Loading...
HomeMy WebLinkAboutREFAC Meeting documents 11-15-2012 Renewable Energy Fund Update (as of November 9, 2012) Current Status e Rounds | - V Grant and Funding Summary OTC UO SOO LOO AY OTC ALASKA — ENERGY AUTHORITY Applications Received Projects Funded 79' 30 25 74 19, 227 Grants in Place 73 28 20 60 6 187 Grants Completed” 33 7 1 1 42 Grants Cancelled i 2 5 0 14 Amount Requested ($M) $ 453.8 $ 293.4 $ 223.5 $ 123.1 $ 132.9 $ 1,226.7 AEA Recommended ($M) $ 100.0 $ 368 $ 65.8 $ 36.6 $ 43.2) $ 282.4 Appropriated ($M) $ 100.0 $ 25.0 $ 25.0 $ 26.6 $ 25.9 $ 202.5 Cash Disbursed ($M) $ 63.4 $ 18.1 $ 10.9 $ 91 $ 7.8 $ 109.3 Match Provided ($M)* $ 20.7 $ 22.6 $ 10.5 $ 34.6 $ 82 $ 96.6 coatibatiom from other sources ($M) $ 92 $ 16 $ 08 $ 145 $ 0 $ 26.1 Available for reallocation ($M) $ 0 $ 0 $ 02 $ 0 $ 9 $ 0.2 1. Includes eleven projects from an earlier solicitation issued by AEA. 2. Represents Grant Awards that are fully executed, completed and closed. 3. These totals are for awarded grants only. Awarded amounts by Round: Round 1 $ 86,239,103 Round 2 $ 21,848,710 Round 3 $ 18,441,745 Round 4 $ 28,214,169 Round 5 $ 11,893,720 The above information is the budgeted amounts for those awards that have been issued. Renewable Energy Fund Round VI Applicant Statistics Number of applications by type (if multiple types were selected, all types are counted) 30 ~—— a es I sh 20 Number of Applicants by Phase 60 50 40 30 20 10 Recon Feasibility Design Construction Number of Applicants by Region 20 18 Renewable Energy ~.nd - Round 6 Rarrow , s DRAFT ¢ Hydro A Geothermal @ Heat Recovery “Transmission Yukon-Koyukuk/ % Other poe Upper T; ene % Solar a x Wind Fairba Khe A 8 & Biomass 31 s3) 3 oO e bs) © ® 3 3 Railbelt Copper River, Valdez Chugach $530 Wasilla Palme a7 Anchoraggt’ 960@ 7”? 943 a 218 gr we 0) 65 Kenai A \/ wae ae A 978 ‘ eee 93 907 BSE © : Sitka ¢, 905” 974, “T906 409 16h 910 m chikan od Aleutians oO oof 0 75 150 300 — ALASKA __. AUTHORITY Miles 83 Applications advanced to Stage 2 Review. Prepared by AEA Energy Data/GIS - 10/24/12 Alaska Energy Authority Renewable Energy Fund Round 6 - Applications Project Name Applicant Name Grant Request Karluk Tribal Council - Wind Energy System Karluk Tribal Council $81,000 902 |Jack River Hydroelectric Project Feasibility Study Native Village of Cantwell $213,750 903 |Northwest Arctic Borough Solar PV Northwest Arctic Borough $75,000 904| Dimond Park Library Geothermal HVAC System City & Borough of Juneau $700,000 905 |HydroPower Surplus to Stored Hydrogen Feasibility Study The Southeast Alaska Power Agency $244,385 906 | Coffman Cove Hydropower Line Extension City of Coffman Cove $175,000 907| Petersburg Community Heating System Retrofit Feasibility Study |City of Petersburg $46,750 908 | Tazimina Hydroelectric Project Capacity Increase INN Electric Cooperative, Inc. $160,000 909 | Mahoney Lake Hydroelectric Project: Phase III City of Saxman $1,000,000 910 |Igiugig Wind Turbine Design Lake and Peninsula Borouah $205,000 911|Levelock Wind Reconnaissance Study Lake and Peninsula Borough $10,000 912|Egegik Wind Feasibility Study Lake and Peninsula Borough $80,000 913}Stetson Creek Diversion/Cooper Lake Dam Facilities Project Chugach Electric Association, Inc. $3,453,920 914/Connelly Lake Hydroelectric Project Alaska Power & Telephone Company $1,752,000 915|Eagle Solar Array Project Alaska Power Company (APC) $132,600 916|Hydaburg Schools Wood Fired Boiler Project Hydaburg City Schools $20,000 917|Blue Lake Hydroelectric Expansion Project City & Borough of Sitka (CBS) $4,000,000 918/West Creek Hydroelectric Project Municipality of Skagway Borough $236,000 919| Metlakatla-Ketchikan Intertie Metlakatla Indian Community (MIC) $9,570,434 920] Walker Lake Hydro Feasibility Project Tlingit-Haida Regional Electric Authority $640,000 921|/AVCP RHA Wood Biomass Heating System AVCP Regional Housing Authority $3,149,387 922|Gartina Falls Hydroelectric Project Inside Passage Electric Cooperative $6,694,000 923|Afognak Biomass Feasibility Study Native Village of Afognak $170,974 924|Seward Schools Biomass Heating System Kenai Peninsula Borough School District (KPBSD) $1,367,464 925|Upper Tanana Biomass CHP Project Alaska Power & Telephone Company $1,990,000 926|AGSD District Heat Loop Project Alaska Gateway School District $2,753,364 927|Galena Community Wood Heat Project City of Galena $2,787,719 928 | Bathymetric survey and marine geological study City of Ouzinkie $356,400 929|Waterfall Creek Hydroelectric Project City of King Cove $2,600,000 930 Allison Creek Project Copper Valley Electric Association, Inc. (CVEA) $6,114,000 931|Nenana Collaborative Biomass Heating System Project Nenana City School District $466,890 932|Design and Construction of Biomass Systems in Interior Villages __|Interior Regional Housing Authority $1,314,380 933 |Biomass Feasibility Studies in Public Facilities, Interior Region Interior Regional Housing Authority $168,959 934|Savoonga Heat Recovery System - Power Plant to Water Plant City of Savoonga $425,701 935 |Atmautluak Washeteria Heat Recovery Project Atmautluak Traditional Council $350,000 936|Heat Recovery for the Water System City of Chuathbaluk $199,863 937|Heat Recovery for the Water Treatment Plant and Washeteria Native Village of Kwinhagak $668,350 938| Feasibility Study and Conceptual Design of Tenakee Inlet Inside Passage Electric Cooperative $3,485,000 939|Stebbins Heat Recovery Project Alaska Village Electric Cooperative, Inc. $1,319,088 940| Heat Recovery for the Water Treatment Plant / Community Store _|City of Marshall $183,200 941|Heat Recovery for the Water Treatment Plant City of Noorvik $985,805 942|Heat Recovery for the Water Treatment Plant/Washeteria Native Village of Tuntutuliak $425,811 943/OIT Inc Waste Heat Turbine Project OIT Inc. $1,629,223 944 |New Stuyahok Heat Recovery Southwest Region School District $498,000 945|St. Mary’s / Pitka’s Point Wind Energy Project Alaska Village Electric Cooperative, Inc. $5,538,592 946 |Shungnak Solar Energy Construction Project Alaska Village Electric Cooperative, Inc. $585,000 947|Marshall Wind Energy Design and Permitting Project Alaska Village Electric Cooperative, Inc. $332,500 948] Wales Wind Energy Feasibility and Conceptual Design Project Alaska Village Electric Cooperative, Inc. $190,000 949|Kotlik Wind Energy Feasibility and Conceptual Design Project Alaska Village Electric Cooperative, Inc. $142,500 950|Russian Mission Wind Feasibility and Conceptual Design Project _ {Alaska Village Electric Cooperative, Inc. $142,500 951/St. Michael/Stebbins Wind Energy Final Design and Permitting Alaska Village Electric Cooperative, Inc. $332,500 952|Cosmos Hills Wind Resource and Intertie Assessment Alaska Village Electric Cooperative, Inc. $221,350 953|Hotham Peak Wind Resource and Intertie Assessment Alaska Village Electric Cooperative, Inc. $207,100 954/|St. Mary’s / Mountain Village Wind Energy Intertie Final Design _| Alaska Village Electric Cooperative, Inc. $332,500 955/St. Mary’s / Pilot Station Wind Energy Intertie Construction Alaska Village Electric Cooperative, Inc. $5,581,800 | 956|Goodnews Bay Wind Energy Feasibility and Conceptual Design Alaska Village Electric Cooperative, Inc. $142,500 957|Shishmaref Wind Energy Feasibility and Conceptual Design Alaska Village Electric Cooperative, Inc. $142,500 959|Ticasuk Brown School Pellet Boiler Project-Phase 2 Fairbanks North Star Borough (FNSB) $350,000 960|TidGen™ Array Project ORPC Alaska 2, LLC $2,000,000 961|Atka Wind Power Project City of Atka $140,000 962|Manokotak Wind & Heat Feasibility Study Manokotak Power Company $193,000 963|Mount Makushin Geothermal Project The Aleut Corporation $32,464,000 964|Excursion Inlet Hydro Project- Phase II Haines Borough $213,536 965|Haines Borough Pellet Heating Project Haines Borough $472,000 966 | High-penetration Wind Energy Project- Kokhanok Kokhanok Electric $185,000 967 |Cold Bay Waste Heat Recovery Project G&K Electric Utility $109,765 968|False Pass Wind Energy Project City of False Pass Electric Utility $185,195 969|Nelson Lagoon Wind Energy Project Nelson Lagoon Electric Cooperative $218,195 970|Kipnuk Wind Diesel Power Generation and Heating Kipnuk Light Plant $2,567,778 971|Eastern Copper Basin Geothermal Assessment Copper Valley Development Association $695,950 972|Akiak Wind Resource Assessment Akiak Native Community/ Akiak IRA Council $181,000 973|Elim Geothermal Resource Assessment I Feasibility City of Elim $527,908 974| Neck Lake Hydro Project Alaska Power Company (APC) $297,600 975 |Juniper creek Hydroelectric Project Feasibility Study Ram Valley LLCA $127,900 976| Knutson Creek Hydroelectric Project Design and Permitting Pedro Bay Village Council $290,000 977|Carlo Creek Hydroelectric Project Reconnaissance Study Native Village of Cantwell $66,500 978 | Indian River Hydroelectric Project Construction City of Tenakee Springs DBA Tenakee Springs Electric Dept $2,988,000 979 |Waste-to-Energy Feasibility Study Chugach Electric Association, Inc. $550,000 980 | Bristol Bay Borough School District Energy Project Bristol Bay Borough School District $45,000 981/Tanana Solar Domestic Hot Water Heating Project City of Tanana $81,700 982|Community Facilities Woody Biomass Space Heating Project Mentasta Traditional Council $460,000 983|Wood Heat Feasibility Study and Conceptual Design Organized Village of Kake $30,700 984 | Noatak Wind Resource Assessment Noatak IRA $181,000 October 22, 2012 Applications Advanced to Stage 2 i $122,412,486 (@8BED ENERGY AUTHORITY