Loading...
HomeMy WebLinkAboutHydaburg Waste Heat Status, Trip Reports & Field Notes 1986FIELD TRIP REPORT Site: Hydaburg Date: 3/5/86 Crew: Peter N. Hansen Purpose of visit: Gathering of field data for waste heat study. I checked in with Temsco Airlines at 7.30 a.m. and after some delays I arrived in Hollis at approximately noon. A van from Temsco Airlines brought me to Klawock, where I picked up the APA truck from DOT's yard. After a bumpy ride I arrived in Hydaburg at 3.30 p-m. Here I met Mr. Bob Sanderson, Mayor of Hydaburg. Together we went through the buildings in which he wanted waste heat recapture equipment installed. We were also given access to the Alaska Power and Telephone power plant, where I had a chance to look at the technical feasibility of installing waste heat recapture equipment. Mr. Sanderson indicated that he would appreciate some help in designing a waste heat recapture system for the City's power Plant which supplies power to the new fish processing plant. This plant utilizes to ea. 450 kw Cummins generator sets. I promised Mr.. Sanderson that I would assist as much as possible in the evaluation of a waste heat recapture system form both power plants. Mr. Sanderson promised to supply all necessary data as soon as possible. I arrived back at the lodge in Klawock at 10.00 p.m. after an exciting ride with a few technical problems with the APA truck. eR 9 pe VOY - = XS - 97s 77C/ NATIONAL le, (S000 (fb. Tluemabt- tt ifo/2/o Fee Hatt Five 12 Peo . W(t. Wiese: en | | | tnd ER fo42 ee Adah, - (ea Dooh Mw PT ape fang Y Ope_ald 19a. Be: CaS pros “ten Cota;