HomeMy WebLinkAboutBeaver PCE Economic Analysis Summary Sheet 1990PCE ECONOMIC ANALYSIS SUMMARY SHEET Village: Beaver Analysis Date: 1/8/90 Summary: RSA estimates a fuel efficiency improvement of 1.9 Kwh/gal achieved by installing a 50 Kw gen-set in place of the existing 125 Kw gen-set. Existing generation equipment consists of a 50 Kw and 125 Kw John Deere gen-set. The 125 Kw set is blown-up. The measured connected load 10/25/88 was 39 Kw. The estimated peak connected load is ??40?? Kw. The Capital cost for the New Project Scenario assumes the 50 Kw gen-set is installed in FY90 at an estimated cost of $48,702. However, this does not include the parallel switchgear. The Capital cost for the Current Scenario assumes the 125 Kw gen-set will be replaced in-kind in FY 90 at an estimated cost of $74,000. The Maximum Construction cost based on a 10 year discounted Economic payback is $156,050. The Maximum Construction cost based on a 10 year PCE payback is $101,156. NOTE: RSA did not calculate an estimated peak connected load for Beaver. Therefore, there is a chance that one 50 Kw gen-set will not carry the full peak load. BEAVER.XLS PCE ECONOMIC ANALYSIS Village: Beaver Construction Cost: $48,702 Elec. Sold FY89: 183760 Kwh* Elec. Increase: 0.00% Net Benefit: $107,348 Fuel Effy FY89: — 5.4 Kwh/gal** New Effy: 1.9 7.3 Kwh/gal Present Value Current Scenario: ($74,000) Fuel Price: —~ 1,086 $/gal* Present Value PCE Scenario: $33,348 Fuel Price Increase 0.00% Discount Rate: 3.00% Max Construction Cost: $156,050 ($74,000) $0 $0 $0 $0 $0 $0 $0 $0 [ Investment Year ($48,702) Savings: " Savings: CURRENT SCENARIO NEW oan SCENARIO Year | Capital ae Fuel Capital Fuel ($) ($ saved) |(gal saved)} ($ saved) ($) ($s Seeds (gal saved)|($ saved) Date: January 8, 1989 Ge il Fuel $0 eloecooDCFCOOOOSO ($74 600) ($74,000) ed ($48, 702) ($48, 702) $82,050 NOTES: CURRENT SCENARIO Capital Cost includes the estimated cost to replace a 125 Kw gen-set IN-KIND There are no fuel savings since the gen-set will be replaced in-kind NEW PROJECT SCENARIO Capital Cost includes the estimated cost to install a 50 Kw gen-set Generating fuel efficiency is improved 1.9 Kwh/gal to 7.3 Kwh/gal Fuel (gallons saved) is based on the generation efficiency improvement and Kwh sold in FY89 Fuel ($ Saved) is based on FY90 $/gallon and gallons of fuel saved O&M costs savings are assumed negligible Maximum Construction Cost is equal to the Construction Cost minus the Present Value Current Scenario plus the Present Value PCE Scenario * From 3/31/89 APUC PCE rate filing ** RSA estimate Page 1 Investment Year Savings: " Savings: APUC/PCE DATA, FY89 Fuel Cost: Kwh Sold: Non-fuel Cost: Kwh Sold: PCE Rate: Elig. Kwh Sold: PCE Total Costs: NOTES: APUC/PCE DATA, FY89 |APUC/PCE CURRENT |NEW PROJECT SCENARIO DATA _FY89 | SCENARIO BEAVER.XLS PCE RATE ANALYSIS PCE ($) PCE ($) |CAPITAL($) PCE ($) $0 $0 ($48, 702) $0 ($20,873)| ($28,579) ($18,463) ($20,873)| ($28,579) ($18,463) ($20,873)} ($28,579) ($18,463) ($20,873)| ($28,579) ($18,463) ($20,873)| ($28,579) ($18,463) ($20,873)| ($28,579) ($18,463) ($20,873)| ($28,579) ($18,463) ($20,873)} ($28,579) ($18,463) ($20,873)} ($28,579) ($18,463) ($20,873)] ($28,579) ($18,463) [Total: ($208, 732)] ($285,790)| ($48, 702)| ($184,634) CURRENT SCENARIO, FY90 $31,711 Fuel Cost: $36,956 183,760 Kwh Sold: 183,760 $21,792 Non-fuel Cost: $30,532 183, 760 Kwh Sold: 183, 760 0.195849 PCE Rate: 0.26815116 106,578 ESTIMATE lig. Kwh Sold: 106,578 $20,873 PCE Total Costs: $28,579 PCE Annual Savings: New Proj vs. APUC/PCE Capital Cost: Simple Payback, years Benefit Cost Ratio: Maximum Cost for 10yr Payback: NEW PROJECT SCENARIO, Fuel Cost: Kwh Sold: Non- fuel Cost: Kwh Sold: PCE Rate: Elig. Kwh Sold: PCE Total Costs: PCE Annual Savings: New Proj vs. Current Fuel Cost, Non-fuel Cost, and Kwh Sold are from the latest APUC PCE rate filing Eligible Kwh Sold is estimated from the annual AEA FY89 PCE report and APUC rate filing CURRENT SCENARIO Fuel Cost is calculated based on CURRENT generating fuel efficiency, kwh sold, and $/gallon for fuel $48,702 4.81 2.08 $101, 156 FY90 $27,337 183,760 $21,792 183, 760 0. 1732388 106578 $18,463 $10,116 Non-fuel Cost includes APUC/PCE DATA Non-fuel cost PLUS depreciation and interest expense for the new equipment Kwh Sold is from the latest APUC PCE rate filing Eligible Kwh Sold is estimated from the annual AEA FY89 PCE report and APUC rate filing NEW PROJECT SCENARIO Fuel Cost Non-fuel Cost is from the latest APUC PCE rate filing Kwh Sold is from the latest APUC PCE rate filing Eligible Kwh Sold is estimated from the annual AEA FY89 PCE report and APUC rate filing CURRENT SCENARIO NON-FUEL COSTS Non-Fuel Cost: Capital Cost: Depreciation Term: Interest Rate: Real Interest Rate: Inflation Rate: Non-fuel Cost plus depreciation and interest expense: $21,792 $74,000 10 yrs 7.00% 3.00% 3.90% Depreciation and Interest Expense Page 2 is calculated based on NEW generating fuel efficiency, kwh sold, and $/gallon for fuel $8,740 per year $30,532 per year FISCAL FISCAL COMMUNITY PERIOD YEAR POPULATION 3 co] 234 4 89 234 5 89 236 6 cd 236 7 4 236 8 ao 234 9 255 10 ao 255 " ao 255 12 co) 255 * Subsubtotal * ** Subtotal ** ** BEAVER ELECTRIC © sesee BEAVER 4 89 86 " od 85 “ Subsubtotal * “* Subtotal ** ** BETHEL UTILITIES CORP. 4692 4692 4692 4692 4692 4692 4692 4692 4462 O62 4462 4462 CANONS 10 W 12 SSSSszseesesg Subsubtotal * * Subtotal ** DATE POPUL CERTIFIED 01/23/86 01/23/86 01/23/86 01/23/86 01/23/86 01/23/86 12/15/89 12/15/89 12/15/88 12/15/88 03/05/85 03/05/85 12/23/86 12/31/86 12/31/86 12/31/86 12/31/86 12/31/86 12/31/86 12/31/86 12/15/88 12/15/88 12/15/88 12/15/88 FY89 FY89 # OF RESID. cust 52 52 53 52 51 51 1 52 51 nu 35 3 14634 1462 1472 1468 1489 14681 1685 1479 1477 1479 1487 1466 COemeanooe 273 271 27% 272 270 272 273 276 280 267 eoccceossu ecccoocecococose # OF CURRENT COMMER. COMMUN. FUEL cust PRICE eessco 55883 1.3136 1.3136 1.3136 1.3136 1.3136 1.3136 1.3136 1.1760 1.1760 1.1550 1.1550 1.1550 ALASKA POWER AUTHORITY POWER COST EQUALIZATION MONTHLY PCE STATISTICS REPORT UTILITY 3121 4736 4960 5383 5673 4709 4198 49891 49891 2775 3145 5920 5920 183300 184625 167160 177555 190500 2086118 220600 176200 191000 174900 177900 170965 2222803 2222803 SUMMARY TOTAL FUEL COST 3090.09 4361.45 4688.84 4910.80 5329.47 5616.77 6592.46 5876.78 5415.06 4118.72 55731.76 55731.76 2962.00 3258.92 6200.92 6200.92 yLailgiPPoc PCE leg 2788800 2673600 2380800 2690400 2846400 3063200 3268800 2584800 2823200 2560000 2604000 2667200 229308 .00 242777 .00 219573.00 233121.00 250231.00 271802.00 254562.00 207211.00 220698.00 202010.00 205474 .00 206843.00 2743410.00 2743410.00 150000 .00 150000.00 150000 .00 150000 .00 150000 .00 150000.00 150000.00 150000.00 150000 .00 150000..00 150000.00 150000 .00 1800000 .00 1800000 ..00 FAPCER13 FAPCEFOS TOTAL =MONTHLY OPERATING kw EXPENSE GENERAT 146200.95 34084 19730.99 46261 8677.84 44992 9485.90 52960 0.00 55231 6468.25 45801 16796.31 29908 10141.64 41545 15444 .96 43331 9058.40 20961 127673.70 465213 127673.70 465213 2078.52 20882 8720.43 20945 10798.95 41827 10798.95 41827 32771200 32771200 «) () MONTHLY TOTAL KWH TOTAL Kw KWH SOLD ELIG. RESID. ELIG. Comm. 32106 17812 2162 42865 21317 2340 40682 21121 2251 48706 24768 1632 50865 25802 2925 41965 20085 2731 27676 18056 2780 42532 20551 2963 3997%6 17814 2750 18599 15806 1815 431266 233252 28535 431266 4s 4 (2338252 28535 cbse fal 19882 3860 5379 19965 4332 4658 39827 8192 9637 39827 8192 9837 145260 *A 9¥O 2333828 514065 134676 2363040 530666 140746 2060780 546452 140654 2301627 612626 143013 2490332 656735 164969 2680616 666609 145007 3049937 T1T369 1504694 2200813 588380 140459 2452022 618341 143272 2111649 542076 138802 2301677 598765 146566 2110016 525548 161961 28255937 7175610 1711099 28255937 7175610 1711099 (ec) TOTAL Kwit ELIG. FACIL. 280 330 310 eooccok 1610 1610 2608 2462 5070 5070 eccooeoocoos ° (a+ becy TOTAL Kin ELIGIBLE 20254 23987 23682 26760 28727 228616 23516 17619 263397 263397 11847, 1125; 23099 23099/ 3932? - 10657 \ 648541 671212 6846906 756539 801704 811616 927863 728839 761613 680876 745311 (667489 8886509 8886509 qyels ok (19) cy >6Y BEAVER VILLAGE COUNCIL POWER COST EQUALIZATION CALCULATION March 31, 1989 FOR PERIOD ENDING . Total KWH Generated - Total KWH Sold (Appendix 2) - Total Non-Fuel Costs (Appendix 2) - Non-Fuel Cost/KWH (C / B) - Total Fuel Costs (Appendix 2) - Fuel Costs/KWH (E / B) - Eligible Costs/KWH (D + F) - Eligible Cost/KWH (G) Less 8.5 cents/KWH . Lesser of (H) or 44 cents/KWH . Average Class Rates (Appendix 3) Residential Commercial Class Power Cost Equalization Per KWH Payable by AEA . Lesser of: (I) x 95%, or (J) Prior Commission Approval 06/30/88 140,870 32,744 $0.2324 29,547 $0.2097 $0.4422 $0.3572 $0.3572 $0.4150 $0.4650 $0.3393 Utility Request 06/30/89 183,760 26,992 $0.1469 31,711 $0.1726 $0.3195 $0.2345 $0.2345 $0.4150 $0.4650 $0.2227 APPENDIX 1 Staff Recommended 06/30/89 183,760 21,792 $0.1186 31,711 $0.1726 $0.2912 $0.2062 $0.2062 $0.4150 $0.4650 $0.1959 os BEAVER VILLAGE COUNCIL p. Efficiency (0 / I) APPENDIX 2 SCHEDULE OF ELIGIBLE POWER COSTS, SALES AND EFFICIENCY FOR PERIOD ENDING March 31,1989 NOTE: See Appendix 2A for instructions and detail. Prior Commission Per Staff Approval Utility Adjustments Non-Fuel Costs: 06/30/88 06/30/89 A. Personnel Costs 27,129 15,588 _B. Power Plant Parts & Supplies 712 1,975 C. Repairs and Maintenance 0 9,429 (9,000) {1} D. General and Administrative 2,765 0 3,600 {2} £. Depreciation 200 0 200 {3} F. Interest Expense 1,938 0 G. Other (Describe) 0 0 H. Total Non-Fuel Costs 32,744 26,992 (5,200) Fuel Costs: I. Gallons Consumed for Electric Generation 28, 686 29,200 J. Price of Fuel:(cts per gal.) 1.086 Weighted Average (See Appendix 2A for instructions) K. Most Recent Price $1.070 $1.030 tis Date Purchased 9/88 M. Total Cost of Fuel (1 x J or K) 29,547 31,711 0. KWH Sales 140,870 183,760 4.91 6.29 21,792 29,200 1.086 31,711 183,760 6.29 {4} ALASKA ENERGY AUTHORITY PAGE: of PCE IMPROVEMENT PROGRAM OATE: 13-Dec-89 LOCATION: BEAVER, ALASKA PREPARED FOR RSA ENGINEERING FILE: Beaver By Clark-Graves, Inc. CONSTRUCTION COSTS QUANTITY UNIT MATERIAL = FREIGHT LABOR LABOR TOTAL OISCIPLINE/ITEMS Hours/ Rate Item Oescr. $/unit = $/Unit unit $/Hour Cost ($) 1 2 RELOCATE FUEL METER 3 Piping 10. (L. FEET 3.40 3.75 0.400 40.95 $235.30 4 Enclosure 1 EACH 120.00 7.81 0.500 40.95 $148.29 6 5 FURNISH ANO INSTALL 50 KVA GENERABOR 1004, Gr (US Eos > 29371 & 325 6 Generator 1 EACH 6,990.00 2,125.00 24.000 40.95 $19,657.80 ~~ 7 Freight Out For Old Engine 1 JOB 100.00 3,375.00 16.000 40.95 $4,130.20 8 NEW SWITCH GEAR (Not Specified 1 JOB 15,000.00 1,250.00 80.000 40.95 $19,526.00 9 RE-COMMISSION REMAINING 50 KVA 1 JOB 3,000.00 625.00 32.000 40.95 $4,935.40 10 GOVERNOR ON REMAINING ENGINE 1 EACH 600.00 62.50 4.000 40.95 $826.30 11 VOLTAGE REGULATOR ON REMAINING 12 ENGINE 1 EACH 350.00 31.25 4.000 40.95 $545.05 13 (In Order To Provide Prices For Governor And 14 Regulator Further Information Is Required As To 15 The Make, Model, Serial #, Etc. Of The 16 Generator To Be Retrofitted. Prices Included 17 Are Very Approx.) 18 TOTALIZING METER 19 Meter And Socket 1 EACH 430.00 31.25 2.000 40.95 $543.15 20 Wire And Conduit 10. -L. FEET 8.50 6.25 0.400 40.95 $311.30 21 OPERATOR TRAINOR 22 Air Transport 1 R. TRIPS 475.00 125.00 $600.00 23 Room And Board 6 MANDAYS 125.00 $750.00 24 Misc. Expense 1 ALLOW 100.00 $100.00 25 = (Salarys Not Included) 26 BURY COPPER GROUND CONDUCTOR 4 Hours 1.000 40.95 $163.80 27 well 28 OIRECT EXPENSE SUBTOTAL: 44 / 465%: (52 (5 687 107 $52,472.59 LoS 29 = 30 3} GENERAL CONTRACTOR SUPPORT 3 33 TOOLS & EQUIP @ 3% 1 ALLOW 1,574.18 $1,574.18 34 HOME OFFICE EXPENSE AT 15% 1 ALLOW 7,870.89 $7,870.89 35 GENERAL REQUIREMENTS 36 Mob/Demob 37 Tools And Equipment 2,000 LB EA.WAY 1.25 $2,500.00 38 = Crew 6 R. TRIPS 475.00 312.50 8.000 40.95 $6,690.60 39 Room And Board 24 MANDAYS 125.00 $3,044.75 40 Supervision 1 WEEK 1,350.00 125.00 60.000 40.95 $3,932. 41 42 GENERAL CONTRACTOR SUPPORT SUB-TOTAL: $25,612.42 43---- ee ee ee ee er er reer mr rrr rrr rrr rrr rrr re 44 SUB-TOTAL $78,085.01 45 46 PROFIT 2 25% $19,521.25 47 TOTAL CONSTRUCTION COST (FY87) $97 ,606.26 48 CONTINGENCY 2 10% $9,760.63 49 CONTRACT COST (FY90) $107, 366.89 50 DESIGN COST @ 6% OF FY90 CONTRACT COST $6,442.01 51 SIOH @ 15.0% OF FY9O CONTRACT COST $16,105.03 52 PROVECT COST (FY90) $129,913.93 53 SALVAGE VALUE (Not Incl.) 54 TOTAL INVESTMENT COST (FY90) 4 $ 35 _(Assuning Sumer Construct ion) UDI y |.52= 14RO .37¥ #8130,000.00. = 4 $27 7 fy 109