HomeMy WebLinkAboutFY18 PCE Statistical Report Utility
STATISTICAL REPORT
of the
POWER COST EQUALIZATION
PROGRAM
Fiscal Year 2018
July 1, 2017 - June 30, 2018
Thirtieth Edition
October 2019
State of Alaska
Mike Dunleavy, Governor
Alaska Energy Authority
TABLE OF CONTENTS
Map of Participating Utilities/Communities ........................... 1 List of Participating Utilities/Communities ............................. 3 Program Highlights ............................................................... 4 Fiscal Year 2017 vs. 2018 .................................................... 5 Fiscal Year 2018 Statistics .............................................. 6-25 Historical Trends Fiscal Years 2009 - 2018 ........................ 26
The Alaska Energy Authority (AEA) complies with Title II of the Americans with Disabilities Act of 1990. This publication is
available in alternative communications formats upon request. Please contact the Authority at (907) 771-3000 to make any
necessary arrangements.
Data for the Power Cost Equalization Annual Statistics is primarily based on information submitted by the utility. Changes to the
reported data and/or significant anomalies have been noted in the comments section.
Data for prior fiscal years does not include data collected after the publication of the PCE Annual Statistics Report for that fiscal
year. Data for this fiscal year reflects only those monthly PCE reports that have been processed prior to publication.
Chignik Lake
Eek
RubyNome
Kake
Elim
Wales
Slana
MintoKoyuk
KobukKiana
Ekwok
Craig
Anvik
Aniak
Akiak
Togiak
Tetlin
Teller
Tanana
Nulato
Noatak
Newtok
Naknek
Kotlik
Kipnuk
Karluk
Kaltag
Huslia
Hughes
Hoonah
Haines
Galena
Egegik
Circle
Chevak
Bethel
Beaver
Angoon
Ambler
Akhiok
Yakutat
Venetie
Tununak
Takotna
Skagway
Selawik
Rampart
Pelican
Nuiqsut
Noorvik
Nikolai
Naukati
McGrath
Klukwan
Klawock
Iliamna
Igiugig
GolovinGambell
Emmonak
Diomede Deering
Cordova
Chitina
Chignik
Chenega
Central
Atqasuk
Tuluksak Tatitlek
Stebbins
St. Paul
Shungnak
Shageluk
Savoonga
Platinum
Ouzinkie
Newhalen
Napakiak
Mentasta
Mekoryuk
Marshall
Levelock
Kwethluk
Kotzebue
Kokhanok
Kivalina
Kasigluk
Kaktovik
Hydaburg
Gustavus
Grayling
Dot Lake
Cold Bay
Buckland
Alakanuk
SleetmuteRed Devil
Quinhagak
Point Lay
Nondalton
Nightmute Napaskiak
Manokotak
Koliganek
King Cove
Chefornak
Aleknagik
Whale Pass
Wainwright
Unalakleet
Twin Hills
St. George
Shishmaref
Shaktoolik
Sand Point
Point Hope
Old Harbor
Nunam Iqua
Larsen Bay
Kongiganak
Hooper Bay
Holy Cross
Healy Lake
Fort Yukon
False Pass
Elfin Cove
Dillingham
Toksook Bay
St. Michael
Scammon Bay
Port Heiden
Pilot Point
Mt. Village
King Salmon
Chuathbaluk
Chistochina
Chalkyitsik
Birch Creek
South Naknek
Lime Village
Kwigillingok
Upper Kalskag
Tok/Tanacross
Port Alsworth
Pitka's Point
Nelson Lagoon
Lower Kalskag
Clark’s Point
White Mountain
Chilkat Valley
Chignik Lagoon
Brevig Mission
Arctic VillageAnaktuvuk Pass
Tenakee Springs
Stevens Village
Russian Mission
Allakaket/Alatna
Thorne Bay/Kassan
Manley Hot Springs
Bettles/Evansville
Eagle/Eagle Village
Northway/Northway Village
Hollis
Koyukuk
Akiachak
Pedro Bay
Oscarville
Atmautluak
Tuntutuliak
Stony River
Nunapitchuk
New StuyahokGoodnews Bay
Coffman Cove
Pilot Station
Crooked Creek
St. Mary's/Andreafsky
0 100 20050Mi
AEA Energy Data/GIS, March, 2019
Power Cost Equalization (PCE) ProgramEligible C o m m u n i ti e s
Adak Atka
AkutanUnalaska
Nikolski
Alaska Energy Regions
Aleutians
Bering Straits
Bristol Bay
Copper River/Chugach
Kodiak
Lower Yukon-Kuskokwim
North Slope
Northwest Arctic
Railbelt
Southeast
Yukon-Koyukuk/Upper Tanana
THIS PAGE LEFT BLANK INTENTIONALLY
2
Birch Creek Electric Napaskiak Electric Utility
Buckland, City of Naterkaq Light Plant
Chalkyitsik Village Council Chefornak
Chenega IRA Village Council Nelson Lagoon Electrical Cooperative
Chignik, City of New Koliganek Village Council
Allakaket / Alatna Hydaburg Chignik Lagoon Power Utility Koliganek
Bettles / Evansville Klawock Chignik Lake Electric Nikolai, City of
Chistochina Mentasta Chitina Electric Inc.Nome Joint Utility System
Coffman Cove Naukati Circle Electric Utility North Slope Borough
Craig Northway / Northway Village Clarks Point Village Council Anaktuvuk Pass Point Hope
Dot Lake / Dot Lake Village Skagway Cordova Electric Co-op Atqasuk Point Lay
Eagle / Eagle Village Slana Diomede Joint Utilities Kaktovik Wainwright
Gustavus Tetlin Egegik Light and Power Nuiqsut
Haines / Covenant Life Thorne Bay / Kassan Elfin Cove Utility Commission Nunam Iqua Electric Company
Healy Tok / Tanacross False Pass, City of Nushagak Electric Cooperative
Hollis Whale Pass Galena, City of Aleknagik / Dillingham
Alaska Village Electric Cooperative G & K Inc.Ouzinkie, City of
Alakanuk Nightmute Cold Bay Pedro Bay Village Council
Ambler Noatak Gold Country Energy Pilot Point Electrical
Anvik Noorvik Central Platinum Commercial Company
Bethel / Oscarville Nulato Golovin Power Utilities Port Heiden Utilities
Brevig Mission Nunapitchuk Gwitchyaa Zhee Utilities Puvurnaq Power Company
Chevak Old Harbor Fort Yukon Kongiganak
Eek Pilot Station Hughes Power & Light Rampart Village Council Electric
Ekwok Pitka's Point Igiugig Electric Company Ruby, City of
Elim Quinhagak I-N-N Electric Cooperative St. George, City of
Emmonak Russian Mission Iliamna / Newhalen / Nondalton St. Paul Municipal Electric
Gambell Savoonga Inside Passage Electric Cooperative Stevens Village IRA Council
Goodnews Bay Scammon Bay Angoon Kake Takotna Community Assoc. Inc.
Grayling Selawik Chilkat Valley Klukwan Tanalian Electric Cooperative
Holy Cross Shageluk Hoonah Port Alsworth
Hooper Bay Shaktoolik Ipnatchiaq Electric Company Tanana Power Company Inc.
Huslia Shishmaref Deering Tatitlek Village IRA Council
Kaltag Shungnak King Cove, City of TDX Adak Generating LLC
Kasigluk St. Mary's / Andreafsky Kipnuk Light Plant Adak
Kiana St. Michael Kokhanok Village Council TDX Corporation
Kivalina Stebbins Kotzebue Electric Association Sand Point
Kobuk Teller Koyukuk, City of TDX Manley Generating LLC
Kotlik Togiak Kwethluk Incorporated Manley Hot Springs
Koyuk Toksook Bay Kwigillingok IRA Council Tenakee Springs, City of
Lower Kalskag Tununak Larsen Bay Utility Company Tuluksak Traditional Power Utility
Marshall Upper Kalskag Levelock Electrical Coop Tuntutuliak Community Service Assoc.
Mekoryuk Wales Lime Village Electric Utility Twin Hills Village Council
Minto Yakutat Manokotak Power Company Umnak Power Company
Mt. Village McGrath Light & Power Nikolski
New Stuyahok Middle Kuskokwim Electric Unalakleet Valley Electrical Cooperative
Alutiiq Power Company Chuathbaluk Sleetmute Unalaska, City of
Karluk Crooked Creek Stony River Ungusrag Power Company
Aniak Light & Power Company Red Devil Newtok
Arctic Village Council Naknek Electric Venetie Village Electric
Atka, City of King Salmon White Mountain, City of
Atmautluak Joint Utilities Naknek / South Naknek
Beaver Joint Utilities Napakiak Ircinraq
FY18 PCE Program Participating Utilities
Akiachak Native Community
Akiak City Council
Alaska Power Company
Akhiok / Kaguyak Electric
Akutan Electric Utility
3
HIGHLIGHTS OF THE POWER COST EQUALIZATION PROGRAM
Eligibility
Utility
An electric utility participating in the Power Cost Equalization Program (PCE) must:
a) provide electric service to the public for compensation; b) during calendar year 1983, had
less than 7,500 megawatt hours of residential consumption or less than 15,000 megawatt
hours if two or more communities were served; and c) during calendar year 1984, the utility
has used diesel-fired generators to produce more than 75% of its electrical consumption.
Customers
Customer eligibility is based on actual power purchased. State and federal offices/facilities,
commercial customers and public schools are excluded from PCE. Residential customers
are eligible for PCE credit up to 500 kilowatt-hours (kWh/s) per month. Community
facilities, as a group, can receive PCE credit for up to 70 kilowatt-hours per month multiplied
by the number of residents in a community.
Formula Used to determine PCE level/kWh for a utility:
Formula: 95% of the eligible costs per kWh between
17.58 cents/kWh, “the floor”
and $1.00/kWh, “the ceiling”.
Costs below 17.58 cents/kWh and above $1.00/kWh are not eligible for PCE.
If the eligible costs are $1.00/kWh or more, the maximum PCE level is 78.30 cents/kWh
($1.00 – 17.58 cents = 82.42 cents x 95% = 78.30 cents).
A participating utility must meet generation efficiency and line loss standards; otherwise the
PCE level is reduced to reflect those standards.
Process
The Regulatory Commission of Alaska (RCA)
RCA determines the PCE level per kWh for each utility. Two categories of costs are used
in determining the PCE level: a) fuel expenses: the cost of fuel, including transportation of
fuel; and b) non-fuel expenses: salaries, insurance, taxes, power plant parts and supplies,
interest and other reasonable costs.
The Alaska Energy Authority (AEA)
Eligible utilities submit monthly reports to AEA that document the eligible power sold and
PCE credits applied to eligible customers’ bills. AEA calculates the amount of PCE on a
monthly basis and issues payment to the utility. AEA verifies the eligibility of customers and
of community facilities. In addition, AEA calculates the required pro-rated PCE levels based
on available funds.
Authority
PCE is governed by Alaska Statutes 42.45.110-170, and by the Alaska Administrative Code
3 AAC 107.200-270 and 3 AAC 52.600-690.
4
5
State of Alaska: Alaska Energy Authority
Power Cost Equalization Program Statistical Data by Utility
Fiscal Year: 2018
NOTES *** = Calculations cannot be made due to lack of data or other circumstances
Some values have been updated from what was provide by utilities
Column a: Residential rates as reported by the utility in fiscal year 2018.
Column b: Rates based upon RCA Letter order in effect for last report filed in fiscal year 2018.
PCE rate reflects 100% funding level.
Column References:a b c d e f g h i j k
a - b i + j
Last Reported Number of Customers PCE Eligible kWh
Residential Community
Facilities
Other
Customers
(Non-PCE)
Residential Community
Facilities Total
AKHIOK/KAGUYAK
ELECTRIC
Akhiok PCE 0.8000$ 0.3872$ $ 0.4128 97 12 27 8 8 72,825 24,891 97,716
Utility Company Total 97 27 8 8 72,825 24,891 97,716
AKIAK CITY COUNCIL
Akiak PCE 0.5300$ 0.2382$ $ 0.2918 389 12 94 8 34 334,744 52,157 386,901
Utility Company Total 389 94 8 34 334,744 52,157 386,901
AKIACHAK NATIVE
COMMUNITY
Akiachak PCE 0.6000$ 0.2620$ $ 0.3380 701 12 191 10 29 554,669 239,388 794,057
Utility Company Total 701 191 10 29 554,669 239,388 794,057
CITY OF AKUTAN
Akutan PCE 0.9500$ 0.7742$ $ 0.1758 1000 12 40 11 24 152,996 108,875 261,871
Utility Company Total 1,000 40 11 24 152,996 108,875 261,871
ALASKA POWER
COMPANY
Allakaket; Alatna PCE 0.8417$ 0.5293$ $ 0.3124 191 13 66 16 18 194,647 89,109 283,756
Bettles; Evansville PCE 0.7171$ 0.4110$ $ 0.3061 20 12 27 5 30 81,998 16,800 98,798
Chistochina PCE 0.6592$ 0.3560$ $ 0.3032 88 12 45 1 19 131,219 12,580 143,799
Coffman Cove PCE 0.2919$ 0.0429$ $ 0.2490 204 12 179 14 46 491,992 88,050 580,042
Craig PCE 0.2919$ 0.0429$ $ 0.2490 1102 12 694 44 310 2,433,601 925,482 3,359,083
Dot Lake; Dot Lake Village
PCE
0.4643$ 0.2885$ $ 0.1758 79 12 24 2 17 73,028 0 73,028
Eagle; Eagle Village PCE 0.6335$ 0.3316$ $ 0.3019 145 12 137 13 32 275,730 60,286 336,016
Gustavus PCE 0.4903$ 0.1608$ $ 0.3295 558 12 472 5 109 1,011,029 35,659 1,046,688
Haines; Covenant Life PCE 0.2817$ 0.0382$ $ 0.2435 2523 12 1,131 40 366 3,711,831 957,649 4,669,480
Healy Lake PCE 1.0006$ 0.6803$ $ 0.3203 22 13 7 3 1 10,474 7,815 18,289
Hollis PCE 0.2919$ 0.0429$ $ 0.2490 112 12 128 1 28 398,507 4,080 402,587
Hydaburg PCE 0.2919$ 0.0429$ $ 0.2490 404 12 121 10 50 522,160 124,898 647,058
Klawock PCE 0.2919$ 0.0429$ $ 0.2490 814 12 399 24 138 1,559,266 499,207 2,058,473
Mentasta PCE 0.6592$ 0.3560$ $ 0.3032 113 12 48 5 20 132,127 20,702 152,829
Naukati PCE 0.2919$ 0.0429$ $ 0.2490 104 12 83 0 14 286,795 0 286,795
Northway; Northway Village
PCE
0.7022$ 0.3968$ $ 0.3054 151 12 87 6 29 270,719 75,225 345,944
Skagway PCE 0.2817$ 0.0382$ $ 0.2435 1065 12 673 44 550 2,006,620 848,289 2,854,909
Slana PCE 0.6592$ 0.3560$ $ 0.3032 128 12 82 1 17 236,320 2,168 238,488
Tetlin PCE 0.4643$ 0.2885$ $ 0.1758 110 12 44 4 8 133,190 67,432 200,622
Thorne Bay; Kasaan PCE 0.2919$ 0.0429$ $ 0.2490 621 12 336 31 122 1,109,005 328,971 1,437,976
Tok; Tanacross PCE 0.4643$ 0.2885$ $ 0.1758 1349 13 756 29 190 2,729,228 218,142 2,947,370
Whale Pass PCE 0.2919$ 0.0429$ $ 0.2490 45 12 80 2 14 186,335 9,051 195,386
Utility Company Total 9,948 5,619 300 2,128 17,985,821 4,391,595 22,377,416
ALASKA VILLAGE
ELECTRIC COOP
Alakanuk PCE 0.4971$ 0.2494$ $ 0.2477 707 12 155 10 36 656,208 255,474 911,682
Ambler PCE 0.5351$ 0.2943$ $ 0.2408 260 12 79 16 19 323,425 177,204 500,629
Utility/Community
Last
Reported
Residential
Rate (based
on 500 kWh)
Last PCE
Rate Applied
Last
Effective
Residential
Rate
Population Reported
Periods
6
State of Alaska: Alaska Energy Authority
Power Cost Equalization Program Statistical Data by Utility
Fiscal Year: 2018
Columns f - h: Values extracted from utilities' most recent fiscal year 2018 monthly report
Column p: Alaska Village Electric Cooperative average price of fuel is per reported actual fuel cost divided by gallons used;
all others are per prices used to determine PCE level
Columns i, j, m: Values summed from fiscal year 2018 utility reports
l m n o p q r s t
o / n
Total Fuel Used (diesel)
Gallons Cost Notes Utility/Community
AKHIOK/KAGUYAK ELECTRIC
33,490$ 232,842 29,345 112,377$ 3.83$ -$ 282,443 0 0 Non-fuel costs not provided by
utility
Akhiok PCE
33,490$ 232,842 29,345 112,377$ 3.83$ -$ 282,443 0 0
AKIAK CITY COUNCIL
87,868$ 1,062,902 93,752 299,024$ 3.19$ 169,284$ 1,212,912 0 0 Akiak PCE
87,868$ 1,062,902 93,752 299,024$ 3.19$ 169,284$ 1,212,912 0 0
AKIACHAK NATIVE
COMMUNITY
204,942$ 1,773,329 135,059 402,295$ 2.98$ 342,769$ 1,933,185 0 0 Akiachak PCE
204,942$ 1,773,329 135,059 402,295$ 2.98$ 342,769$ 1,933,185 0 0
CITY OF AKUTAN
202,741$ 476,868 38,892 100,456$ 2.58$ 304,234$ 477,411 134,170 0 Akutan PCE
202,741$ 476,868 38,892 100,456$ 2.58$ 304,234$ 477,411 134,170 0
ALASKA POWER COMPANY
148,246$ 512,841 49,229 207,726$ 4.22$ 203,961$ 586,632 0 0 Allakaket; Alatna PCE
36,752$ 504,351 45,702 137,749$ 3.01$ 347,920$ 547,700 0 0 Bettles; Evansville PCE
43,440$ 329,506 0 -$ -$ -$ 0 0 0 See Slana for generation data Chistochina PCE
16,325$ 1,065,691 0 -$ -$ -$ 0 0 0 See Craig for generation data Coffman Cove PCE
94,967$ 9,402,877 288,612 695,291$ 2.41$ 3,677,486$ 4,008,958 0 24,481,200 Craig PCE
14,717$ 370,705 0 -$ -$ -$ 0 0 0 See Tok for generation data Dot Lake; Dot Lake Village PCE
104,495$ 688,640 59,733 142,043$ 2.38$ 458,915$ 793,380 23,264 0 Eagle; Eagle Village PCE
138,820$ 1,998,463 19,127 65,003$ 3.40$ 760,190$ 251,372 2,185,112 0 Gustavus PCE
145,533$ 12,420,746 109,691 277,384$ 2.53$ -$ 1,479,240 0 13,445,391 Haines; Covenant Life PCE
6,231$ 31,664 6,122 20,410$ 3.33$ 65,642$ 41,371 0 0 Healy Lake PCE
11,392$ 1,563,623 0 -$ -$ -$ 0 0 0 See Craig for generation data Hollis PCE
18,076$ 1,651,809 0 -$ -$ -$ 0 0 0 See Craig for generation data Hydaburg PCE
58,407$ 7,987,498 0 -$ -$ -$ 0 0 0 See Craig for generation data Klawock PCE
46,341$ 373,092 0 -$ -$ -$ 0 0 0 See Slana for generation data Mentasta PCE
19,225$ 562,945 0 -$ -$ 61,123$ 0 0 0 See Craig for generation data Naukati PCE
115,669$ 1,014,604 88,319 220,908$ 2.50$ 211,650$ 1,124,798 0 0 Northway; Northway Village PCE
87,682$ 13,293,499 4,746 12,099$ 2.55$ 1,882,120$ 55,947 1,968,782 12,527,992 Skagway PCE
71,764$ 517,270 93,775 218,388$ 2.33$ 397,360$ 1,393,272 0 0 Slana PCE
40,687$ 336,731 0 -$ -$ -$ 0 0 0 See Tok for generation data Tetlin PCE
40,350$ 3,453,119 0 -$ -$ -$ 0 0 0 See Craig for generation data Thorne Bay; Kasaan PCE
602,274$ 7,582,658 643,007 1,452,498$ 2.26$ 2,567,355$ 9,323,086 0 0 Tok; Tanacross PCE
24,093$ 326,839 29,431 69,053$ 2.35$ 106,644$ 381,621 0 0 Whale Pass PCE
1,885,486$ 65,989,171 1,437,494 3,518,553$ 33.27$ 10,740,365$ 19,987,377 4,177,158 50,454,583
ALASKA VILLAGE ELECTRIC
COOP
227,045$ 1,881,691 0 -$ -$ 410,588$ 0 0 0 See Emmonak for generation
data
Alakanuk PCE
142,491$ 1,150,884 91,318 290,930$ 3.19$ 251,125$ 1,221,249 0 0 Ambler PCE
Total kWh
Generated
(Diesel)
PCE Payments
Made
Total kWh
Sold
Avg Price
of Fuel
($/gal)
Total Non Fuel
Expenses
Total kWh
Generated
(Non Diesel)
Total kWh
Purchased
7
State of Alaska: Alaska Energy Authority
Power Cost Equalization Program Statistical Data by Utility
Fiscal Year: 2018
NOTES *** = Calculations cannot be made due to lack of data or other circumstances
Some values have been updated from what was provide by utilities
Column a: Residential rates as reported by the utility in fiscal year 2018.
Column b: Rates based upon RCA Letter order in effect for last report filed in fiscal year 2018.
PCE rate reflects 100% funding level.
Column References:a b c d e f g h i j k
a - b i + j
Last Reported Number of Customers PCE Eligible kWh
Residential Community
Facilities
Other
Customers
(Non-PCE)
Residential Community
Facilities Total
Utility/Community
Last
Reported
Residential
Rate (based
on 500 kWh)
Last PCE
Rate Applied
Last
Effective
Residential
Rate
Population Reported
Periods
Anvik PCE 0.5447$ 0.3034$ $ 0.2413 77 12 37 11 17 131,779 46,449 178,228
Bethel; Oscarville PCE 0.3499$ 0.1043$ $ 0.2456 6294 12 1,879 47 863 7,825,477 2,401,472 10,226,949
Brevig Mission PCE 0.4967$ 0.2578$ $ 0.2389 418 12 91 10 24 426,901 143,823 570,724
Chevak PCE 0.5252$ 0.2464$ $ 0.2788 1030 12 205 10 38 843,847 240,446 1,084,293
Eek PCE 0.5053$ 0.2660$ $ 0.2393 341 12 110 10 22 378,538 79,566 458,104
Ekwok PCE 0.5554$ 0.3136$ $ 0.2418 113 12 52 11 15 174,011 25,835 199,846
Elim PCE 0.5209$ 0.2808$ $ 0.2401 339 12 90 11 32 398,660 149,167 547,827
Emmonak PCE 0.4971$ 0.2494$ $ 0.2477 856 12 210 22 60 869,782 614,021 1,483,803
Gambell PCE 0.5128$ 0.2432$ $ 0.2696 721 12 162 14 36 631,487 221,527 853,014
Goodnews Bay PCE 0.5084$ 0.2689$ $ 0.2395 265 12 81 10 12 321,509 64,364 385,873
Grayling PCE 0.5216$ 0.2815$ $ 0.2401 189 12 67 10 14 236,001 128,269 364,270
Holy Cross PCE 0.5081$ 0.2687$ $ 0.2394 155 12 78 10 13 259,135 99,765 358,900
Hooper Bay PCE 0.4907$ 0.2361$ $ 0.2546 1188 12 273 11 60 1,094,454 257,811 1,352,265
Huslia PCE 0.5356$ 0.2948$ $ 0.2408 326 12 102 17 22 407,791 136,136 543,927
Kaltag PCE 0.5179$ 0.2780$ $ 0.2399 172 12 68 14 23 245,313 85,861 331,174
Kasigluk PCE 0.4894$ 0.2380$ $ 0.2514 602 12 121 12 20 596,153 244,403 840,556
Kiana PCE 0.5421$ 0.3010$ $ 0.2411 421 12 126 15 17 480,417 199,712 680,129
Kivalina PCE 0.5462$ 0.3049$ $ 0.2413 429 12 86 10 19 407,538 105,855 513,393
Kobuk PCE 0.6691$ 0.4216$ $ 0.2475 148 12 39 3 15 154,943 89,511 244,454
Kotlik PCE 0.5170$ 0.2771$ $ 0.2399 621 12 123 11 34 554,421 198,143 752,564
Koyuk PCE 0.5083$ 0.2689$ $ 0.2394 331 12 93 11 28 393,311 148,842 542,153
Lower Kalskag PCE 0.5011$ 0.2620$ $ 0.2391 288 12 83 7 11 292,133 91,111 383,244
Marshall PCE 0.4884$ 0.2499$ $ 0.2385 459 12 106 19 21 475,545 167,472 643,017
Mekoryuk PCE 0.5213$ 0.2575$ $ 0.2638 215 12 89 12 25 290,836 87,772 378,608
Minto PCE 0.4900$ 0.2515$ $ 0.2385 212 12 73 7 18 247,785 128,563 376,348
Mt. Village PCE 0.4947$ 0.2559$ $ 0.2388 860 12 179 18 46 769,316 336,197 1,105,513
New Stuyahok PCE 0.5554$ 0.3136$ $ 0.2418 497 12 105 10 37 471,493 78,390 549,883
Nightmute PCE 0.4972$ 0.2365$ $ 0.2607 285 12 53 8 22 243,927 51,584 295,511
Noatak PCE 0.7869$ 0.5335$ $ 0.2534 583 12 116 8 26 599,409 194,958 794,367
Noorvik PCE 0.5095$ 0.2700$ $ 0.2395 644 12 131 10 34 630,432 336,030 966,462
Nulato PCE 0.5164$ 0.2765$ $ 0.2399 246 12 107 18 16 391,840 188,275 580,115
Nunapitchuk PCE 0.4894$ 0.2380$ $ 0.2514 584 12 129 12 25 564,315 94,782 659,097
Old Harbor PCE 0.5485$ 0.3070$ $ 0.2415 231 12 99 12 24 328,389 136,967 465,356
Pilot Station PCE 0.5240$ 0.2838$ $ 0.2402 647 12 136 13 23 555,834 277,287 833,121
Pitkas Point PCE 0.5126$ 0.2729$ $ 0.2397 117 12 29 5 5 118,560 83,088 201,648
Quinhagak PCE 0.4943$ 0.2326$ $ 0.2617 735 12 186 17 25 807,039 287,911 1,094,950
Russian Mission PCE 0.5228$ 0.2826$ $ 0.2402 331 12 76 6 15 347,045 63,458 410,503
Savoonga PCE 0.5047$ 0.2532$ $ 0.2515 729 12 158 9 46 706,686 196,900 903,586
Scammon Bay PCE 0.5068$ 0.2674$ $ 0.2394 570 12 122 8 35 524,468 129,206 653,674
Selawik PCE 0.5199$ 0.2759$ $ 0.2440 847 12 165 17 39 744,697 533,606 1,278,303
Shageluk PCE 0.5391$ 0.2981$ $ 0.2410 77 12 36 8 12 104,474 43,115 147,589
Shaktoolik PCE 0.5043$ 0.2325$ $ 0.2718 281 12 62 4 28 312,460 65,907 378,367
Shishmaref PCE 0.5252$ 0.2849$ $ 0.2403 597 12 145 10 48 617,615 118,106 735,721
Shungnak PCE 0.6691$ 0.4216$ $ 0.2475 299 12 62 9 19 288,610 149,596 438,206
St. Mary's; Andreafsky PCE 0.5126$ 0.2729$ $ 0.2397 587 12 172 18 61 661,850 431,993 1,093,843
St. Michael PCE 0.4971$ 0.2582$ $ 0.2389 417 12 92 10 40 422,597 299,391 721,988
Stebbins PCE 0.4971$ 0.2582$ $ 0.2389 630 12 135 12 36 571,561 102,475 674,036
Teller PCE 0.5433$ 0.3021$ $ 0.2412 263 12 72 6 33 258,607 34,941 293,548
Togiak PCE 0.5109$ 0.2713$ $ 0.2396 893 12 228 19 76 914,297 249,464 1,163,761
8
State of Alaska: Alaska Energy Authority
Power Cost Equalization Program Statistical Data by Utility
Fiscal Year: 2018
Columns f - h: Values extracted from utilities' most recent fiscal year 2018 monthly report
Column p: Alaska Village Electric Cooperative average price of fuel is per reported actual fuel cost divided by gallons used;
all others are per prices used to determine PCE level
Columns i, j, m: Values summed from fiscal year 2018 utility reports
l m n o p q r s t
o / n
Total Fuel Used (diesel)
Gallons Cost Notes Utility/Community
Total kWh
Generated
(Diesel)
PCE Payments
Made
Total kWh
Sold
Avg Price
of Fuel
($/gal)
Total Non Fuel
Expenses
Total kWh
Generated
(Non Diesel)
Total kWh
Purchased
54,081$ 363,936 32,727 80,029$ 2.45$ 79,411$ 401,711 0 0 Anvik PCE
971,702$ 39,158,292 2,974,694 9,690,144$ 3.26$ 8,544,395$ 41,360,000 0 0 Bethel; Oscarville PCE
139,180$ 1,104,118 87,971 234,680$ 2.67$ 240,920$ 1,187,099 0 0 Brevig Mission PCE
288,115$ 2,356,982 135,256 353,684$ 2.61$ 514,297$ 1,768,147 768,927 0 Chevak PCE
126,133$ 876,535 64,170 168,844$ 2.63$ 191,261$ 925,369 0 0 Eek PCE
69,277$ 408,269 0 -$ -$ 89,085$ 0 0 0 See New Stuyahok for
generation data
Ekwok PCE
154,796$ 1,195,730 97,697 264,489$ 2.71$ 260,910$ 1,293,051 0 0 Elim PCE
357,551$ 3,587,209 359,562 939,229$ 2.61$ 782,734$ 5,116,390 478,668 0 Emmonak PCE
222,755$ 1,792,015 115,453 324,762$ 2.81$ 391,020$ 1,469,666 502,851 0 Gambell PCE
104,116$ 673,811 54,055 147,215$ 2.72$ 147,027$ 724,394 0 0 Goodnews Bay PCE
98,601$ 576,096 46,530 119,394$ 2.57$ 125,705$ 620,803 0 0 Grayling PCE
98,706$ 596,390 42,783 106,588$ 2.49$ 130,133$ 622,217 0 0 Holy Cross PCE
342,048$ 3,226,469 199,282 517,331$ 2.60$ 704,020$ 2,783,379 637,294 0 Hooper Bay PCE
161,373$ 1,073,199 83,838 234,897$ 2.80$ 234,174$ 1,128,295 0 0 Huslia PCE
94,795$ 643,719 48,561 124,596$ 2.57$ 140,460$ 695,291 2,472 0 Kaltag PCE
211,392$ 1,642,860 187,019 486,708$ 2.60$ 358,474$ 2,543,607 498,104 0 Kasigluk PCE
199,542$ 1,503,256 113,265 320,891$ 2.83$ 328,013$ 1,628,797 0 0 Kiana PCE
156,927$ 1,217,916 91,192 258,285$ 2.83$ 265,751$ 1,290,371 0 0 Kivalina PCE
86,051$ 590,190 0 -$ -$ 128,780$ 0 0 0 See Shungnak for generation
data
Kobuk PCE
198,255$ 1,809,046 143,136 366,219$ 2.56$ 394,736$ 1,954,180 0 0 Kotlik PCE
146,576$ 1,235,334 91,755 243,233$ 2.65$ 269,552$ 1,302,775 0 0 Koyuk PCE
103,056$ 647,616 0 -$ -$ 141,311$ 0 0 0 See Kalskag for generation data Lower Kalskag PCE
158,657$ 1,367,883 110,404 265,605$ 2.41$ 298,474$ 1,455,817 0 0 Marshall PCE
107,830$ 782,495 54,617 148,819$ 2.72$ 170,742$ 734,939 173,946 0 Mekoryuk PCE
93,834$ 585,530 45,639 100,983$ 2.21$ 127,763$ 623,888 0 0 Minto PCE
277,312$ 2,563,623 190,526 499,265$ 2.62$ 559,386$ 2,747,912 0 0 Mt. Village PCE
180,701$ 1,287,325 112,279 360,372$ 3.21$ 280,896$ 1,798,449 0 0 New Stuyahok PCE
74,554$ 806,503 0 -$ -$ 175,980$ 0 0 0 See Toksook Bay for generation
data
Nightmute PCE
413,702$ 1,765,686 136,839 825,033$ 6.03$ 385,275$ 1,925,947 0 0 Noatak PCE
249,141$ 1,837,183 137,322 406,281$ 2.96$ 400,876$ 1,940,148 12,831 0 Noorvik PCE
161,997$ 943,900 67,625 163,189$ 2.41$ 205,960$ 1,024,460 0 0 Nulato PCE
169,711$ 1,195,639 0 -$ -$ 260,890$ 0 0 0 See Kasigluk for generation data Nunapitchuk PCE
132,744$ 748,089 54,865 153,274$ 2.79$ 163,234$ 823,013 0 0 Old Harbor PCE
234,423$ 1,778,577 141,985 352,925$ 2.49$ 388,088$ 1,878,765 0 0 Pilot Station PCE
52,887$ 330,456 0 -$ -$ 72,106$ 0 0 0 See St. Mary's for generation dataPitkas Point PCE
265,129$ 2,011,683 123,189 325,613$ 2.64$ 438,952$ 1,595,188 567,230 0 Quinhagak PCE
114,609$ 924,532 70,561 180,922$ 2.56$ 201,734$ 996,554 0 0 Russian Mission PCE
230,646$ 2,173,747 151,229 398,020$ 2.63$ 474,315$ 2,148,940 125,256 0 Savoonga PCE
176,224$ 1,543,901 116,936 306,726$ 2.62$ 336,881$ 1,647,222 0 0 Scammon Bay PCE
339,060$ 2,507,187 195,505 565,445$ 2.89$ 547,072$ 2,691,929 11,762 0 Selawik PCE
45,970$ 375,329 34,663 85,972$ 2.48$ 81,897$ 413,027 0 0 Shageluk PCE
90,736$ 1,006,141 60,886 162,030$ 2.66$ 219,541$ 778,175 346,958 0 Shaktoolik PCE
207,627$ 1,598,933 129,275 369,130$ 2.86$ 348,889$ 1,653,881 0 0 Shishmaref PCE
153,579$ 906,146 118,477 471,246$ 3.98$ 197,722$ 1,626,999 0 0 Shungnak PCE
285,684$ 2,597,771 227,888 567,120$ 2.49$ 566,837$ 3,079,112 0 0 St. Mary's; Andreafsky PCE
178,847$ 1,798,373 0 -$ -$ 392,408$ 0 0 0 See Stebbins for generation data St. Michael PCE
178,281$ 1,569,433 248,099 653,461$ 2.63$ 342,453$ 3,553,170 0 0 Stebbins PCE
88,274$ 798,236 58,903 160,358$ 2.72$ 174,176$ 845,976 0 0 Teller PCE
322,917$ 2,881,379 220,344 592,884$ 2.69$ 628,721$ 3,076,705 0 0 Togiak PCE
9
State of Alaska: Alaska Energy Authority
Power Cost Equalization Program Statistical Data by Utility
Fiscal Year: 2018
NOTES *** = Calculations cannot be made due to lack of data or other circumstances
Some values have been updated from what was provide by utilities
Column a: Residential rates as reported by the utility in fiscal year 2018.
Column b: Rates based upon RCA Letter order in effect for last report filed in fiscal year 2018.
PCE rate reflects 100% funding level.
Column References:a b c d e f g h i j k
a - b i + j
Last Reported Number of Customers PCE Eligible kWh
Residential Community
Facilities
Other
Customers
(Non-PCE)
Residential Community
Facilities Total
Utility/Community
Last
Reported
Residential
Rate (based
on 500 kWh)
Last PCE
Rate Applied
Last
Effective
Residential
Rate
Population Reported
Periods
Toksook Bay PCE 0.4972$ 0.2365$ $ 0.2607 656 12 133 15 29 614,963 322,673 937,636
Tununak PCE 0.4972$ 0.2365$ $ 0.2607 387 12 89 9 26 347,802 65,874 413,676
Upper Kalskag PCE 0.5011$ 0.2620$ $ 0.2391 231 12 65 2 29 273,697 9,150 282,847
Wales PCE 0.5562$ 0.3144$ $ 0.2418 167 12 47 5 23 174,383 44,676 219,059
Yakutat PCE 0.4491$ 0.2589$ $ 0.1902 594 12 272 29 149 1,039,278 387,939 1,427,217
Utility Company Total 31,162 8,079 678 2,541 33,523,044 11,902,513 45,425,557
ANIAK LIGHT & POWER
Aniak PCE 0.6302$ 0.3049$ $ 0.3253 517 12 174 8 32 708,761 51,868 760,629
Utility Company Total 517 174 8 32 708,761 51,868 760,629
ARCTIC VILLAGE
COUNCIL
Arctic Village PCE 1.0000$ 0.7830$ $ 0.2170 180 10 79 5 13 140,163 39,502 179,665
Utility Company Total 180 79 5 13 140,163 39,502 179,665
CITY OF ATKA
Atka PCE 0.6250$ 0.2368$ $ 0.3882 65 12 30 18 15 98,085 32,607 130,692
Utility Company Total 65 30 18 15 98,085 32,607 130,692
ATMAUTLUAK TRIBAL
UTILITIES
Atmautluak PCE 0.7000$ 0.4048$ $ 0.2952 315 12 71 6 12 281,190 73,218 354,408
Utility Company Total 315 71 6 12 281,190 73,218 354,408
BEAVER JOINT UTILITIES
Beaver PCE 0.9000$ 0.6128$ $ 0.2872 69 12 43 3 12 83,033 18,000 101,033
Utility Company Total 69 43 3 12 83,033 18,000 101,033
BIRCH CREEK ELECTRIC
COMPANY
Birch Creek PCE 1.1500$ 0.7693$ $ 0.3807 26 10 13 2 7 21,960 0 21,960
Utility Company Total 26 13 2 7 21,960 0 21,960
CITY OF BUCKLAND
Buckland PCE 0.4741$ 0.1334$ $ 0.3407 507 8 102 12 26 320,269 13,031 333,300
Utility Company Total 507 102 12 26 320,269 13,031 333,300
CHALKYITSIK VILLAGE
COUNCIL
Chalkyitsik PCE 0.9500$ 0.5071$ $ 0.4429 79 12 43 10 10 54,278 60,833 115,111
Utility Company Total 79 43 10 10 54,278 60,833 115,111
NATIVE VILLAGE OF
CHENEGA
Chenega Bay PCE 0.6650$ 0.3654$ $ 0.2996 72 12 25 9 20 73,856 34,956 108,812
Utility Company Total 72 25 9 20 73,856 34,956 108,812
CITY OF CHIGNIK
Chignik PCE 0.4160$ 0.2258$ $ 0.1902 96 12 60 10 32 150,918 80,531 231,449
Utility Company Total 96 60 10 32 150,918 80,531 231,449
10
State of Alaska: Alaska Energy Authority
Power Cost Equalization Program Statistical Data by Utility
Fiscal Year: 2018
Columns f - h: Values extracted from utilities' most recent fiscal year 2018 monthly report
Column p: Alaska Village Electric Cooperative average price of fuel is per reported actual fuel cost divided by gallons used;
all others are per prices used to determine PCE level
Columns i, j, m: Values summed from fiscal year 2018 utility reports
l m n o p q r s t
o / n
Total Fuel Used (diesel)
Gallons Cost Notes Utility/Community
Total kWh
Generated
(Diesel)
PCE Payments
Made
Total kWh
Sold
Avg Price
of Fuel
($/gal)
Total Non Fuel
Expenses
Total kWh
Generated
(Non Diesel)
Total kWh
Purchased
228,925$ 1,610,207 241,640 680,708$ 2.82$ 351,349$ 2,775,870 956,308 0 Toksook Bay PCE
103,948$ 994,221 0 -$ -$ 216,940$ 0 0 0 See Toksook Bay for generation
data
Tununak PCE
77,937$ 809,476 110,859 297,258$ 2.68$ 176,629$ 1,563,307 0 0 Upper Kalskag PCE
69,381$ 596,763 47,321 135,375$ 2.86$ 130,215$ 645,091 0 0 Wales PCE
351,732$ 5,184,176 403,107 1,082,225$ 2.68$ 1,131,195$ 6,030,952 0 0 Yakutat PCE
10,571,566$ 117,192,086 8,671,247 25,582,384$ 130.92$ 25,571,480$ 120,112,227 5,082,607 0
ANIAK LIGHT & POWER
240,847$ 2,168,626 200,758 506,333$ 2.52$ 716,122$ 2,603,800 0 0 Aniak PCE
240,847$ 2,168,626 200,758 506,333$ 2.52$ 716,122$ 2,603,800 0 0
ARCTIC VILLAGE COUNCIL
140,678$ 385,351 46,939 228,782$ 4.87$ 11,771$ 533,103 0 0 10 months reported Arctic Village PCE
140,678$ 385,351 46,939 228,782$ 4.87$ 11,771$ 533,103 0 0
CITY OF ATKA
31,034$ 358,907 5,270 23,537$ 4.47$ 31,200$ 57,499 389,053 0 Atka PCE
31,034$ 358,907 5,270 23,537$ 4.47$ 31,200$ 57,499 389,053 0
ATMAUTLUAK TRIBAL
UTILITIES
99,601$ 618,621 53,626 157,872$ 2.94$ -$ 661,233 0 0 Non-fuel costs not provided by
utility
Atmautluak PCE
99,601$ 618,621 53,626 157,872$ 2.94$ -$ 661,233 0 0
BEAVER JOINT UTILITIES
53,489$ 265,521 25,592 86,539$ 3.38$ 58,136$ 188,717 0 0 11 months reported. Reported
sales>generated
Beaver PCE
53,489$ 265,521 25,592 86,539$ 3.38$ 58,136$ 188,717 0 0
BIRCH CREEK ELECTRIC
COMPANY
17,159$ 81,751 9,608 33,623$ 3.50$ 25,006$ 95,324 0 0 10 months reported Birch Creek PCE
17,159$ 81,751 9,608 33,623$ 3.50$ 25,006$ 95,324 0 0
CITY OF BUCKLAND
44,462$ 867,782 87,895 287,759$ 3.27$ -$ 1,080,261 28,678 0 8 months reported, Non-fuel
costs not provided by utility
Buckland PCE
44,462$ 867,782 87,895 287,759$ 3.27$ -$ 1,080,261 28,678 0
CHALKYITSIK VILLAGE
COUNCIL
49,727$ 220,230 31,387 125,576$ 4.00$ -$ 338,590 0 0 Non-fuel costs not provided by
utility
Chalkyitsik PCE
49,727$ 220,230 31,387 125,576$ 4.00$ -$ 338,590 0 0
NATIVE VILLAGE OF CHENEGA
38,865$ 224,769 24,781 104,120$ 4.20$ 15,784$ 262,988 0 0 Chenega Bay PCE
38,865$ 224,769 24,781 104,120$ 4.20$ 15,784$ 262,988 0 0
CITY OF CHIGNIK
55,252$ 652,620 63,229 148,072$ 2.34$ 141,167$ 707,158 0 0 Chignik PCE
55,252$ 652,620 63,229 148,072$ 2.34$ 141,167$ 707,158 0 0
11
State of Alaska: Alaska Energy Authority
Power Cost Equalization Program Statistical Data by Utility
Fiscal Year: 2018
NOTES *** = Calculations cannot be made due to lack of data or other circumstances
Some values have been updated from what was provide by utilities
Column a: Residential rates as reported by the utility in fiscal year 2018.
Column b: Rates based upon RCA Letter order in effect for last report filed in fiscal year 2018.
PCE rate reflects 100% funding level.
Column References:a b c d e f g h i j k
a - b i + j
Last Reported Number of Customers PCE Eligible kWh
Residential Community
Facilities
Other
Customers
(Non-PCE)
Residential Community
Facilities Total
Utility/Community
Last
Reported
Residential
Rate (based
on 500 kWh)
Last PCE
Rate Applied
Last
Effective
Residential
Rate
Population Reported
Periods
CHIGNIK LAKE ELECTRIC
UTILITY
Chignik Lake PCE 0.8500$ 0.4008$ $ 0.4492 64 12 42 8 6 110,341 36,432 146,773
Utility Company Total 64 42 8 6 110,341 36,432 146,773
CHIGNIK LAGOON
POWER UTILITY
Chignik Lagoon PCE 0.6250$ 0.2466$ $ 0.3784 85 12 78 6 12 146,074 58,134 204,208
Utility Company Total 85 78 6 12 146,074 58,134 204,208
CHITINA ELECTRIC INC.
Chitina PCE 0.7000$ 0.3668$ $ 0.3332 104 12 44 2 34 91,556 13,916 105,472
Utility Company Total 104 44 2 34 91,556 13,916 105,472
CIRCLE ELECTRIC LLC
Circle PCE 0.7611$ 0.5312$ $ 0.2299 108 12 38 7 8 95,746 69,485 165,231
Utility Company Total 108 38 7 8 95,746 69,485 165,231
CLARKS POINT VILLAGE
COUNCIL
Clarks Point PCE 1.1000$ 0.6459$ $ 0.4541 54 12 42 7 14 99,759 27,875 127,634
Utility Company Total 54 42 7 14 99,759 27,875 127,634
CORDOVA ELECTRIC
Cordova PCE 0.3532$ 0.0813$ $ 0.2719 2522 12 969 59 606 3,332,589 2,095,784 5,428,373
Utility Company Total 2,522 969 59 606 3,332,589 2,095,784 5,428,373
DIOMEDE JOINT UTLITIES
Diomede PCE 0.6500$ 0.2205$ $ 0.4295 88 12 39 4 14 145,957 27,627 173,584
Utility Company Total 88 39 4 14 145,957 27,627 173,584
CITY OF EGEGIK
Egegik PCE 0.6500$ 0.4722$ $ 0.1778 85 12 81 18 24 122,535 71,400 193,935
Utility Company Total 85 81 18 24 122,535 71,400 193,935
ELFIN COVE UTILITY
COMMISSION
Elfin Cove PCE 0.6800$ 0.4098$ $ 0.2702 44 12 47 6 26 54,301 8,834 63,135
Utility Company Total 44 47 6 26 54,301 8,834 63,135
CITY OF FALSE PASS
False Pass PCE 0.4333$ 0.1160$ $ 0.3173 73 12 29 12 19 72,799 56,106 128,905
Utility Company Total 73 29 12 19 72,799 56,106 128,905
CITY OF GALENA
Galena PCE 0.6700$ 0.1891$ $ 0.4809 488 12 197 14 175 672,363 406,733 1,079,096
Utility Company Total 488 197 14 175 672,363 406,733 1,079,096
G & K INC.
Cold Bay PCE 0.6667$ 0.4432$ $ 0.2235 59 12 38 4 77 68,983 49,380 118,363
Utility Company Total 59 38 4 77 68,983 49,380 118,363
12
State of Alaska: Alaska Energy Authority
Power Cost Equalization Program Statistical Data by Utility
Fiscal Year: 2018
Columns f - h: Values extracted from utilities' most recent fiscal year 2018 monthly report
Column p: Alaska Village Electric Cooperative average price of fuel is per reported actual fuel cost divided by gallons used;
all others are per prices used to determine PCE level
Columns i, j, m: Values summed from fiscal year 2018 utility reports
l m n o p q r s t
o / n
Total Fuel Used (diesel)
Gallons Cost Notes Utility/Community
Total kWh
Generated
(Diesel)
PCE Payments
Made
Total kWh
Sold
Avg Price
of Fuel
($/gal)
Total Non Fuel
Expenses
Total kWh
Generated
(Non Diesel)
Total kWh
Purchased
CHIGNIK LAKE ELECTRIC
UTILITY
60,655$ 300,697 31,945 120,921$ 3.79$ 27,090$ 333,101 0 0 Chignik Lake PCE
60,655$ 300,697 31,945 120,921$ 3.79$ 27,090$ 333,101 0 0
CHIGNIK LAGOON POWER
UTILITY
51,088$ 526,482 22,734 67,038$ 2.95$ 183,008$ 256,058 360,720 0 Chignik Lagoon PCE
51,088$ 526,482 22,734 67,038$ 2.95$ 183,008$ 256,058 360,720 0
CHITINA ELECTRIC INC.
36,600$ 375,535 37,716 111,317$ 2.95$ 139,667$ 442,908 0 0 Chitina PCE
36,600$ 375,535 37,716 111,317$ 2.95$ 139,667$ 442,908 0 0
CIRCLE ELECTRIC LLC
79,710$ 367,798 36,687 94,035$ 2.56$ 139,550$ 401,960 0 0 Circle PCE
79,710$ 367,798 36,687 94,035$ 2.56$ 139,550$ 401,960 0 0
CLARKS POINT VILLAGE
COUNCIL
80,701$ 244,414 30,995 99,801$ 3.22$ -$ 285,900 0 0 Non-fuel costs not provided by
utility
Clarks Point PCE
80,701$ 244,414 30,995 99,801$ 3.22$ -$ 285,900 0 0
CORDOVA ELECTRIC
487,319$ 26,372,323 618,447 1,537,429$ 2.49$ 5,263,043$ 8,434,147 19,380,402 0 Cordova PCE
487,319$ 26,372,323 618,447 1,537,429$ 2.49$ 5,263,043$ 8,434,147 19,380,402 0
DIOMEDE JOINT UTLITIES
38,129$ 451,014 48,293 110,792$ 2.29$ 183,705$ 468,514 0 0 Diomede PCE
38,129$ 451,014 48,293 110,792$ 2.29$ 183,705$ 468,514 0 0
CITY OF EGEGIK
86,230$ 550,585 51,720 143,970$ 2.78$ 114,467$ 613,843 0 0 Egegik PCE
86,230$ 550,585 51,720 143,970$ 2.78$ 114,467$ 613,843 0 0
ELFIN COVE UTILITY
COMMISSION
24,347$ 289,488 28,103 95,678$ 3.40$ 64,930$ 348,455 0 0 Elfin Cove PCE
24,347$ 289,488 28,103 95,678$ 3.40$ 64,930$ 348,455 0 0
CITY OF FALSE PASS
14,953$ 529,852 52,613 121,336$ 2.31$ 102,010$ 647,989 0 0 False Pass PCE
14,953$ 529,852 52,613 121,336$ 2.31$ 102,010$ 647,989 0 0
CITY OF GALENA
216,539$ 5,046,507 423,289 947,652$ 2.24$ 1,236,716$ 5,704,098 0 0 Galena PCE
216,539$ 5,046,507 423,289 947,652$ 2.24$ 1,236,716$ 5,704,098 0 0
G & K INC.
53,854$ 1,842,287 184,622 838,184$ 4.54$ 105,180$ 2,429,402 0 0 Cold Bay PCE
53,854$ 1,842,287 184,622 838,184$ 4.54$ 105,180$ 2,429,402 0 0
13
State of Alaska: Alaska Energy Authority
Power Cost Equalization Program Statistical Data by Utility
Fiscal Year: 2018
NOTES *** = Calculations cannot be made due to lack of data or other circumstances
Some values have been updated from what was provide by utilities
Column a: Residential rates as reported by the utility in fiscal year 2018.
Column b: Rates based upon RCA Letter order in effect for last report filed in fiscal year 2018.
PCE rate reflects 100% funding level.
Column References:a b c d e f g h i j k
a - b i + j
Last Reported Number of Customers PCE Eligible kWh
Residential Community
Facilities
Other
Customers
(Non-PCE)
Residential Community
Facilities Total
Utility/Community
Last
Reported
Residential
Rate (based
on 500 kWh)
Last PCE
Rate Applied
Last
Effective
Residential
Rate
Population Reported
Periods
GOLD COUNTRY ENERGY
Central PCE 0.6826$ 0.3629$ $ 0.3197 86 12 136 1 14 235,205 4,805 240,010
Utility Company Total 86 136 1 14 235,205 4,805 240,010
GOLOVIN POWER
UTILITIES
Golovin PCE 0.3800$ 0.1263$ $ 0.2537 182 12 49 11 43 223,044 128,348 351,392
Utility Company Total 182 49 11 43 223,044 128,348 351,392
GWITCHYAA ZHEE
UTILITY COMPANY
Fort Yukon PCE 0.6552$ 0.3574$ $ 0.2978 558 12 257 17 80 847,257 349,137 1,196,394
Utility Company Total 558 257 17 80 847,257 349,137 1,196,394
HUGHES POWER & LIGHT
Hughes PCE 0.7100$ 0.5342$ $ 0.1758 91 12 46 3 14 156,013 69,515 225,528
Utility Company Total 91 46 3 14 156,013 69,515 225,528
IGIUGIG ELECTRIC
COMPANY
Igiugig PCE 0.9190$ 0.5986$ $ 0.3204 53 12 28 13 11 84,073 44,160 128,233
Utility Company Total 53 28 13 11 84,073 44,160 128,233
ILIAMNA NEWHALEN
NONDALTON
Iliamna Newhalen
Nondalton PCE
0.6500$ 0.3930$ $ 0.2570 441 12 192 16 95 589,578 297,956 887,534
Utility Company Total 441 192 16 95 589,578 297,956 887,534
INSIDE PASSAGE
ELECTRIC
Angoon PCE 0.5597$ 0.3071$ $ 0.2526 408 12 193 8 33 616,778 221,842 838,620
Chilkat Valley PCE 0.5597$ 0.3071$ $ 0.2526 666 12 210 1 40 564,530 1,436 565,966
Hoonah PCE 0.5597$ 0.3071$ $ 0.2526 793 12 377 28 76 1,384,370 630,574 2,014,944
Kake PCE 0.5597$ 0.3071$ $ 0.2526 605 12 238 15 55 787,631 192,659 980,290
Klukwan PCE 0.5597$ 0.3071$ $ 0.2526 95 12 48 9 8 179,428 79,660 259,088
Utility Company Total 2,567 1,066 61 212 3,532,737 1,126,171 4,658,908
IPNATCHIAQ ELECTRIC
COMPANY
Deering PCE 0.6547$ 0.2600$ $ 0.3947 143 12 48 5 15 191,679 89,927 281,606
Utility Company Total 143 48 5 15 191,679 89,927 281,606
KARLUK IRA TRIBAL
COUNCIL
Karluk PCE 0.7000$ 0.4135$ $ 0.2865 24 12 14 4 12 52,084 19,322 71,406
Utility Company Total 24 14 4 12 52,084 19,322 71,406
KING COVE
CORPORATION
King Cove PCE 0.3000$ 0.0001$ $ 0.2999 923 4 192 33 219 224,004 250,453 474,457
Utility Company Total 923 192 33 219 224,004 250,453 474,457
KIPNUK LIGHT PLANT
Kipnuk PCE 0.5053$ 0.2765$ $ 0.2288 673 12 183 6 68 733,526 73,862 807,388
14
State of Alaska: Alaska Energy Authority
Power Cost Equalization Program Statistical Data by Utility
Fiscal Year: 2018
Columns f - h: Values extracted from utilities' most recent fiscal year 2018 monthly report
Column p: Alaska Village Electric Cooperative average price of fuel is per reported actual fuel cost divided by gallons used;
all others are per prices used to determine PCE level
Columns i, j, m: Values summed from fiscal year 2018 utility reports
l m n o p q r s t
o / n
Total Fuel Used (diesel)
Gallons Cost Notes Utility/Community
Total kWh
Generated
(Diesel)
PCE Payments
Made
Total kWh
Sold
Avg Price
of Fuel
($/gal)
Total Non Fuel
Expenses
Total kWh
Generated
(Non Diesel)
Total kWh
Purchased
GOLD COUNTRY ENERGY
86,758$ 360,692 42,429 96,571$ 2.28$ 80,599$ 472,671 0 0 Central PCE
86,758$ 360,692 42,429 96,571$ 2.28$ 80,599$ 472,671 0 0
GOLOVIN POWER UTILITIES
45,451$ 1,016,488 80,611 182,577$ 2.26$ 155,315$ 1,044,080 0 0 Golovin PCE
45,451$ 1,016,488 80,611 182,577$ 2.26$ 155,315$ 1,044,080 0 0
GWITCHYAA ZHEE UTILITY
COMPANY
441,439$ 2,518,288 219,731 1,288,503$ 5.86$ 499,038$ 3,217,833 0 0 Fort Yukon PCE
441,439$ 2,518,288 219,731 1,288,503$ 5.86$ 499,038$ 3,217,833 0 0
HUGHES POWER & LIGHT
118,435$ 391,418 48,138 216,646$ 4.50$ 92,383$ 443,922 0 0 Hughes PCE
118,435$ 391,418 48,138 216,646$ 4.50$ 92,383$ 443,922 0 0
IGIUGIG ELECTRIC COMPANY
77,138$ 256,035 24,789 145,023$ 5.85$ 51,452$ 325,326 0 0 Igiugig PCE
77,138$ 256,035 24,789 145,023$ 5.85$ 51,452$ 325,326 0 0
ILIAMNA NEWHALEN
NONDALTON
350,472$ 2,930,185 7,783 36,349$ 4.67$ -$ 102,490 3,594,343 0 Non-fuel costs not provided by
utility
Iliamna Newhalen Nondalton PCE
350,472$ 2,930,185 7,783 36,349$ 4.67$ -$ 102,490 3,594,343 0
INSIDE PASSAGE ELECTRIC
255,108$ 1,581,236 120,226 294,298$ 2.45$ 509,474$ 1,792,705 0 0 Angoon PCE
172,074$ 1,070,801 0 -$ -$ 545,231$ 0 1,051,920 774,900 Chilkat Valley PCE
613,082$ 4,198,932 246,002 603,533$ 2.45$ 1,037,155$ 3,486,555 1,140,373 0 Hoonah PCE
298,322$ 1,968,818 152,721 372,245$ 2.44$ 678,451$ 2,242,369 0 0 Kake PCE
78,784$ 460,990 0 -$ -$ 136,760$ 0 0 0 See Chilkat Valley for generation
data
Klukwan PCE
1,417,370$ 9,280,777 518,949 1,270,077$ 7.34$ 2,907,071$ 7,521,629 2,192,293 774,900
IPNATCHIAQ ELECTRIC
COMPANY
72,872$ 628,830 43,743 114,736$ 2.62$ 300,978$ 596,835 54,986 0 Deering PCE
72,872$ 628,830 43,743 114,736$ 2.62$ 300,978$ 596,835 54,986 0
KARLUK IRA TRIBAL COUNCIL
28,185$ 187,431 20,091 66,890$ 3.33$ 55,520$ 207,987 0 0 Karluk PCE
28,185$ 187,431 20,091 66,890$ 3.33$ 55,520$ 207,987 0 0
KING COVE CORPORATION
-$ 1,205,668 13,704 29,920$ 2.18$ 25,654$ 200,649 1,205,478 0 4 months reported King Cove PCE
-$ 1,205,668 13,704 29,920$ 2.18$ 25,654$ 200,649 1,205,478 0
KIPNUK LIGHT PLANT
143,835$ 1,796,441 154,585 371,752$ 2.40$ 491,614$ 1,940,748 0 0 Kipnuk PCE
15
State of Alaska: Alaska Energy Authority
Power Cost Equalization Program Statistical Data by Utility
Fiscal Year: 2018
NOTES *** = Calculations cannot be made due to lack of data or other circumstances
Some values have been updated from what was provide by utilities
Column a: Residential rates as reported by the utility in fiscal year 2018.
Column b: Rates based upon RCA Letter order in effect for last report filed in fiscal year 2018.
PCE rate reflects 100% funding level.
Column References:a b c d e f g h i j k
a - b i + j
Last Reported Number of Customers PCE Eligible kWh
Residential Community
Facilities
Other
Customers
(Non-PCE)
Residential Community
Facilities Total
Utility/Community
Last
Reported
Residential
Rate (based
on 500 kWh)
Last PCE
Rate Applied
Last
Effective
Residential
Rate
Population Reported
Periods
Utility Company Total 673 183 6 68 733,526 73,862 807,388
KOKHANOK VILLAGE
COUNCIL
Kokhanok PCE 0.9000$ 0.6555$ $ 0.2445 152 12 59 11 11 169,972 70,360 240,332
Utility Company Total 152 59 11 11 169,972 70,360 240,332
KOTZEBUE ELECTRIC
ASSOCIATION
Kotzebue PCE 0.3816$ 0.1808$ $ 0.2008 3295 12 1,084 26 172 3,651,973 1,586,369 5,238,342
Utility Company Total 3,295 1,084 26 172 3,651,973 1,586,369 5,238,342
CITY OF KOYUKUK
Koyukuk PCE 0.9500$ 0.2756$ $ 0.6744 97 12 67 5 15 92,869 28,030 120,899
Utility Company Total 97 67 5 15 92,869 28,030 120,899
KWETHLUK
INCORPORATED
Kwethluk PCE 1.0000$ 0.2055$ $ 0.7945 805 12 183 2 36 679,040 16,088 695,128
Utility Company Total 805 183 2 36 679,040 16,088 695,128
KWIGILLINGOK IRA
COUNCIL
Kwigillingok PCE 0.6700$ 0.3568$ $ 0.3132 385 12 97 3 23 406,894 56,941 463,835
Utility Company Total 385 97 3 23 406,894 56,941 463,835
LARSEN BAY UTILITY
COMPANY
Larsen Bay PCE 0.4100$ 0.0001$ $ 0.4099 77 12 52 12 30 103,173 65,240 168,413
Utility Company Total 77 52 12 30 103,173 65,240 168,413
LEVELOCK ELECTRICAL
COOP
Levelock PCE 0.8500$ 0.3654$ $ 0.4846 87 11 34 8 30 105,418 35,002 140,420
Utility Company Total 87 34 8 30 105,418 35,002 140,420
LIME VILLAGE ELECTRIC
UTILITY
Lime Village PCE 1.7748$ 0.7830$ $ 0.9918 36 10 17 5 2 10,928 11,952 22,880
Utility Company Total 36 17 5 2 10,928 11,952 22,880
MANOKOTAK POWER
COMPANY
Manokotak PCE 0.5500$ 0.2418$ $ 0.3082 496 12 152 5 35 512,887 63,959 576,846
Utility Company Total 496 152 5 35 512,887 63,959 576,846
MCGRATH LIGHT &
POWER
McGrath PCE 0.7871$ 0.3356$ $ 0.4515 302 12 179 15 88 448,264 192,923 641,187
Utility Company Total 302 179 15 88 448,264 192,923 641,187
MIDDLE KUSKOKWIM
ELECTRIC COOPERATIVE
INC
Chuathbaluk PCE 1.1750$ 0.7350$ $ 0.4400 118 12 32 10 7 79,771 42,223 121,994
Crooked Creek PCE 1.1750$ 0.7350$ $ 0.4400 92 12 30 4 12 79,454 27,236 106,690
16
State of Alaska: Alaska Energy Authority
Power Cost Equalization Program Statistical Data by Utility
Fiscal Year: 2018
Columns f - h: Values extracted from utilities' most recent fiscal year 2018 monthly report
Column p: Alaska Village Electric Cooperative average price of fuel is per reported actual fuel cost divided by gallons used;
all others are per prices used to determine PCE level
Columns i, j, m: Values summed from fiscal year 2018 utility reports
l m n o p q r s t
o / n
Total Fuel Used (diesel)
Gallons Cost Notes Utility/Community
Total kWh
Generated
(Diesel)
PCE Payments
Made
Total kWh
Sold
Avg Price
of Fuel
($/gal)
Total Non Fuel
Expenses
Total kWh
Generated
(Non Diesel)
Total kWh
Purchased
143,835$ 1,796,441 154,585 371,752$ 2.40$ 491,614$ 1,940,748 0 0
KOKHANOK VILLAGE COUNCIL
147,200$ 388,939 42,533 189,679$ 4.46$ 130,721$ 452,200 0 0 Kokhanok PCE
147,200$ 388,939 42,533 189,679$ 4.46$ 130,721$ 452,200 0 0
KOTZEBUE ELECTRIC
ASSOCIATION
942,900$ 19,215,208 1,179,262 2,797,390$ 2.37$ 686,784$ 17,022,643 4,711,606 0 Kotzebue PCE
942,900$ 19,215,208 1,179,262 2,797,390$ 2.37$ 686,784$ 17,022,643 4,711,606 0
CITY OF KOYUKUK
35,420$ 224,654 29,113 74,971$ 2.58$ 30,388$ 310,293 0 0 Koyukuk PCE
35,420$ 224,654 29,113 74,971$ 2.58$ 30,388$ 310,293 0 0
KWETHLUK INCORPORATED
142,733$ 1,576,035 138,417 400,075$ 2.89$ 166,890$ 1,794,165 0 0 Kwethluk PCE
142,733$ 1,576,035 138,417 400,075$ 2.89$ 166,890$ 1,794,165 0 0
KWIGILLINGOK IRA COUNCIL
156,486$ 1,197,756 86,617 242,426$ 2.80$ 402,689$ 1,042,090 306,521 20,792 Kwigillingok PCE
156,486$ 1,197,756 86,617 242,426$ 2.80$ 402,689$ 1,042,090 306,521 20,792
LARSEN BAY UTILITY
COMPANY
-$ 834,648 2,332 8,192$ 3.51$ 38,400$ 28,935 971,111 0 Larsen Bay PCE
-$ 834,648 2,332 8,192$ 3.51$ 38,400$ 28,935 971,111 0
LEVELOCK ELECTRICAL COOP
51,309$ 320,990 33,977 92,815$ 2.73$ 98,515$ 404,972 0 0 Levelock PCE
51,309$ 320,990 33,977 92,815$ 2.73$ 98,515$ 404,972 0 0
LIME VILLAGE ELECTRIC
UTILITY
17,931$ 47,671 11,034 73,378$ 6.65$ -$ 76,998 0 0 Non-fuel costs not provided by
utility
Lime Village PCE
17,931$ 47,671 11,034 73,378$ 6.65$ -$ 76,998 0 0
MANOKOTAK POWER
COMPANY
140,091$ 1,192,005 107,244 298,531$ 2.78$ 250,901$ 1,265,745 0 0 Manokotak PCE
140,091$ 1,192,005 107,244 298,531$ 2.78$ 250,901$ 1,265,745 0 0
MCGRATH LIGHT & POWER
223,822$ 1,943,680 152,818 487,299$ 3.19$ -$ 2,185,495 0 0 Non-fuel costs not provided by
utility
McGrath PCE
223,822$ 1,943,680 152,818 487,299$ 3.19$ -$ 2,185,495 0 0
MIDDLE KUSKOKWIM
ELECTRIC COOPERATIVE INC
86,624$ 209,725 21,184 60,609$ 2.86$ 176,382$ 240,771 0 0 Chuathbaluk PCE
75,510$ 220,550 21,552 61,631$ 2.86$ 186,807$ 245,714 0 0 Crooked Creek PCE
17
State of Alaska: Alaska Energy Authority
Power Cost Equalization Program Statistical Data by Utility
Fiscal Year: 2018
NOTES *** = Calculations cannot be made due to lack of data or other circumstances
Some values have been updated from what was provide by utilities
Column a: Residential rates as reported by the utility in fiscal year 2018.
Column b: Rates based upon RCA Letter order in effect for last report filed in fiscal year 2018.
PCE rate reflects 100% funding level.
Column References:a b c d e f g h i j k
a - b i + j
Last Reported Number of Customers PCE Eligible kWh
Residential Community
Facilities
Other
Customers
(Non-PCE)
Residential Community
Facilities Total
Utility/Community
Last
Reported
Residential
Rate (based
on 500 kWh)
Last PCE
Rate Applied
Last
Effective
Residential
Rate
Population Reported
Periods
Red Devil PCE 1.1750$ 0.7350$ $ 0.4400 15 12 13 0 5 29,935 0 29,935
Sleetmute PCE 1.1750$ 0.7350$ $ 0.4400 98 12 34 4 10 71,311 43,628 114,939
Stony River PCE 1.1750$ 0.7350$ $ 0.4400 41 12 15 5 6 37,044 0 37,044
Utility Company Total 364 124 23 40 297,515 113,087 410,602
NAKNEK ELECTRIC
Naknek;S.Naknek;Kng Slmn
PCE
0.4630$ 0.2578$ $ 0.2052 874 12 733 38 393 1,894,814 734,086 2,628,900
Utility Company Total 874 733 38 393 1,894,814 734,086 2,628,900
NAPAKIAK IRCINRAQ
Napakiak PCE 0.6972$ 0.3122$ $ 0.3850 355 12 107 4 24 350,348 38,618 388,966
Utility Company Total 355 107 4 24 350,348 38,618 388,966
NAPASKIAK ELECTRIC
UTILITY
Napaskiak PCE 0.7000$ 0.2310$ $ 0.4690 458 12 109 8 32 383,527 54,529 438,056
Utility Company Total 458 109 8 32 383,527 54,529 438,056
NATERKAQ LIGHT PLANT
Chefornak PCE 0.4900$ 0.3142$ $ 0.1758 442 12 93 18 30 431,801 67,339 499,140
Utility Company Total 442 93 18 30 431,801 67,339 499,140
NELSON LAGOON
ELECTRICAL COOP
Nelson Lagoon PCE 0.8400$ 0.4899$ $ 0.3501 34 12 26 5 12 102,829 26,019 128,848
Utility Company Total 34 26 5 12 102,829 26,019 128,848
NEW KOLIGANEK
VILLAGE COUNCIL
Koliganek PCE 0.5000$ 0.2461$ $ 0.2539 220 12 74 9 18 232,671 85,675 318,346
Utility Company Total 220 74 9 18 232,671 85,675 318,346
CITY OF NIKOLAI
Nikolai PCE 0.9000$ 0.4937$ $ 0.4063 94 12 40 7 12 115,146 33,295 148,441
Utility Company Total 94 40 7 12 115,146 33,295 148,441
NOME JOINT UTILITY
SYSTEM
Nome PCE 0.3330$ 0.0836$ $ 0.2494 3777 12 1,744 79 373 5,522,195 2,133,156 7,655,351
Utility Company Total 3,777 1,744 79 373 5,522,195 2,133,156 7,655,351
NORTH SLOPE
BOROUGH
Anaktuvuk Pass PCE 0.1500$ -$ $ 0.1500 393 12 99 2 60 236,462 42,158 278,620
Atqasuk PCE 0.2480$ -$ $ 0.2480 248 12 61 2 54 135,318 57,857 193,175
Kaktovik PCE 0.2061$ -$ $ 0.2061 262 12 77 3 51 166,826 68,796 235,622
Nuiqsut PCE 0.0800$ -$ $ 0.0800 446 12 112 3 74 457,000 98,730 555,730
Point Hope PCE 0.1807$ -$ $ 0.1807 711 12 186 2 87 500,248 53,297 553,545
18
State of Alaska: Alaska Energy Authority
Power Cost Equalization Program Statistical Data by Utility
Fiscal Year: 2018
Columns f - h: Values extracted from utilities' most recent fiscal year 2018 monthly report
Column p: Alaska Village Electric Cooperative average price of fuel is per reported actual fuel cost divided by gallons used;
all others are per prices used to determine PCE level
Columns i, j, m: Values summed from fiscal year 2018 utility reports
l m n o p q r s t
o / n
Total Fuel Used (diesel)
Gallons Cost Notes Utility/Community
Total kWh
Generated
(Diesel)
PCE Payments
Made
Total kWh
Sold
Avg Price
of Fuel
($/gal)
Total Non Fuel
Expenses
Total kWh
Generated
(Non Diesel)
Total kWh
Purchased
21,175$ 56,179 9,007 25,752$ 2.86$ 119,058$ 66,398 0 0 Red Devil PCE
81,516$ 220,723 24,166 69,115$ 2.86$ 237,683$ 253,767 0 0 Sleetmute PCE
26,300$ 103,021 14,701 42,065$ 2.86$ 138,944$ 121,517 0 0 Stony River PCE
291,125$ 810,198 90,610 259,172$ 14.30$ 858,873$ 928,167 0 0
NAKNEK ELECTRIC
707,978$ 21,366,158 1,567,417 3,061,769$ 1.95$ 4,061,463$ 22,848,137 0 0 Naknek;S.Naknek;Kng Slmn PCE
707,978$ 21,366,158 1,567,417 3,061,769$ 1.95$ 4,061,463$ 22,848,137 0 0
NAPAKIAK IRCINRAQ
111,969$ 634,910 7,864 2,282$ 0.29$ 123,377$ 217 0 678,406 Value shown as Avg. Price of
Fuel is the $/kWh purchase price
from AVEC
Napakiak PCE
111,969$ 634,910 7,864 2,282$ 0.29$ 123,377$ 217 0 678,406
NAPASKIAK ELECTRIC UTILITY
154,076$ 657,088 83,480 381,646$ 4.57$ 38,095$ 1,032,498 0 0 Napaskiak PCE
154,076$ 657,088 83,480 381,646$ 4.57$ 38,095$ 1,032,498 0 0
NATERKAQ LIGHT PLANT
119,604$ 1,311,234 113,917 341,301$ 3.00$ -$ 1,488,308 0 0 Non-fuel costs not provided by
utility
Chefornak PCE
119,604$ 1,311,234 113,917 341,301$ 3.00$ -$ 1,488,308 0 0
NELSON LAGOON
ELECTRICAL COOP
67,344$ 263,977 30,534 126,254$ 4.13$ 61,171$ 333,223 0 0 Nelson Lagoon PCE
67,344$ 263,977 30,534 126,254$ 4.13$ 61,171$ 333,223 0 0
NEW KOLIGANEK VILLAGE
COUNCIL
74,539$ 671,139 61,734 162,298$ 2.63$ 2,220$ 755,503 0 0 Koliganek PCE
74,539$ 671,139 61,734 162,298$ 2.63$ 2,220$ 755,503 0 0
CITY OF NIKOLAI
62,679$ 371,354 43,501 184,522$ 4.24$ -$ 465,725 0 0 Non-fuel costs not provided by
utility
Nikolai PCE
62,679$ 371,354 43,501 184,522$ 4.24$ -$ 465,725 0 0
NOME JOINT UTILITY SYSTEM
673,631$ 28,746,727 1,830,717 3,678,894$ 2.01$ 6,921,043$ 29,192,032 2,251,280 0 Nome PCE
673,631$ 28,746,727 1,830,717 3,678,894$ 2.01$ 6,921,043$ 29,192,032 2,251,280 0
NORTH SLOPE BOROUGH
3,104$ 3,640,397 309,615 821,456$ 2.65$ 1,170,329$ 4,090,298 0 0 Residential customers not
eligible
Anaktuvuk Pass PCE
5,091$ 2,957,150 256,992 1,125,849$ 4.38$ 1,139,712$ 3,405,420 0 0 Residential customers not
eligible
Atqasuk PCE
6,126$ 4,174,912 369,889 930,293$ 2.52$ 1,124,172$ 4,749,459 0 0 Residential customers not
eligible
Kaktovik PCE
9,466$ 5,707,097 50,333 199,416$ 3.96$ 1,063,648$ 548,144 6,572,967 0 Residential customers not
eligible
Nuiqsut PCE
4,615$ 5,704,561 545,613 1,437,409$ 2.63$ 1,305,437$ 6,802,322 0 0 Residential customers not
eligible
Point Hope PCE
19
State of Alaska: Alaska Energy Authority
Power Cost Equalization Program Statistical Data by Utility
Fiscal Year: 2018
NOTES *** = Calculations cannot be made due to lack of data or other circumstances
Some values have been updated from what was provide by utilities
Column a: Residential rates as reported by the utility in fiscal year 2018.
Column b: Rates based upon RCA Letter order in effect for last report filed in fiscal year 2018.
PCE rate reflects 100% funding level.
Column References:a b c d e f g h i j k
a - b i + j
Last Reported Number of Customers PCE Eligible kWh
Residential Community
Facilities
Other
Customers
(Non-PCE)
Residential Community
Facilities Total
Utility/Community
Last
Reported
Residential
Rate (based
on 500 kWh)
Last PCE
Rate Applied
Last
Effective
Residential
Rate
Population Reported
Periods
Point Lay PCE 0.1887$ 0.0001$ $ 0.1886 269 12 64 1 44 128,704 19,158 147,862
Wainwright PCE 0.1826$ -$ $ 0.1826 557 12 151 3 72 428,188 61,789 489,977
Utility Company Total 2,886 750 16 442 2,052,746 401,785 2,454,531
NUNAM IQUA ELECTRIC
COMPANY
Nunam Iqua PCE 0.3964$ 0.1948$ $ 0.2016 201 12 43 5 11 186,136 138,894 325,030
Utility Company Total 201 43 5 11 186,136 138,894 325,030
NUSHAGAK ELECTRIC
AND
Dillingham; Aleknagik PCE 0.4151$ 0.1616$ $ 0.2535 2533 12 1,013 54 463 3,880,648 753,758 4,634,406
Utility Company Total 2,533 1,013 54 463 3,880,648 753,758 4,634,406
CITY OF OUZINKIE
Ouzinkie PCE 0.4800$ 0.1103$ $ 0.3697 159 12 74 14 22 234,026 116,303 350,329
Utility Company Total 159 74 14 22 234,026 116,303 350,329
PEDRO BAY VILLAGE
COUNCIL
Pedro Bay PCE 0.8200$ 0.3746$ $ 0.4454 32 12 22 4 11 40,138 20,966 61,104
Utility Company Total 32 22 4 11 40,138 20,966 61,104
PILOT POINT ELECTRIC
UTILITY
Pilot Point PCE 0.6000$ 0.2855$ $ 0.3145 74 12 47 10 23 116,317 60,297 176,614
Utility Company Total 74 47 10 23 116,317 60,297 176,614
PLATINUM COMMERCIAL
COMPANY LLC
Platinum PCE 0.9500$ 0.0001$ $ 0.9499 48 3 23 3 11 9,469 3,988 13,457
Utility Company Total 48 23 3 11 9,469 3,988 13,457
PORT HEIDEN UTILITIES
Port Heiden PCE 0.6500$ 0.2988$ $ 0.3512 98 12 47 6 31 156,140 51,079 207,219
Utility Company Total 98 47 6 31 156,140 51,079 207,219
PUVURNAQ POWER
COMPANY
Kongiganak PCE 0.6500$ 0.3173$ $ 0.3327 520 12 107 5 24 446,933 72,721 519,654
Utility Company Total 520 107 5 24 446,933 72,721 519,654
RAMPART VILLAGE
COUNCIL
Rampart PCE 0.9050$ 0.5290$ $ 0.3760 64 9 34 8 6 42,705 40,006 82,711
Utility Company Total 64 34 8 6 42,705 40,006 82,711
CITY OF RUBY
Ruby PCE 0.7500$ 0.4194$ $ 0.3306 178 11 110 33 19 201,254 79,247 280,501
Utility Company Total 178 110 33 19 201,254 79,247 280,501
STEVENS VILLAGE IRA
COUNCIL
20
State of Alaska: Alaska Energy Authority
Power Cost Equalization Program Statistical Data by Utility
Fiscal Year: 2018
Columns f - h: Values extracted from utilities' most recent fiscal year 2018 monthly report
Column p: Alaska Village Electric Cooperative average price of fuel is per reported actual fuel cost divided by gallons used;
all others are per prices used to determine PCE level
Columns i, j, m: Values summed from fiscal year 2018 utility reports
l m n o p q r s t
o / n
Total Fuel Used (diesel)
Gallons Cost Notes Utility/Community
Total kWh
Generated
(Diesel)
PCE Payments
Made
Total kWh
Sold
Avg Price
of Fuel
($/gal)
Total Non Fuel
Expenses
Total kWh
Generated
(Non Diesel)
Total kWh
Purchased
1,476$ 2,973,209 262,256 677,676$ 2.58$ 1,033,664$ 3,535,715 0 0 Residential customers not
eligible
Point Lay PCE
4,799$ 6,156,837 557,941 1,440,928$ 2.58$ 1,148,359$ 7,469,315 0 0 Residential customers not
eligible
Wainwright PCE
34,677$ 31,314,163 2,352,639 6,633,027$ 21.31$ 7,985,322$ 30,600,673 6,572,967 0
NUNAM IQUA ELECTRIC
COMPANY
44,742$ 719,521 61,076 152,016$ 2.49$ 110,945$ 773,657 0 0 Nunam Iqua PCE
44,742$ 719,521 61,076 152,016$ 2.49$ 110,945$ 773,657 0 0
NUSHAGAK ELECTRIC AND
745,994$ 17,454,271 1,268,423 2,624,397$ 2.07$ 3,971,212$ 18,877,300 0 0 Dillingham; Aleknagik PCE
745,994$ 17,454,271 1,268,423 2,624,397$ 2.07$ 3,971,212$ 18,877,300 0 0
CITY OF OUZINKIE
43,588$ 618,573 31,349 87,075$ 2.78$ 118,698$ 386,053 291,848 0 Ouzinkie PCE
43,588$ 618,573 31,349 87,075$ 2.78$ 118,698$ 386,053 291,848 0
PEDRO BAY VILLAGE
COUNCIL
21,954$ 161,840 18,031 67,329$ 3.73$ 35,136$ 192,353 0 0 Pedro Bay PCE
21,954$ 161,840 18,031 67,329$ 3.73$ 35,136$ 192,353 0 0
PILOT POINT ELECTRIC
UTILITY
51,704$ 401,158 46,126 123,817$ 2.68$ 12,063$ 479,371 0 0 Pilot Point PCE
51,704$ 401,158 46,126 123,817$ 2.68$ 12,063$ 479,371 0 0
PLATINUM COMMERCIAL
COMPANY LLC
-$ 44,732 6,028 15,288$ 2.54$ 28,962$ 62,513 0 0 3 months reported Platinum PCE
-$ 44,732 6,028 15,288$ 2.54$ 28,962$ 62,513 0 0
PORT HEIDEN UTILITIES
65,222$ 504,260 51,523 123,603$ 2.40$ 54,498$ 594,720 0 0 Port Heiden PCE
65,222$ 504,260 51,523 123,603$ 2.40$ 54,498$ 594,720 0 0
PUVURNAQ POWER COMPANY
139,932$ 1,124,582 64,832 176,644$ 2.72$ 495,934$ 798,130 438,326 159,981 Kongiganak PCE
139,932$ 1,124,582 64,832 176,644$ 2.72$ 495,934$ 798,130 438,326 159,981
RAMPART VILLAGE COUNCIL
39,555$ 129,491 14,539 44,721$ 3.08$ 15,382$ 162,335 0 0 9 months reported Rampart PCE
39,555$ 129,491 14,539 44,721$ 3.08$ 15,382$ 162,335 0 0
CITY OF RUBY
103,272$ 596,519 49,247 203,217$ 4.13$ 237,217$ 603,675 0 0 11 months reported Ruby PCE
103,272$ 596,519 49,247 203,217$ 4.13$ 237,217$ 603,675 0 0
STEVENS VILLAGE IRA
COUNCIL
21
State of Alaska: Alaska Energy Authority
Power Cost Equalization Program Statistical Data by Utility
Fiscal Year: 2018
NOTES *** = Calculations cannot be made due to lack of data or other circumstances
Some values have been updated from what was provide by utilities
Column a: Residential rates as reported by the utility in fiscal year 2018.
Column b: Rates based upon RCA Letter order in effect for last report filed in fiscal year 2018.
PCE rate reflects 100% funding level.
Column References:a b c d e f g h i j k
a - b i + j
Last Reported Number of Customers PCE Eligible kWh
Residential Community
Facilities
Other
Customers
(Non-PCE)
Residential Community
Facilities Total
Utility/Community
Last
Reported
Residential
Rate (based
on 500 kWh)
Last PCE
Rate Applied
Last
Effective
Residential
Rate
Population Reported
Periods
Stevens Village PCE 1.0700$ 0.5631$ $ 0.5069 41 12 13 3 6 22,542 24,970 47,512
Utility Company Total 41 13 3 6 22,542 24,970 47,512
CITY OF ST. GEORGE
St. George PCE 1.0000$ 0.7767$ $ 0.2233 72 12 39 7 28 100,359 58,980 159,339
Utility Company Total 72 39 7 28 100,359 58,980 159,339
ST. PAUL MUNICIPAL
ELECTRIC
St. Paul PCE 0.4100$ 0.2342$ $ 0.1758 397 12 152 31 50 602,251 333,480 935,731
Utility Company Total 397 152 31 50 602,251 333,480 935,731
TAKOTNA COMMUNITY
ASSOC INC
Takotna PCE 1.0220$ 0.4165$ $ 0.6055 64 12 35 5 17 66,769 23,455 90,224
Utility Company Total 64 35 5 17 66,769 23,455 90,224
TANALIAN ELECTRIC
COOPERATIVE
Port Alsworth PCE 0.5599$ 0.3222$ $ 0.2377 218 12 84 0 68 259,719 0 259,719
Utility Company Total 218 84 0 68 259,719 0 259,719
TANANA POWER
COMPANY INC.
Tanana PCE 0.6527$ 0.3034$ $ 0.3493 224 12 104 7 54 280,367 155,847 436,214
Utility Company Total 224 104 7 54 280,367 155,847 436,214
TATITLEK VILLAGE IRA
COUNCIL
Tatitlek PCE 0.9200$ 0.5894$ $ 0.3306 90 12 40 5 20 104,138 50,927 155,065
Utility Company Total 90 40 5 20 104,138 50,927 155,065
TDX ADAK GENERATING
LLC
Adak PCE 1.4341$ 0.7204$ $ 0.7137 309 12 101 7 121 171,045 147,649 318,694
Utility Company Total 309 101 7 121 171,045 147,649 318,694
TDX CORPORATION
Sand Point PCE 0.7567$ 0.2470$ $ 0.5097 943 12 280 27 88 977,861 752,785 1,730,646
Utility Company Total 943 280 27 88 977,861 752,785 1,730,646
TDX MANLEY
GENERATING LLC
Manley Hot Springs PCE 0.8041$ 0.5045$ $ 0.2996 127 12 85 7 21 163,974 31,566 195,540
Utility Company Total 127 85 7 21 163,974 31,566 195,540
CITY OF TENAKEE
SPRINGS
Tenakee Springs PCE 0.6500$ 0.3554$ $ 0.2946 140 12 126 13 25 207,566 28,302 235,868
Utility Company Total 140 126 13 25 207,566 28,302 235,868
TULUKSAK TRADITIONAL
Tuluksak PCE 0.7500$ 0.3770$ $ 0.3730 363 12 101 6 14 230,645 41,576 272,221
22
State of Alaska: Alaska Energy Authority
Power Cost Equalization Program Statistical Data by Utility
Fiscal Year: 2018
Columns f - h: Values extracted from utilities' most recent fiscal year 2018 monthly report
Column p: Alaska Village Electric Cooperative average price of fuel is per reported actual fuel cost divided by gallons used;
all others are per prices used to determine PCE level
Columns i, j, m: Values summed from fiscal year 2018 utility reports
l m n o p q r s t
o / n
Total Fuel Used (diesel)
Gallons Cost Notes Utility/Community
Total kWh
Generated
(Diesel)
PCE Payments
Made
Total kWh
Sold
Avg Price
of Fuel
($/gal)
Total Non Fuel
Expenses
Total kWh
Generated
(Non Diesel)
Total kWh
Purchased
25,732$ 117,934 20,448 65,437$ 3.20$ 72,826$ 170,133 0 0 Stevens Village PCE
25,732$ 117,934 20,448 65,437$ 3.20$ 72,826$ 170,133 0 0
CITY OF ST. GEORGE
123,163$ 457,946 50,266 346,480$ 6.89$ 20,490$ 592,285 0 0 St. George PCE
123,163$ 457,946 50,266 346,480$ 6.89$ 20,490$ 592,285 0 0
ST. PAUL MUNICIPAL
ELECTRIC
249,681$ 2,982,150 230,112 811,531$ 3.53$ 608,949$ 3,033,386 0 418,343 St. Paul PCE
249,681$ 2,982,150 230,112 811,531$ 3.53$ 608,949$ 3,033,386 0 418,343
TAKOTNA COMMUNITY ASSOC
INC
38,679$ 182,955 23,531 84,126$ 3.58$ 35,595$ 226,266 0 0 Takotna PCE
38,679$ 182,955 23,531 84,126$ 3.58$ 35,595$ 226,266 0 0
TANALIAN ELECTRIC
COOPERATIVE
81,685$ 866,447 77,167 269,416$ 3.49$ -$ 936,769 0 0 Non-fuel costs not provided by
utility
Port Alsworth PCE
81,685$ 866,447 77,167 269,416$ 3.49$ -$ 936,769 0 0
TANANA POWER COMPANY
INC.
140,142$ 1,234,970 99,277 249,631$ 2.51$ 399,738$ 1,347,220 0 0 Tanana PCE
140,142$ 1,234,970 99,277 249,631$ 2.51$ 399,738$ 1,347,220 0 0
TATITLEK VILLAGE IRA
COUNCIL
87,170$ 311,558 34,495 150,703$ 4.37$ 22,718$ 407,801 0 0 Tatitlek PCE
87,170$ 311,558 34,495 150,703$ 4.37$ 22,718$ 407,801 0 0
TDX ADAK GENERATING LLC
202,219$ 1,237,518 164,150 630,951$ 3.84$ 1,625,820$ 2,017,190 0 0 Adak PCE
202,219$ 1,237,518 164,150 630,951$ 3.84$ 1,625,820$ 2,017,190 0 0
TDX CORPORATION
420,267$ 3,580,790 233,961 642,091$ 2.74$ 1,317,693$ 3,191,334 0 730,979 Sand Point PCE
420,267$ 3,580,790 233,961 642,091$ 2.74$ 1,317,693$ 3,191,334 0 730,979
TDX MANLEY GENERATING
LLC
116,365$ 454,707 44,088 101,788$ 2.31$ 237,205$ 558,735 0 0 Manley Hot Springs PCE
116,365$ 454,707 44,088 101,788$ 2.31$ 237,205$ 558,735 0 0
CITY OF TENAKEE SPRINGS
79,532$ 354,625 31,666 104,694$ 3.31$ 70,210$ 411,061 0 0 Tenakee Springs PCE
79,532$ 354,625 31,666 104,694$ 3.31$ 70,210$ 411,061 0 0
TULUKSAK TRADITIONAL
88,490$ 503,087 52,842 194,848$ 3.69$ 65,134$ 602,705 0 0 Tuluksak PCE
23
State of Alaska: Alaska Energy Authority
Power Cost Equalization Program Statistical Data by Utility
Fiscal Year: 2018
NOTES *** = Calculations cannot be made due to lack of data or other circumstances
Some values have been updated from what was provide by utilities
Column a: Residential rates as reported by the utility in fiscal year 2018.
Column b: Rates based upon RCA Letter order in effect for last report filed in fiscal year 2018.
PCE rate reflects 100% funding level.
Column References:a b c d e f g h i j k
a - b i + j
Last Reported Number of Customers PCE Eligible kWh
Residential Community
Facilities
Other
Customers
(Non-PCE)
Residential Community
Facilities Total
Utility/Community
Last
Reported
Residential
Rate (based
on 500 kWh)
Last PCE
Rate Applied
Last
Effective
Residential
Rate
Population Reported
Periods
Utility Company Total 363 101 6 14 230,645 41,576 272,221
TUNTUTULIAK
COMMUNITY
Tuntutuliak PCE 0.6500$ 0.2896$ $ 0.3604 454 12 110 7 31 418,179 20,002 438,181
Utility Company Total 454 110 7 31 418,179 20,002 438,181
TWIN HILLS VILLAGE
COUNCIL
Twin Hills PCE 0.5084$ 0.2742$ $ 0.2342 85 12 33 5 8 108,557 34,252 142,809
Utility Company Total 85 33 5 8 108,557 34,252 142,809
UMNAK POWER
COMPANY
Nikolski PCE 0.7500$ 0.5742$ $ 0.1758 13 12 13 5 8 40,125 10,920 51,045
Utility Company Total 13 13 5 8 40,125 10,920 51,045
CITY OF UNALASKA
Unalaska PCE 0.5004$ 0.1637$ $ 0.3367 4448 12 750 58 197 1,849,828 2,983,706 4,833,534
Utility Company Total 4,448 750 58 197 1,849,828 2,983,706 4,833,534
UNALAKLEET VALLEY
ELECTRIC
Unalakleet PCE 0.4361$ 0.1551$ $ 0.2810 758 12 270 21 88 1,018,953 350,398 1,369,351
Utility Company Total 758 270 21 88 1,018,953 350,398 1,369,351
UNGUSRAQ POWER
COMPANY
Newtok PCE 0.8000$ 0.4171$ $ 0.3829 372 12 71 3 23 243,863 21,116 264,979
Utility Company Total 372 71 3 23 243,863 21,116 264,979
VENETIE VILLAGE
ELECTRIC
Venetie PCE 0.9000$ 0.3917$ $ 0.5083 192 11 104 9 13 178,345 98,877 277,222
Utility Company Total 192 104 9 13 178,345 98,877 277,222
CITY OF WHITE
MOUNTAIN
White Mountain PCE 0.5500$ 0.2569$ $ 0.2931 209 12 65 8 29 234,714 109,053 343,767
Utility Company Total 209 65 8 29 234,714 109,053 343,767
24
State of Alaska: Alaska Energy Authority
Power Cost Equalization Program Statistical Data by Utility
Fiscal Year: 2018
Columns f - h: Values extracted from utilities' most recent fiscal year 2018 monthly report
Column p: Alaska Village Electric Cooperative average price of fuel is per reported actual fuel cost divided by gallons used;
all others are per prices used to determine PCE level
Columns i, j, m: Values summed from fiscal year 2018 utility reports
l m n o p q r s t
o / n
Total Fuel Used (diesel)
Gallons Cost Notes Utility/Community
Total kWh
Generated
(Diesel)
PCE Payments
Made
Total kWh
Sold
Avg Price
of Fuel
($/gal)
Total Non Fuel
Expenses
Total kWh
Generated
(Non Diesel)
Total kWh
Purchased
88,490$ 503,087 52,842 194,848$ 3.69$ 65,134$ 602,705 0 0
TUNTUTULIAK COMMUNITY
106,889$ 921,575 88,980 235,210$ 2.64$ 400,382$ 921,620 107,510 54,194 Tuntutuliak PCE
106,889$ 921,575 88,980 235,210$ 2.64$ 400,382$ 921,620 107,510 54,194
TWIN HILLS VILLAGE COUNCIL
40,324$ 271,334 31,612 89,361$ 2.83$ 21,809$ 308,334 0 0 Twin Hills PCE
40,324$ 271,334 31,612 89,361$ 2.83$ 21,809$ 308,334 0 0
UMNAK POWER COMPANY
29,310$ 167,539 18,490 116,191$ 6.28$ 234,510$ 207,951 0 0 Nikolski PCE
29,310$ 167,539 18,490 116,191$ 6.28$ 234,510$ 207,951 0 0
CITY OF UNALASKA
654,258$ 55,350,767 3,643,265 8,248,912$ 2.26$ 4,666,412$ 57,918,250 0 0 Unalaska PCE
654,258$ 55,350,767 3,643,265 8,248,912$ 2.26$ 4,666,412$ 57,918,250 0 0
UNALAKLEET VALLEY
ELECTRIC
213,539$ 3,953,458 228,032 567,670$ 2.49$ -$ 3,441,700 972,128 0 Non-fuel costs not provided by
utility
Unalakleet PCE
213,539$ 3,953,458 228,032 567,670$ 2.49$ -$ 3,441,700 972,128 0
UNGUSRAQ POWER COMPANY
110,937$ 390,098 39,451 113,384$ 2.87$ 170,537$ 418,864 0 0 Newtok PCE
110,937$ 390,098 39,451 113,384$ 2.87$ 170,537$ 418,864 0 0
VENETIE VILLAGE ELECTRIC
103,541$ 543,006 51,259 203,566$ 3.97$ 19,750$ 712,941 0 0 11 months reported Venetie PCE
103,541$ 543,006 51,259 203,566$ 3.97$ 19,750$ 712,941 0 0
CITY OF WHITE MOUNTAIN
89,548$ 747,765 65,332 158,372$ 2.42$ 183,075$ 821,952 0 0 White Mountain PCE
89,548$ 747,765 65,332 158,372$ 2.42$ 183,075$ 821,952 0 0
25
POWER COST EQUALIZATION PROGRAM
HISTORICAL TRENDS
Fiscal Year 2009 - 2018
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
PARTICIPATION
Participating Utilities 85 84 83 87 88 87 86 88 89 89
Communities Served 184 183 183 188 190 190 190 191 194 194
Population Served 77,518 78,431 77,341 79,644 81,693 82,427 81,969 82,986 83,850 83,400
PCE ELIGIBLE CUSTOMERS
Residential 26,562 26,794 26,753 27,402 27,795 27,716 27,893 28,035 27,857 28,365
Community Facilities 1,903 1,899 1,888 1,919 1,900 1,889 1,850 2,056 2,067 2,090
Total Customers 28,465 28,693 28,641 29,321 29,695 29,605 29,743 30,091 29,924 30,455
FUNDING
Appropriations ($)$38,500,000 $37,660,000 $36,000,000 $39,150,000 $40,100,000 $41,006,000 $41,000,000 $41,000,000 $40,000,000 $32,355,000
Disbursements ($)$37,029,584 $30,627,339 $31,810,803 $39,059,864 $39,715,618 $39,571,659 $37,379,742 $31,042,569 $26,099,807 $26,182,235
Disbursements/Customer ($)$1,301 $1,067 $1,111 $1,332 $1,337 $1,337 $1,257 $1,032 $872 $860
Funding Level 100%100%100%100%100%100%100%100%100%100%
CONSUMPTION
Total MWh Sold (MWH)435,580 422,159 437,266 459,056 463,573 452,751 450,852 447,333 462,998 458,734
PCE Eligible MWh Residential 91,941 91,484 93,175 96,666 97,102 95,990 96,453 94,816 97,751 96,597
Avg. PCE Eligible kWh/Month/Residential Cust 288 285 290 294 291 289 288 282 292 284
PCE Eligible MWh Community Facilities 32,142 31,459 33,116 34,750 34,743 33,409 32,795 34,357 35,747 34,928
Elig. kWh/Month/Capita, Community Facilities 35.0 33.0 36.0 36.0 35.0 34.0 33.3 35.0 36.0 35.0
Total PCE Eligible MWh 124,083 122,943 126,291 131,417 131,845 129,414 129,248 129,173 133,498 131,526
Eligible kWh/Month/Cust, Total Customers 363 357 367 374 370 364 362 358 372 360
COSTS
Average Price of Fuel Oil ($/gallon)$3.97 $3.28 $3.45 $4.02 $4.21 $4.21 $3.97 $3.24 $2.66 $2.86
Total Gallons of Fuel Oil Consumed 29,351,396 27,597,323 28,159,847 29,204,577 28,957,490 27,919,599 27,191,149 26,865,206 28,838,704 28,638,535
Total Cost of Fuel Oil ($)$116,446,822 $90,555,298 $97,042,004 $117,313,926 $121,707,897 $117,483,188 $107,842,372 $87,102,302 $76,759,457 $76,137,419
Total Non-Fuel Costs ($)$55,475,597 $67,018,467 $60,012,748 $69,554,141 $79,772,882 $73,336,386 $76,036,533 $82,964,017 $85,141,895 $89,505,362
FINANCIAL RATIOS
Non-Fuel Costs Per Total kWh Sold 0.1274$ 0.1588$ 0.1372$ 0.1515$ 0.1721$ 0.1620$ 0.1687$ 0.1855$ 0.1839$ 0.1770$
Total Operating Costs Per Total kWh Sold 0.3939$ 0.3733$ 0.3592$ 0.4071$ 0.4346$ 0.4215$ 0.4078$ 0.3802$ 0.3497$ 0.3276$
RATES
Avg. PCE per Eligible kWh Res. & Comm Facility ($/kWh) 0.2984$ 0.2491$ 0.2519$ 0.2972$ 0.3012$ 0.3058$ 0.2892$ 0.2403$ 0.1955$ 0.3021$
Weighted Avg. Residential Rate (Before PCE Paid)0.5195$ 0.4677$ 0.4756$ 0.5131$ 0.4973$ 0.5005$ 0.4915$ 0.4541$ 0.4270$ 0.4226$
Weighted Avg. Residential PCE Rate (Amount PCE pays)0.3064$ 0.2596$ 0.2592$ 0.3044$ 0.3064$ 0.3108$ 0.2919$ 0.2432$ 0.1983$ 0.1987$
Weighted Avg. Residential Effective Rate (1)0.2131$ 0.2081$ 0.2164$ 0.2087$ 0.1909$ 0.1897$ 0.1996$ 0.2109$ 0.2287$ 0.2239$
(1) Amount customers pay for first 500 kWh/month.
26