HomeMy WebLinkAboutAlakanuk Waste Heat 1985 STATE (0 FINCAS KA OFFICE OF THE SQVERNGR ER AUTHORITY pees BY Junear Roe February 22, 1985 Mr. Vincent T. Beans President Alaska Village Electric Co-operative, Inc., Board of Directors 4831 Eagle Street Anchorage, AK 99503 Dear Mr. Beans: I have received your correspondence of January 31 regarding the capital project request by the Alaska Village Electric Co-operative. Thank you for informing me of your organiza- tion's support of the twelve programs to convert village electrical systems to overhead distribution. As you may be aware, I had proposed a Fiscal Year 1986 operating and capital budget for the State of Alaska total- ing $2.97 billion in general funds. With declining oil prices reducing our projected revenue, we will not know with certainty what amount will be available for the capital ; budget until we receive our March revenue forecast. We do : know, however, that the total capital budget will be far less than it has been in recent years. Funding for the projects requests you have submitted has not been included in the proposed budget. In order for the projects to receive consideration throughout the budget process, it is important that the communities submit them as community priorities. I encourage those communities that rate the system conversion project as a top priority to work ! closely with their legislative delegation, as well as with : the appropriate State agencies. You may be assured that all projects included in the final FY 86 budget presented to me by the Legislature will receive full consideration. I have referred a copy of your letter to the Office of Management and Budget, as well as to the Alaska Power Authority, for their information and review. XC. Ed Morns Sunde Write Mr. Vincent T. Beans -2- February 22, 1985 Again, thank you for providing me with this information on your request for funding. Sincerely, /s/ Bill Sheffield Bill Sheffield Governor cc: Jay Hogan, Associate Director Division of Budget Review Office of Management and Budget w/attachment Larry Crawford, Executive Director Alaska Power Authority Department of Commerce and Economic Development w/attachment 4831 EAGLE STREET, ANCHORAGE. ALASKA 99503 TELEPHONE: (907) 561-1818 January 31, 1985 Mr. Bill Sheffield, Governor “Office of the Governor Pouch A 58 Juneau, Alaska 99811 . mr Dy) v9 1 Dear Governor Sheffield: Alaska Village Electric Cooperative serves 48 cities across Alaska with a total population in excess of 15,000. AVEC provides electric service to a majority of communities in Western Alaska with populations from 125 to 800 citizens. The Cooperative has in the past received the large majority of Cooperative money for construction of generation and distribution facilities from REA in the form of loans. This adds an element of interest cost to our KWH retail rates. In addition, the loan funds must be repaid. Many villages and cities have received numerous grants, sometimes ranging into the millions of dollars, for electrical facilities. AVEC originally constructed distribution systems with underground and later surface utilidor in some areas. While well intentioned at the time with funds available, both types of systems have proven to have reliability or maintainabil- ity limitations in the arctic environment. Damage due to ground cracks and frost heaving action causes safety problems to develop. Accordingly, AVEC has been subject to some criticism from regulatory agencies as a result of practical problems associated with providing service in remote village areas, necessitating accelerated conversion action to reduce future problems. Many consumer service entrances were also found to be substandard by investigators and subjects the village consumers served by regulated utilities to immediate disconnection under a growing rigid interpretation of statutes/regulations by State agencies in small villages. The Cooperative has started a program to convert to overhead distribution to improve safety and reliability. The cost to complete this is estimated to be some $15,000,000 in current dollars. We therefore request that AVEC receive a grant to the Cooperative in the amount of $3,890,000 in the new state budget as a first installment on this project with similar annual increments each future year until this task is satisfactorily completed. Included in the list of conversion projects scheduled with the first installment are as follows: Estimated City/Village Cost Shishmaref $454,000 Selawik 630,000 Scammon Bay 258,000 St. Mary's 2nd Phase, St. Mary's Airport Line, 506 ,000 Pitkas Point Intertie, Pitkas Point Stebbins 263,000 Holy Cross 2nd Phase 263,000 Alakanuk 2nd Phase 188 ,000 Marshal] 109,000 Noatak 300,000 Koyuk 245,000 Elim 264,000 St. Michael 410,000 Total $3,890,000 This project will provide long range benefits to the village people in many communities with more reliable and longer life electrical facilities. Accordingly, the Board of Directors of Alaska Village Electric Cooperative unanimously forward this request and encourage the strongest support of the Administration and our elected officials to ensure this receives high priority and adequate funding. mer OF THE BOARD: Vincant ay Lo President AVEC Board of Directors cc: Sen. Frank Ferguson Sen. John Sackett Rep. Al Adams Rep. John Binkley Rep. Jack Fuller. Rep. Kay Wallis CITY OF SHISHMAREF, ALASKA RESOLUTION 85-1 A RESOLUTLON SUPPORTING THE ALASKA VILLAGE ELECTRIC COOPERATLVE'S REQUEST FOR FUNDS TO CONVERT THE URD SYSTEM TO OVERHEAD IN SHISHMAREF, ALASKA. it's electrical power thru an agreement WHEREAS, the City of Shishmaref receives Alaska, with Alaska Village Electric Cooperative, 4831 Eagle Street, Anchorage and a WHEREAS, the current system intact is an overgound "URD'" system. inadequate to serve the City of Shishmaref's needs because of numerous failures within the system, causing power outages throughouc the City, and WHEREAS, che Alaska Village Electric Cooperative has requested monies from the Stace of Alaska to convert the current URD system to an overhead system in the City of Shishmaref, Alaska, NOW THEREFORE BE IT RESOLVED THAT the City of Shishmaref City Council fully supports the Alaska Village Electric Cooperative's request for funding to convert the current URD system to a more reliable overhead system. PASSED and APPROVED THIS Dace aay of a eee 1985 ATTEST: CITY CLERK Bie cae Alaska Village Electric Cooperative, Inc. 4831 Eagle Street Anchorage, Alaska 99503-7497 (907) 561-1818 October 8, 1987 Brent Petrie Alaska Power Authority P.0. Box 190869 Anchorage, Alaska 99519-0869 SUBJECT: AVEC Projects for System Efficiency Improvements Dear Brent: According to our recent telephone conversation, attached is a copy of the list recently sent to Senator Hensley on a variety of capital project which would be useful in AVEC villages. Many of these are related to energy effi- ciency improvement and are self-explanatory. As you can see, there are numerous places where we can use money for upgradings. We could compile some statistical information about what these improvements can do since we have similar installa- tions in other villages. If after reviewing this, you wish to have more details on any projects, we would be pleased to work with you in this regard. Best Regards, yd M. Hodson General Manager XC Don SG were G. Du sete Stu & “ope TO THE VILLAGE ELECTRICAL POWER SYSTEMS OBJECTIVES: Each AVEC power plant would be equipped with waste heat recovery equipment capable of capturing a portion of the heat rejected to the engine coolant and transferring that heat to an end user such as the school, water plant, or city for use in decreasing oi] requirements for space heating. Each AVEC power plant providing peak loads in excess of 175 KW would be equipped with two all-steel, fireproof, long-life generator modules. Each AVEC power plant would be equipped with two of the latest design diesel electric sets featuring peak fuel efficiency. Each AVEC power plant providing peak loads up to 175 KW would be equipped with all-steel, fireproof, long-life generator modules. Each AVEC power plant would be equipped with an insulated, all-steel, fireproof, long-life control module for housing the control equipment in a protected weatherproof area. Each AVEC power plant would be equipped with three control panels capable of providing complete control and protection of each diesel engine and generator. Each AVEC power plant would be equipped with a waste oil blender which would filter waste lubricating oi] and blend it into the normal engine fuel supply to be burned off by the engine. Each AVEC fuel tank farm would be installed on top of an impermeable barrier which would prevent the escape of any leaked or spilled fuel. Each AVEC power plant would have a chain link fence installed around both the power plant and the fuel tank farm to keep children and unauthorized individuals away. Each AVEC distribution system would be converted to an overhead pole supported system having higher reliability and lower losses. COST ESTIMATES BY LOCATION (21 VILLAGE LOCATIONS) Ambler 1 2 3 4 5 6 7 Waste Heat Recovery Completed Generator Modules Completed Latest Design Generator Sets - 2 Each LTA 10s $ 150,000 Control Module Completed Latest Design Control Panels - 3 Each @ $35,000 Completed Waste 0i1 Blender $ 10,000 Impermeable Dike Liner $ 48,000 eau Oe 3: riague vies toms Overhead Distribution Alakanuk WONAMLSWNHe eye) © yey 16) © el 6) © Waste Heat Recovery Generator Modules - 1 Each Latest Design Generator Sets Control Module - 1 Each Latest Design Control Panels Waste Oi] Blender Impermeable Dike Liner Plant Site Fence Overhead Distribution Chevak m ~ ~ 3 WOONAMLWMr- ers SPESTEASe | oe e ee we we oe Waste Heat Recovery Generator Modules - 1 Each Latest Design Generator Sets Control Module - 1 Each Latest Design Control Panels Waste 0i1 Blender Impermeable Dike Liner Plant Site Fence Overhead Distribution Waste Heat Recovery Generator Modules - 1 Each Latest Design Generator Sets Control Module - 1 Each Latest Design Control Panels Waste Oi] Blender Impermeable Dike Liner Plant Site Fence Overhead Distribution Emmonak WONAMAWNHeH seme oe e © © Waste Heat Recovery Generator Modules - 1 Each Latest Design Generator Sets Control Module - 1 Each Latest Design Control Panels Waste Oi] Blender Impermeable Dike Liner Plant Site Fence Overhead Distribution 1 Each KTA 1150 3 Each @ $35,000 2 Each KTA 38s 3 Each @ $35,000 2 Each LTA 10s 3 Each @ $35,000 1 Each KTA 38 3 Each @ $35,000 vumpicecu $257,000 $865,000 493,000 200,000 100,000 200,000 35,000 10,000 64,000 10,000 C re AHO OOH $ 305,000 $ 200,000 $ 300,000 $ 200,000 $ 35,000 $ 10,000 $ 72,000 $ 10,000 $__ 146,000 $ 200,000 $ 150,000 $ 200,000 $ 35,000 $ 10,000 $ 32,000 $ 10,000 Comp sted $ $ $ 200,000 $ 35,000 $ 10,000 $ 64,000 $ 10,000 Completed omp ss WONAMAEWNH es ee ee Waste Heat Recovery Generator Modules Latest Design Generator Sets Control Module Latest Design Control Panels Waste 0i1 Blender Impermeable Dike Liner Plant Site Fence Overhead Distribution Hooper Bay WONAMPWHe Kiana Waste Heat Recovery Generator Modules - 1 Each Latest Design Generator Sets Control Module - 1 Each Latest Design Control Panels Waste 0i1 Blender Impermeable Dike Liner Plant Site Fence Overhead Distribution WDBNAMLSWNHH rue Waste Heat Recovery Generator Modules - 1 Each Latest Design Generator Sets Control Module - 1 Each Latest Design Control Panels Waste 0i1 Blender Impermeable Dike Liner Plant Site Fence Overhead Distribution Kivalina WONAMLSWNHH a aa es oie Waste Heat Recovery Generator Modules Latest Design Generator Sets Control Module - 1 Each Latest Design Control Panels Waste 011 Blender Impermeable Dike Liner Plant Site Fence Overhead Distribution 1 Each KTA 38 3 Each @ $35,000 2 Each KTA 38s 3 Each @ $35,000 1 Each KTA 1150 3 Each @ $35,000 1 Each LTA 10 1 Each @ $15,000 $ 493,000 Completed $ 150,000 Completed Completed $ 10,000 Completed $ 20,000 $ 246,000 3-319, 000 $ 332,000 $ 200,000 $ 300,000 $ 200,000 $ 35,000 $ 10,000 $ 80,000 $ 10,000 $299,000 31,466,000 Completed $ 200,000 $ 100,000 $ 200,000 Completed $ 10,000 $ 56,000 Completed $ 226,000 3782; 000 348 ,000 ompleted 75,000 200 ,000 15,000 10,000 48,000 10,000 245 ,000 PP 7 OF OF OO Koyuk WONAMHWNHHE oe ee ee ew ew Waste Heat Recovery Generator Modules - 1 Each Latest Design Generator Sets Control Module - 1 Each Latest Design Control Panels Waste Oil Blender Impermeable Dike Liner Plant Site Fence Overhead Distribution Noatak WONANAWNHH . Waste Heat Recovery Generator Modules Latest Design Generator Sets Control Module - 1 Each Latest Design Control Panels Waste 0i] Blender Impermeable Dike Liner Plant Site Fence Overhead Distribution Noorvik WONAMPWNHHe oe ee we ee ew nn rad WONDMNS WwWnre . Waste Heat Recovery Generator Modules Latest Design Generator Sets Control Module Latest Design Control Panels Waste Oil Blender Impermeable Dike Liner Plant Site Fence Overhead Distribution . Michael Waste Heat Recovery Generator Modules Latest Design Generator Sets Control Module Latest Design Control Panels Waste Oil Blender Impermeable Dike Liner Plant Site Fence Overhead Distribution _ Pr Each KTA 10s Each @ $35,000 Each LTA 10s Each @ $15,000 Each KTA 1150 Each @ $35,000 Each KTA 1150s Each LTA 10 Each @ $35,000 $ 248,000 $ 200,000 $ 150,000 $ 200,000 $ 35,000 $ 10,000 $ 32,000 $ 10,000 some ietes $ 348,000 Completed $ 150,000 $ 200,000 $ 15,000 $ 10,000 $ 40,000 $ 10,000 $ 191,000 $964,000 $ 493,000 Completed $ 100,000 Completed Completed $ 10,000 $ 52,000 $ 10,000 $ 108,000 3—775,000 Completed Completed $ 200,000 $ 75,000 Completed $ 35,000 $ 10,000 $ 40,000 $ 10,000 vervyvrye WONAMPWNHH oe ee we ew oe Waste Heat Recovery Generator Modules - 1 Each Latest Design Generator Sets Control Module Latest Design Control Panels Waste 0i] Blender Impermeable Dike Liner Plant Site Fence Overhead Distribution Scammon Bay WONAMASWHe . Waste Heat Recovery Generator Modules - 1 Each Latest Design Generator Sets Control Module Latest Design Control Panels Waste 01] Blender Impermeable Dike Liner Plant Site Fence Overhead Distribution Selawik WONAMRPWNHH . eee oe ef we Waste Heat Recovery Generator Modules - 1 Each Latest Design Generator Sets Control Module - 1 Each Latest Design Control Panels Waste Oi] Blender Impermeable Dike Liner Plant Site Fence Overhead Distribution Shaktoolik WONAMAWNHH Waste Heat Recovery Generator Modules - 1 Each Latest Design Generator Sets Control Module - 1 Each Latest Design Control Panels Waste Oi] Blender Impermeable Dike Liner Plant Site Fence Overhead Distribution Each KTA 38 Each @ $25,000 Each LTA 10 Each @ $25,000 Each KTA 1150 Each @ $35,000 Each LTA 10 Each @ $35,000 Completed $ 200,000 $ 150,000 $ 200,000 $ 25,000 $ 10,000 $ 64,000 $ 10,000 $ 246,000 $305,000 $ 348,000 $ 200,000 $ 75,000 $ 200,000 $ 25,000 $ 10,000 $ 40,000 — Completed 1 oe Fa $ 332,000 $ 200,000 $ 100,000 $ 200,000 C $ $ $ Shishmaref 1. Waste Heat Recovery $ 450,000 2. Generator Modules - 1 Each $ 200,000 3. Latest Design Generator Sets - 1 Each KTA 1150 $ 100,000 4. Control Module - 1 Each $ 200,000 5. Latest Design Control Panels - 3 Each @ $35,000 $ 35,000 6. Waste 0i1 Blender $ 10,000 7. Impermeable Dike Liner $ 56,000 8. plant ole Fence ton : 10 ,000 9. Overhead Distribution oupreted Shungnak 1. Waste Heat Recovery Completed 2. Generator Modules Completed 3. Latest Design Generator Sets - 2 Each KTA 1150s $ 200,000 4. Control Module - 1 Each $ 200,000 5. Latest Design Control Panels - 1 Each @ $15,000 $ 15,000 6. Waste Oil Blender $ 10,000 7. Impermeable Dike Liner $ 56,000 8. Plant Site Fence ; mune 9. Overhead Distribution 3 692,000 Stebbins 1. Waste Heat Recovery $ 348,000 2. Generator Modules - 1 Each $ 200,000 3. Latest Design Generator Sets - 1 Each LTA 10 $ 75,000 4. Control Module --1 Each $ 200,000 5. Latest Design Control Panels - 3 Each @ $35,000 $ 35,000 6. Waste Oil Blender $ 10,000 7. Impermeable Dike Liner $ 40,000 8. Plant Site Fence ? aeeraee 9. Overhead Distribution 31,073,000 Wales 1. Waste Heat Recovery $ 191,000 2. Generator Modules - 1 Each $ 200,000 3. Latest Design Generator Sets - 2 Each LTA 10s 1200 RPM $ 150,000 4. Control Module - 1 Each $ 200,000 5. Latest Design Control Panels - 3 Each @ $35,000 $ 35,000 6. Waste Oi] Blender $ 10,000 7. Impermeable Dike Liner $ 24,000 8. Plant Site Fence $ 10,000 9. Overhead Distribution Competed » Waste Heat Recovery Installations (13 Locations - Ambler/E1im/Emmonak/Kiana/St. Michael/ Savoonga/Shaktoolik/Shangnak) Waste Oi] Blenders (21 Locations) Fence Plant Sites (19 Locations - Kiana and Ambler Already Fenced) Impermeable Barriers (249 Tanks) (Only Gambell NIC) Control Modules (17 Locations - Ambler/Noorvik/St. Michael/Gambel1] NIC) Generator Modules (14 Locations) Control Panels (40 Each) Overhead Distribution Conversions (12 Locations) Generator Sets: 15 LTA 10s 9 KTA 1150s 7 KTA 38s TOTAL RECOMMENDED PRIORITY Emmonak Waste Heat Recovery Generator Modules - 1 Each Latest Design Generator Sets - 1 Each KTA 38 Control Module - 1 Each Latest Design Control Panels - 3 Each @ $35,000 Waste 0i1 Blender Plant Site Fence Overhead Distribution ONAN PWNHe ee © © we ew Hooper Bay . Waste Heat Recovery Generator Modules - 1 Each . Latest Design Generator Sets - 1 Each KTA 38s Control Module - 1 Each . Latest Design Control Panels - 3 Each @ $35,000 ORwnr~ . . a $ 4,729,000 $ $ $ 210,000 200 ,000 996,000 $ 3,400,000 $ 2,800,000 $ 480 ,000 $ 2,626,000 $ 1,125,000 $ 900 ,000 $ 1,050,000 $18,516,000 Completed $ PAMwmo~ 200 ,000 150,000 200 ,000 35,000 10,000 10,000 332 ,000 200,000 150,000 200 ,000 35,000 o. waste Uli biendger 7. Plant Site Fence 8. Overhead Distribution Selawik Waste Heat Recovery Latest Design Generator Sets Control Module - 1 Each Latest Design Control Panels Waste Oi] Blender - Impermeable Dike Liner Plant Site Fence Overhead Distribution ONAN WNHeE ee oe ew © Kiana 4. Control Module - 1 Each 5. Latest Design Control Panels 6. Waste 0il Blender Alakanuk 2. Generator Modules - 1 Each 3. Latest Design Generator Sets 4. Control Module - 1 Each 5. Latest Design Control Panels 6. Waste Oil Blender Savoonga 2. Generator Modules - 1 Each 3. Latest Design Generator Sets 4. Control Module 5. Latest Design Control Panels 6. Waste Oil Blender 7. Impermeable Dike Liner 8. Plant Site Fence Shishmaref 1. Waste Heat Recovery 4. Control Module - 1 Each 5. Latest Design Control Panels 6. Waste Oil Blender Each KTA 1150 Each @ $35,000 Each @ $35,000 Each KTA 1150 Each @ $35,000 Each KTA 38 Each @ $25,000 Each @ $35,000 > 1LU,uUU $ 10,000 $299,000 $1,236,000 $ 332,000 $ 100,000 $ 200,000 Completed $ 10,000 $ -0- $ 10,000 $ 306,000 $958,000 $ 200,000 Completed $ 10,000 $210,000 $ 200,000 $ 100,000 $ 200,000 $ 35,000 $10,000 $545,000 $ 200,000 $ 150,000 $ 200,000 $ 25,000 $ 10,000 $ 64,000 $10,000 3659,000 $ 450,000 $ 200,000 $ 35,000 $10,000 3655, 000 Waste Heat Recovery Generator Modules - 1 Each Control Module - 1 Each Ankwnre “ee we ee Waste 0i] Blender TOTAL Waste Heat Recovery Installations (4 Locations) Waste Oil Blenders (8 Locations) Fence Plant Sites (4 Locations) Impermeable Barriers (16 Tanks) Control Modules (8 Locations) Generator Modules (5 Locations) Control Panels (17 Each) Overhead Distribution Conversions (2 Locations) Generator Sets: 2 KTA 1150s 5 KTA 38s TOTAL Latest Design Generator Sets - 2 Each KTA 38s Latest Design Control Panels - 3 Each @ $35,000 SUMMARY 305 ,000 200,000 300,000 200,000 35,000 10,000 31,050,000 $5,958,000 wmumumuwn had $ 1,419,000 $ 80,000 $ 40,000 $ 64,000 $ 1,600,000 $ 1,000,000 $ 200,000 $ 605,000 $ 200,000 $750,000 $5,958,000