Loading...
HomeMy WebLinkAboutEmerging Energy Tech Fund Advis meeting Agenda 5-1-2012Emerging Energy technology Fund Advisory Committee Meeting = ALASKA... Wednesday, May 2° ame ENERGY AUTHORITY AGENDA - Updated 05/01/2012 Location: Denali Commission East Conference Room 510 L Street, Suite 410 Phone: 877-446-3914, participant PIN: 225331# Time: 9:00am — 5:00pm The objective of this meeting is for the Emerging Energy Technology Fund Advisory Committee (EETF-AC) to review abstract scoring by committee members, to discuss the resulting scores, and to formulate a ranked project list for the Alaska Energy Authority to consider for making full proposal project ranking decisions. This meeting will be conducted by electronic media pursuant to AS 42.45.375 and AS 44.62.310. The public is invited to attend. The State of Alaska (AEA) complies with Title Il of the Americans with Disabilities Act of 1990. Persons requiring special accommodations to participate should contact AEA staff at (907) 771- 3028 to make arrangements. For additional information, please contact Jason Meyer, interim EETF Program Manager, at (907) 771-3027 or eetf@aidea.org Chair: Brian Hirsch 9:00am Introductions e Committee and Staff Introductions e Public Introductions e Housekeeping 9:15am Public Comment Period — 3 minutes each 9:30am Discussion and Declaration of Conflict of Interest 9:45am BREAK 10:00am Overview of Sorted Results 10:30am Ranking Discussion 12:00pm LUNCH 1:00pm Ranking Discussion (continued) 2:00pm Ranking Recommendation 2:30pm Formulation of Questions for Ranked Projects 813 West Northern Lights Boulevard Anchorage, Alaska 99503 1 907.771.3000 Toll Free (Alaska Only) 888.300.8534 F 907.771.3044 Project Number Appl Application Title Project Cost Requested Amount_Match Amount ___Match/ Cost Tech Type 001 [Alaska Applied Sciences Solid State Ammonia Synthesis(SASS) $1,000,000] $750,000 $250,000 25.00%] Energy Storage (002 [Alaska Applied Sciences Design & Tooling for Thin-shell Concrete Structures $420,000 $320,000) $100,000 23.81%| _ Energy Efficiency 003 Alaska Division of Forestry Biomass Reforestation for Alaska Boreal Forests $90,000) $45,000) $45,000 50.00% | Biomass oe cy of Bethel tauited ‘and Compressed Natural Gas as a Bridge to Reducing Energy Costs in Rural $923,057 $718,120 $208,977] aaa Cd ast 005 fe et Alaska Renewable |< oy, & ice Supported Wind Energy Powerplant $944,600 $738,000] $206,600] 21.87% Wind ne 006, [Arctic Sun LLC lArctic Thermal Shutters & Doors $150,000 $120,000] $30,000] 20.00%| Energy Efficiency 007 linitestone ower ond Poncelet Kinetics RHK100 Prototype $1,394,177 $1,394,177 $0 0.00%] —_Hydrokinetic Communications 008 lLammergeier Cleantech [Alaska Sewage Sludge Energy Conversion Plant Demonstration $10,377,320) $1,500,000 $8,877,320 85.55% Biomass 009 Genesis Machining and Fabrication | Diesel-Electric Propuplsion & Ultra-Efficient Generators $546,232 $247,036 $299,196 s477x| eee jeneration 010 [Archipelago Marine Energy Marine Hydrokinetic Plant Development for Southeast Alaska $697,000: $521,000} $176,000) 25.25% | Hydrokinetic o11 Arctic Solar Solutions Feasibility of Full Solar Transportation: Using Solar to Power Bicycles and Mopeds $47,305} $45,895 $1,410) 2.98% Solar 012 The Auction Block Co. Solid-Fuel Absorption Refrigeration $1,547,500) $547,500] $1,000,000 462% Biomass : 7 = aiDEG = ae Distributed Generation Technologies, Demonstration of Aqua Flux”, a Distributed Hydrokinetic Generation System, at cians aa ane onl Gplcemen uc Olive Creek Mine 017 Sitka Sound Science Center ‘Seawater Intake Wet Well and Pump Station District Loop $891,586] $755,986) $135,600) 15.21%| Hydrokinetic i Pilot-t 018 Philip W. Kithil, dba Atmocean-Alaska |PeP!°¥ing and Operating a Pilot-Scale Array of the Atmocean Wave Energy/Sequestration) ang 345 $408,345 so 0.00%] —_Hydrokinetic [Technology (West™) in Yakutat 023 Tundra Greens [Tundra Greens $1,610,100] $1,188,700 $421,400 26.17% Wind 024 [Goldstream Solar Motion-Free Tracking Solar Concentrator for Fiberoptic Daylighting $458,000 $458,000 $0) 0.00% Solar 025 EarthRun Energy [Cnidaria System $62,750 $50,000] $12,750 20.32%| __Hydrokinetic 026 ee ee [Cold Climate Ground Source Heat Pump Demo $143,778 $119,467 $24,311 16.91%] Geothermal nter 027, Energy Efficiency Evaluations, LLC | Wind-Diesel-Storage Modeling Project $120,000] $100,000] $20,000 16.67%] Energy Storage 028 UAF [Enhanced Condensation Technology for Organic Rankine Cycle $201,481) $171,313 $30,168 14.97%] Heat Recovery os ae [Design and Verification of a High-Temperature Exhaust Thimble for Increased Building $93,688 su7ase $5,704 6.18%] Energy Efficiency Energy Efficiency and Safety 030) UA Electronic Submersible Pump as a Hydrokinetic Turbine $429,464) $296,741, $132,732] 30.91%| _Hydrokinetic 031 UAF Vertical Axis Wind Turbine for Stand alone Systems $617,300 $503,027| $114,273 18.51% Wind 032 [OM ine. Heat Recovery project $3,000,000} $1,500,000] $1,500,000 50.00% Biomass 033 Volcano View Partnership Village DC Micro-grid/storage/Renewable Energy $540,000 $500,000 $40,000] 7.a1%| Energy Storage 034 llumiTek, LLC ‘Smart Lighting Technology Project $1,495,327 $1,383,657 $111,670) 7.47%] _ Energy Efficiency 035 [Altaeros Energies, Inc. Low Cost Airborne Wind Turbine for Remote villages $1,360,000} $740,000 $620,000) 45.59% i 037 [Oceana Energy Company Hydrokinetic Device Evaluation $2,073,000} $1,453,000 $620,000) 29.91%| __Hydrokinetic 038 Hotel McGrath, LLC Peat Fuel $720,000) $570,000 $150,000 20.83% Biomass 039 Hera Energy Pulse Steam Hydrokinetic Power $1,445,000} $750,000 $695,000) 48.10%| _Hydrokinetic 040 [ABS Alaskan, Inc. VIVACE Hydrokinetic Power Generator System $900,000 $750,000 $150,000) 16.67%| __Hydrokinetic 041 [UAF Bristol Bay Campus Dillingham Hydrokinetic Project $1,041,787| $749,561 $292,226 28.05%| __Hydrokinetic 042 Fie ease Determining Fuel Savings for Fuel Catalysts Deployed in the Seafood Industry $202,000! $166,000] $36,000) 17.82%) Diesel Generation Foundation Efficiency 043, fORPC Rivgen Power System Commercialization $1,726,685! $1,491,750 $234,935) 13.61%| __Hydrokinetic 044 ea chenate tiene nese Production of Fly Ash-Based Geopolymer Cements $622,000] $559,000] $63,000 10.13%] Energy Efficiency enter 045 Hatch [Application of Composite Flywheels $1,189,500 $672,500] $517,000 43.46%] Energy Storage 046 Polarconsult Alaska, Inc. High Voltage Direct Current Transmission System $1,600,000 $1,500,000 {$100,000 6.25% Intertie 047 (City of Nenana [Outdoor Lighting Retrofit and Control System Project $157,106 $126,906] $30,200 19.22%| Energy Efficiency 048) [Chininik Wind Group Electric All Terrain Vehicles $80,000 $8,000} $0 0.00%] Energy Efficiency (049) Intelligent Energy Systems Self Regulated Wind Diesel Grid Using Electric Thermal Storage Units $485,634 $465,634) $20,000 4.12% Wind 050 Intelligent Energy Systems: Enhanced Smart Grid Services for the Chaninik Wind Group $655,000) $630,000) $25,000 3.82% Wind i eel ; 051 Intelligent Energy Systems emia seed Eye 2S See, Neer ars ond rae eee eet | 51,086,750) $1,025,750 $30,000] 2.84% wind 052 [Alaska Dynamics Delta T Wood Stove Generator Project $410,400 $291,900 $118,500) 28.87% Biomass 053 sim’s Welding [Waste Heat Home Power System (WHHPS) $266,150) $174,750 $91,400 34.34% Biomass (054 ‘Alaskan Burner R&D Blue Flame Burners to Improve Fuel Oil Stove Efficiency $467,120) ‘$400,000 $67,120 14.37% Fuel 055 New Hope Refrigeration Zeolite Refrigeration Through Electro-Desorption $380,000) $345,000 $35,000 9.21% Biomass 056 a poe Renewable Liquid Hydrocarbon Fuels from Industrial Processes $500,000) $375,000 $125,000) 25.00% Fuel vices, In 087 tia Vidor Riva Inter Urteel [Marine Environmental Solution Pre-Combustion Catalyst Injection System Test Project $335,747 $286,918] $48,830 14:5ax| Diesel Generation Watershed Council Efficiency 058 Boschma Research, Inc "BRI Cyclo-Turbine™ for Energy Production” $944,131 $769,428 $174,703 18.50%| __Hydrokinetic 059 Benthic GeoScience Inc [Acoustic Environemntal Hazard Evaluation for Riverine Hydrokinetics $196,205 $196,205] $0 0.00%] _Hydrokinetic I ie ascik ce perimental Modular Prototype Construction for Isolated Hybrid Energy Systems in eae se00.s80 $87,500 aioe eaee co 061 Marsh Creek Development of High Efficiency Diesel Electric Generator Set for Energy Projects in Alaska | $752,787 $677,508 $75,279 10.00%| Praat | 062 Marsh Creek [Development of Electric Thermal Storage for Hybrid Energy Projects in Alaska $1,298,750} $1,175,766| $122,984) 9.47% Storage laska it 064 een Paenson [A Standard Approach to Industrial Energy Efficiency £3 (Economy, Energy, Environment) $462,700 $300,700] $162,000 35.01%| Energy Efficiency nc 065 DDI Energy, incorporated IARC Power Generation Systems $550,000) $385,000 $165,000) 30.00% Fuel Cells 066 NANA Regional Corporation Dynamic Grid Balance for Isolated Diesel Power Grid $500,000] $430,000 $70,000 14.00% | ee ribution 068 NANA Regional Corporation (Micro-CHP Development with the Infinia CHP System in NW Alaska $375,000 $305,000] $70,000 18.67% CHP ¥ ti nl a Rann teuiohal Coredrailén [Dynamic Modeling of High-Penetration Wind-Diesel System and Deployment of Lithium 814 008! evaaoo $30,000 a wel lon Energy Storage System 070 Kawerak, Inc. [Kawerak Inc., Native Village LED Lighting Demonstration Project $459,587 $450,656] $8,931 1,94%| Energy Efficiency on Northwest Arctic Borough Arctic Field Testing and Power Curve Verification of the Renewegy VP-20 Wind Turbine $348,300 $293,300 $55,000 15.79% Wind 072 Titan Oil Recovery, Inc. Microbial Enhanced Oil Recovery Demonstration Project - Cook Inlet, Alaska $1,430,000 $730,000] $700,000 48,95%| Enhanced Oil Recovery| Project Cost Requested Amount Match Amount