Loading...
HomeMy WebLinkAboutBradley Lake PMC Meeeting-Tues., June 21, 2005 1Bradley Lake PROJECT MANAGEMENT COMMITTEE MEETING uu [>\ |acos (D&te) —Anclharreg — _A\DEA and AEA ofa Qo (Location) PLEASE SIGN IN No. NAME REPRESENTING ———— Aine 2 | Cred Wanerceddl _HEA 3 ecard Winer Roa 4 ohn Cooler, Onna ou ie = 6 MEA Cortndenrs by cheat) — 7_| Yen Zoserbe MEA Ceoscbexpiatnia, bys pane) | : cae 10 ua 12 13 14 15 16 17 18 19 20 21 22 92Q2\IT9884 Corrente 10:05am DATE: u/a |p005 pas Llosa Mot verted on BRADLEY PMC VOTING Agenda Item No. SS HEA Derr Sy . . Rol\ ( all & r Con %& Cxtensvon Bead [Soe 4 Bed 1*/ men Ot YES NO ABS YES NO ABS S NO ABS CITY OF SEWARD 01% [| =F “| MATANUSKA ELEC ASSOC 14% [7 < CHUGACH ELEC ASSOC 30% [7] 2" HOMER ELEC ASSOC 12% [AT a GOLDEN VAL ELEC ASSOC 17% [e “I MUNI LIGHT & POWER 26% [| J A ALASKA ENERGY AUTHORITY 1 Hf A=4+ OVER 51% B=AEACONCUR With A C = UNANIMOUS D=MAJORITY VOTING METHOD A: 3) Establishment of FY estimated annual 11) Determination of rules, procedures and payment obligation and schedule of each accounts necessary to manage project when Requiring four yeas with 51% of utilities, with no purchaser. no bonds outstanding. AEA vote: 4) Determination of annual project costs after 12) Evaluation and approval of optional project 1) Procedures for scheduling, production and each FY. work and compensation for such work. dispatch of project power. 5) Evaluation of necessity for and scheduling of 13) Application of insurance claims proceeds not 2) Establishment of procedures for use of each required project work. governed by bond resolution. purchaser's water allocation (AEA assent required for license requirements). 6) Determination of appropriate amount of 14) Approval of procedures and any individual insurance. utility agreements relating to electric power 3) Selection among alternative methods that do reserves for project. not involve AEA for funding required project 7) Adoption of additional minimum funding work. amounts for renewal and contingency reserve 15) Approval of consultants. fund above that required by bond resolution. VOTING METHOD B: VOTING METHOD C: 8) Selection among alternate methods that Requiring 4 yeas with 51% of utilities and AEA involve AEA for funding required project Unanimous vote by all (including AEA) concurrence: work. VOTING METHOD D: 1) Arranging operation and maintenance of 9) Adoption or amendment of procedural project. 2) Adoption of budget of annual project costs. VOTE(93Q3/BC5272) committee rules (except dispute resolution). 10) Adoption of project maintenance schedules. Majority vote (including AEA) Election of Officers AgendetemNe Telle Hea ojm PMA te ceviaw : OFM Contract end BRADLEY PMC VOTING adiourn: Wilda DATE: {di [3005 Fecg a ofa Revised Ric S “ Contre ck “8 4 Nos +0 aE cece a st id Posen \ [Gefen 2 Coc Sv \*/8e a ery Gr hth \ [ Fosen, 2 YES NO ABS YES NO Ae CITY OF SEWARD 01% | & [ce “| MATANUSKA ELEC ASSOC 14% — sai | < CHUGACH ELEC ASSOC 30% | a L “| HOMER ELEC ASSOC 12% ae | “| | ST GOLDEN VAL ELEC ASSOC 17% [~ | ol “| 4j MUNI LIGHT & POWER 26% [7] — a ALASKA ENERGY AUTHORITY 7] Tt 7 A=4+ OVER 51% B= AEACONCUR With A C = UNANIMOUS D= MAJORITY VOTING METHOD A: 3) Establishment of FY estimated annual 11) Determination of rules, procedures and payment obligation and schedule of each accounts necessary to manage project when Requiring four yeas with 51% of utilities, with no purchaser. no bonds outstanding. AEA vote: 4) Determination of annual project costs after 12) Evaluation and approval of optional project 1) Procedures for scheduling, production and each FY. work and compensation for such work. - dispatch of project power. 5) Evaluation of necessity for and scheduling of 13) Application of insurance claims proceeds not 2) Establishment of procedures for use of each required project work. governed by bond resolution. purchaser's water allocation (AEA assent required for license requirements). 6) Determination of appropriate amount of 14) Approval of procedures and any individual insurance. utility agreements relating to electric power 3) Selection among alternative methods that do reserves for project. not involve AEA for funding required project 7) Adoption of additional minimum funding work. amounts for renewal and contingency reserve 15) Approval of consultants. fund above that required by bond resolution. VOTING METHOD B: VOTING METHOD C: 8) Selection among alternate methods that Requiring 4 yeas with 51% of utilities and AEA involve AEA for funding required project Unanimous vote by all (including AEA) concurrence: work. VOTING METHOD D: 1) Arranging operation and maintenance of 9) Adoption or amendment of procedural project. 2) Adoption of budget of annual project costs. VOTE(93Q3/BC5272) committee rules (except dispute resolution). 10) Adoption of project maintenance schedules. Majority vote (including AEA) Election of Officers Noxt Dato. = «ww as® ljo:co an BE AND EY Bradley Lake PMC Meeting Set-Up Guidelines (Effective 2002) 1. See last set of minutes to determine next meeting date. Once the date is confirmed, post on-line. The notification is located at: h:/all/showell/bradley lake pmc meetings/advertising/state web page advertisement.doc 2. Call the GCI conference operator to schedule the lines for a teleconference, if necessary. The number is 1-800-770-2121. MEA Via Conk con 3. Fax out a transmittal (two pages) informing members of next meeting date, time, and location. This is located in: h:/all/showell/bradley lake pmc meetings/meeting notification fax cover.doc Also, send via email to the Bradley Lake PMC contacts list. 4. Prepare a DRAFT agenda and fax it to the Chairman. The most current agenda is at the end of the document and it’s located at: h:/all/showell/bradley lake pmc meetings/meeting setup folder/agenda.doc 5. Make changes/additions/deletions as noted by Chairman. Check with Art Copoulos on any other agenda items that may need to be added. 6. Put the packets together. Teleconference sheet (if necessary), agenda, and previous meeting minutes go inside of a black folder. te Labels for the folder are located at: h:/all/showell/bradley lake pmc meetings/labels.doc 8. Prepare documents and fill out DHL and courier slips (there are two local packets) for delivery. Be sure to include for billing purposes that this is related to BPMC. 9. Order lunch if necessary. 10.