Loading...
HomeMy WebLinkAboutMekoryuk Budgets, Acct Statements Reports 1992Listed below are all estimated annual fuel consumption for each 2 wf t community buildings, for 1992. 09. 10. Oll. 012. 13. NIMA Store ~ pay White $97- 5313 ~Gm IRA Office BSRP Office BSRP Shop Community Hall Mekoryuk Covenant Church Clinic City Jail poxya ae P Vi") 242 jal! 4. aw Gao gallons” 7 wor? 660 " 660 " presently no heat 529 gallons- 1991 660 7 385 . 275 " Old PHS Building, to be converted to City Storage, no electricity/ Fire Station heat at present 665 gallons Old City Office, to be renovated for Ciyt's owned Coffee Shop New City Office/Clinic Washeteria 355 gallons 385 " 2,100 . Ap Cost Zs i Mefoar ye wl, ASSume. Tre to G Bldsp C pape VIM’ Shae} I(eule> oN 1900" «f 2.5% Levr pipe AVEc od'$ horeddar Artec Wilkes togfbesth ae 33,200 4+ Yord® Lar vsbD FS 4YZo000 Wee usps ~ (Ry ie] apseriton? Crel's seperate welse,\ ik = fok Qe atta tHe AP (ten) = bee Fart 42 ace “Cpe Unt wu rug + Fer rw ¢h He =< Vo 4eorjag = €2B, cor v LA Mise f pe » Vabves , Pi bi 42 oge v Gly o&", Ae i Cone pnp & Y 1 : Is ae0 & 2) > rt he #72 Gun tgeot) Uses por Ene Ge Bmp se : 4 5500 7 Ldl4s cote sad ap | mo lteh oom i E apse HPP] Lagan rc A-Prpe = Bday to ns 0/ eae = Sad Pee ee (Oday, W/ a\ba 4 2 delpe & (22) doy = 40250 Cont mf 1B bay 10 005) pw, $8 Je = toe Tapp ee 1 Cnet Me & Weber = 4S,Q00 $ My (970 5. Cwlak + & < Sse Avec wel ' FA abe? mnie eet £500 #z,0@ TH * KE coo Meise 152, 7° ; phd M140, 20 ole > UH CH&les ') b prota tel 8 tdeyo : ( Wim Corp Land Plarwins Offrer 2S ar tay C2ceqaQ_ SAD i BSRP of free Scr Ser De ek ee “ prery Mwit Hos 2 Bo - Soe Zaco yk -— BWAG bE0Ge/ po bleaq— —- — CE0GdSs Japl— Sure U%y00 Ga/ wy oy sry eno sp = ‘p To: Steven Stas--' AEA @ “EIVED sis 3 Pagee totay MAY 4 2 eo. DR Biegel AVEC en yt Shey ALASKA ENENGY AUTHORITY here 15 the estmates f- Wales remele = vadiacter system. The final confi guration fo- sales WwW} I be 7 Dual ventilation system u/ damper cpersters Two Z22D—-512€ wmdraters on sfands Two Variable - speed electric ues (2h > ) BSB AMeT Value 20% —gallon expansion tank, HE -806-TR-4P = Heat exchanger AR Ff 3 engmes connected, All- welded /flanged 3B piping system Connection pomts fr future series connection oF Heat Recovers) feet Exchanger The cea victawlic Ppmg system € <mal( ekpansian ne will be wefved Ong. radiate be a stand | and Variable speed drive MIST , and the_ Ducel vent latien system Cxrsts wd out damper opevators . wnat eS These eck estore ; precut Pipe Dieces Te Stitings t be welded m He Sield, Notice thet the wost oS phe second wariable speed Arrive 73500 Jo*4000 must be added to Your estimate. sme. i+ was ao vetiveds unit Te te tek engme 75 Connected aad: #50 poker ton wei gho- » Amd. abdl, Greld aoe AL Buse] i i i doused theo 4 2 4 vt ‘ do wat aod bod on a j §eoad th d @ 4s | ALASKA VILLAGE ELECTRIC co-OP 27 ESTIMATE WORK ORDER - GENERATION Work in progress WORK ORDER #_62G@2'( VILLAGE_UWhles ENGINEER_D-R. Biecee DATE S-io-72 APPROVED 344 Prime Mover (Engine) & Generator _| (341 Structures & Improvements _| (362 Distribution Station Equipment welght | cost weight | cost Trig cost 343,A.2| Engine 341.1 Foundat!on 362.8 Ground grid 343.A.3] Foundation 341.2 Structure/modules/vans 362.9 Swi tchgear-to-transformer ie eines an $c piping & access. connections ‘ad materia Init heaters Diamond floor plate Venti lotion ducts, dampers = Trompelonires Conduit, wirin 362.18 Pads 343.A.4| Gauge panel , 9 362.22 Het 343.C.4| Heat exchanger 341.6 Gantry & access. ‘ re Totalizing meter 343,C.6| Expansion tank & access. 230 750 341.10 | Lighting fixtures, outlets, etc Station service meter Fipings piscine valves, etc, er ont 341.14 Breaker panels 362.35 Transformers upports, braces 4 341.21 Vent. controls, Power transformer Antifreeze 110 gal- HS° | 471 t-stat, fon & motor sD 878 Station service transformer 343.C.7| Circulating punps & access {#) ioe 302 | 1341.24 | Radiator stond 9 w/ ref 1250 | 2109 Miscellaneous 343.C.9| Radiator LEM HO22pQtAtr, ee 50% 341.25 | Safety equipment 343.D | Battery bank starting systen 341.26 | Misc. plant Improvement 346 Miscellaneous Power Plant Equ! pment Battery cables & condul Signs, labels, tags 10 200 weight | cost 343.£.3| Exhaust System Docks 346.9 Fire protection system Muff ler Fence Control panel Piping & access. Road Sensors, horns, fixtures aeper and hangers Site prep. Extinguishing agent, High temperature Insulation 50 608 Miscellaneous evates (3) boo | Goo containers, piping 344 Generator PIPE iWSuLATION sO 500 - 346.12 Waste oi blending equipment Miscellaneous "Pease quced mal] so | so | [342 Fuel Tanks & Piping 346.15 | Tools & maintenance equiprent t = weight cost Miscellaneous {345 Accessory Electric Equipment 342.A.2 | Tank farm prep. welght | cost Liner 345.3 Battery charger Dike Pads 345.6 Engine/generator control panel Fuel tanks Control section Enclosure 342.A.4| Meters Bus 342,A,5| Fuel fill piping & fittings Breakers, CTs, ect Bulk-tank piping & fittings Control cables i. | fun Siebbits ——| Daytank Fill line MATERIAL =_/#,878 ticgd frown > Daytank 3 ; 345.18 | Remote radiator control panel | /7S | — Peine Guat FREIGHT £385 ths. So _seyr=__3, 193 uses pee 17 | 37° ||sone] pus VILLAGE LABOR _/O mes £4 = 840 345.23 sais i i2-a7| Filters STAFE <FIELD 34_wes150 =__2 108 Disconnect switches LABORS ENGINEERING & MD @ $ [50 /D = JOO. Miscellaneous = 6000 345.27 Power —_ and connections s ce, ts] ae LABOR 13, 08@ 8 x 8 Wireway Comments REA 1S__@5,0€0 ' ih = Cable tray & supports REA Antount i —s MISC, EQUIPMENT 7 209 Miscellaneous TOTAL =_ 38,200 ALASKA VILLAGE i 4 t G6 tod bod ELECTRIC CO-OP 27 a do ged fea Bad ied feed d gad acd & ESTIMATE WORK ORDER - GENERATION i 4 4:4 Gad & Abid Work in progress WORK ORDER #6241972 = VILLAGE__Waces ENGINEER _.D.R. Bieeer DATE 3-10-72. APPROVED 1344 Prime Mover (Engine) & Generator 341 Structures & Improvements 362 Distribution Station Equipment weight | cost weight | cost weight | cost 343.A.2| Engine [ 341.1 Foundat!on 362.8 Ground grid 343.A,3| Foundation 341.2 Structure/modules/vans 362.9 Switchgear-to-transformer Vibration Isolators Hydronic piping & access. Iso 388 connections Pad material Unit heaters 362.16 Transclosures Diamond floor plate Ventilation ducts, dampers Conduit, wirin 362.18 Pads 343.A.4| Gauge panel |. , 9 362.22 | Meter: 343.C.4| Heat exchanger Young wed 265 | 1619 341.6 Gantry & access. ‘ : Total izing meter 343.C.6| Expansion tank & access. sO 300 341,10 Lighting fixtures, outlets, etc Station service meter Piping, fittings, valves, etc. 344 1233} [341.14 Breaker panels 362.35 Transformers Supports, braces 92 89 | 1341.21 Vent. controls, Power transformer Ant | freeze t-stat, fan & motor Station service transformer 343.C,7| Circulating pumps & access. 341.24 | Radiator stand Misce | laneous 343.C.9] Radiator 341,25 | Safety equipment 343.D | Battery bank starting ae 341,26 | Misc. plant Improvenent 346 Miscellaneous Power Plant Equipment Battery cables & condul Signs, labels, tags weight | cost 343.£.3| Exhaust System Docks 346.9 Fire protection system Muff ler Fence Control panel Piping & access. Road Sensors, horns, fixtures are and hangers Site prep. Extinguishing agent, High temperature Insulation Miscellaneous containers, piping 344 Generator 346.12 Waste o! | blending equipment Miscellaneous3” AMOT Value 60 AGF |342 Fuel Tanks & Piping — : 346.15 Tools & maintenance equipment aa welght | cost Miscellaneous 1345 Accessory Electric Equipment 342.A.2 = farm prep. T.0, LAGER a aa. welght | cost ike Q.5 adh review. trewel , mvertory 345, Battery charger Pads L.Oad. weldmng setup , 25 welds clanup| membrag 345.6 ae, control panel Fuel tanks 3.0 nds) sastall” AmoT ij Heac-x ¢ 3" pile ak 342.A.4| Meters 2.0 md] Hydroute MMe Cl. loAnectis}r> Bus 342.0.5| Fuel FILL piping & fittings omd| clean-ue whnen tau | Breakers, CTs, ect Bulk-tank piping & fittings Control cables Daytonk fill line MATERIAL = _ 4096 345.18 | Renote radiator control panel Re ott FREIGHT Fl hse SO_st=__ 454 _ Accessor les ee. VILLAGE LABOR _2 mes £4 =___1GS Misc, panels 342.A.6 | Pumps STAFF FIELD es a @ ¢150 fp =___ fee 345,23 | Switchgear 342,A,7| Filters Sy — = Disconnect switches Geese lee LABORS encInecrna_2-5" wp @ ¢_ 190 /p =__37S 345.27 | Power cables and connections TOTAL STAFF LABIR =_Zleo - 8 x 8 Wireway Comments. This CIO Sy rb ference. OVERHEAD: 218% STAFF LABOR =__ Fee Cable tray & supports } MISC, EQUIPMENT [oz Miscellaneous 2 md. wicldng TOTAL = Il, 500 - ( 6IMLZ2Z)