Loading...
HomeMy WebLinkAboutBradley Lake BPMC meeting Operators Report 09-26-2012Bradley Lake BPMC Meeting August 29th, 2012 —- September 26, 2012 Operators Report Unit Statistics: Generation Unit 1 (MWhrs) Unit 2 (MWhrs) Total (MWhrs) August 16,580 11,560 28,070 Hydraulics Avg. Lake Level (ft) Usage (ac ft) Fishwater (ac ft) August 1,149.06 32,218 3,115.0 Current Status: Lake level as of September 26» was 1,181.4 feet. The lake reached its maximum operating level on September 234 and began to spill early September 24th. Between September 16» and September 23"4, lake level increased 23 feet and we continue to receive rain. Since the last meeting we were able to restore 6 needle operation without the unit oscillating. Later when the tie to Anchorage opened up, we found that we had problems in Divider 1 Mode of operation on both units. When the units were in this mode they were responding to control signals. We worked with VA Tech and Emerson to resolve this issue. After going through the program and interface in detail it was found that when VA Tech supplied the Modbus interface they included a Divider Bias. Emerson setup a control for this thinking it was similar to a valve limiter. Our investigation found that VA Tech should have never put this bias into the Modbus interface and that the Divider Bias was to be set at a constant value of 10% whereas the DCS was driving it to 100% after the unit came on line. VA Tech has sent us a new controls load with this bias removed from the Modbus link and Emerson has given us instructions to remove their logic affecting the bias. We plan on making these modifications as soon as we can get it scheduled with Dispatch. Bradley Lake Operator Report Page 1