HomeMy WebLinkAboutPelican Cover Inspection Report 1985•
PELICAN COVE CREEK DAM -AK 00039
PELICAN, ALASKA
co co
ALASKA DAM SAFE'l'Y PROGRAM
PERIODIC DAM SAFETY
INSPECTION REPORT
PREPARED FOR: STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES
DIVISION OF LAND AND WATER MANAGEMENT
BY CHAS. T. MAIN, INC.
FEBRUARY 28, 1985
PELICAN COVE CREEK DArt -AK 00039
PELICAN, ALASKA
PREPARED FOR:
BY
ALASKA OAH SAFETY PRO(';RA.\f
PERIOniC DAM SAFETY
INSPECTION REPORT
STATE OF ALASKA DEPARnfE~lT OF NATURAL RES0URCES
DIVISION OF LAND AND \·TATER ~1ANAGEMENT
ca~s. T. MAIN, INC.
FEBRUARY 28, 1985
~'\AI~ CHAS. T. MAI~. I~ C.
1893 101 EAST 9TH AVE. SUITE 4A, ANCHORAGE, ALASKA 99501 (907) 272·5433
February 28, 19R5 3945-2-1000
SUBJECT: Alaska Department of Natural Resources
Dam Safety Inspection Program
Pelican Cove Creek Dam -AK 00039
State of Alaska
Department of Natural Resources
Division of land and Water Management
555 Cordova Street: Pouch 7-005
Anchorage, Alaska 99510
Attention: Xr. Kyle J. Cherry, P.E.
State Dam Safety Engineer
Gentlemen:
MAIN is pleased to submit herewith our final report on
our inspection of Pelican Cove Creek Dam -AK 00039.
This inspection was conducted on 30 November 1984.
APD/RJT/lem
Enclosure
Very truly yours,
CHAS. T. MAIN, INC.
R•:;;~·:/l f.ng/ineers
a£~-lu_:___ ~
Alton P. ryavis, Jr.
Project '1anager
Richard J, Tucker
Project Engineer
' ' '--.__ ·;
\
\
\ 1
\, . . I , ) Title Sheet
REPORT
PELICAN COVE CREEK D~~
AK 00039
Alaska, Longitude 136°12.9' and Latitude 57°57.5', Pelican Creek
Inspectors:
Review team:
Owned by Pelican Utility Company Inc.
Size Classification: Small
Hazard Potential Classification: Significant
Alton P. Davis, Jr., P.E.
Project Manager -Geotechnical Engineer
Richard J, Tucker, P.E.
Project Engineer -Hydraulic Engineer
~.~ -,. Approved by:
Kyle Cherry, P.E.
Dam Safety Engineer
Ken Hunt
Dam Safety Engineer
Carol Larson
Hydrologist
Approved by:
Chas. T. Main, Inc.
Alaska Department of Natural Resources
a.
b.
c.
d.
e.
f.
g.
UNSAFE DA..~
ALASKA DEPARTifENT OF NATURAL RESOURCES
STATE DAM INSPECTION PROGRAM
Name: Pelican Cove Creek Dam
Type: Timber Crib/Timber Buttress
I. D. No.: AK 00039
Height: 22 ft.
Hazard: Significant
Size: Small
Location:
State: Alaska County:
Nearest D/S City, Town or Village: Village of Pelican
River or Stream: ~elican Creek
h. Owner: Pelican Utility Company
i. Condition of Dam Resulting in Unsafe Dam Report:
Deterioration of timber cribs and buttresses.
j. Description of Danger Involved:
Timber cribs could fail at connections allowing rockfill to
wash out. Without stabilizing weight of rockfill, remainder
of da~ could slide out. Timber buttresses may not be able
to withstand hydrostatic and erosive forces which would
accompany a 1/2 PMF. Loss of the dam could have significant
economic impact on the Village of Pelican which depends
on structure for power and water supply.
k. Recommedations Given to Governor:
Owner should be required to extensively repair or replace the
existing structure within the next five years. The new or
refurbished dam should be designed and built according to
currently accepted engineering practice.
1. Urgency Category: Non-Emergency
m. Emergency Actions Taken: None
n. Remarks: None
ALASKA DAM SAFETY PROGRAM
PERIODIC DAM SAFETY INSPECTION REPORT
OF
PELICAN COVE CREEK DAM -AK 00039
EXECUTIVE SUMMARY
On 2 December 1977, President Carter initiated a National Dam Safety
Program by directing the Corps of Engineers to administer a program of
inspection of all dams classified as high hazard potential by reason
of their location. The National Dam Safety Program was completed in
1982. It was intended that each state would thereafter accept respon-
sibility for non-federal dams located within their jurisdiction. In
July 1966, Governor ~7illiam F.gan signed Alaska Statute AS 46.15 "tJater
Use Act" under which the Alaska State Dam Safety Program has been
initiated.
Under AS 46.15, Pelican Cove Creek Dam was inspected on 30 November
1984 by Chas. T. Main, Inc. under contract to State of Alaska Department
of Natural Resources Division of Land and l.J'ater Management. The timber
cribbing for Pelican Dam has deteriorated to the point where the long
term stability of the structure is in question. The structure should be
replaced or extensive remedial work should be undertaken within the
next five years. When this remedial work is contemplated, a g~eater
spillway capacity, the advisability of a low level outlet and redesign
of the intake/flume structure should also be addressed. It is recommended
that the State Dam Safety Engineer be given a full set of all construction
drawings for any future modifications to the project. It is also
suggested that the FERC license be renewed as soon as possible. This
inspection report also includes a description as well as details of the
new powerhouse and generation units which were constructed to replace the
old unit destroyed by fire in January 19e3.
i
TABLE OF CONTENTS
EXECUTIVE SUMMARY
TABLE OF CONTENTS
GENERAL LOCATION MAP: Figure 1
PROJECT DATA
1. GENERAL
1.1 Authority
1.2 Purpose and Scope
1.3 Inspection Team
2. PROJECT DESCRIPTION
2.1 Location
2.2 Size and Hazard Potential
2.3 Purpose of Dam
2.4 Construction History
2.5 Geology and Soils
2.6 Basin Description
2.7 Description of Project
2.8 Operation and Maintenance
3.
4.
FIELD INSPECTION
3.1 General
3.2 Reservoir Area
3.3 Dam
3.4 Abutments
3.5 Outlet Works
3.6 Spillway
3.7 Downstream Channel
3.8 Instrumentation
HYDROLOGY
4.1
4.2
4.3
History of Flooding
Probable Maximum Flood
Frequency Floods
5. HYDRAULIC EVALUATION
5.1
5.2
Spillway Adequacy
Flood Routing
6. STRUCTURAL STABILITY
ii
Classification
i
ii
iv
v
1
1
1
2
3
3
3
4
4
5
6
6 ..
I
9
9
9
9
10
10
10
11
11
12
12
12
13
14
14
14
15
TABLE OF CONTENTS (Cont'd)
7. PRIOR REPORTS
8. CONCLUSIONS
9. RECOMMENDATIONS
APPENDIX A
APPENDIX B
APPENDIX C
APPENDIX D
Inspection Photographs
Project Plates
Stability Analysis
Inspection Checklist
iii
Page
16
17
18
0 30 ------Scale In Miles
..........
~...,(I .,_ .,.,.,
"'o-. \ ~\ .,,. .
"" )
Map
Location
~ ...... -------~"-1 \ .,,
" \
\
\
'\
\
\
\
\
\
\
~ .,('1
7; ~ '),. ... ..,
~\{
~\
\
\
\
)
(
PELICAN COVE CREEK DAM
LOCATION MAP
"'-)
I
ALASKA DEPT. OF NATURAL RESOURCES
OIV. OF LAND AND WATER MANAGEMENT
Uf( FEB. 28, 198S
394S 2
CLIIIT Jll ~~AI~
1~93
iv FIGURE
PROJECT DATA
PELICAN COVE CREEK DAM -AK 00039
A. GENERAL
B.
Name .
Location
Year Built
Purpose .
Inventory of dam I.D. Number •
Hazard Potential Classification
Size Classification .
Owner
DAM
Type .
Crest Length
Crest Width
Crest Elevation
Height
v
Pelican Cove Creek Dam
Pelican, Alaska
1941
Power/water supply
AK 00039
Significant
Small
Pelican Utility Company Inc.
Pelican, Alaska 9Q823
Walt Cothran, Plant ~anager
Telephone 907-735-4391
Pelican Seafoods Inc.
Seattle, WA (Parent Company)
P.O. Rox 85538
Seattle, WA 9Al05
Rooth Ruckley, ~anager
Telephone 206-367-8476
Timber crib/Timber buttress
135 ft
12 ft (crib section)
14 7.6
22 ft
c. SPILLWAY
Type .
Location
Side Slopes
Crest Elevation
Bottom Width
Length
Discharge Capacity
D. OUTLET WORKS
@ Dam Crest
Broad crested weir timber
planked
in Dam
Vertical
142.6
55.5 ft
12 f t
1900 cfs
No outlet except for flume used for power and water supply
E. RESERVOIR
Normal Maximum Water Surface Elevation
Water Surface Elevation @ Dam Crest
Maximum Storage Volume @ Dam Crest .
Maximum Surface Area @ Dam Crest
Storage Volume @ Spillway Crest
Surface Area @ Spillway Crest
F. HYDROLOGIC DATA
Drainage Area •
Average Annual Discharge
Flood of Record
Project Design Flood
Return Period .
Probable Maximum Flood .
vi
142.6
14 7.6
60 AF (approx.)
6.5 A (approx.)
27 AF (approx.)
6 A (approx.)
12.95 sq mi
36 cfs (approx.)
None recorded,
2000 observed
1900 cfs (zero freeboard)
4.5 years
24,000 cfs
1. GENERAL
1.1 Authority
ALASKA DAM SAFETY PROGRAM
PERIODIC DAM SAFETY INSPECTION REPORT
OF
PELICAN COVE CREEK DAM
AK 00039
Inspection authority is Alaska Statue AS 46.15 "Water Use Act" signed by
Governor ~Hlliam Egan on 1 July 1966. Inspection procedures and criteria
for a Phase I Inspection are set forth in the "Recommended Guidelines for
Safety Inspection of Dams" Appendix D, Volume I, U.S. Army Corps of
Engineers report to the U.S. Congress on National Program of Inspection
of Dams, dated May 1975, and published under Title 33CFR Part 222.
1.2 Purpose and Scope
The purpose of the Alaska Dam Safety Program, Periodic Dam Safety Inspections
is to assemble information and records on existing non-federal dams located
within the State of Alaska and to insure continued public confidence in
the integrity and safety of these important structures.
The scope of this report is to compile results of a visual inspection of
Pelican Cove Creek Dam and an examination of currently available information
relating to design, construction and performance history of the project.
Potential risk to upstream and downstream residents is evaluated and pre-
liminary spillway adequacy and structural assessments are made. Finally,
adequacy of existing records and documents relating to the project are
discussed and recommendations for additional studies and/or remedial
actions are made.
-1-
1.3 Inspection Team
The inspection of Pelican Cove Creek Dam was conducted on 30 Novemher 1984.
The inspection team was composed of the following personnel:
CHAS. T. MAI~, INC.
Alton P. Davis, Jr.
Richard J. Tucker
Project Manager/Geotechnical
Project Engineer/Hydraulics
Mr. Tom Whitmarsh of Pelican Utility CoMpany Inc. accompanied the inspection
team. Mr. Walt Cothran, Plant Manager for Pelican Seafoods Inc., assisted
the inspection team in locating available documents for review and supplied
valuable information regarding the construction history of the project.
The courtesies extended to the inspection team by Pelican Seafoods Inc.
is gratefully acknowledged.
-2-
2. PROJECT DESCRIPTION
2.1 Location
Pelican Cove Creek Dam is located on Pelican Creek at 57° 57.5' North Latitude,
136° 12.9' West Longitude on Chichagof Island within the Tongass National
Forest. The dam site is approximately equidistant from Sitka and Juneau
as shown on Figure 1. The Village of Pelican is located on Lisianski Inlet
approximately one quarter mile downstream of the dam site. The dam is
owned and operated by the Pelican Utility Company of Pelican, Alaska,
which is a subsidiary of Pelican Seafood Inc. The National Dam Inventory
for the State of Alaska identifies this dam as AK 00039.
2.2 Size and Hazard Potential Classification
2.2.1 Size Classification: The height of Pelican Cove Creek Dam is
22 feet and the reservoir has a maximum estimated storage capacity of 60
acre-feet at the dam crest. The size classification is determined by the
height of the dam or the maximum storage capacity whichever gives the
larger size category. A small size dam is less than 40 feet in height and
less than 1000 acre-feet of maximum storage capacity. Pelican Cove Creek
Dam is therefore classified as Small Size based on both height of dam and
maximum storage capacity.
2.2.2 Hazard Potential Classification: Pelican Cove Creek Dam is classified
as Significant Hazard Potential for damage and loss of life in the event
of failure. Significant Hazard Potential is not a quantitative assessment
of the safety of the dam, it simply states the hazard if the dam should
fail for any reason. The downstream area is heavily forested and has a
narrow channel exiting into Lisianski Inlet. There are no dwellings in
the floodplain until the creek reaches tidewater, adjacent to the outlet
of the creek into Lisianski Inlet. MAIN feels that failure of the dam on
Pelican Creek would be of no consequence in this area due to the small
storage in the reservoir relative to the available area of the floodplain.
-3-
Although MAIN feels that potential for damage and loss of life due to
failure of the dam would be low, loss of the dam would effect considerable
economic loss to the town and to the local fish processing industry. The
project impounds the local water supply as well as provides low cost power
which makes the continued presence of the cold storage company attractive.
Because of the great disruption to the local economy which would follow
failure of the dam, Pelican Cove Creek Dam is classied as Significant
Hazard Potential.
2.3 Purpose of Dam
Pelican Cove Creek Dam was constructed in 1941 to provide water supply and
hydroelectric power for the Pelican Seafoods fish processing facility.
The project presently continues to be used for water supply and hydro-
electric power for the Village of Pelican, including the fish processing
plant.
2.4 Construction History
The dam was constructed in 1941 by Mr. Gus Savella whose last known
address was Port Angeles, Washington. ~r. Charlie Raatikainen was the
local person supervising the construction. Design of the project was
by Frank Allelcalf of Juneau, Alaska. A FPC license ~w. 1521 was
issued July 31, 1942 and has recently expired. The owner is presently
engaged in preparing a new application for a FERC license. In January
1983 the original powerhouse was destroyed by fire and was replaced in
June 1984 with a new powerhouse constructed on the old foundation. The
new powerhouse contains two generating units. One unit is rated at
650 kW, while the other at 100 kW. A full set of drawings is available
at the Alaska Corps of Engineers Office.
-4-
2.5 Geology and Soils
2.5.1 Regional Geology: Chichagof Island lies in a broad belt that
strikes northwest and southeast in confornance with the prevailing trend
in southeastern Alaska. Within this belt, intrusives, made up largely
of quartz diorities and other granitoid rocks, have been intruded
parallel to the stratified country rock. These intrusions were
accompanied by metamorphism of some rocks and extensive deformation of
pre-existing rocks including folding, breaking and moving of rocks by
uplifting along vertical faults, strike-slip faults and possible thrust
faulting.
2.5.2 Site Geology: The damsite is on Pelican Cove Creek, a deep,
steep, narrow gorge running down the mountainside from a narrow plateau
to tidewater. Bedrock has been identified as a syenite. At the damsite,
the weathered zones have eroded away due to water action and the exposed
foundation rock is a moderately jointed, sound, durable material. A
general site map showing the area topography is included in this report
(Plate 1).
2.5.3 Seismicity: Chichagof Island lies within the broad region of
~arthquake activity that includes much of southeastern Alaska, south-
eastern Yukon and northwestern coastal British Columbia. Records are
few and of short duration due to the meager population and scarcity of
seismology stations in the region. The Village of Pelican is located
on the hidden Peril Strait fault which appears to join the Fairweather
fault with the Chatham Strait fault (Lynn A. Yehle, 1974). The records
show that, within a radius of SO miles, an earthquake of magnitude 7.1
on the Richter scale took place in 1927 and one of magnitude 6.7 took
place in 1973. The village is in seismic zone 4, ER 1110-2-1806 dated
16 May 1983. An earthquake epicenter map is included in Appendix R,
Plate 2.
-s-
2.6 Basin Description
The drainage basin (see Plate 1) above Pelican Dam is 12.95 square miles
and is located about 1/4 mile above the mouth of Pelican Creek which
empties into the Lisianski Strait near Pelican about 70 miles west of
Juneau. The drainage basin is one of a multitude of watersheds which
drain excess precipitation and snowmelt from Chichagof Island. Basin
topography ranges from a steep, narrow canyon at the damsite to gentle,
sloping streambeds in the intermediate elevation zone with headwater
areas beginning on steep precipitous mountain slopes whose peaks reach
about 3000 feet. Lower elevations of the watershed are covered with
dense stands of conifer trees underlayed by a thick blanket of low grow-
ing vegetation and a surface mantle of spongy peat. As elevation increases,
vegetation decreases. At about 1500 feet, vegetation is near non-existent
with the soil mantle removed to near bedrock by past glaciation. Pre-
vailing maritime storms drench the area with heavy precipitation during
the summer and cover the higher elevation zones with deep snow in the
winter. As temperature moderates in the spring, snowmelt occurs,
leaving the island nearly snowfree by the end of July. Late October
and early November rain normally produces the most severe runoff con-
ditions when 24 hour accumulations may reach 8 inches or more. Climatic
data are not available at Pelican; however, climatic conditions at
Sitka would be representative of those at Pelican. Climatic records
for Sitka for a 99 year period show a mean annual temperature of 43°F
with extremes of 90°F and -l5°F. Average annual precipitation is
approximately 97 inches.
2.7 Description of Project
Pelican Cove Creek Dam is a rock filled timber crib and timber buttress
structure approximately 135 feet long and 22 feet high at its high
point (Photo No. 1). The cribs are all skinned logs of Alaska yellow
cedar approximately 8.5 feet on centers. The logs have been notched
and pinned at the connection points (Photo No. 2). The spillway is a
timber overflow structure 55.5 ft wide. The upstream timber facing
-6-
which is 3 x 8 Alaska yellow cedar planking extends 1 foot above the
chute (Photo No. 2). The top of the dam adjacent to both abutments
has been raised about 6 feet with a nearly vertical yellow cedar plank
face supported by timber buttresses. A 4 x 5 foot timber flume leads
from an intake to the right of the spillway. The intake is controlled
by a steel slide gate that is raised and lowered by a chain. The
flume carries water along a steep side hill 636 feet to an overflow
structure. Partway along the flume is a 90 foot section of rock tunnel.
The flume is constructed of untreated timber lined with plywood. The
overflow structure is the intake water supply line to the Village of
Pelican and for the 36 inch diameter wood stave penstock which conveys
water to the new powerhouse and turbine. The two generating units are
rated at 100 kW and 650 kW. Due to hydraulic limitations, the turbines
are currently capable of 75 and 520 kW, respectively. A preliminary design
for a new higher dam has been prepared. This new dam would be constructed
in a narrow portion of the channel immediately downstream of the existing
structure. Unless Pelican Seafoods or the Town of Pelican can get a grant
from the State or the Alaska Power Authority is willing to construct the
project, repair of the existing structure appears to be the most likely
alternative.
2.8 Operation and Maintenance
Pelican Cove Creek Dam impoundment supplies water for water supply and
hydroelectric power for the Village of Pelican and the Pelican Seafoods
processing plant. Release of water is through an intake to a timber
flume and rock tunnel to a forebay where a wood stave pipeline carries
water to the powerhouse and another pipe conveys potable water to the
village.
The small volume of normal storage (approximately 27 acre-feet) provides
little storage to maintain hydroelectric generation during periods of low
flow. The development would generally be considered to be a run-of-river
operation.
-7-
There are no formal records of project maintenance: however. Pelican
Utility Company has one full time employee responsible for inspecting
and maintaining the system. The project appeared to be well maintained
and is checked at least once a day.
-8-
3. FIELD INSPECTION
3.1 General
The field inspection of Pelican Cove Creek Dam was conducted on 30 November
1984 by Messrs. A. P. Davis, Jr. and R. J. Tucker of Chas. T. Main, Inc.
Personnel from Pelican Utility Company also accompanied the inspection
team as stated in Section 1.3. The Inspection Checklist is included as
Appendix D.
3.2 Reservoir Area
At the time of the inspection, the reservoir was at approximate elevation
138.0 or 5 feet below the spillway crest. The upstream basin is shown on
Photo No. 4. The reservoir is relatively small (27 A-F) and appeared to
contain many windfalls, rotting stumps and other forest debris. Those
portions of the shoreline visable from the dam appeared stable with no
evidence of slides.
3.3 Dam
3.3.1 Crest: Pelican Cove Creek Dam is a timber crib and timber buttress
structure which spans a natural fall above a steep gorge on Pelican Creek
(Photo No. 1). The crest appeared level with no signs of settlement or
displacement. The rock fill below the timber deck appears to have settled
or perhaps was never filled to the top of the structure. The timber
buttress which supports the nonoverflow sections on each side of the
spillway appeared to have deteriorated with some rot, checking and
broken planks evident.
3.3.2 Upstream Face: Examination of the timber planked upstream face
was difficult due to snow cover (Photo No. 3). Those sections which
were visable showed signs of deterioration due to rot and a few planks
were broken with portions missing. There were signs of some minor
settlement at the waterline.
-9-
3.3.3 Downstream Face: The downstream face of the overflow section
showed significant deterioration of the log cribs (Photo No. 2),
especially at the connections. The rock fill was filled to about 3 feet
below the top of the planking. It is not known whether this has been due
to settlement, washing out of some of the smaller pieces or whether the
structure was not filled to the top originally.
3.4 Abutments
Both abutments appeared to be sound rock. The structure appeared to be
well sited with respect to the abutments. With the reservoir drawn down
approximately 5 feet, there were no signs of sigificant leakage at the
abutment contacts. Previous reports have reported significant abutment
abrasion due to the effect of jetting action due to leaks at higher
reservoir levels.
3.5 Outlet Works
The only outlet for the project is the intake for the timber flume which
leads to the intake for the wood stave penstock and water supply pipeline.
This sytems would have the capability of lowering the reservoir approxi-
mately 6 feet during low flow conditions. The intake gate is deteriorated
and is in a precarious location for operating personnel, especially during
high water. The gate has been noted to seal poorly which hinders maintenance
work on the flume and forebay.
3.6 Spillway
The spillway includes the majority of the timber crib portion of the
structure (Photos No. 1 and 3). The upstream planking and top decking
show some deterioration but are in usable condition. The spillway
discharge impinges on the bedrock downstream of the dam. There are no
signs of erosion of the bedrock or deterioration of the structure due to
high spillway discharges.
-10-
3.7 Downstream Channel
The downstream channel was inspected to evaluate potential hazard to life
and property in the hypothetical event of dam failure. Below the damsite
the stream passes through a very steep, narrow channel before exiting into
a tidal estuary some distance upstream of the Pelican hydropower plant and
above where a timber walkway crosses the stream (Photo No. 6).
Due to the relatively small reservoir storage, the constricted nature of
the downstream channel and the broad channel in the estuary, it is not
felt that a breach of the dam would be likely to cause significant down-
stream damage. Photo No. 7 is an air photo showing the dam and downstream
river channel.
3.8 Instrumentation
Core samples of the log cribs were reported to have been taken by the U.S.F.S.
These were said to show the timbers in generally good condition. There are
no other records of instrumentation or monitoring programs at the dam.
-11-
4. HYDROLOGY
4.1 History of Flooding
No specific details of past flooding on Pelican creek are available.
Personnel at the site indicated that it is not uncommon during high
flows for the reservoir level to be 5 feet over the spillway crest.
4.2 Probable Maximum Flood
The September 1978 Phase I National Dam Safety Inspection Report
which was prepared by the Alaska District u.s. Corps of Engineers
included details of a synthetically derived PMF. The PMF for
Pelican Reservoir was derived using computer program HEC-1 and
assuming ''Snyders" unit hydrograph coefficients for CP and TP.
Probable Maxium Precipitation used to determine PMF was provided by
the National Weather Service (NWS) for the Swan Lake hydropower
study, a small basin with similar hydrologic characteristics and
geographic location.
Based on the drainage basin characteristics, the Corps selected precipita-
tion and runoff characteristic parameters which produced a PMF with a peak
inflow of 16,000 cfs.
For this report, MAIN reviewed this previous analysis and has concluded
that the time to peak of the unit hydrograph (TP) of 3.0 hours is
inappropriate and that a much shorter time should be selected. MAIN
redetermined the PMF by applying the Soil Conservation Service's "Triangular
Unit Hydrograph" technique. The estimated time of concentration correction
factor is 1.8. The duration of the unit hydrograph is 0.125 hour and
Tp = 1.128 hours, Qp = 5556 cfs, and Tb = 5.66 hours. The PMP used to
determine PMF was obtained from the Hydrometeorological Report No. 54,
(HMR 54). The 24 hour PMF for a 10 square mile area is about 19 inches.
By using Depth Area Duration (DAD) relationships illustrated in Figure 30
of HMR U54 Report, the PMP values for 6, 9, 12, 18 and 24 hour durations
were estimated to be 9.31, 11.1, 11.78, 13.87, 16.91 and 18.62 inches.
-12-
Assuming a loss rate of 0.1 inch per hour, the peak flow of the PMF was
computed to be about 24,000 cfs for the 12.95 square mile drainage area.
MAIN has adopted this new discharge for this report.
4.3 Frequency Floods
Because the Pelican Cove Creek drainage area 12.95 square miles at the dam
site is not gauged, the determination of the frequency flood peaks was
done by a statistical analysis of the gauged streams which have similar
hydrometeorologic characteristics and by adapting their results to the
Pelican Cove Creek dam site.
The streams selected for the analysis are Tonalite Creek near Tenake,
(Station No. 15106980, drainage area 14.5 square miles), and Kadashan
River near Tenake {Station No. 15106920, drainage area 10.2 square miles).
They are located 15 miles south-southeast from the site.
The data for both streams were analyzed by using a Log Pearson Type III dis-
tribution.
The adaption of the results to Pelican Cove Creek dam site was made by
the assumption that the annual peak discharges of the meteorologically
similar watersheds are proportional to the square roots of the drainage
areas.
The results are tabulated below:
Return Period
(Years)
2
10
25
50
100
200
Qpeak (Pelican Cove Creek Dam Site)
(cfs)
-13-
1660
2530
2870
3080
3270
3450
5. HYDRAULIC EVALUATION
5.1 Spillway Adequacy
The project spillway is an uncontrolled overflow structure with a total
length of approximately 55 feet. Although the upstream planking forms
a sharp crest about 1 foot above the timber deck, it is expected that the
spillway acts as a broad crested weir during flood discharges. Using the
appropriate discharge coefficients, the capacity of the spillway at
elevation 147.6 (zero freeboard) equals about 1900 cfs. This report has
classified this project's hazard potential as Significant. Projects
classified as Significant Hazard Potential should be capable of passing
a flood equal to 1/2 PMF or 12,000 cfs. A flood with a magnitude of
12,000 cfs would overtop the timber buttress structure by approximately
7 feet. It is questionable whether the timber buttress could withstand
the hydrostatic pressure and erosive forces which would accompany such a
flood.
5.2 Flood Routing
Due to the relatively small, steep sided reservoir and uncontrolled
spillway at Pelican Cove Creek Dam, it is expected that Pelican Lake
would have little attenuation effect on major floods.
-14-
6. STRUCTURAL STABILITY
In reviewing available drawings and reports regarding the Pelican Cove
Creek Dam, no stability calculations or stability assumptions were
found.
MAIN elected to analyze the timber crib spillway using our computer
program STAGR. For MAIN's analysis, a one foot section of the spillway
section was selected. The details of this study are presented in
Appendeix c. Stability analyses were conducted for normal, earth-
quake and ice conditions with the headwater at normal operating levels.
In addition, the structure was analyzed for the zero freeboard and
PMF loading conditions. The results shown in Appendix C indicate that
the structure is stable for all anticipated loading conditions.
Examination of the timber cribs and timber buttress raised considerable
doubt concerning their long term structural stability, especially
during major floods. Although the timber crib structure was shown
to be stable if the connections remained intact, failure of one or
more of these connections could result in progressive failure of the
entire dam. In order to insure its continued integrity, extensive
repairs should begin as soon as possible. These could include installa-
tion of a new crib immediately downstream thereby buttressing the old
dam, an entirely new. concrete dam downstream adjacent to the rock tunnel
or a complete demolition and rebuilding of the existing structure in
its present location.
-15-
7. PRIOR REPORTS
A Phase I National Dam Safety Inspection of Pelican Cove Creek Dam was
conducted by the u.s. Corps of Engineers and a report prepared dated
September 1978. This report is on file with the State Dam Safety
Office and was reviewed prior to MAIN's inspection.
USKH Engineering has prepared a series of two reports entitled "Pelican
Power Alternatives Phase I -Reconnaissance Assessment" and "Pelican Power
Alternatives Phase II -Feasibility Study." These reports have been
reviewed and key information has been extracted as prudent.
No other documents were found relating to the design of Pelican Cove Creek
Dam.
-16-
8. CONCLUSIONS
From this inspection and analysis of Pelican Cove Creek Dam, MAIN presents
the following conclusions:
1. A Hazard Potential Classification of Significant is appropriate due
to the economic loss that would result due to loss of hydroelectric
generation and water supply for the Village of Pelican and Pelican
Seafoods.
2. The dam and its appurtenances show significant deterioration and
are in need of extensive repairs or replacement.
3. Analysis of spillway adequacy indicated that the structure can
only pass 1900 cfs before the dam is overtopped. This flood has
a recurrence interval of less than once in five years.
4. If a 1/2 PMF were to occur, the stability of the buttress sections
could be in question due to hydrostatic loading and erosive
forces. The timber crib structure is stable provided the
connections remain intact.
-17-
9. RECOMMENDATIONS
1. Pelican Cove Creek Dam should be repaired, replaced or a new
dam built downstream within the next 5 years.
2. The design of the new or rebuilt structure should include a low
level release, a larger spillway capacity which will prevent
overtopping the dam at the abutment~ and an improved intake
scheme which will make operation less hazardous.
3. A new FERC license should be obtained.
-18-
APPENDIX A
INSPECTION PHOTOGRAPHS
30 NOVEMBER 19R4
• ' ~\
No. 1
Timber crib spill-
way looking toward
left abutment.
No. 2
Typical log crib
connection.
No. 3
Spillway crest and
intake looking
toward right
abutment .
•
I
J
No. 4
Reservoir upstream
of dam.
No. 5
New powerhouse from
timber walkway crossin ~
lower Pelican r.reek.
No. 6
Downstream river
channel •
7. Air Photo of Pelican Cove Creek Dam
27 July 1977
(Flight 976. Frame No. 3)
APPENDIX B
PROJECT PLATES
0 2 -----S c a le In Mllea
t
-N
~
PELICAN COVE CREEK DAM
GENERAL SITE MAP
Al-ASKA DEPT. fW NATURAL RESOURC[S
DI Y. fW LAND AND WATER MANAGEMENT
~AI~
1893
1111 r~•. l i ,IMS
llU•t U t l llfl
1145 t
C'l
0
"• • ., w
~
\
0
C'l
....
• .. 4
... H
G T
H E
H
T s
I u • 0 T
XI
E y
XII
1841-1959
t-!i lne 1 '164
I''
-~------------·--------------·-.....
.IU
..... .... ....
.,.0
•. an •··· .... ...
e···
e.H ..... •" .... ·-· .. ,. •''' .....
'!1 .......• tJ .'!I
e:~ ........ .
•...
::~·
·-..... ..... ;::
1' -··-• ... ·-
B
0
. .. , -... ,..
·-
·.
·· ... .
R T
L
VE MAP OF EARTHQUAKES ACCUMULATI
....... WAGNITUD[ a 4
•ut• to ''''U•H•' '•"o• TO "'u"' u .. O[IIIJ!.,t .. ( g .. UWI( Ill\
t
-N
]
s
..
H
A
··-
I
' I
'
I
I
·-
....
PLATE 2
APPENDIX C
STABILITY ANALYSIS
CASE I
CASE II
CASE III
CASE IV
CASE V
CASES USED IN STABILITY ANALYSIS
Normal Operating Water Levels
H.W.L. = 142.60
T.W.L. =
Normal Operating Water Levels with Earthquake
Water Level same as Case I
Horizontal acceleration due to earthquake
is 0.20 g in the downstream direction
Normal Operating Water Lezvels with ice
H.W.L. = 142.60
T.W.L. =
Horizontal Ice Force at 5 k/ft.
Zero Freeboard
H.W.L. = 147.60
T.W.L. =
Probable Maximum Flood
H.H.L. = 154.10
T.W.L. =
Q 16,000 cfs
PLATE C-1
EL. 142.60 -'5iZ --I -------7--~-----------' -----=
~---·---~-~~ .... .
ROCK FILL ~ // ~ .
:I: +
L __ --'AR
33.00'
PELICAN COVE CREEK DAM-WOOD CRIB DAM
LOADING CONDIT10N
NORMAL CONDITION HW=22.0
EL. 141.60
0
EL. 120.60
:>:::FH = 15.
:>:::FV = 59.
:>:::FH/:>:::FV =0.25
SSF = 2.75
RESULTANT AT X = 1 8. 7
ECCENTRICITY= 2.19
:>:::MR = 956.
:>:::MO = - 1 1 1 •
:>:::MR I :>:::MO = 8. 6 5
BASE STRESS (PSil
7. AT X= 0.0
17. AT X= 33.0
~ 10
S c ale in ft • t
·~
WOOD CRIB SPILLWAY SECTION
ANALYZED FOR STABILITY
ALASKA DEPT. Of' NATURAL RESOURCES
DIY. Of' LAND AND WATER WANAGEWENT
un l't:ll. 28, IM5
3t4~ 2 c-2
CI.IC•r 111 "au fMAI~
CIHO:J
EL. 1~4.10 ·----------~ I
EL. 142.80 ----•
-
-.j ~
-+l .
H~ ROCK FILL
+ r---~~
L_. f ___ _
C o R A-~-----''~r·'===!i·l-----------f-J
noo' _j
PELICAN COVE CREEK DAM-WOOD CRIB DAM
LOADING CONDITION
PMF COND. HW=l 1 .50' ABOVE CREST
EL. 141.80
EL. 120.80
:CFH=31.
:CFV = 88.
:CFH/ :CFV = 0. 35
SSF = 1.99
RESULTANT AT X = 20. 5
ECCENTRICITY = 4.01
:CMR = 1384.
:CMO = -285.
:CMR/:CMO = 4.86
BASE STRESS <PSI l
5. AT X= 0.0
32. AT X= 33.0
0 5 10
Scale In he t ·~
WOOD CRIB SPILLWAY SECTION
ANALYZED FOR STABILITY
ALASKA DEPT. Of NATURAL RESOUACES
DIV. ~ LAND AND WATER MANAGEMENT
rMAIN1
CIH03:...:.J
I -------••n r-~D. ZI,IN5
Clll., ,.. , .....
lt45 2 c-3
SlABILI 1'( SUMMARY
CONDIT ION BASE :FH :FV lfH s Ktl>JJ_l) AN I J lh 1 Mo )_Mil_ BASE STRESS (psi)
TOT LEN CR LEN·-r-EFFLE-N I~ 1 n l ( K1 PS) :fv •-f I DOW~~?~t AM (k-r 1) I 1-FTl
) ~·· UPSTREAM DOWNS I RUM
CAS!:: I n.uu JJ.UU 15. ~9. 0.25 2. 75 14. H 960. 110. 8.65 7.5 1 7. ,,
CASE ll JJ.Ull J:I.Oll 2o. 5Y. 0. 4 -j 1. o2 u.uo %0. 190. .>.09 4.5 20.J
CASte 111 n.uu JJ. ()() 20. SY. 0. J4 2 .oc. ll • .J4 1J6U. lLU~ 4.4.:. J.'> 2!.4
CAS!:: lV JJ.OO JJ.OO ll. 66. ll. JJ 2.11 1 J. Y7 lllU. 190. ).')] 7. 5 20.)
CA~E V JJ.UU JJ.OO ll. 88. U.J) 1.99 12.49 uso. L85. 4.H6 5.0 J2.1J
l'EI.l CAN COVE CltEKK ilAH
S'I'AlllLl TY SUHHAJ: ~
ALASKA DEPT. Of NATURAL RESOURCES
DIV. Of' LAND AND WATER MANAGEMENT
~\AI~ taU fEB. 28,1985
(.t ••• , ... HUt
u~oa '3945 2 -
APPENDIX D
INSPECTION CHECKLIST
.. UNSAFE DAM REPORT FOR~!
a. Name:
b • ~: Tin-, b e ,-C v 1 b j Ti ......., h tt ,--13 v iT r ~ 5 .J
c. I. D. No.: ,4 /<..' () oo 33
d. Height: ~ ~ t:t-
e. Hazard: L Hfi!v~ e.:{l.;~_f e.
f. Size: S J¥J 4..1/
g. Location:
State: County:
Nearest D/S City, Town or Village:
River or Stream: /-. / C k ..., e t c.. ,, .., Y e. e.
h. Owner: I:;) e.. I L '"'4"-_, u f d d· y c d ""'"'p ~ .., '::l
i. Condition of Dam Resulting in Unsafe Dam Report:
n. Remarks:
Signature: ~ ~L) J ;:L
?!
Date : AJ .. -v-3 0 1 I L 8': "f
7
•
•
1.
2.
3.
4. s.
VISUAL INSPECTION CHECKLIST
Name of Dam; PtJ../JC .. o ..., C .. •.·c. C yu k
Inventory No.: A/<. o oo 3 9
Hazard Category: ifiJ i~Y~e~JJ ... ~e..
Size Classification: ~'"41/
Owner: pl!.f 1 c..~' ""
Pe.J1cr:•..,
U r 1 i J1·1 C c.,.,.. p•"' '1
AJ~sk.t:\. <J983;(
w a. It-C o f A sr" ,
p /t:~. ... f /?~ .., "",~ ~ r:
Pe.h ~.., s~ ... 'l·c-•'..1 ~ r ~~~ c..
(Jeflc.-..,.,1 A/ajka.. J9c'i3~
6.
7.
8.
9.
10.
Inventory No. A j;oo 0 3 '3
Sheet ~ of ~
Date Inspected: /l}c•r.' .301 1.?8~
Pool Elevation: I 38 ,C f
Tailwater Elevation: 11../c, c. c.. f 0 c. ....._,
Purpose of Dam: Pc;#t ...-/u'o: Jr v 5.-/'I'J y
Weather: 3 ..1 ,.,:.. -t=J,_.yne.:;,
"'"'(....J,., !)Jot~.v _, ....... ~~-... ~ .... /
.:t.+-Oc-. .,jti<:.
Directions: Mark an "X" in the "YES" or "NO" column.
If item does not apply, write "N/A" in "REMARKS" column.
Use "Other Comments" space to amplify "REMARKS".
ITEM YES NO REMARKS
..
Inventory No. _ _.Ac.~.· ,.:..;k"'--=0-=0::...0~3~3 __
Sheet __ a__;__ of -----"'-1" __
ITEM YES NO REMARKS
--
TH!BER DANS TYPF:: T;..,J;,.,.. c ,.,-,b ~ !'JvHv( '> '>
1. CREST
a. ~ Settler:1ent? _ _x. ----,--
b. Any Hisaligt},s_ent? "' h• .,.,.,-Q{.,~ Sf!r'<-..._ S<: Ill~_......_+ ~t~J<..:-/<~.· r----·-£--. N f:.--;..., < ,...,.;;: c. Adeg__'-;!ate Freq_!:oard? r'ETr.H: ~o~ I r-A7.. -
d. Deck Timbers Sound? J( _j.,....., (.., r,r, Chtt<K~ T /$._.,.,/<,. <!.. --...
2. ABUTHENT & FOU::DATION CONTACTS
---. a:-An~--F:~;-s i-on? X 0 ''(.. +--J~tll~ C-+·:~_1':> ( .,..,_ r) 1-x --~·--·
___ _!;,_. S.e.l;~<.!&~...J:.r~s_ent? ;(--·---
t· c 'B o i l_!L__Q _.r_S_p r i_ ru::_s Downstrean?
d. ExDosed Bedrock? )( --
---~~e_Q_r:.ock Det_~_riorated? -X
__ __L. ___ V..is_lbl!!._P_i_s_p~la·:e..:::e.n.t.~? _A~---r -----
r--------·---I !
3. STRUCTUlC\L & CRIP. TI:m:::RS c-§ '---~---------------~-------------
___ a,_._ 1.\!!.:LJI.e:. t e r t_ QI:: ti 0 n? ;( __ -!-----.. e -;,p~c.l .. flr. Q;.... C • -" #He -11..,.. )
b. Are I.J~~~--Brog;::~_:t_.QE.__J;hes.~.:f'd? __ I{ _1___ .
~--------
c. Ar Ti.::-:2.~rs_l'J:.~q_g_plati_ve_ ~r_rc~ated?_l...... . _]{__*J'</Io<V C ••/.< Y ___ , _________ ~
------~__}xg _'j;',l;::~ b~_rs~:iw~e_Q_QJ.:_B.Qlt;,.ec~? ___ -~ ______ I
--------
• 4. C'tiBS ·-I-
_ ____a_,__ALC.._ G.ti b.s.....l'J. 11 e c' ; : i t' h P,... r lr 1' i 1 "' ? ;( ,< cH k. ~Ill I) llh."'"'' ...... ld;. J I' P~ lu iA..I
b. lL!iGJOkfULC'."·-' , __ ,., .~-± T'<J,f. of:. Do""""\
f--.-..
-
1-----· '
-
--·----~~----
---1--------
-------
------
---------
~"------
-~---------1----i -------, •
Other Comments:
Inventory No. A J< 0 0 0 3 9
Sheet 3 of 5""
ITEM YES NO REMARKS
SPILLWAYS TYPE: ()t: t .,..7!.-,v /3o .. / Cn•-. hi We iv-
"
__.L_ CRES.:r TYPP.: T1""" bo .bY"-·.· ./c.~ s.l"'·r
a. Any Set t Le_M~nts? ~-
b. Any Mi~?_U.&..nments? ;< -
__ c_. __ ArrJ_Cr ac kj. DR1 7(
d. A_~teJ;:,ioration? ;( 5 c;I""J ~ Y"'-' f-+ cJ.~, 1<~
·-
e. Ex_p_Q.s_e_ct_Rc i nfo~emcn t? Nil-------
f. EroQ.i_Q_rl] X. --
_ _z. __ Si.lt_D_e p.QS it Upstrear:J.' ;< 5,/t '"'1 u 5 F<~., .,._.; f=..,.,,.~ f-O.:J,.,) ....
L2_._C.Q(1T.RQL__S IJWCTUR E S TYPP.: 1-); ., '-NO. 1\.')'¥~-
~echanic~l EquipMent Onerable?
--A.l/.A--
~-----
b. Are G<!tes Haintained? ------
_ __c__.__jli_l__L__f_l_a__s_h_b oar d s_]'r :l p Automatically? ... ------
~d~__tancl1ions IrinQable?
__ e.~ __ .A.r___e....Gue.s._Re.mo t e 1 y CQ.ntm.lle d? y
~-CHU.IE TYPE: }.Jc .. e.
__ a..___Anv Cr acJz.in_g..?___ ---~-J.J/A
I --
_ _Q_. _ __A!_ly Deterioration? I --------
, r-----c. Er o si.Qll'L_ --···-
r----_ _d_.___Expo _ _s__e d_R_~in.f..llr~_e n t ? .------±=~ r> ~ep__age____at Lift Li p._e_£_Q.r:....JQJ..nt. ?
~_ll;'ERGY DISSUb'T'G"Q~ ~---ITYPr: ~~-'1<!. d.').,J...-.. J"-t-R..t ~<-:'.2
-"!. ~_n~rioratjon' -------; A) ltt-() "'-~.,.jv~ c k.,
~h_._____L.r.os i .-... n? ----
r------_c_.~_us__ad__l'~i.nf.o rr f>r" P n r-? 'j
5. ~lEIAL A££;JgTf.tJHTr.Fc:: /1.) ,; "' <..
::0 r..-....rr.a_c:i '.n? IV/_!}
h Rr£>,qkag-p? ,]---
~c._._Sc_c_ur e tmcborages'
~...._________B_fERGE.HCY.___S.EI.LLtJ A V TYPE: ).),'11!..
~.a.. Adequa t.e........Grass c ove.r_? A1 I f).
"h ....._c}_e_ai:_.A.p pr a a c b Chann.-.1? -----,
r--.C. ,__Er_o_di.bl e Down.stream c b .:lililf: 1 ? ----
1--_!L__Er..o.di h] c E11se .Elllg_? . ----·
&> ~ r-r>. h 1 e....$._i_d e_Slo_ n&> c: ?
.,
-
--
--
--------
Other Comments:
• Inventory No. _ __..A~k~_,.0'--'0""--=0 __ ,_,3:....:3==----
Sheet 1 of 5"
ITEM YES NO REMARKS
--LOtJ LEVEL OUTLET TYPE:
1. GATES A//1} --~~~~~-~--~~--~~~-----~----+-----~~~~------------------------r----a~·~H_e_~c~h~a~n~i~c~a~l __ E_q,~u.~i-~p~rn_e_n~t~O~r.~e~r~a~b~l~e~?~----+-----4~----+-----T4-'----------------------------~
~-----b_.~A_re Gates Re~~o_t_e~l~y~C~o~n_t_r_o_l_l_e_d __ ? ______ ~-----+----~~--~----------------------------~
c. Are Gates Maintained?
·-2--.--c-o-NCR-'E_T_E __ cO_N_DulT~s~------------------------~----~----~~---4--------------------
____ a_._~ny Cracking,?: ________________________ -+-----4-----~~----~--------------------------~
----~b_._A.~~eterioration?
c. Erosion? ~-----------~--~------------------------------~--------~~----1---------------------------~
___ d~~-~osed Reinforc.~i~n~g?~----------------~-----l-------+-----~---------------------------4
t-----e_. __ Ar e Joints Di ~ p=l-=a-=c-=e:..:d:...:?~---------------1------J--·-----4------+---------------------------~
~-f. Are Joints Leaking?
~HETAL CONDUITS
____ <!·_l~t!g_~al CQ.rroded~? _____________ ~~---!------~f-----+---------------------J
!--__ b_.!_ls_Cond ui t C r acl<,..,c::,d:!...!...? ---------------+-----l----_ --t----+----------------------1
__ -~6I~ Joints Di sn.l.,_a"""'c""'e_d...,~? ____________ -+----___ ---J.------1~---------------------1
,---d_._A_r_g_J'_Q_i n ts Le c1 king_.;_? ______________ -+---------•-----+-----------------------t
_!:~__E.:IERGY DIS SIP AJ:_Q'-'R,_,S,_ _______________ +---·---+------t----+---------------------;
_ r----aLA.flY De t e""r.__i""o~r'-"a-"t""'i"'o""n,__,?'------------------~---~---------_____ ..___ _________________ -------1
b. Ero~ion' -r-----~1-----4-----------------------~
----~~_ExP~sed RPinforc~~G··~e~n~t? _________ -4----~---~-----+--------------------~
~--l:ll~--~~PPJlRTf._N'"".,_,A._,_,_N"'C-'-'E~S.,'---------------------~-----t-----,---f---------jf----------------------------1
a. Corrosion?
b. Break£ge~? ____________________________ -+-----4~----+-----~----------------------------1
f.--c.. Secure Anc.hora?es? '
~------------------------------------------~----+-----4-----------------------------------l
~---------------------------------------------4----·-4----~------------------------------l
Other Comments:
• Inventory No. --L.A,.__k..;:.....;o;....o_:__o--'3:::..-"-.J __ _
Sheet · £ of ---e.?-__
ITEM YES NO REMARKS
INTAKES
}. EQUIP~E_NT
a. Trash Racks? X
b. Trash Rake? ;( -c. Mechanical E~lrmcnt Operable? ;<. ·-----
d. Int~ke Gates? 1\
__ e. Are Racks and Gates Haintainerl? -·4 -----------
f. Arc Gate O£lerators O_eerable?
2. CONCRETE SURFACES
a. Any Cracking? N 1/.J
b. Any Deterioration? ,.__
c. Erosion?
--d. Exposed Reinforcement? -
e • Are Joints Displaced? -----
f. Are Jo ill.t;S Leak 1 nz? .. I -
3. CONCRETE CONDUITS
-------·~~-------~P ----· ~·-Any Cracking? ----·------
___ 1.!.~'\!!Y..Jl.? t_~ rio r a t ion ? ------
c; _ _! __ ~ro~,ton?
_...JL__E_xposed f:.e in f n rc~~en t? -·-~-... ~ .. --·-----
r-----e. Are Joints Dis_p_laced? . ,___ ___ f .!.....Are J_Q_i n t s Leaking? 'I
4. i1ETAL cor;DUITS
a. Is Metal Corroded? iJ7A
b. Is Co."!lduit Cracked?
c. Are Joints Di S.J?.lac ed?
d. Are Joints Leakink!?
5. METAL A_I'_PURTErTAJ'iCES
a. Corrosion? J{ --
h. RreA.kar>e? X.
C• Secure_6._QChQ..rage_§? t:..
. 6. PENSTOCKS .. ·--TYPE ~!ATERIAL: Ttl1.b.~ pJ.,.,.,<.t-{,l.h .. /
__ 1!.! _ _11 at~ r:: i ~_.1.__.12~ t e _r_i_ o_r..E~ r-9.? X.. --Z.,.;... t cJ.~c.k/..:..=:; f>,t:_(..
~_____l:?~Q i l}_tc? _Le_qls:_i.Dzl _____ ;(.. lt:.-. J<~.,<!.. j,,.':> b.,..:._ 1-JIIY~..J b"\ ;. "11"'-<... ·-----·
c. SJ.UlllQL.tL~..QJtat;_e? X s4 .... C.. defCY"l<-¥..../-1-\ -
___ .Jl.,_..An.ch o t:Jl oc k.s_.S_t_q_bl~J ·--~~~--------
_,
--
Other Comments:
.. •
Iii PART I -INVENTORY OF DAMS IN THE UNITED STATES
(PURSUANT TO PUBLIC LAW 92-367)
See te\·erse side lor instructions
-·----······------
Ill Ill 141 lSI (61 171 181 191
H"ME
FORM APPROVED
OMB NO. 49--110421
REOUIRflolENTS CONTROl SYIWIOL
DAEN-CWE-17
IIO I
L" TITUDE
(North)
1111
LONGITUDE
(We.st)
• •
Ill
... IDENTITY ,._ ... HUMBER
!;;
•h 3)•1si6J7
~~A o~jo~,l>
1121
REPORT taTE
--•-·· i_i I I II I I II I I IiI I I I I I I I I I I I I I I 1 i 1 i 111 I j l iII i-l_l_j_1 j __ c.I_LL._l_L_f __ l JDEHTIFIC.A.TJCJot 1 , 1 1 r 1 1 , 1 ~.-1 v 1 , , I"' w 1
(Ill 1141
POPUL"R IUME H"ME OF IMPOUNDMENT
ID~~J~~~c:!~OH~ I I .1 I .I_. I .I_, I _j .1..1 __ , _L.t..L L L L_L_L::J .L_L_L_I :IuL_L_t __ I._L.L i.J ... _. L f._J. L_L.L::J __ L_L_L_I__f _.__,uL.t _.__. __ • _.__.uL_I__L_L_L_i _L_L_L_I .__.__L~I
(lSI 1161 (171 (181 1191 1201
RIVER OR STRE"M POPUL"TIOH
LOCATION
STATISTIC$
1281
REMARKS
ENG 1 ~~~11 4474
• •
STATISTICS
MISC DATA
MISC. DATA
(C onrinued)
MISC. DATA
(Continued)
REMARKS
ENG FO ...
1 Ot:C '11
•
~~~ PART II INVENTORY OF DAMS IN THE UNITED STATES
(PURSUANT TO PUBLIC l.Ail' 92-367)
(291 110) (31) (321
.. ...
lC
"' ' 0
4474A
1491
~-
SPILLWAY
1461
OWNER
Sec reverse sule for Instructions
---~ ---~ -~~----
(33)
(HI
IHSPECTIOH BY
1341
VOLUME Of DAM
(CY)
(SOl
(3S I (36) (371 (38)
POWEll CAPACITY
(471
ENGINEERING BY
(541
IS6 D
• •
Ill
"' FOI!M AI'PIIO\IfD ... IDENTITY • HUMBER OMBNO.~I ..
"'
IIEOOIREM£NTS CONTROL SYMBOL tp: 314151617
DAEN-CWE-17 ~~A cl ~~b; 1~
··--------~--
1191 (40) (411 (42) (4ll (441 (4SI
IUYIGATIOH LOCK$
(48)
CONSTRUCTION BY
(Sll tnt
(sst
AUTHORITY FOR INSPECTION