HomeMy WebLinkAboutKobuk-Shungnak Tie Line Structure Inspection Forms 1992 STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. / 4 PTA'S. C7 - / POLE (HT &CL): 9 — GUY ASsY’s: J /#A ANCHOR ASSY’S: AS /4 MISC. ASSY'S: //65 3/2 -75 /frmg-tin (Kid & FOUNDATION TYPE: Ve fea LE H-PILE DEPTH: /C f EXT: A/a SPEC. DESCRIPTION AERIAL| GRND + REF. FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 27) SETTING INSPECTION Structure Plumb (4%, Top to Bottom) Angle Structure Raked (0-1°/10') Crossarm(s) or Davit Arm(s) Level (1°/10°) | H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) eri FINAL INSPECTION Structure Backfilled (12", NoSettlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1°/10') Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: 4) pate 2 /Y ‘GZ INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / args Pte. iste KEK SG ZS | ssa eS | « 36 STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO._/ PTA'S. © P-? POLE (HT & CL): 35 5S GUY ASSY'S: Q/L-3 BQ/Ez-jo ANCHOR ASSY'S: | /2;- 4 P MISC. ASSY'S: //17.2- 1 FOUNDATION TYPE: 4. P,, é H-PILE DEPTH: EXT: p/ SPEC. REF. DESCRIPTION AERIAL] GRND. FRAMING INSPECTION ee | r fae Ground Correctly Installed NO N/A INSP Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed — Nuts, Eyenuts, Locknuts Installed & Tight ee Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1"/10’) Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1”/10') Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) ao Ties Correctly Installed |__| Splices and/or Deadends Correctly Installed eee INSPECTED: Alaska Energy Authority 3d “it Ores INSPECTED: POWER Engineer's Inc. DATE INSPECTED: Copper Valley Construction APS ID SH 9. EEE TaeDe SPECECA~ ORIS cr 8 SaicE~ is, $5 1-2 STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. _2 PTA'S. 77.3 -/ 5" POLE (HT &CL): 75 — 5 GUY ASSY'S: Th ANCHOR ASSY'S: 4///) MISC. ASSY'S: 1/773 -/5 A FOUNDATIONTYPE: WW»), £ H-PILE DEPTH: 9 ext: a//g ee DESCRIPTION AERIAL| GRND.| ves | NO | N/A | INSP \. FRAMING INSPECTION | Pole Ground Correctly Installed Roofs, Gains, & Holes Treated VAAN Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1°/10') Crossarm(s) or Davit Arm(s) Level (1"/10') Vt Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth Ht \ LI H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) I i Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10') \ 1 Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed —~ Jumpers Correctly Installed Guy Assy(s) Complete and Correct ET CREEL CEE Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: Cor DATE Soa ae INSPECTED: POWER Engineer's Inc. BY: DATE ee) SL EE INSPECTED: Copper Valley Construction BY: DATE / / M7735 DTD. Ea Ta SPEGEICAT ONS cas _MeeacG ON as Ws re STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 3 PTA'S. 2/¢ 7-/ POLE (HT &CL): F.5 — GUY ASSY'S: (6/¢/-3 MISC. ASSY'S: j/,9 5 -// Ilys- FOUNDATION TYPE: -Pré H-PILE DEPTH: 7 6% EXT: W/# oe DESCRIPTION AERIAL caw. YES NO N/A | INSP , P| FRAMING INSPECTION | — Pole Ground Correctly Installed —|~ | Roofs, Gains, & Holes Treated — Arm(s) & Brace(s) Correctly Located and Installed m- Nuts, Eyenuts, Locknuts Installed & Tight on Bolts Correct Length (1/2” - 2") SETTING INSPECTION Structure Plumb (4“, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1“/10') Hardware in Vert. & Horiz. Alignment ; Foundation Set to Correct Depth L ll H-Pile Extension Weld Complete and Correct AL a ith i i H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) it : i Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) | i Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed il Splices and/or Deadends Correctly Installed Jumpers Correctly Installed [ | : LL Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: DATE > ig ur INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / ars ce Haas SPECIECAT ONS FT9 222207 ON a =F? A 1- Guy Goon VWL15%, 5 STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 4/ PTA'S. C/A POLE (HT & CL): 3.5 — $7 GUY ASSY'S: ,/, ANCHOR ASSY’S: MISC. ASSY'S: H/a FOUNDATION TYPE: -P,cé H-PILE DEPTH: , ’ ext: .//¥ piling DESCRIPTION AERIAL] GRND.| YES | NO | N/A | INSP FRAMING INSPECTION | Pole Ground Correctly Installed Roofs, Gains, & Holes Treated \\\ L\ | \ THLE Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2" - 2") SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1/10') Crossarm(s) or Davit Arm(s) Level (1"/10’) ; ; Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct + H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12", No Settlement) (Buried) Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned vt | | A Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) tt Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly installed rf Guy Assy(s) Complete and Correct EIT a) Anchor Assy(s) Complete and Correct A) al ial LT Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: le fo DATE / G ! INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / $7730 VSO D. EFT SPEGEICA” O18 99 _ iz 4sC~C% S 27 A STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK STR.NO. S PTA'S. (2 1 4 POLE (HT&CL): 35 “—<~ GUY ASSY’S: ANCHOR ASSY’S: MISC. ASSY'S: 57%} T BolT Ar rer of Pe mS FOUNDATIONTYPE: //. 22. £ H-PILE DEPTH: / ©” EXT: «f/f ai DESCRIPTION AERIAL] GRND.| YES | NO | N/A | INSP - KOBUK TIE LINE INSPECTED: Alaska Energy Authority BY DATE B/ 4! 4 INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / a7-$2 9299. rae cZ SPECIE'CA” ONS #79 LE f8CT ON a TFPI FRAMING INSPECTION a Pole Ground Correctly Installed CC — Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') ‘ t Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean a - \ - | rt AWK gL | Is i STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE FOUNDATION TYPE: H-PILE DEPTH: Ex i: ee DESCRIPTION aeniat| GRND.| yes | No — —— FRAMING INSPECTION Pole Ground Correctly Installed ch Roofs, Gains, & Holes Treated [Aris & Bracel) Covrecty ocatedanairstated | = |__| - Bolts Correct Length (1/2” - 2”) Felt || fsermucmsrecrion———SSSSSSSC~dYSCidSCidTCidYCC*d Structure Plumb (4", Top to Bottom) joe Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') \ \ \ Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth o_o H-Pile Extension Weld Complete and Correct Pf [Hie Mounting Bolt Hardware Tightenedand Compete | =| |__| Structure CorectiyFacea(anersK) | =| id fFWALINSPECTION SS SSSdYSSC*dSCCdSCC*d Structure Backfilled (12”, No Settlement) (Buried) ; | ue Structure Plumb (4”, Top to Bottom) pel Angle Structure Raked (0-1“/10’) ae HLL li ' 7 - c Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct rey Anchor Assy(s) Complete and Correct SELLER RIG EL Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY 3 Yop op we, ___ DATE ol agi G52) INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / 7 477$C -79099", "282-7 SPEGFICAT ONS FS? 2 242C GC’ 5a 2? Az STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. GUY ASSY'S: PTA'S. CYA POLE(HT&CL): 35 —57 ANCHOR ASSY’S: J /p Lh MISC. ASSY'S: i/A FOUNDATIONTYPE: //_ 7 OK H-PILE DEPTH: 7 © ’ EXT: x//g DESCRIPTION AERIAL] GRND. | YES uo FRAMING INSPECTION Pole Ground Correctly Installed | | Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed = oO Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') ALLEL Ls Hardware in Vert. & Horiz. Alignment Foundationsetio Corre Depth sd Angle Structure Raked (0-1"/10') INSPECTED: POWER Engineer's Inc. BY: DATE / / . ; / INSPECTED: Copper Valley Construction BY DATE / OTE L Me EEL ASL Ast LL Pap ; 47°32 99 S99. Ea SPEGEICA” O*S 59 iE 24207 C%. Sa 752 As STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. PTA'S. C/A POLE (HT & CL): P57 ~~ 57 GUY AssY’s: _//# ANCHOR ASSY’S: d/A MISC. ASSY'S: J //4 FOUNDATION TYPE: )f-7,Lé H-PILE DEPTH: / oO ExT: //4 — DESCRIPTION AERIAL| GRND.| Yes | NO | NWA | INSP \ FRAMING INSPECTION Pole Ground Correctly Installed E Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1"/10') FCETETATTE | fl Gl Myf U Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) i} i Structure Backfilled (12", No Settlement) (Buried) fi fi Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct | eL I¢ le ao 4 9 > 4 m ~ — Structure Area Neat and Clean INSPECTED: Alaska Energy Authority 8 INSPECTED: POWER Engineer's Inc. Htsctet | LTTE EL aL INSPECTED: Copper Valley Construction BY: DATE / / APSO NSD N. aera SPECIEICA™ ONS 39 2 12 F22C7 ON 3 aT F2 A STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. G PTA'S. GyA POLE (HT &CL): 35° ‘- 5" GUY ASSY'S: 4//4 ANCHOR ASSY’S: J /4 MISC. ASSY’S: FOUNDATION TYPE: iA = Pi Le H-PILE DEPTH: O° EXT: /a SPEC. DESCRIPTION REF AERIAL] GRND. | YES NO N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Seucwre tumb(@" Toptosaver) sd Crossarm(s) or Davit Arm(s) Level (1”/10’) \ He HH l | Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') TETLEETT mae Insulators Clean, Complete, & Aligned SILL i Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed El i tL LL Jumpers Correctly Installed bf ee |] [|_| cuyassysicompleteandcorer——SSSC*dSC‘dSSCSCid | [Tanehorassislcompleteandtoree Ss’ dT | Freuctreareaneatandcean Sid et | dt INSPECTED: Alaska Energy Authority BY: 7. DATE 3/4 'JD| Ves i INSPECTED: POWER Engineer's Inc. 8 DATE / INSPECTED: Copper Valley Construction BY: DATE / = r 477309099. GZ SPECIEICA” ONS 7? 52 42C7 CN Sa FP AS STRUCTURE INSPECTION REPORT STR.NO. 7 O PTA'S. C/ ff POLE(HT&CL): 757-5” GUY ASSY'S: rZ ANCHOR ASSY’S: W Z FZ MISC. ASSY'S: Belt AT fToP of Toll H-PILE DEPTH: 128002-01: SHUNGNAK - KOBUK TIE LINE ’ EXT: W//g INSP SPEC. REF. DESCRIPTION FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2" - 2”) Hh i Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1“/10') Hardware in Vert. & Horiz. Alignment i : fl Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct \ H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION EH Structure Backfilled (12”, No Settlement) (Buried) u Frisina Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10’) Cc Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) KK Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. INSPECTED: Copper Valley Construction SPSGEIGA& ONSicge.. BY: Con DATE DI G ' Oz BY: DATE / / BY: DATE /__ STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. // PTA'S. Cy POLE (HT & CL): pr GUY ASSY'S: 4e/g ANCHOR ASSY'S: .//g MISC. ASSY'S: 5P7)7 BoLT AT TeP cf Pelé FOUNDATION TYPE: 7 -2,€ H-PILE DEPTH: 0’ EXT: a//a os DESCRIPTION AERIAL| GRND.| Yes | NO | N/A | INSP ae | FRAMING INSPECTION um Pole Ground Correctly Installed Roofs, Gains, & Holes Treated l ‘ : \ \\ Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10") Insulators Clean, Complete, & Aligned } fl TE \ ee ‘ ; Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed i Jumpers Correctly Installed ue Guy Assy(s) Complete and Correct Pt ee | Anchor Assy(s) Complete and Correct mE Structure Area Neat and Clean | | INSPECTED: Alaska Energy Authority BY: a OS DATE S / u f INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / 7 AP°$2-99 E99. BE 27° SPECIECA” ONS FT9 NE ERCT ON a aTFP ALE STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE | STR.NO. 7 2D PTA'S. G2 POLE (HT &CL): 357 “— s~ GUY ASSY'S: //Z/- 3 ANCHOR ASSY’S: U5 2 (/F3-~/° ¢ ACA CK MISC. ASSY'S: /97.2 ~11 4 FOUNDATION TYPE: Ae Pre H-PILE DEPTH: 0’ EXT: AA oot DESCRIPTION AERIAL] GR Yes | NO | N/A | INSP ND. FRAMING INSPECTION a Pole Ground Correctly Installed | Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1“/10') fr \ i EEL + | | TL EN LTT Hardware in Vert. & Horiz. Alignment o_o Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12", No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) it f Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) HT CUI Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed | eee [Yumperscoreciyinsaeg iP Ti -[euyasayencompieteanacoree SSS] [[arehor Asya) compieteandcoree iT] dtd [serscureAreaneatandcean Si | | Td Ne INSPECTED: POWER Engineer's Inc. B DATE / / INSPECTED: Copper Valley Construction BY: DATE / / 47°SC -99599%) °38072-7° SPECIICA” ONS £22 _ td SesC~ G4, & a=? bp Nidan STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. / PTA'S. C/A POLE (HT &CL): 3S “5 GUY Assy’s: 4//ff ANCHOR ASSY'S: »// Mee aes Pe fol Pes ee | Pee FOUNDATIONTYPE: ,/. D7 H-PILE DEPTH: 7 o ext: J /a oy DESCRIPTION AERIAL| GRND. | YES z= °o N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) |__| SETTING INSPECTION LL Vi Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1"/10') . CE\LS|A \ i CHILE y i \ Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth ( H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12", No Settlement) (Buried) Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1"/10') CHILE i Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed JUmpers Correctly Installed a) es pie Structure Area Neat and Clean LL INSPECTED: Alaska Energy Authority BY: Zope, DATE 3 / GG? | : / INSPECTED: POWER Engineer's Inc. BY: DATE / Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct 1 INSPECTED: Copper Valley Construction BY: DATE / / 7 S730 99. BSE IZ SPECIEICA” GIS 39 2 E407 CN 5 4 7F9 ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. PTA'S. Gg POLE (HT & CL): 57 — GUY ASSY'S: 4 / ANCHOR ASSY'S: ,// MISC. ASSY’S: wre IP Bel AST TOP o Tot. é FOUNDATION TYPE: A Se: H-PILE DEPTH: / g ” EXT: ,//q i DESCRIPTION AERIAL] GRND.| YES | NO | N/A | INSP —}+— FRAMING INSPECTION — Pole Ground Correctly Installed \ i Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') + Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Al Is i LL Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean UEP INSPECTED: Alaska Energy Authority BY: a INSPECTED: POWER Engineer's Inc. BY: INSPECTED: Copper Valley Construction BY:: 47°35 -19S9 9. 2dr 2 SPEGFICA™ ONS #59. “sz 24S E7 C%, 5 a “FF AL STRUCTURE INSPECTION REPORT _128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. / 57 PTA'S. 6 4 POLE(HT&CL): SS - = GUY ASSY'S: p/p ANCHOR ASSY'S: 4 //4 MISC. ASSY'S: J /A FOUNDATION TYPE: Wf. 77.1 H-PILE DEPTH: i ext: »/H/g /0 YES NO N/A | INSP i DESCRIPTION AERIAL FRAMING INSPECTION a Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2" - 2”) Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1°/10') Hardware in Vert. & Horiz. Alignment \ x Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12", No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct ECCT Le secon a swucureareaNeatandcean iY] | | dC / TOTTI BE cE + + INSPECTED: Alaska Energy Authority BY: ear DATE -3/ & A INSPECTED: POWER Engineer's Inc. BY: DATE (Amani) INSPECTED: Copper Valley Construction BY: DATE / / arse aa ce eva Ta SPECIEICAT ONS F592 222C7 CN a ATP AS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. /G PTA'S. /-/ POLE(HT&CL): SS — 5 GUY ASSY’S: ANCHOR ASSY’S: : : > MISC. ASSY'S: 1/772 -1/ SU aLlte WES Oe BT of 7olé — FOUNDATION TYPE: H-PILE DEPTH: / oO” DESCRIPTION AERIAL} GRND. Fmamwawseecron ————~i| «it | Pole Ground Correctly Installed on Roofs, Gains, & Holes Treated aa = [arm) & areca) Correclytoctedandinwates | =| | | [ues venus tocinusinstatesation «| | |_| fsermuawmsrecton——SCid [structure Fumo", Toptesonen) | Faraiestrucurenakea oro) SST SY Crossarm(s) or Davit Arm(s) Level (1"/10') — = iL Hardware in Vert. & Horiz. Alignment | Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct fH} H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1”/10’) i r th hp rr Insulators Clean, Complete, & Aligned f Conductors Undamaged (Ahead Span) ti i Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed i cL fC Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct eae eee LL Structure Area Neat and Clean Ce hh hi INSPECTED: Alaska Energy Authority BY: SS “Ge DATE B/G 'T2 INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / 47°35 239099". “GC T2-2° SPEGEICN ONS Se 5 S-EC CGS 7 a9 AS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. / 7 PTA'S. Cy 4 POLE (HT & CL): 7S “, GUY ASSY'S: //g ANCHOR ASSY'S: ,//g MISC. ASSY'S: IL, FOUNDATION TYPE: //. PYLE H-PILE DEPTH: 7 g ° ext: A/g SPEC. REF. DESCRIPTION AERIAL| GRND. INSP FRAMING INSPECTION Pole Ground Correctly Installed J Roofs, Gains, & Holes Treated : Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4“, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1"/10’) | A | \ Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth \ \ H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) [__[StucturePtumb(@ Topiosotiom) a [ [insulators clean, complete, aligned | [_[eonductorsundamaged ahesd span) dP |i [| conductorsPropery Sagged (ahead span) | = [___|WraplockTescorrectyinstaled = [| Selices andor DeadendsCorrecty installed =| P| Jumpers Correctly Installed | | | \ fl | | tt [ Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean CHT il ef His] fi INSPECTED: Alaska Energy Authority BY: > a _ DAT. 2/ “t-'% INSPECTED: POWER Engineer's Inc. BY: DATE / of INSPECTED: Copper Valley Construction BY: DATE / / M7730 9S9 9. FRET Ze SPECIEIC A” DMS F529 5 22CT ON STP ALE Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') \ Hardware in Vert. & Horiz. Alignment 4 Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned \ f TELE Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Guy Assy(s) Complete and Correct fi ee] Anchor Assy(s) Complete and Correct SEE - A TERT Ay Jumpers Correctly Installed ae Structure Area Neat and Clean STR.NO. / ¥ PTA'S. C2 / POLE (HT & CL): 3g" 5 Guy AssY’s: —_,// ANCHOR ASSY’S: 4! /@ MISC. ASSY'S: J /A FOUNDATION TYPE: 4/2 P,¢ £ H-PILE DEPTH: / o ' ExT: //g — DESCRIPTION AERIAL] GRND.| YES | NO | N/A | INSP eee ee ! FRAMING INSPECTION ELL tL STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE INSPECTED: Alaska Energy Authority BY: fen eS DATE “3/ ¢! Sg INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / id 7 47°30 DSI 9, EFT 2-e SPEGIFICA” OMS ¢59 - 52 S8eC> CN S357 ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. , F PTA'S. POLE (HT &CL): 3S ~S GUY ASSY'S: ,/ ANCHOR ASSY'S: ,//2 MISC. ASSY'S! 4D.) > BotT Ar peor ef foté€ FOUNDATION TYPE: i - SPEC. REF. ne H-PILE DEPTH: / G ’ EXT: // DESCRIPTION AERIAL] GRND. | YES = Oo N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated \ | | \ Arm(s) & Brace(s) Correctly Located and Installed i Nuts, Eyenuts, Locknuts Installed & Tight : r rT Bolts Correct Length (1/2” - 2”) : t l LETTE Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct = 1 tit i i i i cL [wropleckTiescoreciyinsalled Sd | id Spies ander Deadends Coreciyinsaied |__| [=| | fumpersconeciyinsaies —_———SSS«d| i] dd [Guy Asso)complete ana core SSS Td [Anchor Ay) Completeandcoreae «dT «dS Sid fsvuctureareaneatandcien ————S=«dC | | | INSPECTED: Alaska Energy Authority BY Py. DATE BI 'G2 | INSPECTED: POWER Engineer's Inc. BY: DATE / / ry ye t : INSPECTED: Copper Valley Construction BY: DATE / / 1 argc na ea SPECIEICAT ONS #79 52 EFC ON a STEP AS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 2 O PTA'S. C/A POLE (HT &CL): 57 — $7 GUY ASSY'S: =, ///4 ANCHOR ASSY'S: —4// 4 MISC. ASSY'S: »/777 2 — yy FOUNDATION TYPE: //- », C€ H-PILE DEPTH: , 9 EXT: W/2 pg DESCRIPTION GRND. N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed = Oo Roofs, Gains, & Holes Treated Bolts Correct anaes (1/2" - 2") — [SETINGINSPECTION, | [Structure Pumb(@",Topiosorem) iY [[rarawareinver: aHorz Alignment ———*it|_ = | | [FoundationsettocorectDepth_————S—~d S| dT [aie Exersion Weld Completeandcoree |__| |= |_| [Fie Mounting Bolt Hardware Tightened and copie | | | |_| Structure CoveciyFacedanors ———s| | | frwatinseecnon—SSC*dT SSCiT SCY Cid Structure Sackiled (27 Nosetemend) ured | | | —| Sructureumb(@",Toptosonem | | jangle Stucturenakea(@-tno) SYS anette Aig eels | [conductorsundamaged aheedspan) Sst | | | +t [__[cenductorsPropery sagged aheadspan) | z-| |__| _[wraplocktiescorrectyinstated ——SSC«dY | —idYSCC*d [[selicesanctorDeadendsCorectvinstaied |__| |= [Yumperscovecivinsates «iid [___[euyassyercompleteandcoret ———SSSC«dSCSC‘d;SC~*d [archer assis)completeandcoret «dt «dT Cid | es INSPECTED: POWER Engineer's Inc. DATE / A HE A INSPECTED: Copper Valley Construction BY: DATE / / A730 DTV, ESE Qe SPECIFICATIONS cae = Ese CO. = ane STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 7 / PTA'S. 7 / (] POLE (HT &CL): “357 “- 57 GuY ASsSY's: — ,//4 ANCHOR ASSY’S: A MISC. ASSY'S: 4 / / FOUNDATIONTYPE: //_ P,, £ H-PILE DEPTH: /¢ ' EXT: J/7 eg DESCRIPTION AERIAL|GRND.| YES | NO | N/A | INSP FRAMING INSPECTION ce Pole Ground Correctly Installed call | | Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') i i FCCC : it iste LIE ISL Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) ELLE | Ls - aE Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned I. B i Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. , ii iE Tk AT ) < Go > 4 m = ~ INSPECTED: Copper Valley Construction BY: DATE / / “8773599599, G8 2-7" SPECIFICA” ONS F39 _ “15 28SEC" ON, 3 STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 2.2 PTA'S. cy) A POLE (HT &CL): 35 — 5 GUY ASSY’S: W/A ANCHOR ASSY'S: 4) / 4 isc. ASSY’S: = pr /g x = Es, FOUNDATIONTYPE: Af. py H-PILE DEPTH: oo a DESCRIPTION AERIAL | GR YES NO N/A | INSP ND. FRAMING INSPECTION — Pole Ground Correctly Installed i : Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed - Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2") om oo SETTING INSPECTION [nh Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1°/10') Crossarm(s) or Davit Arm(s) Level (1"/10') RELL LETT TT At Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth i H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') i ll EHH FRUEERERLL Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: Sie DATE INSPECTED: POWER Engineer's Inc. BY: DATE ns INSPECTED: Copper Valley Construction BY: DATE f / 47780 9999, ea SPECIEICA” DS FS? 2 GE 24207 ON 5 a TEP STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 27 PTA'S. ¢/A POLE (HT & CL): 75° — <- GUY ASSY'S: 4 //# ANCHOR ASSY'S: Ja MISC. ASSY'S: a//g FOUNDATIONTYPE: “f/_ P £ H-PILE DEPTH: / 0 “ ext: //4 — DESCRIPTION yes | no | NA | INSP _| FRAMING INSPECTION || Pole Ground Correctly Installed a Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2" - 2”) Ht i Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1°/10') HR Ht i i Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct et a am Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. CLIT ET 2 5 kK iM ao < 9 > a m ~ / INSPECTED: Copper Valley Construction MPSS SDA id aT SPECIECA” ONS FT2 LUE ERECT ON BST FF2 ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR NO. 2 PTA'S. @/7 POLE(HT&CL): 3.57 57 GUY ASsSY'S: —_,//g ANCHOR ASSY'S: §_//z MISC. ASSY'S: 1/17 2-1/1 FOUNDATION TYPE: //_ Pu & H-PILE DEPTH: 9 g XT: A) Po DESCRIPTION aeniat| GAN. yes | NO INSP ee FRAMING INSPECTION ie Pole Ground Correctly Installed eer Le Roofs, Gains, & Holes Treated eet | [Arms 8 Brace() Correctly Locatedandintaled | = | |_| [Nuts Eyenuts Locknutsinstaleg Tight «| | | | Bolts Correct Length (1/2” - 2”) 7 SETTING INSPECTION Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1"/10") Crossarm(s) or Davit Arm(s) Level (1°/10') Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct STINT i Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: Pa DATE —S/ 4/7 EHTEL EEE ? o < | INSPECTED: POWER Engineer's Inc. DATE / INSPECTED: Copper Valley Construction BY: DATE / / A782 9999 ERE 2 SPECIEICA™ ONS F59 52 22207 ON BaF ALE STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE Ss STR.NO. 27 S~ PTA'S. Gy POLE (HT & CL): GUY ASSY’S: 4//g ANCHOR ASSY'S: _,//g MISC. ASSY'S: SV (+> Borer pr rer oF Fol FOUNDATIONTYPE: 4/f. Page H-PILE DEPTH: /o | EXT: W//4 YE N/A | INSP SPEC. REF. DESCRIPTION FRAMING INSPECTION Pole Ground Correctly Installed A Roofs, Gains, & Holes Treated | Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2") SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1°/10’) Crossarm(s) or Davit Arm(s) Level (1“/10’) ESELELCEEEUT TTI TT TE Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1°/10') Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. oa ~< N ao =< Oo > = m < ~ INSPECTED: Copper Valley Construction BY: DATE / / t 47°32 99599". *88072-7° SPECEICA” ONS 3? 2 24C7 ON, 5 a E97 ALS Sea e=EagSETEESENEPUIEEEEeEEe STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. — 2 G PTA'S. Go) A POLE (HT & CL): FS - 77 GUY ASSY'S: = ,// ANCHOR ASSY’S: 4/2 MISC. ASSY’S: FOUNDATION TYPE: SPEC. REF. p -pPté DESCRIPTION Jacniat| cano | YES NO FRAMING INSPECTION to Pole Ground Correctly Installed Pt Roofs, Gains, & Holes Treated PT || Arm(s) & Brace(s) Correctly Located and Installed — Nuts, Eyenuts, Locknuts Installed & Tight Pt | SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1°/10’) Crossarm(s) or Davit Arm(s) Level (1“/10') Hardware in Vert. & Horiz. Alignment tH it Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION rf Structure Backfilled (12, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1”/10") Insulators Clean, Complete, & Aligned : i EEL Ay ATH Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: INSPECTED: POWER Engineer's Inc. BY: KELL Ns my COGna INSPECTED: Copper Valley Construction BY: “APSO DEG, ELT SPEGEICA® ONS 39 _ 32 242C7 CM S359 ALS ——— STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 27 PTA'S. C/A POLE (HT&CL): 45 —S~ GUY ASSY'S: ,/ / ANCHOR ASSY’S: 4/ /12 MISC. ASSY'S: w/a Ys H-PILE DEPTH: 0 ExT: WA, FOUNDATION TYPE: SPEC. REF. DESCRIPTION AERIAL WES NO N/A | INSP FRAMING INSPECTION Roofs, Gains, & Holes Treated [[ectsconecttenan my i | Structure Plumb (@",Topiosoror) Sd |__| Angle Structure Raked (0-17/10') | [erosarm or Davie Armlievel i707 «| THardwareinVer. &Horiz. Alignment +t =| | | FoundationsettocerrectDenth SST | | [Tie Extersion weld Completeanacoret |_| | |__| |__| ite Mounting Bot Hardware Tightenedand complete | |__| __| svuctureconeciyracesanors) | | | ‘| _d SES CNS TN [—[ieactresecited 2" Nosettemend ured |_| | 7] __ [[siracturePumb(e".Toptotorom | || dC ee Pree on [Tarte structurenakeatornoy || [ [insulators Clean, omplete, alone’ dT | [_[cenductorsundamaged (ahead span) iT | [__|conductorsPropery sagged (aheadsean) «| | | (|__| [wraplockTesCorreciyinsaled S| S| | iY Cid Splices and/or Deadends Correctly Installed ieee ai eect itichinial Jumpers Correctly Installed Guy Assy(s) Complete and Correct aia Leal Anchor Assy(s) Complete and Correct CE i aS a] Structure Area Neat and Clean = i 2 INSPECTED: Alaska Energy Authority BY: Crve DATES / 4% 2 ee a INSPECTED: POWER Engineer's Inc. BY DATE / / INSPECTED : Copper Valley Construction BY: DATE / / 42°30 I9S9 9. FAY SPEGEICAONSiese is, c22G O%iS aa 27 hs STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 5 © PTA'S. Cy POLE (HT &CL): 3.5" — $~ GUY ASSY'S: , / ANCHOR ASSY’S: ,) /4 MISC. ASSY'S: y/o - 4) & FOUNDATION TYPE: _~ me H-PILE DEPTH: a © EXT: WI /g a DESCRIPTION aeniat| GRND. Yes | NO | N/A feamwewsrecton | | Pole Ground Correctly Installed ce Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Ht 7 i rf LEEEEEEL Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2") SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') Hardware in Vert. & Horiz. Alignment i nt Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct | H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1/10’) a HI | E i Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed LLL Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct TLL Kf i ft a Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: Lon DATE 3/%/QY INSPECTED: POWER Engineer's Inc. BY: DATE / sf 7 INSPECTED: Copper Valley Construction BY: DATE / / 7 ASC ITI, rae raeye SPEGEICAT ONS $39 12 242C7 O% Sa TFI ALS — STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. DF PTA'S. ty POLE (HT & CL): 3 S~ — $7 GUY ASSY'S: 4//g ANCHOR ASSY’S: ,/ /g MISC. ASSY'S: —_, / /f FOUNDATION TYPE: // — Phe H-PILE DEPTH: o ’ ExT: / /g a DESCRIPTION AERIAL] GRND.}| YES | NO | N/A | INSP Re ccenensnennaancianniaiipascncsiaaiell FRAMING INSPECTION oa) Pole Ground Correctly Installed oo Roofs, Gains, & Holes Treated sciatica i Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2") SETTING INSPECTION FE Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1*/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') _— Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth [a | AT H-Pile Extension Weld Complete and Correct WEA SIT \ Z \ SE H-Pile Mounting Bolt Hardware Tightened and Complete Pee Structure Correctly Faced (AH or BK) ie FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) ios nnn \ farglestuctreRaxeato-rnoy «dCi; [rsulatorsGean, Compe @aignes sd |_| [Teenducors undamaged ahesdSpen) it | | |_| conductors Propery Saggedtaheadspon) | c- | | | [wrepleckTiesCorectyintatea «|_| | dd | [selces andor Onadends Covectvinwated || te] _| I ss see OA 00000 T= OT | [euyassysdconpieteandcoree SSE | | [anchor asnislconpiewandtorea ST | i 2 ST INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. BY: DATE / / C INSPECTED: Copper Valley Construction BY: DATE / / arse ogee casera SPEGIEICA™ ONS F329 42 ERECT ON STEP ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. IF PTA'S. 2/7 POLE (HT &CL): S77 GUY ASSY'S: ,//g ANCHOR ASSY’S: ,/ /g MISC. ASSY'S: _, / /f FOUNDATION TYPE: // — os H-PILE DEPTH: /o ’ EXT: I /g a DESCRIPTION aeniat| GaN. yes | no | N/A | INSP FRAMING INSPECTION ka Pole Ground Correctly Installed Roofs, Gains, & Holes Treated ee Arm(s) & Brace(s) Correctly Located and Installed Ge” Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2" - 2") [Structure rium @",Toptosonom) «| =| | |_| [_analestrucurenaked @-r7ioy ———SSSCS~dSC* Crossarm(s) or Davit Arm(s) Level (1“/10') Hardware in Vert. & Horiz. Alignment [__[FoundationsettocorrectOepth SiC | [Wile Extension Weld Completeandcoret |__| | =| [ [Hie Mounting Bot Hardware Tightened and Compete | =| |__| [structure corecv Faced anorex) | frWALinspecTION iY Ss tructure Backfilled (12”, No Settlement) (Buried) [| Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean Here LL cL k INSPECTED: Alaska Energy Authority BY: 4 INSPECTED: POWER Engineer's Inc. BY: DATE /_s] INSPECTED: Copper Valley Construction BY: DATE / / 47°30 9S9 9, id aT SPEGIFICAY OAS eSe 2 <e2G> GS. 5 Vanes Ae STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. FO PTA'S. wy 2 POLE (HT & CL): P57 “— 5 GuY Assy’s: , //f ANCHOR ASSY'S: 4//¢ / MISC. ASSY'S: a / FOUNDATION TYPE: //- 77 & H-PILE DEPTH: ow DESCRIPTION AERIAL} GRND. FRAMING INSPECTION Pole Ground Correctly Installed 8 5 & x VES N/A | INSP Ee | Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1°/10’) ree i g Ay Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') CH LL EULER TEE Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean ECCT CCETI LLL Reise ELL Tet te] LES | INSPECTED: Alaska Energy Authority By-y Cpe DATE 3/4 '% INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / “4773S VED. “GS-7 SPECIFICA™ 81S ¢52 . 12 242C7 CN 3 3 F9 AZ STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE POLE (HT & CL): 33° 5— GUY ASSY’S: 4//4 ANCHOR ASSY'S: ,/ MISC. ASSY'S: S;% sr BolT AT rer of TolEé FOUNDATION TYPE: A- rr LE H-PILE DEPTH: 9 “ EXT: ,/ SPEC. REF DESCRIPTION AERIAL] GRND. INSP FRAMING INSPECTION Pole Ground Correctly Installed = Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) [a = wo a Angle Structure Raked (0-1°/10') Ft a —_ Crossarm(s) or Davit Arm(s) Level (1"/10') Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth eu H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) i Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned CCL i Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean Fee Hy ; A INSPECTED: Alaska Energy Authority BY: 3 a DATE 3/¢ iS INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / ee as Er re SPECIEICAT ONS F592 FR-CT CN a SFP AL DS © STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. 3 2 PTA'S. C/A POLE (HT &CL): 35° 5~ GUY ASSY’S: ,//# ANCHOR ASSY’S: WI/ 9 MISC. ASSY'S: //777.2 -_1/_ H SPuir_ Botr 47 7oP oF fol FOUNDATION TYPE: H-PILE DEPTH: EXT: 4 DESCRIPTION AERIAL| GRND.| yes | NO | N/A | INSP ILEREES: Ll FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') is it Hardware in Vert. & Horiz. Alignment FREED : r Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10’) f E TALL A Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: Lae. DATE “2/ Ct 'F=2| BY: INSPECTED: POWER Engineer's Inc. DATE / / INSPECTED: Copper Valley Construction BY: DATE / / ELL As LL TIL 7 47°35 999, E82 SPECIEICA™ OMS F552 _ NE FSET ES, 5. 3° F9. AZ STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 3 PTA'S. C/-/f7 POLE(HT& CL): 5 GUY ASSY'S: — //f ANCHOR ASSY'S: 4//g MISC. ASSY'S: J /g FOUNDATION TYPE: SPEC. SP atul H-PILE DEPTH: 4 “ EXT: V/F REF DESCRIPTION AERIAL] GRND. INSP + FRAMING INSPECTION | Pole Ground Correctly Installed mo Roofs, Gains, & Holes Treated | Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2") SETTING INSPECTION Structure Plumb (4“, Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1°/10') He i } i \ ‘ Hardware in Vert. & Horiz. Alignment iii Foundation Set to Correct Depth Tih H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) Structure Backfilled (12”, No Settlement) (Buried) ee ee ee Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') SU eae ese Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed | LAT Splices and/or Deadends Correctly Installed Tn a Ps HED pe f UE : Jumpers Correctly installed Guy Assy(s) Complete and Correct Scala ictal ial ahaha [| [anchorassya)completeandcoret | | dL |_| [Structure Areaneatandcieen 00 TT | INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / 1 ar as devas cara SPECEICA” ONS P29 NE EF2C7 ON SV 5TF7 A STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. SS PTA'S. C/-/A POLE (HT & CL): FP s-5— GUY ASSY’S: J /h. ANCHOR ASSY'S: pn! [1 MISC. ASSY'S: Dia FOUNDATION TYPE: //- PL Eé H-PILE DEPTH: /Q “ EXT: a//g sve DESCRIPTION ARiat| GaN, yes | No | NWA | INSP Faamnewsrecion «dtd; Pole Ground Correctly Installed Roofs, Gains, & Holes Treated — a Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight - Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') THEE Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct Tt rh H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) | Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) te Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct ECCT a Assis ELLE Anchor Assy(s) Complete and Correct Structure Area Neat and Clean Kc lh INSPECTED: Alaska Energy Authority BY: Zo. INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / array dea. agra SPECIEICA” O85 £59 42 LAST ON ga TE9 AL STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. _).5~ POLE (HT & CL): 3.7 “— 5- Guy Assy’s: 4//# ANCHOR ASSY'S: 4/ /g MISC. ASSY'S: os Py, BeulT 97. FOP OF = RE FOUNDATION TYPE: . Lé H-PILE DEPTH: 9 /o * EXT: «/g YES) NO N/A | INSP SPEC. REF. DESCRIPTION AERIAL FRAMING INSPECTION Pie Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Pet Arm(s) & Brace(s) Correctly Located and Installed A Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1“/10') : : Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority icp: Ae BY: INSPECTED: POWER Engineer's Inc. INSPECTED: Copper Valley Construction BY: DATE / / arc dod. isa SPEGFICA ONS 39 5 225C ON SATE AS Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4“, Top to Bottom) Angle Structure Raked (0-1“/10’) Crossarm(s) or Davit Arm(s) Level (1°/10’) Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. LLL ele st fc ao < 9 > + m INSPECTED: Copper Valley Construction BY: DATE 1 4773005990998, eae T2-7° SPECIEICAT ONS 6:39 _ 12 22SC7 OU 8 3°89 AS Sy he Hit Hk i ( + ll | ¢ Is ‘ STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. 6, PTA'S. A POLE (HT & CL): 35-5 GUY AssY’s: ,4//g ANCHOR ASSY’S: »//2 MISC. ASSY'S: =s7t,7 BetT AT FoP of Pelé FOUNDATIONTYPE: /f- 2) £ H-PILE DEPTH: / © “ ext: p//2 oe DESCRIPTION aeniat| Gano, yes | NO | N/A nse | uc PoleG ly Installed a ole Ground Correctly Installe } | aE LLL STRUCTURE INSPECTION REPORT STR. NO. 128002-01: SHUNGNAK - KOBUK TIE LINE POLE (HT& CL): Bs -S 37 GUY ASSY'S: J, /z/ -3 MISC. ASSY'S: y/y97 2 - yyy 6/23-; ANCHOR ASSY'S: FOUNDATION TYPE: /“f- 2 ¢ H-PILE DEPTH: 9“ EXT: p//A Ree DESCRIPTION AERIAL N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1”/10’) ee Lea isoaa a ee ail oo ul Ti Tin H-Pile Extension Weld Complete and Correct [Hite Mounting Bolt Hardware Tightened and Complete co] |_| _ Structure CorectiyFacea(anorsK) | | id FINAL INSPECTION Pe bee PE) || | I Structure Backfilled (12", No Settlement) (Buried) Be cit ob Ae | Pee ete EOL al a Insulators Clean, Complete, & Aligned ieee CECE EY [ConductorsUndamaged(AheadSpan) |e | | Conductors Properly Sagged (Ahead Span) a ii Wraplock Ties Correctly Installed Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10') Splices and/or Deadends Correctly Installed Jumpers Correctly Installed nT TE Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority By Sons pee DATED fi) oty nee INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / d ¢ v v &\ P FF Note 2 bower BCI wag lowered AP“e nba tro pre Wise: prope Gleerascel Car Svy wives S785 99 T9 I 3120" BREGEICAT Sisco) B SaGuiG 1. bv 3759.43 STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE | STR.NO. = PTA'S. “/ POLE (HT & CL): BS“ - 5 GUY ASSY'S: =, / / ANCHOR ASSY’S: 3.) //9 MISC. ASSY'S: Ww /A FOUNDATION TYPE: //— 7, cE H-PILE DEPTH: 0 “ ExT: W/ gq SPEC. DESCRIPTION AERIAL} GRND. | YES N/A | INSP REF. FRAMING INSPECTION Pole Ground Correctly Installed 2 rE Roofs, Gains, & Holes Treated ; Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2" - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1°/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') i HR Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth : H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned : N / tL Kd Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean TLE Ek oa Le | INSPECTED: Alaska Energy Authority By: 4 DATE “3/4 INSPECTED: POWER Engineer's Inc. BY: DATE / of INSPECTED: Copper Valley Construction BY: DATE / / “47730 IKON. EB QD SPEGIFIGAT NSS = ESAS" EN 5722) A STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE FRAMING INSPECTION Pole Ground Correctly Installed STR. NO. ao PTA'S. CYA POLE(HT&CL): on - ¥ GUY ASSY'S: // ANCHOR ASSY'S: 4//g MISC. ASSY’S: J (A FOUNDATION TYPE: //- 2 € H-PILE DEPTH: , g ” EXT: H/g ae DESCRIPTION aeriat| crv. | YES | NO | N/A | INSP Roofs, Gains, & Holes Treated Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1"/10’) MTT tf Hardware in Vert. & Horiz. Alignment ttt Ty Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned | \ LL is dl y ace Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) | —__=§__._ Wraplock Ties Correctly Installed i o-g, | Splices and/or Deadends Correctly Installed ee Jumpers Correctly Installed : S li Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct \ E K E Structure Area Neat and Clean INSPECTED: Alaska Energy Authority By: Atos DATE “3 / '¢ INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / 7 arte agg casera SPECIEICA ONS FS9 112 24207 ON STF? STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 4/0 PTA'S. C ¥-2 POLE(HT&CL): 35-57 Guy assy's: § //7 ANCHOR ASSY'S: _,///g MISC. ASSY'S: ; / 7 2 -1/ # FOUNDATIONTYPE: _ 72C£ H-PILE DEPTH: / 9 “ EXT: 2//A SPEC. YES = oO N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed REF. DESCRIPTION AERIAL A Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1"/10') Jrsrareinver: @Hore Alignment «id |_| [[reundatonsettocoreetdeph Sid le Extension Weld Complew andtowet |__| | = [Pte Mounting ole HordwareTightenedand Coneiete| | | |_| [[seuctre corectvraceatanersx «dt | | |_| a i eee Faeccture Pune Toptosorom’ «dt pt | [Faraiesucurenaneaornoy S| dT dt | Tirultorsceor, complete aaioned Ss | | | [Teendctors undamaged (AheoaSpar) ste] | |_| [[eenductors rover sagged taheadsean) | |__| | wepiccttiescovectvistaiea _——SS—SC*dC i id | [selces andor Oradends Corrciyinnaied | | | | _| [Tumperscorecivinsaieg SSC | | [Jewassyencompieteandcoree SES a 2 | Faeuctreareaneatandcean SSC et INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / ECHL 7 1 arse dee a, casera SPECIEICA ONS F392 ERECT ON SSFP ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. <f/ ‘Su ize POLE (HT & CL): BS “- Ss GUY ASSY'S: 4//,2 ANCHOR ASSY'S: 4//7 MISC. ASSY’S: N/A FOUNDATION TYPE: 4/- P, 7 € H-PILE DEPTH: / Q ExT: W//g — DESCRIPTION AERIAL| GRND.| YES | NO | N/A | INSP eee FRAMING INSPECTION Pole Ground Correctly Installed a ee ere Roofs, Gains, & Holes Treated Pail Lied Arm(s) & Brace(s) Correctly Located and Installed a in tn Nuts, Eyenuts, Locknuts Installed & Tight erie Bolts Correct Length (1/2” - 2”) er be a SETTING INSPECTION ae) 1 Structure Plumb (4", Top to Bottom) ee Angle Structure Raked (0-1"/10’) ae conarminorDavtarm@ueel TT eT TT OT LTE UAANT ieee 3 ITNT UDA ecard (Pt eT aa (Ce eH H-Pile Mounting Bolt Hardware Tightened and Complete a Structure Correctly Faced (AH or BK) Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4”, Top to Bottom) 1 | FINAL INSPECTION INSPECTED: Alaska Energy Authority BY: Sp LATE BIS NG i atl hemor . : / Hee LL sists [Tt Ic ‘ INSPECTED: POWER Engineer's Inc. DATE / BY INSPECTED: Copper Valley Construction BY 7 DATE / SaP3S I9S9 9, STZ SPEGFICAT ONSicOF Wa SSE CTO Ss tn te Ae STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 4f> PTA'S. C/A POLE (HT&CL): 3.5% 57 GUY ASSY’S: ,//4 ANCHOR ASSY'S: 4/4 MISC. ASSY'S: 4, //) FOUNDATION TYPE: -Trte H-PILE DEPTH: > ~ ExT: «//g Ss N/A | INSP ne DESCRIPTION AERIAL | GRND. FRAMING INSPECTION a Pole Ground Correctly Installed ' < m = oO Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) ; Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1°/10’) i all Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION ; Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1”/10") HRA LLL Insulators Clean, Complete, & Aligned ECCI ‘ ll Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed TIL al Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: Lp DATE BIS 'G2 | INSPECTED: POWER Engineer's Inc. BY LLL k iL SB fi cL LN INSPECTED: Copper Valley Construction BY: DATE / / t APSO NCO aa SPECIEICA” ONS FS? 2415 24207 ON 5 aT FI ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE PTA'S. Cf POLE (HT & CL): 375° “- <7 GUY ASSY'S: ,f ANCHOR ASSY'S: 4 //7 MISC. ASSY’S: 1/72 -/l FOUNDATION TYPE: en Pit. é H-PILE DEPTH: jo “ EXT: A/a DESCRIPTION AERIAL aamncnsrecion | YES NO N/A AE eee ty [foots conecttenatntiae 2) -___|sermenseecron CS Structure um, Toptosowor) | [romani or Dave arm)ieel (PTO) -_ Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth c ie Mounting Bolt Hardware Tightened and Complete | = fratinspection CS INSPECTED: Alaska Energy Authority BY: Ss Wasa d INSPECTED: POWER Engineer's Inc. BY: DATE a ELA Ast TT Is SHE INSPECTED: Copper Valley Construction BY: DATE 47°35 NSM AY, ESE 2-7e SPECGIEICAT ONS #52 12 242C7 C% Sa 29 ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. of PTA'S. C1 /7 POLE (HT & CL): 3 57-757 GUY ASSY'S: ,//4 ANCHOR ASSY'S: 4//q MISC. ASSY’S: RHA FOUNDATION TYPE: // — P, LE H-PILE DEPTH: 7g’ ext: 4//4 rs DESCRIPTION AERIAL] GRND. | YES NO N/A INSP ee a FRAMING INSPECTION sis Pole Ground Correctly Installed = Roofs, Gains, & Holes Treated | Arm(s) & Brace(s) Correctly Located and Installed c= Nuts, Eyenuts, Locknuts Installed & Tight a Bolts Correct Length (1/2” - 2") e HEH SETTING INSPECTION Structure Plumb (4”, Top to Bottom) oo it Angle Structure Raked (0-1°/10') aU een Crossarm(s) or Davit Arm(s) Level (1"/10') Hardware in Vert. & Horiz. Alignment : Foundation Set to Correct Depth \ H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) : Structure Backfilled (12”, No Settlement) (Buried) \ ( Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) tet ( | Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed a TIN | Finlies aeiordeodendsCorectviwated || fe | fumperscoreciyinstaied i ST | [Guy asss\Conpleteanscoree ———SSS«d SY CP | [Anchor Asy)Completeandcoree «dit it [[serucureareaneatandGean Si [RSPECTED: Alaska tneray Authority VS Zon DATE BG INSPECTED: POWER Engineer's Inc. BY: DATE / / F INSPECTED: Copper Valley Construction BY: DATE / / 47°35 9999. ESE TZ SPEGEICK> OM Sica? oe 22 5G) Gy & eae eee STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. LS PTA'S. C/A POLE (HT & CL): 4/90 - of GUY ASSY'S: <//n ANCHOR ASSY'S: — ,///a MISC. ASSY’S: , [77.2 tH FOUNDATION TYPE: - PiLé H-PILE DEPTH: 9 “ ext: J/g ny DESCRIPTION AERIAL| GRND.| Yes | NO | N/A | INSP Pole Ground Correctly Installed — eee eee Roofs, Gains, & Holes Treated c Arm(s) & Brace(s) Correctly Located and Installed uo Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2") SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1"/10') \ {| i Hardware in Vert. & Horiz. Alignment ( Foundation Set to Correct Depth ( H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) i TL Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1°/10') Insulators Clean, Complete, & Aligned \ Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed : i J Splices and/or Deadends Correctly Installed Jumpers Correctly Installed t cE Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct S i Structure Area Neat and Clean S i i INSPECTED: Alaska Energy Authority BYD on, , DATE 3 I ' FO, INSPECTED: POWER Engineer's Inc. BY DATE / i, INSPECTED: Copper Valley Construction BY: DATE 1 / aPTSS IDSA. Ee SPECIEICAT DAIS F-S9 . UZ BAEC ON 8 a FF ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. <<G PTA'S. GUY ASSY’S: S/, MISC. ASSY’S: POLE (HT & CL): >s7 - s~ O.lT FOUNDATION TYPE: /- VLE H-PILE DEPTH: 0 “ EXT: w/4 ne DESCRIPTION AERIAL} GRND. | YES NO N/A | INSP FRAMING INSPECTION ) fw Pole Ground Correctly Installed AK Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1“/10’) Crossarm(s) or Davit Arm(s) Level (1"/10’) +t ana : Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth ELT TTL H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1”/10’) Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) HEE AER Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed \ t SELL T IS [Et Is Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct fe] Structure Area Neat and Clean r | INSPECTED: Alaska Energy Authority BY: Ho, _ DATE a! Y aS INSPECTED: POWER Engineer's Inc. BY: DATE / / 7 INSPECTED: Copper Valley Construction BY: DATE / / aP$C NSN A, Esa SPECIFICA® ONS FS? _ NE 24207 C™ 5 * et Seis STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. uf 7 o FOUNDATION TYPE: /- 7 ¢ H-PILE DEPTH: { ExT: a//a 6 oo DESCRIPTION aeniat| crv. | yes | No | N/A | INSP FRAMING INSPECTION tee | nL Me Pole Ground Correctly Installed eed Roofs, Gains, & Holes Treated We TT Arm(s) & Brace(s) Correctly Located and Installed ALCL LL Nuts, Eyenuts, Locknuts Installed & Tight ELL Bolts Correct Length (1/2” - 2") Zz SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1°/10’) at HE Hardware in Vert. & Horiz. Alignment \ Foundation Set to Correct Depth Hr HHA aHAGaGEEE H-Pile Extension Weld Complete and Correct : H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12", NoSettlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned uw eoneuctors undamaged aheedspan) io | | [eonaton Prope Sagedtanend span) =| | [[weapock resconecty nated i | [ [soles andor deadenes Coreciyinwaieg | =| | [Premperscoreciynsates i | | | [ewan compieeanacorea et Cd [arene aan compete andorra) TE Structure Area Neat and Clean Pia iT rege EEL Eby INSPECTED: Alaska Energy Authority BY: Pap DATE S14 'G=I INSPECTED: POWER Engineer's Inc. BY: DATE fee lal f INSPECTED: Copper Valley Construction BY: DATE / / 7 ra780 IDSG NG BETZ SPEGEICA™ ONS #59 12 242C~ C3, 8 AEP ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. § PTA'S. G/ POLE (HT &CL): 75-57 GUY ASSY'S: ,// ANCHOR ASSY'S: A/a MISC. ASSY'S: ,/ /4 FOUNDATION TYPE: /_ fic g H-PILE DEPTH: ext: r//a ve DESCRIPTION aeniac| ano. yes | no | N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed HI Roofs, Gains, & Holes Treated we Ye Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1"/10") Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12, NoSettlement) (Buried) ct | ie HHP ll Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly installed Jumpers Correctly Installed LTT Ae ia \ Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct CCHIT JOE ll Ids Structure Area Neat and Clean || INSPECTED: Alaska Energy Authority BY: Mf DATE ESAS) INSPECTED: POWER Engineer's Inc. BY: DATE ge . INSPECTED: Copper Valley Construction 47°35 9999", GHZ SPEGFICA> ONSiFS3 4d SASG" CS, 5 a9 ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. of PTA'S. C/A POLE (HT & CL): Po - <~ GUY ASSY'S: 4//g ANCHOR ASSY'S: a! /a MISC. ASSY'S: US PhiT Dslr AT FeoP eof seek FOUNDATIONTYPE: f- PL ¢ H-PILE DEPTH: 9 /y “ EXT: WHY YES NO N/A | INSP faa DESCRIPTION AERIAL FRAMING INSPECTION Pole Ground Correctly Installed RE Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2“) SETTING INSPECTION Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1°/10') He HTL [s Lf Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth RN H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1”/10’) Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) flee LUT Pad [conductor ropery Sagged(aheadSpar)——=«| t | |__| fwraplockTiesCorrectyinsaled |] «dCi Splices andlor Deadends Corectiyinstaled |_| +t |__| fumperscorreciyinstaed SY Si dT] [Guy Assys\Completeand covet ———SSSCiESCSC‘dSCSC*d [[arehor assy) Completeandcorect «TiC [_[Stuctureareaneatandcean CT dC INSPECTED: Alaska Energy Authority BY: Loy ._DATE 2 I Y'G “=I / INSPECTED: POWER Engineer's Inc. BY: DATE / S |___|FoundationSettocorrect Depth | |__| Structure CorrectlyFaced (aH or@k) || INSPECTED: Copper Valley Construction aPT$C 99a cas SPECEICA” ONS £52 12 24207 O% 5 VF? STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. <() PTA'S. C7 POLE (HT & CL): 35° _ 57 Guy assy's: 39 WI / ANCHOR ASSY'S: 9 4/ / MISC. ASSY’S: WYin2- tl [4 FOUNDATION TYPE: ,/_ > 1 £ H-PILE DEPTH: « “ EXT: Wg Pena DESCRIPTION AERIAL FRAMING INSPECTION Pole Ground Correctly Installed YES NO N/A | INSP VE | Roofs, Gains, & Holes Treated i ff 7 Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1“/10’) Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct 8 H-Pile Mounting Bolt Hardware Tightened and Complete om Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1°/10') a Fi +t E Tt E I Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed TULL iii Guy Assy(s) Complete and Correct a ial eerie TTL rN | 4 rf : sfc | LL Anchor Assy(s) Complete and Correct Structure Area Neat and Clean Ei aE INSPECTED: Alaska Energy Authority BY: INSPECTED: POWER Engineer's Inc. BY: DATE Le INSPECTED: Copper Valley Construction BY: DATE / / “A785 DEI I, EY SPECIFICAT ONS #59 V2 222C7 CY 8 3759 BE STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 57 PTA'S. C/A POLE (HT & CL): FS - s~ GUY AssY's: 4/7 ANCHOR ASSY'S: 4//z MISC. ASSY’S: w/a FOUNDATION TYPE: Hf - 770 & H-PILE DEPTH: /o “ EXT: We SPEC. REF DESCRIPTION AERIAL] GRND.| YES NO N/A | INSP FRAMING INSPECTION mo Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2" - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1"/10’) gt \ : HE A E Hardware in Vert. & Horiz. Alignment TIL Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete | 2— Structure Correctly Faced (AH or BK) — Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10") Insulators Clean, Complete, & Aligned Conductors Properly Sagged (Ahead Span) t= [wraplockTiesCorrectyintaled ———SSSSCSC*dSC | «| Cid CC Splices andlor DeadendsCorrectyinsialed | | | t-| _| P= _[umperscovecivinsated TCT [Guy Asy6)Completeandoret ———SSS*d?CSCSC*dSCSC‘d [ [Anchor assis) completeandcoret———SS«dSCdYSCiT Structure Area Neat and Clean | ee INSPECTED: Alaska Energy Authority BY: A yo—DATE “3/4 ' G2 INSPECTED: POWER Engineer's Inc. BY: DATE TE ee HH rf INSPECTED: Copper Valley Construction BY: DATE / / 7 APSO DEG 9, ER TQ SPEGEICAS ONISese _ Mz s=2C7O™ & 7 3E2 ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 52 PTA'S. 1 /A POLE (HT &CL): FS ~ = GUY ASSY'S: § ,//7 ANCHOR ASSY'S: A /7 MISC. ASSY'S: J/f FOUNDATION TYPE: //- #7, £ H-PILE DEPTH: / 9 “ EXT: W//g ze | _cooror female] vo [= [os FRAMING INSPECTION I~] {| | oo Pole Ground Correctly Installed Roofs, Gains, & Holes Treated “~ Arm(s) & Brace(s) Correctly Located and Installed Fem] fT Nuts, Eyenuts, Locknuts Installed & Tight |e] [| Bolts Correct Length (1/2” - 2”) Pe] | SETTING INSPECTION rf Structure Plumb (4”, Top to Bottom) p-{[ [| Angle Structure Raked (0-1"/10’) mma Crossarm(s) or Davit Arm(s) Level (1°/10') | -| | [| Hardware in Vert. & Horiz. Alignment fe] || Foundation Set to Correct Depth fe] | [| Pile Extension Weld Completeandcoret |__| | =| H-Pile Mounting Bolt Hardware Tightened and Complete p-] |] Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) \ ‘ \ \ i tl Na i Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed STL LR | LLL | Ef li Ls} LL Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. ‘ oF 5 I. |. | va INSPECTED: Copper Valley Construction BY: DATE / / 47°35 9 S9 9. FC Ta SPECIEICA” DNS FS? 12 24 2C7 CN 5 aE ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE POLE(HT&CL): 35> S fé3-10 ANCHOR ASSY'S: /y. 2, ¢ GUY ASSY’S: SfEl-3 MISC. ASSY’S: / [72 -41 FOUNDATION TYPE: ie rie é H-PILE DEPTH: Oe EXT: s/f < c w oO N/A | INSP iy DESCRIPTION AERIAL | GRND. FRAMING INSPECTION | Pole Ground Correctly Installed H+ Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed int tT Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2") SETTING INSPECTION Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1“/10') LATE \ Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth Fh i HSE IEEE A one : Zo CHIT i INSPECTED: Alaska Energy Authority BY: a fepca DATE INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / a7-8o S99. cae caT SPECIFICA” ONS #32 2 5 42C7 CY 5 FF ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 4 </ PTA'S. 07 POLE (HT&CL): 35-5 GUY ASSY’S: V/A ANCHOR ASSY’S: § ,// 77 MISC. ASSY’S: N/A FOUNDATIONTYPE: 7. P, 2 £ H-PILE DEPTH: / © ext: n//4 Ss N/A | INSP pa DESCRIPTION AERIAL| GRND. | Y FRAMING INSPECTION | | Pole Ground Correctly Installed m . 2 oO kK | ! | Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed | | a oe INSPECTED: Alaska Energy Authority | tI \ \ \ TELAT 7 LET AS Ist TT Is THE fi fl INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / t $7730 NSD 9, E8e Ta SPECIEICA” 8S F529 2 24207 ON 3 a TFP ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE | STR.NO. 45.5 PTA'S. Gi-/#H POLE(HT&CL): 35 - 5 GUY ASSY’S: i /A ANCHOR ASSY’S: ,///9 MISC. ASSY'S: Pe /) FOUNDATION TYPE: Ee H-PILE DEPTH: / 0” ExT: J /q scwmon olen |e [oe FRAMING INSPECTION CCL ie) ee Pd Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) ree E E Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1°/10’) Crossarm(s) or Davit Arm(s) Level (1°/10') Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct ha H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION ; Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned NN | TILE ETT Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Sete td err itl | [Anchor Assy} Complete andcoret S| «dT sdf [__[Structureareaneatandciean Sid] dT dC INSPECTED: Alaska Energy Authority BY: fay. DATE “S/ Sl! Ge} BY: INSPECTED: POWER Engineer's Inc. DATE hot? LHI Ns LL INSPECTED: Copper Valley Construction BY: DATE / / AP9C DSO NERC SPECIFICATIONS Soe -“isceeC Cu Ss ce Acs STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STRNO. 5% PTA'S. C7 9 POLE (HT & CL): 3 5 - 5 GUY ASSY'S: W/Z ANCHOR ASSY’S: N/A MISC. ASSY'S: FOUNDATIONTYPE: § “/- 2D, & H-PILE DEPTH: / © coe DESCRIPTION AERIAL] GRND. | YES NO N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed | | \{\ Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed | fl Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1”/10’) ER HELLAS Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed JUmpers Correctly Installed eee Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct NNSLLT TA Structure Area Neat and Clean INSPECTED: Alaska Energy Authority 8 INSPECTED: POWER Engineer's Inc. ao lis iy iS CJ N h } DATE / INSPECTED: Copper Valley Construction BY: DATE / 1 ~ APSE DED D, ide T2-Te SPECEICA” O8S 39 _ 55 34207 C% Sa FI AS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 2-7 PTA'S. (1) Q POLE (HT &CL): 95 5 GUY ASSY'’S: J ANCHOR ASSY’S: ,//4 MISC. ASSY’S: (A FOUNDATIONTYPE: 3 -D),, ¢ H-PILE DEPTH: SPEC. REF. DESCRIPTION AERIAL FRAMING INSPECTION | | Pole Ground Correctly Installed m x Pr, ie a YES N/A | INSP Si AL INAS i zZ AT EET Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Angle Structure Raked (0-1*/10’) Crossarm(s) or Davit Arm(s) Level (1°/10') Hardware in Vert. & Horiz. Alignment ? at \ cist IL Isis | SLT TTR CUE R REL Aes |S INSPECTED: Alaska Energy Authority BY: 2 , DATE INSPECTED: POWER Engineer's Inc. BY: DATE nS INSPECTED: Copper Valley Construction BY: DATE / / 1 “47°90 19 C99", “ESE t2.7¢ SPEGECA™ ONS #59 _ 812 24207 C% 5 2 759 ALE ———— STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. <4 PTA'S. CL / A POLE(HT&CL): SS -¢ GUY ASSY'S: = _x//) ANCHOR ASSY'S: ,/ /f MISC. ASSY’S: uA FOUNDATIONTYPE: 1/- PL ¢ H-PILE DEPTH: / @ ’ ext: w/4 on DESCRIPTION AERIAL N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed um Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1“/10') rt \ + Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth : H-Pile Extension Weld Complete and Correct , H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') \ i He i: Insulators Clean, Complete, & Aligned [[eenductosundemaged aheodspar) ——~it | | |_| | [eenductrsProperiy Sasgedtaheodspor)_——«t t=] | |_| [[wraplocktiescoreciyinmaed __———s«dt | | |_| | [selices anaiorDeadenas oreciyinwaled | | [=| | [rumperscorecivinmaies i Sd de [Ter Asayaicompiete ana core Si Sd id [Tarehor Asnis\ compete nacorret «| | [ez] [[servctureAreaneatandcieen sd] | | INSPECTED: Alaska Energy Authority BY Z,__DATE 5/4 ' 2 | / INSPECTED: POWER Engineer's Inc. BY: DATE / HL INSPECTED: Copper Valley Construction BY: DATE / / t aP8C 9D AN, Eder 2 SPECIFICA” ONS FSF 2d 22SC7 CN SFP ALS a a re STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE ~ | STR.NO. .S Gg PTA'S. C/A POLE (HT &CL): 35 — S GUY ASSY'S: J) ANCHOR ASSY’S: 4/ /4 MISC. ASSY’S: N/A FOUNDATIONTYPE: //- H-PILE DEPTH: / 0 ext: J/4 — DESCRIPTION GRND.| YES NO N/A | INSP FRAMING INSPECTION | ft ae Pole Ground Correctly Installed \ Roofs, Gains, & Holes Treated i i Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1/10') \ Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct \ \ ll ; I H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) | : 7 Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned t \ Conductors Undamaged (Ahead Span) \ Conductors Properly Sagged (Ahead Span) [wrepleckTescorectyinsales iP | Td [Fies andor Ovodends Correctvintaled |_| | —| | Yunperscorecivinsaed iS [[euyassyencompieteana cores Sid i ie | [anchor assiaicomplete andtoree Sid i | [Faeuctureareaneatondcean Sid | TP dd INSPECTED: Alaska Energy Authority BY: 2 cy DATE ue es INSPECTED: POWER Engineer's Inc. vs DATE / INSPECTED: Copper Valley Construction BY: DATE / / o - “HPSS 599899", “G8Er2-7° SPEGFICAS ONSieS>'< iE eKsC~ CO’. Sa 722 As ere DESCRIPTION AERIAL sno. YES FRAMING INSPECTION Pole Ground Correctly Installed E Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2") SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1“/10') Crossarm(s) or Davit Arm(s) Level (1"/10°) Hardware in Vert. & Horiz. Alignment Pete Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete “a Structure Correctly Faced (AH or BK) FINAL INSPECTION ; Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1/10') Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean TATE INSPECTED: Alaska Energy Authority \ il E t CTI BBG CCHIT BE STR. NO. O PTA'S. ¢ / POLE(HT&CL): 75 5 GUY ASSY’S: ANCHOR ASSY'S: // 4 MISC. ASSY'S: i/ 77.2 -// J FOUNDATION TYPE: jf - 2 € H-PILE DEPTH: / g ’ ext: a//9 = oO STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE N/A | INSP tf + CEASE EL " ( E TIL E INSPECTED: POWER Engineer's Inc. BY: INSPECTED: Copper Valley Construction BY: T “47°80 99, “BETZ SPEGEICA> ONS F539 _ *1z S427 C% Sa 59 AS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. : / PTA'S. 2) POLE (HT&CL): 34°- GuY ASSY's: A /A ANCHOR ASSY'S:_4/ / 4 MISC. ASSY’S: wn /4 FOUNDATIONTYPE: //_ DL é H-PILE DEPTH: / © ’ EXT: //q ES N/A | INSP = DESCRIPTION AERIAL| GRND. FRAMING INSPECTION } | “a Pole Ground Correctly Installed =< z oO \ HP Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1"/10’) \ i Fl Hardware in Vert. & Horiz. Alignment ih Foundation Set to Correct Depth TAREE ttt EET H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct A i LCL LLL i Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: Meg DATE S/ Sf $ INSPECTED: POWER Engineer's Inc. BY: DATE i) INSPECTED: Copper Valley Construction BY: DATE / / 7 “HPSS DEV, Baer ZY SPECIEICA™ ONS F359 - 2 24807 CN 3 SFI ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. (2 PTA'S. 1 (A POLE(HT&CL): YO -o GUY ASsY's: A /A ANCHOR ASSY'S: / A MISC. ASSY'S: Nu FOUNDATIONTYPE: /£- 2», c é H-PILE DEPTH: / O ext: -//A Peel DESCRIPTION GRND.| Yes | NO | N/A | INSP FRAMING INSPECTION Ste eed Pole Ground Correctly Installed | Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2 - 2”) SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1°/10') aaRER E TIE E Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct i F TCEER Anchor Assy(s) Complete and Correct Structure Area Neat and Clean LLL aaaee iN INSPECTED: Alaska Energy Authority BY: han. DATE 3 / 4 ¥ G INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / 1 ‘ar-$0 paves. casera SPEGIFICA” ONS 59 12 27EC7 ON Ga TEP ALE STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE POLE(HT&CL): 35-4 GUY ASSY'’S: =, //4 ANCHOR ASSY’S: J / 4 MISC. ASSY'S: wv /A FOUNDATIONTYPE: //- 2,1 & H-PILE DEPTH: 0” ext: J/q sla DESCRIPTION GRND.| YES NO N/A | INSP REF. FRAMING INSPECTION Pole Ground Correctly Installed a Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight pel] |] | Bolts Correct Length (1/2” - 2”) SETTING INSPECTION ee eee Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1“/10’) Crossarm(s) or Davit Arm(s) Level (1°/10') ' i { Hardware in Vert. & Horiz. Alignment \ Foundation Set to Correct Depth Is H-Pile Extension Weld Complete and Correct ua H-Pile Mounting Bolt Hardware Tightened and Complete Pt | Structure Correctly Faced (AH or BK) ret | ft] FINAL INSPECTION p= {| aa Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1°/10') Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct BHT Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: i INSPECTED: POWER Engineer's Inc. BY: DATE / / NCTE LL il INSPECTED: Copper Valley Construction BY: DATE / / t *a7°3S 9 C99, a2 SPECIFICA= GUS F5 _ °F 24SC7 CX. Fa 89 AS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE 4 STR.NO. (, PTA'S. 3-2 POLE(HT&CL): 3$ 9-5 (2) GUY ASSY'S: //£3-jO ANCHOR ASSY'S: 7/7 - Pig MISC. ASSY'S: )/ 97.2 - yy H ms-2' Ifms-s /fF-1¢ FOUNDATIONTYPE: 4/- P,, ¢ H-PILE DEPTH: <5” EXT: a! /q ame GRND.| Yes | No | N/A | INSP Tramncnsenon [oP + Pole Ground Correctly Installed Roofs, Gains, & Holes Treated a Arm(s) & Brace(s) Correctly Located and Installed HE ca Hzae Tees Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') f Hardware in Vert. & Horiz. Alignment r n a Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct rf H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1*/10’) uu Kk Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed n i mT Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean | INSPECTED: Alaska Energy Authority BY ~<a AD DA > / ¢ g INSPECTED: POWER Engineer's Inc. BY: DATE (jane INSPECTED: Copper Valley Construction BY: DATE / / 47°80 I9E9 9, Ear SPECIFICAT ONS F329 _ 12 FRSC ON, & 3759 ALE STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE strR.NO. (, 5 PTA'S. C1 - 71 A POLE(HT&CL): 35-5 GUY ASSY’S: AJ /A ANCHOR ASSY'S: 4 //A 7 MISC. ASSY’S: S/A FOUNDATION TYPE: jt - Fi Le H-PILE DEPTH: 9/6 ° EXT: «J DESCRIPTION AERIAL [ramncnsrecton «| VES NO N/A NE MG ULL S s fRMALINSPECTON = \ EEE THEE x INSPECTED: Alaska Energy Authority BY: Fao DATE ~3/ 4 if INSPECTED: POWER Engineer's Inc. BY: DATE (ae! INSPECTED: Copper Valley Construction BY: DATE / / “ar7$0 99899". ese r2-0° SPEGIEICA” ONS F59 _ iz F4ECT CN SEF ALE STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE PTA'S. C§ 8-2 POLE(HT&CL): FS -S GUY ASSY’S: V/A ANCHOR ASSY'S: A///4 MISC. ASSY'S: 4/77 2 - 1/ # FOUNDATIONTYPE: “+f. PLE H-PILE DEPTH: «, ExT: J/g “i DESCRIPTION AERIAL caw. YES NO [amnnsrecton | ‘| =| [arm) 8 Brace) Correctv oeaiedandirwaled |] _ [wus Evens Locus staegaighe | |_| Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1"/10') ye \ r : : Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned BY: : / INSPECTED: POWER Engineer's Inc. DATE ot ; [i CR th f fF st] PL INSPECTED: Copper Valley Construction BY: DATE / / a7$S 9899 ase SPECIFICAT ONS F392 12 232C7 C8 KEP ALS STRUCTURE INSPECTION REPORT Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1°/10') Crossarm(s) or Davit Arm(s) Level (1"/10') Hardware in Vert. & Horiz. Alignment \ Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION P Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) i ; A i TLL Sh ete | \ Conductors Properly Sagged (Ahead Span) teh. “T- -| [[WreplockTiscorectvintates id | dT re [Yrumpersconecivinsaled i | [eur Assnsicomieteondcoree iP |__| Splices and/or Deadends Correctly installed [ [anchor Ay) compieteandcoree «dP Fserctureareaneatandcean Si | a Aan DATE “SBI 'G INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. BY: INSPECTED: Copper Valley Construction BY: t 4778S IDS 4, Ese IQ DATE / DATE / SPECIEICAT ONS FS2 = IE ERSC™O Wis as AE 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. (,, af PTA'S. C/A POLE (HT&CL): ufo - GUY ASSY'S: —,// 4 ANCHOR ASSY'S: J / 4 MISC. ASSY’S: w/A FOUNDATION TYPE: //. 2. £ H-PILE DEPTH: = 6“ / / EXT: 4//A — DESCRIPTION GRND.| YES NO N/A | INSP FRAMING WEPECTION [Ter _ STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE strR.NO. (, 8 PTA'S. (7 / ff POLE(HT&CL): 4/0 - 4 GUY ASSY’'S: Re; St ANCHOR ASSY'S: KSA fo MISC. ASSY'S: $77; 7° BolT fr 707 of Folé FOUNDATIONTYPE: of - p70 ¢ H-PILE DEPTH: 9/0 ” ext: J/A oe DESCRIPTION AERIAL YES NO N/A INSP FRAMING INSPECTION Pole Ground Correctly Installed Al Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight er eT Bolts Correct Length (1/2" - 2”) eT Le SETTING INSPECTION i Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1/10) Hardware in Vert. & Horiz. Alignment [|e Extension Weld Completeandcorret |__| | | [ite Mounting Bolt Hardware Tightenedand Compete | 7] | __ [__[structurecorecvFaceatanoreg) | | | (iY CC* FINAL INSPECTION I i Structure Backfilled (12”, No Settlement) (Buried) ue Structure Plumb (4”, Top to Bottom) ELL | ae Kf Angle Structure Raked (0-1"/10') A ey EE E Insulators Clean, Complete, & Aligned [[eenductosundomaged aheodsper) «dt |_| [eenauctrsProperySagged aheadspon) «ite _*| [[Wrapiock iescorectvintaies sty | | | [setces andor Oeadends coneciyinnalied |_| [eo yfumperscorecivinsaies ET [ewassrnconpieweandcoree SE | et | Tanehorassis)complewandtorea «TdT sd | | [seructureareaneatandGien SSC | dt [RSPECTED: AlaskatnergyAuthorty Sze DATE ae S| INSPECTED: Alaska Energy Authority BY oe DATE iu?! INSPECTED: POWER Engineer's Inc. ; INSPECTED: Copper Valley Construction BY: DATE / / { "a7 SE 99099", ESCr2-1° SPECIEICAT ONS FS . 712 c=2C™ CXS Wa S59 A3 STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - FOUNDATION TYPE: 4f- Dy ¢ H-PILE DEPTH: / 0 “ — DESCRIPTION FRAMING INSPECTION Pole Ground Correctly Installed YES M8 Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2" - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1/10’) is i Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10") Insulators Clean, Complete, & Aligned fi Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed PTA'S. Cj A POLE (HT &CL): 3S -S GUY ASSY'S: = // Hf ANCHOR ASSY’S: .// 4 MISC. ASSY'S: SPL, 7 Bolt ATES of Pol€ it \ HI : CCIE KOBUK TIE LINE EXT: 2//4 NO N/A | INSP é i : Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BYS53 Zz REE INSPECTED: POWER Engineer's Inc. BY: DATE fit INSPECTED: Copper Valley Construction BY: DATE / / t “47730 NEV, GRETA SPECIEIGAT ONS FS? - SS eneC- Ch 5.327 AS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 70 PTA’S. 2 e7-/ POLE(HT&CL): 3s - < MS H-PILE DEPTH: FOUNDATIONTYPE: 4/- #7 LE EXT: / 0’ cl DESCRIPTION aeriat| can. | Yes | NO | N/A | INSP FRAMING INSPECTION Pole Ground Correctly installed eee Teer Roofs, Gains, & Holes Treated a TE a A: Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight eR Bolts Correct Length (1/2” - 2") SETTING INSPECTION PULTE LO TATU Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) ak i Crossarm(s) or Davit Arm(s) Level (1°/10’) eA 0 [Hardwareinver. Herz Alignment ‘| — || [FoundationsettocerrectDenth ————SSSC*dT | [Hsile Extension Weld Completeandtoret || | = |_| |__| Fite Mounting Bot Hardware Tightenedand complete | |__| __ [structure corectyFaceataners®) | | | iY Gc CU UNC AAoAT T OTT Structure Sackilled (27, Nosetiemend) ured | |__| StructurePiumb(@",Toptosorem) dt | | id jangle structureRakea@-r7n0) SSC | Insulators Gean, complete @Aigned de] ——d|CC* [conductors undamaged head spar) ———+t z-| | |__| Conductors Properly Sagged (Ahead Span) eT Wraplock Ties Correctly Installed Tasers RET Splices and/or Deadends Correctly Installed Lee LER ETENUELTTINY Jumpers Correctly Installed eee TMLee Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct te Structure Area Neat and Clean | INSPECTED: Alaska Energy Authority pri Le DATE S/Y4'9 INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / 1 “47°85 DEIN, “BH CI SPECIEICAT ONS #39 _ Nz 2427 CN 8 a F9 AS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. Fo 4 PTA'S. ,//f POLE(HT&CL): SS —S GUY ASSY'S: MISC. ASSY’S: FOUNDATION TYPE: le: H-PILE DEPTH: © EXT: 4//q | samen mafone| we] | we [ww FRAMING INSPECTION Pee LPC eee! eect Pole Ground Correctly Installed Arm(s) & Brace(s) Correctly Located and Installed Bs ae Nuts, Eyenuts, Locknuts Installed & Tight m fC Bolts Correct Length (1/2” - 2”) Peete et eo fsernmcmsrecton —___————S~dSSCidT Sid? Cd [araiesirucwrenaies orion Sid —Sd| i Crossarm(s) or Davit Arm(s) Level (1°/10') wm oe Hardware in Vert. & Horiz. Alignment A i LTE Ed Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed RSIS : i E Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: An _DATE “S/U/G INSPECTED: POWER Engineer's Inc. BY: DATE ‘id / INSPECTED: Copper Valley Construction BY: DATE / / 1 “a7°80-199 599", “ise r2-Y SPECIEICA? ONS €5? _ 2 228207 CN, 8 3789 ALE STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE POLE(HT&CL): 3S GUY ASSY’S: N/A ANCHOR ASSY’S: 4. / /4 MISC. ASSY’S: USA FOUNDATION TYPE: j/- ?, & H-PILE DEPTH: 9 ext: WI / Z oO N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed a DESCRIPTION AERIAL| GRND. | YES Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed : Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1/10’) i rT \ Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct \ l H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) Structure Backfilled (12”, NoSettlement) (Buried) uu Structure Plumb (4”, Top to Bottom) a ) | Angle Structure Raked (0-1"/10’) mc | ___[rsuiatorsCiean, complete @aioned ste | | | id [[eenductorsundemaged(aheadspar) ———~itc| |__| _| | [eonauctors Property Segged(aheadspor) «ste | | (did Jwraploctiscorectvinstaies te] | did | Finlces andiorDeadendsCorecivinsates | | || _| | fuumpescorecivinsates |] i [Teuyassyaicompieteand core ——SSSSiY Sd [anchor assicompleteandcoret «dT id te] [Jswructureareaneatandcean SSC TdT dT Cd INSPECTED: Alonatneayaunony Lo DATE YEE INSPECTED: POWER Engineer's Inc. BY DATE / of . INSPECTED: Copper Valley Construction BY: DATE / / CTI | K ll 1 arse a casead SPECECAT ONS F222 242C7 ON BaF ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 7.2 PTA'S. G@/ POLE(HT&CL): FS -S GUY ASSY'S: W/A ANCHOR ASSY'S: ,/ H-PILE DEPTH: . : SPEC. REF DESCRIPTION AERIAL} GRND. | YES NO N/A | INSP : Pot FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated ~~ Arm(s) & Brace(s) Correctly Located and Installed “ —= Nuts, Eyenuts, Locknuts Installed & Tight uw Bolts Correct Length (1/2” - 2”) a SETTING INSPECTION Structure Plumb (4”, Top to Bottom) (a Angle Structure Raked (0-1“/10’) a Crossarm(s) or Davit Arm(s) Level (1“/10') Yv Hardware in Vert. & Horiz. Alignment uw ca eames ae a eee oo ——————————— ee Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4", Top to Bottom) Ce Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned Cc uu Lv Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Wraplock Ties Correctly Installed } | ue _ Le uw Anchor Assy(s) Complete and Correct Structure Area Neat and Clean (rd INSPECTED: Alaska Energy Authority BY: DATE 3/4 'S INSPECTED: POWER Engineer's Inc. BY: DATE / / 17 INSPECTED: Copper Valley Construction BY: DATE / / $7730.39 25.9*. “23012.0° SPECIFICA” ONS 259 412 E2207 C4 STEP ALL STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE POLE (HT & CL): SS GUY ASSY’S: / A ANCHOR ASSY'S: 4S / MISC. ASSY’S: J/f4 FOUNDATION TYPE: /f- PLE H-PILE DEPTH: a DESCRIPTION AERIAL|GRND.| YES | NO | N/A | INSP FRAMING INSPECTION er Pole Ground Correctly Installed _ Roofs, Gains, & Holes Treated um et maa seer Arm(s) & Brace(s) Correctly Located and Installed ~~ Nuts, Eyenuts, Locknuts Installed & Tight w Bolts Correct Length (1/2” - 2") “ow dialslalstalaiteledaeieduenl SETTING INSPECTION Structure Plumb (4", Top to Bottom) uw Angle Structure Raked (0-1"/10') om Crossarm(s) or Davit Arm(s) Level (1“/10') Hardware in Vert. & Horiz. Alignment u Foundation Set to Correct Depth uM | H uo -Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete uw Structure Correctly Faced (AH or BK) uu nl FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) L-- Structure Plumb (4", Top to Bottom) ce Angle Structure Raked (0-1“/10’) UH Insulators Clean, Complete, & Aligned ue Conductors Undamaged (Ahead Span) uu Conductors Properly Sagged (Ahead Span) Lt~- Wraplock Ties Correctly Installed u| I--~-ssesnseansssnidnnhmseineiensientiossienetpeesintiesenensnenensnieiaiesiniihnietiaetiniinsueenani entire ee eeineRnRIniaeeSnaIal Splices and/or Deadends Correctly Installed Jumpers Correctly Installed u ou Guy Assy(s) Complete and Correct u Anchor Assy(s) Complete and Correct Ll Structure Area Neat and Clean INSPECTED : Alaska Energy Authority INSPECTED: POWER Engineer's Inc. BY: i INSPECTED: Copper Valley Construction BY: 37735 -I9S¥ I, EseTZT SPEGIFICAT ONS eo 2 _ “ic ES C™ON GS SF AS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE POLE (HT & CL): GUY ASSY'S: //)=/. MISC. ASSY'S: »/y7 2 — FOUNDATION TYPE: H-PILE DEPTH: 0 ’ ext: J/4 SPEC. <a DESCRIPTION AERIAL| GRND.| YES | NO | N/A FRAMING INSPECTION Pole Ground Correctly Installed a Roofs, Gains, & Holes Treated ~ + Arm(s) & Brace(s) Correctly Located and Installed 7 I Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) V | SETTING INSPECTION Structure Plumb (4”, Top to Bottom) ie Angle Structure Raked (0-1“/10’) A y' oor Crossarm(s) or Davit Arm(s) Level (1"/10’) Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) | — Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) | Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) ue Ll u uv Conductors Properly Sagged (Ahead Span) u- Y Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Uw Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean APES 9999. EE 2-3° SPEGFICAT-ONS F259 _ INSPECTED: Alaska Energy Authority BY: DATE 3 / ¢: & on INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / 92 SecGe Sal Saat oe NoTk: ANcHeh STAKED WRONG. APPR OL. FAT. ° STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. 7 PTA'S. C7) A POLE(HT& CL): SS - 5 ANCHOR ASSY’S: —//A H-PILE DEPTH: JO : SPEC. REF DESCRIPTION AERIAL} GRND. | YES NO N/A | INSP FRAMING INSPECTION a Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2") SETTING INSPECTION “ Arm(s) & Brace(s) Correctly Located and Installed a uw “ Structure Plumb (4”, Top to Bottom) im Angle Structure Raked (0-1"/10') um Pe ie aa saa aa TP er nee ae Crossarm(s) or Davit Arm(s) Level (1"/10') uu Hardware in Vert. & Horiz. Alignment uM Foundation Set to Correct Depth \ H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) = ew fe | Structure Plumb (4”, Top to Bottom) uo Angle Structure Raked (0-1"/10') po Insulators Clean, Complete, & Aligned — Conductors Undamaged (Ahead Span) Ce a i sn Conductors Properly Sagged (Ahead Span) Le Wraplock Ties Correctly Installed LY Splices and/or Deadends Correctly Installed JUmpers Correctly Installed Guy Assy(s) Complete and Correct Lu Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED : Alaska Energy Authority INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / 4773S 9 SHI, ESC TEATt SPECIFICAT-ONS 3 _*)2 S4EC7 ON BA TER ALE STRUCTURE INSPECTION REPORT STR. NO. 128002-01: SHUNGNAK - KOBUK TIE LINE SPEC. REF. DESCRIPTION FRAMING INSPECTION Pole Ground Correctly Installed u Roofs, Gains, & Holes Treated om +— il a A HON Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight um Bolts Correct Length (1/2" - 2“) “ SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10’) uw Crossarm(s) or Davit Arm(s) Level (1"/10') Sas a allalnlalis| eter s<crstvel | coals | calle Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth 7a H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) ee FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) ne Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed L&- L- Conductors Undamaged (Ahead Span) i= Ll | Guy Assy(s) Complete and Correct [TITS Anchor Assy(s) Complete and Correct Structure Area Neat and Clean <= INSPECTED: Alaska Energy Authority BY: “7 DATE ~4/ 4 LS INSPECTED: POWER Engineer's Inc. BY: DATE / / ii INSPECTED: Copper Valley Construction BY: DATE / / ] ) u , ‘ ) ‘ ' u 42°35 99299". 1 23072-9° SPEGEICA™ ONS © SPEC. REF. 77 PTA'S. ¢@,A DESCRIPTION AERIAL} GRND. STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE POLE (HT & CL): FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed ee ht Hardware in Vert. & Horiz. Alignment H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) Nuts, Eyenuts, Locknuts Installed & Tight — | | | Bolts Correct Length (1/2” - 2”) uM SETTING INSPECTION i Structure Plumb (4”, Top to Bottom) uM Angle Structure Raked (0-1“/10’) i Crossarm(s) or Davit Arm(s) Level (1"/10’) uw FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed vy vu a n a }- ‘ \ \ a ee eel ee (Ei ONS a ee eee) \ Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct | C | eee SS ee eee Structure Area Neat and Clean Cc INSPECTED: Alaska Energy Authority BY: DATE / Sa INSPECTED: POWER Engineer's Inc. BY: DATE /_/_ INSPECTED: Copper Valley Construction BY: DATE / STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. Tas PTA'S. C1 / 4 POLE(HT&CL): Fy ~S GUY ASSY’S: S/A ANCHOR ASSY’S: —,//4 MISC. ASSY'S: //177.2-// FOUNDATIONTYPE: /Y- PL Zz H-PILE DEPTH: / © ’ EXT: ,J/ SPEC. REF. DESCRIPTION AERIAL] GRND. FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated NINN Arm(s) & Brace(s) Correctly Located and Installed \ Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Coa \ Crossarm(s) or Davit Arm(s) Level (1“/10’) Hardware in Vert. & Horiz. Alignment \ Foundation Set to Correct Depth o— H-Pile Extension Weld Complete and Correct a H-Pile Mounting Bolt Hardware Tightened and Complete | z Structure Correctly Faced (AH or BK) [JRINALINSPECTION. —=SS~C~*~“‘“‘*S*S*S*~SCOSC‘iS Structure Backfilled (12”, No Settlement) (Buried) u Structure Plumb (4”, Top to Bottom) _ Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) i a Conductors Properly Sagged (Ahead Span) a Wraplock Ties Correctly Installed , Ss plices and/or Deadends Correctly Installed Ll . Jumpers Correctly Installed uw Guy Assy(s) Complete and Correct NN Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED : Alaska Energy Authority DATE =S/ ¢' INSPECTED: POWER Engineer's Inc. BY: DATE / ii INSPECTED : Copper Valley Construction 3S UO mn oO n Gy b ‘ ‘ ' u L STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. <7 PTA'S. C/y POLE(HT&CL): Sy. 4 GUY ASSY’S: MISC. ASSY‘S: FOUNDATION TYPE: 9/7 - Fi cé H-PILEDEPTH: =, O° ExT: al/q ae DESCRIPTION INSP FRAMING INSPECTION a if Pole Ground Correctly Installed =| _ Roofs, Gains, & Holes Treated aaa Arm(s) & Brace(s) Correctly Located and Installed alee li Nuts, Eyenuts, Locknuts installed & Tight a Bolts Correct Length (1/2 - 2“) SETTING INSPECTION Structure Plumb (4, Top to Bottom) ag Angle Structure Raked (0-1“/10’) a Crossarm(s) or Davit Arm(s) Level (1"/10’) ~ [| HardwareinVert. &Horiz. Alignment | ~| | | | Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct — H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) L- Structure Plumb (4”, Top to Bottom) 1 Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed EET Splices and/or Deadends Correctly Installed uv Jumpers Correctly installed we u INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE i / | 47°30 $9909.9%, °25012-3" SPECIFIGAC ONSicSrl_ is aaG> GN SU Tes Acs STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. Jo PTA'S. (Cy 4 POLE(HT&CL): Fs - 5° GUY ASSY'S: J / 4 ANCHOR ASSY'S: 4! MISC. ASSY’S: A [ A FOUNDATIONTYPE: 4/ _ py. £ H-PILE DEPTH: oc” EXT: //4 SPEC. REF. A DESCRIPTION ERIAL| GRND. FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated a | Arm(s) & Brace(s) Correctly Located and Installed ta —| Nuts, Eyenuts, Locknuts Installed & Tight um Bolts Correct Length (1/2” - 2") a SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1“/10’) uw \ Crossarm(s) or Davit Arm(s) Level (1”/10') a Hardware in Vert. & Horiz. Alignment uw Foundation Set to Correct Depth uM H-Pile Extension Weld Complete and Correct uw H-Pile Mounting Bolt Hardware Tightened and Complete uo Structure Correctly Faced (AH or BK) uM ee Pt FINAL INSPECTION Structure Backfilled (12", No Settlement) (Buried) Ce i 7 Structure Plumb (4", Top to Bottom) Cl uu Angle Structure Raked (0-1”/10’) Insulators Clean, Complete, & Aligned (ee | Conductors Undamaged (Ahead Span) u a jf al Conductors Properly Sagged (Ahead Span) KE Wraplock Ties Correctly Installed ra Splices and/or Deadends Correctly Installed Jumpers Correctly installed Guy Assy(s) Complete and Correct uw Anchor Assy(s) Complete and Correct Cc Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: DATE 3/ Y'G~ INSPECTED: POWER Engineer's Inc. BY: DATE / / i INSPECTED: Copper Valley Construction BY: DATE f / | $7°35 3929 9", 35022 SPECIFICAS ONS ro" _ iS sac Ch. 5. = AS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 9 | PTA'S. G7 A POLE (HT &CL): 3 - <7 wt DESCRIPTION INSP semansiaiseahabennsasis FRAMING INSPECTION Pole Ground Correctly Installed wa paola, ft = {| Roofs, Gains, & Holes Treated aa Arm(s) & Brace(s) Correctly Located and Installed uw Nuts, Eyenuts, Locknuts Installed & Tight im Bolts Correct Length (1/2” - 2”) SETTING INSPECTION [__$_$ tt \ Structure Plumb (4”, Top to Bottom) CA Angle Structure Raked (0-1"/10') CA Crossarm(s) or Davit Arm(s) Level (1"/10') i Ta | Hardware in Vert. & Horiz. Alignment uw VillllHl |[raundmiontettieoretoerm lito) fer | Will H | -Pile Extension Weld Complete and Correct =z Structure Correctly Faced (AH or BK) ue FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) PITT aLlaue Ti | Structure Plumb (4, Top to Bottom) (oe Insulators Clean, Complete, & Aligned ea Conductors Undamaged (Ahead Span) uv Conductors Properly Sagged (Ahead Span) Mu Wraplock Ties Correctly Installed L Paredes a Ves maas eres aeolian stg hectet ome ote) oa ed TaD TTT TTI SLIT Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean a INSPECTED: Alaska Energy Authority By Loecreann OA BSI 4'S2| BY: INSPECTED: POWER Engineer's Inc. DATE / / We Vey X INSPECTED: Copper Valley Construction BY: DATE / / STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE TT STR.NO. 92 PUAISH GL /i7 POLE(HT&CL): 5S 7-5 | ANCHOR ASSY'S: ,// f Guy assy’s: 4//7 MISC. ASSY'S: // FOUNDATIONTYPE: pf 7 & H-PILE DEPTH: SPEC. REF. DESCRIPTION FRAMING INSPECTION Pole Ground Correctly Installed ai [an ie i) eT ee cr pc Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight | Bolts Correct Length (1/2” - 2”) SETTING INSPECTION \IVN Structure Plumb (4”, Top to Bottom) um Angle Structure Raked (0-1“/10') um | Crossarm(s) or Davit Arm(s) Level (1/10') 7 Hardware in Vert. & Horiz. Alignment Pall Linn TE Foundation Set to Correct Depth “a —_}| EE H-Pile Extension Weld Complete and Correct a H-Pile Mounting Bolt Hardware Tightened and Complete a“ Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12", No Settlement) (Buried) Lr Structure Plumb (4"”, Top to Bottom) Angle Structure Raked (0-1"/10’) | Insulators Clean, Complete, & Aligned Ll Conductors Undamaged (Ahead Span) qs oO; OOo, Tt Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly installed : - | Splices and/or Deadends Correctly Installed Lt OOOO) CO OE ea» Tt Jumpers Correctly Installed \ |S Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED : Alaska Energy Authority INSPECTED: POWER Engineer's inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 93 ‘S; POLE(HT&CL): 9S — $ GUY ASSY'S: A//# ANCHOR ASSY'S: aS / A MISC. ASSY'S: SPL)r BolT > FOUNDATIONTYPE: =f _ ee DESCRIPTION yes | No | N/A | INSP : en FRAMING INSPECTION | | | Pole Ground Correctly Installed — | E — - Roofs, Gains, & Holes Treated “vw a Arm(s) & Brace(s) Correctly Located and Installed “ ———eee—cc..ll— Olea sd Nuts, Eyenuts, Locknuts installed & Tight a Bolts Correct Length (1/2” - 2”) “uw SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') : 7 +— + + —_}—___—__ \ Crossarm(s) or Davit Arm(s) Level (1“/10') Hardware in Vert. & Horiz. Alignment IRIS, Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct \ H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) eH Structure Plumb (4”, Top to Bottom) i Angle Structure Raked (0-1/10’) uM Insulators Clean, Complete, & Aligned l Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) VIN Wraplock Ties Correctly Installed L Splices and/or Deadends Correctly Installed ce Jumpers Correctly Installed (ee Guy Assy(s) Complete and Correct uv Anchor Assy(s) Complete and Correct ~~ Structure Area Neat and Clean LS] INSPECTED: Alaska Energy Authority BY: DATE ree Sins INSPECTED: POWER Engineer's inc. BY: DATE / o/s INSPECTED: Copper Valley Construction BY DATE / L | 37°35 99159 9%. * 3502-79 SPEGEICAT EN S= So She Se Si Oy a es A STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. yb PTA'S. C/A POLE(HT&CL): 35-5 GUY ASSY'S: JA ANCHOR ASSY'S: 4// MISC. ASSY'S: N/A FOUNDATIONTYPE: Y_ Pic & H-PILE DEPTH: 97 g “ EXT: ute ee] DESCRIPTION AERIAL| GRND. No | N/A | INSP Ta aT EP — FRAMING INSPECTION a Pole Ground Correctly Installed wl lee Roofs, Gains, & Holes Treated uo“ Arm(s) & Brace(s) Correctly Located and Installed a Nuts, Eyenuts, Locknuts Installed & Tight Mu Bolts Correct Length (1/2” - 2”) Y“ SETTING INSPECTION Structure Plumb (4”, Top to Bottom) mo Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1"/10’) a“ u“ Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) uw FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) pe Structure Plumb (4", Top to Bottom) jeer al | Angle Structure Raked (0-1"/10') a Insulators Clean, Complete, & Aligned u Conductors Undamaged (Ahead Span) Lv Conductors Properly Sagged (Ahead Span) uu L Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed tes Jumpers Correctly Installed Uw Guy Assy(s) Complete and Correct u LU Anchor Assy(s) Complete and Correct Structure Area Neat and Clean So tn ne nnn ate nt ER EE EE INSPECTED: Copper Valley Construction BY: DATE / / | Lee eee eee eee ee eee ee eee eee ene eee ee ee ee STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE ———————— STRNO. gs PTA'S. = Cay POLE(HT&CL): 35 = ; Cy 3 GUY ASSY'S: N/A ANCHOR ASSY’S: —_A///f FOUNDATION TYPE: 4- y H-PILE DEPTH: 9/7 0° EXT: .'/4 oe DESCRIPTION AERIAL|GRND.| YES | NO | N/A | INSP zs ——E FRAMING INSPECTION | ia Pole Ground Correctly Installed — Ee Roofs, Gains, & Holes Treated iz Arm(s) & Brace(s) Correctly Located and Installed u Nuts, Eyenuts, Locknuts Installed & Tight “~ Bolts Correct Length (1/2” - 2”) v | a ee SETTING INSPECTION — 5 cra cr Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1°/10’) + NA Hardware in Vert. & Horiz. Alignment oo mv _ E_< C.-C] Foundation Set to Correct Depth \ H-Pile Extension Weld Complete and Correct ea H-Pile Mounting Bolt Hardware Tightened and Complete a Structure Correctly Faced (AH or BK) FINAL INSPECTION \ Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned Conductors Properly Sagged (Ahead Span) uo cc Conductors Undamaged (Ahead Span) u L- L- Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Cc Jumpers Correctly Installed u Guy Assy(s) Complete and Correct Ll v |e ee en ere Anchor Assy(s) Complete and Correct Structure Area Neat and Clean WwW INSPECTED: Alaska Energy Authority BY: DATE 3 / f G c= INSPECTED: POWER Engineer's Inc. BY: DATE / / || = INSPECTED: Copper Valley Construction BY: DATE / / STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. (, PTA'S. CIA POLE(HT&CL): 3g 5 GUY ASSY'S: =) / ff ANCHOR ASSY'S: x J / 4 MISC. ASSY’S: : H-PILE DEPTH: SPEC. REF. DESCRIPTION AERIAL| GRND. | YES NO N/A INSP FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed uu Nuts, Eyenuts, Locknuts Installed & Tight Pa Bolts Correct Length (1/2” - 2") “ | SETTING INSPECTION Structure Plumb (4”, Top to Bottom) um Angle Structure Raked (0-1"/10') uo Crossarm(s) or Davit Arm(s) Level (1°/10') — | fl {i u“ Hardware in Vert. & Horiz. Alignment uo Foundation Set to Correct Depth Y H-Pile Extension Weld Complete and Correct “ H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) u Structure Plumb (4”, Top to Bottom) uu Angle Structure Raked (0-1“/10') ue Insulators Clean, Complete, & Aligned — Conductors Undamaged (Ahead Span) it Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed au Splices and/or Deadends Correctly Installed wo , Jumpers Correctly Installed ce \ Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct | u Structure Area Neat and Clean — INSPECTED: Alaska Energy Authority BY: DATE @ / “l' GS INSPECTED: POWER Engineer's Inc. BY: DATE ae ee INSPECTED: Copper Valley Construction BY: DATE / / 128002-01: SHUNGNAK - KOBUK TIE LINE STRUCTURE INSPECTION REPORT ree DESCRIPTION AERIAL] GRND. | YES NO N/A | INSP REF. FRAMING INSPECTION Pole Ground Correctly Installed ‘ {—__ = ia — ea ua Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Se Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2“) niet niece inns SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1“/10’) Crossarm(s) or Davit Arm(s) Level (1“/10’) STATI eT eres Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct uo H-Pile Mounting Bolt Hardware Tightened and Complete | Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned | | Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean DATE S/Y G2 INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. INSPECTED: Copper Valley Construction Jumpers Correctly Installed u L Uw STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. § § PTA'S. Cy ft POLE (HT & CL): SPEC: REF. DESCRIPTION YIES NO N/A INSP FRAMING INSPECTION Pole Ground Correctly Installed GT ae Roofs, Gains, & Holes Treated ii ~ Tame & Brace(s) Correctly Located and Installed oY ma Nuts, Eyenuts, Locknuts Installed & Tight Y Bolts Correct Length (1/2” - 2”) a SETTING INSPECTION Structure Plumb (4”, Top to Bottom) uo Angle Structure Raked (0-1"/10’) a Crossarm(s) or Davit Arm(s) Level (1“/10') Uw Hardware in Vert. & Horiz. Alignment uo Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete a“ Structure Correctly Faced (AH or BK) uw [i (oer aU eet Me Structure Backfilled (12”, No Settlement) (Buried) Le eee ey u Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) — Insulators Clean, Complete, & Aligned i Conductors Undamaged (Ahead Span) = Conductors Properly Sagged (Ahead Span) Le Splices and/or Deadends Correctly Installed C= Jumpers Correctly Installed KH Guy Assy(s) Complete and Correct uu in” Anchor Assy(s) Complete and Correct Structure Area Neat and Clean << INSPECTED: Alaska Energy Authority BY: DATE. “3/ 4'O INSPECTED: POWER Engineer's Inc. BY: DATE md ala) 7 INSPECTED: Copper Valley Construction BY DATE / / | U n ay " a L ‘ ' 1 u STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 9G PTA'S. C¥Y-2 POLE (HT&CL): 3 9-7 <- ANCHOR ASSY’S: SPEC. REF. DESCRIPTION L FRAMING INSPECTION Pole Ground Correctly Installed i —- + Roofs, Gains, & Holes Treated a um Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight rr Bolts Correct Length (1/2 - 2”) YO SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') - Crossarm(s) or Davit Arm(s) Level (1"/10') Hardware in Vert. & Horiz. Alignment H-Pile Extension Weld Complete and Correct a a Foundation Set to Correct Depth i“ a H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Lu i Structure Plumb (4”, Top to Bottom) = Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) = Lu Conductors Properly Sagged (Ahead Span) uu u Wraplock Ties Correctly Installed > Splices and/or Deadends Correctly Installed L- Jumpers Correctly Installed a Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean = INSPECTED: Alaska Energy Authority BY: DATE “3/4 ‘G2 INSPECTED: POWER Engineer's Inc. BY: DATE / ft INSPECTED: Copper Valley Construction BY: DATE / SP 994 9". Ear Tay SPEG RICA ONS ca? “sist Scr = Ae STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. PDS PTA'S. @/ POLE(HT&CL): 35-47 GUY ASSY'S: il/# ANCHOR ASSY'S: —4/ MISC. ASSY'S: SPLIT Bohr AL ZoOP FOUNDATION TYPE: ; H-PILE DEPTH: SPEC. REF. DESCRIPTION AERIAL| GRND. | YES NO N/A | INSP FRAMING INSPECTION a | T Pole Ground Correctly Installed ZT Roofs, Gains, & Holes Treated 7 | Tarm(s) & Brace(s) Correctly Located and Installed “ Nuts, Eyenuts, Locknuts Installed & Tight uw PTT ra Bolts Correct Length (1/2” - 2”) om SETTING INSPECTION ‘ Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1“/10') - eee Ee Crossarm(s) or Davit Arm(s) Level (1“/10') uo eeeee——O——eVOO—V30OeV—VV—VOeVOVeVOoOWV—vwx——a——— Oo oe ea eee oa) "| a Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) J FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) wu Structure Plumb (4", Top to Bottom) + Angle Structure Raked (0-1“/10') uu Insulators Clean, Complete, & Aligned ci Conductors Undamaged (Ahead Span) Lar L Conductors Properly Sagged (Ahead Span) J] $$_ $$ Wraplock Ties Correctly Installed Le Splices and/or Deadends Correctly Installed uw ; Jumpers Correctly Installed vu Guy Assy(s) Complete and Correct u | Anchor Assy(s) Complete and Correct uw Structure Area Neat and Clean LU INSPECTED: Alaska Energy Authority BY: pate S/Y SD | INSPECTED: POWER Engineer's inc. BY: DATE // INSPECTED: Copper Valley Construction BY: DATE if STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. G / a ee POLE (HT & CL): ‘Small ANCHOR ASSY’S: — 4/ ‘fg GUY ASSY'S: 4/ MISC. ASSY’S: FOUNDATION TYPE: SPEC. REF. H-PILE DEPTH: /0)~* DESCRIPTION AERIAL| GRND. | YES NO N/A | INSP ale | ft “ FRAMING INSPECTION | | Pole Ground Correctly Installed al Hl Roofs, Gains, & Holes Treated Sanaa Arm(s) & Brace(s) Correctly Located and Installed a Ti o a Nuts, Eyenuts, Locknuts installed & Tight Bolts Correct Length (1/2” - 2“) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) 5 em mraporverreesenendimemnraenenetemmnmeeenandl Hardware in Vert. & Horiz. Alignment Crossarm(s) or Davit Arm(s) Level (1“/10') ~~ - Foundation Set to Correct Depth ae H-Pile Extension Weld Complete and Correct <a H-Pile Mounting Bolt Hardware Tightened and Complete a een Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) u- Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned = Fe aa Ua SS a TUea dc teachers ratac oa ga LT eae Aes med eee a Conductors Undamaged (Ahead Span) Lu \ Conductors Properly Sagged (Ahead Span) um Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed | Jumpers Correctly Installed Cc nol Guy Assy(s) Complete and Correct — uc Cece ee ee eile eee aaa a ete ll een la Laon Anchor Assy(s) Complete and Correct Structure Area Neat and Clean Cc INSPECTED: Alaska Energy Authority BY: DATE 53/4 ‘| INSPECTED: POWER Engineer's Inc. BY: DATE / t | STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. PTA'S. @ / POLE(HT&CL): SS 5 ANCHOR ASSY’S: 4/7 GUY ASSY'S: of MISC. ASSY'S: WA FOUNDATION TYPE: j//- PL E H-PILE DEPTH: 7 0% ExT: J /A a DESCRIPTION AERIAL| GRND. FRAMING INSPECTION Pole Ground Correctly installed o Roofs, Gains, & Holes Treated a Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2“) i SETTING INSPECTION j————— Structure Plumb (4“, Top to Bottom) iA Angle Structure Raked (0-1“/10’) — Crossarm(s) or Davit Arm(s) Level (1“/10’) uo Hardware in Vert. & Horiz. Alignment uu TC Foundation Set to Correct Depth uo H-Pile Extension Weld Complete and Correct | oO H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) - [_nNatinsrecnonSS~—ST Structure Backfilled (12", NoSettlement) (Buried) ue Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10') uo Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) L Conductors Properly Sagged (Ahead Span) Lz Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Cc Jumpers Correctly installed L- lu — Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority ayp AA DATE Z ££ oe INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / | APS Syd ise SPEGIFICA> ONS OS? = id S42G7 O8. & FF At STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. G3 PTA'S. CY-2 POLE(HT&CL): 35° 5” GUY ASSY'S: 2/4/32 JE3 -/@ ANCHOR ASSY'S: 9 Jy P53 E MISC. ASSY’S: FOUNDATION TYPE: SPEC. REF DESCRIPTION YES NO N/A INSP FRAMING INSPECTION | [ | ae | see Seon cael Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed a Nuts, Eyenuts, Locknuts Installed & Tight eae Bolts Correct Length (1/2” - 2”) “ SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') x Hardware in Vert. & Horiz. Alignment x Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) - FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) ue S EEEEEEEEEEEEEEEREEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEeeee Structure Plumb (4”, Top to Bottom) Guy Assy(s) Complete and Correct “vv ez Anchor Assy(s) Complete and Correct Ss tructure Area Neat and Clean INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. BY: DATE / / ne INSPECTED: Copper Valley Construction BY: DATE / / STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE SPEC, REF DESCRIPTION VES NO N/A INSP : —-—-- FRAMING INSPECTION Pole Ground Correctly Installed | Roofs, Gains, & Holes Treated — —— Arm(s) & Brace(s) Correctly Located and Installed -— uo Nuts, Eyenuts, Locknuts Installed & Tight _ Bolts Correct Length (1/2” - 2”) uM Structure Plumb (4”, Top to Bottom) _ Angle Structure Raked (0-1“/10’) oo Crossarm(s) or Davit Arm(s) Level (1"/10') o -——— Hardware in Vert. & Horiz. Alignment uo Foundation Set to Correct Depth u H-Pile Extension Weld Complete and Correct uu H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) lL Structure Plumb (4", Top to Bottom) Le Angle Structure Raked (0-1"/10') ‘i = | Insulators Clean, Complete, & Aligned = Conductors Undamaged (Ahead Span) uu Conductors Properly Sagged (Ahead Span) L Wraplock Ties Correctly Installed a Splices and/or Deadends Correctly Installed i Jumpers Correctly Installed uu Guy Assy(s) Complete and Correct wv [Anchor As) Complete anacoree «Sid Cd Structure Area Neat and Clean — INSPECTED : INSPECTED : Alaska Energy Authority POWER Engineer's Inc. INSPECTED: Copper Valley Construction BY: DATE / / STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. G5 PIAS @a/a POLE (HT &CL): Ray GUY ASSY'S: xf ANCHOR ASSY'S: a) JA MISC. ASSY'S: Le FOUNDATION TYPE: 7/_ SPEG: REF. Me é H-PILE DEPTH: DESCRIPTION AERIAL] GRND. FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated \)\ Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight ~ Bolts Correct Length (1/2” - 2”) u SETTING INSPECTION Structure Plumb (4“, Top to Bottom) Angle Structure Raked (0-1“/10’) um a Crossarm(s) or Davit Arm(s) Level (1“/10') a Hardware in Vert. & Horiz. Alignment uw Foundation Set to Correct Depth o ———— H-Pile Extension Weld Complete and Correct um ~ H-Pile Mounting Bolt Hardware Tightened and Complete uw Structure Correctly Faced (AH or BK) uo FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) = Structure Plumb (4”, Top to Bottom) co aN I ,, —— ——— Angle Structure Raked (0-1"/10’) co ae ce a ld Insulators Clean, Complete, & Aligned La Conductors Undamaged (Ahead Span) uM Conductors Properly Sagged (Ahead Span) LL Wraplock Ties Correctly Installed a Splices and/or Deadends Correctly Installed a Jumpers Correctly Installed L- Guy Assy(s) Complete and Correct — | Structure Area Neat and Clean wu INSPECTED: Alaska Energy Authority BY: DATE WEE | INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / STRUCTURE INSPECTION REPORT a STR.NO. G6 pTA'S. C/-/A POLE(HT&CL): Fs - 57 Guy AssY's: WJ / ANCHOR ASSY'S: x / / 4 128002-01: SHUNGNAK - KOBUK TIE LINE MISC. ASSY'S: FOUNDATION TYPE: 4 -P Lk py DESCRIPTION REF. FRAMING INSPECTION | | Pole Ground Correctly installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight H-Pile Mounting Bolt Hardware Tightened and Complete FINAL INSPECTION Structure Backfilled (12", No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Bolts Correct Length (1/2” - 2“) a SETTING INSPECTION Structure Plumb (4”, Top to Bottom) a“ Angle Structure Raked (0-1“/10’) ~ Crossarm(s) or Davit Arm(s) Level (1“/10') yw Foundation Set to Correct Depth nu H-Pile Extension Weld Complete and Correct ~ o Structure Correctly Faced (AH or BK) v ——— i— bese Angle Structure Raked (0-1"/10’) w— Insulators Clean, Complete, & Aligned — Conductors Undamaged (Ahead Span) L- Conductors Properly Sagged (Ahead Span) uu Jorn eeenetieeenneremnmneneineseesrengesei enti enyEtnEeISINESE RIE ETTeeReSe En NREENRNNS ieSnIN Neen oR RSRNL Wraplock Ties Correctly Installed L Splices and/or Deadends Correctly Installed Cc Jumpers Correctly Installed uw Guy Assy(s) Complete and Correct l Anchor Assy(s) Complete and Correct ul a j_—<—— Structure Area Neat and Clean a Ll) INSPECTED: Alaska Energy Authority BY! DATE IG '& INSPECTED: POWER Engineer's Inc. BY: DATE / / | INSPECTED: Copper Valley Construction BY: DATE / / | STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. G7 PTA'S. G/) /7 POLE(HT&CL): 35 - <- GUY ASSY'S: —p/ ANCHOR ASSY'S: a//g MISC. ASSY'S: gop FOUNDATION TYPE: //_ D> H-PILE DEPTH: 7 O~ EXT: /A/ps a DESCRIPTION AERIAL|GRND.| YES | NO | N/A | INSP FRAMING INSPECTION v Pole Ground Correctly Installed a Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed \|\ \ Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1“/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') om uo uo Y \ \ — Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct penne neem nie eR Ne TTT TTT H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) uw Structure Plumb (4”, Top to Bottom) uo Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned Cc Conductors Undamaged (Ahead Span) a Conductors Properly Sagged (Ahead Span) LY“ Wraplock Ties Correctly Installed uw Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean ue INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. : INSPECTED: Copper Valley Construction BY: DATE / / | PECIEICA™ DNS FTP ies = STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STRNO. 9 J PTA'S. C7 POLE(HT&CL): SSeS GUY ASSY'S: —_¢/ JH ANCHOR ASSY'S: A//@ MISC. ASSY’S: J -—/1 4 FOUNDATIONTYPE: WP, ¢ H-PILE DEPTH: 7 @ ~ ext: L/W ici DESCRIPTION AERIAL| GRND.| Yes | NO | N/A | INSP | it FRAMING INSPECTION Ii i Pole Ground Correctly Installed a Roofs, Gains, & Holes Treated -reul tii) w) o1d Arm(s) & Brace(s) Correctly Located and Installed — Nuts, Eyenuts, Locknuts Installed & Tight a Bolts Correct Length (1/2” - 2”) a | SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10') uu i Crossarm(s) or Davit Arm(s) Level (1"/10’) ~ Hardware in Vert. & Horiz. Alignment a“ Foundation Set to Correct Depth Y jp | H-Pile Extension Weld Complete and Correct uo H-Pile Mounting Bolt Hardware Tightened and Complete co Structure Correctly Faced (AH or BK) ~ FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) os Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1”/10’) Ce |+-————__+— ——__ + Insulators Clean, Complete, & Aligned LU fp Conductors Undamaged (Ahead Span) sia is cena id al ul Conductors Properly Sagged (Ahead Span) L- L-- Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed — Guy Assy(s) Complete and Correct uw [Anchor Assys)Completeandcorret ~~ +~(| +~| ~|c-l dt Structure Area Neat and Clean a INSPECTED: Alaska Energy Authority BY: DATE “3/4! (= INSPECTED: POWER Engineer's Inc. BY: DATE / o/s INSPECTED: Copper Valley Construction BY: DATE / / | 42730 99549", 25012-9° SPEGFICATIONS FS iS SaSC™ON, 5, 4 =F) WE STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. GUY ASSY’S: MISC. ASSY’S: FOUNDATION TYPE: SPEC. REF. DESCRIPTION INSP FRAMING INSPECTION Pole Ground Correctly installed = Roofs, Gains, & Holes Treated uu Arm(s) & Brace(s) Correctly Located and Installed u ean Nuts, Eyenuts, Locknuts Installed & Tight rg Bolts Correct Length (1/2” - 2”) um SETTING INSPECTION Structure Plumb (4”, Top to Bottom) uw Angle Structure Raked (0-1"/10') m— Crossarm(s) or Davit Arm(s) Level (1“/10') Hardware in Vert. & Horiz. Alignment “~ Foundation Set to Correct Depth “w H-Pile Extension Weld Complete and Correct val H-Pile Mounting Bolt Hardware Tightened and Complete |.“ Structure Correctly Faced (AH or BK) a Ph FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) ca Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned es Conductors Undamaged (Ahead Span) u Conductors Properly Sagged (Ahead Span) gi Wraplock Ties Correctly Installed al Splices and/or Deadends Correctly Installed | te . Jumpers Correctly installed Ll Guy Assy(s) Complete and Correct is Anchor Assy(s) Complete and Correct = Structure Area Neat and Clean ier INSPECTED: Alaska Energy Authority BY: pate “3/4 '@2- INSPECTED: POWER Engineer's Inc. BY: DATE) n/n Clana) || INSPECTED: Copper Valley Construction BY: DATE / $7585 19549", 7250 22-4° SPEGIE:GS ONS eo> os eee ee ees oe STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE a | STR.NO. 7 OQ PTA'S. CUA POLE(HT&CL): 35-5 GUY ASSY'S: Ao //g ANCHOR ASSY’S: Af /49 MISC. ASSY'S! 7/772 - 1) yf FOUNDATION TYPE: SPEC. REF. DESCRIPTION INSP FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated “ Arm(s) & Brace(s) Correctly Located and Installed uu Nuts, Eyenuts, Locknuts Installed & Tight ~ Bolts Correct Length (1/2" - 2”) a SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Y Angle Structure Raked (0-1"/10') rv Tee Crossarm(s) or Davit Arm(s) Level (1"/10’) x a Hardware in Vert. & Horiz. Alignment - oe OO oes Foundation Set to Correct Depth “ H-Pile Extension Weld Complete and Correct ~ \ H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) v FINAL INSPECTION | Structure Backfilled (12”, No Settlement) (Buried) te I senses slaeileeniiaeceintintiiiaanaciedth ipa tetiakdlastbsciinnclins Ne beitinatintemmpeneliimibineenineshitiitenbisilainiitemntanmaninel Structure Plumb (4”, Top to Bottom) a Angle Structure Raked (0-1"/10’) _ \ Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Se eel Conductors Properly Sagged (Ahead Span) | Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed & \ Vv Jumpers Correctly Installed : oat Guy Assy(s) Complete and Correct “uv Anchor Assy(s) Complete and Correct l- Structure Area Neat and Clean — INSPECTED: Alaska Energy Authority BY: DATE 3! G 4S INSPECTED: POWER Engineer's Inc. BY: DATE / J INSPECTED: Copper Valley Construction BY: DATE / / 47°35 3959 ivta-7° SPECIFICA” ONS <3? . 2 F42C7 ONS — 2 aos STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 7 9 / PTA'S. 9 POLE(HT&CL): Ho # GUY ASSY'S: x // ff ANCHOR ASSY'S: J MISC. ASSY'S: wLA FOUNDATION TYPE: 4. ee H-PILE DEPTH: 7 0 EXT: w/4q AERIAL} GRND. | YES NO N/A | INSP SPEC. REF. DESCRIPTION FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed a“ Nuts, Eyenuts, Locknuts Installed & Tight a Bolts Correct Length (1/2” - 2”) (a SETTING INSPECTION Structure Plumb (4”, Top to Bottom) uv Angle Structure Raked (0-1"/10') “ Crossarm(s) or Davit Arm(s) Level (1"/10') vo Hardware in Vert. & Horiz. Alignment CA Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct mo H-Pile Mounting Bolt Hardware Tightened and Complete AIX Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) i Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned 1 Conductors Undamaged (Ahead Span) VIS] IS Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed wu Jumpers Correctly Installed Y Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean rear INSPECTED: Alaska Energy Authority BY? ee las DATE “3B 4'S INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / 3?725 9949") “23002-7" SPEGE:CA~ ONS 22> Se ae STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. yo PTA'S. C/A POLE(HT&CL): 7 o- S Guy assy’s: —_¢//p ANCHOR ASSY’S: w/a OTE. H-PILE DEPTH: 9” EXT: W/ ff Feel DESCRIPTION AERIAL| GRND.| YES | NO | N/A | INSP FRAMING INSPECTION Hi al ee | Pole Ground Correctly Installed | | um Roofs, Gains, & Holes Treated = + Arm(s) & Brace(s) Correctly Located and Installed = aes Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1“/10’) Crossarm(s) or Davit Arm(s) Level (1“/10') a Hardware in Vert. & Horiz. Alignment v Fo) 0) | dng os eae nan la [.aallldk lat |) tm itt eet ase ttre mn min oor at Foundation Set to Correct Depth V H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) | oa - FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) u- Structure Plumb (4”, Top to Bottom) uo Angle Structure Raked (0-1“/10’) uu | nsulators Clean, Complete, & Aligned Lu Conductors Undamaged (Ahead Span) | Conductors Properly Sagged (Ahead Span) sss Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly installed uo Guy Assy(s) Complete and Correct wv Anchor Assy(s) Complete and Correct | Structure Area Neat and Clean ee. INSPECTED: Alaska Energy Authority BY: 1 Ge INSPECTED: INSPECTED: Copper Valley Construction BY: DATE / i | POWER Engineer's Inc. STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE | STR.NO. /OoF PTA'S. @/ fF POLE(HT&CL): 3S -S GUY ASSY'S: A ANCHOR ASSY’S: MISC. ASSY’S: (72 - il ££ FOUNDATIONTYPE: jf- po ¢ H-PILE DEPTH: &/ ne DESCRIPTION AERIAL] GRND.| YES | NO | N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed Y Roofs, Gains, & Holes Treated a ee ee eee eee Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Yo Bolts Correct Length (1/2” - 2") VY sp a i SETTING INSPECTION Structure Plumb (4“, Top to Bottom) Angle Structure Raked (0-1“/10’) Crossarm(s) or Davit Arm(s) Level (1“/10’) . | | Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth . v eee eee ee ee ed H-Pile Extension Weld Complete and Correct — H-Pile Mounting Bolt Hardware Tightened and Complete a Structure Correctly Faced (AH or BK) v | FINAL INSPECTION \ aL TTT ET ey aa a (a a (| Structure Backfilled (12”, No Settlement) (Buried) uu Structure Plumb (4”, Top to Bottom) Ll +__—_____ Angle Structure Raked (0-1“/10’) _ Insulators Clean, Complete, & Aligned cL Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed | Splices and/or Deadends Correctly Installed C Lu Jumpers Correctly Installed - | Guy Assy(s) Complete and Correct a a Anchor Assy(s) Complete and Correct Structure Area Neat and Clean uw INSPECTED: Alaska Energy Authority BY: DATE “S/ Y¥'S2 INSPECTED: POWER Engineer's Inc. BY: DATE / o/s INSPECTED: Copper Valley Construction BY: DATE / | S7°3E 9954 98. 125°02-7° SPEGEICA” ONS cor Ne sroC Cu a aro he STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 79 ¥ PTA'S. POLE(HT&CL): 25 “— S$ Guy assy’s: // cates ASSY'S: 4//p7 Wh FOUNDATION TYPE: H- PP, LE H-PILE DEPTH: /y ” ext: N/g = AERIAL} GRND. | YES NO N/A INSP FRAMING INSPECTION ac Ground Correctly Installed v Roofs, Gains, & Holes Treated MISC. ASSY’S: DESCRIPTION Arm(s) & Brace(s) Correctly Located and Installed —— ———— : —S OTC oT Nuts, Eyenuts, Locknuts Installed & Tight u Bolts Correct Length (1/2” - 2“) | SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1“/10’) Crossarm(s) or Davit Arm(s) Level (1"/10’) ~ Hardware in Vert. & Horiz. Alignment uw Foundation Set to Correct Depth uw H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete uo Structure Correctly Faced (AH or BK) FINAL INSPECTION | emer [as capes ra cs wm sco mens U7 cos | Rn || el | Structure Backfilled (12"”, NoSettlement) (Buried) u Structure Plumb (4", Top to Bottom) ua Angle Structure Raked (0-1“/10') Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) error ot Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Naa Splices and/or Deadends Correctly Installed Ee Jumpers Correctly Installed Le Guy Assy(s) Complete and Correct ti Anchor Assy(s) Complete and Correct ; || uw Structure Area Neat and Clean INSPECTED: Alaska Energy Authority By! pate “3/G G2 INSPECTED: POWER Engineer's Inc. BY: DATE / INSPECTED: Copper Valley Construction BY: DATE / $7°35 699599, 352 SPEC ECA ONS coo -“2isese Cys oe 2S STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. /oS PTA'S. C7 -7 4 POLE (HT &CL): 357-57 | GUY ASSY'S: HLA ANCHOR ASSY'S: 4// misc. assy's: J) /g FOUNDATION TYPE: SPEC. REF. H-PILE DEPTH: 7/0 DESCRIPTION AERIAL} GRND. FRAMING INSPECTION Pole Ground Correctly Installed uo Roofs, Gains, & Holes Treated ao Arm(s) & Brace(s) Correctly Located and Installed uo Nuts, Eyenuts, Locknuts Installed & Tight u Bolts Correct Length (1/2” - 2") SETTING INSPECTION Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1°/10') Hardware in Vert. & Horiz. Alignment ~ Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned lL Conductors Undamaged (Ahead Span) uu | Conductors Properly Sagged (Ahead Span) um Wraplock Ties Correctly Installed um Splices and/or Deadends Correctly Installed en Jumpers Correctly Installed oo Guy Assy(s) Complete and Correct ‘olnkalltonlalelei a Anchor Assy(s) Complete and Correct Ma a _— Structure Area Neat and Clean eee LE INSPECTED: Alaska Energy Authority BY: DATE 3 / % '& . INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY DATE i / FRAMING INSPECTION “ STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. og PTA'S. @ 9-2 POLE(HT&CL): 3S - 5 GUY ASSY'S: _4//4 ANCHOR ASSY’S: 4// 4 MISC. ASSY’S: yn 2a-it 4 FOUNDATIONTYPE: “Af. DP’, g H-PILE DEPTH: 4“ EXT: /g ella DESCRIPTION GRND.| yes | NO | N/A | INSP Pole Ground Correctly Installed Roofs, Gains, & Holes Treated — 4 aoe Crossarm(s) or Davit Arm(s) Level (1“/10') Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Plumb (4”, Top to Bottom) INSPECTED: Alaska Energy Authority BY: INSPECTED: POWER Engineer's Inc. INSPECTED: Copper Valley Construction BY: P22 FT 9 Ea SPEC-FICAT ONS eS? 2 Z5EC7 ON a TF Arm(s) & Brace(s) Correctly Located and Installed a Nuts, Eyenuts, Locknuts Installed & Tight ~ ee Bolts Correct Length (1/2” - 2”) aa SETTING INSPECTION + Structure Plumb (4“, Top to Bottom) o Angle Structure Raked (0-1"/10’) x “a ~ Structure Backfilled (12”, NoSettlement) (Buried) | _ re eee Angle Structure Raked (0-1”/10') Insulators Clean, Complete, & Aligned uu Conductors Undamaged (Ahead Span) lL Conductors Properly Sagged (Ahead Span) uo Wraplock Ties Correctly Installed - Splices and/or Deadends Correctly Installed LU Jumpers Correctly installed a Guy Assy(s) Complete and Correct —_— Anchor Assy(s) Complete and Correct — Structure Area Neat and Clean — STRUCTURE INSPECTION REPORT pt 128002-01: SHUNGNAK - KOBUK TIE LINE Bolts Correct Length (1/2" - 2“) SETTING INSPECTION Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1“/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. INSPECTED: Copper Valley Construction SPEGFICAT ONS «29.2.5 F8EC7 CN Sa \ WNN IN . T]s]e lc ( {fn uo STR.NO. 49 7 PTA'S. Cy A POLE (HT & CL): a GUY ASSY'S: _,//y ANCHOR ASSY'S: a// MISC. ASSY’S: N/A FOUNDATIONTYPE: /¥- PL, LE H-PILE DEPTH: /o ” EXT: w/a a DESCRIPTION GRND.| YES | NO | N/A | INSP FRAMING INSPECTION || Pole Ground Correctly Installed — Roofs, Gains, & Holes Treated om [ Arm(s) & Brace(s) Correctly Located and Installed Cs — Nuts, Eyenuts, Locknuts Installed & Tight — Y ee ee ee ee ee | Structure Correctly Faced (AH or BK) | ey i jd Anchor Assy(s) Complete and Correct STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. / OP PTA'S. 29-2 POLE(HT&CL): 35° 5" GUY ASSY'S: //E/-3 i fe3-yo ANCHOR ASSY'S: =) /y- Dé MISC. ASSY'S: “247.2 =) FOUNDATIONTYPE: /4- P/Lé H-PILE DEPTH: /o ” EXT: A/p os DESCRIPTION yes | No | NA | INSP FRAMING INSPECTION a Pole Ground Correctly Installed om Roofs, Gains, & Holes Treated a Arm(s) & Brace(s) Correctly Located and Installed a a - ssealalenieln Nuts, Eyenuts, Locknuts Installed & Tight uw Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4", Top to Bottom) 7 Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') Hardware in Vert. & Horiz. Alignment | Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct — H-Pile Mounting Bolt Hardware Tightened and Complete | Structure Correctly Faced (AH or BK) LL A FINAL INSPECTION Structure Backfilled (12", NoSettlement) (Buried) — yy \ Structure Plumb (4”, Top to Bottom) UH Angle Structure Raked (0-1"/10’) ul Insulators Clean, Complete, & Aligned s— - Conductors Undamaged (Ahead Span) [Pt Conductors Properly Sagged (Ahead Span) ~~ Wraplock Ties Correctly Installed ao Splices and/or Deadends Correctly Installed Jumpers Correctly Installed uo Guy Assy(s) Complete and Correct uw | Anchor Assy(s) Complete and Correct | Structure Area Neat and Clean _— INSPECTED: Alaska Energy Authority BY: €3/1¢'CD INSPECTED : POWER Engineer's Inc. BY: DATE. / fs INSPECTED: Copper Valley Construction BY: DATE / if 47°35 99 Shea, Ese Ta SPEG FCAT ONS cc. 2 SECT GN ig 1, 2722 Aus STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. O PTA'S. @/ POLE(HT&CL): 3s —S GUY ASSY’s: —_x/ ANCHOR ASSY'S: 4///4 misc. assy's: // A FOUNDATION TYPE: - PyLeé H-PILE DEPTH: 70’ EXT: W/g SRE AERIAL| GRND. | YES NO N/A | INSP REF. DESCRIPTION FRAMING INSPECTION — Pole Ground Correctly Installed a Roofs, Gains, & Holes Treated i Arm(s) & Brace(s) Correctly Located and Installed ma Nuts, Eyenuts, Locknuts Installed & Tight “~ Bolts Correct Length (1/2” - 2”) a SETTING INSPECTION Structure Plumb (4”, Top to Bottom) — Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1°/10') al Hardware in Vert. & Horiz. Alignment ail Foundation Set to Correct Depth a H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) U [pas aS — Structure Plumb (4”, Top to Bottom) ce 1 e_—_—e?:» v®}®}(}*[__®"]] _——— ~ oe Sa Angle Structure Raked (0-1"/10’) _— EEE Et Insulators Clean, Complete, & Aligned c—_ Conductors Undamaged (Ahead Span) Le Conductors Properly Sagged (Ahead Span) ic u Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed — a Guy Assy(s) Complete and Correct Le Anchor Assy(s) Complete and Correct - Structure Area Neat and Clean INSPECTED : Alaska Energy Authority INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / Ss vu om oO n a L ‘ ) u ‘ ) ' ' u STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. oO PTA'S. C/A POLE(HT&CL): PS -S Guy Assy’s: —a// ANCHOR ASSY’S: of /g MISC. ASSY’S: N/A FOUNDATION TYPE: /f- P/, £ SPEC. ext: W/q H-PILE DEPTH: Jo e REF DESCRIPTION AERIAL| GRND. NO N/A | INSP - fe FRAMING INSPECTION Pole Ground Correctly Installed nm ian acaaclainl Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Py Bolts Correct Length (1/2” - 2") SETTING INSPECTION \\ 5 Structure Plumb (4”, Top to Bottom) oo Angle Structure Raked (0-1"/10') mo Crossarm(s) or Davit Arm(s) Level (1"/10’) Hardware in Vert. & Horiz. Alignment | Foundation Set to Correct Depth v H-Pile Extension Weld Complete and Correct rr APN H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) L Structure Plumb (4", Top to Bottom) _, Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) VIVA Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed lL Splices and/or Deadends Correctly Installed | _ | Jumpers Correctly installed - -—__-_:.: TF Oonoo9-o--'-.._ _—_—n—_<=— _—_=<=<=O_ =< OE Guy Assy(s) Complete and Correct L* Anchor Assy(s) Complete and Correct | | a Structure Area Neat and Clean = INSPECTED: Alaska Energy Authority BY? INSPECTED: POWER Engineer's Inc. BY: INSPECTED: Copper Valley Construction STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. /// PTA'S. G/F POLE (HT &CL): SS-S GUY ASSY’S: = x/ ANCHOR ASSY’S: a//q MISC. ASSY’S: N/A FOUNDATIONTYPE: Yf- #77 Zé H-PILE DEPTH: 9“ DESCRIPTION AERIAL} GRND. FRAMING INSPECTION a Pole Ground Correctly Installed Roofs, Gains, & Holes Treated “ Arm(s) & Brace(s) Correctly Located and Installed “ Nuts, Eyenuts, Locknuts Installed & Tight a“ Bolts Correct Length (1/2” - 2”) 7 SETTING INSPECTION Structure Plumb (4, Top to Bottom) uu Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1“/10') Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth “- H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12", NoSettlement) (Buried) | uu Structure Plumb (4”, Top to Bottom) Cc — Angle Structure Raked (0-1"/10’) uz Insulators Clean, Complete, & Aligned uo | Conductors Undamaged (Ahead Span) uw Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed . Jumpers Correctly Installed Z Guy Assy(s) Complete and Correct Z Structure Area Neat and Clean - INSPECTED: Alaska Energy Authority BY: DATE / G ‘Ge INSPECTED: POWER Engineer's Inc. BY: DATE / /_ INSPECTED: Copper Valley Construction BY: DATE / / | STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. // 2 PTA'S. Ci POLE (HT &CL): 35 Ss ‘Aa ANCHOR ASSY’S: —n//1q SPEC. REF. DESCRIPTION FRAMING INSPECTION | | aa c | ee Pole Ground Correctly Installed “| | Roofs, Gains, & Holes Treated ao | Eee | il a Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) a SETTING INSPECTION Structure Plumb (4", Top to Bottom) v iene Angle Structure Raked (0-1“/10’) uw Crossarm(s) or Davit Arm(s) Level (1"/10') Hardware in Vert. & Horiz. Alignment we v Foundation Set to Correct Depth ve H-Pile Extension Weld Complete and Correct o H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) a FINAL INSPECTION $$$ tt Structure Backfilled (12”, No Settlement) (Buried) i = +—— $a Structure Plumb (4", Top to Bottom) /_ Oe Angle Structure Raked (0-1"/10’) uM Insulators Clean, Complete, & Aligned a Conductors Undamaged (Ahead Span) a st Conductors Properly Sagged (Ahead Span) \ x Wraplock Ties Correctly Installed go] Splices and/or Deadends Correctly Installed | a : Jumpers Correctly Installed we Guy Assy(s) Complete and Correct Z Anchor Assy(s) Complete and Correct | eA Structure Area Neat and Clean cs INSPECTED : Alaska Energy Authority INSPECTED: POWER Engineer's Inc. BY: DATE / / , * INSPECTED: Copper Valley Construction BY: DATE / / 477350999998. 250 22-3° SPECIF‘ICA™ ONS F239 iE SAECT ON STF ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. 3 PTA'S. @/4 POLE (HT & CL): 3s - 57 GUY ASSY'S: ,//g ANCHOR ASSY'S: AJ /q MISC. ASSY’S: vv /A FOUNDATION TYPE: 4 - , DESCRIPTION H-PILE DEPTH: /G * SPEC. REF. INSP AERIAL} GRND. FRAMING INSPECTION Pole Ground Correctly Installed , Roofs, Gains, & Holes Treated ni T Arm(s) & Brace(s) Correctly Located and Installed o~ Nuts, Eyenuts, Locknuts installed & Tight Bolts Correct Length (1/2“ - 2”) a SETTING INSPECTION Structure Plumb (4”, Top to Bottom) a Angle Structure Raked (0-1“/10') ~~ Crossarm(s) or Davit Arm(s) Level (1"/10’) Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct | “ H-Pile Mounting Bolt Hardware Tightened and Complete | «~ Structure Correctly Faced (AH or BK) FINAL INSPECTION \{A]S Structure Backfilled (12”, No Settlement) (Buried) T All Structure Plumb (4”, Top to Bottom) ez + +~—— ——_—_— Angle Structure Raked (0-1"/10") — Insulators Clean, Complete, & Aligned LZ Conductors Undamaged (Ahead Span) ve Conductors Properly Sagged (Ahead Span) L- Wraplock Ties Correctly Installed La Splices and/or Deadends Correctly Installed uw Jumpers Correctly Installed a Guy Assy(s) Complete and Correct ce Anchor Assy(s) Complete and Correct ‘Za Structure Area Neat and Clean Ca INSPECTED: Alaska Energy Authority BY: DATE 3/5 ‘G2 INSPECTED: POWER Engineer's Inc. BY: DAE Ceol ee Lenn 1) ) INSPECTED: Copper Valley Construction BY: DATE / / | " a “3 ’ ) n ‘ ) ' ' u ie 3 vu m STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE | STR.NO. ) suf PTA'S. ay POLE(HT&CL): 35-5 GUY ASSY'S: — n// ANCHOR ASSY’S: —_x/ / 4 FOUNDATIONTYPE: /f¥-~ Py i € H-PILE DEPTH: SPEC. REF. 70" AERIAL| GRND.| YES | NO | N/A | INSP Pa FRAMING INSPECTION a Pole Ground Correctly Installed mm Roofs, Gains, & Holes Treated _—_—___ mene Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight DESCRIPTION Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) o Z Angle Structure Raked (0-1"/10’) a Crossarm(s) or Davit Arm(s) Level (1"/10') Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth 7 H-Pile Extension Weld Complete and Correct a“ H-Pile Mounting Bolt Hardware Tightened and Complete y, jp Structure Correctly Faced (AH or BK) uu FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) _ ———_———___++— Structure Plumb (4", Top to Bottom) a Angle Structure Raked (0-1“/10’) a Insulators Clean, Complete, & Aligned uw Conductors Undamaged (Ahead Span) ao Conductors Properly Sagged (Ahead Span) uw Wraplock Ties Correctly Installed — Splices and/or Deadends Correctly Installed eal Jumpers Correctly Installed wz Guy Assy(s) Complete and Correct ~ Anchor Assy(s) Complete and Correct “ Structure Area Neat and Clean i INSPECTED: Alaska Energy Authority BY: DATE 3/5 G2 INSPECTED: POWER Engineer's Inc. BY: DATE / INSPECTED: Copper Valley Construction BY: DATE / BaD ate an scat SPECIFCAT DNSFD2 W2E8 CT ONG ATER ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE GUY ASSY'S: 1H ANCHOR ASSY'S: § n//q MISC. ASSY’S: / SPEC. REF. DESCRIPTION AERIAL} GRND. | YES NO N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight (a Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4, Top to Bottom) Yo Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1“/10') Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct uw \ H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) i Structure Plumb (4”, Top to Bottom) | uo Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned oa — ——_- ae >rwr to —_—_ Conductors Undamaged (Ahead Span) ne Conductors Properly Sagged (Ahead Span) uw Wraplock Ties Correctly Installed we Splices and/or Deadends Correctly Installed Jumpers Correctly installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean _ INSPECTED: Alaska Energy Authority BY: DATE INSPECTED: POWER Engineer's Inc. BY: DATE ee INSPECTED: Copper Valley Construction BY: DATE / / | 37°82 .9909 9%, 5012-7" SPECIFICA” ONS =. - mG GT, Se oe ae STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 7 /E PTA'S. @y ff POLE(HT&CL): 945 “~ 5” GUY AssY’s: “//f ANCHOR ASSY’S: w/a MISC. ASSY'S: J / FOUNDATION TYPE: pf. Pp ¢ H-PILE DEPTH: 0 “ EXT: J /4 SPEC. REF. DESCRIPTION AERIAL] GRND. INSP FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated | Arm(s) & Brace(s) Correctly Located and Installed — Nuts, Eyenuts, Locknuts Installed & Tight v Bolts Correct Length (1/2” - 2") SETTING INSPECTION Structure Plumb (4”, Top to Bottom) x Angle Structure Raked (0-1“/10’) “ Crossarm(s) or Davit Arm(s) Level (1“/10') Hardware in Vert. & Horiz. Alignment YY Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) Y“ FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) _— Structure Plumb (4", Top to Bottom) a Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned — Conductors Undamaged (Ahead Span) a Conductors Properly Sagged (Ahead Span) u Wraplock Ties Correctly Installed a Splices and/or Deadends Correctly Installed Jumpers Correctly Installed ad Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BYZ A, DATE 3 / S92 INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / | $7735 9299, EsLa-Tt SPECIEICA™ ONS H3? 5 STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. // 7 PTA'S. f J-/ POLE (HT & CL): Guy assy'’s: A//# ANCHOR ASSY’S: / /, MISC. ASSY'S: pw /, FOUNDATION TYPE: Jf - pyc € H-PILE DEPTH: d “ ExT: wW/g SPEC. REF. DESCRIPTION YES NO N/A INSP FRAMING INSPECTION al ik Pole Ground Correctly Installed Roofs, Gains, & Holes Treated oe al Arm(s) & Brace(s) Correctly Located and Installed Tee Nuts, Eyenuts, Locknuts Installed & Tight a Bolts Correct Length (1/2” - 2”) “ SETTING INSPECTION Structure Plumb (4“, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION | Structure Backfilled (12”, No Settlement) (Buried) — Structure Plumb (4”, Top to Bottom) Ca Angle Structure Raked (0-1“/10’) “ Insulators Clean, Complete, & Aligned Lc Conductors Undamaged (Ahead Span) u Conductors Properly Sagged (Ahead Span) L Wraplock Ties Correctly Installed lu | Splices and/or Deadends Correctly Installed Me | Jampers Correctly Installed uw Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: DATE (ouSsoe INSPECTED: POWER Engineer's Inc. BY: DATE / / | INSPECTED: Copper Valley Construction BY: DATE / / Pic 39 ch a SPECEICA: ONS roe — eseoC, ON Ss = 2 AS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. //¥ PTA'S. CF. 2 POLE (HT &CL): $0 °- ¥ MISC. ASSY'S: IA, FOUNDATION TYPE: ft, = SPEC; REF. H-PILE DEPTH: gy ” EXT: W/4 DESCRIPTION AERIAL] GRND. INSP FRAMING INSPECTION Pole Ground Correctly Installed “~ Roofs, Gains, & Holes Treated | Arm(s) & Brace(s) Correctly Located and Installed a Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) aT) aemcmemmnmmmmmmmemress TTT IIT ei INR NT TIT Structure Plumb (4“, Top to Bottom) mo Angle Structure Raked (0-1"/10’) mo Crossarm(s) or Davit Arm(s) Level (1/10') mm Hardware in Vert. & Horiz. Alignment Ea TL Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) uw FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) ue Structure Plumb (4”, Top to Bottom) am Angle Structure Raked (0-1/10') a Insulators Clean, Complete, & Aligned lc Conductors Undamaged (Ahead Span) uo Conductors Properly Sagged (Ahead Span) wu Wraplock Ties Correctly Installed | Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority ' SAS eral INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. /7/ G PTA'S. C¥-2 POLE(HT&CL): SS -5 GUY ASSY'S: 2/273 2 Jes -y OANCHOR ASSY'S: 2/y LE MISC. ASSY'S: FOUNDATION TYPE: sy 9, SPEC. REF. H-PILEDEPTH: yg “ ExT: //A DESCRIPTION AERIAL} GRND. FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Vv Arm(s) & Brace(s) Correctly Located and Installed v Nuts, Eyenuts, Locknuts installed & Tight V Bolts Correct Length (1/2” - 2”) 7 SETTING INSPECTION |} Structure Plumb (4”, Top to Bottom) — Angle Structure Raked (0-1“/10') | a Crossarm(s) or Davit Arm(s) Level (1“/10') a esa Symmes Sars gn eS one arc UIT NLEEUGSE Seana | Tce m + Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth V H-Pile Extension Weld Complete and Correct ~~ H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) — Structure Plumb (4”, Top to Bottom) 4 Angle Structure Raked (0-1"/10’) oe Insulators Clean, Complete, & Aligned Cc Conductors Undamaged (Ahead Span) Lt a uu NUN Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed L Jumpers Correctly Installed uu | Guy Assy(s) Complete and Correct uv ~ Anchor Assy(s) Complete and Correct Structure Area Neat and Clean = ———— INSPECTED: Alaska Energy Authority BYS DATE “2 Y Gz | INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 7.20 PTA'S. 305 > 3. POLE(HT&CL): 3s°- 5 GUY ASSY’S: u/A ANCHOR ASSY'S: — x// 4 arec. REF. DESCRIPTION AERIAL| GRND. | YES NO N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed — Roofs, Gains, & Holes Treated ae Arm(s) & Brace(s) Correctly Located and Installed Ce Nuts, Eyenuts Locknuts Installed & Tight K Bolts Correct Length (1/2" - 2“) a SETTING INSPECTION Structure Plumb (4", Top to Bottom) UK Angle Structure Raked (0-1“/10') - Crossarm(s) or Davit Arm(s) Level (1"/10') uv Hardware in Vert. & Horiz. Alignment we | Foundation Set to Correct Depth Ce H-Pile Extension Weld Complete and Correct — Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12", NoSettlement) (Buried) | Structure Plumb (4”, Top to Bottom) uu Angle Structure Raked (0-1“/10’) Insulators Clean, Complete, & Aligned C7 cl Conductors Undamaged (Ahead Span) Conductors Properly Saggec .ead Span) oad Wraplock Ties Correctly Installed uw Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct F Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: a DATE “3/G ' 7 INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / 42°32 I9Ey aN. sera SPEG RCA ONS roe ye ses Gig 2 crs STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. /.2) PTA'S. cl-1A POLE(HT&CL): 3.5 - GUY ASSY'’S: N/A ANCHOR ASSY’S: U/a MISC. ASSY'S: N/a FOUNDATION TYPE: SPEC. REF. DESCRIPTION FRAMING INSPECTION Pole Ground Correctly Installed am Roofs, Gains, & Holes Treated | uo | _| Arm(s) & Brace(s) Correctly Located and Installed oo Nuts, Eyenuts, Locknuts Installed & Tight uu Bolts Correct Length (1/2” - 2) ou | fa —— SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Le | Sn TARE eres rr Angle Structure Raked (0-1"/10') UV Crossarm(s) or Davit Arm(s) Level (1"/10') SS Se sr Hardware in Vert. & Horiz. Alignment — Foundation Set to Correct Depth uo H-Pile Extension Weld Complete and Correct aH H-Pile Mounting Bolt Hardware Tightened and Complete | 4 Structure Correctly Faced (AH or BK) a | | FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) | Re Structure Plumb (4", Top to Bottom) i Angle Structure Raked (0-1"/10') Cc Insulators Clean, Complete, & Aligned Cc Conductors Undamaged (Ahead Span) L Conductors Properly Sagged (Ahead Span) a Wraplock Ties Correctly Installed wv Splices and/or Deadends Correctly Installed cL Jumpers Correctly Installed — Guy Assy(s) Complete and Correct Ye Anchor Assy(s) Complete and Correct Structure Area Neat ard Clean — INSPECTED: Alaska Energy Authority BY’ pate 3/ SOS?) INSPECTED: POWER Engineer's Inc. BY: DATE / fe INSPECTED: Copper Valley Construction BY: DATE / / BPTRO 994 9, ase IZ SPECIFICATHONS F597 EER CT ON TPR ALS STRUCTURE INSPECTION REPORT STR.NO. y22 SPEC. H-PILE DEPTH: 128002-01: SHUNGNAK - KOBUK TIE LINE POLE (HT&CL): 35-57 ANCHOR ASSY’S: J] 4 m io ro REF DESCRIPTION AERIAL] GRND. | YES NO N/A INSP FRAMING INSPECTION a eel Pole Ground Correctly Installed a Roofs, Gains, & Holes Treated i ee T T 1 Arm(s) & Brace(s) Correctly Located and Installed ao : a Pe | 2 Nuts, Eyenuts, Locknuts Installed & Tight a Bolts Correct Length (1/2" - 2“) uo SETTING INSPECTION Structure Plumb (4“, Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1"/10') Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION “3c —_——_—————+ Structure Backfilled (12", NoSettlement) (Buried) Structure Plumb (4”, Top to Bottom) ee ee ee | Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed cl —- uo Conductors Undamaged (Ahead Span) L Td ce [[wrapiockTiescorrectvinsated Te | TT Splices and/or Deadends Correctly Installed Jumpers Correctly Installed pt Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct INSPECTED: Alaska Energy Authority vy RZ pate Bi 5 'F-2 INSPECTED: POWER Engineer's Inc. BY: INSPECTED: Copper Valley Construction BY: 995919") : —_ igei2a SPECIFICATIONS <2? = WesacC OS Ss we VIA DATE / / STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE POLE(HT&CL): Fs-- = DESCRIPTION FRAMING INSPECTION L ea Pole Ground Correctly Installed — Roofs, Gains, & Holes Treated =a Arm(s) & Brace(s) Correctly Located and Installed KH Nuts, Eyenuts, Locknuts Installed & Tight a uo Bolts Correct Length (1/2" - 2”) SETTING INSPECT ON Structure Plumb (4”, Top to Bottom) | = Angle Structure Raked (0-1"/10’) uM Crossarm(s) or Davit Arm(s) Level (1“/10') — Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12", NoSettlement) (Buried) u Structure Plumb (4", Top to Bottom) Le YC Angle Structure Raked (0-1"/10') — Insulators Clean, Complete, & Aligned a Conductors Undamaged (Ahead Span) aa Conductors Properly Sagged (Ahead Span) aa Wraplock Ties Correctly Installed Le Splices and/or Deadends Correctly Installed ME Jumpers Correctly Installed — Guy Assy(s) Complete and Correct al Anchor Assy(s) Complete and Correct om Structure Area Neat and Clean Lc INSPECTED: Alaska Energy Authority BY: DATE —3/ Y'G% INSPECTED: POWER Engineer's Inc. BY: DATE / o/s INSPECTED: Copper Valley Construction BY: DATE / / 37°32 19599, Be 2-7 SPECIFICS “ONS com’ _ McenG 2%. g Tre £S STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. /.2 SPEC. REF. DESCRIPTION AERIAL} GRND. | YES NO N/A | INSP FRAMING INSPECTION Fee Ler Pole Ground Correctly Installed — Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed io Nuts, Eyenuts, Locknuts Installed & Tight : Bolts Correct Length (1/2” - 2”) | SETTING INSPECTION Structure Plumb (4“, Top to Bottom) Angle Structure Raked (0-1“/10’) Crossarm(s) or Davit Arm(s) Level (1"/10’) Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) \ Structure Plumb (4”, Top to Bottom) —-0(aaiv—wlwKwOmWloao>n000C 4090). sis [Ed AIA Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) _ Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed VINA Splices and/or Deadends Correctly Installed VMS Jumpers Correctly installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: Z/4'92 INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / | S7°35 99099, 5012-7" SPEGFICATOAS= = “sl Se2C> CN sia Se AS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 725 PTA'S. 2-4 POLE(HT&CL): Ho GUY ASSY’S: Ww / A ANCHOR ASSY’S: p/ / MISC. ASSY’S: a/ [A Y/A SPEC. REF. FOUNDATIONTYPE: BuRig D H-PILE DEPTH: DESCRIPTION AERIAL] GRND. EXT: W/q ° INSP FRAMING INSPECTION Oe Pole Ground Correctly Installed Roofs, Gains, & Holes Treated haiti Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2“) SETTING INSPECTION Angle Structure Raked (0-1"/10') Hardware in Vert. & Horiz. Alignment H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) eee Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: INSPECTED: POWER Engineer's inc. BY. INSPECTED: Copper Valley Construction BY: 4 39759 SPECFICA” ONS F392 22207 CN ae ~ yyN Structure Plumb (4, Top to Bottom) 7 m Crossarm(s) or Davit Arm(s) Level (1"/10') v Foundation Set to Correct Depth x eg Ll Insulators Clean, Complete, & Aligned — Conductors Undamaged (Ahead Span) STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. /2G PTA'S. C/-/4 POLE(HT&CL): ~fO “of GUY ASSY'S: —n//g ANCHOR assy’s: a// AERIAL] GRND. | YES NO N/A | INSP SPEC. REF. DESCRIPTION FRAMING INSPECTION Pole Ground Correctly Installed a Roofs, Gains, & Holes Treated | arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight ea Bolts Correct Length (1/2" - 2“) v SETTING INSPECTION Structure Plumb (4", Top to Bottom) a Angle Structure Raked (0-1"/10') uw Crossarm(s) or Davit Arm(s) Level (1"/10') Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth y, H | Y -Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION $$] Structure Backfilled (12”, NoSettlement) (Buried) (a Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1“/10’) Insulators Clean, Complete, & Aligned Ll Conductors Undamaged (Ahead Span) L Conductors Properly Sagged (Ahead Span) a Wraplock Ties Correctly Installed ix Splices and/or Deadends Correctly Installed pe Jumpers Correctly Installed — Guy Assy(s) Complete and Correct Le — Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: DATE “3 / S'G2_| INSPECTED: POWER Engineer's Inc. BY: BATE) ely | - INSPECTED: Copper Valley Construction BY: DATE Ae 47°35 -3959 9%. 7 23022-3° SPECIFICAZ ONSi-S7_ “is S=2C7 C8, & a s2 ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 727 PTA'S. C/-/A POLE(HT&CL): HS - | GUY ASSY's: p~//f ANCHOR ASSY'S: _a// MISC. ASSY’S: W/A FOUNDATION TYPE: 2.2; 2D H-PILE DEPTH: aa DESCRIPTION AERIAL|GRND.| YES | NO | N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed — Roofs, Gains, & Holes Treated uo | Arm(s) & Brace(s) Correctly Located and Installed “a Nuts, Eyenuts, Locknuts Installed & Tight uv Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4“, Top to Bottom) Angle Structure Raked (0-1"/10’) a Crossarm(s) or Davit Arm(s) Level (1“/10') a Hardware in Vert. & Horiz. Alignment Y Foundation Set to Correct Depth y H-Pile Extension Weld Complete and Correct a H-Pile Mounting Bolt Hardware Tightened and Complete Yo Structure Correctly Faced (AH or BK) v FINAL INSPECTION Structure Backfilled (12", No Settlement) (Buried) L- | | Structure Plumb (4", Top to Bottom) Ll Angle Structure Raked (0-1"/10') maT Insulators Clean, Complete, & Aligned uC | Conductors Undamaged (Ahead Span) t- Conductors Properly Sagged (Ahead Span) [vg Wraplock Ties Correctly Installed Lc Splices and/or Deadends Correctly Installed aa Jumpers Correctly Installed C= Guy Assy(s) Complete and Correct | — Anchor Assy(s) Complete and Correct C- Structure Area Neat and Clean a INSPECTED: Alaska Energy Authority BY: DATE EE INSPECTED: POWER Engineer's Inc. BY: DATE / / i INSPECTED: Copper Valley Construction BY: DATE / / STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. / 29 -2 POLE(HT&CL): Ho - 42 GUY ASSY'S: 2 /¢;. 3 ANCHOR ASSY'S: 2/ay 4 MISC. ASSY’S: FOUNDATION TYPE: SPEC. REF. PTA'S. lee 3B {oO H-PILE DEPTH: ,//7 AERIAL} GRND. | YES NO N/A INSP + Pole Ground Correctly Installed a Roofs, Gains, & Holes Treated puke DESCRIPTION FRAMING INSPECTION Arm(s) & Brace(s) Correctly Located and Installed ~ Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2“) v SETTING INSPECTION Structure Plumb (4”, Top to Bottom) u- Angle Structure Raked (0-1“/10’) — Crossarm(s) or Davit Arm(s) Level (1“/10’) “ Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth v H-Pile Extension Weld Complete and Correct v H-Pile Mounting Bolt Hardware Tightened and Complete 7 Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) l - | Structure Plumb (4”, Top to Bottom) y Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned Ww Conductors Undamaged (Ahead Span) LL Conductors Properly Sagged (Ahead Span) tl Wraplock Ties Correctly Installed lL Splices and/or Deadends Correctly Installed uu RO _;81_h_ SSS . Jumpers Correctly Installed Guy Assy(s) Complete and Correct UW Anchor Assy(s) Complete and Correct [Pt Ss tructure Area Neat and Clean INSPECTED: Alaska Energy Authority BY? DAIE—B/ SF: [21 INSPECTED: POWER Engineer's Inc. BY: DATE / / \ INSPECTED: Copper Valley Construction BY: DATE / ! STRUCTURE INSPECTION REPORT STR. NO. GUY ASSY'S: V/A ANCHOR ASSY'S: 4//4 MISC. ASSY’S: WA. 128002-01: SHUNGNAK - KOBUK TIE LINE SPEC. REF. ene DESCRIPTION AERIAL} GRND. FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated x —— Arm(s) & Brace(s) Correctly Located and Installed YY Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') rr | Crossarm(s) or Davit Arm(s) Level (1"/10’) “ Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth | r H-Pile Extension Weld Complete and Correct - Structure Correctly Faced (AH or BK) sss fe} FINAL INSPECTION re - : Structure Backfilled (12”, No Settlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned Cc Conductors Undamaged (Ahead Span) LE Conductors Properly Sagged (Ahead Span) uu Wraplock Ties Correctly Installed Co Splices and/or Deadends Correctly Installed oC Jumpers Correctly Installed Cc Guy Assy(s) Complete and Correct uC Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: DATE 3/¢'S > | INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / | ‘ s “ uO m oO " a b « r ” ‘ u 1 STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE SsTR.NO. / FO POLE (HT & CL): GUY ASSY’S: M/A ANCHOR ASSY'’S: pw (AA MISC. ASSY’S: 7. FOUNDATION TYPE: Bu, 2/40 H-PILE DEPTH: W//g ext: W/A/g ee DESCRIPTION AERIAL| GRND. INSP FRAMING INSPECTION ——E + dl Pole Ground Correctly Installed - Roofs, Gains, & Holes Treated a Arm(s) & Brace(s) Correctly Located and Installed ra Nuts, Eyenuts, Locknuts Installed & Tight “ Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1“/10’) a Crossarm(s) or Davit Arm(s) Level (1“/10') Hardware in Vert. & Horiz. Alignment - _—_—_—_—$?R_— ———$—$ —_ —$—$—$—_—$—_—_—_—_—_———— Foundation Set to Correct Depth x H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete “ Structure Correctly Faced (AH or BK) v | FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) U Structure Plumb (4”, Top to Bottom) C= Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned “ Conductors Undamaged (Ahead Span) —_ Conductors Properly Sagged (Ahead Span) o_o Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct _ = Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. INSPECTED: Copper Valley Construction aP-80 3929 98. «250122 SPECIFIC” ONS E29 4.2 ERECT ON SV =TFP ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. /3/ PTA'S. ¢/-/A POLE(HT&CL): yu '- ¥ | GUY ASSY'S: —4/ ANCHOR ASSY'S: 44/4 MISC. ASSY'S: — p/ /f FOUNDATION TYPE: Bu og DESCRIPTION AERIAL|GRND.| YES | NO | N/A | INSP — FRAMING INSPECTION Pole Ground Correctly Installed a Roofs, Gains, & Holes Treated — | —— 4 aah: Arm(s) & Brace(s) Correctly Located and Installed — Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') _ Crossarm(s) or Davit Arm(s) Level (1“/10') ae Hardware in Vert. & Horiz. Alignment 7 Foundation Set to Correct Depth oH H-Pile Extension Weld Complete and Correct - H-Pile Mounting Bolt Hardware Tightened and Complete v Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) Le Structure Plumb (4, Top to Bottom) Lt Angle Structure Raked (0-1“/10’) —_ Insulators Clean, Complete, & Aligned uo Conductors Undamaged (Ahead Span) uo Conductors Properly Sagged (Ahead Span) uM Wraplock Ties Correctly Installed — Splices and/or Deadends Correctly Installed | cc Jumpers Correctly Installed Ll Guy Assy(s) Complete and Correct - Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED : Alaska Energy Authority INSPECTED: POWER Engineer's Inc. BY: DATE / / i 7 INSPECTED: Copper Valley Construction BY: DATE / / STRUCTURE INSPECTION REPORT PTA'S. 128002-01: SHUNGNAK - KOBUK TIE LINE Clie POLE(HT&CL): 3S -s7 SPEC: Pp REF. DESCRIPTION INS fl FRAMING INSPECTION Pole Ground Correctly Installed ma Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2" - 2”) INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. BY: INSPECTED: Copper Valley Construction BY: TAP7SS NGI EE Lat SPECIE CA TONgie on. sage OY eo a ee — STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE POLE(HT&CL): 23-5 H-PILE DEPTH: / 0 * SPEC. © REF DESCRIPTION AERIAL] GRND. : FRAMING INSPECTION Pole Ground Correctly Installed i Roofs, Gains, & Holes Treated pe] ff Arm(s) & Brace(s) Correctly Located and Installed a Nuts, Eyenuts, |__| Nuts, Eyenuts,Locknutsinstalled&Tight = = =o | au | fd] Installed |__| Nuts, Eyenuts,Locknutsinstalled&Tight = = =o | au | fd] v 4 Bolts Correct Length (1/2" - 2”) aol Sucre tates 1G) ul uw Crossarm(s) or Davit Arm(s) Level (1“/10') = + Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth Fa H-Pile Extension Weld Complete and Correct ff a] H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) rf FINAL INSPECTION =T T Structure Backfilled (12”, NoSettlement) (Buried) c Ht Structure Plumb (4”, Top to Bottom) Le Angle Structure Raked (0-1"/10') — Insulators Clean, Complete, & Aligned uw | ue Conductors Undamaged (Ahead Span) a eT [Gay assislconpleteandcoree ——SSS*d Sd Ter BSS Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority DATE -s 1S! SG INSPECTED: POWER Engineer's Inc. BY: DATE / INSPECTED: Copper Valley Construction BY: DATE / / A$C OCI seca SPEGECA MONS € 5? ces Co OY es ee REF. AERIAL] GRND. STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. / 242 PTA'S. G@/-/ 19 POLE (HT & CL): Ia Se GUY ASSY’S: J/A ANCHOR ASSY'S: lA MISC. ASSY'S: wJ/~ FOUNDATION TYPE: 4 . -”, me H-PILE DEPTH: 9 0% ext: // 4 SPEC. INSP INSPECTED: Alaska Energy Authority BY: Se os INSPECTED: POWER Engineer's Inc. BY: INSPECTED: Copper Valley Construction BY: MPSS IEMs ae SPECEICAMIONS OOP’. 2 RacCe ty bo) 2 = 2 o m Pa x o 3 2. ° = = a a ° 3 Zs e - o o 3 Qa a ° a o a o STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. / 3.57 PTA'S. = pg POLE(HT& CL): 35-< GUY ASSY’S: v/4 ANCHOR ASSY’S: A /4@ MISC. ASSY’S: N/A FOUNDATION TYPE: Y-P,1 < H-PILE DEPTH: 0 SPEC. ° REF DESCRIPTION AERIAL| GRND. | YES NO N/A | INSP FRAMING INSPECTION a | Pole Ground Correctly Installed Roofs, Gains, & Holes Treated rth VN Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1“/10') Crossarm(s) or Davit Arm(s) Level (1°/10') : : \ Hardware in Vert. & Horiz. Alignment i Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct + tr H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) il Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') i Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed HH Splices and/or Deadends Correctly Installed oo Jumpers Correctly Installed _ Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct i rh Structure Area Neat and Clean INSPECTED: Alaska Energy Authority 4 Ke INSPECTED: POWER Engineer's Inc. ao os DATE / ~ INSPECTED: Copper Valley Construction BY: DATE / ~ “APSO NCU IN cise ret SPEGIEICA@=UNSror — wa se5G O36 a 2? ; r2 A — i 5G st mt STR.NO. 76 PTA'S. C/ 4 MISC. ASSY'S: //ma-.1 SPEC. © REF. DESCRIPTION AERIAL cao. mamnansecnon «dt sd Pole Ground Correctly Installed FOUNDATIONTYPE: 4 -P,L¢E H-PILE DEPTH: 0” STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE POLE(HT&CL): YO-Y Guy assy’s: — A// 4 ANCHOR ASSY’S: J / ExT: J/q Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1“/10') Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth XY MUTA | : Crossarm(s) or Davit Arm(s) Level (1°/10’) — — — H-Pile Extension Weld Complete and Correct - rt FINAL INSPECTION Structure Backfilled (12", No Settlement) (Buried) Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) INSPECTED: Alaska Energy Authority BY: a A > INSPECTED: POWER Engineer's Inc. BY: INSPECTED: Copper Valley Construction BY: THPT8C ICY TESe ZY SPECIEIGCAMIINS moe! YS SaRe— eX H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) od [Anchor Asi) completeandcorea Sd i ructureAreaneatandcien ———S—S~*iT \ it tt L \ HE \ STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. /37 PTA'S. C/A POLE(HT & CL): P57 <- Guy assy's: J /4 ANCHOR ASSY'S: aj /Q MISC. ASSY'S: N/A FOUNDATION TYPE: -f-P/) ¢ H-PILE DEPTH: / ext: W/p SPEC. | REF DESCRIPTION AERIAL| GRND. N/A | INSP FRAMING INSPECTION cae Arm(s) & Brace(s) Correctly Located and Installed ua Pole Ground Correctly Installed Roofs, Gains, & Holes Treated de A Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) a SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1“/10’) Crossarm(s) or Davit Arm(s) Level (1“/10') HE LETT \ \ IE i tt | HE Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned TU ITIL f Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct eee ; Anchor Assy(s) Complete and Correct Structure Area Neat and Clean eri ihe wi INSPECTED: Alaska Energy Authority BY: 32 we DAIE ~3/ Gz INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / TARE INC IN ESE a SPEGFPICA SIONS eon _ Ye se=G- C4.S (ss STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE DESCRIPTION AERIAL| GRND. REF. STR.NO. 39 PTA'S. 41/4 POLE (HT & CL): 35-5 Guy assy’s: 4/4 ANCHOR assy’s: A / 4 MISC. ASSY’S: J /4 FOUNDATION TYPE: =~ Pye H-PILE DEPTH: / 9’ ExT: W/n SPEC. | FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated VIX Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') \ : iN \ Crossarm(s) or Davit Arm(s) Level (1"/10’) Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth Ks : H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10") | EE Insulators Clean, Complete, & Aligned NR] fe Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct IE E Kv | \ ! Ms Structure Area Neat and Clean INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. INSPECTED: Copper Valley Construction APSE ONCE IN Cis SPECIFICATIONS F-3P _ “id 242C~ ON S375? ALS ol,o <|< olg > 12 mim a PS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. /397 PTA'S. 2/07 - | POLE (HT & CL): FS Guy assy’s:G/é)-3 C/ez-so ANCHOR ASSY'S: ¥/w-P/LE MISC. ASSY'S: —/ -25- FOUNDATION TYPE: H-PLé H-PILE DEPTH: , 5% ExT: J//#4 fee DESCRIPTION AERIAL| GRND. ee FRAMING INSPECTION Pole Ground Correctly Installed 3 be Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION LIL Structure Plumb (4”, Top to Bottom) ee a Angle Structure Raked (0-1"/10') Dee a - Crossarm(s) or Davit Arm(s) Level (1“/10’) Hardware in Vert. & Horiz. Alignment : Foundation Set to Correct Depth mn H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete in en Structure Correctly Faced (AH or BK) ee) ee FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) A f Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned VINT VS Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed t E BE Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct f : i Structure Area Neat and Clean INSPECTED: Alaska Energy Authority : ao ~< } 9 > 4 m ~ INSPECTED: POWER Engineer's Inc. ao < Oo > A m ~ ~ eee INSPECTED: Copper Valley Construction ao ~< Go > a m ~ Nerte 4 Lower C7-1 was lowerech 20% extre to provide . pcsper cleerauce Rev Cyy stress 4278S AVC IN Ese Lat ‘SPECIECAHONS rior. Yn ceeG- Ce 272 STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. / 4/0 PTA'S. C /-/ Q POLE(HT&CL): 35 < | GUY ASSY’S: jd ANCHOR ASSY’S: i MISC. ASSY'S: yg) / 2 FOUNDATION TYPE: //. Po) ¢ SPEC. REF. H-PILE DEPTH: c, ~ AERIAL] GRND. | YES NO N/A | Pole Ground Correctly installed im Roofs, Gains, & Holes Treated | U Lu DESCRIPTION FRAMING INSPECTION Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2" - 2”) wa SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') \\ Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct xv I censascessseinsuncosalgensaaot nats ceitiasiaiDessilieeaisc eileen araberecesaeny einen H-Pile Mounting Bolt Hardware Tightened and Complete ~ Structure Correctly Faced (AH or BK) m ee $$$ jj} FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) - Structure Plumb (4", Top to Bottom) a Angle Structure Raked (0-1"/10’) . _— Insulators Clean, Complete, & Aligned i Conductors Undamaged (Ahead Span) - ot ee eee oO Conductors Properly Sagged (Ahead Span) i \ Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed uo Jumpers Correctly Installed — Guy Assy(s) Complete and Correct — Anchor Assy(s) Complete and Correct - Structure Area Neat and Clean — INSPECTED: Alaska Energy Authority BY: pate “3/ S'S 2 | INSPECTED: POWER Engineer's Inc. INSPECTED: Copper Valley Construction BY: DATE / / STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. / Y | PTA'S. (7-4 A POLE (HT&CL): 3S) 5” GUY ASSY'S: — p/ ANCHOR ASSY’S: —a/ / MISC. ASSY’S: FOUNDATION TYPE: H-PILE DEPTH: “ EXT: W/Q SPEC. REF. AERIAL} GRND. DESCRIPTION FRAMING INSPECTION Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10') = Crossarm(s) or Davit Arm(s) Level (1“/10') a Hardware in Vert. & Horiz. Alignment rie Foundation Set to Correct Depth zz css ngs drier nents deeeataoanananlteeeanensenslienaesininesilienipanideniieiiisisetisil H-Pile Extension Weld Complete and Correct im H-Pile Mounting Bolt Hardware Tightened and Complete | a uw Structure Correctly Faced (AH or BK) Pt FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1"/10') a Insulators Clean, Complete, & Aligned wo 77 Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) a Wraplock Ties Correctly Installed - Splices and/or Deadends Correctly Installed = Jumpers Correctly Installed va Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean — INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. BY: DATE / / | 7 INSPECTED: Copper Valley Construction BY: DATE / i | pig DESCRIPTION GRND. Pole Ground Correctly Installed FRAMING INSPECTION Y YES STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 42 PTA'S. CB-2 POLE(HT&CL): 3.5 - 5 Guy assy’s: 4/4 ANCHOR ASSY’S: w/a MISC. ASSY'S: 7 / 72. 1/ f FOUNDATION TYPE: f - P/(Lé H-PILE DEPTH: a 4 EXT: J/ 77 NO N/A | INSP Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION \L a Sone fe Foundation Set to Correct Depth rf Structure Plumb (4", Top to Lil oe al NIAIN Hef | H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12, NoSettlement) (Buried) Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1°/10') Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) uo Wraplock Ties Correctly Installed a Splices and/or Deadends Correctly Installed a Ge [Fiumperscovecivinsaieg Sd [Jeurassisiconpieweanacoee Sid [ahora complete andorra’ Sd i ee a INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. BY: INSPECTED: Copper Valley Construction BY: “APS NCW AN Eee SPEGEICA TONS 65° 2°15 24207 OS, ga FF STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. ,4 7 PTA'S POLE(HT&CL): FS -5 GUY ASSY’S ANCHOR ASSY’S MISC. ASSY'S: FOUNDATION TYPE: H-PILE DEPTH: EXT: J/g SPEC. REF. .. Ss ts A a cs SS A \ DESCRIPTION AERIAL| GRND. INSP FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated i i Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1“/10') Crossarm(s) or Davit Arm(s) Level (1"/10') P -{ | | Hardware in Vert. & Horiz. Alignment P| Foundation Set to Correct Depth A HH H-Pile Extension Weld evel ts and Correct Soutr covey Feed tere) || frnatinseection———SSSSCidT S| Cd? id [[servcture sacied (27 Nosetemend Gured) | Angle Structure Raked (0-1“/10’) Insulators Clean, Complete, & Aligned ee [wreplockTiescorecivinsaled «dt | | | Spliees andlor Deadenascorecivinwaiee |_| |b] Dumperscoreciyinstaieg Sd [Tey Asans complete anscoree Si [Tarehorasa\Completeandcoree ss INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction 4778S ONCM IN ESE c ZT SPECIEICA TONS FS? i FRSCO CNS TTF ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE POLE(HT&CL): 35-S SPA GUY ASSY'S: Y/aA ANCHOR ASSY’S: MISC. ASSY'S: AS /g FOUNDATION TYPE: H-PILEDEPTH: 0 a DESCRIPTION AERIAL| GRND. INSP =a (aaa =| FRAMING INSPECTION 2 pee eee Pole Ground Correctly Installed uM _——$—— ny Roofs, Gains, & Holes Treated A ae rm(s) & Brace(s) Correctly Located and Installed | Nuts, Eyenuts, Locknuts Installed & Tight u ee a ee Bolts Correct Length (1/2” - 2") i SETTING INSPECTION | 7 Se Pa | (| Structure Plumb (4”, Top to Bottom) v Angle Structure Raked (0-1“/10’) —_— es Crossarm(s) or Davit Arm(s) Level (1"/10') = Hardware in Vert. & Horiz. Alignment yr | Foundation Set to Correct Depth “a H-Pile Extension Weld Complete and Correct eA H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12, NoSettlement) (Buried) iw Structure Plumb (4", Top to Bottom) uC Angle Structure Raked (0-1"/10') | nad Insulators Clean, Complete, & Aligned Ll ++ 4 —_j_| u Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) lL Wraplock Ties Correctly Installed a Splices and/or Deadends Correctly Installed = Jumpers Correctly Installed (rm Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean I nasa e ces r e eea— nS e a—a| INSPECTED: Alaska Energy Authority BY: DATE “S / Si 1G 2] INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / $2735 3904 9%, ESC 12-3 SPECIFIGA= ONS oP oe en Ce OOS oe Se A STRUCTURE INSPECTION REPORT STR.NO. / 5 128002-01: SHUNGNAK - KOBUK TIE LINE 2/4 POLE (HT & CL): F5-5 GUY ASSY’S: 4 ANCHOR ASSY'S: —_,///g MISC. ASSY’S: /A FOUNDATION TYPE: PTA'S. H-PILE DEPTH: yo “ a DESCRIPTION AERIAL] GRND.| YES NO N/A INSP ; L ae FRAMING INSPECTION al Pole Ground Correctly Installed an _— Roofs, Gains, & Holes Treated L Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2“) SETTING INSPECTION a | Structure Plumb (4”, Top to Bottom) l A | Angle Structure Raked (0-1“/10') ue ; 7 : =| casa | Gaacnaa| in | Crossarm(s) or Davit Arm(s) Level (1"/10') ee CZ [rie ecension weld Compieeandtovee | =| FINAL INSPECTION 1X} \ Hardware in Vert. & Horiz. Alignment Structure Backfilled (12”, NoSettlement) (Buried) | Structure Plumb (4", Top to Bottom) Co Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned “a” Conductors Undamaged (Ahead Span) uo Conductors Properly Sagged (Ahead Span) a \ Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct ait Structure Area Neat and Clean uu INSPECTED: Alaska Energy Authority BY: Ah axe DATE = / Y INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / 42°35 9959 9, taser SPEGIECA SONS coe | iticase oe = ee A STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. / &L PTA'S. CIR POLE(HT&CL): 35-5 GUY ASSY’S: J/)4 ANCHOR ASSY'S: A/n MISC. ASSY’S: N/A FOUNDATION TYPE: f- P/ cir H-PILE DEPTH: / 0“ EXT: W/# DESCRIPTION AERIAL] GRND. | YES NO N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated | Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2" - 2”) oo ELECT tL LE SETTING INSPECTION : Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1°/10') [__|erossarmsjordavitarm@ytevel 70) ——————s Hardware in Vert. & Horiz. Alignment q i itt i Structure Correctly Faced (AH or BK) FINAL INSPECTION arse atv a INSPECTED: Alaska Energy Authority By:~p Ln ___ DATE "3/5 'Q2 I BY: INSPECTED: POWER Engineer's Inc. INSPECTED: Copper Valley Construction BY: iseca SPECIECAT ONS F9 LERLCTO NS aT Sie HECHT LL LAM IL RA LLL DATE / / DATE / / STRUCTURE INSPECTION REPORT GUY ASSY’S: N/A MISC. ASSY'S: +/mx2- 1/1 A _ FOUNDATION TYPE: = Fibs H-PILE DEPTH: py , DESCRIPTION GRND. FRAMING INSPECTION ANCHOR ASSY'S: = ,// P XN o YES EXT: w N/A 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. / 4 7 PTA'S. @)A POLE(HT&CL): 75-5 A INSP Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1°/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') ; CELL LU Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth ii H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12", No Settlement) (Buried) : Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') : t = °o | A i Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: Sx En INSPECTED: POWER Engineer's Inc. BY: INSPECTED: Copper Valley Construction BY: APSO OVCV IN ESET 2 if 7 a il SPECIEIGAPONSic oP ia ereG Oe eae Wy I" J? TCL i STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. /Y 3 PTA'S. C/A POLE (HT & CL): SS--5 GUY ASSY'’S: J/4 ANCHOR ASSY'S: J/k MISC. ASSY’S: J/A FOUNDATIONTYPE: [Y- Pig H-PILE DEPTH: / 9% ExT: W//y SPEC. | DESCRIPTION INSP REF. FRAMING INSPECTION | Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2" - 2”) Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1“/10') Crossarm(s) or Davit Arm(s) Level (1“/10') Hardware in Vert. & Horiz. Alignment it LETT Ta! Fh \ tt Foundation Set to Correct Depth “ H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete io | | kf Structure Correctly Faced (AH or BK) per | 2 Bl FINAL INSPECTION FT Structure Backfilled (12”, No Settlement) (Buried) Pf ee ommh | Structure Plumb (4”, Top to Bottom) _ fa | Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed rT i KUL \{\ \ \ i il tl Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean i \ f INSPECTED: Alaska Energy Authority BY: 4 INSPECTED: POWER Engineer's Inc. BY: DATE / / = INSPECTED: Copper Valley Construction BY: / / TAPES IOV IN SESE SPECIRICA HONG FOP’. 2 SaSCON & als? A STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. / 49 PTA'S. ¢c/A POLE(HT&CL): 73-5” Guy assy’s: ,//A ANCHOR ASSY’S: p/p MISC. ASSY'S: § = J /9 FOUNDATIONTYPE: //~ PLE SPEC. © REF. DESCRIPTION AERIAL| GRND. | YES NO N/A | INSP Lean FRAMING INSPECTION — Pole Ground Correctly Installed uW Roofs, Gains, & Holes Treated \ Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2" - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1"/10') : \ | Hardware in Vert. & Horiz. Alignment | Foundation Set to Correct Depth So Y's oly H-Pile Extension Weld Complete and Correct ri i Th f H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12", NoSettlement) (Buried) \ Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') | Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed cht ILL Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. | @ < 9 > as m ~ ~ INSPECTED: Copper Valley Construction BY: DATE / / “APSO VCO IN BET SPECIFCAHIONS cr <2 SasCoG sas a5? STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. /50 PTA'S. c/# POLE(HT&CL): BS7-S GuY ASSY'S: 2 /F)- 2/£3-16 ANCHOR ASSY'S: 2/Y- PILE MISC. ASSY'S: —_//4 FOUNDATION TYPE: /£- 204K H-PILE DEPTH: (” EXT: a//4 YES SPEC. REF. DESCRIPTION AERIAL eno. | fmamnensecnon | «dt [rote Ground covectvnwaied iS Js events Locus stated aight ————_—| fp Jrotscorecienen tier [Fstacure Puno" Toptosoron) ——*Y [[eresarmiordavicarm@bieei(ivioy ite NO N/A | INSP LM \ A ET ‘ [Hardwareinver. aor Alignment i | | | [__[Foundationsetiocorec depth ia | | sok [eee | | __ [Pile extenionWeldcompeteandtoren | | | —| _| [ [ite Mounting Bort Hardware Tightened and Complete | _— |_| pJaicurecorectyracedanor® | | | frmacinsrecton SC dT i —Fsurcture sacked (2% Nosettemend) ured | | | —| | Structure Plumb (4”, Top to Bottom) ff] || Angle Structure Raked (0-1"/10') } —] | | Tinsiatorscean compete aaiones iP] | | [conductorsUndamagedAheadspan) =i | | |_| [conductorsPropery sagged aheadspar) «itu | | __ Wraplock Ties Correctly Installed Craazpy swofrry o shv& Fa/S Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct || Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / SATSC INC IN Ese aD SPECIEICASUMSier'. Wz Asc 8. gy 57S? ? alos STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. / 47/ PTA'S. C/A POLE (HT &CL): 357 -5- GUY ASSY’S: //yv ANCHOR ASSY’S: 1//4 MISC. ASSY'S: 1J/m2 -' FOUNDATIONTYPE: 4/- FE H-PILE DEPTH: so ~ EXT: w/q FRAMING INSPECTION SETTING INSPECTION : Hardware in Vert. & Horiz. Alignment ee Foundation Set to Correct Depth Pa] ft H-Pile Extension Weld Complete and Correct N/A | INSP | H-Pile Mounting Bolt Hardware Tightened and Complete Yv Structure Correctly Faced (AH or BK) P -~]t [| FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4", Top to Bottom) uo Conductors Properly Sagged (Ahead Span) wu == SplcesandlorDeadendsCorreciyinsiaieg +t te | Fumperscoveciyinsaeg dC [Guy Assy) Complete and coves [Anchor Asy)\CompleteandGorret dS INSPECTED: Alaska Energy Authority BYT 5 Lion DATE = / S 9 ee INSPECTED: POWER Engineer's Inc. BY: DATE / / - INSPECTED: Copper Valley Construction BY: DATE / / TAP $C IVEY IN EBELA SPECIFICATIONS F359 NS SRC ON SSFP ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE REF. INSP DESCRIPTION GRND. FRAMING INSPECTION a Pole Ground Correctly Installed Roofs, Gains, & Holes Treated \ EET TL Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) EE Structure Plumb (4“, Top to Bottom) Angle Structure Raked (0-1"/10’) A Crossarm(s) or Davit Arm(s) Level (1“/10') Hardware in Vert. & Horiz. Alignment nm ec [ [Hil exersion weld Completeandtorea—*| | |__| |__| Wile Mounting Bot Hardware Tightened and compete] | | __ [Structure cowrectyFacedtanore) | | dT eames Le ee [ [structure Sactiled (27 Noseitiemen) Gre | | [— |_| [ [structure riumb(e",Toptosonom) «| iY Cd CC*d [faratestrucurenareaorrnoy Sid Sid| dP | [__[fnsulatorscean, Complete @aigned SSCs | CY Yd [_[conactors undamaged aheedspan) Sst | | dt —CC*” [[econductorsProperiy sagged (aheadspan) Sid || iY Cid [|wraplocktiescorrectyintated S| | | did | |siicesandlorDeadends orrecivinsaled «| dt | [umpersconectvinsaeg CT dT SC] [_[GuyAssve)compieteandcoree ——SSSCSC~sC*‘idSC“‘i( ‘(| + [anchor assis)Gompieteandcorrea——SSSC*dYSSCdTSCCd |_| | |seructureareaneatandcieas dT oe] dT Ci ' INSPECTED: Alaska Energy Authority BY. INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / “ATSC AVON AN CEs SPECIFICATIONS F-59 _ °52 S42C7 ON Gat? STR.NO. / 52 PTA'S. C/-/A POLE(HT&CL): Yo- ¥ GUY ASSY'S: Y/A ANCHOR ASSY'S: O/4 MISC. ASSY'S: J / Wole: S WE |\ewarEer FOUNDATIONTYPE: //. Py) ¢ H-PILE DEPTH: .29 “4/G EXT: SPEC. Oy eh STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE POLE(HT&CL): 35-5 Guy assy’s: 4/4 ANCHOR ASSY'S: —,// 4 MISC. ASSY'S: WJ /# FOUNDATION TYPE: -feeé H-PILE DEPTH: , o~ EXT: WJ / A aan DESCRIPTION AERIAL| GRND.| YES | NO | N/A | INSP FRAMING INSPECTION v LL Pole Ground Correctly Installed ree - \ i Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1“/10') Crossarm(s) or Davit Arm(s) Level (1"/10’) | i I‘ Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth , H-Pile Extension Weld Complete and Correct - \ i H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) wL LAWN ELLE Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) EHILE LET | Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct LLL A TL LTT Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY'S - DATE 3/5 '% INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / ATSC VCH IN Ea SPECIFICATIONS FSP _ eR CT ON yg ac? STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. ) 3 4 PTA'S. oc) 9 POLE(HT&CL): 25° 47 GUY ASSY'S: = N/A ANCHOR ASSY’S: (A MISC. ASSY’S: W/4 FOUNDATION TYPE: 7. JE H-PILE DEPTH: =, 0 ’ ext: W ] — DESCRIPTION AERIAL| GRND.| Yes | NO | N/A | INSP FRAMING | ON G INSPECTI | _| Pole Ground Correctly Installed ae Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed i Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) im | | Structure Plumb (4”, Top to Bottom) Ls Hardware in Vert. & Horiz. Alignment eo PA z Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned a Conductors Undamaged (Ahead Span) Le || Conductors Properly Sagged (Ahead Span) Le Wraplock Ties Correctly Installed oo i i [Anchor Asy6)Compleweandcorret «dd ructreAreaneatandGean i | INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / APSO OCG IN Beet SPECIFICATIONS £3? 2 2e#2 C7 ON 3 aT? STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 55 PTA'S. =o A POLE(HT&CL): 35-5 GUY ASSY’S: /A ANCHOR ASSY’S: Ufa MISC. ASSY’S: ‘/m ant H FOUNDATION TYPE: /- P,'Lé H-PILE DEPTH: / 0‘ EXT: a) ) 4 a DESCRIPTION AERIAL|GRND.| ves | NO | N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed : Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed | h Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2" - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1"/10’) | I Hardware in Vert. & Horiz. Alignment \S Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct i H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) ¢ | | + i Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10") Insulators Clean, Complete, & Aligned | ! w\ C Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed || Splices and/or Deadends Correctly Installed Jumpers Correctly Installed rT Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean poe | | INSPECTED: Alaska Energy Authority BY 4 DATE “3 /& ‘G INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / “APSE ANC IN “BBE ZIT SPECIEIGCAT IONS cS _ wa Sea C7 N.S 27 A no We SaG bas a STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. / Slo PTA'S. c/-/A POLE (HT&CL): 3 5°* 5 GUY ASSY’S: Wy ANCHOR ASSY’S: J/g MISC. ASSY’S: N/A FOUNDATION TYPE: 1/7. P), H-PILE DEPTH: / 9° EXT: J /p os DESCRIPTION AERIAL| GRND.| YES | NO | N/A | INSP FRAMING INSPECTION uM Pole Ground Correctly Installed Roofs, Gains, & Holes Treated ‘f ee ie Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1"/10') Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) s il Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1°/10') Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct CCT il (NSS Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: Yee INSPECTED: POWER Engineer's Inc. BY: INSPECTED: Copper Valley Construction BY: TASC IVCV AN, SESE TZ SPECIEICAFHONSr oe! Wa SSC ho" eS S i il i ; \ it Th HT i fi SELL LR A \ paTe 2/S'S DATE / / DATE / / STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. |) 57 PTA'S. 4/4 POLE (HT &CL): 35-5 GUY ASSY’S: “(A ANCHOR ASSY’S: w/p MISC. ASSY’S: N/A FOUNDATIONTYPE: 4/7. P/'Lé H-PILE DEPTH: 0’ EXT: W]y te DESCRIPTION yes | No | N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1"/10’) | Crossarm(s) or Davit Arm(s) Level (1"/10') Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) = eT ea =o es a Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4”, Top to Bottom) t= Angle Structure Raked (0-1"/10’) Lo | | | a || Conductors Undamaged (Ahead Span) ea ) | | wd conductor Propey Sogged ahead sped) | v=] | | | [wrepiockTiescoreciyinsaed —__—————*dt_ p>] | | | [selcesandiorOeadendscorecivinstaies ———~f—| fp | [Yuroerscoreciyinsaiea iY | [ [eu assyiconpieteandcoree i Trehor Asis conpieweanacoree Sst | [arvcureAreaneatandcen SSCs INSPECTED: Alaska Energy Authority BY: A DATE 3/S '% INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / SAP SC OVEK IN ESSE TT SPECIFICA TONS €-59 2 S4ECT ON Sa TO ALS STRUCTURE INSPECTION REPORT REF. FRAMING INSPECTION Pole Ground Correctly Installed DESCRIPTION | | ILL Wu Roofs, Gains, & Holes Treated \ Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2 - 2”) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1"/10') fe ( Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. ) 5 9 PTA'S. ayy POLE (HT & CL): 35°- 5 GUY ASSY'S: = W//# ANCHOR ASSY'’S: 4/4 MISC. ASSY’S: vW/A FOUNDATIONTYPE: =f. Pig H-PILE DEPTH: 0’ EXT: W/g SPEC. © N/A | INSP i , H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete : Structure Correctly Faced (AH or BK) FINAL INSPECTION ‘ Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed f Splices and/or Deadends Correctly Installed v{\ C Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean I As ce LETTE INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. BY: DATE INSPECTED: Copper Valley Construction BY: DATE “aP$C ICI “ESET SPECIEICAPONS « 22. 35 Sect (14S fa AS BY5, Lowe —_PATE “31S! J STRUCTURE INSPECTION REPORT STR. NO. (oea PTA'S. C/A GUY ASSY'S: —AJ/ MISC. ASSY'S: , 7) FOUNDATION TYPE: H- Pile’ H-PILE DEPTH: BEEC DESCRIPTION AERIAL REF. FRAMING INSPECTION ANCHOR ASSY'’S: 3 = > 3 i 70° YES 128002-01: SHUNGNAK - KOBUK TIE LINE POLE (HT &CL): 35-5 ext: v/4 a ° Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1“/10') Crossarm(s) or Davit Arm(s) Level (1"/10’) Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1“/10') Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean KELL LLL | INSPECTED: POWER Engineer's Inc. INSPECTED: Copper Valley Construction BY: "APSO ICY IN TEBE Le SPECIEICAT ONS FDA LER ICT OY HITT i TL X i ECCI LETT TT i At TUTTE INSPECTED: Alaska Energy Authority BY: Trp ~DATE “2i5 ' [DI BY: DATE / DATE / CL Ay / TTT STRUCTURE INSPECTION REPORT Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight fe] Bolts Correct Length (1/2" - 2“) fsermnainspection Sidi Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1“/10') Crossarm(s) or Davit Arm(s) Level (1"/10') u Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth RK u NLL \ H-Pile Extension Weld Complete and Correct K H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) g \ FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) f Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') A Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) \ Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct | | Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority INSPECTED: POWER Engineer's Inc. BY: DATE INSPECTED: Copper Valley Construction BY: DATE H7°SC OVEM IN SESE SPECIFICATIONS F3P ESR CT ONS eI ALS 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. /40 PTA'S. 4/4 POLE(HT&CL): FS- 5 GUY ASSY’S: w A ANCHOR ASSY'’S: v/A MISC. ASSY'S: BY SPLIT BOLT AT ToP OF Bole FOUNDATION TYPE: H-PLE H-PILE DEPTH: /o EXT: v/ A . DESCRIPTION YES NO N/A amnewsrcnon _———+| «dt Pole Ground Correctly Installed INSP a STR.NO. / G/ PTA'S. ¢/# POLE(HT&CL): 35-5 ‘ EX — DESCRIPTION aeniat| GRNO.| ves | No | N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated SsermNGinspecnON SS - Z Zl FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) stucurePiumb™,Toprotonom) «| ee] [ange StucreRakeaornoy <i [nsulatorsceon comple aired «dt | ‘|_| [conductors ndemaged aheaaSpar) | | | | [conductors Propey Sogged ahead sped | c= | | ee a eel ode =f f \ | if [Anchor Asy6)CompleteandGorret «dtd INSPECTED: Alaska Energy Authority BY: -3 . INSPECTED: POWER Engineer's Inc. BY: DATE / / - INSPECTED: Copper Valley Construction BY: DATE / i, “APSO AVCM IND ESELZ SPECIFICA=ONS F359 - iE S2EC7 CN 6° 3-9 AS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. JG 2 PTA’'S. 921A POLE(HT&CL): 35-5 GUY ASSY'S:; = J/g ANCHOR ASSY’S: —nJ/ 4 MISC. ASSY'S: 1 / yy 2) FOUNDATION TYPE: H-PILE DEPTH: SPEC. © REF. DESCRIPTION GRND. FRAMING INSPECTION < Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2" - 2”) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1°/10') ~ crossermGderdavtamminel (iio) _———~+| | | HardwareinVer Horie Aignment «dt FoundationsettoCored est «dt [wile ExtersionWeld Complete andcorea |__| File Mounting Bolt Hardware Tightened and Complete SiucureCorectyFoced(anoree) | [RNALINSPECTON Structure Backfilled (12”, No Settlement) (Buried) s} [MSs i Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1“/10’) insulators clean Complete Aligned —_——st [conductors Undameged Ahead Spor) __———d [conductors ProperySagged(AneedSper) ___—_—| WreplockTiesCorrectyistaled Spies andlor DeadendsCorectvisalied ——_—_—_—| DumpersConeciyinsaled = [Guy Asss)completeand core ————SSS*dCd [Anchor Ay) Complete and Corre Sucre AreaNeatard Gen it \ tt | KIN TS Lt TECH INSPECTED: Alaska Energy Authority BY: Cs 4 é INSPECTED: POWER Engineer's Inc. BY: DATE a INSPECTED: Copper Valley Construction BY: DATE / / i TAI7SE OEM IN CaBE LET SPECIFICATIONS F-S9 LERECT ONS STP ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE | STR.NO. / Gs PTA'S. C/A POLE(HT&CL): 35-5 GUY ASSY’S: J/A ANCHOR ASSY'S: a//4 MISC. ASSY'S: N H FOUNDATION TYPE: - Pr lé H-PILE DEPTH: / O° ext: W/# — DESCRIPTION GRND.| YES NO N/A INSP FRAMING INSPECTION — | lPole Ground Correctly Installed M- Roofs, Gains, & Holes Treated uv |__| Armite) atieaents! Correctly Located and Installed pelo yr {| 4 jp Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) Peo SETTING INSPECTION Structure Plumb (4”, Top to Bottom) a Angle Structure Raked (0-1“/10') Crossarm(s) or Davit Arm(s) Level (1“/10') Hardware in Vert. & Horiz. Alignment La Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct — H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) Lv |) eee ee ee ee ESE ee ee | Structure Plumb (4", Top to Bottom) a Angle Structure Raked (0-1"/10') iz l | Insulators Clean, Complete, & Aligned CZ | Conductors Undamaged (Ahead Span) 1 | | Conductors Properly Sagged (Ahead Span) a Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed a Jumpers Correctly Installed “ Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean (pal INSPECTED : Alaska Energy Authority INSPECTED: POWER Engineer's Inc. INSPECTED: Copper Valley Construction BY: DATE / / STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE eee | STR.NO. sé 4 PTA'S. C/ -4 POLE(HT&CL): SS -S | GUY ASSY’S: ~/A ANCHOR ASSY'S: _x//# —_———. ees MISC. ASSY’S: VLA 0 76° FOUNDATION TYPE: = 4/— we Ce H-PILE DEPTH: EXT: A/a ying DESCRIPTION AERIAL] GRND. | YES NO N/A INSP FRAMING INSPECTION a —— }—$$$_______ Pole Ground Correctly Installed — Roofs, Gains, & Holes Treated _— _| Arm(s) & Brace(s) Correctly Located and Installed mo aS —_S | Nuts, Eyenuts, Locknuts Installed & Tight iA Bolts Correct Length (1/2” - 2”) A Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1“/10') SETTING INSPECTION Structure Plumb (4”, Top to Bottom) - \} \ Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth - H-Pile Extension Weld Complete and Correct | "inl Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) —_— Structure Plumb (4", Top to Bottom) Tc | Insulators Clean, Complete, & Aligned a Conductors Undamaged (Ahead Span) tc Conductors Properly Sagged (Ahead Span) uv | Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct INSPECTED: Alaska Energy Authority DATE / ie 1G INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / 47°35 5959 9%. Cast ia-a" SPECIFICAMIONS CO’. iz See CT OD, & =F? ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE imal —$——_$$—— $n! STR.NO. /O6S PTA'S. @/-) 4 POLE(HT&CL): 3S-S GUY ASSY’S: w/w ANCHOR ASSY’S: 21/4 MISC. ASSY’S: N/A FOUNDATIONTYPE: 4/- 9r€ H-PILE DEPTH: 9g ~ EXT: w/ a? DESCRIPTION AERIAL] GRND.| YES | NO | N/A | INSP FRAMING INSPECTION | is to 7 | Pole Ground Correctly Installed soa | aaa | I | alee Roofs, Gains, & Holes Treated Le | | Arm(s) & Brace(s) Correctly Located and Installed a j_——____+__ | Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2“) SETTING INSPECTION Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1“/10’) Crossarm(s) or Davit Arm(s) Level (1“/10') - | Hardware in Vert. & Horiz. Alignment _ Foundation Set to Correct Depth e H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) —e Structure Plumb (4", Top to Bottom) ca +} Angle Structure Raked (0-1"/10') _— Si caleeleallilasatal eeneieniennthaeneneiiniiesnennainanenaniianail Insulators Clean, Complete, & Aligned uv Conductors Undamaged (Ahead Span) uw Conductors Properly Sagged (Ahead Span) ia Lb Zi Wraplock Ties Correctly Installed Lene ety Splices and/or Deadends Correctly Installed uo Pumperscoveciyinstaeg «YS Cd Guy Assy(s) Complete and Correct ed Anchor Assy(s) Complete and Correct mi = INSPECTED: Alaska Energy Authority BY: DATE 3/3. Sz INSPECTED: POWER Engineer's Inc. BY: DATEinaes/snin/ine INSPECTED: Copper Valley Construction BY! DATE i / APRS -I9S9 4) ed eed" SPEGIE-CATIONS cOricie tasGe eal: 150s STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. / 64 A PTA'S. — /g POLE(HT& CL): es-s GUY ASSY'S:3/€/-3 3/ez~/0 ANCHOR ASSY'S: 2/ ,/- Prté MISC. ASSY’S: J/A FOUNDATION TYPE: 4f- Fie H-PILE DEPTH: 9,9 ~ EXT: fa SEG, REF. DESCRIPTION AERIAL] GRND. | YES NO N/A INSP FRAMING INSPECTION Pole Ground Correctly Installed — | }—__} __ j—__} Roofs, Gains, & Holes Treated _ Arm(s) & Brace(s) Correctly Located and Installed ial en ee Nuts, Eyenuts, Locknuts Installed & Tight ix Bolts Correct Length (1/2” - 2”) | SETTING INSPECTION Structure Plumb (4“, Top to Bottom) - Angle Structure Raked (0-1“/10') Crossarm(s) or Davit Arm(s) Level (1“/10’) Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth nu H-Pile Extension Weld Complete and Correct - H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) | Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10') | Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) ~ Ys YY Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed “v | | Guy Assy(s) Complete and Correct | Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: “3 Lee. DATE 3 / 5'% Z| So ss INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / SIRO 9S. es ae SPECIFICA” ONS icSP'. 55 SZC ON 5 = SR AS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. /ZG PTA'S. 2/6 7-/ POLE(HT&CL): 35.5 GUY ASSY'S\ 4/62 -3 — 5/4/-3 _3/e.5 ANCHOR ASSY'S: 2 / ARLE MISC. ASSY'S: 7 M7 2- wy Wf Se FOUNDATIONTYPE: //- 7'Cé H-PILE DEPTH: /0~ EXT: Vg SPEC. REF. DESCRIPTION AERIAL} GRND. | YES NO N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed | Nuts, Eyenuts, Locknut: stalled & Tight U — \IN | fd Bolts Correct Length (1/2“ - 2“) — SETTING INSPECTION Structure Plumb (4“, Top to Bottom) \ : Angle Structure Raked (0-1"/10') Ta Crossarm(s) or Davit Arm(s) Level (1“/10') — Hardware in Vert. & Horiz. Alignment u- \ Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) a FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4”, Top to Bottom) a Angle Structure Raked (0-1”/10’) Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Ve Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Guy Assy(s) Complete and Correct uM 4 Jumpers Correctly Installed v Va Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED : Alaska Energy Authority INSPECTED: POWER Engineer's Inc. INSPECTED: Copper Valley Construction BY: 37°30 39599 soles! SPECIF'ICA™ONS ¢SP 2 Seer G Oto se At STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. / £7 PTA'S. cy) POLE (HT &CL): 35-5" GUY ASSY'S: S/A ANCHOR ASSY’S: Aa/A MISC. ASSY’S: N/A FOUNDATIONTYPE: 4/7. Prue H-PILE DEPTH: / 07% EXT: Hy | i DESCRIPTION AERIAL] GRND. | YES NO N/A | INSP FRAMING INSPECTION a ———————E————— Pole Ground Correctly Installed — Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed a Nuts, Eyenuts, Locknuts Installed & Tight vy Bolts Correct Length (1/2” - 2“) — SETTING INSPECTION Structure Plumb (4“, Top to Bottom) Angle Structure Raked (0-1"/10') (“a Crossarm(s) or Davit Arm(s) Level (1" ‘0’) uv Hardware in Vert. & Horiz. Alignment x Foundation Set to Correct Depth x H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete 7 Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) v Structure Plumb (4”, Top to Bottom) er | ee ne ee eS ee Angle Structure Raked (0-1"/10’) no Insulators Clean, Complete, & Aligned — Conductors Undamaged (Ahead Span) oa Conductors Properly Sagged (Ahead Span) ow Wraplock Ties Correctly Installed a ; Jumpers Correctly Installed INSPECTED: Alaska Energy Authority DATE G'S? INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / 47°35 9959 9". ES Tat SPECIFICA™ONS #32 “1S S8EC7 CN s = Fa AS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 74 3 PTA'S. Cy 4 POLE (HT &CL): 35-5 GUY ASSY’S: VOL a ANCHOR ASSY'S: 4/4 MISC. ASSY'S: NL FOUNDATIONTYPE: y/- P'lé H-PILEDEPTH: 7» OD” ExT: Mfg SPEC. REF. DESCRIPTION AERIAL} GRND. FRAMING INSPECTION Pole Ground Correctly Installed —| Roofs, Gains, & Holes Treated a Arm(s) & Brace(s) Correctly Located and Installed | Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1“/10’) VINNY 4 —- Crossarm(s) or Davit Arm(s) Level (1“/10') = Hardware in Vert. & Horiz. Alignment — Foundation Set to Correct Depth _ ++ t H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) aE peeliieiaiaet > Structure Plumb (4”, Top to Bottom) Cac Angle Structure Raked (0-1"/10') v a ene Insulators Clean, Complete, & Aligned Fieaucsaiaiminapame I Desisumsperapeeesentsmnces cir] vebenrmseum Gv omacvcs ecco ican eee eee] Cec Tica Conductors Undamaged (Ahead Span) ~ \ Conductors Properly Sagged (Ahead Span) a Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct al uo uw INSPECTED: Alaska Energy Authority DATE 3/5 S12 INSPECTED: POWER Engineer's Inc. BYF DATE / / INSPECTED: Copper Valley Construction BY: DATE / / BPRS IDS 9, 2512-7" SPEGIFICADIGNS eae <= aesC Cia say re aos STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. ) 49 PTA'S. ¢/AA POLE(HT&CL): 35-< GUY ASSY'S: ANCHOR ASSY'S: 4/4 MISC. ASSY’S: s/ p77 2- 7/ FOUNDATIONTYPE: 4, 22¢ H-PILE DEPTH: 7 «7 ExT: w//y ee DESCRIPTION AERIAL] GRND.| ves | NO | N/A | INSP eesti e | ——} FRAMING INSPECTION tt Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed VITAL i Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1“/10’) Crossarm(s) or Davit Arm(s) Level (1“/10’) Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct \ Ph \ H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) — FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) Vv | Structure Plumb (4”, Top to Bottom) a Angle Structure Raked (0-1”/10") Po Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) sr Wraplock Ties Correctly installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED : INSPECTED : Alaska Energy Authority POWER Engineer's Inc. INSPECTED: Copper Valley Construction BY: DATE / / BPRS 9S 9s “zS0T2-)° SPECIFICA™ONS FSP _ 15 24207 CN RTF AL STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 7 70 PTA’S. C/A POLE (HT & CL): 3s-s GUY ASSY’S: N/A ANCHOR ASSY’S: J /4 MISC. ASSY'S: N/a FOUNDATIONTYPE: jf_ PLE H-PILE DEPTH: , 9’ EXT: w/A oe DESCRIPTION GRND.| Yes | No | N/A | INSP —_——_—_——— — FRAMING INSPECTION || i Pole Ground Correctly Installed ae Roofs, Gains, & Holes Treated - Arm(s) & Brace(s) Correctly Located and Installed o — Nuts, Eyenuts, Locknuts Installed & Tight [Boits Correct Length (1/2” - 2”) - | SETTING INSPECTION Structure Plumb (4“, Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1"/10’) T a Hardware in Vert. & Horiz. Alignment — Foundation Set to Correct Depth uo H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete — Structure Correctly Faced (AH or BK) a FINAL INSPECTION — Structure Backfilled (12”, No Settlement) (Buried) r | j}-—_}- T Structure Plumb (4", Top to Bottom) | Angle Structure Raked (0-1"/10') 7 _—————— Insulators Clean, Complete, & Aligned ——__——_— Se Te en ee Conductors Undamaged (Ahead Span) ~ eae EEE Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Y Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Vv Anchor Assy(s) Complete and Correct Y Structure Area Neat and Clean N INSPECTED: Alaska Energy Authority BY! DATE “3/S'G INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / —_— —— ——— A7°32 9959 9%. Esc ra SPEGICAPIONS 27 5 3)2 ca=C- CNG VS eA STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. 7 7/ PTA'S. C/A POLE(HT&CL): 35-5 GUY ASSY’'S: J/4 ANCHOR ASSY’S: W/ /n MISC. ASSY'S: N/A FOUNDATION TYPE: “f - 7)'LE H-PILE DEPTH: 0’ EXT: w/g SPEC. REF DESCRIPTION AERIAL] GRND. | YES NO N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed uo Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight 41 4 Bolts Correct Length (1/2” - 2”) ~ SETTING INSPECTION | ere tne a | Rae eee a ES Structure Plumb (4“, Top to Bottom) a Angle Structure Raked (0-1“/10’) Crossarm(s) or Davit Arm(s) Level (1“/10') Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete “ Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4", Top to Bottom) | OY Angle Structure Raked (0-1"/10') m Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) a VA Wraplock Ties Correctly Installed INSPECTED: Alaska Energy Authority BYS 5 DATE B/S '] INSPECTED: POWER Engineer's Inc. BY: DATE t / INSPECTED : Copper Valley Construction A732 59 S99, seat SPECIFIGCAT ONSir Oo. ic Sa=C) G3, S| = ee ALS STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. / 7.2 PTA'S. 2/c7- | POLE(HT&CL): 35-5 GUY ASSY'S: 3/223 3/¢y7 3/e3-;oANCHOR ASSY'S: 2 /y. BLE MISC. ASSY'S: 47 9 Ay 4 cz FOUNDATION TYPE: 4/- Pz ¢ H-PILE DEPTH: / 9 ” EXT: w//g ae DESCRIPTION AERIAL] GRND.| Yes | NO | N/A | INSP | | FRAMING INSPECTION -— Pole Ground Correctly Installed ~ Roofs, Gains, & Holes Treated m— | Arm(s) & Brace(s) Correctly Located and Installed y_ ~ | | Nuts, Eyenuts, Locknuts Installed & Tight | Bolts Correct Length (1/2” - 2”) Tt | SETTING INSPECTION Structure Plumb (4”, Top to Bottom) a Angle Structure Raked (0-1“/10') - Crossarm(s) or Davit Arm(s) Level (1"/10') x | Hardware in Vert. & Horiz. Alignment ua Foundation Set to Correct Depth Y H-Pile Extension Weld Complete and Correct w/R H-Pile Mounting Bolt Hardware Tightened and Complete | Structure Correctly Faced (AH or BK) x FINAL INSPECTION Sp Structure Backfilled (12”, NoSettlement) (Buried) iH Structure Plumb (4", Top to Bottom) a Angle Structure Raked (0-1"/10’) \}\ Insulators Clean, Complete, & Aligned SS Conductors Undamaged (Ahead Span) 5 Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct (a Anchor Assy(s) Complete and Correct eZ Structure Area Neat and Clean 7 INSPECTED: Alaska Energy Authority BY DATE 3 / Ss iS 2 INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / ee STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. PTA'S. POLE(HT&CL): SS-4+ MISC. ASSY’S: A/a FOUNDATIONTYPE: ./. “LE SPEC. REF. DESCRIPTION FRAMING INSPECTION = Pole Ground Correctly Installed uM u r y Roofs, Gains, & Holes Treated o_ Arm(s) & Brace(s) Correctly Located and Installed - Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2" - 2”) Se SETTING INSPECTION | Structure Plumb (4“, Top to Bottom) 4 Pee eS Angle Structure Raked (0-1"/10') Y Crossarm(s) or Davit Arm(s) Level (1"/10') v Hardware in Vert. & Horiz. Alignment 7 . Foundation Set to Correct Depth uu H-Pile Extension Weld Complete and Correct “ H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) — | FINAL INSPECTION pee sft | Structure Backfilled (12”, NoSettl+ sent) (Buried) — | Structure Plumb (4", Top to Bottom) uw Angle Structure Raked (0-1“/10') vw | Insulators Clean, Complete, & Aligned “ Conductors Undamaged (Ahead Span) — Conductors Properly Sagged (Ahead Span) — Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed “ Jumpers Correctly Installed Guy Assy(s) Complete and Correct | Anchor Assy(s) Complete and Correct Structure Area Neat and Clean oo INSPECTED: Alaska Energy Authority : DATE S/ hae INSPECTED: POWER Engineer's Inc. BY: DATE ge INSPECTED: Copper Valley Construction BY: DATE / / | STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. | 73 PTA'S. @/ A POLE(HT&CL): 35 -<5- GUY ASSY’S: = /g ANCHOR ASSY’S: 4 /4 MISC. ASSY’S: /A FOUNDATION TYPE: ,/ — rg DESCRIPTION YES NO N/A | INSP —— = FRAMING INSPECTION UZ ————- + 1 Pole Ground Correctly Installed mo T or Roofs, Gains, & Holes Treated Uv Arm(s) & Brace(s) Correctly Located and Installed m— Nuts, Eyenuts, Locknuts Installed & Tight V “_ >" | T — Bolts Correct Length (1/2” - 2“) mo SETTING INSPECTION Structure Plumb (4”, Top to Bottom) v | nell orsersensenelicoeioneninealiaanimnanenal Angle Structure Raked (0-1"/10’) - Crossarm(s) or Davit Arm(s) Level (1“/10') im Hardware in Vert. & Horiz. Alignment Yv Foundation Set to Correct Depth - H-Pile Extension Weld Complete and Correct - H-Pile Mounting Bolt Hardware Tightened and Complete | (~~ Structure Correctly Faced (AH or BK) “ | -———_— Sp — FINAL INSPECTION = - z : T Structure Backfilled (12”, No Settlement) (Buried) uw —— Structure Plumb (4”, Top to Bottom) uv a ———_———++ + Angle Structure Raked (0-1”/10') x —————— ee eee Insulators Clean, Complete, & Aligned oY eT + SS] Conductors Undamaged (Ahead Span) Y Conductors Properly Sagged (Ahead Span) 4 Wraplock Ties Correctly Installed o Splices and/or Deadends Correctly Installed v Jumpers Correctly installed Tan Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct x~ | Structure Area Neat and Clean Y INSPECTED: Alaska Energy Authority BY* DATE 3/5 ‘UC INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / APSE IV Sy 9, ESE SPECIFICAONSiGS9). Bens" 03,4 7 sse eS 2 STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. , 74 PTA'S. «@/A POLE(HT&CL): 35-5 GUY ASSY‘S: N/A ANCHOR ASSY'S: yy /9 MISC. ASSY'S: /A FOUNDATION TYPE: H-PILE DEPTH: EXT: SPEC.. REF. DESCRIPTION FRAMING INSPECTION Pole Ground Correctly Installed a eTiatiin tee ; Roofs, Gains, & Holes Treated AERIAL} GRND. — Arm(s) & Brace(s) Correctly Located and Installed — Nuts, Eyenuts, Locknuts Installed & Tight Ww ma Bolts Correct Length (1/2” - 2“) SETTING INSPECTION Structure Plumb (4“, Top to Bottom) m- Angle Structure Raked (0-1“/10’) Crossarm(s) or Davit Arm(s) Level (1"/10') Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth “ H-Pile Extension Weld Complete and Correct ~ H-Pile Mounting Bolt Hardware Tightened and Complete — | Structure Correctly Faced (AH or BK) eet FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) a — | nsulators Clean, Complete, & Aligned a Conductors Undamaged (Ahead Span) a oo Conductors Properly Sagged (Ahead Span) Y Wraplock Ties Correctly Installed uo Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct a Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: pate 3/5 Gio INSPECTED: POWER Engineer's Inc. BY: DATE PINES: INSPECTED: Copper Valley Construction BY: DATE Weil | $7735 I9CI9N “FC T2-7" SPECIFIGAT'ONS cor | js SSC" ONS Sse A SPEC. REF. STRUCTURE INSPECTION REPORT STR.NO. ) 7 5 N/A ANCHOR ASSY’S: —_n/ /4 DESCRIPTION FRAMING INSPECTION 128002-01: SHUNGNAK - KOBUK TIE LINE POLE (HT & CL): GS-5 Pole Ground Correctly Installed Roofs, Gains, & Holes Treated Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2 - 2“) SETTING INSPECTION Structure Plumb (4, Top to Bottom) Angle Structure Raked (0-1“/10') Crossarm(s) or Davit Arm(s) Level (1“/10') Hardware in Vert. & Horiz. Alignment | H-Pile Extension Weld Complete and Correct | Foundation Set to Correct Depth H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12", No Settlement) (Buried) _|v/A| | MA Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10') Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: Go DATE BIS ee INSPECTED: POWER Engineer's Inc. BY: INSPECTED: Copper Valley Construction BY: geer23" SPECIFICA™ONS FS? _ SEeaiaC™ On, Si. = STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR.NO. / 7G PIAS. 225/12 F=f POLE (HT &CL): 3S -_5 MISC. ASSY'S: jy _2 - jy VA. FOUNDATIONTYPE: pf Py H-PILE DEPTH: 7G “ EXT: wl /g oar DESCRIPTION AERIAL| GRND.| YES | NO | N/A | INSP FRAMING INSPECTION r Pole Ground Correctly Installed “ (RNG onli —_|_| — Roofs, Gains, & Holes Treated en Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1"/10°) N/A Crossarm(s) or Davit Arm(s) Level (1°/10’) _ Hardware in Vert. & Horiz. Alignment uo Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12", NoSettlement) (Buried) Y- Structure Plumb (4”, Top to Bottom) j——_———+ pe ee Angle Structure Raked (0-1"/10’) a Insulators Clean, Complete, & Aligned ( iy Conductors Undamaged (Ahead Span) Yyv Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Y“ [ee Splices and/or Deadends Correctly Installed A i Jumpers Correctly Installed AT Guy Assy(s) Complete and Correct i Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: Alaska Energy Authority BY: DATED /S'& INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE Uf / Lowes X- asm howerec ba aa” CECA ONS coe ie easc Go, 2 ae m M7735 9954 9, EST Ia $?) STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. Wee PTA'S. C/A POLE(HT&CL): 35-5 GUY ASSY'S: w/a ANCHOR ASSY'S: 4) / MISC. ASSY'S: w/4 FOUNDATIONTYPE: yf PLE H-PILE DEPTH: 7 6 ’ EXT: A/y a DESCRIPTION AERIAL] GRND.| YES | NO | N/A | INSP + $$ FRAMING INSPECTION — Pole Ground Correctly Installed tructure Plumb (4, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1“/10') Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct Structure Correctly Faced (AH or BK) Structure Backfilled (12"”, NoSettiement) (Buried) Structure Pliimb (4", Top to Bottom) Roofs, Gains, & Holes Treated — Arm(s) & Brace(s) Correctly Located and Installed a Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2") Y | SETTING INSPECTION Ss H-Pile Mounting Bolt Hardware Tightened and Complete | FINAL INSPECTION — \ Angle Structure Raked (0-1”/10") ee eee eee ee ee Insulators Clean, Complete, & Aligned Y Conductors Undamaged (Ahead Span) Y Conductors Properly Sagged (Ahead Span) v Wraplock Ties Correctly Installed Y Splices and/or Deadends Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct INSPECTED: Alaska Energy Authority BY: INSPECTED: POWER Engineer's Inc. BY: INSPECTED: Copper Valley Construction BY: 47°32 59599" Jumpers Correctly Installed Structure Area Neat and Clean v DATE 3S 'Z2~ DATE / / DATE / / STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE POLE(HT&CL): 3S-S SPEC. REF. DESCRIPTION YES NO N/A | INSP FRAMING INSPECTION Pole Ground Correctly Installed = Roofs, Gains, & Holes Treated | | Arm(s) & Brace(s) Correctly Lu ated and Installed - Nuts Eyenuts, Lx <nuts Installed & Tight ( Bolts Correct Length (1/2" - 2") Y SETTING INSPECTION Structure Plumb (4”, Top to Botte n) < | Angle Structure Raked (0-1“/10’) = Crossarm(s) or Davit Arm(s) Level (1“/10’) = Hardware in Vert. & Horiz. Alignment o— Foundation Set to Correct Depth uo H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete ~ Structure Correctly Faced (AH or BK) Y FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) vr Structure P'! ~b(4", Top to Bottom) Vv Angle Structure Raked (0-1/10') v Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly installed Yv Splices and/or Deadends Correctly Installed . Jumpers Correctly Installed Y v Guy Assy(s) Complete and Correct [anchor As) Completeanatorea «di S| ‘72 Structure Area Neat and Clean 5 ; : = INSPECTED: Alaska Energy Authority : / Qe. ___ DAT 3 1S INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / u 40°35 997 4, ds ad SPECIFICA™ONS F359. WE ZaeO C8, 5 Fe A STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. PTA'S. C 9-2 POLE(HT&CL): 35-5 GUY ASSY'S: //7/.3 1/23-0 ANCHOR ASSY'S: 7 Jy PLE MISC. ASSY'S: 2 -// HY fas -2/ _2fm5-5 __'/ 5-10 FOUNDATION TYPE: H-PILE DEPTH: EXT: a DESCRIPTION AERIAL} GRND. | YES NO N/A INSP FRAMING INSPECTION Pole Ground Correctly Installed —_ ene eel Roofs, Gains, & Holes Treated m es ——_}— + —— +> Arm(s) & Brace(s) Correctly Located and Installed — Nuts, Eyenuts, Locknuts Installed & Tight v oo $$$ Bolts Correct Length (1/2” - 2”) e SETTING INSPECTION Structure Plumb (4”, Top to Bottom) —_— Angle Structure Raked (0-1“/10’) L u Crossarm(s) or Davit Arm(s) Level (1“/10') a “ ee Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Bur'ed) “ Structure Plumb (4", Top to Bottom) Angle Structure Raked (0-1“/10') =~ a Insulators Clean, Complete, & Aligned uu Conductors Undamaged (Ahead Span) uv Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Uo Splices and/or Deadends Correctly Installed Y Jumpers Correctly Installed i Guy Assy(s) Complete and Correct LZ Anchor Assy(s) Complete and Correct Z Structure Area Neat and Clean — | INSPECTED: Alaska Energy Authority BY? DATE SIS! INSPECTED: POWER Engineer's Inc. BY: DATE / o/s INSPECTED: Copper Valley Construction BY: DATE / / 7°35 99a 9, BCI 2-7 SPECIFICAONS eS? NE SaSCT CN SREP A STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE STR. NO. / Bo PTA'S. C/A POLE(HT&CL): 35-57 GUY ASSY'’S: w/4 ANCHOR ASSY’S: ALA MISC. ASSY’S: w/a FOUNDATION TYPE: yf, 'c H-PILE DEPTH: 79” EXT: J/4 ao DESCRIPTION AERIAL] GRND. NO N/A | INSP — FRAMING INSPECTION L eeesmneregpe pmeniscasies Ni cient Pole Ground Correctly Installed —— Roofs, Gains, & Holes Treated “ —_—— - Arm(s) & Brace(s) Correctly Located and Installed a Nuts, Eyenuts, Locknuts Installed & Tight aa Bolts Correct Length (1/2” - 2") 7 | | SETTING INSPECTION | Structure Plumb (4”, Top to Bottom) uo | _ Angle Structure Raked (0-1“/10') + ——— — Crossarm(s) or Davit Arm(s) Level (1“/10’) um Hardware in Vert. & Horiz. Alignment = Foundation Set to Correct Depth m | | a eel H-Pile Extension Weld Compiete and Correct Ye H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12", No Settlement) (Buried) is (_ Structure Plumb (4, Top to Bottom) _ fear nm aN cep eee Pea pv Fd a Tim Angle Structure Raked (0-1"/10’) — Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed Jumpers Correctly Installed - : x | Guy Assy(s) Complete and Correct - uo Anchor Assy(s) Complete and Correct Structure Area Neat and Clean ~ ~~ INSPECTED: Alaska Energy Authority BY: DATE 3/S'% INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / / 7°35 39599 a SPECIFICATIONS eS? _ *ic\EasG” O45 WS Se A STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE POLE(HT&CL): 35-5 B/EI- 9 P GUY ASSY'S: 3/e7-3 3/€3-0 ANCHOR ASSY'S: MISC. ASSY'S: //4y 9 -// FOUNDATIONTYPE: 4/- ze H-PILE DEPTH: so” EXT: /g SPEC. REF DESCRIPTION AERIAL] GRND. | YES NO N/A INSP FRAMING INSP N — G INSPECTIO _| Pole Ground Correctly Installed — —— Roofs, Gains, & Holes Treated — = jj} — Arm(s) & Brace(s) Correctly Located and Installed a“ | ; a a peal Nuts, Eyenuts, Locknuts Installed & Tight a fp pa Bolts Correct Length (1/2” - 2”) um SETTING INSPECTION anaes | ceases | Structure Plumb (4“, Top to Bottom) Angle Structure Raked (0-1"/10’) Crossarm(s) or Davit Arm(s) Level (1“/10') - Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct — H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, No Settlement) (Buried) on ——————] —_—____——. Angle Structure Raked (0-1“/10') - Insulators Clean, Complete, & Aligned Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed on ya — Structure Plumb (4", Top to Bottom) Vv Pr - CH Jumpers Correctly Installed Guy Assy(s) Complete and Correct Anchor Assy(s) Complete and Correct pet INSPECTED: Alaska Energy Authority BY: LC. DATE 3! Ss &oQ INSPECTED: POWER Engineer's Inc. BY: DATE INSPECTED: Copper Valley Construction BY: DATE / / NOTE £ LIGHTNING ARRESTORS NOT INSTALLED 3-6-2 MPRS IT 9, Esa SPECIF CATIONS 659 NZ ERECT ON SV -TER A STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE MISC. ASSY'S: 4/7 9 .5A FOUNDATION TYPE: “f- Diy ec H-PILE DEPTH: / Te DESCRIPTION GRND. FRAMING INSPECTION Pole Ground Correctly Installed ——_—_—_— | es Roofs, Gains, & Holes Treated 1 STR.NO. / 92 PTA'S. 97.3 - 5 POLE (HT & CL): 35-<s GUY ASSY'S: —_/7 ANCHOR ASSY'S: 4, )/z , 6 EXT: J/m YES NO N/A | INSP Arm(s) & Brace(s) Correctly Located and Installed Nuts, Eyenuts, Locknuts Installed & Tight Bolts Correct Length (1/2” - 2”) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10') Crossarm(s) or Davit Arm(s) Level (1"/10’) Hardware in Vert. & Horiz. Alignment Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct H-Pile Mounting Bolt Hardware Tightened and Complete Structure Correctly Faced (AH or BK) FINAL INSPECTION Structure Backfilled (12”, NoSettlement) (Buried) Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1"/10’) Insulators Clean, Complete, & Aligned — Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed Splices and/or Deadends Correctly Installed . Jumpers Correctly Installed Guy Assy(s) Complete and Correct ———————<$——— ss \\N\N\——_— qi —__ + ___ —_— VN Hh Anchor Assy(s) Complete and Correct Structure Area Neat and Clean INSPECTED: POWER Engineer's Inc. BY: INSPECTED: Copper Valley Construction BY: QI-3E 49949, “ESD SPECIFICA™ONS 659 9224207 CN a = 7F INSPECTED: Alaska Energy Authority BY: e DATE 3/S'Y STRUCTURE INSPECTION REPORT 128002-01: SHUNGNAK - KOBUK TIE LINE and STR.NO. , 92 PA'S. OO D_/ POLE(HT& CL): FO GUY ASSY‘S: ANCHOR ASSY'S: MISC. ASSY'S: j/7 2—«/ Jf FOUNDATION TYPE: Jy — Jy & H-PILE DEPTH: Jo “ EXT: aa DESCRIPTION AERIAL] GRND.| YES | NO | N/A | INSP | FRAMING INSPECTION L-| — | | Pole Ground Correctly Installed a Roofs, Gains, & Holes Treated uu Arm(s) & Brace(s) Correctly Located and Installed ee TC Nuts, Eyenuts, Locknuts Installed & Tight —— | Bolts Correct Length (1/2” - 27) SETTING INSPECTION Structure Plumb (4”, Top to Bottom) Angle Structure Raked (0-1°/10') Foundation Set to Correct Depth H-Pile Extension Weld Complete and Correct Structure Correctly Faced (AH or BK) FINAL INSPECTION fo oe 4 || Structure Backfilled (12”, NoSettlement) (Buried) mi ue Structure Plumb (4”, Top to Bottom) || Angle Structure Raked (0-1°/10") _ Insulators Clean, Complete, & Aligned u Conductors Undamaged (Ahead Span) Conductors Properly Sagged (Ahead Span) Wraplock Ties Correctly Installed ce | | | = fumpescorecivisaeg dT id de | [Teuyassicompleteanacores dT SY | Anchor Assy(s) Complete and Correct fo | Structure Area Neat and Clean w | . ‘ x a: INSPECTED: Alaska Energy Authority By> 1 Ce DATE LS g INSPECTED: POWER Engineer's Inc. BY: DATE / / INSPECTED: Copper Valley Construction BY: DATE / /