Loading...
HomeMy WebLinkAboutClark's Point Bids, Orders, Invoices, & Payments 1990 wey 125 A Hos v Wo BHA © scHroot MEW RADUTOR CAP w/ 1/7 Ct 7 SUPPLY & RETURN UP TO LINE CONNECTED TO NEW | Se SSrN toned oh rote eee HL MOATERS t ARCTIC PPE SUPPLY L_| BSR Bes Vi a / 7 = A ae [= oH 7 2 = | j ry ees a Ub \ : | cs<" 1 " Il & g 1 & & Es Il 8 is 5 J is as 5 u & 4 i 3 5 28 & i 5 a8 a8 es is B is % 3t st st 5t 7 8 8 ia 7 e : SEE PING SCHEMATIC See Sree teueceott L Sopiemror x hes NOTE: AL COSTING Pew 15 COPPER “um te Cieerron eT UP Sie, Te \UNES CONNECTED TO ARCTIC PRANG. soa | Ww Ww 4 Ae XISTING POWER PLANT FLOOR PLAN NEW POWER PLANT FLOOR PLAN MAE 1/Por-e MAL /Per-e se tag Sore z Bact Fee] aot — reyst cose Fact EST Vive mort ip} ° (lio Pom 7 vywen{amr J, Wn Fg 7. coum Fetes t 7 \ vr [wens 8 te} Gad ie Ei 2 wom} BUTTERFLY Wat rye iM ? 7 COOAAT Fan ye one 9 ! M ~ NEW HEAT EXCHANGER CONNECTIONS - Bones = ies 6k wn} 220Tl-| sores: vur Alosko “Energy Authority ) " JoROOG et rere eae a0 fies Sra he ay me Se cn 2. ROOM AO SET ASE THE Doss SHELL &@ TUBE TYPE ~ NEW PIPING SCHEMATIC - POWER PLANT HX ISOMETRIC - EXISTING PIPING SCHEMATIC - nO KAT Prowect, CLARK'S POINT WASTE HEAT RECAPTURE PROJECT Tee POWER PUNT FLOOR PLAN 2 PEN SOMCTRCS, =a = [ATA =< Ne [pate Reveon ome fare 2 Swe 22 | Sree ¢ CLARKSPT.XLS PLEASE FAX THIS DATA AT THE END OF EACH MONTH TO: ALASKA ENERGY AUTHORITY STEVE STASSEL 1-800-478-7877, or 561-7877 FAX 561-8584 i Waste Heat Loop Temps | Boiler Loop Temps | Outdoor Date: Time: | Supply _| Pressure | Into H/E | Out of H/E| Air Temp | Notes: Community: Clarks Point Building: School Boiler Room D g ¢ 3 4 POUT TTT Page 1 MEMORANDUM State of Alaska TO: Arnold Reimer DATE: August 23, 1990 Accountant FILE NO: c PHONE NO: TH Dave Denig-Chakroff SUBJECT: Manokotak and ir. Rural Programs Clarks Point Waste Heat FROM: it Woodell —~ Development Specialist RE: AEA Contract # 2800278 (Manokotak Waste Heat) AEA Contract # 2800277 (Clarks Point Waste Heat) Article A, Paragraph 9 of each of the Southwest Region School District contracts, states that we are to bill the District for materials taken out of our inventory for these projects. Accordingly, | am attaching John Bulkow’s two materials cost worksheets that you may use to prepare invoices for the District. The total amounts to be billed are as follows: Manokotak Waste Heat Project $22,158.21 Clarks Point Waste Heat Project $ 4,272.41 Each of these worksheets has supporting documentation, showing examples of itemized prices paid by the Energy Authority for inventory purchased. Please include this information with your billing statements. To ensure that funds are returned to the appropriate account Energy Authority accounts, we have two choices: sTAY (1) crediting funds against project ledger codes A pow 81826907 (Manokotak) and 81826908 (Clarks Point), ce 7 cok jo. “ 2 | t \ Ww - hk “ (2) crediting them directly against 81899301 ot Yr (inventory). “ J tf we decide to bring funds into the project ledger codes (option 1), | am attaching two Purchase Requests from John Bulkow that adjust incoming funds to restore them to the waste heat ledger code. If we decide to bring them directly into 81899301 a 2), please void these two purchase requests (AEA- 91-A 1125 and 1126). Either way, it might be useful to include accounting code information on the statements. Please note that our current budget for this project does have an 080 account to ” UU" ¥2"iK I 2"xelkx V2 aa Z|! Vo I TEA Stk Cou PLUINGS Et TEL ¢ * Po wstk PUAN Fertte Su 4oO Bric | STtz rire RTH Size ek / vou a 2 \ 2h TI Pb. 5! Z" PiFbl ST tL oe Leov FUTTING. $ AT Sith LTE cA 7] _ Zz <— 1ISCF KUwGEes WA Grekits Zz ZI KL Etc, | Rrpdckkis | 3 Z2/2\yx Be TURLAD- ©- UETS Bu é Zz Ye y 2! STLer MIPPLES THUA TAD ) = u Yo Zz Bh, y_ 42 THIL ADL Bus ume Zz S/y"" THAD LD courein& Vat Se vy dN Z ZW /e [sO Burtth fry VACYULS Lua Tres £20M StEA-LS yi - U4 Zt Ise 4 FLANGES if lus OUTS F< macCE V 1 Oihat 4 c+ 2% Bronze VVAL VES (ks AT o& Heap N w/ APAPT_ ] =?! ul 1 " uv ‘a | /¢ BRos&h. GATE VAC Misc, | GRUMDIFOS,| Mom | uP 7s-U, F PuMer H/ ELARGE lee 4 DIAL TYPL THERMO METLES 1 yo" Bitrate, SY PAL eee | 2% ete OD- 200 7F SCtCACE ust | TRERICE Mook =B8320204 (oe EauALy o DIAL TY Pe THEAMLOMETER S SAAL AS Above Excern CO —2Y40o °F SCALE USt | 7RELICEL Moder BBBZ02Z05 | (ot eauary LETTER ( * TIRANSMIUNTAIL State of Alas! Alaska Energy Autitority rr a = 701 East Tudor Ro}d | 6/22/90 P.O. Box 190869) ACT EneNine Anchorage, Alaska 995 9 Jens Madsen . RE [ TO _Daningi, Inc. 12 Hamilton Lane —Plainsboro, NJ 08536 GENTLEMEN: WE ARE SENDING YOU {& Attached ( Under separate cover via the following items: O Shop drawings O Prints QO Plans O Samples OD Specifications O Copy of letter O Change order _contract COPIES DATE. | NO. DESCRIPTION | Dt blo> | | | 4 THESE ARE TRANSMITTED as checked below: O For approval O Approved as submitted O Resubmit______ copies for approval O For your use O Approved as noted O Submit_____ copies for distribution O As requested O Returned for corrections O Return______ corrected prints O For review and comment ® _for signature O FOR BIDS DUE __19_____©) PRINTS RETURNED AFTER LOAN TO US REMARKS Attached are three copies of contract number 2800282. Please return two with original signatures to my attention via an overnight courier service. The third is for your use. We will return a fully-executed original to you upon approval. COPY TO__John Bulkow, AEA ; SIGNED: A/) La It enclosures are not as noted, kindly notify us atonceMarlys Hagén. Contrac Admin. IIL a =S ral (3) DANINGI, Inc. Ly, June 11, 1990 TELECOPY ; TO: Alaska Energy Authority Fax # 907 461 3594 John Bulkow Enclosed please find list with pricing ag requested for extra materials needed for mentioned projects. As T mentioned in vur phone conversation, you nesd eniy to inetall ona set of E-joints in the Manokotak Project. The FP-jointe ehall be in- stalled close to tha number 4 in the length imlication "469 Fe.'' on your site plan (8 Pipe length from the elbow turning towards the Power Plant), Place a (100 meter) roll of Plastic Film over the pipes 50 me- ter to each side of the E-joint, Regarding the Clark’s Point Project; you must run the pipe 7 feet ver- tical before entering the building to enable this leo te ahezorkh the ex- pansion From approx,. 1 1/2 length of straight pipe. (Yeu de not need this kind of consideration reyarding Manokotak, «as the pipe runa in front of the buildings are shorter), Please call if you need further info. I have forwarded an i.c.moller manual to you, We will be looking forward to hearing from you, Vary truly yours C Jéns Madsén JOBU0611 . DOC ' 12 Hamilton Lane, Plainsboro, N.J. 08536 Phone: (609) 275 9070 Fax: (609) 793 2579 10d 100 “ONT "TSNINYO 6252 662 609 2b:9t LL-90-O661 Daningt, Inc. 06/1130 12 Hamilten Lane Plainsboro, N.J. 08536 Ph, (609) 275 3070 Fax (6093) 799 2579 Alaska Energy Authirity John Bulkow Manokotak: Part no Inch Description aty Them Pr Total 7461 140/160 Foam Pad 24 12.30 409.60 1363 140 Wall Entry Sieeve 4 11,00 44.90 1829 125/140 End-cap 5 29,00 109,00 76558 2 i/2" 76 E-joint 2 236.70 473.40 3033 140 Joint Coupling for E-ijvint z 36,70 73.40 1645S Zink Anode (1 pcs) 2 3,59 7,90 1726 Dual-Plug (10 pes) 1 12.29 12,10 1727 Steel holts, Complete (25 pes) 1 7.60 7.60 1728 Clamp 1 42.20 48.20 2335 2n'' 76/140 Alu-shields (2 pes) 1 6.40 6.40 8104 Foam Pack no. 4 s? 10.69 604.20 8105 Foam Pack no, §& 2 13.10 39,30 8105 Foam Pack no. §& 20 13.69 272.00 7910 500 mm Plastic film 100 Metres 2 42.20 4.40 1606 Warning Tape 500 Meters 1 27,99 27.90 2,109.50 Clark’s Point 7461 140/160 Foam Pad 12 12,90 154.80 1362 140 Wall Entry Sleeve 4 11.00 44.00 1829 125/140 End-cap S 20.00 100.00 8104 Foam Pack no. 4 14 10,69 148,40 8196 Foam Pack no. 6 lz 13.60 163,20 610.40 Alaska Energy Authority 1962 Pregsure test equipment 1 236.50 : 8045 Installation tools 42-168 j 38,5 Delivered in Seattle, WA To 20d 100 “ONT “ISNINYG 6252 662 609 2b:3L LI-90-O661 to: Jens Madsen, Daningi Inc. from: John Bulkow, AEA date: 5 Jun 90 re: Clark’s Point & Manokotak Waste Heat Projects As per our phone conversation the site plans for the projects at Clark’s Point and Manokotak that we are constructing using I.C. Moeller 76/140 insulated pipes are attached. piping at Manokotak to verify that it sketch that you sent Peter Hansen last year. Please take particular note of the layout of the conforms with the I believe we have enough piping, 90° bends, and taper lock joints to complete the projects, but the majority of our foam packs in stock have begun to go bad due to age miscellaneous items. Please fax back of delivery time for the items listed obtain final approval from the school paying for the projects) and call you order. MANOKOTAK Description 140/160 Foam Pad 140 mm Wall Entry Sleeve 140 mm End Cap 140 Joint Coupling for E-joint (2 1/2") 76 mm E-Joint Zinc Anode (1 pcs) Dual-Plug (10 pcs) Steel bolts, Complete (25 pcs) Clamp (2 1/2") 76/140 Alu-shields (2 pcs) Foam Pack no. 4 Foam Pack no. 6 Foam Pack no. ? (Size required for E-Joint) 500 mm Plastic film 100 Meters Warning Tape 500 Meters CLARK’S POINT Description 140/160 Foam Pad 140 mm Wall Entry Sleeve 140 mm End Cap Foam Pack no. 4 Foam Pack no. 6 and we need some other prices and an estimate below so that I may district (who are back to place the Quantity BR PNEANAPPEPNAHRUDD Quantity