Subject: Southern Intertie Monthly Report for September 2002
-~
W.0.4E9590081
Dear Mr. McMillan:
CHUGAZ!
POWERING ALASKA’S FUTURE
A) Vallone Ga
~2) Sheena —
Enclosed is 1 (one) copy of the Southern Intertie Report for September 2002. If there are
any questions, please contact Dora Gropp, (907) 762-4626.
incerely,
ba
Enclosures: 1 (one) copy of Southern Intertie Monthly Report
c: Lee Thibert)
Michael, Massin
Dora GMyp
Carol Johnson
Mike Cunningham
Don Edwards
Alice Mullins
W.0.#E9590081, Sec., 2.1.3
RF
CHUGA<..
POWERING ALASKA'S FUTURE
CHUGACH ELECTRIC ASSOCIATION, INC.
Anchorage, Alaska
SOUTHERN INTERTIE
Phase IC - EIS
MONTHLY REPORT
For
SEPTEMBER 2002
5601 Minnesota Drive / 99518
P.O. Box 196300
Anchorage, Alaska 99519-6300
il.
IV.
Vi.
TABLE OF CONTENTS
SUMMARY
FINANCIAL
a; Chugach Statement of August 2002
2 Activity Summary of August 2002
35 Transactions, Inception through August 2002
4. Bank Account Activity Summary of August 2002
Ds Section II-A, Southern Intertie Transactions Allocations
SCHEDULE
le Project Schedule
ITEMS FOR APPROVAL
None.
ITEMS FOR DISCUSSION
None.
ITEMS FOR INFORMATION
5 POWER Engineers’ Monthly Report dated September 17, 2002
2s USFWS Record of Decision dated September 11, 2002
I. SUMMARY
We have received the USFWS/KNWR Record of Decision, which denies a permit for the
Proposed transmission line (ENSTAR Route) through the Kenai National Wildlife Refuge
(KNWR). The permit denial is based on the finding that the proposed project is not compatible
with the refuge plans and that a feasible alternative route has been identified (TESORO
Route). Under ANILCA regulations this decision is final and appeals can only be made to the
President of the United States.
RUS’ and the COE’s Record of Decision are expected to be available in October of this year.
We expect these RODs to agree with the findings of the USFWS/KNWR.
The TESORO route would cross two small sections of the KNWR, but permits are not expected
to be necessary. A recent land transaction between the native corporation Point Possession
Inc. and the Conservation Fund has transferred more than 4,000 acres at Pt. Possession to the
KNWR, but reserves lands which can allow easements for the Project.
RUS will refund $32,860 of funds not used for consultants engaged in the EIS preparation.
Expenditures for Phase IC (EIS) of the project stand as follows:
POWER DESCRIPTION | evcineers | COE/USFWS/RUS | CHUGACH | TOTAL
|ORIG. BUDGET $389,547 $160,000| $100,000, _ $649,547 LLOCATED ONTINGENCY $ $0 $0) $0)
TOTAL $389,547 $160,000, $100,000, $649,547 AMENDMENTS $1,501,026) $50,000 $150,000, $1,701,026 TOTAL COMMITMENT| _ $1,890,573, $210,000] $250,000, $2,350,573 ISPENT TO DATE $1,678,785 $187,190, _ $180,287| $2,046,263 k% OF TOTAL 89% 89% 72% 87%
Total Project expenditures as of 09/16/02 stand at $7,150,563.
FINANCIAL
1:
2s
Chugach Statement of August 2002
Activity Summary of August 2002
Transactions, Inception through August 2002
Bank Account Activity Summary of August 2002
Section II-A, Southern Intertie Transactions Allocations
CHUGACH ELECTRIC ASSOCIATION, INC.
Anchorage, Alaska
09/10/02
TO: Dora Gropp - Manager, Transmission & Special Projects
FROM: Marina McCoy-Casey, Plant Accountant
SUBJECT: E9590081 - Southern Intertie Route Selection Study
You had previously requested establishment of this work order to study route selection for
the Southern Intertie for the Intertie Participants Group. The Association will be reimbursed
for charges to this work order. The following charges occurred during August 2002.
Direct Labor
Indirect Labor
Power Engineers Invoice #95585
Heller Ehrman Invoice #10229088
Sub-Total
General, Administrative & Construction Overhead (0.5%)
Total Charges
Costs are allocated as follows:
Grant through AIDEA - 75% $27,092.43
Chugach Electric - 8.8075% $3,181.55
City of Seward - 0.4195% $151.54
GVEA - 5.8587% $2,116.35
HEA - 3.3795% $1,220.78
AML&P - 6.5348% $2,360.58
Please review the attached backup and indicate your concurrence below if you are in
agreement that these charges are correct for this work order and time period.
As per your request, I will keep the original in the work order file.
he ce
Date
Concur:
mmc
Attachments
1,429.80 755.07
33,216.80
541.85 35,943.52
$179.72
$36,123.24
$36,123.24
August 2002
Chugach Electric Association, Inc.
Southern Intertie Activity Summary
Beginning Grant Chugach Ending
Bank Funds Interest Invoices Bank
Year Balance Received Earned Paid Balance
1996 0.00 2,771,277.00 40,361.59 (1,440,252.89) 1,371,385.70
1997 1,371,385.70 1,346,934.44 67,734.52 (2,421,276.94) 364,777.72
1998 364,777.72 525,214.00 19,424.02 (732,050.23) 177,365.51
1999 177,365.51 985,191.00 19,246.30 (643,398.53) 538,404.28
2000 538,404.28 271,383.56 31,904.14 (462,844.32) 378,847.66
2001 378,847.66 787,500.00 15,904.91 (664,381.33) 517,871.24
2002* 517,871.24 __ 525,000.00 7,440.87 (436,843.81) 613,468.30
Total 7,212,500.00 202,016.35 _(6,801,048.05)
* Through August 2002 bank statement (does not include Chugach invoices
for charges incurred in August 2002)
Southern Intertie AIDEA mtg 9/10/2002
CHUGACH ELECTRIC ASSOCIATION, INC.
Southern Intertie Transactions Allocations
Inception Through August 31, 2002
Inception through Year to Date Month
12/31/2000 Through Total Through Ended Inception
5/1/2001 8/1/2002 8/31/2002 __ Through 08/31/02
AIDEA Grant 100% 5,747,986.66 70,768.97 5,900,000.00 - 5,900,000.00
AIDEA Grant 75% - 928,207.97 27,092.43 955,300.40
CEA 8.8075% - 109,002.55 3,181.55 112,184.10
Seward 0.4195% - 5,191.78 151.54 5,343.32
GVEA 5.8587% - 72,507.90 2,116.35 74,624.25
HEA 3.3795% - 41,825.06 1,220.78 43,045.84
AML&P 6.5348% 80,875.37 2,360.58 83,235.95
$ 5,747,986.66 $_7,137,610.63 $ 36,123.24 $ 7,173,733.86 a
9/10/2002
27,092.43
9,030.80
36,123.24
01-02Sinterti
CHUGACH ELECTRIC ASSOCIATION, INC.
Southern Intertie Transactions
Inception Through August 2002
Project Expenditures,
Direct Labor
Indirect Labor
Power Engineers
Miscellaneous
Total
Grant Fund Expenditures
Direct Charges that Chugach has
been Reimbursed for
Plus General, Administrative
& Construction Overhead
Total Amounts Paid to Chugach
Year to Date Month
Inception Through Ended Inception
Through 12/31/00 8/1/2002 08/31/2002 Through 08/31/2002
$190,549.23 $34,574.09 $1,429.80 $226,553.12
75,871.61 17,358.41 755.07 93,985.09
5,060,117.80 1,245,309.17 33,216.80 6,338,643.77
392,851.08 85,468.72 541.85 478,861.65
$7,138,043.62 $5,719,389.72 $1,382,710.39 $35,943.52
Year to Date Month
Inception Through Ended
._ Through 12/31/00 8/1/2002 08/31/2002
$ 5,719,389.71 $ 1,382,710.39 $ 35,943.52
$ 28,596.95 _ $ 6,913.56 _ $ 179.72
$ 5,747,986.66 $__1,389,623.95 $ 36,123.24
9/10/2002
Inception
Through 08/31/2002
$ 7,138,043.62
$ 35,690.23
S_1173,733.86
01-02Sinterti
Invoice Month
Date Incurred Costs OH Total
Dec-95 Jun-Oct 95 22,614.00 113.07 22,727.07
Jan-96 0.00 0.00 0.00
Feb-96 Nov-Dec 95 176,265.61 881.33 177,146.94
Mar-96 Jan-96 7,660.92 38.30 7,699.22
Apr-96 Feb-96 251,912.29 1,259.56 253,171.85
May-96 Mar-96 172,070.45 860.35 172,930.80
Jun-96 Apr-96 127,113.82 635.57 127,749.39
Jun-96 May-96 35,628.41 178.14 35,806.55
Aug-96 Jun-96 40,919.00 204.60 41,123.60
Sep-96 Jul-96 57,116.72 285.58 57,402.30
Oct-96 Aug-96 168,312.54 841.56 169,154.10
Oct-96 Sep-96 202,010.97 1,010.05 203,021.02
Dec-96 Oct-96 171,462.74 857.31 320.05
Life to Date i: 433,087.47 7,165.42 1,440,252.89
Jan-97 Nov-96 234,735.50 1,173.68 235,909.18
Feb-97 Dec-96 306,667.10 1,533.34 308,200.44
Mar-97 Jan-97 5,045.85 25.23 5,071.08
Apr-97 Feb-97 124,380.57 621.90 125,002.47
May-97 Mar-97 177,117.40 885.59 178,002.99
Jun-97 Apr-97 165,814.35 829.07 166,643.42
Jul-97 May-97 158,762.80 793.81 159,556.61
Aug-97 Jun-97 158,786.12 793.93 159,580.05
Aug-97 Jul-97 154,159.15 770.80 154,929.95
Sep-97 Aug-97 243,365.76 1,216.83 244,582.59
Oct-97 Sep-97 193,127.79 965.64 194,093.43
Nov-97 Oct-97 258,833.19 1,294.17 260,127.36
Dec-97 Nov-97 228,435.19 1,142.18 229,577.37
Year to Date 2,409,230.77 12,046.17 2,421,276.94
Life to Date 3,842,318.24 19,211.59 3,861,529.83
Jan-98 0.00 0.00 0.00
Feb-98 Dec-97 153,179.64 765.90 153,945.54
Mar-98 0.00 0.00 0.00
Apr-98 Jan-98 39,750.15 198.75 39,948.90
Apr-98 Feb-98 49,887.09 249.44 50,136.53
May-98 Mar-98 64,102.85 320.51 64,423.36
Jun-98 Apr-98 7,283.97 36.42 7,320.39
Jul-98 May-98 173,312.97 866.56 174,179.53
Aug-98 Jun-98 59,362.04 296.81 59,658.85
Sep-98 Jul-98 38,793.39 193.97 38,987.36
Oct-98 Aug-98 123,711.01 618.56 124,329.57
Nov-98 Sep-98 19,025.07 95.13 19,120.20
Dec-98 0.00 0.00 0.00
Year to Date 728,408.18 3,642.05 732,050.23
Life to Date 4,570,726.42 22,853.64 4,593,580.06
Jan-99 0.00 0.00 0.00
Feb-99 Oct-98 4,729.98 23.65 4,753.63
Nov-98 2,668.64 13.34 2,681.98
Dec-98 63,600.94 318.00 63,918.94
== USFS Refund (27,159.93) 0.00 (27,159.93)
Mar-99 Jan-99 55,203.86 276.02 55,479.88
Apr-99 Feb & Mar 99 133,963.88 669.82 134,633.70
May-99 0.00 0.00 0.00
Jun-99 Apr & May 99 175,367.11 876.83 176,243.94
Jul-99 Jun-99 129,717.72 648.59 130,366.31
Aug-99 Jul-99 62,556.06 312.78 62,868.84
Sep-99 Aug-99 9,366.00 46.83 9,412.83
Oct-99 Sep-99 12,455.30 62.28 12,517.58
Nov-99 Oct-99 9,854.56 49.27 9,903.83
Dec-99 Nov-99 7,738.31 38.69 7,777.00
Year to Date 640,062.43 3,336.10 643,398.53
Life to Date 5,21 0,788.85 26,189.74 5,236,978.59
Inception-to-Date
Charges. 22,727.07
22,727.07
199,874.01
207,573.23
460,745.08
633,675.88
761,425.27
797,231.82
838,355.42
895,757.72
1,064,911.82
1,267,932.84 1,440,252.89
1,676, 162.07
1,984,362.51
1,989,433.59
2,114,436.06
2,292,439.05
2,459,082.47
2,618,639.08
2,778,219.13
2,933,149.08
3,177,731.67
3,371,825.10
3,631,952.46
3,861,529.83
3,861,529.83 4,015,475.37 4,015,475.37 4,055,424.27 4,105,560.80 4,169,984.16 4,177,304.55 4,351,484.08 4,411,142.93 4,450,130.29 4,574,459.86 4,593,580.06 4,593,580.06
4,593,580.06 4,598,333.69 4,601,015.67 4,664,934.61 4,637,774.68 4,693,254.56 4,827,888.26 4,827,888.26 5,004,132.20 5,134,498.51 5,197,367.35 5,206,780.18 5,219,297.76 5,229,201.59 5,236,978.59
01-02Sinterti
Invoice Month Inception-to-Date
Date Incurred Costs OH Total Charges
Jan-00 Dec-99 13,496.23 67.48 13,563.71 5,250,542.30
Feb-00 Jan-00 3,892.65 19.46 3,912.11 5,254,454.41
Mar-00 Feb-00 9,362.97 46.81 9,409.78 5,263,864.19
Apr-00 Mar-00 41,813.83 209.07 42,022.90 5,305,887.09
May-00 Apr-00 20,419.98 102.10 20,522.08 5,326,409.17
Jun-00 May-00 58,113.81 290.57 58,404.38 5,384,813.55
Jul-00 Jun-00 22,827.27 114.14 22,941.41 5,407,754.96
Aug-00 Jul-00 147,084.41 735.42 147,819.83 5,555,574.79
Sep-00 Aug-00 114,403.32 $72.02 114,975.34 5,670,550.13
Oct-00 Sep-00 17,513.29 87.57 17,600.86 5,688,150.99
Nov-00 Oct-00 7,908.09 39.54 7,947.63 5,696,098.62
Dec-00 Nov-00 3,705.76 18.53 3,724.29 5,699,822.91
Year to Date 460,541.61 2,302.71 462,844.32
Life to Date 5,671,330.46 28,492.45 5,699.822.91
Invoice Month Inception-to-Date
Date Incurred Costs OH Total Charges
Jan-01 Dec-00 20,899.33 104.50 21,003.83 5,720,826.74
Feb-01 Jan-01 4,043.31 20.22 4,063.53 5,724,890.27
Mar-01 Feb-01 3,571.96 17.86 3,589.82 5,728,480.09
Apr-01 Mar-01 59,726.05 298.63 60,024.68 5,788,504.77
May-01 Apr-01 3,075.56 15.38 3,090.94 5,791,595.71
Jun-01 May-01 136,597.44 682.99 137,280.43 5,928,876.14
Jul-01 Jun-01 114,465.30 572.33 115,037.63 6,043,913.77
Aug-01 Jul-01 103,783.27 518.92 104,302.19 6,148,215.96
Sep-01 Aug-01 125,054.23 625.27 125,679.50 6,273,895.46
Oct-01 Sep-01 58,546.92 292.73 58,839.65 6,332,735.11
Nov-01 Oct-01 139,311.39 696.56 140,007.95 6,472,743.06
Dec-01 Nov-01 54,974.35 274.87 55,249.22 6,527,992.28
Year to Date 824,049.11 4,120.26 $28,169.37
Life to Date 6,495,379.57 32,612.71 527,992.28
= USFS Reimbursement is not included in total Grant Fund Expenditures
portion of Transaction Spreadsheet.
Invoice Month Inception-to-Date
Date Incurred Costs OH Total Charges
Jan-02 Dec-01 8,306.28 41.53 8,347.81 6,536,340.09
Feb-02 Jan-02 89,287.79 446.44 89,734.23 6,626,074.32
Mar-02 Feb-02 60,933.28 304.67 61,237.95 6,687,312.27
Apr-02 Mar-02 93,531.13 467.66 93,998.79 6,781,311.06
May-02 Apr-02 109,430.46 547.15 109,977.61 6,891,288.67
Jun-02 May-02 85,140.34 425.70 85,566.04 6,976,854.71
Jul-02 Jun-02 55,552.63 277.76 55,830.39 7,032,685.10
Aug-02 Jul-02 77,378.70 386.89 77,765.59 7,110,450.69
Sep-02 Aug-02 35,943.52 179.72 36,123.24 7,146,573.93
Oct-02 Sep-02 0.00 0.00 0.00 7,146,573.93
Nov-02 Oct-02 0.00 0.00 0.00 7,146,573.93
Dec-02 Nov-02 0.00 0.00 0.00 7,146,573.93
Year to Date 615,504.13 3,077.52 618,581.65
Life to Date 7,110,883.70 35,690.23 7,146,573.93
_— USFS Reimbursement is not included in total Grant Fund Expenditures
portion of Transaction Spreadsheet.
01-02Sinterti
July Ending Balance Forward
Total Deposits
Total Withdrawals
Interest Eamed
Balance August 31, 2002
Southern Intertie Grant Fund
Bank Account Activity Summary
August 2002
Southem intertie bank activity
$670,898.74
$0.00
($58,324.20)
$893.76
$613,468.30
9/10/2002
@® 000 01 00 PAGE: 1 DATE: 08/30/02 ACCOUNT: 41100033
First National Bank ——-ALAS KA --
Da sae
CHUGACH ELECTRIC ASSOC INC <T> 30
PO BOX 196300 0
ANCHORAGE AK 99519-6300 0
See eS SSS SSS SSS SSS SSS SSS SS SH HSS HK SSS SH SS SS SS SS SS SS SS SSS SS SSH SS SS SSS SS SS SS SS SS SS SS SS
MAIN BRANCH TELEPHONE : 907-777-4362
PO BOX 100720
ANCHORAGE AK 99510-0720
NON FEDERALLY INSURED REPURCHASE AGREEMENT ACCOUNT 41100033
LAST STATEMENT 07/31/02 670,898.74
22 CREDITS 893.76
1 DEBITS 58,324.20
THIS STATEMENT 08/30/02 613,468.30
- - - - - - - - OTHER CREDITS - - -----+--
DESCRIPTION DATE AMOUN
INTEREST 08/01 32.3
INTEREST 08/02 32.3
INTEREST 08/05 95.6
INTEREST 08/06 30.8
INTEREST 08/07 30.8
INTEREST 08/08 30.8
INTEREST 08/09 30.8
INTEREST 08/12 93.1
INTEREST 08/13 28.7
INTEREST 08/14 28.7
INTEREST 08/15 28.7
INTEREST 08/16 28.7
INTEREST 08/19 86.1
INTEREST 08/20 28.7
INTEREST 08/21 28.7
INTEREST 08/22 28.7
INTEREST 08/23 28.7
INTEREST 08/26 86.1
INTEREST 08/27 28.7
INTEREST 08/28 28.7
INTEREST 08/29 28.7
INTEREST 08/30 28.7 *** CONTINUED ***
000 o1 OC
DATE: 08/30/02 PAGE: :
ACCOUNT: 4110003:
First National Bank
ALASKA
Dae ia
CHUGACH ELECTRIC ASSOC INC
DESCRIPTION DATE AMOUN
TRANSFER TO BUSINESS ACCOUNT 1106061 08/13 58,324.2
----------INTEREST----------
AVERAGE LEDGER BALANCE: 636,334.45 INTEREST EARNED: 893.76 AVERAGE AVAILABLE BALANCE: 636,334.45 DAYS IN PERIOD: 30
INTEREST PAID THIS PERIOD: 893.76 ANNUAL PERCENTAGE YIELD EARNED: 1.72 INTEREST PAID 2002: 7,440.87
--- - - DAILY BALANCE - - - - - - - - DATE......+-s0- BALANCE DATE........2-- BALANCE DATE.........-. BALANCE 08/01 670,931.13 08/13 612,980.06 08/23 613,267.11 08/02 670,963.52 08/14 613,008.76 08/26 613,353.29 08/05 671,059.13 08/15 613,037.46 08/27 613,382.04 08/06 671,089.96 08/16 613,066.16 08/28 613,410.79 08/07 671,120.79 08/19 613,152.27 08/29 613,439.54 08/08 671,151.62 08/20 613,180.98 08/30 613,468.30 08/09 671,182.46 08/21 613,209.69 08/12 671,275.56 08/22 613,238.40
- END OF STATEMENT -
Pore LENDER
SECTION II-A
SOUTHERN INTERTIE TRANSACTIONS ALLOCATIONS
CHUGACH ELECTRIC ASSOCIATION, INC.
Anchorage, Alaska
09/11/02
TO: Dora Gropp, Manager, Transmission & Special Projects
FROM: Marina McCoy-Casey, Plant Accountant
SUBJECT: Invoice for Your Review - Southern Intertie
Attached is a draft invoice and and supporting documents for the billing of
Anchorage Municipal Light and Power's supporting documents for share of allocated
costs for the Southern Intertie, Work Order E9590081.
Work Order: E9590081
Amount of Current Invoice: $2,360.58
For Time Period: 08/01/02 to 08/31/02
Please review the entire invoice package and indicate your concurrence below, that
these charges are correct for this work order and time period. If you want to delete
or change the invoice in any manner, please provide appropriate documentation.
Return the invoice package to me by : 09/18/02
Concur:
Attachments
Chugach Draft Invoice
AML&P 0802
Dan Helmick
Date 09/11/02
Anchorage Municipal Light & Power
1200 East First Avenue Invoice Draft
Anchorage, Alaska 99501-1685
Acct. No. 14300 000 00 2101
Past Due: 11-Oct-02 Folio
To invoice you for AML&P's share of allocated costs for the Southem Intertie, Work Order
E9590081, for the period August 1, 2002 to August 31, 2002.
Direct Labor 1,429.80
Indirect Labor 755.07
Power Engineers Invoice #95585 33,216.80
Heller Ehrman Invoice #10229088 541.85
Sub-Total 35,943.52
General, Administrative & Construction Overhead (0.5%) $ 179.72
Total Charges $ 36,123.24 a
AML&P's Share 6.5348 %
Amount Due From AML&P $ 2,360.58
Attachments
To ensure proper credit, please retum a copy of this
invoice with your payment.
18620 000 15 2101/ E9590081 (AML&P)
maint&svc.xls
CHUGACH ELECTRIC ASSOCIATION, INC.
Anchorage, Alaska
09/11/02
TO: Dora Gropp, Manager, Transmission & Special Projects
FROM: Marina McCoy-Casey, Plant Accountant
SUBJECT: Invoice for Your Review - Southern Intertie
Attached is a draft invoice and and supporting documents for the billing of Homer
Electric's supporting documents for share of allocated costs for the Southern Intertie,
Work Order E9590081.
Work Order: E9590081
Amount of Current Invoice: $1,220.78
For Time Period: 08/01/02 to 08/31/02
Please review the entire invoice package and indicate your concurrence below, that
these charges are correct for this work order and time period. If you want to delete
or change the invoice in any manner, please provide appropriate documentation.
Return the invoice package to me by : 09/18/02
Concur: i= ie Aa ¥ f Cf “ Ce-
Signature’ Date
Attachments
Chugach Draft Invoice
HEA 0802
Don Stead Date
Homer Electric Association
3977 Lake Street Invoice
Homer, Alaska 99603
Acct. No.
Past Due: 11-Oct-02 Folio
To invoice you for HEA's share of allocated costs for the Southern Interne, Work Order
E9590081, for the period August 1, 2002 to August 31, 2002.
Direct Labor
Indirect Labor
Power Engineers Invoice #95585
Heller Ehrman Invoice #10229088
Sub-Total
General, Administrative & Construction Overhead (0.5%)
Total Charges
HEA's Share
Amount Due From HEA
Attachments
To ensure proper credit, please retum a copy of this
invoice with your payment.
18620 000 15 2101/ E9590081 (HEA)
maint&sve.xls
09/11/02
Draft
14300 000 00 2101
1,429.80
755.07
33,216.80
541.85
35,943.52
$ 179512
$36,123.24
3.3795 Yo
$ —T220.78
CHUGACH ELECTRIC ASSOCIATION, INC.
Anchorage, Alaska
09/11/02
TO: Dota Gropp, Manager, Transmission & Special Projects
FROM: Marina McCoy-Casey, Plant Accountant
SUBJECT: Invoice for Your Review - Southern Intertie
Attached is a draft invoice and and supporting documents for the billing of Golden
Valley Electric Association's supporting documents for share of allocated costs for the
Southern Intertie, Work Order E9590081.
Work Order: E9590081
Amount of Current Invoice: $2,116.35
For Time Period: 08/01/02 to 08/31/02
Please review the entire invoice package and indicate your concurrence below, that
these charges are correct for this work order and time period. If you want to delete
or change the invoice in any manner, please provide appropriate documentation.
Return the invoice package to me by: 09/18/02
Concur: Gy au £2 Yui / be
Sigtiatuté Date
Attachments
Steve Haagenster
Golden Valley Electric Association
P. O. Box 71249
Fairbanks, Alaska 99707
Past Due: 11-Oct-02
Chugach Draft Invoice
GVEA 0802
Date
Invoice
Acct. No.
Folio
To invoice you for GVEA's share of allocated costs for the Southern Interte, Work Order
E9590081, for the period August 1, 2002 to August 31, 2002.
Direct Labor
Indirect Labor
Power Engineers Invoice #95585
Heller Ehrman Invoice #10229088
Sub-Total
General, Administrative & Construction Overhead (0.5%)
Total Charges
GVEA's Share
Amount Due From GVEA
Attachments
09/11/02
Draft
14300 000 00 2101
1,429.80
755.07
33,216.80
541.85
35,943.52
$ 179.72
$ 36,123.24
5.8587 %
To ensure proper credit, please retum a copy of this
invoice with your payment.
18620 000 15 2101/ E9590081 (GVEA)
maint&svc.xls
$ 2,116.35
CHUGACH ELECTRIC ASSOCIATION, INC.
Anchorage, Alaska
09/11/02
TO: Dora Gropp, Manager, Transmission & Special Projects
FROM: Marina McCoy-Casey, Plant Accountant
SUBJECT: Invoice for Your Review - Southern Intertie
Attached is a draft invoice and and supporting documents for the billing of City of
Seward's supporting documents for share of allocated costs for the Southern
Intertie, Work Order E9590081.
Work Order: E9590081
Amount of Current Invoice: $151.54
For Time Period: 08/01/02 to 08/31/02
Please review the entire invoice package and indicate your concurrence below, that
these charges are correct for this work order and time period. If you want to delete
or change the invoice in any manner, please provide appropriate documentation.
Return the invoice package to me by: 09/18/02
Concur:
Attachments
Chugach Draft invoice
SEWARD 0802
Dave Calvert Date 09/11/02
City of Seward
P. O. Box 167 Invoice Draft
Seward, Alaska 99664
Acct. No. 14300 000 00 2101
Past Due: 11-Oct-02 Folio
To invoice you for City of Seward's share of allocated costs for the Southem Intertie, Work Order
E9590081, for the period August 1, 2002 to August 31, 2002.
Direct Labor 1,429.80
Indirect Labor 755.07
Power Engineers Invoice #95585 33,216.80
Heller Ehrman Invoice #10229088 541.85
Sub-Total 35,943.52
General, Administrative & Construction Overhead (0.5%) $ 179.72
Total Charges $ 36,123.24
City of Seward's Share 0.4195 %
Amount Due From City of Seward $ 151.54
Attachments
To ensure proper credit, please retum a copy of this
invoice with your payment.
18620 000 15 2101/ E9590081 (SWD)
maint&svc.xls
Ill SCHEDULE
1. Project Schedule
CHUGACH ELECTRIC ASSOCIATION ANCHORAGE - KENAI INTERTIE Tue 9/17/02
PHASE IC
1995 1996 1997 1998 1999 2000 2001 2002 2003 ID_|Task Name % Comp. | Q2 [a3] a4 [ai [a2 [a3 [a4 [ai [a2 Tas [as [ai [a2 [a3 [a4 [ai [a2 [a3 [a4 [ai [a2 [a3 [a4 [at [a2 [03 [04 [ai [a2 [a3 [a4 [ai [a2 [a3 [a4 | a1
1 | ENVIRONMENTAL & ENGINEERING 97% ee
2 PROJECT MANAGEMENT | Sem l44 6p 12131
3 ROUTE SELECTION STUDIES 100% | 45 —_______| 8/30
4 EVAL & PREL.ENGINEERING 100% ent 745
5 | EIS PREPARATION “| 87%
8 Bes | = 8/5 9/28
7 “FRNOTICE | 100% 40/5
8 COMMENT PERIOD 100% wid 128
9 PUBLIC HEARING, WASHIN'| 100% 10/30 | 10/30
10 ~ PUBLIC HEARING, ANCHOR| 100% 1413 bata
"1 PUBLIC HEARING, KENAl | 100%|
12 FEIS — 100%
| 13 | REVIEW PERIOD FEIS 0%
44 /AGENCIES | 98%
15 usFWSt™~S~S~SS*S~«S OOH
16 RUS 98%
17 uss ~ | 100% |
18| COE | 96%
19 ROD | 65% 75 10/18
Rolled Up Progress A = Split nesta suit MTree hi’
Extemal Tasks Rolled Up Split Progress Rolled Up Task
Milestone e Rolled Up Milestone. <> Project Summary GEERT
Project: ANCHORAGE - KENAI INTEF
Date: Tue 9/17/02
PH_IC Page 1
IV ITEMS FOR APPROVAL
None.
Vv ITEMS FOR DISCUSSION
None.
vi ITEMS FOR INFORMATION
1. POWER Engineers’ Monthly Report dated September 17, 2002
2. USFWS Record of Decision dated September 11, 2002
OOM IENGINEERS September 17, 2002
RECEIVER
Ms. Dora Gropp
Chugach Electric Association SEP 1 8 2002
5601 Minnesota Drive, Building A
Anchorage, AK 99518 TRANSMISSION & SPECIAL PROJECT
Subject: POWER Project #120376-14 EIS & Preliminary Engineering
Chugach Contract No. 10629, Monthly Status Report No. 1
For Period August 11 to September 14, 2002
Dear Dora:
This report summarizes the Task 14 activities completed during the reporting period.
Reporting Period Overview:
e Project coordination activities included progress reporting and telephone
conferences.
Revised project schedule with RUS; shortened one month.
Consolidated comments received from RUS.
Began preparation of response to comments and formatting letters.
Reviewed previous RODs. :
Coordinated with RUS regarding ROD outline.
Began preparation of draft ROD for RUS.
Work Planned for Next Reporting Period:
e Complete responses to comments for ROD.
e Prepare and issue RODs.
Current Schedule (RUS Schedule - Version 15): Finish Date
¢ Compile comments from RUS and distribute to team August 16
e Assemble and prepare response to comments September 13
e Review responses September 20
e Agencies complete separate RODs September 27
e Teleconference October 1
e RUS, USFWS issue RODs and USACE issues final October 4
Section 404(b) (1) Evaluation
e Publish in Federal Register notice of availability of the October 11
ROD
e Print and distribute copies of RODs October 18
HLY 23-561
POWER Engineers, Incorporated * 6 A RN A 3940 Glenbrook Dr. « P.O. Box 1066 Phone (208) 788-3456 Hailey. Idaho 83333 Fax (208) 788-2082
Chugach Electric Association
September 17, 2002
Page 2
Budget:
Task 14 Budget $153,509
Task 14 Billed Through Previous Invoice $ 0
Task 14 Billed This Invoice $ 26,192
Task 14 Billed Subtotal to Date $ 26,192
Task 14 Remaining Project Budget $127,317
Total Budget $5,801,767
Total Billed Through Previous Invoice $5,523,847
Total Billed This Invoice $26,192
Total Remaining Project Budget $ 251,728
The above cost summary includes charges for EPG through September 7, 2002 and PEI
through September 14, 2002.
Dora, should you have any questions about this report or any of the backup, please do not
hesitate to contact Mike Walbert or me.
Sincerely,
POWER Engineers, Inc. P
RL (bb
Randy Pollock, P.E.
Project Manager
RP/mw
Enclosures
cc: Mike Walbert (POWER HLY)
Dusty Liman (POWER HLY)
RM/REF 120376-14-55-00-01
HLY 23-561 ral
t'- TOMES ENGINEERS
SOUTHERN INTERTIE PROJECT — 120376-14
PROJECT FINANCIAL SUMMARY — SEPTEMBER, 2002 INVOICE
HLY 23-561
Task 5 budget amount reflects the addition of Contract No. 820, Amendment No. | funds.
Task 10 budget amount reflects the addition of Contract No. 820, Amendment No. 2 funds.
Task 11 budget amount reflects the addition of Contract No. 7614 funds.
Task 12 budget amount reflects the addition of Contract No. 7614, Amendment No. | funds.
Task 13 budget amount reflects the addition of Contract 10629 funds.
Task 14 budget amount reflects the addition of Contract 10629 , Amendment No. | funds.
Tasks 1-10 | Task 11_| Task 12 | Task 14 Total
Base Not to Exceed | $3,043,423 | N/A N/A |N/A N/A $3,043,423
Budget
CWG Contract $103,046 N/A N/A N/A N/A $103,046
Amendment No. 4
DFI Contract $45,000 N/A N/A N/A N/A $45,000
Amendment No. 5 — DFI Contract $11,400 | N/A NIA N/A N/A $11,400
Amendment No. 6 |
DFI Contract $3,502 N/A N/A N/A N/A $3,502
Amendment No.7___| vl
DFI Contract $89,487 N/A ‘| NA N/A [N/A $89,487
Amendment No. 8 Task 5 & 6 $0 NIA N/A |N/A N/A $0
Reallocation * ea 4
Contract $31,926 N/A [N/A N/A N/A $31,926
Amendment No. 9 iL 4 i
Contract $118,193 NIA N/A N/A N/A $118,193
Amendment No. 11
Contract 820, $465,215 N/A N/A NA |N/A $465,215
Amendment No. 1 |
Contract 820 $389,547 N/A N/A N/A N/A $389,547
Amendment No. 2
Contract No. 7614 N/A $731,264 | N/A N/A N/A | $731 264
Contract No. 7614 N/A NIA $129,673 | N/A N/A $129,673
Amendment No. | [
Contract No. 10629_| N/A NA | N/A $486,580 | N/A | $486,580
Contract No. 10629 | N/A N/A N/A N/A $153,509 $153,509
Amendment No. 1 a a (D |
Total Not to $4,300,741 | $731,264 | $129,673 | $486,580 | $153,509 $5,801,767
Exceed Budget
Actual Budget $4,249,250 | $715,413 | $104,832 | $454,352 | $0 $5,523,847
Expended Through
Previous Invoice | Current Invoice $0 $0 $0* $0 $26,192 | $26,192
Amount
Actual Budget $4,249,250 | $715,413 | $104,832 | $454,352 | $26,192 $5,550,039
Expended Through
Current Invoice
Remaining Budget $51,491 $15,851 | $24,841 | $32,228 | $127,317 $251,728
9/17/2002 SOUTHERN INTERTIE PROJECT THROUGH PERIOD ENDING: rm PROJECT SUMMARY REPORT licen
3RD QUARTER 2002 ‘| 4TH QUARTER 2002 TASK MONTH| JUL | AUG | SEP | OCT NOV DEC
14-0 |PM & Monthly Reporting __ |
| Actual % Work Completed | 0% 0%} 20% — 4+—- --
Planned % Complete $ (to date) | | 0% 0% 25%) 50%| 75%) ~—: 100% Actual % Expended $ (to date) | __0%|_ 0% «20% | |
____ Planned $ (this period) | $0 $0 $2,044} $2,044, $2,044 $2,044
_ Actual $ Expended (this period $0 | $0 $1,659 |
| __ Planned $ (to date) $0) $01 $2,044] $4,088) $6,132, $8,176
Actual $ Expended (to date) ++ $0 $0 $1,659
| Contract No. 10629, Amend. 1 $8,176 $8,176 $8,176 | $8,176 | $8,176 | $8,176
Actual Remaining Task Budget _ $8,176 [ $8,176 | $6,517 | |
14-1 |Develop and Format Responses to FEIS Comments _| __Actual% Work Completed [| 0% | 0% 28%] [oo Planned % Complete $(todate) | 0% += 0% == 33%] ~——«67%~—« 100%. ~—=—«100%
Actual % Expended $ (to date) 0% 0%) 20% | |
_____ Planned $ (this period) _ $0 | __$0 | $24, 700 | _ $24,700 | $24,702 | $0 Actual $ Expended (this period) $0 $0 $14,609 |
__Planned $ (to date) $0) ——-$0.,_- $24,700 | $49,400 | $74,102 $74,102 |
| Actual $ Expended (to date) $0 $0 $14,609 Contract No. 10629, Amend. 1 | $74,102 | $74,102 | $74,102 | $74,102 | $74,102 aie
_ Actual Remaining Task Budget | $74,102 | $74,102 | $59,493
14-2 |Assist in Development of the RUS ROD \ i Actual % Work Completed | 0% 0%, 42%] a Planned | % Complete $(todate) | 0% 0%, 33%] 67% 100%, 100%
Actual % Expended $ (to date) _ 0% 0%) et ~ Planned $ (this period) | $0 ‘$0 $9,328] $9, 328 $9,328 «$0
| Actual $ Expended (this period) | $0 $0. $9,924 | Planned $(todate) | $0, $0 $9,328 | $18, 656 | $27, 984 $27,984
Actual $ Expended (to date) $0 $0 $9,924
_ Contract No. 10629, Amend. 1 | $27,984 | $27,984 | $27,984 $27,084 $27,984 | $27,984
Actual Remaining Task Budget _| $27,984 | $27,984 $18,060 |
August 2002, Contract 10629 Amendment No. 1
HLY 23-5614 14
9/17/2002 SOUTHERN INTERTIE PROJECT THROUGH PERIOD ENDING:
Rage Zot 2 PROJECT SUMMARY REPORT OSes 02
38RD QUARTER 2002 4TH QUARTER 2002 |
TASK) MONTH JUL AUG SEP OCT NOV DEC
| 14-3 |Prepare and Distribute Composite ROD Document _ | | “Actual % Work Completed [0% 0%] | Planned % Complete $(todate) | = 0% = 0% 0%) = 0%|_— 50% ____ 100%
Actual % Expended $ (to date) 0%) 0%| 0%
___Planned $(thisperiod) =| == $0, =$0, ~~ $0} __—$0 ($21 G24 $21,624 Actual $ Expended (this period) $0 $0 | at
_____ Planned $ (to date) _ “$0. __ $0} $0. $0 | $21,624 T $43,248 |
L Actual $ Expended (to date) _| $0 _| $0 | $0 | | | Contract No. 10629, Amend. 1 | $43,248 | $43,248 | $43,248 | $43,248 | $43,248 $43,248
- Actual Remaining Task Budget
TASK 14 TOTAL
$43,248 | $43,248 | $43,248
_ Actual % Work Completed __ 0% 0% 20%) .
“Planned % % Complete $ (to date) | __ 0%) 0% 23%! 47% 85% 100%
Actual % Expended $ (to date) 0% 0%! 17%| aL
____ Planned $ (this period) _ $0) $0 | ) | $36,072 | $36, 072 | _ $57, eee | $23,668
Actual $ Expended (this period) _ $0) _ $0. $26,192} :
_____ Planned $ (to date) $0) $0) $36,072 | $72,144 $129, 842 | "$183, 510
Actual $ Expended (to date) $0 $0 | $26,192
r
Contract No. 10629, Amend. 1
“Actual Remaining Task Budget | $153, 510. $153, 510 $197, 318 $153,510 | $153,510 | $153, 510 as
August 2002, Contract 10629 Amendment No. 1 HLY 23-561a 14
SEP-13-2002 FRI 09:44 AM USFWS DIVISION OF REALTY FAX NO, 907 786 3901 P, UL/Ub
W,0,€ FS BWOS/ Lec, [72.5
4
Cay hickce LT pe Thaiboyy
Vb tur Loves “ als
2 ~ lls Gue? fo '
Brian L. Anderson a
U.S. Fish and Wildlife Service oe y
National Wildlife Refuge System - Alaska ¥
Division of Natural Resources
1011 East Tudor Road
Anchorage, Alaska 99503
Telephone: (907) 786-3379
FAX: (907) 786-3905
email: brian_]_anderson@fws.gov
2 4 Yop
DATE: September 13, 2002 seOD
TO: Larry Wolfe - RUS (202-720-0820) ¢ ast Dora Gropp - CEA (762-4617) 4% ks Jack Hewiit - USACE (753-5567) SX ~ GOES Randy Palmer - EPG (602-956-4374) anger” Robin West - KNWR (907-262-3599) ero’
&
NUMBER OF PAGES INCLUDING COVER: 5
Atfached: Record of Decision, Southern Intertie Project
SEP-13-2002 FRI 09:44 AM USFWS DIVISION OF REALTY FAX NO, 907 786 3901 Pr, UdZ/Ud
RECORD OF DECISION
SOUTHERN INTERTIE PROJECT
INTERTIE PARTICIPANTS GROUP
RIGHT-OF-WAY PERMIT APPLICATION E-298-KE
Decision
We, the U.S, Fish and Wildlife Service, through the Regional Director, Alaska Region, hereby
deny a grant of right-of-way (application E-298-KE) to the Intertie Participants Group (IPG) for
development of the Southern Intertie electric transmission line project on the Kenai National
Wildlife Refuge. The proposed project would have significant adverse impacts on Kenai Refuge
resources, was determined to be not compatible with the purposes for which the Kenai Refuge was
established, and there exists an economically feasible and prudent alternative to crossing the Kenai
Refuge. Our decision, made under authority of the National Wildlife Refuge System
Administration Act (16 U.S.C. 668dd), complies with the requirements of the National
Environmental Policy Act [(NEPA) (42 U.S.C. 4371 et seq.)] and the Alaska National Interest
Lands Conservation Act [(ANILCA) (16 U.S.C. 3101)].
Project Description
The IPG consists of Chugach Electric Association, Inc., Municipality of Anchorage - Municipal
Light and Power, City of Seward - Seward Electric System, Matanuska Electric Association, Inc.,
Golden Valley Electric Association, Inc., and Homer Electric Association, Inc. The IPG proposes
10 construct 4 new 138 kilovolt (kV) electric transmission line between the Kenai Peninsula and
Anchorage. The proposed transmission line (Enstar Route) would enter the Kenai Refuge east of
Sterling, and follow the existing Enstar natural gas pipeline for approximately 38.3 miles to
Chickaloon Bay, where it would exit the Refuge at Burnt Island. The 3-phase transmission line
would be supported mostly by guyed steel X-frame towers of approximately 90 fcet in hcight, and
a typical span of 750 feet, For 5.4 miles adjacent to Chickaloon Bay, 70-foot tall single wood
poles with a typical span of 600 feet would be used. A facility enclosed within a 100-foot by 130-
foot fenced area would be constructed for transition from overhead to submarine cable. The right-
of-way width would be 100 fect for single pole, or 150 feet for X-frame structures.
NEPA Compliance
As a cooperating Federal agency, we assisted in preparation of an environmental impact statement!
(EIS) for the project in accordance with the provisions of NEPA and the Council on
Yinvironmental Quality regulations at 40 CFR Parts 1500-1508. We participated in public scoping
and inter-agency meetings, and in public hearings on the project draft EIS as required by Title XI
' Southern Intertie Project Final Environmental Impact Statement, U.S, Department of
Agriculture, Rural Utilities Service, Washington, DC, July, 2002.
1
SEP-13-2002 FRI 09:44 AM USFWS DIVISION OF REALTY FAX NU, YU/ (86 3¥U! Yr. U3/Ud
of ANILCA. The EIS describes the consultation and coordination that has occurred during the
NEPA process.
Title Xl of ANILCA
The Kenai Refuge is a Conservation System Unit designated under ANILCA [Section 304 (4)],
and rights-of-way for transportation and utility systems (TUS) are governed under Title XI of
ANILCA and its implementing regulations at 43 CFR Part 36. Regulations'at 43 CFR 36.7 require
that the following nine fuctors be considered in making a decision regarding a proposed TUS:
1, The need for and economic feasibility of the TUS (43 CFR 36.7 (a)(2)(i)].
The purpose and need for the project is documented in the EIS, and centers around
coirecting existing deficiencies in the Railbelt electrical system south of Anchorage.
Deficiencies include capacily limitations of the existing Quartz Creek transmission line
and its susceptibility to outages due to avalanches and other adverse weather conditions.
Although evaluation of the economic feasibility of electric utility projects is beyond our
scope of expertise, we have no reason to dispute the findings in the EIS.
2, Alternative routes and modes of access, including a determination with respect to whether
there is any economically feasible and prudent alternative’ to rouling the system through or
within an area, and, if not, whether there are alternate routes or modes which would result in
Sewer or less severe impacts upon the area [43 CFR 36.7 (a)(2)(ii)].
The US identificd a number of alternatives to the proposed project, including two major
new Lransmission line routing alternatives (Quartz Creek and Tesoro routes), and a wide
variety of non-transmission alternatives, such as fucl cells, battery energy storage systems,
new gencration, and energy conservation. Of these, only the Tesoro Route transmission
line alternative was found to mect the purpose and need for the project, and was therefore
fully evaluated in the EIS. Originally identified by the IPG as a viable project altcrnative,
the Tesoro Route generally parallels the North Kenai Road from Nikiski to Captain Cook
State Recreation Area, and then follows the existing Tesoro fuels pipeline along the
northwest coast of the Kenai Peninsula to Pt. Possession, where it becomes a submarine
crossing of Turnagain Arm enroute to Anchorage. The route would occupy a
transportation corridor designated by the Kenai Peninsula Borough on Jands removed from
the Kenai Refuge (PLO 3400, May 22, 1964) for development of the Kenai Peninsula.
Although the Tesoro Route would cross the established Kenai Refuge boundary at two
locations for a total of less than two miles, a right-of-way permit from the Service would
not be required at these locations. The cost to construct the Tesoro Route alternative is
*Fconomically feasible and prudent alternative route means a route either within or
outside an area that is based on sound engineering practices and is economically practicable, but
does not necessarily mean the least costly alternative route [43 CFR 36.2 (h)].
2
SEP-13-2002 FR] 09:45 AM USFWS DIVISION OF REALTY FAX NO, 907 786 3901 P. U4/Ud
.
approximately ten percent higher than for the Enstar Route, and the total life cycle cost
favors the Enstar Route by approximately 14 percent. However, the additional costs of
construction and maintenance do not disqualify the Tesoro Route alternative from being an
economically feasible and prudent alternative consistent with the regulatory definition, and
from the standpoint of the IPG.
3. The feasibility and impacts of including different TUSs in the same area
[43 CFR 36.7 (a)(2)(iii)}. i
Both of the new transmission line alternatives are located adjacent to existing pipelines for
much of their routes on the Kenai Peninsula. The Enstar Route parallels the Enstar natural
gas pipeline across the Kenai Refuge, while the Tesoro Route follows the Tesoro fuels
pipeline along the northwest coast of the peninsula. The impacts of co-locating the
proposed transmission line with existing pipelines are similar for both routes, and gencrally
include expansion of existing clearings and access routes. These impacts are described in
detail in the EIS.
4. Short and long term sacial, economic and environmental impacts of national, state or local
significance, including impacts on fish and wildlife and their habitat and on rural, traditional lifestyles [43 CFR 36.7 (a)(2)(iv)].
‘The environmental impacts of the project alternatives are assessed in the EIS. Asa
cooperating Federal agency, the Service assisted in preparation of the document,
particularly in relation to impacts to fish and wildlife, and other Kenai Refuge resources.
According to the EIS, the project will have significant adverse impacts on the following:
fish and wildlife resources; land use and recreation; visual resources; and Refuge
management plans. The proposal would also add to already significant cumulative impacts
on Refuge resources as a result of human activities in and surrounding the Kenai Refuge.
Adverse impacts to fish and wildlife resources of the Kenai Refuge are considered
nationally significant because of the Congressional mandate to conserve these resources,
In light of the above considerations, the EIS identifies the Tesoro Route as the
environmentally preferred alternative.
5. The impucts, if any, on the national security interests of the United States, that may result from
the approval or denial of the application for the TUS [43 CFR 36.7 (a)(2)(v)].
Our denial of this right-of-way application will not affect national security interest that may
be associated with this proposed project, since a feasible alternative has been identified,
and that remains available to the IPG,
6. Any iimpacts that would affect the purposes for which the Federal unit or areca concerned was established [43 CFR 36.7 (a)(2)(vi)].
Our detailed findings in this regard are contained in the attached Compatibility
3
SEP13-2UU2 FRI UY!4> AM USFWS DIVISIUN UF KEALIY FAX NU, YUS (86 SYUL Pr, U9/U9
Determination, which is required under the National Wildlife Refuge System
Administration Act, and is also prepared in compliance with Title XI regulations at 43 CFR
36,1 (b). In summary, we have determined that the use of Refuge lands for the project as
proposed would not be compatible with the purposes for which the Kenai Refuge was
established.
7. Measures which should be instituted to avoid o or minimize negative impacts
[43 CFR 36.7 (a)(2)(vii)].
The EIS examines a full range of practicable measures to miligate the anticipated adverse
impacts of the proposed project, however such measures would not significantly reduce the
impacts sufficient to make the use compatible with Kenai Refuge purposes.
8. The short and long term public values which may be adversely affected by approval of the TUS
versus the short and long term public benefits which may accrue from such approval
[43 CFR 36.7 (a)(2)(viii)}.
No comparison of public values and benefits is necessary, since we will not approve the
right-of-way for the project as proposed. ;
9. Impacts, if any, on subsistence uses [43 CFR 36.7 (a)(2)(ix)}.
Our denial of the right-of-way application for the project as proposed will have no impacts
on current subsistence uses of the Kenai Refuge.
Summary
Based on the factors discussed above, we have decided to deny issuing a right-of-way permit to the
IPG for the Southern Intertie project as proposed. We have established an administrative record
containing the documentation used in reaching this decision, including all documents associated
with preparation of the ELS and Refuge Compatibility Determination.
Prepared by: Zge oe bt eo Date: J/22/oz_
Wildlife Biologist, Division of Natural Resources
Reviewed by: shen. LON fv: & =u Date: 3/adfo2
Chief, Division of
Approved by: De ' Ait — Date: M HD