HomeMy WebLinkAboutAtmautluak PCE Economic Analysis Summary Sheet 1990PCE ECONOMIC ANALYSIS SUMMARY SHEET village: Atmautluak Analysis Date: 1/8/90 Summary: RSA estimates a fuel efficiency improvement of 1.0 Kwh/gal achieved by installing a 75 Kw gen-set in place of the existing 230 Kw gen-set, and running the new 75 Kw gen-set in parallel with the 125 Kw gen-set for winter operation. For summer operation, RSA suggests operating the 75 Kw gen- set. Existing generation equipment consists of a 125 Kw White, 150 Kw John Deere, and a 230 Kw Cummins gen-set. The measured connected load 6/19/89 was 53 Kw. The estimated peak connected load is 154 kw. In order to meet the estimated peak load, automatic paralleling switchgear may be required. The Capital cost for the New Project Scenario assumes the 75 Kw gen-set is installed in FY90 at an estimated cost of $69,793. However, this does not include the parallel switchgear. The Capital cost for the Current Scenario assumes the 230 Kw gen-set will be replaced in-kind in FY 91 at an estimated cost of $113,971. The Maximum Construction cost based on a 10 year discounted Economic payback is $155,325. The Maximum Construction cost based on a 10 year PCE payback is $106,211. ATMAUT.XLS PCE ECONOMIC ANALYSIS Village: Atmaut luak Construction Cost: $69,793 *** Date: January 8, 1989 Elec. Sold FY89: 431224 Kwh * / , |e Jee Elec. Increase: 0.00% Net Benefit: $85,532 AP : 4 Fuel Effy FY89: 8.6 Kwh/gal* New Effy: 1 9.6 Kwh/gal Present Value Current Scenario: ($107,429) Fuel Price: 1.075 $/gal** Present Value PCE Scenario: ($21,897) Fuel Price Increase 0.00% Discount Rate: 3.00% Max Construction Cost: $155,325 CURRENT SCENARIO NEW PROJECT SCENARIO Capital Capital ($ saved) |(gal_saved)| ($ saved) ($) ($ saved) |(gal_saved)|($ saved) Investment Year 0 $0 | ($69,793) Savings: $0 0 $0 " ($113,971) 0 $0 " $0 0 $0 " $0 0 $0 va $0 0 $0 $0 0 $0 " $0 0 $0 " $0 0 $0 " 0 $0 Savings: 0 $0 0 $0 fr ton0s [estor east $0 ($69,793) $47 896 NOTES: CURRENT SCENARIO Capital Cost includes the estimated cost to replace a 230 Kw gen-set IN-KIND There are no fuel savings since the gen-set will be replaced in-kind NEW PROJECT SCENARIO Capital Cost includes the estimated cost to install a 75 Kw gen-set*** Generating fuel efficiency is improved 1.0 Kwh/gal to 9.6 Kwh/gal**** Fuel (gallons saved) is based on the generation efficiency improvement and Kwh sold in FY89 Fuel ($ Saved) is based on FY90 $/gallon and gallons of fuel saved O&M costs savings are assumed negligible Maximum Construction Cost is equal to the Construction Cost minus the Present Value Current Scenario plus the Present Value PCE Scenario * FY89 PCE Data ** 12/31/88 APUC PCE rate filing, updated 7/30/89 *** Capital Cost DOES NOT include cost of paralleling switchgear **** Paralleling Switchgear may be required to achieve full 1.0 Kwh/gal improvement for winter months ESTIMATED EFFICIENCY BASED ON OPERATING 230 KW GEN-SET IN SUMMER, 125 & 150 KW GEN-SETS ARE AVAILABLE Page 1 Investment Year Savings: “ Savings: APUC/PCE DATA, FY89 Fuel Cost: $51,067 Kwh Sold: 399,719 Non-fuel Cost: $107,037 Kwh Sold: 399,719 PCE Rate: 0.295011 Elig. Kwh Sold: 263,397 PCE Total Costs: $77,705 NOTES: APUC/PCE DATA, FY89 ($777, 050)| ($794 ,825)| ($69, 793)| ($688,615) ATMAUT.XLS PCE RATE ANALYSIS APUC/PCE CURRENT |NEW PROJECT SCENARIO DATA FY89 | SCENARIO [ pce ($) | PCE ($) [CAPITAL($) | PCE ($) $0 $0 $0 ($77,705)| ($79,483) ($68,861) ($77,705)| ($79,483) ($68, 861) ($77,705) ($77,705) ($77,705) ($77,705) ($77,705) ($77,705) ($77,705) ($77,705) ($79,483) ($79,483) ($79,483) ($79,483) ($79,483) ($79, 483) ($79,483) ($79, 483) ($68,861) ($68,861) ($68,861) ($68,861) ($68,861) (368,861) ($68,861) ($68,861) CURRENT SCENARIO, FY90 Fuel Cost: $53,903 Kwh Sold: 431,224 Non-fuel Cost: $119,726 Kwh Sold: 431,224 PCE Rate: 0.30175949 Elig. Kwh Sold: 263,397 PCE Total Costs: $79,483 PCE Annual Savings: $8,844 New Proj vs. APUC/PCE Byer ils!s Capital Cost: $69,793 Simple Payback, years 6.57 Benefit Cost Ratio: 1.52 Maximum Cost for 10yr Payback: | $106,211 NEW PROJECT SCENARIO, FY90 Fuel Cost: $48,288 Kwh Sold: 431,224 Non- fuel Cost: $107,037 Kwh Sold: 431,224 PCE Rate: 0.2614361 Elig. Kwh Sold: 263397 PCE Total Costs: $68,861 PCE Annual Savings: $10,621 New Proj vs. Current Fuel Cost, Non-fuel Cost, and Kwh Sold are from the latest APUC PCE rate filing Eligible Kwh Sold is from the CURRENT SCENARIO Fuel Cost annual AEA FY89 PCE report is calculated based on CURRENT generating fuel efficiency, kwh sold, and $/gallon for fuel Non-fuel Cost includes APUC/PCE DATA Non-fuel cost PLUS depreciation and interest expense for the new equipment Kwh Sold is from the annual AEA FY89 PCE report Eligible Kwh Sold is from the NEW PROJECT SCENARIO Fuel Cost annual AEA FY89 PCE report Non-fuel Cost is from the latest APUC PCE rate filing Kwh Sold is from the annual AEA FY89 PCE report Eligible Kwh Sold is from the annual AEA FY89 PCE report CURRENT SCENARIO NON-FUEL COSTS Non-Fuel Cost: $107,037 Capital Cost: $107,429 Depreciation Term: 10 Interest Rate: 7.00% Real Interest Rate: 3.00% Inflation Rate: 3.90% Non-fuel Cost plus depreciation and interest expense: yrs Depreciation and Interest Expense Page 2 is calculated based on NEW generating fuel efficiency, kwh sold, and $/gallon for fuel $12,689 per year $119,726 per year ALASKA POWER AUTHORITY POMER COST EQUALIZATION MONTHLY PCE STATISTICS REPORT “7 UTTLITY SUMMARY # OF # OF # OF CURRENT TOTAL =MONTHLY (a) (b) «c) (a+ bec) FISCAL FISCAL COMMUNITY DATE POPUL RESID. COMMER. COMMUN. FUEL FUEL TOTAL OPERATING KwH MONTHLY TOTAL KWH TOTAL KH TOTAL KWH TOTAL KWH PERIOD §=YEAR POPULATION CERTIFIED cust cust FUEL COST EXPENSE GENERAT KWH SOLD ELIG. RESID. ELIG. COMM. ELIG. FACIL. ELIGIOLE 01/23/86 52 ‘6 1 0.9900 3121 3090.09 —-14200.95 34084 32104 17812 2162 280 20254 ‘ 39 234 01/23/86 52 ‘6 1 0.9900 4405 4361.45 19730.99 46261 42865 21317 2340 330 23967 5 a9 234 01/23/86 53 ry 1 0.9900 4736 4688.84 8677.86 44992 40682 21121 2251 310 23682 6 a 234 01/23/86 52 2 1 0.9900 4960 4910.80 9685.90 52960 48706 24768 1632 360 26760 i} 7 ao 234 01/23/86 51 8 0 0.9900 5383 5329.47 0.00 55231 50865 25802 2925 0 28727 8 ao 234 01/23/86 51 8 0 —0.9900 5673 5616.77 6468.25 45801 41965 20085 2731 0 22816 9 89 255 12/15/89 51 8 0 ~— 1.4000 4709 6592.46 = -16798.31 29908 27676 18056 2780 0 20836 10 89 255 12/15/89 52 8 0 = 1.4000 4198 3876.78 = 1041.64 = 41545, 42532 20551 2963 0 23514 " ro 255 12/15/88 51 8 0 1.4000 3868 5415.06 5444.96 43331 397% 17814 2750 0 20564 12 ro) 255 12/15/88 51 ‘6 0 — 1.4000 3050 4118.72 9058.40 20961 18599 15804 1815 0 17619 * Subsubtotal * 49091 55731.76 © 127473.70 465213 4312646 233252 28535 1610 263397 “* Subtotal ** 49091 55731.76 = 127473.70 465213 431266 “ys 1 (233252 28535 1610 263397 ** BEAVER ELECTRIC - FY89 3 9.04 farrsrd /4p| ® Levee QEAVER ‘4 8 8 03/05/85 35 9 2 1.0600 277s 2962.00 2078.52 20882 19682 3860 5379 2608 11867/)9y42* 9 " a9 85 03/05/85 33 8 2 1.0600 3145 3258.92 8720.43 20945 19965 4332 4458 2462 NBM ays. sy * Subeubtotal * = 5920 6200.92 10798.95 41827 39827 8192 9637 5070 23099 “* Subtotal ** 5920 6200.92 10796.95 41827 39627 8192 9837 5070 23099/ 3932? < “ : - ( : bo A S%O : ( we BETHEL UTILITIES CORP FY89 yi lgiPPuc PCE fle 195260 joes \ * eeee BETHEL 1 89 4692 12/23/86 143473. 0 1.3136 183300 229308.00 150000.00 2788800 2333828 514065 1346476 0 648541 2 39 4692 12/31/86 14620271 0 = 1.3136 184825 262777.00 — 150000.00 2673600 2363060 530466 140766 ° 671212 3 39 4692 12/31/86 472 0.2% 0 = 1.3136 167160 219573.00 — 150000.00 2380800 2060780 544452 140454 0 684906 4 39 4692 12/31/86 1468 272 0 1.3136 177555 233121.00 — 150000.00 2690400 2301427 612626 143913 0 756539 5 89 4692 12/31/86 1489 = 270 0 1.3136 190500 250231.00 150000.00 2846400 2490332 656735, 144969 0 801704 6 89 4692 12/31/86 1481272 0 = 1.3136 208118 271802.00 150000.00 3063200 2680616 666609 145007 0 811616 7 89 4692 12/31/86 1485 273 0 = 1.3136 220400 254562.00 150000.00 3288800 3049937 77369 150496 0 927863 8 89 4692 12/31/86 479.276 0 1.1760 176200 207211.00 — 150000.00 2584800 2200813 588380 140459 0 728839 9 a9 4462 12/15/88 477.280 0 = 1.1760 191000 220698.00 — 150000.00 2823200 2452022 618341 143272 0 761613 10 a9 4462 12/15/88 1479 (283 0 = 1.1550 174900 202010.00 — 150000.00 2560000 21116469 542074 138802 0 680876 n 89 4462 12/15/88 1487 287 0 1.1550 177900 205474.00 150000.00 2604000 2301677 598745 146566 0 745311 12 89 4462 12/15/88 1466-290 0 1.1550 170945 206843.00 150000.00 2467200 2110016 525548 1461961 0 667689 Subsubtotal * 2222803 = .2743410.00 + 1800000.00 32771200 28255937 7175410 1711099 ° 8886509 * Subtotal ** 2222803 2743410.00 1800000.00 32771200 26255937 7175410 1711099 0 6886509 APPENDIX 1 ATMAUTLUAK JOINT UTILITIES POWER COST EQUALIZATION CALCULATION ‘ Prior Commission Utility Staff Determination Request Recommendation A. Total KWH Generated B. Total KWH Sold (Appendix 2) 399,719 399,719 399,719 C, Total Non-Fuel Costs (Appendix 2) $107,037 $107,037 $107,037 1. D, Non-Fuel;Cost/KWH (C / B) 0.2678 0.2678 0.2678 vi E. Total Fuel Costs (Appendix 2) $48,929 $51,067 $51,067 F, Fuel Costs/KWH (E / B) 0.1224 0.1278 0.1278 G, Eligible Costs/KWH (D + F) 0.3902 0.3955 0.3955 1 H, Eligible Cost/KWH (G) Less 8.5 cents/KWH 0.3052 0,3105 0.3105 I. Lesser of (H) or 44 cents/KWH : 0.3052 0,3105 0.3105 J. Average Class Rates (Appendix 3) School $0.2830 $0,2830 $0.2830 All Other $0.3830 $0,3830 $0.3830 Class Power Cost Equalization Per KWH Payable by APA K, Lesser of: (1) I x 95%, or (2) J School $0.2830 $0.2830 $0,2830 All Other $0.2899 $0.2950 $0,2950 ATMAUTLUAK JOINT UTILITIES SCHEDULE OF ELIGIBLE POWER COSTS, SALES AND EFFICIENCY FOR PERIOD ENDING DECEMBER 31, 1988 NOTE: See Appendix 2A for instructions and detail. Prior Commission Per Staff Per Determination Utility Adjustments Staff Non-Fuel Costs: A, Personnel Costs $78,354 $78,354 $78,354 B. Power Plant Parts & Supplies $3,796 $3,796 $3,796 C. Repairs and Maintenance $9,796 $9,796 $9,796 D. General and Administrative $15,091 $15,091 $15,091 E. Depreciation $0 $0 $0 ‘ an F. Interest Expense $0 $0 $0 G. Other ‘(Deseribe) $0 $0 $0 H,. Total Non-Fuel Costs $107,037 $107,037 $107,037 Fuel Costs: I, Gallons Consumed for Electric Generation 47,504 47,504 47,504 J. Price of Fuel: (cents per gallon) $1.0300 $1.0750 $0.0000 $1.0750 Weighted Average Price (See Appendix 2A for instructions) Most Recent Price $1.13 Date Purchased July 20, 1989 Total Cost of Fuel ( I X J) $48,929 $51,067 $0 $51,067 KWH Sales 399,719 399,719 399,719 Efficiency (O / I) 8,41 8.41 6.41 Woo eo COBVNANEWNM-COMBVNAN RUD UNIvNAON NNN CVONANEWN > ud Ono Ran 35 w MWNUNNNR ERR REPRE RWW MRURANLSSEREGRGSZT ESSA ALASKA ENERGY AUTHORITY PCE IMPROVEMENT PROGRAM LOCATION: ATMAUTLUAK , ALASKA OATE: PAGE: of 13-Dec-89 PREPARED FOR RSA ENGINEERING FILE: ATMAUT By Clark-Graves, Inc. sasmees===: CONSTRUCTION COSTS QUANTITY UNIT MATERIAL = FREIGHT LABOR LABOR TOTAL OISCIPLINE/ ITEMS Hours/ Rate Item Oescr. $iUnit = $/Unit Unit $/Hour Cost ($) FURNISH/INST. 75 KW GENERATOR 1 EACH 22,000.00 4,176.00 50.000 40.95 Freight Out For Old Generator 1 Jo8 250.00 8,352.00 32.000 40.95 ELECTRONIC GOVERNORS 2 EACH 600.00 35.00 4.000 40.95 $1,598.00 FURNISH AND INSTALL TOTALIZING METER Meter And Socket 1 EACH 430.00 14.00 2.000 40.95 $526.00 Wire And Conduit 10. L. FEET 8.50 4.00 0.300 40.95 $248.00 L. €.0. READOUT 1 EACH 323.00 7.00 2.000 40.95 $412.00 SERVICE METER, SOCKET & BREAKER 1 EACH 252.00 35.00 6.000 40.95 $533.00 OPERATOR TRAINING Transportation 1 R.TRIP 600.00 35.00 $635.00 Room And Board 6 MANOAYS 125.00 $750.00 Misc. Expense 1 ALLOW 100.00 $100.00 (Salarys Not Included) POWER DISTRIB. SYSTEM STUOY Transportation 2 R.TRIPS 370.00 174.00 12.571 40.95 $2,118.00 Room And Board 12. MANOAYS 125.00 $1,500.00 Added Engineering Expense 12 MANDAYS 12.571 40.95 $6,177.00 (Note This Allowance Should Be Added To The : Engineering Services Provided for Below) CHECKERED PLATE DAY-TANK DIKES 400 LBS 2.01 1.00 $1,204.00 Fasteners And Caulking 40 UL. FEET 2.00 1.00 0.198 40.95 $444.00 DIKE AROUNO STORAGE TANKS Membrane 1,395 S$. FEET 0.65 1.00 0.023 40.95 $3,616.00 Furnish, Fill,Place Sand Bags 1,200 EACH 1.05 1.00 0.167 40.95 $10,666.00 Sump, Valve And Orain Assy. 1 EACH 115.00 35.00 2.000 40.95 $232.00 (Assumes Locally Available Sand) REINSTALL COVER PLATES 1 ALLOW 4.000 40.95 $164.00 CHECKERED PLATE GENERATOR DIKE 1,200 LBS 2.01 1.00 $3,612.00 Fasteners And Caulking 120. «OL. FEET 2.00 1.00 0.198 40.95 | $1,333.00 OIRECT EXPENSE SUBTOTAL: 2 - HSE -=$74,004.00 GENERAL CONTRACTOR SUPPORT fer 23° y $28, 2: 6 OO capa $9,912.00 TOOLS & EQUIP 2 5% * LABOR: 1 ALLOW 1,076.00 $1,076.00 HOME OFFICE EXP.AT 15%*OIRECT: 1 ALLOW = 11,101.00 $11,101.00 GENERAL REQUIREMENTS Mob/Demob Tools And Equipment 2,000 LBS 1.16 $2,320.00 Crew 6 R.TRIPS 370.00 290.00 8.000 40.95 $5,926.00 Room And Board 83 MANDAYS 125.00 $10,411.00 Supervision 2 WEEK 100.00 116.00 60.000 40.95 $5,015.00 GENERAL CONTRACTOR SUPPORT SUB-TOTAL: $35,849.00 DIRECT EXPENSE ANO CONTRACTOR SUPPORT SUB-TOTAL: $109,853.00 PROFIT 2 25% $27,463.00 TOTAL CONSTRUCTION COST (FY89) $137,316.00 CONTINGENCY 2 10% $13,732.00 CONTRACT COST (FY90) $151,048.00 OESIGN COST @ 6% OF FY9O CONTRACT COST $9,063.00 SIOH @ 15.0% OF FY90 CONTRACT COST $22,657.00 PROJECT COST (FY90) $182,768.00 SALVAGE VALUE (Assumed To Be Negligble) 39) _ (Not Incl.) TOTAL INVESTMENT COST (FY90) x : x 5 (Assuming Summer Construction) S54 979 < 197 UA) HTX $183,000.00 = Cyn Up es C97