HomeMy WebLinkAboutMahoney Lake Hydro memo 1994March 31, 1994 APR 4 1994
Alaska Industrial Development
pra Saas and Export Authority Alaska Industrial Development Agency
480 W. Tudor
Anchorage, AK 99503
Re: Mahoney Lake Hydroelectric Project
FERC Project No. 11393
Joint Agency/Native American/Public Meetings
Dear Mr. Snell:
This letter is to confirm the joint agency/Native American/public meetings which will be held on
Tuesday, April 26, 1994, to discuss development of the Mahoney Lake Hydroelectric Project. The
Initial Consultation Document (ICD), which was sent to you via letter dated March 16, 1994,
describes the proposed project and studies that are currently planned.
At the April 26th meetings, we would like to discuss the proposed project, potential environmental
impacts, review the ICD, and discuss the data to be obtained and studies to be conducted as part of
the FERC consultation process. As required under 18 CFR 4.38, a public notice will be published
regarding the meetings. Day and evening sessions will be conducted. The day session will be held
from 10 am to 12 noon in the conference room of the Westmark-Cape Fox Lodge located at 800
Venetia Way in Ketchikan, Alaska. The evening session will be held from 7 p.m. to 9 p.m. at the
same location. Attached is the agenda for the meetings. If any agency staff want to visit the site, we
will conduct a site visit the afternoon of April 26 or the morning of April 27, weather permitting.
Please let us know if you want to attend the site visit.
Please call me or Jack Snyder at (206) 453-1523 if you have any questions or comments concerning
the Mahoney Lake Hydroelectric Project, the April 26th meetings, or the attached meeting agenda.
We look forward to seeing you at the meetings.
Sincerely,
HDR ENGINEERING, INC.
Hl. Ml re
Michael V. Stimac
Manager, Licensing & Environmental Services
cc: Susan Dickinson-City of Saxman Don Clarke-Wilkinson, Barker, Knauer & Quinn
Doug Campbell-Cape Fox Corp. Jack Snyder-HDR
John Braislin-Betts, Patterson & Mines
Enclosure
HDR Engineering, Inc. Suite 1200 Telephone 500 108th Avenue, N.E. 206 453-1523
Bellevue, Washington
98004-5538
MAHONEY LAKE HYDROELECTRIC PROJECT
FERC PROJECT NO. 11393
JOINT AGENCY/NATIVE AMERICAN/PUBLIC MEETINGS
APRIL 26, 1994
10:00 a.m. - 12:00 p.m.
AND
7:00 p.m. - 9:00 p.m.
AGENDA
I. INTRODUCTION
I. LICENSING PROCESS
Ii. PROJECT DESCRIPTION
IV. REVIEW OF STUDY PLANS
Water Quality and Quantity
Fisheries and Aquatic Resources
Wildlife and Botanical Resources
Historic and Archaeological Resources
Recreational Resources
Aesthetic Resources
Erosion and Sediment Control Plan
V. COMMENTS AND SUGGESTIONS
NOTE: Both meetings are open to agency personnel and the public. The morning session,
however, will be primarily directed toward agency matters and concerns whereas the
evening session will be oriented toward the general public.
ECEIVES) — ve
March 31, 1994 APR 4 4994 Hh)
‘a, Mr. Riley Snell Alaska Industrial Development
Alaska Industrial Development Agency and Export Authority
480 W. Tudor
Anchorage, AK 99503
Re: Mahoney Lake Hydroelectric Project
FERC Project No. 11393
Joint Agency/Native American/Public Meetings
Dear Mr. Snell:
This letter is to confirm the joint agency/Native American/public meetings which will be held on
Tuesday, April 26, 1994, to discuss development of the Mahoney Lake Hydroelectric Project. The
Initial Consultation Document (ICD), which was sent to you via letter dated March 16, 1994,
describes the proposed project and studies that are currently planned.
At the April 26th meetings, we would like to discuss the proposed project, potential environmental
impacts, review the ICD, and discuss the data to be obtained and studies to be conducted as part of
the FERC consultation process. As required under 18 CFR 4.38, a public notice will be published
regarding the meetings. Day and evening sessions will be conducted. The day session will be held
from 10 am to 12 noon in the conference room of the Westmark-Cape Fox Lodge located at 800
Venetia Way in Ketchikan, Alaska. The evening session will be held from 7 p.m. to 9 p.m. at the
same location. Attached is the agenda for the meetings. If any agency staff want to visit the site, we
will conduct a site visit the afternoon of April 26 or the morning of April 27, weather permitting.
Please let us know if you want to attend the site visit.
Please call me or Jack Snyder at (206) 453-1523 if you have any questions or comments concerning
the Mahoney Lake Hydroelectric Project, the April 26th meetings, or the attached meeting agenda.
We look forward to seeing you at the meetings.
Sincerely,
HDR ENGINEERING, INC.
Vi ae
Michael V. Stimac
Manager, Licensing & Environmental Services
oct Susan Dickinson-City of Saxman Don Clarke-Wilkinson, Barker, Knauer & Quinn
Doug Campbell-Cape Fox Corp. Jack Snyder-HDR
John Braislin-Betts, Patterson & Mines
Enclosure
HDR Engineering, Inc. Suite 1200 Telephone
500 108th Avenue, N.E. 206 453-1523
Bellevue, Washington 98004-5538
MAHONEY LAKE HYDROELECTRIC PROJECT
FERC PROJECT NO. 11393
JOINT AGENCY/NATIVE AMERICAN/PUBLIC MEETINGS
APRIL 26, 1994
10:00 a.m. - 12:00 p.m.
AND
7:00 p.m. - 9:00 p.m.
AGENDA
I. INTRODUCTION
Ol. LICENSING PROCESS
I. PROJECT DESCRIPTION
IV. REVIEW OF STUDY PLANS
Water Quality and Quantity
Fisheries and Aquatic Resources
Wildlife and Botanical Resources
Historic and Archaeological Resources
Recreational Resources
Aesthetic Resources
Erosion and Sediment Control Plan
V. COMMENTS AND SUGGESTIONS
NOTE: Both meetings are open to agency personnel and the public. The morning session,
however, will be primarily directed toward agency matters and concerns whereas the
evening session will be oriented toward the general public.