Loading...
HomeMy WebLinkAboutN Intertie Schedule 1997Northern Intertie Project - Schedule ; | 1993 1994 1996 19 gee eee Ce ae Se ae Ustal Coss Dec Jan Feb Mar Apr May Jun Jul Aug Sep T Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May T Jun = Jul Aug Sep Oct Nov Dec Jan — Mar Acquire Fairbanks Site Land $ 99.00d| Apr/19/94|_— Aug/24/94 $180,000.00 : Release Right-of-Way Wyman” 3.00d| Feb/10/95| — Feb/16/95 $655.20 | = | Oo 1600.00 Line - Engineering and Design 807.00.d| Dec/O6/93| _ Feb/18/97 $690,977.85] Ti Zi - A 1600.01 Design RFP Haagenson_| 400 d| Dec/06/93| Dec/o9/93 $2,240.00|| a | 1600.02 Evaluate Design Proposals Haagenson, \ §.00 d Jan/10/94 Jan/14/94 $5,400.00 = Select Design Firm Haagenson 1.¢0 d Jan/17/94| Jan/17/94 $280.00 ! {PG Approves Award 100d) Jan/25/94)_ Jan/25/s4 $0.00 \ 1600.03 Finalize Design Contract Haagenson 430d Jan/26/94 Jan/31/94 $2,240.00 Bs] | Issue Notice-to-Proceed Haagenson 100d} Feb/01/94| Feb/01/94 $0.00 Line Design/Project Admin. 737.00d| _Feb/02/94| _ Jan/03/97 $657,831.91 Zz Z Z i ! Project Administration (D&L) PM, (Di 737.00d| Feb/o2/e4| Jan/03/97 $93,320.44 ai : : Data Review (D&L) PM, (Di 50.G0d) Feb/02/94| Apr'13/94 $73,066.67 patna Preliminary Design Criteria (D&L) PE™, (C 18.00d| Apr/14/94| — May/04/94 $52,728.80 1600.04 Prepare Draft Design Manual (D&L) PM, Cc 55.00.d| May/05/94 Julf22/94 $104,948.00 So ey De eee Review Geotech Data (D&L) PM, (D: 20.00d| May/26/94|_— Jun/23/94 $16,322.00 Finalize Foundation Design (D&L) PM, (Di 10.00d| — Apr/07/95| —_ Apr/20/95 $10,320.00 a Construction Details (D&L) PM*, (C 50.00d| Sep/20/94| Dec/o1/94 $55,228.00 1600.05 Design Line / Spot Towers Contingency, 66.60d Jul/25/94 Oct/24/94 $162,926.00 Construction Specifications (D&L) PM*, (C 55.00 d Aug/15/94 Oct/31/94 $37,072.00 Material Specifications (D&L) PM*. (0) 50.00 d May/05/94 Jul/i5/94 $30,395.00 ee oe Prepare Bid Documents (D&L) PM*, (CI 15.00d| _Now/16/94} Dec/08/94 $10,992.00 a Routing Adjustments (D&L) PM, (Di 10.00d| _Now01/94| _ Naw15/94 $10,512.00) sea As-Built Drawings/Closeout (D&L) PM’, (fC 20.00 d Jan/06/97 Jan/31/97 $5,075.45 ora ree Construction Engineering, (D&L) PM’, (C 156.00 d Jul/og/96| Feb/18/97 $17,910.49 | = ES EE FN AEM RS Oo Field Surveys 41400d| Aproa/aa[_ Now22/95 $508,851.42 iz Zz a 1600.06 Centerline Survey for ROW Limits _| Survey Crew 90.00 d Apr/04/94|_ Aug/09/94 $207,771.42 SE 1600.07 Field Stake Structures Survey Crew 60.00d| Aug/29/95| Now22/95 $301,080.00 ————————————— COftaoo.o0 Right-of-Way Clearing 111.00d| Mar/23/95|__ Aug/28/95 $1,070,680.00 Z A 1800.01 Prepare/Bid. Clearing Wyman* 12.00 d| __Mar/23/95| —_ Apr/07/95 $6,240.00 cS | Open Clearing Bids Wyman* 0.09 h Apri07/95 Aprio7/g6- $0.00 A 1800.02 Evaluate Clearing Bids Wyman* 1.00.d Apr/i0/95 Apr/10/95 $520.00 | Award Clearing Contracts |Haagenson aud] Apr/10/95| __Apr/10/95 $0.00 | A 4900.00 ROW Clearing : 414.00 d] _ Mar/23/95|__ Aug/28/95 $1,063,920.00]} u a 1900.01 Clear Link 4 Clearing Crev! Apit4/98| _Jur/16/95 $274,560.00 | 1900.02 _ ClearLink2 ___ | Clearing Crev Apr/26/95| __ Jul/12/95) $314,600.00 \ | 1900.03 __ Clear Link 3 Clearing Crev| J Jun/i9/95}_— Aug/28/95 $286,000.00 i | 1900.04 Clear Link 4 Clearing Crev 23.00d| Mar/23/95| — Apr/24/95 $131,560.00 SE eS 1900.05 Clear Link S Clearing Crev 10.00 d Apr/25/95|__ May/08/95 $57,200.00 — oO 2000.00 Line Construction Contracts 248.50 d Apri2t/96 Apr/15/96| $43,000.00 EE Z ZA 2000.01 Link 1 Contract Documents Haagenson 415.00 d]} — Jun/12/95 Juns/30/95 $4,200.00 PS sna) Open Construction Bids Wyman* 0.00 fr Jun/30/95 Jun/3o/95, $0.00) A 2000.02 Eval.Construction Bids Wyman* 2.00 d Jul/o3/95 Jul/05/95 $1,040.00 a Award Link 1 Contract Haagenson 0.00 d Jul/05/95 Jul/05/95 $0.00 A 2000.03 Link 2 Contract Documents Haagenson 16.00 d| Feb/29/96| — Mar/20/96 $8,400.00 a Open Construction Bids Wyman* 0.03 h Mar/20/96 Mar/20/96 $0.00 A | 2000.04 Eval.Construction Bids Wyman* 2.00 d\ — Marf21/96 Marf22/96 $1,040.00 ' Award Link 2 Contract Haagenson 0.00 d Mar/22/96 Mar/22/96 $0.00 A 2000.05 Link 3 Contract Documents Haagenson 16.00 d Mar/18/96 Apr/05/96 $8,400.00 —a Open Construction Bids Wyman* 0.90 h Apr/05/96 Apr/05/96 $0.00 A 2000.06 Eval.Construction Bids Wyman*~ 2.00 d Apr/i1/96| — Apr/15/96 $1,040.00 = Award Link 3 Contract Haagenson 000d) Apr/15/96| —_Apr/15/96 $0.00 A 2000.07 Link 4 Contract Documents Haagenson 16.00 dj} Jun/15/95 Jul/Og/95 $8,400.00 eS Open Construction Bids Wyman* { 0.00 h Jul/06/95 Jul/og/95 $0.00 A 2000.03 Eval.Construction Bids Wyman* 20d JuvO7/95 Jul/10/95 $1,040.00 = Award Link 4 Contract Haagenson 0.100 d Jul10/95 Jul/10/95 $0.00 A 2000.09 Link 5 Contract Documents Haagenson 16.00 d Apr/21/95|_ May/11/95 $8,400.00 arn Open Construction Bids Wyman* O.0Oh| May/11/95| May/11/95 $0.00 A 2000.10 Eval.Construction Bids Wyman* 2.00 d| May/12/95| — May/15/95 $1,040.00 = Award Link 5 Contract Haagenson 0.00d\ May/15/95|— May/15/95 $0.00 A } | OC) 2100.00 Materials 248.50 d) — Apr/21/95) — Apr/15/96 $21,006,264.25 ZZ ZA 2100.01 Prepare Final Material List/Spec. Haagenson*, 2.90 d Apri21/95 Apr/24/95 $1,060.00 Lal Develop Final Mat! Cost Est. 5.00d| _ Apr/25/95| _ May/01/95 $0.00 == Bid Material Contract 16.00 d|__ May/02/95| — May/22/95 $0.00 Ea Open Material Bids Wyman 0.00 d| May/22/95| — May/22/95 $0.00 A 2100.02 Evaluate Material Bids Haagenson* 6.00d| May/23/95| May/30/95 $2,800.00 | i Award Material Contract O.00d| — Jun/20/95| — Jun/20/95 $0.00 A 2100.03 Accept Matt - Link 4 Material, Con’ 20.00 d Sep/15/95 Oct!12/95, $5,170,939.50 SS 2100.04 Accept Matt - Link 2 Material, Con| 20.00 d| Feb/26/96} — Mar/22/96 $6, 100,002.00 ee 2100,05 Accept Matl - Link 3 Material, Corr 20.90 d{| — Mar/18/96| — Apr/16/96 $5,364,250.00 a 2100.06 Accept Mat! - Link 4 Material, Con’ 20.90d} Sep/15/95| Oct/12/95 $3,205,144.00 a eee 2100.07 Accept Mat! - Link S Material, Cor 20.00d| — Sep/27/95 Oct/24/95 $1,162,068.75 oO 2200.00 Construction Management 268.00d Dec/07/95 Dec/27/96 $532,145.00 { Ez f A 2200.01 Link 1 Inspect /CM Constr. Manar 109.00d| Dec/20/95| May/23/96 $134,611.00 SE rs SS SZ SE EET 2200.02 Link 2 Inspect /CM Constr. Manay 144.00 d Jun/04/96| Dec/27/96 $158,619.00 2200,03 Link 3 Inspect /CM Constr. Mana 122.00d Jun/19/96| — Dec/12/96 $145,063.00 vn.) La ade mee isa 2200.04 Link 4 Inspect /CM Constr. Manay 92.00d| Dec/07/95 Apr/17/96 $65,180.00 s 2200.05 Link 5 Inspect /CM Constr. Mana! 43.00d| Dec/07/85|_ Feb/07/96 $28,672.00 | oO 2300.00 Link 1 Construction 155.50 d Oct/13/95| — May/24/96 $5,392,806.90 Z A 2300.01 Mobilize Equipment Lineman, Cor| 46.00 d Oct/13/95 Dec/19/95 $418,471.21 | a ae 2300,02 Construct Foundations Lineman, Pile 76.00 d Decf20/95 Apri08/96 $1,859,969.64 ASSET ESTES 2300.03 Approve Foundations Wyman~ 5.00 d Apr/15/96 Apr/22/96 $2,600.00 = 2300.04 Pick up Matl - Link 4 Lineman*, Co} 6.00 d Dec/20/95 Dec/28/95 $65,499.80 P| 2300.05 Deliver materials to staging area Lineman*, Co 14.00 d| _Dec/29/95| —_ Jan/18/96 $152,832.70 es | 2300.06 Assemble Structures Lineman’, Co] 25.00d| — Jan/19/96| — Feb/23/96 $328,642.10 TS 2300.07 Erect Structures Lineman’, He 7.00d{ Feb/27/96 Mar/06/96 $1,323,152.70 Ds 2300.08 Approve Erection Wyman 0.00 d Mar/06/96| —_ Mar/O6/96 $0.00 A 2300.09 String Wire Lineman’, Co 52.60 d Feb/22/96 May/03/96 $1,135,330.73 | 2300.10 Tension Wire Lineman*, Co! 9.50 d| May/06/96| — May/17/96 $103,708.00 ) Pin) | 2300.11 Approve Conductor Wyman | §.00 d May/17/96| May/24/96 $2,600.00 ae © 2400.00 Link 2 Construction AI 198.10 d Mar/25/96|_—_ Jan/O6/97 $6,020,813.05 | | Z (LLL LLL LLL f ZLLLLLLE (i 2400.01 Mobilize Equipment _ |Linemanz2, Ge 50,00 d Mari25/96 Jun/03/96 $454,860.01 ‘Seg SUE TN | 2400.02 | construct Foundations Lineman2~, Fl: 86.68 d Jun/o4/96 Oct/04/96 $2,121,221.60 2400.03 | Apprave Foundations Wyman* s.00.d| ocvoaios| — Octi14/96| $2,600.00 | anal | 2400.04 Pick up Mati - Link 2 Linemanz, Cc 6.G0d Jun/04/o6 Jun/11/96} $65,499.80 ee | 2400.05 Deliver materials to staging area Lineman2, Cc 14.00 a) Suné12/96| Juvors96 _$152,832.95 2400.06 Assemble Structures Lineman2, Cq_ 26.00} Jui/02/96) — Aug/09/96 __ $369,606.14 2400.07 Erect Structures Lineman2~, + 8.00 d Aug/15/96| Aug/27/96 $1,440, 746.30 ey 2400.08 Approve Erection |Wyman*~ §.00d| Sep/04/96| — Sep/11/96 $2,600.00 == 2400.09 String Wire Lineman2, Cc §9.00d|} Sep/11/96 Dec/05/96 $1,288, 163.43 2400.10 Tension Wire Lineman2, Cc} 11.00 d Dec/05/96 Dec/20/96 $120,082.80 a 2400.11 Approve Conductor Wyman*~ §.00d| Deci27/96| Jan/OG/97 $2,600.00! a O 2500.00 Link 3 Construction 177.60 d Apr/15/96 Dec/27/96 $4,725, 150.60 ZZ. Zz ZA 2500.01 Mobilize Equipment Lineman2, Cel 46.00 d| __Apr/16/96| _Jun/19/96 $418,471.01 _ arse ae 2500.02 Construct Foundations Lineman2~, FI 47.60 d Jun/19/96} —_ Aug/27/96 $1, 164,927.89 2500.03 Approve Foundations Wyman~ §.00d| Aug/27/96} Sep/04/96 $2,600.00 ee 2500.04 Pick up Mati - Link 3 Lineman2, Cc §.00d| Jun/19/96} —_ Jun/26/96 $54,583.00 = 2500.05 | Deliver materials to staging area Linemanz2, Cc 13.00d| — Jun/26/96 Jul/16/96 $141,915.90 a 2500.06 Assemble Structures Lineman2~, ¢ 25.00 d Jul/16/96|_— Aug/20/96 $326,137.16 AR 2500.07 Erect Structures Lineman2~, § 7.00 d)__Aug/27/96)_ Sep/06/96 $1,323,152.70 ie 2500.08 Approve Erection Wyman~ §.00d| Sep/i1/96| Sep/18/96 $2,600.00 | mpeg 2500.09 String Wire Lineman2, Cc 54.00d| Sep/18/96| _Dec/05/96| $1, 178,996.93 Ee CR ERR 2500.10 Tension Wire Lineman2, Cc! 10.00 d Dec/05/36 Dec/19/96 $109, 166.00 Eee 2500.14 Approve Conductor Wyman~ §.00d| Dec/i9/96| Dec/27/96 $2,600.00 aaa oO 2600.00 Link 4 Construction 124.504 Oct#13/95. Aprf11/96 $3,009,283.28 Zz ZA 2600.01 Mobilize Equipment Lineman, Cor| 32.00 d Oct/13/95 Now/29/95 $291,110.01 AS 2600.02 Construct Foundations Lineman, Pile} 55.00 d Nov/30/95 Feb/16/96 $897,353.52 Se De 2600,03 Approve Foundations Wyman~ §.00.d| Feb/23/96) — Feb/29/96 $2,600.00. = 2600.04 Pick up Mat! - Link 4 Lineman’, Co| 3.00 d Nov/30/95 Dec/04/95 $32,749.90 fies] 2600.05 Deliver materials to staging area Lineman*, Co 6.00 d Dec/05/95 Dec/12/95 $65,499.80 P| 2600.06 Assemble Structures Lineman*, Co 12.00 d| Dec/13/95| Dec/29/95 $163,065.63 Ey 2600.07 Erect Structures Lineman‘, Sk| 3.00 d Feb/12/96 Feb/14/96 $852,779.80 a 2600.08 Approve Erection Wyman~ 5.00 d Feb/15/96) — Feb/22/96 $2,600.00 ae 2600.09 String Wire Lineman*, Col 26.00 d Feb/23/96 Mari28/96 $649,800.01 eS 2600.10 Tension Wire Lineman*, Co} 450d] Mar/29/96 Apr/04/96 $49,124.60 =a 2600.11 Approve Conductor Wyman~ §.00 d Apri04/96 Apr/11/96 $2,600.00 = j12700.00 Link 5 Construction §2.00 d Oct/26/95 Jan/10/96 $1,215,394.62 EZ ZA 2700.01 Mobilize Equipment Lineman, Cor 9.00 d Oct/25/95 Now06/95 $81,874.50 eis | 2700.02 Construct Foundations Lineman, Pite| 24,00 d Novw/07/95 Dec/12/95 $391,572.11 Peis ca ICO 2700,03 Approve Foundations Wyman 1.00 dj; Dee/13/95| — Dec/13/95 $520.00 1 2700,04 Pick up Mati - Link 5 Lineman’, Co} 1.00 d Novw/07/95 Now07/95 $10,916.30 } 2700.05 Deliver materials to staging area Lineman*, Co} 3.00 d fe Novw/08/95, Now 13/95 $32,749.90 ee 2700.06 Assemble Structures Lineman’, Co} §.00 d Now/14/95 Novw20/95 $67,129.50 Es 2700.07 Erect Structures Lineman*, He; 1.00 d Dec/18/95 Dec/18/95 $367,593.10 I 2700.08 Approve Erection Wyman 1.00d| Dec/19/95} — Dec/19/95 $520.00 t 2700.09 String Wire Lineman’, Co} 44.000 Dec/20/95 Jani05/96. $246,165.64 ee 2700.10 | Tension Wire Lineman*, Co 2.00d| Jan/08/96| —_ Jan/09/96 $21,833.60] i i 2700.11 Approve Conductor Wyman 1.00 d Jan/10/96 Jan/10/96 $620.00 1 | Energize Line Lineman, Cor 2.09 d Jan/06/97 Jan/08/a7 $14,655.40 | | \ a Final Inspection Wyman $.00d| Jan/O8/97|_ Jan/15/97 $2,600.00 BE Accept Project 0.00d| Jan/15/97| — Jan/15/97| $0.00 | A | | | | | | | | | | y _ —— _—_— { \ | _ [ _ \ | \ | | } | | 1 1 T | | | \ | — { —t Es I al. $18,000,000.00 $13,815,108.23 Period Costs | $0.00 $9,963.60 $12,344.96. $83,811.05 $137,949.96 $241,632.17 $426,339.54 $362,208.07 $325,197.32 $448,277.66 $402,086.44 $349,809.57 $304,585.02 " $312,792.64 $301,334.59 $234,071.45 $251,968.58 $565,573.71 8.68 $960,905.45 $389,854.56 $26,207.73 $1,377.73 $0.00 | Milestone A Summary April 20, 1994 4403