HomeMy WebLinkAboutS Intertie Route Selection Phase 1 4-1996Southern Intertie Route Selection Study Phase I Status Report on April 2, 1996 eh POWER Engineers c Dames & Moore E ’ Alternative Routes e Tesoro e Enstar e Quartz Creek =» Bird Point Alternatives POWER Engineers Southern Intertie Dames & Moore Project Alternative Corridor Analysis e Siting Opportunities e Key Siting Issues and Constraints e Regulatory Requirements e Recommendations POWER Engineers Southern Intertie Dames & Moore Project Siting Opportunity Key Siting Issues Regulatory Requirements Recommendations Tesoro Route e Existing Tesoro Pipeline e Trumpeter Swan Nests e Captain Cook SRA e Remote Residential Views e Cultural Resource Sites e Land Water Conservation Fund (LWCF) e Underground Line Through Captain Cook SRA e Avoid Possession Point Enstar Route Siting Opportunity e Existing Enstar Pipeline Key Siting Issues e Trumpeter Swan Nesting Habitat e KNWR Minimal and Moderate Management Areas e Potter Marsh e Residential Views e Cultural Resource Sites Regulatory Requirements e Section 404 Recommendations e Underground Line in Potter Marsh Area and Near Chickaloon Bay Quartz Creek Route e Existing Quartz Creek Transmission Line Siting Opportunity Key Siting Issues e Trumpeter Swan Nesting Habitat e Anadromous Fish Streams e Known Avalanche Areas e Chugach National Forest e Chugach State Park e Seward Highway National Scenic Byway e Chugach State Park Natural Management Area e Retention VQO in Chugach National Forest e Cultural Resources e Russian and Kenai Rivers Regulatory e Land Water Conservation Fund Compliance Along Kenai Requirements River e Chugach National Forest Special Use Permit e Chugach State Park Recommendations e Match Structure Types e Minimize Vegetation Clearing Siting Opportunity Key Siting Issues Regulatory Requirements Recommendations Bird Point Submarine Crossing Narrowest Crossing of Turnagain Arm e Sixmile Creek e Proposed Bird Point Recreation Area e Chugach National Forest Special Use Permit e Chugach State Park e Section 404 e Underground Transition Facilities at Bird Point and Sunrise for the Submarine Crossing Siting Opportunity Key Siting Issues Regulatory Requirements Recommendations Bird Point Aerial Crossing Narrowest Crossing of Turnagain Arm e Crossing Sixmile Creek e Proposed Bird Point Recreation Area e 530 Foot Structure in Turnagain Arm e Chugach National Forest Special Use Permit e Aerial Crossing Will Create a FAA Hazard Determination e Chugach State Park e Not Feasible Due to FAA Hazards and Unacceptable Visual Impacts Route Cost Summary Tesoro Enstar Quartz Creek 138kV $$ millions $104.5 - $118.9 $85.6 - $100.0’ $95.2 - $100.9" $84.6 - $90.3° $84.7 - $94.7 230kV $$ millions $115.6 - $135.1 $109.8 - $119.0 $91.2 - $102.3 Line Length Miles POWER Engineers Dames & Moore Dryden & LaRue 55.1 - 59.2 69.5 - 78.4 Note 1: Submarine 4 - 1 phase SCFF Note 2: Submarine 2 - 3 phase Flat SCFF I \ (\ C oR ‘ VC Lido Cewge SAA 115.6 - 140.7 Southern Intertie Project Cable Summary Tesoro Enstar Quartz Creek POWER Engineers Dames & Moore Dryden & LaRue $ millions/miles Base Route Base Route Bird Pt. Alt. Cable Type |4-1 phase SCFF' |4-1 phase SCFF' 1-3 phase 2-3 phase SCFF’ |2-3 phase SCFF’ Pipe Type HPGF Submarine | $63.3/14.2 miles’ | $35.1/7.9 miles’ $ millions/miles |$44.4/14.2 miles” | $24.5/7.9 miles’ | $13.4/4.0 miles Underground $9.5/4.6 miles $15.5/7.6 miles None Southern Intertie Project NKT Flat 3 Phase Cable 1616.7km Installed Since 1941; last 1994/95 First @ 132kV AC in 1950/51; 5.2km Total @ 115kKV AC or higher; 265.9km Contacted two Utilities & Manufacturer e Copenhagen Electricity Department e ELSAM e No Electrical Failures e Mechanical Failures due to anchors and trawlers POWER Engineers Southern Intertie Dames & Moore Project Dryden & LaRue Route Selection Study Lead Agency Determination EIS/ROD (two field seasons) Permits/ROW Acquisition Survey/Design/Procurement e Summer Field Season Construction e Submarine Construction e Summer e In-Service POWER Engineers Dames & Moore Dryden & LaRue Preliminary Schedule June 1996 April 1996 - June 1996 July 1996 - Feb. 1999 Mar. 1999 - Sept. 2001 Mar. 1999 - Sept. 2001 Oct. 2001 - Sept. 2003 May 2003 - Sept. 2003 Jan. 2004 Southern Intertie Project Southern Intertie Project VICINITY MAP Figure 1-1 TIN TI2N TION T8N T6N T4N State Park National Wildlife Refuge | Chugach National Forest Private, Borough or State Selected Land General Reference Features Pipeline / Transmission Line Railroad ‘Borough Boundary Rivers and Streams Oil Platform __ Lakes/Inlet JRANGE _ [e;si4ial2i 4 I 7 | She [0] 8) 2) | 7 | 16/4) 9) L 99 | 20) 21/ 22) 23 | 24/ Corridor / Alternative Route Link Number Code Existing Substations 12 MILES, = Dames & Moore Draft Date: April 2, 1996 Alternative Corridors Southern Intertie Project Proposed Anchorage to Kenai Peninsula Transmission Line Nos NaL NOL NOL NoL