75 0 60 7. 7 0. 75 0 65 7 7 (l "7 ==· 0. 6:; 77 0 75 \). !~ 5 7 ? 0 75 {) 65 7 7 0. 75 0 6~5 7 7 0. 75 0. 65 7 7 0. 75 0 t."i:.1 7. 7 0 70 (I 60 7. 0 0 70 0 oO 7. 0 0. 70 0.60 7 0 0. 70 0. 60 7.0 0. 70 0 60 7.0 0. 75 0. !o5 7. 7 0 75 0.65 7. 7 0. 75 (', b5 77 0 75 () 65 7. 7 0 75 0 65 7. 7 0 75 •) 65 7. 7 0. 73 'J 63 7. 4 0. 75 0. 65 7. 7 0 75 0 65 7 7 0 70 •J 60 7. 0 Cl. 75 0 65 7. 7 0. 75 0 65 7 7 0. 70 0 60 7. 0 0. 75 D 65 7 7 0. /0 (• 60 7 0 0. 70 0. 60 7 0 0. 70 0 60 7. 0 0. 70 0. 60 7. 0 0 70 •J. 60 ? () 0 ..,.,., . ' c. •J <12 "":' "1: ... - ' .. I r1 1 . I I • • ., .. II.A a.l •.• & I PROPOSED ELIM !IYDROELFCfRJC PROJECT PETERSEN CREEK NEAR EL!M ALASKA DATE T!ME B'f'TE ~~AW DATt-, "'.":!.":"::'::::.:1!":~=-~== ==~== ::~::.:=r "="~= ::=··~:t'~:'!":·c::~ Ot.-,/013/85 02: 00 29Ct 14 ()t-.i08185 04: 00 ;;'91 14 06/08i85 06:00 ""i~li l:. -·- i4 06/08/85 08· 00 2Q::J l4 (:t,/08/85 10: 00 294 .1 4 06/08/85 12:00 295 14 •()6/08/9~ 14' 00 296 14 ()6/08/85 16· 00 297 14 06/08/85 18:00 298 15 t)o/08/85 20: oo 2'?9 .1 5 06/08/85 22:00 300 1 ~5 06/0B/85 00:00 3(!1 14 DAILY A'.JE~AGE Vt-tl.UES 06/09/85 02:00 302 14 06/09/85 04:00 303 14 06/09/85 06:00 304 l 4 06/09/85 08:00 305 14 06/09/85 10:00 306 14 06/09/85 12:00 307 14 06/09/85 14:00 308 14 06/0t:;>/85 16: 00 309 14 06/09/85 18' 00 310 .! ~· 06/09/85 20·. 00 3! 1 1 <" _, 06109/85 2200 312 15 06/09/85 00:00 313 15 DAILY A'JERII<::E VALUFS 06/10/85 02:00 3.14 14 04:00 315 14 06:00 316 14 t)6/ 10/85 08: 00 317 14 06/10/85 10:00 318 14 06/10/85 12:00 319 14 06/10/85 14·00 320 14 06/10/85 16•00 3~!1 .14 06/10/85 18: 00 3'"•'"> "'·"'" 15 06/10/85 20:00 32::< 14 '.)6/10/85 22:00 3;14 1 5 06/10/95 00.00 3~~5 14 DAILY ,t,VERAGE VALUES &.I a I 1: :t I I R t ll .. J IL,j DEPTH FEET =":':=-:=:::=::: 0. 70 0. 70 0. 70 0. 70 0 70 0 70 0. 70 0. 70 0 7"' 0 75 0 75 0. 70 0 71 0. 70 0. 70 0 70 0 70 0. 70 0. 70 0. 70 0. '7'0 0. 75 0 75 0. 75 0 75 0. /'2 0 lO 0 70 0. 70 (1, 70 0. 7() 0 70 0 70 0. 70 0. 75 0. 70 0. 75 0. 70 0 71 11/0~/85 PAGE 3~ STAR-! f IME 02/20/85 i6. 00 STA~~E DISCH(~ r~ET CFS =·-=~!:-'!:::!' -· -===-:::= (\ 60 7. 0 '.) :-bO 7 0 0. 60 7 0 0 60 7. 0 (' 60 "7 0 0. 60 7. 0 0. 60 7 0 0. 60 7 (t :J. 65 7. 7 rJ. 65 7. 7 ~) 65 7. 7 0 60 ?. 0 0 6 !. 7.2 0 60 7. 0 0 6.tJ 7. 0 <). 60 7. 0 ,'). tJ.O .0 0. 6(1 7. 0 0 60 7. 0 0 60 7. 0 {1 60 7 0 ·J (··5 7. 7 (' t~5 7. 7 0. 6~) ?, l (l, 65 7. 7 (J. 62 ·--::~ 0. 60 7 0 0. 60 7 0 tJ. 60 7 0 i;:) 60 7 0 0 60 7 0 () 1:.·0 7. 0 (i l·O 7. 0 (1 60 7. 0 o. -t,s 7 7 0. 60 7 0 0. 65 7. 7 0. l';(> 7.0 0. bl 7. 1 ll:.c.l 1: .. J I J I. j a • . . :. f ]I -I • I a I • I a: .I a·;,,l 1: I f'HOPOf-lED ELIM HYDf<OHECTrUC Pf:uJJEC l --.P.ETERSEN CREE~ NF.:AR ELJM, ALASI'.f'. DATE TIME BYTE RAW DATA !'::'!)==== ="::":= :::-: :!"'::::.:::;:-::;,;,:-;;:=·:.:=~ 02·00 3~!6 14 04:00 :1,...,....,. ~ Ll 14 06:00 328 14 06/ j 1/85 08: 00 3;29 14 01:-/11/85 10:00 380 1 4 06/11.'85 12:00 331 1] -Qf:</11/85 14:00 332 14 06/11/85 16 00 3:D 14 06/11/85 18 00 334 14 06/11/85 20:00 3:--15 14 Otl/11/85 22:00 336 14 ()6! 11/85 00: 00 337 14 DAILY AVERAGE VALUES 06/12/85 02:00 338 l3 06112/85 04:00 339 13 06/12/85 06:00 340 13 06/12/85 08:00 341 13 06.f H?/85 10: 00 342 D 06/12/85 12:00 343 1:1 06/12/85 14:00 344 13 05l12l85 H.,: 00 345 13 06/12/85 18:00 346 13 20:00 347 jJ 22:00 348 13 0000 349 13 DAILY A'-,1ERAGE VALUES (16/ 13/85 02: 00 350 1.3 06/13/85 04:00 351 13 --oen3:ta5 Oi!:i: oo 3:,2 l3 06/13/85 08:00 353 13 CH':J/13/85 10:00 354 1 ~~ r:}6/l 3/85 12· 00 35'5 u:: 06/13/85 14:00 356 1.3 16:00 357 J] 18:00 358 jJ 20:00 359 13 22•00 360 13 oo·oo 361 13 DAILY AVERAGE VALUES I 1 I I '-'•·· I &c.l a • &:~:t IL. a:~ a ILl I( J ll j I I 11/05/85 PAGE 38 START TIME 02/20/85 16·(10 DEPTH STAGE DISCH•J FEET FEET CFS ===:::.:;:=.: ---~---====== 0. 70 0. 60 7. rJ 0. 70 0. bfj 7.0 0. 70 0. 60 7. 0 0. 70 0. 60 7. () 0. 70 0. 60 7 0 0. 6~} (1 55 6 3 0. 70 0. 60 /'. 0 0 70 0 60 7. 0 () 7!"1 ·~ 60 7. 0 0 70 {\ 60 7. 0 () 70 '.) 60 7 0 0. 70 ,-:_, 60 7 0 0. 70 0. 60 6. 9 0. 65 0. 55 6. 3 0. 65 'J 55 6 3 0. 65 I) 55 6. 3 0. 65 0 55 6. 3 0.65 0 55 6. 3 0. 65 0 55 t:>. 3 0. 65 0 55 6 3 0 65 (t 55 6. 3 0 65 r:; 55 6. 3 0. 65 0. 55 6. 3 0. 65 •'.J :;s 6. 3 0. 6=1 0 55 6 3 0. 65 I) ::.s 6 3 0 65 >) ~}5 6. 3 0. 65 0. 55 6. 3 0. 65 0 55 6. 3 0 65 D. 55 6. :-l 0. 65 ('. =r~) t:.. 3 0 60 ("1 5(1 5 6 0. 65 0 55 6. 3 0. 65 C• 55 6. 3 0. 65 i) 55 6. 3 0. 65 0 55 6. :~ 0. 65 0 55 6. 3 0 65 0. 55 6. 3 0. 65 0 55 6. ~.! , r·'· IJI a: .. :I •• ll.i<.. a .. t a .,I a I PROPOSED ELIM HYDROEL~CTkiC PROJECT CREEK NEAP. E! I t1: ALASf<,A DATE TIME DY1E RAW DATA ~!':'-=~=~== =::::.: ===;;:.:.:: ====~=~::::= 02:00 362 j" c. 04:00 363 13 06:00 364 12 os·oo 365 t2 10:00 366 13 12:00 367 j ·~ ... _ 14: 0·:> 369 13 16:00 369 13 18:00 370 13 20:00 371 13 22:00 372 13 00:00 373 12 DAILY AVERAGE VALUES 06/15/85 02:00 374 1 ~) r. 06/15/85 04:0{) 3'7"'. 12 ')6/15/85 06· 00 376 1 :l 0!~/ 1 5/85 08: 00 377 1 c; .~ It:_ ·oort5/S5 10~ 00 379 12 06/15/85 12: 00 379 12 06/15/85 14:00 380 12 -os/15/85 16' oo 391 l2 06/15/85 18:00 3B2 12 20:00 38::1 ~~ . ·- 22:00 384 t·~ ,_ 00:00 385 12 DAILY AVERAGE VALUES 06/16/8'5 02:00 386 1 ::~ 06/16/8'5 04:00 387 12 ~·ao/16185 06: oo 388 12 06/16/85 08:00 389 12 06/16/85 10:00 390 I2 06/16/85 12:00 391 12 06/16/85 14:00 392 1'"> .. _ 06/tf:,/85 16• 00 393 1' . t- 06/16/85 18:00 394 12 06/16/85 20:00 395 12 (J6/16/85 22:00 396 l:::'l 06/16/BS oo·oo 397 12 DAILY AVERAGE VALUES I I I I I 1 II I I a I DFPTH FEET ==~=== 0. 60 0 65 0. 60 0. 60 0. 65 0 60 0. 65 0. 65 0. 6:) 0. 65 0. 65 0. 60 0. 63 0 60 0 60 0. 60 0. 60 0 60 0.60 0.60 0. 60 0 60 0. 60 0. 60 0.60 0 60 0 60 0. 60 0. 60 0. 60 0. 60 0 60 0. 60 0. 60 0. 60 0. 60 0. 60 0. 60 0 60 ST,e.R l 11/05/85 PAGE 3Q TIME 02/20!85 16:00 STAGE i.HSCHf; P:G:ET CFS ==:----:::::::::::::: ::."·==-=== 0. 50 5. 6 0 55 6. 3 0. 50 c; ' -· 0 fJ :.o :::.. 6 0 55 .~ 3 0. :H) 5. 6 0. 55 6. 3 0 5!} 6. :1 0. ~~~ 6. 3 () z:;<· -. -:J 6. 3 0. :;,;s. t -.; ...!\ • .._ .. o. :',o 5. 6 0 53 6. 0 0 :'·0 :'· 6 0 5·J 5. 6 0 ~50 5. 6 0. 50 5. 6 0. 50 5. 6 0. 50 5. 6 0. 50 5. 6 0 50 5. 6 !) ~,() 5 6 0. 50 5 6 0. 50 5. 6 o. :>o 5. 6 o. :.>o 5 6 (1. 51) 5 6 0. :::'·0 5 6 0. 50 5. 6 o :~,o 5. 6 1) 50 5. 6 0. 50 5 6 0. 50 5. 6 o. ~;,o 5. 6 0. 50 5. 6 0 50 5. 6 0. 50 5. 6 0. 50 5. 6 r,. 50 5. 6 Itt &.1 I 1 I .• I I I I ,J· ~' -:1 ;I(!' .. ,, all~~ •.• &t L.J a .. l ll,,J PROPOSED FLIM HYDRCELEI.fRIC PRU0~C! PETERSEN CREE~ NEAR ELJM, ALAS~A DATE T I 1'1E B'r"1E P.A\·! D~HA S"ll:;""""'::=c~!'==~ -::.:=~== =·~·.'!:"'-· :::.·;•:-:,:::!"'!':~.~:::: 1)6/1 "1/85 02: 00 .3Cf8 1 .• t. 06/17/95 04:00 3179 I 1 06/1 ~, /85 06: 00 400 12 ot~/t?/85 oe·oo 401 12 06/17/85 10 00 a'I02 1~ 0&/17/85 12·00 403 g~ <)ty/1 7/135 14• 00 404 ' ::1 06117/85 16:00 405 1 ~) "· 06/17/85 18. 00 406 12 01:1/17185 20:00 407 Eel 06/17/85 22:00 408 .!G:' f!t-/17/85 oo·oo . 401.:? 1l DAILY AVERAGE VAtt~S 06/18/85 02 00 410 !;.! Ot-./18/85 04:00 41 i 1 !. Ob/18/85 06:00 412 E~ 06/1B/B5 08:00 413 1 i 06/18/85 10:00 41 •1 I ! 06/18/85 12:00 41~ E' • J I I f\FDTH FE£T =..;::::-...:;;.;::;.;.;= 0 60 0 55 0 60 0. 60 0 60 0. bO 0. 60 0. bO 0 1:.,~) 0. 60 0. t.O 0. 55 0. 59 0. bO 0. 55 0. tO 0 55 0 55 0 60 r 1 1: J •• •• STAR I ll/0~.85 PA~~ flME 0~120185 ~.TA•;.!E f!ISCHO J:.H: r CFS -=-=::-':;:;-:: .. ::.~===.:= 0 50 5 6 ,] 4:, 4 ''? (!. ~0 :::-. 6 '=' 50 ~· 6 0. 50 ~:. !..., ·.:·~ ~~') ;::. 6 0 so 5. 6 0. ~;:) 5. 6 o :_;o 5. b 0. ~-0 5 6 Q. ~:!.0 5 6 I) 4~) •l 9 0 49 5 5 ('1 ~;.;_) 5. 6 I) '~ 5 ll 9 (! 50 s 6 ~). ·~::. tl 9 0. 1~5 4 9 0. SCi 5. 6 , . .. 16· O< ... &I •. I a :1 I J I I I I "' f PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 1 PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 t ' • . i DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS -------------==== ===·====· ===-·= ·==== ====== 4 . 06/19/85 02:00 1 11 0. 55 0.45 4.9 I I 06/19/85 04:00 2 11 0.55 0.45 4.9 : i i'l 06/19/85 06:00 3 11 0. 55 0.45 4.9 i :i 06/19/85 08:00 4 11 0.55 0.45 4.9 : :j 06/19/85 10:00 5 11 0.55 0.45 4.9 06/19/85 12:00 6 11 0.55 0.45 4.9 06/19/85 14:00 7 12 0.60 0. 50 5.6 !'l 06/19/85 16: 00 8 12 0.60 o. 50 5.6 :": I I 06/19/85 18:00 9 12 0.60 0.50 5.6 j,p I : 06/19/85 20:00 10 12 0.60 0. 50 5.6 06/19/85 22:00 11 11 0. ss 0.45 4.9 06/19/85 00:00 12 11 0.55 0.45 4. 9 :;' DAILY AVERAGE VALUES 0. 57 0.47 5. 1 f . :·' 06/20/85 02:00 13 l,, 11 0. 55 0.45 4.9 r. 06/20/85 04:00 14 11 0. 55 0.45 4.9 06/20/85 06:00 15 11 0. 55 0.45 4.9 06/20/85 08:00 16 11 0. 55 0.45 4.9 .,.I 06/20/85 10:00 17 11 0.55 0.45 4.9 r 1 06/20/85 12:00 18 11 0.55 0.45 4.9 i' 06/20/85 14:00 19 11 0. 55 0.45 4.9 f·l 06/20/85 16:00 20 12 0.60 0. 50 5.6 06/20/85 18:00 21 11 0. 55 0.45 4.9 06/20/85 20:00 22 11 0. 55 0.45 4.9 06/20/85 22:00 23 11 0. 55 0.45 4.9 06/20/85 00:00 24 11 0.55 0.45 4.9 DAILY AVERAGE VALUES 0. 55 0.45 5.0 06/21/laS 02:00 25 11 0. 55 0.45 4.9 06/21185 04: 00 26 11 0. 55 0.45 4.9 \ : 'i 06/21/85 06:00 27 11 0. 55 0.45 4.9 06/21./85 OS: 00. 28 11 0. 55 0.45 4.9 06/21/85 10:00 29 11 0. 55 0.45 4.9 06/21/85 12:00 30 11 0. 55 0.45 4.9 06/21/85 14:00 31 11 0.55 0.45 4.9 06/21/85 16:00 32 11 0. 55 0.45 4.9 06/21/85 18:00 33 11 0. 55 0.45 4.9 06/21/85 20:00 34 11 0. 55 0.45 4.9 06/21/85 22:00 35 11 0. 55 0.45 4.9 06/21/85 00:00 36 11 0. 55 0.45 . 4. 9 DAILY AVERAGE VALUES 0. 55 0.45 4.9 f PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 2 PETERSEN CREE~ NEAR ELIM, ALAS~A START TIME 06/19/85 02:00 ·' f DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ·=·===··= ===== ===== ========= ====== ===== ·=====:= ( 06/22/85 02:00 37 11 0. 55 0.45 4.9 06/22/85 04:00 38 11 0.55 0.45 4.9 06/22/85 06:00 39 11 0. 55 0.45 4.9 06/22/85 08:00 40 11 0.55 0.45 4.9 06/22/85 10:00 41 11 0.55 0.45 4.9 06/212/85 12:00 42 11 0. 55 0.45 4.9 06/22/85 14:00 43 11 0. 55 0.45 4.9 06/22/85 16:00 44 11 0. 55 0.45 4.9 06/22/85 18:00 45 11 0. 55 0.45 4.9 06/22/85 20:00 46 11 0. 55 0.45 4.9 06/22/85 22:00 47 11 0. 55 0.45 4.9 06/22/85 00:00 48 11 0. 55 0.45 4.9 DAILY AVERAGE VALUES 0. 55 0. 45 4.9 06/23/85 02:00 49 11 0. 55 0.45 4.9 06/23/85 04:00 50 11 0.55 0.45 4.9 06/23/85 06:00 51 11 0.55 0.45 4.9 06/23/85 08:00 52 11 0. 55 0.45 4.9 06/23/85 10:00 53 11 0. 55 0.45 4.9 06/23/85 12:00 54 11 0. 55 0.45 4.9 06/23/85 14:00 55 11 0.55 0.45 4.9 06/23/85 16:00 56 11 0. 55 0.45 4.9 06/23/85 18:00 57 11 0. 55 0.45 4.9 06/23/85 20:00 58 11 0. 55 0.45 4.9 06/23/85 22:00 59 11 0. 55 0.45 4.9 06/23/85 00:00 60 11 0. 55 0.45 4.9 DAILY AVERAGE VALUES 0.55 0.45 4.9 06/24/85 02:00 61 11 0.55 0.45 4.9 06/24/85 04:00 62 11 0.55 0.45 4.9 1. 06/24/85 06:00 63 11 0. 55 0.45 4.9 06/24/85 08:00 64 11 0.55 0.45 4.9 06/24/85 10:00 65 11 0. 55 0.45 4.9 06/24/85 12:00 66 11 0.55 0.45 4.9 06/24/85 14:00 67 11 0. 55 0.45 4.9 06/24/85 16:00 68 11 0. 55 0.45 4.9 06/24/85 18:00 69 11 0. 55 0.45 4.9 06/24/85 20:00 70 11 0. 55 0. 45 4.9 06/24/85 22:00 71 11 0. 55 0.45 4.9 06/24/85 00:00 72 11 0. 55 0.45 4.9 DAILY AVERAQE VALUES 0. 55 0.45 4.9 J • f PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 3 PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 ~ I • DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS -----==-= ==----·=== =======-== ====== ===== ====== f 06/25/83 02:00 73 11 0. 55 0.45 4.9 06/25/85 04:00 74 11 0. 55 0.45 4. 9 c 06/25/83 06:00 75 11 0. 55 0.45 4. 9 06/25/85 08:00 76 11 0. 55 0.45 4. 9 06/25/85 10:00 77 11 0. 55 0.45 4.9 06/25/85 12:00 78 11 0. 55 0.45 4.9 06/25/85 14:00 79 11 0. 55 0.45 4.9 Oo/25/85 16:oo 80 11 0. ss 0.45 4.9 06/25/83 18:00 81 11 0. 55 0.45 4.9 06/25/85 20:00 82 11 0. 55 0. 45 4.9 06/23/83 22:00 83 11 0.55 0. 45 4.9 06/25/85 00:00 84 11 0. 55 0.45 4.9 DAILY AVERAGE VALUES 0. 55 0.45 4. 9 06/26/83 02:00 85 11 0. 55 0.45 4.9 06/26/85 04:00 86 10 0. 50 0. 40 4. 2 06/26/83 06:00 87 11 0. 55 0.45 4.9 06/26/85 08:00 88 11 0. 55 0.45 4.9 06/26/85 10:00 89 11 a. 55 0. 45 4.9 06/26/85 12:00 90 11 o. 55 0.45 4.9 06/26/85 14:00 91 11 0. 55 0.43 4.9 06/26/83 16:00 92 11 0. 55 0.45 4.9 06/26/83 18:00 93 11 0. 55 0.45 4. 9 06/26/85 20:00 94 11 0. 55 0.45 4.9 06/26/85 22:00 95 10 0. 50 0.40 4.2 06/26/85 00:00 96 11 o. 55 0.45 4.9 DAILY AVERAGE VALUES 0. 54 0.44 4.8 06/27/85 02:00 97 10 0. 50 0. 40 4.2 06/27/85 04: 00 98 11 0. 55 0.45 4.9 06/27/85 06:00 99 10 0. 50 0. 40 4.2 06/27/85 08:00 100 10 0. 50 0.40 4.2 06/27/85 10:00 101 11 0. 55 0.45 4. 9 06/27/85 12:00 102 11 0. 55 0.45 4.9 06/27/85 14:00 103 11 0. 55 0.45 4. 9 06/27/85 16:00 104 11 0. 55 0.45 ·4. 9 06/27/85 18:00 105 11 0. 55 0.45 4.9 06/27/85 20:00 106 11 0. 55 0.45 4.9 i• 06/27/85 22:00 107 11 0. 55 0.45 4.9 . ' i ', 06/27/85 00:00 108 11 0. 55 0.45 4.9 DAILY AVERAGE VALUES 0. 54 0.44 4.7 • PROPOSED ELIM HYDROELECTRIC PROJECT 11/09/85 PAGE 4 f PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 ' f : DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ------=· ===·=· ===== ========== ====== ===== ===-·= 06/28/85 02:00 109 11 0. 55 0.45 4.9 06/28/85 04:00 110 11 0. 55 0.45 4.9 06/28/85 06:00 111 11 0. 55 0.45 4.9 06/28/85 08:00 112 11 0. 55 0.45 4.9 06/28/85 10:00 113 11 0. 55 0.45 4.9 06/28/85 12:00 114 11 0.55 0.45 4.9 06/28/85 14:00 115 11 0. 55 0.45 4.9 06/28/85 16:00 116 11 0.55 0.45 4.9 06/28/85 18:00 117 11 0. 55 0.45 4.9 06/28/85 20:00 118 11 0. 55 0.45 4. 9 06/28/85 22:00 119 11 0. 55 0.45 4.9 06/28/85 00:00 120 11 0. 55 0.45 4.9 DAILY AVERAGE VALUES 0.55 0.45 4.9 06/29/85 02:00 121 11 0. 55 0.45 4.9 06/29/85 04:00 122 11 0. 55 0.45 4.9 06/29/85 06:00 123 11 0. 55 0. 45 4.9 06/29/85 08:00 124 12 0. 60 0. 50 5.6 06/29/85 10:00 125 12 0.60 0. 50 5.6 06/29/85 12:00 126 13 0.65 0. 55 6.3 06/29/85 14:00 127 12 0.60 0. 50 5.6 06/29/85 16:00 128 12 0.60 0. 50 5.6 06/29/85 18:00 129 12 0.60 0. 50 5. 6 06/29/85 20:00 130 12 0.60 0. 50 5.6 06/29/85 22:00 131 12 0. 60 0. 50 5.6 06/29/85 00:00 132 12 0.60 0. 50 5.6 DAILY AVERAGE VALUES 0. 59 0.49 5.5 06/30/85 02:00 133 11 0. 55 0.45 4.9 06/30/85 04:00 134 12 0.60 0. 50 5. 6 06/30/85 06:00 135 11 0. 55 0.45 4.9 06/30/85 08:00 136 11 0. 55 0.45 4.9 06/30/85 10:00 137 11 0. 55 0.45 4. 9 06/30/85 12:00 138 11 0. 55 0.45 4. 9 06/30/85 14:00 139 11 0. 55 0. 45 4.9 06/30/85 16:00 140 11 0. 55 0. 45 4.9 06/30/85 18:00 141 11 0. 55 0.45 4.9 06/30/85 20:00 142 12 0.60 0. 50 5.6 06/30/85 22:00 143 11 0. 55 0.45 4.9 06/30/85 00:00 144 11 0.55 0.45 4.9 DAILY AVERAGE VALUES 0. 56 0. 46 5.0 • c PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 5 PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 f DEPTH STAGE DISCHQ DATE TIME BYTE RAW DATA FEET FEET CFS ::1&11·=·-=------· ===== ========= ====== =·=== =====· ( 07/01/85 0::2:00 145 11 0. 55 0.45 4.9 07/01/85 04:00 146 11 0. 55 0.45 4.9 07/01/85 06:00 147 12 0.60 0. 50 5.6 c 07/01/85 08:00 148 11 0. 55 0.45 4.9 07/01/85 10:00 149 11 0. 55 0.45 4.9 07/01/85 12:00 150 12 0.60 0. 50 5.6 07/01/85 14:00 151 12 0.60 0. 50 5.6 07/01/85 16:00 15::2 12 0.60 0. 50 5.6 07/01/85 18:00 153 12 0.60 0.50 5.6 07/01/85 20:00 154 12 0.60 0. 50 5.6 07/01/85 22:00 155 12 0.60 0. 50 5.6 07/01/85 00:00 156 12 0.60 0.50 5.6 DAILY AVERAGE VALUES 0. 58 0.48 5.4 07/02/85 02:00 157 12 0.60 0.50 5.6 07/02/85 04:00 158 12 0.60 0. 50 5.6 07/02/85 06:00 159 12 0.60 0. 50 5.6 07/02/85 08:00 160 12 0.60 0. 50 5. 6 07/02/85 10:00 161 12 0.60 0. 50 5.6 07/02/85 12:00 16::2 12 0.60 0. 50 5.6 07/02/85 14:00 163 12 0. 60 0.50 5.6 07/02/85 16:00 164 12 0.60 0. 50 5.6 07/02/85 18:00 165 12 0.60 0. 50 5.6 07/02/85 20:00 166 12 0. 60 0.50 5.6 07/02/85 22:00 167 12 0.60 0. 50 5. 6 07/02/85 00:00 168 12 0.60 0. 50 5.6 DAILY AVERAGE VALUES 0. 60 0. 50 5.6 07/03/85 O:Z:OO 169 12 0.60 0. 50 5. 6 07/03/85 04:00 170 12 0. 60 0. 50 5.6 l ' 07/03/85 06:00 171 12 0.60 0. 50 5.6 07/03/85 08:00 172 12 0.60 0.50 5.6 07/03/85 10:00 173 12 0.60 0.50 5.6 07/03/85 12:00 174 12 0.60 0. 50 5.6 07/03/85 14:00 175 12 0.60 0. 50 5.6 07/03/85 16:00 176 12 0.60 0. 50 5.6 07/03/85 18:00 177 12 0.60 0. 50 5.6 07/03/85 20:00 178 12 0.60 0. 50 5.6 i.' 07/03/85 22:00 179 12 0.60 0. 50 5.6 ' 07/03/85 00:00 180 12 0.60 0. 50 5.6 I• DAILY AVERAQE VALUES 0.60 0. 50 5.6 • PROPOSED ELIM HYDROELECTRIC PRO~ECT 11/05/85 PAGE 6 • PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 ' ( DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS --=-===== ===== ===·= ========= =====·== ===== ====:a= 07/04/85 02:00 181 12 0.60 0. 50 5.6 07/04/85 04:00 182 12 0.60 0. 50 5.6 07/04/85 06:00 183 11 0.55 0. 45 4.9 07/04/85 08:00 184 12 0.60 0. 50 5.6 07/04/85 10:00 185 102 0.60 0. 50 5.6 07/04/85 12:00 186 12 0.60 0. 50 5.6 07/04/85 14:00 187 12 0.60 0. 50 5. 6 07/04/85 16:00 188 12 0.60 0. 50 5.6 07/04/85 18:00 189 12 0.60 0. 50 5. 6 07/04/85 20:00 190 12 0.60 0. 50 5. 6 07/04/85 22:00 191 11 0. 55 0.45 4.9 07/04/85 00:00 192 11 0. 55 0.45 4. 9 DAILY AVERAGE VALUES 0. 59 0.49 5.4 07/05/85 02:00 193 11 0. 55 0.45 4.9 07/05/85 04:00 194 11 0. 55 0.45 4. 9 07/05/85 06:00 195 12 0.60 0. 50 5.6 07/05/85 08:00 196 12 0.60 0. 50 5.6 07/05/85 10:00 197 12 0.60 0. 50 5.6 07/05/85 12:00 198 11 0.55 0.45 4.9 07/05/85 14:00 199 12 0.60 0. 50 5.6 07/05/85 16:00 200 12 0.60 0. 50 5. 6 07/05/85 18:00 201 12 0.60 0. 50 5.6 07/05/85 20:00 202 12 0.60 0. 50 5.6 07/05/85 22:00 203 11 0. 55 0. 45 4.9 07/05/85 00:00 204 11 0. 55 0.45 4.9 DAILY AVERAGE VALUES 0. 58 0.48 5.3 07/06/95 02:00 205 11 0. 55 0.45 4.9 07/06/85 04:00 206 11 0. 55 0.45 4.9 07/06/85 06:00 207 11 0. 55 0.45 4.9 07/06/85 08:00 208 11 0. 55 0.45 4.9 07/06/85 10:00 209 11 0. 55 0.45 4.9 07/06/85 12:00 210 12 0.60 0. 50 5.6 07/06/85 14:00 211 11 0. 55 0.45 4.9 07/06/85 16:00 212 11 0. 55 0.45 4. 9 07/06/85 18:00 213 12 0.60 0. 50 5. 6 07/06/85 20:00 214 11 0. 55 0.45 4.9 07/06/85 22:00 215 11 0. 55 0.45 4.9 07/06/85 00:00 216 11 0. 55 0. 45 4. 9 DAILY AVERAGE VALUES 0. 56 0.46 5.0 c PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 7 PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 • I ( DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ----==·= -----==== ·===·==== ====== =====: ====== 07/07/85 02:00 217 11 0. 55 0.45 4.9 07/07/85 04:00 218 11 0. 55 0.45 4.9 07/07/85 06:00 219 11 0.55 0.45 4.9 07/07/85 08:00 220 11 0. 55 0.45 4. 9 07/07/85 10:00 221 12 0.60 0. 50 5.6 07/07/85 12:00 222 12 0.60 0. 50 5. 6 07/07/85 14:00 22:3 12 0.60 0. 50 5.6 07/07/85 16:00 224 12 0.60 0. 50 5.6 07/07/85 18:00 225 12 0.60 0. 50 5.6 07/07/85 20:00 226 12 0.60 • 0. 50 5. 6 07/07/85 22:00 227 12 0.60 0. 50 5.6 07/07/85 00:00 228 12 0.60 0. 50 5.6 DAILY AVERACE VALUES 0. 58 0.48 5.4 07/08/85 02:00 229 11 0. 55 0.45 4.9 07/08/85 04:00 2:30 12 0.60 0. 50 5. 6 07/08/85 06:00 2:31 12 0.60 0. 50 5.6 07/08/85 08:00 2:32 12 0.60 0. 50 5. 6 07/08/85 10:00 23:3 12 0. 60 0. 50 5.6 07/08/85 12:00 2:34 12 0.60 o. 50 5.6 07/08/85 14:00 235 12 0.60 0. 50 5. 6 07/08/85 16:00 2:36 11 0. 55 0.45 4. 9 07/08/85 18:00 237 12 0. 60 0. 50 5.6 07/08/85 20:00 2:38 11 0. 55 0. 45 4.9 07/08/85 22:00 239 11 0. 55 0. 45 4. 9 07/08/85 00:00 240 12 0.60 0. 50 5.6 DAILY AVERAGE VALUES 0. 58 0.48 5. 4 07/09/85 02:00 241 12 0.60 0. 50 5. 6 07/09/85 04:00 242 11 0. 55 0.45 4.9 07/09/85 06:00 24:3 11 0. 55 0. 45 4.9 07/09/85 08:00 244 11 0. 55 0.45 4.9 _, 07/09/85 10:00 245 11 0. 55 0.45 4. 9 07/09/85 12:00 246 11 0. 55 0.45 4.9 07/09/85 14:00 247 11 0. 55 0.45 4.9 07/09/85 16:00 248 12 0.60 0. 50 5.6 07/09/85 18:00 249 12 0.60 0. 50 5.6 07/09/85 20:00 250 12 0.60 0. 50 5.6 07/09/85 22:00 251 11 0. 55 0. 45 4. 9 07/09/85 00;00 252 11 0. 55 0.45 4.9 DAILY AVERACE VALUES 0. 57 0.47 5. 1 . I lt; f· !' ' PROPOSED ELIM HYDROELECTRIC PRO~ECT 11/05/85 PAGE 8 c ' PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 .~ • l DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ··==-·=== =·=·= ----==·=·=~== ====== ==··= ==:rz•= 07/10/85 02:00 253 11 0. 55 0. 45 4.9 07/10/85 04:00 254 11 0. 55 0.45 4.9 07/10/85 06:00 255 11 0. 55 0.45 4.9 07/10/85 08:00 256 11 0. 55 0.45 4.9 07/10/85 10:00 257 12 0.60 0. 50 5.6 07/10/85 12:00 258 11 0. 55 0. 45 4.9 07/10/85 14:00 259 11 0. 55 0.45 4.9 07/10/85 16:00 260 11 0.55 0.45 4.9 07/10/85 18:00 261 11 0. 55 0.45 4.9 07/10/85 20:00 262 11 0. 55 0.45 4.9 07/10/85 22:00 263 11 0. 55 0.45 4.9 07/10/85 00:00 264 11 0. 55 0.45 4.9 DAILY AVERAGE VALUES 0. 55 0.45 5.0 07/11/85 02:00 265 11 0. 55 0.45 4. 9 07/11/85 04:00 266 11 0. 55 0.45 4.9 07/11/85 06:00 267 11 0. 55 0.45 4.9 07/11/85 08: 00 268 11 0.55 0.45 4.9 07/11/85 10: 00 269 11 0. 55 0.45 4. 9 07/11/85 12:00 270 11 0.55 0.45 4.9 07/11/85 14:00 271 11 0. 55 0.45 4.9 07/11/85 16:00 272 11 0. 55 0.45 4.9 07/11/85 18:00 273 11 0.55 0.45 4.9 07/11/85 20:00 274 12 0.60 0. 50 5.6 07/11/85 22:00 275 11 0. 55 0.45 4. 9 07/11/85 00:00 276 11 0. 55 0.45 4.9 DAILY AVERAGE VALUES 0.55 0.45 5.0 07/12/85 02:00 277 11 0. 55 0.45 4. 9 07/12/85 04:00 278 11 0. 55 0.45 4.9 07/12/85 06:00 279 11 0. 55 0.45 4.9 07/12/85 08:00 280 11 0. 55 0.45 4.9 07/12/85 10:00 281 11 0.55 0.45 4.9 07/12/85 12:00 282 11 0. 55 0.45 4. 9 07/12/85 14:00 283 11 0. 55 0.45 4.9 07/12/85 16:00 284 11 0. 55 0. 45 '4. 9 07/12/85 18:00 285 11 0. 55 0.45 4.9 07/12/85 20:00 286 11 0. 55 0.45 4.9 07/12/85 22:00 287 11 0. 55 0.45 4.9 07/12/85 00:00 288 11 0. 55 0. 45 4.9 DAILY AVERAQE VALUES 0.55 0.45 4.9 !,,1 ! ' 4 PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 9 PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 ' 4 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS -·-·=·-=-··==· =·--====-==== ··==·= ===== ====== • 07/13/85 02:00 289 11 0. 55 0.45 4.9 07/13/85 04:00 290 11 0. 55 0.45 4.9 07/13/85 06:00 291 11 0. 55 0.45 4.9 07/13/85 08:00 292 11 0. 55 0.45 4. 9 07/13/85 10:00 293 11 0. 55 0.45 4.9 07/13/85 12:00 294 11 0. 55 0.45 4.9 07/13/85 14:00 295 11 0. 55 0. 45 4.9 07/13/85 16:00 296 11 o. 55 0.45 4.9 07/13/85 18:00 297 11 0. 55 0.45 4.9 07/13/85 20:00 298 11 0. 55 0.45 4.9 07/13/85 22:00 299 11 0.55 0.45 4.9 07/13/85 00:00 300 11 0. 55 0.45 4.9 DAILY AVERAQE VALUES 0. 55 0.45 4. 9 07/14/85 02:00 301 11 0. 55 0.45 4.9 07/14/85 04:00 302 11 0. 55 0.45 4.9 07/14/85 06:00 303 11 0. 55 0.45 4.9 07/14/85 08:00 304 11 0. 55 0.45 4.9 07/14/85 10:00 305 11 0. 55 0.45 4.9 07/14/85 12:00 306 11 0. 55 0.45 4.9 07/14/85 14:00 307 11 0. 55 0.45 4.9 07/14/85 16:00 308 11 0. 55 0.45 4.9 07/14/85 18:00 309 11 0. 55 0.45 4.9 07/14/85 20:00 310 11 0. 55 0.45 4.9 07/14/85 22:00 311 11 0. 55 0.45 4.9 07/14/85 00:00 312 11 o. 55 0.45 4.9 DAILY AVERAGE VALUES 0. 55 0.45 4.9 07/15/85 02:00 313 11 0. 55 0.45 4.9 07/15/85 04:00 314 11 0. 55 0. 45 4.9 07/15/85 06:00 315 11 0. 55 0.45 4.9 07/15/85 08:00 316 11 0. 55 0.45 4.9 07/15/85 10:00 317 11 0.55 0.45 4.9 07/15/85 12:00 318 11 0. 55 0.45 4.9 07/15/85 14:00 319 11 0. 55 0.45 4. 9 07/15/85 16:00 320 11 0. 55 0.45 4.9 07/15/85 18:00 321 11 0. 55 0.45 4.9 07/15/85 20:00 322 11 0. 55 0.45 4.9 07/15/85 22:00 323 11 0. 55 0.45 4.9 07/15/85 00:00 324 11 0. 55 0.45 4.9 DAILY AVERAGE VALUES 0. 55 0.45 4. 9 ' • PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/95 PAGE 10 PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 > • i DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =··===== =·=·= ==== ========= ====== ===== ====== • 07/16/85 02:00 325 11 0. 55 0. 45 4.9 07/16/85 04:00 326 11 0. 55 0. 45 4. 9 07/16/85 06:00 327 11 0. 55 0. 45 4.9 ( 07/16/85 08:00 328 11 0. 55 0.45 4. 9 07/16/85 10:00 329 11 0. 55 0.45 4. 9 07/16/85 12:00 330 11 0. 55 0.45 4. 9 07/16/85 14:00 331 11 0. 35 0.45 4.9 07/16/85 16:00 332 11 0. 55 0.45 4.9 07/16/85 18:00 333 11 0. 35 0.45 4.9 07/16/85 20:00 334 11 0. 35 0. 43 4.9 07/16/95 22:00 335 11 0. 55 0.45 4. 9 07/16/95 00:00 336 11 0. 55 0.45 4. 9 DAILY AVERAGE VALUES 0. 55 0.45 4.9 07/17/95 02:00 337 11 0. 55 0.45 4.9 07/17/85 04:00 339 11 0. 55 0.45 4.9 07/17/95 06:00 339 11 0. 55 0.45 4. 9 07/17/85 08:00 340 11 0. 55 0.45 4. 9 07/17/85 10:00 341 11 0. 55 0.45 4. 9 07/17/85 12:00 342 11 0. 55 0.45 4.9 07/17/85 14:00 343 11 0. 55 0.45 4. 9 07/17/85 16:00 344 11 0. 35 0.45 4. 9 07/17/85 18:00 345 11 0. 55 0.45 4. 9 07/17/85 20:00 346 11 0. 55 0.45 4. 9 07/17/85 22:00 347 11 0. 55 0.45 4. 9 07/17/85 00:00 348 11 0. 55 0.45 4. 9 DAILY AVERAGE VALUES 0. 55 0.45 4.9 07/19/85 02:00 349 11 0. 55 0.45 4.9 07/18/85 04:00 350 11 0. 55 0.45 4.9 07/18/85 06:00 351 11 0. 55 0. 45 4.9 07/18/85 08:00 352 11 0. 55 0.45 4.9 07/18/85 10:00 353 11 0. 55 0.45 4.9 07/18/85 12:00 354 11 0. 55 0.45 4.9 07/19/85 14:00 355 11 0. 55 0.45 4. 9 07/18/85 16:00 356 11 0. 55 0.45 4. 9 07/18/95 18:00 357 11 0. 55 0.45 4. 9 07/18/95 20:00 358 11 0. 55 0.45 4. 9 07/18/95 22:00 359 11 0. 55 0.45 4. 9 07/18/85 00:00 360 11 0. 55 0.45 4. 9 DAILY AVERAQE VALUES 0. 55 0. 45 4.9 • PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 11 f PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 . f DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS --------•••s::• ·=·= =====•a:=== =====· =•=== ====== 07/19/85 02:00 361 11 0. 55 0.45 4.9 07/19/85 04:00 362 11 0. 55 0.45 4.9 07/19/85 06:00 363 10 0. 50 0.40 4.2 07/19/85 08:00 364 11 0. 55 0.45 4. 9 07/19/85 10:00 365 11 0. 55 0.45 4.9 07/19/85 12:00 366 11 0. 55 0.45 4.9 07/19/85 14:00 367 11 0. 55 0.45 4. 9 07/19/85 16:00 368 11 0.55 0.45 4.9 07/19/85 18:00 369 11 0. 55 0.45 4.9 07/19/85 20:00 370 11 0. 55 0.45 4.9 07/19/85 22:00 371 11 0. 55 0.45 4. 9 07/19/85 00:00 372 11 0. 55 0. 45 4.9 DAILY AVERAGE VALUES 0. 55 0.45 4.8 07/:ii!0/85 02:00 373 11 0. 55 0.45 4.9 07/20/85 04:00 374 11 0. 55 0. 45 4. 9 07/20/85 06:00 375 10 0. 50 0.40 4. 2 07/20/85 08:00 376 11 0. 55 0. 45 4.9 07/20/85 10:00 377 11 0. 55 0.45 4.9 07/:ii!0/85 12:00 378 11 0. 55 0.45 4. 9 07/20/85 14:00 379 11 0. 55 0.45 4.9 07/20/85 16:00 380 11 0. 55 0.45 4.9 07/20/85 18:00 381 11 0. 55 0.45 4.9 07/20/85 20:00 382 11 0. 55 0.45 4. 9 07/20/85 22:00 383 11 0. 55 0.45 4.9 07/20/85 00:00 384 11 0. 55 0.45 4.9 DAILY AVERAGE VALUES 0. 55 0.45 4.8 07/21/85 02:00 385 11 0. 55 0.45 4.9 07/21/85 04:00 386 10 0. 50 0.40 4.2 07/21/85 06:00 387 11 0. 55 0.45 4.9 07/21/85 08:00 388 10 0. so 0.40 4.2 07/21/85 10:00 389 10 0. so 0.40 4.2 07/21/85 12:00 390 11 0. 55 0.45 4.9 07/21/85 14:00 391 11 0. 55 0.45 4.9 07/21/85 16:00 392 11 0. 55 0.45 4. 9 07/21/85 18:00 393 11 0. 55 0.45 4.9 07/21/85 20:00 394 11 0. 55 0.45 4.9 07/21/85 22:00 395 11 0. 55 0.45 4.9 07/21/85 00:00 396 10 0. 50 0. 40 . 4. 2 DAILY AVERAGE VALUES 0. 53 0.43 4. 7 ' PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 12 c PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 c DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ------·= -----===== ========= ======= =·=== ====== 07/22/85 02:00 397 11 0. 55 0. 45 4. 9 07/22/85 04:00 398 10 0. 50 0. 40 4. 2 07/22/85 06:00 399 10 0. 50 0. 40 4.2 07/22/85 08:00 400 11 0. 55 0.45 4.9 07/22/85 10:00 401 11 0. 55 0.45 4.9 07/22/85 12:00 402 10 0. so 0.40 4.2 07/22/85 14:00 403 11 0. 55 0.45 4. 9 07/22/85 16:00 404 10 0. so 0.40 4.2 07/22/85 18:00 405 11 0. 55 0.45 4. 9 07/22/85 20:00 406 11 0.55 0.45 4.9 07/22/85 22:00 407 10 0. 50 0.40 4.2 07/22/85 00:00 408 10 0. so 0. 40 4.2 DAILY AVERAGE VALUES 0. 53 0. 43 4.6 07/23/85 02:00 409 10 0. 50 0. 40 4.2 07/23/85 04:00 410 10 0. 50 0.40 4.2 07/23/85 06:00 411 10 0. 50 0.40 4.2 07/23/85 08:00 412 10 0. 50 0.40 4.2 07/23/85 10:00 413 11 0. 55 0.45 4. 9 07/23/85 12:00 414 11 0. 55 0.45 4. 9 07/23/85 14:00 415 10 0. 50 0.40 4. 2 07/23/85 16:00 416 10 0. 50 0.40 4.2 07/23/85 18:00 417 11 0. 55 0.45 4.9 07/23/85 20:00 418 10 0. 50 0.40 4.2 07/23/85 22:00 419 10 0. so 0. 40 4.2 07/23/85 00:00 420 10 0. 50 0.40 4.2 DAILY AVERAGE VALUES 0. 51 0.41 4.4 07/24/85 02:00 421 10 0. 50 0.40 4.2 07/24/85 04:00 422 10 0. 50 0.40 4.2 07/24/85 06:00 423 10 0.50 0.40 4.2 07/24/85 08:00 424 10 0. 50 0.40 4.2 07/24/85 10:00 425 10 0. 50 0.40 4. 2 07/24/85 12:00 426 10 0. 50 0.40 4. 2 07/24/85 14:00 427 11 0. 55 0.45 4. 9 07/24/85 16:00 428 11 0. 55 0.45 4.9 07/24/85 18:00 429 11 0. 55 0. 45 4. 9 07/24/85 20:00 430 10 0. 50 0.40 4.2 07/24/85 22:00 431 10 0. so 0.40 4.2 07/24/85 00:00 432 10 0. so 0.40 4.2 DAILY AVERAGE VALUES 0. 51 0.41 4.4 • PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 13 c PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 f i DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ==-·==== ===·== ==== ========= ======== ===== ====== 07/~5/85 02:00 433 10 0. 50 0.40 4.2 07/~5/85 04:00 434 10 0. 50 0. 40 4.2 07/~5/85 06:00 435 10 0. 50 0.40 4.2 07/25/85 08:00 436 10 0. 50 0.40 4.2 07/25/85 10:00 437 10 0. 50 0.40 4.2 07/~5/85 12:00 438 10 0. 50 0. 40 4.2 07/~5/85 14:00 439 10 0. 50 0. 40 4.2 07/25/85 16:00 440 10 0. 50 0. 40 4.2 07/25/85 18:00 441 10 0. 50 0. 40 4.2 07/25/85 ~0:00 442 10 0. 50 0.40 4.2 07/~5/85 2~:00 443 10 0. 50 0. 40 4.2 07/~5/85 00:00 444 10 0. 50 0.40 4.2 DAILY AVERAGE VALUES 0. 50 0.40 4.2 07/26/85 02:00 445 10 0. 50 0.40 4.2 07/26/85 04:00 446 10 0. 50 0.40 4.2 07/~6/85 06:00 447 10 0. 50 0.40 4.2 07/~6/85 08:00 448 10 0. 50 0.40 4. 2 07/~6/85 10:00 449 10 o. so 0.40 4.2 07/~6/85 1~:00 450 10 0. 50 0.40 4.2 07/~6/85 14:00 451 10 0. 50 0.40 4. 2 07/26/85 16:00 452 10 0. 50 0.40 4. 2 07/26/85 18:00 453 10 0. 50 0.40 4.2 07/26/85 ~0:00 454 10 0. 50 0.40 4.2 07/26/85 22:00 455 10 0. 50 0.40 4.2 07/~6/85 00:00 456 10 0. 50 0.40 4.~ DAILY AVERAGE VALUES 0. 50 0.40 4.2 07/27/85 02:00 457 10 0. 50 0.40 4.2 07/~7/85 04:00 458 10 0. so 0.40 4.2 07/27/85 06:00 459 10 0. so 0. 40 4. 2 07/27/85 09:00 460 10 0. 50 0.40 4.2 07/27/85 10:00 461 10 0. 50 0.40 4. 2 07/27/85 12:00 462 10 0. 50 0.40 4.2 07/27/85 14:00 463 10 0. 50 0.40 4.2 07/27/85 16:00 464 10 0. 50 0.40 '4, 2 07/27/85 18:00 465 10 0. 50 0. 40 4. 2 07/27/85 20:00 466 10 0. 50 0.40 4.2 07/27/85 22:00 467 10 0. 50 0.40 4. 2 07/27/85 00:00 468 10 0. 50 0.40 4. 2 DAILY AVERAGE VALUES 0. 50 0.40 4.2 • PROPOSED ELIM HYDROELECTRIC PRO~ECT 11/05/85 PAGE 14 f PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ----------=== -=-·= ========· ===•== ===== ====-= 07/28/85 02:00 469 10 0. 50 0.40 4.2 07/28/85 04:00 470 10 0. 50 0.40 4.2 07/28/85 06:00 471 10 0. 50 0.40 4.2 07/28/85 08:00 472 10 0. 50 0.40 4. 2 07/28/85 10:00 473 10 0. 50 0.40 4. 2 07/28/85 12:00 474 10 0. 50 0.40 4.2 07/28/85 14:00 475 10 0. 50 0.40 4. 2 07/28/85 16:00 476 10 0. 50 0.40 4.:.! 07/28/85 18:00 477 10 0. 50 0. 40 4.2 07/28/85 20:00 478 10 0. 50 0.40 4.2 07/28/85 22:00 479 10 0. 50 0.40 4.2 07/28/85 00:00 480 10 0. 50 0.40 4.2 DAILY AVERAGE VALUES 0. 50 0.40 4.2 07/:.!9/85 0:.!:00 481 10 0. 50 0.40 4.2 07/29/85 04:00 482 10 0. 50 0.40 4.2 07/29/85 06:00 483 10 0. 50 0.40 4.2 07/29/85 08:00 484 10 0. 50 0.40 4.2 07/29/85 10:00 485 10 0. 50 0.40 4.2 07/29/85 12:00 486 10 0. 50 0.40 4.:.! 07/29/85 14:00 487 10 0. 50 0.40 4.2 07/29/85 16:00 488 10 0. 50 0.40 4.2 07/29/85 18:00 489 10 0. 50 0.40 4.2 07/29/85 20:00 490 10 0. 50 0.40 4. 2 07/29/85 22:00 491 10 0. 50 0.40 4.2 07/29/85 00:00 492 10 0. 50 0.40 4.:.! DAILY AVERAGE VALUES 0. 50 0.40 4.2 07/30/85 02:00 493 10 0. 50 0.40 4.2 07/30/85 04:00 494 10 0. 50 0.40 4.2 07/30/85 06:00 495 10 0. 50 0.40 4.2 07/30/85 08:00 496 10 0. 50 0. 40 4.2 07/30/85 10:00 497 10 0. 50 0.40 4.2 07/30/85 12:00 498 10 0. 50 0.40 4.2 07/30/85 14:00 499 10 0. 50 0.40 4.2 07/30/85 16:00 500 10 0. 50 0. 40 4. 2 07/30/85 18:00 501 10 0. 50 0.40 4.2 07/30/85 20:00 502 10 0. 50 0.40 4.2 07/30/85 22:00 503 10 0. 50 0.40 4.2 07/30/85 00:00 504 10 0. 50 0.40 4.2 DAILY AVERAGE VALUES 0. 50 0.40 4.2 ' f PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 1:5 PETERSEN CREEK NEAR ELJM, ALASKA START TIME 06/19/85 02:00 f DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ----==== ===== ==== =::=======· ======= ===== ====== ( 07/31/85 02:00 505 10 0. 50 0.40 4. 2 07/31/85 04:00 506 10 0. 50 0. 40 4.2 07/31/85 06:00 507 10 0. 50 0.40 4. 2 07/31/85 08:00 508 10 0. 50 0.40 4.2 07/31/85 10:00 509 10 0. 50 0.40 4. 2 07/31/85 1:2:00 510 10 0. 50 0.40 4.2 07/31/85 14:00 511 10 0. 50 0. 40 4.2 07/31/85 16:00 512 10 0. 50 0.40 4.2 07/31/85 18:00 513 10 0. 50 0.40 4.2 07/31/85 20:00 514 10 0. 50 0. 40 4.2 07/31/85 22:00 515 10 0. 50 0.40 4.2 07/31/85 00:00 516 10 0. 50 0.40 4. 2 DAILY AVERAGE VALUES 0. 50 0. 40 4.2 08/01/85 02:00 517 10 0. 50 0.40 4. 2 08/01/85 04:00 518 10 0. 50 0.40 4.2 08/01/85 06:00 519 10 0. 50 0.40 4. :2 08/01/85 08:00 520 10 0. 50 0.40 4. 2 08/01/85 10:00 5:21 10 0. 50 0. 40 4. 2 08/01/85 1:2:00 522 10 0. 50 0.40 4.2 08/01/85 14:00 523 10 0. 50 0.40 4.2 08/01/85 16:00 524 10 0. 50 0. 40 4.2 08/01/85 18:00 5:25 10 0. 50 0.40 4.:2 08/01/85 20:00 526 10 0. so 0.40 4.2 08/01/85 22:00 527 10 0. 50 0.40 4.2 08/01/85 00:00 528 10 0. so 0.40 4.2 DAILY AVERAGE VALUES 0. 50 0. 40 4.2 08/02/85 02:00 Sii!9 10 0. 50 0.40 4.2 08/02/85 04:00 530 10 0. 50 0.40 4. 2 08/02/85 06:00 531 10 0. 50 0.40 4.2 08/02/85 08:00 532 10 0. 50 0.40 4.2 08/02/85 10:00 533 10 0. 50 0.40 4. 2 08/02/85 12:00 534 10 0. so 0.40 4.2 08/02/85 14:00 535 10 0. 50 0.40 4.2 08/02/85 16:00 536 10 0. 50 0.40 4.2 08/02/85 18:00 537 10 0. 50 0.40 4.2 08/02/85 20:00 538 10 0. 50 0.40 4.2 08/02/85 22:00 539 09 0.45 0. 35 3. 1 08/02/85 00:00 540 09 0.45 0.35 3. 1 DAILY AVERAGE VALUES 0.49 0.39 4.0 ' PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 16 c PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 ' f : DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ---------------·= ·=·====== ======= ===== ===·=== ( 08/03/85 02:00 541 10 0. 50 0.40 4.2 08/03/85 04:00 542 10 0. 50 0.40 4.2 08/03/85 06:00 543 10 0. 50 0.40 4.2 08/03/85 08:00 544 10 0. 50 0. 40 4.2 08/03/85 10:00 545 10 0. 50 0.40 4.2 08/03/85 12:00 546 10 0. 50 0.40 4.2 08/03/85 14:00 547 10 0. 50 0.40 4.2 08/03/85 16:00 548 10 0. 50 0.40 4.2 08/03/85 18:00 549 10 0. 50 0.40 4.2 08/03/85 20:00 550 10 0. 50 0.40 4.2 08/03/85 22:00 551 10 0. 50 0.40 4.2 08/03/85 00:00 552 10 0. 50 0.40 4.2 DAILY AVERAGE VALUES 0. 50 0.40 4.2 08/04/S5 02:00 553 10 0. 50 0.40 4.2 08/04/85 04:00 554 10 0. 50 0.40 4.2 08/04/85 06:00 555 10 0. 50 0.40 4.2 08/04/85 08:00 556 10 0. 50 0.40 4.2 08/04/85 10:00 557 10 0. 50 0.40 4.2 08/04/85 12:00 558 10 0. 50 0.40 4.2 08/04/85 14:00 559 10 0. 50 0.40 4.2 08/04/85 16:00 560 10 0. 50 0.40 4.2 08/04/85 18:00 561 10 0. 50 0.40 4.2 08/04/85 20:00 562 10 0. 50 0.40 4.2 08/04/85 22:00 563 09 0.45 0.35 3. 1 08/04/85 00:00 564 09 0.45 0.35 3.1 DAILY AVERAGE VALUES 0.49 0. 39 4.0 08/05/85 02:00 565 09 0.45 0.35 3. 1 08/05/85 04:00 566 09 0.45 0.35 3. 1 08/05/85 06:00 567 09 0.45 0.35 3. 1 08/05/85 08:00 568 10 0. 50 0.40 4.2 08/05/85 10:00 569 10 0. 50 0.40 4. 2 08/05/85 12:00 570 10 0. 50 0. 40 4. 2 08/05/85 14:00 571 10 0. 50 0.40 4.2 08/05/85 16:00 572 10 0. 50 0.40 4. 2 08/05/85 18:00 573 10 0. 50 0.40 4. 2 08/05/85 20:00 574 10 0. 50 0.40 4.2 08/05/85 22:00 575 09 0.45 0.35 3. 1 08/05/85 00:00 576 09 0.45 0. 35 3. 1 DAILY AVERAGE VALUES 0.48 0. 38 3. 7 ' PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 17 « PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 . t DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =··-=·==~~:~ ---=-=··= ========== ====== ===== ====== 08/06/85 02:00 577 09 0.45 0.35 3. 1 08/06/85 04:00 578 09 0.45 0.35 3. 1 ( 08/06/85 06:00 579 10 0. 50 0. 40 4. 2 08/06/85 08:00 580 09 0.45 0.35 3. 1 08/06/85 10:00 581 10 0. 50 0.40 4. 2 08/06/85 12:00 582 10 0. 50 0.40 4.2 08/06/85 14:00 583 10 0. 50 0.40 4.2 08/06/85 16:00 584 10 0. 50 0. 40 4.2 08/06/85 18:00 585 10 0. 50 0. 40 4.2 08/06/85 20:00 586 10 0. 50 0.40 4.2 08/06/85 22:00 587 10 0. 50 0.40 4.2 08/06/85 00:00 588 09 0.45 0. 35 3. 1 DAILY AVERAOE VALUES 0. 48 0.38 3.8 08/07/85 02:00 589 09 0.45 0.35 3. 1 08/07/85 04:00 590 10 0. 50 0.40 4.2 08/07/85 06:00 591 10 0. 50 0.40 4.2 08/07/85 08:00 592 10 0. 50 0.40 4. 2 08/07/85 10:00 593 09 0.45 0.35 3. 1 08/07/85 12:00 594 10 0. 50 0.40 4.2 08/07/85 14:00 595 10 0. 50 0.40 4.2 08/07/85 16:00 596 10 0. 50 0.40 4.2 08/07/85 18:00 597 09 0.45 0. 35 3. 1 08/07/85 20:00 598 10 0. 50 0.40 4. 2 08/07/85 22:00 599 10 0. 50 0. 40 4.2 08/07/85 00:00 600 10 0. 50 0.40 4.2 DAILY AVERAGE VALUES 0.49 0.39 3.9 08/08/85 02:00 601 10 0. 50 0.40 4.2 08/08/85 04:00 602 09 0.45 0. 35 3. 1 08/08/85 06:00 603 10 0. 50 0.40 4.2 08/08/85 08:00 604 10 0. 50 0.40 4.2 08/08/85 10:00 605 10 0. 50 0.40 4.2 08/08/85 12:00 606 10 0. 50 0. 40 4.2 08/08/85 14:00 607 10 0.50 0.40 4.2 08/08/85 16:00 608 10 0. 50 0.40 4. 2 08/08/85 18:00 609 10 0. 50 0. 40 4.2 08/08/85 20:00 610 10 0. 50 0.40 4. 2 08/08/85 22:00 611 10 0. 50 0.40 4.2 08/08/85 00:00 612 10 0. 50 0.40 4.2 DAILY AVERAQE VALUES 0. 50 0.40 4. 1 i . I" • PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/8!5 PAGE 18 c PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 ' ( i DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS -·-·=·=· --=--==== =·======= ======· ===== ===·== 08/09/8!,; 02:00 613 10 0. 50 0.40 4.2 08/09/85 04:00 614 10 0. so 0.40 4.2 08/09/85 06:00 615 11 0. 55 0.45 4.9 08/09/85 08:00 616 11 0. 55 0.45 4.9 08/09/85 10:00 617 10 0. 50 0.40 4.2 08/09/85 12:00 618 10 0. 50 0. 40 4.2 08/09/85 14:00 619 10 0. so 0. 40 4.2 08/09/85 16:00 620 10 0. 50 0.40 4.2 08/09/85 18:00 621 10 0. so 0. 40 4.2 08/09/8!5 20:00 622 10 0. !50 0. 40 4.2 08/09/85 22:00 623 10 0. 50 0.40 4.2 08/09/8!5 00:00 624 10 0. so 0.40 4.2 DAILY AVERAGE VALUES 0. 51 0.41 4.3 08/10/85 02:00 62!5 10 0. !50 0. 40 4.2 08/10/85 04:00 626 10 0. so 0.40 4.2 08/10/85 06:00 627 10 0. 50 0.40 4.2 08/10/85 08:00 628 10 0. 50 0.40 4.2 08/10/85 10:00 629 10 0. so 0.40 4.2 08/10/85 12:00 630 10 0. so 0.40 4.2 08/10/85 14:00 631 10 0. 50 0.40 4.2 08/10/85 16:00 632 10 0. 50 0. 40 4.2 08/10/85 18:00 633 10 0. 50 0.40 4.2 08/10/85 20:00 634 10 0. 50 0.40 4.2 08/10/85 22:00 635 10 0. so 0. 40 4.2 08/10/85 00:00 636 10 0. so 0.40 4.2 DAILY AVERAGE VALUES 0. so 0. 40 4.2 08/11/85 02:00 637 10 0. 50 0.40 4. 2 08/11/85 04:00 638 10 0. 50 0.40 4.2 08/11/85 06:00 639 10 0. 50 0.40 4.2 08/11/85 08: 00 640 10 0. 50 0.40 4.2 08/11/85 10: 00 641 10 0.50 0.40 4.2 08/11/85 12:00 642 10 0. 50 0.40 4. 2 08/11/85 14:00 643 10 0. 50 0.40 4. 2 08/11/85 16:00 644 10 0. 50 0.40 '4. 2 08/11/85 18:00 645 10 0. 50 0.40 4.2 08/11/85 20:00 646 10 0. 50 0.40 4.2 08/11/85 22: 00 647 10 0. 50 0. 40 4.2 08/11/85 00:00 648 10 0. 50 0. 40 4.2 l·· DAILY AVERAGE VALUES 0. so 0. 40 4.2 L. I :•· • ( PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 19 PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS --=··--= ==-·--·=== =====:===·· ====== ====::~~~~ ====== 08/12/85 02:00 649 10 0. 50 0. 40 4.2 08/1~/85 04:00 650 10 0. 50 0.40 4.2 08/12/85 06:00 651 10 0. 50 0. 40 4.2 08/12/85 08:00 652 10 0. 50 0.40 4.2 08/12/85 10:00 653 10 0. 50 0.40 4.2 08/12/85 12:00 654 10 0. 50 0.40 4.:2 08/12/85 14:00 655 10 0. 50 0. 40 4. 2 08/1:2/85 16:00 656 10 0. 50 0.40 4.2 08/12/85 18:00 657 10 0. 50 0.40 4. 2 08/12/85 20:00 658 10 0. 50 0.40 4.2 08/1:2/85 2:2:00 659 10 o. 50 0.40 4.:2 08/12/85 00:00 660 10 0. 50 0. 40 4. 2 DAILY AVERAGE VALUES 0. 50 0.40 4.2 08/13/85 02:00 661 09 0.45 0.35 3. 1 08/13/85 04:00 662 10 0. 50 0.40 4.2 08/13/85 06:00 663 10 0. 50 0. 40 4. :2 08/13/85 08:00 664 10 0. 50 0. 40 4.2 08/13/85 10:00 665 10 0. 50 0. 40 4.2 08/13/85 1:2:00 666 10 0. 50 0. 40 4. 2 08/13/85 14:00 667 10 0. 50 0. 40 4.2 08/13/85 16:00 668 10 0. 50 0. 40 4.2 08/13/85 18:00 669 10 0. 50 0. 40 4.2 08/13/85 :20:00 670 10 0. 50 0. 40 4.2 08/13/85 22:00 671 10 0. 50 0. 40 4.2 08/13/85 00:00 67:2 10 0. 50 0. 40 4.2 DAILY AVERAGE VALUES 0. 50 0.40 4. 1 08/14/85 02:00 673 10 0. 50 0. 40 4.2 08/14/85 04:00 674 10 0. 50 0.40 4.2 08/14/85 06:00 675 10 0. 50 0.40 4. 2 08/14/85 08:00 676 10 0. 50 0.40 4.2 08/14/85 10:00 677 10 0. 50 0. 40 4.2 08/14/85 12:00 678 10 0. 50 0. 40 4.2 08/14/85 14:00 679 10 0. 50 0. 40 4.2 08/14/85 16:00 680 10 0. 50 0.40 4.2 08/14/85 18:00 681 10 0. 50 0.40 4. 2 08/14/85 20:00 682 10 0. 50 0.40 4.2 08/14/85 22:00 683 10 0. 50 0. 40 4.2 08/14/85 00:00 684 10 0. 50 0.40 4. 2 DAILY AVERAGE VALUES 0. 50 0. 40 4.2 • PROPOSED ELIM HYDROELECTRIC PRO~ECT 11/05/85 PAGE 20 f PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 I. f : DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ===·=-·=-=-·=-=---========= ====== ===== ====== f 08/15/85 02:00 685 10 0. 50 0. 40 4.2 08/15/85 04:00 686 10 0. 50 0.40 4.2 08/15/85 06:00 687 10 0. 50 0.40 4.2 08/15/85 08:00 688 10 0. 50 0.40 4.2 08/15/85 10:00 689 10 0. 50 0. 40 4.2 08/15/85 12:00 690 10 0. 50 0.40 4.2 08/15/85 14:00 691 10 0. 50 0. 40 4.2 08/15/85 16:00 692 10 o. 50 0.40 4.2 08/15/85 18:00 693 10 0. 50 0.40 4.2 08/15/85 20:00 694 10 0. 50 0.40 4.2 08/15/85 :22:00 695 10 0. 50 0. 40 4.2 08/15/85 00:00 696 10 0. 50 0.40 4.2 DAILY AVERAGE VALUES 0. 50 0.40 4.2 08/16/85 02:00 697 10 0. 50 0. 40 4. 2 08/16/85 04:00 698 10 0. 50 0.40 4. 2 08/16/85 06:00 699 10 0. 50 0. 40 4.2 08/16/85 08:00 700 10 0. 50 0.40 4.2 08/16/85 10:00 701 10 0. 50 0.40 4.2 08/16/85 12:00 702 10 0. 50 0.40 4.2 08/16/85 14:00 703 10 0. 50 0. 40 4.2 08/16/85 16:00 704 10 0. 50 0. 40 4.2 08/16/85 18:00 705 10 0. 50 0.40 4.2 08/16/85 20:00 706 10 0. 50 0.40 4.2 08/16/85 22:00 707 10 0. 50 0. 40 4.2 08/16/85 00:00 708 10 0. 50 0. 40 4.2 DAILY AVERAGE VALUES 0. 50 0. 40 4.2 08/17/85 02:00 709 10 0. 50 0. 40 4.2 08/17/85 04:00 710 10 0. 50 0.40 4.2 08/17/85 06:00 711 10 0. 50 0.40 4.2 08/17/85 08:00 712 09 0.45 0.35 3. 1 08/17/85 10:00 713 10 0. 50 0.40 4.2 08/17/85 12:00 714 10 0. 50 0.40 4.2 08/17/85 14:00 715 10 0. 50 0.40 4.2 08/17/85 16:00 716 10 0. 50 0.40 4.2 08/17/85 18:00 717 10 0. so 0.40 4.2 08/17/85 20:00 718 10 0. so 0.40 4.2 08/17/85 22:00 719 10 0. 50 0.40 4.2 08/17/85 00:00 720 10 0. 50 0.40 4.2 DAILY AVERAGE VALUES 0. 50 0.40 4. 1 )r1 ' ' !r ,· I " PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 21 f PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 t • DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ··==·=·=· =•=•= ::a:a:=== ========= ====== ===== ====== ( 08/18/85 0:2:00 7:21 10 0. 50 0. 40 4.2 08/18/85 04:00 722 10 0. 50 0.40 4.2 c 08/18/85 06:00 723 10 0. 50 0.40 4.2 " 08/18/85 08:00 724 10 0. 50 0.40 4.2 08/18/85 10:00 725 10 0. 50 0.40 4. 2 08/18/85 12:00 726 10 0. 50 0.40 4. 2 08/18/85 14:00 727 10 0. 50 0.40 4.2 08/18/85 16:00 728 10 0. 50 0.40 4.2 • I,! 08/18/8:'} 18:00 729 10 0. 50 0.40 4.2 08/18/85 20:00 730 10 0. 50 0.40 4.2 08/18/85 22:00 731 10 0. 50 0.40 4.2 08/18/85 00:00 732 10 0. 50 0.40 4. 2 DAILY AVERAGE VALUES 0. 50 0.40 4.2 08/19/85 02:00 733 10 0. 50 0.40 4.2 08/19/85 04:00 734 10 0. 50 0. 40 4.2 08/19/85 06:00 735 10 0. 50 0.40 4.2 08/19/85 08:00 736 10 0. 50 0.40 4.2 08/19/85 10:00 737 10 0. 50 0. 40 4.2 08/19/85 12:00 738 10 0. 50 0.40 4.2 08/19/85 14:00 739 10 0. 50 0.40 4.2 08/19/85 16:00 740 10 0. 50 0.40 4.2 08/19/85 18:00 741 10 0. 50 0.40 4.2 08/19/85 20:00 742 10 0. 50 0. 40 4.2 08/19/85 22:00 743 10 0. 50 0.40 4.2 08/19/85 00:00 744 10 0. 50 0.40 4. 2 I DAILY AVERAGE VALUES 0. 50 0.40 4.2 I i· 08/20/85 02:00 745 10 0. 50 0.40 4.2 08/20/85 04:00 746 10 0. 50 0.40 4. 2 08/20/85 06:00 747 10 0. 50 0. 40 4.2 08/20/85 08:00 748 10 0. 50 0.40 4.2 .-. 08/20/85 10:00 749 10 0. 50 0.40 4. 2 08/20/8:') 12:00 750 10 0. 50 0.40 4.2 08/20/85 14:00 751 10 0. 50 0.40 4.2 08/20/85 16:00 752 10 0. 50 0. 40 4.2 08/20/85 18:00 753 10 0. 50 0. 40 4.2 08/20/85 20:00 754 10 0. 50 0.40 4.2 08/20/85 22:00 755 10 0. 50 0.40 4.2 08/20/85 00:00 756 10 0. 50 0.40 4.2 DAILY AVERAGE VALUES 0. 50 0. 40 4.2 • ( PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 22 PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 • f I DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =-=-==-====· -·==· =••= ========= ====== ===== ====== ( 08/21/85 02:00 757 10 0. 50 0.40 4.2 08/21/85 04:00 758 10 0. 50 0.40 4.2 08/21/85 06:00 759 10 0. 50 0.40 4.2 08/21/85 08:00 760 10 0. 50 0.40 4.2 08/21/85 10:00 761 10 0. 50 0. 40 4.2 08/21/85 12:00 762 10 0. 50 0.40 4.2 08/21/85 14:00 763 10 0. 50 0. 40 4.2 08/21/85 16:00 764 10 0. 50 0.40 4.2 08/21/85 18:00 765 10 0. 50 0. 40 4.2 08/21/85 20:00 766 10 0. 50 0. 40 4.2 08/21/85 22:00 767 10 0. 50 0.40 4.2 08/21/85 00:00 768 10 0. 50 0.40 4.2 DAILY AVERAGE VALUES 0. 50 0.40 4.2 08/22/85 02:00 769 10 0. 50 0.40 4.2 08/22/85 04:00 770 10 0. 50 0.40 4.2 08/22/85 06:00 771 10 0. 50 0. 40 4.2 08/22/85 08:00 772 10 0. 50 0. 40 4.2 08/22/85 10:00 773 10 0. 50 0. 40 4.2 08/22/85 12:00 774 10 0. 50 0. 40 4.2 08/22/85 14:00 775 10 0. 50 0. 40 4.2 08/22/85 16:00 776 10 0. 50 0. 40 4.2 08/22/85 18:00 777 10 0. 50 0.40 4.2 08/22/85 20:00 778 10 0. 50 0.40 4. 2 08/22/85 22:00 779 10 0. 50 0.40 4.2 08/22/85 00:00 780 10 0. 50 0.40 4.2 DAILY AVERAGE VALUES 0. 50 0.40 4.2 08/23/85 02:00 781 10 0. 50 0.40 4.2 08/23/85 04:00 782 10 0. 50 0. 40 4.2 08/23/85 06:00 783 10 0. 50 0.40 4.2 ;, ' 08/23/85 08:00 784 10 0. 50 0.40 4.2 08/23/85 10:00 785 10 0. 50 0.40 4.2 08/23/85 12:00 786 10 0. 50 0.40 4.2 08/23/85 14:00 787 10 0. 50 0.40 4.2 08/23/85 16:00 788 10 0. 50 0.40 4.2 08/23/85 18:00 789 10 0. 50 0.40 4. 2 08/23/85 20:00 790 10 0. 50 0.40 4.2 08/23/85 22:00 791 10 0. 50 0.40 4.2 08/23/85 00:00 792 10 0. 50 0.40 4. 2 DAILY AVERAGE VALUES 0. 50 0. 40 4. 2 II f PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 23 PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 • DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS -··=··=· =•==· =·== ========= =z==== ===== ====== « 08/24/85 02:00 793 10 0. 50 0.40 4.2 08/24/85 04:00 794 10 0. 50 0.40 4.2 f ' 08/24/85 06:00 795 10 0. 50 0.40 4.2 08/24/85 08:00 796 10 0. 50 0.40 4.2 08/24/85 10:00 797 10 0. 50 0. 40 4.2 f 08/24/85 12:00 798 10 0. 50 0.40 4. 2 08/24/85 14:00 799 10 0. 50 0.40 4.2 08/24/85 lo:OO 800 10 0. 50 o. 40 4.2 08/24/85 18:00 801 10 0. 50 0.40 4. 2 08/24/85 20:00 802 10 0. 50 0. 40 4. 2 08/24/85 22:00 803 11 0. 55 0.45 4. 9 08/24/85 00:00 804 11 0. 55 0.45 4. 9 DAILY AVERAGE VALUES 0. 51 0.41 4. 3 08/25/85 02:00 805 11 0.55 0.45 4. 9 08/25/85 04:00 806 10 0. 50 0.40 4.2 08/25/85 Oo:OO 807 10 0. 50 0.40 4.2 08/25/85 08:00 808 10 0. 50 0. 40 4.2 08/25/85 10:00 809 10 0. 50 0. 40 4.2 08/25/85 12:00 810 10 0. so 0.40 4.2 08/25/85 14:00 811 10 0. 50 0.40 4.2 08/25/85 16:00 812 10 0. 50 0.40 4. 2 08/25/85 18:00 813 10 0. 50 0. 40 4.2 08/25/85 20:00 814 10 0. 50 0. 40 4.2 08/25/85 22:00 815 10 0. 50 0.40 4.2 08/25/85 00:00 816 10 0. 50 0.40 4.2 DAILY AVERAGE VALUES 0. 50 0.40 4. 3 08/26/85 02:00 817 10 0. 50 0. 40 4.2 08/26/85 04:00 818 10 0. 50 0.40 4.2 08/26/85 06:00 819 10 0. 50 0.40 4.2 08/26/85 08:00 820 10 0.50 0.40 4.2 08/26/85 10:00 821 10 0. 50 0.40 4.2 08/26/85 12:00 822 10 0. 50 0.40 4.2 08/26/85 14:00 823 10 0. 50 0.40 4.2 08/26/85 16:00 824 10 0. 50 0.40 ·4. 2 08/26/85 18:00 825 10 0. 50 0. 40 4.2 08/26/85 20:00 826 10 0. 50 0.40 4.2 08/26/85 22:00 827 10 0. 50 0.40 4. 2 08/26/85 00:00 828 10 0. 50 0. 40 4.2 DAILY AVERAGE VALUES 0. 50 0. 40 4.2 • PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 24 f PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 f DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS -·-·===· ==·== ==•= ========= ====== ===== ======= 08/27/85 02:00 829 10 0. 50 0.40 4.2 08/27/85 04:00 830 10 0. 50 0.40 4.2 08/27/85 06:00 831 10 0. 50 0.40 4.2 08/27/85 08:00 832 10 0. 50 0.40 4. 2 08/27/85 10:00 833 11 0.55 0.45 4.9 08/27/85 12:00 834 11 0. 55 0.45 4.9 08/27/85 14:00 835 11 0. 55 0.45 4.9 08/27/85 16:00 836 11 0. 55 0.45 4.9 08127/85 18;00 837 11 0. 55 0.45 4.9 08/27185 20:00 838 11 0. 55 0.45 4. 9 08/27/85 22:00 839 11 0. 55 0.45 4.9 08/27/85 00:00 840 11 0. 55 0.45 4.9 DAILY AVERAGE VALUES 0. 53 0.43 4. 7 08/28/85 02:00 841 11 0. 55 0.45 4.9 08/28/85 04:00 842 12 0.60 0. 50 5. 6 08/28/85 06:00 843 12 0.60 0. 50 5.6 08/28/85 08:00 844 11 0. 55 0.45 4.9 08/28/85 10:00 845 11 0. 55 0.45 4. 9 08/28/85 12:00 846 11 0. 55 0.45 4.9 08/28/85 14:00 847 11 0. 55 0.45 4.9 08/28/85 16:00 848 11 0. 55 0.45 4. 9 08/28/85 18:00 849 11 0. 55 0.45 4.9 08/28/85 20:00 850 11 0. 55 0.45 4.9 08/28/85 22:00 851 11 0. 55 0.45 4.9 08/28/85 00:00 852 11 0. 55 0.45 4.9 DAILY AVERAGE VALUES 0. 56 0.46 5.0 08/29/85 02:00 853 11 0. 55 0.45 4.9 08/29/85 04:00 854 11 0. 55 0. 45 4.9 08/29/85 06:00 855 11 0. 55 0. 45 4.9 08/29/85 08:00 856 11 0. 55 0.45 4.9 08/29185 10:00 857 11 0. 55 0.45 4. 9 08/29/85 12:00 858 11 0. 55 0.45 4. 9 08/29/85 14:00 859 11 0. 55 0.45 4.9 08/29/85 16:00 860 12 0. 60 0. 50 5. 0 08/29/85 18:00 861 12 0.60 0. 50 5. 0 08/29/85 20:00 862 12 0.60 0. 50 5.6 08/29/85 22:00 863 11 0. 55 0. 45 4.9 08/29/85 00:00 864 11 0. 55 0. 45 4.9 DAILY AVERAGE VALUES 0. 56 0. 46 5. 1 • ( PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 25 PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 • DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =··===== ===== ==•= ========= ====== ===== ====== 08/30/85 02:00 865 12 0.60 0. 50 5. 6 08/30/85 04:00 866 12 0.60 0. 50 5. 6 ( 08/30/85 06:00 867 12 0. 60 0. 50 5.6 08/30/85 08:00 868 12 0. 60 0. 50 5. 6 08/30/85 10:00 869 12 0.60 0. 50 5. 6 08/30/85 1:2:00 870 12 0. 60 0. 50 5.6 08/30/85 14:00 871 12 0.60 0. 50 5. 6 08/30/85 16:00 87:2 12 0.60 0. 50 5.6 08/30/85 18:00 873 12 0. 60 0. 50 5. 6 08/30/85 20:00 874 12 0.60 0. 50 5.6 08/30/85 22:00 875 1:2 0. 60 0. 50 5.6 08/30/85 00:00 876 12 0.60 0. 50 5.6 DAILY AVERAGE VALUES 0.60 0. 50 5.6 08/31/85 02:00 877 12 0.60 0. 50 5. 6 08/31/85 04:00 878 12 0. 60 0. 50 5.6 08/31/85 06:00 879 12 0. 60 0. 50 5.6 08/31/85 08:00 880 12 0.60 0. 50 5.6 08/31/85 10:00 881 12 0.60 0. 50 5.6 08/31/85 1:2:00 88:2 1:2 0. 60 0. 50 5.6 08/31/85 14:00 883 12 0.60 0. 50 5.6 08/31/85 16:00 884 12 0. 60 0. 50 5.6 08/31/85 18:00 885 13 0. 65 0. 55 6.3 08/31/85 :20:00 886 13 0. 65 0. 55 6.3 08/31/85 22:00 887 13 0.65 0. 55 6.3 08/31/85 00:00 888 13 0.65 0. 55 6.3 DAILY AVERAGE VALUES 0. 62 0. 52 5.8 09/01/8l5 02:00 889 13 0.65 0. 55 6. 3 09/01/85 04:00 890 12 0. 60 0. 50 5.6 09/01/85 06:00 891 12 0. 60 0. 50 5. 6 09/01/85 08:00 892 12 0.60 0. 50 5.6 09/01/85 10:00 893 12 0. 60 0. 50 5.6 09/01/85 12:00 894 13 0.65 0. 55 6. 3 09/01/85 14:00 895 12 0. 60 0. 50 5.6 09/01/85 16:00 896 12 0.60 0. 50 5.6 09/01/85 18:00 897 13 0.65 0. 55 6.3 09/01/85 20:00 898 13 0.65 0. 55 6.3 09/01/85 22:00 899 13 0.65 0. 55 6.3 09/01/85 00:00 900 13 0.65 0. 55 6.3 DAILY AVERAGE VALUES 0.63 0. 53 6.0 .. PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 26 f PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 ' • DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ---=·--= ===== =·== ========= ====== ===== ====== f 09/02/85 02:00 901 13 0. 65 0. 55 6.3 09/02/85 04:00 902 13 0.65 0. 55 6. 3 c 09/02/85 06:00 903 13 0.65 0. 55 6. 3 09/02/85 08:00 904 13 0.65 0. 55 6.3 09/02/85 10:00 905 13 0.65 0. 55 6.3 09/02/85 12:00 906 13 0.65 0. 55 6.3 09/02/85 14:00 907 13 0.65 0. 55 6.3 09/02/85 16:00 908 13 0.65 0. 55 6.3 09/02/85 18:00 909 13 0.65 0. 55 6.3 09/02/85 20:00 910 13 0.65 0. 55 6.3 09/02/85 22:00 911 13 0.65 0. 55 6.3 09/02/85 00:00 912 13 0.65 o. 55 6.3 DAILY AVERAGE VALUES 0.65 0. 55 6.3 09/03/85 02:00 913 13 0.65 0. 55 6. 3 09/03/85 04:00 914 13 0.65 0. 55 6. 3 09/03/85 06:00 915 13 0.65 0. 55 6. 3 09/03/85 08:00 916 13 0.65 0. 55 6.3 09/03/85 10:00 917 13 0.65 0. 55 6.3 09/03/85 12:00 918 13 0.65 0.55 6.3 09/03/85 14:00 919 13 0.65 0. 55 6.3 09/03/85 16:00 920 13 0.65 0. 55 6.3 09/03/85 18:00 921 13 0.65 0. 55 6.3 09/03/85 20:00 922 13 0. 65 0. 55 6.3 09/03/85 22:00 923 13 0. 65 0. 55 6.3 09/03/85 00:00 9:24 13 0. 65 0. 55 6.3 DAILY AVERAGE VALUES 0. 65 0. 55 6. 3 09/04/95 02:00 925 13 0.65 0. 55 6. 3 09/04/85 04:00 926 13 0.65 0. 55 6.3 09/04/85 06:00 927 13 0.65 0. 55 6.3 09/04/85 08:00 928 13 0.65 0. 55 6.3 09/04/85 10:00 929 13 0.65 0. 55 6.3 09/04/85 12:00 930 13 0. 65 0. 55 6. 3 09/04/85 14:00 931 13 0.65 0. 55 6.3 09/04/85 16:00 932 13 0.65 0. 55 6. 3 09/04/85 18:00 933 13 0.65 0. 55 6. 3 09/04/85 :20:00 934 13 0.65 0. 55 6. 3 09/04/85 22:00 935 13 0. 65 0. 55 6. 3 09/04/85 00:00 936 13 0. 65 0. 55 . 6. 3 DAILY AVERAGE VALUES 0.65 0. 55 6.3 ' ( PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 27 PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 • f DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ========= ====== =•== ========= ====== ===== ====== f 09/05/85 02:00 937 13 0.65 0. 55 6.3 09/05/85 04:00 938 13 0.65 0. 55 6. 3 • 09/05/85 06:00 939 13 0.65 0. 55 6.3 09/05/85 08:00 940 13 0.65 0. 55 6. 3 09/05/85 10:00 941 13 0.65 0. 55 6. 3 09/05/85 12:00 942 13 0.65 0. 55 6.3 09/05/85 14:00 943 13 0. 65 0. 55 6.3 09/05/85 16:00 944 13 0.65 0. 55 6. 3 09/05/85 18:00 945 13 0.65 0. 55 6. 3 09/05/85 20:00 946 13 0.65 0. 55 6. 3 09/05/85 22:00 947 13 0.65 0. 55 6. 3 09/05/85 00:00 948 13 0.65 0. 55 6. 3 DAILY AVERAGE VALUES 0. 65 0. 55 6. 3 09/06/85 02:00 949 13 0. 65 0. 55 6. 3 09/06/85 04:00 950 14 0. 70 0.60 7.0 09/06/85 06:00 951 14 0. 70 0. 60 7. 0 09/06/85 08:00 952 14 0.70 0. 60 7. 0 09/06/85 10:00 953 14 0. 70 0.60 7. 0 09/06/85 1:2:00 954 13 0. 65 0. 55 6. 3 09/06/85 14:00 955 13 0. 65 0. 55 6. 3 09/06/85 16:00 956 13 0.65 0. 55 6. 3 09/06/85 18:00 957 13 0. 65 0. 55 6. 3 09/06/85 20:00 958 13 0.65 0. 55 6. 3 09/06/85 22:00 959 14 0. 70 0. 60 7.0 09/06/85 00:00 960 14 0. 70 0. 60 7.0 DAILY AVERAGE VALUES 0. 68 0. 58 6. 7 09/07/85 02:00 961 14 0. 70 0. 60 7. 0 09/07/85 04:00 962 15 0. 75 0. 65 7. 7 ' 09/07/85 06:00 963 15 0. 75 0.65 7. 7 09/07/85 08:00 964 15 0. 75 0. 65 7. 7 09/07/85 10:00 965 15 0. 75 0.65 7. 7 09/07/85 12:00 966 15 0. 75 0.65 7. 7 09/07/85 14:00 967 15 0. 75 0.65 7. 7 09/07/85 16:00 968 14 0. 70 0. 60 7. 0 09/07/85 18:00 969 15 0. 75 0.65 7. 7 09/07/85 20:00 970 15 0. 75 0.65 7. 7 09/07/85 22:00 971 15 0. 75 0. 65 7. 7 09/07/85 00:00 972 15 0. 75 0.65 7. 7 DAILY AVERAOE VALUES 0. 74 0.64 7. 6 ' 4 PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 28 PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 • I f ' DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =··=-==== ====== ==== ========= ====== ===== ====== 09/08/85 02:00 973 15 0. 75 0.65 7. 7 09/08/85 04:00 974 15 0.75 0.65 7. 7 09/08/85 06:00 975 15 0. 75 0.65 7. 7 09/08/85 08:00 976 15 0. 75 0.65 7. 7 09/08/85 10:00 977 15 0. 75 0.65 7. 7 09/08/85 12:00 978 15 0. 75 0.65 7. 7 09/08/85 14:00 979 15 0.75 0.65 7. 7 09/08/85 16:00 980 16 0.80 0. 70 8.4 09/08/85 18:00 981 15 0. 75 0.65 7. 7 09/08/85 20:00 982 15 0. 75 0.65 7. 7 09/08/85 22:00 983 15 0. 75 0.65 7. 7 09/08/85 00:00 984 16 0.80 0. 70 8.4 DAILY AVERAGE VALUES 0. 76 0. 66 7.8 09/09/85 02:00 985 15 0. 75 0. 65 7. 7 09/09/85 04:00 986 16 0.80 0. 70 8.4 09/09/85 06:00 987 16 0.80 0. 70 8.4 09/09/85 08:00 988 15 o. 75 0.65 7. 7 09/09/85 10:00 989 15 0. 75 0.65 7. 7 09/09/85 12:00 990 16 0.80 0. 70 8.4 09/09/85 14:00 991 16 0.80 0. 70 8.4 09/09/85 16:00 992 16 0.80 0. 70 8.4 09/09/85 18:00 993 15 0. 75 0.65 7. 7 09/09/85 20:00 994 15 0. 75 0.65 7. 7 09/09/85 22:00 995 15 0. 75 0.65 7. 7 09/09/85 00:00 996 15 0. 75 0.65 7.7 DAILY AVERAGE VALUES 0. 77 0.67 8.0 09/10/85 02:00 997 15 0. 75 0.65 7. 7 09/10/85 04:00 998 15 0.75 0.65 7. 7 09/10/85 06:00 999 15 0. 75 0.65 7. 7 09/10/85 08:00 000 15 0. 75 0.65 7.7 09/10/85 10:00 001 15 0. 75 0.65 7. 7 09/10/85 12:00 002 15 0. 75 0.65 7. 7 09/10/85 14:00 003 15 0. 75 0.65 7. 7 09/10/85 16:00 004 15 0. 75 0.65 7. 7 09/10/85 18:00 005 15 0. 75 0.65 7. 7 09/10/85 20:00 006 15 0. 75 0.65 7. 7 09/10/85 22:00 007 15 0. 75 0.65 7. 7 09/10/85 00:00 008 15 0. 75 0.65 7. 7 DAILY AVERAGE VALUES 0. 75 0.65 7. 7 • PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGF ;::'9 c PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 () ;? ()() f DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS es===•== =•==• ===a ========= ====== ===== ====== ( 09/11/85 02:00 009 15 0. 75 0.65 7. 7 09/11/85 04:00 010 15 0.75 0.65 7.7 09/11/85 06: 00 011 15 0. 75 0.65 7. 7 09/11/85 08: 00 012 15 0. 75 0.65 7. 7 09/11/85 10:00 013 15 0. 75 0.65 7. 7 09/11/85 12:00 014 15 0. 75 0.65 7. 7 09/11/85 14:00 015 15 0. 75 0.65 7. 7 09/11/85 16:00 016 16 0.80 0.70 8.4 09/11/85 18:00 017 15 0. 75 0.65 7. 7 09/11/85 20:00 018 15 0. 75 0. 65 7. 7 09/11/85 22: 00 019 15 0.75 0. 65 7. 7 09/11/85 00:00 020 15 0. 75 0. 65 7. 7 DAILY AVERAGE VALUES 0. 75 0.65 7.8 09/12/85 02:00 021 16 0.80 0. 70 8.4 09/12/85 04:00 022 15 0. 75 0.65 7. 7 09/12/85 06:00 023 16 0.80 0. 70 8. 4 09/12/85 08:00 024 16 0.80 0. 70 8.4 09/12/85 10:00 025 16 0. 80 0. 70 8.4 09/12/85 12:00 026 15 0. 75 0. 65 7. 7 09/12/85 14:00 027 15 0. 75 0.65 7. 7 09/12/85 16:00 028 15 0. 75 0.65 7. 7 09/12/85 18:00 029 16 0.80 0. 70 8.4 09/12/85 20:00 030 15 0. 75 0.65 7. 7 09/12/85 22:00 031 15 0. 75 0.65 7. 7 09/12/85 00:00 032 15 0. 75 0.65 7. 7 DAILY AVERAGE VALUES 0. 77 0.67 8.0 09/13/85 02:00 033 15 0. 75 0.65 7. 7 09/13/85 04:00 034 15 0. 75 0.65 7. 7 09/13/85 06:00 035 15 0. 75 0. 65 7. 7 09/13/85 08:00 036 15 0. 75 0. 65 7. 7 09/13/85 10:00 037 15 0.75 0.65 7. 7 09/13/85 12:00 038 15 0. 75 0.65 7. 7 09/13/85 14:00 039 15 0. 75 0.65 7. 7 09/13/85 16:00 040 15 0. 75 0.65 7. 7 09/13/85 18:00 041 15 0. 75 0.65 7. 7 09/13/85 20:00 042 15 0.75 0.65 7. 7 09/13/85 22:00 043 16 0.80 0. 70 8.4 09/13/85 00:00 044 16 0.80 0. 70 8.4 DAILY AVERAGE VALUES 0. 76 0.66 7.8 ' 4 PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 30 PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 f DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =••====m •===== ==== ========= ====== ===== ====== 09/14/85 02:00 045 16 0.80 0. 70 8.4 09/14/85 04:00 046 16 O.BO 0.70 B.4 09/14/85 06:00 047 16 0. BO 0. 70 8. 4 09/14/B5 OB:OO 04B 16 0. BO 0. 70 B.4 09/14/85 10:00 049 16 0. 80 0. 70 B. 4 09/14/B5 12:00 050 16 O.BO 0. 70 8. 4 09/14/B5 14:00 051 16 0. 80 0. 70 8.4 09/14/85 16:00 052 16 O.BO 0.70 B.4 09/14/B5 18:00 053 16 0. BO 0. 70 B.4 09/14/B5 20:00 054 16 0. BO 0. 70 8.4 09/14/B5 22:00 055 16 0. BO 0. 70 8. 4 09/14/B5 00:00 056 16 0.80 0.70 B.4 DAILY AVERAGE VALUES 0.80 0. 70 B.4 09/15/B5 02:00 057 16 O.BO 0. 70 B.4 09/15/85 04:00 05B 16 0.80 0. 70 B.4 09/15/B5 06:00 059 17 O.B5 0.75 9.2 09/15/85 OB:OO 060 16 0.80 0. 70 B.4 09/15/B5 10:00 061 16 O.BO 0. 70 B. 4 09/15/85 12:00 062 16 O.BO 0. 70 B. 4 09/15/B5 14:00 063 16 O.BO 0. 70 B.4 09/15/B5 16:00 064 16 O.BO 0. 70 8. 4 09/15/85 18:00 065 16 O.BO 0. 70 B. 4 09/15/85 20:00 066 16 O.BO 0. 70 8.4 09/15/85 22:00 067 16 0.80 0. 70 8. 4 09/15/B5 00:00 06B 16 O.BO 0. 70 8. 4 DAILY AVERAGE VALUES 0.80 0. 70 8. 5 09/16/B5 02:00 069 16 0.80 0. 70 B. 4 09/16/85 04:00 070 16 0.80 0. 70 B.4 09/16/B5 06:00 071 16 O.BO 0. 70 8.4 09/16/85 08:00 072 16 O.BO 0. 70 B.4 09/16/85 10:00 073 16 0.80 0. 70 8.4 09/16/B5 12:00 074 16 0.80 0. 70 8. 4 09/16/85 14:00 075 16 O.BO 0. 70 8.4 09/16/B5 16:00 076 16 0.80 0. 70 B.4 09/16/B5 18:00 077 16 O.BO 0. 70 8. 4 09/16/85 20:00 078 16 0.80 0. 70 8. 4 09/16/85 22:00 079 16 0.80 0. 70 8.4 09/16/85 00:00 OBO 16 O.BO 0. 70 B. 4 DAILY AVERAGE VALUES O.BO 0. 70 B.4 • PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 31 « PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 4 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ·=·====·= •===:== ==== ========= ====== =•=== ==:=:=== 4 09/17/85 02:00 081 16 0.80 0. 70 8.4 09/17/85 04:00 082 16 0.80 0. 70 8.4 09/17/85 06:00 083 16 0.80 0. 70 8. 4 09/17/85 08:00 084 16 0.80 0. 70 8.4 09/17/85 10;00 085 16 0.80 0. 70 8.4 09/17/85 12:00 086 16 0.80 0. 70 8.4 09/17/85 14:00 087 16 0.80 0. 70 8. 4 09/17/85 16:00 oea 16 0.80 0. 70 8.4 09/17/85 18:00 089 16 0.80 0. 70 8.4 09/17/85 20:00 090 16 0.80 0. 70 8. 4 09/17/85 22:00 091 15 0. 75 0.65 7. 7 09/17/85 00:00 092 15 0. 75 0.65 7. 7 DAILY AVERAGE VALUES 0. 79 0.69 8.3 09/18/85 02:00 093 16 0.80 0. 70 8. 4 09/18/85 04:00 094 15 0. 75 0.65 7. 7 09/18/85 06:00 095 15 0. 75 0.65 7. 7 09/18/85 08:00 096 16 0.80 0. 70 8. 4 09/18/85 10:00 097 16 0.80 0. 70 8. 4 09/18/85 12:00 098 16 0.80 0. 70 8. 4 09/18/85 14:00 099 16 0.80 0. 70 8.4 09/18/85 16:00 100 16 0.80 0. 70 8. 4 09/18/85 18:00 101 15 0. 75 0.65 7. 7 09/18/85 20:00 102 16 0.80 0.70 8. 4 09/18/85 22:00 103 16 0.80 0.70 8.4 09/18/85 00:00 104 15 0.75 0.65 7. 7 DAILY AVERAGE VALUES 0. 78 0.68 8.2 09/19/95 02:00 105 15 0. 75 0.65 7. 7 09/19/85 04:00 106 16 0.80 0. 70 8. 4 09/19/85 06:00 107 15 0. 75 0.65 7. 7 09/19/85 08:00 108 15 0. 75 0.65 7. 7 09/19/85 10:00 109 15 0. 75 0.65 7. 7 09/19/85 12:00 110 15 0.75 0.65 7. 7 09/19/85 14:00 111 15 0. 75 0.65 7. 7 09/19/85 16:00 112 15 0. 75 0.65 7. 7 09/19/85 18:00 113 15 0. 75 0.65 7. 7 09/19/85 20:00 114 15 0.75 0.65 7. 7 09/19/85 22:00 115 15 0. 75 0.65 7. 7 09/19/85 00:00 116 15 0. 75 0.65 7. 7 DAILY AVERAGE VALUES 0. 75 0.65 7.8 • f PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 32 PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 . ( DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =======· ====== ==== ========= ====== ===== ====== ( 09/20/85 02:00 117 15 0. 75 0.65 7. 7 09/20/85 04:00 118 14 0. 70 0.60 7.0 09/20/85 06:00 119 15 0. 75 0.65 7. 7 ( " 09/20/85 08:00 120 15 0. 75 0.65 7. 7 09/20/85 10:00 121 14 0. 70 0.60 7.0 09/20/85 12:00 122 15 0. 75 0.65 7. 7 • 09/20/85 14:00 123 15 0. 75 0.65 7. 7 09/20/85 16:00 124 15 0. 75 0.65 7. 7 09/20/85 18:00 125 15 0. 75 0.65 7. 7 09/20/85 20:00 126 14 0. 70 0.60 7.0 09/20/85 22:00 127 14 0. 70 0.60 7.0 09/20/85 00:00 128 14 0. 70 0.60 7.0 DAILY AVERAGE VALUES 0. 73 0.63 7. 4 09/21/85 02:00 129 14 0. 70 o. 60 7.0 09/21/85 04:00 130 14 0. 70 0. 60 7. 0 09/21/85 06:00 131 14 0. 70 0.60 7.0 09/21/85 08:00 132 14 0. 70 0. 60 7.0 09/21/85 10:00 133 14 0. 70 0.60 7.0 09/21/85 12:00 134 14 0. 70 0.60 7.0 09/21/85 14:00 135 14 0. 70 0. 60 7.0 09/21/85 16:00 136 14 0. 70 0.60 7.0 09/21/85 18:00 137 15 0. 75 0.65 7. 7 09/21/85 20:00 138 14 0. 70 0.60 7.0 09/21/85 22:00 139 14 0. 70 0. 60 7.0 09/21/85 00:00 140 14 0. 70 0.60 7.0 DAILY AVERAGE VALUES 0. 70 0.60 7. 1 09/22/85 02:00 141 14 0. 70 0.60 7.0 09/22/85 04:00 142 14 0. 70 0.60 7.0 (. 09/22/85 06:00 143 14 0. 70 0.60 7.0 09/22/85 08:00 144 14 0. 70 0.60 7.0 09/22/85 10:00 145 14 0. 70 0. 60 7. 0 09/22/85 12:00 146 14 0. 70 0. 60 7.0 09/22/85 14:00 147 14 0. 70 0.60 7.0 09/22/85 16:00 148 15 0. 75 0.65 7. 7 09/22/85 18:00 149 14 0. 70 0.60 7.0 09/22/85 20:00 150 14 0. 70 0.60 7.0 09/22/85 22:00 151 14 0. 70 0.60 7.0 09/22/85 00:00 152 14 0. 70 0. 60 7.0 DAILY AVERAGE VALUES 0. 70 0. 60 7. 1 • PROPOSED ELIM HYDROELECTRIC PRO~ECT 11/05/85 PAGE 33 • PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 • I' f DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =•====.c:= =·=·· ==== ========= ====== =·===r ======= 09/23/85 02:00 153 14 0. 70 0.60 7.0 09/23/85 04:00 154 14 0. 70 0.60 7.0 f ,, 09/23/85 06:00 155 14 0. 70 0.60 7.0 09/23/85 08:00 156 14 0. 70 0. 60 7.0 09/23/85 10:00 157 14 0. 70 0.60 7.0 09/23/85 12:00 158 14 0. 70 0.60 7.0 09/23/85 14:00 159 14 0. 70 0. 60 7.0 09/23/85 16:00 160 15 0. 75 0. 65 7. 7 09/23/85 18:00 161 14 0. 70 0. 60 7.0 09/23/85 20:00 162 14 0. 70 0.60 7.0 09/23/85 22:00 163 14 0. 70 0.60 7.0 09/23/85 00:00 164 14 0. 70 0.60 7.0 DAILY AVERAGE VALUES 0. 70 0.60 7. 1 09/24/85 02:00 165 14 0. 70 0.60 7.0 09/24/85 04:00 166 14 0. 70 0.60 7. 0 09/24/85 06:00 167 14 0. 70 o. 60 7.0 09/24/85 08:00 168 14 0. 70 0. 60 7.0 09/24/85 10:00 169 14 0. 70 0.60 7.0 09/24/85 12:00 170 14 o. 70 0.60 7.0 09/24/85 14:00 171 14 0. 70 0.60 7.0 09/24/85 16:00 172 14 0.70 0.60 7.0 09/24/85 18:00 173 14 0. 70 0.60 7. 0 09/24/85 20:00 174 14 0. 70 0. 60 7.0 09/24/85 22:00 175 14 0. 70 0.60 7.0 09/24/85 00:00 176 14 0. 70 0.60 7. 0 DAILY AVERAGE VALUES 0. 70 0. 60 7. 0 09/25185 02:00 177 14 0. 70 0.60 7.0 09/25/85 04:00 178 14 0. 70 0.60 7.0 09/25/85 06:00 179 14 0. 70 0. 60 7.0 09/25/85 08:00 180 14 0. 70 0.60 7.0 09/25/85 10:00 181 14 0. 70 0.60 7.0 09/25/85 12:00 182 14 0. 70 0. 60 7.0 09/25/85 14:00 183 14 0. 70 0.60 7.0 09/25/85 16:00 184 14 0. 70 0.60 ·7. 0 09/25/85 18:00 185 14 0. 70 0. 60 7.0 09/25/85 20:00 186 14 0. 70 0. 60 7.0 09/25/85 22:00 187 14 0. 70 0.60 7.0 09/25/85 00:00 188 14 0. 70 0.60 7.0 DAILY AVERAGE VALUES 0. 70 0.60 7.0 J,.,,' ! I . . ~ ,. PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 34 ( PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 !. f I DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ·=·===== ====r= ·==== ======~== ====== ===== ====== 09/26/85 02:00 189 14 0.70 0. 60 7.0 09/26/85 04:00 190 14 0. 70 0.60 7.0 09/26/85 06:00 191 14 0. 70 0. 60 7.0 09/26/85 08:00 192 14 0. 70 0. 60 7. 0 09/26/85 10:00 193 14 0. 70 0.60 7. 0 09/26/85 12:00 194 14 0. 70 0.60 7. 0 09/26/85 14:00 195 14 0.70 0.60 7. 0 I . 09/26/85 16:00 196 14 0.70 0.60 7. 0 •. r 09/26/85 18:00 197 14 0. 70 0.60 7.0 09/26/85 20:00 198 14 0.70 0.60 7. 0 09/26/85 22:00 199 14 0. 70 0.60 7.0 09/26/85 00:00 200 14 0. 70 0.60 7.0 DAILY AVERAGE VALUES 0. 70 0. 60 7.0 09/27/85 02:00 201 14 0. 70 0.60 7.0 09/27/85 04:00 202 14 0. 70 0.60 7. 0 09/27/85 06:00 203 14 0.70 0.60 7. 0 09/27/85 08:00 204 14 0. 70 0.60 7. 0 09/27/85 10:00 205 14 0. 70 0.60 7.0 09/27/85 12:00 206 14 0.70 0.60 7.0 09/27/85 14:00 207 14 0. 70 0.60 7.0 09/27/85 16:00 208 14 0. 70 0.60 7.0 09/27/85 18:00 209 14 0. 70 0. 60 7.0 09/27/85 20:00 210 14 0. 70 0. 60 7.0 09/27/85 22:00 211 14 0. 70 0. 60 7.0 09/27/85 00:00 212 14 0. 70 0. 60 7.0 DAILY AVERAGE VALUES 0. 70 0. 60 7.0 09/28/85 02:00 213 14 0. 70 0.60 7.0 09/28/85 04:00 214 14 0. 70 0.60 7. 0 09/28/85 06:00 215 14 0. 70 0. 60 7. 0 09/28/85 08:00 216 14 0. 70 0.60 7.0 09/28/85 10:00 217 14 0. 70 0. 60 7. 0 09/28/85 12:00 218 14 0. 70 0.60 7. 0 09/28/85 14:00 219 14 0. 70 0.60 7.0 09/28/85 16:00 220 14 0. 70 0.60 7.0 09/28/85 18:00 221 14 0. 70 0.60 7. 0 09/28/85 20:00 222 14 0. 70 0.60 7.0 09/28/85 22:00 223 14 0. 70 0. 60 7.0 09/28/85 00:00 224 13 0. 65 0. 55 6. 3 DAILY AVERAQE VALUES 0. 70 0.60 6. 9 i .. PROPOSED ELIM HYDROELECTRIC PRO~ECT 11/05/85 PAGE 35 ( PETERSEN CREEK NEAR ELIM, ALASKA START TIME 06/19/85 02:00 • DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ···-·=-==-==·--==a= ========== ======== ===== ======= 4 09/29/85 02:00 225 14 0. 70 0.60 7. 0 09/29/85 04:00 226 14 0. 70 0.60 7.0 09/29/85 06:00 227 14 0. 70 0.60 7.0 09/29/85 08:00 228 14 0. 70 0.60 7.0 09/29/85 10:00 229 14 0. 70 0.60 7.0 09/29/85 12:00 230 14 0. 70 0.60 7.0 09/29/85 14:00 231 14 0. 70 0.60 7.0 09/29/85 16:00 232 14 0. 70 0.60 7.0 09/29/85 18:00 233 14 0. 70 0.60 7.0 09/29/85 20:00 234 14 0. 70 0.60 7.0 09/29/85 22:00 235 14 0. 70 o. 60 7.0 09/29/85 00:00 236 14 0. 70 0.60 7.0 DAILY AVERAQE VALUES 0. 70 0.60 7. 0 09/30/85 02:00 237 14 0. 70 0.60 7.0 09/30/85 04:00 238 14 0. 70 0.60 7.0 09/30/85 06:00 239 14 0. 70 0. 60 7. 0 09/30/85 08:00 ;!40 14 0. 70 0.60 7.0 09/30/85 10:00 241 14 0. 70 0.60 7.0 09/30/85 12:00 24;! 14 0. 70 0.60 7. 0 09/30/85 14:00 243 14 0. 70 0. 60 7.0 09/30/85 16:00 244 14 0. 70 0.60 7.0 09/30/85 18:00 245 14 0. 70 0.60 7.0 09/30/85 20:00 246 14 0. 70 0.60 7. 0 09/30/85 22:00 247 14 0. 70 0.60 7.0 09/30/85 00:00 248 14 0. 70 0.60 7.0 DAILY AVERAGE VALUES 0. 70 0.60 7.0 10/01/8~ 02:00 249 14 0. 70 0.60 7.0 10/01/85 04:00 250 14 0. 70 0.60 7.0 10/01/85 06:00 251 14 0. 70 0.60 7.0 10/01/85 08:00 252 14 0. 70 0.60 7.0 10/01/85 10:00 253 14 0. 70 0.60 7.0 10/01/85 12:00 254 14 0. 70 0.60 7. 0 10/01/85 14:00 255 14 0. 70 0.60 7.0 10/01/85 16:00 256 14 0. 70 0.60 7. 0 10/01/85 18: 00 257 14 0. 70 0.60 7. 0 10/01/85 20:00 258 14 0. 70 0.60 7. 0 !,.1 10/01/85 ;!2:00 259 14 0. 70 0.60 7.0 10/01/85 00:00 260 14 0. 70 0.60 7.0 DAILY AVERAQE VALUES 0. 70 0.60 7. 0 i • PROPOSED ELIM HYDROELECTRIC PROJECT 11/05/85 PAGE 36 f I PETERSEN CREEK NEAR ELJM, ALASKA START TIME 06/19/85 02:00 c DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS --------•==-== ===== ::======== ====== :::a::::: ======= 10/0:2/85 02:00 261 14 0. 70 0.60 7.0 10/0:2/85 04:00 262 14 0. 70 0.60 7.0 10/02/85 06:00 263 14 0. 70 0.60 7.0 10/0:2/85 08:00 :264 14 0.70 0.60 7.0 10/02/85 10:00 265 14 0. 70 0.60 7.0 10/02/85 12:00 266 14 0. 70 0.60 7.0 10/02/85 14:00 267 14 0. 70 0.60 7.0 10/02/85 16:00 268 14 0. 70 0. 60 7.0 10/02/85 18:00 269 14 0. 70 0.60 7.0 10/02/85 20:00 270 14 0. 70 0. 60 7. 0 10/02/85 2:2:00 271 14 0. 70 0.60 7.0 10/02/85 00:00 272 14 0. 70 0.60 7.0 DAILY AVERAGE VALUES 0. 70 0. 60 7.0 10/03/95 02:00 273 14 0. 70 0.60 7. 0 10/03/85 04:00 274 14 0. 70 0.60 7. 0 10/03/85 06:00 275 14 o. 70 0.60 7. 0 10/03/85 08:00 276 14 0.70 0.60 7.0 10/03/85 10:00 277 14 0. 70 0.60 7. 0 10/03/85 12:00 278 14 0.70 0.60 7.0 /• I. 1:1 k! ; :