HomeMy WebLinkAboutKoyuk Construction Cost Study-Waste Heat Recovery System1990WASTE HEAT RECOVERY SYSTEM
KOYUK, ALASKA
CONSTRUCTION COST STUDY
CONSTRUCTION COST
01 General Conditions, Overhead and Profit
02 Sitework
06 Wood and Plastics
13 Special Construction
15 Mechanical
16 Electrical
Subtotal
Estimate contingency for elements
of project not determined at this
early level of design
Esclation at .33% per month
TOTAL CONSTRUCTION COST
PROJECT COST
Design
SIA (Supervision, Inspection
and Administration)
Project Contingency
TOTAL PROJECT COST
(10%)
( 1%)
(10%)
(20%) (10%)
CONCEPT #1
102,671
47,154
4,328
4,150
54,156
5,954
$ 218,413
21,841
2,403
$ 242,657
24,266
48,531
24,266
$ 339,720
CONCEPT #2
109,571
86,665
4,328
4,150
51,860
5,954
$ 262,528
26,253
2,888
$ 291,669
29,167
58,334
29,167
$ 408 ,337
PAGE 2
MARCH 20, 1990
CONCEPT #3
114,861
Ti 199
4,328
4,150
62,870
71,263
$ 304,671
30,467
3,351
$ 338,489
33,849
67,698
33,849
$ 473,885
WASTE HEAT RECOVERY SYSTEM PAGE 3
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #1
CONCEPT #1
WASTE HEAT RECOVERY SYSTEM
KOYUK, ALASKA
CONSTRUCTION COST STUDY
CONCEPT #1
01 - GENERAL CONDITIONS, OVERHEAD
AND PROFIT
QUANTITY UNIT UNIT RATE
PAGE 4
MARCH 20, 1990
ESTIMATED COST
Mobilization
Freight
Supervision, equipment, utilities
clean site, tools and protection
Per diem
Travel costs, including time in travel
Bond and insurance
Profit
10 WKS
210 DAYS
6 RT
1.75 %
10 %
-40
3000.00
110.00
1250.00
30,000
23,100
7,500
3,415
19,856
WASTE HEAT RECOVERY SYSTEM PAGE 5
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #1
02 - SITEWORK
QUANTITY UNIT UNIT RATE ESTIMATED COST
Piles
Mobilize 1 LOT 8,000
Steel thermal piles 4 EA 2100.00 8,400
Drill pile hole 60 LF 25 .00 1,500
Slurry 3 Cy 280.00 840
Freeze back 4 EA 220.00 880
Test and demobilize 1 LOT 3,000
Piped Utilities
Excavate trench for arctic pipe,
including backfilling and spread and
level surplus 286 LF 12750 37D)
2" diameter Schedule 40 pipe with
insulation and arctic pipe protection 572 LF 33.60 19,219
Bend 12 EA 145.00 1,740
WASTE HEAT RECOVERY SYSTEM PAGE 6
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #1
06 - WOOD AND PLASTICS
QUANTITY UNIT UNIT RATE ESTIMATED COST
Glulam beams to support new module 48 LF 36.00 1,728
Miscellaneous metals 800 LBS 1.75 1,400
Access steps, including handrail and
base 1 LOT 1,200
WASTE HEAT RECOVERY SYSTEM PAGE 7
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #1
13. - SPECIAL CONSTRUCTION
QUANTITY UNIT UNIT RATE ESTIMATED COST
Pre-engineered 8'0"x8'0" building
module with floor, exterior wall
structure and roofing complete 1 EA 2500.00 2,500
Hole through exterior wall for heating
pipes 4 EA 110.00 440
Exterior door 1 EA 710.00 710
Louver 1 EA 500.00 500
WASTE HEAT RECOVERY SYSTEM PAGE 8
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #1
15 —- MECHANICAL
QUANTITY UNIT UNIT RATE ESTIMATED COST
Ex change r and Connections
Connection to existing piping to cooling
system of generators 2 EA 72.50 145
Form hole through existing wall for
heating pipes 2 EA 195.00 390
3" diameter black steel welded piping 80 LF 22.65 1,812
Fittings 16 EA 45.00 720
Butterfly valves 3 EA 166.00 498
2" diameter black steel welded
piping including fittings 30 LF 17.45 524
Butterfly valve 2 EA 131.75 264
Insulation to pipe, 3" diameter 80 LF 6.65 532
Ditto, 2" diameter 30 LF 5.50 165
WASTE HEAT RECOVERY SYSTEM PAGE 9
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #1
15 - MECHANICAL
QUANTITY UNIT UNIT RATE ESTIMATED COST
Exchanger and Connections (Continued)
Booster pump 1 EA 1450.00 1,450
Heat exchanger, 300,000 BTUH 1 EA 3485.00 3,485
Unit Heater (2 Each)
(1 - Generator Building and 1 - Module Builaing)
Unit heater, 60 BTUH, including
thermostat 2 EA 330.00 660
1" diameter piping including fittings 80 LF 9.10 728
Gate valves 4 EA 71.00 284
Insulation 80 LF 4.10 328
Radiators
Remove all existing radiators including all
piping back to generators 1 LOT 1,200
Young series 22 radiator 2 EA 3830.00 7,660
WASTE HEAT RECOVERY SYSTEM PAGE 10
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #1
15 - MECHANICAL
QUANTITY UNIT UNIT RATE ESTIMATED COST
Radiators (Continued)
Radiator stand and roof 2 LOTS 3490.00 6,980
3" diameter piping 110 LF 22.65 2,492
Fittings 20 EA 45.00 900
Butterfly valves 11 EA 166.00 1,826
Control valve 1 EA 89 .00 89
Insulation 110 LF 6.65 732
Anti-freeze 150 GALS 7.60 1,140
Hook-up
Form hole through existing wall for
heating pipes 2 EA 195.00 390
2" diameter black steel piping
including fittings 120 LF 17.45 2,094
WASTE HEAT RECOVERY SYSTEM PAGE 11
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #1
15 - MECHANICAL
QUANTITY UNIT UNIT RATE ESTIMATED COST
Hook-up (Continued)
Gate valves 11 EA 156.00 1,716
Check valves 2 EA 156.00 31172
Strainer 2 EA 58.00 116
Balancing valve 3 EA 53.00 159
Temperature control valve 1 EA 225.00 225
Insulation 120 LF 4.40 528
Heat exchanger, 300,000 BTUH 1 EA 3485.00 3,485
Expansion tank, 26 gallon capacity 1 EA 971.00 971
Air separator 1 EA 495.00 495
Pumps, circulation Grundfoss 200,
2" diameter 2 EA 660.00 1,320
TOTAL ESTIMATED COST Continued
WASTE HEAT RECOVERY SYSTEM PAGE 12
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #1
15 - MECHANICAL
QUANTITY UNIT UNIT RATE ESTIMATED COST
Hook-up (Continued)
Connection to existing piping system 2 EA 12250 145
Make-up glycol system connection,
including tank 1 EA 610.00 610
Glycol 110 GAL 7.60 836
Test and balance system 30 HRS 75.00 277250
Controls and Instrumentation
Generator building and new module 1 LOT 2,000
Hook-up inter ties 1 LOT 1,500
WASTE HEAT RECOVERY SYSTEM PAGE 13
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #1
16 —- ELECTRICAL
QUANTITY UNIT UNIT RATE ESTIMATED COST
Motor Connections
Breaker in existing power panel 2 EA 175.00 350
Connection to motor 5) EA 115.00 Di)
Disconnect switch 3 EA 330.00 990
3/4" EMT conduit 100 LF Sei 0 310
#8 copper 400 LF es} 300
New Module
Main feeder and conduit 40 LF 8.50 340
Breaker in existing distribution panel 1 EA 277.00 207
Panel 1 EA 800.00 800
Exterior light fixture 1 EA 330.00 330
Light tixtures 6 EA 190.00 1,140
WASTE HEAT RECOVERY SYSTEM PAGE 14
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #1
16 - ELECTRICAL
QUANTITY UNIT UNIT RATE ESTIMATED COST
New Module (Continued)
Switch 1 EA 55.00 55
Duplex outlets 4 EA 68 .00 272
1/2" conduit 50 LF 2.80 140
#12 copper 150 LF -50 a
WASTE HEAT RECOVERY SYSTEM PAGE 15
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #2
CONCEPT #2
WASTE HEAT RECOVERY SYSTEM
KOYUK, ALASKA
CONSTRUCTION COST STUDY
CONCEPT #2
01 - GENERAL CONDITIONS, OVERHEAD
AND PROFIT
QUANTITY UNIT UNIT RATE
PAGE 16
MARCH 20, 1990
ESTIMATED COST
Mobilization
Freight
Supervision, equipment, utilities
clean site, tools and protection
Per diem
Travel costs, including time in travel
Bond and insurance
Profit
10 WKS
210 DAYS
6 RT
1375 %
10 %
-40
3000.00
110.00
1250.00
30,000
23,100
7,500
4,105
23,866
WASTE HEAT RECOVERY SYSTEM
KOYUK, ALASKA
CONSTRUCTION COST STUDY
CONCEPT #2
02 - SITEWORK
QUANTITY UNIT UNIT RATE
PAGE 17
MARCH 20, 1990
ESTIMATED COST
Piles
Mobilize
Steel thermal piles
Drill pile hole
Slurry
Freeze back
Test and demobilize
Piped Utilities
Excavate trench for arctic pipe,
including backfilling and spread and
level surplus
2" diameter Schedule 40 pipe with
insulation and arctic pipe protection
LOT
EA
LF
cy
EA
LOT
LF
2100.00
25 .00
280.00
220.00
WASTE HEAT RECOVERY SYSTEM PAGE 18
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #2
06 - WOOD AND PLASTICS
QUANTITY UNIT UNIT RATE ESTIMATED COST
Glulam beams to support new module 48 LF 36.00 1,728
Miscellaneous metals 800 LBS 1.75 1,400
Access steps, including handrail and
base 1 LOT 1,200
WASTE HEAT RECOVERY SYSTEM PAGE 19
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #2
13. - SPECIAL CONSTRUCTION
QUANTITY UNIT UNIT RATE ESTIMATED COST
Pre-engineered 8'0"x8'0" building
module with tloor, exterior wall
structure and roofing complete 1 EA 2500.00 2,500
Hole through exterior wall for heating
pipes 4 EA 110.00 440
Exterior door 1 EA 710.00 710
Louver 1 EA 500.00 500
TOTAL ESTIMATED COST
WASTE HEAT RECOVERY SYSTEM PAGE 20
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #2
15 - MECHANICAL
QUANTITY UNIT UNIT RATE ESTIMATED COST
Exchanger and Connections
Connection to existing piping to cooling
system of generators a EA 72.50 145
Form hole through existing wall for
heating pipes 2 EA 195.00 390
3" diameter black steel welded piping 80 LF 22/365 1,812
Fittings 16 EA 45.00 720
Butterfly valves 3 EA 166.00 498
1 1/2" diameter black steel welded
piping including fittings 30 LF 123525 368
Butterfly valve 2 EA 97.50 195
Insulation to pipe, 3" diameter 80 LF 6.65 532
Ditto, 1 1/2" diameter 30 LF 4.40 32
WASTE HEAT RECOVERY SYSTEM PAGE 21
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #2
15 - MECHANICAL
QUANTITY UNIT UNIT RATE ESTIMATED COST
Exchanger and Connections (Continued)
Booster pump 1 EA 1450.00 1,450
Heat exchanger, 300,000 BTUH 1 EA 3485.00 3,485
Unit Heater (2 Each)
(1 - Generator Building and 1 - Module Building)
Unit heater, 60 BTUH, including
thermostat 2 EA 330.00 660
1" diameter piping including fittings 80 LF 9.10 728
Gate valves 4 EA 71.00 284
Insulation 80 LF 4.10 328
Radiators
Remove all existing radiators including all
piping back to generators 1 LOT 1,200
Young series 22 radiator 2 EA 3830.00 7,660
WASTE HEAT RECOVERY SYSTEM PAGE 22 KOYUK, ALASKA
CONSTRUCTION COST’ STUDY MARCH 20, 1990
CONCEPT #2
15 —- MECHANICAL
QUANTITY UNIT UNIT RATE ESTIMATED COST
Radiators (Continued)
Radiator stand and root 2 LOTS 3490.00 6,980
3" diameter piping 110 LF 22.65 2,492
Fittings 20 EA 45.00 900
Butterfly valves 11 EA 166.00 1,826
Control valve 1 EA 89 .00 89
Insulation 110 LF 6.65 132
Anti-freeze 150 GALS 7.60 1,140
Hook-up
Form hole through existing wall for
heating pipes 2 EA 195 .00 390
1 1/2" diameter black steel piping
including fittings 120 LF 12325 1,470
WASTE HEAT RECOVERY SYSTEM PAGE 23
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #2
15 - MECHANICAL
QUANTITY UNIT UNIT RATE ESTIMATED COST
Hook-up (Continued)
Gate valves 11 EA 125.00 1,375
Check valves 2 EA 125.00 250
Strainer a EA 58 .00 116
Balancing valve 3 EA 49.50 149
Temperature control valve 1 EA 225.00 225
Insulation 120 LF 4.40 528
Heat exchanger, 100,000 BTUH 1 EA 3075.00 3,075
Expansion tank, 13 gallon capacity 1 EA 550.00 550
Air separator 1 EA 495.00 495
Pumps, circulation Grundfoss 200,
1 1/2" diameter 2 EA 575.00 1,150
WASTE HEAT RECOVERY SYSTEM PAGE 24
KOYUK, ALASKA
CONSTRUCTION COST S'TUDY MARCH 20, 1990
CONCEPT #2
15 - MECHANICAL
QUANTITY UNIT UNIT RATE ESTIMATED COST
Hook-up (Continued)
Connection to existing piping system 2 KA T2200 145
Make-up glycol system connection,
including tank 1 EA 610.00 610
Glycol 110 GAL 7.60 836
Test and balance system 30 HRS 75.00 27250
Controls and Instrumentation
Generator building and new module 1 Lov 2,000
Hook-up inter ties 1 LOT 1,500
WASTE HEAT RECOVERY SYSTEM PAGE 25
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #2
16 - ELECTRICAL
QUANTITY UNIT UNIT RATE ESTIMATED COST
Motor Connections
Breaker in existing power panel 2 EA 175 .00 350
Connection to motor 5 EA 115.00 575
Disconnect switch 3 EA 330.00 990
3/4" EMT conduit 100 LF 3.10 310
#8 copper 400 LF +75 300
New Module
Main teeder and conduit 40 LF 8.50 340
Breaker in existing distribution panel 1 EA 277.00 277
Panel 1 EA 800.00 800
Exterior light fixture 1 EA 330.00 330
Light tixtures 6 EA 190.00 1,140
WASTE HEAT RECOVERY SYSTEM : PAGE 26
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #2
16 - ELECTRICAL
QUANTITY UNIT UNIT RATE ESTIMATED COST
New Module (Continued)
Switch 1 EA 55.00 55
Duplex outlets 4 EA 68.00 272
1/2" conduit 50 LF 2.80 140
#12 copper 150 LF -50 15
WASTE HEAT RECOVERY SYSTEM PAGE 27
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #3
CONCEPT #3
WASTE HEAT RECOVERY SYSTEM PAGE 28
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #3
01 - GENERAL CONDITIONS, OVERHEAD
AND PROFIT
QUANTITY UNIT UNIT RATE ESTIMATED COST
Mobilization 1 LOT 8,000
Freight 34,500 LBS -40 13,800
Supervision, equipment, utilities
clean site, tools and protection 10 WKS 3000.00 30,000
Per diem 210 DAYS 110.00 23,100
Travel costs, including time in travel 6 RT 1250.00 7,500
Bond and insurance 1.75 % 4,764
Profit 10 $ 27,697
WASTE HEAT RECOVERY SYSTEM PAGE 29
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #3
02 - SITEWORK
QUANTITY UNIT UNIT RATE ESTIMATED COST
Piles
Mobilize 1 LOT 8,000
Steel thermal piles 4 EA 2100.00 8,400
Drill pile hole 60 LF 25.00 1,500
Slurry 3 cy 280.00 840
Freeze back 4 EA 220.00 880
Test and demobilize 1 LOT 3,000
Piped Utilities
Excavate trench for arctic pipe,
including backtilling and spread and
level surplus 1,116 LF 12.50 13,950
2" diameter Schedule 40 pipe with
insulation and arctic pipe protection 572 LF 33.60 19,219
1 1/2" ditto 1,660 LF 31.50 52,290
WASTE HEAT RECOVERY SYSTEM PAGE 30
KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #3
02 - SITEWORK
QUANTITY UNIT UNIT RATE ESTIMATED COST
Piped Utilities (Continued)
2" bend 12 EA 145.00 1,740
1 1/2" bend 12 EA 115.00 1,380
WASTE HEAT RECOVERY SYSTEM PAGE 31 KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #3
06 - WOOD AND PLASTICS
QUANTITY UNIT UNIT RATE ESTIMATED COST
Glulam beams to support new module 48 LF 36.00 1,728
Miscellaneous metals 800 LBS 1.75 1,400
Access steps, including handrail and
base 1 LOT 1,200
WASTE HEAT RECOVERY SYSTEM PAGE 32 KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #3
13. - SPECIAL CONSTRUCTION
QUANTITY UNIT UNIT RATE ESTIMATED COST
Pre-engineered 8'0"x8'0" building
module with floor, exterior wall
structure ana roofing complete 1 EA 2500.00 2,500
Hole through exterior wall for heating
pipes 4 EA 110.00 440
Exterior door 1 EA 710.00 710
Louver 1 EA 500.00 500
WASTE HEAT RECOVERY SYSTEM
KOYUK, ALASKA
CONSTRUCTION COST STUDY
CONCEPT #3
15 - MECHANICAL
Exchanger and Connections
Connection to existing piping to cooling
system of generators
Form hole through existing wall for
heating pipes
3" diameter black steel welded piping
Fittings
Butterfly valves
2" diameter black steel welded
piping including fittings
1 72"? discto
2" butterfly valve
1 1/2" ditto
Insulation to pipe, 3" diameter
Ditto, 2" diameter
Ditto 1 1/2" diameter
QUANTITY UNIT UNIT RATE ESTIMATED COST
PAGE 33
MARCH 20, 1990
80
16
EA
LF
EA
EA
LF
LF
EA
EA
LF
LF
LF
195.00
22.65
45 .00
166.00
17.45
12225
137,..75
97.50
6.65
5.50
4.40
390
1,812
720
498
524
368
264
195
532
165
132
WASTE HEAT RECOVERY SYSTEM PAGE 34 KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #3
15 - MECHANICAL
QUANTITY UNIT UNI’ RATE ESTIMATED COST
Exchanger and Connections (Continued)
Booster pump 1 EA 1450.00 1,450
Heat exchanger, 300,000 BTUH 1 EA 3485.00 3,485
Unit Heater (2 Each)
(1 - Generator Building and 1 - Module Building)
Unit heater, 60 BTUH, including
thermostat 2 EA 330.00 660
1" diameter piping including fittings 80 LF 9.10 728
Gate valves 4 EA 71.00 284
Insulation 80 LF 4.10 328
Radiators
Remove all existing radiators including all
piping back to generators 1 LoT 1,200
Young series 22 radiator 2 EA 3830.00 7,660
WASTE HEAT RECOVERY SYSTEM PAGE 35 KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #3
15 —- MECHANICAL
QUANTITY UNIT UNIT RATE ESTIMATED COST
Radiators (Continued)
Radiator stand and roof 2 LOTS 3490.00 6,980
3" diameter piping 110 LF 22.65 2,492
Fittings 20 KA 45.00 900
Butterfly valves 11 EA 166.00 1,826
Control valve 1 EA 89.00 89
Insulation 110 LF 6.65 732
Anti-freeze 150 GALS 7.60 1,140
Hook-up
Form hole through existing wall tor
heating pipes 2 EA 195 .00 390
2" diameter black steel piping
auncluding fittings 120 LF 17.45 2,094
1 1/2" ditto 120 LF W225 1,470
WASTE HEAT RECOVERY SYSTEM PAGE 36 KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #3
15 - MECHANICAL
QUANTITY UNIT UNIT RATE ESTIMATED COST
Hook-up (Continued)
2" gate valves 11 EA 156.00 1,716
1 1/2" ditto 11 EA 125.00 1,375
2" check valves 2 EA 156.00 312
1 1/2" ditto 2 EA 125.00 250
Strainer 2 EA 58 .00 116
2" Balancing valve 3 EA 53.00 159
1 1/2" ditto 3 EA 49.50 149
Temperature control valve 1 EA 225.00 225
Insulation 120 LF 4.40 528
Heat exchanger, 300,000 BTUH 1 EA 3485.00 3,485
Ditto, 100,000 BTUH 1 EA 3075.00 3,075
WASTE HEAT RECOVERY SYSTEM PAGE 37 KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #3
15 - MECHANICAL
QUANTITY UNIT UNIT RATE ESTIMATED COST
Hook-up (Continued)
Expansion tank, 26 gallon capacity 1 EA 971.00 971
Ditto, 13 gallon 1 EA 550.00 550
Air separator 1 EA 495.00 495
Pumps, circulation Grundfoss 200,
2" diameter 2 EA 660.00 1,320
Ditto 1 1/2" diameter 2 EA 5:75:00 1,150
Connection to existing piping system 2 EA W250 145
Make-up glycol system connection,
including tank 1 EA 610.00 610
Glycol 110 GAL 7.60 836
Test and balance system 30 HRS 15300 2,250
TOTAL ESTIMATED COS!
WASTE HEAT RECOVERY SYSTEM PAGE 38 KOYUK, ALASKA
CONSTRUCTION COST STUDY MARCH 20, 1990
CONCEPT #3
15. - MECHANICAL
QUANTITY UNIT UNIT RATE ESTIMATED COST
Controls and Instrumentation
Generator building and new module 1 LOT 2,000
Hook-up inter ties 1 LOT 1
WASTE HEAT RECOVERY SYSTEM
KOYUK, ALASKA
CONSTRUCTION COST STUDY
CONCEPT #3
16 - ELECTRICAL
UNIT UNIT RATE ESTIMATED COST
MARCH 20,
PAGE 39
1990
QUANTITY
Motor Connections
Breaker in existing power panel a
Connection to motor 7
Disconnect switch 5
3/4" EMT conduit 140
#8 copper 560
New Module
Main feeder and conduit 40
Breaker in existing distribution panel 1
Panel 1
Exterior light fixture 1
Light fixtures 6
EA
EA
LF
LF
LF
EA
EA
EA
175.00
115.00
330.00
3.10
75
8.50
277.00
800.00
330.00
190.00
525
805
1,650
434
420
340
277
800
330
WASTE HEAT RECOVERY SYSTEM
KOYUK, ALASKA
CONSTRUCTION COST STUDY
CONCEPT #3
16 - ELECTRICAL
New Module (Continued)
Switch
Duplex outlets
1/2" conduit
#12 copper
QUANTITY UNIT
1 EA
4 EA
50 LF
150 LF
PAGE 40
MARCH 20, 1990
UNIT RATE ESTIMATED COST
55.00
68.00
2.80
-50
55
212,
140
75