HomeMy WebLinkAboutRed Devil Bids, Invoice Payments 1985TWO RIVERS ELECTRICAL ENGINEERING COMPANY RECEIVED BY
ALASKA Powkre suTHORITY
TREE Company a ia
213 WEST SIXTH (6th) AVENUE ANCHORAGE ALASKA 99501 276-2051
SUBJECT: MID KUS KO KWIM ELECTRIFICATION PROJECT SECTOR THREE (3)
RED DEVIL VILLAGE. OCT 31 1985
COSTS to date on:
CAGE ERG llelels arate allele lallsla cl ezaial eel alee | ale 8,600.00
AEE Reese erstutetelereHesietetetelatestereibl sc 'asialallsle tele 38,211.21
(price F.0.B. Anchorage)
LABOR ee itl elle eters lolalalalate lateral lara otal olulalal a lalleit fae 104,788.79
CHE Ua UM IAt ola oa! b ta 41 ab 149 ,600.00
ADD-ON INFORMATION RELATIVE TO MATERIAL COSTS;
Material costs have risen and Sleetemute sector costs have risen
by 5,000.00 since last quoted. This should be taken into your
consideration when talking time in beginning project. We do not
anticipate any more rises in material costs this year and beginning
iil —of next year prior to construction season beginning. It bebooves
those responsible for money allocations to at least move on the
acquistion of material portion as soon as is financially sound
and possible.
SINCERELY GARY DEAN
For Gary Dean 3;;; Glenn Wade
COST TO CONSTRUCT
: : = "5 NOV -8 PI 35
Distribution System;
meters, drop boxes, poles, line, transformers - contractor T.R.E.E. $141,000. Engineering - contractor T.R.E.E. 8,600.
External hookup 4,400. Generators: (1) 50kw, (1) 40kw 38,500. Power House: Generator Bldg with wiring 18,000.
Survey - Right-of-way 3,500.
Freight - Charter C130 - Anchorage 15,200. Administration 12,400. Travel - (4 trips to Anchorage & P/D, MKEC Mer.) 2,960. Consulting - Preparation of application 5,500. $250,000.
COST TO MAINTAIN
Fuel - 13,000 gallons @ $1,424 $ 18,512. Operator - $700.00 per month x 12 8,400.
Parts 2,800.
Administration 3,200.
Debt service - $250,000.00 @ 5% 24,282,10 (base on fifteen year loan) $ 57,194.10
PROJECTED ANNUAL INCOME
Kuspuk school facility - $3,250. x 09 mos, $ 29,250, Vanderpool Road House - 981, x 12 mos. 11,773. State os Alaska equip. Shop - 151,00 x 12 1,813.
Air plane hookups - 237.95 x 12 2,851.
Eleven residential units (avg. $1,072.70 per unit) 11,500.
$ 57,727.
ANTICIPATED ANNUAL KILOWATT HOUR USEAGE
Commercial: @48.5 kwh
Kuspuk school 65,000kw per year Vanderpool Road House/Store 25,000 mm " Air plane hookups 4,200 7 "
Sub Total 94,200 per year
Residential: @59.0 kwh 20,000 per year
Total 114,200 per year
RECEIVE
ALASKA POM!
"5 oct 24 M0:54
(y#- 1k 1488
vED Aah uQpITY
\Whow MECC DRA Ww ai
ak gud, We
cluish \ pouchit mr UN LAIN - ghectr icity p ww \ WX C
will pe buy ine
{ Ir vi hi
Robert a Gat Vare erprel
Meer nie Lodoe
Youd er per | Sra ine) Dor
bay prwest]e \ lane.
ee oe, KUSPUK-SCHOOL DISTRICT ~~
P.O. Box 108 RECEIVED BY Aniak, Alaska 99557 LASKA POMS” SOON!
(907) 675-4250 BOB R. McHENRY
“85 OcT 24 SBFOAGYENOENT OF SCHOOLS
October 22, 1985
Middle Kuskokwim Electric Cooperative
General Delivery
Crooked Creek, AK 99575
The Kuspuk School District wishes to encourage MKEC to
build a power generating system at Red Devil. Currently,
the district operates its own generators to supply power
for the school. We support MKEC in their efforts to build
a power plant at Red Devil and would continue our support
by purchasing all of the school's power requirements from
MKEC.
Sincerely,
BOB R. MCHENRY#.-» =
Superintendent
lwb