Loading...
HomeMy WebLinkAboutSouthern Intertie report 9-2002Joe Griffith General Manager Evan J. Griffith General Manag September 24, 2002 ECEIVE ) SEP 29 2002 AIDEA/AEA Mr. James McMillan Acting Executive Director Alaska Industrial Development and Export Authority 813 W. Northern Lights Boulevard Anchorage, Alaska 99503-6690 Subject: Southern Intertie Monthly Report for September 2002 -~ W.0.4E9590081 Dear Mr. McMillan: CHUGAZ! POWERING ALASKA’S FUTURE A) Vallone Ga ~2) Sheena — Enclosed is 1 (one) copy of the Southern Intertie Report for September 2002. If there are any questions, please contact Dora Gropp, (907) 762-4626. incerely, ba Enclosures: 1 (one) copy of Southern Intertie Monthly Report c: Lee Thibert) Michael, Massin Dora GMyp Carol Johnson Mike Cunningham Don Edwards Alice Mullins W.0.#E9590081, Sec., 2.1.3 RF CHUGA<.. POWERING ALASKA'S FUTURE CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska SOUTHERN INTERTIE Phase IC - EIS MONTHLY REPORT For SEPTEMBER 2002 5601 Minnesota Drive / 99518 P.O. Box 196300 Anchorage, Alaska 99519-6300 il. IV. Vi. TABLE OF CONTENTS SUMMARY FINANCIAL a; Chugach Statement of August 2002 2 Activity Summary of August 2002 35 Transactions, Inception through August 2002 4. Bank Account Activity Summary of August 2002 Ds Section II-A, Southern Intertie Transactions Allocations SCHEDULE le Project Schedule ITEMS FOR APPROVAL None. ITEMS FOR DISCUSSION None. ITEMS FOR INFORMATION 5 POWER Engineers’ Monthly Report dated September 17, 2002 2s USFWS Record of Decision dated September 11, 2002 I. SUMMARY We have received the USFWS/KNWR Record of Decision, which denies a permit for the Proposed transmission line (ENSTAR Route) through the Kenai National Wildlife Refuge (KNWR). The permit denial is based on the finding that the proposed project is not compatible with the refuge plans and that a feasible alternative route has been identified (TESORO Route). Under ANILCA regulations this decision is final and appeals can only be made to the President of the United States. RUS’ and the COE’s Record of Decision are expected to be available in October of this year. We expect these RODs to agree with the findings of the USFWS/KNWR. The TESORO route would cross two small sections of the KNWR, but permits are not expected to be necessary. A recent land transaction between the native corporation Point Possession Inc. and the Conservation Fund has transferred more than 4,000 acres at Pt. Possession to the KNWR, but reserves lands which can allow easements for the Project. RUS will refund $32,860 of funds not used for consultants engaged in the EIS preparation. Expenditures for Phase IC (EIS) of the project stand as follows: POWER DESCRIPTION | evcineers | COE/USFWS/RUS | CHUGACH | TOTAL |ORIG. BUDGET $389,547 $160,000| $100,000, _ $649,547 LLOCATED ONTINGENCY $ $0 $0) $0) TOTAL $389,547 $160,000, $100,000, $649,547 AMENDMENTS $1,501,026) $50,000 $150,000, $1,701,026 TOTAL COMMITMENT| _ $1,890,573, $210,000] $250,000, $2,350,573 ISPENT TO DATE $1,678,785 $187,190, _ $180,287| $2,046,263 k% OF TOTAL 89% 89% 72% 87% Total Project expenditures as of 09/16/02 stand at $7,150,563. FINANCIAL 1: 2s Chugach Statement of August 2002 Activity Summary of August 2002 Transactions, Inception through August 2002 Bank Account Activity Summary of August 2002 Section II-A, Southern Intertie Transactions Allocations CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska 09/10/02 TO: Dora Gropp - Manager, Transmission & Special Projects FROM: Marina McCoy-Casey, Plant Accountant SUBJECT: E9590081 - Southern Intertie Route Selection Study You had previously requested establishment of this work order to study route selection for the Southern Intertie for the Intertie Participants Group. The Association will be reimbursed for charges to this work order. The following charges occurred during August 2002. Direct Labor Indirect Labor Power Engineers Invoice #95585 Heller Ehrman Invoice #10229088 Sub-Total General, Administrative & Construction Overhead (0.5%) Total Charges Costs are allocated as follows: Grant through AIDEA - 75% $27,092.43 Chugach Electric - 8.8075% $3,181.55 City of Seward - 0.4195% $151.54 GVEA - 5.8587% $2,116.35 HEA - 3.3795% $1,220.78 AML&P - 6.5348% $2,360.58 Please review the attached backup and indicate your concurrence below if you are in agreement that these charges are correct for this work order and time period. As per your request, I will keep the original in the work order file. he ce Date Concur: mmc Attachments 1,429.80 755.07 33,216.80 541.85 35,943.52 $179.72 $36,123.24 $36,123.24 August 2002 Chugach Electric Association, Inc. Southern Intertie Activity Summary Beginning Grant Chugach Ending Bank Funds Interest Invoices Bank Year Balance Received Earned Paid Balance 1996 0.00 2,771,277.00 40,361.59 (1,440,252.89) 1,371,385.70 1997 1,371,385.70 1,346,934.44 67,734.52 (2,421,276.94) 364,777.72 1998 364,777.72 525,214.00 19,424.02 (732,050.23) 177,365.51 1999 177,365.51 985,191.00 19,246.30 (643,398.53) 538,404.28 2000 538,404.28 271,383.56 31,904.14 (462,844.32) 378,847.66 2001 378,847.66 787,500.00 15,904.91 (664,381.33) 517,871.24 2002* 517,871.24 __ 525,000.00 7,440.87 (436,843.81) 613,468.30 Total 7,212,500.00 202,016.35 _(6,801,048.05) * Through August 2002 bank statement (does not include Chugach invoices for charges incurred in August 2002) Southern Intertie AIDEA mtg 9/10/2002 CHUGACH ELECTRIC ASSOCIATION, INC. Southern Intertie Transactions Allocations Inception Through August 31, 2002 Inception through Year to Date Month 12/31/2000 Through Total Through Ended Inception 5/1/2001 8/1/2002 8/31/2002 __ Through 08/31/02 AIDEA Grant 100% 5,747,986.66 70,768.97 5,900,000.00 - 5,900,000.00 AIDEA Grant 75% - 928,207.97 27,092.43 955,300.40 CEA 8.8075% - 109,002.55 3,181.55 112,184.10 Seward 0.4195% - 5,191.78 151.54 5,343.32 GVEA 5.8587% - 72,507.90 2,116.35 74,624.25 HEA 3.3795% - 41,825.06 1,220.78 43,045.84 AML&P 6.5348% 80,875.37 2,360.58 83,235.95 $ 5,747,986.66 $_7,137,610.63 $ 36,123.24 $ 7,173,733.86 a 9/10/2002 27,092.43 9,030.80 36,123.24 01-02Sinterti CHUGACH ELECTRIC ASSOCIATION, INC. Southern Intertie Transactions Inception Through August 2002 Project Expenditures, Direct Labor Indirect Labor Power Engineers Miscellaneous Total Grant Fund Expenditures Direct Charges that Chugach has been Reimbursed for Plus General, Administrative & Construction Overhead Total Amounts Paid to Chugach Year to Date Month Inception Through Ended Inception Through 12/31/00 8/1/2002 08/31/2002 Through 08/31/2002 $190,549.23 $34,574.09 $1,429.80 $226,553.12 75,871.61 17,358.41 755.07 93,985.09 5,060,117.80 1,245,309.17 33,216.80 6,338,643.77 392,851.08 85,468.72 541.85 478,861.65 $7,138,043.62 $5,719,389.72 $1,382,710.39 $35,943.52 Year to Date Month Inception Through Ended ._ Through 12/31/00 8/1/2002 08/31/2002 $ 5,719,389.71 $ 1,382,710.39 $ 35,943.52 $ 28,596.95 _ $ 6,913.56 _ $ 179.72 $ 5,747,986.66 $__1,389,623.95 $ 36,123.24 9/10/2002 Inception Through 08/31/2002 $ 7,138,043.62 $ 35,690.23 S_1173,733.86 01-02Sinterti Invoice Month Date Incurred Costs OH Total Dec-95 Jun-Oct 95 22,614.00 113.07 22,727.07 Jan-96 0.00 0.00 0.00 Feb-96 Nov-Dec 95 176,265.61 881.33 177,146.94 Mar-96 Jan-96 7,660.92 38.30 7,699.22 Apr-96 Feb-96 251,912.29 1,259.56 253,171.85 May-96 Mar-96 172,070.45 860.35 172,930.80 Jun-96 Apr-96 127,113.82 635.57 127,749.39 Jun-96 May-96 35,628.41 178.14 35,806.55 Aug-96 Jun-96 40,919.00 204.60 41,123.60 Sep-96 Jul-96 57,116.72 285.58 57,402.30 Oct-96 Aug-96 168,312.54 841.56 169,154.10 Oct-96 Sep-96 202,010.97 1,010.05 203,021.02 Dec-96 Oct-96 171,462.74 857.31 320.05 Life to Date i: 433,087.47 7,165.42 1,440,252.89 Jan-97 Nov-96 234,735.50 1,173.68 235,909.18 Feb-97 Dec-96 306,667.10 1,533.34 308,200.44 Mar-97 Jan-97 5,045.85 25.23 5,071.08 Apr-97 Feb-97 124,380.57 621.90 125,002.47 May-97 Mar-97 177,117.40 885.59 178,002.99 Jun-97 Apr-97 165,814.35 829.07 166,643.42 Jul-97 May-97 158,762.80 793.81 159,556.61 Aug-97 Jun-97 158,786.12 793.93 159,580.05 Aug-97 Jul-97 154,159.15 770.80 154,929.95 Sep-97 Aug-97 243,365.76 1,216.83 244,582.59 Oct-97 Sep-97 193,127.79 965.64 194,093.43 Nov-97 Oct-97 258,833.19 1,294.17 260,127.36 Dec-97 Nov-97 228,435.19 1,142.18 229,577.37 Year to Date 2,409,230.77 12,046.17 2,421,276.94 Life to Date 3,842,318.24 19,211.59 3,861,529.83 Jan-98 0.00 0.00 0.00 Feb-98 Dec-97 153,179.64 765.90 153,945.54 Mar-98 0.00 0.00 0.00 Apr-98 Jan-98 39,750.15 198.75 39,948.90 Apr-98 Feb-98 49,887.09 249.44 50,136.53 May-98 Mar-98 64,102.85 320.51 64,423.36 Jun-98 Apr-98 7,283.97 36.42 7,320.39 Jul-98 May-98 173,312.97 866.56 174,179.53 Aug-98 Jun-98 59,362.04 296.81 59,658.85 Sep-98 Jul-98 38,793.39 193.97 38,987.36 Oct-98 Aug-98 123,711.01 618.56 124,329.57 Nov-98 Sep-98 19,025.07 95.13 19,120.20 Dec-98 0.00 0.00 0.00 Year to Date 728,408.18 3,642.05 732,050.23 Life to Date 4,570,726.42 22,853.64 4,593,580.06 Jan-99 0.00 0.00 0.00 Feb-99 Oct-98 4,729.98 23.65 4,753.63 Nov-98 2,668.64 13.34 2,681.98 Dec-98 63,600.94 318.00 63,918.94 == USFS Refund (27,159.93) 0.00 (27,159.93) Mar-99 Jan-99 55,203.86 276.02 55,479.88 Apr-99 Feb & Mar 99 133,963.88 669.82 134,633.70 May-99 0.00 0.00 0.00 Jun-99 Apr & May 99 175,367.11 876.83 176,243.94 Jul-99 Jun-99 129,717.72 648.59 130,366.31 Aug-99 Jul-99 62,556.06 312.78 62,868.84 Sep-99 Aug-99 9,366.00 46.83 9,412.83 Oct-99 Sep-99 12,455.30 62.28 12,517.58 Nov-99 Oct-99 9,854.56 49.27 9,903.83 Dec-99 Nov-99 7,738.31 38.69 7,777.00 Year to Date 640,062.43 3,336.10 643,398.53 Life to Date 5,21 0,788.85 26,189.74 5,236,978.59 Inception-to-Date Charges. 22,727.07 22,727.07 199,874.01 207,573.23 460,745.08 633,675.88 761,425.27 797,231.82 838,355.42 895,757.72 1,064,911.82 1,267,932.84 1,440,252.89 1,676, 162.07 1,984,362.51 1,989,433.59 2,114,436.06 2,292,439.05 2,459,082.47 2,618,639.08 2,778,219.13 2,933,149.08 3,177,731.67 3,371,825.10 3,631,952.46 3,861,529.83 3,861,529.83 4,015,475.37 4,015,475.37 4,055,424.27 4,105,560.80 4,169,984.16 4,177,304.55 4,351,484.08 4,411,142.93 4,450,130.29 4,574,459.86 4,593,580.06 4,593,580.06 4,593,580.06 4,598,333.69 4,601,015.67 4,664,934.61 4,637,774.68 4,693,254.56 4,827,888.26 4,827,888.26 5,004,132.20 5,134,498.51 5,197,367.35 5,206,780.18 5,219,297.76 5,229,201.59 5,236,978.59 01-02Sinterti Invoice Month Inception-to-Date Date Incurred Costs OH Total Charges Jan-00 Dec-99 13,496.23 67.48 13,563.71 5,250,542.30 Feb-00 Jan-00 3,892.65 19.46 3,912.11 5,254,454.41 Mar-00 Feb-00 9,362.97 46.81 9,409.78 5,263,864.19 Apr-00 Mar-00 41,813.83 209.07 42,022.90 5,305,887.09 May-00 Apr-00 20,419.98 102.10 20,522.08 5,326,409.17 Jun-00 May-00 58,113.81 290.57 58,404.38 5,384,813.55 Jul-00 Jun-00 22,827.27 114.14 22,941.41 5,407,754.96 Aug-00 Jul-00 147,084.41 735.42 147,819.83 5,555,574.79 Sep-00 Aug-00 114,403.32 $72.02 114,975.34 5,670,550.13 Oct-00 Sep-00 17,513.29 87.57 17,600.86 5,688,150.99 Nov-00 Oct-00 7,908.09 39.54 7,947.63 5,696,098.62 Dec-00 Nov-00 3,705.76 18.53 3,724.29 5,699,822.91 Year to Date 460,541.61 2,302.71 462,844.32 Life to Date 5,671,330.46 28,492.45 5,699.822.91 Invoice Month Inception-to-Date Date Incurred Costs OH Total Charges Jan-01 Dec-00 20,899.33 104.50 21,003.83 5,720,826.74 Feb-01 Jan-01 4,043.31 20.22 4,063.53 5,724,890.27 Mar-01 Feb-01 3,571.96 17.86 3,589.82 5,728,480.09 Apr-01 Mar-01 59,726.05 298.63 60,024.68 5,788,504.77 May-01 Apr-01 3,075.56 15.38 3,090.94 5,791,595.71 Jun-01 May-01 136,597.44 682.99 137,280.43 5,928,876.14 Jul-01 Jun-01 114,465.30 572.33 115,037.63 6,043,913.77 Aug-01 Jul-01 103,783.27 518.92 104,302.19 6,148,215.96 Sep-01 Aug-01 125,054.23 625.27 125,679.50 6,273,895.46 Oct-01 Sep-01 58,546.92 292.73 58,839.65 6,332,735.11 Nov-01 Oct-01 139,311.39 696.56 140,007.95 6,472,743.06 Dec-01 Nov-01 54,974.35 274.87 55,249.22 6,527,992.28 Year to Date 824,049.11 4,120.26 $28,169.37 Life to Date 6,495,379.57 32,612.71 527,992.28 = USFS Reimbursement is not included in total Grant Fund Expenditures portion of Transaction Spreadsheet. Invoice Month Inception-to-Date Date Incurred Costs OH Total Charges Jan-02 Dec-01 8,306.28 41.53 8,347.81 6,536,340.09 Feb-02 Jan-02 89,287.79 446.44 89,734.23 6,626,074.32 Mar-02 Feb-02 60,933.28 304.67 61,237.95 6,687,312.27 Apr-02 Mar-02 93,531.13 467.66 93,998.79 6,781,311.06 May-02 Apr-02 109,430.46 547.15 109,977.61 6,891,288.67 Jun-02 May-02 85,140.34 425.70 85,566.04 6,976,854.71 Jul-02 Jun-02 55,552.63 277.76 55,830.39 7,032,685.10 Aug-02 Jul-02 77,378.70 386.89 77,765.59 7,110,450.69 Sep-02 Aug-02 35,943.52 179.72 36,123.24 7,146,573.93 Oct-02 Sep-02 0.00 0.00 0.00 7,146,573.93 Nov-02 Oct-02 0.00 0.00 0.00 7,146,573.93 Dec-02 Nov-02 0.00 0.00 0.00 7,146,573.93 Year to Date 615,504.13 3,077.52 618,581.65 Life to Date 7,110,883.70 35,690.23 7,146,573.93 _— USFS Reimbursement is not included in total Grant Fund Expenditures portion of Transaction Spreadsheet. 01-02Sinterti July Ending Balance Forward Total Deposits Total Withdrawals Interest Eamed Balance August 31, 2002 Southern Intertie Grant Fund Bank Account Activity Summary August 2002 Southem intertie bank activity $670,898.74 $0.00 ($58,324.20) $893.76 $613,468.30 9/10/2002 @® 000 01 00 PAGE: 1 DATE: 08/30/02 ACCOUNT: 41100033 First National Bank ——-ALAS KA -- Da sae CHUGACH ELECTRIC ASSOC INC <T> 30 PO BOX 196300 0 ANCHORAGE AK 99519-6300 0 See eS SSS SSS SSS SSS SSS SSS SS SH HSS HK SSS SH SS SS SS SS SS SS SS SSS SS SSH SS SS SSS SS SS SS SS SS SS SS SS MAIN BRANCH TELEPHONE : 907-777-4362 PO BOX 100720 ANCHORAGE AK 99510-0720 NON FEDERALLY INSURED REPURCHASE AGREEMENT ACCOUNT 41100033 LAST STATEMENT 07/31/02 670,898.74 22 CREDITS 893.76 1 DEBITS 58,324.20 THIS STATEMENT 08/30/02 613,468.30 - - - - - - - - OTHER CREDITS - - -----+-- DESCRIPTION DATE AMOUN INTEREST 08/01 32.3 INTEREST 08/02 32.3 INTEREST 08/05 95.6 INTEREST 08/06 30.8 INTEREST 08/07 30.8 INTEREST 08/08 30.8 INTEREST 08/09 30.8 INTEREST 08/12 93.1 INTEREST 08/13 28.7 INTEREST 08/14 28.7 INTEREST 08/15 28.7 INTEREST 08/16 28.7 INTEREST 08/19 86.1 INTEREST 08/20 28.7 INTEREST 08/21 28.7 INTEREST 08/22 28.7 INTEREST 08/23 28.7 INTEREST 08/26 86.1 INTEREST 08/27 28.7 INTEREST 08/28 28.7 INTEREST 08/29 28.7 INTEREST 08/30 28.7 *** CONTINUED *** 000 o1 OC DATE: 08/30/02 PAGE: : ACCOUNT: 4110003: First National Bank ALASKA Dae ia CHUGACH ELECTRIC ASSOC INC DESCRIPTION DATE AMOUN TRANSFER TO BUSINESS ACCOUNT 1106061 08/13 58,324.2 ----------INTEREST---------- AVERAGE LEDGER BALANCE: 636,334.45 INTEREST EARNED: 893.76 AVERAGE AVAILABLE BALANCE: 636,334.45 DAYS IN PERIOD: 30 INTEREST PAID THIS PERIOD: 893.76 ANNUAL PERCENTAGE YIELD EARNED: 1.72 INTEREST PAID 2002: 7,440.87 --- - - DAILY BALANCE - - - - - - - - DATE......+-s0- BALANCE DATE........2-- BALANCE DATE.........-. BALANCE 08/01 670,931.13 08/13 612,980.06 08/23 613,267.11 08/02 670,963.52 08/14 613,008.76 08/26 613,353.29 08/05 671,059.13 08/15 613,037.46 08/27 613,382.04 08/06 671,089.96 08/16 613,066.16 08/28 613,410.79 08/07 671,120.79 08/19 613,152.27 08/29 613,439.54 08/08 671,151.62 08/20 613,180.98 08/30 613,468.30 08/09 671,182.46 08/21 613,209.69 08/12 671,275.56 08/22 613,238.40 - END OF STATEMENT - Pore LENDER SECTION II-A SOUTHERN INTERTIE TRANSACTIONS ALLOCATIONS CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska 09/11/02 TO: Dora Gropp, Manager, Transmission & Special Projects FROM: Marina McCoy-Casey, Plant Accountant SUBJECT: Invoice for Your Review - Southern Intertie Attached is a draft invoice and and supporting documents for the billing of Anchorage Municipal Light and Power's supporting documents for share of allocated costs for the Southern Intertie, Work Order E9590081. Work Order: E9590081 Amount of Current Invoice: $2,360.58 For Time Period: 08/01/02 to 08/31/02 Please review the entire invoice package and indicate your concurrence below, that these charges are correct for this work order and time period. If you want to delete or change the invoice in any manner, please provide appropriate documentation. Return the invoice package to me by : 09/18/02 Concur: Attachments Chugach Draft Invoice AML&P 0802 Dan Helmick Date 09/11/02 Anchorage Municipal Light & Power 1200 East First Avenue Invoice Draft Anchorage, Alaska 99501-1685 Acct. No. 14300 000 00 2101 Past Due: 11-Oct-02 Folio To invoice you for AML&P's share of allocated costs for the Southem Intertie, Work Order E9590081, for the period August 1, 2002 to August 31, 2002. Direct Labor 1,429.80 Indirect Labor 755.07 Power Engineers Invoice #95585 33,216.80 Heller Ehrman Invoice #10229088 541.85 Sub-Total 35,943.52 General, Administrative & Construction Overhead (0.5%) $ 179.72 Total Charges $ 36,123.24 a AML&P's Share 6.5348 % Amount Due From AML&P $ 2,360.58 Attachments To ensure proper credit, please retum a copy of this invoice with your payment. 18620 000 15 2101/ E9590081 (AML&P) maint&svc.xls CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska 09/11/02 TO: Dora Gropp, Manager, Transmission & Special Projects FROM: Marina McCoy-Casey, Plant Accountant SUBJECT: Invoice for Your Review - Southern Intertie Attached is a draft invoice and and supporting documents for the billing of Homer Electric's supporting documents for share of allocated costs for the Southern Intertie, Work Order E9590081. Work Order: E9590081 Amount of Current Invoice: $1,220.78 For Time Period: 08/01/02 to 08/31/02 Please review the entire invoice package and indicate your concurrence below, that these charges are correct for this work order and time period. If you want to delete or change the invoice in any manner, please provide appropriate documentation. Return the invoice package to me by : 09/18/02 Concur: i= ie Aa ¥ f Cf “ Ce- Signature’ Date Attachments Chugach Draft Invoice HEA 0802 Don Stead Date Homer Electric Association 3977 Lake Street Invoice Homer, Alaska 99603 Acct. No. Past Due: 11-Oct-02 Folio To invoice you for HEA's share of allocated costs for the Southern Interne, Work Order E9590081, for the period August 1, 2002 to August 31, 2002. Direct Labor Indirect Labor Power Engineers Invoice #95585 Heller Ehrman Invoice #10229088 Sub-Total General, Administrative & Construction Overhead (0.5%) Total Charges HEA's Share Amount Due From HEA Attachments To ensure proper credit, please retum a copy of this invoice with your payment. 18620 000 15 2101/ E9590081 (HEA) maint&sve.xls 09/11/02 Draft 14300 000 00 2101 1,429.80 755.07 33,216.80 541.85 35,943.52 $ 179512 $36,123.24 3.3795 Yo $ —T220.78 CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska 09/11/02 TO: Dota Gropp, Manager, Transmission & Special Projects FROM: Marina McCoy-Casey, Plant Accountant SUBJECT: Invoice for Your Review - Southern Intertie Attached is a draft invoice and and supporting documents for the billing of Golden Valley Electric Association's supporting documents for share of allocated costs for the Southern Intertie, Work Order E9590081. Work Order: E9590081 Amount of Current Invoice: $2,116.35 For Time Period: 08/01/02 to 08/31/02 Please review the entire invoice package and indicate your concurrence below, that these charges are correct for this work order and time period. If you want to delete or change the invoice in any manner, please provide appropriate documentation. Return the invoice package to me by: 09/18/02 Concur: Gy au £2 Yui / be Sigtiatuté Date Attachments Steve Haagenster Golden Valley Electric Association P. O. Box 71249 Fairbanks, Alaska 99707 Past Due: 11-Oct-02 Chugach Draft Invoice GVEA 0802 Date Invoice Acct. No. Folio To invoice you for GVEA's share of allocated costs for the Southern Interte, Work Order E9590081, for the period August 1, 2002 to August 31, 2002. Direct Labor Indirect Labor Power Engineers Invoice #95585 Heller Ehrman Invoice #10229088 Sub-Total General, Administrative & Construction Overhead (0.5%) Total Charges GVEA's Share Amount Due From GVEA Attachments 09/11/02 Draft 14300 000 00 2101 1,429.80 755.07 33,216.80 541.85 35,943.52 $ 179.72 $ 36,123.24 5.8587 % To ensure proper credit, please retum a copy of this invoice with your payment. 18620 000 15 2101/ E9590081 (GVEA) maint&svc.xls $ 2,116.35 CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska 09/11/02 TO: Dora Gropp, Manager, Transmission & Special Projects FROM: Marina McCoy-Casey, Plant Accountant SUBJECT: Invoice for Your Review - Southern Intertie Attached is a draft invoice and and supporting documents for the billing of City of Seward's supporting documents for share of allocated costs for the Southern Intertie, Work Order E9590081. Work Order: E9590081 Amount of Current Invoice: $151.54 For Time Period: 08/01/02 to 08/31/02 Please review the entire invoice package and indicate your concurrence below, that these charges are correct for this work order and time period. If you want to delete or change the invoice in any manner, please provide appropriate documentation. Return the invoice package to me by: 09/18/02 Concur: Attachments Chugach Draft invoice SEWARD 0802 Dave Calvert Date 09/11/02 City of Seward P. O. Box 167 Invoice Draft Seward, Alaska 99664 Acct. No. 14300 000 00 2101 Past Due: 11-Oct-02 Folio To invoice you for City of Seward's share of allocated costs for the Southem Intertie, Work Order E9590081, for the period August 1, 2002 to August 31, 2002. Direct Labor 1,429.80 Indirect Labor 755.07 Power Engineers Invoice #95585 33,216.80 Heller Ehrman Invoice #10229088 541.85 Sub-Total 35,943.52 General, Administrative & Construction Overhead (0.5%) $ 179.72 Total Charges $ 36,123.24 City of Seward's Share 0.4195 % Amount Due From City of Seward $ 151.54 Attachments To ensure proper credit, please retum a copy of this invoice with your payment. 18620 000 15 2101/ E9590081 (SWD) maint&svc.xls Ill SCHEDULE 1. Project Schedule CHUGACH ELECTRIC ASSOCIATION ANCHORAGE - KENAI INTERTIE Tue 9/17/02 PHASE IC 1995 1996 1997 1998 1999 2000 2001 2002 2003 ID_|Task Name % Comp. | Q2 [a3] a4 [ai [a2 [a3 [a4 [ai [a2 Tas [as [ai [a2 [a3 [a4 [ai [a2 [a3 [a4 [ai [a2 [a3 [a4 [at [a2 [03 [04 [ai [a2 [a3 [a4 [ai [a2 [a3 [a4 | a1 1 | ENVIRONMENTAL & ENGINEERING 97% ee 2 PROJECT MANAGEMENT | Sem l44 6p 12131 3 ROUTE SELECTION STUDIES 100% | 45 —_______| 8/30 4 EVAL & PREL.ENGINEERING 100% ent 745 5 | EIS PREPARATION “| 87% 8 Bes | = 8/5 9/28 7 “FRNOTICE | 100% 40/5 8 COMMENT PERIOD 100% wid 128 9 PUBLIC HEARING, WASHIN'| 100% 10/30 | 10/30 10 ~ PUBLIC HEARING, ANCHOR| 100% 1413 bata "1 PUBLIC HEARING, KENAl | 100%| 12 FEIS — 100% | 13 | REVIEW PERIOD FEIS 0% 44 /AGENCIES | 98% 15 usFWSt™~S~S~SS*S~«S OOH 16 RUS 98% 17 uss ~ | 100% | 18| COE | 96% 19 ROD | 65% 75 10/18 Rolled Up Progress A = Split nesta suit MTree hi’ Extemal Tasks Rolled Up Split Progress Rolled Up Task Milestone e Rolled Up Milestone. <> Project Summary GEERT Project: ANCHORAGE - KENAI INTEF Date: Tue 9/17/02 PH_IC Page 1 IV ITEMS FOR APPROVAL None. Vv ITEMS FOR DISCUSSION None. vi ITEMS FOR INFORMATION 1. POWER Engineers’ Monthly Report dated September 17, 2002 2. USFWS Record of Decision dated September 11, 2002 OOM IENGINEERS September 17, 2002 RECEIVER Ms. Dora Gropp Chugach Electric Association SEP 1 8 2002 5601 Minnesota Drive, Building A Anchorage, AK 99518 TRANSMISSION & SPECIAL PROJECT Subject: POWER Project #120376-14 EIS & Preliminary Engineering Chugach Contract No. 10629, Monthly Status Report No. 1 For Period August 11 to September 14, 2002 Dear Dora: This report summarizes the Task 14 activities completed during the reporting period. Reporting Period Overview: e Project coordination activities included progress reporting and telephone conferences. Revised project schedule with RUS; shortened one month. Consolidated comments received from RUS. Began preparation of response to comments and formatting letters. Reviewed previous RODs. : Coordinated with RUS regarding ROD outline. Began preparation of draft ROD for RUS. Work Planned for Next Reporting Period: e Complete responses to comments for ROD. e Prepare and issue RODs. Current Schedule (RUS Schedule - Version 15): Finish Date ¢ Compile comments from RUS and distribute to team August 16 e Assemble and prepare response to comments September 13 e Review responses September 20 e Agencies complete separate RODs September 27 e Teleconference October 1 e RUS, USFWS issue RODs and USACE issues final October 4 Section 404(b) (1) Evaluation e Publish in Federal Register notice of availability of the October 11 ROD e Print and distribute copies of RODs October 18 HLY 23-561 POWER Engineers, Incorporated * 6 A RN A 3940 Glenbrook Dr. « P.O. Box 1066 Phone (208) 788-3456 Hailey. Idaho 83333 Fax (208) 788-2082 Chugach Electric Association September 17, 2002 Page 2 Budget: Task 14 Budget $153,509 Task 14 Billed Through Previous Invoice $ 0 Task 14 Billed This Invoice $ 26,192 Task 14 Billed Subtotal to Date $ 26,192 Task 14 Remaining Project Budget $127,317 Total Budget $5,801,767 Total Billed Through Previous Invoice $5,523,847 Total Billed This Invoice $26,192 Total Remaining Project Budget $ 251,728 The above cost summary includes charges for EPG through September 7, 2002 and PEI through September 14, 2002. Dora, should you have any questions about this report or any of the backup, please do not hesitate to contact Mike Walbert or me. Sincerely, POWER Engineers, Inc. P RL (bb Randy Pollock, P.E. Project Manager RP/mw Enclosures cc: Mike Walbert (POWER HLY) Dusty Liman (POWER HLY) RM/REF 120376-14-55-00-01 HLY 23-561 ral t'- TOMES ENGINEERS SOUTHERN INTERTIE PROJECT — 120376-14 PROJECT FINANCIAL SUMMARY — SEPTEMBER, 2002 INVOICE HLY 23-561 Task 5 budget amount reflects the addition of Contract No. 820, Amendment No. | funds. Task 10 budget amount reflects the addition of Contract No. 820, Amendment No. 2 funds. Task 11 budget amount reflects the addition of Contract No. 7614 funds. Task 12 budget amount reflects the addition of Contract No. 7614, Amendment No. | funds. Task 13 budget amount reflects the addition of Contract 10629 funds. Task 14 budget amount reflects the addition of Contract 10629 , Amendment No. | funds. Tasks 1-10 | Task 11_| Task 12 | Task 14 Total Base Not to Exceed | $3,043,423 | N/A N/A |N/A N/A $3,043,423 Budget CWG Contract $103,046 N/A N/A N/A N/A $103,046 Amendment No. 4 DFI Contract $45,000 N/A N/A N/A N/A $45,000 Amendment No. 5 — DFI Contract $11,400 | N/A NIA N/A N/A $11,400 Amendment No. 6 | DFI Contract $3,502 N/A N/A N/A N/A $3,502 Amendment No.7___| vl DFI Contract $89,487 N/A ‘| NA N/A [N/A $89,487 Amendment No. 8 Task 5 & 6 $0 NIA N/A |N/A N/A $0 Reallocation * ea 4 Contract $31,926 N/A [N/A N/A N/A $31,926 Amendment No. 9 iL 4 i Contract $118,193 NIA N/A N/A N/A $118,193 Amendment No. 11 Contract 820, $465,215 N/A N/A NA |N/A $465,215 Amendment No. 1 | Contract 820 $389,547 N/A N/A N/A N/A $389,547 Amendment No. 2 Contract No. 7614 N/A $731,264 | N/A N/A N/A | $731 264 Contract No. 7614 N/A NIA $129,673 | N/A N/A $129,673 Amendment No. | [ Contract No. 10629_| N/A NA | N/A $486,580 | N/A | $486,580 Contract No. 10629 | N/A N/A N/A N/A $153,509 $153,509 Amendment No. 1 a a (D | Total Not to $4,300,741 | $731,264 | $129,673 | $486,580 | $153,509 $5,801,767 Exceed Budget Actual Budget $4,249,250 | $715,413 | $104,832 | $454,352 | $0 $5,523,847 Expended Through Previous Invoice | Current Invoice $0 $0 $0* $0 $26,192 | $26,192 Amount Actual Budget $4,249,250 | $715,413 | $104,832 | $454,352 | $26,192 $5,550,039 Expended Through Current Invoice Remaining Budget $51,491 $15,851 | $24,841 | $32,228 | $127,317 $251,728 9/17/2002 SOUTHERN INTERTIE PROJECT THROUGH PERIOD ENDING: rm PROJECT SUMMARY REPORT licen 3RD QUARTER 2002 ‘| 4TH QUARTER 2002 TASK MONTH| JUL | AUG | SEP | OCT NOV DEC 14-0 |PM & Monthly Reporting __ | | Actual % Work Completed | 0% 0%} 20% — 4+—- -- Planned % Complete $ (to date) | | 0% 0% 25%) 50%| 75%) ~—: 100% Actual % Expended $ (to date) | __0%|_ 0% «20% | | ____ Planned $ (this period) | $0 $0 $2,044} $2,044, $2,044 $2,044 _ Actual $ Expended (this period $0 | $0 $1,659 | | __ Planned $ (to date) $0) $01 $2,044] $4,088) $6,132, $8,176 Actual $ Expended (to date) ++ $0 $0 $1,659 | Contract No. 10629, Amend. 1 $8,176 $8,176 $8,176 | $8,176 | $8,176 | $8,176 Actual Remaining Task Budget _ $8,176 [ $8,176 | $6,517 | | 14-1 |Develop and Format Responses to FEIS Comments _| __Actual% Work Completed [| 0% | 0% 28%] [oo Planned % Complete $(todate) | 0% += 0% == 33%] ~——«67%~—« 100%. ~—=—«100% Actual % Expended $ (to date) 0% 0%) 20% | | _____ Planned $ (this period) _ $0 | __$0 | $24, 700 | _ $24,700 | $24,702 | $0 Actual $ Expended (this period) $0 $0 $14,609 | __Planned $ (to date) $0) ——-$0.,_- $24,700 | $49,400 | $74,102 $74,102 | | Actual $ Expended (to date) $0 $0 $14,609 Contract No. 10629, Amend. 1 | $74,102 | $74,102 | $74,102 | $74,102 | $74,102 aie _ Actual Remaining Task Budget | $74,102 | $74,102 | $59,493 14-2 |Assist in Development of the RUS ROD \ i Actual % Work Completed | 0% 0%, 42%] a Planned | % Complete $(todate) | 0% 0%, 33%] 67% 100%, 100% Actual % Expended $ (to date) _ 0% 0%) et ~ Planned $ (this period) | $0 ‘$0 $9,328] $9, 328 $9,328 «$0 | Actual $ Expended (this period) | $0 $0. $9,924 | Planned $(todate) | $0, $0 $9,328 | $18, 656 | $27, 984 $27,984 Actual $ Expended (to date) $0 $0 $9,924 _ Contract No. 10629, Amend. 1 | $27,984 | $27,984 | $27,984 $27,084 $27,984 | $27,984 Actual Remaining Task Budget _| $27,984 | $27,984 $18,060 | August 2002, Contract 10629 Amendment No. 1 HLY 23-5614 14 9/17/2002 SOUTHERN INTERTIE PROJECT THROUGH PERIOD ENDING: Rage Zot 2 PROJECT SUMMARY REPORT OSes 02 38RD QUARTER 2002 4TH QUARTER 2002 | TASK) MONTH JUL AUG SEP OCT NOV DEC | 14-3 |Prepare and Distribute Composite ROD Document _ | | “Actual % Work Completed [0% 0%] | Planned % Complete $(todate) | = 0% = 0% 0%) = 0%|_— 50% ____ 100% Actual % Expended $ (to date) 0%) 0%| 0% ___Planned $(thisperiod) =| == $0, =$0, ~~ $0} __—$0 ($21 G24 $21,624 Actual $ Expended (this period) $0 $0 | at _____ Planned $ (to date) _ “$0. __ $0} $0. $0 | $21,624 T $43,248 | L Actual $ Expended (to date) _| $0 _| $0 | $0 | | | Contract No. 10629, Amend. 1 | $43,248 | $43,248 | $43,248 | $43,248 | $43,248 $43,248 - Actual Remaining Task Budget TASK 14 TOTAL $43,248 | $43,248 | $43,248 _ Actual % Work Completed __ 0% 0% 20%) . “Planned % % Complete $ (to date) | __ 0%) 0% 23%! 47% 85% 100% Actual % Expended $ (to date) 0% 0%! 17%| aL ____ Planned $ (this period) _ $0) $0 | ) | $36,072 | $36, 072 | _ $57, eee | $23,668 Actual $ Expended (this period) _ $0) _ $0. $26,192} : _____ Planned $ (to date) $0) $0) $36,072 | $72,144 $129, 842 | "$183, 510 Actual $ Expended (to date) $0 $0 | $26,192 r Contract No. 10629, Amend. 1 “Actual Remaining Task Budget | $153, 510. $153, 510 $197, 318 $153,510 | $153,510 | $153, 510 as August 2002, Contract 10629 Amendment No. 1 HLY 23-561a 14 SEP-13-2002 FRI 09:44 AM USFWS DIVISION OF REALTY FAX NO, 907 786 3901 P, UL/Ub W,0,€ FS BWOS/ Lec, [72.5 4 Cay hickce LT pe Thaiboyy Vb tur Loves “ als 2 ~ lls Gue? fo ' Brian L. Anderson a U.S. Fish and Wildlife Service oe y National Wildlife Refuge System - Alaska ¥ Division of Natural Resources 1011 East Tudor Road Anchorage, Alaska 99503 Telephone: (907) 786-3379 FAX: (907) 786-3905 email: brian_]_anderson@fws.gov 2 4 Yop DATE: September 13, 2002 seOD TO: Larry Wolfe - RUS (202-720-0820) ¢ ast Dora Gropp - CEA (762-4617) 4% ks Jack Hewiit - USACE (753-5567) SX ~ GOES Randy Palmer - EPG (602-956-4374) anger” Robin West - KNWR (907-262-3599) ero’ & NUMBER OF PAGES INCLUDING COVER: 5 Atfached: Record of Decision, Southern Intertie Project SEP-13-2002 FRI 09:44 AM USFWS DIVISION OF REALTY FAX NO, 907 786 3901 Pr, UdZ/Ud RECORD OF DECISION SOUTHERN INTERTIE PROJECT INTERTIE PARTICIPANTS GROUP RIGHT-OF-WAY PERMIT APPLICATION E-298-KE Decision We, the U.S, Fish and Wildlife Service, through the Regional Director, Alaska Region, hereby deny a grant of right-of-way (application E-298-KE) to the Intertie Participants Group (IPG) for development of the Southern Intertie electric transmission line project on the Kenai National Wildlife Refuge. The proposed project would have significant adverse impacts on Kenai Refuge resources, was determined to be not compatible with the purposes for which the Kenai Refuge was established, and there exists an economically feasible and prudent alternative to crossing the Kenai Refuge. Our decision, made under authority of the National Wildlife Refuge System Administration Act (16 U.S.C. 668dd), complies with the requirements of the National Environmental Policy Act [(NEPA) (42 U.S.C. 4371 et seq.)] and the Alaska National Interest Lands Conservation Act [(ANILCA) (16 U.S.C. 3101)]. Project Description The IPG consists of Chugach Electric Association, Inc., Municipality of Anchorage - Municipal Light and Power, City of Seward - Seward Electric System, Matanuska Electric Association, Inc., Golden Valley Electric Association, Inc., and Homer Electric Association, Inc. The IPG proposes 10 construct 4 new 138 kilovolt (kV) electric transmission line between the Kenai Peninsula and Anchorage. The proposed transmission line (Enstar Route) would enter the Kenai Refuge east of Sterling, and follow the existing Enstar natural gas pipeline for approximately 38.3 miles to Chickaloon Bay, where it would exit the Refuge at Burnt Island. The 3-phase transmission line would be supported mostly by guyed steel X-frame towers of approximately 90 fcet in hcight, and a typical span of 750 feet, For 5.4 miles adjacent to Chickaloon Bay, 70-foot tall single wood poles with a typical span of 600 feet would be used. A facility enclosed within a 100-foot by 130- foot fenced area would be constructed for transition from overhead to submarine cable. The right- of-way width would be 100 fect for single pole, or 150 feet for X-frame structures. NEPA Compliance As a cooperating Federal agency, we assisted in preparation of an environmental impact statement! (EIS) for the project in accordance with the provisions of NEPA and the Council on Yinvironmental Quality regulations at 40 CFR Parts 1500-1508. We participated in public scoping and inter-agency meetings, and in public hearings on the project draft EIS as required by Title XI ' Southern Intertie Project Final Environmental Impact Statement, U.S, Department of Agriculture, Rural Utilities Service, Washington, DC, July, 2002. 1 SEP-13-2002 FRI 09:44 AM USFWS DIVISION OF REALTY FAX NU, YU/ (86 3¥U! Yr. U3/Ud of ANILCA. The EIS describes the consultation and coordination that has occurred during the NEPA process. Title Xl of ANILCA The Kenai Refuge is a Conservation System Unit designated under ANILCA [Section 304 (4)], and rights-of-way for transportation and utility systems (TUS) are governed under Title XI of ANILCA and its implementing regulations at 43 CFR Part 36. Regulations'at 43 CFR 36.7 require that the following nine fuctors be considered in making a decision regarding a proposed TUS: 1, The need for and economic feasibility of the TUS (43 CFR 36.7 (a)(2)(i)]. The purpose and need for the project is documented in the EIS, and centers around coirecting existing deficiencies in the Railbelt electrical system south of Anchorage. Deficiencies include capacily limitations of the existing Quartz Creek transmission line and its susceptibility to outages due to avalanches and other adverse weather conditions. Although evaluation of the economic feasibility of electric utility projects is beyond our scope of expertise, we have no reason to dispute the findings in the EIS. 2, Alternative routes and modes of access, including a determination with respect to whether there is any economically feasible and prudent alternative’ to rouling the system through or within an area, and, if not, whether there are alternate routes or modes which would result in Sewer or less severe impacts upon the area [43 CFR 36.7 (a)(2)(ii)]. The US identificd a number of alternatives to the proposed project, including two major new Lransmission line routing alternatives (Quartz Creek and Tesoro routes), and a wide variety of non-transmission alternatives, such as fucl cells, battery energy storage systems, new gencration, and energy conservation. Of these, only the Tesoro Route transmission line alternative was found to mect the purpose and need for the project, and was therefore fully evaluated in the EIS. Originally identified by the IPG as a viable project altcrnative, the Tesoro Route generally parallels the North Kenai Road from Nikiski to Captain Cook State Recreation Area, and then follows the existing Tesoro fuels pipeline along the northwest coast of the Kenai Peninsula to Pt. Possession, where it becomes a submarine crossing of Turnagain Arm enroute to Anchorage. The route would occupy a transportation corridor designated by the Kenai Peninsula Borough on Jands removed from the Kenai Refuge (PLO 3400, May 22, 1964) for development of the Kenai Peninsula. Although the Tesoro Route would cross the established Kenai Refuge boundary at two locations for a total of less than two miles, a right-of-way permit from the Service would not be required at these locations. The cost to construct the Tesoro Route alternative is *Fconomically feasible and prudent alternative route means a route either within or outside an area that is based on sound engineering practices and is economically practicable, but does not necessarily mean the least costly alternative route [43 CFR 36.2 (h)]. 2 SEP-13-2002 FR] 09:45 AM USFWS DIVISION OF REALTY FAX NO, 907 786 3901 P. U4/Ud . approximately ten percent higher than for the Enstar Route, and the total life cycle cost favors the Enstar Route by approximately 14 percent. However, the additional costs of construction and maintenance do not disqualify the Tesoro Route alternative from being an economically feasible and prudent alternative consistent with the regulatory definition, and from the standpoint of the IPG. 3. The feasibility and impacts of including different TUSs in the same area [43 CFR 36.7 (a)(2)(iii)}. i Both of the new transmission line alternatives are located adjacent to existing pipelines for much of their routes on the Kenai Peninsula. The Enstar Route parallels the Enstar natural gas pipeline across the Kenai Refuge, while the Tesoro Route follows the Tesoro fuels pipeline along the northwest coast of the peninsula. The impacts of co-locating the proposed transmission line with existing pipelines are similar for both routes, and gencrally include expansion of existing clearings and access routes. These impacts are described in detail in the EIS. 4. Short and long term sacial, economic and environmental impacts of national, state or local significance, including impacts on fish and wildlife and their habitat and on rural, traditional lifestyles [43 CFR 36.7 (a)(2)(iv)]. ‘The environmental impacts of the project alternatives are assessed in the EIS. Asa cooperating Federal agency, the Service assisted in preparation of the document, particularly in relation to impacts to fish and wildlife, and other Kenai Refuge resources. According to the EIS, the project will have significant adverse impacts on the following: fish and wildlife resources; land use and recreation; visual resources; and Refuge management plans. The proposal would also add to already significant cumulative impacts on Refuge resources as a result of human activities in and surrounding the Kenai Refuge. Adverse impacts to fish and wildlife resources of the Kenai Refuge are considered nationally significant because of the Congressional mandate to conserve these resources, In light of the above considerations, the EIS identifies the Tesoro Route as the environmentally preferred alternative. 5. The impucts, if any, on the national security interests of the United States, that may result from the approval or denial of the application for the TUS [43 CFR 36.7 (a)(2)(v)]. Our denial of this right-of-way application will not affect national security interest that may be associated with this proposed project, since a feasible alternative has been identified, and that remains available to the IPG, 6. Any iimpacts that would affect the purposes for which the Federal unit or areca concerned was established [43 CFR 36.7 (a)(2)(vi)]. Our detailed findings in this regard are contained in the attached Compatibility 3 SEP13-2UU2 FRI UY!4> AM USFWS DIVISIUN UF KEALIY FAX NU, YUS (86 SYUL Pr, U9/U9 Determination, which is required under the National Wildlife Refuge System Administration Act, and is also prepared in compliance with Title XI regulations at 43 CFR 36,1 (b). In summary, we have determined that the use of Refuge lands for the project as proposed would not be compatible with the purposes for which the Kenai Refuge was established. 7. Measures which should be instituted to avoid o or minimize negative impacts [43 CFR 36.7 (a)(2)(vii)]. The EIS examines a full range of practicable measures to miligate the anticipated adverse impacts of the proposed project, however such measures would not significantly reduce the impacts sufficient to make the use compatible with Kenai Refuge purposes. 8. The short and long term public values which may be adversely affected by approval of the TUS versus the short and long term public benefits which may accrue from such approval [43 CFR 36.7 (a)(2)(viii)}. No comparison of public values and benefits is necessary, since we will not approve the right-of-way for the project as proposed. ; 9. Impacts, if any, on subsistence uses [43 CFR 36.7 (a)(2)(ix)}. Our denial of the right-of-way application for the project as proposed will have no impacts on current subsistence uses of the Kenai Refuge. Summary Based on the factors discussed above, we have decided to deny issuing a right-of-way permit to the IPG for the Southern Intertie project as proposed. We have established an administrative record containing the documentation used in reaching this decision, including all documents associated with preparation of the ELS and Refuge Compatibility Determination. Prepared by: Zge oe bt eo Date: J/22/oz_ Wildlife Biologist, Division of Natural Resources Reviewed by: shen. LON fv: & =u Date: 3/adfo2 Chief, Division of Approved by: De ' Ait — Date: M HD Regional Director