HomeMy WebLinkAboutMekoryuk Budgets, Acct Statements Reports 1992Listed below are all estimated annual fuel consumption for each 2 wf
t community buildings, for 1992.
09.
10.
Oll.
012.
13.
NIMA Store ~ pay White $97- 5313 ~Gm
IRA Office
BSRP Office
BSRP Shop
Community Hall
Mekoryuk Covenant Church
Clinic
City Jail
poxya ae P Vi") 242
jal! 4.
aw Gao gallons” 7 wor?
660 "
660 "
presently no heat
529 gallons- 1991
660 7
385 .
275 "
Old PHS Building, to be converted to City Storage, no electricity/
Fire Station
heat at present
665 gallons
Old City Office, to be renovated for Ciyt's owned Coffee Shop
New City Office/Clinic
Washeteria
355 gallons
385 "
2,100 .
Ap
Cost Zs i Mefoar ye wl,
ASSume. Tre to G Bldsp C pape VIM’ Shae} I(eule>
oN 1900" «f 2.5% Levr pipe
AVEc od'$ horeddar Artec Wilkes togfbesth ae
33,200 4+ Yord® Lar vsbD FS 4YZo000
Wee usps ~ (Ry ie] apseriton? Crel's seperate welse,\
ik = fok Qe atta
tHe AP (ten) = bee Fart 42 ace “Cpe Unt wu rug
+ Fer rw ¢h
He =< Vo 4eorjag = €2B, cor
v LA
Mise f pe » Vabves , Pi bi 42 oge v
Gly o&", Ae i Cone pnp
& Y
1 : Is ae0 & 2) > rt he #72 Gun tgeot) Uses
por Ene Ge Bmp se : 4 5500 7 Ldl4s cote sad ap | mo lteh oom i E apse HPP]
Lagan rc A-Prpe = Bday to ns 0/ eae = Sad
Pee ee (Oday, W/ a\ba 4 2 delpe & (22) doy = 40250
Cont mf 1B bay 10 005) pw, $8 Je = toe
Tapp ee 1 Cnet Me & Weber = 4S,Q00
$ My (970
5. Cwlak + & < Sse Avec wel
' FA abe? mnie eet £500 #z,0@
TH * KE coo Meise 152, 7° ; phd M140, 20 ole >
UH CH&les
') b prota tel 8 tdeyo :
( Wim Corp Land Plarwins Offrer
2S ar tay C2ceqaQ_ SAD
i BSRP of free
Scr Ser De ek ee
“ prery
Mwit
Hos 2
Bo - Soe
Zaco yk -— BWAG bE0Ge/
po bleaq— —- —
CE0GdSs
Japl— Sure
U%y00 Ga/ wy oy
sry eno sp
= ‘p To: Steven Stas--' AEA @ “EIVED sis 3 Pagee totay MAY 4 2 eo. DR Biegel AVEC en yt Shey ALASKA ENENGY AUTHORITY
here 15 the estmates f- Wales
remele = vadiacter system.
The final confi guration fo- sales
WwW} I be 7
Dual ventilation system u/ damper cpersters
Two Z22D—-512€ wmdraters on sfands
Two Variable - speed electric ues (2h > )
BSB AMeT Value
20% —gallon expansion tank,
HE -806-TR-4P = Heat exchanger
AR Ff 3 engmes connected,
All- welded /flanged 3B piping system
Connection pomts fr future series connection
oF Heat Recovers) feet Exchanger
The cea victawlic Ppmg system € <mal( ekpansian ne will be wefved Ong. radiate be a stand | and Variable speed drive MIST , and the_ Ducel vent latien system Cxrsts wd out damper opevators .
wnat eS
These eck estore ; precut Pipe Dieces Te Stitings
t be welded m He Sield,
Notice thet the wost oS phe second wariable
speed Arrive 73500 Jo*4000 must be added
to Your estimate. sme. i+ was ao vetiveds unit
Te te tek engme 75 Connected aad:
#50 poker ton wei gho- » Amd. abdl, Greld aoe AL Buse]
i i i doused theo 4 2 4 vt ‘ do wat aod bod on a j §eoad th d @ 4s |
ALASKA VILLAGE ELECTRIC co-OP 27 ESTIMATE WORK ORDER - GENERATION Work in progress
WORK ORDER #_62G@2'( VILLAGE_UWhles ENGINEER_D-R. Biecee DATE S-io-72 APPROVED
344 Prime Mover (Engine) & Generator _| (341 Structures & Improvements _| (362 Distribution Station Equipment
welght | cost weight | cost Trig cost
343,A.2| Engine 341.1 Foundat!on 362.8 Ground grid
343.A.3] Foundation 341.2 Structure/modules/vans 362.9 Swi tchgear-to-transformer
ie eines an $c piping & access. connections
‘ad materia Init heaters
Diamond floor plate Venti lotion ducts, dampers = Trompelonires
Conduit, wirin 362.18 Pads
343.A.4| Gauge panel , 9 362.22 Het
343.C.4| Heat exchanger 341.6 Gantry & access. ‘ re Totalizing meter
343,C.6| Expansion tank & access. 230 750 341.10 | Lighting fixtures, outlets, etc Station service meter
Fipings piscine valves, etc, er ont 341.14 Breaker panels 362.35 Transformers
upports, braces 4 341.21 Vent. controls, Power transformer
Antifreeze 110 gal- HS° | 471 t-stat, fon & motor sD 878 Station service transformer
343.C.7| Circulating punps & access {#) ioe 302 | 1341.24 | Radiator stond 9 w/ ref 1250 | 2109 Miscellaneous
343.C.9| Radiator LEM HO22pQtAtr, ee 50% 341.25 | Safety equipment
343.D | Battery bank starting systen 341.26 | Misc. plant Improvement 346 Miscellaneous Power Plant Equ! pment
Battery cables & condul Signs, labels, tags 10 200 weight | cost
343.£.3| Exhaust System Docks 346.9 Fire protection system
Muff ler Fence Control panel
Piping & access. Road Sensors, horns, fixtures
aeper and hangers Site prep. Extinguishing agent,
High temperature Insulation 50 608 Miscellaneous evates (3) boo | Goo containers, piping
344 Generator PIPE iWSuLATION sO 500 - 346.12 Waste oi blending equipment
Miscellaneous "Pease quced mal] so | so | [342 Fuel Tanks & Piping 346.15 | Tools & maintenance equiprent
t = weight cost Miscellaneous
{345 Accessory Electric Equipment 342.A.2 | Tank farm prep.
welght | cost Liner
345.3 Battery charger Dike Pads
345.6 Engine/generator control panel Fuel tanks
Control section Enclosure 342.A.4| Meters
Bus 342,A,5| Fuel fill piping & fittings
Breakers, CTs, ect Bulk-tank piping & fittings
Control cables i. | fun Siebbits ——| Daytank Fill line MATERIAL =_/#,878
ticgd frown > Daytank 3 ;
345.18 | Remote radiator control panel | /7S | — Peine Guat FREIGHT £385 ths. So _seyr=__3, 193
uses pee 17 | 37° ||sone] pus VILLAGE LABOR _/O mes £4 = 840
345.23 sais i i2-a7| Filters STAFE <FIELD 34_wes150 =__2 108
Disconnect switches LABORS ENGINEERING & MD @ $ [50 /D = JOO.
Miscellaneous = 6000
345.27 Power —_ and connections s ce, ts] ae LABOR 13, 08@
8 x 8 Wireway Comments REA 1S__@5,0€0 ' ih =
Cable tray & supports REA Antount i —s MISC, EQUIPMENT 7 209
Miscellaneous TOTAL =_ 38,200
ALASKA VILLAGE
i 4 t G6 tod bod
ELECTRIC CO-OP 27
a
do ged fea Bad ied feed d gad acd &
ESTIMATE WORK ORDER - GENERATION
i 4 4:4 Gad & Abid
Work in progress
WORK ORDER #6241972 = VILLAGE__Waces ENGINEER _.D.R. Bieeer DATE 3-10-72. APPROVED
1344 Prime Mover (Engine) & Generator 341 Structures & Improvements 362 Distribution Station Equipment
weight | cost weight | cost weight | cost
343.A.2| Engine [ 341.1 Foundat!on 362.8 Ground grid
343.A,3| Foundation 341.2 Structure/modules/vans 362.9 Switchgear-to-transformer
Vibration Isolators Hydronic piping & access. Iso 388 connections
Pad material Unit heaters 362.16 Transclosures
Diamond floor plate Ventilation ducts, dampers Conduit, wirin 362.18 Pads
343.A.4| Gauge panel |. , 9 362.22 | Meter:
343.C.4| Heat exchanger Young wed 265 | 1619 341.6 Gantry & access. ‘ : Total izing meter
343.C.6| Expansion tank & access. sO 300 341,10 Lighting fixtures, outlets, etc Station service meter
Piping, fittings, valves, etc. 344 1233} [341.14 Breaker panels 362.35 Transformers
Supports, braces 92 89 | 1341.21 Vent. controls, Power transformer
Ant | freeze t-stat, fan & motor Station service transformer
343.C,7| Circulating pumps & access. 341.24 | Radiator stand Misce | laneous
343.C.9] Radiator 341,25 | Safety equipment
343.D | Battery bank starting ae 341,26 | Misc. plant Improvenent 346 Miscellaneous Power Plant Equipment
Battery cables & condul Signs, labels, tags weight | cost
343.£.3| Exhaust System Docks 346.9 Fire protection system
Muff ler Fence Control panel
Piping & access. Road Sensors, horns, fixtures
are and hangers Site prep. Extinguishing agent,
High temperature Insulation Miscellaneous containers, piping
344 Generator 346.12 Waste o! | blending equipment
Miscellaneous3” AMOT Value 60 AGF |342 Fuel Tanks & Piping — : 346.15 Tools & maintenance equipment
aa welght | cost Miscellaneous
1345 Accessory Electric Equipment 342.A.2 = farm prep. T.0, LAGER
a aa. welght | cost ike Q.5 adh review. trewel , mvertory
345, Battery charger Pads L.Oad. weldmng setup , 25 welds clanup| membrag
345.6 ae, control panel Fuel tanks 3.0 nds) sastall” AmoT ij Heac-x ¢ 3" pile
ak 342.A.4| Meters 2.0 md] Hydroute MMe Cl. loAnectis}r>
Bus 342.0.5| Fuel FILL piping & fittings omd| clean-ue whnen tau |
Breakers, CTs, ect Bulk-tank piping & fittings
Control cables Daytonk fill line MATERIAL = _ 4096
345.18 | Renote radiator control panel Re ott FREIGHT Fl hse SO_st=__ 454 _
Accessor les ee. VILLAGE LABOR _2 mes £4 =___1GS
Misc, panels 342.A.6 | Pumps STAFF FIELD es a @ ¢150 fp =___ fee
345,23 | Switchgear 342,A,7| Filters Sy — =
Disconnect switches Geese lee LABORS encInecrna_2-5" wp @ ¢_ 190 /p =__37S
345.27 | Power cables and connections TOTAL STAFF LABIR =_Zleo -
8 x 8 Wireway Comments. This CIO Sy rb ference. OVERHEAD: 218% STAFF LABOR =__ Fee
Cable tray & supports } MISC, EQUIPMENT [oz
Miscellaneous 2 md. wicldng TOTAL = Il, 500
- ( 6IMLZ2Z)