Alaska Energy Authority
MEMORANDUM
April 17, 1992
Bradley Lake
Project ——l Committee
Charlie Bussell |
Secretary, PMC
April 28, 1992 Bradley Lake PMC Meeting
Enclosed you will find a copy of the April 28, 1992 Agenda for the Bradley Lake
Project Management Committee meeting. Please provide any comments to
Chairman Kelly. The meeting place will be at Chugach Electric Association in the
Training Room at 10:00 a.m.
For your review, enclosed is a copy of the draft minutes of the March 26, 1992
meeting. An executed copy of the February 28, 1992 is also enclosed for your
records.
DS/CB/ds
Enclosures as stated.
Page | of |
10.
11,
12.
13.
14.
15.
BRADLEY LAKE PROJECT MANAGEMENT COMMITTEE
April 28, 1992
Chugach Electric Association, Inc.
Training Room - 10:00 A.M.
CALL TO ORDER 10:00 A.M.
ROLL CALL
PUBLIC COMMENT
AGENDA COMMENTS
APPROVAL OF MINUTES
March 26, 1992
TECHNICAL COORDINATING SUBCOMMITTEE REPORT
INSURANCE SUBCOMMITTEE REPORT
BUDGET SUBCOMMITTEE REPORT
AGREEMENTS SUBCOMMITTEE REPORT
OPERATION AND DISPATCH SUBCOMMITTEE REPORT
REVIEW OF PROJECT STATUS
OLD BUSINESS
A. Adoption of the Bradley Lake Dispatcher Guidelines Summary
B. Spinning Reserves/Underfrequency Load Shedding - Update
Cc. HEA Bradley Economy Sales to GVEA - Update
D. Modification of Bradley Minimum Operating Levels
NEW BUSINESS
A. Approval of Committee Expenses
COMMUNICATIONS
A. Schedule Next Meeting
ADJOURNMENT
Kelly
Burlingame
Petrie
Ritchey
Sieczkowski
Sieczkowski
Eberle
Burlingame
Lovas
Saxton
DRAFT
BRADLEY LAKE PROJECT MANAGEMENT COMMITTEE
March 26, 1992
CALL TO ORDER
Chairman Kelly called the Bradley Lake Hydroelectric Project Management
Committee to order at 10:00 a.m. in the Training Room at Chugach Electric
Association in Anchorage, Alaska to conduct the business of the Committee per
the agenda and the public notice.
ROLL CALL
Alaska Energy Authority
Charlie Bussell, Designated Representative
Chugach Electric Association
David L. Highers, Designated Representative
Golden Valley Electric Association
Mike Kelly, Designated Representative and Chairman
City of Seward
Dave Calvert, Alternate Representative
Homer Electric Association
Norman L. Story, Designated Representative
Matanuska Electric Association
Ken Ritchey, Designated Representative
Municipal Light & Power
Hank Nikkels, Alternate Representative
Others Present:
Ron Saxton, Ater, Wynne, Hewitt, Dodson & Skerrit
Tim McConnell, Municipal Light & Power
Dave Fair, Homer Electric Association
David Burlingame, Chugach Electric Association
John Cooley, Chugach Electric Association
BPMC Meeting Minutes
March 26, 1992
Page 2 of 7
Gene Bjornstad, Chugach Electric Association
Bradley Evans, Chugach Electric Association
Joe Griffith, Chugach Electric Association
Bob Hufman, AEG&T
Bob Price, Municipal Light & Power
Pete Fraser, Municipal Light & Power
Allan Yost, Rural Electrification Administration
Stanley E. Sieczkowski, Alaska Energy Authority
David R. Eberle, Alaska Energy Authority
Penny Haldane, Alaska Energy Authority
a PUBLIC COMMENT
There being no public comment, the meeting continued to the next agenda item.
4. AGENDA COMMENTS
The meeting agenda was approved with the following additions:
13C. BPMC FISCAL YEAR 1993 BUDGET APPROVAL
13D. ALLOCATION AND SCHEDULING SCHEDULE "A" APPROVAL
13E. AUTHORIZATION FOR A TCS REPRESENTATIVE TO
ACCOMPANY TUNNEL INSPECTORS
13F. APPROVAL OF BRADLEY LAKE TESTING CHARGES
55 APPROVAL OF MINUTES
The minutes of the February 28, 1992 meeting were amended to show Hank
Nikkels as the alternate representative for Municipal Light & Power. The
minutes were approved as amended.
6. TECHNICAL COORDINATION SUBCOMMITTEE REPORT
Dave Burlingame reported that the Technical Coordination Subcommittee (TCS)
had not met. All utilities have received the PTI studies for the expanded
operation of Bradley Lake. This information will be discussed at an upcoming
meeting. Mr. Burlingame addressed the recent trip at 90 megawatts. Some
permitting problems with the Dave's Creek SVCS site have been encountered,
however the completion date should not be affected.
BPMC Meeting Minutes
March 26, 1992
Page 3 of 7
Tim McConnell asked for specifics on the trip. Mr. Burlingame stated that a
high tide contributed to the trip and a report will be forthcoming. Brad Evans
related that the immediate feedback on the trip occurred verbally between
control centers. Norm Story said they had enough information to issue a press
release within the hour.
Intertie reporting forms are filed by the tripping utility. Chairman Kelly would
like the appropriate subcommittee to file a written report regarding all forced
outages at Bradley.
he INSURANCE SUBCOMMITTEE REPORT
The Insurance Subcommittee had nothing to report.
8. BUDGET SUBCOMMITTEE REPORT
Budget Subcommittee Chairman Ken Ritchey passed around a narrative
(Attachment A) as well as a copy of the proposed budget (Attachments B and
C). Mr. Ritchey explained the budget proposal in terms of operator's costs and
owner's costs. The budget subcommittee recommended approval. However,
AEA did not concur with the budget being recommended. The primary budget
dispute was related to AEA overhead costs.
After discussion Chairman Kelly asked Ron Saxton to give an opinion as to
where the budget process could go from this point.
Mr. Saxton related that the Power Sales Agreement and the Bond Resolution
require an approved budget 90 days prior to the beginning of the fiscal year
(April 2, 1992). If the BPMC fails to adopt a budget prior to April 2, 1992
then the Authority is able to unilaterally adopt a budget. The agreement then
provides that the Authority budget is still subject to all the preservation of rights
to dispute the contents.
The first step is to ensure that there is not a breach of the bond resolution. In
order to avoid a technical default the BPMC needs to be sure that some budget
is in place by April 2, 1992. The options would include some compromise
interim budget or the unilateral budget from the Authority.
Under the Power Sales Agreement, these kinds of deadlocks are subject to
dispute resolution procedures adopted by the BPMC. The procedures in place
say that alternative forms of dispute resolution can be sought if three utilities
and the Authority agree. This option is elective. The other alternative is to go
to court. No payment obligations will be affected until July 1.
BPMC Meeting Minutes
March 26, 1992
Page 4 of 7
At this time Chairman Kelly asked Charlie Bussell what position the Authority
would take. Mr. Bussell passed out the Authority's proposed budget
(Attachment D). Stan Sieczkowski stated that the only difference between the
two budgets is on page 2 line 920 (b).
Chairman Kelly adjourned the meeting for a 15 minute caucus among the utility
managers.
The BPMC reconvened at approximately 11:45 a.m. With the understanding
that negotiations could continue at any time and that a budget would be adopted
by the Authority prior to April 2, 1992, Chairman Kelly moved on to the next
item. Approval of the budget would be formally addressed under New
Business.
9. AGREEMENT SUBCOMMITTEE REPORT
Mr. Sieczkowski summarized the status of operating agreements:
Allocation and Scheduling: Exhibit A will be addressed under New
Business.
Dispatch: Finalized and signed copies have been
distributed.
Transmission Facility Maintenance: On agenda at meeting scheduled with HEA
(Between AEA and AEG&) March 27, 1992.
Facilities Interconnected Dispatch: On agenda at meeting scheduled with HEA
(Between AEA and HEA) March 27, 1992.
Communications MOU: Estimated completion date of
April 10, 1992.
SVCS Draft Agreement: CEA comments expected soon.
Dave's Creek Substation: Signed March 13, 1992
(Right of Entry)
Soldotna Substation: On agenda at meeting scheduled with HEA
(Right of Entry) March 27, 1992.
BPMC Meeting Minutes
March 26, 1992
Page 5 of 7
10.
11.
12.
OPERATION & DISPATCH SUBCOMMITTEE REPORT
Stan Sieczkowski reported that the Operation and Dispatch Subcommittee met
on March 4, 1992. Highlights of this meeting were given and a copy of the
draft meeting minutes were distributed as part of the March 26, 1992 pre-
meeting packet.
The SCADA communications problem being investigatedis expected to be
resolved. A letter has been sent to the utilities outlining the 231,000 megawatt-
hours delivered to the utilities as of February 1992. The forecast for next year
is 403,000 megawatt-hours, an increase from 383,000 megawatt-hours.
REVIEW OF PROJECT STATUS
Dave Eberle reported that dewatering of the tunnel had begun the day before
(March 25, 1992.) Currently the reservoir is at elevation 830, down about 300
feet. It was noted that higher than anticipated in-flows may slow the dewatering
process. The tunnel should be accessible by March 31, 1992 at which time a
walk through the penstock will be made to check for debris. Inspection is
scheduled for April 3 - 4, 1992. All parties have been notified so they can be
present and three different insurance carriers have been notified. Equipment has
been mobilized for small repairs but other decisions will be required if major
repairs are needed.
OLD BUSINESS
A. ADOPTION OF THE BRADLEY LAKE DISPATCHER GUIDELINES
SUMMARY
The TCS has not met and therefore adoption of the Bradley Lake
Dispatcher Guidelines Summary will be held over till the next BPMC
meeting.
B. SPINNING RESERVE/UNDERFREQUENCY LOAD SHEDDING -
UPDATE
John Cooley reported that the ASCC Reliability Criteria Committee is
meeting March 31, 1992 to continue discussing the Spinning
Reserves/Underfrequency Load Shedding. The load shed study is
progressing and results are expected by the May Intertie Operating
Committee meeting.
BPMC Meeting Minutes
March 26, 1992
Page 6 of 7
HEA ECONOMY SALES TO GVEA - UPDATE
Chairman Kelly stated that a meeting had occurred regarding the HEA
Bradley Economy Sales to GVEA, however more work is required on
this item.
13. NEW BUSINESS
A. APPROVAL OF COMMITTEE EXPENSES
Ron Saxton distributed a handout on Committee expenses (Attachment
E). All expenses had been approved for payment by the Authority. Mr.
Ritchey motioned, seconded by Mr. Story, the BPMC approve
reimbursement of the Section 31 costs. The motion was unanimously
approved by roll call vote.
LETTER TO LB&A IN SUPPORT OF MICROWAVE UPGRADE
Dave Eberle distributed a draft letter to LB&A in support of Microwave
Upgrade (Attachment F). The letter was changed to read telephone
carrier instead of telephone industry. Dave Highers motioned, seconded
by Mr. Story, to adopt the letter and recommend signature. The motion
was approved without objection.
The letter was transferred to Chugach letterhead and signed at the
meeting.
BPMC FISCAL YEAR 1993 BUDGET APPROVAL
Ken Ritchey motioned, seconded by Mr. Story, to approve the BPMC
budget as recommended by the Budget Subcommittee. In a roll call
vote, the City of Seward, Matanuska Electric Association, Chugach
Electric Association, Homer Electric Association, Golden Valley
Electric Association, and Municipal Light & Power voted in favor of the
proposed budget. The motion was defeated by Alaska Energy
Authority's descending vote.
Chairman Kelly stated that he expected the Authority to adopt a budget
prior to the April 2, 1992 deadline and to notify the members of the
BPMC.
BPMC Meeting Minutes
March 26, 1992
Page 7 of 7
14,
15.
ALLOCATION AND SCHEDULING SCHEDULE "A" APPROVAL
Mr. Story motioned, seconded by Mr. Highers, approval of the
Allocation and Scheduling Exhibit "A". The motion was unanimously
approved by roll call vote.
AUTHORIZATION FOR A TCS REPRESENTATIVE TO
ACCOMPANY TUNNEL INSPECTORS
Mr. Highers motioned, seconded by Mr. Ritchey, that the Technical
Coordinating Subcommittee appoint a representative to accompany the
tunnel inspectors. The motion was approved without objection.
APPROVAL OF BRADLEY LAKE TESTING CHARGES
Stan Sieczkowski reported that the Operation and Dispatch
Subcommittee has reviewed and recommends approval of the Bradley
Lake project start-up test charges (Attachment G). Mr. Highers
motioned, seconded by Mr. Story, the BPMC approve reimbursement of
the test charges. The motion was unanimously approved by roll call
vote.
COMMUNICATIONS
A. SCHEDULE NEXT MEETING
April 28, 1992
10:00 a.m.
CEA Training Room
ADJOURNMENT
There being no further business, the committee adjourned at 12:15 p.m.
Mike Kelly, Chairman
Attest:
Charlie Bussell, Secretary
= | cHMENT A
MEMORANDUM
DATE: March 26, 1992
TO: Bradley Lake Project Management Committee
FROM: Bradley Lake Budget Subcommittee
Tom Lovas, CEA
Pete Frazier, AML&P
Stan Sieczkowski, AEA
Ron Saxton, PMC Attorney Ken Ritchey, MEA
SUBJECT: Bradley Lake FY93 Budget
We have attached a copy of the proposed FY93 Budget. The subcommittee has reviewed all items included in the budget proposal and we believe that the proposed expenditures are appropriate.
The major disagreement i in our budget deliberations has been the amount of AEA
“administrative” cost that the utility participants would have to bear.
The budget drafts that have been circulated to the PMC members prior to this final draft have included the AEA proposed method of allocating AEA’s general and
administrative costs. These allocated general and administrative costs do not include
any general and administrative costs that can easily be directly charged to Bradley Lake. AEA has proposed that Bradley Lake utility participants pay for these
"non-specific" general and administrative costs in the same ratio as the percentage of Bradley Lake direct labor charges compared to direct labor charges on all AEA
projects. In other words, if direct labor charges to the Bradley Lake project are 20 percent of all direct labor charges, Bradley Lake participants would be asked to pay for 20 percent of all general and administrative costs. The actual percentage calculated by AEA was just under 19 percent.
The attached final draft of the FY93 budget proposes, based upon the utility
interpretation of the Bradley Lake Power Sales Agreements, that we calculate the
amount we pay AEA in a different manner. We are recommending that we think of
AEA costs in two parts. That is, AEA incurs costs as owner of the project, and also
incurs costs as operator of the project. Operator costs would be incurred whether AEA or another party were the operator. However, the costs of owning the project are general and administrative costs that should be paid by utility participants only if
the costs are specific to the project. The example noted in tea Power Sales
Agreement, safety inspections and investigations, are AEA general and administrative
costs that are costs AEA incurs as owner of the project.
FROM MEA PALMER AK 3.26.1992 16:0@ P. 2
ee to Bradley Lake Project Management Committee
age 2 March 26, 1992
The utility oe believe that this results in three appropriate categories of expense. The first category are those costs, whether personnel or other, directly incurred by AEA to operate and maintain the proper. The, second category of expense are those “overhead” costs incurred to support the operation and maintenance of the neers The third are specific general and administrative costs. We have attached a breakdown of AEA personnel and non-personnel costs, which places the costs into one of the three categories.
AEA Calculation
Personnel Charge $ 693,025 Non-Personnel Charges -0-
G&A Overhead Costs 423,226
Total $1,116,251
Utility Calculation
“Operator” "Owner" BEM Cua
Direct Personnel $518,187 $ 174,838 Direct Non-Personnel 0 0 Overhead 194.435 nd
Subtotal $712,622 $ 174.838
O&M $712,622 G&A 174.838
Total $887,460
The only difference between the (wo calculations is that the utility participants agree that we should pay for $194,435 of the $423,025 that AEA identified as general : administrative “overhead” costs. We have reasoned that it is likely that there is some word processing, filing, data processing, and other office support needed in the operation of the i Many of these costs would be extraordinarily difficult to specifically identify hour by hour. However, we do not agree that we are obligated to pay for overhead loading on specific G&A expenses.
We will describe our method of dete: the O&M overhead loading. We reviewed each of the pavers who charged time to "overhead." Only those AEA employees who would likely be involved in support of the operation of the project were retained in the O&M overhoad loading analysis. For example, while a
receptionist is needed by AEA, that activity has little to do with the operation of the project. Therefore, the receptionist’s time was not included. On the other hand, we could envision an accounting clerk could be used to update Bradley operating reports.
Therefore, the accounting clerk's time was included.
R=96% 9077459328 03-26-92 10:09AM POO02 #20
MEMORANDUM to Bradley Lake Project Management Committee
Page 3
March 26, 1992
We allocated this resulting overhead based upon Bradley Lake O&M direct personnel
charges compared to all AEA direct personnel charges.
Non-personnel costs were allocated in the same manner, i.e., based upon the
percentage of Bradley Lake O&M direct personnel charges compared to all AEA
direct personnel charges.
These O&M overhead costs would no longer be paid AEA once the project operating
duties are transferred to another party.
One practical result of this analysis is that some expenditures that were included as
O&M we have now classified as G&A, and some expenditures that AEA had designated
as G&A have now been reclassified as O&M. Due to the restraint of time, this budget
document does not reflect this change. However, this change should be made at a
later date.
Recommendation:
The Bradley Lake Budget Subcommittee recommends by a vote of four to one (AEA
voted against the recommendation) that the PMC adopt the attached FY93 budget in
the amount of $2,443,352. The subcommittee also recommends that the PMC direct
the subcommittee to rework the FY93 budget placing only O&M expenditures in
O&M accounts and G&A expenditures in G&A accounts, and to resubmit the revised
budget to the PMC within the next three months.
ig 101.920325.705
Attachments
BRADLEY LAKE FY93 DRAFT BUDGET
ACCOUNT DESCRIPTION
HYDRAULIC POWER GENERATION COMMENT
ITEM
ACCOUNT
TOTAL
535 Operation Supervision and Engineering Supervision, Engineering and Administrative Support -3.2FTE if 257,926
537 Hydraulic Operation Expenses Inspection of Three Diversions 6,000
Snow measurement, SCS 20,000
[sea Monitoring, UAF 20,000
Climatologic - NOAA Weather Service 5,460
Semi-Annual Dam Settlement Survey 2,000
Conservation Studies for Fish and Game 18,000
71,460
538 Electric Operation Expense SCADA Technical Maintenance 25,000)
Powerplant Operations - .4 FTE 42,000
Supplies a 15,000 | 82,000
539 Hydraulic Power Generation Operation Expense [Mechanical vibration and balance testing, consumables such as oil and fillers, die checks 20,000 20,000]
and pressure nitrogen cylinder recharges. if
540.1 Transportation Helicopter Transportation for Project Facility Inspections 91,000
ef Barge Rental to Transport Materials and Dock Fees 27,500
ines Project Site Contract Transportation - Scheduled Fixed Wing Service to Site 70,000
al i Commercial Transportation 14,400)
ie Safety zt __|Technical and Operations Training 14,000) lt
Maintenance Management System ___|Software Upgrade Modification and Training a 4,000 SIH
Communications Divcom Maintenance Fee an 40,000 ta
Le Project radios, pagers, and telephones ut 6,000) il EEE CS eee TTSEEEEay Pee im 266,900
542 Maintenance of Structures [Routine Supplies, Materials and Maintenance Items i if 60,000 60,000
Page 1 of 3 FY93BUDB.XLS 8:39 AM 3/20/92
lw
BRADLEY LAKE FY93 DRAFT BUDGET
ACCOUNT
TOTAL
FERC ITEM
Acct. ACCOUNT DESCRIPTION COMMENT AMOUNT
Maintenance of Electric Plant
Electrical Spare Parts
Contract Labor for Testing Protective and Revenue Meters, Generators, Transformers,
70,000
545 Maintenance of Misc. Hydraulic Plant Mechanical Spare Parts =
Misc. Maintenance Contracts i
45,000)
545.1 Maintenance of Hydraulic Plant O&M Personnel 4.2 FTE 392,000]
547 Fuel Stock Fuel for Bradley Vehicles, Loaders, Graders ee 40,000)
System Control and Load Dispatching Labor - CEA 1 FTE 118,000]
‘Training - CEA Dispatchers 36,000: 7
Economic Dispatch Program (10 yr. Armortization ) - CEA 20,000 Peele
174,000
TRANSMISSION EXPENSES _
Bradley Junction Substation Switchyard Inspection and Tests - HEA 2,000) 2,000,
Maintenance of Overhead Lines Transmission Line Inspection and Maintenance - HEA 39,000 = 39,000
ADMINISTRATIVE, GENERAL AND
REGULATORY EXPENSES
Administration and General Expenses
a. Bradley PMC Costs
PMC Travel Cost 6 PMC Meetings each year in Anchorage _ 23,000)
Subcommittee Travel Cost — 12 Subcommittee Meeting each year 15,000 oe
Meeting General Expenses i PMC Adminstrative Support _ L 18,000] al
| b. Administration Expenses 194,435 194.435
O&M Overhead Loading
Page 2 of 3 FY93BUDB.XLS 8:39 AM 3/20/92
BRADLEY LAKE FY93 DRAFT BUDGET
ACCOUNT
ACCOUNT DESCRIPTION TOTAL
Contract Services
a, Legal Attorney Fees (AEA & Utilities) i"
b. Project Audit Professional Audit Services 15,000 Ll 25,000
Insurance _ 7
a. Property $1M Deductible 160,824
b. Boiler and Machinery $50K Deductible 50,000
c. General Liability One-Sixthe of AEA State Policy Premium 10,000
d. Watercraft & Aviation One Sixth of AEA State Policy Premium 10,000, |
e. Directors and Officers Liability Liability Insurance for the Directors and Officers of the PMC 15,000.
245,824
Regulatory Commission Expenses a, FERC i Land Use Fees FY92 Billing $97,000 100,000]
Administrative Fees Estimate 50,000] _
USGS Streamgaging 210,410 =
Five Year Inspection Engineering Consultant (est. $75,000 in FY96) 15,0] _
b. Permitting AEA Permits Specialist 26,397
401,807
TOTAL FY93 BRADLEY O&M BUDGET
Page 3 of 3
2,443,352 saa
FY93BUDB.XLS 8:39 AM 3/26/92
aea_oh 3/25/92
Summary Utilities OH vs AEA OH
Direct Personnel Charges to Bradley O&M
Additional Proposed Personnel Charge Through Overhead Allocation
Non—Personnel Proposed Charge Through Overhead Allocation
Total AEA Proposed Overhead Allocation
Indirect Non Personnel Exp:
RSA Law O/h legal
Dp Chargebacks computer
Telephone & Post Gen Off Suppt
Courier Svc O/H
Advt Printing / microfim
Advt Prntg/pwr stats, ann rep
Off Equip rep & maint
Repair & Maint DP equip
Off Leased Space
Off Equip Ise copies word process
Off & Libry Supp
Off Supplies
DP Supplies
Commun Equip Gen Off suppt
Data Process Equip Gen Off
Furn & Equip Gen Off
Total Indirect Non Personnel
Times Dir Chgs % of AEA Pers Svc
O&M OH Loading
Personnel Services
Non—personnel Services
Total
AEA (Owner) A&G
Total
22,000
2,500
111,400
6,500
8,000
13,500
18,100
25,000
128,000
20,000
5,600
38,900
38,000
5,000
58,000
3,000
O&M
Direct
518,187 jon i. | an s 503,500
14.2%
71,305
O&M OH
Loading 123,130
71,305
194,435
CHMENT
Total
O&M
641,317
71,305
712,622 = N > : ico FE ES 8 Adjstmt 164,279 64,512
228,791
287,409
135,817
423,226
Utilities
123,130
71,305
194,435
aea_oh 3/25/92
PCN Position Title
401 Executive Director
402 Project Manager—Bradliey
405 Mngr/Agency Operations
406 Director/Acctg & Admin
407 Senior Economist
408 Information Officer
412 Accounting Clerk
413 Accountant
414 Executive Secretary
415 Info Sys Anist/Progrmmr
417 Correspond Sectry I!
420 Receptionist
423 Finance Manager
424 Sys Admin Progrm Engr
425 Dir Fac Ops & Engr
429 Hydro Pit Mnt WKr Elec
430 Hydro Pit Mnt Wkr Elect
431 Hydro Pit Mnt Wkr Elec
432 Sr Elect Engineer
433 Mgr Engin Support
435 Proj Mngr Property
437 Bud Anlyst Loans Admin
440 Drafting Tech
443 Civil Engineer
448 Administrative Asst II
449 Permits & ROW Specist
453 Accountant
454 Accountant
457 Adminst Clerk
458 Personnel Officer
459 Records Coordinator
463 Info Sys Analyst Prgmr
464 Admin Assistant Ill
467 Accounting Tech
468 Administrative Cordnatr
469 Contrct Admintr II
470 Correspondence Secrty |
473 Clerk Ill
474 File Clerk
475 Accounting Clerk
476 Special Assistant
482 Admin Assistant I!
485 Sr Ops Engineer
486 Statistical Analyst
487 General Foreman Bradley
488 Documents Processor
490 Procurement Supervisor
493 Accountant
496 Info Systems Supvisor
new Development Specialist
new Mechanical Engineer
Total Personnel
AEA Total Agency Direct Personnel Services
Direct O/M as a Percent of Total AEA Personnel Svc
Loading AEA Per Ser
Incumbent Cost $ OH on O&MDirect O&M
Bussel 109,710
Eberle 62,165
Petrie 117,585 6,661
Marni 117,585 4,163
Emerson 106,950
Harper 51,123
Macy 41,647 5,898
Hansen 56,734 5,785
Ganthner 56,734
Spears 71,439 10,117
Johnson 41,647 5,898
Vik 32,124
69,071
Wilbanks 62,473
Sieczkowski 117,585
Turner 100,392 100,392 Sherlock 97,662 97,662
Hansen 100,392 100,392
77,822
Khan 102,778
Acuff 88,787 12,574
64,460
Lammers 53,252
Marchegiani 100,351 20,070
Burger 19,961
Arminski 94,276 13,199
Soboklesky 80,417 16,083
53,252
Antoine 44,079
Acuff 73,649 10,430
Bailey 48,292 6,839
waer 60,549 8,575
Hurley 27,413 3,882
Judd 45,431 6,434
Tomory 53,252
Hagen 58,689 8,311
Deacon 37,466
Marsh 36,464 5,164
33,746 4,779
Morrison 37,466
White 106,950
Scott 48,292
Wolf 106,950 42,780
Haldane 61,345
Zidalis 121,554 121,554 Davis 38,531 5,457
60,549 6,055
Choe 83,102
Crosby 85,892 12,164
Ward 88,787
85,007
3,591,829 123130 518,187
3,659,055
14.2%
Direct O&M
O&M OH Loading
Subtotal O&M
A&G (Owner)
Total Personnel SVC charges
AEA A&G
(Owner)
3,454
12,495
30,572
7,782
2,663
9,981
13,199
8,042
10,650
3,747
2,415
42,780
3,067
3,027
12,465
Bradley Total Dir
O&M and
A&G (owner)
6,661
4,163
5,898
5,785
10,117
5,898
3,454
12,495
30,572
100,392
97,662
100,392
7,782
12,574
2,663
20,070
9,981
26,397
24,125
10,650
10,430
6,839
8,575
3,882
6,434
8,311
5,164
4,779
3,747
2,415
85,560
3,067
121,554
5,457
9,082
12,465
12,164
8,501
AEA OVERHEAD ALLOCATION TO BRADLE
PCN Position Title
401 Executive Director
402 Project Manager—Bradley
405 Mngr/Agency Operations
406 Director/Acctg & Admin
407 Senior Economist
408 Information Officer
412 Accounting Clerk
413 Accountant
414 Executive Secretary
415 Info Sys Anist/Progrmmr
417 Correspond Sectry Il
420 Receptionist
423 Finance Manager
424 Sys Admin Progrm Engr
425 Dir Fac Ops & Engr
429 Hydro Pit Mnt WKr Elec 430 Hydro Pit Mnt Wkr Elect
431 Hydro Pit Mnt Wkr Elec
432 Sr Elect Engineer
433 Mgr Engin Support
435 Proj Mngr Property 437 Bud Anlyst Loans Admin
440 Drafting Tech
443 Civil Engineer
448 Administrative Asst II 449 Permits & ROW Specist
453 Accountant
454 Accountant
457 Adminst Clerk
458 Personnel Officer
459 Records Coordinator
463 Info Sys Analyst Prgmr
464 Admin Assistant Ill
467 Accounting Tech 468 Administrative Cordnatr
469 Contrct Admintr Il
470 Correspondence Secrty |
473 Clerk Ill
474 File Clerk
475 Accounting Clerk
476 Special Assistant 482 Admin Assistant Il
485 Sr Ops Engineer 486 Statistical Analyst
487 General Foreman Bradley 488 Documents Processor
490 Procurement Supervisor
493 Accountant
496 Info Systems Supvisor
new Development Specialist
new Mechanical Engineer
Total Personnel
Incumbent
Bussel
Eberle
Petrie
Mami
Emerson
Harper
Macy Hansen
Ganthner
Spears
Johnson Vik
Wilbanks
Sieczkowski
Tumer
Sherlock
Hansen
Khan
Acuff
Lammers
Marchegiani
Burger
Arminski
Soboklesky
Antoine
Acuff
Bailey waer
Hurley Judd
Tomory
Hagen
Deacon
Marsh
Morrison
White
Scott
Wolf
Haldane
Zidalis
Davis
Choe
Crosby
Ward
€
Cost $
109,710
62,165
117,585
117,585
106,950
51,123
41,647
56,734
56,734
71,439
41,647
32,124
69,071
62,473
117,585
100,392
97,662
100,392
77,822
102,778
88,787
64,460
53,252
100,351
19,961
94,276
80,417
53,252
44,079
73,649
48,292
60,549
27,413
45,431
53,252
58,689
37,466
36,464
33,746
37,466
106,950
48,292
106,950
61,345
121,554
38,531
60,549
83,102
85,892
88,787
85,007
3,591,829
Bradley AEA
Construction
5%
100%
1%
5%
25%
11%
5%
1%
Bradley % Charged
to Loading % Owner
aea_oh 3/25/92
AEA O/H Addition!
O&M OHonO&M Admin OH Proposed
100%
100%
100%
20.0%
14.0%
20.0%
100%
10.0%
5.7%
3.5%
14.2%
10.2%
14.2%
14.2%
14.2%
14.2%
14.2%
14.2%
14.2%
14.2%
14.2%
14.2%
14.2%
14.2%
14.2%
5%
10%
5%
14%
10% gig 3 # 15%
10%
5%
40%
25%
58%
40%
100%
72%
30%
100%
100%
100%
39%
100%
10%
14%
100%
100%
100%
100%
100%
100%
100%
75%
100%
100%
75%
74%
16%
100%
100%
100%
225% = 04% — 217.7% = =— 280% = 262%
PMC O/H
Proposed
dir
dir
dir
33
BRADLEY LAKE FY93 DRAFT BUDGET
HYDRAULIC POWER GENERATION
Operation Supervision and Engineering
Supervision, Engineering and Administrative Support - 3.2 FTE
Hydraulic Operation Expenses Inspection of Three Diversions
Snow measurement, SCS
Siesmic Monitoring, UAF
Climatologic - NOAA Weather Service
Semi-Annual Dam Settlement Survey
Conservation Studies for Fish and Game
538 Electric Operation Expense SCADA Technical Maintenance
Powerplant Operations - .4 FTE
Supplies
539 Hydraulic Power Generation Operation Expense Mechanical vibration and balance testing, consumables such as oil and filters, die checks
and pressure nitrogen cylinder recharges.
540.1 Transportation Helicopter Transportation for Project Facility Inspections a1 ,000]
Barge Rental to Transport Materials and Dock Fees 27,500
Project Site Contract Transportation - Scheduled Fixed Wing Service to Site 70,000) |
_— Commercial Transportation _ 14,400
Safety ‘Technical and Operations Training 14,000
Maintenance Management System Software Upgrade Modification and Training _ 4,000]
Communications Divcom Maintenance Fee 40,000] _
—— _ Project radios, pagers, and telephones _ 6,000
— ws oo _ — — — i eee — — — 266,900
542 Maintenance of Structures - [Routine Supplies, Materials and Maintenance Items = 60,000 i 60,000
Page 1 of 3 FY93BUDB.XLS 8:42 AM 3/26/92 wiv aq
BRADLEY LAKE FY93 DRAFT BUDGET
ITEM ACCOUNT
ACCOUNT DESCRIPTION COMMENT AMOUNT TOTAL
S44 Maintenance of Electric Plant Electrical Spare Parts 40,000] We
Contract Labor for Testing Protective and Revenue Meters, Generators, Transformers, ae 30,000 Ly
70,000
545 Maintenance of Misc. Hydraulic Plant Mechanical Spare Parts 20,000
Misc. Maintenance Contracts 25,000
45,000
545.1 Maintenance of Hydraulic Plant O&M Personnel 4.2 FTE 392,000 392,000
547 Fuel Stock Fuel for Bradley Vehicles, Loaders, Graders 40,000] 40,000:
556 System Control and Load Dispatching Labor - CEA 1 FTE 118,000 el
‘Training - CEA Dispatchers 36,000:
Economic Dispatch Program (10 yr. Armortization ) - CEA 20,000
174,000 ua] TRANSMISSION EXPENSES
562 Bradley Junction Substation Switchyard Inspection and Tests - HEA 2,000 2,000
571 Maintenance of Overhead Lines Transmission Line Inspection and Maintenance - HEA : 39,000: 39,000
ADMINISTRATIVE, GENERAL AND n
REGULATORY EXPENSES oe
920 Administration and General Expenses Ht |e a. Bradley PMC Costs i | J i Tit i PEE EE a PMC Travel Cost = 6 PMC Meetings each year in Anchorage 23,000 i a
Subcommittee Travel Cost 12 Subcommittee Meeting each year ee)
Meeting General Expenses u oe PMC Adminstrative Support an 18,000)
i HL EE n r 1 | «56,000
b. Administration Expenses TL ii AEA Administrative and General Costs E e 396,011{ 396,011.
Page 2 of 3 FY93BUDB.XLS 8:42 AM 3/26/92
BRADLEY LAKE FY93 DRAFT BUDGET
FERC ACCOUNT
ACCOUNT DESCRIPTION COMMENT
Contract Services
a. Legal Attorney Fees (AEA & Utilities)
b. Project Audit Professional Audit Services
Insurance |
a, Property $1M Deductible 160,824
b. Boiler and Machinery
| ¢. General Liability
d. Watercraft & Aviation
e. Directors and Officers Liability
$50K Deductible ‘ 50,000 H|
One-Sixthe of AEA State Policy Premium 10,000
One Sixth of AEA State Policy Premium 10,000
Liability Insurance for the Directors and Officers of the PMC 15,000
245,824
Regulatory Commission Expenses
a, FERC
Land Use Fees
Administrative Fees
FY92 Billing $97,000 100,000
Estimate 50,000: USGS Streamgaging _ i
Engineering Consultant (est. $75,000 in FY96)
AEA Permits Specialist
Five Year Inspection
b. Permitting
TOTAL FY93 BRADLEY O&M BUDGET
Page 3 of 3 FY93BUDB.XLS 8:42 AM 3/26/92
DATE:
TO:
FROM:
SUBJECT:
—_ ACHMENT E
Alaska Energy Authority
MEMORANDUM
March 23, 1992
Bradley PMC Members BANOS Brent N. Petrie, Manager
Agency Operations
Bradley PMC Costs
Documentation of the attached summary of costs which was received on
February 26, 1992, have been reviewed and are recommended for approval.
Reimbursement from project construction funds = $506.78.
Reimbursement from Section 31 funds = $14,990.23.
BNP:tlj
Attachments as stated.
aia
92Q1\TJ2653(1) Page 1
UNREIMBURSED BRADLEY LAKE COSTS
COSTS INCURRED
October, 1991 through February, 1992
As Submitted to Ater Wynne
PROJECT COSTS
} FINANCE | TEAM ACTIVITIES
BPMC LEGAL AND ] FINANCE 1990 UTILITY
|} OPINION
LETTERS
360.00 146.78
ioe Poot Ho 360.00
SECTION 31 COSTS
B2(a)
BPMC
ORGANI-
ZATION
CHUGACH: No costs submitted.
GVEA: Includes cost information from December, 1991, January, 1992.
HOMER: Includes cost information from September through December, 1991 and January, 1992.
MATANUSKA: No costs submitted.
ML&P: No costs submitted.
SEWARD: Includes cost information from August through December, 1991.
ATER WYNNE: Includes legal fees and costs from January 1992 through February 21, 1991.
EGW\egw082R.NOs
DRAF ek
March 25, 1992 u pa’ Ja .
The Honorable Ronald L. Larson
Chairman Legislative Budget & Audit Committee Room 502, Capitol Building
Juneau, Alaska 99811
Dear Mr. Chairman:
As the utility managers representing over 95% of Alaska's electric consumers in the railbelt region, we wish to voice our concern regarding a situation that has todate been stalled within your committee.
Over the past decade, the railbelt utilities and the Alaska Energy Authority have worked intently toward the common goal of reducing electric rates and improving system reliability to the area's consumers. Two major projects, the Anchorage-Fairbanks Intertie and the Bradley Lake Hydroelectric Project, which were constructed by the Energy Authority and funded in part by the railbelt utilities, play a significant role in this overall objective.
As an integral part of these projects and the operating agreements with the State, the communications system required to operate and dispatch the projects is provided by the
Energy Authority through the use of the existing state-owned microwave network. To date several million dollars in project funds have been invested in the state's microwave network to meet the operating and reliability requirements for these two projects. The most recent work being associated with the Bradley Lake Hydroelectric Project which was placed into commercial service this past summer.
Pending before your committee is a Reimbursable Services Agreement (RSA) between the Alaska Energy Authority and the Division of Telecommunications to upgrade the existing microwave link between Soldotna and Anchor Point. This section of the microwave network which controls Bradley Lake, is the only portion of the State's system which is 'non-protected' (i.e. does not have standby transmitters and receivers). As a consequence the reliability of this segment is far below the balance of the network, and has already resulted in operational problems on several occasions. It is imperative that this final link be upgraded to overcome these problems and provide the necessary level of overall system reliability. , lawices
We support the proposed RSA between the Energy Authority and the Division of Telecommunications which will accomplish this work and resolve seyerdl other minor
communications problems at Bradley Lake. Although the telephone industry) may try to convince you otherwise, it is clearly in the best interest of the electric consumers that this
upgrade be completed as soon as possible. Any alternatives to the continued use of the existing state microwave system to support the operation of Bradley Lake and the Intertie would be vastly more expensive. Such added costs, would in turn, result in increased rates to our consumers.
92Q1\TJ2662(1) Page 1
Letter to The Honorable Ronaid L. Larson
Subject: RSA between AEA and DIVCOM
March 25, 1992
We request your support and assistance in resolving this matter promptly by approving the ase RSA. If you should have any questions regarding this matter, please do not
esitate to contact any of us.
Sincerely,
Mike Kelly, General Manager Golden Valley Electric Association
Norm Story, General Manager Homer Electric Association
Tom Stahr, General Manager Anchorage Municipal Light & Power
DRE:tlj
92Q1\T32662(2)
David Highers, General Manager Chugach Electric Association
Ken Ritchey, General Manager
Matanuska Electric Association
Everett P. Diener, Manager of Utilities City of Seward
Page 2
Item 10A
BRADLEY LAKE PROJECT
SUMMARY
PROJECT STARTUP TEST CHARGES
Submittal for Bradley Lake Project Management Committee Approval 3/26/92
Utility July 91 August 91 September October 91 Totals
Chugach Electric Association $55,717.48 $39,950.87 -0- $7,336.78 $103,005.13
Golden Valley Electric Association 65,203.00 -0- -0- -0- 65,203.00
Homer Electric Association 25,310.62 13,959.48 -0- -0- 39,270.10
Municipality of Anchorage 2,684.41 -0- -0- -0- 2,684.41
$148,915.51 $53,910.35 $7,336.78 $210,162.64