Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Humpy Creek Streamflow Records 1984
9644/399 A~skaPowerAu~ori~ 1984 STREAMFLOW RECORDS HUMPY CREEK NEAR LARSEN BAY Prepared by Dowl Engineers in Support of the Feasibility Study for Larsen Bay Hydroelectric Project June, 1985 TABLE or CONTENTS Purpose •••• . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Location ••• . ........................................ . Drainage Area. Gaq e .•••..•••. 2 Reference Marks. 3 Discharge Measurements. 3 Rating Curve •• 4 Channel • . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Control. 5 Remarks • . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 APPENDICES Appendix A -Discharge Rating Curve Measurements Appendix B Printout of Discharge Measurements 2-Hour and/or 4-Hour State Data and Corresponding Discharges LIST Or fiGURES Fiqure Project Location Map Figure 2 -Discharge Ratinq Curve -Humpy Creek Larsen Bay, Alaska Figure 3 -1984 Hydrograph of Humpy Creek lable 1 LIST or TABLES Summary Streamflow Data, 1984. Humpy Creek, Larsen Bay, Alaska LARSEN BAY Streamflow Data, Humpy Creek Purpose: The purpose of this effort is to collect streamflow data far Humpy Creek as part of the Kinq Cove Hydroelectric Project Feasibility Study. Streamflow data collection began on December 28, 1981. Streamflow data reports for the calendar years 1982 and 1983 were submitted to the Alaska Power Authority in connection with the feasibility study. The streamflow data presently being gathered is supplement to the hydrology study completed bility of hydropower development. an additional for the feasi- This report includes a daily stream discharge summary table ss well as stage and discharge records for two-hour and/or four-hour periods for the 1984 calendar year. Location: The g8ge is located on the right bank of the creek, 0~5 miles upstream from the mouth and 0.4 miles south of Larsen Aay, 500 feet above the old dam, Latitude 57° 31' 56", Longi- tude 153°59'08", in NE 1/4 SE 1/4 sec. 31, T.JOS., R.29W., Kodiak C-6 Quad (see Figure 1 -Location Map). Drainaqe Area: The drainage area is 6.37 square miles at the stream gaging site. No glaciers exist within the basin. ~ . '( B .,-;::::- . --- -· ·----, /"L I .:.; .. .. ~~) ~ -J ' II r A K II A r SCALE I.OCA TlON I.IAP lOOT TO 11CA1..!: LOCATION OF STREAM GAGING STATION AND HYDROELECTRIC PROJECT AREA . ENGINEERS LARSEN BAY, KODIAK ISLAND, ALASKA FIGURE Gaging equipment consists of a digital recorder/sensor (Omnidata Datapod) and a staff gage. Digital Gage: The digital gage is an Omnidata Datapod coupled with a small piezo-electric pressure transducer and a thermistor temperature probe. The datapod is an ultra low power microprocessor controlled recorder with several advan- tages. The device contains a battery supply, an analog to digital converter (12-15 bits), a microprocessor, a non- volatile storage module and a clock with an accuracy of several minutes per month. The transducer is housed inside a cylindrical stainless steel casing which is secured to the streambed through a driven steel rebar flnd hose clamps. A cablewfly extends to the recorder on the streambank. Two different models ( DP 211 and DP312) of the digital gage are used for this study. Model DP 211 is coupled to a D::~t a Instruments transducer (Model AR) and a Yellow Springs Instruments thermistor, and is set to sample both the pres- sure and temperature every five minutes. This model was discontinued after May of 1984. in Mgy of 1984 and is coupled to (Model PT-105V). It samples only Model DP.312 was installed a Env ira-Labs trflnsducer the minutes. The average of the 5-minute pressure readings every five is recorded every two hours (DP312) or four hours (DP211) in an 8-bit format. Gaging equipment specifications are attached to the 1982 report as Appendix C. 2 Staff Gage: The staff gaqe is a rigid, precisely graduated, porcelain enameled iron plate securely fixed to a fence post driven into the streambed. It was installed on Humpy Creek during an initi3l site visit for the hydroelectric feasibil- ity study. Reference Marks: RM-1 (b~se): A 24-inch long steel rebar with an aluminum cap driven into the ground on the left hank of the creek and 15 feet upstream of the qaqe location. Elevation 5.80 feet, gage datum Discharge Measurements: Continuous measurements of stream discharge are obtained through collection of stage data at the gaging station. The staqe of a stream is the height of the water surface above an established datum. The stage data on Humpy Creek is col- lected ever:~ two Bnd/or four hours by an Dmnidata Datapod digital recorder. In stream rJBging procedures, stage data i s u s e d a s t h e i n d e p e n d e n t v a r i a b l e i n a s t a g e -d is c h a r g. e relation to derive discharges. It is, therefore, norm::Jl practice to establish a relationship (rating curve) between the stage at the gBqinq station and the discharge. This relationship depends on the shape of the cross-section and the roughness of the streambed. Therefore, the relationship has to be established empirically. 3 As part of establishing the rating curve relationship, dis- charge measurements were taken at the gaging station using a Marsh-McBirney Model 201 flow current meter. The stage of the stream was also noted during discharge measurements and is provided below along with the discharge measurements. Date 01/07/84 05/03/84 09/05/84 03/07/85 Ratinq Curve: Discharge (cfs) 7. 6 25 10 4 Gage Height-State (ft) 1.03 (shift 0.07) 1. 70 (transducer-gage change -new staqe 0.90) 0.80 (transducer) 0. 20 The rating curve for Humpy Creek will continue to be devel- oped as additional stage-discharge data points are collect- ed. A preliminar1 rating curve is plotted for the period of record and is shown in Figure 2. sheets are provided in Appendix A. The discharge computation After having established the rating curves, measurements will have to be continued to enable verification, and if necessary, adjustment of the rating curve to the actual cir- cumstances. Deviations from the discharges read from the rating curve are caused by morphological changes of the streambed and stream icing problems. 4 I I I DISCHARGE IN CUBIC FEET PER SECOND ~ RATING CURVE FOR HUMPY CREEK ~ENGINEERS LARSEN BAY ALASKA-YEAR 1984 FIG. 2 Channel: The channel above the gaqe is in a narrow incised, deep canyon with bed material consisting of gravels, cobbles and some boulders. Onl:f a narrow discontinuous floodplain has developed within the canyon. covered with alders and brush. Control: The floodplain and slopes are The control is a cross-section or reach of stream channel that determines the relationship between stage and discharge at that section and for some distance upstream. Permanent controls are desired for a stable stage-discharge relation- ship; however, changes (shifts) in the control occur affect- ing the relationship of stage to discharge. At low stages, a protruding rock outcrop downstream of the digital gage will be the control for stream water levels. At medium and hiqh stages, the channel will be the dominant control. Remarks: Stage records are qood for those periods when the stage sensinq and recording instruments were functioning proper- l:f. Otherwise, dBta gaps exist for summer months when a flood has damaqed the transducer. Data for these periods were Sjnthesized on the basis of weather data (Kodi::lk) and from data on a USGS gage on the same stream a mile upstream from the project area. Reliable data were obtained for over ninety percent of the monitoring period. A mal functioning transducer prevented recovery of stage data for fifteen per- cent of the monitoring period. Performance in the data 5 collection percentage compares favorably with teh 1983 records. The period of synthesized data is indicated in the summary stream discharge table (Table 1). In addition to the stage, stream temperature was also measured up to May of 1984, and the results are provided in the following printout sheets. Larsen Bay cannery water withdrawals were not considered since the gaging station was moved upstre8m of the c8nnery dam on May 5, 1983. 6 Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Total Mean TABLE 1 A SUMMARY OF HUMPY CREEK (LARSEN BAY, ALASKA) STREAMFLOW RECORDS FOR JANUARY 1, 1984 THROUGH DECEMBER 31, 1984 MEAN DAILY DISCHARGE IN CUBIC FEET PER SECOND 1984 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov 5. 7 4.5 3.0 9.4 27 31 6.3 7.8* 10* 9.4 10 5.8 4.4 3. 1 9.5 26 30 6.2 7.6* 10* 10 10 5.5 4.0 3. 1 9.3 24 27 5.4 7.6* 9.8* 10 10 11 5.6 3.3 9.6 25 27 5.2 7. 3* 9.6* 10 10 17 14 6.2 9.5 23 25 5.2 7.3* 9.0* 10 10 11 25 5.8 9.3 23 25 5.2 7.0* 8.7 10 10 7.2 43 5.6 9.3 23 24 5. 1 7.0* 8.6 10 33 7.2 60 5.9 8.9 25 24 5.2 6.5* 7.9 1 0 30 7. 1 64 8.7 8.9 27 22 4.4 6.5* 8.6 10 36 6.6 13 8.2 9.2 29 21 4.5 6.5* 8.3 10 42 6.5 3.7 8. 1 9.4 34 18 5.4 6.5* 8.9 10 40 7.9 3.7 7.8 8.3 39 16 5.2 6.5* 10 10 38 7.3 3.7 7.8 8.2 41 16 4. 1 6.2* 10 10 32 6.7 3.4 7.5 8.0 42 1 5 11 * 6. 2* 8.5 10 32 6.7 3.3 7. 1 7.6 41 14 11 * 5.9* 8.5 10 27 6.4 3.4 7.3 8. 1 41 13 10* 5.9* 8.3 10 23 6.4 3.3 7.5 7.4 48 12 10* 5. 5* 9.2 10 22 6.2 3.3 7.7 7.8 53 1 1 9.9* 9.0* 8.9 10 20 9.2 3.3 7.7 7.9 55 11 9.0* 8.0* 10 10 18 14 3.3 8.0 7.2 54 9.4 9.0* 6.0* 10 10 19 13 3.3 8. 1 7.3 50 9.4 9.0* 6.0* 10 10 24 23 3.3 8.3 8.8 47 8.0 9.0* 5.0* 7.0 10 19 44 3.3 8.2 8. 1 45 7.9 9.0* 4.5* 5.8 10 16 59 3.3 8.6 7. l 42 7.9 8.0* 10* 7.5 10 16 70 3. 3 9.3 7.0 40 7.8 8.0* 11 * 11 10 16 43 3.3 9.7 8.3 40 7.9 8.0* 9.0* 8.9 10 16 27 3.2 9.4 14 39 7. 1 6.0* 9.0* 9.6 10 19 21 3. 1 9.4 17 38 6.5 6.0* 9.0* 9.2 10 35 17 3.0 8.9 26 38 6.5 6.0* 9.8* 10 10 41 5.5 -9.3 27 36 6.5 6.0* 9.2* 10 10 39 4.7 -9.4 -33 -5.8* 10* -10 - 488 301 227 303 1148 467 218 229 271 309 713 15 10 7 10 37 15 7 7 9 10 23 Dec 42 43 42 40 35 32 30 28 25 23 21 19 18 18 17 16 10 10 9.7 9.7 9.6 9.6 9.6 9.6 9.6 9.6 9.7 9.7 9.9 9.7 9.4 594 19 MEAN FLOW FOR THE PERIOD OF RECORD 14 CUBIC FEET PER SECOND *Synthesized Dat3 ·:[ r to eo 10 70 A A 70 eo 10 1101-I I I I I \ ..( ~0 "t llO I \ I (\ 1\ (\ [ ~~ I \ I I I \ I \I\ I \ ;~ U) I n ~ ' I ' I \ I \ I U) ~ ~ (J UCft~ ~nw II r~ (J ~ • UJ UJ ~ ~ ~ ~ v ~ • ' ~ ~ ~ 7 7 ~ ~ I I 6 6 0 0 U) U) e ~ 0 0 4 4 J t 2 1.0 ~0 JANUARY FURUA!IIY MARCH APRIL liUV JUliE ~ULY AU lUST SEPTUIIlft OCTOBER IIOVEIItlfl D£CUUEII ·- ~ENGINEERS 1984 HYDRO GRAPH OF HUMPY CREEK, LARSEN BAY, ALASKA FIGURE 3 APPENDIX A Discharge Rating Curve Measurements PROJECT NAME RIVER t'JI\t1E TRANSECT h'O LARSEN BAY INDH()El.EC HUMPY CRE~Y GAGE SITE--1· 7·~84 PT. STATION lJI DTH <FEf::T) <FEET) ·-·------... 1 49 00 0. 00 2 50. 00 0. 75 3 50. 50 0. 50 4 51.00 0 50 5 '51. 50 0 50 6 52. 00 0 50 7 52. 50 0 50 8 53. 00 0. 50 9 53 50 0. 50 10 54 00 0. 50 11 54 50 0. 50 12 55. 00 0 50 13 55. 50 0 50 14 56. co 0. 50 15 56. 50 0 50 16 57 00 0 50 17 57. 50 0 50 18 58 00 0 50 19 58. 50 0 50 20 59. 00 0 75 21 AO 00 1' 00 22 61 00 1. 00 23 62. 00 0 00 SUM OF CELL DISCHARGES -· 7 60 SUM OF CELL AREAS = 11 87 i'!EAN VELCC I TY ::: 0 64 PagE DEPTH \/ELOC IT'f .\REA DISCHARGE <FEET) <FT/<:-;E(:) (SQ FT) (CFS) ---........ ------........ ·-· ~---. ·~--- 0 00 0.00 0 00 0. 00 0 90 0 00 0. 67 0. 00 0 90 ·-0 10 0 45 --0 04 1 00 0 10 0 50 0 05 1 00 0 40 0 50 0. 20 1 00 0 80 0 50 0 40 1 00 0 90 0 50 0 45 1. 10 1 15 0. 55 0 63 1 10 1. 25 0 55 0 69 1 20 0. '10 0 60 0. 54 1 20 1. 10 0 60 0 66 1 20 1. 20 0. 60 0. 72 1 20 1. 40 0. 60 0. 84 1 20 125 0. 60 0. 75 1 20 1 05 0 60 0 63 1 10 1. 10 0. 55 0.60 1 10 0 60 0 55 0.33 1 00 t) ;..~o 0. 50 0. 10 1. 00 0. 10 0 50 0. 05 1. 00 0 00 0. 75 0 00 0 70 0 00 0. 70 0. 00 0 50 ('· 00 0. 50 0 00 0 00 C• ()(\ 0 00 0 00 CUBIC FT /SEC SQUARE FT FT /SEC t 'i '' \: ' •I i -·I PI I I', . I I I ! I ~ II' , .. I ·I ! p ·-: i· I I I : I . !.i I I ~ .I I ,, . I I PROJECT NAt1E RIVER NAME TRANSECT NO. LARSEN BAY HYDROELEC HUMPY CREEII.. GAGE SITE-05/03/84 PT. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 STATION <FEET> -----·--- 5 00 6. 00 7. 00 8. 00 9. 00 10. 00 11. 00 12. 00 13. 00 14. 00 15. 00 16. 00 17.00 18. 00 18. 50 SUM OF CELL DISCHARGES SUM OF CELL AREAS MEAN VELOCITY = = = WIDTH <FEET> ----- 0. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 0. 75 0. 00 25.81 9. 25 2. 79 DEPTH VELOCITY (FEET> <FT/SEC> -------------- 0. 00 0. 00 0. 30 1. 30 0. 60 2. 00 0.80 3.00 0.90 3. 10 0. 90 3. 50 0.80 3. 70 0.90 3. 00 1. 00 3. 20 0.90 2. 50 0.80 2. 90 0. 70 2. 10 0. 50 1. 70 0.20 0.85 0. 00 0. 00 CUBIC FT. /SEC. SGUARE FT FT. /SEC. p AREA DISCHARGE < SG. FT> <CFS> -----·----------- 0. 00 0.00 0.30 0.39 0.60 1. 20 0.80 2. 40 0.90 2. 79 0.90 3. 15 0.80 2.96 0.90 2. 70 1. 00 3. 20 0.90 2. 25 0.80 2. 32 0. 70 1. 47 0. 50 0.85 0. 15 0. 13 0.00 0 00 t,' ;J< I ! ',! ! I i ' i ; , .. ' r i !" PROJECT NAME RIVER NAME TRANSECT NO. LARSEN BAY HYDRO PRO HUMPY CREEV.. GAGE SlTE-9/5/84 PT. STATION WIDTH (FEET> <FEET> ------------ 1 6. 00 0.00 2 7.00 1. 00 3 8. 00 1. 00 4 9. 00 1. 00 5 10. 00 1. 00 6 11. 00 1. 00 7 12. 00 1. 00 8 13. 00 1. 00 9 14. 00 1. 00 10 15. 00 1. 00 11 16. 00 1. 00 12 17.00 0. 75 13 17. 50 0. 35 14 17.70 0. 00 SUM OF CELL DISCHAPGES = 10. 00 SUM OF CELL AREAS = 5. 19 MEAN VELOC I TY = 1 92 p DEPTH VELOCITY AREA DISCHARGE <FEET> <FT/SEC) <SG. FT> <CFS) --------~---------------------- 0.00 0.00 0.00 0.00 0. 20 0. 70 0. 20 0. 14 0. 40 1. 60 0. 40 0. 64 0. 50 2. 10 0. 50 1. 05 0.60 1. 30 0.60 0. 78 0. 60 1. 90 0. 60 1. 14 0. 60 2. 40 0. 60 1. 44 0 50 2. 50 0. 50 1. 25 0. 60 2. 20 0. 60 1. 32 0. 40 2. 30 0. 40 0.92 0. 50 2. 10 0. 50 1. 05 0.30 1. 10 0. 22 0.25 0. 20 0.30 0. 07 0.02 0.00 0.00 0. 00 0.00 CUBIC FT. /SEC. SGUARE FT. FT. /SEC. ' I t ·r I. I I I' 1~ I I 1::/ ' i H i;! ' ' ·I I 'i ' I ' ' I' I !': ! ,h-:1." ~ PROJECT NAME RIVER NAME TRANSECT NO. LARSEN BAY HYDRO PRJ HUMPY CREEK GAGE-SITE-3/7/85 PT. STATION WIDTH <FEET> <FEET> --------------- 1 5.00 0. 00 ., 6. 00 1. 00 c. 3 7. 00 1. 00 4 8. 00 1. 00 5 9. 00 1. 00 6 10. 00 1. 00 7 11. 00 1. 00 8 12. 00 1. uo 9 13. 00 1. 00 10 14. 00 1. 00 11 15. ou 1. 00 12 16. 00 0.00 SUM OF CELL DISCHARGES = 10.01 SUM OF CELL AREAS = 5. 45 MEAN VELOCITY = 1. 84 Pa DEPTH VELOCITY AREA DISCHARGE <FEET> <FT/SEC> <SO.FT> <CFS) ----------------------------- 0.00 0.00 0. 00 0.00 0.30 1. 05 0. 30 0. 31 0.80 1. 25 0.80 1. 00 0.90 2. 75 0.90 2. 47 0.80 2. 30 0.80 1. 84 0.60 2.20 0. 60 1. 32 0.60 2.30 0.60 1. 38 0. 50 1. 50 0. 50 0. 75 0. 40 0. 50 0. 40 0.20 0.35 1. 70 0. 35 0. 59 0.20 0. 70 0. 20 0. 14 0. 00 0.00 0. 00 0. 00 CUBIC FT. /SEC. SQUARE FT. FT. /SEC. APPENDIX 8 Printout of Discharge Measurements 2-Hour and/or 4-Hour Stage Data and Corresponding Discharges I_) ~I •'' ' I' h(l: I PROPOSED LARSEN 13AV HYDROELECTRIC PROJ HUMPY CREEK NEAR NEAl~ LARSEN BAY, ALASKA DATE TIME BVIE RAW DAT-" MV =·=-=:;:;::::: ===== ===:"::" =======·~;;-:.~ -·-· -·- 01/08/84 04· 00 1 31 tO:t 6. ;;? 01/08/84 08:00 3 32 10-::: 1-J. 4 01/08/84 12:00 5 31 1 n .. · !-J. 2 01/08/84 16·00 7 31 1f)iJ 6. 2 01/08/84 20:00 9 31 104 0 2 01/08/84 00:00 1l 31 105 6 :> DAILY AVERAGE VALUES b 2 01/09/84 04:00 13 31 105 '"·' 2 01/09/84 08: 00 1 5 31 105 .L, 2 01/09/84 12.00 17 :'31 tOS t; 2 01/09/84 16:00 19 31 106 b 2 01/09/84 20: 00 21 31 1.06 0 2 01/09/84 00:00 23 31 106 b 2 DAILY AVERAGE VALUES 6. 2 01/10/84 04:00 2::> 31 106 "' 2 01/10/84 08:00 ~~7 30 toe; tJ 0 01/10/84 12:00 ,. ,'9 30 10:"; b. 0 01/10/84 16: 00 31 30 1<Y.o b \) 01/10/84 20:00 33 30 104 b. 0 01/10/84 00: 00 J:'j 30 10 ·] b I) DAILY AVERAGE VALUES h. •.'1 01111184 04:00 :n 30 104 l':l, <j 01/14"84 08:00 :39 30 l(i~ b () 0111 /94 12: 00 41 30 1•.) ~j 6 0 01/11/84 16:00 4~3 30 t 0'.1 6 0 01/11/84 20:00 '+5 30 l(I":J b 0 01/11/84 00:00 47 30 10':-r;, 0 DAILY AVERAGE VAl UES b 0 01/12/84 04:00 4G' 30 10:.7 I:J. 0 01/12/84 08·oo 51 3:3 1 \} ':: r;,. 6 01/12/84 12.00 53 3.3 1 \}(. ':. 6 01/12/84 16:00 55 33 tOn !:', 6 01/12/84 20:00 57 33 106 !':; 6 01/12/84 00:00 59 32 1 0~/ 6 4 DAILY AVERAGE VALUES 6 5 ()']· 11/85 PAGE 1 START riME 01108/84 04·00 DEPTH STAGf. OISCHG TEMP INCHES FEEl CFS DEG C ======:.::: --------=====.::: ===== 12. 4 1 OJ 7 1 1 5 128 1 0' 7 6 1 5 12. 4 l 01 7 1 1 5 12. 4 1 03 7 l 2 0 12 4 1. OJ 7 1 20 12. 4 1 03 7 1 2. 5 12 5 1 04 7 2 1.8 12 4 1 03 7. 1 2. 5 12. 4 1 OJ 7 1 2. 5 12 4 1 0.3 ., 1 2. 5 12 4 1 03 7 1 3. 0 12 4 1 03 7 .1 3. 0 12 4 1. 03 7. 1 3. 0 12. 4 1 03 7 1 2. 8 12 4 1. OJ 7 1 3.0 120 1' 00 6. 5 2 5 12. 0 1. 00 6. 5 2. 5 12.0 1' 00 6 5 2. 5 12 0 1. 00 6. 5 20 12 0 1.. 00 6 5 2 0 12 1 1 01 6 b 2 4 120 1. 00 6. 5 20 12. 0 1. 01) f.J 5 2. 5 12 0 1 00 6 :-· 2 5 12 0 1. 0!') 6 5 2 5 12. 0 1. Ql) 6 5 2 5 120 1 00 6 2 2 5 12. 0 1. 00 6 '3 2 4 12. 0 1 00 6 s 2. 5 13. 2 1 1 \) 8 ] 2. 5 13 2 1. l.U 8 :3 3.0 13 2 1 10 8 ' ., 30 13.2 1 10 8 :1 3. 0 12 8 1 01 7 6 2. 5 12. 9 1 08 7. 9 28 l . ' PROPOSU; LARSEN Bf1Y HYOPOELEt; TW.! 1: PROJ HUMPY CREEK NEAR NEAR LARSEN B~\ . ALASKA DATE TIME ========= ====== 01/13/84 04:00 01113/84 0800 01/13/84 12: 00 01113/84 16:00 01/13/84 20.00 01/13/84 00:00 01/14/84 04:00 01/14/04 08:00 01/14/84 12· 00 01/14/84 16· 00 01/14/84 20:00 01/14/84 00:00 01/15/84 04:00 01/15/84 08:00 01/15/84 12:00 01/15/84 16:00 01/15/84 20:00 01/15/84 00:00 01/16/84 04: 00 01/16/84 08.00 01/16/84 1200 01/16/84 16·00 01/16/84 2000 01/16/84 00:00 01/17/84 0400 01/17/B4 oe·oo 01/17/81+ 12:00 01/17/84 16:00 01/17184 20:00 01/17/84 00:00 Ovfl RAW DAlA ::=:::::::::·.:::::....~~-: b1 32 l()"j .<.>3 32 10':) t.5 ~31 lOt• 0.' 31 tOt. he' 31 106 7 1 ~3 i t 0!.1 DAILY r~VERAGE VALUES !? 31 11)5 7''1 31 1\)'~ 7 / 30 1 11 ': l'~ 30 11)"1 til 30 1 f)<l 83 30 j OIJ DAILY tWERAGE '.it~LUES 85 ......... IJ' H9 q• • l 9 ~, ·.J '1'5 30 t 0'.' 29 1 (\'1 30 1 0' ~ 32 10:1 3i 11}; 30 1 ii<l DAILY AVERAG[ '·.'M UES 97 30 104 9~ 30 104 101 30 104 103 30 104 105 30 10~ 10: 29 10~ DAILY AVERAGE VM_UES 109 30 tO:• lii 30 105 1 l ·' :]0 1 1\/., 11. ~~ 30 106 11/ 30 106 1 1 ,,. 29 to;:, DAILY AVERAGE VALUES i'1V 6 4 1:•. 4 6 2 I r~ ::> t=. 6 2 '' h c:: b 3 ~) 2 ·~) ':-, 6. 0 6 0 b 0 b 0 b. l 6 () ~) f! to 0 h 4 ·') -f:J c. t., 0 I 6 0 ~. 0 h 0 h 0 b 0 j 8 b 0 b 0 !':> 0 I· (I f, •J t, (• ~) 8 0 0 05·11/B~ PAGE 2 START TIME 01/08/84 04:00 DEPTH INCHES =====·~-: 12 8 12 8 12 4 12. 4 12 4 12 4 12 5 12 4 12 4 12 0 12 0 12 0 12 0 12 1 12 0 11. 6 12 0 12. 8 12. 4 12 0 12 12. 0 12 0 12 0 12 0 12 0 11. 6 11 9 12 0 12 0 12. 0 12 0 12 0 11 6 11. 9 STAGE FEET ==:=:::::":"."':: 1 07 1 07 1 0.1 t. 0 J 1 0 ~ 1 ()] 1. ():+ t 0 j 1 Ol 1 Q,) 1 0(1 t 0(• 1 Q() 1 01 1 0•) 0 9' 1 0\) 1 01 1 CH 1 0<) 1 (i ! 1. 00 1 00 1 00 1 00 1 00 0 97 1 00 1 00 1 00 1 0•) 1. Oil 1. 00 0 97 1 00 D I :3(HG CtS '1 6 7 (J 7 1 7 l. 7 1 7 1 7 ~~ 7 1 7 l 6 ~ 6 5 6 5 6 5 6 7 6 5 6 0 6 5 7 () 7 6 5 6 -, 6 5 6 :j 6 ;; 6 5 6 r· ' 6 <:· b. 4 6. :5 6 5 6 5 6 5 6. 5 6. 0 6 4 TEMP DEG C ===== 2. 5 2. 5 3 0 3. 0 3 0 3. 0 2.8 2 5 2 5 2 5 2 5 2. 0 2 0 2 3 1 5 1 5 1.5 1 5 1 5 2. 0 1.6 2 0 2.0 2. 0 2 0 2. 5 2. 5 2 2 2. 5 2 5 3. 0 3. 0 3. 0 2. 5 2 8 PROPOSED LARSEN DAY 1-frOROELECTiJf( PROJ HUMPY CREEK NEAR NEAR LARSEN Et1r, ALASKA DATE TIME =======·-;.::::;:;: ==:=== 01/18/84 04:00 01118/84 08: 00 01/18/84 12:00 01/18/84 16:00 01/18/84 20:00 01118/84 00: 00 01/19/84 04:00 01/19/84 08:00 01/19/84 12:00 01119/84 16:00 01/19/84 20:00 01/19/84 00.00 01120/84 04. 00 01/20/84 08:00 01/20/84 12:00 01/20/84 16:00 01/20/84 20.00 01/20/84 0000 01/21/84 01/21/84 01/21/84 01/21184 01/21/84 01/21/84 01/22/84 01/22/84 01/22/84 01/22/84 01/22/84 01/22/84 04:00 08:00 12:00 16:00 20:00 oo·oo 04:00 08:00 12:00 16:00 20.00 00.00 BYIE RAW DATI\ ====== ':.C-::-:!' L=?l 29 1 ,;::: 29 ld5 29 1. :~· 7 '30 L;•Q 30 UL 29 DAILY AVERAGE D3 3l. 135 33 13/ 35 13'-i 36 14! 36 14] 36 DAILY AVERAGE 14~) 36 14/ :-.:!8 14'-'~ 41 151 44 15:: 44 15:': 43 DAILY I...VERAGE tYI i f 1 ~~ i, '"'"-~ t (J :( 1.1), l ,-\:.; i ;_:, ., VALUES 1 o:~ lOJ lOJ 1 o:.l 10:1 103 VALUES 101 l. 0~~ 10:.1 1()] U!: o l.•Y! '/f\! UES 151 42 1 OJ 1.59 41 1():1 161 40 t:JJ 16:3 39 1 OJ 16!:• ~38 1 W< 167 38 1 () J DAILY l\VERAGE \lliLUES 16'! 39 l(H !. 7j 44 l•.P 1 r_~ 48 1 o:~ 17~ 5;2 1(\'l 177 55 10-.l 1 79 56 103 DAILY !.~oVERAGE VAlUES r~!, 8 :.' 8 :) 8 h 0 t•. u 5 8 5 9 ~:;, 2 t. 6 ) 0 2 ·, 2 ; 2 6 9 ':1 .. :_ 7 6 8. 2 8 1:1 8 8 U .. .;, Fl d 8 4 ;::} ') <> "-- 8 0 7 8 7 6 7 6 I 9 7 8 8 8 "~/ 6 10 4 11. 0 l 1 2 0 8 Qj'il/85 PAGE 3 START liME 01/08/84 04:00 DEPTH INCHES =====:;;:;: 11 6 11 6 11 6 12 0 12 0 11. 6 11 7 12 4 13 2 14 () 14 4 14 4 14. 4 13. 8 14 4 15. 2 16. 4 17 6 17 6 17 2 16 4 16. 8 16. 4 16. 0 15. 6 15 2 15. 2 15. 9 15.6 17 6 19 2 20 8 22. 0 22.4 19 6 STAG[ FEET ==:::=:=:r 0 97 0 9: 0 .:;.: t 1)(\ 1 Qi) 0 97 (J 98 1 Cd 1 10 1 u 1 dij 1 21) 1. 2\) l j 5 l 20 1 27 1. 3? 1 47' 1 4 ·" 1 4 J 1 3 7 1 40 1 3 ;· 1 ,.., -1 ·"" 1. 30 1. 27 1. 27 1 3~ 1 3<) 4.~ 1 6•' 1 7 j 1. 8.~ 1 8.- 1 6.~ DI!;CHG CFS 6 0 6 \i 6. 0 6 '} b ~;; 6 0 6 7 8 ,1 9 t: io tc\ 1,.., 9 2 10 i2 i4 17 17 1 f, 14 15 14 13 13 1 •) '· 12 1] 13 17 21 26 30 '];1 2~:1 TEMP DEG C ===== 20 1.5 1. 5 1 5 1 5 1.5 1 6 1 5 1 5 1 5 1 5 1. 5 1 5 1 5 1 5 1.5 1 5 1 5 1 5 1.5 1 5 1 5 1.5 1.5 1 5 1.5 1.5 1 5 1.5 1 5 1.5 1 5 1 5 1 5 1.5 i-1 PROPOSED LARSEN BA '{ t·l'l' DROELE\:rt' 'C f'h'OJ HUMPV CREEK NEAR NEAP LARSEN Dt,., ALASKA DATE TIME ====::::::=== ::::::::::::::= 01/23/84 04•00 01/23/84 08 00 01/23/84 12 00 01/23/84 16:00 01/23/84 20·00 01/23/84 00:00 01124/84 04: 00 01/24/84 08:00 01/24/84 12:00 01/24/84 16:00 01/24/84 20•00 01/24184 0000 01/25/84 04:00 01/25/84 08·00 01/25/84 12:00 01/25/84 16:00 01/25/84 20.00 01/25/84 00:00 01/26/84 04:00 01/26/84 08. 00 0112~/84 12: 00 01/26/84 16:00 01/26/84 20:00 01/26/84 00:00 01/27/84 01/27/84 01/27/84 01/27/84 01/27/84 01/27/84 04:00 08:00 12·00 16:00 20:00 00.00 BYH. RAW Dr'\T/1 .:::;:::;:·!..:::===~-:.·;: 1 D 1 sa 1 o:~ 183 61 t 0~1 18!' 62 10.1 187 65 103 1tl9 67 10:J 1-? 1 68 1 O~l DAILY AVERAGE VALUES 1. 9 :-69 1 Q:'l 19~ 71 lO~i l c.;· ' 7 2 1 O:l 1 c;c;> 72 1 o:·· 20J. 72 103 203 74 ten DAILY AVERAGE VAUJES 20s 76 1 {n 20: 79 un 20'7' /'9 1 tU 2.11 77 l()J 21~-l 74 un :-.:.>1 ~_; 71 1 OJ DAIL'v AVERAGE 1-'AUJE!:-3 21 7 70 I Q~j 21 9 68 t (>''1 2;'21 65 l\C 2~?·-:; 61 1 U:' 2.,•:5 58 1 en 2:/7 56 j.--y·, DAILY AVERAGE V~.UES 22l? 54 2:31 '53 ;,~33 51 :115 53 2:37 52 239 49 DAILY AVERAGE t (-::; 1 . i•-:1 ' \, ' 1 <)' ~ 1 ():! 1uJ 1 o:J· 'JALUE.S M\1 11 6 1.'2. d 12. 4 1'3 0 1J. 4 1 J 6 1<2. 7 t .. i. 8 14 2 1 :j 4 1-'~ 4 t4 4 14 8 1 11. 3 1::; 2 15 B 15. u 1 =· 4 14. 8 14. 6 l ·: :J 14 0 1 ) 6 1 'j 0 1 ' . ., . r. 1 i 6 1 :. . 2 L-~-6 1 (), 8 1 n i: 1 ,.., ,., . c. 10 6 10 4 y 8 10 4 05;11/85 PAGE 4 START TIME 01/08/84 04.00 DEPTH INCHES =====:=': 23.2 24. 4 24 8 26 0 26 8 27 2 25. 4 27. 6 28. 4 28.8 28 8 28. 8 29. 6 28. 7 30. 4 31. 6 31 6 30 8 29. 6 29 2 30 5 28. 0 27 2 26. 0 24. 4 23. 2 22. 4 25. 2 21 6 21 2 20. 4 21 2 20. 8 19. 6 20. 8 STAGE FEET :::-::::=:::-:: 193 2 OJ 2 07 2 t! 2 r-, 1 . c.-.. 2 2 7 2 12 2 30 2 :p 2 4•) 2 4( 2 4·) 2. 4 i 2 39 2. 5.3 2 6J 2 o:J 2 57 2 47 2. 43 2 ~4 2 3'] 2 2: 2. 1 2. 0? 1. 9 ·: 8' 2 t r) 80 1 .,., ! . 1. 7(' 1 7 7 1 ? .3 1. 6~1 1. T:J OFJCHG CFS ==:::~.~= . .15 J'-7' 41 4~-, 'j(l '5 ~-2 44 ~~·4 58 60 60 60 64 59 1;,9 7h 76 71 64 62 70 56 ·-'::) ;:,,_ 46 ;J•• ·' 1 :]!'i ~r· 4.:J ;2.9 ;,?.8 "It:; r.;..,, 2fJ 2b 23 27 TEMP DEG C ===== 1 5 1 5 1 5 1 5 1 5 1.5 1 5 1 5 1.5 1 5 1. 5 1. 5 1 5 1. 5 1.5 1.5 1.5 1 "' 1.5 1 5 l 5 1.5 1.5 1.5 1.5 1 5 1.5 1 5 1.5 1 5 1 5 1 5 1.5 1 5 15 PROPOSG> LARSEN GAY t-n OI'WEL.E<.: r;::; C 1-'ROJ HUMPY CREEK NEAR NEAR LARSEN BA~. ALASKA DATE TIME =====:.=:=::::·!: ===== 01/28/84 04·00 01/28/84 08:00 01/28/84 12:00 01128/84 16:00 01/28/84 20.00 01/28/84 0000 01/29/84 04:00 01/29/84 08:00 01/29/84 12:00 01129/84 16. 00 01/29/84 2o·oo 01/29/84 00.00 01/30/84 04:00 01/30/84 08:00 01/30/84 12·00 01/30/84 16:00 01/30/84 20:00 01/30/84 00: 00 01/31/84 04:00 01/31/84 08:00 01/31/84 12:00 01/31/84 16:00 01/31/84 20: 00 01/31/84 00:00 02/01/84 04: 00 02/01/~jll. 08 00 02/01/i'J4 12 00 02/01/84 1600 02/0i/84 20:00 02/01 /()4 00: 00 !'l'"fE RAW 0;~! ~~ ..:::.~-·=~:=-=:::=~~ 2-~ 1 46 1cn 24~J 45 l'.l ~ 245 45 hU ;:~4/ 4:) l ():; 24'-f 50 J.(\ j ;.:51 57 103 DAILV AVERAGE VALUES 253 58 255 47 ;:~s; 47 25tf 36 261 32 263 30 DAILY AVERAGE 10:3 FL~ 1 O:i 10J 1Uil- 104 VALUES 26~ 261 ~26'-:1 .,-.. C::. I l 29 l 0~7 29 1 1.f· 28 1 o:) 28 1 0'7 2T"J. 2 7 1 0:) ~U"i 27 t0'1 DAILY AVERA(:;£ VAlUES 277 27 104 27S' 27 104 281 26 104 ;.,'83 26 lOll. ;:,'w· 26 1 •I•J 287 26 l\YI DAILY AVERAGE VI~UES 289 .-,o• c-:..' f '"10'" <:. ,J 26 26 26 2'75 26 2'17 26 299 26 DAILY /-1VERAGE 1 O:J 1 0"; 10r~ 10!:/ i o:, 1 O~Y VAL.UES ,.,t,} '-.' d. ,; 0 •! 0 ~J 6 1 i i () 1J 4 9 5 1 I. 6 '7" 4 '-:' 4 2 f:J 4 b 0 8 3 8 8 :; 6 ~·) tJ ~: 4 :-;. 4 :') 6 :j 4 ~J 4 ~; 2 -:1 ,;_! j .;> (} ;.-: ·~ 3 2 ..:; 2 ,_: .~ :-] ;? ~ 2 ') 2 ~) 2 05 1 11/Bl ~AGE 5 STA~T TIME 01/08/84 04:00 DEPTH INCHES ===-::::.= 18. 4 18 0 18 0 17.2 20. 0 22 8 19. 1 23. 2 18.8 18. 8 14 4 12 8 12 0 16 7 11 6 11 6 11 2 11. 2 10 8 10 8 11.2 10. 8 10. 8 10. 4 10. 4 10 4 10 4 10 5 10. 4 10. 4 10 4 10 4 10 4 10 4 10 4 STAGf FEE f ::::.:::::::::..-.::::::.: 53 50 1. ~j:) 1 4 1 6, 1 9u 1. 5.::; 1 9 J 1 57 1 5 ~ 1 2•) 1. 0' 1. oc 1 3'i 0 9 0 9· (j 9 3 0 9 J 0 9 1 ~1 0. 9•.! 0 9 0 9 1.) 0 90 0. 87 0 8"' 0. 8r 0 g:· 0 88 0 87 0 8 0 8-' 0. g;· o a·; 0 B" 0 87 01 ~>CHG CF~; ==:'!':~'":"::::.;;::: t .:;· 18 18 }6 :24 J~:; 21 "jt:" ,,.J 20 20 JO 7 6 6 5 17 b 0 6 0 5 4- 5. 4 5 0 5 0 5 ,-,} 5 0 5 () 4 r., 4 !:· 4 '7 4 c; 4 7 4. 5 4 .::; 4 ::; q f:, 4 <; 4 3 4. ~7 TEMP DEG C :=:::===== 1 5 1 5 1 5 1 5 1 5 1 5 1. 5 15 15 1 5 1 5 2 0 2 0 1 7 2 5 2 5 2 5 2 5 2. 5 2 5 2 5 2 0 2 0 2 0 20 20 2 0 2 0 2 5 2 5 2. 5 2 5 2 5 2 5 2. 5 PROPOSFD LARSEN BAY H'r DROEl_EC lH l C PROJ HUMPY CREE!o\ NEAR Nt:A~' LARSEN Br"<r, ALASj.\A DATE TIME =======-= :::::::::=:=::::::::::: 02/02/84 04:00 02/02/84 08:00 02/02/84 12:00 02/02/84 16:00 02/02/Bt:j. 20: 00 02102/84 oo·oo 02/03/84 04:00 02103/84 os·oo 02/03/84 12.00 02/03/84 16:00 02/03/84 20:00 02/03/84 00:00 02/04/84 04:00 02/04/84 08:00 02/04/84 12:00 02/04/84 16:00 02/04/84 20:00 02/04/84 00:00 02/05/84 04:00 02/05/84 08.00 02/05/84 12:00 02/05/84 16:00 02/05/84 2000 02/05/84 00:00 02/06/84 04:00 02/06/84 0800 02/06/84 1;:!:00 02/06/81.1 16.00 02/06/84 20.00 02/06/84 00:00 [!YIL RAW DAfi1 ===::::=.::::-.::· 3()1 26 105 :h).:_; ;;'~6 1 04 .30~' 25 ltH :30 ' 26 1. ()4 :~OC.-' 26 l. 04 311 25 l U~< DAILY AVERAGE VALUES J'.?; 25 l•J'; 31 ": 25 1tY: 31 25 1 11 •1 31'-1 25 1Ud 3:::~ 1 24 1 1):': 3..:;'3 25 tin DAILV 1WERAGE './AL.UES ~J;;•~ 25 l'XJ '3;?""" 26 1cn 3::':9 28 10:1 3J1 28 lOJ :3T: :JO 1 W.! 3]~.; ~12 10:l DAILY AVERAGE \!Al. ULS 337 34 1 en 33S· 37 l () 1 341 41 lll:J 34'3 44 1 en 34 ~~ 4 4 1 f~· ~ :34 7 45 1.1 ')'1 DAILY AVERA~E VALUES 34C: 47 103 3~1 47 10! 35':( so l()"i :35~~ 52 10': 35/ 53 10:·, 35':1 56 10:l DAILY fWERAGE VAlUES r··1\ r "' . ., ,, <=. 'j 2 :;. 0 5 Ci 5 2 5 •) ':] ~· 0 ~j 0 ~ !) 5 0 4 8 :'• 0 ::; 0 ·::· () ~ ~:! :: 6 I) 6 (, 0 4 b ... 8 4 ~j .:2 ,-. 8 !: 8 0 'j 2 t;·. 4 '; 4 1'. 0 1 1:' 4 10 6 11 2 1 •) .2 Oj:11/85 PAGE 6 SfAR i' T fME 01/1)8184 04 00 DEPTH INCHES =====:::=-:.:= 10. 4 10 4 10 0 10. 4 10. 4 10 0 10. 3 10. 0 10.0 10 0 10 0 9 6 10 0 9 9 10 0 10. 4 11 2 112 12 0 12 8 11. 3 13. 6 14. 8 16. 4 17 6 17 6 18.0 16 3 188 18 8 20 0 20. 8 21 2 22 4 20 3 STAGE FE.El ==-=~-:: 0 87 0. 87 0 B:l 0 8 ~ 0 8: 0. 81 0 8•· 0 8 0 8 0. 8 0 81 0. Br! 0 H j 0 8-, 0 8 0 87 0. 9J 0 9.J 1 OfJ t o~ (\ <;'li Li 23 1 ..., .,. ,) 1 4:' 1 4 _,. 1 5•) 1 3b 1 57 1 "" ; 1 6 1 > -I _I 1 i'? 1 87 1 71:1 DIS(t-1(; CP:~ :==~=-=·-::: ~-: 4 <;i 4 ;:; 4 l 4 s 4 4 t 4. •l 4 l 4 i 4. 1 4 3 7 ~~ l 4 0 4 4 '5 5 4 5 4 6 5 7. 6 5 6 8 9 1 t i.4 t7 1 7 J f.:·; 14 ;:..](.1 ~~ ~~~ 14 26 ;_~f-] .32 ;2~5 TEMP DEG C ===::::::::::: 2 5 2 0 2.0 2 0 2. 0 1 5 2 0 1 5 1 5 2 0 2 0 1 5 1 5 1 7 1 5 1 5 1 5 1 5 1 5 1 5 1 5 1.5 1 5 1 5 1.5 1 5 1. 5 1 "' 1 5 1 5 1 5 1.5 1 5 1 5 1 5 ' PROPOSED LARSEN DAY :1\0RLJELE;r,;·rc; PROJ HUMPY CREEK NEAR NEA~ LARSEN EAV, ALASKA DATE TlME -ll'.l:l·===== ::::~==== 02/07/84 04:00 02/07/84 08:00 02/07/84 12:00 02/07/84 16:00 02/07/84 20:00 02/07/84 00:00 02/08/84 04•00 02/08/84 08:00 02/08184 12:00 02/08/84 16:00 02/08/84 20:00 02/08/84 00:00 02/09/84 04:00 02/09/84 08:00 02/09/84 1.2:00 02/09/84 16:00 02/09/84 20:00 02/09/84 00:00 02/10/84 04:00 02/10/84 0800 02/10/84 12.00 02/10/84 16:00 02/10/84 20:00 02/10/84 00.00 02/11184 02/11/84 02/11184 02/11/84 02/11/84 02/11/84 04:00 08.00 12.00 16:00 20:00 00:00 lh I r: RAW OAf,', =~·;·-:: z:=.e::s::::::::::.: 361. 58 l 0 36,3 60 1 (1 J 3t.:'3 t.3 1 <j 1 3h 7 64 1 ((I :36Y 65 10 i 371 67 10.'! DAILY AVERAGE VAl UES 3::'.'1 68 10'~ :us 70 1 n 1 3 7 7 72 1 (H 379 72 10'+ 381 73 !OJ 383 76 10 l DAILY AVERAGE VAl.UES 3B:':i 78 1 o~• 3f:l 79 1. 0.' 38'< 77 1. 0"! 3'~1 70 1.(}.:; 3t>;; 68 l. 3"'~· 68 1 ,y; DA 1 L Y r~VERAGE ' ... '.<~UJES 3'il 6/ 104 3.;;!9 4l J.f)'; 401 24 1 (Jil 4(n 24 l.04 40:'; 24 tOil 40 7 24 ~04 DAILY AVERAGE VALUES 40Li 24 4l ·L 24 41 :'i :?4 4h 24 4-17 24 419 24 DAILY AVERAGE 1 0"· 1 Oil j IJ~j 10:-1 10? 1 o:;. VAI.UES l·o• . ,. 11 0 12 () 1 f-J 1 1 ·:/ '"' ~. 1] {) 1 :i '1 1d. 6 1J 6 14 0 1~ 4 14 4 14 6 1~ ~ 14 4 1 'j 1;_, h.8 15 4 ltl. (; 116 1:; ~ 1 :l 1 ~-4 8 2 •I 8 ~~ 8 h 8 4 8 6 8 4 8 4. 8 4 8 4 n 4 8 4 8 4. 8 ·J~.ll/8/ f'i~GF 7 S1AHT TIME 01/UB/84 04.00 DEPTH INCHES ===::.:== 23. 2 24 0 25. 2 25. 6 26 0 26 8 25. 27 2 28 0 28 8 28 8 29. 2 30. 4 28 7 31. 2 31 6 30.8 28. 0 27. 2 27. 2 29. 3 26. 8 16. 4 9. 6 9. 6 9 6 9 6 13. 6 9. 6 9 6 9. 6 9. 6 9. 6 9. 6 9 6 STAGE' FEEr ==:::...::=:.. = 1 9.1 2 0. 2. l r.:l 2. 1 '"j 2 1 7 2 2 3 2 (r-:; .... t .-, C-!.';.";. 2 3J 2 4•.l 2 4•.\ 2 4) 2 5] 2 3C:: 2. 1-J·:"> 2 6'":; ?. 57 .;~. 3 :-'\ ,-,.-:-c.::.. e.: 2 ;;' -:~ :2. 45 2 2J 1. 37 0 8•) 0 8() 0 8•) 0 81) I 1 J 0 81) 0 8:'• 0 8<! 0. 80 0 8() 0 80 0 80 DISCHG CFS ==::=:::::::. 3'5 ]f-] 4:) 44 46 5{) 4 t.-:.-. .J.::. 56 6\! 60 62 tJ9 60 74 76 71. 5t-, 52 5 .-._ c 64 50 14 3 7 3 ., 3 7 3 t3 3 7 3 7 3 7 3 7 3 7 3. 7 3 l TEMP DEG C ===== 1. 5 1 5 1 5 1.5 1 5 1.5 1.5 1 5 1 5 1.5 2 0 1.5 1 5 1.6 1 5 1 5 1. 5 1.5 1.5 1 5 1.5 2 0 1.5 2. 0 2 0 2 0 2. 0 1.9 2. 5 2.0 2. 5 2. 5 2. 5 2. 5 2 4 PROPOSED LARSEN BAY HYDPOELE:.~f~1!( PROJ HUMPY CREEK NEAR NEAP LARSEN 13l~.Y. ALASKA DATE TIME ======:::~ ---------- 02/12N3~ 04 00 02/12/84 0800 02/12/84 12:00 02/12/84 16:00 02/12/84 20·00 02/12/84 00:00 02/13/84 04.00 02/13/84 08:00 02/13/84 1200 02/13/84 16:00 02/13/84 20:00 02/13/84 00.00 02/14/84 04:00 02/14/84 08:00 02/14/84 12:00 02/14/84 16:00 02/14/84 20:00 02/14/84 00:00 02/1,/84 04:00 02/15/84 08.00 02/15/84 1200 02/1,/84 16:00 02/15/84 20:00 02/15/84 00:00 02/16/84 0400 02/16/84 08:00 02/16/84 12:00 02/16/Btl 16:00 02/16/84 20:00 02/16/84 00:00 13 Y Tt: RAW DA !."1 -::::::::==:=:.::::.: . .: 421 24 JIY' 42'J 24 lO 4::.:5 24 i<..h 427 24 l.i"Y· 4;:,!Q 24 1 0~:> 431 24 1011 DAILY AVERAGE VALUES 433 24 104 tl3~'i 24 ill~ 4:1? 24 1 i)I.J 4:3',' 24 1 Qll 441 24 104 443 24 1 (J'i DAILY !>.VERAGE VALUES 44'5 24 104 44 7 24 1 0'i 449 23 104 451 23 10if 4:YJ 23 UH 45~'i 23 104 DAILY AVERAGE VALUES 45.., 23 10~ 4~>9 23 l<H 4tJ 1 23 1 ;.)/~ 46] 23 10'1 465 23 10'i 46 7 23 1 C•''l DAILY AVERAGE VALUES 4~.9 23 1 o::- 4'11 23 10: .. 1 473 23 1()': 4 7~ 24 1 u•-, 477 23 1U4 419 23 1 0'-l. DAILY AVERAGE VALUES 1"1\' 4 8 4 8 4 8 4 8 4 8 4 8 4 8 '~ 8 ·~ 8 4 8 4 R 4 8 4 8 4. 8 :: 8 .q. 8 4. 6 4 6 if 6 1 6 ~~ 1 4 6 ~ 6 4 6 4 6 4. 6 4 6 4 6 4 !:) If 0 4 f, •'l 8 r:;. 6 4 6 4 6 05 11/85 PAGE 8 START TIME 01/08184 04 00 DEPTH INCHE~; =====:::.. 9.6 9. 6 9. 6 9. 6 9 6 9. 6 9 6 9 6 9 6 9 6 9. 6 9. 6 9.6 9. 6 9. 6 9. 6 9. 2 9 2 9.2 9. 2 9 3 9. 2 9.2 9. 2 9 2 9. 2 9. 2 9. 2 9. 2 9.2 9. 2 9. 6 9.2 9.2 9. 3 STAGE~ FEE r 0 80 0. Bd 0. 8() 0 8\ 0. 80 0. 8•) 0 8•:, 0 BU 0 g ... 0 8U 0 Btl 0 8•~ 0. 8C 0 Btl 0. g,j 0 8\) 0 7.' 0. 7 ( 0. 7] 0 7. 0 7>] 0 77 0 7 7 o. r 0 77 (_) 7? 0 7 7 0. 77 0 7? 0 7: 0 -,·.:; 0 80 0 77 0 77 0 78 DISCHG CFS ====·.:::-=:':": 3. 7 ~3 7 3 7 3 7 :3 :r 3 :] 1 3. '/ :3 7 ~3 -;r 3 ·r 3 7 3 7 3 ? 3 ! 3. 7 3 3 3 3 3 '< 3 3 3. 4 3 J 3 ~), :3. ~3 3 ·~ 3 ,-:-: 3 ::1 3 •J •-' 3. J 3 l 3 l 3 ·; 3 J 3 :; 3 4 TEMP DEG C ===== 2. 5 2 5 2. 5 2 5 2 5 2 0 2. 4 2 0 2. 0 2 0 2 0 2 0 2. 0 2 0 2. 0 2 0 2 0 20 2. 0 2. 0 2. 0 2 0 2 0 2.0 2. 0 2 5 2 5 2. 2 2 5 2. 5 2. 5 2 5 2. 0 2 0 2 3 • PROPOSED LARSEN BAY H :' DRtJEI..E< ff'i J C PROJ HUMPY CREEK NEAR NEAt·' LARSEN Dr~\, ALASKA DATE TIME ====-===== ===== 02/17/84 04:00 02/17/84 08:00 02/17/84 12:00 02/17/84 16:00 02/17/84 20:00 02/17/811 00:00 02/18/84 04:00 02/18/84 08:00 02/18/84 12:00 02/18/84 16:00 02/18/84 20:00 02/18/84 00:00 02/19/84 04:00 02/19/84 08:00 02/19/84 12.00 02/19/84 16:00 02/19/84 20:00 02/19/84 00:00 02/20/84 04:00 02/20/84 08:00 02/20/84 12:00 02/20/84 16·00 02/20/84 20·00 02/20/84 0000 02/21/84 04:00 02/21/84 08:00 02/21/84 12.00 02/21/84 16:00 02/21184 20. 00 02/21/84 00:00 f:lVrF RAW DArt-1 :::-;:::::::~.::~ ::::::::::;.;:::::-:::~ ~·-:- 4;.:31 23 LU·l 48~:: 23 l(Jij 485 23 ltH 4fP' 23 1U4 480 2:3 1•)/l 491 23 l<H DAILV AVERAGE VALUES 493 23 495 23 49? 2:3 499 23 501 23 503 2:J DAILY AVERAGE 104 10~ l ') <i 1•.H 104 lOl VALUES 505 507 50° 5 t 1 23 1()3 "'I" "',,,.) 51.'7 23 1():1 23 tO:J ~~3 10:; 23 1 0'3 23 lin DAlLY AVERAGE VAt UES 5' 7 23 1'1 519 23 1 (\] 521 23 ){ 5.2:3 23 1 () 1 5?5 2.3 1()4 5:?-7 2'J 1\H DAILY AVERAGE VALUES 521:;' 23 5 "}) 23 s::n 2:3 5J~7 23 s:F 23 5~]'-,' 23 DAILY AVERAGE 104 toe; l (jll 105 1 0-~l 104. VALUES ['!',' 4. 6 4. 6 4 6 4 6 4 6 4 6 4 b 4 6, I~ 6 4 6 4 6 4 6 4 6 ll 6 <I 6 l 6 'j 6 -~ b 1 b 6 IJ b tl b 4 1:. 4 b IJ. 6 ;J 6 4 b Jt 6 ~~ 6 4 6 4 ~) 4 f-) 4 6 l 6 lf 6 05 tt:Bi PAGE 9 SrART TfMF.: 01/(}8/84 04 00 DEPTH INCHES ==:."';::::;:;::::;;: 9 2 9. 2 9. 2 9.2 9. 2 9. 2 9. 2 9. 2 9. 2 9. 2 9.2 9. 2 9. 2 9.2 9 2 9 2 9. 2 9 2 9. 2 9. 2 9 2 9. 2 9. 2 9.2 9 2 9. 2 9 2 9. 2 9 2 9 2 9 2 9. 2 9 2 9. 2 9.2 STAG" FEE;· 0 .. , 0 .• ' 0. 7, 0 ..,., I .' 0 T' 0 77 0 77 0. 77 0 77 0 77 0 ., 0. 77 0 "l? 0 ..,. ) . 0. 7 7 0 77 0 '/7 0 7 ." 0. 7: 0 7 0 ,, 0 ? / 0 :1 0. 7 0 7 0 'T ., J I 0 7-' 0. 7 7 0. 7 7 0. 77 0 ~~ 7 0 77 0 7.7 0 77 0 77 0 /7 DISC HI~ CFS :::::;;;;;:::::::::::.•.:;:-;;. .3. 3 3 :J 3 :; 3 -~ 3 :'3 3 :) 3 3 ~ 3 3 3 3 ~ ~ 3 3 3 J 3 3 :.i j J ] 3 3 3 3 3 3 3 ::1 3 3 3 :~ 3 8 3 '.\ 3 '! 3 3 J 3 J 3 3 ~ 3 l 3 3 3 3 3 3 3. ~ TEMP DEG C ==::::::::== 2 0 2 0 2.0 2 0 2 0 2.0 2 0 2 0 2. 0 2 0 2. 0 2. 0 1 5 1.9 1 5 1 5 1.5 1.5 1.5 1 5 1.5 1 5 1 5 1. 5 1 5 2.0 2.0 1. 7 2. 0 2 5 2. 0 2. 5 2. 5 2 0 2.3 PROPOSE:D LARSEN BAY 11: DROELEC Fir 1_ PROJ 0':· 11/85 t1 <\GE 10 HUMPY CREEK NEAR NEAR LARSEN eN.', ALASKA START TIME 01/08/84 04·00 DEPTH STAGt. DIC:iCHG TEMP DATE TIME BYTE RAW DAfA f1\ INCHES FLET c~s DEG C :::::======~ ====:: ==:::::::;:::=:::~·:.;.;.~.-:::: -~·--. ======-= --~--~-==:-::==.!:.:::~ ===== 02/22/84 04:00 54 1 23 104 ·l 6 9. 2 0 i'l 3 ·:, ·' 2.0 02/22/84 08.00 54] 2:-J l.Cl4 4 b 9. 2 0 ..,, I , 3 '_; 2 0 02/22/84 12:00 54') 23 104 "f 6 9 2 0 77 8 -J 2.0 02/22/84 16:00 54' 23 1.0'5 4 6 9. 2 0 ,-_~ 3 2 5 02/22/84 20:00 54'? 23 1 o·~ l.f. 6 9.2 0 7"! 3 .i 2. 5 02/22/84 00:00 ~.':<71 •. ,,..-.l 1()") r.l 6 9. 2 0 ..,., .-. ) 2 5 c:..J I ' -~ ~ DAILV AVERAGE VALUES 4 6 9 2 0 7/ 3 <; 2. 3 02/23/84 04:00 5"•') "'-' 23 i05 lj. b 9. 2 0 77 3 2 5 02/23/84 08:00 ss:-; 23 10il 4 1:_, 9. 2 0 7 3 ~:; 2 0 02/23/84 12:00 5'jl 23 too. •l f.. 9. 2 0 7,: 3 3 2. 0 02/23/84 16:00 559 23 1\)'> '+ 6 9. 2 0 71 3 3 2. 5 02/23/84 20:00 561 23 1 (J"> 4 6 9.2 0. l? 3 -.-. ~· 2. 5 02/23/84 00:00 563 23 l 0'/ tj .. 6 9. 2 0 .,-. 3 3 2. 5 DAIL'l' AVERAGE VAL.UES 4 6 9.2 0 77 3 ] 2 3 02/24/84 04:00 56~) 23 1 ( )"· 4 6 9 2 0 7 7 3 :J 2 5 02/24/84 08:00 5b7 23 1 l)ll-4 6 9.2 0 7/ 3 ] 2. 0 02/24/84 12"00 569 23 1 O'i-4 6 9. 2 0 77 3 3 20 02/24/84 16:00 5?1 23 10;-i 4 6 9. 2 0 7! 3 .3 2. 5 02/24/84 20:00 57:.-~ 23 1 ()') 4 6 9.2 0 77 .3 :_3 2 5 02/24/84 00:00 575 23 105 •l .<., 9. 2 0 1 ;r 3 '·' " 2 5 DAILY AVERAGE VN.UES 4 6 9. 2 0. 77 3 ··:· ·..J 2. 3 02/25/84 04:00 t:: ""t ~r ::;, ... 23 j ()'} ... 6 9. 2 0 77 3 3 2. 5 02/25/84 08.00 5 '1<::1 23 l ()''i 4 6 9 2 0 T~' 3 J 2 5 02/25/84 12:00 5B1 23 l U\) --~ b 9. 2 0 ?7 3 ,., . _:) 2 5 02/2'5/84 16:00 5<3:3 23 lOb 4 6 9. 2 0 -.-, I . 3 ·~:: 3 0 02/25/84 20 00 58~; 23 ; or_-:, .-:, t::. 9. 2 0 "T7 I • 3 > 2. 5 02/25/84 00:00 5t1/ 23 ! ()~j ..... b 9 2 0 -. '7 I .' 3 :; 2. 5 DAILY AVERAGE VN.UES 4 6 9.2 0 ?7 3. '3 2. 6 02/26/84 04:00 5B9 23 1 o~:, :~ 6 9. 2 0 77 3 3 2 5 02/26/84 08:00 591 23 10~ 4 6 9 2 0 ..,..., I ( 3 3 2. 5 02/26/84 12·00 5'ii::l 23 t 0~~ tj ~. 9.2 0 i'7 3 ~:! 2 5 02/26/84 16:00 sq~ 23 1 oc, 4 t_. 9 2 0 -, ., 3 3 2 5 02/26/84 20~00 59J 23 10~ 4 6 9. 2 0. 77 3. 3 2 5 02/26/84 00:00 599 23 l (J~j 4. 6 9.2 0 7? 3 3 2 5 DAILY AVERAGE VALUES 4 6 9. 2 0 77 3. ::> 2. 5 4 PRDPOSt~D LARSEN BAY H1 DROELEC n::, c F·POJ HUMPY CREEK NEAR NEA"' LARSEhl UA,, ALASKA DATE TIME B'>l( RAW D,\111 r.il' ,, 0~·11/8S rAGE 11 SlAHT TIME 01/08/84 04 00 DEPTH INCHES STAGE: FEEl DISCHG CFt-: TEMP DEG C ========= ===== ----..=.::::::::::::::=·-= :.:-· ... -:::::::::.: ~";" ====== ==:-:·::;:-:::: ==·;::;:-:::.':"' ====== 02/27/84 02/27/84 02/27/84 02/27/84 02/27/84 02/27/84 02/28/84 02/28/84 02/28/84 02/28184 02/28/84 02/28/84 04:00 08:00 12:00 16:00 20:00 oo·oo 04·00 08:00 12:00 16 00 20:00 00:00 02/29/84 04.00 02/29/84 08:00 02/29/84 12:00 02/29/84 16:00 02/29/84 20:00 02/29/84 oo·oo 03/01/84 04:00 03/01/84 08:00 03/01/84 12:00 03/01/84 16:00 03/01/84 20:00 03/01/84 oo·oo 03/02/84 04.00 03/02/84 08:00 03/02/84 12:00 03/02/84 16.00 03/02/84 2o·oo 03/02/84 00:00 601 2~] 60'~ 23 60:'-· 23 60.' 22 609 22 611 22 DAILV AVERAGE 613 22 ..... .t 5 22 617 23 td s· 22 6c'.l 22 623 22 DAILY AVERAGE H/.':; 10':· Jlj '1 1 0~~ '· 0~) 1.n~ './i>.1.UES 10'· 1 0'7 1 U·l 1 (_ .\ ~-) 1u:~ t()i \!,;, UES 62~j 2.2 i.ti;j 6.T? 22 1.<1'1 6,,19 22 I <H 6J1 22 t\:1:1 6_;; 22 JuS 6'1"> 22 1 0'-' DAILY 1NERAGE VAL.UFS 6P 22 105 619 22 10'3 641 22 iO'.~ 64:1 22 i06 64 •:; 22 l'r> 6 ~~ .:· 22 1 ()ll DA IL 'r' f1VERAGE VAUJ~S 64<::' 22 1 o::; 6CJ1. 22 i•Jll 6':'1-~ 22 ll!4 6~7:' 22 l. ()') 6'57 23 10'~ 6~0 23 105 DAILY AVERAGE v'f\l.UES 4 6 4 6 4 b 4 4 4 4 4 4 4 5 4. 4 4 4 4 b "f '"~ 4 4 4 lj. ~~ li .ii 4 'f ~~ 4 4 ;;. 4 ,. 4 ··i 4 4 4 4 4 .j 4 4 4 4 4 .') 4 + 4 'f 4 .'~ 4 ·l 4 4 ·l '+ 4 6 ~ •. 6 4 5 9. 2 9.2 9. 2 8. 8 8 8 8 8 9.0 8 8 8 8 9 2 8 8 8.8 8 8 8.9 8 8 8.8 8. 8 8. 8 8 8 8 8 8. 8 8. 8 8 8 8 8 8. 8 8 8 8 8 8. 8 8 8 8 8 8. 8 8. 8 9.2 9. 2 8. 9 0 'T '• , I / 0 77 0 -, . l : 0 7.-'1 0 7'CJ 0 l] 0. 7•-;i 0 7j 0 7.:: 0. 7 0 7 j 0 7-, • J 0 3 0. 74 0 7 3 0 I :3 0 7J 0 7*t ' '-,.....J 0 ., :j l· . .t 0 7:3 0 T3 0. 73 0 73 0. 7] 0 73 0 7'3 0 73 0. 7:'5 0 -," ..• .,:1 0 7J 0 7~ 0 ?.? 0 ~~ I .' 0 77 0 74 3 3 -, 3 3 1) 3 {) 3. i.l 3 ., c 3 0 3 () 3 ·'· 3 I! 3 (} 3 , .. , ,, 3 l 3 (j 3 (! 3 E) 3 (> 3 0 3 () 3 I) 3 0 3 0 3 0 3 \., 3 (· 3 1) 3 ,) 3 0 3 0 3 C• 3 u 3 ,:; 3 .~ 3 2. 5 2. 5 2 5 2 5 2. 5 2. 5 2. 5 2 5 2. 5 2. 0 2. 5 2. 5 2.0 2. 3 2 0 2. 0 20 2 5 2. 5 2. 5 2 3 2. 5 2. 5 2. 5 3. 0 2 5 2 0 2 5 1 5 2. 0 2. 0 2. 5 2. 5 2 5 2. 2 PROPOSED LARSEN BA'Y f·' 10R1JELE I>-' i '· PROJ HUMPY CREEK NEAR NEAP LARSEN fJAY. ALASKA DATE TIME ========== ====:== 03/03/84 04:00 03/03/84 08 00 03/03/84 12 00 03/03/84 16:00 03/03/84 20:00 03/03/84 0000 03/04/84 04:00 03/04/84 os·oo 03/04/84 12:00 03/04/84 16.00 03/04/84 20.00 03/04/84 00:00 03/05/84 04:00 03/05/84 08:00 03/05/84 12:00 03/05/84 16:00 03/05/84 20:00 03/05/84 00:00 03/06/84 04:00 03/06/84 08:00 03/06/84 12.00 03/06/84 16:00 03/06/84 20:00 03/06/84 00:00 03/07/84 04:00 03/07/84 08:00 03/07184 12:00 03/07/84 16:00 03/07/84 2o·oo 03/07/84 00:00 13¥1 E RAW DA li-1 =!;:.: =:~:-:;;.:.::::::=:-·~ 6lcJ1 22 1 t;<.:, 6f,:.l 22 \ O<l 66;;\ 22 tu<I 6h ·.· 22 1 (\'J 6b" ~~:J 1 U'j 6lt 22 10:5 DAILY 1WERAGE '/ALUES 6 7··, 22 i. ij·') 6 :H; 2;::~ 1 u'·'. 67 22 tO'S o79 23 10C} 6FJ l 24 l O':i 6tU 24 l 0': DAILY "\VERAGE VA; IJES 68~· 27 l. 0·1 6f:l7 29 1 ()<~ 61-J'I 29 1 o:) 691 30 l(I!J 69'~ 31 iOS 695 30 10"' DAILY AVERAGE VALUES 69/ 29 69S' 28 701 27 7():":.) 27 705 30 70/ 31 DAILY IWERf~GE 709 30 711 29 7D 28 7J5 28 ?t / 28 l19 27 DAILY AVERAGE 1 !j 1.0 to 1C!h 1 U•:. 1. o~) '.;'to,!_ UES 1 (\':' 1. (; .·) 1 ;\:t 1 "' . 1 0') 10-i V/-;LUES {"1\./ .. , 4 if 4 ll 4 '1 4 4 6 'I· 4 /j <1 4 4 ~ 4 q 4 4 6 ~ 8 q 8 4 6 ':::' 4 8 :_; 8 t. 0 ~ i £2 ;_, 0 9 5 0 5 6 5 4 <; 4 ,J.J 0 lJ ~? ~ ! I;· 0 s 8 ~:; i:J s 6 :~ t.~ 5 4 5. 7 0 -·11t8:' f'AGE 12 START fiME 01/0H/84 04 00 DEPTH INCHES ===::=:=::; 8. 8 8. 8 8 8 8 8 9 2 8. 8 8. 9 8 8 8 8 8 8 9 2 9. 6 9. 6 9. 1 10 8 11 6 11 6 12 0 12 4 12 0 11 7 11 6 11. 2 108 108 120 12. 4 11. 5 12. 0 11 6 11. 2 11. 2 11. 2 10. 8 11. 3 STAG~= FEEf 0. 7J 0 71 0 ··~ I .;. 0 7] 0 -; ' 0 7J 0 74 0 /') 0. 7:3 0 7 ~I 0 7? 0 81' 0 8•) 0 76 0 91.\ 0 9/ 0 9' 1. c ... :. 1 0) 1 0•.) 0. 98 0 q: 0 9J 0 9d 0. 9•; 1 0·:· 1 O.J 0 96 1. I)() 0 9 7 0. 9'] 0 en 0 9:J 0 90 0 94 DISUIG CF'c :;.;::::::.::-:::=;..;::!::., 3 0 3 0 3 0 3 n 3 j 3 0 3 l 3 n 3 3 ~'\ 3 _; 3 7 3 ! 3. 3 5 0 6 0 6 0 6 5 7 t 6 5 6. 2 6 0 5 4 5 1} 5 0 6 •c-; 7 5 t=l 6 s 6 0 5 4 5 4 5 '1 5 0 5. 6 TEMP DEG C =::::::::=::::: 2. 5 2 0 2 0 2. 5 2. 5 2 5 2 3 2. 5 2 5 2. '3 2. 5 2. 5 2 5 2. 5 2 0 2.0 2 5 2 5 2 5 2 5 2.3 2. 5 2. 5 2 5 3 0 3 0 2. 5 2. 7 2. 5 2.0 2 0 "') c; c.. - 2 5 2 0 2 3 ' t 1 I 1 ' j I j l f ' t i j I , r ' I I I i I I I j • I I • PROPOSED LARSEN BA~ HrDROELECfHlC PROJ 0)··11/83 PAGE 13 HUMPY CREEK NEAR Nf.t\1;' LARSEN llA1, ALASKA START TIME 01/08/84 04:00 DEPTH STAGF DtSf.HG TEMP DATE TIME BY rr RAW DAT t.1 f•i\. INCHES FEET CFC: DEG C ======~~ ===== ==::-:::~· =====:-::::::. ... ~· .. , =~:.:=::::""':: ===::..:::.."":'; ===== :=.::::::::-.:::::: ===== 03/08/84 04·00 721. 27 10:1 '-i 4 10 8 0 90 5 0 2. 5 03/08/8ll 08:00 '"'Y . .., ... ~ tc:J 27 105 :'I_ 4 10 8 0 90 5 0 2 5 03/08/84 1200 725 27 i Oi> :} 4 10. 8 090 5 () 3.0 03/08/84 16:00 721 27 1 0!'. s 4 10 8 o_ 9-J 5 () 3.0 03/08/84 20:00 7:!9 31 10:', t:-2 12. 4 1 ()3 7 ) 2. 5 03/08/84 00:00 7.3! 33 1.0') ,, 6 13. 2 1. lti 8 ,, __ , 2 5 DAILY AVERAGE VALUES ~~ 7 11. 5 0. 96 s s· 2 7 03/09/84 04:00 7TJ 34 105 t; 8 1-3 6 1. 1 J 8 9 2. 5 03/09/84 08:00 7:15 34 105 !':1 8 13 6 1 lJ 8 9 2 5 03/09/84 12:00 7Ji 34 105 '"" A 13 6 1 1J 8 9 2. 5 03/09/84 16:00 7:19 33 t 06 I_• 6 13 2 1 1•) 8 3 3. 0 03/09/84 20:00 74! 34 lO~ r~ 8 13. 6 1 1 _j 8 9 2 5 03/09/84 00:00 74:-~ 33 105 I; 6 13.2 1 lCl 8 :3 2. 5 DAILY r ... VERAGE VALUES ~J 7 13. 5 1 p 8 7 2 6 03/10/84 04.00 74"' 33 105 f; 6 13 2 1-1 t) 8 :3 2 5 03/10/84 08:00 74 ~ 33 105 l; 6 13. 2 1 tu 8. ~3 2. 5 03/10/84 12:00 74<;· 32 1.05 b 4 12.8 1. 07 7 6 2. 5 03/10/84 16:00 751 33 l()-(, 6 13. 2 1. 10 8 3 3. 5 03/10/84 20:00 7~)3 33 lOt:> <:J 6 13. 2 1. 10 8 ·? --..J 3.0 03/10/84 00:00 -y c. t;; I ~ f '·" 33 10~; ':-6 13. 2 1 10 8 .-, . ..:. 2. 5 DAILY AVERAGE VAI .. UES t, 6 13. 1 1. 10 8 2 2 8 03/11184 04: 00 75l 33 105 ~J. 6 13. 2 1. 10 8. 3 2. 5 03/11/84 08:00 759 33 lOS I;; b 13 2 1 1 : \ 8. 3 2. 5 03/11/84 12:00 7b1 3-"") "'-1 ()I. t. 4 12.8 107 7. c, 3.0 03/lt/84 16:00 7h8 32 1 •.) .' 6 tj 12 8 1 o.-r 7 b 3. 5 03/11/84 20:00 76~ 3:] 1 Or-/-_, 6 13. 2 l. l (• 8 ~ 3. 0 03/11/84 00:00 767 33 lUh 6.6 13 2 1 11:• 8 ·~ _, 3 0 DAILY AVERAGE VALUES 6 5 13. 1 1 Qi:;l 8 1 2. 9 03/12/84 04. 00 769 32 1 <.)1-, 6 4 12 8 1 07 7 6 3.0 03/12/84 08 00 771 32 H'-"-tJ 4 128 1 07 7. 6 3.0 03/12/84 12.00 773 32 1 (\(:.; b 4 12. 8 1 ()7 7 ~-= 3.0 03/12/84 16:00 Tl'5 3'' "-1 (!7 6 4 128 1 0.7 7 b 3. 5 03/12/84 2000 77? 33 1 Ot.> (:.,_ 6 13. 2 1 1•.:> 8 .:. 3. 0 03/12/84 00:00 779 33 lOt• l.o 6 13.2 1. 10 8 3 3.0 DAILY 1WERAGE VAl_UES b '5 12 9 1 08 7 E 3. 1 ! 1 r ' ~ f i { I I J t J I J l J I i f l t } L • 1 ~ PROPOSED LARSEN BA V f! • DROELEe.; n .. · C PROJ o:; .. 1118::> PAGE 14 HUMPY CREEK NEAR NEAtJ LARSEN BAY. ALASKA START TIME 01108/84 04·00 DEPTH STAGE DI~:;CHG TEMP DATE TIME BYH RAW D.~ fA r~· .... INCHES FEET CF ~; DEG C ======:-=::::: ====-= =::::.:::~ :::::::::::::-:..-::=:-::::;;·::·;:: ----=====~ ----·-=:::=:':;;~~:':':" ===== 03/13/84 04:00 781 :33 105 b f3 13.2 1 1t:' 8 .-, . .._, 2 5 03/13/84 08:00 783 33 105 t, 6 13.2 1 10 8 3 2 5 03/13/84 12:00 78'5 T' . "-105 1:,, 4· 12.8 107 7. 1:. 2. 5 03/13/84 16:00 787 32 107 i-J 4 12. 8 1. 0'' 7 6 3 5 03/13/84 20:00 789 32 1 0~1 6 4 12.8 1 0 .' 7. 6 3. 0 03/13/84 00:00 791 32 105 f..: 4 128 1 07 7. 6 2. 5 DAILY AVERAGE VALUES 6 5 12.9 1 08 7. 8 2 8 03/14/84 04:00 79.3 32 105 6. 4 12. 8 1. 07 7 6 2. 5 03/14/84 08:00 795 31 104 i:J 2 12 4 1 0 ~ 7. 1 2. 0 03/14/84 12:00 79 7 ~32 J.OS b. 4 12. 8 1 0 .' 7 f:, 2. 5 03/14/84 16:00 799 32 lOb 6. 4 12. 8 1 o~ 7. 0 3.0 03/14/84 20:00 801 32 107 6 4 12.8 1. 07 7 t, 3. 5 03/14/84 00:00 80:1 32 lOt> fJ. 4 12. 8 1. 0. 7 6 3.0 DAILY AVERAGE ·.-'ALVES t 4 12. 7 1. Ot1 7. 5 2. 8 03/15/84 04:00 80~ 31 1 f)t; 6 2 12 4 1 OJ 7 1 3. 0 03/15/84 08:00 801 31 1 06 .~ ~~ 12. 4 1 0.5 7. 1 3 0 03/15/84 12:00 809 :.31 lOb 6 2 12.4 1 O'J 7 1 3. 0 03/15/84 16:00 811 31 l(F .. ,, 2 12. 4 1 0.! 7. 1 3. 5 03/15/84 20:00 81'::: 31 107 1,:, 2 12. 4 1 OJ 7. 1 3. 5 03/15/84 00:00 81~-3i l'J/, 6 ;:1 12 4 1 o·.;; 7. 1 3. 0 DAILY AVERAGE VALUES "J 2 12 4 1. 0 j 7. 1 3.2 03/16/84 04:00 817 31 10h (; 2 12.4 1 03 7 1 3. 0 03/16/84 08:00 819 31 10/c. 6 2 12. 4 1 03 7. 1 3. 0 03/16/84 12:00 821 31 tOh 6 2 12. 4 1. 01 7 1 3 0 03/16/84 16:00 823 31 tm: 6 2 12. 4 1 03 7 1 4.0 03/16/84 20:00 825 32 trP ,.:J 4 12.8 1 07 7. b 3. 5 03/16/84 00:00 8 ·,-, .: .. I 32 l 01· 6 4 12.8 1. 07 7 t, 3. 0 DAILV AVERAGE VALUES 6 3 12. 5 j Qll. 7 :~ 3 ;1 03/17/84 0400 829 32 t ()6 1-4 4 12.8 1 07 ., 6 3 0 03/17/84 08:00 831 31 1 (1!-. 6 ~' 12. 4 1 OJ 7 1 3. 0 03/17/84 1.2:00 8.3::1 31 1• 1!, t:) ~~ 12. 4 1 0 '! 7 l 3.0 03/17/t-34 16:00 8:35 31 1 ()fJ { 'J (} L. 12. 4 1 0) 7 1 4 0 03/17/84 20:00 837 32 10l 6 4 12.8 1. 01 7. 0 3. 5 !' 03/17/84 00:00 839 33 106 6 tJ 13.2 1. 1'! 8. :J 3. 0 DAILY AVERAGE VALUES 6. 3 12. 7 1 06 7 5 3 3 • f • i I t l I I I J f f I f I j • i I • I • l I 5 .. !i PROPOSED LARSEN BAY iiYDROELECTR l C PROJ !}:1 /11/8:5 PAGE 15 HUMPY CREEK NEAR NEAl? LARSEN Bl\1, ALASKA START TIME 01/08184 04:00 DEPTH STAGE DISCHG TEMP DATE TIME BYTF: RAW OA Tl1 t1',-' INCHES FEET CFS DEG C =======-::== ==~== =·=::-:-::: ========::·-· =:::..:::--~:: ====='::'; ~-===== ::::::::::::-=:.::~~-~ ===== 03/18/84 04:00 841 32 l.O'~ 0. 4 12. 8 i 0/ 7 b 2. 5 03/18/84 08:00 843 32 105 CJ 4 12. 8 1. 0? 7. 6 2. 5 03/18/84 12:00 845 32 10:'.> 6 4 12. 8 1. 07 7. 6 2 5 03/18/84 16:00 847 32 107 6 4 12.8 1 0'7 7 6 3. 5 03/18/84 20 00 849 32 1 (! 7 0 4 12. 8 1 o·· 7 6 3 5 03/18/84 oo·oo 851 33 ltl~ 6 6 13. 2 1 1 () 8 3 2. 5 DAILY AVERAGE VALVES t; 4 12. 9 1. 08 7 7 2 8 03/19/84 04:00 853 32 1011 0 4 12 8 1 07 7 6 2. 0 03/19/84 08:00 855 32 104 6 4 12 8 1. 07 7 6 2.0 03/19/84 12:00 851 32 104 e., 4 12.8 1 . 0' 7 b 2 0 03/19/84 16·00 859 32 10' b. 4 12. 8 1 0 7 b 3. 5 03/19/84 20:00 861 32 107 b. 4 12. 8 1. 0.' ., 6 3. 5 03/19/84 00:00 86:::1 33 10:'1 6. 6 13. 2 1. 10 8 3 2 5 DAILY AVERAGE VALUES 6 4 12. 9 1. 08 7 7 2 6 03/20/94 04:00 865 33 1 fJll 6. 6 13.2 1.10 8 3 2. 0 03/20/84 08:00 867 32 104 6 4 12 8 1 o: 7 6 2.0 03/20/84 12:00 869 32 10•l 6. 4 12. 8 1. 0? 7. 6 2:0 03/20/84 16:00 871 32 l()fj 6. 4 12.8 1 07 7. 6 4 0 03/20/84 20:00 873 33 107 6. 6 13.2 1. 10 8. 3 3. 5 03/20/84 00.00 875 33 1 ()~. 6. 6 13. 2 1. 10 8 3 3.0 DAILY AVERAGE 1/ALIJES 0 5 13. 0 1 0'? 8. 0 2 8 03/21/84 04:00 877 33 10~> (:; 6 13. 2 1 10 8. 3 2. 5 03/21/84 08:00 8?9 32 10'5 6. 4 12. 8 1. 07 7. 6 2. 5 03/21184 12:00 881 3'"1 "'· 1 ()(. b. 4 12.8 1. 0'?' 7. 6 3. 0 03/21/84 16·00 883 33 10'~ 6 6 13.2 1 10 8 ~~ 4 5 03/21/84 20:00 885 33 1 ()~1 6. 6 13. 2 1 1 ,, 8 3 4.0 03/21/8.11 00·00 887 33 l 0.7 (, 6 13.2 1. 1 •) 8. :3 3. 5 DAILY AVERAGE VALUES 6. 5 13. 1 1 09 8 1 3. 3 03/22/84 04:00 889 33 1 t..}~-~ 6.6 13. 2 1 10 8 3 3. 0 03/22/84 08:00 891 33 106 b 6 13. 2 1. 1 () 8 -:{ 3.0 03/22/84 12:00 893 33 1Q7 6 6 13. 2 1 10 8 3 3. 5 03/22/84 16:00 89~ 33 109 6.6 13. 2 1 1() 8. 3 4. 5 03/22/84 20:00 897 33 li}FJ 6 6 13, 2 1. 10 8. :·~ 4.0 03/22/84 00:00 899 33 1 Ot: · 6. 6 13. 2 1 10 8 'J 3. 0 DAILY AVERAGE VM.UES 6. 6 13.2 1. 10 8 ,, . ..., 3. 5 ' f l t i j " t , ~ I I * I 1 I • t i l I I .. ( . ' I i j I PROPOSED LARSEN BAY HVDROHE:..; fR J. C F'RO,.J 05' 11183 PAGE 16 HUMPY CREEK NEAR NEAf• LARSEN J1,-;,, ;;LASKA START TIME 01/08/84 04:00 DEPTH STAtiF DISCHG TEMP DATE TIME El'< TE RAW D.~ 1 ~' t1'v' INCHES FEET CFE: DEG C ======== ===== =-= =:.:.::::::::::=-==·.::=-==-::~ ====== ====~ ==:.:::::=== ===== 03/23/84 04·00 901 33 10~ '·' 6 13. 2 1.10 8.3 2. 5 03/23/84 08:00 903 33 i04 h. 6 13. 2 1. 10 8 ,, ·J 2. 0 03/23/84 12:00 905 32 l<H b.4 12. 8 1 07 7. 6 2. 0 03/23/84 16:00 90/ 33 109 b 6 13. 2 1 1t) 8. 'J 4. 5 03/23/84 20·00 909 33 108 6. 6 13.2 1 1 ( ~· 8. '3 4.0 03/23/84 00:00 911 33 t()f, 6. 6 13. 2 1 10 8 3 3. 0 DAILY AVERAGE VALUES 6. 6 13. 1 1. 1'.) 8.2 3. 0 03/24/84 04:00 91'3 33 1 ()f, 6. ~) 13. 2 1. 10 8 ., ,., 3.0 03/24/84 08:00 915 33 1t)b 6 6 13.2 1 10 8. ] 3. 0 03/24/84 12:00 91/' 33 1()7 ~. 6 13.2 1 10 8 ') ..... 3. 5 03/24/84 16:00 919 33 11 6 6 13. 2 1 10 8. 3 5.0 03/24/84 20:00 921 34 109 6. B 13. 6 1 LJ 8 '7' 4. 5 03/24/84 00:00 9;;;>] 35 107 7 0 14.0 1 1 9 6 3. 5 DAILY AVERAGE VALUES f_, 7 13. 4 1 1 8 b 3.8 03/25/84 04:00 q25 34 107 {, 8 13. 6 ! LJ 8 q 3. 5 03/25/84 08:00 C.F.J-, I .. _I 34 11.)"' f) 8 13. 6 1 1 J 8 9 3 5 03/25/84 12·00 929 33 1.0' b . ..., 13.2 1. 1 t) 8 3 3. 5 03/25/84 16:00 9:31 34 1\H 6. 8 13. 6 1 LJ 8. 9 4. 5 03/25/84 20:00 933 36 lOH 7 ;;;! 14 4 1 20 10 4. 0 03/25/84 00:00 935 37 10(, 7. 4 14. 8 1. 2:; 11 3 0 DAILY AVERAGE VALUES I-_ 0 13. 9 1 1 5 9. 3 3 7 03/26/84 04:00 937 36 106 7. 2 14. 4 1 2() 10 3. 0 03/26/84 08:00 939 35 101:1 7 0 140 1. 17 9. 6 3. 0 03/26/84 12:00 941 34 107 i-; 8 13. 6 1 1.3 8 9 3.5 03/26/84 16:00 943 35 t09 7 0 14.0 1. 1? 9. 6 4. 5 03/26/84 20.00 94'? 36 1 OH 7 2 14 4 1' 20 10 4 0 03/26/8tl 00.00 94/ 36 i (Jt. ·~~ .-., ' ~ 14 4 1 21) 10 3.0 DAILY AVERAGE VALUES ., l 14. 1 1. il,') 9. 7 3. 5 03/27/84 04:00 949 36 1 o:"> 7 2 14. 4 1' 20 10 2. 5 03/27/84 08·oo 951 34 j ()~) (; 8 13. 6 1 13 8 9 2. 5 03/27/84 12:00 953 34 1 Ot: "' 8 13. 6 1 LJ 8 9 3.0 0312718 1~ 16:00 955 35 1 ()I.:? 7 0 14 0 1 1 7 9 t.• 4 5 03/27/84 20:00 9C::.,'7 ~I 35 109 /. 0 140 1.17 9 ~A:~ 4. 5 03/27/84 00.00 959 35 toe.· 7 0 14.0 1 17 9 c_. 3. 0 DAILY AVERAGE VALUES 7 0 13. 9 1 16 9 4 3.3 I I I ( l I I f '~ f f i f t • I I l £ ! f' ' .. PROPOSED LARSEN BAV HVDROELECfRlC PROJ 05,11/8:7 PAGE 17 HUMPY CREEK NEAR NEAR LARSEN I:JAY, ALASKA START TIME 01/08/84 04.00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DA li\ M'.l INCHES FEE r CFS DEG C -=-·--== =-=-= ==:-;.;.-:'; ===::=::::;:n:t~\~": =:"' ;.=::::: :=:=•=~ ====~ ::::::::_-_;:;;:;;.: =====- 03/28/84 04:00 961 35 105 7 0 14.0 1. 1 7 9 b 2 5 03/28/84 08:00 96;~i 35 tOll ?. 0 14.0 1. 17 9 6 20 03/28/84 12.00 9!:.':' 35 lOb 7' 0 14.0 1 1.:" 9 b 3. 0 03/':28/84 16:00 9tJ7 34 1 (f.' h 8 13 6 1.13 8 q 3. 5 03/28/8.!l· 20: 00 969 34 107 '"> 8 13. 6 1. L1 8 '1' 3. 5 03/28/84 00:00 971 35 HI I:> 7_ 0 14. 0 1 1. 7 9. 6 3.0 DAILY AVERAGE VN.UES b 9 13.9 1. 1 t;. 9. 4 2.9 03/29/84 04.00 97~~\ 34 10::-b 8 13 6 1 1] 8 <;' 2 5 03/29/84 08:00 97~ 34 105 "" 8 13 6 1 l3 8 q 2. 5 03/29/84 12:00 QT> ' ' I 34 10!'1 f:J 8 13. 6 1 l.J 8 9 3.0 03/29/84 16:00 9'~Q 34 109 6 8 13 6 1 1 ·~ '0 8 9 4. 5 03/29/84 20:00 9t:lt 34 108 b 8 13. 6 1 1 3 8 9 4. 0 03/29/84 00:00 983 34 107 6. 8 13.6 1 13 8 c;. 3. 5 DAIL'Y AVERAGE IIALUES 6 8 13. 6 1 13 8 9 3 3 03/30/84 04:00 98~ 34 1 ()7 6 8 13 6 1. L) 8 Q 3. 5 03/30/84 08:00 987 34 11) ~.' 6 f3 13. 6 1 1J 8 (.;: 3. 5 03/30/84 12:00 989 34 1():' (:,,_ 8 13. 6 1 13 8. 9 3. 5 03/30/84 16:00 991 34 1 l i 6. 8 13. 6 1' 1] 8 9 5. 5 03/30/84 20:00 99~3 36 109 7 2 14. 4 1. 2() 10 4. 5 03/30/84 00:00 995 36 1 () l 7 2 14 4 1 20 10 3 5 DAILY ~VERAGE V~.UE8 ":;, 9 13. 9 1 15 9. :3 4.0 03/31/84 04:00 997 35 106 7 0 140 1. 17 9. 6 3 0 03/31/84 08:00 99Q 35 1 Ore, 7 0 14.0 1. 1 ~' 9 6 3 0 03/31/84 12:00 001 34 10' 6 8 13. 6 1 13 8 9 3 5 03/31/84 16·00 00::3 34 1 1 1:• 6 8 13. 6 1 1J 8 9 5.0 03/31/84 20:00 005 35 108 7 0 14.0 1 1 ? Q 6 4.0 03/31/84 00:00 007 35 1 Or-, l 0 14.0 1. 1 7 9 c 3.0 DAILT AVERAGE VAi_UES 6 9 13. 9 1. 16 9. <l 3. 6 04/01/84 04:00 009 35 10~ 7 0 14.0 1. 1 ;" 9. 6 2. 5 04/01/84 08:00 011 34 107 6 8 13. 6 1. 13 8 9 2. 5 04/01/84 12:00 013 34 1 i)? 6. 8 13. 6 1. 13 8 9 3 5 04/01/84 16:00 015 35 1 t 0 7. 0 14.0 1 17 9 6 5. 0 04/01/84 20:00 017 35 109 7 0 14.0 1 1 7 9. 6 4. 5 04/01/84 00:00 019 35 10 ' 7 0 14. 0 1. 17 9. 6 3. 5 DAILY AVERAGE VALUES 6. 9 13. 9 1. 1l.. 9. 4 3. 6 i f f ] I j I I I • I l i PROPOSF: 0 LARSEN BAY Hr DROELEC r;-: l C PROJ 0'5: 11/BS PI~GE 18 HUMPY CREEK NEAR NEAR LARSEN BAY, ALASKA START TIME 01/08/84 04·00 DEPTH STAGE OISCHG TEMP DATE TIME fiYTF PAW OA T'A 1'1\) INCHES FEEr CFS DEG C ========·-:::: ===== ===-:: ·-=====~.:::::· -:::.:. -. ···-· ====-=::-=====:;. ::==:::~:::::-:: ===== 04/02/84 04:00 021 35 106 :" 0 14. 0 1 17 9 ~J 3. 0 04/02/84 08:00 02~Ci 35 1 {)I', 7 0 14. 0 1 17 9 0 3 0 04/02/84 12:00 o-)" ( ...... 34 101, 6 8 13. 6 1 1 ~~ 8 S' 3. 0 04/02/84 16:00 o·~~ ~: 35 1 H'• : 0 14.0 1 1 .! 9 6 5 0 04/02/84 20:00 o:::.·9 35 10H 7 0 14 0 1. 1 7 9 6 4 0 04/02/84 00:00 031 35 1 0! .• (' 0 14 0 1. L' 9 6 3 0 DAILY AVERAGE VALUES 7 0 13. 9 1. 1,, 9 ~· 3 5 04/03/84 04:00 o·~"' .J•.J 34 105 6. 8 13 6 1 1 1 8 9 2. 5 04/03/84 08:00 035 34 10~ ;. . 8 13. 6 1 13 8 9 2. 5 04/03/84 12:00 03? 34 107 ~; 8 13 6 l 1 ; 8 '-' 3 5 04/03/84 16:00 o:J"~ 34 til. 6 8 13. 6 1 1J 8 c;: 5. 5 04/03/84 20:00 041. 36 109 7 2 14. 4 1 20 i!] 4. 5 04/03/84 00:00 043 36 lOh 7 2 14. 4 1. 20 10 3 0 DAILY AVERAGE vALUES 6. 9 13. 9 1. 1'j 9 ~.:; 3 6 04/04/84 04:00 04"' ~15 104 ? 0 14. 0 1. 1 7 9 t. 2 0 04/04/B4 08:00 047 35 10J ? 0 14. 0 1. 1 :~ 9 6 1.5 04/04/84 12:00 049 35 lOb 7 0 14 0 1. 1 7 9. 6 3. 0 04/04/84 16:00 051 35 1•Y:' 7 0 14. 0 1 17 9 6 4 5 04/04/84 20:00 053 35 toe I 0 14 0 1 l ·:-9 b 4. 0 04/04/84 00:00 055 35 1 ()i, 7 0 14 0 1. 17 9. f:., 3 0 DAILY AVERAGE VALUES 7 0 14 0 1 17 9 6 3 0 04/05/84 04:00 0::57 35 105 7 0 14. 0 1 17 9 6 2. 5 04/05/84 08:00 059 35 105 ? 0 14.0 1 17 9. 6 2. 5 04/0S/84 12:00 061 35 106 7 0 14.0 1. 17 9 b 3.0 04/0~/84 16:00 063 35 lOR -; 0 14 0 1 1 7 9 6 4. 0 04/05/84 20:00 065 35 tt'R 7 0 14 0 1.17 9 f:.> 4. 0 04/05/84 00:00 067 34 1 Ot· f. 8 13. 6 1 1.1 8 ,,; 3. 0 DAILY AVERAGE VN.UES I. 0 13. 9 1 tr:. 9. 5 3 2 04/06/84 04:00 069 34 lOS 6 8 13. 6 1. 13 8 9 2 s 04/06/84 08:00 071 34 10'5 to 8 13. 6 1 1 J 8 9 2. 5 04/06/84 12:00 orJ 34 1 tY; b 8 13. 6 l.LJ 8 9 3 5 04/06/84 16:00 0'75 35 1 1 1 7 0 14. 0 1 1 7 9 .~ 5 5 04/06/84 20:00 on 35 109 7 0 14.0 1 1 7 9 t, 4. 5 04/06/84 00:00 079 35 lOb· 7 0 14.0 1 1 7 9 6 3 0 DAILY AVERAGE VALUES 6 9 13.8 1. 15 9 -) . -' 3. 6 ' f i l l I ! } t ! f i I I ' I I I I j . i I = ; : PROPOSED LARSEN BAY HYDROELECTR;C PROJ 05illi85 PAGE 19 HUMPY CREEK NEAR NEAR LARSEN Bin', ALASKA START TIME 01108/84 04·oo DEPTH STAGE DISCHG TEMP DATE TIME B OE RAW OA L'' r1\l INCHES FEET CFS DEG C =======:'!: ::s::::::::= =="':":.:::.-===-==:;;.:::-..::·:-=~=-= ====== ===-::::= ==:-::.~~== ===== 04/07/84 04:00 081. 34 H15 .":, 8 13. 6 1 13 8. 9 2 5 04/07/84 08:00 OB3 34 HIS (: 8 13.6 1 1) 8 9 2. 5 04/07/84 12·00 085 35 1 Ob l 0 14.0 1 1 : 9 b 3.0 04/07/84 16•00 087 34 1 1}0 6 8 13 6 1 1 ·:; 8 9 4 5 04/07/84 20:00 089 35 lOS· 7 0 14 0 1 1l 9 f:. 4 5 04/07/84 oo·oo 091 35 J Oi: 7 0 14. 0 1 1 ~ , I 9 .... .; 3.0 DAILY AVERAGE VAU.JES 6 9 13. 8 1 Li 9. :..1 3 3 04/08/84 04:00 09] 34 tOS 6. 8 13. 6 1 1 3 8 9 2 5 04/08/84 08:00 095 34 104 b 8 13.6 t. 1 J 8 9 2 0 04/08/84 12:00 097 34 1 iJt. 6 8 13. 6 1 1 ) 8. 9 3.0 04/08/84 16:00 099 34 108 6 8 136 1. 1 j 8 9 4.0 04/08/84 20:00 101 34 108 6 8 13.6 1 1 8 9 4.0 04/08/84 00:00 103 34 1 0.' ..:.. 8 13. 6 1 1 J 8 9 3. 5 DAILY AVERAGE V,t;;.UES 6 8 13. 6 1 1 :; 8 9 3.2 04/09/84 04:00 105 34 1 0h 0. 8 13. 6 1 1J 8 9 3.0 04/09/84 08:00 107 34 1 ()t; ~ 8 13. 6 1 13 8. 9 3. 0 04/09/84 12:00 109 34 1 {)c-, 6 8 13. 6 i 1 ··:, 8 9 3 0 04/09/84 16:00 111 34 1 ()'> fc 8 13.6 1. 13 8. 9 3. 5 04/09/84 20:00 113 34 1()? b 8 13.6 l 1 . .;; 8. 9 3. 5 04/09/84 00:00 115 34 l 0'1 6 8 13 6 1 n B. 9 2 0 DAILY AVERAGE '/AI.IJES 1-, 8 13.6 1 1 3 8. 9 3 0 04/10/84 04:00 11 7 34 1 O~J ,.~ 8 13 6 1. 1 8. 9 1 5 04/10/84 08:00 119 35 10] 0 14.0 1 1;: 9 6 1 5 04/10/84 12:00 121 37 lOJ ~· 4 14.8 1 2J 11 1 5 04/10/84 16:00 1:-;l] 34 107 ,., 8 13. 6 1 1:3 8 9 3. 5 04/10/84 20:00 125 33 107 'J 6 13. 2 1 1(} 8 -,; . ~· 3 5 04/10/84 00:00 1d'l 33 l ()ri t.> 6 13 2 1 tl) 8 3 2. 0 DAILY AVERAGE VALUES 6 9 13. 7 1 14 9 :J. 2 3 04/11/84 o4·oo 12:9 33 103 I"; 6 13_2 1 1(1 8 3 1. 5 04/11/84 08:00 LH 35 1 (J:'J 7 0 14.0 1 1? 9 6 1.5 04/11/84 12:00 1:1:3 39 lO:J ? 8 15.6 1 ....,,\ ..:J,. 13 1 5 04/11/84 16:00 13'5 ::14 10o ,.,, 8 13 6 1 L1 8 Q 3 0 04/11/84 20:00 131 33 107 t• 6 13. 2 1 10 8 3 3 5 04/11/84 00:00 139 33 1 0~)' !;; 6 13. 2 1. 10 8 3 2. 5 DAILY AVERAGE VALUES b 9 13. 8 1. 15 9 4 2. 3 l I t ( I 1 I i i J.i-' f I 1 I I I J I I I I I I I I I l . i PROPOSED LARSEN BA v H': OROELE:; ~ ;::1! C PROJ 05 11/85 Pt~GE 20 HUMPY CREEK NEAR NEAH LARSEN 11 /\I', ALASKA START TlME 01/08/84 04:00 DEPTH STAGE DISCH(i TEMP DATE TIME BYTE RAW OATil M\' ,. INCHES FEET CFS DEG C =======:::. ====== ==:-:-; .:=:=:::::::=::::==~~ -·--··· ====== :::=:::::::::::::=::--::. ====:-:::.::.. ===== 04/12/84 04•00 14 j 33 1.04 6 6 13.2 1 10 8 3 2. 0 04/12/84 08:00 143 33 104 b 6 13. 2 1. 1l) 8 3 2. 0 04/12/84 12:00 145 33 10~· 6. 6 13. 2 1. 1!) 8 '.1 .J 2. 5 04/12/84 16:00 14 3:1 109 6 f, 13.2 1 1 (l 8 3 4 5 04/12/84 20:00 149 33 10c: 6 "' 13. 2 1 1•) 8 ,, . .;, 4 0 04/12/84 00:00 1 <;1 ~L 33 tOh 6 6 13.2 1. 1 .:· 8 :i 3. 0 DAILY AVERAGE VAL.UES 6. 6 13. 2 1. 1(~ 8. ::; 30 04/13/84 04:00 153 33 liJ.•, 6. 6 13. 2 1 Ui 8 3 3 0 04/13/84 08:00 j 55 33 101: b 6 13. 2 l 1 (\ 8 -:> .... 3.0 04/13/84 12:00 157 32 t•J? 6 4 12. 8 1 o;· 7. 6 3. 5 04/13/04 16:00 159 33 1Oft f, 6 13. 2 1 1 ·: 8.3 4 0 04/13/84 20:00 161 33 108 b 6 13.2 1. 1 •J 8. :3 4. 0 04/13/84 00:00 163 33 l (j(-, b 6 13. 2 j 10 8 3 3 0 DAILY AVERAGE 'h\l_UES t". 6 13. 1 1. 1 c .. 8.2 3. 4 04/14/84 04:00 165 33 1 Or, 6. 6 13.2 1 10 8 :3 3.0 04/14/84 08:00 167 32 tlk, 6 4 12. 8 1 07 7. 6 3.0 04/14/84 12:00 169 32 1 Of: 6. 4 12. 8 1. 0 1 7. 6 4 0 04/14/84 16:00 171 32 110 6. 4 12. 8 1 0? 7.6 5 0 04/14/84 20:00 173 3:3 l ()0 6. 6 13.2 1. 10 8.3 4. 5 04/14/84 00:00 17'5 33 1.(.)'·· 6. 6 13. 2 1 Ui 8 3 3 0 DAILY AVERAGE V~.UES ~j '5 13 0 1. OS' 8. 0 3 8 04/15/84 04:00 177 32 1 Qtl-6. 4 12 8 1. 0' 7. 6 2 0 04/15/84 08:00 179 32 104 6 4 12.8 1 0 7. 6 2.0 04/15/84 12:00 181. 32 l lY> 6. 4 12.8 1. Q;' 7 6 2 5 04/1~/84 16:00 183 32 109 ,.:_, 4 12.8 1. 0' 7. 6 4 5 04/15/84 20·oo U35 32 1 ().' 6 4 12.8 1. 0:' 7. 6 3. 5 04/15/84 00:00 187 32 1. ()l~ ~). 4 12. 8 1 0 7 7 b 2. 0 DAILY AVERAGE VALUES b 4 12.8 1. Ol 7 6 2 8 04/16/84 04.00 189 32 Hn t-i 4 12. 8 1.. 0 .' 7. 6 1 5 04/16/84 08:00 191 33 10.1 '" b 13. 2 1. 1•) 8 ':> • ..J 1.5 04/16/84 12:00 193 35 1. !)tl 7 0 14. 0 t 1 7 9 6 2 0 04/16/84 16:00 t9t> 32 1 or; t> 4 12 8 1 0 7 6 4 0 04/16/84 20:00 19"1 32 101':1 i!>. 4 12. 8 1. Oi' 7 6 4. 0 04/16/84 00:00 109 32 1 0!::· i:. 4 12 8 1. 0 7 7 6 3 0 DAILY AVERAGE VAI_UES b 5 13. 1 1 OS' 8 1 2. 7 • • ! ~ l I ' f j • f I i I ] I I I 1 i t .. PROPOSED LARSEN BA't' HYDROELEC nne PROJ o:1 11/85 PAGE 21 HUMPY CREEK NEAR NEAR LARSEN El~\'Y, ALASKA START TIME 01/08/84 04:00 DEPTH STAGE OISCHG TEMP DATE TIME BYTE RAW DAl4 r1v INCHES FEET CFB DEG C ======== ====== ===-:~;.:.( ;:.:;;;==--==:=..:::=~ = .-:.;;;;:;;:;:;: =====.:::: ==:::::.==· :::::::.,.:.;.::.:.::::: ====== 04/17/84 04:00 201 3::J 104 b 4 128 1 0! 7 b 2 0 04/17/84 08:00 203 3J. 1.0] J, 2 12 4 1 O.J 7 ' 1 5 04/17/84 12.00 20'5 32 1011 t, 4 12 8 1 0~' 7 h 2.0 04/17/84 16·00 2()7 32 109 '=• 4 12 8 1 07 7 t. 4 5 04/17/84 20:00 2l)C :32 JO:' 6 4 12 8 1 0 l 7 !~. 3. 5 04/17/84 00:00 2 j 1 31 JIH (':) ., "-12 4 1 OJ -, t 2. 0 DAIL'y AVERAGE VALUES 6 3 12. 7 1 {}1:, 7. 4 26 04/18/84 04:00 21 ~1 31 103 6. 2 12. 4 1. o::'l 7 1 1.5 04/18/84 08:00 2lS 32 1 i) 1 t; 4 12 8 1 07 7 f 1 5 04/18/84 12·00 21i' 35 1(!J 7 () 140 1 1 : 9 .~ 1 5 04/18/84 16:00 ~~ 19 32 loi:.J 6. 4 12 8 1. 0? 7 t, 4 0 04/18/84 20:00 221 32 10El b 4 12. 8 1 OT 7. 6 4. 0 04/18/84 00:00 223 31 1011 6 2 12. 4 1 0] 7 l 2.0 DAILY AVERAGE \IN.UES f, 4 12. 9 1 0/ 7' ~:: 2. 4 04/19/84 04:00 225 3l t \\ 1 ,.:., 2 12 4 1 0? 7 t 1.5 04/19/84 08:00 2;2:1 32 1 o:~ 6 4 12 8 1 o: 7 6 1 5 04/19/84 12:00 229 35 104 7 0 14.0 1. 17 9. 6 2 0 04/19/84 16.00 2:H 32 1 o·-~ 6 4 12 8 1 07 7 6 4. 5 04/19/84 20:00 2:3:3 32 1 t)::.:· 6. 4 12 B 1 07 7. 6 4. 5 04/19/84 00:00 2:35 ]2 ll)' 6. 4 12 8 t 07 7 6 3 5 DAILY AVERAGE VAi.UES C.. 5 129 1. o.::i 7 9 2. 9 04/20/84 04:00 237 32 i<J:;-f.:; 4 12.8 l 0 7 7. l':l 2. 5 04/20/84 08:00 2.39 31 1 0~. "'' 2 12. 4 1 OJ 7. t 2 5 04/20/94 12:00 241 31 1.ln, 6. 2 12. 4 1. o:! 7 1 3 0 04/20/84 16·00 24<3 :11 1 O".i 6 ::.~ 12 4 t 0.1 7 l 4. 5 04/20/84 20:00 24~1 31. i ,·,~..;. " ·") I >: 124 1 0.1 7 ) 4. 5 04/20/84 00:00 24'' 31 tO'; f: 2 12. 4 1 0 J 7 ' ' l 2. 5 DAILY AVERAGE VAl UES b 2 12. 5 l 04 7 '?. 3. 3 04/21/84 04 00 24.:-; 31 t 0.~ 6 2 12. 4 1 OJ 7 1 1 5 04/21184 08:00 251 32 10] 6 4 12 8 1 0? 7. t! 1.5 04/21/84 12:00 253 3::.1 101 6 ~) 13.2 1 to 8 3 1.5 04/21/84 16:00 25'5 31. l(.l<l 6. ;:.:! 124 1. 0 J .,. . ' l 2.0 04/21/84 20:00 257 31 I. o::! 6 2 12. 4 1 0 3 7 1 1 5 04/21/84 00:00 259 30 10::. 6 0 12.0 1 O<J 6. 5 1.5 DAILY AVERAGE V~.UES 6 3 12. 5 1. 04 7. 3 1.6 : ... ,. t t ' ·~ f J ! I ! I i I ' I j t .I PROPOSED LARSEN BA'\ HYDRUELECT-•r,:. F·FOJ 0 ~ 1 1 I 8') PAGE 22 HUMPY CREEK NEAR NEAR LARSEN n,;,, ALASKA STARr TIME 01108/84 04·00 DEPTH STAGL DISCHG TEMP DATE TIME BYlE RAW DAT,; Mt ... ' INCHES FEET CFf: DEG C ======-==-===== ::::-:::::-.::::-:; ==~=·.:::::<:!!"'.:'::-::. =:.~· ~:::· ====-== :::::::::::-.::::::= =====·.=:.~ ===== 04/22/84 04:00 261 32 IIY.l ,':, 4 12 8 1. 07 7 6 1 5 04/22/~)4 08: 00 263 34 1\.)J CJ 8 13.6 1 1] 8 9 1 5 04/22/84 12.00 265 37 10.) 7 4 14 8 L2 i l 1.5 04/22/84 16. 00 .,, -.., :36 ten ., ""' 14 4 1. 2<:-10 1.5 t. _) J i .::~ 04/22/84 20:00 26'·' 32 1. OJ 6 4 128 1 o-: 7 f, 1 5 04/22/84 oo·oo 2 71 32 1.Q~: 6 4 12.8 1 0 l 7 tJ 1 5 DAILY AVERAGE VALUES 6 8 13 5 1 13 8 8 1.5 04/23/84 04:00 27':1 32 tUJ 0 4 12 8 1. Q-::' 7. t., 1 5 04/23/84 08:00 2-:~,l 33 1_():"} ,i~ ~~) 13. 2 1 17:1 8 -~ .J 1 5 04/23/84 12:00 2:/-::-p HP 7 4 14 8 1 .-. "'-11 1 5 04/23/84 16:00 2','0 33 1 ((': t".· 6 13. 2 1 1 1 8 r:: 1.5 04/23/84 20:00 2f31 31 105 6 2 124 1 0-.1 7 1 2. 5 04/23/84 00:00 28:1 30 104 -:. 0 12.0 1 01) 6 5 2 0 DAILY AVERAGE vAUJES t· 5 13. 1 1. Oi 8 1 1 8 04/24/84 04•00 2B'::· 30 t rr;' ~~ 0 12 0 1 0' \ 6 5 1 5 04/24/84 08:00 2fP :)0 1 ()J f, 0 12. 0 1 QJ_j 6. 5 1.5 04/24/84 12:00 2f19 33 103 b 6 13. 2 1. 10 8 ":) .. _, 1.5 04/24/84 16.00 291 31 t•J9 6 2 12. 4 1 O.J 7 1 4. 5 04/24/84 20:00 293 :31 108 6 2 12. 4 1 03 7 l 4.0 04/24/84 00:00 295 31 1 •)'5 6 2 12 4 1 03 7 t 2. 5 DAILY AVERAGE VALUES 6 2 12 4 1 OJ 7 1 2 6 04/25/84 04:00 297 30 103 6.0 12.0 1. 0\) b. 5 1.5 04/25/84 08:00 299 31 11Y.1 6 ''1 .. _ 12. 4 1 03 7 1 1.5 04/25/94 12:00 301 31 t I}'; 6 2 12. 4 1 0] 7 1 3. 0 04/2~184 16:00 303 3J 1 f\\) 6 2 12 4 1 03 7 1 4 5 04/25/84 20:00 305 31 t fj,~ t-..... *' ('"_ 12 4 1 o:3 7 l 4 0 04/25/8~ 00:00 307 3i l_l )1:. 6 2 12.4 1 0.1 ? 1 3 0 DAILY AVERAGE VAlUES 6. 2 12. 3 1 03 7 C• 2 9 04/26/84 04·00 309 31 lOt:"" ... 6. 2 12.4 1 o:3 7 1 3.0 04/26/84 08:00 311 31 t<)r ~ .. 2 12 4 1 o:J 7 1 3. s 04/26/84 12:00 313 3t l. ()<:: 6 2 12 4 108 7. j 4 s 04/26/84 16:00 31 ~5 ~J? ,_,;_ ~. 1;~ 6 4 12. 8 1 o.· 7. 6 6 0 04/26/84 20:00 31.7 35 1 1 ::.~ 7 0 14. 0 1 1/ 9. 6 6. 5 04/26/84 00:00 319 37 11(). 74 14 8 1 21 it 5 0 DAILY AVERAGE VALUES 6 6 13 1 1 09 8 3 4 8 • i l i I l f t I I f I ' t l I i I I I I I I I I i j ' ~ PROPOSE[) LARSEN BAv 1-h'DfHJELEc m fC PROJ 0'5 11/8:5 p,~GE 23 HUMPY CREEK NEAR NEAR LARSEN Ul'>r, ALASKA :::>rART 1 H1E 01 /08!84 o4·oo DEPTH STAQi,-DISC r-H; TEMP DATE TIME EYTE. RAW DATr; 1'1',' INCHES FEE f CFS DEG C ======== ===== ~==-...:-::::::-====:~:::::::::-::""'!' ="""!\'~;.;._~. ====='1:": =-====-:: ====~= ===== 04/27/84 04:00 321 3o 10•? 7 2 14. 4 1. 20 10 4 5 04/27/84 08:00 323 36 10q 7 .. ) "--14. 4 1. 2\1 10 4. 5 04/27/84 12:00 3.;~s 37 111 7 4 14 8 1. 2l 11 5. 5 04/27/84 16·00 32? 4:3 t ' 4 t-:: b 17 2 l 4J u:. 7. 0 04/27/84 20:00 329 47 tll s:· 4 18 8 1. 57 20 5 5 04/27/84 00:00 ]31 42 1.0' 8 4 16 8 1 4(• 15 3. 5 OA I L Y AVERAGE 'lALUES ti 0 16. 1 1. 34 14 5. 1 04/28/84 04:00 333 40 107 8 0 16 0 1. 33 i.J 3. 5 04/28/84 08:00 335 38 106 7 6 15. 2 1 27 1 ... , "'-3. 0 04/28/84 12:00 :3:::17 38 tOW 7 6 15. 2 1 27 1 :_;' 4. 5 04/28/84 16:00 339 41 112 H 2 16. 4 1 :r 14 6. 0 04/28/84 20:00 341 50 111 10 0 20 0 1 67 24 5. 5 04/28/84 00.00 34'3 51 j 09 1i) 2 20. 4 1 70 ?5 4. 5 DAILY AVERAGE VALUES 8. 6 17.2 1 44 17 4. 5 04/29/84 04:00 3·'15 51 108 10 2 20 4 1 70 . .;;::; 4.0 04/29/84 08:00 347 51 107 10 ;;: 20. 4 1 7() .25 3. 5 04/29/84 12:00 349 49 109 '-i 8 19.6 1 63 23 4. 5 04/29/84 16:00 351 51 1.l 1 10. 2 20. 4 1 70 25 5 5 04/29/84 20:00 35:3 53 i09 10. 6 21. 2 i 77 ~.::8 4. 5 04/29/84 00:00 3"FJ 53 108 10. 6 212 1 7 .... • I 28 4. 0 DAILY /"VERf..,GE v,-,, __ !JES 1C J 20. 5 1 ?t 26 4 3 04/30/84 04:00 351 52 10 ·' 10 4 20.8 1. 7,1 26 3. 5 04/30/84 08.00 3'"0 52 10'' 10. 4 20. 8 1 73 26 3 5 04/30/84 12:00 361 51 108 10 2 20. 4 1. 7C• ·:::> c; ·-~ 4. 0 04/30184 16:00 3f./3 52 11 i_) 10 4 20.8 1 TJ 26 5 0 04/30/84 20:00 36:-1 54 109 10 8 21. 6 1. 80 2.'-t 4 5 04/30/84 00:00 31,7 54 1. ()7 10 8 216 1 EJC) 29 3. 5 DAILY AVERAGE VALUES 1 (\ 5 21 0 1. 7'3 d.7 4. 0 05/01/84 04:00 361;; 53 JQ'j 10 6 21.2 1 _, / I 28 2. 5 05/01184 08: 00 871 52 1 0h 10 4 20.8 1 7J ~6 3.0 05/01/84 12·00 373 52 108 10 4 20.8 1. ? J ,2f'::J 4. 0 05/01/84 16:00 375 52 t09 10 4 20.8 1 7 3 26 4. 5 05/01/84 20:00 3?l 54 110 10 8 21 6 1 80 29 5. 0 05/01/84 00:00 379 53 t Ol:·l' 10.6 212 1. 77 28 40 DAILY AVERAGE VALUES 10. 5 21. 1 1. 7(_, 27 3. 8 t t i PROPOSED LARSEN BAY HYDfh:Jt.Lh: f!{; C F'HOJ HUMPY CREEK NEAR NEAR LARSEN BA~. ALASKA DATE TIME BYTE RAW DATA M'J ========::; ===== =--='=~:-:-' ===~::::::::::::.:.;:·_-:: ::.7:::::.;: 0~/02/84 04:00 381 52 10' 10 4 05/02/84 o8·oo 383 5i 10.7 10 2 05/02/84 12:00 -38S Si 10<1 10 2 05/02/84 16:00 387 51 11 ":\ 1.0 2 05/02/84 20:00 389 52 1 1 " 10 4 05/02/84 00:00 :]9t 52 t08 10 4 DAILY AVERAGE VALUES 10 3 05/03/84 04:00 393 51 t 0""' 1() 2 05/03/84 08:00 395 51 1 u··· 10 2 f G~'lt 11/8:) PI\GE 24 START TIME 01/08!84 04:00 DEPTH STAGE DISCHG TEMP INCHES FEET CFS DEG C ======.-:: ====~..:: ==:::::::;::;;:: ===== 20.8 1 7] 2tJ 3. 5 20. 4 1. 70 25 3. 5 20. 4 1. 71} 25 4. 5 20. 4 1. 71) 25 6. 5 20 8 1 ?J 26 6. 0 20. 8 1 7J 26 4.0 20. 6 1 72 26 4. 7 20. 4 1. 70 25 3 5 20 4 1' 70 25 3. 5 I r l i It j l PROPOSED LARSEN BAr H'vDROELECTtUC PROJ t, .I HUMPY CREEK NEAR LARSEN BAY, ALASfo',A j: ' "I I~ DATE TIME BYTE RAW DATA ' ! ======!:::= ===== ===-= ========= j'l O:!t/04/84 02:00 1 18 I ' 05/04/84 04:00 2 18 05/04/84 06:00 3 18 0~/04/84 08:00 4 18 05/04/84 10:00 5 18 05/04/84 12:00 6 18 05/04/84 14:00 / 18 05/04/84 16:00 8 18 05/04/84 18:00 9 18 05/04/84 20.00 10 18 05/04/84 22:00 t1 18 05/04/84 00:00 1 ,, <'-18 DAILY AVERAGE VALUES 05/05/84 02:00 1.3 18 05/05/84 04:00 14 17 05/05/84 06:00 15 17 1•-ti 05/05/84 08:00 16 17 .I 05/05/84 10:00 17 17 05/05/84 12:00 18 17 111 05/05/84 14:00 19 18 : I 05/05/84 16:00 20 17 !Pl! 05/05/84 18:00 21 17 05105/84 20:00 22 17 o5tC!Jite4 22:oo 23 17 0~/05/84 00:00 24 17 DAILY AVERAGE VALUES •H 05/06/84 o2:oo 2~ 17 05/06/84 04.oo 2o 17 05/06/84 06:00 27 17 osto6t84 o8:oo 28 1 7 05/06/84 1o:oo 29 17 ost06/84 12:oo 30 16 05/06/84 14:00 31 17 05/06/84 16·00 32 17 05/01!1/84 18:00 33 17 05/06/84 20:00 34 18 05/06/84 22:oo 35 18 05/06/84 00:00 36 17 DAILY AVERAGE VALUES I I. I DEPTH FEET ====== 0.90 0,90 0.90 0. 90 0, 90 0. 90 0.90 0.90 0.90 0. 90 0,90 0.90 0.90 0.90 0,85 0.85 0.85 0.85 0. 85 0.90 0.85 0, 85 0.85 0.85 0.85 0.86 0.85 0.85 0.85 0.85 0.85 0.80 0.85 0.85 0.85 0.90 0.90 0.85 0.85 f OS/11/85 ~ :! f PAGE START TIME 05/04/84 STAGE DISCHG FEET CFS ===== ======= 090 25 0 90 25 0.90 25 0. 90 25 0, 90 25 0 90 25 0.90 25 0.90 25 0. 90 25 0. 90 25 0,90 25 0. 90 25 0.90 25 0,90 25 0 85 23 0.85 23 0.85 23 0.85 23 0.85 23 0.90 25 0, 85 23 0.85 23 0.85 23 0.85 23 085 2:3 0.86 23 085 23 0.85 23 0.85 23 0.85 23 0.85 23 0. 80 21 0. 85 23 0. 85 23 085 23 0.90 25 0.90 25 0. 85 23 0.85 23 I I I I I ~ ! 1 02:00 i f 1 t I f ' ' l i f 4 f I 1 t l i I ' ' ' i i . ~ .. PROPOSED LARSEN DAY H~DROELECTH:C PROJ 05111/85 PAGE 3 HUMPY CREEK NEAR LAW'iE.N BAY, ALASKA STAHT TIME 05/04/84 02•00 DEPTH STAGE DISCHG DATE TIME BYlF RAW DA1A FEET FEEl CFS =======::: ===== ::::: ...... ·;. :::::::::;:;:::=::::.--=:'.!: ·= ~ ====== :.:.=~== ===;:.~.::::-=:: 05/10/84 02:00 ., ,.., I ) 19 0.95 0. 95 27 05/10/84 04:00 74 19 0.95 0.95 27 05/10/84 Ob:OO 75 19 0.95 095 27 05/10/84 08:00 76 to 0. 95 0 95 27 05/10/84 10.00 ,..., I ' lq 0 95 0 95 27 05/10/84 12:00 7f3 10 ' . 0.95 0. 95 27 05/10/84 14:00 "7Q ' ' 20 1. 00 i. 00 30 05/10/84 1b:OO f31) 20 1. 00 1. 00 30 05/10/84 18·00 81 21 1 05 1. 05 32 0!5/10/84 20:00 8;:;: 21 1. 05 1. 05 32 05/10/84 22:00 H':l 2i 1 05 1 05 32 05/10/84 00:00 84 ;;•1 1 05 1. 05 32 DAILY AVERAGE VALUES 0.99 0. 99 29 05/11/84 02:00 8'5 21 1. 05 1. 05 """'· .. i ..:>c. 05/11184 04: 00 8,£., 20 1 00 1. 00 30 05/11/84 Ob: 00 R.·' 20 1 00 t. 00 30 05/11/84 08:00 tl8 21 1. 05 1 05 32 05/11184 10:00 89 21 1. 05 1. 05 32 05/11/84 12:00 90 2.1 1 05 105 32 05/11/84 14:00 91 21 1 05 1 05 32 0!5/11/84 1b:OO 92 22 1. 10 l 10 35 05/11/84 18: 00 92·: 23 1 15 1. 15 38 05/11/84 20:00 9.1! 2'.:.1 1. 15 1. 15 38 0!5/11/84 22:00 95 23 1. 15 1 15 38 05/11/84 oo·oo 9o 23 1. 15 1. 15 38 DAILY AVERAGE VALUES 1 08 1 08 34 05/12/84 02:00 97 23 1. 15 1. 15 38 05/12/84 04:00 '7'8 '1·'1 1. 10 1. 10 35 c..:::.. 05/12/84 Ob:OO 99 23 1. 15 1. 15 38 05/12/84 08:00 100 22 1. 10 1. 10 35 05/12/84 10.00 101 23 1. 15 1 15 38 05/12/84 12:00 1 o;~ ... , r"j O:..·J 1 15 1. 1 s 3B 05/12/84 14·00 103 2:3 1. 15 1 15 38 05/12/84 16:00 104 24 1. 20 1. 20 40 05/12/84 18:00 10~ 25 1. 25 1. 25 4.3 05/12/84 20:00 106 24 1. 20 1. 20 40 05/12/84 22·00 107 24 1. 20 1. 20 40 05/12/84 00:00 lOB :;:!4 1. 20 1. 20 40 DAILY AVERAGE VALUES 1. 17 1 17 39 ' ; ' I I I ' f J I ! • j ( ' /4 I l I I i I ) ( i i - PROPOSED LARSEN BAY H>DROELE(<PJC PROJ 05:11/85 PAGE 4 HUMPY CREEK NEAR LARSEN BAY. 4L.ASi",A STARf TIME 05/04/84 02:00 DEPTH STAGE DISCHG DATE TIME IJ'Yrt RAl.J DAT". FEET i="EET CFS =======:!.:= =:==== =-=..~~=;: '.""..':::::::=.:::-=.:=::=:::--::::::::: ===;;::== ----..... ===:-:::.::.;-=-: 05/13/84 02:00 lOS' ----~4 120 1. 20 40 05/13/84 04:00 i. 1 f\ :H 1. 20 1 20 40 05/13/84 0600 1 1 ) :;.'4 1. 20 1 20 40 05/13/84 o8·oo 1 12 24 1. 20 i. 20 40 05/13/84 10·00 11.3 24 1 20 1. 20 40 05/13/8<1 12·00 lH 24 1 20 1 20 40 05/13/84 14:00 115 24 120 120 40 05/13/84 1600 116 25 1. 25 1. 25 43 05/13/84 18:00 111' 25 1. 25 1. 25 4'] 05/13/84 20:00 118 25 1. 25 1 "'G "'-43 05/13/84 22·00 110 '"'lG •~ '·~ 125 1 25 43 05/13/84 00:00 12(• 25 1. 25 1 25 43 DAILY AVERAGE VALUES 1. 22 1. 22 41 05/14/84 02:00 12t 25 125 1. 25 43 05/14/84 04:00 .. ..-, .... , 24 1 20 1 20 40 ,1_1:-i:.. 05/14/84 06:00 j 2':J 2.5 1. 25 125 4;3 05/14/84 08:00 124 24 120 1 20 40 05/14/84 10·oo 1<15 24 1. 20 1 20 40 05/14/84 1200 126 ·j (:' e._ .. J 1. 25 i 25 43 05/14/84 14.00 127 24 1. 20 1. 20 40 05/14/84 16:00 128 25 125 125 43 05/14/84 18:00 1 .~~ ,~, r::. 125 1. 25 4~3 c." 05/14/84 20:00 1.](• 25 1. 25 1 25 43 05/14/84 22:00 LJl ·J;:; c:.. 1. 25 1 25 43 05/14/84 00:00 1.J2 2:j 125 1 .. 25 43 DAIU' tNERAGE ',IALUES 1. 23 1 23 42 05/15/84 02:00 1.1'3 25 1. 25 1. 25 43 05/15/84 04:00 1 '~~ ,. ;;.~4 1. 20 1. 20 40 05/15/84 06:00 L35 24 1. 20 1. 20 40 05/15/84 08:00 1 :If:· 24 1. 20 1 20 40 05/15/84 10.00 1 37 24 1. 20 1 20 40 05/15/84 12:00 1 ]t.l 24 1. 20 1. 20 40 05/15/84 14·00 1 ]" 24 1. 20 1 20 40 05/15/84 16·00 140 24 1. 20 1 ~0 40 05/15/84 18.00 141 25 1. 25 1. 25 43 05/15/84 20:00 14;;,~ 24 1. 20 1. 20 40 05/15/84 22:00 143 25 1. 25 1. 25 4'3 05/15/84 oo·oo 144 24 1. 20 1 20 40 DAILY AVERAGE 0ALUES 1. 21 1 21 41 f I I i I ' I ' I ' t I • ~ 'It i I I' • ~ • I • l ' ' PROPOSEC. LARSEN BA\' HvORIJELF•~ i"i~ IC PRO.J 0'.1,11185 p,:\GE 5 HUMPY CREEK NEAR LAF~·3EN BAY. !.;LASV,A START TIME 05/04!84 02:00 DEPTH ':3TAGE DISCHG DATE TIME BY:~ RAW Q,~ r to\ FEET FEET CP:~ ======== ===:::.= _ .. _, ::::-::::::::::::::::-::-:::::-;::·::::.:; ====== :'!"'=-..:==::::..: :::::::::::::~-:;::.=:: 05/16/84 02:00 1, ~.· 24 1. 20 1 20 40 05/16/84 04:00 14o 24 1. 20 1. 20 40 05/16/84 06.00 14 ·: 21i 1. 20 1 20 4l) 05/16/84 08:00 14B 24 1. 20 1. 20 40 05/16/84 10:00 1 :~ .-;· :::? ~~ 1. 20 1. 20 40 05/16/84 12:00 150 24 1. 20 1 20 40 05/16/84 14:00 15! 24 1. 20 1 . ;2(.\ 40 05/16/84 16:00 1 t.: •• :Jt:.;: 24 1. 20 1' 20 40 05/16/84 18:00 1 5~j 2'." 1. 25 1. 25-43 05/16/84 20:00 1 '51! 2:-; 1. 25 1 25 43 OS/16/84 22:00 1"" '·, "'"')r, c:.. 1.25 1 25 43 05/16/84 00:00 l St. 2~ 1. 25 1 ~r:; 43 DAILY AVERAGE VALUES 1 22 1 , ..... , • #!'! . .::... 41 05/17/84 02:00 15' -~ <; "'·-1. 25 1 2'3 43 05/17/84 04·00 1 "ji?t ·->s r:.. ·-~ 1 25 i 25 43 05/17/84 06:00 1. "'JC:• 25 1. 25 1 25 4'., _ ... 05/17/84 08:00 l6C 2t-; 1. 30 1. 30 46 05/17/84 10:00 161 2~. 1. 30 1 30 46 05/17/84 12:00 1 '";_: 27 1 35 1. 35 49 05/17/84 14:00 16~ 21 1 35 1. 35 49 05/17/84 16:00 16~ '"'7 "'-' 1. 35 1 35 49 05/17/84 18:00 1 !:.5 ~~t:· 1. 40 1 40 52 05/17/84 20:00 1 6t· 28 1. 40 l 40 52 05/17/84 22:00 1 b :;· 28 1. 40 i. 40 52 05/17/84 00:00 lf,A 28 1 40 1 40 52 DAILY AVERAGE VALUES 1 33 1. 33 48 05/18/84 02:00 1 ~JC.· 2fJ 1. 40 1. 40 52 05/18/84 0400 t 7(• 28 1 40 j 40 c,·; .• c;. 05/18/84 06:00 l 7'1 20 1. 40 1 40 52 05/18/84 08 00 1 '7r! ' ... 28 1. 40 j 40 52 05/18/84 to·oo 17.3 28 1.40 1 40 52 05/18/84 1200 174 28 1. 40 1. 40 52 05/18/84 1400 175 2B 1. 40 1 40 52 05/18/84 16. 00 1 7,., 29 1. 45 1. 45 55 05/18/84 18:00 177 2·~· 1' 45 i. 45 55 05/18/84 20:00 178 29 145 1. 45 55 05/18/84 22·00 179 29 145 1. 45 55 05/18/84 0000 !80 29 1. 45 1 45 55 DAIL'I' AVERAGE 1./A!.VE!=-; 1 42 1 42 53 r I I j I J I J f ~ tc t f ' l PROPOS~~ LARSEN BAt ~YOROELECT~.c PROJ O'J 1 11/85 Pf~GE 6 HUMPY CREEK NEAR LARSEN BAY. At.ASj~~.A START TIME 05/04/84 02"00 DEPTH STAGE DIS,:HG DATE TIME BY He h'AW UA fe~ FEET FEFl CF~~ ======-=~= ==tt== ":':.:::"'-':"'':! .::.:::::::::.:::::::'!~=:.:.: ---·· ====== ====.:= ====="";'.;:' 05/19/84 02:00 HiJ 29 1. 45 1. 4S 55 05/19/84 04:00 1[4.;:' 28 140 1 40 52 05/19/84 06:00 F43 ..... .:::; '"-· 1. 45 1 45 5'5 05/19/84 08:00 1 i3i~ 2:~ 1. 40 1 40 s.;: 05/19/84 10:00 Hi:-. 29 1. 45 1. 45 5'' 05/19/84 12:00 186 ;~~· 1. 45 1. 45 5"1 05/19/84 14:00 1 >CJ? 29 1 45 1 45 55 05/19/84 16:00 1 t:lFJ 29 1. 45 1 45 55 05/19/84 18:00 1 fj'7 2q 145 1 45 5:::· 05/19/84 20:00 19·~1 29 1.45 1. 45 55 05/19/84 22:00 1 "'! .-·..:·· <' .. 145 1 45 55 05/19/84 00:00 1 •.:·~: 2Ci 1. 45 i 45 5"' DAILY AVERAGE VAL.UES L 44 l. 44 55 05/20/84 02:00 i (.) ..... 1 '""lQ c: .. 1 45 1 45 55 05/20/84 04:00 194 2\.::· 1. 45 1 45 55 05/20/811 06:00 1 :;. <. 2~J 1. 40 1 40 52 05/20/84 08.00 1 ..:,• t: 2''il 1. 45 1. 45 53 05/20/84 10·00 1"'' 29 1. 45 1. 45 55 05/20/84 12:00 l"'f"' 2B 1. 40 1 40 5'., <::. 05/20/84 14:00 19C.: 2~:J 1. 40 1 41) 5;;:' 05/20/84 16:00 2!)'_:• ·~ ... · t::, .' 1. 45 1 45 55 05/20/84 18:00 2(•1 29 1. 45 1 45 55 05/20/84 20:00 20;? 29 145 1 45 55 05/20/84 22:00 20.~ 2H 1. 40 1. 40 52 05/20/84 00:00 204 28 1. 40 1. 40 52 DAILY AVERAGE VALUES 1. 43 1. 43 54 05/21/84 02:00 20':• 2f3 1. 40 1 40 5-' c:. 05/21/84 04:00 21)~_ ... ~. 2t~ 1 40 i 40 :;,:;·. 05/21/84 06:00 207' 28 1. 40 1. 40 52 05/21/84 08:00 208 28 1. 40 1 40 52 05/21/84 10:00 20S 27 1. 35 135 49 05/21/84 12:00 210 -:r• <:..' 1. 35 1 35 49 05/21/Bll 14:00 211 . ., ..... c. .• 1 35 1 35 49 05/21/84 16:00 21 ;:: 27 135 1. 35 49 05/21/84 18:00 212. 27 1 35 135 49 05/21/84 2000 214 27 135 1 35 49 05/21/84 2200 215 27 135 l. 35 49 05/21/84 00: 00 21o 27 1. 35 i 35 49 DATLY AVERAGE VALUES 1. 37 1 37 50 i ! ( f f ' ! I 4 ' I I j f f r l ! ! r ! ( 1 r PROPOS>:.u LARSEN BAr fn DRDE!.Er:: ri-; i C PROJ ()~. 11/85 PAGE 7 HUMPY CREEK NEAR LARSFN BAY, t~LfiSKA START TIME 05/04/84 02:00 DEPTH STAGE OTSCHG DATE TIME IW l t f? AW r1A l'(., FEET rEET CFS ======== ====== ::::::":.:;::-.; :•::::::::: =::::::•::;:,-; w~. ======== --····-··-==::=.·:::'!":'-:::: 05/22/84 0200 217 28 1. 40 1 40 52 05/22/84 04•00 .!18 27 1. 35 1. 35 49 05/22/84 06:00 21q .-,, c., 1. 35 1 :35 40 05/22/84 08 00 2~0 2lJ 1. 30 1. 30 4/o 05/22/84 10:00 .:;:;>t 2r~> 1. 30 i. 30 46 05/22/84 12.00 ~?~.'~~\ 26 1. 30 1 30 4t.· 05/22/84 14:00 22:] 26 1. 30 i. 30 46 05/22/84 16:00 2.2'1 2b 1. 30 1 30 46 05/22N34 18: 00 225 26 1 30 i 30 46 05/22/84 20:00 2:;:~ .. 2c. .. 1. 30 1 30 4tJ 05/22/84 22:00 22:' 21!:, 1. 30 1 30 4t, 05/22/84 00:00 22t1 26 1. 30 i 30 46 DAILl' AVERAGE VALUES 1. 32 i 32 47 05/23/84 02:00 229 2r:: :J 1. 25 l 25 43 05/23/84 04:00 230 ,.....,. 1. 25 1. 25 43 c::: ..... 05/23/04 06·00 211 25 1 25 1 25 43 05/23/84 08:00 2J~~ 25 1 25 1 25 43 05/23/84 10:00 233 25 1 25 1 '""'C:, . =-~ 43 05/23/84 12:00 ~>34 25 1. 25 t 25 43 05/23/84 14:00 2.35 25 1. 25 1 25 43 05/23/84 1600 2;16 2:':· 1 25 1 25 4'3 05/23/84 1800 237 2io 1 30 1 30 46 05/23/84 20:00 2·,·3t·J ~~~ ,1 1 35 i. :]5 49 05/23/84 22:00 ~··~o «--. .., ' c .. 1 35 1 35 49 05/23/84 00:00 240 26 1. 30 1 --.r, . JlJ 46 DA ll.Y AVERAGE VA\_UES 1. 28 1. 28 45 05/24/84 02:00 ;;.241 2~ 1. 25 1. 25 4:'3 05/24/84 04:00 24.=' 2~:, 1. 25 1 :;-•5 4'" 05/24/84 06:00 24'3 .., .. c.,} 1. 25 1. 25 4.3 05/24/84 08:00 244 ~r..:: .c. ~J· 1. 25 1 25 4 -~ 05/24/84 10:00 245 2::, 1. 25 1 :;c. 4:3 05/24/84 12:00 246 "'1 e, c:. '~ 1. 25 1 25 4-:l 05/24/84 14:00 24} ")C. C..•-1 1. 25 1 25 4J 05/24/84 1600 241:-' '1<1 c . 1. 20 1 20 40 05/24/84 18:00 249 24 1. 20 1. 20 40 05/24/84 20:00 250 24 1. 20 1 20 40 05/24/84 22:00 251 25 1. 25 1. 25 4-' . .;) 05/24/84 00:00 25~~ 24 1. 20 1 20 40 DAILY AVERAGE VALUES 1 23 1 23 42 I i t I I J I I t J I I I I I i I I t t f i PROPOSEU LARSEN BAV H\UROELEGfRl~ PRQJ Oei 11i85 F·AGE 8 HUMPY CREEK NEAR LAPSEN BAY, ~\LASfi,A S1ART TIME 05/04/84 02:00 DEPTH STAGE DISCHG DATE TIME l1 '-' l E RAW OA T,u, FEET FEET CFS ======-=:::= ===== =="';!:';:;:"!. =~=::::::::::."::~...::'~ ====== -====~ =:;:!!=·:.:::.:~ 05/25/84 02.00 25] ?.4 1. 20 1 20 40 05/25/84 04:00 2~;4 24 1. 20 ! 20 40 05/25/84 06.00 255 24 1. 20 t 20 40 05/25/84 0800 2Sf., 24 1. 20 1 20 40 05/25/84 10·00 257 23 1. 15 1 15 38 05/25/84 1200 258 ~~4 L 20 l 20 40 05/25/84 14:00 259 24 1. 20 1. 20 40 05/25/84 16:00 260 ;.,:4 1. 20 1 20 40 05/25/84 18:00 ~-. ' .. O..nJ. ~25 125 1 25 43 05/25/84 20:00 262 25 1 25 l. 25 43 05/25/84 2200 -~!6] ~~4 1 20 1 20 4() 05/25/84 00.00 264· ;,•4 1. 20 1 20 40 DAILY AVERAGE ~ALVES 1 20 1. 20 40 05/26/84 02:00 ,2,LJ<j 2·~ 1 20 120 4(.\ 05/26/84 04·00 2b6 :-·] 1 15 t 15 38 05/26/8<l 06·00 26/ 23 115 t 15 38 05/26/84 08.00 26t; 2.1 1. 15 1 15 38 05/26/84 10:00 260:.' ~~3 1. 15 1 15 38 05/26/84 12:00 ~! ?t) '>'' c;. ~.:i 1 15 1 15 38 05/26/84 14:00 ;;u t 2il 1 20 120 4!) 05/26/84 16·00 ....,_.,..., c .. / ...... '1"' L:.. ,/ 1. 25 1 25 41 05/26/84 18:00 27? 2') 1. 25 1 25 43 05/26/84 2000 2711 2~:1 1 25 i. 25 4.3 05/26/84 22:00 27~ 2"' 125 1 25 4.3 05/26/84 00:00 2~'~. 2:, 1. 25 1 25 43 DAIL''' AVERAGE './ALUES 120 1. 20 40 05/27/84 02•00 27' 24 1. 20 120 40 05/27/84 04:00 2:.'8 24 1. 20 1 20 40 05/27/84 06:00 2 :J r;~ 2<l 1 20 1. 20 40 05/27/84 08:00 28t) 24 1. 20 120 40 05/27/84 10:00 281 ") "J c..·-' 1 15 1 15 38 05/27/84 12:00 28? 2] 1 15 i 15 38 05/27/84 14:00 28'.:: 2] 1 15 1 15 38 05/27/84 16-00 2B4 .., -, ' j 1. 15 1 15 38 05/27/84 1800 285 ......,. ··, 1 15 1 15 38 "',) 05/27/84 20:00 28f, 2.3 1 15 1 15 38 05/27/84 22.00 2B7 2J 1. 15 1 15 38 05/27/84 oo·oo 288 .....,. ·,1 1. 15 1. 15 38 c..~ DAILY AVERAGE VALUES 1. 17 117 3'7' I i I i I a f } I ! f f ' PROPOSEL' LARSEN BAr 1-i\ DROELE• .. fill C PROJ 0 '} i 11 /8 '1 F!,GE 9 HUMPY CREEK NEAR LARCif.N BAY, f1i...J•SY.A START T[ME 05/04/84 02 00 DEPTH STAGE DISCHG DATE TIME BYH RAW [):,r,, FEET FEI:.1 CFC ======~= ===== --·--:::::::::::::.~=·=~::. ;-_· =====:::::::: ·--~--·~-:::::==-=:::::::::: 0~/28/84 02:00 2F:L.' 2-.~ 1. 15 1 1 5 38 05/28/84 04:00 2;-J,_; 2J 1. 15 i. 1 '5 38 05/28/84 Ob:OO 2~,;: 2' • .J 1. 15 1. 15 38 03/28/84 08:00 ,..,,--,,., 2:J 1. 15 1 15 38 c:. -,; .. 05/28/84 10.00 2Y::·1 ... 1 •• ,._ J 1. 15 i 15 38 05/28/84 12:00 ~~~·r'il ... , .. , c.-.J 1 15 1 15 38 05/28/84 14:00 295 , ..... .:::.. .. ) 1. 15 i. 15 38 05/28i84 16:00 296 2:] 1 15 1 15 38 05/28/84 18.00 2·~~ 23 1 15 1 15 38 05/28/84 20.00 ~9t~ 2"] 1 15 1 15 38 05/28/84 22:00 ;;:>91:' 2:-J 1 15 1 15 38 ost28/B4 oo·oo 300 2:3 1. 15 i 15 38 DAILY AVERAGE ','ALVES 1 15 1 15 38 05/29/B4 02·00 301 ...... ~ '\ 1. 15 1. 15 3t-J "'-' 0~/29/84 04:00 302 23 1. 15 L t5 38 05/29/84 Ob:OO 303 '"l"":'• t:;...--..1 1. 15 j 15 38 05/29/134 08:00 304 2J 1. 15 1. 15 38 0~/29/84 10:00 305 2"! 1. 15 1 15 38 05/29/84 12:00 306 ~--:. C:...J 1. 15 1 15 38 05/29/84 14:00 30"7 .., ~· c;..J 1. 15 1. 15 38 0~/29/84 lb:OO 308 ... ,, .. 1. 15 1 15 38 c .. ~J 05/29/84 18:00 30'i' ., ··; C..•.,.} 1. 15 1 15 38 05/29/84 20·oo 310 21 1. 15 1 15 38 0~/29/84 22:00 31J. 23 1. 15 1 15 38 05/29/84 QO:OO 31;_ 2~ ...:l 1. 15 j 15 38 DAILY AVERAGE V~ IJES 1 15 1. 15 38 05/30/84 02:00 31·:; 1""\>...0:. 1. 10 1 10 35 c· t:. 05/30/84 04:00 314 2,.! 1 15 1. 15 3tl 05/30/84 Ob:OO 3i~ ... 1 "' (', -J 1 15 1 15 38 05/30/84 08:00 31t-2,) 1. 15 1 15 38 05/30/84 10:00 31 :' 23 1. 15 1. 15 38 05/30/84 1200 31 r~ 23 1 15 1 15 38 05/30/84 1400 31'1' ''1·"1 c~.r::-1. 10 1 10 35 05/30/84 lb:OO 320 22 1. 10 1 10 35 05/30/84 18:00 321 22 1. 10 1 10 35 05/30/84 20 00 32:-::: 22 1. 10 1. 10 35 05/30/84 2200 3'"1'" .C:..•.J 22 1. 10 1. 10 35 05/30/84 00:00 324 .,,, c_.:;,: 1. 10 1 10 35 DAILY AVERAGE VALUES 1. 12 1 1" "· 36 • t t I I 1 I I • f i I l j ' 1 I 1 I • I J I I i . ... PROPOSED LARSEN BAY h•DRO~LECfRTC PROJ 05.'11 /8'::· Pt>.GE 10 HUMPY CREEK NEAR LARSEN BAY. Ri..t\ShA SlART TlME 05/04;84 02:00 DEPTH STAGE DISCH<"": DATE TIME BYlE RAW DAfl, FEET FEET CFS ======":::= ==s=== :-::.=:"':"=:: :;;::::::=:::::::::::-: ·-======= ===== ==~==::.~ 05131/84 02:00 325 '""J·} c. e. 1. 10 1 10 35 05131184 04:00 326 22 1. 10 l 10 35 05131!84 06. 00 327 22 1. 10 l 10 35 05131184 08:00 ];.;8 21 1. 05 1 OS 3;2 05131184 10:00 3;;1q 22 1. 10 1 10 ;3S 05131/1:-14 12:00 ;·LIC 2i 1. 05 1. 05 3,.;> 05131184 14:00 3::11 21 1 05 1. 05 32 0 5 I 31 I 8 4 1 6 · 00 J:J:::; 21. 1 05 1. OS 32 05131184 18:00 JjJ 21 1 05 1 05 3.;: 05131184 20:00 3Jtl 2i. 1 05 i. 05 3.? 05131184 22:00 :3-."3~) 21 1. 05 i 05 3.~· 05131184 00:00 3Jf: 2i 1 05 1. 05 3~ DAILY AVERAGE VAL.0ES 1. 07 1 07 3:! 06101184 02:00 ., ·-,·--: ~.:).' 21 1 OS 1. 05 3J 06101184 04:00 3.3H 20 1. 00 1 00 3C> 06101184 06:00 3.J<? 2i 1 05 1. 05 3~ 06101184 08:00 J4(' 20 1. 00 j 00 :30 06101184 10:00 34! 21 1 05 1 05 3d 06101184 12:00 34:,;' 20 1. 00 i. 00 30 06101184 14:00 3'D 20 1. 00 1. 00 30 061011FJ4 16:00 344 21 1. 05 1 05 32 06101184 18:00 34'_; 20 1. 00 1. 00 30 06101184 20:00 34,L, 20 1. 00 1 00 30 06101184 22:00 347 20 1. 00 1. 00 30 06101184 00:00 34t: 20 1. 00 1. 00 30 DAILY AVERAGE VALUES 1. 02 1. 02 31 06102184 02:00 31'-i 20 1 00 1. 00 30 06102184 04:00 350 20 1. 00 1. 00 3i.) 06102184 06:00 351 20 1. 00 1. 00 30 06102184 08:00 35~' 20 1. 00 1 00 30 06102184 10:00 35:3 20 1. 00 1. 00 30 06102184 12:00 354 2<) 1. 00 1. 00 30 06102184 14:00 35~ 20 1. 00 1. 00 30 06102/84 16:00 35t. 20 1. 00 1 IJO 3(.\ 06102184 18:00 357 ,.,,-. c.-1. 00 1. 00 3•.) 06102184 20:00 35fJ 20 1. 00 1 00 30 06102184 22:00 3'59 19 0 95 095 '17 r.:..- 06102184 00:00 31:>0 19 0. 95 0. 95 27 DAILY AVERAGE VALUES 0.99 0.99 30 I f ' I I ' j I j I 1 f f l f l I I I I I I .. j ; ' l j ' .. ' PROPOS~D LARSEN BAY HYDROELE(fRJC PROJ 0'5:'1118'5 PAGE 11 HUMPY CREEK NEAR LARSlN BAY, AU\SII,A START fiME 05/u4/84 02:00 DEPTH STAGE DISCHG DATE TIME BYfF RAW DAIA FEET FEFT CF:~ ======-== ===== ==·! ::.= ==-====-==-..:-.: ====== --·--·--:::==~=== 06/03/84 02:00 31':>1 19 0. 95 0.95 27 06/03/84 04:00 36~:' 19 0.95 095 27 06/03/84 06:00 36] 19 0. 95 0.95 2/ 06/03/84 08:00 36·1 19 095 0 95 2] 06/03/84 10:00 3/J:j 19 0.95 0. 95 ,.,, C-• 06/03/84 12:00 3~·1, 19 095 0 95 2.?. 06/03/84 14:00 367 19 0. 95 0. 95 21. 06/03/84 16:00 36t1 19 095 095 27 06/03/84 18:00 36<,.' 19 0 95 0. 95 27' 06/03/84 20:00 3.7 0 1 ''? 0. 95 0. 95 27 06/03/84 22:00 371 19 0. 95 0 95 ,., . .., c:../ 06/03/84 00:00 37~:.' 19 095 0 95 ,.,~ c:..: DAILY AVERAGE VALUES 0. 95 0. 95 27 06/04/84 02:00 37:3 19 0.95 0. 95 27 06/04/84 04:00 374 19 0. 95 0 95 27 06/04/84 06:00 3 ?~-. t<i' 0.95 0 95 27 06/04/84 08:00 37~-19 0.95 () 95 27 06/04/84 10:00 377 19 0. 95 () 95 27 06/04/84 12:00 37f3 19 0.95 0 95 27 06/04/84 14:00 379 18 0.90 0 90 25 06/04/84 16:00 31:30 19 0. 95 0. 95 27 06/04/84 18:00 381 19 0.95 0 95 27 06/04/84 20:00 382 19 0. 95 0 95 27 06/04/84 22:00 38::! 18 0. 90 0. 90 25 06/04/84 00:00 384 18 0. 90 0 90 25 DAILY AVERAGE VALUES 0. 94 0 94 27 06/05/84 02:00 385 18 0.90 0. 90 25 06/05/84 04:00 38b 18 0.90 0 90 2'j 06/05/84 06:00 38/ 18 0.90 0. 90 25 06/05/84 08:00 388 18 0. 90 0. 90 2':• 06/05/84 10:00 389 18 0. 90 0. 90 2"' 06/05/84 12:00 390 18 0. 90 0 90 ,.,c: c.~· 06/05/84 14:00 391 18 0. 90 0 90 "1', ~ ·- 06/05/84 16:00 3S''J 19 0. 95 0. 95 ,.,~ C:..l 06/05/84 18:00 393 18 0.90 0. 90 25 06/05/84 20:00 394 18 0. 90 0. 90 25 06/05/84 22:00 395 18 0. 90 0. 90 25 06/05/84 00:00 39t_, 18 0. 90 0 90 25 DAILY AVERAGE VALUES 0. 90 0 90 25 ' . I j I j I j i 1 • ! f ' ! I ! I j I J f ~ ~ PROPOSED LARSEN BAY t-tY DRiJf=L.E<..: rH fC PROJ O'J i1/85 PAGE 12 HUMPY CREEK NEAR LARSEN BAY, f~L ASV • .i\ SlART riME 05104/84 02:00 DEPTH STAGE DISCHG DATE TIME f:li' Tie RAW DA rr~ FEET FEET CFS -===-===== =r===-= ==~==-===-=:::==:::=-::k-: ====== ~-----=====:= 06/06/84 02:00 39-7 18 0. 90 0 90 25 06/06/84 04:00 398 18 0. 90 0. 90 25 06/06/84 06:00 399 lEi 0. 90 0. 90 2"' 06/06/84 08:00 400 18 0. 90 0. 90 25 06/06/84 10:00 401 18 0. 90 0. 90 2~1 06/06/84 12:00 40~·: 11:1 0.90 0. 90 25 06/06/84 14:00 40:i 18 0. 90 0 90 25 06/06/84 16:00 404 18 0 90 0 90 25 06/06/84 18:00 405 18 0. 90 0. 90 25 06/06/84 20:00 40tl 18 0. 90 0 90 25 06/06/84 22:00 407 18 0. 90 0. 90 2'5 06/06/84 00:00 408 18 0. 90 0 90 2:1 DAILY AVERAGE VALUES 0. 90 o. o:;.o 25 06/07/84 02:00 4(19 18 0. 90 0 90 25 06/07/84 04:00 410 lf-J 0 90 0 9(• .,<; c.~ 06/07/84 06:00 41i 18 090 0 90 25 06/07/84 08:00 4L? 17 0 85 0 85 23 06/07/84 10:00 413 18 0.90 0. 90 25 06/07/84 12:00 414 17 0. 85 0 85 23 06/07/84 14:00 415 1? 0 85 0. 85 23 06/07/84 16:00 4i6 18 0. 90 0 90 25 06/07/84 18:00 41,. 1. 7 085 0 85 2.] 06/07i84 20:00 4iH 1 ? 0 85 0 85 23 06/07/84 22:00 41.q 1.7 0. 85 0 85 23 06/07/84 00:00 420 17 0.85 0. 85 23 DAILY r~VERAGE VALUES 0. 87 0. 87 24 06/08/84 02:00 4?1 J.7 0.85 0 85 2:.i 06/08/84 04:00 4~2~-=.: 17 0.85 0. 85 23 06/08/84 06:00 42:~ 18 0. 90 0 90 25 06/08/84 08:00 42 1+ 18 0. 90 0. 90 25 06/08/84 10.00 425 1. 7 085 0 85 23 06/08/84 12:00 4;?t 17 0. 85 0 85 23 06/08/84 14:00 4;.,'7 Fl 0. 90 090 25 06/08/84 16:00 428 18 0. 90 0. 90 25 06/08/84 18:00 4;29 18 0. 90 0 90 25 06/08/84 20:00 4JO li::l 0 90 0 90 25 06/08/84 22:00 4:31 17 0. 85 0 85 23 06/08/84 00:00 432 107 0. 85 0 85 23 DAILY AVERAGE VALUES 0. 88 0 88 24 t f I l t 4 f • f I j I 1 I 1 r J I J I 1 ' t l ' 'i- PROPOSED LARSEN BAY HY OROELEC rt< l C f-'ROJ OS,l1/85 PAGE 13 HUMPY CREEK NEAR LARSEN BAY, AU"'SKA SlART TIME 05/04/84 02:00 DEPTH STAGE DISCHG DATE TIME BYIE RAW DA fA FEET FEET CFS ======::=:::: ===== =.::'::-:: :=:.:::::-:::::::=:-.:-:.·.·~. ====== -~ ·--·--===~=:=- 06/09/84 02:00 4T3 17 0.85 0 85 2::1 06/09/84 04:00 4·.H 1I 0.85 0.85 2J 06/09/84 06:00 435 1 ,<_, 0. 80 0. 80 21 06/09/84 08:00 I!Jt .. u~ 0.80 0. 80 21. 06/09/84 10:00 4''17 1 .~ 0. 85 0 85 2J 06/09/84 12:00 4JP Uc. 0.80 080 21 06/09/84 14:00 439 16 080 0. 80 21 06/09/84 16:00 440 16 0.80 080 21 06/09/84 18:00 44J 16 0. 80 0. 80 21 06/09/84 20:00 442 16 0 80 0 80 21 06/09/84 22:00 443 1o 0. 80 0 80 21 06/09/84 00:00 444 16 0. 80 0 80 21 DAILY AVERAGE VALUES 0 81 0. 81 22 06/10/84 02:00 445 16 0.80 0 80 2i 06/10/84 04:00 446 16 0. 80 0. 80 21 06/10/84 06:00 447 if_:, 0 80 0. 80 2i 06/10/84 08:00 44t1 1b 0. 80 0 80 21 06/10/84 10:00 449 16 0.80 0 80 21 06/10/84 12:00 450 16 0. 80 0. 80 21 06/10/84 14:00 45l 16 0 80 0 80 21 06/10/84 16:00 45;:' 1 f., 080 0 80 21 06/10/84 18:00 45] U;; 0.80 0. 80 21 06/10/84 20:00 45:l. if., 080 0. 80 21 06/10/84 22:00 455 1.6 0.80 0 80 21 06/10/84 00:00 456 16 0.80 0 80 21 DAILY AVERAGE VAL.UES 0.80 0.80 2i 06/11/84 02:00 457 15 0. 75 0 75 18 06/11/84 04:00 458 15 0. 75 0. 75 18 06/11/84 06:00 459 15 0. 75 0. 75 18 06/11/84 08:00 460 15 0. 75 0 75 18 06/11/84 10:00 461 15 0. 75 0 75 18 06/11/84 12:00 462 15 0. 75 0 75 18 06/11/84 14:00 463 15 0 75 0 75 18 06/11/84 16:00 464 15 0. 75 0. 75 18 06/11/84 18:00 465 15 0. 75 0. 75 18 06/11/84 20:00 466 15 0. 75 0. 75 18 06/11/84 22:00 467 15 0. 75 0 75 18 06/11/84 00:00 468 15 0 75 0 75 18 DAILY AVERAGE V~_UES 0. 75 0 75 18 • r t [ f i j f 1' r l j r f ! , ,. "' ~ .i ' • ' PROPOSED LARSEN BAY HYOROELECf01C PROJ 0::0 1 11/85 PAGE 14 HUMPY CREEK NEAR LARSEN BAY, /~l AS!,~,A START TIME 05/04/84 02:00 DEPTH STAGE OISl:H<:i DATE TIME BYTE RAW OAT r, FEET FEET CFS =======·= ::c::=:== ===~-::: ==-:-:-=~-:-=·· .. :-. ======= ====.:= =====-:= 06/12/84 02:00 469 15 0. 75 0 75 18 06/12/84 04:00 470 14 0. 70 0. 70 16 06/12/84 0600 4·71 14 0. 70 0. 70 16 06/12/84 08:00 47·-·, ·<! 14 0. 70 0 70 u_, 06/12/84 10·00 47:] j 4 0. 70 0. 70 16 06/12/84 12:00 474 15 0. 75 0 75 18 06/12/84 14:00 475 14 0. 70 0 70 16 06/12/84 16:00 476 14 0 70 0 70 16 06/12/84 18:00 477 14 0. 70 0. 70 16 06/12/84 20:00 47F; 14 0. 70 0 70 16 06/12/84 22:00 47S· 14 0. 70 0. 70 16 06/12/84 00:00 48C• 14 0. 70 0 70 16 DAILY AVERAGE VAl.UES 0. 71 0. 71 16 06/13/84 02:00 481 j 4 0. 70 0. 70 16 06/13/84 04:00 48::,' 1.4 0 70 0. 70 16 06/13/84 06:00 48:~ 14 0. 70 0 70 16 06/13/84 08:00 484 14 0. 70 0 70 16 06/13/84 10:00 485 jij 0. 70 0 70 16 06/13/84 12:00 486 14 0. 70 0. 70 16 06/13/84 14:00 4~37 14 0 70 0 70 16 06/13/84 16:00 488 1 11 0. 70 0. 70 u, 06/13/84 18:00 4[19 14 0. 70 0 70 16 06/13/84 20:00 490 14 0. 70 0. 70 11:> 06/13/84 22:00 491 14 0. 70 0. 70 16 06/13/84 00:00 49;;' 14 0. 70 0 70 16 DAILY AVERAGE VALUES 0 70 0. 70 16 06/14/84 02:00 q9:3 Ll 0. 65 0 65 1 5 06/14/84 04:00 4911 13 0.65 0. 65 1'J 06/14/84 06:00 49~· L3 0.65 0 65 15 06/14/84 08:00 496 1 .• 0. 65 0. 65 1 :'j 06/14/84 1000 497 LJ 0. 65 0. 65 1 '''} 06/14/!:14 12·00 49~1 1 3 0. 65 0 65 1 '5 06/14/BlJ. 14:00 49c;' l -~ 0. 65 0 6'5 15 06/14/84 16 00 50(.• Li 0. 65 0 65 15 06/14/84 18:00 501 lJ 0. 65 0. 65 1 ~- 06/14/84 20:00 so;,' 13 0.65 0 65 15 06/14/84 22:00 so:J Ll 0. 65 0.65 15 06/14/84 00 00 504 13 0. 65 0. 65 15 DAILY I-\VERAGE VAI..UES 065 0 65 15 ' ~ • I 1 I i f f • ! i t I I I I i .. • I j J I i PROPOSED LARSEN GAY H~DROELECfHIC PROJ o·.: ... 11185 PAGE 15 HUMPY CREEK NEAR LARSEN BAY, /o~U\SI' .. A START TIMF 05/04/84 o2·oo DEPTH STAGE DJSCHG DATE TIME BY H: RAW D·~ lA FEET FEET CFS ========::::= ======= = = ::::: ======~:-:--;"':.· ====== -----===:::.:::::· 06/15/84 02:00 50S 13 0.65 0 65 15 06/15/84 04:00 '506 1 :J 0.65 0 65 15 06/15/84 06:00 501' 1:3 0.65 065 1 ::1 06/15/84 08:00 508 13 0. 65 0 65 15 06/15/84 10:00 '50'? 13 0. 65 0.65 15 06/15/84 12:00 510 1'3 0.65 0 65 15 06/15/84 14:00 Sil 12 0. 60 0 60 13 06/15/84 16:00 512 12 0 60 0. 60 1:3 06/15/84 18:00 513 13 0 65 0.65 15 06/15/84 20:00 51-1 12 0. 60 0. 60 13 06/15/84 22:00 515 13 0.65 0. 65 15 06/15/84 00:00 516 12 0. 60 0 60 13 DAILY AVERAGE VALUES 0.63 0.63 14 06/16/84 02:00 517 12 0. 60 0. 60 1J 06/16/84 04:00 518 12 0. 60 0. 60 L3 06/16/84 06:00 519 1 ,, '"-o. oO 060 13 06/16/84 08:00 520 12 060 o oO 13 06/16/84 10:00 521 1 ,-, 0 60 0. 60 13 06/16/84 12:00 s·"~'"• .... c:...:-. 1.2 0 60 0 60 13 06/16/84 14:00 523 12 0.60 0. 60 13 06/16/84 16:00 524 12 0. 60 0. 60 1::3 06/16/84 18:00 5.~'3 12 0.60 0.60 13 06/16/84 20:00 5;:,'""" 1.2 0. 60 0. 60 1'3 06/16/84 22:00 52/ 12 0. 60 0. 60 13 06/16/84 00:00 528 12 0. 60 0. 60 13 DAILY AVERAGE VALUES 0. 60 0. oO 1.3 06/17/84 02:00 52'7' 12 0. 60 0. 60 1 j 06/17/84 04:00 5.10 L2 0. 60 060 1 -. 06/17/84 06:00 5:J1 11 0. 55 0. 55 11 06/17/84 08:00 532 12 0. 60 0 60 13 06/17/84 10:00 533 1d 0.60 0 60 13 06/17/84 12:00 5:3·1. 15 0. 60 0 60 1] 06/17/84 14:00 53~ 12 060 0 60 13 06/17/84 16:00 536 12 0. 60 0 60 1J 06/17/84 1a·oo s:~? 1 i 0. 55 0 55 11 06/17/84 20:00 538 12 0. 60 0. 60 1.3 06/17/84 22:00 539 11 0. 55 0 55 11 06/17/84 00:00 540 11 0. 55 0 55 11 DAILY AVERAGE VALUES 0 58 0 58 12 I, ' ~ y ' 1 ~ f f r i t ' f • J I I J # i j I "' ~ PROPOSED LARSEN BAY HY DRIJELE•: !"f< l C PROJ 0;~·11/85 PAGE 16 HUMPY CREEK NEAR LARSEN BAY, f-L. AS~.A START TIME 05/04/84 02:00 DEPTH STAGE DISCHG DATE TIME BYT[ RAW DATI, FEET FEET CFS =-=:.•tw===: ==-::IIIC= ==== =~·-====~~===-~:::: ==•a:~=== ======= :::::z==·:.::::;.: 06/18/84 02:00 S41 11 0. 55 0. 55 11 06/18/84 04:00 542 11 0 55 0. 55 11 06/18/811 06:00 543 11 0 55 0 55 11 06/18/84 08:00 544 l1 0. 55 0 55 1 1 06/18/84 10:00 545 11 0. 55 () 55 11 06/18/84 12:00 54b 1 1 0 55 0 55 11 06/18/84 14:00 547 1 i 0. 55 0. 55 11 06/18/84 16:00 548 11 0. 55 0. 55 11 06/18/84 18:00 549 1 i 0 55 0. 55 11 06/18/84 20:00 55(' 11 0. 55 0 55 1 i 06/18/84 22:00 551 11 0. 55 0. 55 1l 06/18/84 00:00 5%:' 11 0. 55 0 55 11 DAILY AVERAGE VALUES 0. 55 0. 55 11 06/19/84 02:00 553 11 0. 55 0. 55 11 06/19/84 04:00 554 11 0. 55 0. 55 11 06/19/84 06:00 555 11 0. 55 0. 55 11 06/19/84 08:00 55~. 11 0 55 0 55 11 06/19/84 10:00 55"7 11 0. 55 0. 55 11 06/19/84 12:00 5'58 11 0. 55 0 55 11 06/19/84 14:00 sse.· 11 0. 55 0. 55 11 06/19/84 16:00 5h0 10 0. 50 0 50 9. 4 06/19/84 18:00 5t>1 1 1 0. 55 0 55 1 1 06/19/84 20:00 562 11 0. 55 0 55 11 06/19/84 22:00 56:3 11 0. 55 0. 55 11 06/19/84 00:00 564 1.1 0 55 0 55 11 DAILY AVERAGE VALUES 0. 55 0 55 11 06/20/84 02:00 56~ 10 0. 50 0. 50 9. 4 06/20/84 04:00 566 11) 0. 50 0. 50 9 4 06/20/84 06:00 567 10 0. 50 0. 50 9. 4 • 06/20/84 08:00 568 10 0. 50 0. 50 9. 4 06/20/84 10:00 569 lO 0. 50 0. 50 9. 4 06/20/84 12:00 571/ 10 0. 50 0 50 9. 4 06/20/84 14·00 57'; 10 0. 50 0 50 9. 4 06/20/84 16:00 572 10 0. 50 0 50 9. <1 06/20/84 18:00 5 7::i 10 0. 50 0 50 9 4 06/20/84 20:00 574 10 0. 50 0. 50 9. 4 06/20/84 22:00 575 10 0. 50 0. 50 9. 4 06/20/84 00:00 576 10 0. 50 0 50 9. 4 DAILY AVERAGE VALUES 0 50 0 50 9 4 t t J f { PROPOSED LARSEN DA~ hvDROELEClHIC PROJ 05,11185 PAGE 17 HUMPY CREEK NEAR LARSEN BAY, .4LM3KA START TIME 05/04184 02:00 DEPTH Sf AGE DIS(HG DATE TIME BY IT_ RAW DA f ,:; FEET FEET CFS =======:.: ===== :::::=-::'!"; ==::::::::=:=!:.::;::.:~ ====== =.:,:.:::::.:::::= ====~-::·=: 06/21/84 02:00 5'' ·: I, 10 0. 50 0 50 9 4 06/21/84 04: 00 571:3 10 0. 50 0. 50 9 4 06/21/84 06:00 57-;• 10 0. 50 0. 50 9. 4 06/21/84 08:00 5BO 10 0. 50 0 50 9 4 06/21/84 10:00 581 10 0. 50 0 so 9. 4 06/21/84 12:00 SG:~~ 10 0. so 0. 50 9 4 06/21/84 14:00 SFB 10 0. 50 0. 50 9 4 06/21/84 16:00 584 10 0. 50 0. 50 9. 4 06/21/84 18:00 58~} 10 0. 50 0. 50 9 4 06/21/84 20:00 586 10 0. 50 0 50 9. 4 06/21/84 22:00 Stl' 10 0. 50 0. 50 9 4 06/21/84 00:00 5£11::1 10 0. 50 0 50 9 4 DAILY .4VERAGE VALUES 0. 50 0 50 9 4 06/22/84 02:00 58'> 10 0. 50 0. 50 9. 4 06/22/84 04:00 SS'O 0'1' 0. 45 0 45 7, 9 06/22/84 06:00 59J 09 0. 45 0 45 7 9 06/22/84 08:00 s~·:-2 09 0. 45 0 45 7 9 06/22/84 to·oo 593 O'i 0. 45 0 45 7 9 06/22/84 12:00 594 09 0. 45 0 45 7. 9 06/22/84 14:00 59'] 0'? 0. 45 0. 45 7. 9 06/22/84 16:00 596 09 0. 45 0 45 7 9 06/22/84 t8·oo 5SP o.:.-. 0. 45 0 45 7. 9 06/22/84 20:00 598 09 0.45 0. 45 7. 9 06/22/84 22:00 ~99 09 0.45 0. 45 7. 9 06/22/84 00:00 600 09 0.45 0 45 7. 9 DAILY AVERAGE VALUES 0 45 0. 45 8. 0 06/23/84 02:00 601 09 0. 45 0 45 7 9 06/23/84 04.00 602 09 0.45 0 45 7 9 06/23/84 06:00 o0:3 09 0.45 0 4'5 7 9 06/23/84 08:00 604 09 0.45 0 45 7. 9 06/23/84 10:00 605 09 0. 45 0 45 7. 9 06/23/84 12.00 606 09 0. 45 0 45 7 9 06/23/84 14:00 607 09 0. 45 0 45 7. 9 06/23/84 16:00 608 09 0. 45 0 45 7. 9 06/23/84 18:00 609 09 0. 45 0. 45 7 9 I· 06/23/84 20:00 610 09 0.45 0 45 7 9 06/23/84 22:00 611 09 0.45 0 45 7. 9 06/23/84 00:00 61:;: oo 0. 45 0 45 7 9 DAILY t-,VERAGE VAl_UES 0. 45 0 45 7 9 • l l l I I I J I . . PROPOSED LARSEN BAY H~OROELEC"RlC PROJ 0<)'11185 PAGE 18 HUMPY CREEK NEAR LARSEN BAY, t..L.ASKA SlART TIME 05/04/84 02:00 DEPTH STAGE OfSCHG DATE TIME BVTE RAW IJAI.:'I FEET FEET CFS ========= ===== :::.:::-:.:; =:-=:=.:=-:-::::::::~:::-:.: ====== ;.~.:~==== ======·= 06/24/84 02:00 613 09 0. 45 0 45 7. 9 06/24/84 04:00 614 09 0. 45 0. 45 7. 9 06/24/84 06.00 61S 09 0. 45 0 45 7. 9 06/24/84 08:00 t, 1 tl 09 0 45 0 45 7. 9 06/24/84 10:00 61 :· o~ 0.45 0 45 7 ,:; 06/24/84 12:00 6lE QQ 0. 45 0 45 7 <-;· 06/24/84 14:00 619 0L;' 0 45 0 45 7. 9 06/24/84 16:00 6.20 09 0. 45 0 45 7. 9 06/24/84 18:00 621 09 0 45 0 45 7. s· 06/24/84 20:00 t~;t·;: 09 0.45 0 45 7. 9 06/24/84 22:00 c2~3 09 0. 45 0 45 7. 9 06/24/84 00:00 b24 09 0. 45 0 45 7 9 DAIL V AVERAGE 1/ALIJES 0. 45 0. 45 7 9 06/25/84 02:00 625 09 0. 45 0 45 7. 9 06/25/84 04·00 6';;r. 09 0.45 0. 45 7 9 06/25/84 06:00 62"' 0'7 0. 45 0 45 7 9 06/25/84 08:00 62f-< oq 0.45 0 45 7. 9 06/25/84 10:00 6.?.Q 09 0. 45 0 45 7. 9 06/25/84 12:00 630 09 0. 45 0. 45 7. 9 06/25/84 14:00 631 09 0 45 0 45 7. 9 06/25/84 16:00 63:?. 09 0. 45 0. 45 7. 9 06/25/84 18:00 63'3 09 0. 45 0.45 7. 9 06/25184 20·00 634 o::.: 0. 45 0 45 7. 9 06/25184 22:00 635 0'1 0. 45 0 45 7. 9 06/25/84 00:00 63o 08 0. 40 0. 40 6. 5 DAILY AVERAGE vALUES 0. 45 0 45 7. 8 06/26/84 02:00 6::-n ()'7' 0. 45 0 45 7. c;. 06/26/84 04:00 638 09 0. 45 0 45 7 .:.· 06/26/84 06:00 b.~:J'"-09 0. 45 045 7. 9 06/26/84 08:00 640 09 0.45 0 45 7. 9 06/26/84 10:00 641 09 0. 45 0 45 7. 9 06/26/84 12:00 642 oo 0. 45 0 45 7. 9 06/26/84 14:00 64:.:) OS' 0.45 0 45 7 9 06/26/134 16:00 644 09 0. 45 0. 45 7. 9 06/26/84 18:00 645 o..;.o 0.45 045 7. 9 06/26/84 20•00 64tJ 09 0.45 0. 45 7 9 06/26/84 22:00 647 09 0.45 o. 45 7. 9 06/26/84 00:00 648 09 0. 45 (}. 45 7 9 DAILY AVERAGE VALUES 0. 45 0 45 7.9 ' I I I i t J ' • ~ ~ f • ~ i i PROPOSED LARSEN DAY HvOROELECfklC PROJ 05··11/85 PAGE 19 HUMPY CREEK NEAR LARSEN BAY. !~LASKA ~.:I TAR r Tii1t: 05/04/84 02:00 DEPTH STAGE DISCHG DATE TIME rnTt'. RAW OArA FEET FEET CFS ======:.:= ===== :.::.:~:.:":"~ -:::::=::::::-=:.::~-:: :::-.·:· ====== ~ ···-···---===:::::.::::-::: 06/27/84 02:00 64<;' 09 0.45 0 45 7 9 06/27/84 04:00 650 os· 0.45 0 45 7. 9 06/27/84 06:00 6::• 1 09 0.45 0. 45 7. 9 06/27/84 08:00 6r.:;-~ 09 0.45 0 45 7 cJ 06/27/84 10:00 ~ c;··_, "..J...-.... 09 045 0 45 7. 9 06/27/84 12:00 651L OFJ 0. 40 0 40 6. '5 06/27/84 14:00 6-r;.G ,., '-' Ot3 0. 40 0. 40 6. 5 06/27/84 16:00 65t· 08 0.40 0 40 6. 5 06/27/84 18:00 657 08 0 40 0 40 6. 5 06/27/84 20:00 658 08 0. 40 0 40 6. 5 06/27/84 22:00 6~'9 08 0. 40 0 4() 6. 5 06/27/84 00:00 6(,0 O:J 0. 40 0 40 6 ;::; DAILY AVERAGE VALUES 0 42 0 42 7. 1 06/28/84 02:00 661 08 0. 40 0. 40 6. 5 06/28/84 04:00 o62 08 0.40 0. 40 6. 5 06/28/84 06:00 66:::~ o·~~ 0. 40 0. 40 6. 5 06/28/84-08: 00 664 Of: 0 40 0. 40 6. 5 06/28/84 10:00 6b:'j oe 0.40 0. 40 6. 5 06/28/84 12:00 t.t:.b Ot1 0.40 0 40 6. 5 06/28/84 14:00 66i" 08 0.40 0. 40 6. 5 06/28/84 16:00 668 08 0.40 0. 40 6. 5 06/28/84 18:00 669 08 0. 40 0. 40 6. 5 06/28/84 20:00 6/0 08 0. 40 0 40 6. 5 06/28/84 22:00 671 08 0.40 0. 40 6. 5 06/28/84 00:00 672 08 0. 40 0 40 6. 5 DAILY AVERAGE VALUES 0.40 0 40 6. 5 06/29/84 02:00 6 7::3 08 0 40 0 40 1:.. 5 06/29/84 04:00 674 08 0.40 0. 40 6. 5 06/29/84 06:00 675 08 0. 40 0. 40 6. ~· 06/29/84 08:00 676 08 0. 40 0. 40 6. 5 06/29/84 10:00 677 08 0. 40 0 40 6. 5 06/29/84 12·00 678 08 0. 40 0 40 b 5 06/29/8<l 14:00 679 08 0.40 0. 40 6 ':j 06/29/84 16:00 680 08 0 40 0. 40 6. 5 06/29/84 18:00 681 Otl 0. 40 0, 40 6. 5 06/29/84 2000 682 08 0.40 0. 40 6. 5 06/29/84 22:00 683 08 0. 40 0. 40 6 5 06/29/84 0000 684 08 0. 40 0 40 6. 5 DAILY AVERAGE VALUES 0.40 0. 40 6. :':; ' , ' i f f f I ! I I ) i f I PROPOSED LARSEN BAY HvDROELECTrilC PROJ 05/11/85 PAGE 20 HUMPY CREEK NEAR LARSF.N BAY, ALASI-i.A START TIME 05/04/84 02:00 DEPTH STAGE DISCHG DATE TIME Bvrr RAW DATA FEET FEET CFS ======== ====-== =:::=:::::·":. :::-:;::::::::::==~=--:= ====== c==== ====== 06/30/84 02:00 68~) 08 0. 40 0. 40 6. 5 06/30/84 04:00 6flf:, 00 0. 40 0. 40 6. '5 06/30/84 06·00 687 08 0. 40 0. 40 6 5 06/30/84 08:00 6RP 08 0. 40 0. 40 6 5 06/30/84 10:00 6·~" 08 0. 40 040 6. ') 06/30/84 12:00 690 08 0. 40 0. 40 6 s 06/30/84 14:00 691 08 040 0. 40 6. 5 06/30/84 16:00 692 08 0 40 0 40 6. 5 06/30/84 18:00 693 08 0 40 0. 40 6. 5 06/30/84 20:00 694 08 0 40 0. 40 6. 5 06/30/84 22:00 69~ 08 0. 40 0. 40 6. :i 06/30/84 00:00 b'-96 08 0. 40 0. 40 6 . .:;:. DAILY AVERAGE VALUES 0. 40 0 40 6. 5 07/01/84 02:00 697 08 0. 40 0 lJO 6. 5 07/01/84 04:00 698 08 0. 40 0. 40 6. 5 07/01/84 06·00 60L• '' 08 0. 40 0 40 6. 5 07/01/84 08:00 700 08 0. 40 0 40 6. s 07/01/84 10:00 701 08 0. 40 0.40 6. 5 07/01/84 12:00 702 08 0. 40 0 40 6. 5 07/01/84 14:00 703 07 0. 35 0. 35 5. 2 07/01/84 16:00 704 07 0. 35 0 35 5. 2 07/01/84 18:00 70~~ 08 0. 40 0 40 6. 5 07/01/84 20:00 706 08 0. 40 0 40 6. 5 07101184 22:00 701 08 0.40 0. 40 6. 5 07/01/84 00:00 708 08 0. 40 0. 40 6. 5 DAILY AVERAGE VALUES 0.39 0 39 6. 3 07102184 02:00 709 08 0 40 0. 40 6. ~ 07/02/84 04:00 710 08 0. 40 0. 40 6. 5 07/02/84 06:00 711 08 0. 40 0. 40 6. 5 07/02/84 08:00 712 08 0. 40 0. 40 6. 5 07/02/84 10:00 7L] 08 0. 40 0. 40 6. 5 07/02/84 12:00 714 08 0.40 0 40 6. 5 07102184 14:00 7i. 5 08 0. 40 0 40 6. 5 07102184 16:00 716 08 0. 40 0. 40 6. 5 07/02/84 18:00 71'l 08 0.40 0. 40 6. 5 07/02/84 20:00 718 o·J 0. 35 0.35 5 . .;,~ 07/02/84 22:00 719 07 0.35 0. 35 5 :::> 07/02/84 00:00 720 07 0.35 0.35 5. 2 DAILY AVERAGE VALUES 0.39 0. 39 6. 2 • £ ' f f I [ ,, ! ~ j I ! f t ' PROPOSEr, LARSEN BAY HY OROEL.EC f!-: i C PROJ 0:5' 11 /8~7 PAGE 21 HUMPY CREEK NEAR LARSEN BAY, ALt~SKA START TI11E 05/04/84 02:00 DEPTH STAGE Dl5CHO DATE TIME BYIE RAW DATA FEET FEET CFS ======:::::: ===== 7.:-:=:-:::::: ==:::-::;..:::::::-:::::;:-",_ ====== :;::::-:~-:~-: ::;:=::::-..::.::.=::-: 07/03/84 02:00 721 07 0. 35 0 35 5, 2 07/03/84 04:00 722 07 035 0. 35 5 .~: 07/03/84 06:00 723 07 0.35 0. 35 5 . .;: 07/03/84 08:00 724 07 0.35 0 35 5 :J 07/03/84 10:00 72~1 08 0, 40 0 40 6. 5 07/03/84 12:00 /2/; OB 0. 40 0, 40 6. 5 07/03/8~ 14:00 721 07 0.35 0,35 5. 2 07/03/84 16:00 728 07 0. 35 0, 35 5. 2 07/03/84 18.00 729 07 0.35 0.35 5. 2 07/03/84 2000 730 07 0. 35 0.35 5 2 07/03/84 22:00 731 07 0 35 0 35 5. d 07/03/84 00:00 l~:J~! 07 0, 35 0. 35 5. d. DAILY AVERAGE VALUES 0. 36 0 36 5. 4 07/04/8~ 02:00 73:3 07 0.35 0 35 5. d 07/04/84 04:00 734 o:-' 0 35 0.35 5 '• 07/04/84 06:00 735 07 0. 35 0 35 5, 2 07/04/8.!1 08:00 7'J6 07 0.35 0. 35 5. ~:: 07/04/84 10:00 737 07 0.35 0.35 5. 2 07/04/84 12:00 738 07 0.35 0 35 5. 2 07/04/84 14·00 739 07 0.35 0. 35 5 ·~ . "" 07/04/84 16·00 740 07 0. 35 0. 35 5. 2 07/04/84 18:00 741 {)'? 0.35 0 :35 5 J 07/04/84 20:00 74~' 0? 035 0 '35 5 ·::: 07/04/84 22:00 743 07 0. 35 0. 35 5 ;,2 07/04/84 00:00 744 07 0.35 0 35 5, 2 DAILY AVERAGE VALUES 0.35 0. 35 5 2 07/05/84 02:00 745 0? 0.35 0. 35 5 . ..., .;:;; 07/05/84 04:00 746 07 0. 35 035 5. ~z 07/05/84 06:00 74? 07 0. 35 0.:35 5. ,]. 07/05/84 08:00 748 07 0.35 0. 35 5. 2 07/05/84 10:00 749 07 0.35 0 .. 35 5. 2 07/05/84 12:00 75() 07 0.35 0 35 5 .-. . " 07/05/84 14:00 75;_ 07 0.35 0. 35 5. 2 07/05/84 16:00 75~' 07 0.35 0 ~'3'5 5 -; • f..Z. 07/05/84 18:00 753 07 0.35 0. 35 5 . .;: 07/05/84 20:00 754 07 0. 35 0 35 5 ;: 07/05/84 22:00 7'-'" ::1 ,; 07 0.35 0. 35 5. 2 07/05/84 00:00 756 07 0. 35 0.35 5. 2 DAILY AVERAGE VALUES 0. 35 035 5. :2 4 ' 1 f t ~ ' f r ; f l f j £ t PROPOSED LARSEN BAY HYDRDELE(fRlC PROJ 05.111.185 PAGE 22 HUMPY CREEK NEAR LARSEN BAY, l~l.ASf'..A SlART TIME 05/04184 02 00 DEPTH STAGE DISCt-IG DATE TIME BYrE RAW DI~Tf\ FEET FEEl CFS ===!:::==== ===== ==::-:~:: =~:===~=:-::::~-:.:· ====== ~.::::.:::.:=::=-::: ===:.::::::::-:;::.:-: 07/06/84 02:00 75 0? 0. 35 0 35 5 j 07/06/84 04:00 75f: ()7 0.35 0 :.15 5. ;: 07/06/84 06:00 759 07 0.35 0 35 5 ;~ 07/06/84 08:00 7h() 07 0.35 0 35 5 ., r. 07/06/84 10·00 7,., l 07 0.35 0. 35 5 .2 07/06/84 12:00 76~) 07 0. 35 0 35 5. 07/06/84 14:00 763 07 0.35 0 ~i5 5 .~ 07/06/84 16:00 764 07 0.35 0 T:1 5. -~ 07/06/84 18·00 ll-->5 07 035 0. 35 5. 2 07/06/84 20:00 766 07 0.35 0.35 5 ~: 07/06/84 22:00 7 i:: ,I 07 0.35 0 35 5 " 07/06/84 00:00 76f-! 07 0.35 o ::.;s 5 .:: DAILY AVERAGE VALUES 0. 35 0 35 5. d.. 07/07/84 02:00 769 07 0.35 0 35 5. ;;:: 07107/84 04:00 7l0 07 0.35 0 35 5 d 07/07/84 06:00 771 OJ 0.35 0. 35 5. ,:;2 07/07/84 08:00 7l? 07 0. 35 0 :-:J5 5 ., . <;. 07/07/84 10:00 778 0/ 0.35 0 35 5. 2 07/07/84 12:00 774 07' 0.35 0 35 5. 2 07/07/84 14:00 T'" I .;· 07 0. 35 0. 35 5. 2 07/07/84 16:00 Tit. 07 0.35 0 35 5. 2 07/07/84 18:00 T77 07 0.35 0 35 5 2 07/07/84 20:00 778 07 0.35 \) 35 5. 2 07/07/84 22:00 T/'7' 07 0. 35 0 35 5 2 07/07/84 00:00 780 Of..~ 0 30 0. 30 4 0 DAILY lWERAGE VALUES 0. 35 0 35 5 1 07/08/84 02.00 781 1)7 0.35 0. 35 5 ~· 07/08/84 04:00 78.::.' 07 0. 35 0 35 5 <.J 07/08/84 06:00 78:3 07 0.35 0. 35 5. 2 07/08/84 08:00 784 07 0.35 0 35 5 :> 07/08/84 10:00 785 07 035 0 35 5 .., '"" 07/08/84 12:00 7Bt, 07 0. 35 0 35 5. 2 07/08/84 1400 7g·;r 07 0. 35 0 :35 5 2 07/08/84 16 00 788 0? 035 0 35 s d 07/08/84 1800 78<:-' 07 0. 35 0 35 5 . .;' 07/08/84 20:00 790 07 0 35 0 35 5 ·:t 07/08/84 2200 791 07 0.35 0.35 5 2 07/08/84 00:00 792 07 0.35 0 35 5 ·'") 1:.. DAlLY AVERAGE VALUES 0. 35 035 5 •"'\ . .::: ' f l I 1 j I i l f f l f I I I j f ( { ' ' PROPOSED LARSEN BAY HvDROELECT~lC rROJ O':. ·· 11t95 PAGE 23 HUMPY CnEEK NEAR LARSEI\l BAY, ALASJ.\A STAPT TIME 05/04/84 02.00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DA 1 t'\ FEET FEET CFS ======::::::: ====== =:::::::.."::":", ...::=-:::~:==~· "::""~ ~===== ~~·----===::=.::::::·:;:::: 07/09/84 02:00 793 06 0.30 0. 30 4 0 07/09/84 04:00 79'• l)h 0.30 0. 30 4 0 07/09/84 06:00 795 Ob 0. 30 0. 30 4. 0 07/09/84 08:00 796 06 0. 30 0 30 4 0 07/09/84 10·00 -r(;J .., I • 06 0. 30 0. 30 4 0 07/09/84 12:00 79G Q7 0.35 0.35 5 .. , ,._ 07/09/84 14:00 79<? 07 0. 35 0.35 5 .. 2 07/09/84 16:00 800 07 0.35 0 35 5 2 07/09/84 18:00 801 07 0.35 0. 35 =; -: ..... ' c.. 07/09/84 20:00 80';:: 06 0. 30 0 30 4 (' 07/09/84 22:00 8 1)3 Ob 0.30 0. 30 40 07/09/84 00:00 80/l-06 0. 30 0 30 4. 0 DAILY AVERAGE VALUES 0. 32 0. 32 4. 4 07/10/84 02.00 80'S 06 0 30 0 30 4 0 07/10/84 04:00 80~, 07 0. 35 0 35 5 2 07/10/84 06:00 807 06 0.30 0.30 4.0 07/10/84 08:00 808 06 0.30 0 30 4.0 07/10/84 10:00 809 06 0.30 0 30 4. 0 07/10/84 12:00 810 06 0. 30 0 30 4. 0 07/10/84 14:00 81.1 06 0. 30 0. 30 4. 0 07/10/84 16:00 81? Of., 0.30 0. 30 4. 0 07/10/84 18:00 8t:~ o·.: 0.35 0.35 5. ;;: 07/10/84 20:00 81-'1 07 0.35 0. 35 5 •J . ~ 07/10/84 22:00 815 07 0. 35 0. 35 5. :2 07/10/84 00:00 816 07 0.35 0. 35 5 2 DAILY I~VERAGE VALUES 0.32 032 4. "j 07/11/84 02.00 817 07 0.35 0 35 ~ •') ..... t-:. 07/11/84 04:00 8H) 07 0. 35 0 :3:5 5. 2 07/11184 06: 00 81 ,. 07 0.35 0. 35 5 . .:2 07/11/84 08: 00 820 07 0. 35 0 35 '5. 2 07/11/84 1000 82i 07 035 0.35 5. 2 07/11/84 12:00 822 Oi' 035 0. 35 5. 2 07/11184-14:00 8:;Y1 07 035 0 35 5 2 07/11/84 16:00 8?.4 07 0.35 0 35 5 ·:J . c. 07/11/84 18:00 8.:';•5 {18 0. 40 0 40 6 5 07/11/84 20:00 826 08 0. 40 0 40 6 5 07/11/84 22:00 8:;~-. _, 07 0.35 0. 35 5 2 07/1118.11 00:00 828 07 0.35 0. 35 5. 2 DAILV AVERAQE VALUES 0.36 036 5 4 , .I i.,l • t i I I I I ~ f f: i t f PROPOS£[; LARSEN BAY t-i\ DROELF.C ;"~~ fC PROJ 0 1 11185 f-·AG£ 24 HUMPY CREEK NEAR LARSEN BA'I', AUISio\A START TIME 05/04184 02·00 DEPTH STAGE DISCHG DATE TIME B'i1 E RAW {)l>t 1,\ FEET FEET CH> ••••==c= ====-= ::':!::.':::::;; ===~=---'::~~-.-: ======= ::::.-::;:;:::-:::;:;:;. ===..::::.:..·:-:: 07/12/84 02:00 8:;;.:;; IYl 0.35 0. 35 5. c2 07/12/84 04:00 8]•) 0? 0. 35 0.35 5. ::' 07/12/84 06:00 83: 07 0. 35 03'5 5. c.~ 07/12/84 08:00 8·";.) 0? 0.35 0 35 5 . .2 07/12/84 10:00 8 3:.; 07 0. 35 0 35 5 ·:J 07/12/84 12:00 834 Ol 0 35 0 35 5. ?. 07/12/84 14:00 835 07 0.35 0.35 5. ;,> 07/12/84 16:00 836 07 0. 35 0 35 5 "' -~ 07/12/84 18:00 837 07 0.35 0. 35 5. 2 07/12/84 20·00 8:48 07 0.35 0.35 5 2 07/12/84 22:00 83'i 0'' \.. 0.35 0 35 5. 2 07/12/84 00:00 840 07 0. 35 0. 35 5 ., . e. DAILY AVERAciE VALUES 0 35 0 35 5. 2 07/13/84 02:00 841 06 0. 30 0.30 4. 0 07/13/84 04:00 84~:e' 06 0 30 0. 30 4. 0 07/13/84 06:00 843 06 0. 30 0 30 4 0 07/13/84 08:00 844 06 0. 30 0. 30 4. 0 07/13/84 10:00 84;) 06 0. 30 0. 30 4. 0 07/13/84 12:00 846 06 0.30 0.30 4 0 07/13/84 14:00 847 Oi> 0. 30 0 30 4.0 07/13/84 16:00 848 06 0.30 0. 30 4. 0 07/13/84 18:00 849 Oc. 0.30 0. 30 4.0 07/13/84 20:00 851.) 07 0. 35 0 35 5. 2 07/13184 22:00 851 06 0.30 0. 30 4. 0 07/13/84 00:00 852 06 0. 30 0 30 4. 0 DAILY AVERAGE VA;.UES 0 30 0 30 4. 1 07/14/84 02:00 853 (),<_ 0. 30 0.30 4 (• 07/14/84 04:00 854 06 030 0 30 4 0 07/14/84 06:00 855 06 0. 30 0. 30 4 0 07/14/84 08:00 856 06 0. 30 0 30 4 0 07/14/84 1000 857 06 0.30 0 30 4 0 07/14/84 12.00 858 06 0. 30 030 4 0 07/14/84 14:00 85':;; 06 0. 30 0. 30 4. 0 07/14/84 16:00 860 Ot, 0. 30 0 30 4 0 07/14/84 18·00 8o1 06 0.30 0. 30 4. 0 07/14184 20.00 86.;: 09 0.45 0 45 7 9 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 1 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =··==--· -=·=== =··= ====·==== ====== ===== ====== 09/06/84 0:2:00 1 17 0.8:5 0.85 10 09/06/84 04:00 2 17 0.85 0.85 10 09/06/84 06:00 3 17 0.85 0.85 10 09/06/84 08:00 4 17 0.85 0.85 10 09/06/84 10:00 5 17 0. 85 0.85 10 09/06/84 1:2:00 6 17 0. 8:5 0.85 10 09/06/84 14:00 7 14 0. 70 0. 70 9.2 09/06/84 16:00 8 09 045 0. 45 6.8 09/06/84 18:00 9 08 0.40 0. 40 6.3 09/06/84 20:00 10 08 0. 40 0. 40 6.3 09/06/84 22:00 11 09 0.45 0.45 6.8 09/06/84 00:00 12 13 0.65 0.65 8. 7 DAILY AVERAGE VALUES 0. 68 0.68 8. 7 09/07/84 02:00 13 17 0.85 0.85 10 09/07/84 04:00 14 17 0. 85 0.85 10 09/07/84 00:00 15 17 0.85 0.85 10 09/07/84 08:00 16 17 0.85 0.85 10 09/07/84 10:00 17 17 0. 85 0.85 10 09/07/84 12:00 18 17 0. 85 0.85 10 09/07/84 14:00 19 17 0.85 0.85 10 09/07/84 16:00 20 11 0. 55 0. 55 7.8 09/07/84 18:00 21 08 0. 40 0.40 6. 3 09/07/t: 20:00 :22 08 0. 40 0. 40 6. 3 09/07/ 4 22:00 23 08 0. 40 0. 40 6.3 09/07/84 00:00 24 09 0.45 0.45 6.8 DAILY AVERAGE VALUES 0. 68 0.68 8.6 09/08/84 02:00 25 09 0.45 0.45 6. 8 09/08/84 04:00 26 15 0.75 0. 75 9.6 09/08/84 06:00 27 17 0.85 0.85 10 09/08/84 08:00 28 17 0.85 0. 85 10 09/08/84 10:00 29 17 085 0.85 10 09/08/84 12:00 30 17 0.85 0.85 10 09/08/84 14:00 31 09 0.45 0. 45 6.8 09/08/84 16:00 32 08 0. 40 0. 40 6.3 09/08/84 18:00 33 08 0.40 0. 40 6.3 09/08/84 20:00 34 08 0.40 0.40 6.3 09/08/84 22:00 35 08 0.40 0. 40 6. 3 09/08/84 00:00 36 08 0. 40 0. 40 6. 3 DAILY AVERAGE VALUES 0. 59 0. 59 7. 9 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 2 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ========= ===== ==== ========= ====== ===== ====== 09/09/84 02:00 37 16 0.80 0.80 10 09/09/84 04:00 38 17 0.85 0.85 10 09/09/84 06:00 39 17 0.85 0.85 10 09/09/84 08:00 40 17 0.85 0.85 10 09/09/84 10:00 41 17 0.85 0.85 10 09/09/84 12:00 42 17 0.85 0.85 10 09/09/84 14:00 43 17 0.85 0.85 10 09/09/84 16:00 44 12 0. 60 0.60 8.3 09/09/84 18:00 45 08 0. 40 0. 40 6. 3 09/09/84 20:00 46 08 0. 40 0. 40 6. 3 09/09/84 22:00 47 08 0. 40 0.40 6.3 09/09/84 00:00 48 08 0.40 0. 40 6. 3 DAILY AVERAGE VALUES 0.68 0.68 8. 6 09/10/84 02:00 49 15 0. 75 0. 75 9.6 09/10/84 04:00 50 17 0.85 0.85 10 09/10/84 06:00 51 17 0.85 0.85 10 09/10/84 08:00 52 17 0.85 0.85 10 09/10/84 10:00 53 17 0.85 0.85 10 09/10/84 12:00 54 12 0.60 0. 60 8. 3 09/10/84 14:00 55 08 0.40 0.40 6.3 09/10/84 16:00 56 08 0. 40 0.40 6. 3 09/10/84 18:00 57 08 0.40 0. 40 6.3 09/10/84 20:00 58 08 0. 40 0.40 6. 3 09/10/84 22:00 59 08 0. 40 0.40 6. 3 09/10/84 00:00 60 17 0.85 0. 85 10 DAILY AVERAGE VALUES 0.63 0.63 8. 3 09/ll/84 02:00 61 17 0.85 0.85 10 09/11/84 04: 00 62 17 0.85 0.85 10 09/11/84 06: 00 63 17 0.85 0.85 10 09/11/84 08:00 64 17 0.85 0.85 10 09/11/84 10: 00 65 17 0.85 0.85 10 09/11/84 12:00 66 17 0. 85 0.85 10 09/11/84 14:00 67 17 0.85 0.85 10 09/11/84 16:00 68 12 0.60 0. 60 8. 3 09/11/84 18:00 69 08 0. 40 0. 40 6.3 09/11/84 20:00 70 08 0.40 0. 40 6. 3 09/11/84 22:00 71 07 0. 35 0.35 5. 8 09/11184 00:00 72 17 0.85 0.85 10 DAILY AVERAGE VALUES 0. 71 0. 71 8. 9 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 3 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ===::rz::=::c: ::IIU&::;z ==== ========= ====== ===== ====== 09/12/84 02:00 73 17 0.85 0.85 10 09/12/84 04:00 74 17 0.85 0.85 10 09/12/84 06:00 75 17 0.85 0.85 10 09/12/84 08:00 76 17 0.85 0.85 10 09/12/84 10:00 77 17 0.85 0.85 10 09/12/84 12:00 78 17 0.85 0. 85 10 09/12/84 14:00 79 17 0.85 0.85 10 09/12/84 16:00 80 17 0.85 0.85 10 09/12/84 18:00 81 17 0.85 0.85 10 09/12/84 20:00 82 18 0.90 0. 90 11 09/12/84 22:00 83 17 0.85 0.85 10 09/12/84 00:00 84 17 0.85 0.85 10 DAILY AVERAGE VALUES 0.85 0.85 10 09/13/84 02:00 85 17 0.85 0.85 10 09/13/84 04:00 86 17 0.85 0.85 10 09/13/84 06:00 87 17 0.85 0.85 10 09/13/84 08:00 88 17 0.85 0.85 10 09/13/84 10:00 89 17 0.85 0.85 10 09/13/84 12:00 90 17 0. 85 0. 85 10 09/13/84 14:00 91 17 0.85 0.85 10 09/13/84 16:00 92 17 0.85 0.85 10 09/13/84 18:00 93 17 0. 85 0.85 10 09/13/84 20:00 94 17 0.85 0. 85 10 09/13/84 22:00 95 17 0.85 0. 85 10 09/13/84 00:00 96 17 0.85 0.85 10 DAILY AVERAGE VALUES 0.85 0.85 10 09/14/84 02:00 97 17 0.85 0.85 10 09/14/84 04:00 98 17 0.85 0.85 10 09/14/84 06:00 99 17 0.85 0.85 10 09/14/84 08:00 100 17 0.85 0.85 10 09/14/84 10:00 101 17 0.85 0.85 10 09/14/84 12:00 102 17 0.85 0.85 10 09/14/84 14:00 103 13 0.65 0.65 8. 7 09/14/84 16:00 104 08 0. 40 0. 40 6.3 09/14/84 18:00 105 08 0. 40 0.40 6.3 09/14/84 20:00 106 08 0.40 0.40 6.3 09/l4/84 22: 00 107 08 0. 40 0. 40 6. 3 09/14/84 00:00 108 12 0.60 0. 60 8. 3 DAILY AVERAGE VALUES 0.66 0.66 8. 5 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 4 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ==::o:===== ==·== ==== ========= ====== ===== ====== 09/15/84 02:00 109 17 0.85 0. 85 10 09/15/84 04:00 110 17 0.85 0.85 10 09/15/84 06:00 111 17 0.85 0.85 10 09/15/84 08:00 112 17 0.85 0.85 10 09/15/84 10:00 113 17 0.85 0.85 10 09/15/84 12:00 114 17 0.85 0.85 10 09/15/84 14:00 115 17 0.85 0.85 10 09/15/84 16:00 116 10 0. 50 0. 50 7 3 09/15/84 18:00 117 07 0.35 0.35 5.8 09/15/84 20:00 118 07 0.35 0.35 5.8 09/15/84 22:00 119 07 0.35 0.35 5. 8 09/15/84 00:00 120 10 0. 50 0. 50 7.3 DAILY AVERAGE VALUES 0.67 0. 67 8. 5 09/16/84 02:00 121 17 0.85 0.85 10 09/16/84 04:00 122 18 0.90 0.90 11 09/16/84 06:00 123 17 0. 85 0.85 10 09/16/84 08:00 124 17 0 85 0.85 10 09/16/84 10:00 125 17 0.85 0.85 10 09/16/84 12:00 126 17 0. 85 0.85 10 09/16/84 14:00 127 13 0.65 0. 65 8. 7 09/16/84 16:00 128 08 0.40 0. 40 6.3 09/16/84 18:00 129 07 0 35 0.35 5.8 09/16/84 20:00 130 07 0.35 0.35 5.8 09/16/84 22:00 131 07 0.35 0.35 5. 8 09/16/84 00:00 132 07 0. 35 0.35 5. 8 DAILY AVERAGE VALUES 0.63 0. 63 8.3 09/17/84 02:00 133 13 0.65 0.65 8. 7 09/17/84 04:00 134 18 0.90 0. 90 11 09/17/84 06:00 135 18 0. 90 0.90 11 09/17/84 08:00 136 17 0. 85 0.85 10 09/17/84 10:00 137 17 085 0. 85 10 09/17/84 12:00 138 17 0. 85 0.85 10 09/17/84 14:00 139 17 0.85 0.85 10 09/17/84 16:00 140 10 0. 50 0. 50 7.3 09/17/84 18:00 141 07 0.35 0.35 5. 8 09/17/84 20:00 142 07 0.35 0.35 5.8 09/17/84 22:00 143 14 0. 70 0. 70 9.2 09/17/84 00:00 144 18 0. 90 0.90 11 DAILY AVERAGE VALUES 0. 72 0. 72 9. 2 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 5 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ========= ==•== ==== ======:::== ======= ===== ====== 09'/18/84 02:00 145 17 0.85 0. 85 10 09'/18/84 04:00 146 17 0.85 0.85 10 09'/18/84 06:00 147 17 0.85 0. 85 10 09'/18/84 08:00 148 17 0.85 0.85 10 09'/18/84 10:00 149 17 0. 85 0.85 10 09/18/84 12:00 150 17 0. 85 0.85 10 09/18/84 14:00 151 17 0.85 0. 85 10 09'/18/84 16:00 152 07 0.35 0.35 5. 8 09/18/84 18:00 153 07 0.35 0.35 5. 8 09/18/84 20:00 154 07 0.35 0.35 5. 8 09'/18/84 22:00 155 12 0.60 0. 60 8. 3 09'/18/84 00:00 156 18 0. 90 0. 90 11 DAILY AVERAGE VALUES 0. 71 0. 71 8.9 09'/19/84 02:00 157 17 0.85 0.85 10 09/19/84 04:00 158 17 0.85 0.85 10 09/19'/84 06:00 159' 17 0.85 0.85 10 09'/19'/84 08:00 160 17 0.85 0.85 10 09/19/84 10:00 161 17 0.85 0.85 10 09/19/84 12:00 162 17 0. 85 0.85 10 09/19'/84 14:00 163 17 0.85 0. 85 10 09'/19/84 16:00 164 18 0. 90 0. 90 11 09/19/84 18:00 165 18 0. 90 0. 90 11 09/19/84 20:00 166 18 0. 90 0. 90 11 09/19'/84 22:00 167 18 0. 90 0. 90 11 09'/19/84 00:00 168 17 0. 85 0.85 10 DAILY AVERAGE VALUES 0.87 0.87 10 09/20/84 02:00 169 17 0.85 0.85 10 09/20/84 04:00 170 17 0.85 0.85 10 09/20/84 06:00 171 17 0. 85 0. 85 10 09/20/84 08:00 172 17 0.85 0. 85 10 09'/20/84 10:00 173 17 0.85 0. 85 10 09/20/84 12:00 174 17 0.85 0. 85 10 09/20/84 14:00 175 17 0.85 0.85 10 09'/20/84 16:00 176 17 0.85 0.85 10 09/20/84 18:00 177 18 0.90 0. 90 11 09/20/84 20:00 178 18 0. 90 0. 90 11 09/20/84 22:00 179 18 0. 90 0. 90 11 09/20/84 00:00 180 17 0.85 0. 85 10 DAILY AVERAGE VALUES 0.86 0.86 10 PROPOSED LARSEN BAY HYDROELECTR PROJECT 0:5/14/85 PAGE 6 HUMPY CREEK NEAR LARSEN BAY. ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =·====== ·=-=== m:::== ========= ====== ===•s ====== 09/21/84 02:00 181 17 0. 85 0. 85 10 09/21/84 04: 00 182 17 0.85 0.85 10 09/21/84 06:00 183 17 0.85 0.85 10 09/21/84 08:00 184 17 0.85 0.85 10 09/21/84 10:00 185 17 0.85 0.85 10 09/21/84 12:00 186 17 0.85 0.85 10 09/21/84 14:00 187 17 0.85 0.85 10 09/21/84 16: 00 188 18 0. 90 0. 90 11 09/21/84 18:00 189 18 090 0 90 11 09/21/84 20:00 190 18 0. 90 0 90 11 09/21/84 22:00 191 18 0. 90 0.90 11 09/21/84 00:00 192 18 0.90 0. 90 11 DAILY AVERAGE VALUES 0. 87 0.87 10 09/22/84 02:00 193 18 0. 90 0. 90 11 09/22/84 04:00 194 18 0.90 0.90 11 09/22/84 06:00 195 18 0. 90 0. 90 11 09/22/84 08:00 196 06 0. 30 0.30 5.2 09/22/84 10:00 197 06 0. 30 0.30 5. 2 09/22/84 12:00 198 06 0. 30 030 5.2 09/22/84 14:00 199 07 0.35 0.35 5. 8 09/22/84 16:00 200 07 0.35 0.35 5. 8 09/22/84 18:00 201 07 0.35 0. 35 5.8 09/22/84 20:00 202 07 0.35 0.35 5. 8 09/22/84 22:00 203 07 0. 35 0.35 5. 8 09/22/84 00:00 204 07 0.35 0. 35 5. 8 DAILY AVERAGE VALUES 0. 48 0.48 7. 0 09/23/84 02:00 205 07 0.35 0.35 5. 8 09/23/84 04:00 206 07 0.35 0.35 5.8 09/23/84 06:00 207 07 0.35 0. 35 5. 8 09/23/84 08:00 208 07 0.35 0.35 5.8 09/23/84 10:00 209 07 0. 35 0.35 5. 8 09/23/84 12:00 210 07 0.35 0. 35 5. 8 09/23/84 14:00 211 07 0.35 0.35 5. 8 09/23/84 16:00 212 07 0.35 0.35 5. 8 09/23/84 18:00 213 07 0.35 0.35 5.8 09/23/84 20:00 214 07 0. 35 0.35 5. 8 09/23/84 22:00 215 07 0.35 0.35 5. 8 09/23/84 00:00 216 07 0.35 0.35 5.8 DAILY AVERAGE VALUES 0. 35 0.35 5. 8 PROPOSED LARSEN BAY HYOROELECTR PROJECT 05/14/85 PAGE 7 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===== ==== ======·== ====== ====== ====== 09/24/84 02:00 217 07 0.35 0.35 5.8 09/24/84 04:00 218 07 0 35 0. 35 5.8 09/24/84 06:00 219 05 0.25 0.25 4.6 09/24/84 08:00 220 17 0. 85 0.85 10 09/24/84 10:00 221 17 0. 85 0.85 10 09/24/84 12:00 222 17 0.85 0.85 10 09/24/84 14:00 223 15 0. 75 0 75 9. 6 09/24/84 16:00 224 07 0.35 0.35 5. 8 09/24/84 18:00 225 07 0.35 0. 35 5. 8 09/24/84 20:00 226 07 0.35 0. 35 5. 8 09/24/84 22:00 227 07 0.35 0. 35 5.8 09/24/84 00:00 228 18 0. 90 0. 90 11 DAILY AVERAGE VALUES 0. 55 0. 55 7. 5 09/25/84 02:00 229 18 0.90 0.90 11 09/25/84 04:00 230 17 0.85 0.85 10 09/25/84 06:00 231 17 0.85 0.85 10 09/25/84 08:00 232 17 0. 85 0.85 10 09/25/84 10:00 233 17 0.85 0.85 10 09/25/84 12•00 234 17 0.85 0.85 10 09/25/84 14:00 235 17 0.85 0.85 10 09/25/84 16:00 236 18 0.90 0.90 11 09/25/84 18:00 237 18 0.90 0.90 11 09/25/84 20:00 238 18 0.90 0.90 11 09/25/84 22:00 239 18 0.90 0.90 11 09/25/84 00:00 240 18 0. 90 0.90 11 DAILY AVERAGE VALUES 0. 88 0. 88 11 09/26/84 02:00 241 18 0.90 0.90 11 09/26/84 04:00 242 17 0.85 0.85 10 09/26/84 06:00 243 17 0.85 0.85 10 09/26/84 08:00 244 17 0.85 0.85 10 09/26/84 10:00 245 17 0.85 0. 85 10 09/26/84 12:00 246 17 0.85 0.85 10 09/26/84 14:00 247 16 0.80 0.80 10 09/26/84 16:00 248 07 0.35 0. 35 5.8 09/26/84 18:00 249 07 0.35 0. 35 5. 8 09/26/84 20:00 250 07 0.35 0. 35 5. 8 09/26/84 22:00 251 09 0.45 0.45 6. 8 09/26/84 00:00 252 18 0. 90 0.90 11 DAILY AVERAGE VALUES 0. 70 0. 70 8. 9 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 8 HUMPY CREEK NEAR LARSEN BAY. ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===== ==== ========= ======= ===== ------------ 09/27/84 02:00 253 18 0. 90 0. 90 11 09/27/84 04:00 254 17 0.85 0. 85 10 09/27/84 06:00 255 17 0.85 0.85 10 09/27/84 08:00 256 17 0. 85 0. 85 10 09/27/84 10:00 257 17 0. 85 0. 85 10 09/27/84 12:00 258 17 0.85 0. 85 10 09/27/84 14:00 259 17 0.85 0.85 10 09/27/84 16:00 260 18 0. 90 0. 90 11 09/27/84 18:00 261 11 0. 55 0. 55 7. 8 09/27/84 20:00 262 07 0.35 035 5. 8 09/27/84 22:00 263 13 0. 65 0. 65 8. 7 09/27/84 00:00 264 18 0. 90 0. 90 11 DAILY AVERAGE VALUES 0. 78 0. 78 9. 6 09/28/84 02:00 265 18 0. 90 0. 90 11 09/28/84 04:00 266 18 0. 90 0. 90 11 09/28/84 06:00 267 18 0. 90 0. 90 11 09/28/84 08:00 268 18 0. 90 0. 90 11 09/28/84 10:00 269 18 0. 90 0. 90 11 09/28/84 12:00 270 18 0. 90 0. 90 11 09/28/84 14:00 271 14 0. 70 0. 70 9. 2 09/28/84 16:00 272 07 0. 35 0. 35 5. 8 09/28/84 18:00 273 07 0.35 0. 35 5. 8 09/28/84 20:00 274 07 0. 35 0. 35 5. 8 09/28/84 22:00 275 12 0.60 0. 60 8. 3 09/28/84 00:00 276 17 0 85 0.85 10 DAILY AVERAGE VALUES 0. 72 0. 72 9. 2 09/29/84 02:00 277 17 0.85 0.85 10 09/29/84 04:00 278 18 0. 90 0. 90 11 09/29/84 06:00 279 17 0. 85 0. 85 10 09/29/84 08:00 280 17 0. 85 0. 85 10 09/29/84 10:00 281 17 0. 85 0 85 10 09/29/84 12:00 282 17 0. 85 0. 85 10 09/29/84 14:00 283 17 0. 85 0. 85 10 09/29/84 16:00 284 18 0. 90 0. 90 11 09/29/84 18:00 285 11 0. 55 0. 55 7. 8 09/29/84 20:00 286 13 0. 65 0. 65 8. 7 09/29/84 22:00 287 18 0. 90 0. 90 11 09/29/84 00:00 288 17 0. 85 0.85 10 DAILY AVERAGE VALUES 0. 82 0. 82 10. 0 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 9 HUMPY CREEK NEAR LARSEN BAY. ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ===·===== =·=== ==== ===-====== ====== ===-== ::::===== 09/30/84 0:2:00 289 17 0. 85 0.85 10 09/30/84 04:00 290 17 0. 85 0.85 10 09/30/84 06:00 291 17 0.85 0.85 10 09/30/84 08:00 292 17 0.85 0.85 10 09/30/84 10:00 293 17 0.85 0.85 10 09/30/84 12:00 294 17 0.85 0.85 10 09/30/84 14:00 295 17 0.85 0.85 10 09/30/84 16:00 296 17 0.85 0.85 10 09/30/84 18:00 297 17 0. 85 0.85 10 09/30/84 20:00 298 17 0.85 0.85 10 09/30/84 22:00 299 17 0.85 0.85 10 09/30/84 00:00 300 17 0.85 0.85 10 DAILY AVERAGE VALUES 0.85 0.85 10 10/01/84 02:00 301 17 0.85 0.85 10 10/01/84 04:00 302 17 0.85 0.85 10 10/01/84 06:00 303 16 0.80 0.80 10 10/01/84 08:00 304 15 0. 75 0. 75 9. 6 10/01/84 10:00 305 15 0. 75 0. 75 9. 6 10/01/84 1:2:00 306 15 0. 75 0. 75 9.6 10/01/84 14:00 307 15 0. 75 0. 75 9.6 10/01/84 16:00 308 11 0. 55 0. 55 7.8 10/01/84 18:00 309 11 0. 55 0. 55 7.8 10/01/84 20:00 310 13 0.65 0.65 8. 7 10/01/84 22:00 311 16 0.80 0.80 10 10/01/84 00:00 312 17 0.85 0.85 10 DAILY AVERAGE VALUES 0. 74 0. 74 9.4 10/02/84 02:00 313 16 0.80 0. 80 10 10/02/84 04:00 314 17 0.85 0.85 10 10/02/84 06:00 315 17 0. 85 0.85 10 10/02/84 08:00 316 17 0. 85 0.85 10 10/02/84 10:00 317 17 0.85 0.85 10 10/02/84 12:00 318 17 0.85 0.85 10 10/02/84 14:00 319 17 0.85 0.85 10 10/02/84 16:00 3:20 17 0.85 0.85 10 10/02/84 18:00 3:21 17 0.85 0.85 10 10/02/84 20:00 322 17 0.85 0.85 10 10/02/84 22:00 323 17 0.85 0.85 10 10/02/84 00:00 324 17 0.85 0.85 10 DAILY AVERAGE VALUES 0.85 0.85 10 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 10 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02•00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===== =•== ========= ======= ===== ====== 10/03/84 02:00 325 17 0.85 0.85 10 10/03/84 04:00 326 17 0.85 0.85 10 10/03/84 06:00 327 17 0. 85 0. 85 10 10/03/84 08:00 328 17 0.85 0.85 10 10/03/84 10:00 329 17 0. 85 0. 85 10 10/03/84 12:00 330 17 0.85 0.85 10 10/03/84 14:00 331 17 0. 85 0. 85 10 10/03/84 16:00 332 17 0. 85 0.85 10 10/03/84 18:00 333 17 0.85 0.85 10 10/03/84 20:00 334 17 0. 85 0. 85 10 10/03/84 22:00 335 17 0. 85 0.85 10 10/03/84 oo.oo 336 17 0. 85 0. 85 10 DAILY AVERAGE VALUES 0.85 0.85 10 10/04/84 02:00 337 17 0.85 0.85 10 10/04/84 04:00 338 17 0.85 0.85 10 10/04/84 06:00 339 17 0. 85 0.85 10 10/04/84 08:00 340 17 0. 85 0. 85 10 10/04/84 10:00 341 17 0.85 0. 85 10 10/04/84 12:00 342 17 0. 85 0. 85 10 10/04/84 14:00 343 17 0.85 0. 85 10 10/04/84 16:00 344 17 0.85 0. 85 10 10/04/84 18:00 345 17 0.85 0. 85 10 10/04/84 20:00 346 17 0. 85 0. 85 10 10/04/84 22:00 347 17 0. 85 0. 85 10 10/04/84 00:00 348 17 0.85 0. 85 10 DAILY AVERAGE VALUES 0.85 0. 85 10 10/05/84 02:00 349 17 0. 85 0. 85 10 10/05/84 04:00 350 17 0.85 0. 85 10 10/05/84 06:00 351 16 0. 80 0. 80 10 10/05/84 08:00 352 17 0.85 0.85 10 10/05/84 10:00 353 17 0. 85 0.85 10 10/05/84 12:00 354 17 0. 85 0. 85 10 10/05/84 14:00 355 17 0. 85 0. 85 10 10/05/84 16:00 356 17 0. 85 0. 85 10 10/05/84 18:00 357 17 0. 85 0.85 10 10/05/84 20:00 358 17 0.85 0. 85 10 10/05/84 22:00 359 17 0. 85 0. 85 10 10/05/84 00:00 360 17 0.85 0. 85 10 DAILY AVERAGE VALUES 0. 85 0. 85 10 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 11 HUMPY CREE~ NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ====•=== ·==== =.:.•= ========= ====·== ===== ====-=== 10/06/84 02:00 361 16 0.80 0.80 10 10/06/84 04:00 362 16 0.80 0. 80 10 10/06/84 06:00 363 17 0.85 0.85 10 10/06/84 08:00 364 16 0.80 0.80 10 10/06/84 10:00 365 17 0. 85 0. 85 10 10/06/84 12:00 366 16 0 80 0.80 10 10/06/84 14:00 367 17 0.85 0.85 10 10/06/84 16:00 368 17 0.85 0.85 10 10/06/84 18:00 369 17 0. 85 0.85 10 10/06/84 20:00 370 17 0.85 0.85 10 10/06/84 22:00 371 17 0.85 0.85 10 10/06/84 00:00 372 17 0.85 0.85 10 DAILY AVERAGE VALUES 0. 83 0.83 10 10/07/84 02:00 373 17 0.85 0.85 10 10/07/84 04:00 374 17 0.85 0.85 10 10/07/84 06:00 375 17 0. 85 0. 85 10 10/07/84 08:00 376 16 0.80 0.80 10 10/07/84 10:00 377 16 0. 80 0. 80 10 10/07/84 12:00 378 17 0.85 0. 85 10 10/07/84 14:00 379 17 0.85 0.85 10 10/07/84 16:00 380 17 0.85 0.85 10 10/07/84 18:00 381 17 0.85 0.85 10 10/07/84 20:00 382 17 0.85 0.85 10 10/07/84 22:00 383 16 0.80 0.80 10 10/07/84 00:00 384 17 0.85 0.85 10 DAILY AVERAGE VALUES 0. 84 0. 84 10 10/08/84 02:00 385 16 0.80 0.80 10 10/08/84 04:00 386 16 0.80 0. 80 10 10/08/84 06:00 387 16 0 80 0.80 10 10/08/84 08:00 388 16 0.80 0. 80 10 10/08/84 10:00 389 16 0.80 0.80 10 10/08/84 12:00 390 16 0.80 0.80 10 10/08/84 14:00 391 16 0. 80 0.80 10 10/08/84 16:00 392 16 0.80 0.80 10 10/08/84 18:00 393 16 0.80 0.80 10 10/08/84 20:00 394 16 0. 80 0. 80 10 10/08/84 22:00 395 16 0.80 0. 80 10 10/08/84 00:00 396 16 0.80 0.80 10 DAILY AVERAGE VALUES 0.80 0.80 10 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 12 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ==z:===== ••==s =·== ========== ====== ===== ====== 10/09/84 02:00 397 16 0. 80 0. 80 10 10/09/84 04:00 398 16 0.80 0. 80 10 10/09/84 06:00 399 16 0.80 0.80 10 10/09/84 08:00 400 16 0. 80 0.80 10 10/09/84 10:00 401 16 0.80 0.80 10 10/09/84 12:00 402 16 0.80 0.80 10 10/09/84 14:00 403 16 0. 80 0. 80 10 10/09/84 16:00 404 16 0.80 0.80 10 10/09/84 18:00 405 16 0.80 0. 80 10 10/09/84 20:00 406 16 0.80 0.80 10 10/09/84 22:00 407 16 0. 80 0. 80 10 10/09/84 00:00 408 16 0.80 0. 80 10 DAILY AVERAGE VALUES 0.80 0.80 10 10/10/84 02:00 409 16 0.80 0.80 10 10/10/84 04:00 410 16 0. 80 0.80 10 10/10/84 06:00 411 16 0.80 0.80 10 10/10/84 08:00 412 16 0.80 0.80 10 10/10/84 10:00 413 16 0.80 0. 80 10 10/10/84 12:00 414 16 0. 80 0. 80 10 10/10/84 14:00 415 16 0.80 0.80 10 10/10/84 16:00 416 16 0.80 0. 80 10 10/10/84 18:00 417 16 0. 80 0.80 10 10/10/84 20:00 418 16 0.80 0.80 10 10/10/84 22:00 419 16 0.80 0.80 10 10/10/84 00:00 420 16 0.80 0.80 10 DAILY AVERAGE VALUES 0.80 0.80 10 10/11/84 02:00 421 16 0. 80 0.80 10 1 0/11/84 04: 00 422 16 0. 80 0.80 10 10/11/84 06.00 423 16 0.80 0.80 10 10/11/84 08:00 424 16 0.80 0. 80 10 10/11/84 10:00 425 16 0.80 0.80 10 10/11/84 12:00 426 16 0.80 0.80 10 10/11/84 14~ 00 427 16 0.80 0.80 10 10/11/84 16:00 428 16 0.80 0.80 10 10/11184 18: 00 429 16 0.80 0. 80 10 10/11/84 20:00 430 16 0. 80 0. 80 10 10/ll/84 22:00 431 16 0. 80 0.80 10 10/11/84 00:00 432 16 0.80 0.80 10 DAILY AVERAGE VALUES 0.80 0.80 10 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 13 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== =·=== ==== a:::==·==== =====-=-===== ====== 10/12/84 02:00 433 16 0.80 0.80 10 10/12/84 04:00 434 16 0. 80 0.80 10 10/12/84 06:00 435 16 0.80 0. 80 10 10/12/84 08:00 436 16 0.80 0. 80 10 10/12/84 10:00 437 16 0.80 0.80 10 10/12/84 12:00 438 16 0.80 0.80 10 10/12/84 14:00 439 16 0. 80 0.80 10 10/12/84 16:00 440 16 0. 80 0. 80 10 10/12/84 18:00 441 16 0.80 0.80 10 10/12/84 20:00 442 16 0. 80 0.80 10 10/12/84 22:00 443 16 0.80 0.80 10 10/12/84 00:00 444 16 0. 80 0. 80 10 DAILY AVERAGE VALUES 0. 80 0.80 10 10/13/84 02:00 445 16 0.80 0.80 10 10/13/84 04:00 446 16 0. 80 0. 80 10 10/13/84 06:00 447 16 0. 80 0. 80 10 10/13/84 08:00 448 16 0.80 0.80 10 10/13/84 10:00 449 16 0.80 0.80 10 10/13/84 12:00 450 16 0. 80 0.80 10 10/13/84 14:00 451 16 0. 80 0.80 10 10/13/84 16:00 452 16 0. 80 0. 80 10 10/13/84 18:00 453 16 0.80 0.80 10 10/13/84 :20:00 454 16 0.80 0.80 10 10/13/84 :2:2:00 455 16 0.80 0.80 10 10/13/84 00:00 456 16 0. 80 0.80 10 DAILY AVERAGE VALUES 0. 80 0. 80 10 10/14/84 02:00 457 16 0.80 0.80 10 10/14/84 04:00 458 16 0. 80 0.80 10 10/14/84 06:00 459 16 0. 80 0.80 10 10/14/84 08:00 460 16 0. 80 0. 80 10 10/14/84 10:00 461 16 0.80 0.80 10 10/14/84 12:00 462 16 0.80 0.80 10 10/14/84 14:00 463 16 0. 80 0.80 10 10/14/84 16:00 464 16 0. 80 0.80 10 10/14/84 18:00 465 16 0. 80 0.80 10 10/14/84 20:00 466 16 0.80 0.80 10 10/14/84 22:00 467 16 0.80 0.80 10 10/14/84 00:00 468 16 0.80 0.80 10 DAILY AVERAGE VALUES 0. 80 0.80 10 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 14 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ========= =·=== ==== ========= ====== ===== ====== 10/15/84 02:00 469 16 0. 80 0. 80 10 10/15/84 04:00 470 16 0.80 0. 80 10 10/15/84 06:00 471 16 0.80 0. 80 10 10115/84 08:00 472 16 0. 80 0. 80 10 10/15/84 10:00 473 16 0. 80 0.80 10 10/15/84 12:00 474 16 0. 80 0. 80 10 10/15/84 14:00 475 16 0. 80 0. 80 10 10/15/84 16:00 476 16 0. 80 0. 80 10 10/15/84 18:00 477 16 0.80 0.80 10 10/15/84 20:00 478 16 0.80 0.80 10 10/15/84 22:00 479 16 0. 80 0.80 10 10/15/84 00:00 480 16 0. 80 0. 80 10 DAILY AVERAGE VALUES 0.80 0. 80 10 10/16/84 02:00 481 16 0.80 0.80 10 10/16/84 04:00 482 16 0.80 0.80 10 10/16/84 06:00 483 16 0.80 0.80 10 10/16/84 08:00 484 16 0.80 0. 80 10 10/16/84 10:00 485 16 0.80 0.80 10 10/16/84 12:00 486 16 0.80 0.80 10 10/16/84 14:00 487 16 0. 80 0.80 10 10/16/84 16:00 488 16 0. 80 0.80 10 10/16/84 18:00 489 16 0.80 0.80 10 10/16/84 20:00 490 16 0.80 0.80 10 10/16/84 22:()0 491 16 0.80 0.80 10 10/16/84 00:00 492 16 0.80 0.80 10 DAILY AVERAGE VALUES 0. 80 0.80 10 10/17/84 02:00 493 16 0.80 0. 80 10 10/17/84 04:00 494 16 0.80 0.80 10 10/17/84 06:00 495 16 0.80 0.80 10 10/17/84 08:00 496 16 0. 80 0.80 10 10/17/84 10:00 497 16 0. 80 0.80 10 10/17/84 12:00 498 16 0.80 0.80 10 10/17/84 14:00 499 16 0.80 0.80 10 10/17/84 16:00 500 16 0.80 0.80 10 10/17/84 18:00 501 16 0.80 0.80 10 10/17/84 20·00 502 16 0.80 0.80 10 10/17/84 22:00 503 16 0.80 0. 80 10 10/17/84 00:00 504 16 0.80 0.80 10 DAILY AVERAGE VALUES 0.80 0.80 10 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 15 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ==·====== ====• ==== ========·== ====== ====== ====== 10/18/84 02:00 505 16 0.80 0. 80 10 10/18/84 04:00 506 16 0.80 0.80 10 10/18/84 06:00 507 16 0.80 0.80 10 10/18/84 08:00 508 16 0.80 0.80 10 10/18/84 10:00 509 16 0.80 0.80 10 10/18/84 12:00 510 16 0.80 0.80 10 10/18/84 14:00 511 16 0.80 0.80 10 10/18/84 16:00 512 16 0.80 0.80 10 10/18/84 18:00 513 16 0.80 0.80 10 10/18/84 20:00 514 16 0.80 0.80 10 10/18/84 22:00 515 16 0.80 0. 80 10 10/18/84 00:00 516 16 0.80 0.80 10 DAILY AVERAGE VALUES 0.80 0.80 10 10/19/84 02:00 517 16 0.80 0.80 10 10/19/84 04:00 518 16 0.80 0.80 10 10/19/84 06:00 519 16 0.80 0.80 10 10/19/84 08:00 520 16 0.80 0.80 10 10/19/84 10:00 521 16 0. 80 0.80 10 10/19/84 12:00 522 16 0.80 0.80 10 10/19/84 14:00 523 16 0.80 0.80 10 10/19/84 16:00 524 16 0.80 0.80 10 10/19/84 18:00 525 16 0.80 0.80 10 10/19/84 20:00 526 16 0.80 0.80 10 10/19/84 22:00 527 16 0.80 0. 80 10 10/19/84 00:00 528 16 0.80 0.80 10 DAILY AVERAGE VALUES 0.80 0.80 10 10/20/84 02:00 529 16 0. 80 0.80 10 10/20/84 04:00 530 16 0.80 0.80 10 10/20/84 06:00 531 16 0.80 0.80 10 10/20/84 08:00 532 16 0.80 0.80 10 10/20/84 10:00 533 16 0.80 0.80 10 10/20/84 12:00 534 16 0.80 0.80 10 10/20/84 14:00 535 16 0.80 0.80 10 10/20/84 16:00 536 16 0.80 0.80 10 10/20/84 18:00 537 16 0.80 0.80 10 10/20/84 20:00 538 16 0. 80 0.80 10 10/20/84 22:00 539 16 0.80 0.80 10 10/20/84 00:00 540 16 0.80 0. 80 10 DAILY AVERAGE VALUES 0.80 0.80 10 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 16 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===== ==== ========= ====== ===== ====== 10/21/84 02:00 541 16 0. 80 0.80 10 10/21184 04: 00 542 16 0.80 0.80 10 10/21184 06: 00 543 16 0.80 0.80 10 10/21/84 08:00 544 16 0. 80 0.80 10 10/21/84 10:00 545 16 0.80 0.80 10 10/21/84 12:00 546 16 0.80 0.80 10 10/21/84 14:00 547 16 0. 80 0.80 10 10/21/84 16:00 548 17 0.85 0.85 10 10/21/84 18:00 549 16 0.80 0.80 10 10/21/84 20:00 550 16 0.80 0.80 10 10/21/84 22:00 551 16 0.80 0.80 10 10/21/84 00:00 552 16 0.80 0. 80 10 DAILY AVERAGE VALUES 0. 80 0.80 10 10/22/84 0:2:00 553 16 0.80 0. 80 10 10/22/84 04:00 554 16 0.80 0.80 10 10/22/84 06:00 555 16 0.80 0.80 10 10/22/84 08:00 556 16 0.80 0. 80 10 10/22/84 10:00 557 16 0.80 0.80 10 10/22/84 12:00 558 16 0.80 0.80 10 10/22/84 14:00 559 16 0. 80 0.80 10 10/22/84 16:00 560 16 0. 80 0.80 10 10/22/84 18:00 561 16 0.80 0.80 10 10/22/84 :20:00 562 16 0.80 0.80 10 10/22/84 :22•00 563 16 0.80 0.80 10 10/22/84 00:00 564 16 0.80 0.80 10 DAILY AVERAGE VALUES 0.80 0.80 10 10/23/84 02:00 565 16 0.80 0.80 10 10/23/84 04:00 566 16 0.80 0.80 10 10/23/84 06:00 567 16 0.80 0. 80 10 10/23/84 08:00 568 16 0.80 0.80 10 10/23/84 10:00 569 16 0.80 0.80 10 10/23/84 12:00 570 16 0.80 0.80 10 10/23/84 14:00 571 16 0.80 0.80 10 10/23/84 16:00 572 16 0.80 0.80 10 10/23/84 18:00 573 16 0. 80 0. 80 10 10/23/84 20:00 574 16 0.80 0.80 10 10/23/84 22•00 575 16 0.80 0.80 10 10/23/84 00: 00 576 16 0.80 0.80 10 DAILY AVERAGE VALUES 0. 80 0. 80 10 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 17 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02.00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =======· =··== :a::=•= =·====·== ==-=== ===== =====z= 10/24/84 02:00 577 16 0.80 0. 80 10 10/24/84 04:00 578 16 0.80 0. 80 10 10/24/84 06:00 579 16 0. 80 0.80 10 10/24/84 08:00 580 16 0.80 0.80 10 10/24/84 10:00 581 16 0.80 0. 80 10 10/24/84 12:00 582 16 0. 80 0. 80 10 10/24/84 14:00 583 16 0.80 0.80 10 10/24/84 16:00 584 16 0.80 0.80 10 10/24/84 18:00 585 17 0.85 0.85 10 10/24/84 20:00 586 16 0.80 0. 80 10 10/24/84 22:00 587 17 0.85 0.85 10 10/24/84 00:00 588 16 0.80 0.80 10 DAILY AVERAGE VALUES 0. 81 0.81 10 10/25/84 02:00 589 16 0 80 0.80 10 10/25/84 04:00 590 16 0. 80 0 80 10 10/25/84 06:00 591 16 0. 80 0.80 10 10/25/84 08:00 592 16 0. 80 0.80 10 10/25/84 10:00 593 16 o.eo 0.80 10 10/25/84 12:00 594 16 0. 80 0.80 10 10/25/84 14:00 595 16 o. eo 0.80 10 10/25/84 16:00 596 16 o. eo 0.80 10 10/25/84 18:00 597 16 0.80 0. 80 10 10/25/e4 20:00 598 16 o. eo 0.80 10 10/25/84 22:00 599 16 o.eo o.eo 10 10/25/84 00:00 600 16 0.80 0. 80 10 DAILY AVERAGE VALUES 0.80 0. 80 10 10/26/84 02:00 601 17 0.85 0.85 10 10/26/84 04:00 602 17 0.85 0.85 10 10/26/84 06:00 603 17 0.85 0.85 10 10/26/e4 08:00 604 17 o.e5 0.85 10 10/26/84 10:00 605 16 0.80 0.80 10 10/26/84 12:00 606 16 0.80 0.80 10 10/26/84 14:00 607 16 0.80 0. 80 10 10/26/84 16:00 608 16 0.80 o.eo 10 10/26/84 18:00 609 16 o.eo o.eo 10 10/26/84 20:00 610 16 0.80 0.80 10 10/26/84 22:00 611 16 o.eo 0.80 10 10/26/84 00:00 612 16 0.80 0.80 10 DAILY AVERAGE VALUES 0. 82 0. 82 10 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/eS PAGE 1e HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/e4 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== =·==== ==== ========· ====== ====== ====== 10/27/e4 02:00 613 16 o.eo o. eo 10 10/27/e4 04:00 614 16 o.eo o.eo 10 10/27/e4 06:00 615 16 o.eo o.eo 10 10/27/e4 oe:oo 616 16 o. eo o.eo 10 10/27/e4 10:00 617 16 o. eo o. eo 10 10/27/e4 12:00 618 16 o.eo o.eo 10 10/27/84 14:00 619 16 0. 80 0.80 10 10/27/e4 16:00 620 15 0. 75 0. 75 9.6 10/27/84 18:00 621 16 o.eo 0. 80 10 10/27/e4 20:00 622 16 o.eo o. eo 10 10/27/e4 22:00 623 16 0.80 o.eo 10 10/27/e4 00:00 624 16 o.eo o.eo 10 DAILY AVERAGE VALUES o.eo o. eo 10.0 10/2e/e4 02:00 625 16 o. eo o.eo 10 10/28/e4 04:00 626 16 0.80 o.eo 10 10/2e/e4 06:00 627 16 o.eo o.eo 10 10/28/e4 oe:oo 628 16 o.eo o.eo 10 10/28/e4 10:00 629 16 0.80 o.eo 10 10/2ele4 12:00 630 15 0. 75 0. 75 9. 6 10/28/e4 14:00 631 16 o.eo o.eo 10 10/2ete4 16:00 632 16 o.eo o. eo 10 10/2e/e4 1e:oo 633 16 0.80 o.eo 10 10/2e/e4 20:00 634 16 o.eo o.eo 10 10/28/e4 22:00 635 16 0.80 o.eo 10 10/2ete4 00:00 636 16 0.80 o. eo 10 DAILY AVERAGE VALUES o.eo o.eo 10. 0 10/29/84 02:00 637 16 o.eo o.eo 10 10/29/e4 04:00 638 16 0.80 o. eo 10 10/29/e4 06:00 639 16 0.80 o.eo 10 10/29/e4 oe:OO 640 16 0.80 o.eo 10 10/29/e4 10:00 641 16 0.80 o.eo 10 10/29/e4 12:00 642 16 0. 80 o.eo 10 10/29/e4 14:00 643 16 0. 80 0.80 10 10/29/84 16:00 644 17 0.85 0.85 10 10/29/84 1e:oo 645 17 o.e5 o.e5 10 10/29/e4 20:00 646 16 o.eo o.eo 10 10/29/e4 22:00 647 17 0.85 o.e5 10 10/29/e4 00:00 648 16 0.80 o.eo 10 DAILY AVERAGE VALUES 0.81 o.e1 10 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 19 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ==•===== ·==-=· ==== c:::::::ac:===== ====== ===== ====== 10/30/84 02:00 649 17 0.85 0.85 10 10/30/84 04:00 650 16 0.80 0.80 10 10/30/84 06:00 651 17 0.85 0.85 10 10/30/84 08:00 652 16 0.80 0.80 10 10/30/84 10.00 653 17 0.85 0.85 10 10/30/84 12:00 654 17 0.85 0.85 10 10/30/84 14:00 655 17 0.85 0.85 10 10/30/84 16:00 656 17 0.85 0.85 10 10/30/84 18:00 657 16 0.80 0.80 10 10/30/84 20:00 658 17 0.85 0.85 10 10/30/84 22:00 659 16 0.80 0.80 10 10/30/84 00:00 660 16 0. 80 0.80 10 DAILY AVERAGE VALUES 0.83 0.83 10 10/31184 02: 00 661 17 0. 85 0.85 10 10/31184 04: 00 662 17 0.85 0.85 10 10/31/84 06:00 663 17 0.85 085 10 10/31/84 08:00 664 17 0.85 0.85 10 10/31184 10:00 665 16 0. 80 0.80 10 10/31/84 12:00 666 16 0.80 0.80 10 10/31/84 14:00 667 16 0.80 0.80 10 10/31/84 16:00 668 17 0.85 0. 85 10 10/31/84 18:00 669 16 0. 80 0.80 10 10/31/84 20:00 670 17 0. 85 0.85 10 10/31/84 22:00 671 17 0.85 0. 85 10 10/31/84 00:00 672 17 0.85 0.85 10 DAILY AVERAGE VALUES 0.83 0.83 10 11/01/84 02:00 673 17 0.85 0.85 10 11/01/84 04: 00 674 17 0.85 0.85 10 11/01/84 06:00 675 17 0.85 0.85 10 11/01/84 08: 00 676 16 0.80 0.80 10 11/01/84 10: 00 677 17 0. 85 0.85 10 11/01/84 12: 00 678 17 0.85 0. 85 10 11/01/84 14:00 679 17 0.85 0.85 10 11/01/84 16:00 680 17 0.85 0.85 10 11/01/84 18:00 681 17 0.85 0. 85 10 11/01/84 20:00 682 17 0.85 0.85 10 11/01184 22:00 683 17 0.85 0.85 10 11/01/84 00:00 684 16 0.80 0.80 10 DAILY AVERAGE VALUES 0.84 0. 84 10 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 20 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02.00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===== ==== ========= ======= ====== ====== 11/02/84 02:00 685 17 0.85 0.85 10 11/02/84 04:00 686 16 0. 80 0.80 10 11/02/84 06:00 687 17 0. 85 0.85 10 11/02/84 08:00 688 17 0.85 0.85 10 11/02/84 10:00 689 17 0.85 0.85 10 11/02/84 12:00 690 17 0.85 0.85 10 11/02/84 14:00 691 17 0.85 0.85 10 11/02/84 16:00 692 16 0.80 0.80 10 11/02/84 18:00 693 16 0. 80 0.80 10 11/02/84 20:00 694 16 0. 80 0.80 10 11102/84 22: 00 695 17 0.85 0.85 10 11/02/84 00:00 696 17 0.85 0.85 to DAILY AVERAGE VALUES 0.83 0.83 10 11/03/84 02:00 697 17 0.85 0.85 10 11/03/84 04:00 698 17 085 0.85 10 11/03/84 06:00 699 17 0.85 0.85 10 11/03/84 08:00 700 16 0.80 0.80 10 11/03/84 10: 00 701 16 0.80 0.80 10 11/03/84 12: 00 702 16 0. 80 0.80 10 11/03/84 14:00 703 16 0. 80 0 80 10 11/03/84 16: 00 704 16 0. 80 0. 80 10 11/03/84 18:00 705 16 0.80 0.80 10 11/03/84 20:00 706 16 0. 80 0. 80 10 11/03/84 22:00 707 16 0. 80 0. 80 10 11/03/84 00:00 708 16 0.80 0.80 10 DAILY AVERAGE VALUES 0. 81 0.81 10 11/04/84 02: 00 709 16 0.80 0. 80 10 11/04/84 04:00 710 16 0.80 0.80 10 11/04/84 06:00 711 16 0.80 0.80 10 11/04/84 08:00 712 16 0. 80 0.80 10 11/04/84 10:00 713 16 0.80 0.80 10 11/04/84 12:00 714 16 0.80 0.80 10 11/04/84 14:00 715 16 0. 80 0.80 10 11/04/84 16:00 716 15 0. 75 0. 75 9. 6 11/04/84 18:00 717 16 0.80 0.80 10 11/04/84 20: 00 718 16 0.80 0.80 10 11/04/84 22:00 719 16 0. 80 0. 80 10 11/04/84 00:00 720 16 0.80 0.80 10 DAILY AVERAQE VALUES 0.80 0.80 10.0 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 21 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =====-==== .as:zn•=• ==== ========== ====== ===== ====== 11/05/84 02:00 721 16 0. 80 0.80 10 11/05/84 04:00 722 16 0.80 0.80 10 11/05/84 06:00 723 16 0.80 0.80 10 11/05/84 08:00 724 16 0.80 0.80 10 11/05/84 10:00 725 16 0.80 0.80 10 11/05/84 12:00 726 16 0.80 0.80 10 11/05/84 14:00 727 17 0. 85 0.85 10 11/05/84 16:00 728 16 0.80 0.80 10 11/05/84 18: 00 729 17 0 85 0. 85 10 11/05/84 20:00 730 16 0 80 0.80 10 11/05/84 22:00 731 17 0.85 0.85 10 11/05/84 00:00 732 16 0.80 0.80 10 DAILY AVERAGE VALUES 0. 81 0.81 10 11/06/84 02:00 733 16 0.80 0. 80 10 11/06/84 04:00 734 16 0. 80 0.80 10 11/06/84 06:00 735 16 0. 80 0.80 10 11/06/84 08:00 736 16 0.80 0.80 10 11/06/84 10· 00 737 17 0.85 0.85 10 11/06/84 12:00 738 17 0.85 0.85 10 11/06/84 14:00 739 17 0.85 0.85 10 11/06/84 16: 00 740 17 0.85 0. 85 10 11/06/84 18:00 741 16 0.80 0.80 10 11/06/84 20:00 742 16 0. 80 0.80 10 11/06/84 22:00 743 17 0.85 0.85 10 11/06/84 00:00 744 17 0.85 0.85 10 DAILY AVERAGE VALUES 0.83 0.83 10 11/07/84 02: 00 745 105 5. 25 5.25 35 11/07/84 04:00 746 105 5.25 5. 25 35 11/07/84 06:00 747 105 5.25 5.25 35 11/07/84 08:00 748 105 5. 25 5. 25 35 11/07/84 10:00 749 105 5. 25 5. 25 35 11/07/84 12:00 750 105 5.25 5. 25 35 11/07/84 14:00 751 105 5.25 5. 25 35 11/07/84 16:00 752 105 5. 25 5.25 35 11/07/84 18:00 753 84 4. 20 4. 20 30 11/07/84 20:00 754 84 4. 20 4. 20 30 11/07/84 22:00 755 84 4. 20 4. 20 30 11/07/84 00:00 756 84 4. 20 4.20 30 DAILY AVERAGE VALUES 4. 90 4. 90 33 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 22 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===== =z:::-== ========= ====== ===== ====== 11/08/84 02:00 757 84 4.20 4. 20 30 11/08/84 04:00 758 84 4 20 4.20 30 11/08/84 06:00 759 84 4. 20 4.20 30 11/08/84 08:00 760 84 4.20 4.20 30 11/08/84 10:00 761 83 4. 15 4. 15 30 11/08/84 12:00 762 85 4.25 4. 25 30 11/08/84 14:00 763 84 4. 20 4.20 30 11/08/84 16:00 764 82 4. 10 4. 10 29 11/08/84 18:00 765 83 4. 15 4. 15 30 11/08/84 20:00 766 84 4.20 4.20 30 11/08/84 22:00 767 85 4.25 4.25 30 11/08/84 00:00 768 83 4. 15 4. 15 30 DAILY AVERAGE VALUES 4. 19 4. 19 30 11/09/84 02:00 769 110 5. 50 5. 50 36 11/09/84 04:00 770 110 5. 50 5. 50 36 11109/84 06: 00 771 110 5. 50 5. 50 36 11109/84 08: 00 772 110 5. 50 5. 50 36 11/09/84 10:00 773 110 5. 50 5. 50 36 11/09/84 12:00 774 110 5. 50 5. 50 36 11/09/84 14:00 775 110 5. 50 5. 50 36 11/09/84 16:00 776 110 5. 50 5. 50 36 11/09/84 18:00 777 109 5. 45 5. 45 35 11/09/84 20:00 778 110 5. 50 5. 50 36 11/09/84 22:00 779 110 5. 50 5. 50 36 11/09/84 00:00 780 110 5. 50 5. 50 36 DAILY AVERAGE VALUES 5. so S. SO 36 11/10/84 02:00 781 140 7.00 7. 00 42 11/10/84 04:00 782 142 7. 10 7. 10 42 11/10/84 06·00 783 143 7. 15 7. 15 42 11/10/84 08:00 784 144 7.20 7. 20 43 11/10/84 10:00 785 141 7. 05 7.05 42 11/10/84 12:00 786 142 7. 10 7. 10 42 11/10/84 14·00 787 143 7. 15 7. 15 42 11/10/84 16:00 788 144 7.20 7. 20 43 11/10/84 18:00 789 139 6.95 6. 95 42 11/10/84 20:00 790 131 6. 55 6. 55 40 11/10/84 22:00 791 145 7. 25 7.25 43 11/10/84 00:00 792 146 7.30 7. 30 43 DAILY AVERAGE VALUES 7.08 7.08 42 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 23 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ==•::::~:===== ===== ==== ·======== ====== ===== ====== 11/11/84 02: 00 793 130 6. 50 6. 50 40 11/11/84 04:00 794 131 6. 55 6. :55 40 11/11/84 06:00 795 131 6. 55 6. 55 40 11/11/84 08:00 796 132 6.60 6. 60 40 11/11/84 10:00 797 132 6.60 6. 60 40 11/11/84 12:00 798 131 6. 55 6. 55 40 11/11/84 14:00 799 130 6. 50 6. 50 40 11/11/84 16:00 800 130 6. 50 6. 50 40 11/11184 18:00 801 130 6. 50 6. 50 40 11/11/84 20:00 802 130 6. so 6. 50 40 11/11/84 22:00 803 130 6. 50 6. 50 40 11/11/84 00.00 804 125 6.25 6.25 39 DAILY AVERAGE VALUES 6. 51 6. 51 40 11/12/84 02:00 805 120 6.00 6.00 38 11/12/84 04:00 806 119 5.95 5.95 38 11/12/84 06:00 807 120 6. 00 6.00 38 11/12/84 08:00 808 120 6.00 6.00 38 11/12/84 10:00 809 120 6.00 6. 00 38 11/12/84 12:00 810 121 6. OS 6.05 38 11/12/84 14:00 811 118 5. 90 5. 90 37 11/12/84 16:00 812 115 5. 75 5. 75 37 11/12/84 18:00 813 120 6.00 6.00 38 11/12/84 20:00 814 120 6. 00 6.00 38 11/12/84 22:00 815 120 6.00 6. 00 38 11/12/84 00:00 816 120 600 6. 00 38 DAILY AVERAGE VALUES 5. 97 5.97 38 11/13/84 02:00 817 93 4.65 4. 65 32 11/13/84 04:00 818 93 4.65 4.65 32 11/13/84 06:00 819 91 4.55 4. 55 32 11113/84 08:00 820 92 4. 60 4. 60 32 11/13/84 10:00 821 93 4.65 465 32 11/13/84 12:00 822 91 4. 55 4. 55 32 11/13/84 14:00 823 90 4. 50 4. 50 31 11/13/84 16:00 824 90 4. 50 4. 50 31 11/13/84 18:00 825 92 4 60 4.60 32 11/13/84 20:00 826 90 4. 50 4. 50 31 11/13/84 22:00 827 90 4. 50 4. 50 31 11/13/84 00:00 828 90 4 50 4. 50 31 DAILY AVERAGE VALUES 4. 56 4. 56 32 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 24 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ====== ==== ========== ====== ===== ======= 11/14/84 02:00 829 91 4. 55 4. 55 32 11114/84 04: 00 830 91 4. 55 4. 55 32 11/14/84 06:00 831 91 4 55 4. 55 32 11/14/84 08:00 832 92 4.60 4.60 32 11/14/84 10:00 833 90 4. 50 4. 50 31 11/14/84 12:00 834 90 4. 50 4. 50 31 11/14/84 14:00 835 92 4. 60 4.60 32 11/14/84 16:00 836 91 4. 55 4. 55 32 11/14/84 18:00 837 92 4.60 4. 60 32 11/14/84 20:00 838 92 4.60 4.60 32 11/14/84 22:00 839 90 4. 50 4. 50 31 11/14/84 00:00 840 92 4. 60 4.60 32 DAILY AVERAGE VALUES 4. 56 4. 56 32 11/15/84 02: 00 841 72 3. 60 3.60 27 ll/15/84 04:00 842 70 3. 50 3. 50 27 11/15/84 06: 00 843 70 3. 50 3. 50 27 11/15/84 08:00 844 69 3.45 3.45 26 11/15/84 10:00 845 68 3. 40 3. 40 26 11/15/84 12:00 846 71 3. 55 3. 55 27 11/15/84 14:00 847 72 3.60 3.60 27 11/15/84 16:00 848 70 3. 50 3. 50 27 11/15/84 18: 00 849 70 3. 50 3. 50 27 11/15/84 20: 00 850 70 3. 50 3. 50 27 11/15/84 22: 00 851 70 3. 50 3. 50 27 11/15/84 00: 00 852 70 3. 50 3. 50 27 DAILY AVERAGE VALUES 3. 51 3. 51 27 11/16/84 02:00 853 60 3.00 3.00 24 11/16/84 04:00 854 60 3.00 3.00 24 11/16/84 06:00 855 61 3.05 3.05 24 ll/16/84 08:00 856 59 2.95 2.95 24 11/16/84 10:00 857 59 2. 95 2.95 24 11/16/84 12: 00 858 58 2.90 2. 90 23 11/16/84 14:00 859 58 2.90 2.90 23 11/16/84 16:00 860 57 2.85 2.85 23 11/16/84 18:00 861 56 2. 80 2.80 23 11/16/84 20: 00 862 55 2. 75 2. 75 23 11/16/84 22:00 863 54 2. 70 2. 70 22 11/16/84 00:00 864 58 290 2. 90 23 DAILY AVERAGE VALUES 2.90 2.90 23 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05114185 PAGE 25 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09106184 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS :::~:::nt:=••== =••=• =c::•::c ========== ====== ===== ====:::::== 11 I 1 7184 02: 00 865 53 2.65 2.65 22 11/1 7 I 84 04: 00 866 52 2. 60 2.60 22 11/17184 06:00 867 53 2.65 2.65 22 11117184 08:00 868 50 2. 50 2. 50 21 11117184 10:00 869 51 2. 55 2. 55 22 11117184 12: 00 870 52 2. 60 2.60 22 11117184 14:00 871 53 2.65 2.65 22 11117184 16:00 872 53 2.65 2.65 22 11/17184 18:00 873 53 2.65 2. 65 22 11/17184 20: 00 874 53 2.65 2. 65 22 11/17184 22:00 875 53 2.65 2.65 22 11/17184 00:00 876 53 2.65 2. 65 22 DAILY AVERAQE VALUES 2.62 2.62 22 11/18184 02: 00 877 46 2.30 2.30 20 11/18184 04:00 878 45 2.25 2.25 20 11/18184 06:00 879 44 2. 20 2.20 20 11/18184 08: 00 880 43 2. 15 2. 15 19 11/18184 10:00 881 44 2. 20 2.20 20 11/18184 12:00 882 45 2.25 2. 25 20 11/18184 14: 00 883 44 2. 20 2.20 20 11/18184 16:00 884 46 2. 30 2. 30 20 11/18184 18:00 885 46 2. 30 2.30 20 11118184 20:00 886 46 2. 30 2. 30 20 11/18184 22:00 887 46 2. 30 2. 30 20 11/18184 00:00 888 45 2. 25 2.25 20 DAILY AVERAGE VALUES 2.25 2.25 20 11/19/84 02:00 889 42 2. 10 2. 10 19 11119/84 04:00 890 41 2.05 2.05 19 11/19184 06:00 891 40 2.00 2.00 18 11119/84 08:00 892 42 2. 10 2. 10 19 11/19/84 10:00 893 41 2.05 2.05 19 11119184 12:00 894 40 2. 00 2.00 18 11/1 9/84 14: 00 895 39 1 95 1. 95 18 11/1 9 I 84 16: 00 896 41 2. 05 2.05 19 11/19/84 18: 00 897 40 2.00 2.00 18 11/19/84 20:00 898 40 2.00 2.00 18 11/19184 22:00 899 39 1. 95 1. 95 18 11/19/84 00: 00 900 40 2.00 2.00 18 DAILY AVERAGE VALUES 2. 02 2.02 18 PROPOSED LARSEN BAY HYOROELECTR PROJECT 05/14/85 PAGE 26 HUMPY CREEX NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===== =::== zs======== ====== ===== ====== 11/20/84 02:00 901 45 2.25 2.25 20 11/20/84 04:00 902 44 2. 20 2.20 20 11/20/84 06:00 903 43 2 15 2. 15 19 11/20/84 08:00 904 44 2.20 2.20 20 11/20/84 10:00 905 45 2.25 2.25 20 11/20/84 12:00 906 44 2.20 2.20 20 11120/84 14: 00 907 43 2. 15 2. 15 19 11/20/84 16:00 908 42 2. 10 2. 10 19 11120/84 18: 00 909 41 2.05 2.05 19 11/20/84 20:00 910 40 2. 00 2.00 18 11/20/84 22:00 911 39 1. 95 1. 95 18 11/20/84 00:00 912 46 2.30 2. 30 20 DAILY AVERAGE VALUES 2. 15 2. 15 19 11/21/84 02:00 913 50 2. 50 2. 50 21 11/21/84 04:00 914 55 2. 75 2. 75 23 11121/84 06: 00 915 58 2. 90 2.90 23 11/21/84 08:00 916 59 2. 95 2. 95 24 11/21/84 10:00 917 59 2. 95 2. 95 24 11/21/84 12:00 918 60 3. 00 3. 00 24 11/21/84 14: 00 919 61 3.05 3. 05 24 11/21/84 16:00 920 60 3.00 3. 00 24 11121/84 18:00 921 60 3. 00 3.00 24 11121/84 20: 00 922 60 3.00 3. 00 24 11121184 22: 00 923 60 3.00 3.00 24 11/21/84 00:00 924 55 2. 75 2. 75 23 DAILY AVERAGE VALUES 2.90 2. 90 24 11/22/84 02:00 925 50 2. 50 2. 50 21 11/22/84 04:00 926 45 2.25 2.25 20 11/22/84 06:00 927 46 2.30 2. 30 20 11/22/84 08:00 928 46 2. 30 2.30 20 11/22/84 10:00 929 46 2. 30 2. 30 20 11122/84 12: 00 930 45 2.25 2.25 20 11/22/84 14:00 931 44 2. 20 2.20 20 11/22/84 16: 00 932 41 2.05 2.05 19 11/22/84 18: 00 933 40 2. 00 2.00 18 11122/84 20: 00 934 39 1. 95 1. 95 18 11/22/84 22:00 935 38 1. 90 1. 90 18 11/22/84 00:00 936 38 1. 90 1. 90 18 DAILY AVERAGE VALUES 2. 16 2. 16 19 PROPOSED LARSEN BAY HYDRQELECTR PROJECT 05/14/85 PAGE 27 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =··===== ==·=· ---= ====•==== ====== ====== ====== 11/23/84 02:00 937 35 1. 75 1. 75 17 11123/84 04:00 938 34 1. 70 1. 70 16 11/23/84 06:00 939 35 1. 75 1. 75 17 11123/84 08:00 940 34 1. 70 1. 70 16 11123/84 10: 00 941 35 1. 75 1. 75 17 11/23/84 12:00 942 35 1. 75 1. 75 17 11/23/84 14: 00 943 34 1. 70 1. 70 16 11/23/84 16:00 944 34 1. 70 1. 70 16 11/23/84 18:00 945 33 1. 65 1. 65 16 11123/84 20: 00 946 32 1. 60 1. 60 16 11/23/84 22:00 947 33 1. 65 1. 65 16 11/23/84 00:00 948 34 1. 70 L 70 16 DAILY AVERAGE VALUES 1. 70 1. 70 16 11124/84 02: 00 949 34 1. 70 1. 70 16 11/24/84 04:00 950 34 1. 70 1. 70 16 11/24/84 06:00 951 33 1. 65 1. 65 16 11/24/84 08:00 952 33 1. 65 1. 65 16 11/24/84 10:00 953 33 1. 65 1. 65 16 11/24/84 12:00 954 34 1. 70 1. 70 16 11/24/84 14:00 955 35 1 75 1. 75 17 11/24/84 16:00 956 34 1. 70 1. 70 16 11/24/84 18:00 957 33 1. 65 1. 65 16 11/24/84 20:00 958 34 1. 70 1. 70 16 11/24/84 22:00 959 34 1. 70 1. 70 16 11/24/84 00:00 960 35 1. 75 1. 75 17 DAILY AVERAGE VALUES 1. 69 1. 69 16 11/25/84 02:00 961 34 1. 70 1. 70 16 11/25/84 04:00 962 33 1. 65 1. 65 16 11/25/84 06:00 963 32 1. 60 1. 60 16 11/25/84 08:00 964 31 1. 55 1. 55 15 11/25/84 10:00 965 32 1. 60 1. 60 16 11/25/84 12:00 966 33 1. 65 1. 65 16 11/25/84 14: 00 967 34 1. 70 1. 70 16 11/25/84 16:00 968 33 1. 65 1. 65 16 11/25/84 18:00 969 32 1. 60 1. 60 16 11/25/84 20:00 970 31 1. 55 1. 55 15 11/25/84 22:00 971 30 1. 50 1. 50 15 11/25/84 00:00 972 31 1. 55 l. 55 15 DAILY AVERAGE VALUES 1. 61 1. 61 16 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 28 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== =•s::~== ==== =======~= ====== ===== ====== 11/26/84 02: 00 973 32 1 60 1. 60 16 11/26/84 04:00 974 33 1 65 1. 65 16 11/26/84 06'00 975 33 1. 65 1. 65 16 11/26/84 08:00 976 34 1. 70 1. 70 16 11/26/84 10:00 977 34 1. 70 1. 70 16 11/26/84 12: 00 978 30 1. 50 1. 50 15 11/26/84 14:00 979 33 1. 65 1. 65 16 11/26/84 16:00 980 31 1. 55 1. 55 15 11/26/84 18:00 981 32 1. 60 1. 60 16 11/26/84 20:00 982 33 1. 65 1. 65 16 11/26/84 22:00 983 32 1. 60 1. 60 16 11/26/84 00:00 984 32 1. 60 1. 60 16 DAILY AVERAGE VALUES 1. 62 1. 62 16 11/27/84 02: 00 985 38 1. 90 1 90 18 11/27/84 04: 00 986 39 1. 95 1. 95 18 11/27/84 06: 00 987 40 2.00 2.00 18 11/27/84 08:00 988 41 2. 05 2.05 19 11/27/84 10:00 989 42 2. 10 2. 10 19 11/27/84 12:00 990 40 2.00 2.00 18 11/27/84 14:00 991 41 2. 05 2.05 19 11/27/84 16:00 992 41 2.05 2.05 19 11/27/84 18:00 993 42 2. 10 2. 10 19 11/27/84 20: 00 994 42 2. 10 2. 10 19 11/27/84 22:00 995 42 2. 10 2. 10 19 11/27/84 00:00 996 60 3.00 3.00 24 DAILY AVERAGE VALUES 2. 12 2. 12 19 11/28/84 02: 00 997 102 5. 10 5. 10 34 11/28/84 04:00 998 105 5.25 5.25 35 11/28/84 06:00 999 108 5.40 5.40 35 11/28/84 08:00 000 105 5.25 5.25 35 11/28/84 10:00 001 110 5. 50 5. 50 36 11/28/84 12:00 002 105 5.25 5.25 35 11/28/84 14:00 003 101 5.05 5.05 34 11/28/84 16:00 004 106 5. 30 5. 30 35 11/28/84 18:00 005 107 5.35 5. 35 35 11/28/84 20:00 006 108 5. 40 5. 40 35 11/28/84 22:00 007 106 5. 30 5. 30 35 11/28/84 00:00 008 106 5. 30 5. 30 35 DAILY AVERAGE VALUES 5. 29 5. 29 35 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 29 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =z•••=== cr=-•=• •==a ===z-=••== ====== ===== ====== 11/29/84 02:00 009 135 6.75 6. 75 41 11/29/84 04:00 010 135 6. 75 6. 75 41 11/29/84 06:00 011 136 6. 80 6.80 41 11/29/84 08:00 012 138 6.90 6.90 41 11/29/84 10: 00 013 138 6. 90 6.90 41 11/29/84 12:00 014 138 6.90 6.90 41 11129/84 14: 00 015 137 6. 85 6.85 41 11/29/84 16:00 016 138 6. 90 6.90 41 11/29/84 18:00 017 140 7.00 7.00 42 11/29/84 20:00 018 139 6. 95 6.95 42 11/29/84 22:00 019 130 6. 50 6. 50 40 11/29/84 00:00 020 129 6.45 6.45 40 DAILY AVERAGE VALUES 6. 80 6.80 41 11/30/84 02:00 021 120 6.00 6.00 38 11/30/84 04:00 022 119 5. 95 5.95 38 11/30/84 06:00 023 130 6. 50 6. 50 40 11/30/84 08:00 024 120 6.00 6.00 38 11/30/84 10:00 025 131 6. 55 6. 55 40 11/30/84 12:00 026 130 6. 50 6. 50 40 11/30/84 14•00 027 129 6.45 6.45 40 11/30/84 16:00 028 128 6. 40 6.40 39 11/30/84 18:00 029 130 6. 50 6. 50 40 11/30/84 20:00 030 131 6. 55 6. 55 40 11/30/84 22:00 031 132 6.60 6. 60 40 11/30/84 00:00 032 133 6.65 6.65 40 DAILY AVERAGE VALUES 6.39 6. 39 39 12/01/84 02:00 033 134 6. 70 6. 70 41 12/01/84 04:00 034 135 6. 75 6. 75 41 12/01/84 06:00 035 136 6.80 6.80 41 12/01184 08:00 036 137 6. 85 6.85 41 12/01/84 10:00 037 139 6.95 6.95 42 12/01/84 12:00 038 140 7.00 7. 00 42 12/01/84 14:00 039 142 7. 10 7. 10 42 12/01/84 16:00 040 145 7.25 7.25 43 12/01184 18: 00 041 145 7.25 7.25 43 12/01/84 20:00 042 145 7.25 7.25 43 12/01/84 22:00 043 146 7.30 7. 30 43 12/01/84 00:00 044 146 7.30 7.30 43 DAILY AVERAGE VALUES 7.04 7. 04 42 PROPOSED LARSEN BAY HYDROELECTR PRO~ECT 05/14/85 PAGE 30 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =======• c:ur:a:== =·== =====·==· =====-===== ====== 12/02/84 02:00 045 148 7. 40 7. 40 43 12/02/84 04:00 046 147 7. 35 7. 35 43 12/02/84 06:00 047 146 7. 30 7. 30 43 12/02/84 08:00 048 146 7. 30 7. 30 43 12/02/84 10:00 049 145 7. 25 7.25 43 12/02/84 12:00 050 145 7.25 7. 25 43 12/02/84 14:00 051 146 7. 30 7.30 43 12/02/84 16:00 052 145 7.25 7.25 43 12/02/84 18:00 053 140 7.00 7.00 42 12/02/84 20:00 054 140 7.00 7.00 42 12/02/84 22:00 055 140 7.00 7.00 42 12/02/84 00:00 056 139 6. 95 6. 95 42 DAILY AVERAGE VALUES 7.20 7. 20 43 12/03/84 02:00 057 138 6.90 6. 90 41 12/03/84 04:00 058 139 6.95 6.95 42 12/03/84 06:00 059 139 6. 95 6.95 42 12/03/84 08:00 060 139 6.95 6 95 42 12/03/84 10:00 061 139 6.95 6.95 42 12/03/84 12:00 062 139 6.95 6.95 42 12/03/84 14:00 Ob3 139 6. 95 b.95 42 12/03/84 16:00 064 139 b.95 b. 95 42 12/03/84 18:00 065 140 7. 00 7.00 42 12/03/84 20:00 06b 142 7. 10 7. 10 42 12/03/84 22:00 Ob7 142 7. 10 7. 10 42 12/03/84 00:00 068 142 7. 10 7. 10 42 DAILY AVERAGE VALUES b. 99 6. 99 42 12/04/84 02:00 069 142 7. 10 7. 10 42 12/04/84 04:00 070 144 7.20 7.20 43 12/04/84 06:00 071 145 7.25 7.25 43 12/04/84 08:00 072 145 7.25 7.25 43 12/04/84 10:00 073 145 7.25 7.25 43 12/04/84 12:00 074 146 7.30 7. 30 43 12/04/84 14:00 075 146 7. 30 7. 30 43 12/04/84 1b:OO 076 136 b.80 6. eo 41 12/04/84 18:00 077 110 5. 50 5. 50 36 12/04/84 20:00 078 110 5. 50 5. 50 36 12/04/84 22:00 079 110 5. 50 5. 50 36 12/04/84 00:00 080 110 5. 50 5. 50 3b DAILY AVERAGE VALUES 6. 62 6.62 40 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 31 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ::=:..:::~==== s::u=••• ·=-== -·====·== ====== ===== ====== 12/05/84 02:00 081 111 5. 55 5. 55 36 12/05/84 04:00 082 112 5.60 5. 60 36 12/05/84 06:00 083 110 5. 50 5. 50 36 12/05/84 08:00 084 108 5. 40 5.40 35 12/05/84 10:00 085 108 5. 40 5. 40 35 12/05/84 12:00 086 108 5. 40 5. 40 35 12/05/84 14:00 087 110 5. 50 5. 50 36 12/05/84 16:00 088 110 5. 50 5. 50 36 12/05/84 18:00 089 105 5.25 5.25 35 12/05/84 20:00 090 100 5 00 5.00 34 12/05/84 22:00 091 90 4. 50 4. 50 31 12/05/84 00:00 092 91 4. 55 4. 55 32 DAILY AVERAGE VALUES 5. 26 5.26 35 12/06/84 02:00 093 92 4.60 4.60 32 12/06/84 04:00 094 93 4.65 4.65 32 12/06/84 06:00 095 94 4. 70 4. 70 32 12/06/84 08:00 096 90 4 50 4. 50 31 12/06/84 10:00 097 91 4 55 4. 55 32 12/06/84 12:00 098 92 4.60 4.60 32 12/06/84 14:00 099 93 4. 65 4.65 32 12/06/84 16:00 100 94 4. 70 4. 70 32 12/06/84 18:00 101 93 4.65 4. 65 32 12/06/84 20:00 102 92 4.60 4. 60 32 12/06/84 22:00 103 90 4. 50 4. 50 31 12/06/84 00:00 104 89 4. 45 4. 45 31 DAILY AVERAGE VALUES 4. 60 4.60 32 12/07/84 02:00 105 90 4. 50 4. 50 31 12/07/84 04:00 106 89 4.45 4.45 31 12/07/84 06:00 107 88 4. 40 4. 40 31 12/07/84 08:00 108 90 4. 50 4. 50 31 12/07/84 10:00 109 85 4.25 4.25 30 12/07/84 12:00 110 84 4. 20 4.20 30 12/07/84 14:00 111 86 4.30 4. 30 30 12/07/84 16:00 112 83 4. 15 4. 15 30 12/07/84 18:00 113 85 4. 25 4.25 30 12/07/84 20:00 114 84 4.20 4 20 30 12/07/84 22:00 115 83 4. 15 4. 15 30 12/07/84 00:00 116 82 4. 10 4. 10 29 DAILY AVERAGE VALUES 4.29 4.29 30 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/8:5 PAGE 32 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ========= =--=· =•== ====:a:===== ====== ===== ====== 12/08/84 02:00 117 82 4. 10 4. 10 29 12/08/84 04:00 118 82 4. 10 4. 10 29 12/08/84 06:00 119 86 4.30 4. 30 30 12/08/84 08:00 120 86 4.30 4.30 30 12/08/84 10:00 121 80 4.00 4. 00 29 12/08/84 12:00 122 75 3. 75 3. 75 28 12/08/84 14:00 123 74 3. 70 3. 70 27 12/08/84 16:00 124 72 3.60 3.60 27 12/08/84 18:00 125 73 3.65 365 27 12/08/84 20:00 126 74 3. 70 3 70 27 12/08/84 22:00 127 75 3. 75 3. 75 28 12/08/84 00:00 128 74 3. 70 3. 70 27 DAILY AVERAGE VALUES 3.89 3.89 28 12/09/84 02:00 129 73 3.65 3.65 27 12/09/84 04:00 130 72 3. 60 3. 60 27 12/09/84 06:00 131 73 3. 65 3. 65 27 12/09/84 08:00 132 74 3. 70 3. 70 27 12/09/84 10:00 133 60 3.00 3.00 24 12/09/84 12:00 134 62 3. 10 3. 10 24 12/09/84 14:00 135 61 3.05 3.05 24 12/09/84 16:00 136 60 3.00 3.00 24 12/09/84 18:00 137 60 3.00 3.00 24 12/09/84 20:00 138 61 3.05 3.05 24 12/09/84 22:00 139 62 3. 10 3. 10 24 12/09/84 00:00 140 60 3.00 3.00 24 DAILY AVERAGE VALUES 3.24 3.24 25 12/10/84 02:00 141 59 2.95 2.95 24 12/10/84 04:00 142 59 2.95 2. 95 24 12/10/84 06:00 143 58 2.90 2. 90 23 12/10/84 08:00 144 57 2.85 2.85 23 12/10/84 10:00 145 55 2. 75 2. 75 23 12/10/84 12:00 146 54 2. 70 2. 70 22 12/10/84 14:00 147 55 2. 75 2. 75 23 12/10/84 16:00 148 54 2. 70 2. 70 22 12/10/84 18:00 149 53 2.6:5 2.65 22 12/10/84 20:00 150 52 2. 60 2.60 22 12/10/84 22:00 151 53 2.65 2.65 22 12/10/84 00:00 152 51 2. 55 2. 55 22 DAILY AVERAGE VALUES 2. 75 2. 75 23 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 33 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHQ DATE TIME BYTE RAW DATA FEET FEET CFS =•======= ==·=-= •zr== ====s===-== ====== ====== ======= 12/11/84 02:00 153 52 2.60 2.60 22 12/11/84 04:00 154 50 2. 50 2. 50 21 1 2/11/84 06: 00 155 51 2. 55 2. 55 22 12/11/84 08:00 156 50 2. 50 2. 50 21 12/11/84 10:00 157 50 2. 50 2. 50 21 12/11/84 12:00 158 49 2. 45 2. 45 21 12/11/84 14:00 159 48 2. 40 2. 40 21 12/11/84 16: 00 160 47 2.35 2.35 20 12/11/84 18: 00 161 46 2. 30 2.30 20 12/11/84 20: 00 162 45 2. 25 2.25 20 12/11/84 2:2:00 163 44 2. 20 2.20 20 12/11/84 00: 00 164 45 2.25 2.25 20 DAILY AVERAGE VALUES 2.40 2. 40 21 12/12/84 02:00 165 45 2.25 2.25 20 12/12/84 04:00 166 44 2.20 2.20 20 12/12/84 06:00 167 45 2. 25 2.25 20 12/12/84 08:00 168 44 2.20 2. 20 20 12/12/84 10:00 169 44 2.20 2.20 20 12/12/84 12:00 170 43 2. 15 2. 15 19 12/12/84 14:00 171 42 2. 10 2. 10 19 12/12/84 16:00 172 41 2.05 2.05 19 12/12/84 18:00 173 40 2.00 2.00 18 12/12/84 :20:00 174 40 2. 00 2.00 18 12/12/84 :2:2:00 175 40 2.00 2.00 18 12/12/84 00:00 176 40 2.00 2.00 18 DAILY AVERAGE VALUES 2. 12 2. 12 19 12/13/84 02:00 177 41 2.05 2.05 19 12/13/84 04:00 178 40 2.00 2.00 18 12/13/84 06:00 179 39 1. 95 1. 95 18 12/13/84 08:00 180 39 1. 95 1. 95 18 12/13/84 10:00 181 38 1. 90 1. 90 18 12/13/84 12:00 182 38 1. 90 1. 90 18 12/13/84 14:00 183 40 2. 00 2.00 18 12/13/84 16:00 184 38 1. 90 1. 90 18 12/13/84 18:00 185 38 1. 90 1. 90 18 12/13/84 20:00 186 37 1. 85 1. 85 17 12/13/84 22:00 187 39 1. 95 1. 95 18 12/13/84 00:00 188 38 1. 90 1. 90 18 DAILY AVERAGE VALUES 1. 94 1. 94 18 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 34 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== =··== ==== ========= ====== ====a ====== 12/14/84 02:00 189 38 1 90 1. 90 18 12/14/84 04:00 190 38 1 90 1. 90 18 12/14/84 06:00 191 38 1. 90 1. 90 18 12/14/84 08:00 192 38 1. 90 1. 90 18 12/14/84 10:00 193 39 1. 95 1. 95 18 12/14184 12:00 194 38 1. 90 1. 90 18 12/14/84 14:00 19:5 38 1. 90 1. 90 18 12/14/84 16:00 196 39 1. 95 1. 95 18 12/14184 18:00 197 38 1. 90 1 90 18 12/14/84 20:00 198 37 1. 85 1. 85 17 12/14/84 22:00 199 38 1 90 1. 90 18 12/14/84 00:00 200 39 1. 95 1. 95 18 DAILY AVERAGE VALUES 1. 91 1. 91 18 12/15/84 02:00 201 36 1. 80 1. 80 17 12/15/84 04:00 202 37 1. 85 1. 85 17 12/15/84 06:00 203 38 1. 90 1. 90 18 12/15/84 08:00 204 38 1. 90 1. 90 18 12/15/84 10:00 205 36 1. 80 1. 80 17 12/15/84 12:00 206 35 1. 75 1. 75 17 12/15/84 14:00 207 36 1. 80 1. 80 17 12/15/84 16:00 208 35 1. 75 1. 75 17 12/15184 18:00 209 35 1. 75 1. 75 17 12/15/84 20:00 210 35 1. 75 1 75 17 12/15184 22:00 211 35 1. 75 1. 75 17 12/15/84 00:00 212 35 1. 75 1. 75 17 DAILY AVERAGE VALUES 1. 80 1. 80 17 12/16/84 02:00 213 35 1. 75 1. 75 17 12/16/84 04:00 214 35 1. 75 1. 75 17 12/16/84 06:00 215 35 1. 75 1. 75 17 12/16/84 08:00 216 35 1. 75 1. 75 17 12/16/84 10:00 217 34 1. 70 1. 70 16 12/16/84 12:00 218 34 1. 70 1. 70 16 12/16/84 14:00 219 34 1. 70 1. 70 16 12/16/84 16:00 220 34 1 70 1. 70 16 12/16/84 18:00 221 34 1. 70 1. 70 16 12/16/84 20:00 222 35 1. 75 1. 75 17 12/16/84 22:00 223 34 1. 70 1. 70 16 12/16/84 00:00 224 34 1. 70 1. 70 16 DAILY AVERAGE VALUES 1. 72 1. 72 16 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 35 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ====~~::=== ==a==· ==== ========= ======= ===== ====== 12/17/84 02:00 225 34 1. 70 1. 70 16 12/17/84 04:00 226 34 1 70 1. 70 16 12/17/84 06:00 227 34 1. 70 1. 70 16 12/17/84 08:00 228 34 1. 70 1. 70 16 12/17/84 10:00 229 33 1. 65 1. 65 16 12/17/84 12:00 230 33 1. 65 1. 65 16 12/17/84 14:00 231 33 1 65 1. 65 16 12/17/84 16:00 232 33 1. 65 1 65 16 12/17/84 18:00 233 33 1. 65 1. 65 16 12/17/84 20:00 234 33 1. 65 1. 65 16 12/17/84 22:00 235 33 1 65 1. 65 16 12/17/84 00:00 236 33 1. 65 1. 65 16 DAILY AVERAGE VALUES 1. 67 1. 67 16 12/18/84 02:00 237 33 165 1. 65 16 12/18/84 04:00 238 33 1. 65 1. 65 16 12/18/84 06:00 239 33 1. 65 1. 65 16 12/18/84 08:00 240 33 1. 65 1. 65 16 12/18/84 10:00 241 16 0. 80 0.80 10 12/18/84 12:00 242 16 0. 80 0.80 10 12/18/84 14:00 243 16 0.80 0.80 10 12/18/84 16:00 244 16 0. 80 0. 80 10 12/18/84 18:00 245 16 0.80 0.80 10 12/18/84 20:00 246 16 0. 80 0. 80 10 12/18/84 22:00 247 16 0.80 0.80 10 12/18/84 00:00 248 17 0.85 0.85 10 DAILY AVERAGE VALUES 1. 09 1. 09 12 12/19/84 02:00 249 16 0.80 0. 80 10 12/19/84 04:00 250 16 0.80 0.80 10 12/19/84 06:00 251 16 0.80 0.80 10 12/19/84 08:00 252 16 0.80 0.80 10 12/19/84 10:00 253 16 0. 80 0.80 10 12/19/84 12:00 254 16 0.80 0.80 10 12/19/84 14:00 255 16 0.80 0.80 10 12/19/84 16:00 256 16 0.80 0.80 10 12/19/84 18:00 257 16 0. 80 0.80 10 12/19/84 20:00 258 16 0. 80 0.80 10 12/19/84 22:00 259 16 0.80 0. 80 10 12/19/84 00:00 260 16 0. 80 0.80 10 DAILY AVERAGE VALUES 0.80 0. 80 10 PROPOSED LARSEN BAY HYDRDELECTR PROJECT 05/14/85 PAGE 36 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ==•===== =··== •=-== ======·==-====== ===·= ======= 12/20/84 02:00 261 16 0.80 0. 80 10 12/20/84 04·00 262 16 0.80 0.80 10 12/20/84 06:00 263 16 0.80 0. 80 10 12/20/84 08:00 264 15 0. 75 0. 75 9. 6 12/20/84 10:00 265 15 0. 75 0. 75 9.6 12/20/84 12·00 266 15 0. 75 0. 75 9.6 12/20/84 14:00 267 15 0. 75 0. 75 9.6 12/20/84 16:00 268 15 0. 75 0. 75 9.6 12/20/84 18:00 269 15 0. 75 0. 75 9. 6 12/20/84 20:00 270 15 0. 75 0. 75 9. 6 12/20/84 22:00 271 15 0. 75 0. 75 9.6 12/20/84 00:00 272 15 0. 75 0. 75 9. 6 DAILY AVERAGE VALUES 0. 76 0. 76 9. 7 12/21/84 02:00 273 16 0. 80 0.80 10 12/21/84 04:00 274 16 0.80 0. 80 10 12/21184 06: 00 275 16 0. 80 0.80 10 12/21/84 08:00 276 16 0. 80 0.80 10 12/21/84 10:00 277 16 0. 80 0.80 10 12/21/84 12:00 278 16 0.80 0.80 10 12/21184 14: 00 279 15 0. 75 0. 75 9. 6 12/21/84 16:00 280 15 0. 75 0. 75 9.6 12/21/84 18:00 281 16 0.80 0.80 10 12/21/84 20:00 282 15 0. 75 0. 75 9.6 12/21/84 22:00 283 16 0. 80 0. 80 10 12/21/84 00:00 284 15 0. 75 0. 75 9. 6 DAILY AVERAGE VALUES 0. 78 0. 78 9. 9 12/22/84 02:00 285 15 0. 75 0. 75 9.6 12/22/84 04:00 286 15 0. 75 0. 75 9.6 12/22/84 06:00 287 15 0. 75 0. 75 9. 6 12/22/84 08:00 288 15 0. 75 0. 75 9.6 12/22/84 10:00 289 15 0. 75 0. 75 9.6 12/22/84 12:00 290 15 0. 75 0. 75 9.6 12/22/84 14:00 291 15 0. 75 0. 75 9. 6 12/22/84 16:00 292 14 0. 70 0. 70 9.2 12/22/84 18:00 293 15 0. 75 0. 75 9.6 12/22/84 20:00 294 15 0.75 0. 75 9. 6 12/22/84 22:00 295 15 0. 75 0. 75 9.6 12/22/84 00:00 296 15 0. 75 0. 75 9.6 DAILY AVERAGE VALUES 0. 75 0. 75 9. 6 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 37 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS :==•===== ===== ==== =====·=== ==z::=== ===== ====== 12/23/84 02:00 297 16 0.80 0.80 10 12/23/84 04:00 298 16 0.80 0. 80 10 12/23/84 06:00 299 15 0. 75 0. 75 9.6 12/23/84 08:00 300 15 0. 75 0. 75 9.6 12/23/84 10:00 301 15 0. 75 0. 7:5 9.6 12/23/84 12:00 302 15 0. 75 0. 75 9. 6 12/23/84 14:00 303 15 0. 75 0. 75 9. 6 12/23/84 16:00 304 15 0. 75 0. 7:5 9. 6 12/23/84 18:00 305 15 0. 75 0. 75 9. 6 12/23/84 20:00 306 1:5 0. 75 0. 7:5 9. 6 12/23/84 22:00 307 15 0. 75 0. 75 9. 6 12/23/84 00:00 308 15 0. 7:5 0. 7:5 9. 6 DAILY AVERAGE VALUES 0. 76 0. 76 9. 7 12/24/84 02:00 309 15 0. 75 0 7:5 9. 6 12/24/84 04:00 310 15 0. 75 0. 75 9. 6 12/24/84 06:00 311 15 0. 75 0. 75 9.6 12/24/84 08:00 312 15 0. 75 0. 7:5 9.6 12/24/84 10:00 313 15 0. 75 0. 75 9.6 12/24/84 12:00 314 15 0. 75 0. 75 9.6 12/24/84 14:00 315 15 0. 75 0. 75 9. 6 12/24/84 16:00 316 15 0. 75 0. 75 9. 6 12/24/84 18:00 317 15 0. 75 0. 75 9.6 12/24/84 20:00 318 15 0. 75 0. 75 9.6 12/24/84 22:00 319 15 0. 75 0. 75 9. 6 12/24/84 00:00 320 15 0. 75 0. 75 9. 6 DAILY AVERAGE VALUES 0. 75 0. 75 9.6 12/25/84 02·00 321 15 0. 75 0. 75 9. 6 12/25/84 04:00 322 15 0. 75 0.75 9. 6 12/25/84 06:00 323 15 0. 75 0. 7:5 9. 6 12/25/84 08:00 324 15 0. 75 0. 75 9. 6 12/25/84 10:00 325 15 0. 75 0. 75 9. 6 12/25/84 12:00 326 15 0. 75 0 75 9. 6 12/25/84 14:00 327 15 0. 75 0. 75 9.6 12/25/84 16:00 328 15 0. 75 0. 75 9. 6 12/25/84 18:00 329 15 0. 75 0.75 9.6 12/25/84 20:00 330 15 0. 75 0. 75 9. 6 12/25/84 22:00 331 15 0. 75 0. 75 9. 6 12/25/84 00:00 332 1:5 0. 75 0. 75 9 6 DAILY AVERAGE VALUES 0. 75 0. 75 9.6 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 38 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== =·=== ==== ========= ======= ===== ====== 12/26/84 02:00 333 15 0. 75 0. 75 9.6 12/26/84 04·00 334 15 0. 75 0. 75 9. 6 12/26/84 06:00 335 15 0. 75 0. 75 9.6 12/26/84 08:00 336 15 0. 75 0. 75 9. 6 12/26/84 10:00 337 15 0. 75 0. 75 9. 6 12/26/84 12:00 338 15 0. 75 0. 75 9. 6 12/26/84 14:00 339 15 0. 75 0. 75 9.6 12/26/84 16:00 340 15 0. 75 0. 75 9. 6 12/26/84 18:00 341 15 0. 75 0. 75 9. 6 12/26/84 20:00 342 15 0. 75 0. 75 9. 6 12/26/84 22:00 343 15 0. 75 0. 75 9.6 12/26/84 00:00 344 15 0. 75 0. 75 9.6 DAILY AVERAGE VALUES 0. 75 0. 75 9.6 12/27/84 02:00 345 15 0. 75 0. 75 9.6 12/27/84 04:00 346 15 0. 75 0. 75 9.6 12/27/84 06:00 347 15 0. 75 0. 75 9.6 12/27/84 08:00 348 15 0. 75 0. 75 9. 6 12/27/84 10:00 349 15 0. 75 0. 75 9.6 12127184 12:00 350 15 0. 75 0. 75 9.6 12/27/84 14:00 351 15 0. 75 0. 75 9.6 12/27/84 16:00 352 15 0. 75 0. 75 9.6 12/27/84 18:00 353 15 0. 75 0. 75 9.6 12/27/84 20:00 354 15 0. 75 0. 75 9.6 12/27/84 22:00 355 15 0. 75 0. 75 9. 6 12/27/84 00:00 356 15 0. 75 0. 75 9.6 DAILY AVERAGE VALUES 0. 75 0. 75 9. 6 12/28/84 02:00 357 15 0. 75 0. 75 9. 6 12/28/84 04:00 358 15 0. 75 0. 75 9.6 12/28/84 06:00 359 15 0. 75 0. 75 9. 6 12/28/84 08:00 360 16 0.80 0.80 10 12/28/84 10:00 361 15 0. 75 0. 75 9.6 12/28/84 12:00 362 15 0. 75 0. 75 9.6 12/28/84 14:00 363 15 0. 75 0. 75 9. 6 12/28/84 16:00 364 15 0. 75 0. 75 9.6 12/28/84 18:00 365 15 0. 75 0. 75 9. 6 12/28/84 20:00 366 15 0. 75 0. 75 9. 6 12/28/84 22:00 367 16 0.80 0.80 10 12/28/84 00:00 368 15 0. 75 0. 75 9.6 DAILY AVERAGE VALUES 0. 76 0. 76 9. 7 PROPOSED LARSEN BAY HYDROELECTR PROJECT 05/14/85 PAGE 39 HUMPY CREEK NEAR LARSEN BAY, ALASKA START TIME 09/06/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===-=== ==== ========= ====== ===== ====== 12/29/84 02•00 369 15 0.75 0. 75 9.6 12/29/84 04:00 370 16 0.80 0.80 10 12/29/84 06:00 371 16 0.80 0.80 10 12/29/84 08:00 372 15 0. 75 0. 75 9. 6 12/29/84 10:00 373 15 0. 75 0. 75 9.6 12/29/84 12:00 374 15 0. 75 0. 75 9. 6 12/29/84 14:00 375 15 0 75 0. 75 9.6 12/29/84 16.00 376 15 0. 75 0. 75 9. 6 12/29/84 18:00 377 15 0. 75 0. 75 9. 6 12/29/84 20:00 378 15 0. 75 0. 75 9. 6 12/29/84 22:00 379 15 0. 75 0. 75 9. 6 12/29/84 00:00 380 15 0. 75 0. 75 9.6 DAILY AVERAGE VALUES 0. 76 0. 76 9. 7 12/30/84 02:00 381 15 0. 75 0. 75 9. 6 12/30/84 04:00 382 16 0.80 0.80 10 12/30/84 06:00 383 16 0.80 0. 80 10 12/30/84 08:00 384 15 0. 75 0. 75 9.6 12/30/84 10:00 385 15 0. 75 0. 75 9. 6 12/30/84 12:00 386 15 0. 75 0. 75 9.6 12/30/84 14:00 387 16 0. 80 0.80 10 12/30/84 16:00 388 16 0.80 0. 80 10 12/30/84 18:00 389 16 0.80 0.80 10 12/30/84 :i!O:OO 390 16 0. 80 0. 80 10 12/30/84 :i!:i!:OO 391 16 0.80 0.80 10 12/30/84 00:00 392 16 0. 80 0. 80 10 DAILY AVERAGE VALUES 0. 78 0. 78 9. 9 12/31/84 02:00 393 16 0.80 0.80 10 12/31/84 04:00 394 16 0. 80 0.80 10 12/31184 06:00 395 16 0.80 0.80 10 12/31/84 08:00 396 16 0.80 0.80 10 12/31/84 10:00 397 16 0. 80 0. 80 10 12/31184 12:00 398 16 0. 80 0.80 10 12/31/84 14:00 399 16 0.80 0.80 10 12/31/84 16:00 400 16 0.80 0.80 10 12/31/84 18:00 401 15 0. 75 0. 75 9. 6 12/31/84 20:00 402 15 0. 75 0. 75 9. 6 12/31/84 22:00 403 15 0. 75 0. 75 9. 6 12/31184 00: 00 404 15 0. 75 0.75 9. 6 DAILY AVERAGE VALUES 0. 78 0. 78 9. 9