Loading...
HomeMy WebLinkAboutFeasibility Study for King Cove Hydro Project Supplemental Data Report 1985fEASIBILITY STUDY fOR KING COVE HYDROELECTRIC PROJECT SUPPLEMENTAL DATA REPORT: HYDROLOGY Prepared For: Alaska Power Authority Prepared By: DOWL Engineers May, 1985 W. 0 • liD 1 3 4 7 0 TABLE OF CONTENTS PAGE Purpose •. ............................................. 1 Location. ................................................ 1 Drainage Area........................................... 1 Gage ..••..••••.. ........................................ Reference Marks. ................................. Discharge Measurements. ................................. Rating Curve. Channel. Control. Remarks. ................................................ Appendix A Appendix B Figure 1 Figure 2 Figure 3 Table APPENDICES Discharge Rating Curve Measurements Printout of Discharge and 4-Hour Stage Data Discharges Measurements 2-Hour and Corresponding LIST or FIGURES Project Location Map Discharge Rating Curve Delta King Cove, Alaska 198 4 Hydrograph of Delta Creek LIST Or TABLES Summary Streamflow Data, 1984. Delta Creek, King Cove, Alaska Creek 2 3 3 4 4 5 5 KING COVE Streamflow Data, Delta Creek Purpose: The purpose of this effort is to collect streamflow data for Delta Creek as part of the King Cove Hydroelectric Project Feasibility Study. Streamflow data collection began on January 7, 1982. Streamflow data reports for the calendar years 1982 and 1983 were submitted to the Alaska Power Authority. The streamflow data presently being gathered is an additional supplement to the hydrology study completed for the. feasibility of hydropower development. This report includes a daily stream discharge summary table as well as stage and discharge records for two-hour and/or four-hour periods for the 1984 calendar year. Location: The gaging station is located on the Creek, Lat. 55°07'39 11 , Lonq. 162°16'19 11 proof copy of Fort Randall A-1 Quad, 5 Cove, 0.5 miles north of the airstrip. can be reached by walking 0.5 miles up right bank of Delta based on an advance miles north of King The gaging station the trail from the edge of the landing strip (see Figure 1 -Location Map). Drainage Area: The drainaqe r~rea is 4.03 square miles at the gage site. The aerial extent of glaciers within the drainage basin is 0.33 square miles. The western tributary of Delta Creek derives its flow from this glacier, thus tending to smooth summer flows in Delta Creek as a result of snow and ice melting. ;,, ~ENGINEERS 'v ( I ( I 'I \ . ...., l I I ( ( I I LOCATION OF STREAM GAGING STATION AND HYDROELECTRIC PROJECT AREA KING COVE, ALASKA -3- ~_J LOCATION MAP HTS FIGURE Gaging equipment consists of a digital recorder/sensor (Omnidata Datapod) and a staff gage. Digital Gage: The digital gage is an Omnidata Datapod coupled with a small piezo-electric pressure transducer and a thermistor temperature probe. The datapod is an ultra low power microprocessor controlled recorder with several advan- tages. The device contains a battery supply, an analog to digital converter (12-15 bits), a microprocessor, a non- volatile storage module and a clock with an accuracy of several minutes per month. The transducer is housed inside a cylindrical stainless steel casing which is secured to the streambed through a driven steel rebar and hose clamp. A cableway extends to the recorder on the streambank. Two different models (DP211 and DP312) of the digital gage are used for this study. t~odel DP211 is coupled to a DatCJ. Insruments transducer (Model AB) and a Yellow Springs Instruments thermistor, and is set to sample both the pressure and temperature every five minutes. This model was discontinued after May of 1984. Model DP312 was installed in May of 1984 and is coupled to a Enviro-labs transducer (Model Pl-105V). It samples only the pressure every five minutes. The average of the 5-minute readings is recorded every two hours (DP312) or four hours (DP211) in an 8-bit format. Gaging equipment specifications are attached to the 1982 report as Appendix C. 2 Staff Gaqe: The staff gage is a rigid, precisely graduated, porcelain enameled iron plate securely fixed to a fence post driven into the streambed. It was installed on Delta Creek during an initial site visit for the hydroelectric feasibil- ity study (9-17-81). Reference Marks: Reference Mark-1 (Base): .A. 24-inch long steel rebar with an aluminum cap driven into the ground on the left bank of the creek, 15 feet to the east of the gage location. Elevation 6.64 feet, gage datum Discharge Measurements: Continuous measurements of stream discharge are obtained through collection of stage data at the gaging station. The stage of a stream is the height of the water surface above an established datum. The stage data on Delta Creek is col- lected every two hour-s and/or four hours by an Omnidata Datapod digital recorder. In stre8m gaging stage data is used as the independent vc.niable procedures, in a stBge- discharge relation to derive discharges. It is, therefore, norm3l practice to establish a relationship (rating curve) between the stage at the gaging station and the discharge. This relationship depends on the shape of the cross-section and the roughness of the streambed. Therefore, the rela- tionship has to be established empirically. As part of establishing the rating curve relationship, dis- charge measurements were taken at the gaging station using a 3 Marsh-McBirney Model 201 flow current meter. The stage of the stream W8S 3lso noted during discharge me8surements and is provided below along with the discharge measurements. Date 01/11/84 05/08/84 10/09/84 03/13/85 Rating Curve: Discharge 26 1 7 41 1 9 ( c fs) Gage Heigh)-Stage (ft) 1. 48 1. 30 1. 8 5 1. 35 The rating curve for Delta Creek will continue to be devel- oped 8S additional stage-discharge data points are collect- ed. A preliminary rating curve is plotted for the period of record and is shown in Figure 2. sheets are provided in Appendix A. The discharqe computation After having established the rating curves, measurements will have to be continued to enable verification, and if necessary, adjustment of the rating curve to the actual ~ir­ cumstances. Deviations from the discharges read from the rating curve are caused by morphological changes of the streambed and stream icinq problems. Channel: The channel above the gage has a relatively narrow flood- plain with indications of past channel braiding activities. 4 3r- 2.5 ~ ~ lLI 1.&.1 21-II-..... ..... ~ ..... ... 1- ::t: ~ 1.5 1-ijj 0 ::t: lLI (!) ..... ..... <[ ~ 1.0 I I I I I I ~ I I I I 10 15 20 2!5 30 40 50 60 70 80 90 100 DISCHARGE IN CUBIC FEET PER SECOND ~ RATING CURVE FOR DELTA CREEK ~ENGINEERS KING COVE, ALASKA-YEAR 1984 FIG. 2 The left and respectively. adjoining the and mosses. right banks are five to twenty feet high The stream banks and slopes of the bluffs stream are moderately vegetated with alders Bed material consists of gravel, cobbles and occasional boulders. Control: The control is a cross-section or reach of stream channel that determines the relationship between stage and discharge at that section and for some distance upstream. Permanent controls are desired for a stable stage-discharge relation- ship; however, changes (shifts) in the control occur affect- ing the relationship of stage to discharge. At low stages, a protruding rock outcrop downstream of the digital gage will be the control for stream water levels. At medium and high stages, the channel will be the dominant control. Remarks: Stage records are good for those periods when the stage sensing and recording instruments were functionina proper- ly. Otherwise, data gaps exist for winter months, and data for these periods were synthesized on the basis of weather data (Cold Bay) and from data on nearby gaging stations. Reliable data were obtained for eighty-five percent of the monitoring period. Shifts in the stream control and a mal- functioning transducer prevented recovery of stage data for fifteen percent of the monitoring period. Performance in the data collection percentage compares favorably to the 198.3 year records and is primarily due to the absence of 5 river ice jams and a satisfactory transducer performance. The period of synthesized data is indicated in the summary stream discharge table (Table 1). In addition to the stage, stream temperature was also measured up to May, 1984, and the results are provided in the following printout sheets. 6 Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Total Mean TABLE 1 A SUMMARY OF DELTA CREEK (KING COVE, ALASKA) STREAMFLOW RECORDS FOR JANUARY 1, 1984 THROUGH DECEMBER 31, 1984 MEAN DAILY DISCHARGE IN CUBIC FEET PER SECOND 1984 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov 29 19 16 27* 22* 26 36 39 33 33 82 27 21 16 24* 21* 36 34 46 32 33 53 26 23 16 28* 20* 57 36 34 28 38 42 26 19 15 21* 21* 35 45 30 27 45 42 25 15 22 22* 20* 30 46 29 60 35 38 24 18 24 19* 19* 32 60 28 65 34 34 30 18 20 20* 18* 30 64 28 68 32 31 26 18 18 28* 17* 29 59 31 66 30 29 25 18 17 25* 17 30 45 36 58 29 28 23 17 16 24* 18 28 48 35 41 28 27 22 17 17 19* 19 28 44 36 36 27 27 24 17 17 18* 19 31 46 28 34 28 38 24 17 16 18* 22 34 47 26 32 27 46 22 17 16* 18* 37 39 39 26 36 26 54 23 17 16* 17* 26 34 37 25 36 25 47 22 17 17* 17* 24 39 41 25 36 25 43 21 16 17* 16* 31 40 38 28 32 25 39 21 16 16* 16* 34 37 40 28 31 23 36 21 16 17* 17* 29 36 40 25 27 22 41 21 16 17* 20* 30 33 36 30 27 21 35 21 16 16* 21* 26 32 42 28 89 21 32 20 16 18* 20* 22 47 42 26 69 21 30 22 16 20* 22* 20 42 37 29 54 21 28 19 17 24* 23* 20 37 34 75 45 21 27 20 16 30* 33* 20 32 31 41 44 20 26 19 16 17* 35* 20 36 39 31 38 20 26 19 16 16* 38* 20 50 38 36 35 23 28 21 15 16* 40* 19 61 36 35 33 26 28 23 16 18* 26* 20 47 35 35 31 31 29 20 -20* 25* 22 39 37 28 32 131 30 19 -32* -25 -33 28 -99 - 705 496 573 573 697 698 1107 1285 1005 1275 1017 22 17 18 23 22 36 41 32 42 32 36 MEAN FLOW FOR THE PERIOD OF RECORD 29 CUBIC FEET PER SECOND *Synthesized Data Dec 27 25 25 25 22 23 28 24 22 26 27 23 22 22 23 21 39 52 44 37 36 33 37 30 28 26 28 55 38 39 46 1095 30 IJ ~~I I : L_ I - I 1 I I I J J - I I I 200 100 ~ (.) w (!) 80 a:: <( so ::c (.) (f) 40 0 20 MEAN FLOW 29 CFS 200 (f) roo 1L (.) w (!) a:: <( ::c (.) (f) 0 10~--------~----------~--------~----------~----------~--------~----------~--------~----------~~,------~----------~--------~~ I .IANUARY fEBRUARY MARCH APRIL IIAY JUNE JULY AUClUST SEPTEMBER OCTOBER NOVEMBER DECEMBER ~ENGINEERS 1984 HYDROGRAPH OF DELTA CREEK, KING COVE, ALASKA FIGURE 3 APPENDIX A Discharge Rating Curve Measurements t PROJECT NAI•IE RIVER NAt1E TRANSECT NO KING COVE HVDROELECT DELTA CREEK GAGE SITE-1-11-84 PT. STATION WIDTH (FEET) <FEEn ----· .... ------- 1 47.00 0. 00 2 47. 50 0. 50 3 48.00 0. 75 4 49.00 1. 00 5 50.00 1. 00 6 51.00 1. 00 7 52. 00 1. 00 8 53. 00 1. 00 9 54. 00 1. 00 10 55. 00 1. 00 11 56.00 1. 00 12 57 00 1. 00 13 58. 00 1. 00 14 59. 00 1. 00 15 60. 00 1. 00 16 61. 00 1. 00 17 62. 00 1. 00 18 63. 00 1. 00 19 64. 00 1. 00 20 65. 00 0. 75 21 65 5(J 0.00 SUM OF CELL DISCHARGES :: 26. 50 SUM OF CELL AREAS = 21 35 MEAN VELOC In· = 1 24 r DEPTH VELOCITY AREA DISCHARGE <FEET> <FT;SEC) <SQ. FT> <CFS) -----__ ,._.,. _______ ----------------- 0. 00 0.00 0. 00 0.00 0. 50 1. 00 0.25 0.25 0 50 1. OS 0.38 0.39 0.90 0. 80 0.90 0 72 1. 20 1. 30 1. 20 1. 56 1. 30 1. so 1. 30 1 95 1 30 1. 40 1. 30 1 82 1. 40 1. 90 1. 40 2. 66 1. 50 2. 00 1. 50 3. 00 1. 50 1. 60 1. 50 2. 40 1. 60 1. 10 1. 60 1 76 1. 80 1. 40 1. 80 2. 52 1. 60 1. 40 1. 60 2. 24 1. 30 1. 40 1. 30 1. 82 1. 30 1 50 1. 30 1. 95 1. 40 0.60 1. 40 0. 84 0. 70 0. 30 0. 70 0.21 0. 70 0 05 0. 70 0. 03 0. 70 0. 15 0. 70 0. 10 0. 70 0. 50 0. 52 0.26 0.00 0.00 0.00 0.00 CUBIC FT. /SEC. SQUARE FT FT /SEC t I) , .. I PROJECT NAME RIVER NAME TRANSECT NO. KING COVE HYDRO PROJ DELTA CREEK GAGE SITE-05/08/84 PT. STATION WIDTH <FEET> <FEET> ------------ 1 5.00 0.00 2 6.00 1. 00 3 7. 00 1. 00 4 8.00 1. 00 5 9.00 1. 00 6 10.00 1. 00 7 11.00 1. 00 8 12. 00 1. 00 9 13.00 1. 00 10 14.00 1. 00 11 15. 00 1. 00 12 16. 00 1. 00 13 17.00 1. 00 14 18.00 1. 00 15 19.00 1. 00 16 20.00 1. 00 17 21. 00 1. 00 18 22.00 1. 00 19 23.00 0. 75 20 23. 50 0. 50 21 24.00 0. 50 22 24. 50 0.00 SUM OF CELL DISCHARGES = 17. 76 SUM OF CELL AREAS = 15. 92 MEAN VELOCITY = 1. 12 DEPTH VELOCITY AREA DISCHARGE <FEET> <FT/SEC> <SO.FT) <CFS) ----------------------------- 0.00 0.00 0.00 0.00 0.20 0. 60 0.20 0. 12 0.30 1. 15 0. 30 0.34 0.40 0. 45 0.40 0. 18 0.60 1. 00 0.60 0.60 0. 50 0. 70 0. 50 0. 35 0.90 1. 60 0.90 1. 44 1. 00 2. 00 1. 00 2.00 1. 30 1. 50 1. 30 1. 95 1. 20 1. 80 1. 20 2. 16 1. 40 1. 60 1. 40 2.24 1. 40 1. 00 1. 40 1. 40 1. 10 0. 70 1. 10 0. 77 1. 00 0. 10 1. 00 0. 10 1. 00 0. 50 1. 00 0. 50 0.80 0. 70 0.80 0. 56 0. 70 0.20 0. 70 0. 14 1. 00 0.90 1. 00 0 90 0.90 1. 90 . 0. 68. 1. 28 0.60 1. 70 0.30 0. 51 0.30 1. 40 0. 15 0.21 0.00 0. 00 0.00 0.00 CUBIC FT. /SEC. SGUARE FT. FT. /SEC. t i i ' ' ; ,I PROJECT NAME RIVER NAME TRANSECT NO. KING COVE HVOROELEC DELft~ CREEK GAGE SITE-10/9/84 PT. STATION WIDTH <FEET> <FEEl> -----··-------- 1 3. 50 0.00 2 4.00 1. 25 3 6.00 1 50 4 7.00 1. 00 5 8.00 1. 00 6 9.00 1. 00 7 10.00 1. 00 8 11.00 1. 00 9 12.00 1. 00 10 13.00 1. 50 11 15.00 2. Ql) 12 17.00 2.00 13 19. 00 2.00 14 21.00 1. 50 15 22. 00 1. 35 16 23. 10 1. 00 17 24.00 0.00 SUM OF CELL DISCHARGES ~ 41. 27 SUM OF CELL AREAS = 20. 84 MEAN VELOCITY :::: 1 98 p DEPTH VELOCITY AREA DISCHARGE <FEET> <FT/SEC> <SG. FT> iCFS> ---·-----~-------------------·--- 0.00 0.00 0.00 0. 00 0. 40 1. 70 0.50 0.85 0. 80 0. 60 1 20 0. 72 1. 00 0. 90 1. 00 0. 90 1. so 1. 10 1. so 1. 6S 160 2. 70 1.60 4 32 1. 60 1. 30 1. 60 2.08 1. 50 2. 00 1. so 3. 00 1 30 2.60 1. 30 3.38 1. 40 2. 20 2. 10 4. 62 1. 20 2.30 2. 40 5. 52 1. 20 2. 90 2.40 6.96 1. 00 2.00 2.00 4. 00 0.60 2. 50 0.90 2.25 0. 40 1. 50 0. 54 0. 81 0.30 0. 70 0.30 021 0.00 0. 00 0.00 0.00 CUBIC FT. /SEC SQUARE FT. FT. /SEC. t ' • PROJECT NAME RIVER NAME TRANSECT NO. KING COVE HYDRO PRJ DELTA CREE!>(. GAGE SITE-3/13/85 PT. STATION WIDTH <FEET) <FEET) -----·------·-- 1 2. 00 0. 00 2 3. 00 1. 00 3 4. 00 1. 00 4 5. 00 1. 00 5 6. 00 1. 00 6 7.00 1. 00 7 8. 00 1. 00 8 9.00 1. 00 9 10.00 1. 00 10 11. 00 1. 00 11 12. 00 1. 50 12 14.00 2.00 13 16. 00 2. 00 14 18. 00 1. 25 15 18. 50 0. 00 SUM OF CELL DISCHARGES ·-· 19 46 SUM OF CELL AREAS = 15.45 MEAN VELOCITY = 1. 26 DEPTH VELOCITY AREA DJSCHARG£ <FEET> <FT/SEC) (SG. FT) <CFS) ______ ..__ ---·---------------·---·-·------·- 0.00 0.00 0.00 0. 00 0. 50 0. 15 0. 50 0. 07 0. 90 0. 30 0.90 0. 27 1. 00 0. 80 1. 00 0 AO 1. 20 1. 40 1. 20 1 68 1. 20 1. 60 1. 20 1. 92 1. 30 1. 80 1. 30 2. 34 1. 30 1. 80 1. 30 2 34 1 30 2. 00 1. 30 2.60 1 10 1. 40 1. 10 1. 54 1 20 1. 10 1. 80 l. 98 1. 10 1. 10 2.20 2. 42 0. 70 1. 00 1. 40 i. 40 0. 20 0. 40 0.25 0. 10 0. 00 0. 00 0.00 0 00 CUBIC FT. /SEC SGUARE FT. FT. /SEC. APPENDIX B Printout of Discharqe Measurements 2-Hour and/or 4-Hour Staqe Data and Corresponding Discharges PROPOSED KING COVE HVDROELECTR PROJECT 05/09/85 PAGE 1 DELTA CREEK NEAR V..ING COVE. ALASKA START TIME 01/12/84 04:00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DATA MV INCHES FEET CFS DEG C ! ~ : -------------SJC!:=::r::; =====s==:-=:: :s=::-:::: -=---:;;: ====·= ====== ====== 01/12/84 04:00 1 50 10~3 10.0 20.0 1. 47 24 1.5 01/12/84 08:00 3 50 102 10.0 20.0 1. 47 24 1.0 01/12/84 12:00 5 50 102 10.0 20. 0 1. 47 24 1.0 01/12/84 16:00 7 51 103 10.2 20. 4 1. 50 25 1 5 01/12/84 20:00 9 50 101 10.0 20.0 1. 47 24 0. 5 01/12/84 00:00 11 50 100 10.0 20. 0 1 47 24 0.0 DAILY AVERAGE VALUES 10. 0 20. 1 1. 48 24 0.9 01/13/84 04:00 13 51 100 10.2 20.4 1. 50 25 0.0 01/13/84 08:00 15 50 100 10.0 20.0 1. 47 24 0.0 01/13/84 12:00 17 49 100 9.8 19.6 1. 43 22 0.0 01/13/84 16:00 19 51 100 10.2 20. 4 1. 50 25 0.0 01/13/84 20:00 21 50 100 10.0 20.0 1. 47 24 0.0 01/13/84 00:00 23 50 100 10.0 20.0 1. 47 24 0.0 DAILY AVERAGE VALUES 10.0 20. 1 1. 47 24 0.0 01/14/84 04:00 25 49 101 9. a 19.6 1. 43 22 0. 5 01/14/84 08:00 27 49 101 9. 8 19.6 1. 43 22 0. 5 01/14/84 12:00 29 49 102 9. 8 19.6 1. 43 22 1.0 01/14/84 16:00 31 49 103 9 8 19. 6 1. 43 22 1. 5 01/14/84 20:00 33 49 103 9.8 19.6 1. 43 22 1.5 01/14/84 00:00 35 49 103 9. 8 19.6 1. 43 22 1.5 DAILY AVERAGE VALUES 9. 8 19.6 1. 43 22 1. 1 01/15/84 04:00 37 50 103 10.0 20.0 1. 47 24 1.5 01/15/84 08:00 39 50 103 10. 0 20.0 1. 47 24 1 5 0 h't5ff:l4 12: 00 41 49 103 9. 8 19.6 1. 43 22 1.5 01/.4 16:00 43 49 105 9. 8 19.6 1. 43 22 2. 5 01/ .·. 84 20:00 45 49 104 9. 8 19.6 1. 43 22 2.0 01115/84 00:00 47 49 104 9. 8 19.6 1. 43 22 2.0 DAILY AVERAGE VALUES 9. 9 19. 7 1. 44 23 1. 8 :I · 01/U.r/84 04:00 49 49 104 9.8 19. 6 L 43 22 2.0 !lP; 01/16/84 08:00 51 49 104 9.8 19. 6 1. 43 22 2.0 • i 01/16/84 12:00 53 49 104 9. 8 19.6 1. 43 22 2.0 01/16/84 16:00 55 49 105 9 8 19.6 1. 43 22 2. 5 01/16/84 20:00 57 49 104 9. 8 19. 6 1. 43 22 2.0 01/16/84 00:00 59 48 103 9.6 19.2 1. 40 21 1. 5 DAILY AVERAGE VALUES 9.8 19. 5 1. 43 22 2.0 I JAr,) ~'I lrj ~ ; r·! tv H I I ~ l . ~ PRUPOStu ~ING ~u~E HYUROEL~~~~ PKuv CT (.,.,_;, j9/f.,.-PA,.._ "" DELTA CREEK NEAR KING COVE, ALM:;KA START TIME 01/12/84 04:00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DATA MV INCHES FEET CFS DEG C =:n::s:=:::: ==:== ===: ====~:~·"":':'~ ==::::l!!t =====:::: ===== ======= ===== 01/17/84 04:00 61 48 1oa 0 6 19. 2 1. 40 21 1.5 01/17/84 08:00 63 48 103 9. 6 19. 2 1. 40 21 1. 5 01/17/84 12:00 65 49 103 9. 8 19.6 1 43 22 1.5 01/17/84 16:00 67 48 105 9. 6 19.2 1. 40 21 2. 5 01/17/84 20:00 69 48 108 9 6 19.2 1. 40 21 1. 5 01/17/84 00:00 71 48 102 9. 6 19. 2 1. 40 21 1. 0 DAILY AVERAGE VALUES 9. 6 19. 3 1. 41 21 1.6 01118/84 04: 00 73 48 102 9. 6 19.2 1. 40 21 1.0 01/18/84 08:00 75 48 101 9. 6 19.2 1. 40 21 0. 5 01/18/84 12:00 77 48 101 9 6 19.2 1. 40 21 0. 5 01/18/84 16: 00 79 48 103 9 6 19. 2 1. 40 21 1.5 01118/84 20: 00 81 48 101 9 6 19.2 1. 40 21 0. 5 01/18/84 00:00 83 48 101 9 6 19.2 1. 40 21 0. 5 DAILY AVERAGE VALUES 9. 6 19. 2 1. 40 21 0.8 01119/84 04:00 85 48 101 9.6 19.2 1. 40 21 0. 5 01/19/84 o8·oo 87 48 101 9. 6 19.2 1 40 21 0. 5 01/19/84 12:00 89 48 100 9. 6 19.2 1. 40 21 0.0 01/19/84 16:00 91 48 102 9.6 19. 2 1 40 21 1.0 01/19/84 20:00 93 47 100 9. 4 18. 8 1. 37 20 0.0 01/19/84 00:00 95 48 100 9. 6 19.2 1. 40 21 0.0 DAILY AVERAGE VALUES 9. 6 19. 1 1. 40 21 0.3 01/20/84 04:00 97 48 100 9.6 19.2 1 40 21 0.0 01120/84 08:00 99 48 100 9. 6 19.2 1 40 21 0.0 01/20/84 12:00 101 47 100 9. 4 18.8 1 37 20 0.0 01/20/84 16:00 103 48 101 9.6 19. 2 1. 40 21 0. 5 01120184 20:00 105 47 101 9. 4 18.8 1. 37 20 0. 5 01/20184 00:00 107 47 103 9. 4 18.8 1. 37 20 1. 5 DAILY AVERAGE VALUES 9. 5 19.0 1. 39 21 0. 4 01/21/84 04:00 109 48 104 9. 6 19.2 1. 40 21 2.0 01/21/84 08:00 111 48 104 9.6 19. 2 1. 40 21 20 01/21184 12: 00 113 48 104 9.6 19.2 1. 40 21 2. 0 01/21184 16:00 115 48 105 9. 6 19.2 1. 40 21 2.5 01/21/84 20:00 11'1 47 103 9. 4 18.8 1 37 20 1.5 01/21/84 00:00 119 47 101 9.4 18.8 1. 37 20 0 5 DAILY AVERAGE VALUES 9. 5 19. 1 1. 39 21 1. 8 I• PROJOSED K1ING t:O~E HYD~OELt:.t; r~ PNUJ~CT l un J9i6;; 'PA~:rc:. ' :;. DELTA CREEK NEAR KING COVE, ALASKA START TIME 01/i2/84 04:00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DATA MV INCHES FEET CFS DEG C •••••••e ••••• ~=:¥• :=:::sus•=•cn:~t:o ==-.:;;;:::: a::.•s:a•= s::u::c:::.::: ====== ===== 01/22/84 04:00 121 47 101 9. 4 18.8 1. 37 20 0. 5 01/22/84 08:00 123 47 101 9. 4 18.8 1.. 37 20 0. 5 01/22/84 12:00 125 47 101 9. 4 18.8 1 37 20 0. 5 01/22/84 16:00 127 47 102 9. 4 18.8 1. 37 20 1.0 01/22/84 20:00 129 47 100 9. 4 18.8 L 37 20 0.0 Ot/22/84 00:00 131 47 100 9. 4 18.8 1. 37 20 0.0 DAILY AVERAGE VALUES 9 4 18.8 1. 31 20 0.4 01/23/84 04:00 133 48 100 9.6 19.2 1. 40 21 0.0 01/23/84 08:00 135 49 100 9.8 19.6 1. 43 22 0.0 01/23/84 12:00 137 50 100 10.0 20.0 1. 47 24 0.0 01/23/84 16:00 139 50 100 10.0 20.0 1. 47 24 0.0 01/23/84 20:00 141 47 100 9.4 18.8 1. 37 20 0.0 01/23/84 00:00 143 47 100 9. 4 18. 8 1. 37 20 0.0 DAILY AVERAGE VALUES 9. 7 19. 4 1. 42 22 0.0 Ol/24/84 04:00 145 46 100 9.2 18. 4 1. 33 19 0.0 01124/84 08:00 147 46 101 9. 2 18. 4 1. 33 19 0. 5 01/24/84 12:00 149 47 101 9. 4 18.8 1' 37 20 0. 5 01/24/84 16:00 151 47 103 9.4 18.8 1 37 20 1.5 01/24/84 20:00 153 46 103 9.2 18. 4 1. 33 19 1.5 01/24/84 00:00 155 46 103 9. 2 18. 4 1. 33 19 1.5 DAILY AVERAGE VALUES 9. 3 18. 5 1. 34 19 0.9 01/25/84 04:00 157 46 103 9.2 18.4 1. 33 19 1.5 01125/84 08: 00 159 46 103 9. 2 18. 4 1. 33 19 1.5 01/25/84 12:00 161 47 102 9. 4 18.8 1. 37 20 1. 0 01/25/84 16:00 163 47 103 9. 4 18.8 1. 37 20 1 5 01/2$/84 20:00 165 47 103 9.4 18.8 1. 37 20 1. 5 01/25184 00:00 167 46 102 '7'. 2 18.4 1. 33 19 1.0 DAILY AVERAGE VALUES 9. 3 18. 6 1. 35 20 1. 3 01/26/84 04:00 169 47 103 9 4 18.8 1. 37 20 1 5 01/26/84 08:00 171 46 103 9 2 18.4 1. 33 19 1 5 01/26/84 12:00 173 46 103 9.2 18. 4 1. 33 19 1.5 01/26/84 16:00 175 46 104 9. 2 18.4 133 19 2. 0 01/26/84 20:00 177 46 104 92 18. 4 1. 33 19 2.0 01/26/84 00:00 179 46 103 9.2 18. 4 1. 33 19 1.5 DAILY AVERAGE VALUES 9. 2 18. 5 1. 34 19 1. 7 ' t f ' (J:;;>/J9/8;j PROPOSED KING COVE HYDROELECTR PROJECT ' PA!.:it. '+ DELTA CREEK NEAR KING COVE. ALASKA START TIME 01/12/84 04:00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DATA MV INCHES FEET CFS DEG C ========= ====== :=:= ====~====== ===== ::===== ===== ==~=== ===== 01/27/84 04:00 181 46 103 9.2 18.4 1. 33 19 1. 5 01/27/84 08:00 183 46 102 9. 2 18.4 1. 33 19 1.0 01/27/84 12:00 185 46 101 9. 2 18. 4 1. 33 19 0. 5 01/27/84 16:00 187 46 102 9. 2 18.4 1. 33 19 1. 0 01/27/84 20:00 189 46 101 9. 2 18. 4 1. 33 19 0. 5 01/27/84 00:00 1.91 46 101 9.2 18.4 1. 3~3 19 0.5 DAILY AVERAGE VALUES 9.2 18. 4 1. 33 19 0.8 01/28/84 04:00 193 46 1.02 9 2 18.4 1. 33 19 1.0 01/28/84 08:00 195 46 101 9.2 18.4 1. 33 19 0. 5 01/28/84 12:00 197 46 100 9.2 18.4 1. 3:3 19 0.0 01/28/84 16:00 199 48 101 9. 6 19.2 1. 40 21 0. 5 01/28/84 20:00 201 49 102 9 8 19.6 1. 43 22 1.0 01/28/84 00:00 203 50 103 10 0 20.0 1. 4'7 24 1.5 DAILY AVERAGE VALUES 9. 5 19.0 1. 38 21 0.8 01/29/84 04:00 205 51 103 10. 2 20.4 1. 50 25 1.5 01/29/84 08:00 207 50 103 10. 0 20.0 1. 47 24 1.5 01/29/84 12:00 209 49 104 9. 8 19. 6 143 22 2.0 01/29/84 16:00 211 49 104 9. 8 19.6 1. 43 22 2.0 01/29/84 20:00 213 49 103 9. 8 19.6 1. 43 22 1. 5 01/29/84 00:00 215 48 102 9. 6 19.2 1. 40 21 1.0 DAILY AVERAGE VALUES 9 9 19. 7 1. 44 23 1. 6 01/30/84 04:00 217 47 101 9. 4 18. 8 1. 37 20 0. 5 01/30/84 08:00 219 47 101 9. 4 18.8 1. 37 20 0. 5 01/30184 12:00 221 47 101 9. 4 18.8 1. 37 20 0. 5 01/30/84 16:00 223 47 103 9. 4 18.8 1. 37 20 1.5 01/30/84 20:00 225 46 102 9 2 18. 4 1. 33 19 1. 0 01130184 00:00 227 47 101. 9. 4 18.8 1 37 20 0. 5 DAILY AVERAGE VALUES 9. 4 18. 7 1. 36 20 0.8 01/31184 04:00 229 47 101 9. 4 18.8 1. 37 20 0. 5 01/31/84 08:00 231 46 100 9.2 18. 4 1. 33 19 0.0 01/31/84 12:00 233 46 100 9. 2 18. 4 1. 33 19 0.0 01/31/84 16:00 235 46 102 !;· .... '· G 18. 4 1. 33 19 1.0 01/31/84 20:00 237 46 101 9. 2 18. 4 1. 33 19 0. 5 01/31/84 00:00 239 46 101 9. 2 18. 4 1. 33 19 0. 5 DAILY AVERAGE VALUES 9. 2 18. 5 1 34 19 0.4 . ' i 'l'' t-nu)ost.u .. hNG -..u~E I,, •. JOEL .... J .~ P .... Jw!:CT I (. 19/f i PA DELTA CREEK NEAR KING COVE, ALASKA START TIME 01/12/84 04:00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DATA MV INCHES FEET CFS DEG C •••••••• :sm••• ::::=:::== ==z:s::e:=•~= =~:::o:= 11:!:!:--=·= ====== ====:::::= ===== 02/01/84 04:00 241 46 101 9 2 18. 4 1. 33 19 0. 5 02/01/84 08:00 243 46 100 9.2 18. 4 1. 33 19 0.0 02/01/84 12:00 245 46 100 9. 2 18. 4 1. 33 19 0.0 02/01/84 16:00 247 45 100 9. 0 18. 0 1. 30 18 0.0 02/01184 20:00 249 46 100 9. 2 18.4 1 33 19 0. 0 02/01/84 00:00 251 47 100 9. 4 18.8 137 20 0.0 DAILY AVERAGE VALUES 9.2 18. 4 1. 33 19 0. 1 02/02/84 04:00 253 48 100 9. 6 19.2 1. 40 21 0.0 02/02/84 08:00 255 48 100 9.6 19.2 1. 40 21 0.0 02/02/84 12:00 257 49 100 9.8 19.6 1. 43 22 0.0 02/02/84 16:00 259 48 100 9.6 19.2 1. 40 21 0.0 02/02/84 20:00 261 47 100 9. 4 18.8 1. 37 20 0.0 02/02/84 00:00 263 47 100 9. 4 188 1. 37 20 0.0 DAILY AVERAGE VALUES 9.6 19. 1 1. 40 21 0.0 02/03/84 04:00 265 47 100 9. 4 18.8 1. 37 20 0. 0 02/03/84 08:00 267 50 100 10.0 20.0 1. 47 24 0.0 02/03/84 12:00 269 52 100 10.4 20.8 1. 53 26 0.0 02/03/84 16:00 271 49 100 9.8 19.6 1. 43 22 0.0 02/03/84 20:00 273 48 100 9. 6 19.2 1. 40 21 0. 0 02/03/84 00:00 275 52 100 10. 4 20. 8 1. 53 26 0. 0 DAILY AVERAGE VALUES 9, 9 19.9 1. 46 23 0.0 02/04/84 04:00 277 55 100 11. 0 22.0 1. 63 31 0.0 02/04/84 08:00 279 58 100 11. 6 23.2 1. 73 35 0.0 02/04/84 12:00 281 62 100 12. 4 24. 8 1. 87 42 0.0 02/04/84 16:00 283 67 100 13. 4 26. 8 2.03 52 0. 0 02/04194 20:00 285 67 100 13.4 26.8 2.03 52 0. 0 02/04/84 00:00 287 68 100 13.6 27.2 2.07 54 0. 0 DAILY AVERAGE VALUES 12.6 25. 1 1. 89 44 0.0 02/05/84 04:00 289 71 100 14.2 28.4 2. 17 60 0.0 02/05/84 08:00 291 71 100 14.2 28. 4 2. 17 60 0.0 02/05/84 12:00 293 70 100 14.0 28.0 2. 13 58 0.0 02/05/84 16:00 295 67 100 13.4 26. 8 2.03 52 0.0 02/05/84 20:00 29"/ 67 100 13. 4 26.8 2.03 52 0.0 02/05/84 00:00 299 47 101 9. 4 18.8 1 37 20 0. 5 DAILY AVERAGE VALUES 13. 1 26.2 1. 98 50 0. 1 t i l : ~ .. ' I PROPOSED KING COVE HYD~OEU::.C l P!-!O.J~CT 0-.JI J9/8"· 'PA"'"'-t.. DELTA CREEK NEAR KING COVE, ALASKA START TIME 01/12/84 04:00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DATA MV INCHES FEET CFS DEG C ========::::'!:: =::::::r==s= ==::::.~ ======:== -·-"'·-·-====== ===== ===~==== ===== 02/06/84 04:00 301. 45 103 9 0 18. 0 1. 30 18 1. 5 02/06/84 08:00 303 45 103 9.0 18.0 1. 30 18 1. 5 02/06/84 12:00 305 45 103 9.0 18.0 1 30 18 1.5 02/06/84 16:00 307 45 104 9.0 18. 0 1. 30 18 2.0 02/06/84 20:00 309 45 104 9.0 18.0 1. 30 18 2.0 02/06/84 00:00 311 45 103 9. 0 18.0 1 30 18 1. 5 DAILY AVERAGE VALUES 9. 0 18. 0 1 30 18 1.7 02/07/84 04:00 313 44 10~~ 8.8 17.6 1. 27 17 1.5 02/07/84 08:00 315 45 103 9. 0 18.0 1. 30 18 1.5 02/07/84 12:00 317 45 10:1 9.0 18. 0 1. 30 18 1.5 02/07/84 16:00 319 44 103 8 8 17.6 1. 27 17 1.5 02/07/84 20:00 321 45 103 9.0 18. 0 1 30 18 1. 5 02/07/84 00:00 323 45 103 9.0 18.0 1 .. 30 18 1.5 DAILY AVERAGE VALUES 8. 9 17.9 1. 29 18 1.5 02/08/84 04:00 325 45 103 9. 0 18.0 1. 30 18 1.5 02/08/84 08:00 327 45 103 9. 0 18.0 1. 30 18 1.5 02/08/84 12:00 329 45 103 9. 0 18.0 1. 30 18 1.5 02/08/84 16:00 331 45 104 9. 0 18. 0 1 30 18 2.0 02/08/84 20:00 333 45 104 9. 0 18.0 1. 30 18 2.0 02/08/84 00:00 335 45 104 9. 0 18.0 1. 30 18 2.0 DAILY AVERAGE VAL_UES 9. 0 18.0 1. 30 18 1.8 02/09/84 04:00 337 45 104 9. 0 18. 0 1. 30 18 2. 0 02/09/84 08:00 339 45 103 9. 0 18.0 1. 30 18 1.5 02/~/84 12:00 341 45 103 9. 0 18. 0 1 30 18 1. 5 02/09/84 16:00 343 45 103 9. 0 18.0 1. 30 18 1. 5 02/09/84 20:00 345 45 104 9. 0 18.0 1 30 18 2.0 0210'U84 00: 00 34? 45 104 9. 0 18. 0 1. 30 18 2. 0 DAILY AVERAGE VALUES 9 0 18.0 1. 30 18 1.8 02/10/84 04:00 349 45 104 9.0 18. 0 1. 30 18 2.0 02/10/84 08:00 351 44 104 8 8 17.6 1. 27 17 2.0 02/10/84 12:00 353 45 104 9. 0 18.0 1. 30 18 2.0 02/10/84 16:00 355 44 104 8. 8 17. 6 1. 27 17 20 02/10/84 20:00 357 44 104 8. 8 17.6 1. 27 17 2. 0 02/10/84 00:00 359 44 104 8.8 17. 6 1. 27 17 2.0 DAILY AVERAGE VALUES 8.9 17. 7 1 28 17 2.0 I ., .-n.J•oSLu .liNG .... )IE ..... JIOEL-~)R F,,_ T i l19i~ J pp DELTA CREEK NEAR KING COVE, ALASKA START TIME 01/12/84 04·00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DAfA M\/ INCHES FEET CFS DEG C --------····-·=== :::::.======~=--:: =':':::;:;== ====== ===== =====:;;:. ::::===== 02/11/84 04:00 361 44 104 i.:Oi. B 17.6 127 17 2.0 02/11/84 08:00 3..:.:.J 44 104 f3 8 17.6 1. 27 17 2.0 02/11/84 12:00 365 45 104 9.0 18.0 1. 30 18 2.0 02/11184 16: 00 367 44 104 8 8 17. 6 1. 27 17 2 0 02/11/84 20.00 369 44 104 8. 8 17.6 1. 27 17 2. 0 02/11/84 00:00 371 44 104 8. 8 17.6 1 , . .., . c.' 17 2.0 DAILY AVERAGE VALUES 8 8 17. 7 128 17 2 0 02/12/84 04:00 373 44 103 8.8 17.6 1. 27 17 1.5 02/12/84 08:00 375 44 101 8.8 17.6 1. 27 17 0.5 02/12/84 12:00 377 44 101 8.8 17.6 1. 27 17 0. 5 02/12/84 16:00 379 44 102 8 8 17.6 1. 27 17 1. 0 02/12/84 20:00 381 44 102 8. 8 17.6 1. 27 17 1.0 02/12/84 00:00 38:3 44 103 8. 8 17. 6 1. 27 17 1.5 DAILY AVERAGE VALUES 8. 8 17.6 1. 27 17 1.0 02/13/84 04:00 385 44 103 8 8 17.6 1. 27 17 1.5 02/13/84 08:00 387 44 104 8.8 17.6 1. 27 17 2.0 02/13/84 12:00 389 44 104 8. 8 17.6 1. 27 17 2.0 02/13/84 16:00 391 44 104 8. 8 17.6 1. 2? 17 2.0 02/13/84 20:00 39:~ 44 104 8. 8 17.6 1. 27 17 2.0 02/13/84 00:00 395 44 104 8. B 17.6 1. 27 17 2.0 DAILY AVERAGE VALUES 8.8 17.6 1. 2'7 17 1. 9 02/14/84 04:00 397 44 1.04 8. 8 17.6 1.2/' 17 2.0 02/14/84 08:00 399 44 104 8.8 17.6 1. 27 17 2.0 02/14/84 12:00 401 44 104 8. 8 17.6 1. 27 17 2. 0 02/14/84 16:00 403 44 104 8. 8 17.6 1. 27 17 2. 0 02/14/84 20•00 405 44 104 8. 8 17.6 1. 27 17 2.0 02/14/84 00:00 407 44 104 8.8 17.6 1. 27 17 2.0 DAILY AVERAGE VALUES 8.8 17.6 1. 2'7 1.7 2. 0 02/15184 04:00 409 44 104 8. 8 17.6 1. 27 17 2. 0 02/15/84 08:00 411 44 104 8. 8 17.6 1. 27 17 2.0 02/15/84 12:00 413 44 104 8.8 17.6 1. 27 17 2.0 02/15/84 16:00 415 44 10'5 8. 8 17.6 127 17 2. 5 02/15/84 20:00 41'.7 44 104 8. 8 17.6 1. 27 17 2.0 02/15/84 00:00 419 44 104 8. 8 17 6 1. 27 17 2.0 DAILY AVERAGE VALUES B. 8 17. 6 1. 27 17 2. 1 I I f i ! t i PROPOSED KING COVE HYDROELEC(R PROJECT O::iiJ9i8::7 PAt;t:_ t:l DELTA CREEK NEAR KING COVE, ALASKA START TIME 01/12/84 04:00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DATA MV INCHES FEET CFS DEG C ===-~====== ====== ==::=:::~ :-::::::::::=====:.'.:.. =)~:::..·:::: ====== =====:= ===~== ===== 02/16/84 04:00 421 44 10"l 8 8 17. 6 1 27 17 2.0 02/16/84 08:00 423 44 104 8. 8 17.6 L 27 17 2.0 02/16/84 12:00 425 43 104 8.6 17.2 1. 23 16 2.0 02/16/84 16:00 427 44 104 8.8 17.6 1. 27 17 2.0 02/16/84 20:00 429 43 104 8 6 17.2 1. 2:3 16 2. 0 02/16/84 00:00 431 44 103 8. 8 17.6 1. 27 17 1. 5 DAILY AVERAGE VALUES 8. 7 17. 5 1. 26 1.7 1.9 02/17/84 04:00 43::.~ 43 103 8. 6 17.2 1. 23 16 1. 5 02/17/84 08:00 435 43 102 8. 6 17.2 1. 23 16 1. 0 02/17/84 12:00 437 43 102 8. 6 17.2 1 23 16 1.0 02/17/84 16:00 439 43 102 8. 6 17.2 1. 23 16 1.0 02/17/84 20:00 441 43 101 8.6 17.2 1. 23 16 0.5 02/17/84 00:00 443 44 102 8. 8 17.6 1. 27 17 1. 0 DAILY AVERAGE VALUES 8.6 17.3 1. 24 16 1.0 02/18/84 04:00 445 44 102 8. 8 17.6 1. 27 17 1. 0 02/18/84 08:00 447 43 102 8. 6 17.2 1. 23 16 1.0 02/18/84 12:00 449 43 103 8. 6 17. 2 1. 23 16 1.5 02/18/84 16:00 451 43 103 8. 6 17.2 l.. 23 16 1.5 02/18/84 20:00 453 43 103 8. 6 17. 2 1. 23 16 1. 5 02/18/84 00:00 455 43 103 8. 6 17.2 1. 23 16 1.5 DAILY AVERAGE VALUES 8. 6 17. 3 1. 24 16 1.3 02/19/84 04:00 457 43 10::1 8. 6 17.2 1. 23 16 1.5 02/19/84 08:00 459 43 103 8.6 17.2 1. 23 16 1 5 02/19/84 12:00 461 43 108 8. 6 17.2 L 23 16 1. 5 02/19/84 16:00 463 43 103 8. 6 17.2 1. 23 16 1.5 02/19/94 20:00 465 43 104 8. 6 17.2 1. 23 16 2.0 02/19/84 00:00 467 43 104 8. 6 17. 2 1. 23 16 2.0 DAILY AVERAGE VALUES 8.6 17. 2 1. 23 16 1' 7 02/20/84 04:00 469 43 104 8. 6 17.2 1. 23 1.6 2.0 02/20/84 08:00 471 43 102 8.6 17.2 1. 23 16 1.0 02/20/84 12:00 473 43 10l 8. 6 17.2 1. 23 i6 0. 5 02/20/84 16:00 475 43 102 8. 6 17.2 1. 23 16 1.0 02/20/84 20:00 477 44 103 8.8 17.6 1 27 17 1.5 02/20/84 00:00 479 43 104 8 6 17.2 1 23 16 2.0 DAILY AVERAGE VALUES 8. 6 17.3 1. 24 i6 1.3 I • I J l P~u~OSEu ~ING LuVE hYu OEL~L~~ Pnu~!CT <.,~,J9i£_ PA~- DELTA CREEK NEAR KING COVE, ALASKA START TIME 01/12/84 04:00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DATA MV INCHES FEET CF"S DEG C -----------·::. -·Jill:= -----··=-=~== ••=a:== ===== ====== ===== 02/21/84 04:00 481 43 104 8. 6 17. 2 1. 2'3 16 2. 0 02/21/84 08:00 483 43 104 8.6 17.2 1. 23 16 2.0 02/21184 12: 00 485 43 104 8. 6 17.2 1. 23 16 2.0 02/21/84 16:00 487 43 104 8.6 17. 2 1. 23 16 2.0 02/21/84 20:00 489 43 104 8.6 17.2 1. 23 16 2.0 02/21/84 00:00 491 43 104 8.6 17.2 1. 23 16 2.0 DAILY AVERAGE VALUES 8. 6 17.2 1.. 23 16 2.0 02/22/84 04:00 493 43 104 8.6 17.2 1. 23 16 2. 0 02/22/84 08:00 495 43 104 8. 6 17.2 1. 23 16 2.0 02/22/84 12:00 497 43 104 8.6 17.2 L 23 16 2.0 02/22/84 16:00 499 43 105 8. 6 17. 2 1. 2:) 16 2. 5 02/22/84 20:00 501 43 104 8. 6 17. 2 1. 23 16 2.0 02/22/84 00:00 503 43 104 8 6 17.2 1. 2'3 16 2.0 DAILY AVERAGE VALUES 8. 6 17.2 1. 23 16 2. 1 02/23/84 04:00 505 43 104 8. 6 17.2 1 23 16 2.0 02/23/84 08:00 507 43 104 8.6 17.2 1. 23 16 2.0 02/23/84 12:00 509 43 104 8. 6 17.2 L 23 16 2.0 02/23/84 16:00 511 43 105 8 6 17.2 1. 23 16 2. 5 02/23/84 20:00 513 43 104 8.6 17.2 1 23 16 2.0 02/23/84 00:00 515 43 104 8. 6 17. 2 1. 23 16 2.0 DAILY AVERAGE VALUES 8. 6 17.2 1. 23 16 2. 1 02/24/84 04:00 517 43 103 8. 6 17.2 1. 2.3 16 1.5 02/24/84 08:00 519 43 101 8. 6 17.2 1. 23 16 0. 5 02/24184 12:00 521 42 100 8. 4 16.8 1. 20 15 0.0 02/24/84 16:00 523 43 100 8.6 17.2 1. 23 16 0. 0 02/24/94 20:00 525 43 100 8. 6 17.2 1. 23 16 0. 0 02/24/84 00:00 527 48 100 9.6 19.2 1. 40 21 0 0 DAILY AVERAGE VALUES 8. 7 17. 5 1 25 17 03 02/25/84 04:00 529 58 100 11. 6 23.2 1. T3 35 0.0 02/25/84 08:00 531 74 100 14 8 29.6 2.27 67 0.0 02/25/84 12:00 533 82 100 16. 4 32.8 2. 53 88 0.0 02/25/84 16:00 535 77 100 15.4 30.8 2. 37 74 0_0 02/25/84 20:00 537 66 100 13.2 26. 4 2 00 50 0.0 02/25/84 00:00 539 66 100 13. 2 26. 4 2.00 50 0.0 DAILY AVERAGE VALUES 14. 1 28.2 2. 15 61 0. 0 ',1 I l I , I t PROPOSED KING COVE HYDROELECT~ PROJ CT ' UoiJ9/8::J PA\:Tt:. ' 1v DELTA CREEK NEAR KING COVE, ALASKA START TIME 01/12/84 04:00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DATA MV INCHES FEET CFS DEG C =!::====== :=:::::::= ==== =========~ -·---=====~ ====== ==::::==== ===== 02/26/84 04:00 541 6/-.., 100 13.2 26.4 2. 00 50 0. 0 02/26/84 08:00 543 47 100 9. 4 18.8 1. 37 20 0. 0 02/26/84 12:00 545 43 101 8.6 17.2 1. 23 16 0. 5 02/26/84 16:00 547 43 102 8.6 17.2 1. 23 16 1 0 02/26/84 20:00 549 43 to;;~ 8. 6 17.2 1. 23 16 1. 0 02/26/84 00:00 551 43 103 8. 6 17.2 1. 23 16 1.5 DAILY AVERAGE VALUES 9. 5 19.0 1. 38 22 0. 7 02/27/84 04:00 553 43 103 8. 6 17.2 1. 23 16 1.5 02/27/84 08:00 555 43 103 8. 6 17.2 1. 23 16 1.5 02/27/84 12:00 557 42 103 8. 4 16.8 1. 20 15 1.5 02/27/84 16:00 55c;' 43 103 8. 6 17.2 1. 23 16 1. 5 02/27/84 20:00 561 42 103 8. 4 16.8 1. 20 15 1 5 02/27/84 00:00 563 42 103 8. 4 16.8 1. 20 15 1.5 DAILY AVERAGE VALUES 8. 5 17.0 1. 22 16 1. 5 02/28/84 04:00 565 42 102 8.4 16.8 1. 20 15 1.0 02/28/84 08:00 567 42 102 8. 4 16.8 1. 20 15 1. 0 02/28/84 12:00 569 42 101 8. 4 16.8 1. 20 15 0. 5 02/28/84 16:00 571 42 101 8. 4 16.8 1. 20 15 0. 5 02/28/84 20:00 ~73 42 101 8. 4 16.8 1. 20 15 0, 5 02/28/84 00:00 575 42 101 8. 4 16.8 1. 20 15 0. 5 DAILY AVERAGE VALUES 8. 4 16.8 1. 20 15 0. 7 02/29/84 04:00 577 42 101. B. 4 16.8 1 20 15 0. 5 02/29/B4 08:00 579 42 101 8. 4 16.8 1. 20 15 0. 5 02/29/84 12:00 581 42 102 B. 4 16.8 1. 20 15 1.0 02/29/84 16:00 583 43 102 8.6 17.2 1. 23 16 1. 0 02/2./94 20:00 585 43 103 8.6 17.2 1. 23 16 1. 5 02129/84 00:00 587 43 103 8. 6 17.2 1. 23 16 1 5 DAILY AVERAGE VALUES 8. 5 17.0 1. 22 16 1.0 03/01/84 04:00 589 43 103 8.6 17.2 1. 23 16 1. 5 03/01/84 08:00 591 43 103 8. 6 17.2 1. 23 16 1.5 03/01/84 12:00 593 43 103 8.6 17.2 1. 23 16 1. 5 03/01/84 16:00 595 43 104 8. 6 17.2 1. 23 16 2.0 03/01/84 20:00 597 43 104 8. 6 17.2 1. 23 16 2.0 03/01/84 00:00 599 43 104 8.6 17.2 1. 23 16 2. 0 DAILY AVERAGE VALUES 8.6 17.2 1. 23 16 1.8 PHU~OSEu ~~NG ~u~E HYu~OELe~,k PkuvJCT (,~,J9/8" I PA\..~ ! L DELTA CREEK NEAR KING COVE, ALASKA START TIME 01/12/84 04:00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DATA t1V INCHES FEET CFS DEG C ----------=--sa::r== =•=-=••====~= ==== •===== ===== ====== ====== 03/02/84 04:00 601 42 104 8. 4 16.8 1. 20 15 2.0 03/02/84 08:00 603 43 103 8.6 17.2 L 23 16 1' 5 03/02/84 12:00 605 43 108 8. 6 17.2 1. 23 16 1.5 03/02/84 16:00 607 43 104 8.6 17.2 1 23 16 2.0 03/02/84 20:00 609 42 104 8. 4 16.8 1. 20 15 2.0 03/02/84 00:00 611 42 104 8. 4 16.8 1. 20 15 2.0 DAILY AVERAGE VALUES 8. 5 17. 0 122 16 1.8 03/03/84 04:00 613 43 104 8. 6 17.2 1. 23 16 2.0 03/03/84 08:00 615 43 104 8. 6 17.2 1. 23 16 2. 0 03/03/84 12:00 617 42 104 8. 4 16.8 1. 20 15 2. 0 03/03/84 16:00 619 43 104 8. 6 17.2 1. 23 16 2.0 03/03/84 20:00 621 43 104 8. 6 17.2 1. 23 16 2.0 03/03/84 00:00 623 42 104 8. 4 16.8 1. 20 15 2 0 DAILY AVERAGE VALUES 8. 5 17. 1 J.. 22 16 2.0 03/04/84 04:00 625 42 104 8. 4 16.8 120 15 2.0 03/04/84 08:00 627 42 104 8. 4 16.8 1 20 15 2.0 03/04/84 12:00 629 42 104 8. 4 16. 8 1. 20 15 2. 0 03/04/84 16:00 631 42 104 8. 4 16.8 1. 20 15 2.0 03/04/84 20:00 633 42 104 8. 4 16.8 1. 20 15 2.0 03/04/84 00:00 635 43 103 8.6 17.2 1. 23 16 1.5 DAILY AVERAGE VALUES 8. 4 16.9 1. 21 15 1.9 03/05/84 04:00 637 45 101 9. 0 18. 0 1. 30 18 0. 5 03/05/84 08:00 639 49 100 9.8 19.6 1. 43 22 0. 0 03/05/84 12:00 641 52 100 10 4 20.8 1. 53 26 0.0 03/05/84 16:00 643 49 102 9.8 19.6 1 4:3 22 1.0 03/05/84 20:00 645 51 102 10. 2 20. 4 1. 50 25 1. 0 03/05/84 00:00 647 48 102 c:·. 6 19.2 1. 40 21 1.0 DAILY AVERAGE VALUES 9. 8 19. 6 1 .. 43 22 0. 6 03/06/84 04:00 649 47 103 9. 4 18.8 1. 37 20 1. 5 03/06/84 08:00 651 48 102 9. 6 19. 2 1.40 21 1. 0 03/06/84 12:00 653 51 102 10.2 20. 4 1. 50 25 1.0 03/06/84 16:00 655 51 103 10. 2 20. 4 1. 50 25 1.5 03/06/84 20:00 657 52 102 10. 4 20.8 L 53 26 1 0 03/06/84 00:00 659 52 102 10. 4 20. 8 1. 53 26 1. 0 DAILY AVERAGE VALUES 10. 0 20. 1 1. 47 24 1.2 l. ~ ! ~ l ' PROPOSED K'ING COVE HYD OELEC IR PfWJECT ! 0:.Jrj9/6..., PAuc. i 1:::. DELTA CREEK NEAR KING COVE, ALASKA START TIME 01/12/84 04:00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DATA MV INCHES FEET CFS DEG C ======== :=::==== ==== =====:::::::::::=::::.: :::::::::::=: ======= :c::::n:::::= ====== ===== 03/07/84 04:00 661 49 103 9. 8 19. 6 1. 43 22 1.5 03/07/84 08:00 663 47 103 9. 4 18.8 1. 37 20 1.5 03/07/84 12:00 665 46 104 9. 2 18.4 1. 33 19 2.0 03/07/84 16:00 667 46 106 9. 2 18.4 1 33 19 3.0 03/07/84 20:00 669 46 104 9.2 18. 4 1 33 19 2.0 03/07/84 00:00 671. 46 104 9. 2 18. 4 1. 33 19 2.0 DAILY AVERAGE VALUES 9.3 18. 7 1 35 20 2.0 03/08/84 04:00 673 45 103 9. 0 18.0 1. 30 18 1.5 03/08/84 08:00 675 45 103 9. 0 18.0 1. 30 18 1. 5 03/08/84 12:00 677 45 103 9. 0 18.0 1. 30 18 1.5 03/08/84 16:00 679 45 105 9. 0 18. 0 1. 30 18 2. 5 03/08/84 20:00 681 45 104 9. 0 18.0 1 30 18 2.0 03/08/84 00:00 683 45 103 9.0 18.0 1. 30 18 1.5 DAILY AVERAGE VALUES 9. 0 18.0 1.. 30 18 1.8 03/09/84 04:00 685 45 102 9. 0 18.0 1. 30 18 1. 0 03/09/84 08:00 687 44 102 8. 8 17.6 1. 27 17 1.0 03/09/84 12:00 689 44 102 8. 8 17.6 l. 27 17 1. 0 03/09/84 16:00 691. 44 104 8. 8 17.6 1. 27 17 2.0 03/09/84 20:00 693 44 103 8.8 17.6 1 27 17 1.5 03/09/84 00:00 695 44 102 8. 8 17.6 1. 27 17 1.0 DAILY AVERAGE VALUES 8.8 17. 7 1. 28 17 1.3 03/10/84 04:00 697 43 101 8. 6 17.2 l. 23 16 0.5 03/10/84 08:00 699 43 100 8.6 17.2 1. 23 16 0.0 03/10/84 12:00 701 43 100 8. 6 17.2 1. 23 16 0. 0 03/10/84 16:00 703 43 102 8.6 17.2 1. 2;1 16 1.0 03/10/84 20:00 705 43 100 8.6 17.2 1. 23 16 0. 0 03!10184 00:00 707 43 100 8.6 17. 2 1. 2:3 16 0.0 DAILY AVERAGE VALUES 8. 6 17. 2 1. 23 16 0.3 03/11/84 04:00 709 43 100 8. 6 17.2 1. 23 16 0.0 03/11/84 08:00 711 44 100 B. 8 17.6 1. 27 17 0.0 03/11184 12: 00 713 44 100 8.8 17.6 1. 27 17 0. 0 03/11/84 16:00 715 45 101 9. 0 18. 0 1. 30 18 0. 5 03/11/84 20:00 717 44 100 8. 8 17.6 1. 27 17 0.0 03/11/84 00.00 '719 44 100 8. 8 17. 6 1. 27 17 0. 0 DAILY AVERAGE VALUES 8. 8 17.6 1. 27 17 0. 1 I ~.~ y ~ i 't j ; l ; o5/09/8!:> PROPOSED KING COVE HYDROELECTR PROJECT PAt;E 1:3 DELTA CREEK NEAR KING COVE, ALASKA START TIME 01/12/84 04:00 I t DEPTH STAGE DISCHG TEMP I. I DATE TIME BYTE RAW DATA MV INCHES FEET CFS DEG C -------------=·== =·=·--·-= ===----=-= ===•= ====== ===== 03/12/84 04:00 721 44 100 8. 8 17.6 1. 27 17 0.0 03/12/84 08:00 723 44 100 8. 8 17. 6 1. 27 17 0.0 03/12/84 12:00 725 44 102 8.8 17.6 1. 27 17 1. 0 03/12/84 16:00 727 44 105 8.8 17.6 1. 27 17 2. 5 03/12/84 20:00 729 44 103 8.8 17.6 1. 27 17 1.5 03/12/84 00:00 731 44 103 B. 8 17.6 1. 27 17 1.5 DAILY AVERAGE VALUES 8. 8 17.6 1. 27 17 1. 1 03/13/84 04:00 733 43 103 8. 6 17.2 1. 23 16 1.5 03/13/84 08:00 735 43 103 8. 6 17.2 1. 23 16 1.5 03/13/84 12:00 737 43 104 8.6 17.2 1. 23 16 2.0 03/13/84 16:00 739 44 105 8. 8 17. 6 1. 27 17 2. 5 03/13/84 20:00 741 44 104 B. 8 17.6 1. 27 17 2.0 03/13/84 00:00 743 43 103 8.6 17.2 1. 23 16 1.5 DAILY AVERAGE VALUES 8 .. 7 17.3 1. 24 16 1.8 03/14/84 04:00 745 43 103 8.6 17.2 1. 23 16 1.5 03/14/84 08:00 747 43 103 8. 6 17.2 1. 23 16 1.5 03/14/84 12:00 749 43 103 8.6 17.2 1. 23 16 1.5 03/14/84 16:00 751 45 104 9.0 18.0 1. 30 18 2.0 .. I PROPOSED KINO COVE HYDROELECT PRO~ECT 05/02/85 PAQE 1 DELTA CREEK NEAR KINO COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAOE DISCHG DATE TIME· BYTE RIM DATA _.__ FEET FEET CFS --······ ··=·· ---· ··--·-··· ··-----=--= ·····= 05/09/84 02:00 1 25 1. 25 1. 25 16 05/09/84 04:00 2 25 1. 25 1. 25 16 05/09/84 06:00 3 25 1. 25 1. 25 16 05/09/84 08:00 4 25 1. 25 1. 25 16 05/09184 10:00 .. 5·----25 l. 25 1. 25 16 05/09/84 12:00 6 25 1. 25 1. 25 16 05/09/84 14:00 7 25 1. 25 1. 25 16 05/09184 16:00 & e 1. 25 1. 25 16 05/09/84 18:00 9 26 1. 30 1. 30 18 05/09/84 20:00 10 27 1. 35 1. 35 19 05/09/94 22~ GO· -H -----27 1. 35 1. 35 19 05/09/84 00:00 12 27 1. 35 1. 35 19 DAILY AVERAQE VALUES 1. 28 1. 28 17 05/10/84 02:00 13 26 1. 30 1. 30 18 05/10/84 04:00 14 26 1. 30 1. 30 18 05/1018406:00 -15 ... ·26-1. 30 1.30 18 05/10/84 08:00 16 25 1. 25 1. 25 16 05/10/84 10:00 17 25 1. 25 1. 25 16 05/10/84 12:00 1-8-25-1. 25 1. 25 16 05/10/84 14:00 19 25 1. 25 1. 25 16 05/10/84 16:00 20 25 1. 25 1. 25 16 05/1-G/-84---l-8: 00· ·--i!1 . 27 1. 35 1. 35 19 o5t1QM:oo 22 27 1. 35 1. 35 19 05/HL ..• ·• : oo 23 28 1. 40 1. 40 21 051 101-84--GG: 00 ·-24 -27 1. 35 1. 35 19 DAILY AVERAGE VALUES 1. 30 1. 30 18 05/1 t-184--02+00 -----iil:J.-·---27· 1. 35 1. 35 19 05/11/84 04: 00 26 26 1. 30 1. 30 18 05111/84 06: 00 27 26 1. 30 1. 30 18 05/11/84 08:00 28 26 1. 30 1. 30 18 05/11/84 10:00 29 26 1. 30 1. 30 18 l' 05/11/84 12: 00 30 26 1. 30 1. 30 18 05/11/84 14:00 --·. 31-----25 1. i!5 1. 25 16 j.' 05/11/84 16:00 32 26 1. 30 1. 30 18 I 05/11/84 18:00 33 27 1. 35 1. 35 19 I 1 ,, 05/11/84 :1!0; 00 34 28 1.40 21 H 1. 40 05/11/84 22:00 35 28 1. 40 1. 40 21 1:..! 05/11/84 00:00 36 28 1. 40 1. 40 21 ! I DAibVAVERAOE VALUES t.aa 1; 33 19 • PROPOSED KING COVE HVDROELECT PRO~ECT 05/02/85 PAGE 2 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ==·----· =·--· ----·==··-·-· ·=··-= ==·--==·-·= 05/12/84 02:00 37 27 1. 35 1. 35 19 05/12/84 04:00 38 27 1. 35 1. 35 19 05/12/84 06:00 39 27 1. 35 1. 35 19 05/12/84 08:00 40 26 1. 30 1. 30 18 05/12/84 10:00 41 26 1. 30 1. 30 18 05/12/84 12:00 42 26 1. 30 1. 30 18 05/12/84 14:00 43 26 1. 30 1. 30 18 05/12/84 16:00 44 26 1.30 1. 30 18 05/12/84 18:00 45 27 1. 35 1. 35 19 05/12/84 20:00 46 27 1. 35 1. 35 19 05/12/84 22:00 ·47 27 1. 35 1. 35 19 05/12/84 00:00 48 27 1. 35 1. 35 19 DAILY AVERAGE VALUES 1. 33 1. 33 19 05/13/84 02:00 49 27 1. 35 1. 35 19 05/13/84 04:00 50 26 1. 30 1. 30 18 05/13/84 06:00 51 26 1. 30 1. 30 18 05/13/84 08:00 52 26 1. 30 1. 30 18 05/13/84 10:00 53 26 1. 30 1. 30 18 05/13/84 12:00 54 27 1. 35 1. 35 19 05/13/84 14:00 55 27 1. 35 1. 35 19 05/13/84 16:00 56 28 1. 40 1. 40 21 05/13/84 18:00 57. 28 1. 40 1. 40 21 05/13/84 20:00 58 29 1. 45 1. 45 23 05/13/84 22:00 59 32 1. 60 1. 60 29 05/13/84 00:00 60 35 1. 75 1. 75 36 DAILY AVERAGE VALUES 1. 40 1. 40 22 05/14/84 02:00 61 40 2.00 2.00 50 05/14/84 04:00 62 42 2. 10 2. 10 56 05/14/84 06:00 63 40 2.00 2.00 50 05/14/84 08:00 64 38 1. 90 1. 90 44 05/14/84 10:00 65 35 1. 75 1. 75 36 05/14/84 12:00 66 34 1. 70 1. 70 34 05/14/84 14:00 67 33 1. 65 1. 65 31 05/14/84 16:00 68 32 1. 60 1. 60 29 05/14/84 18:00 69 32 1. 60 1. 60 29 05/14/84 20:00 70 32 1. 60 1. 60 29 05/14/84 22:00 71 31 1. 55 1. 55 27 05/14/84 00:00 72 32 1. 60 1. 60 29 ·DAILY AVERA@E VALUES 1. 75 1. 75 37 PROPOSED KING COVE HVDROELECT PROJECT 05/02/85 PAGE 3 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =··=··=--···· ----·=·------···=·· ·=··-aua=•== 05/15/84 02:00 73 31 1. 55 1. 55 27 05/15/84 04:00 74 31 1. 55 1. 55 27 05/15/84 06:00 75 31 1. 55 1. 55 27 05/15/84 08:00 76 31 1. 55 1. 55 27 05/15/84 10:00 77 30 1. 50 1. 50 25 05/15/84 12:00 78 30 1. 50 1. 50 25 05/15/84 14:00 79 30 1. 50 1. 50 25 05/15/84 16:00 80 30 1. 50 1. 50 25 05/15/84 18:00 81 30 1. 50 1. 50 25 05/15/84 20:00 82 31 1. 55 1. 55 27 05/15/84 22:00 83 31 1. 55 1. 55 27 05/15/84 00:00 84 30 1. 50 1. 50 25 DAILY AVERAGE VALUES 1. 53 1. 53 26 05/16/84 02:00 85 30 1. 50 1. 50 25 05/16/84 04:00 86 30 1. 50 1. 50 25 05/16/84 06:00 87 29 1. 45 1. 45 23 05/16/84 08:00 88 29 1. 45 1. 45 23 05/16/84 10:00 89 29 1. 45 1. 45 23 05/16/84 12:00 90 29 1. 45 1. 45 23 05/16/84 14:00 91 29 1. 45 1. 45 23 05/16/84 16:00 92 29 1. 45 1. 45 23 05/16/84 18:00 93 29 1. 45 1. 45 23 05/16/84 20:00 94 30 1. 50 1. 50 25 05/16/84:22:00 95 30 1. 50 1. 50 25 05/16/94 00:00 96 30 1. 50 1. 50 25 DAILY AVERAGE VALUES 1. 47 1. 47 24 05/17/84 02:00 97 30 1. 50 1. 50 25 05/17/84 04:00 98 29 1. 45 1.45 23 05/17/84 06:00 99 29 1. 45 1. 45 23 05/17/84 08:00 100 29 1. 45 1. 45 23 05/17/84 10:00 101 29 1. 45 1. 45 23 05/17/84 12:00 102 30 1. 50 1. 50 25 05/17/84 14:00 103 32 1. 60 1. 60 29 05/17/84 16:00 104 34 1. 70 1. 70 34 05/17/84 18:00 105 36 1. 80 1. 80 39 05/17/84 20:00 106 37 1. 95 1. 95 41 05/17/94 22:00 107 38 1. 90 1. 90 44 05/17/84 00:00 108 38 1. 90 1. 90 44 DAILY AVERAGE VALUES 1. 63 1. 63 31 PROPOSED KING COVE HYDROELECT PROJECT 05/02/85 PAGE 4 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE OISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =---·=------· ..... =·-------•==---=·-== =·==== 05/18/84 02:00 109 37 1. 85 1. 85 41 05/18/84 04:00 110 36 1.80 1. 80 39 05/18/84 06:00 111 35 1. 75 1. 75 36 05/18/84 08:00 112 34 1. 70 1. 70 34 05/18/84 10:00 113 33 1. 65 1. 65 31 05/18/84 12:00 114 33 1. 65 1. 65 31 05/18/84 14:00 115 32 1. 60 1. 60 29 05/18/84 16:00 116 33 1. 65 1. 65 31 05/18/84 18:00 117 33 1. 65 1. 65 31 05/18/84 20:00 118 34 1. 70 1. 70 34 05/18/84 22:00 119 34 1. 70 1. 70 34 05/18/84 00:00 120 33 1. 65 1. 65 31 DAILY AVERAGE VALUES 1. 70 1. 70 34 05/19/84 02:00 121 32 1. 60 1. 60 29 05/19/84 04:00 122 32 1. 60 1. 60 29 05/19/84 06:00 123 S2 1. 60 1. 60 29 05/19/84 08:00 124 31 1. 55 1. 55 27 05/19/84 10:00 125 31 1. 55 1. 55 27 05/19/84 12:00 126 31 1. 55 1. 55 27 05/19/84 14:00 127 31 1. 55 1. 55 27 05/19/84 16:00 128 31 1. 55 1. 55 27 05/19/84 18:00 129 33 1. 65 1. 65 31 05/19/84 20:00 130 34 1. 70 1. 70 34 05/19/84 22:00 131 34 1. 70 1. 70 34 05/19/94 00:00 132 33 1. 65 1. 65 31 DAILY AVERAGE VALUES 1. 60 1. 60 29 05/20/84 02:00 133 33 1. 65 1. 65 31 05/20/84 04:00 134 32 1. 60 1. 60 29 05/20/84 06:00 135 32 1. 60 1. 60 29 05/20/84 08:00 136 31 1. 55 1. 55 27 05/20/84 10:00 137 31 1. 55 1. 55 27 05/20/84 12:00 138 31 1. 55 1. 55 27 05/20/84 14:00 139 31 1. 55 1. 55 27 05/20/84 16:00 140 32 1. 60 1. 60 29 05/20/84 18:00 141 34 1. 70 1. 70 34 05/20/84 20:00 142 35 1. 75 1. 75 36 05/20/84 22:00 143 35 1. 75 1. 75 36 05/20/84 00:00 144 33 1. 65 1. 65 31 DAILY· AVERA* VALUES· 1. 63 1. 63 30 ' PROPOSED KINQ COVE HYDROELECT PROJECT 05/02/85 PAGE 5 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DlSCHG DATE TIME BYTE RAW DATA FEET FEET CFS =-------..... --·-•.c=•····· =•••a::• =•==--·-·== 05/21/84 02:00 145 33 1. 65 1. 65 31 05/21/84 04:00 146 32 1. 60 1. 60 29 05/21/84 06:00 147 31 1. 55 1. 55 27 05/21/84 08:00 148 31 1. 55 1. 55 27 05/21/84 10:00 149 31 1. 55 1. 55 27 05/21/84 12:00 150 30 1. 50 1. 50 25 05/21/84 14:00 151 30 1. 50 1. 50 25 05/21184 16: 00 152 30 1. 50 1. 50 25 05/21/84 18:00 153 30 1. 50 1. 50 25 05/21/84 20:00 154 30 1. 50 1. 50 25 05/21/84 22:00 155 30 1. 50 1. 50 25 05/21/84 00:00 156 30 1. 50 1. 50 25 DAILY AVERAGE VALUES 1. 53 1. 53 26 05/22/84 02:00 157 30 1. 50 1. 50 25 05/22/84 04:00 158 29 1. 45 1. 45 23 05/22/84 06:00 159 29 1. 45 1. 45 23 05/22/84 08:00 160 29 1. 45 1. 45 23 05/22/84 10:00 161 28 1. 40 1. 40 21 05/22/84 12:00 162 28 1. 40 1. 40 21 05/22/84 14:00 163 28 1. 40 1. 40 21 05/22/84 16:00 164 28 1. 40 1. 40 21 05/22/84 18:00 165 28 1. 40 1. 40 21 05/22/84 20:00 166 28 1. 40 1. 40 21 05/22/fM22:00 167 28 1. 40 1. 40 21 05/22/94 00:00 . 168 28 1. 40 1. 40 21 DAILY AVERAGE VALUES 1. 42 1. 42 22 05/23/84 02:00 169 28 1. 40 1. 40 21 05/23/84 04:00 170 28 1. 40 1. 40 21 05/23/84 06:00 171 28 1. 40 1. 40 21 05/23/84 08:00 172 27 1. 35 1. 35 19 05/23/84 10:00 173 27 1. 35 1. 35 19 05/23/84 12:00 174 27 1. 35 1. 35 19 05/23/84 14:00 175 27 1. 35 1. 35 19 05/23/84 16:00 176 27 1. 35 1. 35 19 05/23/84 18:00 177 27 1. 35 1. 35 19 05/23/84 20:00 178 27 1. 35 1. 35 19 05/23/84 22:00 179 27 1. 35 1. 35 19 05/23/84 00:00 180 27 1. 35 1. 35 19 DAILY AYERAQE VALUES 1. 36 1. 36 20 PROPOSED KING COVE HYDROELECT PRO~ECT 05/02/85 PAGE 6 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =====--= ··==· =··= ==-=·-·== zu:::zaa• ==··= ·=·=== 05/24/84 02:00 181 27 1. 35 1. 35 19 05/24/84 04:00 182 27 1. 35 1. 35 19 05/24/84 06:00 183 27 1. 35 1. 35 19 05/24/84 08:00 184 27 1. 35 1. 35 19 05/24/84 10:00 185 27 1. 35 1. 35 19 05/24/84 12:00 186 27 1. 35 1. 35 19 05/24/84 14:00 187 27 1. 35 1. 35 19 05/24/84 16:00 188 27 1. 35 1. 35 19 05/24/84 18:00 189 27 1. 35 1. 35 19 05/24/84 20:00 190 28 1. 40 1. 40 21 05/24/84 22:00 191 28 1. 40 1. 40 21 05/24/84 00:00 192 28 1. 40 1. 40 21 DAILY AVERAGE VALUES 1. 36 1. 36 20 05/25/84 02:00 193 28 1. 40 1. 40 21 05/25/84 04:00 194 27 1. 35 1. 35 19 05/25/84 06:00 1-95 27 1. 35 1. 35 19 05/25/84 08:00 196 27 1. 35 1. 35 19 05/25/84 10:00 197 27 1. 35 1. 35 19 05/25/84 12:00 198 27 1. 35 1. 35 19 05/25/84 14:00 199 27 1. 35 1. 35 19 05/25/84 16:00 200 27 1. 35 1. 35 19 05/25184 18:00 201 27 1. 35 1. 35 19 05/25/84 20:00 202 28 1. 40 1. 40 21 05/25/84 22:00 203 29 1. 45 1. 45 23 05/25/84 00:00 204 28 1. 40 1. 40 21 DAILY AVERAGE VALUES 1. 37 1. 37 20 05/26/84 02:00 205 28 1. 40 1. 40 21 05/26/84 04:00 206 28 1. 40 1. 40 21 05/26/84 06:00 207 28 1. 40 1. 40 21 05/26/84 08:00 208 28 1. 40 1. 40 21 05/26/84 10:00 209 27 1. 35 1. 35 19 05/26/84 12:00 210 27 1. 35 1. 35 19 05/26/84 14:00 211 27 1. 35 1. 35 19 05/26/84 16:00 212 27 1. 35 1. 35 19 05/26/84 18:00 213 28 1. 40 1. 40 21 05/26/84 20:00 214 28 1. 40 1. 40 21 05/26/84 22:00 215 28 1. 40 1. 40 21 05/26/84 00:00 216 28 1. 40 1. 40 21 DAILY AVERAGE VALVES 1. 38 1. 38 20 PROPOSED KING COVE HYDROELECT PROJECT 05/02/85 PAGE 7 DELTA CREEK NEAR KING COVE• ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHQ DATE TIME BYTE RAW DATA FEET FEET CFS ==·====== =···· ----···-···== ===··-===·· ===•== 05/27/84 02:00 217 28 1. 40 1. 40 21 05/27/84 04:00 218 28 1. 40 1. 40 21 05/27/84 06:00 219 28 1. 40 1. 40 21 05/27/84 08:00 220 27 1. 35 1. 35 19 05/27/84 10:00 221 27 1. 35 1. 35 19 05/27/84 12:00 222 27 1. 35 1. 35 19 05/27/84 14:00 223 27 1. 35 1. 35 19 05/27/84 16:00 224 27 1. 35 1. 35 19 05/27/84 18:00 225 27 1. 35 1. 35 19 05/27/84 20:00 226 28 1. 40 1. 40 21 05/27/84 22:00 227 27 1. 35 1. 35 19 05/27/84 00:00 228 28 1. 40 1. 40 21 DAILY AVERAGE VALUES 1. 37 1. 37 20 05/28/84 02:00 229 27 1. 35 1. 35 19 05/28/84 04:00 230 27 1. 35 1. 35 19 05/28/84 06:00 231 27 1. 35 1. 35 19 05/28/84 08:00 232 27 1. 35 1. 35 19 05/28/84 10:00 233 27 1. 35 1. 35 19 05/28/84 12:00 234 27 1. 35 1. 35 19 05/28/84 14:00 235 27 1. 35 1. 35 19 05/28/84 16:00 236 26 1. 30 1. 30 18 05/28/84 18:00 237 26 1. 30 1. 30 18 05/28/84 20:00 238 26 1. 30 1. 30 18 05/28/84 22:00 239 27 1. 35 1. 35 19 05/28184 00:00 240 27 1. 35 1. 35 19 DAILY AVERAGE VALUES 1. 34 1. 34 19 05/29/84 02:00 241 27 1. 35 1. 35 19 05/29/84 04:00 242 27 1. 35 1. 35 19 05/29/84 06:00 243 27 1. 35 1. 35 19 05/29/84 08:00 244 27 1. 35 1. 35 19 05/29/84 10:00 245 27 1. 35 1. 35 19 05/29/84 12:00 246 27 1. 35 1. 35 19 05/29/84 14:00 247 27 1. 35 1. 35 19 05/29/84 16:00 248 27 1. 35 1. 35 19 05/29/84 18:00 249 27 1. 35 1. 35 19 05/29/84 20:00 250 28 1. 40 1. 40 21 05/29/84 22:00 251 28 1. 40 1. 40 21 05/29/84 00:00 252 28 1. 40 1. 40 21 DAILY AVERAGE VALUES 1. 36 1. 36 20 PROPOSED KING COVE HYDROELECT PROJECT 05/02/S~ PAGE 8 DELTA CREEK NEAR KINO COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STACE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =-----------= ----·==··-·== ====== =·=== ·===== 05/30/84 02:00 253 28 1. 40 1. 40 21 05/30/84 04:00 254 27 1. 35 1. 35 19 05/30/84 06:00 255 27 1. 35 1. 35 19 05/30/84 08:00 256 27 1. 35 1. 35 19 05/30/84 10:00 257 27 1. 35 1. 35 19 05/30/84 12:00 258 27 1. 35 1. 35 19 05/30/84 14:00 259 28 1. 40 1. 40 21 05/30/84 16:00 260 28 1. 40 1. 40 21 05/30/84 18:00 261 29 1. 45 1. 45 23 05/30/84 20:00 262 30 1. 50 1. 50 25 05/30/84 22:00 263 3:1. 1. 55 1. 55 27 05/30/84 00:00 264 31 1. 55 1. 55 27 DAILY AVERAGE VALUES 1. 42 1. 42 22 05/31/84 02:00 265 31 1. 55 1. 55 27 05/31/84 04:00 266 31 1. 55 1. 55 27 05/31/84 06:00 . 267 30 1. 50 1. 50 25 05/31/84 08:00 268 30 1. 50 1. 50 25 05/31184 10:00 269 30 1. 50 1. 50 25 05/31/84 12:00 270 29 1. 45 1. 45 23 05/31/84 14:00 271 29 1. 45 1. 45 23 05/31/84 16:00 272 30 1. 50 1. 50 25 05/31/84 18:00 273 30 1. 50 1. 50 25 05/31/84 20:00 274 30 1. 50 1. 50 25 05/31/EM 22:00 275 31 1. 55 1. 55 27 05/31/84 00:00 276 31 1. 55 1. 55 27 DAILY AVERAGE VALUES 1. 51 1. 51 25 06/01/84 02:00 277 31 1. 55 1.55 27 06/01184 04:00 278 31 1. 55 1. 55 27 06/01/84 06:00 279 30 1. 50 1. 50 25 06/01/84 08:00 280 30 1. 50 1. 50 25 06/01/84 10:00 281 30 1. 50 1. 50 25 06/01/84 12:00 282 30 1. 50 1. 50 25 06/01/84 14:00 283 30 1. 50 1. 50 25 06/01/84 16:00 284 30 1. 50 1. 50 25 06/01/84 18: 00 285 31 1. 55 1. 55 27 06/01/84 20:00 286 31 1. 55 1. 55 27 06/01184 22: 00 287 32 1. 60 1. 60 29 06/01/84 00:00 288 32 1. 60 1. 60 29 DAILY AVEftAeE VALUES 1. 53 1. 53 26 PROPOSED KING COVE HYDROELECT PROJECT 05/02/85 PAGE 9 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ·==··=·· -----=··= ••:.::••··--·==·----·=· ===•=: 06/02/84 02:00 289 33 1. 65 1. 65 31 06/02/84 04:00 290 33 1. 65 1. 65 31 06/02/84 06:00 291 33 1. 65 1. 65 31 06/02/84 08:00 292 33 1. 65 1. 65 31 06/02/84 10:00 293 34 1. 70 1. 70 34 06/02/84 12:00 294 34 1. 70 1. 70 34 06/02/84 14:00 295 34 1. 70 1. 70 34 06/02/84 16:00 296 35 1. 75 1. 75 36 06/02/84 18:00 297 35 1. 75 1. 75 36 06/02/84 20:00 298 37 1. 85 1. 85 41 06/02/84 22:00 299 37 1. 85 1. 85 41 06/02/84 00:00 300 39 1 95 1. 95 47 DAILY AVERAGE VALUES 1. 74 1. 74 36 06/03/84 02:00 301 41 2.05 2.05 53 06/03/84 04:00 302 42 2. 10 2. 10 56 06/03/84 06:00 303 43 2. 15 2. 15 59 06/03/84 08:00 304 43 2. 15 2. 15 59 06/03/84 10:00 305 44 2.20 2.20 63 06/03/84 12:00 306 43 2. 15 2. 15 59 06/03/84 14:00 307 44 2.20 2.20 63 06/03/84 16:00 308 44 2.20 2. 20 63 06/03/84 18:00 -309 43 2. 15 2. 15 59 06/03/84 20:00 310 41 2.05 2.05 53 06/03/EM 22:00 311 40 2.00 2.00 50 06/03/84 00: 00 312 39 1. 95 1. 95 47 DAILY AVERAGE VALUES 2. 11 2. 11 57 06/04/84 02:00 313 38 1. 90 1. 90 44 06/04/84 04:00 314 36 1. 80 1. 80 39 06/04/84 06:00 315 36 1. 80 1. 80 39 06/04/84 08:00 316 3! 1. 75 1. 75 36 06/04/84 10:00 317 34 1 70 1. 70 34 06/04/84 12:00 318 34 1. 70 1. 70 34 06/04/84 14:00 319 34 1. 70 1. 70 34 06/04/84 16:00 320 33 1. 65 1. 65 31 06/04/84 18:00 321 34 1. 70 1. 70 34 06/04/84 20:00 322 34 1. 70 1. 70 34 06/04/84 22:00 323 33 1. 65 1. 65 31 06/04/84 00:00 324 33 1. 65 1. 65 31 DAILY AVERAGE VALUES 1. 73 1. 73 35 PROPOSED KING COVE HYDROELECT PRO~ECT 05/02/85 PAOE 10 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ••=:~:~:••=• ==·=· ··=-=====·----====---===·= ====== 06/05/84 02:00 325 33 1. 65 1. 65 31 06/05/84 04:00 326 33 1. 65 1. 65 31 06/05/84 06:00 327 33 1. 65 1. 65 31 06/05/84 08:00 328 32 1. 60 1. 60 29 06/05/84 10:00 329 3&! 1. 60 1. 60 29 06/05/84 12:00 330 32 1. 60 1. 60 29 06/05/84 14:00 331 32 1. 60 1. 60 29 06/05/84 16:00 332 32 1. 60 1. 60 29 06/05/84 18:00 333 32 1. 60 1. 60 29 06/05/84 20:00 334 32 1. 60 1. 60 29 06/05/84 22:00 335 32 1. 60 1. 60 29 06/05/84 00:00 336 32 1. 60 1. 60 29 DAILY AVERAGE VALUES 1. 61 1. 61 30 06/06/84 02:00 337 33 1. 65 1. 65 31 06/06/84 04:00 338 33 1. 65 1. 65 31 06/06/84 06:00 339 33 1. 65 1. 65 31 06/06/84 08:00 340 33 1. 65 1. 65 31 06/06/84 10:00 341 33 1. 65 1. 65 31 06/06/84 12:00 342 33 1. 65 1. 65 31 06/06/84 14:00 343 33 1. 65 1. 65 31 06/06/84 16:00 344 33 1. 65 1. 65 31 06/06/94 18:00 345-33 1. 65 1. 65 31 06/06/84 20:00 346 33 1. 65 1. 65 31 06/06/84 22:00 347 34 1. 70 1. 70 34 06/06/94 00:00 348 34 1. 70 1. 70 34 DAILY AVERAGE VALUES 1. 66 1. 66 32 06/07/84 02:00 ·3441' 33 1. 65 1. 65 31 06/07/84 04:00 350 33 1. 65 1. 65 31 06/07/84 06:00 351 33 1. 65 1. 65 31 06/07/84 08:00 352 32 1. 60 1. 60 29 06/07/84 10:00 353 32 1. 60 1. 60 29 06/07/84 12:00 354 32 1. 60 1. 60 29 06/07/84 14:00 355 32 1. 60 1. 60 29 06/07/94 16:00 356 32 1. 60 1. 60 29 06/07/84 18:00 357 33 1. 65 1. 65 31 06/07/84 20:00 358 33 1. 65 1. 65 31 06/07/84 22:00 359 34 1. 70 1. 70 34 06/07/84 00:00 360 33 1. 65 1. 65 31 DAILY AVERAeE VALUES 1. 63 1. 63 30 PROPOSED KING COVE HYDROELECT PROJECT 05/02/85 PAGE 11 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =·=·==-· =···· -----------·= -----------==-·=· 06/08/84 02:00 361 33 1. 65 1. 65 31 06/08/84 04:00 362 33 1. 65 1. 65 31 06/08/84 06:00 363 33 1. 65 1. 65 31 06/08/84 08:00 364 32 1. 60 1. 60 29 06/08/84 10:00 365 32 1. 60 1. 60 29 06/08/84 12:00 366 32 1. 60 1. 60 29 06/08/84 14:00 367 31 1. 55 1. 55 27 06/08/84 16:00 368 31 1. 55 1. 55 27 06/08/84 18:00 369 31 1. 55 1. 55 27 06/08/84 20:00 370 31 1. 55 1. 55 27 06/08/84 2:2:00 371 32 1. 60 1. 60 29 06/08/84 00:00 372 32 1. 60 1. 60 :29 DAILY AVERAGE VALUES 1. 60 1. 60 29 06/09/84 02:00 373 32 1. 60 1. 60 29 06/09/84 04:00 374 32 1. 60 1. 60 29 06/09/84 06:00 375 33 1. 65 1. 65 31 06/09/84 08:00 376 33 1. 65 1. 65 31 06/09/84 10:00 377 33 1. 65 1. 65 31 06/09/84 12:00 378 33 1. 65 1. 65 31 06/09/84 14:00 379 32 1. 60 1. 60 29 06/09/84 16:00 380 32 1. 60 1. 60 29 06/09/84 18:00 381 33 1. 65 1. 65 31 06/09/84 20:00 382 33 1. 65 1. 65 31 06/09/84 22:00 383 33 1. 65 1. 65 31 06/09/84 00:00 384 33 1. 65 1. 65 31 DAILY AVERAGE VALUES 1. 63 1. 63 30 06/10/84 02:00 385 33 1. 65 1.65 31 06/10/84 04:00 386 3:2 1. 60 1. 60 29 06/10/84 06:00 387 32 1. 60 1. 60 29 06/10/84 08:00 388 31 1. 55 1. 55 27 06/10/84 10:00 389 32 1. 60 1. 60 29 06/10/84 12:00 390 31 1. 55 1. 55 27 06/10/84 14:00 391 31 1. 55 1. 55 27 06/10/84 16:00 392 31 1. 55 1. 55 27 06/10/84 18:00 393 31 1. 55 1. 55 27 06/10/84 20:00 394 31 1. 55 1. 55 27 06/10/84 22:00 395 32 1. 60 1. 60 29 06/10/84 00:00 396 31 1. 55 1. 55 27 DAILY AVERAGE VALUES 1. 58 1. 58 28 PROPOSED KINO COVE HYDROELECT PRO~ECT 05/02/85 PAQE 12 DELTA CREEK NEAR KINO COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE OISCHQ DATE TIME BYTE RAW DATA FEET FEET CFS :s:•==·== ···== =··= ====···== ==·=== ==·=· ====== 06/11/84 02:00 397 31 1. 55 1. 55 27 06/11/84 04:00 398 31 1. 55 1. 55 27 06/11/84 06:00 399 31 1. 55 1. 55 27 06/11/84 08:00 400 31 1. 55 1. 55 27 06/11/84 10: 00 401 31 1. 55 l. 55 27 06/11/84 12: 00 402 31 1. 55 1. 55 27 06/11/84 14: 00 403 31 1. 55 1. 55 27 06/11/84 16: 00 404 31 1. 55 1. 55 27 06/11/84 18:00 405 31 1. 55 1. 55 27 06/11/84 20:00 406 32 1. 60 1. 60 29 06/11184 22:00 407 99 1. 65 1. 65 31 06/11/84 00:00 408 33 1. 65 1. 65 31 DAILY AVERAGE VALUES 1. 57 1. 57 28 06/12/84 02:00 409 33 1. 65 1. 65 31 06/12/84 04:00 410 33 1. 65 1. 65 31 06/12/84 06:00 411 33 1. 65 1. 65 31 06/12/84 08:00 412 33 1. 65 1. 65 31 06/12/84 10:00 413 33 1. 65 1. 65 31 06/12/84 12:00 414 33 1. 65 1. 65 31 06/12/84 14:00 415 33 1. 65 1. 65 31 06/12/84 16:00 416 33 1. 65 1. 65 31 06/12/84 19:00 417 33 1. 65 1. 65 31 06/12/84 20:00 418 33 1. 65 1. 65 31 06/12/84 22:00 419 33 1. 65 1. 65 31 06/12194 00!00 .. 420 33 1. 65 1. 65 31 DAILY AVERAGE VALUES 1. 65 1. 65 31 06/13/84 02:00 421 33 1. 65 1. 65 31 06/13/84 04:00 422 33 1. 65 1. 65 31 06/13/84 06:00 423 32 1. 60 1. 60 29 06/13/84 08:00 424 33 1. 65 1. 65 31 06/13/84 10:00 425 33 1. 65 1. 65 31 06/13/84 12:00 426 34 1. 70 1. 70 34 06/13/84 14:00 427 34 1. 70 1. 70 34 06/13/84 16:00 428 34 1. 70 1. 70 34 06/13/84 18:00 429 35 1. 75 1. 75 36 06/13/84 20:00 430 35 1. 75 1. 75 36 06/13/84 22:00 431 36 1. 80 1. 80 39 06/13/84 00:00 432 36 1. 80 1. 80 39 DAlLY AVERME VALVES l. 70 1. 70 34 PROPOSED KING COVE HYDROELECT PROJECT 05/02/85 PAGE 13 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ==·=-·=-., •••• --·-··==·-··= =·===· =··== c.::n=•== 06/14/84 02:00 433 35 1. 75 1. 75 36 06/14/84 04:00 434 35 1. 75 1. 75 36 06/14/84 06:00 435 35 1. 75 1. 75 36 06/14/84 08:00 436 35 1. 75 1. 75 36 06/14/84 10:00 437 35 1. 75 1. 75 36 06/14/84 12:00 438 35 1. 75 1. 75 36 06/14/84 14:00 439 35 1. 75 1. 75 36 06/14/84 16:00 440 37 1. 85 1. 85 41 06/14/84 18:00 441 38 1. 90 1. 90 44 06/14/84 20:00 442 38 1. 90 1. 90 44 06/14/84 22:00 -449 38 1. 90 1. 90 44 06/14/84 00:00 444 37 1. 85 1. 85 41 DAILY AVERAGE VALUES 1. 80 1. 80 39 06/15/84 02:00 445 36 1. 80 1. 80 39 06/15/84 04:00 446 35 1. 75 1. 75 36 06/15/84 06:00 4-47 35 1. 75 1. 75 36 06/15/84 08:00 448 34 1. 70 1. 70 34 06/15/84 10:00 449 34 1. 70 1. 70 34 06/15/84 12:00 450 33 1. 65 1. 65 31 06/15/84 14:00 451 33 1. 65 1. 65 31 06/15/84 16:00 452 33 1. 65 1. 65 31 06/15/84 18:00 453 34 1. 70 1. 70 34 06/15/84 20:00 454 34 1. 70 1. 70 34 06/15/84 22:00 455 34 1. 70 1. 70 34 06/1519400:00 456 34 1. 70 1. 70 34 DAILY AVERAGE VALUES 1. 70 1. 70 34 06/16/84 02:00 457 34 1. 70 1. 70 34 06/16/84 04:00 458 34 1. 70 1. 70 34 06/16/84 06:00 459 34 1. 70 1. 70 34 06/16/84 08:00 460 34 1. 70 1. 70 34 06/16/84 10:00 461 34 1. 70 1. 70 34 06/16/84 12:00 462 34 1. 70 1. 70 34 06/16/84 14:00 463 35 1. 75 1. 75 36 06/16/84 16:00 464 37 1. 85 1. 85 41 06/16/84 18:00 465 38 1. 90 1. 90 44 06/16/84 20:00 466 38 1. 90 1. 90 44 06/16/84 22:00 467 39 1. 95 1. 95 47 06/16/84 00:00 468 39 1. 95 1. 95 47 DAILY AVERAGE YALUES 1. 79 1. 79 39 • PROPOSED KINO COVE HYDROELECT PRO~ECT 05/02/85 PAGE 14 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAQE DISCHO DATE TIME BYTE RAW DATA FEET FEET CFS ---=··=-···== =·== ==•=a•••=• •==••= ·=··· ===··== 06/17/84 02:00 469 38 1. 90 1. 90 44 06/17/84 04:00 470 38 1. 90 1. 90 44 06/17/84 06:00 471 37 1. 85 1. 85 41 06/17/84 08:00 472 37 1. 85 1. 85 41 06/17/84 10:00 473 36 1.80 1.80 39 06/17/84 12:00 474 36 1. 80 1. 80 39 06/17/84 14:00 475 36 1. 80 1. 80 39 06/17/84 16:00 476 36 1. 80 1. 80 39 06/17/84 18:00 477 36 1. 80 1. 80 39 06/17/84 20:00 478 36 1. 80 1. 80 39 06117184 22:00 -479 36 1. 80 1. 80 39 06/17/84 00:00 480 36 1. 80 1. 80 39 DAILY AVERAGE VALUES 1. 83 1. 83 40 06/18/84 02:00 481 35 1. 75 1. 75 36 06/18/84 04:00 482 35 1. 75 1. 75 36 06/18/84 06:00 483 35 1. 75 1. 75 36 06/18/84 08:00 484 35 1. 75 1.75 36 06/18/84 10:00 485 35 1. 75 1. 75 36 06/18/84 12:00 486 35 1. 75 1. 75 36 06/18/84 14:00 487 35 1. 75 1. 75 36 06/18/84 16:00 488 35 1. 75 1. 75 36 06/18/84 18:00 489 35 1. 75 1. 75 36 06/18/84 20:00 490 36 1. eo 1. 80 39 06/18/84 22:00 491 36 1. 80 1. 80 39 06/18/tM 00:00 492 36 1. 80 1. 80 349 DAILY AVERAGE VALUES 1. 76 1. 76 37 06/19/84 02:00 ~93 36 1. 80 1. 80 39 06/19/84 04:00 494 35 1. 75 1. 75 36 06/19/84 06:00 495 35 1. 75 1. 75 36 06/19/84 08:00 496 35 1. 75 1. 75 36 06/19/84 10:00 497 34 1. 70 1. 70 34 06/19/84 12:00 498 34 1. 70 1. 70 34 06/19/84 14:00 . 499 34 1. 70 1. 70 34 06/19/84 16:00 500 35 1. 75 1. 75 36 06/19/84 18:00 501 35 1. 75 1. 75 36 06/19/84 20:00 502 35 1. 75 1. 75 36 06/19/84 22:00 503 35 1. 75 1. 75 36 06/19/84 00:00 504 35 1. 75 1. 75 36 DAILY AYERAGE YALUES 1. 74 1. 74 36 PROPOSED KINQ COVE HYDROELECT PRO~ECT 05/02/85 PAQE 15 DELTA CREEK NEAR KINQ COVE• ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHQ DATE TIME BYTE RAW DATA FEET FEET CFS ==z••=•• •••=:~~: ----···-··==· =·-===· --------==-06/20/84 02:00 505 35 1. 75 1. 75 36 06/20/84 04:00 506 34 1. 70 1. 70 34 06/20/84 06:00 507 34 1. 70 1. 70 34 06/20/84 08:00 508 34 1. 70 1. 70 34 06/20/84 10:00 509 S4 1. 70 1. 70 34 06/20/84 12:00 510 33 1. 65 1. 65 31 06/20/84 14:00 511 33 1. 65 1. 65 31 06/20/84 16:00 512 33 1. 65 1. 65 31 06/20/84 18:00 513 33 1. 65 1. 65 31 06/20/84 20:00 514 34 1. 70 1. 70 34 06/20/84 2i!:OO 515 34 1. 70 1. 70 34 06/20/84 00:00 516 34 1. 70 1. 70 34 DAILY AVERAGE VALUES 1. 69 1. 69 33 06/21/84 02:00 517 34 1. 70 1. 70 34 06/21184 04:00 518 33 1. 65 1. 65 31 06/21/84 06:00 lH9 33 1. 65 1. 65 31 06/21/84 08:00 520 33 1. 65 1. 65 31 06/21/84 10:00 521 33 1. 65 1. 65 31 06/21/84 12:00 522 33 1. 65 1. 65 31 06/21/84 14:00 523 33 1. 65 1. 65 31 06/21/84 16:00 524 33 1. 65 1. 65 31 06/21184 18:00 525 34 1. 70 1. 70 34 06/21/84 20:00 526 34 1. 70 1. 70 34 06/21184 22:00 527 34 1. 70 1. 70 34 06121/tM-00:00 528 34 1. 70 1. 70 34 DAILY AVERAGE VALUES 1. 67 1. 67 32 06/22/84 02:00 629 34 1. 70 1. 70 34 06/:22/84 04:00 530 34 1. 70 1. 70 34 06/2:2/84 06:00 531 34 1. 70 1. 70 34 06/2:2/84 08:00 532 35 1. 75 1. 75 36 06/:22/84 10:00 533 35 1. 75 1. 75 36 06/22/84 12:00 534 37 1. 85 1. 85 41 06122/84 14:00 536 39 1. 95 1. 95 47 06/:22/84 16:00 536 43 2. 15 2. 15 59 06/22/84 18:00 537 44 2.20 2.:20 63 06/22/84 20:00 &38 44 2.20 2.20 63 06/22/84 22:00 539 43 2. 15 2. 15 59 06/:22/84 00:00 540 41 2.05 2.05 53 DAILY AVERAGE VALUES 1. 93 1. 93 47 • PROPOSED KING COVE HYDROELECT PRO~ECT 05/02/85 PAGE 16 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DAT-A FEET FEET CFS ==·=·-== ----· =·=-=······=-======= =··=· ====== 06/23/84 02:00 541 40 2.00 2.00 50 06/23/84 04:00 542 39 1. 95 1. 95 47 06/23/84 06:00 543 38 1. 90 1. 90 44 06/23/84 08:00 544 37 1. 85 1. 85 41 06/23/84 10:00 545 37 1. 85 1. 85 41 06/23/84 12:00 546 36 1. 80 1. 80 39 06/23/84 14:00 547 36 1. 80 1. 80 39 06/23/84 16:00 548 36 1. 80 1. 80 39 06123/84 18:00 549 36 1. 80 1. 80 39 06/23/84 20:00 550 37 1. 85 1. 85 41 06123184 22:00 551 37 1. 85 1. 85 41 06/23/84 00:00 552 37 1. 85 1. 85 41 DAILY AVERAGE VALUES 1. 86 1. 86 42 06/24/84 02:00 553 37 1. 85 1. 85 41 06/24/84 04:00 554 37 1. 85 1. 85 41 06/24/84 06:00 5-55 36 1. 80 1. 80 39 06/24/84 08:00 556 36 1. eo 1. so 39 06/24/84 10:00 557 35 1. 75 1. 75 36 06124/84 12:00 558 35 1. 75 1. 75 36 06/24/84 14:00 559 35 1. 75 1. 75 36 06/24/84 16:00 560 35 1. 75 1. 75 36 06/24184 18:00 561 35 1. 75 1. 75 36 06/24/84 :20:00 562 35 1. 75 1. 75 36 06/:24/84 :22:00 563 35 1. 75 1. 75 36 06124194 oo: oo~ · -564 34 1. 70 1. 70 34 DAILY AVERAGE VALUES 1. 77 1. 77 37 06125/94 02:00 .. 565 34 1. 70 1. 70 34 06/25/84 04:00 566 34 1. 70 1. 70 34 06/25/84 06:00 567 33 1. 65 1. 65 31 06/25/84 08:00 568 33 1. 65 1. 65 31 06/25/84 10:00 569 33 1. 65 1. 65 31 06/25/84 12:00 570 33 1. 65 1. 65 31 06125184 14:00 571 33 1. 65 1. 65 31 06125/84 16:00 572 33 1. 65 1. 65 31 06/25184 18:00 573 33 1. 65 1. 65 31 06125/84 20:00 574 33 1. 65 1. 65 31 06/25/84 22:00 575 33 1. 65 1. 65 31 06125/84 00:00 576 33 1. 65 1. 65 31 DAILY AVERAGE VALUES 1. 66 1. 66 32 ~ PROPOSED KING COVE HYDROELECT PRO~ECT 05/02/85 PAGE 17 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ·=--====· ·=·--=·== •:r:•===·== ====== ====· ====== 06/26/84 02:00 577 33 1. 65 1. 65 31 06/26/84 04:00 578 33 1. 65 1. 65 31 06/26/84 06:00 579 33 1. 65 1. 65 31 06/26/84 08:00 580 33 1. 65 1. 65 31 06/26/84 10:00 581 33 1. 65 1. 65 31 06/26/84 12:00 582 33 1. 65 1. 65 31 06/26/84 14:00 583 34 1. 70 1. 70 34 06/26/84 16:00 584 35 1. 75 1. 75 36 06/26/84 18:00 585 37 1. 85 1. 85 41 06/26/84 20:00 586 38 1. 90 1. 90 44 06/26/84 22:00 587 98 1. 90 1. 90 44 06/26/84 00:00 588 39 1. 95 1. 95 47 DAILY AVERAGE VALUES 1. 75 1. 75 36 06/27/84 02:00 589 39 1. 95 1. 95 47 06/27/84 04:00 590 39 1. 95 1. 95 47 06/27/84 06:00 591 39 1. 95 1. 95 47 06/27/84 08:00 592 39 1. 95 1. 95 47 06/27/84 10:00 593 39 1. 95 1. 95 47 06/27/84 12:00 594 39 1. 95 1. 95 47 06/27/84 14:00 595 40 2.00 2.00 50 06/27/84 16:00 596 41 2.05 2.05 53 06/27/84 18:00 597 41 2.05 2.05 53 06/27/84 20:00 598 41 2.05 2.05 53 06/27/84 22:00 599 41 2.05 2.05 53 06/27/84 00:00 bOO 40 2.00 2.00 50 DAILY AVERAGE VALUES 1. 99 1. 99 50 06/28/84 02:00 b01 39 1. 95 1. 95 47 06/28/84 04:00 602 38 1. 90 1. 90 44 06/28/84 06:00 603 38 1. 90 1. 90 44 06/28/84 08:00 604 40 2. 00 2.00 50 06/28/84 10:00 605 45 2.25 2.25 66 06/28/84 12:00 606 48 2.40 2.40 77 06/28/84 14:00 607 48 2.40 2.40 77 06/28/84 16:00 608 48 2.40 2.40 77 06/28/84 18:00 609 46 2.30 2.30 70 06/28/84 20:00 610 44 2.20 2.20 63 06/28/84 22:00 611 43 2. 15 2. 15 59 06/28/84 00:00 612 41 2.05 2.05 53 DAlbY AVERAGE VALVES 2. 16 2. 16 61 ' PROPOSED KING COVE HYDROELECT PROJECT 05/02/85 PAGE 18 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =···-==· •••s:::• ----··=····=· =•=••a =·---======= 06/29/84 02:00 613 41 2.05 2.05 53 06/29/84 04:00 614 40 2.00 2.00 50 06/29/84 06:00 615 40 2.00 2.00 50 06/29/84 08:00 616 39 1. 95 1. 95 47 06/29/84 10:00 ot7 39 1. 95 1. 95 47 06/29/84 12:00 618 38 1. 90 1. 90 44 06/29/84 14:00 619 38 1. 90 1. 90 44 06/29/84 16:00 620 39 1. 95 1. 95 47 06/29/84 18:00 621 39 1. 95 1. 95 47 06/29/84 20:00 622 39 1. 95 1. 95 47 06/29/84 2:2:00 623 39 1. 95 1. 95 47 06/29/84 00:00 624 38 1. 90 1. 90 44 DAILY AVERAGE VALUES 1. 95 1. 95 47 06/30/84 02:00 625 37 1. 85 1. 85 41 06/30/84 04:00 626 37 1. 85 1. 85 41 06/30/84 06:00 .. 627 36 1. 80 1. 80 39 06/30/84 08:00 628 36 1. 80 1. 80 39 06/30/84 10:00 629 35 1. 75 1. 75 36 06/30/84 12:00 630 35 1. 75 1. 75 36 06/30/84 14:00 631 35 1. 75 1. 7:5 36 06/30/84 16:00 632 36 1. 80 1. 80 39 06/30/84 18:00 633 37 1. 85 1. 85 41 06/30/84 20:00 634 36 1. 80 1. 80 39 06/30/fo}4 22:00 635 36 1. 80 1. eo 39 06/30184 00: 00 . o36 36 1. 80 1. 80 39 DAILY AVERAGE VALUES 1. eo 1. eo 39 07/01/84 02:00 637 36 1. eo 1. 80 39 07/01/e4 04:00 638 35 1. 75 1. 75 36 07/01/e4 06:00 639 35 1. 75 1. 75 36 07/01184 oe: 00 640 34 1. 70 1. 70 34 07/01/e4 10:00 641 34 1. 70 1. 70 34 07/01/84 12:00 642 34 1. 70 1. 70 34 07/011e4 14: 00 643 34 1. 70 1. 70 34 07/01/84 16:00 644 34 1. 70 1. 70 34 07/01/84 te:oo 645 35 1. 75 1. 7:5 36 07/01/84 20:00 646 35 1. 75 1. 75 36 07/01/84 22:00 647 36 1. 80 1. 80 39 07/01/e4 00:00 64e 35 1. 75 1. 75 36 BAlLY AYERAGE YALUES 1. 74 1. 74 36 PROPOSED KING COVE HYDROELECT PROJECT 05/02/85 PAGE 19 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======··= ---=· ==·· ==•====== ====-== =·==· ===·== 07/02/84 02:00 649 35 1. 75 1. 75 36 07/02/84 04:00 650 35 1. 75 1. 75 36 07/02/84 06:00 651 34 1. 70 1. 70 34 07/02/84 08:00 652 34 1. 70 1. 70 34 07/02/84 10:00 653 34 1. 70 1. 70 34 07/02/84 12:00 654 34 1. 70 1. 70 34 07/02/84 14:00 655 34 1. 70 1. 70 34 07/02/84 16:00 6S6 34 1. 70 1. 70 34 07/02/84 18:00 657 34 1. 70 1. 70 34 07/02/84 20:00 658 34 1. 70 1. 70 34 07/02/84 22:00 659 34 1. 70 1. 70 34 07/02/84 00:00 660 34 1. 70 1. 70 34 DAILY AVERAGE VALUES 1. 71 1. 71 34 07/03/84 02:00 661 34 1. 70 1. 70 34 07/03/84 04:00 662 34 1. 70 1. 70 34 07/03/84 06:00 663 34 1. 70 1. 70 34 07/03/84 08:00 664 33 1. 65 1. 65 31 07/03/84 10:00 665 33 1. 65 1. 65 31 07/03/84 12:00 666 33 1. 65 1. 65 31 07/03/84 14:00 667 34 1. 70 1. 70 34 07/03/84 16:00 668 34 1. 70 1. 70 34 07/03/84 18:00 669 36 1. 80 1. 80 39 07/03/84 20:00 670 38 1. 90 1. 90 44 07/03184 22:00 671 38 1. 90 1. 90 44 07/03/84 00:00 672 38 1. 90 1. 90 44 DAILY AVERAGE VALUES 1. 75 1. 75 36 07/04/84 02:00 673 39 1. 90 1. 90 44 07/04/84 04:00 674 38 1. 90 1. 90 44 07/04/84 06:00 675 38 1. 90 1. 90 44 07/04/84 08:00 676 38 1. 90 1. 90 44 07/04/84 10:00 677 38 1. 90 1. 90 44 07/04/84 12:00 678 37 1. 85 1. 85 41 07/04/84 14:00 679 38 1. 90 1. 90 44 07/04/84 16:00 680 38 1. 90 1. 90 44 07/04/84 18:00 681 38 1. 90 1. 90 44 07/04/84 20:00 682 39 1. 95 1. 95 47 07/04/84 22:00 683 40 2.00 2.00 50 07/04/84 00:00 684 40 2.00 2.00 50 DAl-bY AVERAGE 'IALUES 1. 92 1. 92 45 ' PROPOSED KING COVE HYDROELECT PROJECT 05/02/95 PAGE 20 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ===:===== ··=== ·=== ===·=·--· ·=··== =••sa ====== 07/05/84 02:00 685 40 2.00 2.00 50 07/05/94 04:00 686 39 1. 95 1. 95 47 07/05/84 06:00 687 39 1. 95 1. 95 47 07/05/84 08:00 688 39 1. 95 1. 95 47 07/05/84 10:00 689 38 1. 90 1. 90 44 07/05/84 12:00 690 38 1. 90 1. 90 44 07/05/84 14:00 691 37 1. 85 1. 85 41 07/05/84 16:00 692 38 1. 90 1. 90 44 07/05/84 18:00 693 39 1. 95 1. 95 47 07/05/84 20:00 694 39 l. 95 1. 95 47 07/05/84 22:00 695 39 1. 95 1. 95 47 07/05/84 00:00 696 39 1. 95 1. 95 47 DAILY AVERAGE VALUES 1. 93 1. 93 46 07/06/84 02:00 697 38 1. 90 1. 90 44 07/06/84 04:00 698 37 1. 85 1. 85 41 07/06/84 06: 00 699 38 1. 90 1. 90 44 07/06/84 08:00 700 39 1. 95 1. 95 47 07/06/84 10:00 701 41 2.05 2.05 53 07/06/84 12:00 702 42 2. 10 2. 10 56 07/06/84 14:00 703 44 2.20 2.20 63 07/06/84 16:00 704 46 2.30 2.30 70 07/06/84 18:00 705 48 2. 40 2.40 77 07/06/94 20:00 706 48 2.40 2.40 77 07/06/84 22:00 707 48 2.40 2.40 77 07/06/EM 00:00 708 46 2.30 2.30 70 DAILY AVERAGE VALUES 2. 15 2. 15 60 07/07/84 02:00 109 44 2.20 2.20 63 07/07/84 04:00 710 43 2. 15 2. 15 59 07/07/84 06:00 711 42 2. 10 2. 10 56 07/07/84 08:00 712 42 2. 10 2. 10 56 07/07/84 10:00 713 43 2. 15 2. 15 59 07/07/84 12:00 714 43 2. 15 2. 15 59 07/07/84 14:00 715 43 2. 15 2. 15 59 07/07/84 16:00 716 44 2.20 2.20 63 07/07/94 18:00 717 46 2.30 2.30 70 07/07/84 20:00 718 47 2.35 2.35 73 07/07/84 22:00 719 47 2.35 2. 35 73 07/07/84 00:00 720 47 2.35 2.35 73 DAlLY AVERAGE VALUES 2.21 2. 21 64 ~ PROPOSED ~INQ COVE HYDROELECT PROJECT 05/02/85 PAGE 21 DELTA CREE~ NEAR ~ING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHQ DATE TIME BYTE RAW DATA FEET FEET CFS ••:.••=z•• ---------------·-= ·=··-· ==··· ===·-== 07/08/84 02:00 721 47 2.35 2.35 73 07/08/84 04:00 722 46 2.30 2.30 70 07/08/84 06:00 723 45 2.25 2.25 66 07/08/84 08:00 724 44 2.20 2.20 63 07/08/84 10:00 725 43 2. 15 2. 15 59 07/08/84 12:00 726 43 2. 15 2. 15 59 07/08/84 14:00 727 42 2. 10 2. 10 56 07/08/84 16:00 728 41 2.05 2.05 53 07/08/84 18:00 729 41 2.05 2. 05 53 07/08/84 20:00 730 41 2.05 2.05 53 07/08/84 22:00 731 41 2.05 2.05 53 07/08/84 00:00 732 41 2.05 2.05 53 DAILY AVERAGE VALUES 2. 15 2. 15 59 07/09/84 02:00 733 40 2.00 2.00 50 07/09/84 04:00 734 39 1. 95 1. 95 47 07/09/84 06:00 735 39 1. 95 1. 95 47 07/09/84 08:00 736 38 1. 90 1. 90 44 07/09/84 10:00 737 38 1. 90 1. 90 44 07/09/84 12:00 738 3S 1 90 1. 90 44 07/09/84 14:00 739 37 1. 85 1. 85 41 07/09/84 16:00 740 38 1. 90 1. 90 44 07/09/84 18:00 741 38 1. 90 1. 90 44 07/09/84 20:00 742 39 1. 95 1. 95 47 071091&4 22:00 743 38 1. 90 1. 90 44 07109184 oo:oo 744 39 1. 95 1. 95 47 DAILY AVERAQE VALUES 1. 92 1. 92 45 07/10/84 02:00 ·745 41 2.05 2.05 53 07/10/84 04:00 746 42 2. 10 2. 10 56 07/10/84 06:00 747 41 2.05 2.05 53 07/10/84 08:00 748 41 2.05 2.05 53 07/10/84 10:00 149 40 2.00 2.00 50 07/10/84 12:00 750 39 1. 95 1. 95 47 07/10/84 14:00 751 39 i. 95 1. 95 47 07/10/84 16:00 752 38 1. 90 1. 90 44 07/10/84 18:00 753 38 1. 90 1. 90 44 07/10/84 20:00 754 38 1. 90 1. 90 44 07/10/84 22:00 755 38 1. 90 1. 90 44 07/10/84 00:00 756 37 1. 85 1. 85 41 OAI~Y AVERAGE VALUES 1. 97 1. 97 48 PROPOSED KING COVE HYDROELECT PROJECT 0~/02/8~ PAGE 22 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ------------· ----·=···--=· =•=s::•= =··=-===·=·= 07/11/84 02: 00 757 37 1. 85 1. 85 41 07/11184 04:00 758 38 1. 90 1. Ci'O 44 07/11/84 06:00 759 38 1. 90 1. 90 44 07/11/84 08:00 760 38 1. 90 1. 90 44 07/11/84 10:00 761 37 1. 85 1. 85 41 07/11/84 12:00 762 37 1. 85 1. 85 41 07/11/84 14:00 763 38 1. 90 1. 90 44 07/11/84 16:00 764 38 1. 90 1. 90 44 07/11/84 18:00 765 39 1. 95 1. 95 47 07/11/84 20:00 766 40 2. 00 2.00 50 07/11/84 22;00 767 39 1. 95 1. 95 47 07/11/84 00:00 768 38 1. 90 1. 90 44 DAILY AVERAGE VALUES 1. 90 1. 90 44 07/12/84 02:00 769 37 1. 85 1. 85 41 07/12/84 04:00 770 37 1. 85 1. 85 41 07/12/84 06:00 771 36 1.80 1.80 39 07/12/84 08:00 772 36 1. eo 1. eo 39 07/12/84 10:00 773 35 1. 75 1. 75 36 07/12184 12:00 774 36 1.80 1. 80 39 07/12/84 14:00 775 37 1. 85 1. 85 41 07/12/84 16:00 776 40 2.00 2.00 50 07/12/84 18!-00 777 42 2. 10 2. 10 56 07/12/84 20:00 778 42 2. 10 2. 10 56 07/12/lf4 22:00 779 42 2. 10 2. 10 56 07/1219400:00 780 42 2. 10 2. 10 56 DAILY AVERAGE VALUES 1. 93 1. 93 46 07/13/84 02:00 781 42 2. 10 2. 10 56 07/13/84 04:00 782 41 2.05 2.05 53 07/13/84 06:00 783 40 2.00 2.00 50 07/13/84 08:00 784 39 1. 95 1. 95 47 07/13/84 10:00 785 39 1. 95 1. 95 47 07/13/84 12:00 786 38 1. 90 1. 90 44 07/13/84 14:00 787 38 1. 90 1. 90 44 07/13/84 16:00 788 38 1. 90 1. 90 44 07/13/84 18:00 789 38 1. Ci'O 1. 90 44 07/13/84 20:00 790 38 1. 90 1. 90 44 07/13/84 22:00 791 38 1. 90 1. 90 44 07/13/84 00:00 792 38 1. 90 1. 90 44 DAILY AYERAGE YALUES 1. 95 1. 95 47 • PROPOSED KINQ COVE HVDROELECT PRO~ECT 05/02/85 PAGE 23 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =··-==•= =··=· ==·= ===•==·== ===--·= =···= ====== 07/14/84 02:00 793 38 1. 90 1. 90 44 07/14/84 04:00 794 37 1. 85 1. 85 41 07/14/84 06:00 795 37 1. 85 1. 85 41 07/14/84 08:00 796 37 1. 85 1. 85 41 07/14/84 10:00 797 36 1. 80 1. 80 39 07/14/84 12:00 798 35 1. 75 1. 75 36 07/14/84 14:00 79f:/ 35 1. 75 1. 75 36 07/14/84 16:00 BOO 36 1. 80 1. 80 39 07/14/84 18:00 801 36 1. 80 1. 80 39 07/14/84 20:00 802 36 1. 80 1. 80 39 07/14/84 22:00 803 96 1. 80 1. 80 39 07/14/84 00:00 804 36 1. 80 1. 80 39 DAILY AVERAGE VALUES 1. 81 1. 81 39 07/15/84 02:00 805 36 1. 80 1. 80 39 07/15/84 04:00 806 35 1. 75 1. 75 36 07/15/84 06:00 807 35 1. 75 1. 75 36 07/15/84 08:00 808 3:5 1. 75 1. 75 36 07/15/84 10:00 809 35 1. 75 1. 75 36 07/15/84 12:00 810 34 1. 70 1. 70 34 07/15/84 14:00 811 34 1. 70 1. 70 34 07/15/84 16:00 812 34 1. 70 1. 70 34 07/15/84 18:00 813 35 1. 75 1. 75 36 07/15/84 020:00 814 36 1. 80 1. 80 39 07/15/84 22:00 815 36 1. 80 1. 80 39 o7ttstP oo:oo 816 36 1. 80 1. 80 39 DAILY AVERAGE VALUES 1. 75 1.75 37 07/16/84 0;!:00 817 36 1. 80 1. eo 39 07/16/84 04:00 818 36 1. 80 1. 80 39 07/16/84 06:00 819 36 1. 80 1. 80 39 07/16/84 08:00 820 36 1. eo 1. 80 39 07/16/84 10:00 821 36 1. 80 1. 80 39 07/16/84 12:00 822 35 1. 75 1. 75 36 07/16/84 14:00 S23 35 1. 75 1. 75 36 07/16/84 16:00 824 37 1. 85 1. 85 41 07/16/84 18:00 825 39 1. 95 1. 95 47 07/16/84 20:00 826 39 1. 95 1. 95 47 07/16/84 22:00 827 38 1. 90 1. 90 44 07/16/84 00:00 828 38 1. 90 1. 90 44 DAIL. V AVERAGE VAL.UES 1. 84 1. 84 41 • PROPOSED KING COVE HVDROELECT PRO~ECT 05/02/85 PAGE 24 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =-==•===·· ------=-= =·-=·-==== ====== ====·= ====== 07/17/84 02:00 829 37 1. 85 1. 85 41 07/17/84 04:00 830 36 1. 80 1. 80 39 07/17/84 06:00 831 36 1. 80 1. 80 39 07/17/84 08:00 832 35 1. 75 1. 75 36 07/17/84 10:00 833 35 t. 75 1. 75 36 07/17/84 12:00 834 35 1. 75 1. 75 36 07/17/84 14:00 835 35 1. 75 1. 75 36 07/17/84 16:00 836 as 1. 75 1. 75 36 07/17/84 18:00 837 36 1. 80 1. 80 39 07/17/84 20:00 838 37 1. 85 1. 85 41 07/17/84 22:00 839 37 1. 85 1. 85 41 07/17/84 00:00 840 37 1. 85 1. 85 41 DAILY AVERAGE VALUES 1. 80 1. 80 38 07/18/84 02:00 841 37 1. 85 1. 85 41 07/18/84 04:00 842 36 1. 80 1. 80 39 07/18/84 06:00 e43 36 1. 80 1. eo 39 07/18/84 08:00 844 35 1. 75 1. 75 36 07/18/84 10:00 845 35 1. 75 1. 75 36 07 /18/e4 12: 00 . e46 36 1. 80 1. eo 39 07/18/84 14:00 847 36 1. 80 1. 80 39 07/18/84 16:00 848 36 1. 80 1. 80 39 07/18/84 19:00 949 37 1. 85 1. 85 41 07/18/84 20:00 850 38 1. 90 1. 90 44 07/18/84 22:00 851 39 1. 95 1. 95 47 07/1e/94 00:00 e52 38 1. 90 1. 90 44 DAILY AVERAGE VALUES 1. 83 1. 83 40 07/19/e4 02:00 es3 38 1. 90 1. 90 44 07/19/84 04:00 854 37 1. 85 1. 85 41 07/19/84 06:00 855 36 1. 80 1. 80 39 07/19/84 08:00 856 36 1. 80 1. 80 39 07/19/84 10:00 857 35 1. 75 1. 75 36 07/19/84 12:00 858 35 1. 75 1. 75 36 07/19/84 14:00 e59 35 1. 75 1. 75 36 07/19/84 16:00 860 36 1. 80 1. 80 39 07/19/84 18:00 861 37 1. 85 1. 85 41 07/19/84 20:00 862 38 1. 90 1. 90 44 07/19/84 22:00 863 38 1. 90 1. 90 44 07/19/84 00:00 864 37 1. 85 1. 85 41 DAILY AVERAGE VALVES 1. 83 1. 83 40 PROPOSED KING COVE HYDROELECT PRO~ECT 05/02/85 PAGE 25 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ·=·====• ··=== ===--===·==·= =·=·== -·=·= ===·== 07/20/84 0::2:00 865 37 1. 85 1. 85 41 07/20/84 04:00 866 36 1. 80 1. 80 34i' 07/20/84 06:00 867 35 1. 75 1. 75 36 07/20/84 08:00 868 34 1. 70 1. 70 34 07/20/84 10:00 869 34 1. 70 1. 70 34 07/::20/84 1::2:00 870 34 1. 70 1. 70 34 07/::20/84 14:00 871 34 1. 70 1. 70 34 07/20/84 16:00 872 .. 34 1. 70 1. 70 34 07/20/84 18:00 873 34 1. 70 1. 70 34 07/20/84 20:00 874 35 1. 75 1. 75 36 07/20/84 ::22:00 &78 . 96 1. 80 1. 80 39 07/20/84 00:00 876 35 1. 75 1. 75 36 DAILY AVERAGE VALUES 1. 74 1. 74 36 07/21/84 02:00 877 36 1. 80 1. 80 39 07/21/84 04:00 878 35 1. 75 1. 75 36 07/21/84 06:00 879 36 1. 80 1. 80 39 07/21/84 08:00 880 36 1. 80 1. 80 39 07/::21/84 10:00 881 37 1. 85 1. 85 41 07/21184 12:00 882 37 1. 85 1. 85 41 07/21/84 14:00 883 38 1. 90 1. 90 44 07/21/84 16:00 884 39 1. 95 1. 95 47 07/21/84 18:00 885 39 1. 95 1. 95 47 07/21/84 20:00 886 38 1. 90 1. 90 44 07/:2111J4 22:00 887 38 1. 90 1. 90 44 07/21/84 00:00 888 38 1. 90 1. 90 44 DAILY AVERAGE VALUES 1. 86 1. 86 4::2 07/22/84 02:00 889 38 1. 90 1. 90 44 07/::22/84 04:00 890 38 1. 90 1. 90 44 07/22/84 06:00 891 37 1. 85 1. 85 41 07/22/84 08:00 892 36 1. 80 1. 80 39 07/22/84 10:00 893 36 1. 80 1. 80 39 07/22/84 12:00 894 36 1. 80 1. 80 39 07/22/84 14:00 895 36 1. 80 1. 80 39 07/22/84 16:00 896 37 1. 85 1. 85 41 07/22/84 18:00 897 38 1. 90 1. 90 44 07/22/84 20:00 898 39 1. 95 1. 95 47 07/2::2/84 22:00 899 38 1. 90 1. 90 44 07/22/84 00:00 900 38 1. 90 1. 90 44 DAILY AVERAGE VALUES 1. 86 1. 86 42 PROPOSED KING COVE HYDROELECT PROJECT 05/02/85 PAGE 26 DELTA CREEK NEAR KING COVE. ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS -------= -·=·= ·=·· =·=·===·= ==·-·= =···= ==···= 07/23/84 02:00 901 38 1. 90 1. 90 44 07/23/84 04:00 902 37 1. 85 1. 85 41 07/23/84 06:00 903 37 1. 85 1. 85 41 07/23/84 08:00 904 36 1. 80 1. 80 39 07/23/84 10:00 905 35 1. 75 1. 75 36 07/23/84 12:00 906 35 1. 75 1. 75 36 07/23/84 14:00 907 34 1. 70 1. 70 34 07/23/84 16:00 908 34 1. 70 1. 70 34 07/23/84 18:00 909 34 1. 70 1. 70 34 07/23/84 20:00 910 34 1. 70 1. 70 34 07/23/84 22:00 911 34 1. 70 1. 70 34 07/23/84 00:00 912 34 1. 70 1. 70 34 DAILY AVERAGE VALUES 1. 76 1. 76 37 07/24/84 02:00 913 34 1. 70 1. 70 34 07/24/84 04:00 914 35 1. 75 1. 75 36 07/24184 06:00 915 35 1. 75 1. 75 36 07/24/84 08:00 916 34 1. 70 1. 70 34 07/24/84 10:00 917 34 1. 70 1. 70 34 07/24/84 12:00 918 34 1. 70 1. 70 34 07/24/84 14:00 919 34 1. 70 1. 70 34 07/24/84 16:00 920 34 1. 70 1. 70 34 07/24/84 18:00 921 33 1. 65 1. 65 31 07/24/84 20:00 922 33 1. 65 1. 65 31 07/24/$4 22:00 923 34 1. 70 1. 70 34 07/24194 00:00 924 33 1. 65 1. 65 31 DAILY AVERAGE VALUES 1. 70 1. 70 34 07/25/84 02:00-925 33 1. 65 1. 65 31 07/25/84 04:00 926 33 1. 65 1. 65 31 07/25/84 06:00 927 33 1. 65 1. 65 31 07/25/84 08:00 928 33 1. 65 1. 65 31 07/25/84 10:00 929 33 1. 65 1. 65 31 07/25/84 12:00 930 32 1. 60 1. 60 29 07/25/84 14:00 931 33 1. 65 1. 65 31 07/25/84 16:00 932 33 1. 65 1. 65 31 07/25/84 18:00 933 33 1. 65 1. 65 31 07/25/84 20:00 934 33 1. 65 1. 65 31 07/25/84 22:00 935 33 1. 65 1. 65 31 07/25/84 00:00 936 33 1. 65 1. 65 31 DAILY AYERA9E VALVES 1. 65 1. 65 31 PROPOSED KING COVE HYDROELECT PROJECT 05/02/85 PAGE 27 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =•==•==• ••••c =··= ==····==· ·=··=-====· ===··= 07/26/84 02:00 937 34 1. 70 1. 70 34 07/26/84 04:00 938 34 1. 70 1. 70 34 07/26/84 06:00 939 34 1. 70 1. 70 34 07/26/84 08:00 940 35 1. 75 1. 75 36 07/26/94 10:00 941 37 1. 85 1. 85 41 07/26/84 12:00 942 38 1. 90 1. 90 44 07/26/84 14:00 943 37 1. 85 1. 85 41 07/26/84 16:00 944 37 1. 85 1. 85 41 07/26/84 18:00 945 37 1. 85 1. 85 41 07/26/84 20:00 946 37 1. 85 1. 85 41 07126/94 22:00 947 36 1. 80 1. 80 39 07/26/84 00:00 948 36 1. 80 1. 80 39 DAILY AVERAGE VALUES 1. 80 1. 80 39 07/27/84 02:00 949 35 1. 75 1. 75 36 07/27/84 04:00 950 35 1. 75 1. 75 36 07127184 06:00 951 34 1. 70 1. 70 34 07/27/84 08:00 952 34 1. 70 1. 70 34 07127184 10:00 953 34 1. 70 1. 70 34 07/27/84 12:00 . ·954 34 1. 70 1. 70 34 07127184 14:00 955 35 1. 75 1. 75 36 07/27184 16:00 956 36 1. 80 1. 80 39 07127184 18:00 957 37 1. 85 1. 85 41 07/27/84 20:00 958 38 1. 90 1. 90 44 07/27/a, 22:00 959 38 1. 90 1. 90 44 o7t27tM oo:oo 960 39 1. 90 1. 90 44 DAILY AVERAGE VALUES 1. 78 1. 78 38 07/28/84 02:00 961 37 1. 85 1. 85 41 -07/28/84 04:00 962 37 1. 85 1. 85 41 07/28/84 06:00 963 36 1. 80 1. 80 39 07/28/84 08:00 964 35 1. 75 1. 75 36 07/28/84 10:00 965 34 1. 70 1. 70 34 07/28/84 12:00 966 34 1. 70 1. 70 34 07/28/84 14:00 967 34 1. 70 1. 70 34 07128/84 16:00 968 34 1. 70 1. 70 34 07/28/84 18:00 969 34 1. 70 1. 70 34 07/28184 20:00 970 34 1. 70 1. 70 34 07/28/84 22:00 971 34 1. 70 1. 70 34 07/28/84 00:00 972 34 1. 70 1. 70 34 DAU. Y AVERAQE VALVES 1. 74 1. 74 36 PROPOSED KING COVE HYDROELECT PROJECT 05/02/85 PAGE 28 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ====·=== =···= •••• IIICS···-1:1:211 ===·=-====·= =·=·== 07/29/84 02:00 973 34 1. 70 1. 70 34 07/29/84 04:00 974 34 1. 70 1. 70 34 07/29/84 06:00 975 34 1. 70 1. 70 34 07/29/84 08:00 976 34 1. 70 1. 70 34 07/29/84 10:00 977 3~ 1. 75 1. 75 36 07/29/84 12:00 978 35 1. 75 1. 75 36 07/29/84 14:00 979 35 1. 75 1. 75 36 07/29/84 16:00 980 35 1. 75 1. 75 36 07/29/84 18:00 981 35 1. 75 1. 75 36 07/29/84 20:00 982 35 1. 75 1. 75 36 07/29/84 22;00 -983 35 1. 75 1. 75 36 07/29/84 00:00 984 35 1. 75 1. 75 36 DAILY AVERAGE VALUES 1. 73 1. 73 35 07/30/84 02:00 985 35 1. 75 1. 75 36 07/30/84 04:00 986 35 1. 75 1. 75 36 07/30/84 06: 00 997 35 1. 75 1. 75 36 07/30/84 08:00 988 35 1. 75 1. 75 36 07/30/84 10:00 989 35 1. 75 l. 75 36 07/30/84 12:00 990 35 1. 75 1. 75 36 07/30/84 14:00 991 35 1. 75 1. 75 36 07/30/84 16:00 992 35 1. 75 1. 75 36 07/30/84 l8:00 993 36 1. 80 1. 80 39 07/30/84 20:00 994 36 1. 80 1. so 39 07/30/84 22:00 995 36 1. 80 1. 80 39 07/30/94 00: 00 996 35 1. 75 1. 75 36 DAILY AVERAGE VALUES 1. 76 1. 76 37 07/31/84 02:00 997 35 1. 75 1. 75 36 07/31/84 04:00 998 34 1. 70 1. 70 34 07/31/84 06:00 999 33 1. 65 1. 65 31 07/31/84 08:00 000 33 1. 65 1. 65 31 07/31/84 10:00 001 33 1. 65 1. 65 31 07/31/84 12:00 002 33 1. 65 1. 65 31 07/31/84 14:00 003 32 1. 60 1. 60 29 07/31/84 16:00 004 33 1. 65 1. 65 31 07/31/84 18:00 005 34 1. 70 1. 70 34 07/31/84 20:00 006 35 1. 75 1. 75 36 07/31/84 22: 00 007 35 1. 75 1. 75 36 07/31/84 00:00 008 34 1. 70 1. 70 34 DAILY AYERA9E VALUES 1. 68 1. 68 33 PROPOSED KING COVE HYDROELECT PRO~ECT 05/02/85 PAGE 29 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =----=--=·=·· ··== ---=··=--·=-==z:: =-===· ======= 08/01/84 02:00 009 34 1. 70 1. 70 34 08/01/84 04:00 010 34 1. 70 1. 70 34 08/01/84 Ob:OO 011 34 1. 70 1. 70 34 08/01/84 08:00 012 35 1. 75 1. 75 36 08/01/84 10: 00 -019 35 1. 75 1. 75 36 08/01/84 12:00 014 35 1. 75 1. 75 36 08/01/84 14:00 015 96 1. 80 1. 80 39 08/01/84 16:00 016 37 1. 85 1. 85 41 08/01/84 18:00 017 38 1. 90 1. 90 44 08/01/84 20:00 018 38 1. 90 1. 90 44 08/01/84 22:00 019 38 1. 90 1. 90 44 08/01/84 00:00 020 39 1. 95 1. 95 47 DAILY AVERAGE VALUES 1. 80 1. 80 39 08/02/84 02:00 021 40 2.00 2.00 50 08/02/84 04:00 022 40 2.00 2.00 50 08/02/84 06:00 023 40 2.00 2.00 50 08/02/84 08:00 024 40 2.00 2.00 50 08/02/84 10:00 025 40 2.00 2.00 50 08/02/84 12:00 026 38 1. 90 1. 90 44 08/0l:i!/84 14:00 027 38 1. 90 1. 90 44 08/02/84 16:00 028 38 1. 90 1. 90 44 08/02/84 18:00 -029 38 1. 90 1. 90 44 08/02/94 20:00 030 38 1. 90 1. 90 44 08/02/Sf. 22:00 031 38 1. 90 1. 90 44 08102/P oo:oo 032 37 1. 85 1. 85 41 DAILY AVERAGE VALUES 1. 94 1. 94 46 OS/03/24 02;00 033 :u, 1. 80 1. 80 39 08/03/84 04:00 034 35 1. 75 1. 75 36 08/03/84 06:00 035 35 1. 75 1. 75 36 08/03/84 08:00 036 35 1. 75 1. 75 36 08/03/84 10:00 037 34 1. 70 1. 70 34 08/03/84 12:00 038 34 1. 70 1. 70 34 08/03/84 14:00 039 33 1. 65 1. 65 31 08/03/84 16:00 040 33 1. 65 1. 65 31 08/03/84 18:00 041 34 1. 70 1. 70 34 08/03/84 20:00 042 34 1. 70 1. 70 34 08/03/84 22:00 043 34 1. 70 1. 70 34 08/03/84 00:00 044 33 1. 65 1. 65 31 DAILY AVERAOE VALUES 1. 71 1. 71 34 PROPOSED KING COVE HYDROELECT PROJECT 05/02/85 PAGE 30 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE OISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ==··===·---··-= ··== ==·====== ·=·=== ===== ======- 08/04/84 02:00 045 33 1. 65 1. 65 31 08/04/84 04:00 046 33 1. 65 1. 65 31 08/04/84 06:00 047 33 1. 65 1. 65 31 08/04/84 08:00 048 32 1. 60 1. 60 29 08/04/84 10:00 049 32 1. 60 1. 60 29 08/04/84 12:00 050 32 1 60 1. 60 29 08/04/84 14:00 051 32 1. 60 1. 60 29 08/04/84 16:00 052 33 1. 65 1. 65 31 08/04/84 18:00 053 32 1. 60 1. 60 29 08/04/84 20:00 054 32 1. 60 1. 60 29 08/04184 22:00 055 32 1. 60 1. 60 29 08/04/84 00:00 056 32 1. 60 1. 60 29 DAILY AVERAGE VALUES 1. 62 1. 62 30 08/05/84 02:00 057 32 1. 60 1. 60 29 08/05/84 04:00 058 32 1. 60 1. 60 29 08/05184 06:00 059 32 1. 60 1. 60 29 08/05/84 08:00 060 31 1. 55 1. 55 27 08/05/84 10:00 061 32 1. 60 1. 60 29 08/05/84 12:00 062 32 1. 60 1. 60 29 08/05/84 14:00 063 31 1. 55 1. 55 27 08/05/84 16:00 064 32 1. 60 1. 60 29 08/05/94 18~00 065 32 1. 60 1. 60 29 08/05/84 20:00 066 32 1. 60 1. 60 29 08/05/84 22:00 067 32 1. 60 1. 60 29 08/05/94 00: 00 068 32 1. 60 1. 60 29 DAILY AVERAGE VALUES 1. 59 1. 59 29 08/06/84 02:00 069 32 1. 60 1. 60 29 08/06/84 04:00 070 32 1. 60 1. 60 29 08/06/84 06:00 071 31 1. 55 1. 55 27 08/06/84 08:00 072 31 1. 55 1. 55 27 08/06/84 10:00 073 31 1. 55 1. 55 27 08/06/84 12:00 074 31 1. 55 1. 55 27 08/06/84 14:00 075 31 1. 55 1. 55 27 08/06/84 16:00 076 32 1. 60 1. 60 29 08/06/84 18:00 077 32 1. 60 1. 60 29 08/06/84 20:00 078 33 1. 65 1. 65 31 08/06/84 22:00 079 32 1. 60 1. 60 29 08/06/84 00:00 080 32 1. 60 1. 60 29 BAILY AVERAGE VALUES 1. 58 1. 58 28 PROPOSED KING COVE HYDROELECT PRO~ECT 05/02/85 PAGE 31 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ·--==·=· =----•••• a=r•==••u:u== :au~r••=• ==·=· ===·=== 08/07/84 02:00 081 32 1. 60 1. 60 29 08/07/84 04:00 082 32 1. 60 1. 60 29 08/07/84 06:00 083 31 1. 55 1. 55 27 08/07/84 08:00 084 31 1. 55 1. 55 27 08/07/84 10:00 &85 31 1. 55 1. 55 27 08/07/84 12:00 086 31 1. 55 1. 55 27 08/07/84 14:00 087 31 1. 55 1. 55 27 08/07/84 16:00 088 31 1. 55 1. 55 27 08/07/84 18:00 089 31 1. 55 1. 55 27 08/07/84 20:00 090 32 1. 60 1. 60 29 08/07/94 22:00 091 32 1. 60 1. 60 29 08/07/84 00:00 092 32 1. 60 1. 60 29 DAILY AVERAGE VALUES 1. 57 1. 57 28 08/08/84 02:00 093 31 1. 55 1. 55 27 08/08/84 04:00 094 31 1. 55 1. 55 27 08/08/94 06:00 095 31 1. 55 1. 55 27 08/08/84 08:00 096 30 1. 50 1. 50 25 08/08/84 10:00 097 31 1. 55 1. 55 27 08/08/94 12;00 099 32 1. 60 1. 60 29 08/08/84 14:00 099 32 1. 60 1. 60 29 08/08/84 16:00 100 33 1. 65 1. 65 31 09/08/94 18:00 101 34 1. 70 1. 70 34 08/08/94 20:00 102 35 1. 75 1. 75 36 08/0e/84 22:00 103 36 1. 80 1. eo 39 oatoata-4 oo: oo 104 36 1. eo 1. eo 39 DAILY AVERAGE VALUES 1. 63 1. 63 31 08/09/84 02;00 105 35 1. 75 1. 75 36 08/09/84 04:00 106 35 1. 75 1. 75 36 08/09/84 06:00 107 35 1. 75 1. 75 36 08/09/84 08:00 108 35 1. 75 1. 75 36 08/09/84 10:00 109 34 1. 70 1. 70 34 08/09/84 12:00 110 34 1. 70 1. 70 34 08/09/84 14:00 111 34 1. 70 1. 70 34 08/09/84 16:00 112 35 1. 75 1. 75 36 08/09/84 18:00 113 35 1. 75 1. 75 36 oe/09/84 20:00 114 36 1. 80 1. 80 39 08/09/84 22:00 115 36 1. 80 1. 80 39 08/09/84 00:00 116 35 1. 75 1. 75 36 DAib Y AVE-RAOE VALUES 1. 75 1. 75 36 PROPOSED KING COVE HYDROELECT PRO~ECT 05/02/85 PAGE 32 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ---=-·=· ··=== ··=· ·=···-=·-:a•==•a:: =··=· ====e• 08/10/84 02:00 117 35 1. 75 1. 75 36 08/10/84 04:00 118 34 1. 70 1. 70 34 08/10/84 06:00 119 34 1. 70 1. 70 34 08/10/84 08:00 120 34 1. 70 1. 70 34 08/10/84 10:00 121 94 1. 70 1. 70 34 08/10/84 12:00 122 35 1. 75 1. 75 36 08/10/84 14:00 123 35 1. 75 1. 75 36 08/10/84 16:00 124 34 1. 70 1. 70 34 08/10/84 18:00 125 34 1. 70 1. 70 34 08/10/84 20:00 126 34 1. 70 1. 70 34 08/10/84 22:00 127 34 1. 70 1. 70 34 08/10/84 00:00 128 34 1. 70 1. 70 34 DAILY AVERAGE VALUES 1. 71 1. 71 35 08/11/84 02: 00 129 35 1. 75 1. 75 36 08/11/84 04:00 130 35 1. 75 1. 75 36 08/11/84 06:00 131 36 1. 80 1.80 39 08/11/84 08:00 132 36 1. 80 1. 80 39 08/11/84 10:00 133 35 1. 75 1. 75 36 08/11/84 12: 00 134 35 1. 75 1. 75 36 08/11/84 14:00 135 35 1. 75 1. 75 36 08/11/84 16:00 136 35 1. 75 1. 75 36 08/11/94 18: 0(} 137 35 1. 75 1. 75 36 08/11/84 20:00 138 34 1. 70 1. 70 34 08/11/Ef4 22:00 139 34 1. 70 1. 70 34 08/11/94 00:00 140 33 1. 65 1. 65 31 DAILY AVERAGE VALUES 1. 74 1. 74 36 08/12/94 02:00 1-41 32 1. 60 1. 60 29 08/12/84 04:00 142 32 1. 60 1. 60 29 08/12/84 06:00 143 31 1. 55 1. 55 27 08/12/84 08:00 144 31 1. 55 1. 55 27 08/12/84 10:00 145 31 1. 55 1. 55 27 08/12/84 12:00 146 31 1. 55 1. 55 27 08/12/84 14:00 1-47 31 1. 55 1. 55 27 08/12/84 16:00 148 31 1. 55 1. 55 27 08/12/84 18:00 149 32 1. 60 1. 60 29 08/12/84 20:00 150 33 1. 65 1. 65 31 08/12/84 22:00 151 32 1. 60 1. 60 29 08/12/84 00:00 152 32 1. 60 1. 60 29 DAILY AVERAGE VALUES 1. 58 1. 58 28 PROPOSED KING COVE HYDROELECT PROJECT O::J/02/8~ PAGE 33 DELTA CREEK NEAR KING COVE, ALASKA START TIME 0~/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAWDATA FEET FEET CFS =·==···· :~:~•=•• -·-· =·==···--=-···= ==-==· ====·· 08/13/84 02:00 153 31 1. 5~ 1. 55 27 08/13/84 04:00 154 30 1. 50 1. 50 2~ 08/13/84 06:00 155 30 1. 50 1. 50 25 08/13/84 08:00 156 30 1. 50 1. 50 25 08/13/84 10:00 157 so 1.50 1. 50 25 08/13/84 12:00 158 29 1. 45 1. 45 23 08/13/84 14:00 159 30 1. 50 1. 50 25 08/13/84 16:00 160 30 1. 50 1. 50 25 08/13/84 18:00 161 31 1. 55 1. 55 27 08/13/84 20:00 162 32 1. 60 1. 60 29 08/13/84 22:00 16-3 32 1. 60 1. 60 29 08/13/84 00:00 164 32 1. 60 1. 60 29 DAILY AVERAQE VALUES 1. 53 1. 53 26 08/14/84 02:00 165 31 1. 55 1. 55 27 08/14/84 04:00 166 30 1. 50 1. 50 25 08/14/84 06:00 167 30 1. 50 1. 50 25 08/14/84 08:00 168 30 1. 50 1. 50 25 08/14/84 10:00 169 29 1. 45 1. 45 23 08/14184 12:00 170 29 1. 45 1. 45 23 08/14/84 14:00 171 29 1. 45 1. 45 23 08/14/84 16:00 172 30 1. 50 1. 50 25 08114184 18:00 173 31 1. 55 1. 55 27 08/14/84 20:00 174 31 1. 55 1. 55 27 08/14/114 :Z2:00 175 32 1. 60 1. 60 29 08/14/94 00:00 176 31 1. 55 1. 55 27 DAILY AVERAGE VALUES 1. 51 1. 51 26 08/15/84 02:00 177 30 1. 50 1. 50 25 08/15/84 04:00 178 30 1. 50 1. 50 25 08/15/84 06:00 179 30 1. 50 1. 50 25 08/15/84 08:00 180 29 1. 45 1. 45 23 08/15/84 10:00 181 29 1. 45 1. 45 23 08/15/84 12:00 182 29 1. 45 1. 45 23 08/15/84 14:00 1&3 29 1. 45 1. 45 23 08/15/84 16:00 184 30 1. 50 1. 50 25 08/15/84 18:00 185 31 1. 55 1. 55 27 08/15/84 20:00 1-Sb 32 1. 60 1. 60 29 08/15/84 22:00 187 32 1. 60 1. 60 29 08/15/84 00:00 188 31 1. 55 1. 55 27 DAlbY AVERAGE VALUES 1. 51 1. 51 25 PROPOSED KING COVE HYDROELECT PRO~ECT 0:5/02/85 PAGE 34 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ----=::•• ---·= •••• =•==••u•=• =·==== ===:=• ==:a=== 08/16/84 02:00 189 30 1. 50 1. 50 25 08/16/84 04:00 190 30 1. :50 1. 50 25 08/16/84 06:00 191 30 1. :50 1. 50 25 08/16/84 08:00 192 29 1. 45 1. 45 23 08/16/84 10:00 193 29 1. 45 1. 45 23 08/16/84 12:00 194 29 1. 45 1. 45 23 08/16/84 14:00 195 29 1. 45 1. 45 23 08/16/84 16:00 196 30 1. 50 1. 50 25 08/16/84 18:00 197 30 1. 50 1. 50 25 08/16/84 20:00 198 31 1. 55 1. 55 27 08/16/84 22:00 !99 31 1. 55 1. 55 27 08/16/84 00:00 200 31 1. 55 1. 55 27 DAILY AVERAGE VALUES 1. 50 1. 50 25 08/17/84 02:00 201 31 1. 55 1. 55 27 08/17/84 04:00 202 31 1. 55 1. 55 27 08/17/84 06:00 «03 31 1. 55 1.55 27 08/17/84 08:00 204 32 1. 60 1. 60 29 08/17/84 10:00 205 32 1. 60 1. 60 29 08/17184 12:00 206 31 1. 55 1. 55 27 08/17/84 14:00 207 32 1. 60 1. 60 29 08/17/84 16:00 208 32 1. 60 1. 60 29 08/17184 18:00 209 32 1. 60 1. 60 29 08/17/84 20:00 210 32 1. 60 1. 60 29 08/17/fH 22:00 211 32 1. 60 1. 60 29 08/171fi400:00 212 32 1. 60 1. 60 29 DAILY AVERAGE VALUES 1. 58 1. 58 28 08/18/94 02:00 213 31 1. 55 1. 55 27 08/18/84 04:00 214 31 1. :55 1. 55 27 08/18/84 06:00 215 31 1. 55 1. 55 27 08/18/84 08:00 216 31 1. 55 1. :55 27 08/18/84 10:00 217 31 1. 55 1. 5:5 27 08/18/84 12:00 218 31 1. :55 1. :55 27 08/18184 14:00 219 31 1. 55 1. 55 27 08/18/84 16:00 220 32 1. 60 1. 60 29 08/18/84 18:00 221 32 1. 60 1. 60 29 08/18/84 20:00 222 32 1 60 1. 60 29 08/18/84 22:00 223 32 1. 60 1. 60 29 08/18/84 00:00 224 31 1. 55 1. 55 27 DIIILY AVERA9E VALUES 1. 57 1. 57 29 PROPOSED KING COVE HYDROELECT PROJECT 05/02/85 PAGE 35 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======·= ··=·· -=··-==····=--==·-=-== =·=== ::r:r••=== 08/19/84 02:00 225 31 1. 55 1. 55 27 08/19/84 04:00 226 30 1. 50 1. 50 25 08/19/84 06:00 227 30 1. 50 1. 50 25 08/19/84 08:00 228 29 1. 45 1. 45 23 08/19/84 10:00 0!9 29 1. 45 1. 45 23 08/19/84 12:00 230 29 1. 45 1. 45 23 08/19/84 14:00 231 29 1. 45 1. 45 23 08/19/84 16:00 232 29 1. 45 1. 45 23 08/19/84 18:00 233 29 1. 45 1. 45 23 08/19/84 20:00 234 30 1. 50 1. 50 25 08/19/84 22:00 -235 31 1. 55 1. 55 27 08/19/84 00:00 236 31 1. 55 1. 55 27 DAILY AVERAGE VALVES 1. 49 1. 49 25 08/20/84 02:00 237 32 1. 60 1. 60 29 08/20/84 04:00 238 33 1. 65 1. 65 31 08/20/84 oc: oo-239 33 1. 65 1. 65 31 08/20/84 08:00 240 32 1. 60 1. 60 29 08/20/84 10:00 241 32 1. 60 1. 60 29 08/20/84 12:00 242 32 1. 60 1. 60 29 08/20/84 14:00 243 32 1. 60 1. 60 29 08/20/84 16:00 244 32 1. 60 1. 60 29 08/20/84 18:00 245 32 1. 60 1. 60 29 08/20/84 20:00 246 33 1. 65 1. 65 31 08/20/84 :22:00 247 33 1. 65 1. 65 31 08120/M oo:oo 248 33 1. 65 1. 65 31 DAILY AVERAGE VALVES 1. 62 1. 62 30 08/21/84 02:00 249 33 1. 65 1. 65 31 08/21/84 04:00 250 33 1. 65 1. 65 31 08/21/84 06:00 251 32 1. 60 1. 60 29 08/21/84 08:00 252 31 1. 55 1. 55 27 08/21/84 10:00 253 31 1. 55 1. 55 27 08/21/84 12:00 254 31 1. 55 1. 55 27 08121/84 14:00 255 31 1. 55 1. 55 27 08/21/84 16:00 256 31 1. 55 1. 55 27 08/21184 18:00 257 31 1. 55 1. 55 27 08/21/84 20:00 258 31 1. 55 1. 5!5 27 08/21/84 22:00 259 31 1. 55 1. 55 27 08/21/84 00:00 260 31 1. 55 1. 55 27 DAILY AVERAQE VALUES 1. 57 1. 57 28 PROPOSED KINO COVE HYDROELECT PROJECT muo2/8:5 PAQE 36 DELTA CREEK NEAR KINO COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS --------------·=·· -=-····== ==r·=·= ===·=· ====== 08/22/84 02:00 261 31 1. :55 1. 55 27 08/22/84 04:00 262 31 1. 55 1. 55 27 08/22/84 06:00 263 31 1. 55 1. 55 27 08/22/84 08:00 264 30 1. 50 1. 50 25 08/22/84 lO:OG 265 30 1. 50 1.50 25 08/22/84 12:00 266 30 1. 50 1. 50 25 08/22/84 14:00 267 30 1. 50 1. 50 25 08/22/84 16:00 268 30 1. 50 1. 50 25 08/22/84 18:00 269 30 1. 50 1. 50 25 08/22/84 20:00 270 30 1. 50 1. 50 25 08/22/84 22:00 271 30 1. 50 1. 50 25 08/22/84 00:00 272 30 1. 50 1. 50 25 DAILY AVERAGE VALUES 1. 51 1. 51 26 08/23/84 02:00 273 30 1. 50 1. 50 25 08/23/84 04:00 274 30 1. 50 1. 50 25 08/23/84 06:00 275 31 1. 55 1. 55 27 08/23/84 08:00 276 31 1. 55 1. 55 27 08/23/84 10:00 277 31 1. 55 1. 55 27 08/23/84 12:00 278 32 1. 60 1. 60 29 08/23/84 14:00 279 32 1. 60 1. 60 29 08/23/84 16:00 280 32 1. 60 1. 60 29 08/23/84 18:00 281 32 1. 60 1. 60 29 08/23/84 20:00 282 33 1. 65 1. 65 31 08/23/~ 22:00 283 34 1. 70 1. 70 34 08/23/94 00:00 284 35 1. 75 1. 75 36 DAILY AVERAGE VALUES 1. 60 1. 60 29 08/24/84 02:00 285-41 2.05 2.05 53 08/24/84 04:00 286 56 2.80 2.80 111 08/24/84 06:00 287 55 2. 75 2. 75 107 08/24/84 08:00 288 55 2. 75 2. 75 107 08/24/84 10:00 289 52 2.60 2.60 93 08/:24/84 12:00 290 50 2. 50 2. 50 85 08/24/84 14:00 291 46 2.30 2.30 70 08/24/84 16:00 292 43 2. 15 2. 15 59 08/24/84 18:00 293 41 2.05 2.05 53 08/24/84 20:00 294 43 2. 15 2. 15 59 08/24/84 22:00 295 41 2.05 2.05 53 08/24/84 00:00 296 40 2.00 2.00 50 DAILY AVERAGE VALUES 2.35 2.35 75 PROPOSED KING COVE HYDROELECT PROJECT 05/02/e5 PAGE 37 DELTA CREEK NEAR KING COVE. ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS -=====·= =·=·· ----==····---:=====· ====-====== oe/25/84 02:00 297 37 1. 85 1. 85 41 08/25/84 04:00 29e 39 1. 95 1. 95 47 08/25/84 06:00 299 40 2.00 2.00 50 08/25/84 08:00 300 39 1. 95 1. 95 47 08/25/e4 10:00 301 37 1. 85 1. 85 41 oe/25/e4 12:00 302 37 1. 85 1. 85 41 oet25/e4 14:00 303 37 1. 85 1. e5 41 oe/25/84 16:00 . 304 36 1. 80 1. eo 39 08/25/84 18:00 305 35 1. 75 1. 75 36 08/25/84 20:00 306 35 1. 75 1. 75 36 08/25/84 122:00 307 34 1. 70 1. 70 34 Oe/25/84 00:00 308 34 1. 70 1. 70 34 DAILY AVERAGE VALUES 1. 83 1. e3 41 oe/26/84 02:00 309 34 1. 70 1. 70 34 08/26/84 04:00 310 33 1. 65 1. 65 31 oe/:26/84 06:00 311 33 1. 65 1. 65 31 oe/26/84 08:00 31:2 33 1. 65 1. 65 31 08/:26/84 10:00 313 33 1. 65 1. 65 31 oe/26/e4 12:00 314 32 1. 60 1. 60 29 oe/26/84 14:00 315 32 1. 60 1. 60 29 oe/26/84 16:00 316 32 1. 60 1. 60 29 oet2b/84 1e:oo 317 32 1. 60 1. 60 29 08/26/84 20:00 318 33 1. 65 1. 65 31 08/26/84 22:00 319 33 1. 65 1. 65 31 oe/26/84 00:00 320 34 1. 70 1. 70 34 DAILV AVERAGE VALUES 1. 64 1. 64 31 08/27/e4 02:00 321 36 1. 80 1. eo 39 08/27/84 04:00 322 37 1. 85 1. 85 41 08/27/84 06:00 3:23 35 1. 75 1. 75 36 08/27/e4 08:00 324 34 1. 70 1. 70 34 08/27/84 10:00 325 34 1. 70 1. 70 34 08/27/84 12:00 326 34 1. 70 1. 70 34 08/27/84 14:00 . 327 34 1. 70 1. 70 34 oe/27/84 16:00 328 34 1. 70 1. 70 34 08/27/84 1e:OO 329 34 1. 70 1. 70 34 08/27/84 20:00 330 34 1. 70 1. 70 34 08/27/e4 22:00 331 35 1. 75 1. 75 36 08/27/e4 00:00 332 35 1. 75 1. 75 36 PAibV AVERAOE VALUES 1. 73 1. 73 36 PROPOSED KING COVE HYDROELECT PROJECT 0~/02/85 PAGE 38 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/0~/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ----=·=· =···· ·=·= ==·····== --=-·= -=·== ==··== 08/28/84 02:00 333 34 1. 70 1. 70 34 08/28/84 04:00 334 34 1. 70 1. 70 34 08/28/84 06:00 335 34 1. 70 1. 70 34 08/28/84 08:00 336 34 1. 70 1. 70 34 08/28/84 10:00 337 34 1. 70 1. 70 34 08/28/84 12:00 338 34 1. 70 1. 70 34 08/28/84 14:00 33~ 34 1. 70 1. 70 34 08/28/84 16:00 340 34 1. 70 1. 70 34 08/28/84 18:00 341 34 1. 70 1. 70 34 08/28/84 20:00 342 35 1. 75 1. 75 36 08/28/84 22:{)0 943 35 1. 75 1. 75 36 08/28/84 00:00 344 35 1. 75 1. 75 36 DAILY AVERAGE VALUES 1. 71 1. 71 35 08/29/84 02:00 345 37 1. 85 1. 85 41 08/29/84 04:00 346 37 1. 85 1. 85 41 08/29/84 06:00 347 38 1. 90 1. 90 44 08/29/84 08:00 348 36 1. 80 1. 80 39 08/29/84 10:00 349 34 1. 70 1. 70 34 08/29/84 12:00 350 34 1. 70 1. 70 34 08/29/84 14:00 351 34 1. 70 1. 70 34 08/29/84 16:00 352 33 1. 65 1. 65 31 08/29/84 18:00 353 33 1. 65 1. 65 31 08/29/84 20:00 354 33 1. 65 1. 65 31 08/29/84 22:00 355 33 1. 65 1. 65 31 08/29/9400:00 356 33 1. 65 1. 65 31 DAILY AVERAGE VALUES 1. 73 1. 73 35 08/30/84 02: 00 -357 33 1. 65 1. 65 31 08/30/84 04:00 358 32 1. 60 1. 60 2~ 08/30/84 06:00 359 32 1. 60 1. 60 29 08/30/84 08:00 360 31 1. 55 1. 55 27 08/30/84 10:00 361 31 1. ~5 1. 55 27 08/30/84 12:00 362 31 1. 55 1. 55 27 08/30/84 14:00 363 31 1. 5~ 1. 5~ 27 08/30/84 16:00 364 31 1. ~5 1. ~~ 27 08/30/84 18:00 365 31 1. ~5 1. 5~ 27 08/30/84 20:00 366 31 1. ~5 1. ~5 27 08/30/84 22:00 367 31 1. 55 1. 55 27 08/30/84 00:00 368 31 1. 55 1. 55 27 DAll.Y AVERA@E VALUES 1. 57 1. 57 28 PROPOSED KING COVE HYDROELECT PRO~ECT 0:5/02/85 PAGE 39 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =··===·= ··=== =··= ===··=·== ===-·· ====· ====== 08/31/84 02:00 369 31 I 1. 55 1. 55 27 08/31/84 04:00 370 31 1. 55 1. 55 27 08/31/84 06:00 371 31 1. 55 1. 55 27 08131/84 08: 00 372 30 1. 50 1. 50 25 08/31/84 10:00 373 31 1. 55 1. 55 27 08/31/84 12:00 374 31 1. 55 1. 55 27 08/31/84 14:00 375 32 1. 60 1. 60 29 08/31/84 16:00 376 31 1. 55 1. 55 27 08/31/84 18:00 377 32 1. 60 1. 60 29 08/31/84 20:00 378 33 1. 65 1. 65 31 08/31/84 22:00 ·····379 33 1. 65 1. 65 31 08/31/84 00:00 380 34 1. 70 1. 70 34 DAILY AVERAGE VALUES 1. 58 1. 58 28 09/01/84 02:00 381 34 1. 70 1. 70 34 09/01/84 04:00 382 34 1. 70 1. 70 34 09/01184 06:00 383 35 1. 75 1. 75 36 09/01184 08:00 384 35 1. 75 1. 75 36 09/01/84 10:00 385 35 1. 75 1. 75 36 09/01/84 12:00 386 34 1. 70 1. 70 34 09/01/84 14:00 387 34 1. 70 1. 70 34 09/01184 16:00 388 34 1. 70 1. 70 34 09/01/84 18:00 389 33 1. 65 1. 65 31 09/01/84 20:00 390 33 1. 65 1. 65 31 09/01184 22:00 391 32 1. 60 1. 60 29 09101/M OOc:OO 392 33 1. 65 1. 65 31 DAILY AVERAGE VALUES 1. 69 1. 69 33 09/02/84 02:00 ~3 35 1. 75 1. 75 36 09/02/84 04:00 394 35 1. 75 1. 75 36 09/02/84 06:00 395 34 1. 70 1. 70 34 09/02/84 08:00 396 33 1. 65 1. 65 31 09/02/84 10:00 397 33 1. 65 1. 65 31 09/02/84 12:00 398 33 1. 65 l. 65 31 09/02/84 14:00 399 33 1. 65 1. 65 31 09/02/84 16:00 400 33 1. 65 1. 65 31 09/02/84 18:00 401 33 1. 65 1. 65 31 09/02/84 20:00 402 33 l. 65 1. 65 31 09/02/84 22:00 403 33 1. 65 1. 65 31 09/02/84 00:00 404 32 1. 60 1. 60 29 9AILV AVERAGE VALVES 1. 67 1. 67 32 PROPOSED KING COVE HYDROELECT PROJECT 0!5/02/95 PAGE 40 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET "CFS =••=•==s ••••• =··· =·==··=--·====· ====-· ====== 09/03/84 02:00 405 32 1. 60 1. 60 29 09/03/84 04:00 406 32 1. 60 1. 60 29 09/03/84 06:00 407 32 1. 60 1. 60 29 09/03/84 08:00 408 32 1. 60 1. 60 29 09/03/84 10:00 409 32 1. 60 1. 60 29 09/03/84 12:00 410 32 1. 60 1. 60 29 09/03/84 14:00 411 32 1. 60 1. 60 29 09/03/84 16:00 412 32 1. 60 1. 60 29 09/03/84 18:00 413 31 1. 55 1. 55 27 09/03/94 20:00 414 31 1. 55 1. 55 27 09/03/94 22:00 415 31 1. 55 1. 55 27 09/03/94 00:00 416 31 1. 55 1. 55 27 DAILY AVERAGE VALUES 1. 58 1. 58 28 09/04/94 02:00 417 31 1. 55 1. 55 27 09/04/84 04:00 418 31 1. 55 1. 55 27 09/04/84 06:00 419 31 1. 55 1. 55 27 09/04/84 08:00 420 31 1. 55 1. 55 27 09/04/84 10:00 421 31 1. 55 1. 55 27 09/04/84 12:00 422 31 1. 55 1. 55 27 09/04/84 14:00 423 31 1. 55 1. 55 27 09/04/84 16:00 424 31 1. 55 1. 55 27 09104184 18:-oo 425 31 1. 55 1. 55 27 09/04/84 20:00 426 31 1. 55 1. 55 27 09/04/84 22:00 427 31 1. 55 1. 55 27 09/04/94 00:00 428 31 1. 55 1. 55 27 DAILY AVERAGE VALUES t. 55 1. 55 27 09/05/84 02:00 429 31 1. 55 1. 55 27 09/05/84 04:00 430 33 1. 65 1. 65 31 09/05/84 06:00 431 37 1. 85 1. 85 41 09/05/84 08:00 432 36 1. eo 1. eo 39 09/05/84 10:00 433 36 1. 80 1. 80 39 09/05/84 12:00 434 38 1. 90 1. 90 44 09/05/84 14:00 435 41 2.05 2.05 53 09/05/84 16:00 436 44 2.20 2.20 63 09/05/84 18:00 437 48 2.40 2. 40 77 09/05/84 20:00 438 55 2.75 2. 75 107 09/05/84 22:00 439 53 2.65 2.6!5 98 09/05/84 00:00 440 53 2.65 2.65 98 DAILY AVERAGE VALUES 2. 10 2. 10 60 PROPOSED KING COVE HYDROELECT PRO~ECT 05/02/8:5 PAGE 41 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =··=·-=· ··==· ----·=·----=--·-·--=---· ==··=- 09/06/84 02:00 441 50 2. 50 2. 50 85 09/06/84 04:00 442 47 2.3:5 2.35 73 09/06/84 06:00 443 44 2.20 2.20 63 09/06/84 08:00 444 43 2. 15 2. 15 59 09/06/84 10:00 445 46 2.30 2.30 70 09/06/84 12:00 446 49 2. 45 2.45 81 09/06/84 14:00 447 45 2.25 2.2:5 66 09/06/84 16:00 448 43 2. 15 2. 15 59 09/06/84 18:00 449 41 2.05 2.05 53 09/06/84 20:00 450 40 2.00 2.00 50 09/06/84 22:00 451 42 2. 10 2. 10 56 09/06/84 00:00 452 45 2.25 2.25 66 DAILY AVERAGE VALUES 2.23 2.23 65 09/07/84 02:00 453 44 2.20 2.20 63 09/07/84 04:00 454 43 2. 15 2. 15 59 09/07/84 06:00 455 42 2. 10 2. 10 56 09/07/84 08:00 456 43 2. 15 2. 15 59 09/07/84 10:00 457 43 2. 15 2. 15 59 09/07/84 12:00 458 45 2.25 2.25 66 09/07/84 14:00 459 45 2.25 2.25 66 09/07/84 16:00 460 47 2.35 2. 35 73 09/07/84 18:00 461 48 2.40 2.40 77 09/07/84 20:00 462 48 2.40 2.40 77 09/07184 22:00 463 51 2. 55 2. 55 89 09/07/fMOO!OO 464 46 2.30 2.30 70 DAILY AVERAGE VALUES 2.27 2.27 68 09/08/84 02:00 465 46 2.30 2.30 70 -' 09/08/84 04:00 466 44 2.20 2.20 63 09/08/84 06:00 467 46 2.30 2.30 70 09/08/84 08:00 468 49 2.45 2.45 81 09/08/84 10:00 469 47 2.35 2.35 73 09/08/84 12:00 470 48 2.40 2.40 77 09/08/84 14:00 471 45 2.25 2.25 66 09/08/84 16:00 472 45 2.25 2.25 66 09/08/84 18:00 473 44 2.20 2.20 63 09/08/84 20:00 474 42 2. 10 2. 10 56 09/08/84 22:00 475 41 2.05 2.0:5 53 09/08/84 00:00 476 41 2.05 2.05 53 DAibV AVERAQE VALUES 2.24 2.24 66 PROPOSED KINQ COVE HYDROELECT PRO~ECT 05/02/85 PAGE 42 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAQE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS --------..... ----==------,.,. ·=··---··== -=--== 09/09/84 02:00 477 41 2.05 2.05 53 09/09/94 04:00 478 41 2.05 2.05 53 09/09/84 06:00 479 42 2. 10 2. 10 56 09/09/84 08:00 480 43 2. 15 2. 15 59 09/09/84 10:00 491 47 2;35 2.35 73 09/09/84 12:00 492 46 2.30 2.30 70 09/09/84 14:00 483 43 2. 15 2. 15 59 09/09/84 16:00 494 43 2. 15 2. 15 59 09/09/84 18:00 485 42 2. 10 2. 10 56 09/09/84 20:00 486 41 2.05 2.05 53 09/09/84 22:00 497 40 2.00 2.00 50 09/09/84 00:00 488 40 2.00 2.00 50 DAILY AVERAGE VALUES 2. 12 2. 12 58 09/10/84 02:00 489 39 1. 95 1. 95 47 09/10/84 04:00 490 38 1. 90 1. 90 44 09/10184 06:00 . 491 39 1. 90 1. 90 44 09/10/84 08:00 492 37 1. 85 1. 85 41 09/10/84 10:00 493 37 1. 85 1. 85 41 09110184 12:00 494 37 1. 85 1. 85 41 09/10/84 14:00 495 36 1. 80 1. 80 39 09/10184 16:00 496 36 1. 80 1. 80 39 09/10194 1-9:00 497 36 1. 80 1. 80 39 09/10/84 20:00 498 36 1. 80 1. 80 39 09/101M22:oo 499 36 1. 80 1. 80 39 09/10184 ()()-: 00 500 36 1. 80 1. 80 39 DAILY AVERAGE VALUES 1. 84 1. 84 41 09/11/84 02:00 ·5{)-1 36 1.80 1. 80 39 09/11/84 04; 00 502 35 1. 75 1. 75 36 09/11184 06:00 503 35 1. 75 1. 75 36 09/11/84 08:00 504 35 1. 75 1. 75 36 09/11/84 10:00 505 35 1. 75 1. 75 36 09111/84 12:00 506 35 1. 75 1. 75 36 09/11/84 14:00 507 35 1. 75 1. 75 36 09/11/84 16:00 508 35 1. 75 1. 75 36 09/11/84 18:00 509 35 1. 75 1. 75 36 09/11/84 20:00 510 35 1. 75 1. 75 36 09/11/84 22:00 511 35 1. 75 1. 75 36 09/11/84 00:00 512 35 1. 75 1. 75 36 DAILY AYERAGE YAL-uES 1. 75 1. 75 36 PROPOSED KINO COVE HYDROELECT PROJECT 05/02/85 PAOE 43 DELTA CREEK NEAR KINO COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAOE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS --------==···· .... --------------· =---· ···=·= 09/12/84 02:00 513 34 1. 70 1. 70 34 09/12/84 04:00 514 34 1. 70 1. 70 34 09/12/84 06:00 515 34 1. 70 1. 70 34 09/12/84 08:00 516 34 1. 70 1. 70 34 09/12/84 10:00 517 34 1. 70 1. 70 34 09/12/84 12:00 518 34 1. 70 1. 70 34 09/12/84 14:00 519 34 1. 70 1. 70 34 09112/84 16:00 520 34 1. 70 1. 70 34 09112/84 18:00 521 34 1. 70 1. 70 34 09/12/84 20:00 522 33 1. 65 1. 65 31 09112/84 22:0()--52a 3-3· 1. 65 1. 65 31 09/12/84 00:00 524 34 1. 70 1. 70 34 DAILY AVERAGE VALUES 1. 69 1. 69 34 09/13/84 02:00 525 33 1. 65 1. 65 31 09/13/94 04:00 526 33 1. 65 1. 65 31 09/13/84 06:00 527 33 1. 65 1. 65 31 09/13/84 08:00 529 33 1. 65 1. 65 31 09/13/84 10:00 529 33 1. 65 1. 65 31 09/13/84 12:00 590 33 1. 65 1. 65 31 09/13/84 14:00 531 33 1. 65 1. 65 31 09/13/84 16:00 532 34 1. 70 1. 70 34 09/13/84 18:00 593 35 1. 75 1. 75 36 09/13/84 :i!O:OO 534 34 1. 70 1. 70 34 09/13/122: 00 535 34 1. 70 1. 70 34 09/131 00:00 836 34 1. 70 1. 70 34 DAILY AVERAGE VALUES 1. 68 1. 68 32 09/14/84 02:00 . 837 34 1. 70 1. 70 34 09/14/84 04:00 539 35 1. 75 1. 75 36 09/14/84 06:00 539 35 1. 75 1. 75 36 09/14/84 08:00 540 34 1. 70 1. 70 34 09/14/84 10:00 541 34 1. 70 1. 70 34 09/14/94 12:00 542 34 1. 70 1. 70 34 09/14/84 14:00 :J43 34 1. 70 1. 70 34 09/14/84 16:00 544 35 1. 75 1. 75 36 09/14/84 18:00 545 36 1. 80 1. eo 39 09/14/84 20:00 546 36 1. 80 1. 80 39 09/14/84 22:00 547 35 1. 75 1. 75 36 09/14/84 00:00 548 35 1. 75 1. 75 36 DAI~Y AV£RAQE VALUES 1. 74 1. 74 36 PROPOSED KING COVE HYDROELECT PRO~ECT 05/02/85 PAGE 44 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS --··==·= ..... ·=--===···==:= ==·=== ··==· ====== 09/15/84 02:00 549 36 1. 80 1. 80 39 09/15/84 04:00 550 35 1. 75 1. 75 36 09/15/84 06:00 551 34 1. 70 1. 70 34 09/15/84 08:00 552 34 1. 70 1. 70 34 09/15184 10:00 553 35 1. 75 1. 75 36 09/15/84 12:00 554 3:5 1. 75 1. 75' 36 09/15/84 14:00 555 35 1. 75 1. 75 36 09/15/84 16:00 556 35 1. 75 1. 75 36 09/15/84 18:00 557 35 1. 75 1. 75 36 09/15/84 20:00 558 35 1. 75 1. 75 36 09/15/84 22:00 . 559 35 1. 75 1. 75 36 09/15/84 00:00 560 36 1. 80 1. 80 39 DAILY AVERAGE VALUES 1. 75 1. 75 36 09/16/84 02:00 561 36 1. 80 1. 80 39 09/16/84 04:00 562 35 1. 75 1. 75 36 09/16/84 06:00 563 35 1. 75 1. 75 36 09/16/84 08:00 564 35 1. 75 1. 75 36 09/16/84 10:00 565 34 1. 70 1. 70 34 09/16/84 12:00 566 34 1. 70 1. 70 34 09/16/84 14:00 567 33 1. 65 1. 65 31 09/16/84 16:00 568 33 1. 65 1. 65 31 09/16/84 18:00 569 34 1. 70 1. 70 34 09/16/84 20:00 570 35 1. 75 1. 75 36 09/16/84 22:00 571 38 1. 90 1. 90 44 o9t16t94 oo:oo 572 36 1. 80 1. 80 39 DAILY AVERAGE VALUES 1. 74 1. 74 36 09/17/84 02:00 573 35 1. 75 1. 75 36 09/17/84 04:00 574 34 1. 70 1. 70 34 09/17/84 06:00 575 34 1. 70 1. 70 34 09/17/84 08:00 576 33 1. 65 1. 65 31 09/17/84 10:00 577 33 1. 65 1. 65 31 09/17/84 12:00 578 33 1. 65 1. 65 31 09/17/84 14:00 579 33 1. 65 1. 65 31 09/17/84 16:00 580 33 1. 65 1. 65 31 09/17/84 18:00 581 33 1. 65 1. 65 31 09/17/84 20:00 582 33 1. 65 1. 65 31 09/17/84 22:00 583 33 1. 65 1. 65 31 09/17/84 00:00 584 33 1. 65 1. 65 31 DAILY AYERA&e VALUES t. 67 1. 67 32 PROPOSED KINO COVE HYDROELECT PRO~ECT 05/02/85 PAQE 45 DELTA CREEK NEAR KINO COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE Tlf'IE BYTE RAW DATA FEET FEET CFS --===·=· =---· ----·==····==== ----== ==·=· -----= 09/18/84 02:00 585 32 1. 60 1. 60 29 09/18/84 04:00 586 33 1. 65 1. 65 31 09/18/84 06:00 587 33 1. 65 1. 65 31 09/18/84 08:00 588 33 1. 65 1. 65 31 09/18/84 10:00 589 33 1. 65 1. 65 31 09/18/84 12:00 590 33 1. 65 1. 65 31 09/18/84 14:00 591 33 1. 65 1. 65 31 09/18/84 16:00 592 93 1. 65 1. 65 31 09/18/84 18:00 593 33 1. 65 1. 65 31 09/18/84 20:00 594 33 1. 65 1. 65 31 09/18/84 22;00 -595 -92 1. 60 1. 60 29 09/18/84 00:00 596 32 1. 60 1. 60 29 DAILY AVERAOE VALUES 1. 64 1. 64 31 09/19/84 02:00 597 32 1. 60 1. 60 29 09/19/84 04:00 598 31 1. 55 1. 55 27 09/19/84 06:00 599 32 1. 60 1. 60 29 09/19/84 08:00 600 31 1. 55 1. 55 27 09/19/84 10:00 601 31 1. 55 1. 55 27 09/19/84 12:00 602 31 1. 55 1. 55 27 09/19/84 14:00 603 31 1. 55 1. 55 27 09/19/84 16:00 604 31 1. 55 1. 55 27 09/19/84 18:00 605 31 1. 55 1. 55 27 09/19/84 20:00 606 31 1. 55 1. 55 27 09/19/11 22:00 607 31 1. 55 1. 55 27 09/1f!// . 00-~ 00 608 31 1. 55 1. 55 27 DAILY AVERAGE VALUES 1. 56 1. 56 27 Of!//20/84 02:00 ··009 31 1. 55 1. 55 27 09/20/84 04:00 610 31 1. 55 1. 55 27 09/20/84 06:00 611 30 1. 50 1. 50 25 09/20/84 08:00 612 30 1. 50 1. 50 25 09/20/84 10:00 613 30 1. 50 1. 50 25 09/20/84 12:00 614 31 1. 55 1. 55 27 09/20/84 14:00 615 30 1. 50 1. 50 25 09/20/84 16:00 616 30 1. 50 1. 50 25 09/20/84 18:00 617 30 1. 50 1. 50 25 09/20/84 20:00 618 30 1. 50 1. 50 25 09/20/84 22:00 619 32 1. 60 1. 60 29 09/20/84 00:00 620 37 1. 85 1. 85 41 DAILY AVERAGE VALUES 1. 55 L 55 27 PROPOSED KING COVE HYDROELECT PROJECT 0:5/02/8:5 PAGE 46 DELTA CREEK NEAR KING COVE, ALASKA START TIME 0:5/09/84 02:00 DEPTH STAGE DISCHG DATE TIME ·BYTE RAW DATA FEET FEET CFS ----------··· ···= -===·-·===· ·=-·==---=-· ====== 09/:ii!1/84 02:00 621 40 2.00 2.00 50 09/21/84 04:00 622 46 2.30 2.30 70 09/21/84 06:00 623 :50 2. 50 2. 50 85 09/21/84 08:00 624 53 2.65 2.65 98 09/21/84 10:00 625 53 2.65 2.65 98 09/21/84 12:00 626 52 2.60 2.60 93 09/21/84 14:00 627 54 2. 70 2.70 102 09/21/84 16:00 628 54 2. 70 2. 70 102 09/21/84 18:00 629 48 2.40 2.40 77 09/21/84 20: 00 630 53 2.65 2.65 98 09/21/84 22:00 6-31 56 2.80 2.80 111 09/21/84 00:00 632 49 2.45 2.45 81 DAILY AVERAGE VALUES 2.53 2. 53 89 09/22/84 02:00 633 47 2.35 2.35 73 09/22/84 04:00 634 48 2. 40 2.40 77 09/22/84 06:00 6-35 46 2.30 2.30 70 09/22/84 08:00 636 49 2.45 2. 45 81 09/22/84 10:00 637 45 2.25 2.25 66 09/22/84 12:00 638 45 2.25 2.25 66 09/22/84 14:00 639 45 2.25 2.25 66 09/22/84 16:00 640 48 2. 40 2.40 77 09/22/E* 18:00 641 45 2.25 2.25 66 09/22/84 20:00 642 45 2.25 2.25 66 09/22/EI-' 22:00 643 45 2.25 2.25 66 09/22/84 00:00 644 43 2. 15 2. 15 59 DAILY AVERAGE VALUES 2.30 2.30 69 09/23/84 02:00 ·-645 42 2. 10 2. 10 56 09/23/84 04:00 646 40 2.00 2.00 50 09/23/84 06:00 647 39 1. 95 1. 95 47 09/23/84 08:00 648 39 1. 95 1. 95 47 09/:ii!3/84 10:00 649 39 1. 95 1. 95 47 09/23/84 12:00 650 39 1. 95 1. 95 47 09/23/84 14:00 651 49 2.45 2.45 81 09/23/84 16:00 652 48 2.40 2.40 77 09/23/84 18:00 653 42 2. 10 2. 10 56 09/23/84 20:00 654 40 2.00 2.00 50 09/23/84 2:ii!:OO 655 39 1. 95 1. 95 47 09/23/84 00:00 656 39 1. 95 1. 95 47 DAILY AVERAGE YALUES 2.06 2.06 54 PROPOSED KINQ COVE HYDROELECT PROJECT 0!5/02/95 PAGE 47 DELTA CREEK NEAR KJNQ COVE, ALASKA START TIME 05/09/94 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFB •••==•m• •••==• ·-=·= ===··====-•-=::::••• --··= =====-= 09/24/94 02:00 657 39 1. 95 1. 95 47 09/24/94 04:00 659 40 2.00 2.00 50 09/24/94 06:00 659 42 2. 10 2. 10 56 09/24/94 09:00 660 40 2.00 2.00 50 09/24/94 10:00 661 39 1. 95 1. 95 47 09/24/84 12:00 662 39 1. 95 1. 95 47 09/24/94 14:00 663 39 1. 90 1. 90 44 09/24/84 16:00 664 38 1. 90 1. 90 44 09/24/94 18:00 665 37 1. 95 1. 85 41 09/24/94 20:00 666 37 1. 95 1. 95 41 09/24/84 22: eo -667 36 1.90 1. so 39 09/24/84 00:00 669 36 1. 80 1. 80 39 DAILY AVERAGE VALUES 1. 92 1. 92 45 09/25/84 02:00 669 37 1. 85 1. 85 41 09/25/84 04:00 670 37 1. 85 1. 85 41 09/25/84 06:00 671 40 2.00 2.00 50 09/25/84 08:00 672 44 2.20 2.20 63 09/25/84 10:00 673 38 1. 90 1. 90 44 09/25/84 12:00 674 37 1. 85 1. 85 41 09/25/84 14:00 675 36 1. 80 1. 80 39 09/25/84 16:00 676 36 1. 80 1. 80 39 0912&184 18:00 677 38 1. 90 1. 90 44 09/25/84 20:00 678 37 1. 85 1. 85 41 09/25/. 22:00 679 37 1. 85 1. 85 41 09125/EM 00: oo · 680 36 1. 80 1. 80 39 DAILY AVERAGE VALUES 1. 89 1. 89 44 09/26/84 02:00 -681 36 1. 80 1. 80 39 09/26/84 04:00 682 35 1. 75 1. 75 36 09/26/84 06:00 683 35 1. 75 1. 75 36 09/26/84 08:00 684 34 1. 70 1. 70 34 09/26/84 10:00 685 35 1. 75 1. 75 36 09/26/84 12:00 686 36 1. 80 1. 80 39 09/26/84 14:00 687 39 1. 95 1. 95 47 09/26/84 16:00 688 37 1. 85 1. 85 41 09/26/84 18:00 689 37 1. 85 1. 85 41 09/26/84 20:00 690 36 1. eo 1.80 39 09/26/84 22:00 691 35 1. 75 1. 75 36 09/26/84 00:00 692 35 1. 75 1. 75 36 DAILY AVERAQE -VALUES 1. 79 1. 79 38 PROPOSED KINQ COVE HYDROELECT PROJECT 0:5/02/85 PAGE 48 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DAT"-FEET FEET CFS ......... . .... ----------·=· ---··= ---------·= 09/27/84 02:00 693 35 1. 75 1. 75 36 09/27/84 04:00 694 35 1. 75 1. 75 36 09/27/84 06:00 695 35 1. 75 1. 75 36 09/27/84 08:00 696 34 1. 70 1. 70 34 09/27/84 10:00 697 34 1. 70 1. 70 34 09/27/84 12:00 698 34 1. 70 1. 70 34 09/27/84 14:00 699 35 1. 75 1. 75 36 09/27/84 16:00 700 35 1. 75 1. 75 36 09/27/84 18:00 701 34 1. 70 1. 70 34 09/27/84 20:00 702 35 1. 75 1. 75 36 09/27/84 22:00 700 35 1. 75 1. 75 36 09/27/84 00:00 704 35 1. 7:5 1. 75 36 DAILY AVERAQE VALUES 1. 73 1. 73 35 09/28/84 02:00 705 34 1. 70 1. 70 34 09/28/84 04:00 706 34 1. 70 1. 70 34 09128/84 06:00 707 34 1. 70 1. 70 34 09/28/84 08:00 708 34 1. 70 1. 70 34 09/28/84 10:00 709 34 1. 70 1. 70 34 09/28/84 12:00 710 34 1. 70 1. 70 34 09/28/84 14:00 711 34 1. 70 1. 70 34 09/28/84 16:00 712 33 1. 65 1. 65 31 09/28/84 1-9:00 ·713· 34 1. 70 1. 70 34 09/28/120:00 714 33 1. 65 1. 65 31 09/28/ 22:00 715 33 1. 65 1. 65 31 09/28/84 00:00 716 33 1. 65 1. 65 31 D"-ILY AVERAGE VALUES 1. 68 1. 68 33 09/29/84 o.!: 00 717 33 1. 65 1. 65 31 09/29/84 04:00 718 33 1. 65 1. 65 31 09/29/84 06:00 719 33 1. 65 1. 65 31 09/29/84 08:00 720 33 1. 65 1. 65 31 09/29/84 10:00 721 33 1. 65 1. 6:5 31 09/29/84 12:00 722 33 1. 65 1. 65 31 09/29/84 14:00 723 33 1; 65 1. 65 31 09/29/84 16:00 724 33 1. 65 1. 6:5 31 09/29/84 18:00 725 33 1. 65 1. 65 31 09/29/94 20:00 726 33 1. 65 1. 65 31 09/29/84 22:00 727 33 1. 65 1. 65 31 09/29/84 00:00 728 33 1. 65 1. 65 31 D"-ILY AVERAGE YALUES 1. 65 1. 65 31 PROPOSED KINO COVE HYDROELECT PROJECT 05/02/85 PAQE 49 DELTA CREEK NEAR KINO COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =•==••=• ••••a ···= ==····---=·--·· -----===··= 09/30/84 02:00 729 33 1. 65 1. 65 31 09/30/84 04:00 730 32 1. 60 1. 60 29 09/30/84 06:00 731 33 1. 65 1. 65 31 09/30/84 08:00 732 33 1. 65 1. 65 31 09/30/84 10:00 733 33 1. 65 1. 65 31 09/30/84 12:00 734 34 1. 70 1. 70 34 09/30/84 14:00 735 34 1. 70 1. 70 34 09/30/84 16:00 736 34 1. 70 1. 70 34 09/30/84 18:00 737 33 1. 65 1. 65 31 09/30/84 20:00 738 33 1. 65 1. 65 31 09/30/84 22:00 739 33 1. 65 1. 65 31 09/30/84 00:00 740 33 1. 65 1. 65 31 DAILY AVERAGE VALUES 1. 66 1. 66 32 10/01/84 02:00 741 33 1. 65 1. 65 31 10/01/84 04:00 742 33 1. 65 1. 65 31 10/01/84 06:00 743 33 1. 65 1. 65 31 10/01/84 08:00 744 34 1. 70 1. 70 34 10/01/84 10:00 745 33 1. 65 1. 65 31 10/01/84 12:00 746 33 1. 65 1. 65 31 10/01/84 14:00 747 33 1. 65 1. 65 31 10/01/84 16:00 748 33 1. 65 1. 65 31 10/0l/84 18~ .00 749 34 1. 70 1. 70 34 10/01184 20:00 750 33 1. 65 1. 65 31 10/0111,12:00 751 36 1. 80 1. 80 39 101011 · O<k-00 ··--752 36 1. 80 1. eo 39 DAILY AVERAGE VALUES 1. 68 1. 68 33 10/02/84 02;00 -7:J3 34 1. 70 1. 70 34 10/02/84 04:00 754 34 1. 70 1. 70 34 10/02/84 06:00 755 34 1. 70 1. 70 34 10/02/84 08:00 754t 34 1. 70 1. 70 34 10/02/84 10:00 757 34 1. 70 1. 70 34 10/02/84 12:00 758 35 1. 75 1. 75 36 10/02/84 14:00 759 ~4 1. 70 1. 70 34 10/02/84 16:00 760 34 1. 70 1. 70 34 10/02/84 18:00 761 33 1. 65 1. 65 31 10/02/84 20:00 762 34 1. 70 1. 70 34 10/02/84 22:00 763 33 1. 65 1. 65 31 ,,i 10/02/84 00:00 764 33 1. 65 1. 65 31 DA 11. V AV&RAQ&: VAl-UES 1. 69 1. 69 33 PROPOSED KING COVE HYDROELECT PROJECT 05/02/85 PAGE 50 DELTA CREEK NEAR KING COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ·-······ ---·· ----·==···-== ===·--==·=· ====== 10/03/84 02:00 765 33 1. 65 1. 65 31 10/03/84 04:00 766 33 1. 65 1. 65 31 10/03/84 06:00 767 33 1. 65 1. 65 31 10/03/84 08:00 768 33 1. 65 1. 65 31 10/03/84 10:00 769 33 1. 65 1. 65 31 10/03/84 12:00 770 33 1. 65 1. 65 31 10/03/84 14:00 771 33 1. 65 1. 65 31 10/03/84 16:00 772 34 1. 70 1. 70 34 10/03/84 18:00 773 35 1. 75 1. 75 36 10/03/84 20:00 774 37 1. 85 1. 85 41 10/03/84 22:00 :"/75 4e 2.00 2.00 50 10/03/84 00:00 776 47 2.35 2.35 73 DAILY AVERAGE VALVES 1. 77 1. 77 38 10/04/84 02:00 777 44 2.20 2.20 63 10/04/84 04:00 778 40 2.00 2.00 50 10/04/84 06:00 779 39 1. 95 1. 95 47 10/04/84 08:00 780 38 1. 90 1. 90 44 10/04/84 10:00 781 37 1. 85 1. 85 41 10/04/84 12:00 782 37 1. 85 1. 85 41 10/04/84 14:00 783 38 1. 90 1. 90 44 10/04/84 16:00 784 38 1. 90 1. 90 44 10/04/84 18:00 795 37 1. 85 1. 85 41 10/04/84 20:00 786 37 1. 85 1. 85 41 10/04/~4 22:00 787 37 1. 85 1. 85 41 10/04/84 00:00 788 36 1. 80 1. 80 39 DAILY AVERAGE VALVES 1. 91 1. 91 45 10/05/84 02:00 789 35 1. 75 1. 75 36 10/05/84 04:00 790 35 1. 75 1. 75 36 10/05/84 06:00 791 35 1. 75 1. 75 36 10105/84 08:00 792 35 1. 75 1. 75 36 10105/84 10:00 793 35 1. 75 1. 75 36 10/05/84 12:00 794 35 1. 75 1. 75 36 10/05/84 14:00 795 34 1. 70 1. 70 34 10/05/84 16:00 796 34 1. 70 1. 70 34 10/05/84 18:00 797 34 1. 70 1. 70 34 10/05/84 20:00 798 34 1. 70 1. 70 34 10/05/84 22:00 799 34 1. 70 1. 70 34 10/05/84 00:00 800 34 1. 70 1. 70 34 DA I LV AYERAGE 'N!LVES 1. 73 1. 73 35 PROPOSED KING COVE HYDROELECT PRO~ECT 05/02/85 PAGE 51 DELTA CREEK NEAR KINO COVE, ALASKA START TIME 05/09/84 02:00 DEPTH STAGE DISCHQ DATE TIME BYTE RAW DATA FEET FEET CFS =··--··-= --··· ----·······== ---·== ::=:attaaUII&':III ====== 10/06/84 02:00 801 34 1. 70 1. 70 34 10/06/84 04:00 802 34 1. 70 1. 70 34 10/06/84 06:00 803 35 1. 75 1. 75 36 10/06/84 08:00 804 34 1. 70 1. 70 34 10/06/84 10:00 805 34 1. 70 1. 70 34 10/06/84 12:00 806 34 1. 70 1. 70 34 10/06/84 14:00 807 34 1. 70 1. 70 34 10/06/84 16:00 808 34 1. 70 1. 70 34 10/06/84 18:00 809 34 1. 70 1. 70 34 10/06/84 20:00 810 34 1. 70 1. 70 34 10/06/84 WZ2:00 811 34 1. 70 1. 70 34 10/06/84 00:00 812 34 1. 70 1. 70 34 DAILY AVERAGE VALUES 1. 70 1. 70 34 10/07/84 02:00 813 34 1. 70 1. 70 34 10/07/84 04:00 814 34 1. 70 1. 70 34 10/07/84 06:00 815 33 1. 65 1. 65 31 10/07/84 08:00 816 33 1. 65 1. 65 31 10/07/84 10:00 817 33 1. 65 1. 65 31 10107184 12:00 818 33 1. 65 1. 65 31 10/07/84 14:00 819 33 1. 65 1. 65 31 10/07/84 16:00 820 33 1. 65 1. 65 31 10/07/84 18;00 821 33 1. 65 1. 65 31 10/07/84 20:00 822 33 1. 65 1. 65 31 10/07/ .. 22:00 823 33 1. 65 1. 65 31 10/0?194 00:00 9241 33 1. 65 1. 65 31 DAILY AVERAGE VALUES 1. 66 1. 66 32 10/08/84 Od!;OO 82& 33 1. 65 1. 65 31 10/08/84 04:00 826 33 1. 65 1. 65 31 10/08/84 06:00 827 33 1. 65 1. 65 31 10/08/84 08:00 828 32 1. 60 1. 60 29 10/08/84 10:00 829 32 1. 60 1. 60 29 10/08/84 12:00 830 33 1. 65 1. 65 31 10/08/84 14:00 831 33 1. 65 1. 65 31 10/08/84 16:00 832 33 1. 65 1. 65 31 10/08/84 18:00 833 33 1. 65 1. 65 31 10/08/84 20:00 834 32 1. 60 1. 60 29 10/08/84 22:00 835 32 1. 60 1. 60 29 l. i 10/08/84 00:00 836 32 1. 60 1. 60 29 DAit.. Y AVERAGE YALVES ,..._ 1. 63 1. 63 30 ,. '• ~ • • • • - PROPOSED KINO COVE HVDROELECT PROJECT DELTA CREEK NEAR KINO COVE. ALASKA DATE TIME BYTE R.t~W DATA ·=====·= ----· -------------10/09/84 02:00 837 32 10/09/84 04:00 838 32 10/09/84 06:00 839 32 10/09/84 08:00 840 32 10/09/84 10:00 841 32 10/09/84 12:00 842 33 05/02/85 PAGE 52 START TIME 05/09/84 02:00 DEPTH STAGE DISCHO FEET FEET CFS -----------==·==· 1. 60 1. 60 29 1. 60 1. 60 29 1. 60 1. 60 29 1. 60 1. 60 29 l. 60 1. 60 29 1. 65 1. 65 31 PROPOSED KING COVE HYDROELECTRIC PROJEC 05/08/85 PAGE 1 DELTA CREEK NEAR KING COVE,ALASKA START TIME 10/10/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ---------=·--==== ====••=;;== =·==== ===== ====== 10/10/84 02:00 1 32 1. 60 1. 60 29 10/10/84 04:00 2 32 1. 60 1. 60 29 10/10/84 06:00 3 32 1. 60 1. 60 29 10/10/84 08:00 4 32 1. 60 1. 60 29 10/10/84 10:00 5 32 1. 60 1. 60 29 10/10/84 12:00 6 31 1. 55 1. 55 27 10/10/84 14:00 7 32 1. 60 1. 60 29 10/10/84 16:00 8 31 1. 55 1 55 27 10/10/84 18:00 9 32 1. 60 1. 60 29 10/10/84 20:00 10 31 1. 55 1. 55 27 10/10/84 22:00 11 31 1. 55 1. 55 27 10/10/84 00:00 12 31 1. 55 1. 55 27 DAILY AVERAGE VALUES 1. 58 1. 58 28 i i 10/11/84 02:00 13 31 1. 55 1. 55 27 1(' 10/11/84 04:00 14 31 1. 55 1. 55 27 10/11/84 06:00 15 31 1. 55 1. 55 27 10/11/84 08:00 16 31 1. 55 1. 55 27 :,, 10/11/84 10:00 17 31 1. 55 1. 55 27 10/11/84 12: 00 18 31 1. 55 1. 55 27 10/11/84 14:00 19 31 1. 55 1. 55 27 10/11/84 to· oo 20 31 1. 55 1. 55 27 10/11/84 18: 00 21 31 1. 55 1. 55 27 10/11/84 20:00 22 31 1. 55 1. 55 27 10/11/84 22:00 23 31 1. 55 1 55 27 10/11/84 00: 00 24 31 1. 55 1. 55 27 DAILY AVERAGE VALUES 1 55 1. 55 27 1o,ma4 02:00 25 31 1. 55 1. 55 27 t0/t2/84 04:00 26 31 1. 55 1. 55 27 10/12/84 06:00 27 31 1. 55 1. 55 27 10/12/84 08:00 28 31 1. 55 1. 55 27 10/12/84 10:00 29 31 1. 55 1. 55 27 f\P, 10/12/84 12:00 30 31 1. 55 1. 55 27 '.,I 10/12/84 14:00 31 32 1. 60 1. 60 29 I 10/12/84 16:00 32 32 1. 60 1. 60 29 10/12/84 18:00 33 32 1. 60 1. 60 29 I 10/12/84 20:00 34 31 1. 55 1. 55 27 ~0~ [. 10/12/84 22:00 35 31 1. 55 1. 55 27 10/12/84 00:00 36 31 1. 55 1. 55 27 ~" DAILY AVERAGE VALUES 1. 56 1. 56 28 ! ~ " • ~ % ~Nu~OS~u ~ING ~ubE h•u~OEL~~~~IC r"bJEL <..~ J8/£_ 1 PA __ DELTA CREEK NEAR KING COVE.ALASKA START TIME 10/10/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ::=:!:!J!:!!!e:ll:::'!!:!!.:=: ===== ::::=~= ======:::::::= ====:~ ===== ====== 10/13/84 02:00 ~17 31 1. 55 1. 55 27 10/13/84 04:00 38 31 1. 55 1. 55 27 10/13/84 06:00 39 31 1. 55 1. 55 27 10/13/84 08:00 40 31 1. 55 1 55 27 10/13/84 10:00 41 31 1. 55 1. 55 27 10/13/84 12:00 42 31 1. 55 1. 55 27 10/13/84 14:00 43 31 1. 55 1. 55 27 10/13/84 16:00 44 31 1. 55 1. 55 27 10/13/84 18:00 45 31 1. 55 1. 55 27 10/13/84 20:00 46 31 1. 55 1. 55 27 10/13/84 22:00 47 31 1. 55 1 55 27 10/13/84 00:00 48 31 1. 55 1. 55 27 DAILY AVERAGE VALUES 1. 55 1. 55 27 10/14/84 02:00 49 31 1. 55 1. 55 27 10/14/84 04:00 50 31 1. 55 t. 55 27 10/14/84 06:00 51 31 1. 55 1. 55 27 10/14/84 08:00 52 31 1. 55 1. 55 27 10/14/84 10:00 53 30 1. 50 1. 50 25 10/14/84 12:00 54 30 1. 50 1. 50 25 10/14/84 14:00 55 30 1. 50 1. 50 25 10/14/84 16:00 56 30 1. 50 1. 50 25 10/14/84 18:00 57 31 1. 55 t. 55 27 10/14/84 20:00 58 30 1. 50 1. 50 25 10/14/84 22:00 59 30 1. 50 1. 50 25 10/14/84 00:00 60 30 1. 50 1. 50 25 DAILY AVERAGE VALUES 1. 52 1. 52 26 10/1&184 02:00 61 30 1. 50 1. 50 25 10/15/84 04:00 62 30 1. 50 1. 50 25 10/15/84 06:00 63 30 1. 50 1. so 25 10/15/84 08:00 64 30 1. 50 1. 50 25 10/15/84 10:00 65 30 1. 50 1. 50 25 10/15/84 12:00 66 30 1. 50 1. 50 25 10/15/84 14:00 67 30 1. 50 1. 50 25 10/15/84 16:00 68 30 1. 50 1. 50 25 10/15/84 18:00 69 30 1. 50 1. 50 25 10/15/84 20:00 70 30 1. 50 1. 50 25 10/15/84 22:00 71 30 1. 50 1. 50 25 10/15/84 00:00 72 30 1. 50 1. 50 25 ' ' DAILY AVERAGE VALUES 1. 50 L 50 25 i : i ' i ..• ! . PRO~OSED KING co'vE HYohoELt:.L fR Ic PHb.JEL VJt b8/b,J PA.,,_ .J DELTA CREEK NEAR KING COVE.ALASKA START TIME 10/10/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ssss===~ "!':!=::S:BStS ===!IJ" =========::-=: =-===·= :::;:;:::::::== ====== 10/16/84 02:00 73 30 1. 50 1. 50 25 10/16/84 04:00 74 30 1. 50 1. 50 25 10/16/84 06:00 75 30 1. 50 1. 50 25 10/16/84 08:00 76 30 1.50 1. 50 25 10/16/84 10:00 77 30 1. 50 1. 50 25 10/16/84 12:00 78 29 1. 45 1.. 45 23 10/16/84 14:00 79 30 1. 50 1. 50 25 10/16/84 16:00 80 30 1. 50 1.. 50 25 10/16/84 18:00 81 30 1. 50 1. 50 25 10/16/84 20:00 82 30 1. 50 1. 50 25 10/16/84 22:00 83 30 1. 50 1. 50 25 10/16/84 00:00 84 30 1 50 1 .. 50 25 DAILY AVERAGE VALUES 1. 50 1. 50 • ., <; ""-- 10/17/84 02:00 85 30 1. 50 1. 50 25 10/17/84 04:00 86 30 1. 50 1. 50 25 10/17/84 06:00 87 30 1. 50 1. 50 25 10/17/84 08:00 88 30 1. 50 1. 50 25 10/17/84 10:00 89 30 1. 50 1. 50 25 10/17/84 12:00 90 30 1. 50 1. 50 25 10/17/84 14:00 91 30 1. 50 L 50 25 10/17/84 16:00 92 31 1. 55 1. 55 27 10/17/84 18:00 93 30 1. 50 1. 50 25 10/17/84 20:00 94 30 1. 50 1. 50 25 10/17/84 22:00 95 30 1. 50 1 50 25 10/17/84 00:00 96 29 1. 45 1. 45 23 DAILY AVERAGE VALUES 1. 50 1. 50 25 10/19/84 02:00 97 30 1. 50 1. 50 25 10/18/84 04:00 98 29 1. 45 1 45 2:3 10/18/84 06:00 99 29 1 45 1. 45 23 10/18/84 08:00 100 29 1. 45 1. 45 23 10/18/84 10:00 101 29 1. 45 1. 45 23 10/18/84 12:00 102 29 1. 45 1. 45 23 10/18/84 14:00 103 29 1. 45 1. 45 23 10/18/84 16:00 104 29 1. 45 1. 45 23 10/18/84 18:00 105 29 1. 45 1 45 23 10/18/84 20:00 106 29 1. 45 1. 45 23 10/18/84 22:00 107 29 1. 45 1. 45 23 10/18/84 00:00 108 29 1. 45 1. 45 23 DAILY AVERAGE VALUES 1. 45 1. 45 23 PRU~OSE.u lo\iiNG ~..u{!E nruJOELc::.'-~~ IC '"'hJE<.. ! L~, Jet£ .. I PA __ > DELTA CREEK NEAR KING COVE,ALASKA START TIME 10/10/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ==~== ::::::::=:= ========= ====== ===== ====== 10/19/84 02:00 109 29 1. 45 1. 45 23 10/19/84 04·00 110 29 1. 45 1. 45 2:3 10/19/84 06:00 111 29 1. 45 1. 45 23 10/19/84 08:00 112 28 1. .40 1. 40 21 10/19/84 10:00 113 29 1. 45 145 23 10/19/84 12:00 114 28 1. 40 1. 40 21 10/19/84 14:00 115 29 1. 45 1. 45 23 10/19/84 16:00 116 28 1. 40 1. 40 21 10/19/84 18:00 117 29 1. 45 1. 45 23 10/19/84 20:00 118 29 1. 45 1. 45 23 10/19/84 22:00 119 28 1. 40 1. 40 21 10/19/84 00:00 120 29 1. 45 1. 45 23 DAILY AVERAGE VALUES 1. 43 1 43 22 10/20/84 02:00 121 28 1. 40 1. 40 21 10/20/84 04:00 122 28 1. 40 1. 40 21 10/20/84 06:00 123 28 1. 40 1. 40 21 10/20/84 08:00 124 28 1. 40 1. 40 21 10/20/84 10:00 125 28 1. 40 1. 40 21 10/20/84 12:00 126 28 1. 40 1. 40 21 10/20/84 14:00 127 28 1. 40 1. 40 21 10/20/84 16:00 128 28 1. 40 1. 40 21 10/20/84 18:00 129 28 1. 40 1 40 21 10/20/84 20:00 130 28 1 40 1. 40 21 10/20/84 22:00 131 28 1. 40 1. 40 21 10/20/84 00:00 132 28 1. 40 1. 40 21 DAILY AVERAGE VALUES 1 40 1. 40 21 10/21/84 02:00 133 28 1. 40 1. 40 21 10/21184 04:00 134 28 1. 40 1. 40 21 10/21/84 06:00 135 28 1. 40 1. 40 21 10/21/84 08:00 136 28 1. 40 1. 40 21 10/21/84 10:00 137 28 1. 40 1. 40 21 10/21/84 12:00 138 28 1. 40 1. 40 21 10/21184 14: 00 139 28 1. 40 1. 40 21 10/21184 16: 00 140 29 1 45 1. 45 23 10/21/84 18:00 141 28 1. 40 1. 40 21 10/21/84 20:00 142 28 1. 40 1. 40 21 10/21/84 22:00 143 27 1. 35 1 35 19 10/21/84 00:00 144 27 1. 35 1. 35 19 DAILY AVERAGE VALUES 1. 40 1. 40 21 1-'Ku)OSE.v "'jiNG ..... ...,bE ~., •. JOEL ... "'.~ IC ... .!JJEt. l iSlE i PA DELTA CREEK NEAR KING COVE,ALASKA START TIME 10/10/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS --===··== --==== ==== ::::s:===-===== s•===• c==•= ====== 10/22/84 02:00 145 28 1. 40 1. 40 21 10/22/84 04:00 146 27 1. 35 1. 35 19 10/22/84 06:00 147 28 1. 40 1. 40 21 10/22/84 08:00 148 28 1.40 1. 40 21 10/22/84 10:00 149 28 1 40 1. 40 21 10/22/84 12:00 150 28 1. 40 1. 40 21 10/22/84 14:00 151 29 1. 45 1. 45 23 10/22/84 16:00 152 28 1.40 1. 40 21 10/22/84 18:00 153 29 1. 45 1. 45 23 10/22/84 20:00 154 28 1. 40 1. 40 21 10/22/84 22:00 155 28 1.40 1. 40 21 10/22/84 00:00 156 28 1. 40 1. 40 21 DAILY AVERAGE VALUES 1. 40 1. 40 21 10/23/84 02:00 157 28 1. 40 1. 40 21 10/23/84 04:00 158 28 1. 40 1. 40 21 10/23/84 06:00 159 28 1. 40 1. 40 21 10/23/84 08:00 160 28 1. 40 1. 40 21 10/23/84 10:00 161 28 1. 40 1. 40 21 10/23/84 12:00 162 28 1. 40 1. 40 21 10/23/84 14:00 163 28 1. 40 1. 40 21 10/:23/84 16:00 164 28 1. 40 1. 40 21 10/23/84 18:00 165 28 1. 40 1. 40 21 10/23/84 20:00 166 28 1. 40 1. 40 21 10/23/84 22:00 167 28 1. 40 1. 40 21 10/23/84 00:00 168 28 1. 40 1. 40 21 DAILY AVERAGE VALUES 1. 40 1. 40 21 10/24184 02:00 169 28 1. 40 1. 40 21 10/24/84 04:00 170 28 1.40 140 21 10/24/84 06:00 171 28 1.40 1. 40 21 10/24/84 08:00 172 28 1. 40 1. 40 21 10/24/84 10:00 173 28 1. 40 1. 40 21 10/24/84 12:00 174 28 1. 40 1. 40 21 10/24/84 14:00 175 28 1. 40 1. 40 21 10/24/84 16:00 176 28 1. 40 1. 40 21 10/24/84 18:00 177 29 1. 45 1. 45 23 10/24/84 20:00 178 29 1. 45 1. 45 23 10/24/84 22:00 179 28 1. 40 1. 40 21 10/24/84 00:00 180 28 1. 40 1. 40 21 DAILY AVERAGE VALUES 1. 41 1. 41 21 ' l I i i .• ;t v.J,b8tLw i ~Nu~OS~u ~ING ~uVE HYuAOEL~~•RlC ~NOJE~ PA,.,c. .... DELTA CREEK NEAR KING COVE, AL.ASio<.A START TIME 10/10/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ==::=:=::=~ :::==~= ::==== ========== ====-=== ===== ====:::::= 10/25/84 02:00 181 28 1. 40 L 40 21 10/25/84 04:00 182 28 1. 40 1. 40 21 10/2~/84 06:00 183 28 1. 40 1. 40 21 10/25/84 08:00 184 28 1. 40 L 40 21 10/25/84 10:00 185 28 1. 40 1. 40 21 10/2~/84 12:00 186 27 1. 35 1. 35 19 10/25/84 14:00 187 27 1. 35 1. 35 19 10/25/84 16:00 188 28 1. 40 1. 40 21 10/25/84 18:00 189 28 1. 40 1. 40 21 10/25/84 20:00 190 28 1. 40 1. 40 21 10/25/84 22:00 191 27 1. 35 1. 35 19 10/25/84 00:00 192 27 1. 35 1 35 19 DAILY AVERAGE VALUES 1. 38 1. 38 20 10/26/84 02:00 193 27 1.35 1. 35 19 10/26/84 04:00 194 27 1. 35 1. 35 19 10/26/84 06:00 195 27 1. 35 1. 35 19 10/26/84 08:00 196 27 1. 35 1. 35 19 10/26/84 10:00 197 27 1. 35 1. 35 19 10/26/84 12:00 198 27 1. 35 1. 35 19 10/26/84 14:00 199 27 1. 35 1. 35 19 10/26/84 16: 00 . 200 27 1.35 1. 35 19 10/26/84 18:00 201 28 1. 40 1. 40 21 10/26/84 20:00 202 28 1. 40 1. 40 21 10/26/84 22:00 203 28 1. 40 1. 40 21 10/26/84 00:00 204 28 1. 40 1. 40 21 DAILY AVERAGE VALUES 1. 37 1. 37 20 10/27/84 02:00 205 28 1. 40 1. 40 21 10/21/84 04:00 206 28 1. 40 1. 40 21 10/27/84 06:00 207 28 1. 40 1. 40 21 10/27/84 08:00 208 28 1. 40 1. 40 21 10/27/84 10:00 209 29 1. 45 1. 45 23 10/27/84 12:00 210 29 1. 45 1. 45 23 10/27/84 14:00 211 29 1. 45 1. 45 23 10/27/84 16:00 212 29 L 45 1. 45 23 10/27/84 18:00 213 29 1. 45 1. 45 23 10/27/84 20:00 214 30 1. 50 1. 50 25 10/27/84 22:00 215 30 1 50 1. 50 25 10/27/84 00:00 216 31 1. 55 1. 55 27 DAILY AVERAGE VALUES 1. 45 1. 45 23 ~ ~ ,., I 1-"urlost...., .JING ...... )JE t,, "'~OEL-~ .tR IC .. JJJEt. i ' ietE PA--,, - DELTA CREEK NEAR KING COVE, ALASI.(A START TIME 10/10/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS •••••••' •m.,•• :IU!DS::V ::=::::as==r:csu=: =·=-== ====== ====== 10/28/84 02:00 217 31 1. 55 1. 55 27 10/28/84 04:00 218 31 1. 55 1. 55 27 10/28/84 06:00 219 30 1. 50 1. 50 25 10/28/84 08:00 220 30 1. 50 L 50 25 10/28/84 10:00 221 31 1. 55 1. 55 27 10/28/84 12:00 222 31 1. 55 1. 55 27 10/28/84 14:00 223 30 1. 50 1. 50 25 10/28/84 16:00 224 31 1. 55 L 55 27 10/28/84 18:00 225 30 1. 50 1. 50 25 10/28/84 20:00 226 30 1. 50 1. 50 25 10/28/84 22:00 227 30 1. 50 1. 50 25 10/28/84 00:00 228 29 1. 45 1. 45 23 DAILY AVERAGE VALUES 1. 52 152 26 10/29/84 02:00 229 29 1. 45 1. 45 23 10/29/84 04:00 230 29 1. 45 1. 45 23 10/29/84 06:00 231 29 1. 45 1. 45 23 10/29/84 08:00 232 29 1. 45 1. 45 23 10/29/84 10:00 233 28 1. 40 1. 40 21 10/29/84 12:00 234 29 1. 45 1. 45 23 10/29/84 14:00 235 28 1. 40 1. 40 21 10/29/84 16:00 236 29 1. 45 1. 45 23 10/29/84 18:00 237 30 1. 50 1 50 25 10/29/84 20:00 238 33 1. 65 1. 65 31 10/29/84 22:00 239 41 2.05 2, 05 53 10/29/84 00:00 240 49 2.45 2. 45 81 DAILY AVERAGE VALUES 1. 60 1. 60 31 10/30194 02:00 241 55 2.75 2. 75 107 10/30/84 04:00 242 62 3. 10 3. 10 1.42 10/30/84 06:00 243 62 3. 10 3 10 142 10/30/84 08:00 244 62 3. 10 3. 10 142 10/30/84 10:00 245 62 3. 10 3. 10 142 10/30/84 12:00 246 66 3.30 3. 30 165 10/30/84 14:00 247 62 3. 10 3. 10 142 10/30/84 16:00 248 59 2.95 2.95 126 10/30/84 18:00 249 57 2.85 2. 85 116 10/30/84 20:00 250 53 2.65 2.65 98 10/30/84 22:00 251 58 2.90 2. 90 121 10/30/84 00:00 252 60 3.00 3.00 131 DAILY AVERAGE VALUES 2.99 2. 99 131 • I i f ~ I "'""'ilQSL ... HNG ~-VE ' .. V,OEL--.fR IC .. bJE I b8/f. j PI· DELTA CREEK NEAR KING COVE.ALASKA START TIME 10/10/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =====:== ===::= ===== =======-== ====== ====== ======== 10/31/84 02:00 253 61 3.05 3.05 137 10/31/84 04:00 254 58 2.90 2. 90 121 10/31/84 06·00 255 55 2. 75 2. 75 107 10/31/84 08:00 256 53 2.65 2.65 98 10/31/84 10:00 257 51 2.55 2. 55 89 10/31/84 12:00 258 51 2 55 2. 55 89 10/31/84 14:00 259 51 2. 55 2. 55 89 10/31/84 16:00 260 51 2. 55 2. 55 89 10/31/84 18:00 261 51 2. 55 2. 55 89 10/31/84 20:00 262 53 2.65 2 65 98 10/31/84 22:00 263 52 2. 60 2. 60 93 10/31/84 00:00 264 52 2.60 2.60 93 DAILY AVERAGE VALUES 2.66 2 66 99 11/01184 02: 00 265 51 2.55 2. 55 89 11/01/84 04:00 266 50 2. 50 2. 50 BS 11/01/84 06:00 267 50 2. 50 2. 50 85 11101184 08: 00 268 50 2. 50 2. 50 85 11/01/84 10: 00 269 50 2. 50 2. 50 85 11/01184 12:00 270 51 2. 55 2. 55 89 11/01/84 14:00 271 50 2. 50 2. 50 85 11/01/84 16: 00 272 50 2. 50 2. 50 85 11/01/84 18:00 273 49 2.45 2. 45 81 11/01/84 20•00 274 49 2. 45 2.45 81 11/01/84 22:00 275 47 2. 35 2. 35 73 11101/84 00:00 276 45 2.25 2. 25 66 DAILY AVERAGE VALUES 2. 47 2. 47 82 11/0~/84 02:00 277 44 2.20 2.20 63 1110~/84 04: 00 278 43 2. 15 2. 15 59 11/02/84 06:00 279 43 2. 15 2. 15 59 11/02/84 08:00 280 42 2. 10 2. 10 56 11/02/84 10:00 281 41 2.05 2.05 53 11/02/84 12:00 282 41 2.05 2.05 53 11102/84 14: 00 283 41 2.05 2. 05 53 11/02/84 16: 00 284 40 2. 00 2. 00 50 11/02/84 18:00 285 40 2.00 2. 00 50 11/02/84 20:00 286 40 2.00 2.00 50 11/02/84 22:00 287 39 1. 95 i. 95 47 11/02/84 00:00 288 39 1. 95 1. 95 47 DAILY AVERAGE VALUES 2.05 2.05 53 i nurLOSE..u ,JrNi; -.u~E i .... JoEL ... ~ .~iC , .. bJEt. !. ' . 18/E -I PA DELTA CREEK NEAR KING COVE.ALASKA START TIME 10/10/84 02·00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ••••••== •=•a• ==== :a===·==== ====== ===== ====== 11/03/84 02:00 289 38 1. 90 1. 90 44 11/03/84 04:00 290 38 1. 90 1. 90 44 11/03/84 06:00 291 38 1. 90 1. 90 44 11/03/84 08:00 292 39 1. 90 1 90 44 11/03/84 10:00 293 37 1. 85 1. 85 41 11/03/84 12:00 294 37 1. 85 1. 85 41 11103/84 14: 00 295 37 1. 85 1. 85 41 11/03/84 16: 00 296 37 1. 85 1. 85 41 11/03/84 18:00 297 37 1. 85 1. 85 41 11/03/84 20:00 298 37 1. 85 1. 85 41 11/03/84 22:00 299 37 1. 85 1. 85 41 11/03/84 00:00 300 36 1. 80 1. 80 39 DAILY AVERAGE VALUES 1. 86 1. 86 42 11/04/84 02: 00 301 36 1. 80 1. 80 39 11/04/84 04:00 302 36 1. 80 1. 80 39 11/04/84 06: 00 303 36 1. 80 1. 80 39 11/04/84 08:00 304 36 1. 80 i. 80 39 11/04/84 10:00 305 36 1. eo 1. 80 39 11/04/84 12: 00 306 37 L 85 1 85 41 11/04/84 14:00 307 37 1. 85 i. 85 41 11/04/84 16: 00 308 40 2.00 2. 00 50 11/04/84 18:00 309 38 1. 90 1. 90 44 11/04/84 20:00 310 37 1. 85 1. 85 41 11/04/84 22: 00 311 37 1. 85 1. 85 41 11/04/84 00: 00 312 37 1. 85 1. 85 41 DAILY AVERAGE VALUES 1. 85 1. 85 41 11/05/84 02:00 313 37 1. 85 1. 85 41 11/05/84 04:00 314 37 1. 85 1. 85 41 11/05/84 06:00 315 37 1. 85 i. 85 41 11/05/84 08:00 316 36 1. 80 1. 80 39 11/05/84 10:00 311 36 1. 80 1. 80 39 11/05/84 12:00 318 35 1. 75 1. 75 36 11105/84 14:00 319 35 1.75 1. 75 36 11/05/84 16: 00 320 35 1. 75 1. 75 36 11/05/84 18:00 321 35 1. 75 1. 75 36 11/05/84 20:00 322 35 1. 75 1. 75 36 11/05/84 22:00 323 35 1. 75 1. 75 36 11/05/84 00: 00 324 35 1. 75 1. 75 36 DAILY AVERAGE VALUES 1. 78 1. 78 38 i-'twJOSE.u "iiNG ~-.u~E h, ,JOELc::.." .~ IC rnbJEt. ! c ... JetE... i PA __ i 1 DELTA CREEK NEAR KING COVE,ALASKA START TIME 10/10/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ====~=~:!!: ===::== :::o::== ========·~ ====== ===== ::=:::::t:;.:::=: 11106/84 02: 00 325 35 1. 75 1.75 36 11/06/84 04: 00 326 34 1. 70 1 70 34 11/06/84 06:00 327 34 1. 70 1. 70 34 11/06/84 08:00 328 34 1.70 1. 70 34 11/06/84 10:00 329 34 1. 70 1. 70 3<J 11106/84 12: 00 330 34 1. 70 1. 70 34 11/06/84 14:00 331 34 1. 70 1. 70 34 11/06/84 16:00 332 34 1. 70 1. 70 34 11/06/84 18: 00 333 34 1. 70 1. 70 34 11106/84 20: 00 334 34 1. 70 1. 70 34 11/06/84 22: 00 335 34 1. 70 1. 70 34 t 1106/84 00: 00 336 34 1. 70 1. 70 34 DAILY AVERAGE VALUES 1. 70 1. 70 34 11/07/84 02:00 337 33 1. 65 1 65 31 11/07/84 04: 00 338 33 1. 65 1. 65 31 11/07/84 06:00 339 33 1. 65 1. 65 31 11/07/84 08:00 340 33 1. 65 1. 65 31 11/07/84 10:00 341 33 1. 65 1. 65 31 11/07/84 12:00 342 33 1. 65 1. 65 31 11/07/84 14:00 34:3 33 1. 65 1. 65 31 11/07/84 16: 00 344 33 1. 65 1. 65 31 11/07/84 18:00 345 33 1. 65 1. 65 31 11/07/84 20:00 346 33 1. 65 1. 65 31 11/07/84 22:00 347 32 1. 60 1. 60 29 11/07/84 00:00 348 32 1. 60 1. 60 29 DAILY AVERAGE VALUES 1. 64 1. 64 31 11108JEI4 02:00 349 32 1. 60 1. 60 29 11/oStS4 04:00 350 32 1. 60 1 60 29 11/08/84 06:00 351 32 1. 60 1. 60 29 11/08/84 08:00 352 32 1. 60 1. 60 29 11/08/84 10:00 353 32 1. 60 1. 60 29 11/08/84 12: 00 354 32 1. 60 1. 60 29 11/08/84 14:00 355 32 1. 60 1. 60 29 11/08/84 16:00 356 32 1. 60 1. 60 29 11/08/84 18:00 357 32 1. 60 1. 60 29 11/08/84 20: 00 358 32 1. 60 1. 60 29 11/08/84 22:00 359 32 1. 60 1. 60 29 11/08/84 00:00 360 31 1. 55 1. 55 27 DAILY AVERAGE VALUES 1. 60 1. 60 29 PROJOSE.U K!ING t;U~E HYuJoELt:.t: I IC 1-'ttO.JEl. t.~cu J8/b:J ' PA~:rc:. 1 .. DELTA CREEK NEAR KING COVE.ALASKA START TIME 10/10/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS -·=-•••m=:w =-=··· ':':::=== ••-==u=•== ======·-===::== ====== 11/09/84 02:00 361 31 1. 55 1. 55 27 11/09/84 04:00 362 31 1. 55 1 55 27 11/09/84 06:00 363 31 1. 55 1. 55 27 11/09/84 08: 00 364 32 1.60 1. 60 29 11/09/84 10:00 365 32 1. 60 1. 60 29 11/09/84 12:00 366 32 1. 60 1. 60 29 11/09/84 14:00 367 32 1. 60 1. 60 29 11/09/84 16:00 368 32 1. 60 1. 60 29 11/09/84 18:00 369 32 1. 60 1. 60 29 11/09/84 20:00 370 31 1. 55 1. 55 27 11/09/84 22: 00 371 31 1. 55 1. 55 27 11/09/84 00:00 372 31 1. 55 i. 55 27 DAILY AVERAGE VALUES 1. 58 1. 58 28 11/10/84 02: 00 373 31 1. 55 1. 55 27 11/10/84 04:00 374 3t 1. 55 1 55 27 11/10/84 06:00 375 31 1. 55 1. 55 27 11/10/84 08:00 376 31 1. 55 1. 55 27 11/10/84 10:00 377 31 1. 55 1. 55 27 11/10/84 12:00 378 31 1. 55 1. 55 27 11/10/84 14:00 379 31 1. 55 1. 55 27 11/10/84 16:00 380 31 1. 55 1. 55 27 11/10/84 18:00 381 31 1. 55 1. 55 27 11/10/84 20:00 382 31 1. 55 1. 55 27 11/10/84 22:00 383 31 1. 55 1. 55 27 11/10/84 00:00 384 31 1. 55 1. 55 27 DAILY AVERAGE VALUES 1. 55 1. 55 27 11/11/84 02:00 385 30 1. 50 1. 50 25 11/11/84 04:00 386 30 1. 50 1. 50 25 11/11/84 06:00 387 31 1. 55 1.. 55 27 11/11/84 08:00 388 30 1. 50 1. 50 25 11111/84 10:00 389 31 1. 55 1. 55 27 11/11/84 12: 00 390 30 1. 50 1. 50 25 11/11/84 14: 00 391 31 1. 55 1. 55 27 11/11/84 16:00 392 31 1. 55 1 55 27 11/11/84 18:00 393 31 1. 55 1. 55 27 11/11/84 20:00 394 31 1. 55 1. 55 27 11111/84 22: 00 395 31 1. 55 1. 55 27 11/11/84 00: 00 396 32 1. 60 1. 60 29 DAILY AVERAGE VALUES 1. 54 1. 54 27 • ! f • i t-"u,60SE:.~..~ "'ING ..,.u'./E I, ,_,.~DEL ....... .iR I C , "DJEt.. l. ... J8/( .. l PA _ 1 DELTA CREEK NEAR KII\IG COVE, ALASKA START TIME 10/10/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ===:==== ::=::::::=== :::.:::::-:::::= ===~!:=::=:=: ====== ===:::::-::::; ====-== 11/12/84 02:00 397 :)2 1. 60 1. 60 29 11/12/84 04:00 398 34 1. 70 1. 70 34 11/12/84 06:00 399 35 L 75 1. 75 36 11/12/84 08:00 400 36 1. 80 1. 80 39 11/12/84 10: 00 401 38 1. 90 1. 90 44 11112/84 12: 00 402 39 1. 95 1 95 47 11/12/84 14:00 403 39 1. 95 1. 95 47 11/12/84 16:00 404 36 1. 80 1. 80 39 11/12/84 18:00 405 35 1. 75 1. 75 36 11/12/84 20:00 406 34 1. 70 1. 70 34 11112/84 22:00 407 34 1. 70 1. 70 34 11/12/84 00:00 408 33 1. 65 1. 65 31 DAILY AVERAGE VALUES 1. 77 1 77 38 11/13/84 02:00 409 33 1. 65 1. 65 31 11/13/84 04:00 410 33 1. 65 1. 65 31 11/13/84 06:00 411 33 1. 65 1. 65 3t 11/13/84 08:00 412 33 1. 65 1. 65 31 11/13/84 10:00 413 36 1. 80 1. 80 39 11/13/84 12:00 414 39 1. 95 1. 95 47 11/13/84 14:00 415 41 2.05 2.05 53 11/13/84 16: 00 416 43 2. 15 2. 15 59 11/13/84 18:00 417 44 2.20 2.20 63 11/13/84 20:00 418 43 2. 15 2. 15 59 11/13/84 22: 00 419 41 2.05 2.05 53 11/13/84 00: 00 420 40 2. 00 2.00 so DAILY AVERAGE VALUES 1. 91 1. 91 46 11114/84 02: 00 421 39 1. 95 1. 95 47 11/14194 04:00 422 39 1. 95 1. 95 47 11114/84 06: 00 423 38 1. 90 1. 90 44 11/14/84 08:00 424 39 1. 95 195 47 11/14/84 10:00 425 41 2.05 2.05 53 11/14/84 12:00 426 40 2. 00 2. 00 50 11/14/84 14:00 427 41 2.05 2.05 53 11/14/84 16:00 428 42 2. 10 2. 10 56 11114/84 18:00 429 44 2.20 2.20 63 11/14/84 20:00 430 46 2. 30 2. 30 70 11/14/84 22:00 431 43 2. 15 2. 15 59 11/14/84 00:00 432 41 2.05 2.05 53 DAILY AVERAGE VALUES 2.05 2.05 54 i I I k i . i PROPOSED KING COVE HYO OELEG tR IC r'HOJEt; 1 I.J:.Jtb8/b,J ' p(......,c 1 .... DELTA CREEK NEAR KING COVE,ALASKA START TIME 10/10/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS !llmt=esma• CDC'!II:B az::::::l::: ====s==== ======= ===== ======= 11115/84 02: 00 433 40 2.00 2. 00 50 11115/84 04: 00 434 39 1. 95 1. 95 47 11/15/84 06:00 435 38 1. 90 1. 90 44 11/15/84 08:00 436 3Y 1. 95 1. 95 47 11/15/84 10:00 437 39 1. 95 1. 95 47 11/15/84 12:00 438 40 2.00 2.00 50 11/15/84 14:00 439 40 2.00 2.00 50 11/15/84 16:00 440 39 1. 95 1. 95 47 11115/84 18:00 441 39 1.95 1. 95 47 11/15/84 20:00 442 39 1. 95 i. 95 47 11/15/84 22:00 443 38 1. 90 1. 90 44 11/15/84 00: 00 444 38 1. 90 1. 90 44 DAILY AVERAGE VALUES 1. 95 1. 95 47 11/16/84 02:00 445 37 1. 85 1 85 41 11/16/84 04: 00 446 37 1. 85 1. 85 41 11116/84 06:00 447 37 1. 85 1. 85 41 11116/84 08:00 448 38 1. 90 1. 90 44 11/16/84 10:00 449 39 1. 95 1. 95 47 11/16/84 12:00 450 38 1. 90 1. 90 44 11/16/84 14:00 451 38 1. 90 1. 90 44 11/16/84 16: 00 452 38 1. 90 1. 90 44 11/16/84 18:00 453 38 1. 90 1. 90 44 11/16/84 20:00 454 37 1. 85 1. 85 41 11/16/84 22:00 455 37 1. 85 1. 85 41 11/16/84 00:00 456 36 1. 80 1. 80 39 DAILY AVERAGE VALUES 1. 88 1. 88 43 11117/94 02: 00 457 36 1. 80 1. 80 39 11/17/84 04: 00 458 36 1. 80 1. 80 39 11/17/84 06: 00 459 36 1 80 1. 80 39 11/1 7/84 08: 00 460 35 1. 75 L 75 36 11117/84 10:00 461 35 1. 75 1. 75 36 11117/84 12:00 462 35 1. 75 1. 75 36 11/17/84 14:00 463 35 1. 75 1. 75 36 11/1 7/84 16: 00 464 36 1. 80 1. 80 39 11/1 7/84 1 8: 00 465 37 L 85 1. 85 41 11/17/84 20:00 466 37 1. 85 1. 85 41 11/17/84 22·00 467 37 1. 85 1. 85 41 11/17/84 00:00 468 36 1. 80 1. 80 39 DAILY AVERAGE VALUES 1. 80 1. 80 39 ~"u)os~u JING ~u~E h.v~OEL~~~~IC rnbJEL c-. 18/f.. PA_ 1 DELTA CREEK NEAR KING COVE,ALASKA START TIME 10/10/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS :!e'm:====!:!::'!:o: ===== ==== =====:=== ====== ===== ======= 11118/84 02:00 4b9 36 1. 80 1 80 39 11118184 04:00 470 35 1. 75 1. 75 36 11118184 06:00 471 35 1. 75 1. 75 36 11118184 08: 00 472 35 1. 75 1. 75 36 11118184 10: 00 473 35 1. 75 1. 75 36 11 I 18184 12: 00 474 35 1 75 1. 75 36 11118/84 14:00 475 36 1. 80 1 80 39 11118/84 16:00 476 35 1. 75 1. 75 36 11118/84 18:00 477 35 1. 75 1. 75 36 11118/84 20:00 4"78 34 1. 70 1. 70 34 11118184 22:00 479 34 1. 70 1. '70 34 11118184 00:00 480 34 1. 70 1. 70 34 DAlLY AVERAGE VALUES 1. 75 1. 75 3!J 11/19184 02: 00 481 34 1. 70 1. 70 34 11119/84 04:00 482 34 1. 70 1. 70 34 11119/84 06: 00 483 34 1. 70 1. 70 34 11119/84 08:00 484 34 1. 70 1. 70 34 11119/84 10·00 485 36 1. 80 1. 80 39 11119/84 12:00 486 40 2.00 2. 00 50 11 I 19/84 14: 00 487 41 2.05 2.05 53 11 I 19/84 16: 00 488 39 1. 95 1 95 47 11119/84 18: 00 489 38 1. 90 1. 90 44 11119/84 20:00 490 37 1. 85 1. 85 41 11/19184 22:00 491 37 1. 85 1 85 41 11/19/84 00:00 492 36 1. 80 1. 80 39 DAILY AVERAGE VALUES 1. 83 1. 83 41 11/20/84 02:00 493 36 1. 80 1. 80 39 11120/84 04:00 494 35 1. 75 1. 75 36 11/20/84 06:00 495 35 1. 75 1. 75 36 11/20/84 08: 00 496 35 1. 75 1. 75 36 11120/84 10: 00 497 35 1. 75 1. 75 36 11/20/84 12:00 498 34 1. 70 1. 70 34 11/20/84 14:00 499 34 1. 70 1. 70 34 11120184 16: 00 500 35 1. 75 1. 75 36 11/20/84 18: 00 501 34 1. 70 i. 70 34 11/20/84 20:00 502 35 1. 75 1. 75 36 ., 11/20/84 22:00 503 34 L 70 1. 70 34 I 11120/84 00:00 504 34 1. 70 1. 70 34 DAILY AVERAGE VALUES 1. 73 1. 73 35 ' t-l"fu)OSE:.u ..JING \..u~E 1., uJOELc:.." .'RIC r nDJEI... ~..._ . .ire;e..~ PA-~ L DELTA CREEK NEAR KING COVE.ALASKA START TIME 10/10/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ------== ===== =:=::::::t.= =======::::::=:::::: ======= ===== ====== 11/21/84 02:00 505 34 1. 70 1. 70 34 11/21/84 04: 00 506 34 1. 70 1. 70 34 11/21184 06: 00 507 34 1. 70 1. 70 34 11/21/84 08:00 508 33 1. 65 1. 65 31 11/21184 10: 00 509 34 1. 70 1. 70 34 11/21184 12: 00 510 33 1. 65 1. 65 31 11/21/84 14:00 511. 33 1. 65 1. 65 31 11/21184 16: 00 512 33 1. 65 1. 65 31 11/21/84 18:00 513 33 1. 65 1. 65 31 11/21/84 20:00 514 33 1. 65 1. 65 31 11/21/84 22:00 515 33 1. 65 1. 65 31 11/21/84 00:00 516 33 1. 65 1. 65 31 DAILY AVERAGE VALUES 1. 67 1. 67 32 11/22/84 02:00 517 33 1. 65 1. 65 31 11/22/84 04:00 518 33 1. 65 1 65 31 11/22/84 06:00 519 33 1. 65 1. 65 31 11/22/84 08:00 520 33 1. 65 1. 65 31 11/22/84 10: 00 521 32 1. 60 1. 60 29 11/22/84 12:00 522 31 1. 55 1. 55 27 11/22/84 14:00 523 32 1. 60 1. 60 29 11/22/84 16: 00 524 32 1. 60 1. 60 29 11/22/84 18:00 525 32 1. 60 1. 60 29 11/22/84 20:00 526 32 1. 60 1. 60 29 11/22/84 22:00 527 32 1. 60 i. 60 29 11/22/84 00:00 528 32 1. 60 1 60 29 DAILY AVERAGE VALUES 1. 61 1. 61 30 11/23/84 02:00 529 32 1. 60 1. 60 29 11/23/84 04:00 530 32 1. 60 1. 60 29 11/23/84 06:00 531 32 1 60 1. 60 29 11/23/84 08: 00 532 32 1. 60 1. 60 29 11/23/84 10: 00 533 31 1. 55 1. 55 27 11/23/84 12:00 534 31 1. 55 1. 55 27 11/23/84 14:00 535 32 1. 60 1. 60 29 11/23/84 16: 00 536 31 1. 55 1 55 27 11/23/84 18: 00 537 31 1 55 1. 55 27 11/23/84 20:00 538 31 1. 55 1. 55 27 11/23/84 22: 00 539 31 1. 55 1. 55 27 11123/84 00: 00 540 31 1. 55 1. 55 27 DAILY AVERAGE VALUES 1. 57 1. 57 28 i ; . . ' " ' t>RO~OSI:.D ~IN<.: ~..;JVE r-rvu~OELt:.d·R Il t•JOJ£.... V,.jtbBJ ... ,.. ' p,..,..,.~ L DELTA CREEK NEAR KING COVE,ALASKA START TIME 10/10/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS !l!Cl!ll:~=:s:::==e ====== :=::.=:;-:;::::::::r: =:::=:::~!!::t==== ====== ===== =:::::o::==== 11/24/84 02:00 541 31 1. 55 1. 55 27 11/24/84 04:00 542 31 1. 55 1. 55 27 11/24/84 06:00 543 31 1. 55 1. 55 27 11/24/84 08:00 544 31 1 55 1 55 27 11/24/84 10:00 545 31 1. 55 1. 55 27 11/24/84 12:00 546 31 1. 55 1. 55 27 11/24/84 14: 00 547 31 1 55 1. 55 27 11/24/84 16:00 548 31 1. 55 1 55 27 11/24/84 18:00 549 31 1. 55 1 55 27 11/24/84 20:00 550 31 1. 55 1. 55 27 11/24/84 22: 00 551 31 1. 55 1. 55 27 11/24/84 00:00 552 30 1. 50 1. 50 25 DAILY AVERAGE VALUES 1. 55 1. 55 '"17 c.. 11/25/84 02:00 553 31 1. 55 1. 55 27 11/25/84 04: 00 554 30 1. 50 1. 50 25 11/25/84 06:00 555 30 1. 50 1. 50 25 11/25/84 08:00 556 31 L 55 1. 55 27 11125/84 10: 00 557 31 1. 55 1. 55 27 11/25/84 12: 00 558 30 1. 50 1. 50 25 11/25/84 14: 00 559 30 1. 50 1. 50 25 11/25/84 16: 00 560 30 1. 50 1. 50 25 11/25/84 18: 00 561 30 1. 50 1. 50 25 11/25/84 20:00 562 30 1. 50 1. 50 25 11/25/84 22:00 563 30 1. 50 1. 50 25 11/25/84 00:00 564 30 1. 50 1. 50 25 DAILY AVERAGE VALUES 1. 51 1 51 26 11/2h/84 02:00 565 30 1. 50 1. 50 25 11/26!84 04: 00 566 30 1. 50 1. 50 25 11/26/84 06:00 567 30 1. 50 1. 50 25 11/26/84 08:00 568 30 1. 50 1. 50 25 11/26/84 10:00 569 30 1. 50 1. 50 25 11126/84 12: 00 570 30 1. 50 1. 50 25 11/26/84 14:00 571 30 1. 50 1. 50 25 11/26/84 16:00 5-,.-, lc:. 30 1. 50 1. 50 25 11/26/84 18:00 578 30 1. 50 1. 50 25 11/26/84 20:00 574 30 1. 50 1. 50 25 11/26/84 22: 00 575 31 1. 55 1. 55 27 11/26/84 oo· oo 576 32 1. 60 1. 60 29 DAILY AVERAGE VALUES 1. 51 1. 51 26 • w . . PI'<U~OSE:.u r-.iiNG 1...u~E i-1 r uJOELc::u IC rr.bJEL. ~. -· JelL-PA--i DELTA CREEK NEAR J.UNG COVE, ALAS!I,A START TIME 10/10/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS s•=='-"rm~~ :::.o=Z"••• ===== =~======!'!!' !1::21·==· ===== ====== 11/27/84 02:00 577 33 1. 65 1. 65 31 11/27/84 04:00 578 33 1 65 1. 65 31 11/27/84 06: 00 579 32 1. 60 i. 60 29 11/27/84 08:00 580 32 1. 60 1 60 29 11/27/84 10:00 581 31 1. 55 i. 55 27 11/27/84 12:00 582 31 1. 55 1 55 27 11/27/84 14:00 583 31 1. 55 1. 55 27 11/27/84 16:00 584 31 1. 55 1. 55 27 11/27/84 18:00 585 31 1 55 i. 55 27 11/27/84 20:00 586 31 1. 55 1. 55 27 11/27/84 22:00 587 31 1. 55 1. 55 27 11/27/84 00:00 588 31 1. 55 1. 55 27 DAILY AVERAGE VALUES 1. 58 1. 58 28 11/28/84 02:00 589 31 1. 55 1. 55 27 11/28/84 04:00 590 31 1. 55 1. 55 27 11/28/84 06:00 591 31 1. 55 1. 55 27 11/28/84 08:00 592 31 1..55 1. 55 27 11/28/84 10: 00 59~:1 32 1. 60 1. 60 29 11/28/84 12: 00 594 31 1. 55 1 55 27 11/28/84 14:00 595 32 1. 60 1. 60 29 11/28/84 16: 00 596 32 1. 60 1 60 29 11/28/84 18:00 597 32 1. 60 1. 60 29 11/28/84 20:00 598 32 1. 60 1. 60 29 11/28/84 22:00 599 32 1. 60 1 60 29 11/28/84 00:00 600 32 1. 60 1. 60 29 DAILY AVERAGE VALUES 1. 58 1. 58 28 11/29/84 02:00 601 32 1. 60 1. 60 29 11/29/84 04: 00 602 32 1. 60 1. 60 29 11129/84 06: 00 603 32 1. 60 1. 60 29 11/29/84 08:00 604 32 1. 60 1. 60 29 11/29/84 10:00 605 31 1. 55 1 55 27 11/29/84 12:00 606 31 1. 55 1. 55 27 11/29/84 14: 00 607 31 1. 55 1. 55 27 11/29/84 16:00 608 31 1. 55 1. 55 27 11/29/84 18:00 609 31 1. 55 1. 55 27 11129/84 20: 00 610 32 1. 60 1. 60 29 11/29/84 22: 00 611 34 170 1. 70 34 11/29/84 00:00 612 35 1. 75 1. 75 36 DAILY AVERAGE VALUES 1. 60 1. 60 29 ~ ~ I PRO~OS~u ~ING LuVE Mlu~OEL~\.. IC rNLJE\.. \.. ·" 18it-i PA .. _ L DELTA CREEK NEAR KING COVE,ALASKA START TIME 10/10i84 02 00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS e!e!!!!=:~e~= ==!!!:.=: ==;::.:::: =====!:!==:::': ======== -----====== __ ,.... __ 11/30/84 02:00 613 34 L 70 1. 70 34 11/30/84 04: 00 614 34 1. 70 1. 70 34 11130/84 06: 00 615 33 1. 65 1. 65 31 11 /30/84 08: 00 616 32 L 60 1. 60 29 11/30/84 10:00 617 32 1. 60 1. 60 29 11/30/84 12: 00 618 32 1. 60 1. 60 29 11/30/84 14:00 619 32 1. 60 1. 60 29 11/30/84 16:00 620 32 1. 60 1. 60 29 11/30/84 18:00 621 32 1. 60 1. 60 29 11/30/84 20:00 622 32 1. 60 1. 60 29 11/30/84 22:00 623 32 1. 60 1. 60 29 11/30/84 00:00 624 32 1. 60 1. 60 29 DAILY AVERAGE VALUES 1. 62 1. 62 30 12/01/84 02:00 625 31 1. 55 1. 55 27 12/01/84 04:00 626 31 1. 55 1. 55 27 12/01/84 06:00 627 31 1. 55 1. 55 27 12/01/84 08:00 628 31 1. 55 1. 55 27 12/01/84 10: 00 629 31 1. 55 1. 55 27 12/01/84 12:00 630 31 1. 55 1. 55 27 12/01/84 14:00 631 31 1. 55 1. 55 27 12/01/84 16:00 632 30 1. 50 1. 50 25 12/01/84 18:00 633 31 1. 55 1. 55 27 12/01/84 20:00 634 31 1. 55 1. 55 27 12/01184 22: 00 635 31 1. 55 1. 55 27 12/01/84 00:00 636 30 1. 50 1. 50 25 DAILY AVERAGE VALUES 1. 54 1. 54 27 12/02/84 02:00 637 31 1. 55 1. 55 27 12/02184 04:00 638 31 1. 55 1 55 27 12/02/84 06:00 639 30 1. 50 1. 50 25 12/02/84 08:00 640 30 1. 50 1. 50 25 12/02/84 10:00 641 30 1. 50 1. 50 25 12/02/84 12:00 642 30 1. 50 i. 50 25 12/02/84 14:00 643 30 1. 50 1. 50 25 12/02/84 16:00 644 30 1. 50 1. 50 25 12/02i84 18:00 645 30 1. 50 1. 50 25 12/02/84 20:00 646 30 1. 50 1. 50 25 12/02/84 22:00 647 30 1. 50 i 50 25 12/02/84 00:00 648 30 1. 50 1. 50 25 DAILY AVERAGE VALUES 1. 51 1. 51 25 r. ! f'RU~OSI:::.l..' ~ ING "'u"E nriJ~OELc.\.. i!R I C l'nb.JE"' v ·"' 118/L . ..-PA..:,_ ' 1. DELTA CREEK NEAR KING COVE.ALASKA START TIME 10/10184 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =•==s•~~ =====-::r=== ====•==== ==:==== ===== ====== 12/03/84 02:00 649 30 1. 50 L 50 25 12/03/84 04:00 650 30 1. 50 1. 50 25 12/03/84 06:00 651 30 1. 50 1. 50 25 12/03/84 08:00 652 30 t.·5o 1. 50 25 12/03/84 10:00 653 30 1. 50 1. 50 25 12/03/84 12:00 654 30 1. 50 1 50 25 12/03/84 14:00 655 30 L 50 1 50 25 12/03/84 16:00 656 30 1. 50 1. 50 25 12/03/84 18:00 657 30 1. 50 1, 50 25 12/03/84 20:00 658 30 1. 50 1. 50 25 12/03/84 22:00 659 30 1. 50 L 50 25 12/03/84 00:00 660 30 t' 50 1. 50 25 DAILY AVERAGE VALUES 1. 50 1. 50 25 12/04/84 02:00 661 30 1. 50 1. 50 25 12/04/84 04:00 662 30 1. 50 1. 50 25 12/04/84 06:00 663 30 1. 50 1. 50 25 12/04/84 08:00 664 30 L 50 1. 50 25 12/04/84 10:00 665 29 1. 45 1. 45 23 12/04/84 12:00 666 30 1. 50 1. 50 25 12/04/84 14:00 667 30 1. 50 1. 50 25 12/04/84 16:00 668 30 1 50 1. 50 25 12/04/84 18:00 669 29 1. 45 1. 45 23 12/04/84 20:00 670 29 1. 45 t. 45 23 12/04/84 22:00 671 30 1. 50 1. 50 25 12/04/84 00:00 672 30 1. 50 1. 50 25 DAILY AVERAGE VALUES 1. 49 1 49 25 12/05194 02:00 673 29 1. 45 1. 45 23 12/05/84 04:00 674 30 1. 50 1. 50 25 12/05/84 06:00 675 29 1. 45 1 45 23 12/05/84 08:00 676 29 1. 45 1. 45 23 12/05/84 10:00 677 29 1. 45 1. 45 23 12/05/84 12:00 678 29 1. 45 1. 45 23 12/05/84 14:00 679 29 1. 45 1. 45 23 12/05/84 16:00 680 28 1. 40 1. 40 21 12/05/84 18:00 681 28 1. 40 1. 40 21 12/05/84 20:00 682 28 1. 40 1. 40 21 12/05/84 22:00 683 27 1. 35 1. 35 19 12/05/84 00:00 684 27 1. 35 1. 35 19 DAILY AVERAGE VALUES 1. 43 1. 43 22 1-'t-<U~OSE:.u 1'\tiNG ..... u~E h Y uriOELt...'-' ' 1.r .... JB/£.._ IC rl"'i.JJEL PA,.'-' 2'- DELTA CREEK NEAR KING COVE, Al-ASKA START TIME 10/10/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ~=~~==== ====== ==== ::.::=====:::: ::-====== ----·-=====:: 12/06/84 02:00 685 28 1. 40 L 40 21 12/06/84 04:00 686 28 1. 40 1 40 21 12/06/84 06:00 68"7 29 1. 45 1. 45 23 12/06/84 08:00 688 29 1. 45 1. 45 23 12/06/84 10:00 689 30 1. 50 1. 50 25 12/06/84 12:00 690 30 1. 50 l 50 25 12/06/84 14:00 691 29 1. 45 t. 45 23 12/06/84 16:00 692 29 1. 45 1. 45 23 12/06/84 18:00 693 29 1 45 1. 45 23 12/06/84 20:00 694 29 1. 45 1. 45 23 12/06/84 22:00 695 29 1 45 1. 45 23 12/06/84 00:00 696 29 1. 45 1. 45 23 DAILY AVERAGE VALUES 1. 45 1. 45 23 12/07/84 02:00 697 29 1. 45 1. 45 23 12/07/84 04:00 698 30 1. 50 1. so 25 12/07/84 06:00 699 31 1. 55 1. 55 27 12/07/84 08:00 700 31 1. 55 155 27 12/07/84 10:00 701 32 1. 60 1. 60 29 12/07/84 12:00 702 34 1. 70 1. 70 34 12/07/84 14:00 703 34 1. 70 1. 70 34 12/07/84 16:00 704 32 1. 60 L 60 29 12/07/84 18:00 705 32 1. 60 1. 60 29 12/07/84 20:00 706 31 1. 55 1. 55 27 12/07/84 22:00 707 31 1. 55 1. 55 27 12/07/84 00:00 708 30 1. 50 1. 50 25 DAILY AVERAGE VALUES 1 57 1. 57 28 12/09/94 02:00 709 30 1. 50 1. 50 25 12/09/84 04:00 710 30 1. 50 1. 50 25 12/08/84 06:00 711 30 1. 50 1. 50 25 12/08/84 08:00 712 30 1. 50 1. 50 25 12/08/84 10:00 713 30 1. 50 1. 50 25 12/08/84 12:00 714 30 1. 50 1. 50 25 12/08/84 14:00 715 30 1. 50 i. 50 25 12/08/84 16:00 716 30 1. 50 1. 50 25 12/08/84 18:00 717 29 1 45 i. 45 2;3 12/08/84 20:00 718 29 1. 45 1. 45 23 12/08/84 22:00 719 29 1. 45 1. 45 23 12/08/84 00:00 720 29 1. 45 1. 45 23 DAILY AVERAGE VALUES 1. 48 1 48 24 i, I I··· ' ; i . ~ I ' PROPOSED KING COVE HYDROEL~CTRIC PROJEC 0::>/08/l:l!J PA\:11:. iil DELTA CREEK NEAR KING COVE.ALASKA START TIME 10/10/84 02.00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS :c::a::~:ua==== ====• ;.;;:;;:;;:::;z;; ;;:::.=====~:!'::" ======== ===== ====== 12/09/84 02:00 721 29 L 45 L 45 23 12/09/84 04:00 722 29 1. 45 1. 45 23 12/09/84 06:00 723 29 1. 45 1. 45 23 12/09/84 08:00 724 29 1. 45 1. 45 23 12/09/84 10:00 725 29 1. 45 1. 45 23 12/09/84 12:00 726 28 1. 40 1. 40 21 12/09/84 14:00 727 29 1. 45 1. 45 23 12/09/84 16:00 728 29 1.45 1. 45 23 12/09/84 18:00 729 28 1. 40 1 40 21 12/09/84 20:00 730 29 1. 45 1. 45 23 12/09/84 22:00 731 28 1. 40 1. 40 21 12/09/84 00:00 732 28 1. 40 1. 40 21 DAILY AVERAGE VALUES 1. 43 1. 43 22 12/10/84 02:00 733 28 1. 40 1. 40 21 12/10/84 04:00 734 29 1. 45 1. 45 23 12/10/84 06:00 735 29 1. 45 1. 45 23 12/10/84 08:00 736 30 1. 50 1. 50 25 12/10/84 10:00 737 30 1. 50 1. 50 25 12/10/84 12:00 738 30 1. 50 1. 50 25 12/10/84 14:00 739 31 1. 55 1. 55 27 12/10/84 16:00 740 31 1. 55 1. 55 27 12/10/84 18:00 741 32 1. 60 1. 60 29 12/10/84 20:00 742 32 1. 60 1. 60 29 12/10/84 22:00 743 33 1. 65 1. 65 31 12/10/84 00:00 744 33 1.65 1. 65 31 DAILY AVERAGE VALUES 1. 53 1. 53 26 12/11/84 02: 00 745 33 1. 65 1. 65 31 12/11/84 04:00 746 32 1. 60 1. 60 29 12/11/84 06: 00 747 32 1. 60 1. 60 29 12/11/84 08:00 748 31 1. 55 1. 55 27 12/11/84 10:00 749 31 1. 55 1. 55 27 12/11/84 12:00 750 31 1. 55 1. 55 27 12/11/84 14• 00 751 30 1. 50 1. 50 25 12/11/84 16: 00 752 30 1. 50 1. 50 25 12/11/84 18: 00 753 30 1. 50 1. 50 25 12/11/84 20:00 754 30 1. 50 1. 50 25 12/11/84 22:00 755 30 1. 50 1. 50 25 12/11/84 00:00 756 30 1. 50 1. 50 25 DAILY AVERAGE VALUES 1. 54 1 54 27 1-'~u)OSI:.u rJiNG ,_,)JE L n1~0EL~'"' ,~ IC , "bJEL \,,-t8/[._ PP _ 2. DELTA CREEK NEAR KING COVE, ALASf',A START TIME 10/10184 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ========= ===== :::::::::::::: =========:::"'::: ====== ===== ::::!:C:c:=== 12/12/84 02:00 757 29 L 45 1. 45 23 12/12/84 04:00 758 29 1. 45 1. 45 23 12/12/84 06:00 759 29 1. 45 1. 45 23 12/12/84 08:00 760 29 1.45 1. 45 23 12/12/84 10:00 761 29 1. 45 1. 45 23 12/12/84 12:00 762 29 1. 45 L 45 23 12/12/84 14:00 763 29 1. 45 1. 45 23 12/12/84 16:00 764 29 1. 45 L 45 23 12/12/84 18:00 765 29 1.45 1. 45 23 12/12/84 20:00 766 28 1. 40 1. 40 21 12/12/84 22:00 767 28 t' 40 1. 40 21 12/12/84 oo·oo 768 28 1. 40 1 40 21 DAILY AVERAGE VALUES 1. 44 l. 44 23 12/13/84 02:00 769 29 1. 45 1. 45 23 12/13/84 04:00 770 30 1. 50 1. 50 25 12/13/84 06:00 771 29 1. 45 1. 45 23 12/13/84 08:00 772 29 1. 45 1. 45 23 12/13/84 10:00 773 28 1. 40 L 40 21 12/13/84 12:00 774 28 1. 40 1. 40 21 12/13/84 14:00 77~ 28 1. 40 L 40 21 12/13/84 16:00 776 29 1. 45 1. 45 23 12/13/84 18:00 777 28 1. 40 1. 40 21 12/13/84 20:00 778 29 1. 45 1. 45 23 12/13/84 22:00 779 28 L 40 1. 40 21 12/13/84 00:00 780 29 1. 45 1 45 23 DAILY AVERAGE VALUES 1. 43 1. 43 22 12/14/84 02:00 781 28 1. 40 1.. 40 21 12tt4tS4 04:00 782 28 1. 40 1. 40 21 12/14/84 06:00 783 28 1. 40 i. 40 21 12/14/84 08:00 784 28 1. 40 t. 40 21 12/14/84 10:00 785 28 1. 40 1. 40 21 -12/14/84 12:00 786 28 1. 40 1. 40 21 12/14/84 14:00 787 28 1. 40 1. 40 21 12/14/84 16:00 788 28 1. 40 1. 40 21 12/14/84 18:00 789 28 1. 40 1. 40 21 12/14/84 20:00 790 29 1. 45 1. 45 23 12/14/84 22:00 791 30 1. 50 1. 50 25 12/14/84 00:00 792 31 1. 55 1. 55 27 DAILY AVERAGE VALUES 1. 43 1. 43 22 ' \_ :. l, ~ " • PRbPOSED ~ING CdVE HVDROELEChnc P~OJE.c DELTA CREEK NEAR KING COVE,ALASKA DATE TIME ---··--= ·==== 12/15/84 02:00 12/15/84 04·00 12/15/84 06:00 12/15/84 o8·oo 12/15/84 10:00 12/15/84 12:00 12/15/84 14:00 12/15/84 16:00 12/15/84 18:00 12/15/84 20:00 12/15/84 22:00 12/15/84 00:00 12/16/84 02:00 12/16/84 04:00 12/16/84 06:00 12/16/84 08:00 12/16/84 10:00 12/16/84 12:00 12/16/84 14:00 12/16/84 16:00 12/16/84 18:00 12/16/84 20:00 12/16/84 22:00 12/16/84 00:00 12/17194 02:00 12117/84 04:00 12/17/84 06:00 12/17/84 08:00 12/17/84 10:00 12/17/84 12:00 12/17/84 14:00 12/17/84 16:00 12/17/84 18:00 12/17/84 20:00 12/17/84 22:00 12/17/84 00:00 BYTE RAW DA1"A ~-=--_,..-~~~=.'!:!=-=~= 793 31 794 30 795 30 796 29 797 29 798 29 799 29 800 29 801 29 802 29 803 28 804 28 DAILY AVERAGE VALUES 805 28 806 28 807 28 808 28 809 28 810 28 811 28 812 28 813 28 814 28 815 29 816 29 DAILY AVERAGE VALUES 817 29 818 30 819 31 820 33 821 33 822 34 823 35 824 36 825 37 826 40 827 44 828 45 DAILY AVERAGE VALUES DEPTH FEET :=ec:.c=== 1. 55 1. 50 1. 50 1. 45 1. 45 1. 45 1. 45 1. 45 1. 45 1 45 1. 40 1 40 1. 46 1. 40 1. 40 1. 40 1. 40 1. 40 1. 40 1. 40 1. 40 1. 40 1. 40 1. 45 1. 45 1. 41 1. 45 1. 50 1. 55 1. 65 1. 65 1. 70 1. 75 1. 80 1. 85 2.00 2. 20 2.25 1. 78 u::-)08/ti-::1 · PHi.:Ft:. START TIME 10/10/84 STAGE FEET ===== 1 55 1. 50 1. 50 1. 45 1. 45 1. 45 1. 45 1 45 1. 45 1. 45 1 40 1. 40 1. 46 1. 40 1. 40 1. 40 1. 40 1. 40 1. 40 1. 40 1. 40 1. 40 1. 40 i. 45 1. 45 1. 41 1. 45 1. 50 1. 55 1. 65 1. 65 1. 70 1. 75 1. 80 1. 85 2. 00 2.20 2.25 1 78 DISCHG CFS ====== 27 25 25 23 23 23 23 23 23 23 21 21 23 21 21 21 21 21 21 21 21 21 21 23 2:'3 21 23 25 27 31 31 34 36 39 41 so 63 66 39 ;.;.., 02 00 ~ ~ I I ~ . PRO OSEU ~ING LU~E hru~OEL~C! lC YHbJEL i.,.J. JatL,, PA-.._ 2, DELTA CREEK NEAR KING COVE,ALAS~A START TIME 10/10/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DAT,.;.. FEET FEET CFS =m==~!!!!e~ =~=== ==::::=:= ==:===:::::.-::::: ====s= ==:=:::::::::: ::::===== 12/18/84 02:00 829 45 2.25 2.25 6o 12/18/84 04:00 830 44 2.20 2. 20 63 12/18/84 06:00 831 42 2. 10 2. 10 56 12/18/84 08:00 832 42 2. 10 2. 10 56 12/18/84 10:00 833 41 2.05 2.05 53 12/18/84 12:00 834 41 2.05 2.05 53 12/18/84 14:00 835 40 2.00 2.00 50 12/18/84 16:00 836 40 2.00 2. 00 50 12/18/84 18:00 837 39 L 95 1. 95 47 12/18/84 20:00 838 39 1. 95 1. 95 47 12/18/84 22:00 839 38 L 90 1. 90 44 12/18/84 00:00 840 38 1. 90 1. 90 44 DAILY AVERAGE VALUES 2.04 2.04 52 12/19/84 02:00 841 38 1. 90 1. 90 44 12/19/84 04:00 842 38 1. 90 1. 90 44 12/19/84 06:00 843 39 1. 95 1. 95 47 12/19/84 08:00 844 39 1. 95 1. 95 47 12/19/84 10:00 845 39 1. 95 1. 95 47 12/19/84 12:00 846 39 1. 95 1. 95 47 12/19/84 14:00 847 38 1. 90 1. 90 44 12/19/84 16·00 848 38 1. 90 1. 90 44 12/19/84 18:00 849 37 1. 85 1. 85 41 12/19/84 20:00 850 37 1. 85 1. 85 41 12/19/84 22:00 851 37 1. 85 1. 85 41 12/19/84 00:00 852 36 1. 80 1. 80 39 DAILY AVERAGE VALUES 1. 90 1. 90 44 12/20/84 02:00 853 36 1. 80 1. 80 39 12/20/84 04:00 854 36 1 80 1. 80 39 12/20/84 06:00 855 36 1. 80 1. 80 39 12/20/84 08:00 856 35 1. 75 1. 75 36 12/20/84 10:00 857 35 1. 75 1. 75 36 12/20/84 12:00 858 36 1. 80 1. 80 39 12/20/84 14:00 859 35 1. 75 1. 75 36 12/20/84 16:00 860 35 1 75 1. 75 36 12/20/84 18:00 861 35 1. 75 1. 75 36 12/20/84 20:00 862 35 1. 75 1. 75 36 12/20/84 22:00 863 35 1. 75 1. 75 36 12/20/84 00:00 864 35 1. 75 1. 75 36 DAILY AVERAGE VALUES 1. 77 1. 77 37 ,1 .,. ' I, ' l l I ~ t 1 PROPOSED KING COVE HVDRIJELEC RIC PROJEc u::ub8it:~:J PA<,'t. ~J DELTA CREEK NEAR KING COVE. ALASf',A START TIME 10/10/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ----·-QJ:iS ;:;;:.:::=:::::::!!!: ~~~~ ~!"e!~======-.;: ====== ===== ====== 12/21184 02.00 865 35 1. 75 1. 75 36 12/21/84 04:00 866 35 L 75 1. 75 36 12/21i84 06:00 867 36 1. 80 1. 80 39 12/21/84 08:00 868 36 1. 80 1. 80 39 12/21/84 10:00 869 35 1. 75 1. 75 36 12/21/84 12:00 870 35 1. 75 1 75 36 12/21184 14:00 871 35 1. 75 1. 75 36 12/21184 16: 00 872 35 1. 75 1. 75 36 12/21/84 18:00 873 35 1. 75 1 75 36 12/21/84 20:00 874 35 1. 75 1. 75 36 12/21/84 22:00 875 34 1. 70 1. 70 34 12/21/84 00:00 876 34 1. 70 1. 70 34 DAILY AVERAGE VALUES 1. 75 1. 75 36 12/22/84 02:00 877 34 1. 70 1. 70 34 12/22/84 04:00 878 34 1. 70 i. 70 34 12/22/84 06:00 879 34 1. 70 1 70 34 12/22/84 08:00 880 33 1. 65 1 65 31 12/22/84 10:00 881 33 1. 65 1. 65 31 12/22/84 12:00 882 33 L 65 1. 65 31 12/22/84 14:00 883 33 1. 65 1. 65 31 12/22/84 16:00 884 33 1. 65 1. 65 31 12/22/84 18:00 885 33 1. 65 i. 65 31 12/22/84 20:00 886 34 1 70 1. 70 34 12/22/84 22:00 887 34 1. 70 1. 70 34 12/22/84 00:00 888 34 1. 70 1. 70 34 DAILY AVERAGE VALUES 1. 68 1. 68 33 12/23/84 02:00 889 35 1. 75 1. 75 36 12/23/84 04:00 890 36 1. 80 1.. 80 39 12/23/84 06·00 891 37 1. 85 1. 85 41 12/23/84 08:00 892 38 1. 90 1. 90 44 12/23/84 10:00 893 37 1. 85 1. 85 41 12/23/84 12:00 894 36 LBO 1. 80 39 12/23/84 14:00 895 36 1. eo 1. 80 39 12/23/84 16:00 896 35 1. 75 1. 75 36 12/23/84 18:00 897 34 1. 70 1. 70 34 12/23/84 20:00 898 34 1. 70 1. 70 34 12/23/84 22:00 899 34 1. 70 1 70 34 12/23/84 00:00 900 33 1. 65 1. 65 31 DAILY AVERAGE VALUES 1. 77 1. 77 37 1 ~ ~·" ·If, .. ·· ~ ) l i. i ~ '"Jo8t __ 1 P. ---~Nu OS~u ~INb ~~VE n•~ROE~~~~RI~ r~OJ~~ .. -- DELTA CREEK NEAR KING COVE,ALASKA START TIME 10/10/84 02·00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ~=:'!!!!==~= ====== ==== ==~====== ====== ===== ====== 12/24/84 02:00 901 33 1 65 L 65 31 12/24/84 04:00 902 33 L 65 L 65 31 12/24/84 06:00 903 33 L 65 1. 65 31 12/24/84 08:00 904 33 L 65 1. 65 31 12/24/84 10:00 905 32 1. 60 1. 60 29 12/24/84 12:00 906 32 L 60 1. 60 29 12/24/84 14:00 907 32 1. 60 1. 60 29 12/24/84 16:00 908 32 1. 60 1. 60 29 12/24/84 18:00 909 32 L 60 1. 60 29 12/24/84 20:00 910 32 L 60 1. 60 29 12/24/84 22:00 911 32 1. 60 1. 60 29 12/24/84 00:00 912 32 1. 60 1. 60 29 DAILY AVERAGE VALUES 1. 62 1. 62 30 12/25/84 02:00 913 31 1. 55 1. 55 27 12/25/84 04:00 914 32 1. 60 L 60 29 12/25/84 06:00 915 31 1. 55 i. 55 27 12/25/84 08:00 916 31 1. 55 1. 55 27 12/25/84 10:00 917 31 L 55 i. 55 27 12/25/84 12:00 918 32 1. 60 L 60 29 12/25/84 14:00 919 31 1. 55 1. 55 27 12/25/84 16:00 920 32 L 60 1. 60 29 12/25/84 18:00 921 32 1. 60 1. 60 29 12/25/84 20:00 922 32 1. 60 1.. 60 29 12/25/84 22:00 923 32 L 60 1. 60 29 12/25/84 00:00 924 32 1. 60 L 60 29 DAILY AVERAGE VALUES 1 58 1. 58 28 12/~184 02:00 925 32 1. 60 1. 60 29 12/2&184 04:00 926 31 1. 55 1. 55 27 12/26/84 06:00 927 31 1. 55 1. 55 27 12/26/84 08:00 928 31 1. 55 1. 55 27 12/26/84 10:00 929 3i 1. 55 1. 55 27 12/26/84 12:00 930 31 1. 55 1. 55 2'7 12/26/84 14:00 931 31 1. 55 1. 55 27 12/26/84 16:00 932 30 1. 50 L 50 25 12/26/84 18:00 933 30 L 50 1. 50 25 12/26/84 20:00 934 30 1. 50 1. 50 25 12/26/84 22:00 935 30 1. 50 1. 50 25 12/26/84 00:00 936 30 1. 50 1. 50 25 DAILY AVERAGE VALUES 1. 53 1. 53 26 f< I !·: l-1 I I '' • I l i . l ! PROPOSED KING COVE HYDROELECTRIC PRO~EC DELTA CREEK NEAR KING COVE,ALASKA DATE TIME ••••••:=s •=••• 12/27/84 02:00 12/27/84 04:00 12/27/84 06:00 12/27/84 08:00 12/27/84 10:00 12/27/84 12:00 12/27/84 14:00 12/27/84 16:00 12/27/84 18:00 12/27/84 20:00 12/27/84 22:00 12/27/84 00:00 12/28/84 02:00 12/28/84 04:00 12/28/84 06:00 12/28/84 08:00 12/28/84 10:00 12/28/84 12:00 12/28/84 14:00 12/28/84 16:00 12/28/84 18:00 12/28/84 20:00 12/28/84 22:00 12/28/84 00:00 12/291'84 02:00 12/29/84 04:00 12/29/84 06:00 12/29/84 08:00 12/29/84 10:00 12/29/84 12:00 12/29/84 14:00 12/29/84 16:00 12/29/84 18:00 12/29/84 20:00 12/29/84 22:00 12/29/84 00:00 BYTE RAW DATA ~~;a:;.;;. ;:.;;;;::;;:;>;:;:.:::::=~""';"' 937 30 938 30 939 30 940 30 941 30 942 30 943 30 944 30 945 31 946 33 947 36 948 37 DAILY AVERAGE VALUES 949 39 950 43 951 46 952 45 953 43 954 42 955 42 956 42 957 41 958 40 959 38 960 38 DAILY AVERAGE VALUES 961. 37 962 36 963 36 964 36 965 36 966 35 967 35 968 35 969 35 970 36 971 36 972 37 DAILY AVERAGE VALUES DEPTH FEET =::.:=•==- 1. 50 1. 50 1. 50 1.·50 1. 50 1. 50 1. 50 1. 50 1. 55 1. 65 1. 80 1. 85 1 57 1. 95 2. 15 2.30 2.25 2. 15 2. 10 2. 10 2. 10 2. 05 2. 00 1. 90 1. 90 2. 08 1. 85 1. 80 1. 80 1. 80 1. 80 1. 75 1. 75 1. 75 1. 75 1. 80 1. 80 1. 85 1. 79 05/b8/t.:i:J PAGE. START TIME 10/10/84 STAGE FEET ::::::=::::= 1. 50 1. 50 L 50 1. 50 1. 50 1. 50 1. 50 1 50 1. 55 1. 65 1. 80 1. 85 1 57 i. 95 2. 15 2. 30 2.25 2 15 2. 10 2. 10 2. 10 2.05 2.00 1. 90 1. 90 2.08 1. 85 1. 80 1. 80 1. 80 1 80 1. 75 1. 75 1. 75 1. 75 1. 80 1. 80 1. 85 1. 79 DISCHG CFS ====== 25 25 25 25 25 25 25 25 27 31 39 41 28 47 59 "70 66 59 56 56 56 53 50 44 44 55 41 39 39 39 39 36 36 36 36 39 39 41 38 2/ 02:00 I , . , f·n.urOSE.u ,.!ING -..vVE 1 ....... WEL-'"' I c , '"b'-'E'-I_ ~8/t PA 2 DELTA CREEK NEAR KING COVE,ALASKA START TIME 10/10/84 02 00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ==~:e:!:=~~ ~~~~~ ==== =======-== ====:= ;:::::==:::: =!';::==== 12/30/84 02:00 973 37 LEIS l. 85 41 12/30/84 04:00 974 38 1 90 1. 90 44 12/30/84 06:00 975 37 1. 85 L 85 41 12/30/84 08:00 976 37 L 85 L 85 41 12/30/84 10:00 977 36 1. 80 1. 80 39 12/30/84 12:00 978 37 L 85 L 85 41 12/30/84 14:00 979 36 1. 80 1. 80 39 12/30/84 16:00 980 36 1. 80 1. 80 39 12/30/84 18:00 981 36 1. 80 1. 80 39 12/30/84 20:00 982 35 1. 75 1. 75 36 12/30/84 22:00 983 35 1. 75 L 75 36 12/30/84 00:00 984 35 1. 75 L 75 36 DAILY AVERAGE VALUES 1. 81 1. 81 39 12/31/84 02:00 985 34 L 70 1 70 34 12/31/84 04:00 986 34 1. 70 1. 70 34 12/31/84 06:00 987 35 1. 75 L 75 36 12/31/84 08:00 988 36 1. 80 1 80 39 12/31/84 10:00 989 38 1. 90 1. 90 44 12/31/84 12:00 990 40 2.00 2. 00 50 12/31/84 14:00 991 42 2. 10 2. 10 56 12/31/84 16:00 992 42 2. 10 2 10 56 12/31/84 18:00 993 41 2.05 2. 05 53 12/31184 20: 00 994 40 2.00 2.00 50 12/31/84 22:00 995 40 2.00 2. 00 50 12/31184 00: 00 996 40 2.00 2. 00 50 DAILY AVERAGE VALUES 1. 93 t. 93 46 Ot/01/85 02:00 997 39 1. 95 1. 95 47 01/01/95 04:00 998 38 1. 90 1 90 44 01/01/85 06:00 999 38 1. 90 1. 90 44 01/01/85 08:00 000 37 1. 85 1 85 41 01/01/85 10:00 001 37 1. 85 1. 85 41 01/01185 12: 00 002 37 1. 85 1. 85 41 01101/85 14: 00 003 37 1. 85 1. 85 41 01/01185 16: 00 004 37 1. 85 1 85 4i 01/01/85 18:00 005 36 1. 80 1. 80 39 01/01/85 20: 00 006 36 1. 80 1. 80 39 01101/85 22: 00 007 35 1. 75 1. 75 36 01/01/85 00:00 008 35 1. 75 1. 75 36 DAILY AVERAGE VALUES 1. 84 1. 84 41 AUTHOR DATE DUE oL/,., /L JLTf Zi.. ~ . i HIGHSMITH klC 004 1985 ROOM BORROWER'8 NAME NUMBER L......._L"D ... J #42-302l PRINT8D IN u.&.A. _I I I