Loading...
HomeMy WebLinkAboutBPMC Meeting - August 24, 1992 210. 11. 12. 13. 14. BRADLEY LAKE PROJECT MANAGEMENT COMMITTEE August 24, 1992 Chugach Electric Association, Inc. Training Room 10:00 a.m. CALL TO ORDER 10:00 a.m. ROLL CALL PUBLIC COMMENT AGENDA COMMENTS APPROVAL OF MEETING MINUTES - July 23, 1992 TECHNICAL COORDINATING SUBCOMMITTEE REPORT BUDGET SUBCOMMITTEE REPORT AGREEMENTS SUBCOMMITTEE REPORT OPERATION AND DISPATCH SUBCOMMITTEE REPORT REVIEW OF PROJECT STATUS OLD BUSINESS A. Spinning Reserves/Under Frequency Load Shedding Update B. Bradley Lake Construction Cost Review & Update on Siesmic Measurement Issues NEW BUSINESS A. Approval of Committee Expenses B. Approval of Utility Agreements COMMUNICATIONS A. Schedule Next Meeting ADJOURNMENT RECORD UOPY FILE NO wR $=!) Mw <)au Se Highers Burlingame Ritchey Sieczkowski Sieczkowski Eberle Lovas Ritchey Garzini BRADLEY LAKE FY93 BUDGET rec] ITEM | ACCOUNT ACCOUNT DESCRIPTION COMMENT AMOUNT | TOTAL ES 535 Supervision, Engineering and Administrative Support - 3.2 FTE 257,926 537 Hydraulic Operation Expenses Inspection of Three Diversions 6,000 ‘Snow measurement, SCS 20,000 _| |Siesmic Monitoring, UAF 50,000 Climatologic - NOAA Weather Service 5,460) Semi-Annual Dam Settlement Survey 2,000 — Conservation Studies for Fish and Game 18,000 101,460 538 SCADA Technical Maintenance 25,000 Powerplant Operations - .4 FTE 42,000 Supplies 15,000 82,000 539 Hydraulic Power Generation Operation Expense Mechanical vibration and balance testing, consumables such as oil and filters, die checks 20,000 20,000 and pressure nitrogen cylinder recharges. 540.1 Transportation Helicopter Transportation for Project Facility Inspections 91,000) Barge Rental to Transport Materials and Dock Fees 27,500 Project Site Contract Transportation - Scheduled Fixed Wing Service to Site 70,000) ‘Commercial Transportation 14,400 Safety [Technical and Operations Training 14,000 Maintenance Management System ‘Software Upgrade Modification and Training 4,000 Communications Divcom Maintenance Fee 40,000 Project radios, pagers, and telephones 6,000) | | ca 542 [Routine Supplies, Materials and Maintenance Items 60,000 60,000 at ae rly hs <2 i= zQ2 — ~|~ aD > ot y |e ¢ ° c ms) Page i\ of 3 FY93BUDB.XLS 1:41 PM 8/24/92 { { T LN3WHOVILY BRADLEY LAKE FY93 BUDGET Page of 3 FY93BUDB.XLS 1:43 PM 8/24/92 T }——____ | — FERC ITEM ACCOUNT Acct. ACCOUNT DESCRIPTION COMMENT AMOUNT TOTAL 544 Maintenance of Electric Plant Electrical Spare Parts 40,000 Contract Labor for Testing Protective and Revenue Meters, Generators, Transformers, 30,000 70,000 545 Maintenance of Misc. Hydraulic Plant [Mechanical Spare Parts 20,000: (Misc. Maintenance Contracts 25,000 45,000 545.1 Maintenance of Hydraulic Plant O&M Personnel 4.2 FTE 392,000 392,000 547 Fuel for Bradley Vehicles, Loaders, Graders | 40,000 40,000: | i |556 Labor - CEA 1 FTE 118,000 Training - CEA Dispatchers 36,000) Economic Dispatch Program (10 yr. Armortization ) - CEA 20,000 174,000 2,000) 2,000 ‘Transmission Line Inspection and Maintenance - HEA 39,000 39,000 | a. Bradley PMC Costs PMC Travel Cost 6 PMC Meetings each year in Anchorage 23,000 | Subcommittee Travel Cost 12 Subcommittee Meeting each year 15,000 | PMC Adminstrative Support 18,000] | 25,000] | 81,000] | AEA Administrative and General Costs 396,011 396,011 BRADLEY LAKE FY93 BUDGET Acct. 923 Attorney Fees (AEA & Utilities) 10,000, Professional Audit Services $1M Deductible 160,824 $50K Deductible 50,000 One-Sixth of AEA State Policy Premium 10,000) One Sixth of AEA State Policy Premium 10,000) Liability Insurance for the Directors and Officers of the PMC 15,000 245,824 FY92 Billing $97,000 Estimate USGS Streamgaging Engineering Consultant (est. $75,000 in FY96) AEA Permits Specialist TOTAL FY93 BRADLEY O&M BUDGET Page of 3 2,699,928 2,699,928 FY93BUDB.XLS 1:43 PM 8/24/92 ATTACHMENT 2 RECORD VOPY FILE NO Bradley Lake Operations and Dispatch PRO 3°) mw CJ Summary of Meeting on August 18, 1992 for Bradley Project Manager's Committee oe VY Correspondence - received for discussion of Scheduling Procedures, Spinning Reserve, Bradley Lake Project Summary Reports, Operational Procedures and Allocation Update. Operation - the lake elevation was 1139.2 ft. on August 17. Inflow is beginning to slow down. 45,680 MWH was delivered during July. The communication, DECNet and SCADA systems were being worked on by project and contract personnel. There was an outage on August 13. Unit one tripped off-line. This problem was detected when the project was islanded. Load changes, under this condition, greater than 1/2 MW/minute creates problems in the system. This problem is being investigated. Increased unit start-stops have caused other control problems to surface that previously were not detected in the synch circuits. The Division of Information will be requested to initiate the dispatcher ring down circuit upon receipt of approval and transfer of funds. The storing water criteria need committee review and input and will be presented at the next meeting for discussion. After a lengthy discussion of scheduling procedures, it was the consensus of the committee that Bradley was agreed to, by the managers, to be operated as an energy project. The declared capability versus project capacity causes difficulty at times in scheduling, therefore, this philosophy may need to be revisited if capacity becomes an issue. To accomodate the scheduling issue, there were two motions passed which are summarized: 1 Utilities scheduling above their 90MW sfare willbe cut back proportionately to 90MW for unit trips or system emergencies. Under normal load changes, the approved schedule will not be allowed to change; 2. The utilities will submit a weekly schedule by Tuesday, reviewed on Wednesday, confirmed by Thursday and implemented on Saturday at 0001 hours. Spinning reserve calculation methods were discussed. Chugach Electric Association (CEA) provided an example of a proposed method. The discussion addressed the issue of being able to use an utilities capacity when they committed that capacity to another utility. This led to an unresolved problem in the O&D. There was a motion to refer this issue to the Bradley PMC. The method suggested by CEA to calculate the spinning reserve was accepted by the O&D noting that the method of calculation only was approved. Annual maintenance on the Bradley units was discussed and the schedule will be coordinated with the participating utilities. The next meeting is set for September 15, 1992. 92Q3\IT3449(1) Page | of 1