Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Feasibility Study for Old Harbor Hydro Project Supplemental Data Report 1985
FEASIBILilY STUDY FOR OLD HARBOR HYDROELEClRIC PROJECT SUPPLEMENTAL DAlA REPORl: HYDROLOGY Prepared For: Alaska Power Authority Prepared By: DOWL Engineers May, 1985 W. 0 • liD 1 3 4 7 0 TABLE Of CONTENTS Purpose •• . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Location. . ........................................ . Drainage Are a • . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Gage •.••. ................................ 2 Reference Marks ....... . ................................. 3 Discharge Measurements. ................................. 3 Rating Curve .......... . ................................. 4 Channel. 4 Control. 5 Remarks................................................. 5 Appendix A Appendix 8 Figure Figure 2 Figure 3 Table APPENDICES Discharge Rating Curve Measurements Printout of Discharge Measurements 4-Hour and/or 2-Hour Stage Data and Corresponding Discharges LIST Of FIGURES Project Location Map Discharge Ratinq Curve Midway Creek, Alaska 1984 Hydrograph of Midway Creek LIST Of TABLES Summary Streamflow Data, 1984 Midway, Alaska OLD HARBOR Streamflow Data, Midway Creek Purpose: The purpose of this effort is to collect streamflow data for Midway Creek as part of the Old Harbor Hydroelectric Project Feasibility Study. Streamflow data collection began on December 28, 1981. Streamflow data reports for the calendar years 1982 and 1983 were submitted to the Alaska Power Authority in connection with the feasibility study. The streamflow data presently being gathered is an additional supplement to the hydroloqy study completed for the feasi- bility of hydropower development. This report includes a daily stream discharge summary table as well as stage and discharge records for four-hour and/or two-hour periods for the 1984 calendar year. Location: Lat. 57°14'12", Long. 153°14'52" in NW1/4NW1/4 Sec. 15, T.34S., R.25W., on right bank, 0.5 miles upstream from the mouth, 3.5 miles northeast of Old Harbor, Alaska (Kodiak A-4 Quad). Drainage Area: The drainage area is 2.28 mi2 at the gage site, and no glaciers location exist within the of the proposed selected gage ·~ Slc.e. drainage basin. The powerhouse hydropower project is at the ----Ex:STING ROAO A~D TRA,'lSMISSION LINE .~~ / / SCALE # / 1 • repreeente 0.87 mi. ISLAND ... LOCATION MAP 0001 TO SCALE ~ENGINEERS LOCATION OF STREAM GAGING STATION AND HYDROELECTRIC PROJECT AREA OLD HARBOR, KODIAK ISLAND, ALASKA FIGURE Gaging equipment consists of a digital recorder/sensor (Omnidata Datapod) and a staff gage. Digital Gage: lhe digital gage is an Omnidata Datapod coupled with a small piezo-electric pressure transducer and a thermistor temperature probe. lhe datapod is an ultra low power microprocessor controlled recorder with several advan- tages. lhe device contains a battery supply, an analog to digital converter (12-15 bits), a microprocessor, a non- volatile storage module and a clock with an accuracy of several minutes per month. lhe transducer is housed inside a cylindrical stainless steel casing which is secured to the streambed through a driven steel rebar and hose clamps. A cableway extends to the recorder on the streambank. lwo different models (DP211 and DP312) of the digital gage are used for this study. Model DP211 is coupled to a Data Instruments transducer (Model AB) and a Yellow Springs Instruments thermistor, and is set to sample both the pres- sure and temperature every five minutes. !his model was discontinued after May of 1984. Model DP312 was installed in May of 1984 and is coupled to a Enviro-Labs transducer (Model PT-105V). It samples only the pressure every five minutes. lhe average of the 5-minute readings is recorded ever1 two hours (DP312) or four hours (DP211) in an 8-bit format. Gaging equipment specifications are attached to the 1982 report as Appendix C. 2 Staff Gage: lhe staff gage is a rigid, precisely graduated, porcelain enameled iron plate securely fixed to a fence post driven into the streambed. It was installed on Midway Creek during an initial site visit for the hydroelectric feasibil- ity study. Reference Marks: RM-1 (base). A 24-inch long steel rebar with an aluminum cap driven into the ground on the right bank of the creek and 10 feet upstream of the gage location: Elevation 5.81 feet, gage datum Discharge Measurements: Continuous measurements of stream discharge are obtained through collection of stage data at the gaging station. lhe stage of a stream is the height of the water surface above an established datum. lhe stage data on Midway Creek is collected every two and/or four hours by an Dmnidata Datapod digital recorder. In stream gaging procedures, stage data is used as the independent variable in a stage-discharge relation to derive discharges. It is, therefore, normal practice to establish a relationship (rating curve) between the stage at the gaging station and the discharge. lhis relationship depends on the shape of the cross-section and the roughness of the streambed. lherefore, the relationship has to be established empirically. As part of establishing the rating curve relationship, dis- charge measurements were taken at the gaging station using a 3 Marsh-McBirney Model 201 flow current meter. !he stage of the stream was also noted during discharge measurements and is provided below along with the discharge measurements. Date 01/06/84 05/02/84 09/05/84 03/05/85 Rating Curve: Discharge (cfs) 1 I 23 4.4 5.6 Gage Height-Stage (ft) 1. 35 2.10 (transducer-gage change-new stage 0.90) 0.25 0.32 !he rating curve for Midway Creek will continue to be devel- oped as additional stage-discharge data points are collect- ed. A preliminar; rating curve is plotted for the period of record and is shown in figure 2. !he discharge computation sheets are provided in Appendix A. After having established the rating curves, measurements will have to be continued to enable verification, and if necessary, adjustment of the rating curve to the actual cir- cumstances. Deviations from the discharges read from the rating curve are caused by morphological changes of the streambed and stream icing problems. Channel: Midway Creek is three miles northeast of Old Harbor. It is a short mountain creek (3.7 miles long) with a steep 4 2 1.5 1- t1 LL. :! .8 1- % (!!> liLI :r: w 0 .5 "' (.!) / / / 4 !56 7 8910 DISCHARGE IN CUBIC FEET PER SECOND _.. -....... ~ RATING CURVE FOR MIDWAY CREEK FIG. 2 ~ENGINEERS OLD HARBOR ALASKA-YEAR 1984 gradient (0.10 ft/ft). It has developed an alluvial flood plain near the mouth of Big Creek where it discharges into Midway Bay. The gage is located at a point where the steep mountain slope and the flood plain merge. The streambed material consists of silt, sand and gravel within the flood plain with large cobbles and boulders upstream in the steep portions of the creek. Along the stream valley, extensive alder, elderberry and salmonberry thickets intermix with a grass meadow. Control: The control is a cross-section or reach of stream channel that determines the relationship between stage and discharge at that section and for some distance upstream. Permanent controls are desired for a stable stage-discharge relation- ship; however, changes (shifts) in the control occur affect- ing the relationship of stage to discharge. At low stages, a protruding rock outcrop downstream of the digital gage will be the control for stream water levels. At medium and high stages, the channel will be the dominant control. Remarks: Stage records are good for those periods when the stage sensinq and recording instruments were functioning proper- ly. Otherwise, data gaps exist for winter months, and data for these periods were synthesized on the basis of weather data (Kodiak) and from data on nearby gaging stations (Myrtle Creek). Reliable data were obtained for sixty-seven percent of the monitoring period. Shifts ranging from 0.10 5 to 1.5 feet in the stream control caused considerable incon- venience in the analysis of stage data. Performance loss in the data collection percentage (when compared to the 1983 records) is primarily due to the malfunctioning of the transducer and river ice problems. lhe period of synthe- sized data is indicated in the summary stream discharge table (Table 1). In addition to the stage, stream tempera- ture was also measured up to May, 1984, and the results are provided in the following printout sheets. 6 Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Total Mean TABLE 1 A SUMMARY OF MIDWAY CREEK (OLD HARBOR, ALASKA) STREAMFLOW RECORDS FOR JANUARY 1, 1984 THROUGH SEPTEMBER 31, 1984 1984 Jan Feb Mar Apr May Jun Jul Aug 15 6.4 5.7 6.3 9.2* 8.9 16 4.4 13 6.4 5.8 6.1 9.2* 10 16 4.5 11 6.4 6.2 6.2 22 8.9 14 5.0 9.4 6.4 8.5 6.3 21 8.5 12 3.6 8.7 7.4 15 6.0 20 8.5 9.7 3.7 9.0 7.2 11 5.7 20 7.0 7.7 3.7 4.8 16 10 5.7 19 8.4 6.5 3.7 5.0 15 14 5.7 21 7.8 5.5 3.8 6.6 13 16 6.2 22 7.6 4.4 3.6 5.6 6.8 14 5.8 23 14 4.0 3.8 6.2 6.3 13 5.7 24 9.5 4.0 3.5 21 6.0 11 5.5 24 22 3.5 3.7 18 5.7 9.0 5.5 23 20 3.3 3.7 13 5.7 8. 1 5.5 22 15 2.8 3.6 11 5.7 8.2 5.4 34 12 2.8 3.9 9.8 5.7 9.3 7.2* 48 11 3.4 3.9 9.2 5.7 9.4 6.7* 50 9.5 3.8 4.0 8.6 5.7 8.5 5.7* 29 8.3 4.0 4.4 8.2 5.5 7.8 5.2* 20 7.1 4.0 4. 1 7.8 5.8 7.4 5.2* 10 5.8 3.9 4.0 7.6 5.8 7.3 4.6* 18 11 4.0 4.5 9.8 5.7 7.3 4.5* 16 1 1 2.3 4.1 18 5. 7 6.8 4.3* 13 14 2.8 3.9 22 5.6 6.7 4.2* 13 15 3.7 2.3 22 6.2 6.6 4.2* 12 57 3.7 3.7 18 8.4 6.7 7.6* 10 65 3.6 3.8 7.5 6.5 6.8 9.8* 9.4 27 4.0 4.0 6.9 6.1 6.4 11* 13 16 4.7 4.4 7.5 5.8 6.5 15* 13 16 4.2 4.3 6.9 -6.5 16* 9.4 16 4.0 4.3 6.5 -6.5 -9.5 -4.3 3.8 333 205 272 199 606 458 173 122 11 7 9 7 19 15 6 4 MEAN FLOW FOR THE PERIOD OF RECORD 11 CUBIC FEET PER SECOND. *Synthesized data Sep 4. 1 4.3 4.2 4.3 1. 7* 1.8* 2.0* 23 10 7.6 5.6 5.2 8.0 27 15 18 13 10 8.8 7.2 6.4 32 139 32 48 22 18 30 25 42 - 575 19 - I I l I I - I I I I I ( I I l J ._F' I I I I I i I I 200 100 90 80 70 80 DO 40 30 20 en MEAN FLOW II CFS LL. (.) w (!) 0:: <{ :r: (.) en Cl 4 3 2 I 0 ~ANUARY FEBRUARY MARCH APRIL ~ -1984 ENGINEERS HYDRO GRAPH OF MIDWAY 200 II 100 90 80 ~, 70 60 60 40 30 20 en 10 LL. (.) 9 8 w 7 (!) 6 0:: <( D ::r: () en 4 0 3 2 i\ I 0 MAY ~UNE ~ULY AUGUST I SEPTEMBER I CREEK, OLD HARBOR» ALASKA\ Fl GURE I r 1 ,,. APPENDIX A Discharge Rating Curve Measurements PROJECT NAME RIVER NA11E TRANSECT NO. PT. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 OLD HAPBOR HYDROELEC MIDWAY CREEK GAGE SITE-1-6-84 STATION WIDTH (FEET) <FEET> ------------ 43. 00 0.00 44.00 0. 75 44. 50 0. 50 45.00 0. 50 45. so 0. 50 46.00 0. 50 46. 50 0. so 47.00 0. 75 48.00 1. 00 49.00 1. 00 50.00 1.00 51.00 1. 00 52. 00 1. 00 53.00 1. 00 54.00 0. 00 SUM OF CELL DISCHARGES = 11. 11 SUM OF CELL AREAS = 5.97 MEAN VELOGITY = 1. 86 F DEPTH VELOCITY AREA DISCHARGE CFEET) <FT/SEC> (SQ. FT> <CFS) ---------·--------------------- 0.00 0. 00 0.00 0.00 0.60 0. 70 0.45 0.31 0. 70 1. 75 0.35 0.61 0.80 2. 75 0.40 1. 10 0.80 2. 50 0.40 1. 00 0.80 2. 10 0.40 0.84 0. 70 1. 90 0.35 0.66 0. 70 1. 90 0.52 1. 00 0. 70 2.20 0. 70 1. 54 0. 70 2. 10 0. 70 1. 47 0. 55 1. 90. 0. 55 1. 04 0. 55 1. 90 0. 55 1. 04 0.40 1. 00 0. 40 0. 40 0.20 0. 40 0.20 0.08 0. 00 0.00 0.00 0.00 CUBIC FT. /SEC. SQUARE FT. FT. /SEC. PROJECT NAME RIVER NAME TRANSECT NO. PT. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 OLD HARBOR HYDRO PRJ MIDWAY CREEK GAGE SITE-5/2/84 STATION WIDTH <FEET> CFEET> ______ _.... ----- 0. 50 0.00 1. 50 0. 75 2.00 0. 75 3.00 1. 00 4.00 1. 00 5.00 1 00 6.00 1. 00 7.00 1. 00 8.00 1. 00 9. 00 1. 00 10.00 1. 00 11.00 1. 00 12.00 1. 00 13.00 1. 00 14.00 1. 00 15.00 1. 00 16. 00 1. 00 17.00 0. 00 SUM OF CELL DISCHARGES = 23.00 SUM OF CELL AREAS -12. 99 MEAN VELOCITY ·-· 1. 77 DEPTH VELOCITY AREA DISCHARGE <FEET> CFT/SEC) CSG.FT> CCFS> ------------·----------------- 0.00 0. 00 0.00 0.00 0. 70 0. 15 0. 52 0. 08 0. 75 0. 50 0. 56 0. 28 0. 90 0. 60 0. 90 0. 54 1. 00 1. 40 1. 00 1. 40 1. 10 2. 20 1. 10 2. 42 1. 10 2. 40 1. 10 2.64 1. 10 2. 30 1. 10 2. 53 1. 00 2. 30 1. 00 2.30 1. 00 1. 90 1. 00 1. 90 0. 90 2. 20 0.90 1. 98 0.90 2. 10 0. 90 1. 89 0. 90 2. 00 0. 90 1 80 0.80 2.00 0.80 1. 60 0.60 1. 60 0. 60 0. 96 0. 40 1. 30 0. 40 0. 52 0.20 0 80 0. 20 0. 16 0.00 0.00 0. 00 0.00 CUBIC FT. /SEC. SQUARE FT. FT. /SEC. PROJECT NAME RIVER NAME TRANSECT NO. PT. 1 2 3 4 5 6 7 8 9 10 11 12 13 SUM OF CELL SUM OF OLD HARBOR HYDROELEC MfDWAY CREEK GAGE SlTE-9/5/84 STATION WIDTH <FEET) (FEET> ___ ., _____ ----- 1. 00 0.00 2.00 1. 00 3.00 1. 00 4.00 1. 00 5.00 1. 00 6. 00 1. 00 7.00 1. 00 8.00 1. 00 9. 00 1. 00 10. 00 1. 00 11.00 1. 00 12 00 1. 00 13.00 0.00 DISCHARGES = 4.45 CELL AREAS = 5.60 MEAN VELOCITY = 0. 79 p DEPTH VELOCITY AREA DISCHARGE (FEET> <FTiSEC> <SO.FT> <CFS) ------------------------------ 0. 00 0.00 0.00 0.00 0.80 0.05 0.80 0.04 0. 80 0.85 0.80 0.68 0.65 1. 10 0.65 0. 71 0.60 1. 05 0.60 0.63 0. 50 0.85 0.50 0.42 0. 50 0.80 0. 50 0. 40 0. 50 1. OS 0. 50 0. 52 0.35 0.90 0.35 0.31 0.40 1. 10 0.40 0. 44 0. 30 0. 60. 0.30 0. 18 0.20 0. so 0.20 0. 10 0 00 0.00 0.00 0.00 CUBIC FT /SEC. SOU ARE FT. FT. /SEC. PROJECT NAME RIVER NAME TRANSECT NO. PT. 1 2 3 4 5 6 7 8 9 10 11 12 13 SUM OF CELL OLD HARBOR HYDRO PJ MIDWAY CREEIII GAGE SITE-3/5/85 STATION WIDTH <FEET> <FEET> ------------ 1. 00 0.00 2.00 1. 00 3. 00 1. 00 4.00 1. 00 5. 00 l. 00 6.00 1. 00 7.00 1. 00 8.00 1. 00 9. 00 1. 00 10.00 1. 00 11. 00 1. 00 12.00 1. 00 13.00 0.00 DISCHARGES = 5. 91 SUM OF CELL AREAS = 6. 70 MEAN VELOCITY = 0. '88 Pat. DEPTH VELOCITY AREA DISCHARGE <FEET> <FT/SEC> <SG.FT> (CFS> ----------------------------- 0.00 0.00 0.00 0.00 0.20 0. 50 0.20 0. 10 0.30 0.65 0. 30 0. 19 0. 40 0. 95 0. 40 0. 38 0. 70 1. 40 0. 70 0.98 0.60 1. 55 0.60 0.93 0. 70 1. 15 0. 70 0.80 0. 70 0.25 0. 70 0. 17 0.80 0. 70 0. 80 0. 56 0. 90 1. 30 0.90 1. 17 0.80 0. 40 0.80 0.32 0.60 0. so 0.60 0. 30 0.00 0.00 0. 00 0.00 CUBIC FT. /SEC SQUARE FT. FT. /SEC. APPENDIX 8 Printout of Discharge Measurements 2-Hour and/or 4-Hour Stage Data and Corresponding Discharges PROPOSED OLD HARBOR HYDROELECTR PRO~ECT 05/12/85 PAGE 1 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 01/07/84 04.00 DEPTH STAGE DISCHG TEMP DATE TIMSi 8-YTii RAW DATA ..... INGHES FEET CFS DEG C =······· ••••• ···= ·····-·--···= =··==· =·=·· ======= ==•:= 01/07/84 04:00 1 25 103 5.0 10.0 0.83 5.0 1.5 01/07/84 08:00 3 24 103 4.8 9.6 0.80 4.7 1.5 01/07/84 12:00 5 24 103 4.8 9.6 0.80 4. 7 1.5 01/07/84 16:00 7 24 103 4.8 9. 6 0.80 4. 7 1. 5 0:1107/84 -~ 00 9 . 24-103 4.8 9.6 o,ao 4.7 1.5 01/07/84 00:00 11 24 102 4.8 9.6 0.80 4. 7 1. 0 DAlLY AVERAGE VALUES 4.8 9. 7 0.81 4.8 1.4 01/08/84 04:00 13 24 101 4.8 9.6 0.80 4. 7 0. 5 01/08/84 08:00 15 24 101 4.8 9.6 0.80 4. 7 0. 5 01/08/84-l2T 00--17 -24· 101 4;8 9.6 e. so-4;7 0. 5 01/08/84 16:00 19 24 103 4.8 9.6 0.80 4. 7 1.5 01/08/84 20:00 21 26 103 5.2 10.4 0.87 5.4 1. 5 01/08/84 00:00 -23 27 103 8.4 10.8 0.90 5. 7 1.5 DAILY AVERAGE VALUES 5.0 9.9 0.83 5.0 1. 0 01/09/84 04~00 28 28 103 8. 6 11.2 o.9a 6; 1 1.5 01/09/84 08:00 27 29 103 5. 8 11.6 0.97 6.4 1.5 01/09/84 12:00 29 30 104 6.0 12.0 1. 00 6.8 2.0 01/09/84 16+(}0 31 31 104 6.2 12.4 1. 03 7. 2. 2.0 01/09/84 20:00 33 30 104 6.0 12.0 1. 00 6.8 2.0 01/09/84 00:00 35 28 104 5.6 11. 2 0.93 6. 1 2.0 .J!\cl. ·-I)AILY AVERAGE-VAL-vES 5; 9 t 1-;-7 --e~ 98 6.6 1. 8 01/10/84 04:00 37 28 104 5<.6 11.2 0.93 6. 1 2.0 01/10/84 08:00 .. -39 27 lG-3 5.4 10.8 0. 90 5. 7 1.5 01/10/84 12:00 41 27 103 5.4 10.8 0.90 5. 7 1. 5 01/10/84 16:00 43 26 104 5.2 10.4 0.87 5.4 2.0 01/10/84 -20,()0.. --4e-2ft toa 8;·2 10.4 0;87 &.4 1.5 01/10/84 00:00 47 26 103 5. 2 10.4 0. 87 5.4 1.5 DAILY AVERAGE VALUES 5.3 10. 7 0.89 5. 6 1.7 01/11/84 04:00 49 26 103 5.2 10.4 0.87 5.4 1.5 01/11/84 OB: 00 51 26 103 5. 2 10.4 0.87 5.4 1.5 . ot/lt/84 tahoo 33---27 102 &. 4. 10.8 0.90 5; 7 1. 0 01/11/84 16:00 55 31 103 6. 2 12.4 1.03 7.2 1.5 01/11/84 20:00 57 29 104 5.8 11.6 0.97 6. 4 2.0 01/11/84 00: 00 &9·· 30 104 6.0 12.0 1.00 6.8 2.0 DAILY AVERAGE VALUES 5.6 11. 3 0.94 6.2 1.6 PROPOSED OLD HARBOR HYDROELECTR PROJECT MIDWAY CREEK NEAR OLD HARBOR, ALASKA 05/12/85 PAGE 2 START TIME 01/07/84 04:00 DEPTH STAGE DISCHG KV INGHES -FEET GFS aar••••• ••••• •••• ••••••••• 01/12/84 04:00 01112184 08;00 01/12/84 12:00 01/12/84 16:00 01 /12/84 --1iKh 00 01/12/84 00:00 61 45 104 6--3-51 t-04 65 65 104 67 71 104 ------M 63---105-- 71 58 105 DAILY AVERAGE VALVES 01/13/84 04:00 73 59 105 01/13/84 08:00 75 59 105 Gt/13/84 !2TOQ-----~ ---8& --495----- 01/13/84 16:00 79 54 105 01/13/84 20:00 81 51 105 01/13/84 00:-00 ·------93 49-----1()5 DAILY AVERAQE VALVES 9.0 10.2 13.0 14.2 -l-2;6 11.6 11.8 11.8 11.8 -·H,O 10.8 10. 2 9.8 10.9 18.0 2{);4 26.0 28.4 -25-: 2 23.2 23.5 23.6 23.6 22.0- 21.6 20.4 19.6 21. e 0-ll 14-184-~-00---------85----47---«}5-----·------9: -4---HLS 18. 4 17.6 17.6 16.8 16.8 01/14/84 08:00 87 46 105 9.2 01/14/84 12:00 89 44 105 8.8 ot ll41-B4 t6: oo---91 44 ... toe-e. 8 01/14/84 20:00 93 42 104 8.4 01/14/84 00:00 95 42 104 8.4 ---·--------~¥-AVERAGE YAt~S e, B -1-7; 7 01/15/-;,04: 00 97 41 103 OlltSI-O....oo--------9-9 -41 103. 01/15/84 12:00 101 40 103 01/15/84 16:00 103 40 103 0111~/-84-~-00-----1-05 -~ -104- 01/15/84 00:00 107 39 104 DAILY AVERAGE VALVES 01/16/84 04:00 109 38 105 01/16/84 08:00 111 38 105 Ol/1WS4-l2-:-QO..---·-U-3 --38---!03-- 01/16/84 16:00 115 37 105 01/16/84 20:00 117 37 105 Ol/16-/84-oo~ ~------H-9-----3?'--l-G&- DAILY AVERAGE VALVES 8.2 e. 2. 8.0 8.0 7.8 7. 8 8.0 16.4 16:4 16.0 16.0 1&:6. 15.6 16.0 7.6 15.2 7.6 15.2 . . ---7. 6 . --18-: -2 7.4 14.8 7.4 14.8 .. ?;-4 -1-4-. 8 7. 5 15.0 1. 50 1. 70 c. 17 2.37 -~. 10 1. 93 1. 96 1. 97 1. 97 1. 83 1. 80 1. 70 1. 63 1. 82 l.·-57 1. 53 1. 47 1. 47 1. 40 1. 40 1.-4-7 1. 37 1. 37 1. 33 1. 33 1. ao 1. 30 1. 33 1. 27 1. 27 --1, 27 1. 23 1.23 1:-23· 1. 25 13 16 24 28 23 20 21 21 21 18 18 16 15 18 !4 14 13 13 12 12 13 11 11 11 11 10 10 11 10 10 10 9.6 9.6 9.6 9. 8 TEMP DEO C 2.0 2. 0 2.0 2. 0 2. 5 2. 5 2.2 2. 5 2. 5 2; 5 2. 5 2. 5 2.5 2. 5 . 2:·5 2. 5 2. 5 ·2. 5 2.0 2.0 2.3 1.5 1.5 1.5 1.5 2.0 2.0 1. 7 2. 5 2. 5 2. 5 2.5 2. 5 2. 5 2. 5 PROPOSED OLD HARBOR HYDROELECTR PROJECT 05/12/85 PAGE 3 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 01/07/84 04:00 DEPTH STAQE DISCHQ TEMP DATE' TIME BYTE RAW DATA M\1 INGHES FEET CFS DEG C --------=···· •••• ........... •••• •••s:•= ==·--====== ==•== 01/17/84 04:00 121 37 105 7. 4 14.8 1. 23 9.6 2. 5 01/17/84 08:00 1123 36 104 7.2 14. 4 1. 20 9.2 2.0 01/17/84 12:00 125 36 105 7.2 14.4 1. 20 9.2 2. 5 01/17/84 16:00 127 3b 105 7. 2 14.4 1. 20 9.2 2. 5 01/17/94 ;tO; 00 129 -36 ~·· 7.2 l4o4 t.20 9.2 2. 5 01/17/84 00:00 131 35 104 7.0 14.0 1. 17 8. 7 2.0 DAILY AVERAOE VALUES 7.2 14.4 1. 20 9.2 2.3 01/18/84 04:00 133 35 102 7.0 14.0 1. 17 8. 7 1.0 01/18/84 08:00 135 35 101 7.0 14.0 1. 17 a. 7 0. 5 Ol/ 18/94 l;l; 00-· 137 .. .. 33-·101 -7.0 14.0 1. 17 a. 7 0. 5 01/18/84 16:00 139 35 101 7.0 14.0 1. 17 8. 7 0. 5 01/18/84 20:00 141 34 101 6.8 13.6 1. 13 8.3 0. 5 01/18/84 00:00 143 94 100 6.8 13.6 1. 13 8.3 0.0 DAILY A\IERAQE VALUES 6.9 13.9 1. 16 8.6 0. 5 01/19/84 04:00 ····-·-145 34 100 6.8 13.6 1. 13 8;3 0.0 01/19/84 08:00 147 34 100 6.8 13.6 1. 13 8.3 0.0 01/19/84 12:00 149 34 100 6.8 13.6 1. 13 8.3 0.0 01/19/84 16:00 --151 34 101 6.8 13.6 1. 13 8.3 0. 5 01/19/84 20:00 153 34 100 6.8 13.6 1. 13 8.3 0.0 01/19/84 00:00 155 33 101 6.6 13.2 1. 10 7. 9 0. 5 nA I b¥ ·AVERAGE VALUES I 6.8 13. 5 l. 13 a.2 0.2 01/20/84 04:00 157 33 101 6.6 13.2 1. 10 7.9 0. 5 01/201-~'08:·00 ---159 33 101 6.6 13.2 1. 10 7.9 0. 5 01/20/84 12:00 161 33 101 6.6 13.2 1. 10 7.9 0. 5 01/20/84 16:00 163 33 102 6.6 13.2 1. 10 7. 9 1.0 01/20/8420:00· -·4-65-aa 102 6.6 ta.2 1. 10 7.9 1.0 01/20/84 00:00 167 32 102 6.4 12.8 1. 07 7.5 1.0 DAILY AVERAGE VALUES 6.6 13. 1 1. 10 7. 8 0.8 01/21/84 04:00 169 33 102 6.6 13.2 l. 10 7.9 1.0 01/21/84 08:00 171 32 102 6.4 12.8 1. 07 7.5 1. 0 01/21/84 12:00 173 32 102 6.4 12.8 1. 07 7. 5 1.0 01/21/84 16:00 175 32 103 6.4 12.8 1. 07 7. 5 1. 5 01/21/84 20: 00 177 32 102 6. 4 12.8 1. 07 7. 5 1.0 01/21/94 00:00 --179 32 102 6.4 12.8 1. 07 7.5 1.0 DAILY A\IERAQE VALUES 6.4 12.9 1. OS 7.6 1. 1 PROPOSED OLD HARBOR HYDROELECTR PROJECT 05/12/85 PAGE 4 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 01/07/84 04:00 DEPTH STAQE DISCHQ TEMP DATE TIME BYTE RAW-DATA MV IN<iHES FEET CFS DEQ C a•=-•=••• -----•••• ===····-· ===· =====· ===== ====== ==·== 01/22/84 04:00 181 31 100 6.2 12.4 1. 03 7.2 0.0 01/22/84 08:00 183 33 100 6.6 13.2 1. 10 7. 9 0.0 Ot/22/84 12:00 185 37 100 7. 4 14.8 1. 23 9. 6 0. 0 01/22/84 16:00 187 39 100 7. 8 15.6 1. 30 10 0.0 01/22/84 20;00 189 4Q 100-8.0 to.o l. 33 11 0.0 01/22/84 00:00 191 44 100 8.8 17.6 1. 47 13 0.0 DAILY AVERAGE VALUES 7. 5 14.9 1. 24 9.8 0.0 01/23/84 04:00 193 48 100 9.6 19.2 1. 60 15 0.0 01/23/84 08:00 195 53 100 10.6 21. 2 1. 77 17 0.0 01/23/S4 12~-00---1-97--.. -57 100 11.4 22.8 1. 90 19 0.0 01/23/84 16:00 199 57 100 11. 4 22.8 1. 90 19 0.0 01/23/84 20:00 201 57 100 11. 4 22.8 1. 90 19 0.0 01/23/84 00:00 203 38 100 11.6 23.2 1. 93 20 0.0 DAILY AVERAGE VALUES 11. 0 22.0 1. 83 18 0.0 01/24/84 04;-00-----~-., 100 12.2 ·24. 4 ~.03 -22 0.0 01/24/84 08:00 207 64 100 12.8 25.6 2. 13 24 0.0 01/24/84 12:00 209 66 100 13.2 26.4 2.20 25 0.0 01/24/S4 16;00 211 61 tOO 12. 2 24.4 2.03 22 0.0 01/24/84 20:00 213 58 too 11. 6 23.2 1. 93 20 0.0 01/24/84 00:00 215 58 100 11. 6 23.2 1. 93 20 0.0 · -DAlkV · -AV€RAQE VAbUE:S ... 12.3 24,5 -2.04 c2 0.0 01/25/ 04:00 217 59 100 11.8 23.6 1. 97 21 0. 0 01/25 .. ba;oo .... ~19 60 100 12.0 24.0 2.00 21 0.0 01/25/84 12:00 221 60 100 12.0 24.0 2.00 21 0. 0 01/25/84 16:00 223 59 100 11. 8 23.6 1. 97 21 0. 0 01/25/84 20;..00 ······---225 M-100 12.8 2:\?, -6 2. 13 24 0. 0 01/25/84 00:00 227 68 100 13.6 27.2 2.27 26 0. 0 DAILY AVERAGE VALUES 12.3 24. 7 2.06 22 0. 0 01/26/84 04:00 229 69 100 13.8 27.6 2.30 27 0.0 01/26/84 08: 00 231 66 100 13.2 26.4 2.20 25 0. 0 01/26/84 12: oo. --.. 233---~---100 t*l. 4 --24.8--2.07 22 0.0 01/26/84 16:00 235 50 100 10.0 20.0 1. 67 16 0.0 01/26/84 20:00 237 39 101 7.8 15.6 1. 30 10 0. 5 01/26/8400~00 -·--23-9 ·-37-101 7.4 14.8 1. 23 ·9.6 0.5 DAILY AVERAGE VALUES 10. 8 21. 5 1. 80 18 0. 2 PROPOSED OLD HARBOR HYDROELECTR PRO~ECT 09/12/85 PAQE 5 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 01/07/84 04:00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DATA MV INCHES FEET CFS DEQ C =··--·=--·-·-•••a:. =·=··-=== •••• =··=== ===·· ====== =·=== 01/27/84 04:00 241 36 101 7.2 14.4 1. 20 9. 2 0. 5 01/27/84 08:00 243 33 101 6.6 13.2 1. 10 7.9 0. 5 01/27/84 12:00 245 31 101 6.2 12.4 1. 03 7.2 0. 5 01/27/84 16:00 247 30 101 6.0 12.0 1. 00 6.8 0. 5 Ol/;;!7/84 ;;tO:OO 249 30 lOt-6, 0 12.0 1. OG 6.8 0. 5 01/27/84 00:00 251 30 101 6. 0 12.0 1. 00 6.8 0. 5 DAILY AVERAGE VALUES 6.3 12.7 1. 06 7. 5 0. 5 01/28/84 04:00 253 30 101 6.0 12.0 1. 00 6.8 0. 5 01/28/84 08:00 25!') 30 101 6.0 12.0 1. 00 6. 8 0. 5 Ol/2S/S4 12;00 257 30 1-01 6.0 12.0 1. 0() 6,8 0. 5 01/28/84 16:00 259 30 101 6. 0 12.0 1. 00 6.8 0. 5 01/28/84 20:00 261 30 101 6. 0 12.0 1. 00 6.8 0. 5 01/28/84 00:00 :263 3:2 101 6.4 12.8 1. 07 7. 5 0. 5 DAILY AVERAGE VALUES 6. 1 12. 1 1. 01 6.9 0. 5 01/29/84 04;00 265 3:2 101 6. 4 12.8 1. 07 7.5 0. 5 01/29/84 08: 00 267 32 101 6. 4 12.8 1. 07 7.S 0. 5 01/29/84 12:00 269 32 101 6. 4 12.8 1. 07 7. 5 0. 5 01/29/84 16:00 271 33 101 6.6 13.2 1. 10 7.9 0. 5 01/29/84 20:00 273 32 101 6. 4 12.8 1. 07 7.5 0. 5 01/29/84 00:00 275 31 102 6.2 12. 4 1. 03 7.2 1.0 -DAU.V AVERAGE VALUES 6.4 12.8 1. 07 7. 5 0.6 01/30/fH,()4:00 277 31 102 6.2 12.4 1. 03 7.2 1.0 01/301-84--08! -00 279 30 102 6.0 12.0 1. 00 6.8 1.0 01/30/84 12:00 281 30 103 6.0 12.0 1. 00 6.8 1.5 01/30/84 16:00 283 30 103 6.0 12.0 1. 00 6.8 1.5 01/30/84 20: ()(}. 285 30 103 6.0 12;0 1. 00 6.8 1. 5 01/30/84 00:00 287 30 103 6.0 12.0 1. 00 6.8 1.5 DAILY AVERAGE VALUES 6.0 12. 1 1. 01 6. 9 1.3 01/31/84 04:00 289 30 103 6.0 12.0 1. 00 6.8 1.5 01/31/84 08:00 291 29 102 9.8 11. 6 0. 97 6.4 1.0 01/31/84 1:2:00 293 29 102 5. 8 11. 6 0.97 6. 4 1.0 01/31/84 16:00 299 29 103 5.8 11. 6 0.97 6.4 1.5 01/31/84 20:00 297 29 102 5.8 11.6 0.97 6.4 1.0 01/31/84 00:00 299 29 101 5. 8 11. 6 0.97 6.4 0. 5 DAILY AVERAGE VALUES 9. 8 11. 7 0.98 6. 5 1. 1 PROPOSED OLD HARBOR HYDROELECTR PROJECT 05/12/85 PAGE 6 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 01/07/84 04:00 DEPTH STAQE DISCHG TEMP DATE THE BYTE RAW DATA -MY INCHES FEET CFS DEG C -······· -----···= ---·-·.2-11: ·=·· =·=-=·= ==··= ===··· ==-== 02/01/84 04:00 301 29 101 5.8 11. 6 0.97 6.4 0.5 02/01/84 08:00 303 29 100 5.8 11.6 0.97 6.4 0.0 02/01/84 12:00 305 29 101 5. 8 11.6 0.97 6.4 0. 5 02/01/84 16:00 307 29 102 5. 8 11.6 0.97 6.4 1.0 02/01/84 20:00 3G9 Q9 lW 5. 9 H. 6-0; 97 6.4 1.5 02/01/84 00:00 311 29 103 5.8 11.6 0.97 6. 4 1. 5 DAILY AVERAGE VALUES 5. 8 11. 6 0.97 6. 4 0.8 02/02/84 04:00 313 29 103 5.8 11.6 0.97 6.4 1.5 02/02/84 08:00 315 29 103 5. 8 11. 6 0.97 6.4 1.5 02/02/84 12; 00 --3!7---2-9· 1-G2-·· &.8 11. 6-0.97 6.4 1.0 02/02/84 16:00 319 29 103 5.8 11. 6 0.97 6.4 1.5 02/02/84 20:00 321 29 101 5. 8 11.6 0.97 6.4 0. 5 02/02/84 00:00 a2-3 ~9-101 5.8 11. 6 0.97 6. 4 o. 5 DAILY AVERAGE VALUES 5.8 11. 6 0.97 6. 4 1. 1 021'03/84 .04; Q(} ---323 29 tOl . 5. 8 11.6 0.-97 6. 4 0. 5 02/03/84 08:00 327 29 101 5.8 11. 6 0.97 6. 4 0. 5 02/03/84 12:00 329 29 102 5. 8 11.6 0. 97 6. 4 1.0 02/03/84 16:00 331 29 101 5.8 11.6 0.97 6.4 0. 5 02/03/84 20:00 333 29 101 5.8 11. 6 0.97 6. 4 o. 5 02/03/84 00:00 335 29 101 5.8 11.6 0.97 6. 4 o. 5 -DA·I-LY AVERAGE VAl-UES 5.8 11.6 0.97 6.4 0.6 g;~g:~JI: g:~. gg ____ ..... 337 29 101 5.8 11. 6 0.97 6. 4 0. 5 339 29 101 5, 8 11. 6 0.97 6. 4 0. 5 02/04/84 12:00 341 29 100 5. 8 11. 6 0.97 6.4 0.0 02/04/84 16:00 343 29 101 5. 8 11.6 0.97 6.4 0. 5 02/04/84 ~o;. 00-. 345--~9 101 5.8 11. 6 0.97 6. 4 0. 5 02/04/84 00:00 347 29 101 5.8 11.6 0.97 6.4 0. 5 DAILY AVERAGE VALUES 5. 8 11. 6 0.97 6.4 0.4 • 02/05/84 04:00 349 29 100 5.8 11.6 0. 97 6.4 0.0 02/05/84 08:00 351 35 100 7.0 14.0 1. 17 8. 7 0.0 02/05/S4 12:00 ~--· .. 39 100 7.8 Hi. 6 1.30 10 0.0 02/05/84 16:00 355 30 101 6.0 12.0 1. 00 6.8 o. 5 02/05/84 20:00 357 29 101 5.8 11.6 0.97 6.4 0. 5 02/05/84 00:00 -339 -28 H)l 5. 6 11. 2 0.93 6. 1 0. 5 DAILY AVERAGE VALUES 6.3 12. 7 1. 06 7. 4 0.3 PROPOSED OLD HARBOR HYDROELECTR PROJECT 0:5/12/85 PAGE 7 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 01/07/84 04:00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DATA M\1 INCHES FEET CFS DEGC ··=-·----••••• -··· .......... ---= ====•a =----:a===·= ===== 02/06/84 04:00 361 28 101 5.6 11.2 0.93 6. 1 0. 5 02/06/84 08:00 363 28 100 5.6 11. 2 0.93 6. 1 0.0 02/06/84 12:00 365 32 100 6.4 12.8 1. 07 7.5 0.0 02/06/84 16:00 367 29 101 5.8 11. 6 0.97 6. 4 0. 5 02/06/84 20: 00 369 30 100 6.0 12.0 1. 00 6.8 0. 0 02/06/84 00:00 371 38 100 7.6 1:5.2 1. 27 10 0.0 DAILY AVERAGE VALUES 6.2 12.3 1. 03 7.2 0.2 02/07/84 04:00 373 44 100 8.8 17.6 1. 47 13 0. 0 02/07/84 08:00 375 51 100 10.2 20.4 1. 70 16 0.0 02/07/84 12;00 377 56 100 11.2 22.4 1. 87 19 0.0 02/07/84 16:00 379 51 100 10.2 20.4 1. 70 16 0.0 02/07/84 20:00 381 47 100 9.4 18.8 1. 57 14 0.0 02/07/84 00:00 393 48 100 9.6 19.2 1. 60 15 0.0 DAILY AVERAGE VALUES 9.9 19.8 1. 6:5 16 0.0 02/08/84 04:00 . 365 50 100 10.0 20.0 1. 67 16 0.0 02/08/84 08:00 387 52 100 10.4 20.8 1. 73 17 0.0 02/08/84 12:00 389 52 100 10.4 20.8 1. 73 17 0.0 02/08/84 16:00 391 49 100 9.8 19.6 1. 63 15 0.0 02/08/84 20:00 393 44 100 8.8 17.6 1. 47 13 0.0 02/08/84 00:00 395 45 100 9.0 18.0 1. 50 13 0.0 DA I{;; V AVERAQE VALUES 9. 7 19. 5 1. 62 15 0.0 02/09/tM04:00 397 46 101 9.2 18.4 1. 53 14 0. 5 02/09/84 08:00 399 48 100 9.6 19.2 1. 60 15 0.0 02/09/84 12:00 401 50 100 10.0 20.0 1. 67 16 0.0 02/09/84 16:00 403 47 100 9. 4 18.8 1. 57 14 0.0 02/09/84 20:00 405 40 101 8.0 16.0 1. 33 11 0. 5 02/09/84 00:00 407 36 100 7.2 14.4 1. 20 9.2 0.0 DAILY AVERAGE VALUES 8. 9 17.8 1. 48 13 0.2 02/10/84 04:00 409 31 100 6.2 12.4 1. 03 7.2 0.0 02/10/84 08:00 411 30 101 6.0 12.0 1. 00 6.8 0. 5 02/10/84 12;00 413 30 101 6.0 12.0 1.00 6.8 0. 5 02/10/84 16:00 415 30 101 6. 0 12.0 1. 00 6.8 0.5 02/10/84 20:00 417 30 101 6.0 12.0 1. 00 6.8 0. 5 02/10/84 00:00 419 29 101 5. 8 11. 6 0.97 6.4 0. 5 DAILY AVERAGE VALUES 6.0 12.0 1. 00 6.8 0.4 PROPOSED OLD HARBOR HYDROELECTR PROJECT 05/12/85 PAGE 8 MIDWAY CREEK NEAR OLD HARBOR I ALASKA START TIME 01/07/84 04:00 DEPTH STAGE DISCHQ TEMP DATE TIME BYTE RAW DATA MV INCHES FEET CFS DEQ C .:~•••••=• ··=·· ···= =····=·-----== ======· =···· ====== ··=== 02/11/84 04:00 421 30 101 6.0 12.0 1. 00 6.8 0. 5 02/11/84 08:00 423 29 101 5.8 11. 6 0.97 6.4 0. 5 02/11/84 12:00 425 28 101 5.6 11.2 0.93 6. 1 0. 5 02/11/84 16:00 427 28 102 5. 6 11. 2 0.93 6. 1 1.0 02/11/84 20:00. ·-·-~9 28 102 5;6 11:2 0.93 6. 1 1.0 02/11/84 00:00 431 28 102 5.6 11. 2 0.93 6. 1 1.0 DAILY AVERAGE VALUES 5. 7 11.4 0.95 6.3 0.8 02/12/84 04:00 433 28 102 5. 6 11.2 0.93 6. 1 1. 0 02/12/84 08:00 435 28 102 5. 6 11. 2 0.93 6. 1 1.0 02/12/84 12,00 -·437 ~ 103-!'J, 6 11. 2 0.93 6. 1 1.5 02/12/84 16:00 439 28 103 5.6 11. 2 0.93 6. 1 1.5 02/12/84 20:00 441 27 103 5. 4 10.8 0.90 5. 7 1.5 02/12/84 00:00 -44a 28-102 5. 6 11.2 0.93 6. 1 1.0 DAILY AVERAGE VALUES 5.6 11. 1 0.93 6. 0 1.3 02/13/84 04:00 --441 27 102 5.4 10.8 0.90 5. 7 1.0 02/13/84 08:00 447 27 102 5. 4 10.8 0.90 5. 7 1.0 02/13/84 12:00 449 27 102 5.4 10.8 0.90 5. 7 1.0 02/13/84 16:00 451 27 102 5. 4 10.8 0.90 5. 7 1.0 02/13/84 20:00 453 27 103 5.4 10.8 0.90 5. 7 1.5 02/13/84 00:00 455 27 102 5.4 10.8 0.90 5. 7 1.0 -DAlk¥ AYERAQE VALUES 5, 4 10.8 0.90 5. 7 1. 1 o2t141CM04:oo 457 27 102 5. 4 10.8 0.90 5. 7 1. 0 02/14/8408:00 439 27 101 3. 4 10.8 0.90 5. 7 0. 5 02/14/84 12:00 461 27 101 5. 4 10.8 0.90 5. 7 0. 5 02/14/84 16:00 463 27 102 5. 4 10.8 0.90 5. 7 1.0 02/14/84 20:00 %5 27 102 5. 4 10.8 0.90 5. 7 1.0 02/14/84 00:00 467 27 102 5. 4 10.8 0.90 5. 7 1.0 DAILY AVERAGE VALUES 5.4 10.8 0.90 5. 7 0.8 02/15/84 04:00 469 27 102 5.4 10.8 0.90 5. 7 1.0 02/15/84 08:00 471 27 102 5. 4 10.8 0.90 5. 7 1. 0 02/15/84 1:.!;00 473 27 103 5, 4 10.8 0.90 5. 7 1.5 02/15/84 16:00 475 27 103 5. 4 10.8 0.90 5. 7 1.5 02/15/84 20:00 477 27 103 5. 4 10.8 0.90 5. 7 1.5 02/15/84 00:00 479 27 W3 5.4 10.8 0.90 5. 7 1. 5 . i DAILY AVERAGE VALUES 5. 4 10.8 0.90 5. 7 1 3 t·: PROPOSED OLD HARBOR HYDROELECTR PRO~ECT 0~/12/85 PAGE 9 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 01/07/84 04:00 DEPTH STAGE DISCHG TEMP OAT£ TIME BYTE RAW DATA MY INCHES FEET CFS DEG C =····=·· -·-·-·---····=···---·= ==··=== =··=· ====== ==.--= 02/16/84 04:00 481 27 102 5. 4 10.8 0.90 5. 7 1.0 02/16/84 09:00 483 27 102 5. 4 10.8 o.qo 5. 7 1.0 02/16/84 12:00 485 27 101 5. 4 10.8 0.90 5. 7 0. 5 02/16/84 16:00 487 27 102 5.4 10.8 0.90 5. 7 1.0 02/16/84 :iilO;OO 489 ;}.7 102 5. 4 10.8 o.qo 5. 7 1. 0 02/16/84 00:00 491 27 102 5.4 10.8 0.90 5. 7 1.0 DAILY AVERAGE VALUES 5. 4 10.8 0.90 5. 7 0.9 02/17/84 04:00 4q3 27 102 5.4 10.8 0.90 5. 7 1.0 02/17/84 08:00 495 27 102 5. 4 10.8 0.90 5. 7 1.0 02/17/&4 lii&;OO 497 27 102 5.4 10.8 0.90 5. 7 1.0 02/17/84 16:00 499 27 103 ~.4 10.8 0.90 5. 7 1.5 02/17/84 20:00 ~01 27 103 5.4 10.8 0.90 5. 7 1.5 02/17/84 00:00 803 27 102 5.4 10.8 0.90 5. 7 1.0 DAILY AVERAGE VALUES 5. 4 10.8 0. 90 5. 7 1.2 02/18/84 04:00 305 27 102 5.4 10.8 0.90 5. 7 1.0 02/18/84 08:00 ~07 27 101 ~-4 10.8 0.90 5. 7 0. 5 02/18/84 12:00 509 27 101 5. 4 10.8 0.90 ~-7 0. 5 02/18/84 16:00 511 27 102 5.4 10.8 0.90 5. 7 1.0 02/18/84 20:00 513 27 102 5. 4 10.8 0.90 5. 7 1.0 02/18/84 00:00 515 27 101 5.4 10.8 0.90 5. 7 0. 5 DAib Y AYERAGE YAUIES 5.4 10.8 0.90 5. 7 0.8 0211q194 04:00 517 26 101 5.2 10.4 0.87 5. 4 0. 5 02/l9l....,.08l 00 . 319 26 100 5. 2 10.4 0.87 5.4 0.0 02/19/84 12:00 521 26 100 5.2 10.4 0.87 5. 4 0.0 02/19/84 16:00 ~23 27 101 5. 4 10.8 0.90 5. 7 0. 5 02/19/84 20:00 325 26 100 5. 2 10.4 o,97 5. 4 0.0 02/19/84 00:00 527 26 100 5.2 10.4 0.87 5.4 0.0 DAILY AVERAGE VALUES 5.2 10.5 0.88 5. 5 0.2 02/20/84 04:00 529 26 101 5.2 10.4 0.87 5. 4 0. 5 02/20/84 08:00 531 27 100 ~-4 10.8 0.90 5. 7 0.0 02/20/84 12:00 533 27 100 5.4 10.8 0.90 5. 7 0.0 02/20/84 16:00 ~35 28 101 5.6 11.2 0.93 6. 1 0. 5 02/20/84 20:00 537 27 101 5.4 10.8 0.90 5. 7 0. 5 02/20/84 00:00 539 28 100 5. 6 11. 2 0.93 6. 1 0.0 DAILY AVERAGE VALUES 5. 4 10.9 0. 91 5.8 0.3 l"i PROPOSED OLD HARBOR HYDROELECTR PROJECT 0:5/12/85 PAGE 10 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 01/07/84 04:00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DATA MY INCHES FEET CFS DEQ C =-------DSI111-B ----·-===····= ==== =•:::~:=== ===== =====· ==::::== 02/21/84 04:00 341 29 100 5. 8 11. a 0.97 6.4 0.0 02/21/84 08:00 843 27 101 5. 4 10.8 0.90 5. 7 0.5 02/21/84 12:00 545 27 101 5. 4 10.8 0.90 5. 7 0. 5 02/21/84 16:00 547 27 101 5. 4 10.8 0.90 5. 7 0. 5 02/21/84 20:00 549 27 101 5. 4 10.8 0.90 5. 7 0. 5 02/21/84 00:00 551 27 101 5. 4 10.8 0.90 5. 7 0. 5 DAILY AVERAGE VALUES 5. 5 10. 9 0.91 5.8 0. 4 02/22/84 04:00 553 27 101 5.4 10.8 0.90 5. 7 0. 5 02/22/84 08:00 555 27 101 5.4 10.8 0.90 5. 7 0. 5 02/22/94 12;00-$$7 27 ·101 5, 4 10.8 o,9o 5. 7 0. 5 02/2:il/84 16:00 559 27 102 5. 4 10.8 0.90 5. 7 1.0 02/22/84 20:00 561 27 102 5. 4 10.8 0.90 5. 7 1.0 02/22/84 00:00 563 27 102 5. 4 10.8 O.ct'O 5. 7 1.0 DAILY AVERAGE VALUES 5. 4 10.8 0.90 5. 7 0.8 02/23/84 04:00 5&S 27 102 5. 4 10.8 0.90 5. 7 1.0 02/23/84 08:00 567 27 101 5. 4 10.8 0.90 5. 7 0. 5 02/23/84 12:00 56ct' 27 101 5. 4 10.8 0.90 5. 7 0. 5 02/23/84 16:00 571 27 102 5. 4 10.8 0.90 5. 7 1.0 02/23/84 20:00 573 27 102 5.4 10.8 0.90 5. 7 1.0 02/23/84 00:00 575 27 102 5.4 10.8 0.90 5. 7 1. 0 ··DAlbY ·AYERAOE VALUES 5. 4 10.8 0.90 5. 7 0.8 02/24/8404:00 577 27 102 5. 4 10.8 0.90 5. 7 1. 0 02124184 oa:oo. 579 27 102 5. 4 10.8 0. 90 5. 7 1.0 02/24/84 12:00 581 27 102 5. 4 10.8 0.90 5. 7 1.0 02/24/84 16:00 383 26 103 5.2 10.4 0.87 5.4 1.5 02/24/84 20;00· 585 2& 103 3. 2 10.4 0.87 5. 4 1.5 02/24/84 00:00 587 27 103 5. 4 10.8 0.90 5. 7 1 5 DAILY AVERAGE VALUES 5. 3 10. 7 0.89 5. 6 1. 3 02/25/84 04:00 589 27 103 5.4 10.8 0.90 5. 7 1.5 02/25/84 08:00 591 26 103 5.2 10.4 0.87 5.4 1.5 02/25/S4 12~00 593 26 102 5.2 10.4 0.87 5.4 1.0 02/25/84 16:00 595 27 101 5. 4 10.8 O.ct'O 5. 7 0. 5 02/25/84 20:00 597 31 100 6.2 12.4 1. 03 7.2 0.0 02/2:5/84 00:00 599 33 100 &.6 13.2 1. 10 7. 9 0.0 DAILY AVERAGE VALUES 5. 7 11. 3 0.95 6.2 0.8 PROPOSED OLD HARBOR HYDROELECTR PROJECT 05/12/85 PAGE 11 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 01/07/84 04:00 DEPTH STAQE DISCHQ TEMP DATE Tll'tfi BYTE RAW DATA M'w' INGHES FEET CFS DEQ C =··----· ····-..... ==··-----=··= ====ss= =·=== ===·== ===== 02/26/84 04:00 601 34 101 6.8 13.6 1. 13 8.3 0. 5 02/26/84 08:00 603 37 101 7. 4 14.8 1. 23 9.6 0. 5 02/26/84 12:00 605 36 101 7. 2 14.4 1. 20 9. 2 0. 5 02/26/84 16:00 607 34 101 6. 8 13.6 1. 13 e. 3 0. 5 02/26/84 20:00 6<)9 32 102 6. 4 12.8 1. 07 7. 5 1.0 02/26/84 00:00 611 31 103 6.2 12.4 1. 03 7.2 1.5 DAILY AVERAGE VALUES o. a 13.6 1. 13 8.4 0.8 02127/84 04:00 613 30 103 6.0 12.0 1. 00 6.8 1.5 02/27/84 08:00 615 30 103 6. 0 12.0 1. 00 o. a 1.5 02/27/84 12:00 617 29 103 5.8 11.0 0.97 6. 4 1.5 02/27/84 16:00 619 29 104 5.8 11.0 0.97 6.4 2.0 02/27/84 20:00 621 29 104 5. a 11. 0 0.97 6.4 2.0 02/27/84 00:00 623 28 103 5.6 11.2 0.93 6. 1 1.5 DAILY AVERAGE 'w'ALUES 5. 8 11. 7 0.97 6. 5 1.7 02/28/84 04:00 025 28 103 5.6 11. 2 0.93 6. 1 1.5 02/28/84 08:00 627 28 103 5.6 11. 2 0.93 6. 1 1.5 02/28/84 HZ: 00 629 28 103 5.6 11. 2 0.93 6. 1 1.5 02/28/84 16:00 631 28 103 5. 0 11.2 0. 93 6. 1 1. 5 02/28/84 20:00 633 28 103 5. 0 11.2 0.93 6. 1 1.5 02/28/84 00:00 635 28 103 5.6 11. 2 0.93 6. 1 1.5 DAILY AYERA9E VALUES 5.6 11. 2 0.93 6. 1 1.5 02/29/84 04:00 637 28 103 5.6 11.2 0.93 6. 1 1.5 02/29/84-:00 639 28 103 5.6 11. 2 0.93 6. 1 1. 5 02/29/84 12:00 641 27 103 5. 4 10.8 0.90 5. 7 1.5 02/29/84 16:00 643 27 104 5. 4 10.8 0.90 5. 7 2.0 02/29/84 20:00 045 27 103 5.4 10.8 0.90 5. 7 1.5 02/29/84 00:00 647 27 102 5. 4 10.8 0.90 5. 7 1.0 DAILY AVERAGE VALUES 5. 5 10.9 0.91 5.8 1. 5 03/01/84 04:00 649 27 102 5. 4 10.8 0.90 5. 7 1. 0 03/01/84 08:00 651 27 102 5. 4 10.8 0.90 5. 7 1. 0 03/01/84 12:00 653 27 102 5. 4 10.8 0.90 5. 7 1.0 03/01/84 16:00 655 27 104 5. 4 10.8 0.90 5. 7 2.0 03/01/84 20:00 657 27 104 5. 4 10.8 0.90 5. 7 2.0 03/01/84 00:00 659 27 102 5. 4 10.8 0.90 5. 7 1.0 DAILY AVERAQE VALUES 5. 4 10.8 0.90 5. 7 1.3 PROPOSED OLD HARBOR HYDROELECTR PROJECT 05/12/85 PAGE 12 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 01/07/84 04:00 DEPTH STAQE DISCHG TEMP DATE TIME BYTE RAW DATA MV INCHES FEET CFS DEQ C =··-=-·· ·=··· ···= ==·==··== =··= ==·=·-=a••• ===a== s:ar:-=scc: 03/02/84 04:00 661 27 102 5.4 10.8 0.90 5. 7 1.0 03/02/84 08:00 663 27 102 5. 4 10.8 0.90 5. 7 1.0 03/02/94 12:00 665 27 101 5.4 10.8 0.90 5. 7 0. 5 03/02/84 16:00 667 27 102 5.4 10.9 0.90 5. 7 1.0 03/02/84 20: 00 --6o9 28 1G2 5.6 11.2 0.93 6. 1 1.0 03/02/94 00:00 671 27 103 5.4 10.8 0.90 5. 7 1.5 DAILY AVERAGE VALUES 5. 4 10.9 0.91 5.8 1.0 03/03/84 04:00 673 27 103 5. 4 10.8 0.90 5. 7 1.5 03/03/84 09:00 675 27 103 5. 4 10.8 0.90 5. 7 1.5 03/03/84 12;00 677 27 103 5.4 10.8 0.90 5. 7 1.5 03/03/84 16:00 679 28 102 5. 6 11. 2 0.93 6. 1 1.0 03/03/84 20:00 681 29 102 5.8 11. 6 0.97 6.4 1.0 03/03/84 00:00 683 ~ 102 6.4 12.8 1. 07 7. 5 1.0 DAILY AVERAGE VALUES 5. 7 11. 3 0.95 6.2 1. 3 03/04/84 04:00 685 35 102 7.0 14.0 l. l7 8. 7 1.0 03/04/94 08:00 687 33 102 6.6 13.2 1. 10 7. 9 1.0 03/04/84 12:00 689 33 103 6. 6 13.2 1. 10 7.9 1.5 03/04/84 16:00 691 33 104 6. 6 13.2 1. 10 7.9 2.0 03/04/94 20:00 693 34 104 6.8 13.6 1. 13 8.3 2.0 03/04/84 00:00 695 38 102 7.6 15.2 1. 27 10 1. 0 -DAlbY··AVERAGE VALUES 6. 9 13.7 1. 15 8. 5 1. 4 o3/051EI,f. 04: oo 697 50 101 10.0 20.0 1. 67 16 0. 5 03/0$/IP-0&1;00 ···699 31 101 10. 2 20.4 1. 70 16 0. 5 03/05/84 12:00 701 50 102 10.0 20.0 1. 67 16 1.0 03/05/84 16:00 703 47 102 9.4 18.8 1. 57 14 1.0 ! : 03/05/84 20:00 705 4:t-. 103 9. 0 18.0 1. 50 13 1.5 03/05/94 00:00 707 43 103 8.6 17.2 1. 43 12 1.5 DAILY AVERAGE VALUES 9. 5 19. 1 1. 59 15 1.0 03/06/84 04:00 709 40 103 8.0 16.0 1. 33 11 1.5 03/06/84 08:00 711 38 104 7.6 15.2 1. 27 10 2.0 03/06/S4 12;00 713 37 104 7.4 14.8 l. 23 9.6 2.0 03/06/84 16:00 715 38 105 7.6 15.2 1. 27 10 2. 5 03/06/94 20:00 717 44 103 8.8 17.6 l. 47 13 1.5 03/06/84 00;00 719 44 103 8.8 ·17. 6 1. 47 13 1.5 DAILY AVERAGE VALUES 8.0 16. 1 1. 34 11 1.8 i.. I , PROPOSED OLD HARBOR HYDROELECTR PRO~ECT 05/12/85 PAGE 13 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 01/07/84 04:00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DATA MV INCHES FEET CFS DEG C =··===·· -··=· ···= -==··==··= ==·= =·==== =='="='S ====== ===== 03/07/84 04:00 721 41 104 8.2 16.4 1. 37 11 2.0 03/07/84 08:00 723 40 104 8.0 16.0 1. 33 11 2.0 03/07/84 12:00 725 38 104 7. 6 15.2 1. 27 10 2.0 03/07/84 16:00 727 37 105 7. 4 14.8 1. 23 9. 6 2. 5 03/07/84 20:00 729 37 104 7.4 14.8 1. 23 9.6 2.0 03/07/84 00:00 731 36 104 7. 2 14.4 1. 20 9.2 2.0 DAILY AVERAGE VALUES 7.6 15.3 1. 27 10 2. 1 03/08/84 04:00 733 36 104 7.2 14. 4 1. 20 9.2 2.0 03/08/84 08:00 735 37 105 7. 4 14.8 1. 23 9.6 2. 5 03/08/84 12:00 737 38 105 7.6 15.2 1. 27 10 2. 5 03/08/84 16:00 739 46 103 9.2 18.4 1. 53 14 1.5 03/08/84 20:00 741 56 102 11. 2 22.4 1. 87 19 1. 0 03/08/84 00:00 743 59 102 11.8 23.6 1. 97 21 1.0 DAILY AVERAGE VALUES 9. 1 18. 1 1. 51 14 1.8 03/09/84 04:00 745 56 1o-3 11.2 22.4 1. 87 19 1.5 03/09/84 08:00 747 53 103 10.6 21. 2 1. 77 17 1.5 03/09/84 12:00 749 51 104 10.2 20.4 1. 70 16 2.0 03/09/84 16:00 7!H 48 105 9. 6 19.2 1. 60 15 2. 5 03/09/84 20:00 753 48 104 9. 6 19.2 1. 60 15' 2.0 03/09/84 00:00 755 50 104 10.0 20.0 1. 67 16 2.0 DAikV AVERAGE VALUES 10.2 20.4 1. 70 16 1.9 03/10/84 04:00 757 52 104 10. 4 20.8 1. 73 17 2.0 03/10/S4 08: 00 759 49 104 9.8 19.6 1. 63 15 2.0 03/10/84 12:00 761 46 105 9.2 18.4 1. 53 14 2. 5 03/10/84 16:00 763 46 105 9.2 18. 4 1. 53 14 2. 5 03/10/84 20:00 763 43 lOS 9. 0 18.0 1. 50 13 2. 5 03/10/84 00:00 767 44 105 8. 8 17.6 1. 47 13 2. 5 DAILY AVERAGE VALUES 9. 4 18.8 1. 57 14 2.3 03/11/84 04:00 769 46 104 9.2 18.4 1. 53 14 2.0 03/11/84 08:00 771 44 104 8.8 17.6 1. 47 13 2.0 03/11/84 12:00 773 43 105 8.6 17.2 1. 43 12 2. 5 03/11/84 16:00 775 43 105 8. 6 17.2 1. 43 12 2. 5 03/11/84 20:00 777 44 105 8.8 17.6 1. 47 13 2. 5 03/11/84 00:00 779 43 105 8.6 17.2 1. 43 12 2. 5 DAILY AVERAGE VALUES 8. 8 17. 5 1. 46 13 2. 3 PROPOSED OLD HARBOR HYDROELECTR PROJECT 05/12/85 PAGE 14 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 01/07/84 04:00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DATA MY INCHES FEET CFS DEG C ··==•=.=• -·==-----········= ··=-= ==-=== azt=r:•w -==-=== ====· 03/12/84 04:00 781 42 105 8. 4 16. 8 1. 40 12 2. 5 03/12/84 08:00 783 41 105 8.2 16.4 1. 37 11 2. 5 03/12/84 12:00 785 39 105 7. 8 15.6 1. 30 10 2. 5 03/12/84 16:00 787 39 106 7.8 15.6 1. 30 10 3. 0 03/12/84 20:00 ·····-7&9· 38-· -1{)5.· 7,6 15.2 1. 27 10 2. 5 03/12/84 00:00 791 38 105 7.6 15.2 t. 27 10 2. 5 DAILY AVERAQE VALUES 7.9 15.8 1. 32 11 2.6 03/13/84 04:00 793 37 105 7. 4 14.8 1. 23 9. 6 2. 5 03/13/84 08:00 795 36 104 7.2 14.4 1. 20 9.2 2. 0 03/13/84 12: 00 ·+97-· 36 105 7.~ 14;4 1. 20 9. 2 2. 5 03/13/84 16:00 799 35 106 7.0 14.0 1. 17 8. 7 3.0 03/13/84 20:00 801 35 105 7. 0 14.0 1. 17 8. 7 2. 5 03/13/84 00:00 soa 35 105 7.0 14.0 1 17 B. 7 2. 5 DAILY AVERAOE VALUES 7. 1 14.3 1. 19 9.0 2. 5 03/14/84 Q4;00 -803 34 105 6.8 13.6. 1. 13 8.3 2. 5 03/14/84 08:00 807 34 104 6.8 13.6 1. 13 8.3 2.0 03/14/84 12:00 809 34 105 6.8 13.6 1. 13 8.3 2.5 03/14/84 16!00 811 33 106 6.6 13.2 1. 10 7.9 3.0 03/14/84 20:00 813 33 105 6. 6 13.2 1. 10 7.9 2. 5 03/14/84 00:00 815 33 105 6.6 13.2 1. 10 7.9 2. 5 D~lt. Y AVERAQE VAbVE:S 6. 7 13.4 1. 12 B. 1 2. 5 03/15/Eif 04:00 817 33 105 6. 6 13.2 1. 10 7.9 2. 5 03/15/fi 08; 00 819 34 104 6.8 13.6 1. 13 8.3 2.0 03/15/84 12:00 821 34 104 6.8 13.6 1. 13 8. 3 2.0 03/15/84 16:00 823 34 106 6.8 13.6 1. 13 8. 3 3.0 03/ 15/84 20; 00. . 925 34 105 6.8 13.6 1. 13 8.3 2. 5 03/15/84 00:00 827 34 105 6.8 13.6 1. 13 8.3 2. 5 DAILY AVERAGE VALUES 6.8 13. 5 1. 13 8.2 2.4 03/16/84 04:00 829 35 104 7. 0 14.0 1. 17 8. 7 2. 0 03/16/84 08:00 831 36 105 7. 2 14.4 1. 20 9.2 2. 5 03/16/84 l~;OO ·.s33· 36 lOS 7. 2 14.4 1. 20 9.2 2. 5 03/16/84 16:00 835 37 106 7.4 14.8 1. 23 9.6 3.0 03/16/84 20:00 837 37 105 7. 4 14.8 1. 23 9. 6 2. 5 03/16/84 00:00 ·839 37 105 7.4 14.8 1. 23 9.6 2.5 DAILY AVERAGE VALUES 7.3 14.5 1. 21 9. 3 2. 5 PROPOSED OLD HARBOR HYDROELECTR PRO~ECT 05/12/8:5 PAGE 15 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 01/07/84 04:00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DATA MV INCHES FEET CFS DEG C :•.:r..UICI'-=::tr:• ···=· --·-·==···--· ==·· ==··=== =•a•=: ====== ===== 03/17/84 04:00 841 37 105 7. 4 14.8 1. 23 9.6 2. 5 03/17/84 08:00 843 37 105 7. 4 14.8 1. 23 9. 6 2. 5 03/17/84 12:00 845 36 105 7.2 14.4 1. 20 9.2 2. 5 03/17/84 16:00 847 36 107 7. 2 14.4 1. 20 9.2 3. 5 03/17/84 20;00 -849 37 106 7. 4 14.8 1. .23 9.6 3.0 03/17/84 00:00 851 36 105 7. 2 14.4 1. 20 9.2 2. 5 DAILY AVERAGE VALUES 7.3 14.6 1. 22 9.4 2.8 03/18/84 04:00 853 36 104 7.2 14. 4 1. 20 9.2 2.0 03/18/84 08:00 855 35 104 7.0 14.0 1. 17 e. 1 2.0 03/18/94 12! 00 . 857 a4 105 6.8 13.6 1. 13 8.3 2.5 03/18/84 16:00 859 34 107 6.8 13.6 1. 13 8.3 3. 5 03/18/84 20:00 861 34 106 6.8 13.6 1. 13 8.3 3.0 03/18/84 00:00 863 34 104 6.8 13.6 1. 13 8.3 2.0 DAILY AVERAGE VALUES 6.9 13.8 1. 15 a. 5 2. 5 03/19/84 04:00 803 34 103 6.8 13.6 1. 13 8.3 1. 5 03/19/84 08:00 867 33 103 6.6 13.2 1. 10 7.9 1.5 03/19/84 12:00 869 33 103 6.6 13.2 1. 10 7.9 1.5 03/1<1/84 16:00 871 32 107 6.4 12.8 1. 07 7. 5 3. 5 03/19/84 20:00 873 32 107 6.4 12.8 1. 07 7. 5 3. 5 03/19/84 00:00 875 32 104 6. 4 12.8 1. 07 7. 5 2.0 DA-IkY AIJERAGE IJALUES 6. 5 13. 1 1. 09 7.8 2. 3 03/20/St 04:00 877 33 104 6.6 13.2 1. 10 7.9 2.0 o3t2otEI4-oe:oo 879 32 104 6. 4 12.8 1. 07 7. 5 2.0 03/20/84 12:00 881 32 105 6. 4 12.8 1. 07 7. 5 2. 5 03/20/84 16:00 883 31 107 6.2 12.4 1. 03 7.2 3. 5 03120/84 20: 00 aa& 31 106 6.2 12.4 1. 03 7 . .2 3.0 03/20/84 00:00 887 31 105 6.2 12.4 1. 03 7.2 2.5 DAILY AVERAGE VALUES 6. 3 12.7 1. 06 7.4 2.6 03/21/84 04:00 889 31 105 6.2 12.4 1. 03 7.2 2. 5 03/21/84 08:00 891 31 104 6.2 12.4 1. 03 7.2 2.0 03/21/84 12: 00-893 31 104 6.2 12.4 1. (}3 7.2 2.0 03/21/84 16:00 895 31 104 6.2 12.4 1. 03 7.2 2.0 03/21/84 20:00 897 31 105 6.2 12.4 1. 03 7.2 2. 5 03/21/84 00:00 899 32 104 6. 4 12.8 1. 07 7. 5 2.0 DAILY AVERAGE VALUES 6.2 12. 5 1. 04 7.3 2.2 PROPOSED OLD HARBOR HYDROELECTR PROJECT 05/12/85 PAGE 16 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 01/07/84 04:00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DATA MY INCHES FEET CFS DE9 C ==•==··· ··=-== •=== ···=-=·==-•:a:=• ==·==· =·=== ·===·== •==z== 03/22184 04:00 901 32 104 6. 4 12.8 1. 07 7. 5 2.0 03/22/84 08:00 903 ::n 104 6.2 12.4 1. 03 7.2 2.0 03/22/84 12:00 905 31 105 6.2 12.4 1. 03 7.2 2. 5 03/22/84 16:00 907 31 107 6.2 12.4 1. 03 7.2 3. 5 03/22/84 20:00 909 31 107 6. 2 12. 4 1. 03 7.2 3. 5 03/22/84 00:00 911 31 104 6.2 12.4 1. 03 7.2 2.0 DAILY AVERAGE VALVES 6.2 12.5 1. 04 7.3 2.6 03/23/84 04:00 913 30 103 6.0 12.0 1.00 6.8 1.5 03/23/84 08:00 915 30 102 6. 0 12.0 1. 00 6.8 1.0 03/23/84 12:00 --917 30 103 6.0 12.0 1. 00 6.8 1.5 03/23/84 16:00 919 30 107 6.0 12.0 1. 00 6.8 3. 5 03/23/84 :.!0:00 921 30 107 6.0 12.0 1. 00 6.8 3. 5 03/23/84 00:00 923 30 105 6.0 12.0 1. 00 6.8 2. 5 DAILY AVERAGE VALVES 6. 0 12.0 1. 00 6.8 2.3 03/24/84 04:·00----. 923. 3Q 10& 6.0 12.0 1.-00 6.8 2.5 03/24/84 08:00 927 30 104 6.0 12.0 1. 00 6.8 2.0 03/24/84 12:00 929 30 105 6.0 12.0 1. 00 6.8 2. 5 03/24/84 16:00 931 29 108 5. e 11.6 0.97 6. 4 4.0 03/24/84 :.!0:00 933 30 108 6.0 12.0 1. 00 6. 8 4.0 03/24/84 00:00 935 30 106 6.0 12.0 1. 00 6.8 3.0 -OAlkV AVERAGE VALUES 6.0 11. 9 1. 00 6. 7 3.0 03/2,/$f04:00 937 30 105 6.0 12.0 1. 00 6.8 2.5 031:23/fi--OEkOO -939 30 104 6.0 12.0 1. 00 6.8 2.0 03/25/84 12:00 941 29 105 5.8 11.6 0.97 6.4 2. 5 03/25/84 16:00 943 29 109 5.8 11.6 0.97 6. 4 4. 5 03/25/84 20:00 945 29 108 5.8 11.6 0.97 6.4 4.0 03/25/84 00:00 947 30 106 6.0 12.0 1. 00 6.8 3.0 DAILY AVERAGE VALVES 5. 9 11.8 0.99 6.6 3. 1 03/26/84 04:00 949 29 105 5. 8 11. 6 0.97 6.4 2. 5 03/26/84 08:00 951 30 105 6.0 12.0 1. 00 6.8 2. 5 03/26/84 l:OZ;OO 953 30 105 6.0 12.0 l. 00 6.8 2. 5 03/26/84 16:00 955 30 106 6.0 12.0 1. 00 6. 8 3. 0 03/26/84 20:00 957 30 107 6.0 12.0 1. 00 6.8 3. 5 03/26/84 00¥00 939 30 to& 6.0 12.0 1. 00 6.8 2. 5 DAILY AVERAGE VALVES 6.0 11. 9 1. 00 6. 7 2. 8 ' I • PROPOSED OLD HARBOR HYDROELECTR PRO~ECT 0~/12/8!5 PAGE 17 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 01/07/84 04:00 DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DATA MY INCHES FEET CFS DEG C ==·===== ••s=• ==·· ===-======= =-== ======= ===---==·=== ====== 03/27/84 04:00 961 30 10!5 6.0 12.0 1. 00 6. 8 2. 5 03/27/84 08:00 963 30 104 6.0 12.0 1. 00 6.8 2.0 03/27/84 12:00 965 30 105 6.0 12. 0 1. 00 6.8 2. 5 03/27/84 16:00 967 30 107 6. 0 12.0 1. 00 6. 8 3. 5 03/27/84 20:00--969 30 107 6,0 12.0 1. 00 6.8 3. 5 03/27/84 00:00 971 30 105 6.0 12.0 1. 00 6. 8 2. 5 DAILY AVERAGE VALUES 6.0 12.0 l. 00 6.8 2.8 03/28/84 04:00 973 29 104 5. 8 11. 6 o.cn 6.4 2.0 03/28/84 08:00 975 29 104 5.8 11.6 0.97 6. 4 2.0 03/28/84 12i00 ···977 «!9 105 5.8 11. 6 0.97 6. 4 iit 5 03/28/84 16:00 979 29 105 5.8 11. 6 0. 97 6.4 2.5 03/28/84 20:00 981 29 101 5.8 11. 6 0.97 6.4 0.5 03/28/84 00:00 989 29 101 5. 8 11. 6 0.97 6. 4 0. 5 DAILY AVERAGE VALUES 5.8 11. 6 0.97 6.4 1. 7 03/29/84 04;00 985 29 101 5.8 11. 6 0. 97 6.4 0. 5 03/29/84 08:00 987 29 101 5. 8 11.6 0.97 6. 4 0. 5 03/29/84 12:00 989 29 102 5. 8 11. 6 0. 97 6. 4 1.0 03/29/84 16:00 991 29 103 5. 8 11. 6 0.97 6.4 1.5 03/29/84 20:00 993 30 104 6.0 12.0 1. 00 6.8 2.0 03/29/84 00:00 995 30 104 6.0 12.0 1. 00 6.8 2.0 DAILY AVERAGE VALUES 5.9 11. 7 0.98 6. s 1.3 03/30184 04:00 997 29 104 5.8 11. 6 0.97 6.4 2.0 03/30/rM 08:00 999 29 103 5.8 11.6 0.97 6.4 1.5 03/30/84 12:00 001 29 104 5. 8 11.6 0.97 6.4 2.0 03/30/84 16:00 003 29 108 5.8 11. 6 0.97 6. 4 4.0 03/30/84 20: 00 005 30 107 6. 0 12.0 1. 00 6.8 3. s 03/30/84 00:00 007 30 105 6.0 12.0 1. 00 6.8 2. 5 DAILY AVERAGE VALUES 5.9 11.7 0.98 6. 5 2.6 03/31/84 04:00 009 30 104 6.0 12.0 1. 00 6.8 2.0 03/31/84 08:00 011 30 104 6.0 12.0 1. 00 6.8 2. 0 03/31/84 12:00 013 29 105 5.8 11.6 0.97 6.4 2. 5 03/31/84 16:00 015 29 107 !5.8 11.6 0.97 6.4 3. 5 03/31/84 20:00 017 29 106 !5.8 11. 6 0.97 6. 4 3. 0 03/31/84 00:00 019 29 104 5. a 11. 6 0.97 6.4 2.0 DAILY AVERAGE VALUES 5. 9 11.7 0.98 6. 5 2. 5 PROPOSED OLD HARBOR HYDROELECTR PROJECT 05/12/85 PAGE 19 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 01/07/84 04:00 DEPTH STAGE DISCHQ TEMP DATE TIME BYTE RAW DATA MV INCHES FEET CFS DEQ C ----·=·· --··· =··= ·===-=-·=== ==•= ====== ======= ====== ===== 04/06/84 04:00 081 27 99 5. 4 10.8 0.90 5. 7 -. 5 04/06/84 08:00 083 27 98 5. 4 10.8 0.90 5. 7 -1.0 04/06/84 12:00 085 27 100 5. 4 10.8 0. 90 5. 7 0.0 04/06/84 16:00 087 27 106 5. 4 10.8 0.90 5. 7 3.0 04/06/84 20:00 089~ 27 107 5. 4 10.8 0.90 5. 7 3. 5 04/06/84 00:00 091 27 100 5. 4 10.8 0.90 5. 7 0.0 DAILY AVERAGE VALUES 5. 4 10.8 0.90 5. 7 0.8 04/07/84 04:00 093 27 97 5. 4 10.8 0.90 5. 7 -1. 5 04/07/84 08:00 095 27 97 5. 4 10.8 0.90 5. 7 -1. 5 04107184 12;00 097 27 101 5. 4 10.8 0.90 5. 7 0. 5 04/07/84 16:00 099 27 108 5. 4 10.8 0.90 5. 7 4.0 04/07/84 20:00 101 27 106 5.4 10.8 0.90 5. 7 3.0 04/07/84 00:00 103 27 100 5. 4 10.8 0.90 5. 7 0. 0 DAILY AVERAGE VALUES 5. 4 10.8 0.90 5. 7 0.8 04/08/84 04:00 105 27 97 5.4 10.8 0.90 5. 7 -1. 5 04/08/84 08:00 107 27 96 5. 4 10.8 0.90 5. 7 -2.0 04/08/84 12:00 109 27 96 5. 4 10.8 0.90 5. 7 -2. 0 04/08/84 16:00 111 27 96 5. 4 10.8 0.90 5. 7 -2.0 04/08/84 20:00 113 27 94 5. 4 10.8 0.90 5. 7 -3.0 04/08/84 00:00 115 27 94 5. 4 10.8 0.90 5. 7 -3.0 DAILY AVERAGIE VALUES 5. 4 10.8 0.90 5. 7 -2.3 04/0CJ'/&404:00 117 28 94 5. 6 11.2 0.93 6. 1 -3.0 o4109ta4 os: oo llCJ' 29 95 5.8 11. 6 0.97 6. 4 -2. 5 04/09/84 12:00 121 28 97 5.6 11.2 0.93 6. 1 -1. 5 04/09/84 16:00 123 28 99 5. 6 11. 2 0.93 6. 1 -. 5 04/09/84 20:00 128 29 99 5.6 11. 2 0.93 6. 1 -. 5 04/09/84 00:00 127 28 96 5. 6 11. 2 0.93 6. 1 -2. 0 DAILY AVERAOE VALUES 5.6 11.3 0.94 6.2 -1. 7 04/10/84 04:00 129 28 93 5. 6 11.2 0.93 6. 1 -3. 5 04/10/84 08:00 131 28 92 5. 6 11.2 0.93 6. 1 -4.0 04/10/84 12:00 133 27 94 5. 4 10.8 0.90 5. 7 -3.0 04/10/84 16:00 135 27 101 5.4 10.8 0.90 5. 7 0. 5 04/10/84 20:00 137 27 CJ'9 5. 4 10.8 0.90 5. 7 -.5 04/10/84 00:00 139 27 93 5. 4 10.8 0.90 5. 7 -3. 5 DAILY AVERAGE VALUES 5. 5 10.9 0.91 5.8 -2. 3 PROPOSED OLD HARBOR HYDROELECTR PRO~ECT 05/12/85 PAGE 20 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 01/07/84 04:00 "] DEPTH STAGE DISCHG TEMP DATE TIME BYTE RAW DATA I"IV INCHES FEET CFS DEG C =···=·== ····= =··-===·==·=· -=•== ===··::!::= =·==-====•=: ======= 04/11/84 04:00 141 27 90 5. 4 10.8 0.90 5. 7 -5.0 04/11/84 08:00 143 27 89 5.4 10.8 0.90 5. 7 -5. 5 04/11/84 12:00 145 27 92 5. 4 10.8 0.90 5. 7 -4.0 04/11/84 16:00 147 27 99 5.4 10.8 0.90 5. 7 -. 5 04/11/84 20:00 149 -27 99 5. 4 10.8 0.90 5. 7 -. 5 04/11/84 00:00 151 27 95 5. 4 10.8 0.90 5. 7 -2. 5 DAILY AVERAGE VALUES 5. 4 10.8 0.90 5. 7 -3.0 04/12/84 04:00 153 27 92 5. 4 10.8 0.90 5. 7 -4.0 04/12/84 08:00 155 26 92 5. 2 10.4 0.87 5.4 -4.0 04/12/84 14;00 .. 1.:17 26 95 5.2 10.4 0.87 5.4 -2. 5 04/12/84 16:00 1:59 27 100 5. 4 10.8 0.90 5. 7 0.0 04/12/84 20:00 161 26 101 5.2 10.4 0.87 5. 4 0. 5 04/12/84 00:00 163 26 97 5.2 10.4 0.87 5. 4 -1. 5 DAILY AVERAGE VALUES 5.3 10. 5 0.88 5. 5 -1. 9 04/13/84 04:00 ·lb.:~ 26 93 5. 2 10.4 0.87 5.4 -3. 5 04/13/84 08:00 167 26 93 5.2 10.4 0.87 5.4 -3. 5 04/13/84 12:00 169 26 96 5. 2 10.4 0.87 5. 4 -2.0 04/13/84 16:00 171 26 102 5. 2 10.4 0.87 5. 4 1.0 04/13/84 20:00 173 26 101 5. 2 10.4 0.87 5.4 0. 5 04/13/84 00:00 175 27 97 5. 4 10.8 0.90 5.7 -1. 5 DAILY AVERAGE VALVES 5. 2 10.5 o.ee '· 5 -1. 5 04/14/tlf 04:00 177 27 95 5. 4 10.8 0.90 5. 7 -2. 5 04/l41P.o&:OO 179 26 94 5. 2 10. 4 0.87 5. 4 -3.0 04/14/84 12:00 181 26 96 5. 2 10.4 0.87 5.4 -2.0 04/14/84 16:00 183 26 101 5. 2 10.4 0.87 5. 4 0. 5 04/14/84 40:00 185. 27 99 5-.4 10.8 0.90 5. 7 -. 5 04/14/84 00:00 187 26 95 5.2 10.4 0.87 5. 4 -2. 5 DAILY AVERAGE VALUES 5.3 10. 5 0.88 5. 5 -1. 7 04/15/84 04:00 189 26 92 5.2 10.4 0.87 5.4 -4. 0 04/15/84 08:00 191 26 91 5. 2 10.4 0.87 5. 4 -4. 5 04/15/S4 1-;00 -193 26 . 94 5.2 10.4 0.87 5.4 -3.0 04/15/84 16:00 195 26 102 5.2 10.4 0.87 5. 4 1. 0 04/15/84 20:00 197 26 101 5.2 10.4 0.87 5.4 0. 5 04/15/8400:00 199 26 93 5. 2 10.4 0.87 5.4 -3. 5 DAILY AVERAGE VALUES 5. 2 10.4 0.87 5. 4 -2.3 PROPOSED OLD HARBOR HYDROELECTR PROJECT MIDWAY CREEK NEAR OLD HARBOR, ALASKA DATE TIME BYTE RAW DATA ··-·=·=· ···=· =---·=·-··=== 04116/84 04:00 201 27 89 MY =··= 5. 4 05/12/85 PAGE 21 START TIME 01107/84 04:00 DEPTH STAGE DISCHQ TEMP INCHES FEET CFS DEQ c =·==== ====· ===·== ===== 10.8 0.90 5. 7 -5. 5 PROPOSED OLD HARBOR HYDROELECTR PROJECT 05/16/85 PAGE 1 MIDWAY CREEK NEAR OLD HARBOR I ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===== ==== ========= ====== ===== ::e:::::n::== 05/03/84 02:00 1 17 0.85 0.85 21 05/03/84 04:00 2 18 0.90 0.90 23 05/03/84 06:00 3 18 0.90 0. 90 23 05/03/84 08:00 4 17 0.85 0.85 21 05/03/84 10:00 5 18 0.90 0. 90 23 05/03/84 12:00 6 18 0.90 0. 90 23 05/03/84 14:00 7 17 0.85 0.85 21 05/03/84 16:00 8 17 0.85 0.85 21 05/03/84 18:00 9 17 0.85 0.85 21 05/03/84 20:00 10 17 0.85 0.85 21 05/03/84 22:00 11 17 0.85 0.85 21 05/03/84 00:00 12 17 0.85 0.85 21 DAILY AVERAGE VALUES 0.87 0.87 22 05/04/84 02:00 13 17 0.85 0.85 21 05/04/84 04:00 14 17 0.85 0.85 21 05/04/84 06:00 15 17 0.85 0.85 21 05/04/84 08:00 16 17 0. 85 0.85 21 05/04/84 10:00 17 17 0.85 0.85 21 05/04/84 12:00 18 17 0.85 0.85 21 05/04/84 14:00 19 17 0.85 0.85 21 05/04/84 16:00 20 17 0.85 0.85 21 05/04/84 18:00 21 17 0.85 0.85 21 05/04/84 20:00 22 17 0.85 0.85 21 05/04/84 22:00 23 17 0.85 0.85 21 05/04/84 00:00 24 16 0. 80 0.80 20 DAILY AVERAGE VALUES 0.85 0.85 21 05/05/84 02:00 25 16 0.80 0. 80 20 05/05/84 04:00 26 16 0.80 0. 80 20 05/05/84 06:00 27 16 0.80 0. 80 20 05/05/84 08:00 28 16 0.80 0.80 20 05/05/84 10:00 29 16 0.80 0.80 20 05/05/84 12:00 30 16 0.80 0.80 20 05/05/84 14:00 31 16 0.80 0.80 20 05/05/84 16:00 32 16 0. 80 0.80 20 05/05/84 18:00 33 16 0. 80 0.80 20 05/05/84 20:00 34 16 0.80 0.80 20 05/05/84 22:00 35 16 0.80 0. 80 20 05/05/84 00:00 36 16 0.80 0.80 20 DAILY AVERAGE VALUES 0.80 0.80 20 PROPOSED OLD HARBOR HYDROELECTR PROJECT 05/16/-85 PAGE .2 MIDWAY CREE~ NEAR OLD HARBOR, ALAS~ A START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===== a=== ========= ====== ===== ====== 05/06/84 02:00 37 16 0. 80 0.80 20 05/06/84 04:00 38 16 0.80 0.80 20 05/06/84 06:00 39 16 0.80 0.80 20 05/06/84 08:00 40 16 0.80 0.80 20 05/06/84 10:00 41 16 0.80 0. 80 20 05/06/84 12:00 42 16 0.80 0. 80 20 05/06/84 14:00 43 16 0.80 0.80 20 05/06/84 16:00 44 16 0.80 0. 80 20 05/06/84 18:00 45 16 0.80 0.80 20 05/06/84 20:00 46 16 0. 80 0.80 20 05/06/84 22:00 47 16 0.80 0. 80 20 05/06/84 00:00 48 16 0. 80 0. 80 20 DAILY AVERAGE VALUES 0.80 0.80 20 05/07/84 02:00 49 15 0. 75 0. 75 18 05/07/84 04:00 50 15 0. 75 0. 75 18 05/07/84 06:00 51 15 0. 75 0. 75 18 05/07/84 08:00 52 15 0. 75 0. 75 18 05/07/84 10:00 53 15 0. 75 0. 75 18 05/07/84 12:00 54 15 0. 75 0. 75 18 05/07/84 14:00 55 15 0. 75 0. 75 18 05/07/84 16:00 56 15 0. 75 0.75 18 05/07/84 18:00 57 15 0. 75 0. 75 18 05/07/84 20:00 58 16 0. 80 0.80 20 05/07/84 22:00 59 16 0. 80 0. 80 20 05/07/84 00:00 60 16 0.80 0.80 20 DAILY AVERAGE VALUES 0. 76 0. 76 19 05/08/94 02:00 61 16 0. 80 0.80 20 05/08/84 04:00 62 16 0.80 0.80 20 05/08/84 06:00 63 16 0.80 0.80 20 05/08/84 08:00 64 16 0. 80 0.80 20 05/08/84 10:00 65 16 0.80 0.80 20 05/08/84 12:00 66 16 0.80 0. 80 20 05/08/84 14:00 67 16 0.80 0. 80 20 05/08/84 16:00 68 16 0.80 0.80 20 05/08/84 18:00 69 16 0.80 0.80 20 05/08/84 20:00 70 17 0.85 0.85 21 05/08/84 22:00 71 18 0.90 0.90 23 05/08/84 00:00 72 18 0.90 0.90 23 DAILY AVERAGE VALUES 0. 82 0. 82 21 1 PR(--··JED -· -; HA~--'f H'·~-lELf'---~ PR-··;-. T 1sT ART ~ 05: . ' 1/35 -11'\GE 13 MIDWAY CREEK NEAR OLD HARBOR, ALASKA TIME OS/03/84, 02:60 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===== ==== ========= ====== ===== ====== 05/09/84 02:00 73 18 0. 90 0. 90 23 05/09/84 04:00 74 17 0.85 0. 85 21 05/09/84 06:00 75 17 0.85 0.85 21 05/09/84 08:00 76 17 0. 85 0. 85 21 05/09/84 10:00 77 17 0. 85 0. 85 21 05/09/84 12:00 78 17 0.85 0.85 21 05/09/84 14:00 79 17 0.85 0.85 21 05/09/84 16:00 80 17 0.85 0. 85 21 05/09/84 18:00 81 18 0. 90 0. 90 23 05/09/84 20:00 82 18 0. 90 0. 90 23 05/09/84 22:00 83 19 0. 95 0. 95 25 05/09/84 00:00 84 18 0. 90 0. 90 23 DAILY AVERAGE VALUES 0. 88 0. 88 22 05/10/84 02:00 85 18 0. 90 0. 90 23 05/10/84 04:00 86 18 0. 90 0. 90 23 05/10/84 06:00 87 18 0. 90 0. 90 23 05/10/84 08:00 88 17 0.85 0. 85 21 05/10/84 10:00 89 18 0. 90 0.90 23 05/10/84 12:00 90 17 0.85 0.85 21 05/10/84 14:00 91 17 0.85 0.85 21 05/10/84 16:00 92 17 0. 85 0.85 21 05/10/84 18:00 93 18 0. 90 0. 90 23 05/10/84 20:00 94 19 0. 95 0.95 25 05/10/84 22:00 95 19 0. 95 0.95 25 05/10/84 00:00 96 19 0.95 0. 95 25 DAILY AVERAGE VALUES 0. 90 0. 90 23 05/11/84 02:00 97 19 0. 95 0.95 25 05/11/84 04:00 98 19 0.95 0. 95 25 05/11/84 06:00 99 18 0. 90 0. 90 23 05/11/84 08:00 100 18 0. 90 0.90 23 05/11/84 10:00 101 18 0. 90 0.90 23 05/11/84 12:00 102 18 0. 90 0. 90 23 05/11/84 14:00 103 18 0. 90 0. 90 23 05/11/84 16:00 104 18 0. 90 0. 90 23 05/11/84 18:00 105 19 0. 95 0.95 25 05/11/84 20:00 106 19 0.95 0. 95 25 05/11/84 22:00 107 20 1. 00 1. 00 27 05/11/84 00:00 108 19 0.95 0. 95 25 DAILY AVERAGE VALUES 0. 93 0.93 24 = ' . • • i PRut-'u::)ED uL..1./ HAt.;::,u~ H\ ..,l"ld£LE. ..... , PRLh.Jt:.-: T MIDWAY CREEK NEAR OLD HARBOR, ALASKA DATE TIME ======== ===== 05/12/84 02.00 05/12/84 04• 00 05/12/84 06:00 05/12/84 08:00 05/12/84 10:00 05/12/84 12:00 05/12/84 14:00 05/12/84 16:00 05/12/84 18:00 05/12/84 20:00 05/12/84 22:00 05/12/84 00:00 05/13/84 02:00 05/13/84 04:00 05/13/84 06:00 05/13/84 08:00 05/13/84 10:00 05/13/84 12:00 05/13/84 14:00 05/13/84 16:00 05/13/84 18:00 05/13/84 20:00 05/13/84 22:00 05/13/84 00:00 05/14/84 0:1!:00 05/14/84 04:00 05/14/84 06:00 05/14/84 08:00 05/14/84 10:00 05/14/84 12:00 05/14/84 14:00 05/14/84 16:00 05/14/84 18:00 05/14/84 20:00 05/14/84 22:00 05/14/84 00:00 BYTE RAW DATA ==== ========= 109 19 110 19 111 18 112 18 113 18 114 18 115 18 116 18 117 18 118 19 119 19 120 19 DAILY AVERAGE VALUES 121 19 122 19 123 18 124 18 125 18 126 18 127 17 128 18 129 17 130 17 131 17 132 17 DAILY AVERAGE VALUES 133 17 134 17 135 17 136 17 137 17 138 17 139 17 140 17 141 17 142 18 143 18 144 19 DAILY AVERAGE VALUES DEPTH FEET ====== 0.95 0.95 0.90 0.90 0.90 0.90 0.90 0. 90 0.90 0.95 0.95 0.95 0.92 0.95 0.95 0.90 0. 90 0.90 0. 90 0.85 0. 90 0. 85 0.85 0.85 0.85 0.89 0.85 0.85 0. 85 0. 85 0. 85 0. 85 0.85 0.85 0.85 0.90 0.90 0.95 0. 87 lo51&~,~5 , ~GE 4 START TIME 05/03/84 02:00 STAGE FEET ===== 0. 95 0.95 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0. 95 0.95 0.95 0.92 0.95 0.95 0.90 0. 90 0. 90 0.90 0.85 0.90 0.85 0.85 0.85 0.85 0.89 0.85 0.85 0. 85 0.85 0.85 0. 85 0.85 0.85 0.85 0.90 0.90 0.95 0. 87 DISCHG CFS ====== 25 25 23 23 23 23 23 23 23 25 25 25 24 25 25 23 23 23 23 21 23 21 21 21 21 23 21 21 21 21 21 21 21 21 21 23 23 25 22 tPRL. ~JED ' ~ ___ I HAL-~ H~ ELE. j PRt _ iT fo5,. !f35 ~\GE !5 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ========= ===== ==== ========= ====== ====== ====== 05/15/84 02:00 145 19 0. 95 0.95 25 05/15/84 04:00 146 20 1. 00 1. 00 27 05/15/84 06:00 147 21 1. 05 1. 05 28 05/15/84 08:00 148 22 1. 10 1. 10 30 05/15/84 10:00 149 23 1. 15 1. 15 32 05/15/84 12:00 150 24 1. 20 1. 20 34 05/15/84 14:00 151 24 1. 20 1. 20 34 05/15/84 16:00 152 25 1. 25 1. 25 36 05/15/84 18:00 153 26 1. 30 1. 30 38 05/15/84 20:00 154 27 1. 35 1. 35 40 05/15/84 22:00 155 27 1. 35 1. 35 40 05/15/84 00:00 156 27 1. 35 1. 35 40 DAILY AVERAGE VALUES 1. 19 1. 19 34 05/16/84 02:00 157 27 1. 35 1. 35 40 05/16/84 04:00 158 27 1. 35 1. 35 40 05/16/84 06:00 159 27 1. 35 1. 35 40 05/16/84 08:00 160 27 1. 35 1. 35 40 05/16/84 10:00 161 27 1. 35 1. 35 40 05/16/84 12:00 162 29 1. 45 1. 45 44 05/16/84 14:00 163 31 1. 55 1. 55 48 05/16/84 16:00 164 34 1. 70 1. 70 55 05/16/84 18:00 165 34 1. 70 1. 70 55 05/16/84 20:00 166 35 1. 75 1. 75 57 05/16/84 22:00 167 35 1. 75 1. 75 57 05/16/84 00:00 168 35 1. 75 1. 75 57 DAILY AVERAGE VALUES 1. 53 1. 53 48 05/17/84 02:00 169 35 1. 75 1. 75 57 05/17/94 04:00 170 35 1. 75 1. 75 57 05/17/84 06:00 171 34 1. 70 1. 70 55 05/17/84 08:00 172 32 1. 60 1. 60 51 05/17/84 10:00 173 32 1. 60 1. 60 51 05/17/84 12:00 174 33 1. 65 1. 65 53 05/17/84 14:00 175 31 1. 55 1. 55 48 05/17/84 16:00 176 32 1. 60 1. 60 51 05/17/84 18:00 177 31 1. 55 1. 55 48 05/17/84 20:00 178 30 1. 50 1. 50 46 05/17/84 22:00 179 28 1. 40 1. 40 42 05/17/84 00:00 180 27 1. 35 1. 35 40 DAILY AVERAGE VALUES 1. 58 1. 58 50 I I! I t l: l l I I 05/16/85 PAGE '6 PROPOSED OLD HARBOR HYOROELECTR PROJECT MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ====== ==== ========= ====== ===== ====== 05/18/84 02:00 181 25 1. 25 1. 25 36 05/18/84 04:00 182 24 1. 20 1. 20 34 05/18/84 06:00 183 23 1. 15 1. 15 32 05/18/84 08:00 184 23 1. 15 1. 15 32 05/18/84 10:00 185 22 1. 10 1. 10 30 05/18/84 12:00 186 21 1. 05 1. 05 28 05/18/84 14:00 187 20 1. 00 1. 00 27 05/18/84 16:00 188 20 1. 00 1. 00 27 05/18/84 18:00 189 19 0.95 0.95 25 05/18/84 20:00 190 19 0.95 0.95 25 05/18/84 22:00 191 19 0.95 0.95 25 05/18/84 00:00 192 20 1. 00 1. 00 27 DAILY AVERAGE VALUES 1. 06 1. 06 29 05/19/84 02:00 193 20 1. 00 1. 00 27 05/19/84 04:00 194 19 0. 95 0.95 25 05/19/84 06:00 195 19 0.95 0.95 25 05/19/84 08:00 196 17 0. 85 0.85 21 05/19/84 10:00 197 16 0.80 0.80 20 05/19/84 12:00 198 15 0. 75 0.75 18 05/19/84 14:00 199 15 0. 75 0.75 18 05/19/84 16:00 200 15 0. 75 0. 75 18 05/19/84 18:00 201 15 0. 75 0. 75 18 05/19/84 20:00 202 15 0. 75 0. 75 18 05/19/84 22:00 203 14 0. 70 0. 70 16 05/19/84 00:00 204 14 0. 70 0. 70 16 DAILY AVERAGE VALUES 0. 81 0.81 20 05/20/84 02:00 205 13 0.65 0. 65 15 05/20/84 04:00 206 12 0.60 0. 60 13 05/20/84 06:00 207 11 0. 55 0.55 12 05/20/84 08:00 208 10 0. 50 0. 50 10 05/20/84 10:00 209 10 0. 50 0. 50 10 05/20/84 12:00 210 10 0. 50 0. 50 10 05/20/84 14:00 211 09 0.45 0. 45 8.9 05/20/84 16:00 212 09 0.45 0.45 8.9 05/20/84 18:00 213 09 0. 45 0.45 8. 9 05/20/84 20:00 214 10 0. 50 0. 50 10 05/20/84 22:00 215 10 0. 50 0.50 10 05/20/84 00:00 216 09 0.45 0.45 8.9 DAILY AVERAGE VALUES 0. 51 0. 51 10 PRl lED HA lit H1 IELE ! PR n I l05. J85 t'\GE i 7 i. MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ====· ==== ========= ======= ===== ====== 05/21/84 02.00 217 15 0. 75 0. 75 18 05/21/84 04:00 218 15 0. 75 0. 75 18 05/21/84 06:00 219 15 0. 75 0.75 18 05/21/84 08:00 220 16 0.80 0. 80 20 05/21/84 10:00 221 14 0. 70 0. 70 16 05121/84 12:00 222 15 0. 75 0. 75 18 05/21184 14:00 223 14 0. 70 0. 70 16 05/21/84 16:00 224 15 0. 75 0. 75 18 05/21/84 18:00 225 15 0. 75 0. 75 18 05/21/84 20:00 226 14 0. 70 0. 70 16 05/21/84 22:00 227 16 0.80 0.80 20 05/21184 00:00 228 15 0. 75 0. 75 18 DAILY AVERAGE VALUES 0. 75 0. 75 18 05/22/84 02:00 229 13 0.65 0.65 15 05/22/84 04:00 230 13 0.65 0.65 15 05/22/84 06:00 231 14 0. 70 0. 70 16 05/22/84 08:00 232 13 0.65 0.65 15 05/22/84 10:00 233 13 0. 65 0.65 15 05/22/84 12:00 234 13 0.65 0.65 15 05/22/84 14:00 235 14 0. 70 0. 70 16 05/22/84 16:00 236 14 0. 70 0. 70 16 05/22/84 18:00 237 15 0. 75 0. 75 18 05/22/84 20:00 238 13 0.65 0.65 15 05/22/84 22:00 239 13 0.65 0.65 15 05/22/84 00:00 240 13 0.65 0.65 15 DAILY AVERAGE VALUES 0.67 0.67 16 05/23/84 02:00 241 13 0.65 0.65 15 05/23/84 04:00 242 12 0. 60 0.60 13 05/23/84 06:00 243 12 0.60 0.60 13 05/23/84 08:00 244 12 0. 60 0.60 13 05/23/84 10:00 245 12 0.60 0.60 13 05/23/84 12:00 246 12 0.60 0.60 13 05/23/84 14:00 247 12 0.60 0.60 13 05/23/84 16:00 248 12 0. 60 0.60 13 05/23/84 18:00 249 12 0.60 0.60 13 05/23/84 20:00 250 12 0.60 0.60 13 05/23/84 22:00 251 12 0.60 0.60 13 05/23/84 00:00 252 12 0.60 0.60 13 DAILY AVERAGE VALUES 0.60 0.60 13 ! I ! I I ! I PROPOSED ULU HAk~UH H~uHuELELrK'PRuvt~T MIDWAY CREEK NEAR OLD HARBOR, ALASKA DATE TIME 05/24/84 02:00 OS/24/84 04:00 05/24/84 06:00 OS/24/84 08:00 05/24/84 10:00 05/24/84 12:00 05/24/84 14:00 05/24/84 16:00 05/24/84 18:00 05/24/84 20:00 05/24/84 22:00 05/24/84 00:00 05/25/84 02:00 05/25/84 04:00 05/25/84 06:00 05/25/84 08:00 05/25/84 10:00 05/25/84 12:00 05/25/84 14:00 05/25/84 16:00 05/25/84 18:00 05/25/84 20:00 05/25/84 22:00 05/25/84 00:00 05/26/84 02:00 05/26/84 04:00 05/26/84 06:00 05/26/84 08:00 05/26/84 10:00 05/26/84 12:00 05/26/84 14:00 05/26/84 16:00 05/26/84 18:00 05/26/84 20:00 05/26/84 22:00 05/26/84 00:00 BYTE RAW DATA ·=== ========== 253 11 254 12 255 12 256 11 257 12 258 12 259 12 260 11 261 12 262 12 263 12 264 12 DAILY AVERAGE VALUES 265 11 266 11 267 11 268 11 269 10 270 12 271 11 272 11 273 12 274 11 275 10 276 11 DAILY AVERAGE VALUES 277 10 278 10 279 10 280 10 281 09 282 10 283 11 284 10 285 10 286 10 287 10 288 10 DAILY AVERAGE VALUES DEPTH FEET ====== 0. 55 0.60 0. 60 0. 55 0.60 0. 60 0.60 0. 55 0.60 0.60 0.60 0.60 0. 59 0. 55 0. 55 0. 55 0. 55 0. 50 0.60 0. ss 0. 55 0.60 0. 55 0. 50 0. 55 0. 55 0. 50 0. 50 0. 50 0. 50 0. 45 0. 50 0. 55 0. 50 0. 50 0. 50 0. 50 0. 50 0. 50 ! ' l 105/ .~.o,'eS r ~GE START TIME 05/03/84 STAGE FEET ===== 0. 55 0.60 0.60 0. 55 0.60 0.60 0. 60 0. 55 0.60 0.60 0.60 0.60 0. 59 0. 55 0. 55 0. 55 0. 55 0. 50 0.60 0. 55 0. 55 0.60 0. 55 0. 50 0. 55 0. 55 0. so 0. 50 0. 50 0. 50 0. 45 0. 50 0. 55 0. 50 0. 50 0. 50 0. 50 0. 50 0. 50 DISCHG CFS ====== 12 13 13 12 13 13 13 12 13 13 13 13 13 12 12 12 12 10 13 12 12 13 12 10 12 12 10 10 10 10 8. 9 10 12 10 10 10 10 10 10 # lg 02:00 ' HA>.--~ H'. _ .. JELE l PRI. ___ !T io5, iss itlGE 19 PRL. _..JED MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =:::::======= ===== ==== ========= ====== ===== ====== 05/27/84 02:00 289 09 0. 45 0. 45 8. 9 05/27/84 04:00 290 09 0.45 0.45 8. 9 05/27/84 06:00 291 10 0. 50 0. 50 10 05/27/84 08:00 292 10 0. 50 0. 50 10 05/27/84 10:00 293 10 0. 50 0. 50 10 05/27/84 12:00 294 10 0. 50 0. 50 10 05/27/84 14:00 295 09 0.45 0. 45 8. 9 05/27/84 16:00 296 09 0.45 0.45 8.9 05/27/84 18•00 297 10 0. 50 0. 50 10 05/27/84 20:00 298 09 0. 45 0.45 8. 9 05/27/84 22:00 299 09 0. 45 0.45 8.9 05/27/84 00:00 300 09 0. 45 0.45 8.9 DAILY AVERAGE VALUES 0. 47 0.47 9.4 05/28/84 02:00 301 12 0.60 0.60 13 05/28/84 04:00 302 12 0.60 0. 60 13 05/28/84 06:00 303 12 0.60 0. 60 13 05/28/84 08:00 304 13 0.65 0. 65 15 05/28/84 10:00 305 12 0.60 0. 60 13 05/28/84 12:00 306 11 0. 55 0. 55 12 05/28/84 14:00 307 12 0.60 0.60 13 05/28/84 16:00 308 12 0.60 0.60 13 05/28/84 18:00 309 12 0.60 0.60 13 05/28/84 20:00 310 12 0.60 0. 60 13 05/28/84 22:00 311 12 0.60 0.60 13 05/28/84 00:00 312 12 0.60 0. 60 13 DAILY AVERAGE VALUES 0.60 0. 60 13 05/29/84 02:00 313 12 0.60 0. 60 13 05/29/EI4 04:00 314 12 0.60 0. 60 13 05/29/84 06:00 315 13 0.65 0.65 15 05/29/84 08:00 316 13 0.65 0.65 15 05/29/84 10:00 317 11 0. 55 0. 55 12 05/29/84 12:00 318 11 0. 55 0. 55 12 05/29/84 14:00 319 11 0. 55 0. 55 12 05/29/84 16:00 320 12 0.60 0.60 13 05/29/84 18:00 321 13 0.65 0.65 15 05/29/84 20:00 322 12 0.60 0.60 13 05/29/84 22:00 323 12 0.60 0.60 13 05/29/84 00:00 324 12 0.60 0.60 13 DAILY AVERAGE VALUES 0. 60 0. 60 13 j PROt' ubie:D LIL.U I J: I t los; ...... )as I ~GE lo HAfo:11..1~ H~un LE~•n PRuv~~T MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ========= ===== ==== ========= =:r::==== ===== ====== 05/30/84 02:00 325 09 0.45 0.45 8.9 05/30/84 04:00 326 10 0. 50 0. 50 10 05/30/84 06:00 327 10 0. 50 0. 50 10 05/30/84 08:00 328 09 0.45 0.45 8.9 05/30/84 10:00 329 10 0. 50 0. 50 10 05/30/84 12:00 330 10 0. 50 0. 50 10 05/30/84 14:00 331 09 0. 45 0.45 8.9 05/30/84 16:00 332 09 0.45 0.45 8.9 05/30/84 18:00 333 09 0.45 0.45 8.9 05/30/84 20:00 334 09 0. 45 0.45 8.9 05/30/84 22:00 335 10 0. 50 0. 50 10 05/30/84 00:00 336 09 0.45 0.45 8. 9 DAILY AVERAGE VALUES 0.47 0. 47 9. 4 05/31/84 02:00 337 10 0. 50 0. 50 10 05/31/84 04:00 338 09 0.45 0.45 8.9 05/31/84 06:00 339 10 0. 50 0. 50 10 05/31/84 08:00 340 10 0. 50 0. 50 10 05/31/84 10:00 341 09 0. 45 0.45 8.9 05/31/84 12:00 342 10 0. 50 0. 50 10 05/31/84 14:00 343 09 0.45 0.45 8. 9 05/31/84 16:00 344 10 0. 50 0. 50 10 05/31/84 18:00 345 10 0. 50 0. 50 10 05/31/84 20:00 346 09 0.45 0. 45 8.9 05/31/84 22:00 347 09 0.45 0.45 8.9 05/31/84 00:00 348 09 0.45 0. 45 8.9 DAILY AVERAGE VALUES 0.48 0. 48 9. 5 06/01/84 02:00 349 09 0.45 0.45 8.9 06/01/84 04:00 350 09 0.45 0.45 8.9 06/01/84 06:00 351 09 0. 45 0.45 8.9 06/01/84 08:00 352 09 0.45 0. 45 8.9 06/01/84 10:00 353 09 0. 45 0.45 8.9 06/01/84 12:00 354 09 0. 45 0. 45 8. 9 06/01184 14·00 355 09 0.45 0.45 8.9 06/01/84 16:00 356 09 0.45 0.45 8.9 06/01/84 18:00 357 09 0.45 0.45 8.9 06/01/84 20:00 3:58 09 0. 45 0.4:5 8.9 06/01/84 22:00 359 09 0.45 0.45 8. 9 06/01/84 00:00 360 09 0. 45 0.45 8. 9 DAILY AVERAGE VALUES 0. 45 0.45 8.9 JPRL . ..,JED ---~ HAL __ J H' _ JELE-.I PRL __ h tos, Iss ~GE lt MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =::::::!====== ====== ==== ========= ====== ===== ====== 06/02/84 02:00 361 10 0. 50 0. 50 10 06/02/84 04:00 362 10 0. 50 0. 50 10 06/02/84 06:00 363 10 o. :m 0. 50 10 06/02/84 08:00 364 10 0. 50 0. 50 10 06/02/84 10:00 365 10 0. 50 0. 50 10 06/02/84 12:00 366 10 0. 50 0. 50 10 06/02/84 14:00 367 10 0. 50 0. 50 10 06/02/84 16:00 368 10 0. 50 0. 50 10 06/02/84 18:00 369 10 0. 50 0. 50 10 06/02/84 20:00 370 10 0. 50 0. 50 10 06/02/84 22:00 371 10 0. 50 0. 50 10 06/02/84 00:00 372 10 0. 50 0. 50 10 DAILY AVERAGE VALUES 0. 50 0. 50 10 06/03/84 02:00 373 09 0.45 0. 45 8.9 06/03/84 04:00 374 09 0. 45 0.45 8.9 06/03/84 06:00 375 09 0. 45 0. 45 8. 9 06/03/84 08:00 376 09 0.45 0.45 8. 9 06/03/84 10:00 377 09 0.45 0.45 8. 9 06/03/84 12:00 378 09 0. 45 0.45 8. 9 06/03/84 14:00 379 09 0. 45 0.45 8. 9 06/03/84 16:00 380 09 0.45 0.45 a. 9 06/03/84 18:00 381 09 0.45 0. 45 8.9 06/03/84 20:00 382 09 0.45 0. 45 a. 9 06/03/84 22:00 383 09 0.45 0.45 8.9 06/03/84 00:00 384 09 0.45 0. 45 8. 9 DAILY AVERAGE VALUES 0.45 0.45 8.9 06/04/84 02:00 385 09 0.45 0.45 8.9 06/04/94 04:00 386 09 0.45 0. 45 8.9 06/04/84 06:00 387 09 0.45 0.45 8.9 06/04/84 08:00 388 09 0.45 0.45 8.9 06/04/84 10:00 389 09 0.45 0.45 8. 9 06/04/84 12:00 390 09 0.45 0.45 8.9 06/04/84 14:00 391 09 0. 45 0.45 8. 9 06/04/84 16:00 392 09 0. 45 0. 45 8.9 06/04/84 18:00 393 08 0. 40 0. 40 7. 6 06/04/84 20:00 394 08 0. 40 0.40 7.6 06/04/a4 22:00 395 08 0. 40 0.40 7.6 06/04/84 00:00 396 oa 0.40 0. 40 7.6 DAILY AVERAGE VALUES 0.43 0.43 8. 5 PRD~uJED u~u 1 HAkauJ HvuKJELE~IKlPRu~t~T i05tio)85 r~GE 12 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/B4 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===== ==== ========== ====== ===== ====== 06/05/B4 02:00 397 OB 0.40 0.40 7. 6 06/05/B4 04:00 39B OB 0.40 0.40 7. 6 06/05/B4 06:00 399 OB 0.40 0. 40 7.6 06/05/B4 08:00 400 OB 0.40 0.40 7. 6 06/05/B4 10:00 401 09 0.45 0.45 B.9 06/05/B4 12:00 402 09 0.45 0.45 B. 9 06/05/B4 14:00 403 09 0. 45 0. 45 B. 9 06/05/B4 16:00 404 09 0.45 0. 45 B. 9 06/05/B4 1B:OO 405 09 0.45 0.45 B. 9 06/05/B4 20:00 406 09 0.45 0.45 B.9 06/05/B4 22:00 407 09 0.45 0.45 B. 9 06/05/B4 00:00 40B 09 0.45 0.45 B. 9 DAILY AVERAGE VALUES 0. 43 0.43 B. 5 06/06/B4 02:00 409 OB 0.40 0. 40 7. 6 06/06/B4 04:00 410 OB 0.40 0.40 7.6 06/06/B4 06:00 411 OB 0.40 0. 40 7. 6 06/06/B4 OB:OO 412 OB 0. 40 0. 40 7. 6 06/06/B4 10:00 413 07 0. 35 0.35 6. 3 06/06/B4 12:00 414 OB 0. 40 0. 40 7.6 06/06/B4 14:00 415 07 0.35 0.35 6.3 06/06/B4 16:00 416 OB 0. 40 0.40 7. 6 06/06/B4 1B:OO 417 07 0.35 0.35 6. 3 06/06/B4 20:00 41B 07 0.35 0.35 6.3 06/06/B4 22:00 419 07 0.35 0. 35 6. 3 06/06/B4 00:00 420 07 0.35 0.35 6.3 DAILY AVERAGE VALUES 0.3B 0.3B 7. 0 06/07/84 02:00 421 09 0.45 0.45 B.9 06/07/B4 04:00 422 09 0.45 0.45 B. 9 06/07/B4 06:00 423 OB 0.40 0.40 7.6 06/07/B4 OB:OO 424 09 0.45 0.45 B.9 06/07/B4 10:00 425 OB 0.40 0.40 7.6 06/07/B4 12:00 426 OB 0. 40 0.40 7.6 06/07/84 14:00 427 09 0.45 0.45 B. 9 06/07/84 16:00 42B 09 0.45 0.45 B.9 06/07/84 1B:OO 429 09 0.45 0.45 B.9 06/07/B4 20:00 430 OB 0.40 0.40 7. 6 06/07/B4 22:00 431 OB 0.40 0.40 7.6 06/07/B4 00:00 432 09 0.45 0.45 B.9 DAILY AVERAGE VALUES 0.43 0.43 B. 4 fpRL. uJED ~-~~ HAL~-J H\ .. JELL .. J PRL--a Jo5, 185 lt\GE 3 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02•00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===== ==== :::=:======== ====== ===== ====== 06/08/84 02:00 433 08 0.40 0.40 7. 6 06/08/84 04:00 434 08 0.40 0. 40 7. 6 06/08/84 06:00 435 08 0.40 0. 40 7. 6 06/08/84 08:00 436 08 0.40 0. 40 7. 6 06/08/84 10:00 437 08 0.40 0.40 7. 6 06/08/84 12:00 438 08 0.40 0.40 7.6 06/08/84 14:00 439 09 0.45 0.45 8. 9 06/08/84 16:00 440 08 0.40 0.40 7. 6 06/08/84 18:00 441 09 0.45 0.45 8. 9 06/08/84 20:00 442 08 0.40 0.40 7. 6 06/08/84 22:00 443 08 0. 40 0.40 7.6 06/08/84 00:00 444 08 0. 40 0. 40 7.6 DAILY AVERAGE VALUES 0. 41 0.41 7. 8 06/09/84 02:00 445 08 0.40 0. 40 7.6 06/09/84 04:00 446 08 0. 40 0. 40 7.6 06/09/84 06:00 447 08 0.40 0. 40 7.6 06/09/84 08:00 448 08 0. 40 0.40 7. 6 06/09/84 10:00 449 08 0.40 0. 40 7.6 06/09/84 12:00 450 08 0. 40 0.40 7. 6 06/09/84 14:00 451 08 0. 40 0.40 7.6 06/09/84 16:00 452 08 0. 40 0.40 7.6 06/09/84 18:00 453 08 0.40 0. 40 7. 6 06/09/84 20:00 454 08 0. 40 0.40 7.6 06/09/84 22:00 455 08 0.40 0. 40 7.6 06/09/84 00:00 456 08 0.40 0.40 7.6 DAILY AVERAGE VALUES 0.40 0.40 7.6 06/10/84 02:00 457 12 0.60 0.60 13 06/10/84 04:00 458 12 0.60 0.60 13 06/10/84 06:00 459 12 0. 60 0.60 13 06/10/84 08:00 460 12 0. 60 0.60 13 06/10/84 10:00 461 12 0.60 0.60 13 06/10/84 12:00 462 13 0.65 0. 65 15 06/10/84 14:00 463 13 0.65 0.65 15 06/10/84 16:00 464 13 0.65 0.65 15 06/10/84 18:00 465 13 0.65 0.65 15 06/10/84 20:00 466 13 0. 65 0.65 15 06/10/84 22:00 467 13 0.65 0.65 15 06/10/84 00:00 468 12 0.60 0.60 13 DAILY AVERAGE VALUES 0. 63 0.63 14 I PROPOJED ULUI HAk.~:~uJ H'v ut'(jELE~,.. ,,) PRL"Jc.JT ios, a.,las . ~GE 14 MIDWAY CREEK NEAR OLD HARBOR. ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ====== ==c= ========= ====== ===== ====== 06/11/84 02:00 469 09 0. 45 0. 45 8. 9 06/11/84 04:00 470 09 0.45 0.45 8. 9 06/11/84 06:00 471 09 0.45 0. 45 8. 9 06/11/84 08:00 472 09 0. 45 0.45 8. 9 06/11/84 10:00 473 09 0.45 0. 45 8. 9 06/11/84 12:00 474 10 0. 50 0. 50 10 06/11/84 14:00 475 10 0. 50 0. 50 10 06/11/84 16:00 476 10 0. 50 0. 50 10 06/11/84 18:00 477 10 0. 50 0. 50 10 06/11/84 20:00 478 09 0. 45 0.45 8. 9 06/11/84 22:00 479 10 0. 50 0. 50 10 06/11/84 00:00 480 10 0. 50 0. 50 10 DAILY AVERAGE VALUES 0. 48 0. 48 9. 5 06/12/84 02:00 481 17 0. 85 0. 85 21 06/12/84 04:00 482 17 0. 85 0.85 21 06/12/84 06:00 483 17 0.85 0.85 21 06/12/84 08:00 484 17 0.85 0. 85 21 06/12/84 10:00 485 18 0.90 0.90 23 06/12/84 12:00 486 18 0. 90 0.90 23 06/12/84 14:00 487 18 0.90 0.90 23 06/12/84 16:00 488 18 0. 90 0.90 23 06/12/84 18:00 489 18 0. 90 0.90 23 06/12/84 20:00 490 18 0.90 0. 90 23 06/12/84 22:00 491 18 0. 90 0. 90 23 06/12/84 00:00 492 17 0. 85 0.85 21 DAILY AVERAGE VALUES 0.88 0. 88 22 06/13/84 02:00 493 16 0.80 0.80 20 06/13/84 04:00 494 16 0. 80 0.80 20 06/13/84 06:00 495 16 0.80 0. 80 20 06/13/84 08:00 496 16 0.80 0.80 20 06/13/84 10:00 497 16 0. 80 0. 80 20 06/13/84 12:00 498 16 0. 80 0.80 20 06/13/84 14:00 499 16 0.80 0.80 20 06/13/84 16:00 500 16 0. 80 0. 80 20 06/13/84 18:00 501 16 0.80 0.80 20 06/13/84 20:00 502 16 0.80 0.80 20 06/13/84 22:00 503 16 0.80 0. 80 20 06/13/84 00:00 504 16 0.80 0.80 20 DAILY AVERAGE VALUES 0.80 0.80 20 PRL. ~j:;:D ---i HAL-* H't iELE i PRt (T !05, 185 ~GE 5 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS :::::======= ===== ==== ========= ====== ===== ====== 06/14/84 02:00 505 13 0.65 0.65 15 06/14/84 04:00 506 13 0. 65 0.6:5 15 06/14/84 06:00 507 14 0. 70 0. 70 16 06/14/84 08:00 508 13 0.65 0.65 15 06/14/84 10:00 509 13 0.65 0.65 15 06/14/84 12:00 510 12 0. 60 0.60 13 06/14/84 14:00 511 13 0.65 0. 65 15 06/14/84 16:00 512 13 0.65 0.65 15 06/14/84 18:00 513 13 0.65 0.65 15 06/14/84 20:00 514 13 0.65 0.65 15 06/14/84 22:00 515 13 0.65 0.65 15 06/14/84 00:00 516 13 0. 65 0.65 15 DAILY AVERAGE VALUES 0. 65 0.65 15 06/15/84 02:00 517 11 0. 55 0. 55 12 06/15/84 04:00 518 11 0. 55 0. 55 12 06/15/84 06:00 519 11 0. 55 0. 55 12 06/15/84 08:00 520 11 0. 55 0. 55 12 06/15/84 10:00 521 11 0. 55 0. 55 12 06/15/84 12:00 522 11 0. 55 0. 55 12 06/15/84 14:00 523 11 0.55 0. 55 12 06/15/84 16:00 524 11 0. 55 0. 55 12 06/15/84 18:00 525 11 0. 55 0. 55 12 06/15/84 20:00 526 11 0. 55 0. 55 12 06/15/84 22:00 527 11 0. 55 0. 55 12 06/15/84 00:00 528 11 0. 55 0. 55 12 DAILY AVERAGE VALUES 0. 55 0. 55 12 06/16/84 02:00 529 11 0. 55 0. 55 12 06/16/94 04:00 530 11 0. 55 0. 55 12 06/16/84 06:00 531 10 0. 50 0. 50 10 06/16/84 08:00 532 10 0. 50 0. 50 10 06/16/84 10:00 533 11 0. 55 0. 55 12 06/16/84 12:00 534 11 0. 55 0. 55 12 06/16/84 14:00 535 10 0. 50 0. 50 10 06/16/84 16:00 536 10 0. 50 0. 50 10 06/16/84 18:00 537 10 0. 50 0. 50 10 06/16/84 20:00 538 10 0. 50 0. 50 10 06/16/84 22:00 539 10 0. 50 0. 50 10 06/16/84 00:00 540 10 0. 50 0. 50 10 DAILY AVERAGE VALUES 0. 52 0. 52 11 PRu~uJEo uLuiHAhou~ H\unJELE~•nl PRuv~!T o:;, ""',Is:; , ~GE 16 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ========= ===== =:=== ========== ====== ===== ====== 06/17/84 02:00 541 09 0. 4:5 0. 4S 8. 9 06/17/84 04:00 S42 09 0.4S 0. 45 8. 9 06/17/84 06:00 S43 09 0.4S 0.4S 8. 9 06/17/84 08:00 S44 09 0.4S 0.4S 8.9 06/17/84 10:00 54S 10 0. 50 0. so 10 06/17/84 12:00 S46 10 0. so 0. so 10 06/17/84 14:00 S47 10 0. so 0. so 10 06/17/84 16:00 S48 10 0. so 0. so 10 06/17/84 18:00 549 10 0. so 0. so 10 06/17/84 20:00 sso 09 0. 4S 0.4S 8.9 06/17/84 22:00 S51 09 0.4S 0.45 8. 9 06/17/84 00:00 SS2 10 0. so 0. so 10 DAILY AVERAGE VALUES 0. 48 0.48 9. s 06/18/84 02:00 5S3 08 0.40 0.40 7.6 06/18/84 04:00 SS4 08 0. 40 0.40 7. 6 06/18/84 06:00 5S5 09 0.45 0.45 B. 9 06/18/84 08:00 556 08 0. 40 0. 40 7. 6 06/18/84 10:00 557 09 0.45 0.45 8.9 06/18/84 12:00 558 09 0.45 0.45 8. 9 06/18/84 14:00 5S9 09 0. 4S 0.4S 8.9 06/18/84 16:00 560 09 0.4S 0.4S 8. 9 06/18/84 18:00 561 08 0. 40 0.40 7. 6 06/18/84 20:00 S62 08 0. 40 0.40 7. 6 06/18/84 22:00 563 08 0. 40 0. 40 7.6 06/18/84 00:00 564 09 0. 45 0.45 8. 9 DAILY AVERAGE VALUES 0. 43 0. 43 B. 3 06/19/84 02:00 565 07 0.35 0.35 6.3 06/19/84 04:00 566 08 0. 40 0.40 7. 6 06/19/84 06:00 567 08 0.40 0.40 7.6 06/19/84 08:00 568 08 0. 40 0. 40 7.6 06/19/84 10:00 569 07 0.35 0.35 6.3 06/19/84 12:00 570 07 0.35 0.35 6.3 06/19/84 14:00 571 07 0.35 0.35 6.3 06/19/84 16:00 572 07 0.35 0.35 6. 3 06/19/84 18:00 573 08 0. 40 0. 40 7.6 06/19/84 20:00 574 08 0.40 0.40 7. 6 06/19/84 22:00 575 08 0. 40 0.40 7.6 06/19/84 00:00 576. 08 0.40 0.40 7. 6 DAILY AVERAGE VALUES 0.38 0.38 7. 1 i PR ..... ~.kED __ J HA .. --h H -· DELL_ .I PR ____ tT i 05 res iAGE h7 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =====::::==== ===== ==== ========= ====== ===== ======= 06/20/84 02:00 577 06 0.30 0,30 5. 1 06/20/84 04:00 578 07 0.35 0.35 6. 3 06/20/84 06:00 579 07 0. 35 0.35 6.3 06/20/84 08:00 580 07 0. 35 0. 35 6.3 06/20/84 10:00 581 07 0.35 0.35 6.3 06/20/84 12:00 582 06 0. 30 0.30 5. 1 06/20/84 14:00 583 06 0.30 0. 30 5. 1 06/20/84 16:00 584 06 0.30 0. 30 5. 1 06/20/84 18:00 585 06 0.30 0.30 5. 1 06/20/84 20:00 586 07 0. 35 0.35 6. 3 06/20/84 22:00 587 07 0. 35 0.35 6. 3 06/20/84 00:00 588 07 0.35 0. 35 6. 3 DAILY AVERAGE VALUES 0.33 0.33 5. 8 06/21/84 02:00 589 10 0. 50 0. 50 10 06/21/84 04:00 590 10 0. 50 0. 50 10 06/21/84 06:00 591 10 0. 50 0. 50 10 06/21/84 08:00 592 11 0. 55 0. 55 12 06/21/84 10:00 593 11 0. 55 0. 55 12 06/21/84 12:00 594 11 0. 55 0. 55 12 06/21/84 14:00 595 11 0. 55 0. 55 12 06/21/84 16:00 596 10 0. 50 0. 50 10 06/21/84 18:00 597 10 0. 50 0. 50 10 06/21/84 20:00 598 10 0. 50 0. 50 10 06/21/84 22:00 599 10 0. 50 0. 50 10 06/21/84 00:00 600 11 0. 55 0. 55 12 DAILY AVERAGE VALUES 0. 52 0. 52 11 06/22/84 02:00 601 11 0. 55 0. 55 12 06/22/84 04:00 602 11 0. 55 0. 55 1:2 06/22/84 06:00 603 11 0. 55 0. 55 12 06/22/84 08:00 604 10 0. 50 0.50 10 06/22/84 10:00 605 10 0. 50 0. 50 10 06/22/84 12:00 606 10 0. 50 0. 50 10 06/22/84 14:00 607 10 0. 50 0. 50 10 06/22/84 16:00 608 10 0. 50 0. 50 10 06/22/84 18:00 609 11 0. 55 0. 55 12 06/22/84 20:00 610 10 0. 50 0. 50 10 06/22/84 22:00 611 10 0. 50 0. 50 10 06/22/84 00:00 612 10 0. 50 0. 50 10 DAILY AVERAGE VALUES 0. 52 0. 52 11 i J I . . .. I * ' PROPO ED ULD HA~BW~ H~u~JELE~IHI PRW~~tT 05/.10/85 r•AGE 18 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ========:::= ====== ==== ========== ====== ====== ======= 06/23/84 02:00 613 12 0. 60 0. 60 13 06/23/84 04:00 614 12 0. 60 0. 60 13 06/23/84 06:00 615 12 0.60 0. 60 13 06/23/84 08:00 616 13 0. 65 0.65 15 06/23/84 10:00 617 13 0.65 0.65 15 06/23/84 12:00 618 13 0.65 0.65 15 06/23/84 14:00 619 13 0.65 0.65 15 06/23/84 16:00 620 12 0.60 0. 60 13 06/23/84 18:00 621 12 0.60 0. 60 13 06/23/84 20:00 622 12 0.60 0.60 13 06/23/84 22:00 623 12 0.60 0.60 13 06/23/84 00:00 624 12 0.60 0.60 13 DAILY AVERAGE VALUES 0.62 0.62 14 06/24/84 02:00 625 13 0.65 0.65 15 06/24/84 04:00 626 13 0.65 0.65 15 06/24/84 06:00 627 13 0.65 0.65 15 06/24/84 08:00 628 13 0.65 0. 65 15 06/24/84 10:00 629 13 0.65 0. 65 15 06/24/84 12:00 630 13 0.65 0.65 15 06/24/84 14:00 631 13 0.65 0.65 15 06/24/84 16:00 632 13 0.65 0.65 15 06/24/84 18:00 633 13 0.65 0. 65 15 06/24/84 20:00 634 13 0.65 0. 65 15 06/24/84 22:00 635 13 0.65 0. 65 15 06/24/84 00:00 636 13 0.65 0. 65 15 DAILY AVERAGE VALUES 0.65 0.65 15 06/25/84 02:00 637 35 1. 75 1. 75 57 06/25/84 04:00 638 34 1. 70 1. 70 55 06/25/84 06:00 639 35 1. 75 1. 75 57 06/25/84 08:00 640 36 1. 80 1. 80 59 06/25/84 10:00 641 35 1. 75 1. 75 57 06/25/84 12:00 642 35 1. 75 1. 75 57 06/25/84 14:00 643 35 1. 75 1. 75 57 06/25/84 16:00 644 36 1. 80 1. 80 59 06/25/84 18:00 645 35 1. 75 1. 75 57 06/25/84 20:00 646 35 1. 75 1. 75 57 06/25/84 22:00 647 35 1. 75 1. 75 57 06/25/84 00:00 648 35 1. 75 1. 75 57 DAILY AVERAGE VALUES 1. 75 1. 75 57 i PRUt'U:::J~D UL..) HAhuu~ H'r ur~JELE-. • PRL.v"-~T 1o5, .~.iss . AGE l9 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ::=:======= ===== ==== ========== ====== ===== ====== 06/26/84 02:00 649 38 1. 90 1. 90 64 06/26/84 04:00 650 38 1. 90 1. 90 64 06/26/84 06:00 651 38 1. 90 1. 90 64 06/26/84 08:00 652 38 1. 90 1. 90 64 06/26/84 10:00 653 39 1. 95 1. 95 66 06/26/84 12:00 654 39 1. 95 1. 95 66 06/26/84 14:00 655 38 1. 90 1. 90 64 06/26/84 16:00 656 38 1. 90 1. 90 64 06/26/84 18:00 657 39 1. 95 1. 95 66 06/26/84 20:00 658 39 1. 95 1. 95 66 06/26/84 22:00 659 39 1. 95 1. 95 66 06/26/84 00:00 660 39 1. 95 1. 95 66 DAILY AVERAGE VALUES 1. 93 1 93 65 06/27/84 02:00 661 20 1. 00 1. 00 27 06/27/84 04:00 662 20 1. 00 1. 00 27 06/27/84 06:00 663 19 0. 95 0.95 25 06/27/84 08:00 664 ;;!1 1. 05 1. 05 28 06/27/84 10:00 665 20 1. 00 1. 00 27 06/27/84 12:00 666 21 1. 05 1. 05 28 06/27/84 14:00 667 21 1. 05 1. 05 28 06/27/84 16:00 668 20 1. 00 1. 00 27 06/27/84 18:00 669 20 1. 00 1. 00 27 06/27/84 20:00 670 20 1. 00 1. 00 27 06/27/84 22:00 671 20 1. 00 1. 00 27 06/27/84 00:00 672 20 1. 00 1. 00 27 DAILY AVERAGE VALUES 1. 01 1. 01 27 06/28/84 02:00 673 14 0. 70 0. 70 16 06/28184 04:00 674 14 0. 70 0. 70 16 06/28/84 06:00 675 13 0.65 0.65 15 06/28/84 08:00 676 13 0. 65 0.65 15 06/28/84 10:00 677 14 0. 70 0. 70 16 06/28/84 12:00 678 13 0.65 0.65 15 06/28/84 14:00 679 14 0. 70 0. 70 16 06/28/84 16:00 680 14 0. 70 0. 70 16 06/28/84 18:00 681 14 0. 70 0. 70 16 06/28/84 20:00 682 14 0. 70 0. 70 16 06/28/84 22:00 683 14 0. 70 0. 70 16 06/28/84 00:00 684 14 0. 70 0. 70 16 DAILY AVERAGE VALUES 0. 69 0.69 16 1 I f ~ J · " i t'~GE 'PROPOSED OLD HARBO HYOR ELECTR 1 PRO~EtT '05tlo/85 .2o MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ========= ===== ==== ========::: ====== ===== ====== 06/29/84 02:00 685 13 0. 65 0. 65 15 06/29/84 04:00 686 13 0.65 0.65 15 06/29/84 06:00 687 13 0.65 0.65 15 06/29/84 08:00 688 13 0.65 0.65 15 06/29/84 10:00 689 14 0. 70 0. 70 16 06/29/84 12:00 690 14 0. 70 0. 70 16 06/29/84 14:00 691 14 0. 70 0. 70 16 06/29/84 16:00 692 14 0. 70 0.70 16 06/29/84 18:00 693 14 0. 70 0. 70 16 06/29/84 20:00 694 14 0. 70 0. 70 16 06/29/84 22:00 695 14 0. 70 0. 70 16 06/29/84 00:00 696 14 0. 70 0. 70 16 DAILY AVERAGE VALUES 0.68 0.68 16 06/30/84 02:00 697 14 0. 70 0. 70 16 06/30/84 04:00 698 14 0. 70 0. 70 16 06/30/84 06:00 699 14 0. 70 0. 70 16 06/30/84 08:00 700 14 0. 70 0. 70 16 06/30/84 10:00 701 15 0. 75 0.75 18 06/30/84 12:00 702 14 0. 70 0. 70 16 06/30/84 14:00 703 14 0. 70 0. 70 16 06/30/84 16:00 704 14 0. 70 0. 70 16 06/30/84 18:00 705 14 0. 70 0. 70 16 06/30/84 20:00 706 14 0. 70 0. 70 16 06/30/84 22:00 707 14 o. 70 0. 70 16 06/30/84 00:00 708 14 0. 70 0. 70 16 DAILY AVERAGE VALUES 0. 70 0. 70 16 07/01/84 02:00 709 15 0. 75 0. 75 18 07/01/84 04:00 710 14 0. 70 0. 70 16 07/01/84 06:00 711 14 0. 70 0. 70 16 07/01/84 08:00 712 14 0. 70 0. 70 16 07/01/84 10:00 713 14 0. 70 0. 70 16 07/01/84 12:00 714 14 0. 70 0. 70 16 07/01184 14:00 715 14 0. 70 0. 70 16 07/01/84 16:00 716 14 0. 70 0.70 16 07/01/84 18:00 717 13 0.65 0.65 15 07/01/84 20:00 718 14 0. 70 0. 70 16 07/01/84 22:00 719 14 0. 70 0. 70 16 07/01/84 00:00 720 14 0. 70 0. 70 16 DAILY AVERAGE VALUES 0. 70 0. 70 16 fPRl _ lED I HAt I H~ IELE I PR ~T 105, 185 ~GE {:!1 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 . DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ========= ===== ==== =========== ====== ===== ====== 07/02/84 02:00 721 13 0.65 0.65 15 07/02/84 04:00 722 15 0. 75 0. 75 18 07/02/84 06:00 723 14 0. 70 0.70 16 07/02/84 08:00 724 14 0. 70 0. 70 16 07/02/84 10:00 725 14 0. 70 0. 70 16 07/02/84 12:00 726 14 0. 70 0. 70 16 07/02/84 14:00 727 14 0. 70 0. 70 16 07/02/84 16:00 728 14 0. 70 0. 70 16 07/02/84 18:00 729 15 0. 75 0. 75 18 07/02/84 20:00 730 14 0. 70 0. 70 16 07/02/84 22:00 731 14 0. 70 0. 70 16 07/02/84 00:00 732 13 0.65 0.65 15 DAILY AVERAGE VALUES 0. 70 0. 70 16 07/03/84 02:00 733 12 0.60 0.60 13 07/03/84 04:00 734 12 0.60 0.60 13 07/03/84 06:00 735 12 0. 60 0.60 13 07/03/84 08:00 736 12 0. 60 0.60 13 07/03/84 10:00 737 12 0. 60 0.60 13 07/03/84 12:00 738 13 0.65 0.65 15 07/03/84 14:00 739 13 0.65 0.65 15 07/03/84 16:00 740 13 0.65 0.65 15 07/03/84 18:00 741 12 0. 60 0.60 13 07/03/84 20:00 742 12 0.60 0.60 13 07/03/84 22:00 743 12 0.60 0. 60 13 07/03/84 00:00 744 12 0. 60 0. 60 13 DAILY AVERAOE VALUES 0.61 0.61 14 07/04/94 02:00 745 11 0. 55 0. 55 12 07/04/94 04:00 746 11 0. 55 0. 55 12 07/04/84 06:00 747 11 0. 55 0. 55 12 07/04/84 08:00 748 11 0. 55 0. 55 12 07/04/84 10:00 749 11 0. 55 0. 55 12 07/04/84 12:00 750 11 0. 55 0. 55 12 07/04/84 14:00 751 11 0. 55 0. 55 12 07/04/84 16:00 752 11 0. 55 0. 55 12 07/04/84 18:00 753 11 0. 55 o. 55 12 07/04/84 20:00 754 11 0. 55 0. 55 12 07/04/84 22:00 755 11 0. 55 0. 55 12 07/04/84 00:00 756 10 0. 50 0.50 10 DAILY AVERAGE VALUES 0. 55 0. 55 12 PRu~udED u~ujHAKuu~ H~u~JELE~~~~ PRuv~tT ' r~GE ' 05t.Lo)85 .1:!2 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== -===::r: ===::a: z:========= ======= ===== ====== 07/05/84 02:00 757 09 0.45 0.45 8.9 07/05/84 04:00 758 10 0. 50 0. 50 10 07/05/84 06:00 759 10 0. 50 0. 50 10 07/05/84 08:00 760 10 0. 50 0. 50 10 07/05/84 10:00 761 09 0. 45 0.45 8.9 07/05/84 12:00 762 09 0.45 0.45 8.9 07/05/84 14:00 763 10 0. 50 0. 50 10 07/05/84 16:00 764 10 0. 50 0. 50 10 07/05/84 18:00 765 10 0. 50 0. 50 10 07/05/84 20:00 766 10 0. 50 0. 50 10 07/05/84 22:00 767 10 0. 50 0. 50 10 07/05/84 00:00 768 10 0. 50 0.50 10 DAILY AVERAGE VALUES 0.49 0.49 9. 7 07/06/84 02:00 769 08 0.40 0.40 7. 6 07/06/84 04:00 770 08 0. 40 0.40 7. 6 07/06/84 06:00 771 08 0.40 0. 40 7.6 07/06/84 08:00 772 08 0.40 0.40 7. 6 07/06/84 10:00 773 08 0. 40 0.40 7.6 07/06/84 12:00 774 08 0.40 0.40 7.6 07/06/84 14:00 775 09 0.45 0.45 8.9 07/06/84 16:00 776 08 0. 40 0. 40 7. 6 07/06/84 18:00 777 08 0.40 0.40 7. 6 07/06/84 20:00 778 08 0. 40 0. 40 7.6 07/06/84 22:00 779 08 0.40 0. 40 7. 6 07/06/84 00:00 780 08 0. 40 0.40 7.6 DAILY AVERAGE VALUES 0. 40 0. 40 7. 7 07/07/84 02:00 781 07 0.35 0.35 6.3 07107184 04:00 782 07 0.35 0.35 6.3 07/07/84 06:00 783 07 0.35 0.35 6. 3 07/07/84 08:00 784 07 0.35 0.35 6.3 07/07/84 10:00 785 07 0.35 0.35 6.3 07/07/84 12:00 786 07 0.35 0.35 6.3 07/07/84 14:00 787 07 0.35 0.35 6.3 07/07/84 16:00 788 08 0. 40 0.40 7.6 07/07/84 18:00 789 07 0.35 0.35 6.3 07/07/84 20:00 790 08 0. 40 0.40 7.6 07/07/84 22:00 791 07 0.35 0.35 6.3 07/07/84 00:00 792 07 0. 35 0.35 6.3 DAILY AVERAGE VALUES 0. 36 0.36 6. 5 I ' 1 I l PRur-u;::JED UL.I) HAh.uun H\ "'"'"'ELE-. •" PRL,v._j T o5, ___ ia5 . ~GE 1!3 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===== ==== =====·=== ====== ===== ====== 07/08/84 02:00 793 06 0.30 0.30 5. 1 07/08/84 04:00 794 06 0.30 0. 30 S. 1 07/08/84 06:00 79S 06 0.30 0. 30 5. 1 07/08/84 08:00 796 06 0.30 0.30 s. 1 07/08/84 10:00 797 06 0.30 0. 30 5. 1 07/08/84 12:00 798 06 0.30 0.30 5. 1 07/08/84 14:00 799 06 0.30 0.30 s. 1 07/08/84 16:00 800 06 0.30 0.30 s. 1 07/08/84 18:00 801 07 0.3S 0.35 6.3 07/08/84 20:00 802 07 0.35 0.35 6.3 07/08/84 22:00 803 07 0. 3S 0.35 6.3 07/08/84 00:00 804 07 0.3S 0.35 6. 3 DAILY AVERAGE VALUES 0.32 0.32 s. s 07/09/84 02:00 80S 05 0. 25 0.25 4.0 07/09/84 04:00 806 05 0.2S 0.25 4.0 07/09/84 06:00 807 OS 0.25 0.2S 4. 0 07/09/84 08:00 808 OS 0.25 0.2S 4. 0 07/09/84 10:00 809 06 0.30 0.30 s. 1 07/09/84 12:00 810 06 0. 30 0. 30 5. 1 07/09/84 14:00 811 06 0.30 0.30 s. 1 07/09/84 16:00 812 06 0.30 0. 30 S. 1 07/09/84 18:00 813 OS 0.25 0.25 4.0 07/09/84 20:00 814 OS 0.2S 0.2S 4. 0 07/09/84 22:00 815 05 0.25 0.25 4.0 07/09/84 00:00 816 05 0.25 0.25 4. 0 DAILY AVERAGE VALUES 0.27 0.27 4. 4 07/10/84 02:00 817 OS 0.25 0.2S 4.0 07/10/94 04:00 818 OS 0.25 0.25 4.0 07/10/84 06:00 819 05 0.25 0. 25 4.0 07/10/84 08:00 820 OS 0.25 0.25 4. 0 07/10/84 10:00 821 05 0.25 0.2S 4. 0 07/10/84 12:00 822 05 0.25 0.25 4.0 07/10/84 14:00 823 05 0.25 0.25 4.0 07/10/84 16:00 824 OS 0.25 0.25 4.0 07/10/84 18:00 825 OS 0.25 0.25 4.0 07/10/84 20:00 826 05 0. 25 0.2S 4. 0 07/10/84 22:00 827 05 0.2S 0.25 4. 0 07/10/84 00:00 828 05 0. 25 0.2S 4.0 DAILY AVERAGE VALUES 0.2S 0.25 4.0 fPRO~uJED uLu 1 HAkDu~ H\u~JELE~•"iPRuve~T ' ' 05, ... ..,)95 ' . AGE J,4 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ::::=;====== ===== ==== ========= ====== ·==== ======== 07/11/84 02:00 829 05 0.25 0.25 4. 0 07/11/84 04:00 830 05 0.25 0. 25 4. 0 07/11/84 06:00 831 05 0.25 0.25 4.0 07111/84 08:00 832 05 0.25 0.25 4. 0 07/11/84 10:00 833 05 0. 25 0.25 4. 0 07/11/84 12:00 834 05 0.25 0.25 4. 0 07/11/84 14:00 835 05 0.25 0.25 4.0 07/11/84 16:00 836 05 0.25 0.25 4. 0 07/11/84 18:00 837 05 0.25 0.25 4.0 07/11/84 20:00 838 05 0.25 0.25 4.0 07/11/84 22:00 839 05 0.25 0.25 4.0 07/11/84 00:00 840 05 0.25 0.25 4.0 DAILY AVERAGE VALUES 0.25 0.25 4.0 07/12/84 02:00 841 04 0. 20 0.20 2. 9 07/12/84 04:00 842 05 0.25 0.25 4. 0 07/12/84 06:00 843 04 0. 20 0.20 2.9 07/12/84 08:00 844 05 0.25 0.25 4.0 07/12/84 10:00 845 04 0.20 0.20 2.9 07/12/84 12:00 846 05 0.25 0.25 4.0 07/12/84 14:00 847 04 0.20 0.20 2.9 07/12/84 16:00 848 05 0.25 0.25 4.0 07/12/84 18:00 849 04 0.20 0. 20 2.9 07/12/84 20:00 850 05 0.25 0.25 4.0 07/12/84 22:00 851 05 0.25 0.25 4.0 07/12/84 00:00 852 04 0.20 0.20 2. 9 DAILY AVERAGE VALUES 0.23 0.23 3. 5 07/13/84 02:00 853 04 0.20 0.20 2.9 07/13/84 04:00 854 04 0.20 0.20 2.9 07/13/84 06:00 855 04 0.20 0.20 2.9 07/13/84 08:00 856 04 0. 20 0.20 2.9 07/13/84 10:00 857 05 0.25 0.25 4.0 07/13/84 12:00 858 04 0.20 0. 20 2.9 07/13/84 14:00 859 05 0.25 0.25 4.0 07/13/84 16:00 860 04 0.20 0.20 2.9 07/13/84 18:00 861 05 0.25 0.25 4.0 07/13/84 20:00 862 04 0.20 0.20 2.9 07/13/84 22:00 863 04 0.20 0.20 2. 9 07/13/84 00:00 864 05 0.25 0.25 4.0 DAILY AVERAGE VALUES 0.22 0.22 3. 3 i PRL. ~JED ___ I HAl·-·-·· H\ JELE I PR .. tT I 05, 185 ~GE ~5 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ==a===== ===== ===== ========= ====== ===== ====== 07/14/84 02:00 865 04 0.20 0.20 2.9 07/14/84 04:00 866 04 0. 20 0.20 2.9 07/14/84 06:00 867 04 0.20 0.20 2.9 07/14/84 08:00 868 04 0.20 0.20 2.9 07114/84 10:00 869 04 0.20 0.20 2.9 07/14/84 12:00 870 04 0.20 0.20 2. 9 07/14/84 14:00 871 04 0.20 0.20 2.9 07/14/84 16:00 872 03 0. 15 0. 15 2. 0 07/14/84 18:00 873 04 0.20 0.20 2.9 07/14/84 20:00 874 04 0.20 0.20 2. 9 07/14/84 22:00 875 04 0.20 0.20 2.9 07/14/84 00:00 876 04 0.20 0.20 2.9 DAILY AVERAGE VALUES 0.20 0.20 2.8 07/15/84 02:00 877 03 0. 15 0. 15 2.0 07/15/84 04:00 878 04 0.20 0.20 2.9 07/15/84 06:00 879 04 0.20 0.20 2.9 07/15/84 08:00 880 04 0.20 0.20 2.9 07/15/84 10:00 881 04 0.20 0.20 2.9 07/15/84 12:00 882 04 0.20 0.20 2.9 07/15/84 14:00 883 04 0.20 0.20 2.9 07/15/84 16:00 884 04 0.20 0. 20 2.9 07/15/84 18:00 885 04 0.20 0.20 2.9 07115/84 20:00 886 04 0.20 0.20 2. 9 07/15/84 22:00 887 04 0. 20 0.20 2. 9 07/15/84 00:00 888 04 0.20 0.20 2.9 DAILY AVERAGE VALUES 0.20 0.20 2.8 07/16/84 02:00 889 04 0. 20 0. 20 2. 9 07/16/S4 04:00 890 04 0.20 0. 20 2. 9 07/16/84 06:00 891 05 0.25 0.25 4. 0 07/16/84 08:00 892 05 0.25 0. 25 4.0 07/16/84 10:00 893 04 0.20 0. 20 2. 9 07/16/84 12:00 894 04 0.20 0.20 2. 9 07/16/84 14:00 895 04 0.20 0. 20 2. 9 07/16/84 16:00 896 05 0.25 0.25 4. 0 07/16/84 18:00 897 04 0.20 0. 20 2. 9 07/16/84 20:00 898 04 0.20 0.20 2.9 07/16/84 22:00 899 05 0.25 0.25 4.0 07/16/84 00:00 900 05 0.25 0.25 4.0 DAILY AVERAGE VALUES 0.22 0.22 3.4 I I j 1o5/16)85 1-'~GE ' ' PROPOSED OLD HARBOR HYDROELECTR PROJECT 26 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===== ::=== =====·=== ====== ====== ======= 07/17/84 02:00 901 05 0.25 0.25 4.0 07/17/84 04:00 902 05 0.25 0.25 4.0 07/17/84 06:00 903 05 0.25 0.25 4.0 07/17/84 08:00 904 05 0.25 0.25 4.0 07/17/84 10:00 905 05 0.25 0.25 4.0 07/17/84 12:00 906 04 0. 20 0.20 2.9 07/17/84 14:00 907 05 0.25 0.25 4. 0 07/17/84 16:00 908 05 0.25 0.25 4.0 07/17/84 18:00 909 05 0.25 0.25 4.0 07/17/84 20:00 910 04 0.20 0.20 2.9 07/17/84 22:00 911 05 0. 25 0.25 4.0 07/17/84 00:00 912 05 0.25 0.25 4.0 DAILY AVERAGE VALUES 0.24 0.24 3.8 07/18/84 02:00 913 05 0.25 0.25 4.0 07/18/84 04:00 914 05 0.25 0.25 4.0 07/18/84 06:00 915 OS 0.25 0.25 4.0 07/18/84 08:00 916 05 0.25 0.25 4.0 07/18/84 10:00 917 05 0.25 0.25 4.0 07/18/84 12:00 918 05 0. 25 0.25 4.0 07/18/84 14:00 919 05 0. 25 0.25 4.0 07/18/84 16:00 920 05 0.25 0.25 4.0 07/18/84 18:00 921 05 0.25 0.25 4. 0 07/18/84 20:00 922 05 0.25 0.25 4. 0 07/18/84 22:00 923 05 0.25 0.25 4.0 07/18/84 00:00 924 05 0.25 0.25 4.0 DAILY AVERAGE VALUES 0.25 0.25 4.0 07/19/84 02:00 925 05 0.25 0.25 4.0 07/19/84 04:00 926 05 0.25 0.25 4. 0 07/19/84 06:00 927 05 0.25 0.25 4.0 07/19/84 08:00 928 05 0.25 0.25 4. 0 07/19/84 10:00 929 05 0.25 0.25 4.0 07/19/84 12:00 930 05 0.25 0.25 4.0 07/19/84 14:00 931 05 0.25 0.25 4.0 07/19/84 16:00 932 05 0. 25 0.25 4.0 07/19/84 18:00 933 05 0.25 0.25 4. 0 07/19/84 20:00 934 05 0.25 0.25 4. 0 07/19/84 22:00 935 05 0.25 0.25 4.0 07/19/84 00:00 936 05 0.25 0.25 4.0 DAILY AVERAGE VALUES 0.25 0.25 4.0 a Je: ! ' PRwr u D ..,._.., HAl"J'-" H\ ""'"JELE~ .. J PRL"',_J:T ~o5, t85 AGE !27 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ==·== ==== ========= ====== ===== ====== 07/20/84 02:00 937 05 0.25 0.25 4. 0 07/20/84 04:00 938 05 0.25 0.25 4. 0 07/20/84 06:00 939 05 0.25 0.25 4. 0 07/20/84 08:00 940 05 0.25 0.25 4.0 07/20/84 10:00 941 05 0. 25 0.25 4.0 07/20/84 12:00 942 05 0. 25 0.25 4.0 07/20/84 14:00 943 05 0.25 0.25 4.0 07/20/84 16.00 944 04 0. 20 0.20 2. 9 07/20/84 18:00 945 05 0. 25 0.25 4.0 07/20/84 20:00 946 05 0.25 0.25 4. 0 07/20/84 22:00 947 05 0.25 0.25 4. 0 07/20/84 00:00 948 05 0.25 0.25 4.0 DAILY AVERAGE VALUES 0.25 0.25 3.9 07/21/84 02:00 949 05 0.25 0.25 4.0 07/21/84 04:00 950 05 0.25 0. 25 4.0 07/21/84 06:00 951 05 0.25 0.25 4.0 07/21/84 08:00 952 05 0. 25 0.25 4. 0 07/21/84 10:00 953 05 0.25 0.25 4. 0 07/21/84 12:00 954 05 0.25 0.25 4.0 07/21/84 14:00 955 05 0.25 0.25 4.0 07/21/84 16:00 956 05 0. 25 0.25 4.0 07/21/84 18:00 957 05 0. 25 0.25 4.0 07/21/84 20:00 958 05 0.25 0.25 4. 0 07/21/84 22:00 959 05 0.25 0.25 4. 0 07/21/84 00:00 960 05 0.25 0.25 4.0 DAILY AVERAGE VALUES 0.25 0.25 4. 0 07/22/94 02:00 961 05 0.25 0.25 4. 0 07/22/84 04:00 962 05 0.25 0.25 4.0 07/22/84 06:00 963 05 0.25 0.25 4.0 07/22/84 08:00 964 04 0.20 0.20 2. 9 07/22/84 10:00 965 03 0. 15 0. 15 2.0 07/22/84 12:00 966 03 0. 15 0. 15 2.0 07/22/84 14:00 967 03 0. 15 0. 15 2. 0 07/22/84 16:00 968 03 0. 15 0. 15 2.0 07/22/84 18:00 969 02 0. 10 0. 10 1. 1 07/22/84 20:00 970 02 0. 10 0. 10 1. 1 07/22/84 22:00 971 0:2 0. 10 0. 10 1. 1 07/22/84 00:00 972 02 0. 10 0. 10 1. 1 DAILY AVERAGE VALUES 0. 16 0. 16 2.3 PROPOJED ULJ HAk~uh Hvu~JELE~IK! PRUvttT 1 05tJ.oi85 ' r~GE ~8 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===== ==== ========= ====== ===== ====== 07/23/84 02:00 973 03 0. 15 0. 15 2.0 07/23/84 04:00 974 03 0. 15 0. 15 2. 0 07/23/84 06:00 975 04 0.20 0.20 2. 9 07/23/84 08:00 976 04 0.20 0. 20 2. 9 07/23/84 10:00 977 04 0.20 0.20 2.9 07/23/84 12:00 978 04 0.20 0.20 2. 9 07/23/84 14:00 979 04 0. 20 0. 20 2.9 07/23/84 16:00 980 04 0. 20 0. 20 2.9 07/23/84 18:00 981 04 0. 20 0.20 2.9 07/23/84 20:00 982 04 0.20 0.20 2.9 07/23/84 22:00 983 04 0.20 0.20 2. 9 07/23/84 00:00 984 04 0.20 0.20 2. 9 DAILY AVERAGE VALUES 0. 19 0. 19 2.8 07/24/84 02:00 985 05 0.25 0.25 4.0 07/24/84 04:00 986 05 0.25 0.25 4. 0 07/24/84 06:00 987 05 0.25 0.25 4. 0 07/24/84 08:00 988 05 0.25 0.25 4.0 07/24/84 10:00 989 05 0.25 0.25 4.0 07/24/84 12:00 990 04 0. 20 0.20 2.9 07/24/84 14:00 991 05 0.25 0.25 4.0 07/24/84 16:00 992 04 0. 20 0.20 2.9 07/24/84 18:00 993 05 0.25 0.25 4.0 07/24/84 20:00 994 04 0.20 0.20 2.9 07/24/84 22:00 995 05 0.25 0.25 4. 0 07/24/84 00:00 996 05 0.25 0.25 4. 0 DAILY AVERAGE VALUES 0. 24 0.24 3. 7 07/25/94 02:00 997 05 0.25 0.25 4.0 07/25/84 04:00 998 05 0.25 0.25 4.0 07/25/84 06:00 999 05 0.25 0.25 4.0 07/25/84 08:00 000 05 0. 25 0.25 4.0 07/25/84 10:00 001 05 0.25 0.25 4.0 07/25/84 12:00 002 04 0.20 0.20 2. 9 07/25/84 14:00 003 04 0.20 0.20 2.9 07/25/84 16:00 004 04 0.20 0. 20 2. 9 07/25/84 18:00 005 05 0.25 0.25 4. 0 07/25/84 20:00 006 05 0.25 0.25 4.0 07/25/84 22:00 007 05 0.25 0.25 4.0 07/25/84 00:00 008 05 0.25 0.25 4.0 DAILY AVERAGE VALUES 0.24 0.24 3. 7 l PRL, ... JED ~-J HA .. --·-H'. _ .. JELL .. J PR,_ __ h l 05, !a:; ~GE !?9 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ========= ===== ==== ========= ======= ===== ====== 07/26/84 02:00 009 05 0.25 0.25 4.0 07/26/84 04:00 010 05 0.25 0.25 4. 0 07/26/84 06:00 011 05 0.25 0.25 4.0 07/26/84 08:00 012 05 0.25 0. 25 4.0 07/26/84 10:00 013 05 0.25 0.25 4.0 07/26/84 12:00 014 04 0.20 0.20 2.9 07/26/84 14:00 015 04 0.20 0.20 2.9 07/26/84 16:00 016 04 0.20 0.20 2. 9 07/26/84 18:00 017 04 0.20 0.20 2. 9 07/26/84 20:00 018 05 0.25 0.25 4. 0 07/26/84 22:00 019 05 0.25 0.25 4. 0 07/26/84 00:00 020 05 0.25 0. 25 4. 0 DAILY AVERAGE VALUES 0.23 0. 23 3. 6 07/27/84 02:00 021 05 0.25 0.25 4.0 07/27/84 04:00 022 05 0. 25 0.25 4.0 07/27/84 06:00 023 05 0.25 0. 25 4. 0 07/27/84 08:00 024 05 0.25 0.25 4. 0 07/27/84 10:00 025 05 0.25 0.25 4.0 07/27/84 12:00 026 05 0.25 0.25 4.0 07/27/84 14:00 027 05 0.25 0.25 4.0 07/27/84 16:00 028 05 0.25 0.25 4.0 07/27/84 18:00 029 05 0.25 0.25 4.0 07/27/84 20:00 030 05 0.25 0.25 4. 0 07/27/84 22:00 031 05 0.25 0.25 4. 0 07/27/84 00:00 032 05 0.25 0.25 4. 0 DAILY AVERAGE VALUES 0. 25 0.25 4.0 07/28/84 02:00 033 05 0.25 0.25 4. 0 07/28/94 04:00 034 05 0.25 0. 25 4.0 07/28/84 06:00 035 06 0.30 0.30 5. 1 07/28/84 08:00 036 05 0. 25 0.25 4.0 07/28/84 10:00 037 06 0. 30 0.30 5. 1 07/28/84 12:00 038 06 0. 30 0.30 5. 1 07/28/84 14:00 039 06 0. 30 0.30 5. 1 07/28/84 16:00 040 05 0.25 0.25 4.0 07/28/84 18:00 041 06 0.30 0.30 5. 1 07/28/84 20:00 042 06 0.30 0.30 5. 1 07/28/84 22:00 043 06 0. 30 0.30 5. 1 07/28/84 00:00 044 06 0. 30 0.30 5. 1 DAILY AVERAGE VALUES 0. 28 0. 28 4. 7 I PROPOJED OLI} HAH.I:fU~ HYuKJELE~IKi PRU~~tT io5,~o)85 r~GE ~0 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ========= ===== ::::;:== ::::======== ======= ===== ====== 07/29/84 02:00 045 06 0.30 0.30 5. 1 07/29/84 04:00 046 05 0.25 0.25 4. 0 07/29/84 06:00 047 06 0. 30 0.30 5. 1 07/29/84 08:00 048 05 0.25 0. 25 4.0 07/29/84 10:00 049 05 0.25 0.25 4.0 07/29/84 12:00 050 05 0.25 0.25 4.0 07/29/84 14:00 051 05 0.25 0.25 4.0 07/29/84 16:00 052 05 0.25 0.25 4. 0 07/29/84 18:00 053 05 0.25 0. 25 4.0 07/29/84 20:00 054 05 0.25 0.25 4.0 07/29/84 22:00 055 05 0.25 0.25 4.0 07/29/84 00:00 056 05 0.25 0.25 4. 0 DAILY AVERAGE VALUES 0.26 0. 26 4. 2 07/30/84 02:00 057 05 0. 25 0.25 4.0 07/30/84 04:00 058 05 0.25 0.25 4.0 07/30/84 06:00 059 05 0.25 0.25 4. 0 07/30/84 08:00 060 05 0.25 0.25 4.0 07/30/84 10:00 061 05 0.25 0.25 4. 0 07/30/84 12:00 062 05 0.25 0.25 4. 0 07/30/84 14:00 063 05 0.25 0.25 4.0 07/30/84 16:00 064 05 0.25 0.25 4. 0 07/30/84 18:00 065 05 0.25 0.25 4. 0 07/30/84 20:00 066 05 0.25 0.25 4.0 07/30/84 22:00 067 05 0.25 0.25 4. 0 07/30/84 00:00 068 05 0. 25 0.25 4.0 DAILY AVERAGE VALUES 0. 25 0.25 4.0 07/31/84 02:00 069 06 0.30 0. 30 5. 1 07/31/84 04:00 070 05 0.25 0.25 4.0 07/31/84 06:00 071 06 0.30 0. 30 5. 1 07/31184 08: 00 072 05 0.25 0. 25 4.0 07/31/84 10:00 073 05 0.25 0.25 4.0 07/31/84 12:00 074 05 0.25 0.25 4.0 07/31/84 14:00 075 05 0.25 0.25 4. 0 07/31/84 16:00 076 05 0. 25 0.25 4.0 07/31/84 18:00 077 05 0.25 0.25 4. 0 07/31184 20: 00 078 05 0. 25 0.25 4. 0 07/31/84 22:00 079 05 0.25 0.25 4.0 07/31184 00: 00 080 06 0.30 0. 30 5. 1 DAILY AVERAGE VALUES 0.26 0.26 4.3 fPRC ED f HAl f H) J;:LE I PRI fT I ,o5, j85 -~GE ]11 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===== ==== ========= ====== ===== ======= 08/01/84 02:00 081 06 0. 30 0. 30 5. 1 08/01/84 04:00 082 06 0.30 0. 30 5. 1 08/01/84 06:00 083 05 0.25 0.25 4. 0 08/01/84 08:00 084 06 0. 30 0. 30 5. 1 08/01/84 10:00 085 05 0.25 0.25 4.0 08/01/84 12:00 086 05 0.25 0.25 4.0 08/01/84 14:00 087 05 0.25 0.25 4.0 08/01184 16:00 088 05 0.25 0.25 4. 0 08/01184 18:00 089 05 0.25 0.25 4.0 08/01/84 20:00 090 05 0.25 0.25 4.0 08/01184 22:00 091 05 0.25 0.25 4.0 08/01/84 00:00 092 06 0.30 0.30 5. 1 DAILY AVERAGE VALUES 0.27 0.27 4. 4 08/02/84 02:00 093 06 0.30 0. 30 5. 1 08/02/84 04:00 094 06 0. 30 0. 30 5. 1 08/02/84 06:00 095 05 0.25 0.25 4. 0 08/02/84 08:00 096 05 0.25 0.25 4. 0 08/02/84 10:00 097 05 0.25 0.25 4. 0 08/02/84 12:00 098 05 0.25 0.25 4. 0 08/02/84 14:00 099 05 0.25 0.25 4.0 08/02/84 16:00 100 05 0.25 0.25 4.0 08/02/84 18:00 101 06 0.30 0.30 5. 1 08/02/84 20:00 102 06 0.30 0.30 5. 1 08/02/84 22:00 103 05 0. 25 0.25 4.0 08/02/84 00:00 104 06 0.30 0. 30 5. 1 DAILY AVERAGE VALUES 0.27 0.27 4. 5 08/03/84 02:00 105 06 0. 30 0.30 5. 1 08/03/94 04:00 106 06 0.30 0. 30 5. 1 08/03/84 06:00 107 06 0. 30 0.30 5. 1 08/03/84 08:00 108 06 0. 30 0. 30 5. 1 08/03/84 10:00 109 06 0.30 0. 30 5. 1 08/03/84 12:00 110 06 0.30 0. 30 5. 1 08/03/84 14:00 111 06 0.30 0.30 5. 1 08/03/84 16:00 112 06 0.30 0.30 5. 1 08/03/84 18:00 113 06 0. 30 0.30 5. 1 08/03/84 20:00 114 05 0.25 0.25 4. 0 08/03/84 22:00 115 06 0.30 0.30 5. 1 08/03/84 00:00 116 06 0.30 0.30 5. 1 DAILY AVERAGE VALUES 0.30 0.30 5.0 1 PRtlf"'oJED uL) HAt<l:luA I I J. HYuKuELE~lK PRu~~~T ' i '05110185 r~GE ~2 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ====== ==== ========= ======= ===== ====== 08/04/84 02:00 117 06 0. 30 0.30 5. 1 08/04/84 04:00 118 05 0.25 0.25 4.0 08/04/84 06:00 119 05 0.25 0. 25 4. 0 08/04/84 08:00 120 05 0.25 0.25 4.0 08/04/84 10:00 121 05 0.25 0.25 4.0 08/04/84 12:00 122 05 0.25 0.25 4. 0 08/04/84 14:00 123 04 0.20 0.20 2. 9 08/04/84 16:00 124 04 0.20 0.20 2. 9 08/04/84 18:00 125 04 0.20 0.20 2.9 08/04/84 20:00 126 04 0.20 0.20 2. 9 08/04/84 22:00 127 04 0.20 0.20 2.9 08/04/84 00:00 128 05 0.25 0.25 4.0 DAILY AVERAGE VALUES 0.23 0.23 3.6 08/05/84 02:00 129 05 0. 25 0.25 4.0 08/05/84 04:00 130 05 0.25 0. 25 4. 0 08/05/84 06:00 131 05 0. 25 0.25 4. 0 08/05/84 08:00 132 05 0.25 0.25 4.0 08/05/84 10:00 133 05 0.25 0.25 4. 0 08/05/84 12:00 134 05 0.25 0.25 4. 0 08/05/84 14:00 135 04 0.20 0.20 2. 9 08/05/84 16:00 136 04 0. 20 0.20 2. 9 08/05/84 18:00 137 04 0.20 0. 20 2. 9 08/05/84 20:00 138 05 0.25 0. 25 4.0 08/05/84 22:00 139 05 0.25 0.25 4. 0 08/05/84 00:00 140 05 0.25 0.25 4.0 DAILY AVERAGE VALUES 0.24 0.24 3.7 08/06/84 02:00 141 05 0. 25 0.25 4.0 08/06/84 04:00 142 05 0.25 0.25 4. 0 08/06/84 06:00 143 05 0.25 0.25 4. 0 08/06/84 08:00 144 05 0.25 0.25 4.0 08/06/84 10:00 145 05 0.25 0.25 4. 0 08/06/84 12:00 146 05 0.25 0.25 4.0 08/06/84 14:00 147 04 0. 20 0. 20 2. 9 08/06/84 16:00 148 04 0. 20 0.20 2. 9 08/06/84 18:00 149 04 0. 20 0.20 2. 9 08/06/84 20:00 150 05 0.25 0.25 4.0 08/06/84 22:00 151 05 0.25 0.25 4.0 08/06/84 00:00 152 05 0.25 0.25 4. 0 DAILY AVERAGE VALUES 0.24 0.24 3. 7 I PRGruJED ._.._) HAi,..,u,, H\ "'"JELE-.. J PRL.,_, .... h '051 _ las ~GE b3 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS :::======= ===== ==== ========= ====== ===== ====== 08/07/84 02:00 153 05 0. 25 0.25 4. 0 08/07/84 04:00 154 05 0.25 0.25 4.0 08/07/84 06:00 155 06 0. 30 0.30 5. 1 08/07/84 08: 00 156 05 0.25 0.25 4.0 08/07/84 10:00 157 05 0.25 0.25 4.0 08/07/84 12:00 158 04 0.20 0.20 2.9 08/07/84 14:00 159 04 0. 20 0.20 2. 9 08/07/84 16:00 160 04 0.20 0. 20 2. 9 08/07/84 18:00 161 04 0.20 0.20 2.9 08/07/84 20:00 162 05 0.25 0.25 4.0 08/07/84 22:00 163 05 0.25 0.25 4.0 08/07/84 00:00 164 05 0.25 0.25 4.0 DAILY AVERAGE VALUES 0.24 0.24 3. 7 08/08/84 02:00 165 05 0.25 0.25 4.0 08/08/84 04:00 166 05 0.25 0.25 4.0 08/08/84 06:00 167 05 0.25 0. 25 4. 0 08/08/84 08:00 168 05 0.25 0. 25 4. 0 08/08/84 10:00 169 05 0.25 0.25 4.0 08/08/84 12:00 170 05 0.25 0.25 4.0 08/08/84 14:00 171 04 0.:;;!0 0.20 2.9 08/08/84 16:00 172 05 0.25 0. 25 4. 0 08/08/84 18:00 173 04 0.20 0.20 2. 9 08/08/84 20:00 174 05 0.25 0.25 4.0 08/08/84 22:00 175 05 0. 25 0.25 4.0 08/08/84 00:00 176 05 0.25 0.25 4. 0 DAILY AVERAGE VALUES 0.24 0.24 3. 8 08/09/84 02:00 177 05 0.25 0. 25 4.0 08/09/84 04:00 178 05 0.25 0.25 4. 0 08/09/84 06:00 179 05 0.25 0.25 4. 0 08/09/84 08:00 180 05 0.25 0.25 4. 0 08/09/84 10:00 181 05 0.25 0.25 4. 0 08/09/84 12:00 182 05 0.25 0.25 4.0 08/09/84 14:00 183 04 0.20 0.20 2. 9 08/09/84 16:00 184 04 0.20 0.20 2. 9 08/09/84 18:00 185 04 0.20 0. 20 2. 9 08/09/84 20:00 186 04 0.20 0.20 2.9 08/09/84 22:00 187 05 0. 25 0.25 4. 0 08/09/84 00:00 188 05 0.25 0. 25 4. 0 DAILY AVERAGE VALUES 0.23 0. 23 3. 6 IPR~~uJED ULJHAnouA H\unJELE~,J PRu~c!T ~ 05, ~ ... )85 . ~GE B4 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===== ==== ========= ====== ==::::== =:::==== 08/10/84 02:00 189 05 0.25 0.25 4.0 08/10/84 04:00 190 05 0.25 0.25 4. 0 08/10/84 06:00 191 05 0.25 0.25 4. 0 08/10/84 08:00 192 05 0.25 0. 25 4. 0 08/10/84 10:00 193 05 0.25 0.25 4.0 08/10/84 12:00 194 05 0.25 0. 25 4.0 08/10/84 14:00 195 04 0.20 0.20 29 08/10184 16:00 196 04 0. 20 0. 20 2. 9 08/10/84 18:00 197 05 0.25 0.25 4.0 08/10/84 20:00 198 05 0. 25 0.25 4. 0 08/10/84 22:00 199 05 0.25 0.25 4.0 08/10/84 00:00 200 05 0.25 0.25 4.0 DAILY AVERAGE VALUES 0.24 0.24 3.8 08/11/84 02:00 201 05 0.25 0.25 4.0 08/11/84 04:00 202 05 0.25 0.25 4.0 08/11/84 06:00 203 05 0.25 0. 25 4.0 08/11/84 08:00 204 05 0.25 0.25 4. 0 08/11/84 10:00 205 05 0.25 0.25 4.0 08/11/84 12:00 206 04 0.20 0.20 2.9 08/11/84 14:00 207 04 0. 20 0. 20 2.9 08/11184 16:00 208 04 0.20 0.20 2.9 08/11/84 18:00 209 04 0.20 0.20 2. 9 08/11/84 20:00 210 04 0. 20 0.20 2.9 08/11/84 22:00 211 05 0.25 0. 25 4.0 08/11/84 00:00 212 05 0.25 0.25 4.0 DAILY AVERAGE VALUES 0. 23 0.23 3. 5 08/12/84 02:00 213 05 0.25 0.25 4.0 08112/84 04:00 214 05 0.25 0. 25 4.0 08/12/84 06:00 215 05 0.25 0.25 4.0 08/12/84 08:00 216 05 0.25 0. 25 4. 0 08/12/84 10:00 217 05 0.25 0.25 4. 0 08/12/84 12:00 218 05 0.25 0.25 4.0 08/12/84 14:00 219 04 0.20 0.20 2. 9 08/12/84 16:00 220 04 0.20 0.20 2. 9 08/12/84 18:00 221 04 0.20 0.20 2. 9 08/12/84 20:00 222 05 0.25 0.25 4.0 08/12/84 22:00 223 05 0.25 0.25 4.0 08/12/84 00:00 224 05 0.25 0.25 4. 0 DAILY AVERAGE VALUES 0.24 0.24 3. 7 f PRL ... JED __ J HA .. --.~ H'.~ .. JELE .. i PR ___ tT { i 05. i85 iAGE tl5 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ==:=:t== ==== ========== ====== ===== =====:::::: 08/13/84 02:00 225 05 0.25 0. 25 4.0 08/13/84 04:00 226 05 0.25 0.25 4. 0 08/13/84 06:00 227 05 0.25 0.25 4.0 08/13/84 08:00 228 05 0. 25 0.25 4.0 08/13/84 10:00 229 05 0.25 0.25 4. 0 08/13/84 12:00 230 05 0.25 0.25 4.0 08/13/84 14:00 231 04 0.20 0. 20 2. 9 08/13/84 16:00 232 04 0.20 0.20 2.9 08/13/84 18:00 233 05 0.25 0.25 4. 0 08/13/84 20:00 234 04 0.20 0.20 2. 9 08/13/84 22:00 235 05 0.25 0.25 4.0 08/13/84 00:00 236 05 0.25 0.25 4. 0 DAILY AVERAGE VALUES 0.24 0.24 3. 7 08/14/84 02:00 237 05 0.25 0.25 4. 0 08/14/84 04:00 238 05 0.25 0.25 4. 0 08/14/84 06:00 239 05 0.25 0.25 4. 0 08/14/84 08:00 240 05 0.25 0. 25 4.0 08/14/84 10:00 241 05 0.25 0.25 4. 0 08/14/84 12:00 242 05 0.25 0.25 4.0 08/14/84 14:00 243 04 0.20 0.20 2.9 08/14/84 16:00 244 04 0. 20 0.20 2.9 08/14/84 18:00 245 04 0.20 0.20 2. 9 08/14/84 20:00 246 04 0.20 0.20 :2. 9 08/14/84 22:00 247 05 0.25 0.25 4.0 08/14/84 00:00 248 05 0. 25 0.25 4.0 DAILY AVERAGE VALUES 0. 23 0.23 3.6 08/15/84 02:00 249 05 0.25 0.25 4. 0 08/15/84 04:00 250 05 0.25 0.25 4. 0 08/15/84 06:00 251 06 0.30 0. 30 5. 1 08/15/84 08:00 252 05 0.25 0.25 4. 0 08/15/84 10:00 253 05 0.25 0.25 4.0 08/15/84 12:00 254 05 0. 25 0.25 4. 0 08/15/84 14:00 255 04 0.20 0.20 2. 9 08/15/84 16:00 256 04 0.20 0.20 2. 9 08/15/84 18:00 257 05 0.25 0.25 4. 0 08/15/84 20:00 258 05 0.25 0.25 4.0 08/15/84 22:00 259 05 0.25 0.:25 4. 0 08/15/84 00:00 260 05 0. 25 0.25 4. 0 DAILY AVERAGE VALUES 0.25 0.25 3.9 l ."=: i I IE . . PRLr u..-D ......... .., HAL .... -.. H\ ~"-LE~ .. J PRL..,-lT 1o5, is5 !AGE t6 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===== ==== ========= ====== ===== ====== 08/16/84 02:00 261 05 0.25 0.25 4. 0 08/16/84 04:00 262 05 0.25 0.25 4. 0 08/16/84 06:00 263 06 0.30 0.30 5. 1 08/16/84 08:00 264 05 0.25 0.25 4. 0 08/16/84 10:00 265 05 0.25 0.25 4.0 08/16/84 12:00 266 05 0.25 0. 25 4.0 08/16/84 14:00 267 04 0.20 0.20 2.9 08/16/84 16:00 268 04 0. 20 0.20 2.9 08/16/84 18:00 269 05 0.25 0.25 4.0 08/16/84 20:00 270 05 0.25 0.25 4. 0 08/16/84 22:00 271 05 0. 25 0.25 4.0 08/16/84 00:00 272 05 0.25 0.25 4.0 DAILY AVERAGE VALUES 0.25 0.25 3.9 08/17/84 02:00 273 05 0.25 0. 25 4. 0 08/17/84 04:00 274 05 0. 25 0. 25 4. 0 08/17/84 06:00 275 05 0.25 0.25 4. 0 08/17/84 08:00 276 05 0.25 0.25 4. 0 08/17/84 10:00 277 05 0. 25 0.25 4. 0 08/17/84 12:00 278 05 0. 25 0.25 4. 0 08/17/84 14:00 279 05 0.25 0.25 4.0 08/17/84 16:00 280 05 0.25 0.25 4.0 08/17/84 18:00 281 05 0.25 0.25 4.0 08/17/84 20:00 282 05 0.25 0.25 4. 0 08/17/84 22:00 283 05 0.25 0. 25 4. 0 08/17/84 00:00 284 05 0.25 0.25 4. 0 DAILY AVERAGE VALUES 0.25 0.25 4. 0 08/18/84 02:00 285 05 0. 25 0.25 4. 0 08/18/94 04:00 286 06 0.30 0.30 5. 1 08/18/84 06:00 287 06 0.30 0.30 5. 1 08/18/84 08:00 288 06 0.30 0.30 5. 1 08/18/84 10:00 289 05 0.25 0.25 4.0 08/18/84 12:00 290 05 0.25 0.25 4. 0 08/18/84 14:00 291 05 0.25 0.25 4.0 08/18/84 16:00 292 05 0.25 0.25 4.0 08/18/84 18:00 293 05 0.25 0.25 4. 0 08/18/84 20:00 294 05 0.25 0.25 4.0 08/18/84 22:00 295 05 0.25 0.25 4.0 08/18/84 00:00 296 06 0.30 0.30 5. 1 DAILY AVERAGE VALUES 0.27 0.27 4. 4 iPRL. JED I HA t H' IELE I PR n I l 05. )85 rAGE f17 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===== ==== ========= ====== ===== ====== 08/19/84 02:00 297 06 0.30 0.30 5. 1 08/19/84 04:00 298 06 0. 30 0. 30 5. 1 08/19/84 06:00 299 06 0.30 0.30 5. 1 08/19/84 08:00 300 06 0.30 0.30 5. 1 08/19/84 10:00 301 05 0.25 0.25 4. 0 08/19/84 12:00 302 05 0.25 0.25 4.0 08/19/84 14:00 303 04 0. 20 0.20 2. 9 08/19/84 16:00 304 05 0.25 0.25 4. 0 08/19/84 18:00 305 04 0.20 0.20 2.9 08/19/84 20:00 306 04 0. 20 0.20 2. 9 08/19/84 22:00 307 05 0.25 0.25 4. 0 08/19/84 00:00 308 05 0.25 0.25 4.0 DAILY AVERAGE VALUES 0.25 0.25 4. 1 08/20/84 02:00 309 05 0.25 0.25 4.0 08/20/84 04:00 310 05 0.25 0.25 4.0 08/20/84 06:00 311 05 0.25 0.25 4.0 08/20/84 08:00 31::2 05 0.25 0. 25 4.0 08/20/84 10:00 313 05 0.25 0.25 4. 0 08/20/84 12:00 314 05 0. 25 0.25 4.0 08/20/84 14:00 315 05 0.25 0.25 4.0 08/20/84 16:00 316 05 0.25 0.25 4. 0 08/20/84 18:00 317 05 0.25 0.25 4.0 08/20/84 20:00 318 05 0.25 0.25 4. 0 08/20/84 22:00 319 05 0.25 0.25 4.0 08/20/84 00:00 320 05 0.25 0.25 4. 0 DAILY AVERAGE VALUES 0.25 0.25 4. 0 08/21/84 02:00 321 06 0. 30 0. 30 5. 1 08/21/84 04:00 322 06 0.30 0.30 5. 1 08/21/84 06:00 323 06 0. 30 0.30 5. 1 08/21/84 08:00 324 06 0. 30 0.30 5. 1 08/21/84 10:00 325 05 0.25 0.25 4.0 08/21/84 12:00 326 05 0.25 0.25 4.0 08/21/84 14:00 327 05 0.25 0.25 4. 0 08/21/84 16:00 328 05 0.25 0.25 4.0 08/21/84 18:00 329 05 0.25 0.25 4.0 08/21/84 20:00 330 05 0.25 0.25 4.0 08/21/84 22:00 331 05 0.25 0.25 4.0 08/21/84 00:00 332 06 0. 30 0.30 5. 1 DAILY AVERAGE VALUES 0.27 0.27 4. 5 J ! 1 Je: ' } PRLru ED '-''-"' HAl,...,...,., H\ ""'" LE~, .J PRGv~~ T I lo5, __ .i85 lt\GE il8 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS =========== ===== ===== ========= ====== ===== ====== 08/22/84 02:00 333 06 0.30 0. 30 5. 1 08/22/84 04:00 334 06 0. 30 0. 30 5. 1 08/22/84 06:00 335 06 0. 30 0.30 5. 1 08/22/84 08:00 336 05 0.25 0.25 4. 0 08/22/84 10:00 337 05 0.25 0. 25 4.0 08/22/84 12:00 338 05 0.25 0.25 4.0 08/22/84 14:00 339 04 0. 20 0. 20 2. 9 08/22/84 16:00 340 05 0.25 0. 25 4.0 08/22/84 18:00 341 04 0.20 0. 20 2. 9 08/22/84 20:00 342 05 0.25 0.25 4.0 08/22/84 22:00 343 05 0.25 0.25 4.0 08/22/84 00:00 344 05 0.25 0.25 4.0 DAILY AVERAGE VALUES 0.25 0.25 4. 1 08/23/84 02:00 345 05 0.25 0. 25 4.0 08/23/84 04:00 346 05 0.25 0. 25 4.0 08/23/84 06:00 347 05 0.25 0. 25 4.0 08/23/84 08:00 348 05 0.25 0. 25 4. 0 08/23/84 10:00 349 05 0.25 0.25 4. 0 08/23/84 12:00 350 05 0.25 0. 25 4.0 08/23/84 14:00 351 05 0.25 0. 25 4. 0 08/23/84 16:00 352 04 0. 20 0. 20 2. 9 08/23/84 18:00 353 05 0.25 0.25 4.0 08/23/84 20:00 354 05 0.25 0.25 4.0 08/23/84 22:00 355 05 0.25 0.25 4. 0 08/23/84 00:00 356 05 0.25 0.25 4. 0 DAILY AVERAGE VALUES 0. 25 0.25 3. 9 08/24/84 02:00 357 05 0.25 0.25 4.0 08/24/84 04:00 358 05 0.25 0. 25 4. 0 08/24/84 06:00 359 06 0.30 0. 30 5. 1 08/24/84 08:00 360 05 0. 25 0.25 4.0 08/24/84 10:00 361 01 0.05 0.05 0. 40 08/24/84 12:00 362 04 0. 20 0. 20 2.9 08/24/84 14:00 363 03 0. 15 0. 15 2. 0 08/24/84 16:00 364 02 0. 10 0. 10 1. 1 08/24/84 18:00 365 00 0.00 0.00 0. 00 08/24/84 20:00 366 01 0. 05 0.05 0. 40 08/24/84 22:00 367 02 0. 10 0. 10 1. 1 08/24/84 00:00 368 03 0. 15 0. 15 2.0 DAILY AVERAGE VALUES 0. 15 0. 15 2.3 ' PRL, ~JED HA .. --.~ H'. -... JELL .. .l PR ___ tT 05. 185 iAGE f39 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ========== ===== ==== ========== ====== ===== ====== 08/25/84 02:00 369 03 0. 15 0. 15 2. 0 08/25/84 04:00 370 04 0. 20 0. 20 2. 9 08/25/84 06:00 371 04 0.20 0.20 2. 9 08/25/84 08:00 372 05 0. 25 0. 25 4. 0 08/25/84 10:00 373 05 0.25 0.25 4.0 08/25/84 12:00 374 05 0. 25 0. 25 4. 0 08/25/84 14:00 375 05 0. 25 0.25 4.0 08/25/84 16:00 376 05 0.25 0. 25 4. 0 08/25/84 18:00 377 05 0.25 0. 25 4.0 08/25/84 20:00 378 05 0. 25 0. 25 4. 0 08/25/84 22:00 379 05 0.25 0. 25 4. 0 08/25/84 00:00 380 05 0.25 0. 25 4. 0 DAILY AVERAGE VALUES 0. 23 0.23 3. 7 08/26/84 02:00 381 05 0.25 0. 25 4.0 08/26/84 04:00 382 06 0. 30 0. 30 5. 1 08/26/84 06:00 383 05 0.25 0.25 4. 0 08/26/84 08:00 384 05 0. 25 0.25 4. 0 08/26/84 10:00 385 05 0. 25 0.25 4.0 08/26/84 12:00 386 05 0. 25 0.25 4. 0 08/26/84 14:00 387 04 0.20 0. 20 2. 9 08/26/84 16:00 388 04 0.20 0.20 2. 9 08/26/84 18:00 389 04 0.20 0.20 2. 9 08/26/84 20:00 390 05 0. 25 0.25 4.0 08/26/84 22:00 391 05 0.25 0. 25 4.0 08/26/84 00:00 392 05 0. 25 0.25 4.0 DAILY AVERAGE VALUES 0.24 0.24 3. 8 08/27/84 02:00 393 05 0.25 0.25 4.0 08/27/84 04:00 394 05 0. 25 0.25 4. 0 08/27/84 06:00 395 05 0. 25 0.25 4.0 08/27/84 08:00 396 05 0. 25 0. 25 4. 0 08/27/84 10:00 397 05 0.25 0.25 4. 0 08/27/84 12:00 398 05 0. 25 0.25 4. 0 08/27/84 14:00 399 05 0. 25 0. 25 4.0 08/27/84 16:00 400 05 0.25 0.25 4. 0 08/27/84 18:00 401 05 0.25 0.25 4.0 08/27/84 20:00 402 05 0.25 0.25 4.0 08/27/84 22:00 403 05 0.25 0.25 4.0 08/27/84 00:00 404 05 0.25 0.25 4. 0 DAILY AVERAGE VALUES 0.25 0.25 4. 0 PRwruJED u~...) HAh ...... J H\ l.mJELE ..... , ,) PRLv~..JT ios~ -~.iss . ~GE i.o MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ======== ===== ==== ========== ====== ===== ======= 08/28/84 02:00 405 05 0.25 0. 25 4. 0 08/28/84 04:00 406 06 0. 30 0.30 s. 1 08/28/84 06:00 407 06 0. 30 0. 30 s. 1 08/28/84 08:00 408 06 0.30 0. 30 s. 1 08/28/84 10:00 409 05 0. 25 0.25 4. 0 08/28/84 12:00 410 05 0.25 0. 25 4.0 08/28/84 14:00 411 05 0.25 0.25 4. 0 08/28/84 16:00 412 05 0. 25 0. 25 4. 0 08/28/84 18:00 413 05 0.25 0.25 4. 0 08/28/84 20:00 414 05 0.25 0.25 4.0 08/28/84 22:00 415 05 0.25 0.25 4. 0 08/28/84 00:00 416 06 0.30 0. 30 5. 1 DAILY AVERAGE VALUES 0.27 0. 27 4. 4 08/29/84 02:00 417 05 0.25 0.25 4.0 08/29/84 04:00 418 05 0.25 0.25 4. 0 08/29/84 06:00 419 06 0.30 0.30 5. 1 08/29/84 08:00 420 06 0.30 0. 30 5. 1 08/29/84 10:00 421 05 0.25 0.25 4.0 08/29/84 12:00 422 05 0.25 0.25 4. 0 08/29/84 14:00 423 05 0.25 0.25 4. 0 08/29/84 16:00 424 05 0.25 0.25 4. 0 08/29/84 18:00 425 05 0. 25 0. 25 4.0 08/29/84 20:00 426 05 0. 25 0.25 4.0 08/29/84 22:00 427 05 0.25 0.25 4. 0 08/29/84 00:00 428 06 0.30 0.30 5. 1 DAILY AVERAGE VALUES 0.26 0. 26 4.3 08/30/84 02:00 429 06 0. 30 0. 30 s. 1 08/30/84 04:00 430 06 0. 30 0. 30 5. 1 08/30/84 06:00 431 06 0.30 0. 30 5. 1 08/30/84 08:00 432 06 0.30 0. 30 5. 1 08/30/84 10:00 433 05 0.25 0.25 4.0 08/30/84 12:00 434 05 0. 25 0.25 4. 0 08/30/84 14:00 435 05 0. 25 0. 25 4.0 08/30/84 16:00 436 05 0.25 0.25 4.0 08/30/84 18:00 437 05 0.25 0.25 4. 0 08/30/84 20:00 438 04 0. 20 0.20 2. 9 08/30/84 22:00 439 05 0.25 0.25 4.0 08/30/84 00:00 440 05 0.25 0. 25 4. 0 DAILY AVERAGE VALUES 0. 26 0.26 4. 3 lpR(.,.. .... JED ~-J HAL-~.~ H\~ .. JELE_ i PRL __ h f05t ia5 ~GE ~1 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ========= ===== ==== ========== ====== :::==== ======= 08/31/84 02:00 441 05 0.25 0. 25 4. 0 08/31/84 04.00 442 05 0.25 0.25 4. 0 08/31/84 06:00 443 05 0.25 0.25 4. 0 08/31/84 08:00 444 05 0.25 0. 25 4. 0 08/31/84 10:00 445 05 0.25 0.25 4. 0 08/31/84 12:00 446 05 0.25 0.25 4. 0 08/31/84 14:00 447 04 0. 20 0.20 2. 9 08/31/84 16:00 448 04 0.20 0.20 2. 9 08/31/84 18:00 449 05 0. 25 0.25 4.0 08/31/84 20•00 450 05 0.25 0. 25 4.0 08/31/84 22:00 451 05 0.25 0.25 4.0 08/31/84 00:00 452 05 0.25 0.25 4.0 DAILY AVERAGE VALUES 0.24 0. 24 3.8 09/01/84 02:00 453 05 0.25 0.25 4. 0 09/01/84 04:00 454 05 0. 25 0.25 4. 0 09/01184 06:00 455 06 0.30 0.30 5. 1 09/01184 08:00 456 06 0.30 0.30 5. 1 09/01/84 10:00 457 05 0.25 0.25 4.0 09/01/84 12:00 458 05 0.25 0. 25 4.0 09/01/84 14:00 459 04 0.20 0.20 2. 9 09/01/84 16:00 460 05 0. 25 0.25 4. 0 09/01/84 18:00 461 05 0.25 0.25 4. 0 09/01/84 20:00 462 05 0.25 0.25 4.0 09/01/84 22:00 463 05 0.25 0.25 4.0 09/01/84 00:00 464 05 0.25 0.25 4.0 DAILY AVERAGE VALUES 0.25 0.25 4. 1 09/02/84 02:00 465 06 0. 30 0.30 5. 1 09/02/94 04:00 466 06 0. 30 0. 30 5. 1 09/02/84 06:00 467 06 0. 30 0. 30 5. 1 09/02/84 08:00 468 06 0. 30 0.30 5. 1 09/02/84 10:00 469 05 0. 25 0. 25 4. 0 09/02/84 12:00 470 05 0.25 0.25 4.0 09/02/84 14:00 471 04 0. 20 0.20 2. 9 09/02/84 16:00 472 05 0.25 0.25 4. 0 09/02/84 18:00 473 05 0. 25 0.25 4.0 09/02/84 20:00 474 05 0.25 0.25 4. 0 09/02/84 22:00 475 05 0.25 0.25 4. 0 09/02/84 00:00 476 05 0.25 0.25 4. 0 DAILY AVERAGE VALUES 0.26 0.26 4. 3 f ' . P R L.-....... ~D ...,,_.., I HAl .... ~· H~~ .. -l::LE_ ... PRL ___ JT 105/ 135 ~GE t2 MIDWAY CREEK NEAR OLD HARBOR, ALASKA START TIME 05/03/84 02:00 DEPTH STAGE DISCHG DATE TIME BYTE RAW DATA FEET FEET CFS ========= ===== ==== ========::::: ====== ===== ====== 09/03/84 02:00 477. 05 0.25 0.25 4.0 09/03/84 04:00 478 06 0. 30 0.30 5. 1 09/03/84 06:00 479 06 0.30 0. 30 5. 1 09/03/84 08:00 480 06 0. 30 0. 30 5. 1 09/03/84 10:00 481 05 0. 25 0. 25 4. 0 09/03/84 12:00 482 05 0. 25 0.25 4. 0 09/03/84 14:00 483 04 0.20 0.20 2. 9 09/03/84 16:00 484 05 0.25 0.25 4.0 09/03/84 18:00 485 05 0.25 0.25 4.0 09/03/84 20:00 486 05 0.25 0.25 4.0 09/03/84 22:00 487 05 0.25 0.25 4. 0 09/03/84 00:00 488 05 0.25 0.25 4.0 DAILY AVERAGE VALUES 0.26 0.26 4. 2 09/04/84 02:00 489 05 0. 25 0.25 4. 0 09/04/84 04:00 490 05 0.25 0. 25 4.0 09/04/84 06:00 491 06 0. 30 0. 30 5. 1 09/04/84 08:00 492 06 0.30 0.30 5. 1 09/04/84 10:00 493 05 0.25 0.25 4.0 09/04/84 12:00 494 05 0. 25 0.25 4. 0 09/04/84 14:00 495 05 0.25 0.25 4. 0 09/04/84 16:00 496 05 0. 25 0.25 4. 0 09/04/84 18:00 497 05 0.25 0.25 4. 0 09/04/84 20:00 498 05 0.25 0.25 4.0 09/04/84 22:00 499 05 0.25 0.25 4.0 09/04/84 00:00 500 05 0.25 0.25 4. 0 DAILY AVERAGE VALUES 0. 26 0.26 4. 2 09/05/84 02:00 501 05 0.25 0. 25 4.0 09/05/94 04:00 502 05 0.25 0.25 4. 0 09/05/84 06:00 503 06 0.30 0. 30 5. 1 09/05/84 08:00 504 05 0. 25 0.25 4.0 DAILY AVERAGE VALUES 0.26 0.26 4. 3