HomeMy WebLinkAboutMetering Audit For Alaska Power Authority Southeast Alaska Facilities 19841984 Metering Audit For ALASKA POWER AUTHORITY Southeast Alaska Facilities uls @Be0G8 Utility Systems & Applications, Inc. SBA June 8, 1984 Mr. Larry Wolf Operations Engineer Alaska Power Authority 334 West Fifth Avenue Anchorage, Alaska SUBJECT: METER AUDIT - SOUTHEAST ALASKA APA FACILITIES May 30 to June 5, 1984 Dear Larry: Attached are the documents pertaining to our audit of the metering points at Alaska Power Authority's Wrangell, Petersburg, Ketchikan, Tyee and Swan Lake facilities. The information is divided into two sections: the individual test sheets for each metering point tested and a general report, which briefly covers a number of items APA should consider changing. We would be pleased to submit a proposal providing any or all of the changes recommended. A special thanks to Dick Ballard is in order for the hospitality extended during our visit and particularly for the travel arrangements he was able to set up on such short notice. His scheduling of our trips to the various facilities cut the time we expected to spend by about two days. Utility Systems and Applications, Inc. appreciates the opportunity to serve Alaska Power Authority and looks forward to assisting you in the future. Sincerely, Fh GL 03 LI Edward R. Schild, P.E. ERS: pc Enc. 4160 S.E. International Way * D 207 + Portland, Oregon 97222 (503) 659-3441 THE WATTS DOCTOR ALASKA POWER AUTHORITY Metering Audit Summary Between May 29 and June 4, 1984, Utility Systems and Applications, Inc. provided testing, calibration and verification for 26 metering points at Alaska Power Authority facilities in Wrangell, Petersburg, Ketchikan, Tyee and Swan Lake, Alaska. The following report, along with the audit sheets for each metering point, detail our findings, observations and recommendations. I. METER AUDIT CRITERIA AND PROCEDURE Each metering point was tested and evaluated in a standardized manner, which included some or all of the following procedures and techniques: A. Meter Test and Calibration i. Each KWH meter was isolated from its circuit and “as found" tested for Full Load, Light Load, Power Factor and Balance. In addition, those meters equipped with demand registers were checked for Demand Zero Point, Demand Rise Rate and Demand Reset Time. Za Each meter was adjusted as necessary to operate within the following tolerances where possible: a. Full Load and Light Load: at least +/- 0.3% b. Power Factor: at least +/- 0.75% Cc. Balance: no more than 0.5% variation among elements Due to defects, some meters could not be adjusted to meet the above tolerances; this is discussed in Section II A of this report. B. Magnetic Tape Recorder Packages The KWH and QH meters associated with these packages were tested as noted in Section A above. In addition, the pulse initiators were checked for proper operation and the pulse per revolution rate was checked against Nameplate rate. The pulse values were also calculated and marked in the appropriate place on the recorder face plate. Identification Where necessary, the meters were given additional identification markings and the dial multiplier was calculated and marked on the multiplier tag. Current Transformer and Potential Transformer Ratio and Quality Verification. Where possible, each C.T. and P.T. was visually inspected and nameplate data checked for ratio and quality. Whenever there was sufficient loading and accessibility, primary current was compared to secondary current on the C.T. circuit. Current Transformer Burden Check The burden test is basicaly a proof test to determine how well the C.T. can provide constant current with increasing loads. "Good" C.T.s are those in which little current drop occurs when high resistance (up to 6 ohms) is inserted into a C.T. secondary circuit. "Bad" C.T.s show a Sharp drop at low currents with small additions of load. This test also indicates whether there are any "shorts" in the C.T. secondary circuit. Phase Angle Analysis Where there was sufficient loading, phase angle readings were taken to verify correctness of wiring and power load factor. In addition, the meter disk was timed and KW demand calculated and compared to actual load current and phase angle. Meter Seals Each meter, except those in the magnetic tape packages, was sealed with a pressed lead seal. The seal mark number pressed into these lead seals is "80". Magnetic Tape Replacement Magnetic tape replacement instructions were given to selected personnel at each metering point where a recorder was in service. Tks GENERAL COMMENTS A. E. Meter Tests A major source of metering error encountered during the audit concerned Westinghouse switchboard type meters. All but two of these meters were approximately 5% slow. We were not able to bring several of these into adjustment. In trying to determine why these meters were slow, it appears that sometime in February Westinghouse installed LED potential indicating lamps on these meters. In order to do this, they would have to change the potential coil on each meter element. These new potential coils had different field strengths, which made the meters run slower (5%) and some of these meters did not have enough adjustment left to fully correct for this. Several other meters have little or no adjustment left. Due to this problem, many of these meters should be returned to the factory for rebuilding. Current Transformer Quality Several installations did not have 0.3 metering accuracy class current transformers for the KWH metering. The C.T.s that are in service are relay class and may or may not be close to ratio at metering currents, Unnecessary Potential Transformers The two station service meters at Swan Lake were connected to the secondary of the P.T.s (277 to 120) but these are 277 volt meters. Improper Metering Several installations were metered 3-phase 3-wire, but should be 3-phase 4-wire. These occur at Wrangell switchyard and Petersburg. "In" and "Out" Metering Several installations have "In" and "Out" metering, but the "Out" meter is wired the same as the "In" meter. The meter at Wrangell switchyard was changed, but the Petersburg and Tyee were left at request. There is no “Out" metering at Bailey Substation, so when Ketchikan feeds power to Swan Lake, this power cannot be registered. Magnetic Tape Recorder Metering Packages Two of the three packages did not have provision for testing (test switch) and on the third, the test switch is incorrectly wired and cannot be used in testing. In these packages, it is not possible to seal the individual meters because they do not have individual glass covers. If you were to seal the package cover, the magnetic tapes would be inaccessible for monthly changes. Pulse values on all the magnetic tape recorder packages are 100 KWH or Q-Hour per pulse. Some meters have to turn 15 disk revolutions for one pulse. These are very low pulse rates which give a demand definition of 400 KW. Pulse rates could be ten times as fast and still not be close to tape saturation. This would greatly improve demand definition . Because the meters in these packages do not have separate covers, care needs to be taken to keep dirt out of the package. An additional digital recording package should be considered at Bailey Substation. Demand Definition of Mechanical Demand Register Special register ratios have been ordered to give multipliers of 1000 on many of the meters. As a result, many of these have poor demand definition and cannot read be read closer then 500 KW. IIl RECOMMENDATIONS The following is a review off the Recommendations listed on the Audit Test Sheets. A. B. Cc. Wrangell Substation 1) Verify accuracy class of all current transformers. If magnetic tape package C.T.s are not 0.3 accuracy class, they should be replaced. 2) Several of the switchboard meters should be returned to the factory for rebuild. 3) Install test switch for magnetic tape recorder package. Increase pulse initiator output by at least a factor of 10. Wrangell Switchyard 1) The C.T. ratio should be verified. 2)) The metering is 3-wire and should be replaced with 4-wire metering. 3) One of the meters should be returned to the factory for rebuild. 4) Register demand definition is poor and a magnetic tape could be installed to improve this. Petersburg Substation 1) Two meters have incorrect demand register scale plates. 2) One switchboard meter has the incorrect cover, which makes it impossible to reset the demand without removing the cover. 3) The metering is 3-wire, but should be 4-wire. The metering on the magnetic tape package should be changed to 4-wire as it appears this is the billing meter. (This will require installation of three P.T.s). Consideration should be given to installing 4-wire metering on the other two circuits also. The customer will have line to ground loads in the future. 4) None of the current transformers are 0.3 accuracy class and should at least be replaced on the Magnetic tape package metering. 5) 6) 7) 2) 3) 4) 5) Swan 1) 2) 3) 4) The "Out" meter is wired for "In" power. A test switch should be installed to enable convenient testing for the magnetic tape package. The pulse rate should be increased at least a factor of 10 on the magnetic tape package in order to improve demand definition. c.T. ratio and accuracy class needs to be verified as C.T.s were inaccessible on the station service metering. The generator C.T.s are not 0.3 accuracy class and are relay class. The station total metering is 3-wire but the system is 4-wire. This metering should be changed to 4-wire for best accuracy. The test switch should be rewired to enable easier testing for the magnetic tape metering package. The pulse rate to the magnetic tape should be increased by at least a factor of 10 to improve demand definition. Lake The potential transformer should be removed from the metering circuit for both station service meters. They are not necessary and create inaccuracies in the registration. Install test switches or "slide" kits to enable easier testing of station service meters. Station service C.T.s are not 0.3 accuracy class C.T.s. Due to loading of P.T.s and wire length, a separate potential cable should be run to the generator meters. Iv F. Bailey Substation 1) "Out" metering should be installed at this location. 2) The current transformers are not 0.3 accuracy class and should be replaced. 3)) A magnetic tape recorder should be installed at this location. CONCLUSION Most likely, all of the metering at present is plus or minus 3% of actual as we left it. This can be improved to approximately plus or minus 0.5% by making the changes as recommended. When billing is occuring, these installations should definitely be repaired. The meters themselves, with the exception of a few, were left better than plus or minus 0.38. TEST CARD - FILE #984-14 *#* CUSTOMER SERVICE INFORMATION *** Test Date: 5/29/84 Rate Schedule: Alaska Power Authority Customer: Wrangell Substation - Breaker T51, Line 1 Service Type and Voltage: 3P 4W WYE 7200/12470 **##METER INFORMATION *#** Meter # = T-51 Voltage: = 120 Kh: 1.8 Test Amps: 2.5 Manufs Westinghouse Wires 4 Rea 46 8/27 M. Factors 5/6 Types D4B-3FM Phase: 3 Grs 100 Form: 9B Demand Register Types = Mark la interval: 15 Full Scales 4.32 *** METER TEST DATA *#* As Found Full Loads -4,779% Light Load: -5.30% EFFs -4.87% PFs -6.07% Bal: 0.3819 As Left Full Load: 0.14% Light Loads -0.06% EFF: 0.10% PF: -0.75% Balk 0.16% Demand Test: OK Reset Motor Time: 15:00 Creep Test: OK Measured PF; 90% **#* METER DATA *** Correct Meter Applications Yes Meter Conditions Good As Found Readings: KWH 0204 KW 0.30 KVAR 12 Month Peak KW: Meter Defects: Detent too loose - Adjusted. * Meter Adjustments: FL, LL, PF, BAL Multiplier: 1000 Socket Bypass Condition: Test Switch - Good #** INSTRUMENT TRANSFORMER DATA *** Current Transformers: — {090/300 to 5 on 100 tap C.T. Burden Test: Fair - No drop at | ohm at 0.25 amps Potential Transformer: GF, JVM-5 60 to | *#* PROPERLY APPLIED METER CIRCUITS *** Socket Wiring: Correct Circuit Grounding: Correct Instrument Wiring: Correct Current Circuit Wire Size: 12 Length: 15' Condition: Good *#* REVENUE CHANGE **#* #*#® VOLTAGE MEASUREMENTS *** WYE Van 121.5 “BN 121.5 YON 121.5 8 c ; 4 Wire VAN Van Von 3 Wire VaB Visc Ven *** PHASE ANGLE *** we ¥4, 2 Vala @ Velo 28 : : Delta Vycl, Vac's Youle Neutral Hf Center tap Alaska Power Authority 1984-14 Page 2 *** COMMENTS *** Meter was found 4.87% slow and was adjusted. Unable to locate information on current transformer accuracy as C.T. nameplates not accessible. *** RECOMMENDATIONS *** Verify accuracy class of current transformers. TEST CARD - FILE 4984-15 ##* CUSTOMER SERVICE INFORMATION *** Test Dates 5/29/84 Rate Schedule: Alaska Power Authority Customer: = Wrangell Substation - Breaker T-52, Line 2 Service Type and Voltage: 3P 4W WYE 7200/12470 ***METER INFORMATION *** Meter # = T-52 Voltage: 120 Kh: 1.8 Test Amps: Manuf: Westinghouse Wires 4 Re: 46 8/27 M. Factor: Types D4B-3FM Phaser 3 Gra 100 Form: Demand Register Types Mark la interval: 15 Full Scale: **#* METER TEST DATA *** As Found Full Load: = _4,439% Light Load: 6.92% EFF: -4.79% PF: -5.68% As Left Full Load: -0.52% Light Load: 0.00% EFF: -0.42% PFs -0.43% Demand Test: OK Reset Motor Time: 15:01 Creep Test: OK Measured PF; 99% **#* METER DATA *** Correct Meter Application: yes Meter Condition: Good As Found Readings: KWH 9756 KW 0.73 KVAR 12 Month Peak KW: Meter Defects: No adjustment available to "speed" meter on FL Meter Adjustments: FL, LL, PF Multiplier: 1000 Socket Bypass Condition: Good - Test Switch *** INSTRUMENT TRANSFORMER DATA *** Ce Trane | peniane wn Son TOD haps CT. Bam teats Fair - No drop at 1.7 amps and 0.5 ohms D, ae er - Potential Transformer: G.E. JVM-5 60 to! **#* PROPERLY APPLIED METER CIRCUITS *** Socket Wiring: Correct Circuit Grounding: Incorrect - Potential return not tied down. Instrument Wiring: Worrect Current Circuit Wire Size: }2 Length: 15' Condition: Good *** REVENUE CHANGE *#* *#** VOLTAGE MEASUREMENTS *** WYE Vv v Vv. AN 110 BN 133 CN Wo 8 c 4 Wire VAN VN Von 3 Wire VAB Vac Voa *** PHASE ANGLE *** wee | Fal =) Sees) | Mente) | i Delta Vacl, Vaca Foul. t 2.5 5/6 9B 4.32 Bal: 0.21% Balk 0.21% *Neutral if Center fp Alaska Power Authority 1984-15 Page 2 *** COMMENTS *** Meter potential return not tied to potential transformer neutral, giving voltages as listed. A jumper was found missing on breaker 5] indicating KW meter potential neutral. This was repaired. Voltages measured then at 121, 121, 121 respectively. Phase angle then measured at 12, 13, 12 degrees respectively. This affected KWH metering and transducers on breakers 50, 52, 53 and 54. Meter was found to be approximately 5% slow and there was not enough full load adjustment available to properly calibrate the instrument. Therefore, it was left at 99.48% registration on full load. Unable to locate information on C.T. accuracy class as nameplates not accessible. ** RECOMMENDATIONS *** Meter should be returned to factory for repair as dampening magnet must be changed. Verify accuracy class of current transformers. TEST CARD - FILE #984-16 *#* CUSTOMER SERVICE INFORMATION *** Test Date: 5/30/84 Rate Schedule: Alaska Power Authority Customer: Wrangell Substation - Breaker T-53 Line 3 Service Type and Voltage: 3P 4W WYE **#*#METER INFORMATION *** Meter # 1-53 Voltage: | 20 Kh: 1.8 Test Amps: Manuf: West Wires s Res 46 8/27 M. Factors Types D4B-3FM Phaser 3 Gri 100 Form: Demand Register Types Mark la Intervals 15 Full Scalez *#* METER TEST DATA #** As Found Full Load: -5-03% Light Load: -6.09% EFF: -5.24% PF: -6.47% As Left Full Load: 0.24% Light Load: 0.08% EFF: 0.219% PF: -0.43% Bale 0.37% Demand Test: OK Reset Motor Time: 15:01 Creep Test: OK Measured PF: 91% *#* METER DATA *** Correct Meter Application: Yes Meter Conditions Good As Found Readings: KWH = 0720 KW 0.62 KVAR 12 Month Peak KW: Meter Defects: None Meter Adjustments: FL, LL, PF Multiplier: 1000 Socket Bypass Condition: —§ Test Switch - Good **#* INSTRUMENT TRANSFORMER DATA *** Current Transtormerss 100/300 to 5 on 100 tap C.T. Burden Test: Fair - No drop at 0.5 ohms and | amp Potential Transtormer: G.E. JVM-5 60 to | *** PROPERLY APPLIED METER CIRCUITS *** Socket Wiring: Correct Circuit Grounding: Incorrect - Potential return not tied down Instrument Wiring: Correct Current Circuit Wire Size: 12 Length: [> Condition: — Good *** REVENUE CHANCE *** *#** VOLTAGE MEASUREMENTS *** WYE Van 110 ‘Bn 133 Von 115g c a 4 Wire VAN Ven Von 3 Wire VAB Vac Von *#* PHASE ANGLE *#* WE Vania 7° Vonty 7 Yonlc 76 Delta Vacl, Nacla owe Neutral 1 Center typ 2.5 5/6 9B 4.32 Bals 0.37% Alaska Power Authority 1984-16 Page 2 #4 COMMENTS *** Meter potential return not tied down to potential transformer neutral. See Comments on File 1984-15. #4 RECOMMENDATIONS *** Verify accuracy class of current transformers. TEST CARD - FILE #984-17 *##* CUSTOMER SERVICE INFORMATION *** Test Date: 5/30/84 Rate Schedule: Alaska Power Authority Customer: Wrangell Substation Breaker T-54, Line 4 Service Type and Voltage: 3P 4W WYE 7200/12470 ***METER INFORMATION *** Meter # = T-54 Voltage: 120 Kh: 1.8 Test Aimps: 2.5) Manul: West Wires 4 Re: 46 8/27 M. Factors 5/6 Types D4B-3FM Phases 5 Gre 100 Form: 9B Demand Register Types Mark la Interval: 15 Full Scales 4.32 *** METER TEST DATA *#* As Found Full Load: -4.72% Light Load: -5.619 EFF -4.90% PFs -5.88% Bals 0.32% As Left Full Load: 0.22% Light Load: = -0. 10% EFF: 0.16% PFs -0.18% Balls 0.32% Demand Test: OK Reset Motor Time: 15:00 Creep Test: OK Measured PF: 98% *#* METER DATA *## Correct Meter Application: Yes Meter Conditions Good As Found Readings: KWH 0756 KW 0.2 KVAR 12 Month Peak KW: Meter Defects: None Meter Adjustments: FL, LL, PF Multiplier: 1000 Socket Bypass Condition: Test Switch - Good *** INSTRUMENT TRANSFORMER DATA *** Current Transtormers: — 100/300 on 100 tap C.T. Burden Test: Fair - No drop at 0.5 ohms and 0.5 amps Potential Transformer: G.E. JVM-5 60 to | *** PROPERLY APPLIED METER CIRCUITS *** Socket Wiring: Correct Circuit Grounding: Incorrect Instrument Wiring: Correct Current Circuit Wire Sizes 12 Length: ID! Condition: Good *®* REVENUE CHANCE *** **#* VOLTAGE MEASUREMENTS *** WYE Yan iio) “BN 33, YON i c i “Wire Vay Vian Rows 3 Wire VaAB Vac Vea *** PHASE ANGLE **# WYE Vantaa 10 Vents 20. Vouk 0 Delta Vict, Vide Dsl Neutral If Center tap Alaska Power Authority 1984-17 Page 2 *** COMMENTS *** Meter potential return not tied down to potential transformer neutral. See Comments on File 1984-15. *** RECOMMENDATIONS *** Verify accuracy class of current transformers. TEST CARD - FILE £984-18 *#* CUSTOMER SERVICE INFORMATION *** Test Date: 5/29/84 Rate Schedule: Alaska Power Authority Customer: Wrangell Substation - Main KWH Meter "In" Service Type and Voltages 3P 4W WYE 7200/12470 ***METER INFORMATION *** Meter # 150-KWH Voltage: = 20 Kh: 1.8 Test Amps: Manuf: West Wire: 4 Re: 15 35/8 1M. Factors Typer WRP-23-KWH Phaser A Gr 100 Form: Demand Register Typez No Register Intervals Full Scale: *** METER TEST DATA *** As Found Full Load: 9,4;.% Light Load: 0.10% EFF: 0.35% PFs 06.10% As Left Full Load: 0.26% Light Load: = _9,92% EFF: 0.21% PF: 0.10% Demand Test: Reset Motor Time: Creep Test: OK Measured PF: 95% *** METER DATA **# Correct Meter Application: yo, Meter Condition: Good As Found Readings: KWH 0929|7. KW KVAR 12 Month Peak KW: Meter Defects: None Meter Adjustments: pL Multiplier: — {990 Socket Bypass Condition: = No test switch *** INSTRUMENT TRANSFORMER DATA *** Current Transformers: — 390/600 to 5 on 300 tap C.T. Burden Test: Good - No drop at 6 ohms and 1.5 amps Potential Transformer: G.E. JVM-5 60 to 1 *** PROPERLY APPLIED METER CIRCUITS *** Socket Wiring: Correct Circuit Grounding: Incorrect - Potential return not tied down Instrument Wiring: Correct Current Circuit Wire Size: 12 Length: 25! Condition: — Good *** REVENUE CHANGE *#** *** VOLTAGE MEASUREMENTS *** YE : / E YAN 110 YBN 133 Yon 15 ob € 4 Wire VAN Ven Von 3 Wire VAB Vac Vea ##* PHASE ANGLE **# WYE Vania 19) Veh 19 Yoni 16 \ Delta Vac, Yec's Von 2.5, 5/18 Bal Bal: 0.34% 0.34% 5 = Neutral If Center fap Alaska Power Authority 1984-18 Page 2 *** COMMENTS *** This meter is in a Westinghouse WRP-23 magnetic tape package. See File 1984-19 for Q-Hour test results. There is no test switch for the package, which makes it difficult and time consuming to test the meters in this package. Since these meters do not have individual glass covers, much care needs to be taken to keep dirt out of the meters. Before the magnetic tape is changed each month, the panel should be opened and the cover dusted before removal. The contro! room should be kept as clean as possible at all times. Pulses from this meter are fed to channel B of the tape recorder. Pulse Mp=1250/81 which gives a KWH/pulse of 100 with a C.T. ratio of 300 to 5 and P.T. ratio of 60. This gives demand definition of 400KW. Mag tape battery carryover found not connected. This was connected. Because of the type of cover on this package, it must be sealed every month when the tape is changed. Meter package potential return was not connected. See File 1984-15 for details. *** RECOMMENDATIONS *** Install test switch for this package. A pulse initiator with an Mp 125/81 would give a demand definition of 40KW and should be installed. Verify accuracy class of current transformers. TEST CARD - FILE 4984-19 #** CUSTOMER SERVICE INFORMATION *** Test Date: 5/29/84 Rate Schedule: Alaska Power Authority Customer: Wrangell Sub - Main QH Meter "In" Service Type and Voltages 3P 4W WYE 7200/12470 ***METER INFORMATION *** Meter # = T-50 QH Voltage: 120 Kh: 1.8 Test Amps: 2.5 Manuf; West Wire: 4 Res 15 35/8IM. Factors 5/18 Types WRP-23 QH Phase 3 Gr 100 Form: 9B Demand Register Type: Intervals Pull Scale: *** METER TEST DATA *** As Found Full Load: 0.30% Light Load: 0.44% EFF: 0.33% PF: 0.36% Walz 0.51% As Left Full Load: 0.17% Light Load: 0.30% EFF: 0.20% PF: 0.26% Balk 0.20% Demand Test: Reset Motor Time: Creep Test: OK Measured PF; 95% *** METER DATA **# Correct Meter Application: yes Meter Conditions Good As Found Readings: KWhi Kw KVAR QH 01797 12 Month Peak KW: Meter Defects: None Meter Adjustments: pay, PL Multiplier: 1000 Socket Bypass Condition: No test switch *** INSTRUMENT TRANSFORMER DATA *** Current Transformers: — see File 1984 C.T. Burden Test: "oon oon Potential Transformer: " noon ***® PROPERLY APPLIED METER CIRCUITS #** Socket Wiring: woomon Circuit Grounding: noonw oon Instrument Wiring: nom on Current Circuit Wire Size: Length: Condition: *** REVENUE CHANGE *** *** VOLTAGE MEASUREMENTS *** WYE Tam _ Veg: . re . * Wire Van Vis Von 3 Wire VaB Vc Vea Ki *** PHASE ANGLE **# me ah Visnhs Vonlc Delta Vacly Vac's Vente Neutral Ht Center Tap Alaska Power Authority 1984-19 Page 2 *#* COMMENTS *** See File 1984-18 for Comments. Pulse value for Q-Hour meter which feeds channel "C" on the magnetic tape is 100 QH/pulse. *** RECOMMENDATIONS *** See File 1984-18. Change pulse initiator to increase pulse rate. TEST CARD - PILE 4984-20 ##® CUSTOMER SERVICE INFORMATION *** Test Date: 5/30/84 Rate Schedule: Alaska Power Authority Customer: Wrangell Substation - Main Feed Out KWH Service Type and Voliage: 3P 4W WYE 7200/12470 ***METER INFORMATION *** Meter # 69780385 Voltage: = 120 Kh: 1.8 Test Amps: 2.5 Manuf: West Wires 4 Res 15 35/8IM. Factors 5/18 Types D4B-3FM Phase: 3 Grit 100 Form: 9B Demand Register Types = Mark la Interval: 15 Full Scale: 12.96 *#*# METER TEST DATA *##* As Found Full Load: -4,95% Light Load: = -6.02% EFF: -5.16% PR: -6.31% Bals 0.67% As Left Full Load: 0.25% Light Load: -0.06% EFF: 0.18% PF: -0.46% Bals 0.23% Demand Test: OK Reset Motor Time: 15:00 Creep Test: OK Measured PE: 95% *#* METER DATA *** Correct Meter Application: Yes Meter Condition: Fair As Found Readings: KWH = 0727 Kw 0.2 KVAR 12 Month Peak KW: Meter Defects: Demand pointer rubbing on meter face-corrected, no "FL" fast adjust left Meter Adjustments: FL, LL, PF , BAL Multiplier: 1000 Socket Bypass Condition: Test Switch - Good *** INSTRUMENT TRANSFORMER DATA *** Current Transformers: — 300/600 on 300 tap C.T. Burden Test: Good - No drop at 6 ohms and 1.5 amps Potential Transformer: G.E. JVM-5 60 to | ***® PROPERLY APPLIED METER CIRCUITS "** Socket Wiring: Correct Circuit Grounding: Incorrect - Potential return not tied down Instrument Wiring: Correct Current Circuit Wire Size: 12) Lengths Zo Conditions Good *** REVENUE CHANGE *** *#*® VOLTAGE MEASUREMENTS *** we Pam) (ia) “em | 180 ||| *om)) is) w ; : oe = "a Vis YON 3 Wire VAB Vc VoA fi *** PHASE ANGLE *#* WYE Vint, 199 Vast, 199 Veal. 196 Delta Vacla Vacs Vonle Neutral Ht Center tip Alaska Power Authority 1984-20 Page 2 *** COMMENTS *** This meter records power to APA system from the Wrangell Generation. Meter was found to be approximately 5% slow and when adjusted, there was no "Fast" adjustment left in the full load calibrating mechanism. *** RECOMMENDATIONS *** Meter should be returned to factory for rebuild as magnet is too strong. Verify accuracy class of current transformers. TEST CARD - FILE #984-21 *## CUSTOMER SERVICE INFORMATION *** Test Date: 5/30/84 Rate Schedule: Alaska Power Authority Customer: Wrangell Switchyard - "Out" Meter (to Petersburg) Service Type and Voltage: 3P 4W WYE 40K V/69KV ***METER INFORMATION *** Meter # 69980621 Voltage: 120 Kh: 1.2 Test Amps: 2.5 Manuf: West Wire: 3 Re: 3 17/36 M. Factor: 1/24 Type: D4B-2FM Phase: 3 Ger 100 Form: 5B Demand Register Type: Mark la Interval: 15 Full Scale: 57.6 *** METER TEST DATA ®** As Found Full Load: = -4.69% Light Load: = -5.009% EFF: — -4.75% PFs -5.8199 Bals 0.07% As Left Full Load: 0.07% Light Load: 0.00% EFF 0.06% PF: -0.43% Balt 0.06% Demand Test: OK Reset Motor Times 15:00 Creep Test: OK Measured PR: 99% *** METER DATA *#* Correct Meter Application: No Meter Condition: Good As Found Readings: KWhi 3726 KW 03.5 KVAR 12 Month Peak KW: Meter Defects: Meter Adjustments: FL, LL, PF Multiplier: 1000 Socket Bypass Condition: Good - Test Switch #** INSTRUMENT TRANSFORMER DATA *** Current Transformers: square D IK 650-4015-002, 200/400 on 200 tap not verified C.T. Burden Test: Good - No drop at 0.6 amps and 6 ohms Potential Transformers square D V2-350-69, 350/600 on 600 tap *** PROPERLY APPLIED METER CIRCUITS #*4 Socket Wiring: Gorrect Circuit Grounding: Correct Instrument Wiring: Correct Current Circuit Wire Size: 1g Length: 150" Conditions — Gooq *** REVENUE CHANGE *** *#** VOLTAGE MEASUREMENTS *** WYE VAN Ven YON is C S 4 Wire VAN VN Von 3Wire Vay 114 Vac 115 Vea 115 Ki *** PHASE ANGLE *** ills Von's Yonlc Delta Vacta 35 Vacs 331 Yonlc ‘ B Neutral lf Center tip Alaska Power Authority 1984-21 Page 2 **#* COMMENTS *** The meter is for Power "Out". This is power flowing from the Wrangell Switchyard to Petersburg. The CT ratio was not able to be verified at 200. Meter demand definition is 500KW. The service voltage is 4 Wire WYE, but the installation is metered 3 Wire. If customer loads on connected phase to ground on the "unmetered" phase, inaccuracy will result. The meter was found 4.75% slow and was adjusted. *** RECOMMENDATIONS *** The C.T. ratio should be verified by measuring primary amps and comparing to secondary amps. Due to very poor meter demand definition a mag tape recorder should be installed if readings are used for billing. The meter should be replaced with a 4-Wire meter. C.T.'s and P.T.'s exist to do this. TEST CARD - FILE #984-22 *## CUSTOMER SERVICE INFORMATION *** Test Dates 5/30/84 Rate Schedule: Alaska Power Authority Customer: — Wrangell Switch Yard - In Meter (From Petersburg) Service Type and Voltage: 3P 4W WYE 4OKV/69KV ***METER INFORMATION *** Meter # = 69980620 Voltage: 120 Kh: bat Test Ainps: 2.5 Manuf: West Wires 3 Res 3.17/36 M. Factors 1/24 Types D4B-2FM Phase: 3 Gar 100 Form: 5B Demand Register Typet ark Ia latervals 15 Pull Scale: 57.6 *** METER TEST DATA *** As Found Full Load: _5 970, Light Load: 5,339, EVV: 5,089 PR? -6.19% Bak As Left Full Load: -0.67% Light Load: 0.40% EFF: -0.46% PF: -0.439% Bal Demand Test? ox Reset Motor Time: 14:58 Creep Test: OK Measured PF: 99% *#*# METER DATA *#* Correct Meter Application; 4 Meter Conditions Poor As Found Readings: KWH 3664 KW 3.5 KVAR 12 Month Peak KW: Meter Defects: No full load "Fast" adjustment left in mechanism Meter Adjustments: FL, LL, PF ’ ’ Multiplier: 1000 Socket Bypass Condition: Good - Test Switch *** INSTRUMENT TRANSFORMER DATA *** Current Transtormerst couare D IK 650-4015-002 200/400 on 200 tap not verified Cale Haein Fea Good - No drop at 0.6 amps and 6 ohms ) az ve are Potential Transformers square D V-2-350-69 350/600 on 600 tap *** PROPERLY APPLIED METER CIRCUITS *** Socket Wiring: Incorrect Circuit Grounding: Gonrect Instrument Wiring: Correct Current Circuit Wire Size: 1g Length: 150! Condition: Good *** REVENUE CHANGE *** *** VOLTAGE MEASUREMENTS *** . re YE VAN Ven VON Bh gs 4 Wire VAN Vin Von 3Wire Yan 116 “pc 115 = = Yor 115 ‘a *** PHASE ANGLE *** ee || ark Yen's Vonle t 0.48% 0.48% \ Delta Vacla 35 Vacs 331 Vonle Neutral If Center Tip Alaska Power Authority 1984-22 Page 2 *** COMMENTS *** Meter was found to be approximately 5% slow and could not be properly adjusted on full load due to lack of available adjustment in the mechanism. Therefore, the meter was left at 99.33% registration on full load. Meter demand definition 500 KW. This meter is supposed to record power "In" from Petersburg. It was wired the same as the "Out" meter in File 1984-21 which means it was also recording "Out" power. This was corrected so meter is now registering "In" power. We were unable to verify the C.T. ratio at 200 to 5 although it appears to be correct. This meter is a 3 wire meter as in File 1984-21. *** RECOMMENDATIONS *** The C.T. ratio should be verified as in File 1984-21. The meter should be returned to the factory for repairs. Due to poor demand definition a mag tape recorder should be used if this point is used for billing. A 4 wire meter should be installed as in File 1984-21. TEST CARD - FILE 4984-23 **#* CUSTOMER SERVICE INFORMATION *** Test Date: 5/31/84 Rate Schedule: Alaska Power Authority Customers Petersburg - Substation Breaker T61 - Line | Service Type and Voltage: 3P 4W WYE 14.4KV/24.9KV ***#*METER INFORMATION *** Meter # = T-61 69980624 Voltage: 120 Kh: 1.2 Test Amps: 2.5 Manuf: West Wire: 3 Res 6 17/18 M. Factor: 1/12 Types D4B-2FM Phaser 3 Grs 100 Form: 5B Demand Register Typez = Mark Ia interval: 15 Full Scales 2323; ##* METER TEST DATA *** As Found Full Load: = _5,229 Light Load: = _5,299% EFF: -5.23% PF: -6.52% Bal As Left Full Load: 0.10% Light Load: -0.02% EFF: 0.08% PF: -0.07% Bals Demand Test: OK Reset Motor Time: 15:00 Creep Test: OK Measured PF: 99% Leading *** METER DATA *** Correct Meter Application: No Meter Condition: Good As Found Readings: KWH 1386 KW 1.6 KVAR 12 Month Peak KW: Meter Defects: Dirty magnet - was cleaned Meter Adjusiments: FL, LL, PF Multiplier: 1000 Socket Bypass Condition: Test Switch Good *** INSTRUMENT TRANSFORMER DATA *** Current Transformers: = Mc Graw WAI59-C 300 to 5 tap C.T. Burden Test: Good - No drop at | ohm and 0.6 amps Potential Transformer: G.E. JVM-6 200 to | *** PROPERLY APPLIED METER CIRCUITS *** Socket Wiring: Correct Circuit Grounding: Correct Instrument Wiring: Correct Current Circuit Wire Size: Length: Condition: *#* REVENUE CHANGE *** *#** VOLTAGE MEASUREMENTS *** : c WYE VAN YBN Von 8 c 4% Wire VAN Van Von 3Wire Vay 114 Vac It Yon 115 *** PHASE ANGLE **# WYE Vania Von's Vonlc 0.07% 0.05% Delta Vactg 26 Vachs 327) Vogl ‘Neutral Hf Center tap Alaska Power Authority 1984-23 Page 2 *** COMMENTS *** This metering is wired to show power flowing from the Petersburg Hydro into the station. Meter was found 5.23% slow and was adjusted. The current transformers are not 0.3 metering accuracy class. Service is 4 wire WYE, but metering is 3-wire. *** RECOMMENDATIONS *** If this meter is ever to be used for revenue metering the C.T.'s should be changed to 0.3 accuracy class, and a 4-wire meter should be used. See File 1984-25 Comments and Recommendations. TEST CARD - FILE A984-24 *## CUSTOMER SERVICE INFORMATION **# Test Dates 5/31/84 Rate Schedule: Alaska Power Authority Customers — Petersburg Substation T62 Line 2 Service Type and Voltages 3P 4W WYE = 14.4/24.9KV ***#*METER INFORMATION *** Meter # 69980622 Voltages =—-:1 20 Kh: 1.2 Test Amps: 2-9 Manulz West Wires 3 Res 6 17/18 M. Factoes 1/12 Types D4B-2FM Phases 3 Gri 100 Forni ob Demand Register Type: = Mark la Intervals 15 Full Scales 28.8 *** METER TEST DATA *#** As Found Full Load: = -4.88% Light Load: -5.21% EFF: -4.95% PFs -5.98% Bal; 0.24% As Left Full Load: 0.05% Light Load: = -0.06% EFF: - 0.039 PF: 0.03% ~— Bas 920% Demand Test: OK Reset Motor Time: 15:00 Creep Test: OK Measured PF; 88% **#® METER DATA *** Correct Meter Application: No Meter Conditions Good As Found Readings: KWH =3898 =KW 3.8 KVAR 12 Month Peak KW: Meter Detects: None Meter Adjustments: FL, LL, PF Multipliers 1000 Socket Bypass Condition: Good - Test Switch #** INSTRUMENT TRANSFORMER DATA *** Current Transformers: = Mc Graw WACI59C 300 to 5 tap C.T. Burden Test: Good - No drop at | ohm and 1.5 amps Potential Transformer: G.E. JVW-6 200 to | #** PROPERLY APPLIED METER CIRCUITS *** Socket Wiring: Correct Circuit Grounding: Correct Instrument Wiring: Correct Current Circuit Wire Size: {9 Length: 100" Contin: coe *#* REVENUE CHANGE ##* *** VOLTAGE MEASUREMENTS *** WYE VAN VBN Yon 8 : 4 Wire Vv AN VN Von 3 Wire VaB 114 Vac 115 VoA *** PHASE ANGLE *#* WYE Vv AN! A Van's Delta Vacla 60 Vac's 14 t CNC N B CNC 356 Vv Neutral lf Center tap Alaska Power Authority 1984-24 Page 2 *** COMMENTS *** Demand register has incorrect demand scale plate. It reads full scale at 2.88 but should be scaled to 28.8. Meter found at 4.95% slow and was adjusted. The current transformers are not 0.3 metering accuracy class. Service is 4-wire WYE, but metering is 3-wire. *** RECOMMENDATIONS *** If this meter is ever to be used for revenue purposes, the C.T.s should be changed to 0.3 accuracy Class and a 4-wire meter installed. See File 1984-25. A new demand scale plate should be ordered for the meter indicating a 28.8 full scale. TEST CARD - FILE &984-25 *#* CUSTOMER SERVICE INFORMATION *** Test Date: 5/31/84 Rate Schedule: Alaska Power Authority Customer: Petersburg Substation Main Power "In" T60 KWH Meter Service Type and Voltage: 3P 4W WYE 14.4/24.9KV ***METER INFORMATION *** Meter # 69983852 Voltage: 120 Kh: 1.2 Test Amps: Manuf: West Wire: 3 Res 6 17/18 M. Factor: Types WRP-22KWH Phases 5 art 100 Form: Demand Register Type: luterval: Pull Scale: *#8 METER TEST DATA ##* As Found Full Load: 0.59% Light Load: = _g,;4o, EVE: 0.44% PF: 0.46% As Left Full Load: -0.08% Light Load: = _9 969 EFF: -0.08% PF: 0.16% Demand Test: V/A Reset Motor Time: N/A Creep Test: OK Measured PF: 65% *** METER DATA *** Correct Meter Application: \\o Meter Condition: Good As Found Readings: KWH 93655 KW KVAR 12 Month Peak KW: Meter Defects: None Meter Adjustments: FL, LL, BAL Multiplier: 1000 Socket Bypass Condition: = No Test Switch *** INSTRUMENT TRANSFORMER DATA *** Current Transtormerss = Wc Graw WAC159C 300 to 5 tap C.T. Burden Test: Good - No drop at | amp and | ohm Potential Transformer: GF, JyW-6 200 to | **® PROPERLY APPLIED METER CIRCUITS *** Socket Wiring: Correct Circuit Grounding: Correct Instrument Wiring: Correct Current Circuit Wire Size: 10 Length: 100! Condition: — Good *** REVENUE CHANGE *** #*® VOLTAGE MEASUREMENTS *** WYE VAN Von Von : ‘ ¢ 9 Pe iene Vis Yon 3 Wire VAB 114 Vc 114 Vea LID K «** PHASE ANGLE *** wre TAA Visnhs Vonlc oe ee ane: ee ee 'Neutral HM Cemer tip 2.5 1/12 5B Bali 9.65% Balk 9.30% Alaska Power Authority 1984-25 Page 2 x" COMMENTS *** This meter is for main power KWH into the Petersburg substation. The Q-Hour meter in File 1984-26 is also in the WRP-22 magnetic tape package. See Comments in File 1984-18 for care needed to change magnetic tape. This installation has no test switch, which makes it difficult to test. This installation is metered 3-wire, but should be 4-wire and customer is anticipating line to ground loads. With an Mp of 125/18, C.T. ratio 300 to 5 and P.T. 200 to 1, pulse rates for the magnetic tape are 100 KWH/pulse for channel "B" KWH, and 100 QH/pulse for channel "C" Q-Hour. Demand definition is only 400 KW with this pulse rate. The battery carryover was connected on the recorder. The C.T.'s are not 0.3 metering accuracy class. ** RECOMMENDATIONS *** A test switch should be installed to enable easier testing at this installation. This installation should be remetered 4-wire for proper metering. At this time 3-wire metering may be all right as customer claims all loads are connected line to line. A pulse initiator with an Mp of 25/36 should be used to improve demand definition to 40 KW. The C.T. should be changed to 0.3 metering accuracy class. Line to ground P.T.'s will need to be added. TEST CARD - FILE #984-26 *## CUSTOMER SERVICE INFORMATION *** Test Date: 5/31/84 Customer: Petersburg Substation - Main Power Service Type and Voltage: 3P 4-Wire WYE ***#METER INFORMATION *** Rate Schedule: "In" T60 Q-Hour In 14.4/24.9KV Alaska Power Authority Meter # 69683852 Q-H Yoltage: 120 Khi 1.2 Test Aimpss 2.5 Manuf: West Wire: 3 Res 6 17/18 M. Factors 1/12 Types WRP-22 QH Phases 3 Gra 100 Korma: 5B Demand Register Typez laterval: Pull Scales *#* METER TEST DATA #** As Found Full Load: 0.32% Light Load: = _9 490, EFF: 0.16% PF: o.10% Balk 9.500% As Left Full Load: 0.01% Light Load: = _g ago, EFF: -0.03% PF 9.1304 Balt 9.350 Demand Test: y/a Reset Motor Time: N/A Creep Test: OK Measured PF: 65% *** METER DATA *** Correct Meter Application: No Meter Conditions Good As Found Readings: KWH 93450 KW KVAR 12 Month Peak KW: Meter Defects: None Meter Adjustments: FL, LL BAL Multiplier: — | 990 Socket Bypass Conditions = No Test Switch *** INSTRUMENT TRANSFORMER DATA *** Current Transformers: See File 1984-25 C.T. Burden Test: won oon Potential Transformers on on ou *** PROPERLY APPLIED METER CIRCUITS *** Socket Wiring: wom oon Circuit Grounding: nom on Instrument Wiring: mon oon Current Circuit Wire Size: Length: Condition: #e® REVENUE CHANGE *#*# *** VOLTAGE MEASUREMENTS *** vYE VAN YBN YON 8 c “ 4 Wire VAN Von VN 3 Wire VaAB Vac Vea *#* PHASE ANGLE *#* dad, r. Van's Yenc Delta Vac, am ee BNeutral If Center tp Alaska Power Authority 1984-26 Page 2 *** COMMENTS *** See File 1984-25 ** RECOMMENDATIONS *** See File 1984-25 TEST CARD - FILE @984-27 *#* CUSTOMER SERVICE INFORMATION *** 5/31/84 Customer: Petersburg Substation - Main KWH Out T60 Service Type and Voltage: 3P 4W WYE 14.4/24.9KV ***METER INFORMATION *** Test Date: Rate Schedule: Meter # 69980623 Voltage: 120 Kh: 1.2 Test Amps: Manuf: West Wire: 3 Rei 6 17/18 M. Factor: Types D4B-2FM Phase: 3 Gri 100 Form: Demand Register Type: Mark la Interval: 15 Full Scale: *** METER TEST DATA *** As Found Full Load: = -5.31% Light Load: = -7.43% EVP: — -5.73% Pz -6.989% As Left Full Load: -0.18% Light Load: 0.08% EFF: -0.13% PF: -0.03% Demand Test: OK Reset Motor Time: 15:00 Creep Test: OK Measured PP: 65% ##® METER DATA **# Correct Meter Application: No Meter Condition: Fair As Found Readings: KWHi 3461 KW l KVAR 12 Month Peak KW: Meter Defects: Magnet dirty - cleaned, no fast F.L. adjustment left Meter Adjustinenis: FL, LL, PF Multiplier: 1000 Socket Bypass Conditions = Test Switch - Good *** INSTRUMENT TRANSFORMER DATA *** Current Transformers: See File 1984-25 C.T. Burden Test: “| 3|\* Potential Transformer: Pi Fe ***® PROPERLY APPLIED METER CIRCUITS "** Socket Wiring: Incorrect Circuit Grounding: Correct Instrument Wiring: Correct Current Circuit Wire Size: 10) Length: 100' Condition: *** REVENUE CHANCE **# *** VOLTAGE MEASUREMENTS *** “= VAN Yen Yon i‘ C re || Fay Vn YON 3 Wire VAL 114 Vac 114 Vea 115 ‘i #** PHASE ANGLE *## mer | ari Van's Vonte oe ee ee a A ; Good Alaska Power Authority 2.5 1/12 5B 28.8 thal: Bal 0.10% 0.15% ‘Neutral I Center tip Alaska Power Authority 1984-27 Page 2 *** COMMENTS ** The cover is incorrect for this meter so it is not possible to reset the demand without removing the cover. The demand register has an incorrect scale plate. It reads full scale 2.88 but should read 28.8 KW. Meter found 5.73 slow and was adjusted. There is no "Fast" adjustment left in the full load calibrating mechanism. The demand pointer was found bent and was repaired and adjusted. The meter is wired for "In" power but is for "Out" power and is labeled as such. This was not changed per Dick Ballard. In addition there is "In" and "Out" metering at the Wrangell Switch Yard. The C.T.'s (same C.T.'s as in File 1984-25) are not 0.3 metering accuracy class. #9 RECOMMENDATIONS *** The meter cover should be replaced and the register scale plate should be replaced with proper scale plate. The meter should be rewired for "Out" power in the event the utility gains the capability to put power into the APA system. The C.T.'s should be changed to 0.3 metering accuracy class and a 4-wire meter installed. TEST CARD - FILE 4984-28 *#*® CUSTOMER SERVICE INFORMATION *** Test Date: 6/1/84 Rate Schedule: Alaska Power Authority Customer: Tyee Power House - Gen.#fl Station Service Service Type and Voltage: 3P 4W WYE 277/480 ***METER INFORMATION *** Meter # = 69981219 Voltage: 120 Kh: 12 Test Amps: Manuf: West Wire: 3 Rei 86 29/36M. Factor: Types D4B-2FM Phase: 3 Gri 100 Borin: Demand Register Type: Mark Ja laterval: 15 Pull Scales *#* METER TEST DATA *** As Found Pull Loads 9.920 Light Load: 0.50% EEK: 0.28% PF: -0.17% As Lett Full Load: 0.21% Light Load: 0.22% EFF: 0.21% PF: -0.26% Demand Test: ox Reset Motor Time: 15:02 Creep Test: OK Measured PF: 95% *#* METER DATA, *** Correct Meter Application: io Meter Conditions Good As Found Readings: KWH = 90252 KW 0.00 KVAR 12 Month Peak KW: Meter Defects: None Meter Adjustments: | 1 Multiplier: 1000 Socket Bypass Condition: Test Switch *#* INSTRUMENT TRANSFORMER DATA *** Current Transformers: — 1200 to 5 not verified C.T. Burden Test: Good - No drop at 0.5 amps and 3 ohms Potential Transformer: — west PpW 4 to | *** PROPERLY APPLIED METER CIRCUITS *** Socket Wiring: Correct Circuit Grounding: Correct Instrument Wiring: Correct Current Circuit Wire Size: 12 Length: 10' Condition: Good **® REVENUE CHANGE **#* *#** VOLTAGE MEASUREMENTS *** — VAN Yen YON r ‘ 4 Wire VAN Vin VoN 3 Wire Vay 122) Vac 122 Vea 122 ‘i *** PHASE ANGLE *#* Te | Ane Von's Vonte 2.5 1 3/72 5B 2.304 Bal 0.13% Bak 0.13% ee ee Neutral If Center fap Alaska Power Authority 1984-28 Page 2 *** COMMENTS *** Station service is 4-wire WYE, but metering is 3-wire. If all loads are not connected line to line, then errors could result due to unmetered leg. The C.T.'s were not accessible, and the ratio and accuracy class could not be verified. *** RECOMMENDATIONS *** The C.T.'s ratio and accuracy should be verified, or the accuracy Class. TEST CARD - FILE #&984-29 *##* CUSTOMER SERVICE INFORMATION *** Test Date: 6/1/84 Rate Schedule: Customer: = Tyee Power House Generator #2 Station Service Service Type and Voltage: 3P 4W WYE 277/480 ***METER INFORMATION *** Meter # = 69981220 Voltage: 120 Kh: 1.2 Test Amps: Manuf: West Wire: 3 Re: 86 29/3. Factor: Types D4B-2FM Phase: 3 Gri 100 Form: Demand Register Types Mark la Interval: 15 Full Scale: *#@ METER TEST DATA ®#* As Found Pull Loads _¢ gg, Light Load: 0.03% EMF: -0.07% PF: -0.26% As Left Full Load: -0.09% Light Loud: 0.03% UN: -0.07% VF: -0.26% Demand Test? Gx Reset Motor Time: 15:02 Creep Test: OK Measured PF: 96% *** METER DATA **#* Correct Meter Application: Meter Condition: Good As Found Readings: KWH 136 KW 0.11 KVAR 12 Month Peak KW: Meter Defects: None Meter Adjustments: None Multiplier: 1000 Socket Bypass Condition: Good - Test Switch *** INSTRUMENT TRANSFORMER DATA *** Current Transformers: 1200 to 5 - Not verified C.T. Burden Tests Good - No drop at 2 ohms and 0.5 amp Potential Transformer: — ywoct ppw, 4 to | , *** PROPERLY APPLIED METER CIRCUITS *** Socket Wiring: Alaska Power Authority 2.5 75/72 5B 2.304 Balz 0.38% Balk 0.38% Correct Circuit Grounding: Correct Instrument Wiring: Correct Current Circuit Wire Size: 12 Length: 10! Condition: Good **#*® REVENUE CHANGE *** *** VOLTAGE MEASUREMENTS *** WYE VAN Yen Von 8 ( “Wire Van Vis Yon ae Ne 08) | ee ee ug *** PHASE ANGLE *** ee | Are Von's Vontle Delta V, (i, 51 Vacty 342 Verne SNeutral If Center fap Alaska Power Authority 1984-29 Page 2 **#* COMMENTS *** Station service is 4-wire WYE, but metering is 3-wire. If all loads are not connected line to line then errors could result due to unmetered leg. The C.T.'s were not accessible, and their ratio and accuracy Class could not be verified. *** RECOMMENDATIONS *** The C.T. ratio and accuracy should be verified. TEST CARD - FILE 4984-30 ### CUSTOMER SERVICE INFORMATION *** Test Date: 6/1/84 Rate Schedule: Alaska Power Authority Customer: = Tyee Power House - Generator Unit #1 Service Type and Voltage: 3P 3W 13.8KV ***METER INFORMATION *** Meter # 69980614 Voltage: 120 Kh: ey) Fest Anips: 2.5 Manuf: West Wire: 3 Res 4 49/144M. Bactor: 5/96 Types D4B-2FM Phase: 3 Gra 100 orm: ots Demand Register Type: Mark la Intervals 15 Pull Scale: 46.08 *** METER TEST DATA *** As Found Full Loads _5_) 9g Light Load: -5.1196 EF: -5.11% PFs -6.16% Bals 0.14% As Left Full Loads -0.07% Light Load: 0.12% Ells -0.02% PF: -0.10% Bals 0.10% Demand Test: OK Reset Motor Time: 15:02 Creep Test: OK Measured PF: 76% Leading *#** METER DATA *** Correct Meter Application: — yes Meter Condition: Good As Found Readings: KWHE 9437) KW 0.00 KVAR 12 Month Peak KW; Meter Defects: None Meter Adjustincats: Demand Zero, FL, PF Multiplier: 1000 Socket Bypass Condition: Good - Test Switch *#** INSTRUMENT TRANSFORMER DATA *** Current Transtormerss — RisHO KOGYO ER-48 800 to 5 C#00 C.T. Burden Test: Good - No drop at | amp and 5 ohms Potential Transformer: RISHO KOGYO RP172-M 120 to | *#* PROPERLY APPLIED METER CIRCUITS *** Socket Wiring: Gorrect Circuit Grounding: Correct Instrument Wiring: Correct Current Circuit Wire Size: 10 Length: 100! Condition: Good *** REVENUE CHANGE *** *** VOLTAGE MEASUREMENTS *** WYE VAN Van Yon 8 ‘ . 4 Wire VAN Van Von 3 Wire Van 112 Vac 112 Va 12 Ki © PHASE ANGLE *** WYE Vanla Yen's Vonle Delta Vact, 352 Vacly 290 Vente SNeutral H Center tip Alaska Power Authority 1984-30 Page 2 * COMMENTS *** The C.T.'s are relay class C400 and not 0.3 accuracy class. Relays are also in this metering circuit. Meter found 5.11% slow, and was adjusted. *** RECOMMENDATIONS *** It best accuracy is desired, 0.3 accuracy Clauss C.T.'s should be installed. TEST CARD - FILE #1984-31 *## CUSTOMER SERVICE INFORMATION *** Test Date: 6/1/84 Rate Schedule: Alaska Power Authority Customer: Tyee Power House Generator Unit #2 Service Type and Voltages 3P 3W Delta 13.8 KV ***METER INFORMATION *** Meter # 69980618 Voltage: 120 Kh: 1.2 Test Amps: Manuf: West Wire: 3 Re: 4 49/14. Factor: Types D4B-2FM Phase: 3 Gri 100 Form: Demand Register Types = Mark la Interval: 15 Full Scale: *** METER TEST DATA #** 2.5 5/96 5B 46.08 As Found Full Load: = -5,3794 Light Load: -5.71% EFF: -5.44% PF: -6.379% Bals 0.15% As Left Full Load: -0.07% Light Load: 0.18% EFF: -0.02% PF: 0.30% Balls 0.15% Demand Test: OK Reset Motor Time: 15:01 Creep Test: OK Measured PF; 76% Leading *** METER DATA **# Correct Meter Application: Yes Meter Condition: Good As Found Readings: KWH #4586 KW 3.5 KVAR 12 Month Peak KW: Meter Defecis: None Meter Adjustments: — Demand Zero, FL, PF Multiplier: 1000 Socket Bypass Condition: Good - Test Switch *** INSTRUMENT TRANSFORMER DATA *** Current Transformers: — RisHO KOGYO ER-48 800 to 5 C.T. Burden Test: Good - No drop at | amp and 5 ohms Potential Transformer: ~~ RIsHO KOGYO RP172-M 120 to | *** PROPERLY APPLIED METER CIRCUITS *** Socket Wiring: Gorrect Circuit Grounding: Correct Instrument Wiring: Correct Current Circuit Wire Size: 19 Length: 100' Conditions Good *** REVENUE CHANGE *** *** VOLTAGE MEASUREMENTS *** Wve VAN Vn Von i" c 4 Wire Van Vian Von 3 Wire Vay 113 Vac 113 Van 113 *** PHASE ANGLE *** wre Mana Von's Vonle It 5 Delta Vacla 351 Vac's 290 Vonle Neutral If Center tip Alaska Power Authority 1984-31 Page 2 *#® COMMENTS *** The C.T.'s are relay class C400 and not 0.3 accuracy class. Relays are also in this metering circuit. Meter found 5.44% slow and was adjusted. *** RECOMMENDATIONS *** If best accuracy is desired, 0.3 accuracy class C.T.'s should be installed. TEST CARD - FILE &984-32 *#* CUSTOMER SERVICE INFORMATION *** Test Date: 6/1/84 Rate Schedule: Alaska Power Authority Customers Tyee Power House Switch Yard KWH "In" Service Type and Voltage: 3P 4W WYE 39/69 KV ***METER INFORMATION *** Meter # = 69980619 Voltage: 120 Khe [52 Test Anips: 205 Manul: West Wire: 3 Res 3 17/36M. Factor: 1/24 Types D4B-2FM Phase: 3 Gr 100 Form: 5B Demand Register Typez ark Ja Intervals 15 Pull Scales 57.6 *#® METER TEST DATA *** As Found Full Loads 5) 30, bight Load: — _5 939g ELF: -5.15% PRs 6.319 Balk 9.24% As Left Full Load: 0.02% Light Load: 0.04% EP: 0.02% PF -0.179% Bal 9.15% Demand Test: 4, Reset Motor Time: 15:01 Creep Test: OK Measured PF: 74% *#* METER DATA *## Correct Meter Application: \\, Meter Conditions Good As Found Readings: KWH ¢¢92 KW 3.0 KVAR 12 Month Peak KW: Meter Defects: none: Meter Adjustinents: Detent, FL, PF ’ ’ Multiplier: 1000 Socket Bypass Condition: Good = Test Switch **® INSTRUMENT TRANSFORMER DATA "e* Current Transtormerss ost ByYM 200/400 on 200 tap CAT. Burien Tests Good - No Drop at 0.8 amps and 1.5 ohms ) a yx . Potential Transformers co are 2 U2-350-69 350/600 on 600 tap *** PROPERLY APPLIED METER CIRCUITS "** Socket Wiring: Correct Circuit Grounding: Correct Ins ining: ~ Astrument Wiring Gorrect Current Circuit Wire Size: jo Length: 300° Condition: Good **# REVENUE CHANGE *** *** VOLTAGE MEASUREMENTS *** WYE VAN Vn VON 8 c ” 4 Wire VAN VEN VN : 3 Wire Vay 115) Vac 115 Vea 115 *** PHASE ANGLE *** WYE Vania Von's Vonlc Delta Vaclg 347 Vacly 287) Vente Neutral H Genter fap Alaska Power Authority 1984-32 Page 2 «ee COMMENTS *** This meter is wired for "Out" power and not "In" power. This was not changed. It can be changed by switching terminal 2 with 3 and 8 with 9 on the back of the meter case. When meter is used for power "Out" it could be in error as system is 4-wire WYE, but is metered 3-wire. When used in the "In" mode, accuracy will be okay as secondary transformer connection is Delta. Meter was found 5.15% slow and was adjusted. This meter is in the same metering circuit as those in File 1984-33 and 34. *#* RECOMMENDATIONS *** Consider changing to 4-wire metering. TEST CARD - FILE 4984-33 *#** CUSTOMER SERVICE INFORMATION *** Test Date: 6/1/84 Rate Schedule: Alaska Power Authority Customer: Tyee Power House Switch Yard KWH "Out" Service Type and Voltage: 3P 4W WYE 39/69KV ***METER INFORMATION *** Meter # KWH-Out Voltage: =| 20 Kh: 1.2 Test Amps: 2,5 Manuf: West Wire: 3 Rei 3.17/36 M. Factor: 1/24 Types WRP-22 Phases 3 Gri 100 Form: 5B Demand Register Type: None Intervals N/A Full Scales N/A *** METER TEST DATA *** As Found Full Load: — 9.52% Light Load: = _9,369, EF: 0.34% PF: 9.230% Bali 9,459 As Left Full Load: -0.19% Light Load: 0.02% EFF: 0.16% PF: 9.039% Balk 9.459, Demand Test: Reset Motor Time: N/A Creep Test: N/A Measured PF: OK *#* METER DATA *** Correct Meter Application: 740 Meter Conditions No As Found Readings: KWH Gooq 3K W 06020 KVAR 12 Month Peak KW: Meter Defects: None Meter Adjustments: FL, LL Multipliers 1900 Socket Bypass Conditions pest Switch **® INSTRUMENT TRANSFORMER DATA *** Current Transtormerst west BYM 200/400 on 200 tap C.T. Burden Test: Good - No drop at 0.8 amps and 1.5 ohms Potential Transformer? square D U2-350-69 350/600 on 600 tap *** PROPERLY APPLIED METER CIRCUITS *** Socket Wiring: Gorrect Circuit Grounding: Correct Instrument Wiring: Correct Current Circuit Wire Size: 19 Length: 300' Conditions — Goog *#** REVENUE CHANGE *** *** VOLTAGE MEASUREMENTS *** WYE VAN BN YON i C . 4 Wire VAN Ven Von 3 Wire Van 115 Vac 115 Von 115 N “** PHASE ANGLE **# WE Vana Yen's Yonle Delta Vact, 347 Vacty 287 Vente “Neutral I Center up Alaska Power Authority 1984-33 Page 2 #4 COMMENTS *** This metering could be in error as system is 4-wire WYE, but metering ts 3-wire. Any phase to ground load reflected through the system due to all WYE-WYE transformer banks will not be registered on the unmetered leg. This meter along with the Q-Hour meter in File 1984-34 is connected to a magnetic tape recorder via pulse initiators on the meters. The pulse value for both of these meters is 100 KWH/pulse with an Mp=125/36, a C.T. ratio of 200 to 5 and P.T. ratio of 600 to 1. With this pulse rate demand definition is only 400 KW. Channel "B" is the KWH channel and channel "C" is the Q-Hour channel. The battery carry over was connected. Although this installation has a test switch it is not wired properly to enable meter testing from it. *** RECOMMENDATIONS *** The metering should be changed to 4-wire metering for best accuracy. A pulse initiator with at least an Mp of 25/72 should be used which would lower demand definition to 40 KW. The test switch should be rewired enabling easier testing of the magnetic tape metering package. TEST CARD - FILE #984-34 *## CUSTOMER SERVICE INFORMATION *** Test Date: 6/1/84 Rate Schedule: Alaska Power Authority Customer: TYEE Power House Switch Yard - Q-Hour "Out" Service Type and Voltage: 3P 4W WYE 39/69KV ***METER INFORMATION *** Meter # = Out-QH Voltages =—:120 Kh: 1.8 Test Amps: 2.5 Manuf: West Wires 3 Rez 3 17/36 M. Factor: 1/24 Type: WRP-22 Phase: 3 Grs 100 Form: 5B Demand Register Type: None : Interval: Full Scales *** METER TEST DATA *** As Found Full Load: — 053% Light Load: 0.77% EFF 0.58% PF: 0.80% Balz 0.15% As Left Full Load: 0.07% Light Load: 0.20% EFFs 0.10% PF: 0.30% Balls 0.15% Demand Test: N/A Reset Motor Time: N/A Creep Test: OK Measured PF: 74% *** METER DATA *** Correct Meter Application: No Meter Conditions Good As Found Readings: KWH ooi44 KW KVAR 12 Month Peak KW: Meter Detects: None Meter Adjustments: py Multiplier: 1000 Socket Bypass Condition: Test Switch *#* INSTRUMENT TRANSFORMER DATA *** Current Transformerst — see File 1984-32 C.T. Burden Test: nono Potential Transtormer: wom oon *** PROPERLY APPLIED METER CIRCUITS *** Socket Wiring: Correct Circuit Grounding: Correct Instrument Wiring: Correct Current Circuit Wire Size: 19 Length: 30! Condition: — Good **® REVENUE CHANGE *** *** VOLTAGE MEASUREMENTS *** 7 c WYE VAN Vian VoN b C 4 Wire VAN VN Von 3 Wire VAB Vac Vor *** PHASE ANGLE **# W¥E Vania Vesnhs Von'c r Della Vacly Mosk Vest: Neutral If Center tip Alaska Power Authority 1984-34 Page 2 *** COMMENTS *** See File 1984-33. *** RECOMMENDATIONS *** See File 1984-33. TEST CARD - FILE 4984-35 ### CUSTOMER SERVICE INFORMATION *** Test Date: 6/3/84 Rate Schedule: Alaska Power Authority Customer: = Swan Lake Power House - Station Service Unit #2 Service Type and Voltage: 3P 4W WYE 277/480 Volt ***METER INFORMATION *#** Meter # = 30975323 Voltages = 277 Kh: 3.6 Test Amps: 2,5 Manulz G.E. Wires 4 Rre 55 5/9 M. Bactors I Types DS-5S Phaser 3 Gr 50 Form: 6B Demand Register Typez None Interval: N/A Full Scales N/A *e* METER TEST DATA *** As Found Full Load: 0.00% Light Load: = -|,399% EFF: -0.28% PF: -0.31% Bal: 0.03% As Left Full Load: 0.07% Light Load: = -9,169 EFF: 0.02% PF: -0.09% Bals 0.03% Demand Test: N/A Reset Motor Time: N/A Creep Test: OK Measured PF: No load **® METER DATA *#* Correct Meter Application: Yes Meter Condition: Good As Found Readings: KWH 0085 KW KVAR 12 Month Peak KW: Meter Defects: None Meter Adjustments: LL Multipliers 576 Socket Bypass Condition: = No bypasses *#* INSTRUMENT TRANSFORMER DATA *** Current Transformers: Abbott 806-122 1200 to 5 C.T. Burden Test: No load - could not test Potential Transformer: G.E. JAV-O 2.4 to | *** PROPERLY APPLIED METER CIRCUITS *** Socket Wiring: No load - could not check Circuit Grounding: “48 ow 8 Instrument Wiring: woo ys 8 P.T.'s not necessary Current Circuit Wire Size: 12) Length: 10! Condition: — Good *#* REVENUE CHANGE *#** *** VOLTAGE MEASUREMENTS **#* WE VAN Ven Von 8 c - 4 Wire VAN VN Yon Wire Vay Yc Vea Ki "** PHASE ANGLE **# WYE Vanta Von's Vonle Delta Vacl, Worl Mpls Neutral M Center Fup Alaska Power Authority 1984-35 Page 2 *** COMMENTS *** 2.4 to | P.T.'s are wired into the metering circuit. These should not be used, as meter is rated 277 Volts which makes the P.T.s unnecessary. There is no test switch or provision for testing the meter in the circuit without disconnecting wires and shorting C.T.s with jumpers. The meter does not have a disconnect "Slide". The current transformers are not 0.3 metering accuracy class, and are meant for relay application and not KWH metering. Since this is not a billing location this accuracy may be adequate. Ratio could vary by as much as +10%. At time of test station service transformer was not at site, so phase angle, burden and wiring verification could not be checked. *** RECOMMENDATIONS *** Eliminate P.T.'s from KWH metering circuit. Meter multiplier will then be 240 without existing P.T.'s. Install "Slide" kit or test switch to provide a location to disconnect meter for testing, and to allow testing of phase angle and instrument transformers without having to disconnect wiring. Installation should be checked under load when transformer is repaired. TEST CARD - FILE &984-36 ##® CUSTOMER SERVICE INFORMATION *** Test Dates 6/3/84 Rate Schedule: Alaska Power Authority Customer: Swan Lake Power House, Station Service Unit #1 Service Type and Voltage: 3P 4W WYE 277/480 Volt *"*METER INFORMATION *** Meter # = 30975265 Voltage: = 277 Kh: 3.6 Test Amps: 2.5 Manuf: G.E. Wires 4 Rr: 55 5/9 Me. Bactor: 1 Types DS 5S Phases 3 Gri 50 Form: 6B Demand Register Typez None Interval: N/A Full Scale: N/A *** METER TEST DATA *** As Found Full Load: = _9,27% Light Load: = _|,.799 EFF: = -9.56% PF: -0.79% Bak 0.25% As Left Full Load: 0.08% Light Load: 0.11% EFF: 0.09% PF: 0.23% Balk 9.25% Demand Test: \y/A Reset Motor Time: N/A Creep Test: OK Measured PF; 97% *#* METER DATA **# Correct Meter Applications yes Meter Condition: Good As Found Readings: KWH = 9478 KW KVAR 12 Month Peak KW: Meter Defects: None Meter Adjustments: FL, LL Multipliers 57¢ Socket Bypass Condition: No bypasses *** INSTRUMENT TRANSFORMER DATA *** Current Transformers: abbott 806-122 1200 to 5 C.T. Burden Test: Good - No drop at 2 ohms and 0.5 amps Potential Transformer: G.E. JVO-O 2.4 to | *#* PROPERLY APPLIED METER CIRCUITS *** Socket Wiring: Correct Circuit Grounding: Correct Instrument Wiring: Correct - Except potential transformer not necessary Current Circuit Wire Sizes 7 Length: 10" ee #** REVENUE CHANGE **# *** VOLTAGE MEASUREMENTS *** WYE VAN 114 Ven 114 VON 14 ob ¢ - A Wire Van Ven Yon 3 Wire Vay Yc VoA Ki *** PHASE ANGLE *** WYE Vania 23) Vents 13200 Vente 3 Delta Vacla Vaal O cnilee Neutral If Center tap Alaska Power Authority 1984-36 Page 2 *** COMMENTS *** Same as File 1984-35 except this installation had load at time of test. *** RECOMMENDATIONS *** See File 1984-35, TEST CARD - FILE 4984-37 ##* CUSTOMER SERVICE INFORMATION *** Test Date: 6/3/84 Rate Schedule: Alaska Power Authority Customer: Swan Lake Power House - Generation Unit #1 Service Type and Voltage: 3P 3W 13.8KV ***METER INFORMATION *** Meter # 30978486 Voltage: 120 Kh: 1.2 Test Aimps: 2.5 Manuf: G.E. Wires 3 Rez 166 2/3 M. Bactors 1 Types DS-63 Phases 3 Grn 50 Form: 5B Demand Register Typez None latervals N/A Full Scale: N/A *#* METER TEST DATA *** As Found Full Load: — 92394 Light Load: 1.20% EF: 0.42% PF: 9,279 Bali 9.97% As Left Full Load: -0.03% Light Load: _9.920% EFF: = _9,939 PF 09.37% Balk 9.1596 Demand Test: V/A Reset Motor Times N/A Creep Test: OK Measured PF: 89% *#* METER DATA *#* Correct Meter Application: Yes Meter Condition: Good As Found Readings: KWH 00896 KW KVAR 12 Month Peak KW: Meter Defects: None Meter Adjustments: BAL, LL Multiplier: = 19200 Socket Bypass Condition: — Test Plug #*#* INSTRUMENT TRANSFORMER DATA *** Current Transformers: =G.F. JCS-O 800 to 5 C.T. Burden Test: Good - No drop at 5 ohms and 0.5 amps Potential Transformers Balteau Stand, Inc - VI02-110 120 to | *** PROPERLY APPLIED METER CIRCUITS *** Socket Wiring: Correct Circuit Grounding: Correct Instrument Wiring: Correct Current Circuit Wire Sizes lo Lengths 150! Conditions Good *** REVENUE CHANGE *** #*#*® VOLTAGE MEASUREMENTS *** _—_ YAN i140 YBN qyio ‘CN 13,9 8 u * 4 Wire VAN Von Von +uke =F an Yc Yoa Ki *** PHASE ANGLE **# Wye Vania Visn's Vonle r Delta Vaca 47 Vac's 347 Vonle Neutral If Center fp Alaska Power Authority 1984-37 Page 2 *** COMMENTS *** There is approximately 0.5 Volt drop on the potential transformer circuit due to loading of P.T. and P.T. circuit. *#** RECOMMENDATIONS *** Run separate potential leads from P.T.'s to KWH meter. TEST CARD - FILE 4984-38 *## CUSTOMER SERVICE INFORMATION *** Test Date: 6/3/84 Rate Schedule: Customer: = Swan Lake Power House Generation Unit #2 Alaska Power Service Type and Voltage: 3P 3W 13.8 KV ***METER INFORMATION *** Meter # 30978485 Voltage: 120 Kh: 1.2 Test Amps: Manuf: G.E. Wire: 3 Re: 166 2/3 M. Factors Types DS-63 Phases 3 Gra 50 Form: Demand Register Types None interval: N/A Full Scales *** METER TEST DATA *** As Found Full Load: 0.37% Light Load: 0.18% EFF: 0.34% PFs 0.24% As Left Full Load: 0.04% Light Load: 0.08% EFF: 0.05% PF: 0.38% Bals 0.25% Demand Test: N/A Reset Motor Time: N/A Creep Test: OK Measured PF: 91% **# METER DATA **# Correct Meter Application: Yes Meter Condition; Good As Found Readings: KWH 00437. KW KVAR 12 Month Peak KW: Meter Defects: None Meter Adjustments: BAL, FL Multiplier: 19200 Socket Bypass Condition: Test Plug *** INSTRUMENT TRANSFORMER DATA *** Current Transformers: G.E. JCS-0 800 to 5 C.T. Burden Test: Good - No drop at 5 ohms and 0.3 Amps Potential Transformer: — Balteau Stand,Inc. VI-02-110, 120 to | *** PROPERLY APPLIED METER CIRCUITS "** Socket Wiring: Correct Circuit Grounding: Correct Instrument Wiring: Correct Current Circuit Wire Size: 10 Lengths 150' Condition: = Good *** REVENUE CHANGE *** ®#*® VOLTAGE MEASUREMENTS *** wre VAN Ven YON ‘ c ~ 4 Wire VAN Ven Von 3 Wire Van 115-1 Yc 115.6 Veg 115.2 K ***® PHASE ANGLE *## REV ax Von's Yontc Delta Vacl, 53) Vacly Von 354 SNeutral H Center fap 2.5 N/A Balz 0.63% Alaska Power Authority 1984-38 Page 2 *#* COMMENTS *** See File 1984-37. *#® RECOMMENDATIONS *** See File 1984-37. TEST CARD - FILE #984-39 ##*# CUSTOMER SERVICE INFORMATION *** Test Dates 6/4/84 Rate Schedule: Customer: Bailey Substation - Swan Lake Line Alaska Power Authority Service Type and Voltage: 3P 3W 34.5 KV Delta **®METER INFORMATION *** Meter # 50979665 Voltage: 120 Kh: 1-2 Test Amps: 2.5 Manuf: G.E. Wire: 3 Re: 5 5/9 M. Factors 1/30 Types DS-63 Phase: 3 Gra 50 Form: Demand Register Types one Interval: Pull Scales ##* METER TEST DATA #*** As Found Full Load: 93; 0, Light Load: 0.55% ENF: 0.36% PF? o.oo, Bal 9.089% As Left Full Load: -0.02% Light Load: 0.14% EFF: 0.01% PF 9.290 Balt ¢ ogg Demand Test: jj, Reset Motor Time: N/A Creep Test: OK Measured PF: 97% *## METER DATA **# Correct Meter Application: y.. Meter Conditions Good As Found Readings: KWH j59;9 KW KVAR 12 Month Peak KW: Meter Detects: None Meter Adjustments: FL, LL Multiplier: 999 Socket Bypass Conditions — 7..; Plug **#* INSTRUMENT TRANSFORMER DATA *** Current Transtormerst © &_ MRB CT 500 to 5 tap, C 200, ratio not verified Sooke io Toom Good - No drop at 5 ohms and 1.6 amps y po any . Potential Transformer: WT-200 300 to | *** PROPERLY APPLIED METER CIRCUITS *** Socket Wiring: Correct Circuit Grounding: Carract Instrument Wiring: Correct Current Circuit Wire Size: ig Length: 100" Condition: Good #*® REVENUE CHANGE *** *** VOLTACE MEASUREMENTS *** Wve YAN Ven YON is c nN 4% Wire VAN Vien Von Wire Vag 113.9 Vac 1145 Yoa 114.2 Ki *** PHASE ANGLE *** WHE Vana Yen's Vonlo 344 Delta Vacly 45 Vachs Vonle Neutral Hf Center tap Alaska Power Authority 1984-39 Page 2 #0 COMMENTS *** The C.T.'s are relay class C200 and not 0.3 metering accuracy class. There is "In" metering only (Power from Swan Lake), but no "Out" metering (Power to Swan Lake in event Swan Lake NOT running). C.T. ratio could not be verified. *** RECOMMENDATIONS *** 0.3 Metering accuracy class C.T.'s should be installed. "Out" metering should be installed. An electronic meter with "In" and "Out" capabilities could replace existing meter in the panel. The C.T. ratio should be verified. A magnetic tape recorder should be installed at this location.