Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Nome Waste Heat Project Agreements, Contracts, & Budget 1992
oe State of Alaska d Walter J. Hickel, Governor Alaska Energy Authority A Public Corporation May 5, 1992 Mr. Joe Murphy, Utility Manager Nome Joint Utility System P.O. Box 70 Nome, Alaska 99762 Subject: Project Agreement No. 2800434 Amendment No. 1 Dear Mr. Murphy: Enclosed for your files is an original signature copy of the subject amendment for the Nome Joint Utility System Rural Technical Assistance project. If you have any questions, please contact me or Steve Stassel, Project Manager, at 800-478-7877 or at the address marked below. We are pleased to be able to assist with this project. i a i bee David Denig-Chakr Director of Rural Programs DDC:ekn cc: Senator Albert P. Adams, Alaska State Legislature Representative Richard Foster, Alaska State Legislature Gary Smith, Alaska Energy ay Author i Pat Woodell, Alaska Energy Authority Marlys Hagen, Alaska Energy Authority 0, PO. Box 110809 Juneau, Alaska 99811-0809 (907) 465-3575 x PO. Box 190869 7014 East Tudor Road Anchorage, Alaska 99519-0869 (907) 561-7877 Contact No. 2800434 ALASKA ENERGY AUTHORITY GRANT AGREEMENT Nome Joint Utility System Rural Technical Assistance Amendment No. 1 THE GRANT AGREEMENT (Alaska Energy Authority Contract No. 2800434) entered into on the 12th day of September, 1991, between NOME JOINT UTILITY SYSTEM, (the Utility) and the ALASKA ENERGY AUTHORITY (Energy Authority), is hereby amended, this “4 *~ dayof_ 4A, _, 1992, as follows: Agreement Ending Date The ending date for this Agreement is extended from April 30, 1992, to April 30, 1993, and the following references in the original agreement are modified to reflect this change: (A) PURPOSE AND DESCRIPTION Last sentence of project description. (B) Article B. NOME JOINT UTILITY SYSTEM COVENANTS, Paragraph 5. THIS AGREEMENT has been reviewed, agreed to, and executed by the following parties: for the ERS ENERGY AUTHORITY by VITA iy f d.4 VAL i Charlie Bussell (Date) Executive Director STATE OF ALASKA ss. THIRD JUDICIAL DISTRICT ) Th foregoing Agreement was acknowledge before me this 25” day of , 1992, by Cyatibue Fagg , the it acti of the Alaska Energy Authority. clay ublic, State of Alaska My Commission Expires: Oc} |2,)992 for NOME JOINT UTILITY SYSTEM: wigs) 7 y (Dat 5 Wane pees ? rity 5 STATE OF ALASKA ) ) ss. FOURTH JUDICIAL DISTRICT ) The foregoing Agreement ie acknowledged before me this _¢ = a day of Loferd , 1992, by J05. MOR , the UT. TIY. MANAGER of Nome doint Utility System. a: Ah Et otal ublic, State o Vo My Commission Expires: Alaska Energy Authority A Public Corporation September 18, 1991 Mr. Joe Murphy, Utility Manager Nome Joint Utility System P.O. Box 70 Nome, Alaska 99762 Subject: Project Agreement No. 2800434 Dear Mr. Murphy: Two signed original copies of the subject agreement for the Nome Joint Utility System Rural Technial Assistance for a Waste Heat project are enclosed. Please initial the date changes on page 1 and retain one copy for your files. Please forward the other original back to our agency. The Energy Authority - as required by state statute - has also forwarded a copy of this agreement to the Alaska Department of Labor. We are required to notify the Department about construction projects that use state funds. Please call Pat Woodell, of my staff if the Department of Labor contacts you with questions about this project. If you have any questions about the scope, schedule or procedures for the projects, please contact Gary Smith, Manager of Rural Projects, at 800-478- 7877. We are pleased to be able to assist with this project. / Lo Sincerely, Jv f 4 “a | J /, | 4 pe | WH IK Avie — David Denig-Chakroff Director of Rural Programs DDC:ekn Enclosure as stated cc: Senator Albert P. Adams, Alaska State Legislature Representative Richard Foster, Alaska State Legislature Sue White, Alaska Energy Authority » Gary Smith, Alaska Energy Authority Pat Woodell, Alaska Energy Authority Dominic Costanzo, Alaska Energy Authority © PO. Box AM Juneau, Alaska 99811 (907) 465-3575 Z PO. Box 190869 701 EastTudor Road Anchorage, Alaska 99519-0869 (907) 561-7877 Sew Contract No. XX 00437 NOME JOINT UTILITY SYSTEM GRANT AGREEMENT Nome Joint Utility System Rural Technical Assistance PURPOSE AND DESCRIPTION This Agreement entered into this we a Lait , 1991, is between the ALASKA ENERGY AU’ (Energy Authority) and NOME JOINT UTILITY SYSTEM (the Utility). The Agreement provides a grant to the Utility to provide engineering and construction of a waste heat recovery system at the Utility power Plant to provide heat t ity water system (the Project). This Agreement will terminate on January3| ry A PRI we Article A. ALASKA ENERGY AUTHORITY COVENANTS The Energy Authority will: 1. Subject to appropriation and availability, provide the Utility with a grant not to exceed $20,000 for the Project. 2. Budget and expend these funds in the State Accounting System (AKSAS) under 32449, Collocation Code 08149612, Ledger Code 81823107. 3. Upon receipt of an invoice requesting payment and documentation of actual costs, make a one-time reimbursement to the Utility to cover actual costs of the Project. Article B. | NOME JOINT UTILITY SYSTEM COVENANTS The Utility will: 1. Expend grant funds only for the purposes provided for under this Agreement. 2. Provide engineering and construction management services for connection of Unit #12 jacketwater, oil cooler, and after cooler loop heat recovery to the City water heating system. 3. Provide the Energy Authority with copies of the system as-built in AutoCad Release 10 or higher format. 4. Oversee all engineering services necessary for the completion of the Project and ensure that all payments are made to contractors and vendors. 5. Complete all work associated with this Project prior to enuery 30, 1992. g Lh Apai\ \ pwesiel t Nome Joint Utility System Gram Agreement Page 2 of 5 6. Bill the Energy Authority for the reimbursement described in Article A, Paragraph 3, but not in excess of actual costs of the Project. 7. Permit the Energy Authority to inspect, in such manner and at all reasonable times, all the Utility’s activities related to the Utility’s performance under this Agreement. Such right of examination shall include inspection of the Utility’s offices, facilities, and accounting records associated with the Project. Article C. MUTUAL COVENANTS The Energy Authority and the Utility agree to the following: 1. Indemnification. The Utility shall indemnify, save harmless and defend the Energy Authority, its officers, agents, servants, and employees from all liability, including costs and expenses, for all actions or claims resulting from injuries or damages sustained by any person or property arising directly or indirectly as a result of any error, omission or negligent act of the indemnifying party, its officers, agents, servants, or employees or anyone directly or indirectly employed by it in the performance of this Agreement. 2. Rights to Terminate Agreement. The Utility acknowledges the right of the Energy Authority to terminate this Agreement without payment of liquidated damages to the Utility if it is determined by the Energy Authority to be in the best interest of the State to do so; if funds are no longer available, or for cause. For the on of this paragraph, "cause" is defined as the provision of incorrect or misleading information by the Utility or the Utility’s failure to provide information that, in the opinion of the Energy Authority, is a material fact that would have influenced Energy Authority actions. Under these conditions, The Utility waives any right of recourse and will reimburse the Energy Authority for all unspent funds the tility has received at to this Agreement plus all costs, including attorneys’ fees, incurred by the Energy Authority to perfect its claim or collect those funds. The Energy Authority may also terminate the Agreement if the Utility fails to complete the Project by January 30, 1992 or if the Utility fails to meet standards or perform services described in Article B. 3. Availability of Funding. The Utility acknowledges that this Agreement is subject to availability of money from the State of Alaska or other sources to finance performance under this Agreement. If funding is withdrawn, reduced, or limited in any way after the effective date of this Agreement and before the completion of performance, the Energy Authority may terminate the Agreement without incurring damages. The Energy Authority may, in its discretion, renegotiate the terms of this Agreement to comply with any new funding limitations or conditions. 4. ‘Audit Requirements. This Agreement is subject to the audit requirements of Title 2, Chapter 45 (Grant ee of the Alaska Administrative Code (AAC), commonly referred to as the "Single Audit Regulation." 5. Parties not Being Agents of Each Other. It is agreed that the Parties, their officers, agents, servants and employees shall act in an independent capacity and not as agents of the other parties in the performance of this Agreement. 6. Disputes. Either party to this Agreement may bring an action against the other party in the superior court for the State of Alaska to resolve a dispute arising FN:Nomejus\dde Nome Joint Utility System Gram Agreement Page 3 of 5 under this Agreement. Any lawsuit involving this Agreement shall be heard by the * superior court, Third Judicial District at Anchorage. All legal costs, including attorneys’ fees not otherwise pr ided for in this Agreement, shall be allocated pursuant to Alaska Civil Rule 82. at, 7. Binding Effect. This Agreement and all of its terms, covenants, conditions, appendices and attachments represent the entire agreement and shall extend to and be binding upon the respective heirs, executors, administrators, grantees, successors and assigns of the parties to this Agreement. 8. Severability. If any section, paragraph, clause or provision of this Agreement or any agreement referred to in this Agreement shall be finally adjudicated by a court of competent jurisdiction to be invalid or unenforceable, the remainder of this Agreement shall be unaffected by such adjudication and all the remaining provisions of this Agreement shall remain in full force and effect as if such section, paragraph, clause or provision or any part thereof so adjudicated to be invalid had not been included herein. 9. Declaration of Public Benefit. The parties acknowledge that the Project is to be constructed for the benefit of the general public and will not deny any person use of Project facilities or use of power produced from Project facilities due to race, religion, color, marital status, age, sex, or national origin. 10. Notices. Any notice required of either party shall be in writing and, unless receipt of such notice is expressly required by the terms of this Agreement, shall be deemed served when deposited in the mail in a sealed envelope, with sufficient first class postage affixed, and addressed to the appropriate party. The notices shall be sent to each party’s place of business, which in the case of the Energy Authority shall be: Charlie Bussell, Executive Director Alaska Energy Authority P.O. Box 190869 Anchorage, Alaska 99519-0869 907) 561-7877 (907) 561-8584 (FAX) and in the case of the Utility shall be: Joe Murphy, Utility Manager Nome Joint Utility System P.O. Box 70 Nome, Alaska 99762 907) 443-5288 (907) 443-3028 (FAX) FN:Nomejus\ddce Nome Joint Utility System Grant Agreement Page 4 of S THIS AGREEMENT has been reviewed, agreed to, and executed by the following parties: for the SKA BNERGY AUTHORITY wy Udder r-4 (Signature) (ate) Charlie Bussell Executive Director (Name Printed) (Title) STATE OF ALASKA SS THIRD JUDICIAL DISTRICT The foregoing Agreement was acknowledged before me _ this 2th day of pit aber 991, by Chale Buspar, the_Sxecutye Divectam of the Alaska Energy Authority. 4 Notary Public, State of Alaska My Commission Expires: Oct [21993 FN:Nomejus\dde Nome Joint Utility System G...... .\greement Page S of 5 for the NOME JOINT UTILITY SYSTEM: by i _ p (Signature) af Joe Murphy (Name Printed) STATE OF ALASKA ss. FOURTH JUDICIAL DISTRICT F- 2p - ate tility Manager (Tiley The foregoing Agreement was acknowledged before me this 27 day of yst FN:Nomejus\dde 4 , 1991, by Joe Murphy, Utility Manager of the Nome Joint Utility yee E. Carlee ublic, State of Alaska ‘ My Commission Expires: ecduy / Z/SGSF yy ALASKA ENERGY AUTHORITY RURAL PROGRAMS Revision No. PROJECT BUDGET Community $138 Nome Budget 8 2040 & PJ CODE NAME PJ CODE PROJECT NAME Preparer, G BS Project Manager SreEU. : KE Date TAUS q/ (992 Source(s) of Funding PROJECT Line Chart of Accounts OTE (Era) TOTAL 1 Direct Personal Serv W/Benefits =. 192 ssseeeee —— nneeeeeeeeeeeaeneneees — seseeeeeeeeeeeeeeeeeeee — teeeeeeecerseneeeereeee eeeeeeeeeececeeceeeeeeees 2 Indirect Personal Services naa. 9 3. stee daeeeeeeeeeeeeeeseeees — teseeeeeeeesssssssssees — Sesessessesesessssnstee — seeeeeseeesesssscesescece [Line 2 = 50% X Line 1) 3 71000 PERSONAL SERVICE SUBTOTAL / GSS LARS [Line 3 = Ln 1 + Line 2) 4 72000 TRAVEL & PER DIEM © : — 5 Engineer & Prof Serv Contracts = heaaeeeeee S$ SENGESUEOe —— Seaeeeeeeeeeeeeereeees ——— Gaeeaeeneeeeeeeeeeeene — Geeeeeeeeeeeeeeeeneeees — Gaecueeeeceseeeeeeeeesees 6 Freight =» § NaatetteentEetesseeeeese saesevsceeeecesevscees seaeeeesecsucsaseaseaee saseavsceaceacsaceacens sarsussassassaseaseceeese 7 Project Contingency =» | sauugacefherscenseetevse steveceeesevaeeasenens seaeeaeeneaseaseasese seavscvacaseaseacsases sauseaeeeescsaceseeesees 8 Indirect Non-Personal Services seeeeeeeeeseeeeeeeeees eae neeeeeeeneessseeeces — Geseeeeeeeeeeesceeeeees — sesecececeessececseeneece [Line 8 = 18% X Line 1) 9 73000 OTHER SERVICES SUBTOTAL [ [EO £0 [Line 9 = Sum of Lines 5,6,7,8] 10 74000 PROJECT MAT'LS & EQUIPMENT ao a n 75000 AEA EQUIPMENT © —_ 12 77000 GRANTS 2,000 JZ, GOO __ [SEE BUDGET ON REVERSE SIDE) 13 TOTAL 22 COS 22, Gos Ms ioctnsaa) _ NOTES: Matrix Code (da PER AER Commizmen Project AR 234) _ a win Rer FesreR Pome Project CC : Project LC Sat BUDGET APPROVALS “(Please initial and date) Don Whelan _— GarySmith Project Manager Director/Rural Programs Pat Woodel] Janet Hansen Manager/Rural Projects . AVG 7/ Executive Director Project Manager : Gloria Manni gfi2(T COMMUNITY PROJECT NAME PREPARER 77000-Grants ALASKA ENERGY AUTHORITY RURAL PROGRAMS DIRECTORATE PROJECT BUDGET Grant Funding Addendum DATE PREPARED —_—_——— Labor Travel/Per Diem Material Freight Contract TOTAL 20 00S $ LO,090 ALASKA ENERGY AUTHORITY RURAL PROJECT DEVELOPMENT WORKSHEET Project Manager: SEVE Date: 766 7/ Community: Me OTE Project Description [Describe reason for initiating project (response to correspondence, site visit, etc.) the situation, needs, proposal for resolving same, and issues pertinent to funding source restrictions (e.g., life, health, and safety improvements; efficiency improvements; emergency risk, etc.)] ep RECs 6 KSA EL WEL CAY 26/6 , BO? PRL CLSUF Ret Lamy ) Ponte. 1 BUG IFR Ee ait CONSTR Hct A CORN ELT he rO HEA We Cry WRrER SYSTEM, ToTAe FROVECT COS ™ es BS ot ew (bbe br Zore 20a Fegeceo rem KER Fyecoe Fearn Overs ), [ITU EST 7etES Scope of Work (__ Preliminary x Final) [Itemize tasks in as much detail as possible} = ). Ppouire Ene ues Me, Consregsrrans MEA CEM) Es Sep uiceS Fer Con Eetiyok Lee7 (2 RETURNER, OIE CORE, AME perencalreR poop (Bb PECMECH TO THE avty wRreR. NEAITVS SSE x 2, Feovipe. REAR wit) COPIES OF WE Srsvex AS~ Co/cr Ji Noro ced Pel eKs& /O a MaXtle2 (Bkhirwel, samy Preliminary Cost Estimate (Total): $_ 29700 Gygw J Proposed Funding Source(s) List appropriation(s), Outside funding source(s), Other agency funding, Financing through onds or other means] LNT 6 : No \ OTE - RIK \ E RR) > If any outside source funding is involved, describe on reverse side the proposed billing ; arrangements, conditions for receipt of and use of funds, and any other issues affecting project management. [ progect DESCRIPTION (CONTINUED) SCOPE OF WORK (CONTINUED) PROPOSED FUNDING SOURCE(S) (CONTINUED) Project Management Plan (__ Preliminary _X Final) 1. Who will be the eventual owner of this project? City Alaska Energy Authority IRA Council Other (specify) Private Utility 2. Will AEA grant funds for the project? - > Yes No If so, specify method: Through Trustee X directly to Grantee 3. Check proposed extent of involvement of AEA staff, contractors, City/Utility staff, and/or force account labor for the activities listed below: EXTENT OF INVOLVEMENT IN ACTIVITY ACTIVITY GROUP None Minimal Oversight Moderate Heavy Project AEA Staff Management AEA Contractors PP TT ET SS ELT 1 City/Utility Staff I ey < City/Utility Contractors seen Design | AEA Staff x TTT TTT EEE AEA Contractors City/Utility Staff TT | City/Utility Contractors cep pel Materials _.AEA Staff Purchasing AEA Contractors 7) AT City/Utility Staff Veto City/Utility Contractors = Construction AEA Staff AEA Contractors AAPA it] Force Account Labor A ig City/Utility Contractors cent Inspection AEA Staff AEA Contractors TT Ey City/Utility Staff Sa City/Utility ne cece Operation & AEA Staff AT aintenance AEA Contractors Ls City/Utility Staff TEE City/Utility Contractors RT TE > Estimated Project Start Date) /OV7/__; EndDate_@JAn 7% e On reverse side, provide additional information and/or describe pertinent issues that will affect the management of this project. PROJECT MANAGEMENT PLAN (CONTINUED 5. Additional information and issues: Project Development Schedule << < | Y/N Item Staff Responsible A. Project Planning Tasks: PCE Analysis George Matz Other Econ./Finan. Analysis Final Scope of Work Final Management Plan Project Budget Budget Review - Directorate Gary S./Dave D-C - Agency (over $50K) Brent Petrie Loan/Financing Application Marcey Rawitcher B. Grant/Project Agreement Preparation: Draft Grant/Project Agreement Pat Woodell In-house Review of Draft Community/Utility Draft Review Attorney General Draft Review Pat Woodell Final Grant/Project Agreement Pat Woodell Attorney General Approval Pat Woodell Community/Utility Approval Agency Approvals Marlys Hagen C. Trustee Project Setup: Complete Set-up Sheet Request Check From Accounting Pat Woodell Receive Check at AEA Don Whelan Forward Check/Set-up to KPMC Pat Woodell D. Commence Project (i.e., purchase materials, let contracts, hire labor, etc.) Estimated Completion Date ALASKA ENERGY HORITY PROJECT BUDGET WORKSHEET Project Information Community: =) = = Project Name: Number: _———Cs—C—.C—CTC AEA Prcoj Maarnaaggeer: Date prepared: + ~—dDate of Basis: Prepared by: = ______. — Approved - by: LABOR (field work Name Task | Hrs | Rate | Subtotal Tt | | a_i 2a ===ses ee ee [rp CommunityLabor Ci‘“‘*é‘s OD | A an | | Tu | B PER DIEM AND TRAVEL Field | PD | Sub- | Number Sub- Days | Rate | total | of Trips total ALASKA ENERGY HORITY PROJECT BUDGET WORKSHEET Project Information MATERIAL Description FREIGHT RP0401-2 Description Notes Notes Total Amount Amount Total CONTRACT ‘ Description Notes Amount ATA AAA ae rer NINO ng SUMMARY Teal Personal Services(A+D) Travel & Perdiem (C) Material (E) Freight (F) Contract (B+G) Total - APA + avrooaa between Nome Joint Utilities, The Nome City School District, and the Alaska Power Authority outlines the responsibilities of the parties involved and the procedures to be followed in connection with design, request for proposal, proposal evaluation, construction, start-up, acceptance, and operation and maintenance of the Nome-Beltz Remote Generator Project. Tnis agreement entered into this /§ 4 day on Seppmber, 1986 SHE ALASKA POWER AUTHORITY WILL: Al. Perform a detailed review of the existing site conditions and perform a detailed design of a waste heat recovery system for the A2.- Request, receive, and evaluate proposals for the supply of aan engine-generator package and for all necessary waste heat recovery equipment for the proposed project. y equip Prop: Pro} A3. Recommend to tne other parties to this Project Agreement a cnoice of engine-generator package and waste heat recovery equipment. form all necessary engineering functions in connection with S project such as detailed design, technical interface with ppliers, witnessing of performance tests, and general struction inspection. Assist in start-up and run-in procedures and operator training as needed. A6. ins Assemble and prepare an Operations and Maintenance Manual for the project after project start-up. A7. Assist the other parties to this Project Agreement in trouble shooting of the waste heat recapture system if needed for one year after project completion. NOME JOINT UTILITIES WILL: Bl. Secure all necessary access and Rights-of-Way to Nome Joint Utilic owned or operated property for the Alaska Power Authority and its consultants on the project. B2. Provide transportation, and limited man power assistance to Power Authority Personnel on site as requested in connection with performance of Power Authority responsibilities as described in sections Al-A?. B3. responsibility for it Operation and maintenance in writing within 14 calendar days from receipt of Notice of Project Completion from the Alaska Power Authority. 34. Operete and maintain the system in strict compliance with instructions given in tne Operations and Maintenance Manual as delivered by the Alaska Power Authority. BS. Secure access for performance testing by Alaska Power Authority personnel or consultants on contract to the Alaska Power Autnorit to any part of the waste heat recapture system located on Nome Joint Utility owned or operated property or in any Nome Joint Utility owned or operated structure over the life of the project. B6. On request provide Alaska Power Authority personnel access to and copies of any information or document related to any phase of this project over the life of the project. B7. Contribute construction funding to this project in an amount not to exceed $100,000 Bs. Provide manpower and materials as needed for the construction of this project at cost without any mark up. BO. - Provide and/or pay for the following services, materials and supplies in connection with the operation, maintenance and overhaul of this project: Lubrication oil il spare parts for scheduled and unscneduled maintenance. All spare parts for overhauls and repairs. il necessary power for the operation of pumps, fans, and controls. All manpower for operation, maintenance, and overhauls. and repairs. 65% of the cost of the fuel used by the generator during the months September-May inclusive. 80% of the cost of the fuel used by the generator during the months June-August inclusive. The amount of fuel used will be determined as follows: n A fuel meter will be installed in the supply line to the generator day tank. This meter will provide the primary fuel consumption figure. A station meter will be installed on thre generator to measure its total electrical generation. This meter will provide a secondary fuel consumption figure through the formula: Fuel used = kilowatthours produced/l4 (gallons). If the difference between the primary and the secondary fuel consumption figures is less than 20% of the smallest figure, the average of she two figures will be used. If the difference is more than 20% of the smallest figure, the secondary figure will be used. The cost of the fuel will be the cost of fuel delivered into the tank at the Nome SBeltz High School Utilit Building including transportation charges from Nome. Nome Joint Utilities payment for fuel will be limited to the amount of fuel calculated by the formula: Kilowatthours produced/20 (gallons). If the fuel consumption at the High School Utility Building exceeds the sum of (140,000 plus (Kilowatthours produced/20) ) (gallons) the excess fuel expense will be shared evenly by Nome City School District and Nome Joint Utilities. It is agreed that Items B9 and C9 of this Project Agreement are to be reviewed and renegotiated after one year of operation. Blo. Receive from the project: All the power generated by the generator. Bll. Reimburse the Alaska Power Authority for travel expenses and other expenses incurred in connection with this project. The total reimbursement to be made by Nome Joint Utilities to the Alaska Power Authority will not exceed $1,500. NOME CITY SCHOOL DISTRICT WILL: 7 Secure all necessary access and Rights-of-Way to Nome City School District owned or operated property for the Alaska Power Authority and its consultants. C2. Provide transportation, and limited man power assistance to Power Authority Personnel on site as requested in connection with performance of Power Authority responsibilities as described in sections Al-A?. C3. maintenance in writing within 14 calendar days from receipt of Notice of Project Completion from the Alaska Power Authority. C4. Operate and maintain tne system in strict compliance with instructions given in the Operations and Maintenance Manual as delivered by the Alaska Power Authority. Secure access for Alaska Power Authority personnel or consultants eon contract to tne Alaska Power Authority to any part of the waste neat recapture system located on Nome City School District owned or operated property or in any Nome City School District owned or operated structure over the life of the project for performance monitoring. cé6. On request provide Alaska Power Authority personnel access to and copies of any information or document related to any phase of this project over the life of the project. c7. Contribute construction funding to this project in an amount not to exceed $100,000 cs. Provide manpower and materials as needed for the construction of this project at cost without any mark up. cg. Provide and/or pay for the following services, materials and supplies in connection with the operation, maintenance and overhaul of this project: 35% of the cost of the fuel used by the generator during the months September-May inclusive. 20% of the cost of the fuel used by the generator during the months June-August inclusive. Space for the generator and all related equipment in the School Utility Building. Nome City School District will pay for fuel used as outlined in this Article B9 up to, but not to exceed 140,000 gallons per year, including the fuel burned in the existing boilers in the High School Utility Building. The amount of fuel used and the cost of the fuel will be determined as described in Article B9 of this Project Agreement. If the fuel consumption at the High School Utility Building exceeds the sum of (140,000 plus (Kilowatthours produced/20) ) (gallons) the excess fuel expense will be shared evenly by Nome City School District and Nome Joint Utilities. eive from the pr o uo wt o a All the heat generated by the was ad e neat recapture system. -S agreed that Items B9 and C9 of this Project Agreement ar eviewed and renegotiated after one year of operation. o £ On request provide Alaska Power Authority personnel access to and copies of any information or document related to any phase of this project over the life of the project. C12. Reimburse the Alaska Power Authority for travel expenses and other expenses incurred in connection with this project. The total reimbursement to be made by Nome City School District to the Alaska Power Authority will not exceed $1,500. The Alaska Power Authority, Nome Joint Utilities, and the Nome City School District agree to the following general conditions: Dl. Hold Harmless Agreement it is recognized by the parties of this Project Agreement that tne Alaska Power Authority has no economic interest in this project. Thus Nome Joint Utilities and the Nome School District agree to hold the Alaska Power Authority harmless for any and all claims against the Alaska Power Authority for actions in connection with this project unless such claims are caused by gross negligence on behalf of the Alaska Power Authority. . D2. Assignment of Authority Nome Joint Utilities and the Nome City School District assign to the Alaska Power Authority full authority over all engineering decisions in connection with initial study, design, construction, start-up, and run-in of this project. D4. Declaration of Cooperation The parties of this Project Agreement agree to make every reasonable effort to promote timely completion of this project within the 1986 construction season through responsiveness and cooperation. At the request of any one party, Project Meetings with the parties to this Project Agreement will be held within 7 calendar days of the receipt of such request by the other parties. All meetings will be held in Nome unless a different ue socation can be mutually agreed upon. imi 20 Autnority Expenses vnless oved sy a =o : LOrity Board o Directo & Power wil 2 expend more thar $20,000 ect. F ded 5 the Alaska Power Accnor: 2 spent ska Power Authority ¢ se.earvie and oc expenses. Tne Alasks Astnor: €@impurse Nome Joint Utilit or Nome ¢ scnool ny expenses of any kind ince ng any legal expense onnection with this projec This Project Agreement has been reviewed, agreed to, and executed by the following parties: Alaska Power Authorit LblLo. LYALL Robert D. Heath Date Executive Director Approved: ss- THIRD CUDICIAL DISTRICT Th foregoing Project Agreement was acknowledged before me this as day of Aditer _ + 1986. by Robert D. Heath, the Executive Director of the Alaska Power Authority, an Alaskan Corporation, on behalf of the corporfjffion. Nome City School District Super Yntendent STATE OF ALASKA ) ss. THIRD JUDICIAL DISTRICT ) The, foregoing Project Agreement was acknowledged before me this [Eb day of Seplinth , 1986, by Larry Labolle, Superintendent of Nome City School District. ene 2 Prrehent Notary Public, State of Alaska My commission expires: /-3/-f9 Nome Joint Utilities LLL LIE ewes 28-8 Bill McKinney Date Utility Manager STATE OF ALASKA ) ss. THIRD JUDICIAL DISTRICT ) The foregoing Project Agreement was acknowledged before me this- Sith aay of Sym hak , 1986, by Bill McKinney, Utility Manager for Nomd Joint Utilities. Viens 2 eerehan Notary Public, State of Alaska My commission expires: -S/, Alaska Power Authority Strate of Alaska TELECOPY (ANCHORAGE Telecopy Phone No. (907) 561-8584) (QUNEAU Telecopy Phone No. (907) 465-3767) hh. TELECOPY SENT TO: Sede ere NAME OF COMPANY: eee COMPANY ADDRESS: TELECOPY PHONE NUMBER: 443 3028 SENDER: Petex n TELEPHONE NUMBER: 261 722i CHARGE CODE: 81899930 NUMBER OF PAGES SENT: 3 INCLUDING THIS COVER PAGE DATE SBN721/89. If YOU DO NOT RECEIVE ALL OF THIS TELECOPY PLEASE CALL: (907) 261-7240-Anchnorage (907) 465-3575-Juneau SPECIAL INSTRUCTIONS: Please give me a call, if you have any questions. 8 tae ere ee ga agreement. {il PO. Box AM Juneau. Alaska 44 (907) 465-3575 2 8eSPrdg°o8e? 704 East Tucer Ancnorage Alaska 99519-0869 (907) S$641-7877 TRANSMISSION REPORT THIS DOCUMENT (REDUCED SAMPLE ABOVE) WAS SENT **k COUNT ** # 3 **kK SEND ek T NO REMOTE STATION I. D. START TIME DURATION RPAGES ] COMMENT | 1 4433028 9-21-89 13:27 1°48" 3 | 5 TOTAL 0:01'48" 3 XEROX TELECOPIER 7020 NY Alaska Po wer Authority State of Alaska TELECOPY (ANCHORAGE Telecopy Phone No. (907) 561-8584) (JUNEAU Telecopy Phone No. (907) 465-3767) Murph TELECOPY SENT TO: Hate NAME OF COMPANY: nae COMPANY ADDRESS: TELECOPY PHONE NUMBER: 443 3028 SENDER: Peter Hansen TELEPHONE NUMBER: 261 7221 CHARGE CODE: 81899930 NUMBER OF PAGES SENT: 3 INCLUDING THIS COVER PAGE DATE SENT21/89 IF YOU DO NOT RECEIVE ALL OF THIS TELECOPY PLEASE CALL: (907) 261-7240-Anchorage (907) 465-3575-Juneau SPECIAL INSTRUCTIONS: For your review an Please give me a call, if you have any questions. We can ship th i agreement. = PO. Box AM Juneau, Alaska 99811 (907) 465-3575 wt aif 9 704 EastTudorRoad Anchorage. Alaska 99519-0869 = (907) Sé1- = 2RRSpIGgOM? 70" Fonte 2 Steve Toace’ 52.872" AGREEMENT THIS AGREEMENT is entered into this day of >» 1989, between the Alaska Energy Authority and Nome Joint Utility Systems (NJUS). THE PARTIES HERETO AGREE that NJUS will provide materials and equipment to the Energy Authority in exchange for the receipt of the following arctic piping materials (prices shown are Energy Authority costs F.0.B. Seattle, Washington): 8 ea. elbow kits @ $52.28 2 ea. Tee kits @ $89.72 6 ea. 15 degree joint kits @ $40.13 6 ea. heat shrink end caps @ $6.28 8 ea. elbow foam pads @ $10.00 1 ea. roll sealing strip @ $24.63 20 ea. lengths of pipe @ $220.67 10 ea. joint kits @ $33.83 2 ea. foam packs #4 @ $7.82 2 ea. foam packs #6 @ $9.15 1 ea. foam pack #7 @ $10.48 The values of these materials is the agreed price of $6,065.70. This price includes a 5% freight allowance Seattle, Washington to Anchorage, AK. Shipment of these materials from the Energy Authority warehouse at Highland Road, Eagle River, AK to Nome, AK is the responsibility of NJUS. 4 sections of pipe included in the above quantities are currently located at Ryan Air Service, Nome, AK and shipment from Ryan Air Service to NJUS will be the responsibility of NJUS. The above listed materials will become available to NJUS immediately upon the signing of this Agreement by both parties. Materials and equipment to be provided by NJUS to the Energy Authority for the above materials are yet to be identified, but the value of these materials and equipment will be equal to the total agreed value of $6,065.70. Materials and equipment selected by the Energy Authority will be delivered by NJUS to any address in Nome as requested at the time delivery is required. The value of the selected materials and/or equipment will be the cost to NJUS at the time of purchase including freight charges to Nome. Upon request NJUS will document to the Energy Authority the cost of the materials and/or equip- ment with copies of invoices, etc. Materials and/or equipment in stock in Nome will be delivered to the Energy Authority immediately upon request and materials not in stock will be ordered immediately upon request and delivered to the Energy Authority immediately upon request after becoming available to NJUS. NJUS will store any selected materials in its yard in Nome until December 31, 1990 at no charge to the Energy Authority. 6601/DD55(1) THIS AGREEMENT has been reviewed, agreed to, and executed by the follow- ing parties: ALASKA ENERGY AUTHORITY Robert E. LeResche ate Executive Director STATE OF ALASKA } ss. THIRD JUDICIAL DISTRICT ) The foregoing agreement was acknowledged before me this day of , 1989 by Robert E. LeResche, the Executive Director of the Alaska Energy Authority, an Alaskan Corporation, on behalf of the corporation. Notary Public, State of Alaska My Commission Expires: NOME JOINT UTILITY SYSTEMS Joe Murphy Date Utilities Manager STATE OF ALASKA } ss. THIRD JUDICIAL DISTRICT ) The foregoing agreement was acknowledged before me this day of >» 1989 by Joe Murphy, Utilities Manager for Nome Joint Utility Systems on behalf of the Utility Systems. Notary Public, State of Alaska My Commission Expires: 6601/DD55(2) Ree me EN eet 334 West 5th Avenue, .2nd-Floor Anchorage, Alaska 99501 (907) 276-0001 (907) 277-7641 owes Jair WWI WE LAMINA fr alg I TO | GENTLEMEN: | WE ARE SENDING YOU O Attached O Under separate cover via____...._=—=_—=_=_=_==_=__=_——_the following items: O Shop drawings O Prints O Plans O Samples O Specifications O Copy of letter O Change order Oo COPIES DATE |__No. DESCRIPTION t / | Mime Teint Ukithes Agreement THESE ARE TRANSMITTED as checked below: QsGor approval REMARKS O For your use O As requested O For review and comment O FOR BIDS DUE QO Oo QO oO Approved as submitted O Resubmit________ copies for approval Approved as noted O Submit copies for distribution Returned for corrections O Return________ corrected prints 19_______© PRINTS RETURNED AFTER LOAN TO US Pe€ wove €&VG2_ SHS ss Stmicae FO Jere __ Ge Ca ya CLECTL/E. Cop Ab CEEMEDE GE Do x Few mows Agéo BIL COPY TO Joa £_ y ay SIGNED: hr If enclosures are not as noted, kindly notify us at once. AGREEMENT THIS AGREEMENT jis entered into this day of >» 1989, between the Alaska Energy Authority and Nome Joint Utility Systems (NJUS). THE PARTIES HERETO AGREE that NJUS will provide materials and equipment to the Energy Authority in exchange for the receipt of the following arctic piping materials (prices shown are Energy Authority costs F.0.B. Seattle, Washington): 8 ea. elbow kits @ $52.28 2 ea. Tee kits @ $89.72 6 ea. 15 degree joint kits @ $40.13 6 ea. heat shrink end caps @ $6.28 8 ea. elbow foam pads @ $10.00 1 ea. roll sealing strip @ $24.63 20 ea. lengths of pipe @ $220.67 10 ea. joint kits @ $33.83 2 ea. foam packs #4 @ $7.82 2 ea. foam packs #6 @ $9.15 1 ea. foam pack #7 @ $10.48 The values of these materials is the agreed price of $6,065.70. This price includes a 5% freight allowance Seattle, Washington to Anchorage, AK. Shipment of these materials from the Energy Authority warehouse at Highland Road, Eagle River, AK to Nome, AK is the responsibility of NJUS. 4 sections of pipe included in the above quantities are currently located at Ryan Air Service, Nome, AK and shipment from Ryan Air Service to NJUS will be the responsibility of NJUS. The above listed materials will become available to NJUS immediately upon the signing of this Agreement by both parties. Materials and equipment to be provided by NJUS to the Energy Authority for the above materials are yet to be identified, but the value of these materials and equipment will be equal to the total agreed value of $6,065.70. Materials and equipment selected by the Energy Authority will be delivered by NJUS to any address in Nome as requested at the time delivery is required. The value of the selected materials and/or equipment will be the cost to NJUS at the time of purchase including freight charges to Nome. Upon request NJUS will document to the Energy Authority the cost of the materials and/or equip- ment with copies of invoices, etc. Materials and/or equipment in stock in Nome will be delivered to the*Energy Authority immediately upon request and materials not in stock will be ordered immediately upon request and delivered to the Energy Authority immediately upon request after becoming available to NJUS. NJUS will store any selected materials in its yard in Nome until December 31, 1990 at no charge to the Energy Authority. 6601/0D55(1) THIS AGREEMENT has been reviewed, agreed to, and executed by the follow- ing parties: ALASKA ENERGY AUTHORITY Robert E. LeResche Date Executive Director STATE OF ALASKA ss. THIRD JUDICIAL DISTRICT ) The foregoing agreement was acknowledged before me this day of , 1989 by Robert E. LeResche, the Executive Director of the Alaska Energy Authority, an Alaskan Corporation, on behalf of the corporation. Notary Public, State of Alaska My Commission Expires: NOME JOINT UTILITY SYSTEMS Joe Murphy Date Utilities Manager STATE OF ALASKA ) ) SS THIRD JUDICIAL DISTRICT ) The foregoing agreement was acknowledged before me this day of » 1989 by Joe Murphy, Utilities Manager for Nome Joint Utility Systems on behalf of the Utility Systems. Notary Public, State of Alaska My Commission Expires: 6601/DD55(2)