Loading...
HomeMy WebLinkAboutBradley Lake PMC Meeting-Wed., Jan. 7, 2004 1Moting Suggested resoltitions: Mepo~ Resofttion #1: A ol - { Be it resolved that the BPMC authorize HEA to immediately proceed with contract negations with VA tech to provide the services and equipment as described in their proposal of September 23, 2003, at a cost not to exceed $1.8 Million. A decision to proceed or not to proceed with the work past the modeling phase will be allowed under this contract. The modeling phase is not to exceed $400,000 dollars. Preacd te ansovta ir FERC Cp prove ot Med if) corbyors nt / MOTION: Ve (ey and; yr fo ] i U é ———_7-+——__ Nf Jot 10w / a Resolutio n #2: 04-2 Cartimed erg bypwrr a ve ogo Be is resolved that the BPMC requests HEA to enter into a professional-services. —contraect with Don Stead in order to retain his eniowiedge and services for this governor modification project. - ex 3,008. Terms to be negotiated by HEA and Mr. Stead. hts poce MOTION: ip € Giedt sak a Dowws Cabred Vy = a ae Where dL ye Bradley Lake PROJECT MANAGEMENT COMMITTEE MEETING i LO Wi01, on Ao / 0 (Date) ATDEA Boasel fan PAM (Location) PLEASE SIGN IN REPRESENTING 4 ULES 5 Pees Ae Lf 6 Sot =. a 7 ee Tae Cafe Ge : 9 i Lye bl ney 10 | Zool Dee W Eoin bhewe 2 | Kee nLe 13 STIZAEAW HAACIEVS oS 14 2 cK KekKar 15 16 17 - 18 19 20 | 21 22 92Q2\IT9884 Bradley Lake PROJECT MANAGEMENT COMMITTEE MEETING (Date) (Location) PLEASE SIGN IN No. NAME REPRESENTING 10 11 12 13 14 15 16 17 18 19 20 21 22 92Q2\IT9884 Agenda Item No. CITY OF SEWARD MATANUSKA ELEC ASSOC CHUGACH ELEC ASSOC HOMER ELEC ASSOC GOLDEN VAL ELEC ASSOC MUNI LIGHT & POWER ALASKA ENERGY AUTHORITY A=4+ OVER 51% BRADLEY PMC VOTING DATE: 7 fOviey / 200 +70. a ot te us eee 01% 14% PT Ze 30% FI eee 12% [Ze Ze im PE) CiCédDE T 26% [Zh ret EE] B= AEA CONCUR With A C = UNANIMOUS D = MAJORITY VOTING METHOD A: Requiring four yeas with 51% of utilities, with no AEA vote: 1) Procedures for scheduling, production and dispatch of project power. 2) Establishment of procedures for use of each purchaser's water allocation (AEA assent required for license requirements). 3) Selection among alternative methods that do not involve AEA for funding required project work. VOTING METHOD B: Requiring 4 yeas with 51% of utilities and AEA concurrence: 1) Arranging operation and maintenance of project. 2) Adoption of budget of annual project costs. VOTE(93Q3/BC5272) 3) Establishment of FY estimated annual payment obligation and schedule of each purchaser. Determination of annual project costs after each FY. 4) Evaluation of necessity for and scheduling of required project work. 5) Determination of appropriate amount of insurance. 6) 7) Adoption of additional minimum funding amounts for renewal and contingency reserve fund above that required by bond resolution. 8) Selection among alternate methods that involve AEA for funding required project work. 9) Adoption or amendment of procedural committee rules (except dispute resolution). 10) Adoption of project maintenance schedules. Determination of rules, procedures and accounts necessary to manage project when no bonds outstanding. 11) Evaluation and approval of optional project work and compensation for such work. 12) 13) Application of insurance claims proceeds not governed by bond resolution. Approval of procedures and any individual utility agreements relating to electric power reserves for project. 14) 15) Approval of consultants. VOTING METHOD C: Unanimous vote by all (including AEA) VOTING METHOD D: Majority vote (including AEA) Election of Officers Agenda Item No. CITY OF SEWARD MATANUSKA ELEC ASSOC CHUGACH ELEC ASSOC HOMER ELEC ASSOC GOLDEN VAL ELEC ASSOC MUNI LIGHT & POWER ALASKA ENERGY AUTHORITY A=4+ OVER 51% DATE: BRADLEY PMC VOTING YES NO ABS YES NO ABS YES NO ABS 01% q 14% [Te] LS 30% 12% | 17% [Ta cS 26% [ Ft] a C = UNANIMOUS D= MAJORITY B= AEA CONCUR With A VOTING METHOD A: Requiring four yeas with 51% of utilities, with no AEA vote: 1) Procedures for scheduling, production and dispatch of project power. 2) Establishment of procedures for use of each purchaser's water allocation (AEA assent required for license requirements). 3) Selection among alternative methods that do not involve AEA for funding required project work, VOTING METHOD B: Requiring 4 yeas with 51% of utilities and AEA concurrence: 1) Arranging operation and maintenance of project. 2) Adoption of budget of annual project costs. VOTE(93Q3/BC5272) 3) 4) 5) 6) 7) 8) 9) Establishment of FY estimated annual payment obligation and schedule of each purchaser. Determination of annual project costs after each FY. Evaluation of necessity for and scheduling of required project work. Determination of appropriate amount of insurance. Adoption of additional minimum funding amounts for renewal and contingency reserve fund above that required by bond resolution. Selection among alternate methods that involve AEA for funding required project work. Adoption or amendment of procedural committee rules (except dispute resolution). 10) Adoption of project maintenance schedules. 11) 12) 13) 14) 15) Determination of rules, procedures and accounts necessary to manage project when no bonds outstanding. Evaluation and approval of optional project work and compensation for such work. Application of insurance claims proceeds not governed by bond resolution. Approval of procedures and any individual utility agreements relating to electric power reserves for project. Approval of consultants. VOTING METHOD C: Unanimous vote by all (including AEA) VOTING METHOD D: Majority vote (including AEA) Election of Officers Alaska Industrial Development and Export Aut AIDEAVAEA Rent Alaska Energy Authority BRADLEY LAKE PROJECT MANAGEMENT COMMITTEE REGULAR MEETING AGENDA Wednesday, January 7, 2004, 9:00 a.m. (Via electronic media at AIDEA/AEA — 813 W. Northern Lights Boulevard) (Corner of Arctic and Northern Lights Boulevard) 1. CALL TO ORDER ~ Haagenson 2. ROLL CALL (for Committee members) “ 3. PUBLIC ROLL CALL (for all others present) a 4, PUBLIC COMMENT \~ 5. AGENDACOMMENTS ~~ 6. APPROVAL OF MEETING MINUTES October 21, 2003 —- 7. NEW BUSINESS 1 A. VA Tech Budgetary Proposal .~ B. Day B. FERC Update = / Copoulos/Thrall A424 ; (ot ee V net. tyauat Ww Cc. Dedge® Nab [US THES COAaT = Uae ; : 8. COMMITTEE REPORTS / COMMENTS Lennie [Apple ale A. Next Meeting Date .~ Haagenson B. Operators Report ¢~ C. Insurance/Risk Assessment Scope of Work/Signed (~ Haagenson 9. ADJOURNMENT / oo a ( ead! TY tte hey (erm ~ SS ak + DN 813 West Northern Lights Boulevard * Anchorage, Alaska 99503 907 / 269-3000 * FAX 907 / 269-3044 * Toll Free (ALASKA ONLY) 888 / 300-8534 * www.aidea.org If you are unable to attend the meeting in person, please use the following phone instructions: TELECONFERENCE INSTRUCTIONS Wednesday, January 7, 2004 — 9:00 a.m. To join the meeting, please do the following: Dial 1-800-315-6338 Enter 813# x * x Transmission Result Report (MemoryTX) ( Jan... 2004 8:44AM) * * * 1) AIDEAZAEA 2) Date/Time: Jan. 7. 2004 8:34AM File Page No. Mode Destination Pg (3) Result Not Sent 3417 Memory TX 95626994 P. 6 OK 919072353323 OK 96899368 OK 92635204 OK 919072244085 OK 915032260079 OK Reason for error E.1) Hang up or tine fail —.2) —.3) No answer E.4) zo PLEASE DELIVER TO THE FOLLOWING: Steve Haagenson Golden Valley Electric Association (907) 458-5951 Joe Griffith Chugach Electric Association (907) 562-6994 Rick Eckert Homer Electric Association (907) 235-3323 Wayne Carmony Matanuska Electric Association (907) 689-9368 Jim Posey Anchorage Municipal Light & Power — (907) 263-5204 Dave Calvert City of Seward (907) 224-4085 Ron Saxton Ater Wynne LLP (503) 226-0079 Pleas add A Bre Racket for pacleds reacting 2 F-00, 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 ALASKA ENERGY AUTHORITY BRADLEY LAKE FINAL CONSTRUCTION LIST REPORT OF ACTIVITY 11-30-03 ITEM Fish Study/Mitigation-complete Fish Water SCADA - Const-complete Moose Mitigation Fund - complete Diversion Tunnel - complete Powerhouse Floor/Paint - complete SVC Spares : Equipment - complete Misc Engineering -complete Fishwater Bypass Cleanup - complete ADIT Access Modification - complete Building Roof Modification - complete Airfield Road Access - complete Cold Weather Modification-complete Rip Rap Upstream Face of Left Dam - complete Approved Workorders unfinished at 3/96 B018 Roof-Wood Storage : B019 Parapit Wall/Gate complete B021 Fishwater Diverstion complete Penstock Condensation - complete Governor Instability Study System Analysis Equip at SVCs - complete Contingency (Unallocated funding) Transfer trip schemes - Old Invoices - complete AEA Operating Costs complete Brown & Root Retainage complete Interest on Retainage complete Previously approved punchlist Control System Modifications (A) (B) (C) (D) (C) - (D) SETTLEMENT (A) + (B) 11-30-03 AGREEMENT | Adjustment/| Revised | Payments thru}; Estimate PUNCHLIST | Reallocation| Estimate 11-30-03 to Complete 220,000.00 (17,217)| 202,782.90 202,782.90 - 100,000.00 15,639 | 115,639.15 115,639.15 - 185,215.00 575 185,790 185,790.16 - 5,000.00 (693) 4,307 4,307.45 - 5,000.00 (1,583) 3,417 3,417.07 - 145,000.00 (145,000) - - = Wi under review 15,000.00 (6,879) 8,121 8,121.48 - 40,000.00 (40,000) - - = 325,000.00 (12,931) 312,069 312,069.23 - 18,000.00 (4,761) 13,239 13,238.77 - 45,000.00 22,038 67,038 67,038.14 - 35,000.00 (5,416) 29,584 29,584.46 - 5,000.00 (4,705) 295 294.53 - 175,000.00 (91,010) 83,990 83,989.85 - _ 155,244.00 3,740 | 158,984 | 158,983.83 | - 145,000.00 1,021,400 | 1,166,400 812,676.30 353,723.70 150,000.00 (138,770) 11,230 11,230.40 - 290,844.00 426,068 716,912 - 716,912.40 170,500.00 (15,275) 155,225 155,225.36 - 70,000.00 (14,464) 55,536 55,535.82 - 102,958.00 (102,958) - - - 100,000.00 (100,000) - - . 2,502,761 787,800 | 3,290,561 2,219,924.90 | 1,070,636.10 970,480.00 (787,800) 182,680 - 182,680.00 3,473,241 - 3,473,241 2,219,924.90 | 1,253,316.10 H:\ALL\ELAINE\BRADLEY\Bradley Construction\BLCONST-11-30-03 - Punchlist ™ P. | 7 * * * Transmission Result Report (MemoryTX) ( Jan. .. 2004 10:34AM) * * ¥ 1) AIDEA/AEA 2) Date/Time: Jan. 7. 2004 10:31AM File Page No. Mode Destination Peg (s) Result Not Sent 3418 Memory TX 96899368 P. 8 OK error —.1) Hangs up or line fail —.2) Busy —.3) No answer E.4) No facsimile connection AIDE AWA fit Facsimile Transmittal re Dan Loert CONPANY: ME A Fax tt ( L DATE: =Z- oF 150 ATH Number of pages including cover page: va Transmittal Contents: Comments: Notice: This facsimile may contain confidential information that is being transmitted to and is Intended only for the use of the recipient named above. Reading, disclosure, discussion, dissemination, distributich, or copying of this information by anyone other than the named recipient or his or her employees or agents is strictly prohibited. Mf you have. received this facsimile in error, please immediately destroy it and natify us by telephone at (907) 269-3000. 1813 West Northem Lights Boulevard * Anchorage, Alaska 99503 907 / 269-3000 = FAX $07 / 269-3044 * Toll Free (ALASKA ONLY) 888 / 300-8534 + www: aidea. org Alaska Industrial Development and Export Authority AlD = ALi NEA Alaska Energy Authority Facsimile Transmittal TO: Don. Loere rn COMPANY: A eS A Fax #: ( ) FROM: SS ree we NAS Powe Ue DATE: (= 7-27 2:30 ATA Number of pages including cover page: & Transmittal Contents: Comments: Notice: This facsimile may contain confidential information that is being transmitted to and is intended only for the use of the recipient named above. Reading, disclosure, discussion, dissemination, distribution, or copying of this information by anyone other than the named recipient or his or her employees or agents is strictly prohibited. If you have received this facsimile in error, please immediately destroy it and notify us by telephone at (907) 269-3000. 813 West Northern Lights Boulevard.e Anchorage, Alaska 99503 907 / 269-3000 * FAX 907 / 269-3044 * Toll Free (ALASKA ONLY) 888 / 300-8534 * www.aidea.org PLEASE DELIVER TO THE FOLLOWING: Steve Haagenson Golden Valley Electric Association Joe Griffith Chugach Electric Association Rick Eckert Homer Electric Association Wayne Carmony Matanuska Electric Association Jim Posey Anchorage Municipal Light & Power Dave Calvert City of Seward Ron Saxton Ater Wynne LLP 6 pet Vleaw odd A frie (907) 458-5951 (907) 562-6994 (907) 235-3323 (907) 689-9368 (907) 263-5204 (907) 224-4085 (503) 226-0079 Dacha Pre fod ads pect up (270, Summary of FY04 proposed budget adjustments Scenario A-surplus not refunded Chugach Electric Muni of Anch. AEG&T GVEA Seward Total 30.40% 25.90% 25.80% 16.90% 1.00% 100.00% Proposed O&M additions 124,700.80 106,241.80 105,831.60 69,323.80 4,102.00 410,200.00 (see detail schedule) Adjustment for change in surplus FY03 actual vs projected-unaudited 337,403.52 287,458.92) (286,349.04) (187,569.72 1,109,880.00) Net decrease-FY04 contributions 212,702.72 181,217.12) (180,517.44) (118,245.92 6,996.80 699,680.00 Scenario B-surplus refunded Proposed O&M additions 124,700.80 106,241.80 105,831.60 69,323.80 4,102.00 410,200.00 (see detail schedule) Adjustment for not using FY03 surplus to fund FY04 budget 274,664.30 234,006.76 233,103.26 152,691.67 9,035.01 903,501.00 Net increase-FY04 contributions 399,365.10 340,248.56 338,934.86 222,015.47 13,137.01 1,313,701.00 Refund-FY03 surplus-unaudited (612,067.82) _ (521,465.68) (519,452.30) (340,261.39) (20,133.81) (2,013,381.00) Net effect 212,702.72) (181,217.12) (180,517.44) (118,245.92) _ (6,996.80) (699,680.00 Scenario A Bradley Lake FY04 Amended Budget Summary Chugach Electric Muni of Anch. AEG&T GVEA Seward Total 30.40% 25.90% 25.80% 16.90% 1.00% 100.00% Expenses Budget additions 90,500.80 77,104.30 76,806.60 50,311.30 2,977.00 297,700.00 Increase for Governor 34,200.00 29,137.50 29,025.00 19,012.50 1,125.00 112,500.00 (assumed all in FY04) FY04 Budget Additions 124,700.80 106,241.80 105,831.60 69,323.80 4,102.00 410,200.00 Effect of Actual Surplus vs projected used FY03 Projected Surplus used in FY04 budget 274,664.30 234,006.76 233,103.26 152,691.67 9,035.01 903,501.00 FY03 Actual Surplus (see below) (612,067.82) (521,465.68) (519,452.30) (340,261.39) (20,133.81) _(2,013,381.00) Total adjustment for change in surplus (337,403.52) (287,458.92) (286,349.04) (187,569.72) (11,098.80) (1,109,880.00) Net decrease-FY04 Contributions $ (212,702.72) $ (181,217.12) $ (180,517.44) $ (118,245.92) $ (6,996.80) $ (699,680.00) Assumptions -Governor work all in FY04-out of R&C fund Payback over 4 year period. When budget adjustments are finalized, actual contributions will be calculated with effect on interest earnings included in calculation. -FY03 surplus is used for FY04 O&M-unaudited-may not be final -Effect on interest earnings not considered for this analysis FY04 Budget adjustments-Scenerio A FERC Acct Description $ amount Explanation 544 Repair projects-runner $ 80,000.00 Unexpected repairs and relays 540 FERC Land use fees $ 33,000.00 Rates billed by FERC in prior year for prior years incorrect 543 HEA O&M-Maintenance $ 53,700.00 Increase up to contract amount 920 PMC Legal $ 30,000.00 924 Insurance $ 90,000.00 Increased actual costs capital Snow Machines $ 11,000.00 O&D committee recommendation $ 297,700.00 capital Governor $450,000.00 current budget=$1,050,000 revised budget $1,500,000 Scenario B Bradley Lake FY04 Amended Budget Summary Chugach Electric Muni of Anch. AEG&T GVEA Seward Total 30.40% 25.90% 25.80% 16.90% 1.00% 100.00% Expenses Budget additions $ 90,500.80 $ 77,104.30 $ 76,806.60 $ 50,311.30 $ 2,977.00 $ 297,700.00 Increase for Governor 34,200.00 29,137.50 29,025.00 19,012.50 1,125.00 112,500.00 (assumed all in FY04) FY04 Budget Adjustments 124,700.80 106,241.80 105,831.60 69,323.80 4,102.00 410,200.00 FY04 projected surplus 274,664.30 234,006.76 233,103.26 152,691.67 9,035.01 903,501.00 Total adjustment for change in surplus 274,664.30 234,006.76 233,103.26 152,691.67 9,035.01 903,501.00 Net increase in contributions needed $ 399,365.10 $ 340,248.56 $ 338,934.86 $ 222,015.47 $ 13,137.01 $ 1,313,701.00 Refund of actual surplus through 6/03 (see below) (612,067.82) (521,465.68) (519,452.30) (340,261.39) (20,133.81) $ (2,013,381.00) Net increase (decrease)-FY04 contributions $ (212,702.72) $ (181,217.12) $ (180,517.44) $ (118,245.92) $ (6,996.80) $ (699,680.00) Assumptions -Governor work all in FY04-out of R&C fund Payback over 4 year period -FY03 surplus is refunded-unaudited-may not be final -Effect on interest earnings not considered for this analysis When budget adjustments are finalized, actual contributions will be calculated with effect on interest earnings included in calculation. -FY03 final numbers are unaudited-FY3 surplus may not be final FY04 Budget adjustments-Scenario B FERC Acct Description $ amount Explanation 544 Repair projects-runner $ 80,000.00 Unexpected repairs and relays 540 FERC Land use fees $ 33,000.00 Rates billed by FERC in prior year for prior years i incorrect 543 HEA O&M-Maintenance $ 53,700.00 Increased up to HEA contract amount 920 PMC Legal $ 30,000.00 924 Insurance $ 90,000.00 Increased actual costs capital Snow Machines $ 11,000.00 O&D committee recommendation ~$297,700.00_ capital Governor $450,000.00 current budget=$1,050,000 revised budget $1,500,000 BRADLEY L. .(E PROJECT MANAGEMEN: COMMITTEE List of Representatives Representative Steve Haagenson Chairman Jim Posey Vice Chairman Dave Calvert Joe Griffith Rick Eckert Art Copoulos Secretary/Treasurer Wayne D. Carmony Ronald L. Saxton Legal Counsel Effective Date: 01/09/03 Revised Date: 12/30/03 Alternate Bob Day Bob Zacharski Karl Reiche Don Zoerb Larry Hittle Utility Golden Valley Electric Association P.O. Box 71249 (758 Illinois) Fairbanks, Alaska 99707 Phone: 452-1151 Fax: 458-5951 shh@qvea.com Municipal Light & Power 1200 E. First Avenue Anchorage, Alaska 99501 Phone: 279-7671 Fax: 263-5204 PoseyJM @ci.anchorage.ak.us City of Seward P.O. Box 167 234 Fourth Avenue Seward, Alaska 99664 Phone: 224-4071 Fax: 224-4085 dcalvert @ cityofseward.net Chugach Electric Association 5601 Minnesota Drive Anchorage, Alaska 99518 Phone: 563-7494 Fax: 562-6994 joe_griffith @ chugachelectric.com Homer Electric Association 3977 Lake Street Homer, Alaska 99603 Phone: 235-8167 Fax: 235-3323 reckert@homerelectric.com AIDEA/AEA 813 W. Northern Lights Boulevard Anchorage, Alaska 99503-2495 Phone: 269-3000 Fax: 269-3044 acopoulos @ aidea.org Matanuska Electric Association P.O. Box 2929 (163 Industrial Way) Palmer, Alaska 99645-2929 Phone: 689-9211 Fax: 689-9368 prworrell@matanuska.com AterWynne 222 S.W. Columbia, Suite 1800 Portland, Oregon 97201-6618 Ph: (503) 226-1191 Fax: 226-0079 rls@aterwynne.com State of Alaska Public Notice Page 1 of 1 Home Go Back Edit ‘ 4 4 Public Noti Online P ublic N otice Bradley Lake Project Management State of Alaska Online Committee Meeting Submitted by: Brenda Fuglestad/IDEA/DCED Date Submitted: 12/31/2003 11:41 AM Date Modified: Ak Admin Journal: [not printed] Attachments: No files attached Bradley Lake Project Management Committee Meeting Category: Public Notices Department: Community & Economic Development Publish Date: 12/31/2003 Location: Anchorage Archive Date: 01/08/2004 Coastal District: N/A Body of Notice: ALASKA ENERGY AUTHORITY/ALASKA INDUSTRIAL DEVELOPMENT AND EXPORT AUTHORITY Regular Meeting Public Notice Bradley Lake Project Management Committee Notice is hereby given that the Bradley Lake Project Management Committee will hold a regular meeting on Wednesday, January 7, 2004, at 9:00 a.m. For additional information contact Steve Haagenson, Chairman. This meeting will be conducted by electronic media pursuant to AS 44.88.050(a) and AS 44.62.310 at the following location: Alaska Industrial Development and Export Authority's Board Room, 813 W. Northern Lights Boulevard, Anchorage, Alaska; The public is invited to attend. The State of Alaska (AIDEA) complies with Title II of the Americans with Disabilities Act of 1990. Disabled persons requiring special modifications to participate should contact AIDEA staff at (907) 269-3000 to make arrangements. Revision History: 12/31/2003 11:41:25 AM by Brenda Fuglestad/IDEA/DCED/State/Alaska/US $$WebClient [Submitter] [Anon] Home Page Notices by: Department | Category | Publish Date http://notes3.state.ak.us/pn/pubnotic.nsf/cec52605f7c 156e7a8925672a0060a9 1 b/f56064f3.... 12/31/2003 BRADLEY LAKE PROJECT MANAGEMENT COMMITTEE REGULAR MEETING AGENDA 7: OD Wednesday, January 7, 2004, y0:60 a.m. (Via electronic media at AIDEA/AEA — 813 W. Northern Lights Boulevard) (Corner of Arctic and Northern Lights Boulevard) 1. CALL TO ORDER Haagenson 2. ROLL CALL (for Committee members) 3. PUBLIC ROLL CALL (for all others present) 4. PUBLIC COMMENT 5. AGENDA COMMENTS 6. APPROVAL OF MEETING MINUTES October 21, 2003 7. NEW BUSINESS A, VA Tech Budgetary Proposal B. Day B)\ FERC Upat C £4 li 8. COMMITTEE REPORTS / COMMENTS OfeNE Zoe A. Next Meeting Date Haagenson B. Operators Report Cc. Insurance/Risk Assessment Scope of Work/Signed Haagenson 9. ADJOURNMENT Alaska Industrial Development and Export Authority AIDE AvAAR Alaska Energy Authority Facsimile Transmittal TO: Se Ve (ese nsin 7 i COMPANY: VEL / A Q- Fax #: (70 7) 15d -S757 FROM: ee Pibnadt DATE: (x —_ 36-03 Number of pages including cover page: ox Transmittal Contents: Comments: DH siherda fon Agora! Notice: This facsimile may contain confidential information that is being transmitted to and is intended only for the use of the recipient named above. Reading, disclosure, discussion, dissemination, distribution, or copying of this information by anyone other than the named recipient or his or her employees or agents is strictly prohibited. If you have received this facsimile in error, please immediately destroy it and notify us by telephone at (907) 269-3000. 813 West Northern Lights Boulevard.* Anchorage, Alaska 99503 907 / 269-3000 * FAX 907 / 269-3044 * Toll Free (ALASKA ONLY) 888 / 300-8534 * www.aidea.org Pp. | ear * * * Transmission Result Report (MemoryTX) (Dec-su. 2003 7:54AM) * * # 1) AIDEAZAEA 2) Date/Time: Dec-30. 2003 7:53AM File Page No. Mode Destination Pg (s) Result Not Sent 3408 Memory TX 919074585951 Pree OK Reason for error E.1) Hangs up or line fail E +2) Bu E.3) No answer —.4) No : Y ‘Aiea Emery Aviom y facsimile connection Facsimile Transmittal To: Str Haspensir COMPANY: Abe” Nofice: This facsimile may contain confidential information that is being transmitted to and is lertencled use of the recipient named above. Reading, disclosure, discussion, Sissernination, distributien, or copying of this information by anyone other than the named recipient or his or her employees or agents Is strictly prohibited. If you have recoived this facsirnile in error, please immediately destroy It and notify us by telehone at (907) 269-3000. 813 West Northern Lights Boulevard. Anchorage, Alaska 99503 ‘907 / 269-3000 + FAX 907 / 269-3044 + Toll Free (ALASKA ONLY] 888 / 300-8534 + wwwaidea.og: P. | Transmission Result Report (MemoryTX) ( Dec.s1. 2003 8:16AM) * * * * x x 1) AIDEA/AEA 2) Date/Time: Dec.31. 2003 8:06AM File Page No. Mode Destination Pg (s) Result Not Sent 3411 Memory TX 919074585951 P. 2 OK 95626994 OK 96899368 OK 92635204 OK 919072244085 OK 915032260079 OK Reason for error E-1) Hang up or line fail —.2) Busy E.3) No answer E.4) No facsimile connection PLEASE DELIVER TO THE FOLLOWING: Steve Haagenson Golden Valley Electric Association (907) 458-5951 Joe Griffith Chugach Electric Association (907) 562-6994 Rick Eckert Homer Electric Association (907) 235-3323 Wayne Carmony Matanuska Electric Association (907) 689-9368 Jim Posey Anchorage Municipal Light & Power = (907) 263-5204 Dave Calvert City of Seward (907) 224-4085 Ron Saxton Ater Wynne LLP (503) 226-0079 Notification of Bradley Lake Project Management Committee Meeting A regular meeting is scheduled to be held on Wednesday, January 7, 2004, at 10:00 a.m. at the Alaska Industrial Development and Export Authority’s Board Room. Packets for this meeting are scheduled to be sent out at a later date. Should you not be able to attend in person, directions for connecting to the meeting via phone will also be included in your packet. Please call Shauna at (907) 269-3028 with questions. h:\all\sdean\bradley\mtg notification fax cover.doc Page | of 1 Shauna Howell From: Shauna Howell Sent: Tuesday, December 16, 2003 8:43 AM To: Art Copoulos; Brenda Applegate; Dave Calvert; Dianne Hillemeyer; Jim Posey; Joe Griffith; Rick Eckert; Ron Saxton; Steve Haagenson; Wayne Carmony Subject: Bradley Lake PMC Meeting Importance: High The next Bradley Lake PMC meeting will be held on Wednesday, January 7, 2004, at 10:00 a.m. in the AIDEA Board Room. Packets will be sent out ata later date. Please mark your calendars. Happy Holidays! --Shauna Howell 269-3028 12/16/2003 x Pahl Transmis...n Result Report (MemoryTX) ( Dec..v- 2003 8:47AM) * * * x & x 1) AIDEA/ZAEA 2) Date/Time: Dec-16. 2003 8:41AM File Page No. Mode Destination Pg (s) Result Not Sent 3388 Memory TX 919074585951 Ps | (2 OK 95626994 OK 919072353323 OK 96899368 OK 92635204 OK 919072244085 OK 915032260079 OK Reason for error E.1) Hang up or line fail E.2) Busy E.3) No answer E.4) No facsimile connection PLEASE DELIVER TO THE FOLLOWING: Steve Haagenson Golden Valley Electric Association (907) 458-5951 Joe Griffith Chugach Electric Association (907) 562-6994 Rick Eckert Homer Electric Association (907) 235-3323 Wayne Carmony —_- Matanuska Electric Association (907) 689-9368 Jim Posey Anchorage Municipal Light & Power (907) 263-5204 Dave Calvert City of Seward (907) 224-4085 Ron Saxton Ater Wynne LLP (503) 226-0079 PLEASE DELIVER TO THE FOLLOWING: Steve Haagenson Joe Griffith Rick Eckert Wayne Carmony Jim Posey Dave Calvert Ron Saxton Golden Valley Electric Association Chugach Electric Association Homer Electric Association Matanuska Electric Association Anchorage Municipal Light & Power City of Seward Ater Wynne LLP (907) 458-5951 (907) 562-6994 (907) 235-3323 (907) 689-9368 (907) 263-5204 (907) 224-4085 (503) 226-0079 PLEASE DELIVER TO THE FOLLOWING: Steve Haagenson Joe Griffith Rick Eckert Wayne Carmony Jim Posey Dave Calvert Ron Saxton Golden Valley Electric Association Chugach Electric Association Homer Electric Association Matanuska Electric Association Anchorage Municipal Light & Power City of Seward Ater Wynne LLP (907) 458-5951 (907) 562-6994 (907) 235-3323 (907) 689-9368 (907) 263-5204 (907) 224-4085 (503) 226-0079 Notification of Bradley Lake Project Management Committee Meeting TIME CHANGE A regular meeting is scheduled to be held on Wednesday, January 7, 2004, at 9:00 a.m. at the Alaska Industrial Development and Export Authority’s Board Room. Packets for this meeting are scheduled to be sent out today. Should you not be able to attend in person, directions for connecting to the meeting via phone will also be included in your packet. Please call Shauna at (907) 269-3028 with questions. h:\all\sdean\bradley\mtg notification fax cover.doc Alaska Industrial Development and Export At*' ~~ AIDE AWA AN cent Alaska Energy Authority June 2, 2003 Mr. Steve Haagenson Golden Valley Electric Association, Inc. Chairman, Bradley Lake Project Management Committee P.O Box 71249 Fairbanks, Alaska 99707-1249 Re: Representatives to BPMC and alternate Dear Steve: Pursuant to Section 13 of the Bradley Lake Project Power Sales Agreement, the Alaska Energy Authority (AEA) designates Art Copoulos as the AEA representative to the Bradley Lake Project Management Committee, and Karl Reiche as the alternate representative. Their contact information is as follows: Art Copoulos Karl Reiche (907) 269-3029 (907) 269-3017 acopoulos@aidea.org kreiche@aidea.org Singerely> i Ron Milfer Executive Director RMAC/éd H:\ALL\sdean\Art\bpmc designate.doc CC: Joe Griffith, CEA Norm Story, HEA Dave Calvert, City of Seward Wayne Carmony, MEA Jim Posey, AML&P Art Copoulos, AEA Karl Reiche, AEA 813 West Northern Lights Boulevard * Anchorage, Alaska 99503 907 / 269-3000 * FAX 907 / 269-3044 * Toll Free (ALASKA ONLY) 888 / 300-8534 * www.aidea.org