Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
S Intertie report 1-2000
CHUGACH ELECTRIC ASSOCIATION, INC. ach Cin ASSOCIATION, INC. ECEIVE January 26, 2000 JAN ¢ Alaska Industrial Development N26 2009 and Export Authority Alaska Industrial Developme 480 West Tudor Road and Export Authority 7 Anchorage, Alaska 99503-6690 Sa Attention: Mr. Randy Simmons, Executive Director atatona 2, Subject: Southern Intertie Monthly Report for January 2000 ou W.0.#E9590081 Dear Mr. Simmons: Please find enclosed 1 (one) copy of the Southern Intertie Report for the month of January 2000. If there are any questions, please contact Dora Gropp, (907) 762-4626. Sincerely, Eugene “ Sorted i General Manager he ENG G:ah Enclosures: 1 (one) copy of Southern Intertie Monthly Report C: Lee Thibert Michael Massin Dora Gropp Jim Borden Mike Cunningham Don Edwards W.0.#E9590081, Sec., 2.1.3 RF 5601 Minnesota Drive ¢ P.O. Box 196300 ¢ Anchorage, Alaska 99519-6300 Phone 907-563-7494 « FAX 907-562-0027 CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska SOUTHERN INTERTIE Phase IC —- EIS MONTHLY REPORT for JANUARY 2000 5601 Minnesota Drive P.O. Box 196300 Anchorage, Alaska 99519-6300 II. III. TABLE OF CONTENTS SUMMARY FINANCIAL 1. Bank Statement of December 1999 2. Chugach Statement for December 1999 3. Total Project Expenditures, Inception Through December 1999 4. Chugach Activity Summary for December 1999 SCHEDULE ITEMS FOR APPROVAL None. ITEMS FOR DISCUSSION None. ITEMS FOR INFORMATION 1. POWER Engineers’ Monthly Report dated January 19, 2000 2. January 14, 2000 Revision of the Memorandum of Understanding with RUS and USFWS 3. Letter of January 7, 2000 to RUS/USFWS and COE SUMMARY A draft outline of the EIS has been presented by RUS’ consultant MANGI and has been accepted by the federal agencies. The Memorandum of Understanding between the federal agencies and the IPG has been revised again to reflect that the US Army Corps of Engineers will not participate in the EIS preparation. The COE will use the EIS developed by the RUS/USFWS for their permitting reviews. We have expressed our concern over possible criticism of the COE’s non participation at a later time to all three agencies (see letter in Section VI). We will invite State and local agencies to review the Environmental Analysis (EVAL) in the next month to allow their staff to familiarize itself with the proposed route and the remaining alternative. The MOU between the agencies and the applicant (IPG) requires that the Applicant print the DEIS. The DEIS is expected to be available in May. Funding for the printing and distribution is presently not in place and needs be secured from AIDEA prior to April 30, 2000. Expenditures for Phase IC (EIS) of the project stand as follows : DESCRIPTION POWER |COE/USFWS/|CHUGACH TOTAL ENGINEERS RUS ORIG. BUDGET $389,547 $160,000} $100,000 $649,547 ALLOCATED $38,955 $0 $0 $38,955 CONTINGENCY TOTAL $428,502 $160,000} $100,000 $688,502 AMENDMENTS $0 $0 $0 $0 TOTAL $428,502 $160,000} $100,000 $688,502 COMMITMENT SPENT TO DATE $24,852 $99,034] $14,410 $138,296 % OF TOTAL 6% 62% 14% 20% Total Project expenditures as of 01/18/00 are $5,242,596. Il. FINANCIAL 1. Bank Statement of December 1999 2. Chugach Statement for December 1999 3. Total Project Expenditures, Inception Through December 1999 4. Chugach Activity Summary for December 1999 Southern Intertie Grant Fund Bank Account Activity Summary December, 1999 November Ending Balance Forward Total Deposits Total Withdrawals Interest Earned Balance Dec 31, 1999 Southern intertie bank activity.xls $553,568.94 ($17,680.83) $0.00 $2,516.17 $538,404.28 01/18/2000 VALE: 12/31/99 ACCOUNT: 41100 ae First National Bank CM Gea rare CHUGACH ELECTRIC ASSOCIATION I T 30 PO BOX 196300 ANCHORAGE AK 99519-6300 MAIN BRANCH PO BOX 100720 ANCHORAGE AK 99510-0720 SES SSS S SSS SSS SSS SSS SeSSSeSSeer See esesses=scessse: DESCRIPTION . DEBITS CREDITS DATE BALAN( BALANCE LAST STATEMENT ........- cece ccc ce cece eee c es eeeces 11/30/99 553,568.! INTEREST 81.97 12/01/99 553,650.! INTEREST 81.99 12/02/99 553,732.! TRANSFER 10 BUSINESS ACCOUNT 1106061 - 9,903.83 12/03/99 543,829.¢ INTEREST 80.53 12/03/99 543,909.¢ INTEREST 239.36 12/06/99 544,148.¢ INTEREST j 78.31 12/07/99 544,227.: INTEREST 78.32 12/08/99 544,305.5 INTEREST 78.34 12/09/99 544,383-5 INTEREST 78.35 12/10/99 544,462.: INTEREST 237.53 12/13/99 544,699.€ INTEREST 80.85 12/14/99 544,780.€ INTEREST 80.87 12/15/99 544,861.5 INTEREST ; 80.88 12/16/99 544,942.4 INTEREST 80.89 12/17/99 545,023.3 INTEREST | 245.66 12/20/99 545,268.S INTEREST 83.90 12/21/99 545,352.68 INTEREST 83.91 12/22/99 545,436.17 INTEREST 83.92 12/23/99 545,520.6 INTEREST 83.94 12/24/99 545,604.6 INTEREST 250.31 12/27/99 545,854.9 INTEREST 82.45 12/28/99 545,937.3 TRANSFER TO BUSINESS ACCOUNT 1106061 7,777.00 12/29/99 538,160.3 INTEREST 81.28 12/29/99 538,241.6 INTEREST 81.30 12/30/99 538,322.9 INTEREST 81.31 12/31/99 538,404.2 BALANCE THIS STATEMENT ....cceecceccrrccnncecececccccecee 12/31/99 538,404.2 x= *x* ex CONTINUED «* & & First National Bank MAGI tate DATE: CHUGACH ELECTRIC ASSOCIATION I 12/31/99 ACCOUNT: 4110¢ NON FEDERALLY INSURED REPURCHASE AGREEMENT ACCOUNT 41100033 SS SS SSS SSS SSS SSS SS SSS SS SS SSS SS SS SSS SSS SSS SSS SS SS SSS SS SS SSS SSS SS SS SESE EE EEE== TOTAL CREDITS (23) 2,516.17 TOTAL DEBITS (2) 17,680.83 INTEREST THIS STATEMENT 2,516.17 INTEREST PAID 1999 19,242.66 - END OF STATEMENT - CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska 01/18/00 TO: Dora Gropp - Manager, Transmission & Special Projects FROM: Debra Williams, Plant Accountant SUBJECT: 9590081 - Southern Intertie Route Selection Study You had previously requested establishment of this work order to study route selection for the Southern Intertie for the Intertie Participants Group. The Association will be reimbursed for charges to this work order. The following charges occurred during December 1999. Direct Labor 3,864.66 Indirect Labor 1,560.58 Power Engineers - Invoice 68259 5,589.62 Heller, Ehrman White & McAuliffe-Invoice 9935983 1,084.82 USDA-Rural Utilities Services (Contract DACW69-97-D-0013) 1,364.20 FedEx-Invoice 4-900-98681 32.35 Sub-Total $13,496.23 General, Administrative & Construction Overhead (0.5%) 67.48 Total Charges $13,563.71 Please review the attached backup and indicate your concurrence below if you are in agreement that these charges are correct for this work order and time period. As per your request, | will keep the original in the work order file. Concur: Dore. Lz. Ly (19 -—CO SignatGre Date KP WOfiles/E9590081 Attachments ae REECE: a. ¢ United States Department of Agriculture Rural = JAN 1 0 2099 Rural Business—Cooperative Service.* Rural Housing Service » Rural Utilities Service Washington, DC 20250 . -FRANSMISS 10 _ SPECIAL PROUSGE JAN 3 2000 Ms. Dora L. Gropp Manager, Transmission & Special Projects. Chugach Electric Association, Inc. P.O. Box 196300 Anchorage, Alaska 99519-6300 Dear Ms. Gropp: The regulations that implement the provisions of the Alaska Native Interest Lands Conservation Act provide for the reimbursement of Federal agency costs associated with the processing of the application. I am hereby requesting reimbursement for travel expenses incurred to participate in the December 14 and 15, 1999 meetings f in Anchorage. A copy of my travel voucher that was filed with the veDe ational Gin Genter is As specified in Attachment C to the Cooperative Agreement between the RUS and the Intertie Participants Group (IPG), the check should be made payable to USDA, Rural Utilities Service, Stop 1571, 1400 Independence Ave. SW, Washington, DC 20250-1571. If you have any questions, please contact me at (202) 720-5093. 27h 5 Sincerely, pntleeley For hay Hae LAWRENCE R. WOLFE "PROJEC 7 Mans Acting Director BY: ie, Engineering and Environmental Staff DIREETOR, ENGINEERING SER: 70 Rural Utilities Service BY_ fA _ EXECUTIVE MGR. TED NETVIORK CERGCES DATE . BY:_____ ALA ——— GENERAL MANAGER TATE ENTERED jan 7 2 2000 W.0.# E7900 8/ _ conit__ 2276 Rural Development is an Equal Opportunity Lender Vea Complaints of discrimination should be sent to: f ¢ Secretary of Agriculture, Washington, DC 20250 CG \e Alaska Seafood International, LLC Contract, 10474-0068 We Fees 9230055802/9200 3,050.00 Disbursements 19959002 $0.00 Gee eo? v a sap $ 2,809.50 Intertie Environmental, 10474-0070 Fees $ 1,083.50 1861017101/92 : 4 Disbursements wo moprere | °° $ 1.32 Total $ 1,084.82 Cook Inlet Environmental, 10474-0071 Fees 9230055802/9200 $ 94.00 [7a Disbursements $ 0.0 Total $ 94.00 Total fees for all matters : $ 92,154.05 Total disbursements for all matters . $ 5,195.19 Total general retainers applied _ $ 0.00 Total current billing for all matters $ 97,349.24 This statement may not include the entirety of expense items (such as telephone, reproduction, travel and related services) for some of which we have not been billed. ENTERED DEC 2 91999 E) ©2471 6100 Corumsta CENTER 701 Firtn Avenue SEATTLE WASHINGTON 98104-7098 ‘TELEPHONE: (206) 447-0900 Facsimace: (206) 447-0849 Fees Disbursements Total Fees Disbursements Total Fees- Disbursements Total Fees Disbursements Total Fees Disbursements Total ( fo HELLER EHRMAN WHITE & MSAULIFFE ATTORNEYS / / ( A PARTNERSHIP OF PROFESSIONAL “RECI DEC 16 1999 Summary Statement--Invoice No. 9935983 Chugach Electric Association Financing, 10474-0003 1861017102/9200 F9900697 Purpa Matters, 10474-0007 9280055802/9200 Misc. Alaska Assignments, 10474-0022 1861017101/9200 P9800688 Act Filings, 10474-0024 9230055802/9200 Rate Matters - Wholesale, 10474-0030 9280055802/9200 $ 225.00 $ 0.00 $ 225.00 $ 1,508.00 $403.87 $ 1,911.87 -$ 1,534.00 $ 122.96 $ 1,656.96 $+ 55.50 $ 1,712.46 $ 1,740.00 $___ 62.75 $ 1,802.75 $ 32.00 $ 230.74 $ 262.74 GENERAL COUNSEL'S OFFICE FOR LEGAL SERVICES RENDERED THROUGH November, 1999 PorTLAND Tacoma ANCHORAGE San FRanctsco Los ANGELES Pao ALTo WasHincTon, D.C. Honc KonG SINGAPORE Pe ~ 7 a“ Via RE « Project Expenditures Direct Labor Indirect Labor Power Engineers Miscellaneous Total Grant Fund Expenditures Direct Charges that Chugach has been Reimbursed for Pius General, Administrative & Construction Overhead Total Amounts Paid to Chugach cc: Dora Gropp Kathy Harris CHUGACH ELECTRIC ASSOCIATION, INC. Southern Intertie Transactions Inception Through December 31, 1999 Year to Date Month Inception Through Ended Inception Through 12/31/98 12/01/1999 12/31/1999 Through 12/31/1999 $139,963.89 $17,993.07 $3,864.66 $161,821.62 52,278.09 7,727.58 1,560.58 61,566.25 4,180,875.68 533,309.60 5,589.62 4,719,774.90 268,608.32 37,192.55 2,481.37 308,282.24 Se ee $4,641,725.98 __ Year to Date Inception Through $596,222.80 $13,496.23 Month Ended Inception Through 12/31/98 12/01/1999 12/31/1999 Through 12/31/1999 $4,570,726.42 22,853.64 3,336.10 $4,593,580.06 01/18/2000 $667,222.36 $670,558.46 $13,496.23 $5,251,445.01 $67.48 26,257.22 $13,563.71 $5,277,702.23 98-99Sinterti.xis Invoice Month Inception-to-Date Date Incurred Costs OH Total Charges ~ Dee85 Jun-Oct95 22,614.00 113.07 22,727.07 22,727.07 Jan-96 0.00 0.00 0.00 22,727.07 Feb-96 Nov-Dec95 176,265.61 881.33 177,146.94 199,874.01 Mar-96 Jan-96 7,660.92 38.30 7,699.22 207,573.23 Apr-96 Feb-96 251,912.29 1,259.56 253,171.85 460,745.08 May-96 Mar-96 172,070.45 860.35 172,930.80 633,675.88 Jun-96 Apr-96 127,113.82 635.57 127,749.39 761,425.27 Jun-96 May-96 35,628.41 178.14 797,231.82 Aug-96 Jun-96 40,919.00 204.60 838,355.42 Sep-96 Ju-96 57,116.72 285.58 ; 895,757.72 Oct-96 Aug-96 168,312.54 841.56 169,154.10 1,064,911.82 Oct-96 Sep-96 202,010.97 1,010.05 203,021.02 1,267,932.84 Dec-96 Oct-96 __ 171,462.74 857.31 _ 172,320.05 1,440,252.89 Life to Date 1,433,087.47 7,165.42 _1,440,252.89 Jan-97 Nov-96 234,735.50 1,173.68 235,909.18 1,676,162.07 Feb-97 Dec-96 306,667.10 1,533.34 308,200.44 1,984,362.51 Mar-97 Jan-97 5,045.85 25.23 5,071.08 1,989,433.59 Apr-97 Feb-97 124,380.57 621.90 125,002.47 2,114,436.06 May-97 Mar-87 177,117.40 885.59 178,002.99 2,292,439.05 Jun-97 Apr97 165,814.35 829.07 166,643.42 2,459,082.47 Jul-97 May-97 158,762.80 793.81 159,556.61 2,618,639.08 Aug-97 Jun-87 158,786.12 793.93 159,580.05 2,778,219.13 Aug-97 Jub87 154,159.15 770.80 154,929.95 2,933,149.08 Sep-97 Aug-97 243,365.76 1,216.83 244,582.59 3,177,731.67 Oct-97 Sep-97 193,127.79 965.64 194,093.43 3,371,825.10 Nov-87 Oct-97 258,833.19 1,294.17 260,127.36 3,631 ,952.46 Dec-97 Nov-87 228,435.19 1,142.18 _ 229,577.37 3,861,529.83 Year to Date 2,409,230.77 12,046.17 _2,421,276.94_ Life to Date ~F842,318.24 19,211.59 _3,661,529.83 Jan-98 0.00 0.00 0.00 3,861 ,529.83 Feb-98 Dec-97 153,179.64 765.90 153,945.54 4,015,475.37 Mar-98 0.00 0.00 0.00 4,015,475.37 Apr-98 Jan-88 39,750.15 198.75 39,948.90 4,055,424.27 Apr-98 Feb-98 49,887.09 249.44 50,136.53 4,105,560.80 May-98 Mar-98 64,102.85 320.51 64,423.36 4,169,984.16 Jun-98 Apr-98 7,283.97 36.42 7,320.39 4,177,304.55 JuFg8 May-98 173,312.97 866.56 174,179.53 4,351 ,484.08 Aug-98 Jun-98 59,362.04 296.81 59,658.85 4,411 ,142.93 Sep-98 Juk88 38,783.39 193.97 38,987.36 4,450,130.29 Oct-98 Aug-98 123,711.01 618.56 124,329.57 4,574,459.86 Nov-98 Sep-98 19,025.07 95.13 19,120.20 4,593,580.06 Dec-98 0.00 0.00 0.00 4,593,580.06 Year to Date 728,408.18 3,642.05 732,050.23 Life to Date 4,570,726.42 22,853.64 _4,593,580.06_ Jan-99 0.00 0.00 0.00 4,593,580.06 Feb-99 Oct-98 4,729.98 23.65 4,753.63 4,598,333.69 Nov-98 2,668.64 13.34 2,681.98 4,601,015.67 Dec-98 63,600.94 318.00 63,918.94 4,664,934.61 ‘- USFS Refund (27,159.93) 0.00 —-(27, 159.93) 4,637,774.68 Mar-99 Jan-89 55,203.86 276.02 55,479.88 4,693,254.56 Apr-99 Feb &Mar99 133,963.88 669.82 134,633.70 4,827,888.26 May-99 0.00 0.00 0.00 4,827,888.26 Jun-99 Apr&May99 175,367.11 876.83 176,243.94 5,004,132.20 Ju-s9 Jun-99 129,717.72 648.59 130,366.31 5,134,498.51 Aug-99 Jubs9 62,556.06 312.78 62,868.84 5,197,367.35 Sep-99 Aug-99 9,366.00 46.83 9,412.83 5,206,780.18 Oct-99 Sep-99 12,455.30 62.28 12,517.58 5,219,297.76 Nov-99 Oct-99 9,854.56 49.27 9,903.83 5,229,201.59 Dec-99 Nov-99 7,738.31 38.69 7,777.00 5,236,978.59 Jan-00 Dec-99__ 13,496.23 67.48 13,563.71 5,250,542.30 Year to Date 640,062.43 3,336.10 643,398.53 Life to Date 5,210,768.85 26,180.74 __5,236,978.59_ oe USFS Reimbursement is not included in total Grant Fund Expenditures portion of Transaction Spreadsheet. Chugach Electric Association, Inc. Southern Intertie Activity Summary December, 1999 Beginning Grant Chugach Ending Bank Funds Interest Invoices Bank Year Balance Received Earned Paid Balance 1996 0.00 2,771,277.00 40,361.59 (1,440,252.89) 1,371,385.70 1997 1,371,385.70 1,346,934.00 67,734.96 (2,421,276.94) 364,777.72 1998 364,777.72 525,214.00 19,424.02 (732,050.23) 177,365.51 1999* 177,365.51 988,194.64 19,242.66 (646,398.53) 538,404.28 Total 5,631,619.64 146,763.23 _(5,239,978.59. * Through December, 1999 bank statement (does not include Chugach invoices for charges incurred in December 1999) Southern Intertie AIDEA mtg.xls 01/18/2000 II. SCHEDULE CHUGACH ELECTRIC ASSOCIATION ANCHORAGE - KENAI INTERTIE Tue 01/18/00 PHASE IB 1995 1996 1997 1998 1999 2000 2001 ID | Task Name % Comp. 1 [ENVIRONMENTAL & ENGINEERING 75% 2 PROJECT MANAGEMENT 70% 3 ~ ROUTE SELECTION STUDIES 100% 4 | EVAL & PREL.ENGINEERING 100% 5 EIS PREPARATION 8% | 6 DEIS —_ 10% 7 COMMENT PERIOD “0% 8 FEIS 0% 9 |AGENCIES 50% 10 USFWS 31% 1 RUS 50% 12 USFS 100% 13 ROD _ 0% Task Saree Rolled Up Task eal Project Summary USE) Project: ANCHORAGE - KENAI INTE Progress MEE Rolled Up Milestone <> Split uuu Date: Tue 01/18/00 Milestone @ Rolled Up Progress NS = Rolled Up Split Summary QE External Tasks PH_IC.MPP Page 1 IV. ITEMS FOR APPROVAL None. Vv. ITEMS FOR DISCUSSION None. IV. ITEMS FOR INFORMATION 1. POWER Engineers’ Monthly Report dated January 19, 2000 2. January 14, 2000 Revision of the Memorandum of Understanding with RUS and USFWS 3. Letter of January 7, 2000 to RUS/ USFWS and COE IENGINEERS RY UWE RRECEIVET) JAN 2 0 2099 J 19, 2000 NSMISSION & _ SPECIAL PROJECT Ms. Dora Gropp Chugach Electric Association 5601 Minnesota Drive, Building A Anchorage, AK 99518 Subject: POWER Project #120376 EIS & Preliminary Engineering Chugach Contract No. 820, Monthly Status Report No. 12 For Period December 12, 1999 — January 1, 2000 Dear Dora: This report summarizes the activities completed during December 1999 for Task 10. During the reporting period, our activities included project reporting, coordination of activities between the project team and attendance at the meetings in Anchorage on December 14 and 15, 1999. The attached Project Summary Report spreadsheet is based on the Amendment No. 2 authorized budget. Included with this monthly status report are Daily Activity Logs for each person with time to the project for this invoicing period. The Environmental Planning Group (EPG) has also submitted activity logs which are included with this report. This report includes the following attachments: 1) Overall Financial Project Summary 2) Project Summary Report by Task 3) Daily Activity Logs Memorandum of Understanding The MOU was revised during the meeting on December 14, 1999. The USFWS will continue in the role of a Cooperating Agency. USFS will not be included as part of the revised MOU. Chugach is the Applicant and Construction Manager for the IPG. RUS will continue at Lead Agency. Larry Wolfe signed the revised MOU for RUS on December 15, 1999 and Chugach circulated the MOU to the other parties for review and signature. The Corp of Engineers (COE) agreed to be a Participating Agency at the meeting, however, they returned the MOU unsigned. HLY 23-012 POWER Engineers, Incorporated 3940 Gienbrook Dr. * P.O. Box 1066 Phone (208) 788-3456 Hailey, Idaho 83333 Fax (208) 788-2082 Chugach Electric Association January 19, 2000 Page 2 Schedule: At the Agency DEIS Coordination Meeting with RUS, USFWS and the COE on December 14, 1999 in Anchorage, a schedule was agreed to and attached to the signed MOU. The schedule indicates that the DEIS will be completed by June 2, 2000. The Record of Decision is scheduled for January 2, 2001. RUS’s third party contractor is currently preparing the DEIS on this schedule. Task Comments: The primary work accomplished in December was the agency and project team meetings in Anchorage on December 14 and 15, 1999, along with preparation and follow-up for those meetings. The meetings were budgeted and completed under the Task 1 — Technical Support budget. At that meeting, the MOU was also updated (Task 6) and the COE was briefed (Task 7, Randy Pollock and Tim Tetherow met with Jack Hewitt from the Corps). While no time has been charged to Tasks 6 and 7, at least part of the planned effort for updating the MOU and briefing the COE has been completed, so we have shown these two tasks as 50% complete. Budget: Task 10 Budget $389,547 Task 10 Expended Through Previous Invoice $ 8,216 Task 10 Expended This Period $ 16,637 Task 10 Actual Remaining Project Budget $364,694 Total Budget $4,300,741 Expended Through Previous Invoice $3,904,980 Expended This Period $16,637 Actual Remaining Project Budget $ 379,124 HLY 23-012 DOWER syciis Chugach Electric Association January 19, 2000 Page 3 Dora, should you have any questions about this report or any of the backup, please do not hesitate to contact Mike Walbert or me. Sincerely, POWER Engineers, Inc. oii Randy Pollock, P.E. Project Manager RP/Ik Enclosures cc: PROJECT TEAM HLY 23-012 GE ZOWeER SOUTHERN INTERTIE ROUTE SELECTION STUDY - PHASE 1 - 120376 PROJECT FINANCIAL SUMMARY - DECEMBER, 1999 INVOICE Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8 Task 9 Task 10 Project Total Base Not to Exceed Budget $351,050 $660,706 $584,010 $303,475 $402,570 $247,616 $101,480 $202,655 $189,861 N/A $3,043,423 CWG Contract Amendment No. 4 $23,789 $18,885 $22,602 $32,866 $4,904 N/A N/A N/A N/A N/A $103,046 DFI Contract Amendment No. 5 N/A N/A N/A N/A $45,000 N/A N/A N/A N/A N/A $45,000 DFI Contract Amendment No. 6 N/A N/A N/A N/A $11,400 N/A N/A N/A N/A N/A $11,400 DFI Contract Amendment No. 7 N/A N/A N/A N/A $3,502 N/A N/A N/A N/A N/A $3,502 DFI Contract Amendment No. 8 N/A N/A N/A N/A $89,487 N/A N/A N/A N/A N/A $89,487 Task 5 & 6 Reallocation * N/A N/A N/A N/A $194,150 ($194,150) N/A N/A N/A N/A $0 Contract Amendment No. 9 N/A N/A N/A N/A $31,926 N/A N/A N/A N/A N/A $31,926 Contract Amendment No. 11 N/A N/A N/A N/A $118,193 N/A N/A N/A N/A N/A $118,193 Contract 820, Amendment No. 1 N/A N/A N/A N/A $465,215 N/A N/A N/A N/A N/A $465,215 Contract 820 Amendment No. 2 N/A N/A N/A N/A N/A N/A N/A N/A N/A $389,547 $389,547 Total Not to Exceed Budget $374,839 $679,591 $606,612 $336,341 $1,366,349 $53,466 $101,480 $202,655 $189,861 $389,547 $4,300,741 Actual Budget Expended Through Previous Invoice $374,839 $679,583 $606,540 $336,315 $1,353,299 $52,250 $101,476 $202,610 $189,852 $8,216 $3,904,980 Current Invoice Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $16,637 $16,637 Actual Budget Expended Through Current Invoice $374,839 $679,583 $606,540 $336,315 $1,353,299 $52,250 $101,476 $202,610 $189,852 $24,853 $3,921,617 Remaining Budget $0 $8 $72 $26 $13,050 ¢ Task 5 budget amount reflects the addition of Contract No. 820, Amendment No. | funds. ¢ Task 10 budget amount reflects the addition of Contract No. 820, Amendment No. 2 funds. HLY 23-012 $1,216 $4 $45 $9 $364,694 $379,124 1/19/00 Page 1 of 3 Tech/Environmental Support SOUTHERN INTERTIE PROJECT PROJECT SUMMARY REPORT THROUGH PERIOD ENDING: 01-01-00 4TH QUARTER 1999 1ST QUARTER 2000 Actual % Work Completed 2% 11% | Planned % Complete $ (to date) 10-2 Actual % Expended $ (to date) 0% | 2% 11%, _ Planned $ (this period) fe | | ‘Actual $ Expended (this period) $366 | $3,903 $15,627 | |__ Planned $(todate) _ _ - Actual $ Expended (to date) _ $366 | $4,269 $19,896 | Contract No. 820, Amend. No.2 | $175,265 | $175,265 | $175,265 | | - Actual Remaining Task Budget $174,899 | $170,996 | $155,369 | Actual Remaining Task Budget Public Involvement | __Actual% Work Completed | | 0% 0% 0% Planned % Complete $ (to date) | | _ - Actual % Expended $ (to date) 0% 0%| 0% | __ Planned $ (this period) ; fe Actual $ Expended (this period) $0 $0 $0 | ___ Planned $ (to date) | Actual $ Expended (to date) $0 $0 $0 | Contract No. 820, Amend. No.2 | $88,603 $88,603 | $88,603 fe $88,603 $88,603 $88,603 | 10-3 |Mailing List | ___ Actual % Work Completed 0% 0% 0% Planned % Complete $ (to date) | - L ; Actual % Expended $ (to date) 0% 0% 0% | Planned $ (this period) f _ | “Actual $ Expended (this period) $0. $0 $0 | Planned $ (to date) ; Actual $ Expended (to date) $0 $0 $0. Contract No. 820, Amend. No. 2 $19,040 $19,040 $19,040 | Actual Remaining Task Budget 11/08/99 Contract 820 Amendment No. 2 $19,040 | $19,040 HLY 23-012a $19,040 | 1/19/00 SOUTHERN INTERTIE PROJECT THROUGH PERIOD ENDING: Page 2 of 3 PROJECT SUMMARY REPORT 01-01-00 4TH QUARTER 1999 1ST QUARTER 2000 TAS MONTH NOV DEC JAN FEB MAR | 10-4 |Print & Distribute DEIS/EIS NOT APPLICABLE AT THIS TIME 10-5 Actual % Work Completed Planned % Complete $ (to date) Actual % Expended $ (to date) Planned $ (this period) Actual $ Expended (this period) ____ Planned $ (to date) Actual $ Expended (to date) | Contract No. 820, Amend. No. 2 Actual Remaining Task Budget 11/08/99 Contract 820 Amendment No. 2 HLY 23-012a PM & Schedule Admin. Actual % Work Completed 3% 5% 6% | Planned % Complete $(todate)| | _ Actual % Expended $ (to date) 3% | 5% 6% | _ Planned $ (this period) - _ | _ Actual $ Expended (this period) $2,260 $1,686 $1,010 | Planned $ (to date) : | el - | | _Actual $ Expended (to date) $2,260 $3,946 $4,956 | Contract No. 820, Amend. No.2 | $76,935 $76,935 | $76,935 | | Actual Remaining Task Budget $74,675 | $72,989 $71,979 | 10-6 |Update MOU | Actual % Work Completed | | 0% 0% 50% _ | | Planned % Complete $ (to date) _ | _| | / Actual % Expended $ (to date 0%, 0% 0%, __ Planned $ (this period) | | ee [ Actual $ Expended (this period) | $0 | _ $0 $0 _ Planned $ (to date) - ; | Actual $ Expended (to date) $0 $0 $0 Contract No. 820, Amend. No. 2 $12,501 | $12,501 $12,501 Actual Remaining Project Budget] $12,501 $12,501 | $12,501 | T 1/19/00 Page 3 of 3 Brief Corps of Engineers SOUTHERN INTERTIE PROJECT PROJECT SUMMARY REPORT THROUGH PERIOD ENDING: 01-01-00 Actual % Work Completed 0% Planned % Complete $ (to date) PHASE 10 TOTAL Actual % Expended $ (to date) 0% 0% 0% ! Planned $ (this period) r AT I Tl Actual $ Expended (this period) $0 $0 $0 Planned $(todate) ss | - ny ian AL | Actual $ Expended (to date) $0 _ $0 | $0 | | Contract No. 820, Amend. No.2 | $17,203 $17,203| $17,203 | i Te Actual Remaining Task Budget $17,203 | $17,203} $17,203 $386,921 —t Actual % Work Completed 1% 2% 6%, | Planned % Complete $ (to date) | 7 | Ta Actual % Expended $ (to date) 1% 2% 6% | Planned $ (this period) i ie tii Actual $ Expended (this period) | $2,626 $5,589 | $16,637) 7 nil} __ Planned $ (to date) 7 7 a | Actual $ Expended (to date) $2,626 | $8,215 $24,852 Ar _ $389,547 | $389,547 | $389,547 | | $381,332 | $364,695 11/08/99 Contract 820 Amendment No. 2 HLY 23-012a DAILY ACTIVITY LOG Project Name: Chugach — Southern Intertie Project No: 120376-10 Project Staff Asst.: Laurie Kaufman Period Ending: 1/1/2000 Your Name: Randy Pollock — Project Manager. Company: PEI Date Description of Work Performed 12-13-99 23-01-01 Agency Kickoff Meeting in Anchorage 12-14-99 23-01-01 Agency Kickoff Meeting in Anchorage 12-15-99 | 23-01-01 Agency Kickoff Meeting in Anchorage 12-16-99 | 23-01-01 Agency Kickoff Meeting in Anchorage 12-20-99 23-01-01 Follow-up to agency Meetings 12-23-99 23-01-01 Meeting Minutes and follow-up to agency meetings. 12-27-99 23-01-01 Meeting Minutes and follow-up to agency meetings. 12-29-99 55-05-01 PM and Coordination, Follow-up to agency Meetings Note: Completed form to be turned in with your time sheet on Mondays. Staff Assistant will forward to the designated Project Staff Assistant for distribution/filing. HLY 23-012d(120376-10)k DAILY ACTIVITY LOG Project Name:Southern Intertie Project - Chugach Project No: 120376-10 Project Staff Asst.: Laurie Kaufman Period Ending:Jan. 1, 2000 Your Name: Mike Walbert Company:POWER Engineers Date Task Description of Work Performed 12/18/99 120376-10-55-05-02 Project Reporting Note: Completed form to be turned in with your time sheet on Mondays. Staff Assistant will forward to the designated Project Staff Assistant for distribution/filing. HLY 23-012e(120376-10)Ak DAILY ACTIVITY LOG Project Name: Southern Intertie DEIS Support_ Project No: 120376-10 Project Staff Asst.: Laurie Kaufman Period Ending: 01/01/00 Your Name: Claire L. Liman Company: PEl Date Description of Work Performed 12/18/99 55-05-02 Project Reporting Note: Completed form to be turned in with your time sheet on Mondays. Staff Assistant will forward to the designated Project Staff Assistant for distribution/filing. HLY 23-012f (120376-10) /Ik DAILY ACTIVITY LOG Project Name: Southern Intertie DEIS Support Project No: 120376-10 Project Staff Asst.: Laurie Kaufman Period Ending: 01/01/00 Your Name: Laurie Kaufman Company: PEl Date Description of Work Performed 12/18/99 55-05-02 Project Reporting | 12/25/99 55-00-02 Project Reporting Note: Completed form to be turned in with your time sheet on Mondays. Staff Assistant will forward to the designated Project Staff Assistant for distribution/filing. HLY 23-012g (120376-10) Ak DAILY ACTIVITY LOG Project Name: Southern Intertie Project Project No: 01014 Project Staff Asst: Brandie Powers Period Ending: 1/1/00 Employee Name: Garlyn Bergdale Company: EPG, Inc WIE Date Description of Work Performed No. 0} Meetings in Anchorage 12/18/99 Develop scope/Schedule/MOU 12/25/99 Review Mangi scope of work Note: Completed form to be turned in with your timesheet on Mondays. Staff Assistant will forward to the designated Project Staff Assistant for distribution/filing. DAILY ACTIVITY LOG Project Name: Southern Intertie Project Project No: 01014 Project Staff Asst: Brandie Powers Period Ending: Employee Name: Brandie Powers Company: EPG, Inc Date Description of Work Performed 12/12/99 12/18/99 Note: Completed form to be turned in with your timesheet on Mondays. Staff Assistant will forward to the designated Project Staff Assistant for distribution/filing. DAILY ACTIVITY LOG Project Name: Southern Intertie Project Project No: 01014 Project Staff Asst: Brandie Powers Period Ending: Employee Name: Janie Larson Company: EPG, Inc Note: Completed form to be turned in with your timesheet on Mondays. Staff Assistant will forward to the designated Project Staff Assistant for distribution/filing. MEMORANDUM OF UNDERSTANDING BETWEEN RURAL UTILITIES SERVICE, U.S. FISH AND WILDLIFE SERVICE, AND CHUGACH ELECTRIC ASSOCIATION, INC. FOR ANILCA AND NEPA COMPLIANCE FOR THE SOUTHERN INTERTIE PROJECT RUS: USFWS: 1448-70181-97-K004 CEA: E9590081 I. | INTRODUCTION AND PURPOSE Six electric utilities that are collectively known as the Intertie Participants Group (IPG) have proposed to construct a new transmission line in Alaska. The IPG consists of Chugach Electric Association, Inc. (Chugach); Municipality of Anchorage - Municipal Light and Power; City of Seward - Seward Electric System; Matanuska Electric Association, Inc.; Golden Valley Electric Association, Inc. (GVEA); and Homer Electric Association, Inc. (HEA). These six utilities are jointly identified as the Applicant. The proposal, which is referred to as the Southern Intertie Project (Proposed Project), consists of the construction and operation of a 230kV transmission line and associated facilities to be operated initially at 138kV between Anchorage and a location on the Kenai Peninsula in Alaska. Chugach will act as the construction manager for the Proposed Project. One or more of the alternative routes being considered would cross the Kenai National Wildlife Refuge, a designated conservation system unit under the Alaska National Interest Lands Conservation Act (ANILCA) P.L. 96-487). Therefore regulations implementing Title XI of ANILCA will apply to the entire project (43 CFR Part 36). The Title XI Transportation/Utility Systems Permit Application has been filed with and accepted by the United States Fish and Wildlife Service, Rural Utilities Service and Corps of Engineers. Whereas Federal lands and/or Federal financing assistance may be required, the Rural Utilities Service (RUS), will be the Lead Agency; and U.S. Fish and Wildlife Service (USFWS) will be a Cooperating Agency for the National Environmental Policy Act (NEPA) process. These agencies will be collectively referred to as the Federal Agencies. It is the purpose of this memorandum to establish an understanding between the Lead Agency, Cooperating Agency and Applicant regarding the conditions and procedures to be followed in compliance with ANILCA provisions and preparation of the Environmental Impact Statement (EIS) through a joint Applicant/Agency effort. The EIS will be prepared in compliance with NEPA, as implemented by the Council on Environmental Quality (CEQ) Regulations 40 CFR Parts 1500-1508 and RUS environmental policies and procedures (7 CFR Part 1794) plus the pertinent regulations of the USFWS and COE as appropriate. © \Wau\annalisa'worddoes\gropp south tiemoy_12_99, doc January 14, 2000 Page 1 of 5 The objective of this Memorandum of Understanding (MOU), which supersedes the original MOU executed on July 25, 1997, is to ensure the timely preparation of an EIS that (a) satisfies the environmental review requirements of the participating Federal Agencies and other applicable Federal environmental regulations and legislative requirements; and (b) establishes a process to conduct an environmental review of the alternatives identified that would meet the needs of the IPG. The Federal Agencies have agreed to achieve consensus on the process and content of the EIS, and the decision- making in accordance with their applicable laws and regulations. The EIS will be prepared by a third-party contractor under the direction of the Lead Agency with assistance from the other Federal Agencies. To facilitate the environmental review process, the Applicant has provided an Environmental Analysis (EVAL). The EIS will be based on the EVAL prepared by the Applicant’s Consultant. The Applicant and its Consultant will also provide technical assistance for the EIS preparation, as required. II. JOINT RESPONSIBILITIES The Federal Agencies and Applicant, to the extent of their involvement and jurisdiction in the Proposed Project, shall: m= Identify the significant issues to be studied, identify the project alternatives to be studied and the environmentally preferred alternative, and coordinate the decision process. = Actively participate in all phases of the EIS preparation as specified in the attached schedule. The schedule may be modified in accordance with applicable regulations. m= Participate in the process as appropriate with Federal, State, regional, and local agencies and the public for the purpose of increasing communication and soliciting comments on the EIS. m= Facilitate coordination of efforts and exchange of information. m= Designate a representative(s) to serve as the day-to-day liaison and/or contact person for this proposed project. m= Hold public hearings on the Draft EIS (DEIS) as required. m= = After the close of the DEIS review and comment period, review the comments submitted by the pubic and Federal, State, and local agencies, and develop responses to comments for incorporation into the final EIS (FEIS). m= Prepare a mailing list for distribution of project information. January 14, 2000 Page 2 of 5 Ill. INDIVIDUAL RESPONSIBILITIES In addition to the joint responsibilities mentioned above, the parties will have the following individual responsibilities. 1. LEAD AGENCY RESPONSIBILITIES RUS as the Lead Agency will: m= Ensure that the DEIS is based on the Applicant’s EVAL and other information, with support from the other Federal Agencies. m= Direct the development of the DEIS by the third-party contractor. m File DEIS and FEIS with Environmental Protection Agency (EPA) and provide notice(s) in the Federal Register (FR). = Receive all comments on the DEIS and FEIS and distribute to other Federal Agencies and the Applicant. = Direct the preparation of the FEIS by the third-party contractor, with support from the other Federal Agencies. m= Issue a ROD. 2. USFWS RESPONSIBILITIES (COOPERATING AGENCY) The USFWS will: m Review and comment on the DEIS and FEIS prior to filing with EPA. mu Assist the Lead Agency with responses to DEIS and FEIS comments. =~ =Issue a ROD. 3. APPLICANT RESPONSIBILITIES The Applicant will: m Provide engineering, construction, financial analysis, technical and environmental information to the Federal Agencies for the preparation of the DEIS, FEIS and ROD. ‘¢ Mataunnalisa\worddocs\gropp south tieimou_12_99.doc January 14, 2000 Page 3 of 5 = Be responsible for identifying and securing all Federal, State and local permits and authorizations required for construction and operation of the proposed project. m= In accordance with applicable laws reimburse the lead and Cooperating Agencies for costs associated with preparation of the EIS. m Provide the following DEIS, FEIS and ROD support: - conduct supplemental public involvement activities; - provide input to agency responses to the DEIS and FEIS comments - maintain project mailing list; - print and assist in distribution of the DEIS and FEIS; - provide logistic support to the agencies in scheduling public hearings if required; and, - publish local and State notices of availability of the DEIS, FEIS and ROD. IV. MODIFICATIONS AND TERMINATION 1. Each party to this MOU may terminate this agreement after 30 days prior notice, in writing, to the other parties. During the intervening 30 days, the parties agree to actively attempt to resolve any outstanding disputes and disagreements. The Applicant shall not direct the modification, inclusion or exclusion of any materials pertinent to the EIS preparation excepting the exclusion of confidential information. The Applicant recognizes the responsibility of the Federal Agencies to comply with NEPA, to determine the necessity for preparing an EIS, to define the issues, to review and require modifications of the EIS, and to respond to the public and the Agencies' comments on the EIS. However, in executing the MOU, the Applicant reserves the right to contest, in any administrative or judicial proceedings, any adverse decision concerning the issues in the EIS or any other Federal or State requirements relating to the Proposed Project. This MOU becomes effective upon the signature by the last party. It will remain in force thereafter, unless terminated. It may be subject to annual amendments, or as otherwise becomes necessary, which will outline work to be accomplished during that period. In no event will this MOU remain in effect longer than three years from its effective date. Nothing herein shall be construed as delegating the Government to expend, or as involving the United States in any contract or other obligation for the future payment of, money in excess of appropriations authorized by law and administratively allocated for this work. (Next page for signatures) Mata \annalisa\worddocs\gropp\south tie\mow_12_99.doe January 14, 2000 Page 4 of 5 We have read the foregoing and agree to accept the provisions herein. For Rural Utilities Service: For Chugach Electric Association, Inc. for Intertie Participants Group: Signed Date Title For U.S. Fish and Wildlife Service: Signed: Date Title Attachment: EIS Preparation Schedule AH ‘cMatalannalisa\worddocs\gropplsouth te\mou_12_99.doe January 14, 2000 Signed Title Page 5 of 5 Date SOUTHERN INTERTIE PROJECT EIS PREPARATION SCHEDULE Application Filed Application Accepted DEIS Outline for Review Available DEIS Outline Accepted by PDEIS PDEIS Review (including meetings) RDEIS Review Camera Ready DEIS Available by Print and Distribute DEIS Public Review Publish FEIS by ROD by (CNDATA\EXCELWNTERTIENEISSCHED xis 1 01/10/2000 - 02/28/2000 - 03/23/2000 - 04/14/2000 - 04/24/2000 05/08/2000 05/08/2000 - 06/02/2000 06/02/2000 - 07/17/2000 09/01/2000 01/02/2001 January 14, 2000 CHUGACH ELECTRIC ASSOCIATION, INC. January 7, 2000 Via fax line: 202 720 0820 Mr. Larry Wolfe Senior Environmental Protection Specialist Rural Utilities Service 1400 Independence Ave., Mail Stop 157 Washington, DC 20250-1571 Subject: Southern Intertie Project NEPA/ANILCA Process Dear Mr. Wolfe: In light of the controversy possible during the public review(s) of the DEIS/EIS for the Southern Intertie Project we have again reviewed the regulations governing the NEPA process. We are still concerned that the somewhat ambiguous status of the COE as presently outlined in the revised MOU could lead to a challenge to the entire process. It is our interpretation of the CEQ guidance documents that an agency with “jurisdiction by law,” e.g. an agency that has to issue a permit for a project, has to be a cooperating agency in the NEPA process. A brief review of the proposed construction methods after our meeting on December 14,1999 have lead to the understanding that the COE may or may not have to issue a Section 404 (Clean Water Act) permit for land section(s) of the tie. The COE would however have jurisdiction over the submarine portion of the project under Section 10 of the Rivers and Harbors Act. Chugach installed submarine cables in 1999 in Knik Arm and was issued a permit under both Section 404 and Section 10. While regulations governing the NEPA process for individual federal agencies do not interpret the participation of a cooperating agency, the CEQ regulations do. It is our reading of the CEQ regulations that COE must be a cooperating agency if its has jurisdiction by law over the project. The CEQ guidance documents also indicate, however, that COF’s role as a cooperating agency does not have to be particularly burdensome. We request that this issue be reviewed again so that COE can participate under the MOU as a cooperating agency without undue burden or drain on resources. Sincerely, Ov. < fey Dora L. Gropp, P.E. Manager, Transmission & Special Projects DLG/ah eee c: Brian Anderson/USFWS Jack Hewitt/COE - 753-5567 Carol Johnson Paul Beveridge/HEM Randy Pollock/PEI - 208 788 2082 W.O. E9590081, Sec.5. 5601 Minnesota Drive * P.O. Box 196300 * Anchorage, Alaska 99519-6300 Phone 907-563-7494 * FAX 907-562-0027