Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Tuntutuliak Waste Heat 1991
MEMORANDUM Date: December 23, 1991 To: Steve Stassel From: Brian Gray Bl és Re: Tuntutuliak Waste Heat I talked to Gary Smith today and presented the options as we discussed them: a future waste heat system in conjunction with a new power plant at $40,000, a waste heat recovery module constructed next summer at $90,000, or a waste heat system constructed this winter at over $100,000. He said we do not have a source of funds to facilitate a project this big and thinks we should add the waste heat system to a new power plant. Sue agrees with this and will explain the situation to Wally Wallace. File all the information (including cost estimates) developed so far for future reference. You shouldn’t have to do anything else on this project except possibly provide budget figures for legislative requests. TUNTBGM1 Filename H:\RP\RPBUDGET.XLS Alaska Energy Authority Rural Programs Revision No. 0 Project Budget Community TUNTUTULIAK Budget Heat PJ CODE NAME PJ CODE ROJECT NAME Preparer SJS Project Manager SJS Date 12/20/91 Source(s) of Funding PROJECT Line Chart of Accounts TOTAL 1 Direct Personal Services w/ Benefits $20,000 $0 $20,000 2 Indirect Personal Services $10,000 $0 $10,000 [Line 2 = 50% x line 1] 3 71000 Personal Services SUBTOTAL $30,000 $0 $30,000 | [line 3 = line 1 + line 2] 4 72000 Travel and Perdiem $6,300 $0 $6,300 5 Engineer & Prof Services Contracts $100 $100 6 Freight $5,400 $5,400 7 Project Contingency $8,200 $8,200 8 Indirect Non-Personal Services $3,600 $0 $3,600 [line 8 = 18% x line 1] 9 73000 Other Services SUBTOTAL $17,300 $0 | $0 $17,300 ]Itine 9 = sum of lines 5,6,7,8] 10 74000 Project Materials and Equip. $0 $0 $0 1 75000 AEA Equipment $100 $100 12 77000 Grants $38,800 $0 | $38,800 [see budget on reverse side] 13 TOTAL $92,500 $0 | $0 $0 $0 $92,500 | [In 13 = sum of lines 3,4,9,10,11,12] Notes: ; ; Matrix Code | i THe i felt Maley Project AR Base) om Semmer Project CC Covsttochon FYI vswEe Project LC | A Pee FAB WH Assen A4ED DA AC HEEE AWD Sin EDOM Budget Approvals (initial and date) ce: Gloria Manni Project Manager Director Don Whelan Rural Programs Gary Smith Pat Woodell Manager/ Rural Programs Executive Janet Hansen Director Project Manager PROJECT BUDGET WORKSHEET Project Information Tuntutuliak Waste Heat Construction Community: Project Name: Project Number: AEA Project Manager: S. Stassel Date Prepared: 20-Dec-91 Date of Basis: 20-Dec-91 Prepared by: S. Stassel Date of Completion: Labor (Field Work) Name Task Subtotal CHIP S. Construction 4,707 DAN J. Construction 4,707 OT (BOTH) 5,467 STEVE S. Site Visit & Final Insp 1,671 | Local Labor (2 people) Total | : $16,552 Force Acct Labor FICA, FUTA, ESC | 160} 18.5 2960 Force Acct Labor Incl's OT + above | 120] 27.75 3330 | Total $6,290 Per Diem and Travel Name Field |PD |Sub- |No. Rate |Sub- |Total Days |Rate|total [Trips [total DAN J. 14] 100] 1400] 2| 500{ 1000 2400 CHIP S, 14] 100] 1400] 2| 500] 1000 2400 STEVE S 500] 2| 500 1500 Total $6,300 Labor (Office Work) Name Task Hrs ___|Rate_|Subtotal STEVE S Project Mgt, Design 40} 33.41 1,336 Pat W Grant Agmt 4} 40.52 162 Don W Acctg 8] 35.77 286 JOEL S. Drafting 37.5] 23.5 881 STEVE S. Invoice Processing 20} 33.41 668] — ~ Totall_109. $3,334 PROJECT BUDGET WORKSHEET Project Information Material Description Notes |Amount | Misc Piping & Valves, pumps PP, WHM and Wash tie-in | 18,500} Glycol 110 gal drum Dowfrost 1,000} 2 Heat ExchangerS (May be avail in stock) 10,000] Arctic Piping and fittings Contributed by AEA to project 2,500] Total $32,000 Freight Description Notes Amount WHM,HXR, Piping and mtls 10,000 # @ $.50/# 5,000 Arctic Pipe 4 sticks = 800 # @ $.45/# to Bethel 360 Total $5,360 Contract [Description Notes Amount Hvy Equip (2 dayS) 500 Total $500 Summary Personal Services (A+D) $19,886 Travel and Per Diem (C) $6,300 Material (E) $32,000 Freight (F) $5,360 Contract (B+G) $6,790 Total $70,336 E Community TUNTUTULIAK PJ CODE NAME Preparer SJS Line Chart of Accounts 1 Direct Personal Services w/ Benefits 2 Indirect Personal Services 3 71000 Personal Services SUBTOTAL 4 72000 Travel and Perdiem 5 Engineer & Prof Services Contracts 6 Freight 7 Project Contingency 8 Indirect Non-Personal Services 9 73000 Other Services SUBTOTAL 10 74000 Project Materials and Equip. 1 75000 AEA Equipment 12 77000 Grants 13 TOTAL Matrix Code Project AR Project CC Project LC Budget Approvals (initial and date) Project Manager Manager/ Rural Programs Filename H:\RP\RPBUDG2.XLS Alaska Energy Authority Rural Programs Project Budget Budget WASTE HEAT PJ CODE ROJECT NAME Project Manager SJS $25,700 Date 12/20/91 Source(s) of Funding s/s $0 $o $o $o $0 $0 Revision No. 0 PROJECT TOTAL $25,700 $12,850 [Line 2 = 50% x line 1] $38,550 | [line 3 = line 1 + line 2] $9,100 $100 $4,626 $18,250 $4,626 [line 8 = 18% x line 1] $100 $38,000 $104,000 8 {8} |8/8/s Director Rural Programs Executive Director $18,250 | [line 9 = sum of lines 5,6,7,8] $38,000 [see budget on reverse side] $0 $0 $104,000 |[In 13 = sum of lines 3,4,9,10,11,12] Notes: THis ESTIMKTE iS BASE, ON Winter Con SfRoethonr FyY22. H/E AO REMofe Bad's tb BE iwstAlled ow Sie ow Exist~6 PP plat: cc: Gloria Manni Don Whelan Gary Smith Pat Woodell Janet Hansen Project Manager PROJECT BUDGET WORKSHEET Project Information Community: Tuntutuliak Project Name: Waste Heat Construction Project Number: AEA Project Manager: S. Stassel Date Prepared: 20-Dec-91 Date of Basis: 20-Dec-91 Prepared by: S. Stassel Date of Completion: Labor (Field Work) Name Task Hrs |Rate {Subtotal CHIP S. Construction 160} 30.37 4,859 DAN J. Construction 160} 30.37 4,859 OT (BOTH) 240} 45.56 10,933 STEVE S. Site Visit & Final Insp 50] 33.41 1,671 Local Labor (2 people) Total 610 $22,322 Force Acct Labor FICA, FUTA, ESC 240} 18.5 4440 Force Acct Labor Incl's OT + above 180} 27.75 4995 Total] 420 $9,435 Per Diem and Travel Name Field |PD |Sub- |No. Rate |Sub- |Total Days {Rate Trips total DAN J. 2 500} 1000 3800 CHIP S. 2| 500} 1000 3800 STEVE S 2| 500} 1000 1500 3000 $9,100 Labor (Office Work) Name Task Hrs {Rate |Subtotal STEVE S Project Mgt, Design 40} 33.41 1,336 bo W Grant Agmt__ 4} 40.52 162 Don W Acctg 8} 35.77 286 JOEL S. Drafting 37.5| 23.5 881 STEVE S. Invoice Processing _ 20] 33.41 668 = $3,334 PROJECT BUDGET WORKSHEET Description Misc Piping & Valves, pumps Glycol 2 Heat ExchangerS Project Information Material Notes Amount PP, WHM and Wash tie-in 110 gal drum Dowfrost May be avail in stock) _ 14,500 1,000 Arctic Piping and fittings Contributed by AEA to project 2,500 Total $28,000 Freight Description Notes Amount HXR, Piping and mtls [7,000 # @ $.50/# 3,500 Arctic Pipe 4 sticks = 800 # @ $.45/# to Bethel 360 Total $3,860 Contract Description Notes Amount Hvy Equip (2 dayS) 500 | | | | | | Total $500 Summary Personal Services (A+D) $25,656 Travel and Per Diem (C) $9,100 Material (E) $28,000 Freight (F) $3,860 Contract (B+G) $9,935 Total $76,551 WH Lost Exhmate Ap Sommez cons fevchean Forde bla. We 12/9/49) ASSumphons — 1) Many fold mmueeaa Ceperetdws tt 2@-Khewn y's 2)Pao's Ae, corPols Amd PiPirg wll bo pre-Lb bed And wsG/lep (ao Meadullo fr Ship ping pom Avchovrag a tr Tun, 3) Meche 7p IPR will be msrllew Aone sors (2D fet fon PP» wr) Be BV va lass 44 50 6- 2" BF LUG vAlver 4500 | 2% Shenae, 4y00 2 .Rmcw's 3” pipe w/ fp ‘00 ~ He US ph exp tate eer : fanepy Uolbrrie 29 A erets 300 ! [140 yes) mse £ 4220 | #2 GO eee 6 thw za w HM Epa 41D 2 Pan's w/ 1 sph Lars 1950 Z* pipe «| fhp ae LY its, #comtink, 2", Pipe fap Nepo dot Lavo & paral o/ = 4,e0 IQ- Bt WE BE Vales, 4 y00 prekeg | Murphy Siei'leh pages 1-3" Amoy ae I-cr'ec Pexp = "250 oie Per tathe— \opepd aitgone «ted utp te “nw : Ay teu movify ey 19g WTP WH syst V2 /tfyy We 4200 — stock apt "se Girae te Art var 920p 1 Heymedloe 42en _ es (Pre Gye AP & uv, 6200 “ tO ne |00'= B shtky ¢ 43 20/e4 = %voen € 90? - G0 / 24 = -Sdo0 Sr pales (4x “rs Yea = 220 —trise “et AF QA90D a 4+ QEA “Lrtor jy = Yours a ~~ 20 serge) fer = tEpe0 ae vison Fs TO tee — HoRt y2 = — Zoot x2 : bo 439 460 70 vv ALASKA ENERGY AUTHORITY RURAL PROGRAMS Community 1 Aot Og Jon Tb TUN Revision No. PROJECT BUDGET pudget 4339 TON TUTRUIAK WH INVESTIGATION PJ CODE NAME PJ CODE PROJECT NAME Preparer E. Clay Project Manager _‘- CLAY pate /o/2/9] Source(s) of Funding PROJECT Line Chart of Accounts TA - FY TOTAL 1 Direct Personal Serv W/Benefits = eee 1.e42 ne acecececesecceessoscs Sa eeaeaasaasccscccccens — ceneaceeannvecseceences — Sasssserevenccanccseesees 2 Indirect Personal Services =§- | ertee rene 522 veces eeseessccccecessescces — taaeseeesessesneceees — ceeeessnsaceecesssnenae — sessenereceveeseceeseaers [Line 2 = 50% X Line 1] 3 71000 PERSONAL SERVICE SUBTOTAL \,560 4 72000 TRAVEL & PER DIEM 5 Engineer & Prof Serv Contracts 6 Freight 7 Project Contingency 8 Indirect Non-Personal Services 9 73000 OTHER SERVICES SUBTOTAL L38+o 10 74000 PROJECT MAT'LS & EQUIPMENT Z00 11 75000 AEA EQUIPMENT © 12 77000 GRANTS Oo 13 TOTAL 4220 L3CO [Line 3 = Ln 1 + Line 2) (Line 8 = 18% X Line 1] Lo4o [Line 9 = Sum of Lines 5,6,7,8] Z0O oO oO [SEE BUDGET ON REVERSE SI (Line 13 = Sum of Lines 3. 4,9,10,11,12] 4,200 NOTES: Matrix Code / Project AR Project CC Project LC B/L2T1 [lp BUDGET APPROVALS (Please initial and date) Project Manager Ci Ze OPEN ROcr¢e / Manager/Rural Projects cc: Gloria Manni Don Whelan ; /. GarySmith Director/Rural Programs 10 2, 9) Pat Woodel! Executive Director Janet Chan ALASKA ENERGY AUTHORI RURAL PROJECT DEVELOPMENT WORKSHEET Project Manager: %. GoVAY Date: |o/z /9/ Community: ToOWTo TOLIAK Project Description [Describe reason for initiating project (response to correspondence, site visit, etc.) the situation, needs, proposal for resolving same, and issues pertinent to funding source restrictions (e.g., life, health, and safety improvements; efficiency improvements; emergency risk, etc.)] INVESTIGATE PROBLEMS WITH FAILED Waste Hear SYsTem AT Tite CeQvVEST OF WALLY WALLIS oF YERC. Scope of Work (__ Preliminary _0AFinal) [Itemize tasks in as much detail as possible] 1) WETICE FALeED wheTe HEAT SYSTEM, Z) PREPRE R&oOMMENOATIOSS 4 COST EsTimates FOr to tiN6 SYSTEM, Preliminary Cost Estimate (Total): $ Proposed Funding Source(s) [List appropriation(s), Outside funding source(s), Other agency funding, Financing through onds or other means] If any outside source funding is involved, describe on reverse side the proposed billing / arrangements, conditions for receipt of and use of funds, and any other issues affecting project management. Project Management Plan (__ Preliminary _\ Final) 1. Who will be the eventual owner of this project? __ City ____ Alaska Energy Authority IRA Council Other (specify) Private Utility De INVESTIGATIoN ONLY 2. Will AEA grant funds for the project? Yes x No If so, specify method: Through Trustee Directly to Grantee 3. Check proposed extent of involvement of AEA staff, contractors, City/Utility staff, and/or force account labor for the activities listed below: EXTENT OF INVOLVEMENT IN ACT IVITY ACTIVITY GROUP None Minimal Oversight Moderate Heavy Project AEA Staff x Management AEA Contractors City/Utility Staff City/Utility Contractors Design | "AEA Staff | AEA Contractors ity/Utility Contractors er ace cee Pn neeefeceeene Materials AEA Staff Purchasing perce ity/Utility N/A | _Cisy/Uilty Contractors Construction | AEA Staff ~T . AEA Contractors N/A, Force Account Labor City/Utility Contractors Inspection AEA Staff v Ciry/Utlity Stat ity/Utility St / a Ciy/Utility Contractors Operation & AEA Staff “t aintenance ca Saran ity/Utility N/pe City/Utility Contractors 4. Estimated Project Start Date_]0/z/2 | ; EndDate_/2/3) ken . 5. On reverse side, provide additional information and/or describe pertinent issues that will affect the management of this project. Project Development Schedule Estimated Completion Date N/A 10 [z/a| Y/N Item Staff Responsible A. Project Planning Tasks: N PCE Analysis George Matz Nv Other Econ./Finan. Analysis Y Final Scope of Work Y Final Management Plan Y ~ Project Budget Budget Review Y - Directorate Gary S./Dave D-C N __ - Agency (over $50K) Brent Petrie Nn Loan/Financing Application Marcey Rawitcher am Ie B. Grant/Project Agreement Preparation: Draft Grant/Project Agreement Pat Woodell In-house Review of Draft Community/Utility Draft Review Attorney General Draft Review Pat Woodell Final Grant/Project Agreement Pat Woodell Attorney General Approval Pat Woodell Community/Utility Approval Agency Approvals Marlys Hagen C. Trustee Project Setup: Complete Set-up Sheet Request Check From Accounting Pat Woodell Receive Check at AEA Don Whelan Forward Check/Set-up to KPMC Pat Woodell D. Commence Project (i.e., purchase materials, let contracts, hire labor, etc.) we 4) N/A ALASKA ENERGY AU...RITY PROJECT BUDGET WORKSHEET Project Information Community: Tow TO TUL AL Project Name: TON TUTUUAE WH INVEST CAT OS Number: AEA Proj Manager: 2-GLAY Date prepared: _/O/e/9( __—_ Date of Basis: Prepared by: _J>- GRAM Approved by: LABOR (field work Task ‘Community Labor Total 2D|A - Total B PER DIEM AND TRAVEL RPO401-1 ALASKA ENERGY AUT. ._ 3ITY PROJECT BUDGET WORKSHEET Project Information MATERIAL Description Notes Amount _| Total Zoo FREIGHT Description Notes 7 Amount | a P I | Le —_ | Total AQ CONTRACT Description | Notes Amount ‘community equipment rental (elto -CAD: WVESTinATion 4 eport| Z Hee @ ose dee. B00 | Fes: CAO | __| 2 Hee $7 500 — -— an — I SUMMARY Toul_| L2oe Personal Services(A+D) Travel & Perdiem (C) Material (E) Freight (F) Contract (B+G) Total RP0401-2 a FROM: Smith, Gary TO: Stassel, Steven DATE: 12-13-91 TIME: 14:12 cc: Gray, Brian SUBJECT: Tuntuliak Waste Heat PRIORITY: ATTACHMENTS: Please provide at least concept level project costs for the options that you have identified. FORWARDED FROM: Smith, Gary FROM: Stassel, Steven TO: Smith, Gary DATE: 12-13-91 TIME: 9:34 AM cc: Gray, Brian Stassel, Steven SUBJECT: Tuntuliak Waste Heat PRIORITY: ATTACHMENTS: Gary... I have reviewed the information we have on the Tunt. WH system and talked with Wally Wallace at YKHC. The previous WH system has been completely disassembled and scrapped. Only one generator (there are three generator modules, all with skid mounted radiators) had been connected to the waste heat system. A new generator has been installed since the waste heat system has been abandoned and most of the WH piping in the module has been scrapped. There are miscellaneous pieces of the waste heat system on-site. These include a small P&F H/E, three small S&T H/E's, an old B&G pump, and several Amot valves. The arctic piping has been removed and is laying nearby (the piping consisted of PHS "plastic" arctic pipe with copper piping placed inside. Apparently, the copper pipe is gone.) Although a waste heat system once existed, there is not enough left of it to be of much use. In essence, an entirely new waste heat system is required. OPTIONS: We have several options. We can build a new waste heat system this winter. This is not recommended due to the increased cost of construction during the winter. Most likely the WH system would not be on line until February at the earliest. This would allow about three or four months of fuel savings for this winter. The additional cost to construct the system during the winter will be more than the cost of fuel saved in the three or four months. We can wait and build the WH system in the spring or summer. This is the recommended solution. I suggest that we design and construct a portable WH module that can be easily transported when fully assembled and install it this spring/summer. The module would be a completely self-contained unit with at least one radiator (and piped for a second radiator), a heat exchanger a complete with all piping required and stubbed to the exterior wall, amot valve, lites and all wiring and controls necessary to operate. What I imagine is essentially a "fan room" similar to what is in Buckland and Akiak. We have most of the arctic piping required availablein stock and may have a heat exchanger that could be used. The third option is to do nothing at the present time. I have been told that Tunt. "may" get a new power plant sometime in the next 2 to 3 years. If a new power plant is built, a WH system could be constructed as part of the project. Please let me know what you would like me to do. Thx. Steve FROM: Stassel, Steven TO: Smith, Gary DATE: 12-13-91 TIME: 9:34 AM cc: Gray, Brian Stassel, Steven SUBJECT: Tuntuliak Waste Heat PRIORITY: ATTACHMENTS: I have reviewed the information we have on the Tunt. WH system and talked with Wally Wallace at YKHC. The previous WH system has been completely disassembled and scrapped. Only one generator (there are three generator modules, all with skid mounted radiators) had been connected to the waste heat system. A new generator has been installed since the waste heat system has been abandoned and most of the WH piping in the module has been scrapped. There are miscellaneous pieces of the waste heat system on-site. These include a small P&F H/E, three small S&T H/E's, an old B&G pump, and several Amot valves. The arctic piping has been removed and is laying nearby (the piping consisted of PHS "plastic" arctic pipe with copper piping placed inside. Apparently, the copper pipe is gone.) Although a waste heat system once existed, there is not enough left of it to be of much use. In essence, an entirely new waste heat system is required. OPTIONS: We have several options. We can build a new waste heat system this winter. This is not recommended due to the increased cost of construction during the winter. Most likely the WH system would not be on line until February at the earliest. This would allow about three or four months of fuel savings for this winter. The additional cost to construct the system during the winter will be more than the cost of fuel saved in the three or four months. We can wait and build the WH system in the spring or summer. This is the recommended solution. I suggest that we design and construct a portable WH module that can be easily transported when fully assembled and install it this spring/summer. The module would be a completely self-contained unit with at least one radiator (and piped for a second radiator), a heat exchanger complete with all piping required and stubbed to the exterior wall, amot valve, lites and all wiring and controls necessary to operate. What I imagine is essentially a "fan room" similar to what is in Buckland and Akiak. We have most of the arctic piping required availablein stock and may have a heat exchanger that could be used. The third option is to do nothing at the present time. I have been told that Tunt. "may" get a new power plant sometime in the next 2 to 3 years. Ifa new power plant is built, a WH system could be constructed as part of the project. Please let me know what you would like me to do. Thx. Twt WH ALE TUNTUTULIAK COMMUNITY SERVICES ASSOCIATION | ELECTRICAL SERVICES GENERAL DELIVERY TUNTUTULIAK, ALASKA 99680 EIVED December 4, 1991 ore 09 1991 ALASSA CC ORSY AUTHORITY Charlie Bussell-Executive Director Alaska Energy Authority P.O. Box 190869 Anchorage, Alaska 99519-0869 Dear Mr. Bussell: I am writing again to request assistance, financially for 2 things which fall under the capital project program. First we would like for Tuntutuliak to be included for Bulk Fuel storage facilities repair in FY '93 in your proposed capital project budget. We have the facilities, with the dyke partially, but mostly finished. Sue White of your staff has the pictures of what needs to be done. Second we would like to request a permanent power house facility with improved switchgear and paralleling capabilities. Currently we are equipped with 3 125 kw generators. One is for backup, and the other 2 have paralleling capabilities. The 3 generators are in seperate modules. It is our feeling that we would be more ef- ficient if all of our generators had paralleling capabilities, and if all were under one roof. And it would make monitoring the generators easier and less time consuming. Since an engineer from there might be coming... he may want to take a look at the above mentioned to see if it would be feasable and practical for us. if you have any questions or need more information, contact me at above letterhead, and in advance, thank-you for your consideration. Sincerely, TCSA-Electrical Services yp ele &e RAECC i Kastor Robert J. Enoch c 4 General Manager From: BGray:Anch:AEA To: Steve cc: Gary Subj: Tuntutuliak Waste Heat Gary had a conversation with Wally Wallis with Yukon-Kuskokwim Health Corporation recently. Apparently PHS installed a waste heat system to the water plant in 1982 (Project # AN-81-263.) According to Wally they had to shut it down because of glycol loss. Wally wanted to get about $20,000 to "fix it up." He said as-builts should be available from Don Coswell with PHS. This is not a high priority project but at some point this fall we should try to get the as-builts and do a little investigating to see what is involved. FROM: Stassel, Steven TO: Smith, Gary DATE: 12-13-91 TIME: 9:34 AM cc: Gray, Brian Stassel, Steven SUBJECT: Tuntuliak Waste Heat PRIORITY: ATTACHMENTS: I have reviewed the information we have on the Tunt. WH system and talked with Wally Wallace at YKHC. The previous WH system has been completely disassembled and scrapped. Only one generator (there are three generator modules, all with skid mounted radiators) had been connected to the waste heat system. A new generator has been installed since the waste heat system has been abandoned and most of the WH piping in the module has been scrapped. There are miscellaneous pieces of the waste heat system on-site. These include a small P&F H/E, three small S&T H/E's, an old B&G pump, and several Amot valves. The arctic piping has been removed and is laying nearby (the piping consisted of PHS "plastic" arctic pipe with copper piping placed inside. Apparently, the copper pipe is gone.) Although a waste heat system once existed, there is not enough left of it to be of much use. In essence, an entirely new waste heat system is required. OPTIONS: We have several options. We can build a new waste heat system this winter. This is not recommended due to the increased cost of construction during the winter. Most likely the WH system would not be on line until February at the earliest. This would allow about three or four months of fuel savings for this winter. The additional cost to construct the system during the winter will be more than the cost of fuel saved in the three or four months. We can wait and build the WH system in the spring or summer. This is the recommended solution. I suggest that we design and construct a portable WH module that can be easily transported when fully assembled and install it this spring/summer. The module would be a completely self-contained unit with at least one radiator (and piped for a second radiator), a heat exchanger complete with all piping required and stubbed to the exterior wall, amot valve, lites and all wiring and controls necessary to operate. What I imagine is essentially a "fan room" similar to what is in Buckland and Akiak. We have most of the arctic piping required availablein stock and may have a heat exchanger that could be used. The third option is to do nothing at the present time. I have been told that Tunt. "may" get a new power plant sometime in the next 2 to 3 years. Ifa new power plant is built, a WH system could be constructed as part of the project. Please let me know what you would like me to do. Thx. ¢ FROM: Stassel, Steven b TO: Gray, Brian DATE: 12-12-91 TIME: 12:39 PM CC: Stassel, Steven SUBJECT: Tuntutuliak Waste Heat PRIORITY: ATTACHMENTS : Brian, please review and let me know if I should send this to Gary Gary... I have reviewed the information we have on the Tunt. WH system and talked with Wally Wallace at YKHC. The previous WH system has been completely disassembled and scrapped. Only one generator (there are three generator modules, all with skid mounted radiators) had been connected to the waste heat system. A new generator has been installed since the waste heat system has been abandoned and most of the WH piping in the module has been scrapped. There are miscellaneous pieces of the waste heat system on-site. These include a small P&F H/E, three small S&T H/E’s, an old B&G pump, and several Amot valves. The arctic piping has been removed and is laying nearby (the piping consisted of PHS "plastic" arctic pipe with copper piping placed inside. Apparently, the copper pipe is gone.) Although a waste heat system once existed, there is not enough left of it to be of much use. In essence, an entirely new waste heat system is required. RECOMMENDATIONS : I need to know to what extent should I pursue this project further. I suggest that if we are going to construct a WH system in Tunt. that I conduct a site visit to determine the extent of the work required in both the WIP and power plant. The likelyhood of our being able to "patch" what is left of the "old" WH system together to last even this winter is nil. I have been told that Tunt. "may" get a new power plant sometime in the next 2 to 3 years. If this is even remotely possible, I suggest that we design and construct a portable WH module that can be easily transported when fully assembled and install it this Spring. The module would be a completely self-contained unit with at least one radiator (and piped for a second radiator), a heat exchanger complete with all piping required and stubbed to the exterior wall, amot valve, lites and all wiring and controls necessary to operate. What I imagine is essentially a "fan room" similar to what is in Buckland and Akiak. The overall dimensions would be about 6 feet wide, 12 feet long and about 8 to 10 feet tall. The module would be skid mounted and could be easily located and placed at the power plant site and connected to the existing generator modules. One option that Brian suggested would be to design it so that if a new power plant is built, the module could be attached to the side of the new power plant on cantilevered supports. 4 Once the module is in place, the arctic piping (about 40 feet one-way) would tbe routed along the ground on 4’ long 4" x 12" supports and tied-in to the WIP. The WH system would be tied into the boilers through a heat exchanger (the existiing P&F H/E may work). I believe we have a heat exchanger in stock that we could use for the module. We also have enough arctic pipe, straight shells, foam paks, and ISO weld 90's to do the job. We do not have any of the 90 clam shell joints, but would only need maybe 8 or ten. We may have a circular coil radiator that might be usable at Hiland (see Hans J.) Please let me know what you would like me to do. Thx. Steve wy oo aese aa uw orRu! TURUIY RUSRKURWITT ALIA CURE IU 15618584 P.01785 Yukon-Kuskokwim Health Corporation “Fostering Native Se(f-Determination in Primary Care, Prevention and Health Promotion” FAX TRANSMITTAL COVER SHEET (907)543-5277 NUMBER OF PAGES INCLUDING THIS COVER SHEET | &| REMARKS : SHOULD YOU HAVE ANY QUESTIONS, OR IF YOU DID NOT RECEIVE ALL OF THE PAGES, PLEASE CONTACT THE PERSON AT THE NUMBER LISTED BELOW. THANK YOU VERY MUCH. PHONE AND EXTENSION | allo RAI eV 8 ¥5-532/ SS 7 P.O. Box 528 = Bethel, Alaska 99559 (907) 543-3321 NWYTer-lzz. oll oo orRUM YUKUN KUSKUKWIM HLTH CURP TO 15618584 P.02/85 a Yukon-Kuskokwim Health Corporation “Fostering Native Self-Determination in Primary Care, Prevention and Health Promotion” NOVEMBER 27, 1991 TO: COMMUNITY AND REGIONAL AFFAIRS 949 E. 36TH AVE. ANCHORAGE, ALASKA 99508-4302 FROM: WALLY WALLACE, RMW YUKON-KUSKOKWIM HEALTH CORPORATION P.O. BOX 528 BETHEL, ALASKA 99559 ATTENTION: MR. IKE WAITS SUBJECT: " TUNTUTULIAK WATER PLANT REBUILD” DEAR IKE, THANK YOU AND YOUR COLLEGUES FOR ALLOWING US TO BE OF ASSISTANCE TO YOU AND THE PEOPLE OF TUNTUTULIAK IN ATTEMPTING TO PROVIDE SAVE WATER TO THEM BY REPAIRING THE WATER PLANT, ENCLOSED IS MY BEST ESTIMATE AS TO THE PARTS AND EQUIPMENT NEEDED TO REPAIR AND REBUILD THE PLANT SO THAT IT WILL BE ABLE TO OPERATE ONCE AGAIN IN AN EFFICIENT MANNER. SINCE THIS IS ONE OF MY VILLAGES IN MY SERVICE AREA I HAVE NOT INCLUDED AIRFARE OR MY TRAINING TIME OR INDIRECT CHARGES TO THE EST/MATE. THE EXTRACTOR SHOULD DEFINATELY BE INCLUDED INORDER TO SAVE FUEL AND ELECTRICITY AND WILL REDUCE THE WEAR AND TEAR ON THE BOILERS - PAYING FOR INSELF IN SHORT ORDER. THE WASTE HEAT RECOVERY SYSTEM WILL MAKE THE WATER TREATMENT MORE EFFICIENT BRINGING THE WATER TEMPERATURE UP FASTER SO THE CHEMICALS WILL HAVE MORE TIME TO REACT AND SAVE FUEL COSTS BY BEING THE MAIN SOURCE OF HEAT IN THE EVENING, BE DON'T HESITATE TO CALL ME IF | CAN BE OF FURTHER ASSISTANCE. P.O. Box 528 ~— Bethel, Alaska 99559 (907) 543-3321 peer eee bee PURUNM RUOKURWIN ALIN LURE iu 1Db1lrD84 P.03-@5 Bs Yukon-Kuskokwim Health Corporation “Fostering Native Self Determination in Primary Care, Prevention and Health Promotion” SINCERELY, YUKON-KUSKOKWIM HEALTH CORPORATION PARTS LIST - WITH PRICES ENCLOSED CC DARLENE WRIGHT ORIE WILLIAMS P.O. Box 528 Bethel, Alaska 99559 (907) 543-3321 My ch asek 4atee Ruri November 26, 1991 TURUN KRUSKUKW ITT ALIA LURK IU Yukon Kuskokwim Heatth Corporation Wally Wallace, R.M.W. Here are the prices you requested for Tuntutuliak Water Plant rebuilt. Parts for Speedaire Compressor, Mdl # 2Z4994, Head Plate Gasket XA007100AV Fitter VT013001AV Cylinder Gasket XA003300AV Cylinder Gasket XAO008800AV Bearing Cap Gasket XA003200AV Oil Seal ST0211600AV Flywheel V-Belt PU000400AG Valve Repair Kit VT 210300AJ Piston Ring Set VT 210400AJ Gasket Kit 1R398 Chemical Metering Pump: Liquid Metronics, Mdl¥A1 41-1525 Hayes/SeaFlow, Mdi# ME-4PG-1" 4" ABS-DWV Pipe 10’ Sections 4" ABS-DWV No-Hub Couplings Calcium Hypochlorite 65%, 4.5 Lbs. {&/Cs) 1” Copper Fittings 90's Tee's preenaghy jale Adaptor Female Adaptor Couplings 2° ABS P Traps Heater Coils for Cutler-Hammer #1036 #1041 1 1/2" Copper Sweat Check Valves 1/2” Schedule 80 PVC Unions Analog Clamp-on Meter amiprove Mdl # TM43A Wire Hand Brushes 1/2" Size 1" Size 1 1/2 Size Lead Free Sokder (Lg Can) Flux Brushes (Pkg 144) 5/18" Width 3/8" = Width 1/2" Width Flux Brushes (each) 1/2" Width 3/4" Width 1" Width 2° Width 15618584 406.00 1000.00 60.00 300.00 600.00 56.00 24.60 600.00 30.00 57.00 97.50 9750 30.00 25.00 36.00 36.00 P.@4/25 NOV-27-1991 11:22 FROM YUKON KUSKOKWIM HLTH CORP TO 15618584 P.@5/@S5 Boiler Parts 1537.00 Generator Set Parts Board for Gen. Set 424.50 Batt Gen 250.00 Glycall 1500.00 Parts For Heat Recovery Honeywells Valves 600.00 Honeywells Controles 800.00 Honeywell Pumps Large Cers 3000.00 Honeywell Pumps Cers 600.00 2 Heat Exchangers 1600.00 Mag Starters 1500.00 Machinery Parts 2 Dryer Motors 475.00 2 Washer Motors $40.00 2 Timers 270.00 1 Extractor 4000.00 Miso 1000.00 Fuel 1000.00 Labor 2000.00 Freight 1000.00 Total $ 26,385.75 TOTAL P.@5 VS por lilly Willer feliz ly callep re back Povrtdlile wy 26 HORN B00 olan tai — 2 2A Lay pheices Uw) oe bol BR |, Oxtig 2 PVD 140 pay i: A wi) isle ee ees ae De Bokeh Of ities hte HAR CA pe LAr ly Lidiee ~ Rott-h Year jofulay [G2 UIR- 9I0os Turret OA ap FA YES — parle AB “CO - 332i - K fe Dave Scheu t. SY3-37l( X/94s~ Cia! Ey Cp that iil Aga pe = AGA oo ll Do cost YLEC [s pesistig Tet to 5 Unhkateau gotyp qd Jorminy — ler 14, ft frog [econ pur mee 8% e Dos hus peel = Tha cbrcree Sy clans 1 Bala. ty a Ss ? WA kao heon BAAI3 dom vbr SAT dary ty paactag 2 Bok fe paxp's ete ee hwe. DPE + ee8S ee misery «Lz paple QD) MAR 2 lot = 4A pe q BA rhog, HE F Diy FROM : > Petro-CAD Consulting ** PHONE NO. : 907 283 5210 Pa (2 Tontu tlle Wash Cea? WVahes eI Froslans: Coensrdlers we re. averhadtira . Pa wdker tink was ouerhadtea CUaske hedt was ol Scorinecterd, lUasle. heat Lines from gonerciters to Tred fet plant Anvornectad haste. a” EG pret on s. fe : ) LA lb" Amt bales | Mode 1g 24 287+ /Bee | Seria/# cess] 2) | @ 2" Amat bahe Medel 28 Fe 77 9504 3) D> BES Pimp 1%" Medel |% ABE WAP, 1250 BPmx See. & 92 345- 4) [@ Alla-Lacs! fit alate heat eechenger, Wty. Me, 15°94¢ | Ye (9B? Tyre Pol -vL | (32P8/, e27sF Innerpass —Hetsiche , Octerpass - Colds inl s)/@ LIT hell ¢ Fohe. Hart y-er | Medd 549065 Factory Ae 0O-69082 Cat. he, WY-43-¥2,, Yr Nae 6) Zea ITT Shell d Tope Haat e-. Factory Av, 1ZE 09 Cat. he Wy -/e4-4s- /$o*, 325° Aratt Ror SCBOSF aka WATIONAL | 42-182 100 SHEETS Made in U.S. A. The problem wes that the generis wele. averhel hig so Yhe unok fread uas Arvomecto, Kaw watteR tonk uas dlse averh=tfing WYoberials mn pjdnt: 2 ca Ard bles - matl | R4O0bTIBE LS B46 (4AATAR Lot 1750 TP 2 W284s¢ ALFA LAVAL Flate X eR: AUC. Ma, 15024 YE ERB Ve fol-v VoOORS¢ to 27 F MGR jee — P00. Caan.s SiO la Amor Yyuve 28FC FI XxSO/ [77 Sheh tite Hat K-a- = Medel 549 06S- LAG-We ©-C9ICB? CAT~ We WY- 43-42. 19 83 Uae 2@ 1 dd ¢yvioe Kee Natl Bb 263057 [50% 328° bok niles Fre, W. (26609 CAT We UW -(O4-45-