Loading...
HomeMy WebLinkAboutRed Devil Bids, Invoice Payments 1985TWO RIVERS ELECTRICAL ENGINEERING COMPANY RECEIVED BY ALASKA Powkre suTHORITY TREE Company a ia 213 WEST SIXTH (6th) AVENUE ANCHORAGE ALASKA 99501 276-2051 SUBJECT: MID KUS KO KWIM ELECTRIFICATION PROJECT SECTOR THREE (3) RED DEVIL VILLAGE. OCT 31 1985 COSTS to date on: CAGE ERG llelels arate allele lallsla cl ezaial eel alee | ale 8,600.00 AEE Reese erstutetelereHesietetetelatestereibl sc 'asialallsle tele 38,211.21 (price F.0.B. Anchorage) LABOR ee itl elle eters lolalalalate lateral lara otal olulalal a lalleit fae 104,788.79 CHE Ua UM IAt ola oa! b ta 41 ab 149 ,600.00 ADD-ON INFORMATION RELATIVE TO MATERIAL COSTS; Material costs have risen and Sleetemute sector costs have risen by 5,000.00 since last quoted. This should be taken into your consideration when talking time in beginning project. We do not anticipate any more rises in material costs this year and beginning iil —of next year prior to construction season beginning. It bebooves those responsible for money allocations to at least move on the acquistion of material portion as soon as is financially sound and possible. SINCERELY GARY DEAN For Gary Dean 3;;; Glenn Wade COST TO CONSTRUCT : : = "5 NOV -8 PI 35 Distribution System; meters, drop boxes, poles, line, transformers - contractor T.R.E.E. $141,000. Engineering - contractor T.R.E.E. 8,600. External hookup 4,400. Generators: (1) 50kw, (1) 40kw 38,500. Power House: Generator Bldg with wiring 18,000. Survey - Right-of-way 3,500. Freight - Charter C130 - Anchorage 15,200. Administration 12,400. Travel - (4 trips to Anchorage & P/D, MKEC Mer.) 2,960. Consulting - Preparation of application 5,500. $250,000. COST TO MAINTAIN Fuel - 13,000 gallons @ $1,424 $ 18,512. Operator - $700.00 per month x 12 8,400. Parts 2,800. Administration 3,200. Debt service - $250,000.00 @ 5% 24,282,10 (base on fifteen year loan) $ 57,194.10 PROJECTED ANNUAL INCOME Kuspuk school facility - $3,250. x 09 mos, $ 29,250, Vanderpool Road House - 981, x 12 mos. 11,773. State os Alaska equip. Shop - 151,00 x 12 1,813. Air plane hookups - 237.95 x 12 2,851. Eleven residential units (avg. $1,072.70 per unit) 11,500. $ 57,727. ANTICIPATED ANNUAL KILOWATT HOUR USEAGE Commercial: @48.5 kwh Kuspuk school 65,000kw per year Vanderpool Road House/Store 25,000 mm " Air plane hookups 4,200 7 " Sub Total 94,200 per year Residential: @59.0 kwh 20,000 per year Total 114,200 per year RECEIVE ALASKA POM! "5 oct 24 M0:54 (y#- 1k 1488 vED Aah uQpITY \Whow MECC DRA Ww ai ak gud, We cluish \ pouchit mr UN LAIN - ghectr icity p ww \ WX C will pe buy ine { Ir vi hi Robert a Gat Vare erprel Meer nie Lodoe Youd er per | Sra ine) Dor bay prwest]e \ lane. ee oe, KUSPUK-SCHOOL DISTRICT ~~ P.O. Box 108 RECEIVED BY Aniak, Alaska 99557 LASKA POMS” SOON! (907) 675-4250 BOB R. McHENRY “85 OcT 24 SBFOAGYENOENT OF SCHOOLS October 22, 1985 Middle Kuskokwim Electric Cooperative General Delivery Crooked Creek, AK 99575 The Kuspuk School District wishes to encourage MKEC to build a power generating system at Red Devil. Currently, the district operates its own generators to supply power for the school. We support MKEC in their efforts to build a power plant at Red Devil and would continue our support by purchasing all of the school's power requirements from MKEC. Sincerely, BOB R. MCHENRY#.-» = Superintendent lwb