HomeMy WebLinkAboutConstruction Cost Estimate Karluk Bulk Fuel System 95% Submittal, Karluk 1991HMS 9111 CONSTRUCTION COST ESTIMATE KARLUK BULK FUEL SYSTEM 95% SUBMITTAL KARLUK, ALASKA COST CONSULTANT ENGINEER HMS Inc. Raj Bhargava Associates 301 East Fireweed Lane Anchorage, Alaska 99503 4103 Minnesota Drive Anchorage, Alaska 99503 (907) 561-1653 February 25, 1991 (907) 562-0420 FAX KARLUK BULK FUEL SYSTEM 2 KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 NOTES REGARDING THE PREPARATION OF THIS COST ESTIMATE This estimate has been prepared from 95% drawings and spec/cut sheet received on 2/20/91 and provided by the following: M 2 drawings Raj Bhargava Associates, Anchorage Cc 2 drawings Tryck, Nyman and Hayes, Anchorage s 1 drawing Tryck, Nyman and Hayes, Anchorage This estimate is priced to reflect local force account labor with some skilled contractor’s labor for Spring 1991 construction. All force account labor is priced at $22.00 per hour. Skilled labor for subcontractor has been priced at $42.50 per hour. An option is priced as all work by general contractor using A.S. Title 36 wage rates, per diems, etc. This is a statement of probable construction cost only and excludes: 1. A/E fees 2. Administrative costs 3. Cost of any other work not shown on the drawings Unit prices and costs indicated in this estimate are based on current knowledge. The possible effects of current hostilities in the Middle East have not been considered in the preparation of this estimate. KARLUK BULK FUEL SYSTEM aa 2 KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 SUMMARY FORCE ACCOUNT AND SKILLED LABOR BASIC Relocate 50,000 Gallon Tank 201,597 ADD 1. 2,000 Gallon Above Ground Tank 16,480 2. Aircraft Fill Line 94,868 TOTAL BASIC AND ADDITIVES 312,945 OR OPTION All Work by General Contractor BASIC Relocate 50,000 Gallon Tank 247,248 ADD 1. 2,000 Gallon Above Ground Tank 18,320 2. Aircraft Fill Line 105,459 TOTAL BASIC AND ADDITIVES 371,027 PAG KARLUK BULK FUEL SYSTEM = KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE ESTIMATED CONSTRUCTION COST SUMMARY FORCE ACCOUNT AND SKILLED LABOR Relocate 50,000 Gallon Tank N ke and Fill es Demolition 1,000 100 3,759 4,759 New Dike 10,024 522 11,484 21,508 Concrete Supports 4,702 90 1,980 6,682 Tank Relocation 2,114 252 9,439 11,553 Tank Piping 415 45 1,915 2,330 Truck Fill 876 ay 468 1,344 Remote Fill at Tank 3,434 88 3,639 7,073 Remote Fill at Barge 811 13 553 1,364 Ricwill Piping 31,790 1402 57,383 89,173 Sump Drain 915 34 1,118 2,033 SUBTOTAL 56,081 2557 91,738 147,819 General Conditions, Overhead and Profit 48,861 SUBTOTAL 196,680 Contingency 2.50 4,917 201,597 PAGE 4 KARLUK BULK FUEL SYSTEM KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 RELOCATE 50,000 GALLON TANK, NEW DIKE AND FILL LINES coral UNIT MATERIAL TOTAL LABOR MATERIAL QUANTITY UNIT RATE TOTAL HOURS RATE TOTAL AND LABOR Demolitions Remove 3'0"x6‘0"x1‘0" thick concrete ballasts and straps from tank 4 EA NA 8 22.00 176 176 Puge 50,000 gallon tank of dangerous vapors prior to relocation Be LOT NA 10 42.50 425 425 Drain tank of fuel or water contents (assume 1,000 gallons) x Lot NA 4 42.50 170 170 Cut and remove 2" diameter x 48" vent line i EA NA il 42.50 43 43 Ditto 1 1/2" stand pipe Y EA NA 1 42.50 43 43 Excavate and remove 4" diameter buried drain pipe 40 LF NA 16 22.00 352 352 Ditto 4" gate valve 1 EA NA Included Remove tank from dike and set on (6) structural supports for relocation 2 EA 1000.00 1,000 60 42.50 2,550 3,550 SUBTOTAL DEMOLITION 1,000 100 3,759 4,759 PAGE 5 KARLUK BULK FUEL SYSTEM KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 RELOCATE 50,000 GALLON TANK, NEW DIKE AND FILL LINES TOTAL MATERIAL TOTAL LABOR MATERIAL QUANTITY UNIT TOTAL HOURS RATE TOTAL AND LABOR New Dike Excavate gravel berm and save : material for reuse 213 cy NA 54 22.00 1,188 1,188 Remove liner and dispose 896 SF NA 6 22.00 132 132 Excavate for new dike and stockpile 809 cy NA 200 22.00 4,400 4,400 Ditto at bottom of tank and sump pit 128 cy NA 34 22.00 748 748 12" NFS under tank from stockpile 42 cy NA 20 22.00 440 440 Overall 12" liner bedding 6" under and 6" over liner 221 cy 25.00 5,525 78 22.00 1,716 7,241 Form outside berm with stockpile 200 cy NA 50 22.00 1,100 1,100 Dispose surplus on site 400 cy NA 40 22.00 880 880 30 mil Cooley 1023S urethane liner 4,090 SF 1.10 4,499 40 22.00 880 5,379 SUBTOTAL NEW DIKE 10,024 522 11,484 21,508 PAGE 6 KARLUK BULK FUEL SYSTEM KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 RELOCATE 50,000 GALLON TANK, NEW DIKE AND FILL LINES TOTAL UNIT MATERIAL TOTAL MATERIAL QUANTITY UNIT RATE TOTAL HOURS RATE AND LABOR Concrete Tank Support and Sump Pit 3,000 psi concrete slab and support saddle (5) 14 cy 225.00 3,150 18 22.00 396 3,546 23 1/2"x23 1/2"x25" deep x 6" thick concrete sump pit (1) a cy 225.00 225 2 22.00 44 269 Formwork to side of 8" slab and support saddle 107 SF 1.50 161 12 22.00 264 425 Ditto curved to tank bottom profile 240 SF 2.85 684 36 22.00 792 1,476 Formwork to sump pit walls 32 SF 2.00 64 4 22.00 88 152 Bar reinforcement to saddles 850 LBS 0.35 298 12 22.00 264 562 Ditto sump pit 50 LBS 0.35 18 2 22.00 44 62 Geofabric to both sides of liner at sump pit 48 SF 0.25 12 1 22.00 22 34 (2) 2"x6" AWW fixed to pit walls with (2) 3/8" stainless steel bolts 6 LF 2.50 15 1 22.00 22 37 Drill 1 1/2" diameter drain hole in wood 20 EA NA 1 22.00 22 22 ‘ PAGE 7 KARLUK BULK FUEL SYSTEM KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 TOTAL UNIT MATERIAL TOTAL MATERIAL QUANTITY UNIT RATE TOTAL HOURS RATE TOTAL AND LABOR RELOCATE 50,000 GALLON TANK, NEW DIKE AND FILL LINES onc. Tank Support and Sum) it Conti: 16"x16"x1 1/4" Neenah grate set on wood frame 1 EA 75.00 75 L 22.00 22 97 SUBTOTAL CONCRETE TANK SUPPORT AND SUMP PIT 4,702 90 1,980 6,682 PAGE 8 KARLUK BULK FUEL SYSTEM KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 RELOCATE 50,000 GALLON TANK, NEW DIKE AND FILL LINES TOTAL UNIT MATERIAL TOTAL LABOR MATERIAL QUANTITY UNIT RATE TOTAL HOURS RATE TOTAL AND LABOR Tank Relocation Wire brush exterior of tank 2,487 SF NA 62 22.00 1,364 1,364 Remove tank from temporary supports and set on new concrete slab/support saddles 1 EA NA 80 42.50 3,400 3,400 Paint tank with Tnemec Series 135 Chembuild paint 2,487 SF 0.85 2,114 110 42.50 4,675 6,789 SUBTOTAL TANK RELOCATION 2,114 252 9,439 11,553 PAGE 9 KARLUK BULK FUEL SYSTEM KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 RELOCATE 50,000 GALLON TANK, NEW DIKE AND FILL LINES ROTAL MATERIAL TOTAL LABOR MATERIAL QUANTITY UNIT TOTAL HOURS RATE TOTAL AND LABOR Tank Piping Remove threaded fittings and cap openings with doped plugs 4 EA NA 4 42.50 170 170 Cut hole for 8" emergency vent x EA NA 2 42.50 85 85 Ditto 3" vent 2 EA NA 2 42.50 85 85 Ditto 3" gauge hatch L EA NA 1 42.50 43 43 Ditto 4" truck fill a EA. NA 1 42.50 43 43 Plug above openings for air test 5 EA 15.00 75 5 42.50 213 . 288 Air test tank a LoT NA 16 42.50 680 680 Remove plugs for new fittings 5 EA NA 2 42.50 85 85 Weld 3"x60" vent pipe to tank 2 EA 40.00 80 3 42.50 128 208 Install 3" CB300-3 screened vent to above 2 EA 25.00 50 3 42.50 128 178 Weld 3" CB232-3 gauge hatch with locking cover to tank 1 EA 45.00 45 2 42.50 85 130 Weld 8" CB368 emergency vent to tank L EA 165.00 165 4 42.50 170 335 SUBTOTAL TANK PIPING 415 45 1,915 2,330 KARLUK BULK FUEL SYSTEM KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE RELOCATE 50,000 GALLON TANK, NEW DIKE AND FILL LINES UNIT MATERIAL TOTAL LABOR PAGE 10 2/25/91 TOTAL MATERIAL QUANTITY UNIT RATE TOTAL HOURS RATE uc 11 4" welded steel pipe to bottom of tank (1) 12 LF 15.00 180 2 42.50 4" elbow welded to pipe 1 EA 61.00 61 2 42.50 4" flanged Series F ball valve welded to elbow z EA 225.00 225 2 42.50 4" Camlock OPW-644D quick disconnect with dust cap welded to BV zh EA 185.00 185 2 42.50 Weld foot valve to bottom of fill line inside tank + EA 225.00 225 3 42.50 SUBTOTAL TRUCK FILL 876 11 TOTAL 85 85 85 85 128 468 AND LABOR 265 146 310 270 353 1,344 PAGE 11 KARLUK BULK FUEL SYSTEM KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 RELOCATE 50,000 GALLON TANK, NEW DIKE AND FILL LINES TOTAL UNIT MATERIAL TOTAL MATERIAL QUANTITY UNIT RATE TOTAL HOURS RATE TOTAL AND LABOR Remote Fill Line at Tank Weld 4" fitting to tank 2 EA 50.00 100 3 42.50 128 228 4" elbow welded to pipe 9 EA 61.00 549 18 42.50 765 1,314 4" welded ball valve 2 EA 225.00 450 4 42.50 170 620 4"x12" ditto flex connection 2 EA 115.00 230 3 42.50 128 358 4" Schedule 40 fill pipe up to berms 136 LF 15.00 2,040 54 42.50 2,295 4,335 4"x4"x24" AWW cribbing to above at 10'0" o/c at EA 4.50 50 5 22.00 110 160 Cap fill line for airport additive 1 EA 15.00 15 a 42.50 43 58 SUBTOTAL REMOTE FILL LINES AT TANK 3,434 88 3,639 7,073 PAGE 12 KARLUK BULK FUEL SYSTEM KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 RELOCATE 50,000 GALLON TANK, NEW DIKE AND FILL LINES TOTAL UNIT MATERIAL TOTAL LABOR MATERIAL QUANTITY UNIT RATE TOTAL HOURS RATE TOTAL AND LABOR e Fil e r Weld 4" elbow to prefabricated pipe 1 EA 61.00 61 2 42.50 85 146 4" steel pipe welded to fittings (3 sections) 2 LF 20.00 40 2 42.50 85 125 4" flanged check valve welded to pipe a EA 215.00 215 3 42.50 128 343 4" ditto ball valve Class 150 1 EA 225.00 225 : 2 42.50 85 310 4" Camlock OPW-644D quick disconnect with dust cap welded to BV 1 EA 185.00 185 2 42.50 85 270 3/4" locking globe valve with hose end connection and 3/4"x12" pipe leg welded to 4" pipe a EA 85.00 85 2 42.50 85 170 SUBTOTAL REMOTE FILL LINE AT BARGE 811 13 553 1,364 KARLUK BULK FUEL SYSTEM KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE RELOCATE 50,000 GALLON TANK, NEW DIKE AND FILL LINES LABOR TOTAL PAGE 13 2/25/91 TOTAL MATERIAL MATERIAL TOTAL QUANTITY UNIT TOTAL HOURS RATE Ricwill Piping Excavate 3'0"x3‘0" deep trench and dispose 267 cy NA 66 22.00 Backfill with stockpile 307 cy NA 78 22.00 4" Schedule 40 pipe inside 8 5/8"x 10 gauge prefabricated asphalt coated fiber reinforced pipe conduit laid in trench 800 LF 33.25 26,600 1,080 42.50 End seals 2 EA 150.00 300 8 42.50 4"x8 5/8" elbows 10 EA 325.00 3,250 40 42.50 Cathodic protection 800 LF 2.05 1,640 30 42.50 SUBTOTAL 31,790 1,302 Sub‘s Instructor 10 MD NA 100 50.00 SUBTOTAL RICWILL PIPING 31,790 1,402 1,452 1,716 45,900 340 1,700 1,275 52,383 5,000 57,383 AND LABOR 1,452 1,716 72,500 640 4,950 2,915 84,173 5,000 89,173 KARLUK BULK FUEL SYSTEM oes KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 RELOCATE 50,000 GALLON TANK, NEW DIKE AND FILL LINES sores MATERIAL TOTAL MATERIAL QUANTITY UNIT TOTAL HOURS RATE TOTAL AND LABOR s n Pi Excavate and backfill trench 27 cy NA 16 22.00 352 352 4" Schedule 40 drain pipe 46 LF 15.00 690 14 42.50 595 1,285 4" gate valve at outlet al EA 200.00 200 2 42.50 85 285 4"x6" long steel pipe welded at inlet a EA 15.00 15 aL 42.50 43 58 4" plug to above 2 EA 10.00 10 al 42.50 43 53 SUBTOTAL SUMP DRAIN PIPE 915 34 1,118 2,033 PAGE 15 KARLUK BULK FUEL SYSTEM KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 TOTAL UNIT MATERIAL TOTAL MATERIAL QUANTITY UNIT RATE TOTAL HOURS RATE AND LABOR RELOCATE 50,000 GALLON TANK, NEW DIKE AND FILL LINES General Requirements FORCE ACCOUNT Mobilization/demobilization (local contractor) . 7 LOT 750.00 750 1000.00 1,000 1,750 Freight 22 TONS NA 280.00 6,160 6,160 Equipment (backhoe, crane, etc.) 45 DAYS NA 250.00 11,250 11,250 Supervision 6 WKS NA 1800.00 10,800 10,800 Per diem (skilled labor only) 174 MD 40.00 6,960 NA NA 6,960 Clean up 6 WKS 50.00 300 70.00 420 720 SUBTOTAL 37,640 General liability insurance only (no bonds) (37,640 + 147,819) 1 % 1,855 Contractor’s fee (on direct works only) 5 % 9,366 SUBTOTAL GENERAL REQUIREMENTS 48,861 PAGE 1 KARLUK BULK FUEL SYSTEM ° KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 ADDITIVES 1 AND 2 (FORCE ACCOUNT) PAGE 17 KARLUK BULK FUEL SYSTEM KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 ADDITIVE #1 TOTAL 2,000 GALLON ABOVE GROUND FUEL TANK TO POWER PLANT UNIT MATERIAL TOTAL LABOR MATERIAL QUANTITY UNIT RATE TOTAL HOURS RATE TOTAL AND LABOR Demolitions Excavate above and around buried fuel tank and dispose (assume no contaminated soils) 48 cy NA 12 22.00 264 264 Empty fuel from tank (assume 500 gallons) 2. LOT NA 2 42.50 85 85 Disconnect 1/2" FOS&R lines at day tank inside building 2 EA NA a2 42.50 85 85 Ditto at tank 2 EA NA a) 42.50 43 43 Excavate to expose pipe 20 LF NA 4 22.00 88 88 Remove 1/2" FOS&R buried lines (2) 20 LF NA 2 42.50 85 85 Ditto vertically and inside building (2) 12 LF NA 2 42.50 85 85 Remove 1/2" fusible valve and save for reuse aL EA NA 0.50 42.50 21 21 Cut and remove 2"x60" vent and fill pipes 2 EA NA 1 42.50 43 43 PAGE 18 KARLUK BULK FUEL SYSTEM KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 ADDITIVE #1 a 2,000 GALLON ABOVE GROUND FUEL TANK TO POWER PLANT UNIT MATERIAL TOTAL BATERIAL, QUANTITY UNIT RATE TOTAL HOURS RATE ‘TOTAL AND LABOR Demolitions (Continued) Remove tank and dispose 1 EA NA 6 42.50 255 255 Fill tank hole and pipe trench with gravel 119 cy 25.00 2,975 30 22.00 660 3,635 Grade and level disturbed ground 465 SF NA 2 22.00 44 44 SUBTOTAL DEMOLITION 2,975 64.50 1,758 4,733 New Tank and Piping 2,000 gallon closed top dike (Ace and Tank Equipment Co.) tank complete with I beam, skids, vents, connections, and accessories set on gravel pad overall size 6‘2"x8‘2"x16" long c EA 4250.00 4,250 40 42.50 1,700 5,950 1/2" copper Type K FOS&R lines (2) 60 LF 1.50 90 6 42.50 255 345 1/2" dielectric unions 2 EA 2.50 5 1 42.50 43 48 1/2" double swing joint 6 EA 3.50 21 3 42.50 128 149 Strike plate below 1/2" FOS at bottom of tanks 1 EA 5.00 5 al 42.50 43 48 PAGE 19 KARLUK BULK FUEL SYSTEM KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 ADDITIVE #1 TOTAL 2,000 GALLON ABOVE GROUND FUEL TANK TO POWER PLANT eee aoe eeree Ee QUANTITY UNIT RATE TOTAL HOURS RATE TOTAL AND LABOR lew T. and Pipin Co: nue Reconnect FOS&R to day tank inside building 2 EA 5.00 10 2 42.50 85 95 Reinstall 1/2" fusible valve i EA NA 0.50 42.50 21 21 1/2" Webster OSVA5O safety valve 4 EA 25.00 25 2 42.50 43 68 Attack fill spill containment box ; CN200 to tank 1 EA 45.00 45 2 42.50 85 130 2"x24" galvanized vent pipe with T and elbow assembly and 1/4" mesh screen cover connected to tank 2 EA 22.50 45 3 42.50 128 173) 6"x6" AWW box made from 2"x6" lumber for FOS&R at grade 10 LF 2.90 29 3 22.00 66 95 Seal 1/2" penetration into wall with silicone and escutcheon plate 2 EA 5.00 10 a 22.00 22 32 Paint tank and dike with owner selected paint 668 SF 0.15 100 10 22.00 220 320 SUBTOTAL NEW TANK AND PIPING 4,635 73.50 2,839 7,474 PAGE 20 KARLUK BULK FUEL SYSTEM KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 ADDITIVE #1 pao 2,000 GALLON ABOVE GROUND FUEL TANK TO POWER PLANT UNIT MATERTAL SS TOTAL MATERIAL) QUANTITY UNIT RATE TOTAL HOURS RATE AND LABOR SUBTOTAL ADDITIVE #1 7,610 138.00 4,597 12,207 General Requirements 31.71 % 2,413 1,458 3,871 Contingency 2.50 % 251 151 402 TOTAL ADDITIVE #1 10,274 138 6,206 16,480 PAGE 21 KARLUK BULK FUEL SYSTEM KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 ADDITIVE #2 TOTAL AIRCRAFT FILL LINE UNIT MATERIAL TOTAL MATERIAL QUANTITY UNIT RATE TOTAL HOURS RATE TOTAL AND LABOR Remote Fill Line at Airport Weld 4" elbow to prefabricated jacketed pipe zt EA 61.00 61 2 42.50 85 146 4" steel pipe welded to fitting (3 sections) 2 LF 20.00 40 2 42.50 85 125 4" flanged check valve welded to pipe 1 EA 215.00 215 3 42.50 128 343 4" ditto ball valve Class 150 . EA 225.00 225 2 42.50 85 310 4" Camlock OPW-644D quick disconnect with dust cap welded to ball valve 1 EA 185.00 185 2 42.50 85 270 SUBTOTAL REMOTE FILL 726 La 468 1,194 Ricwill Prefabricated Piping Excavate 3'0"x3‘0" deep trench and dispose 212 cy NA 52 22.00 1,144 1,144 Backfill with stockpile 245 cy NA 62 22.00 1,364 1,364 4" Schedule 40 steel pipe inside 8 5/8"x10 gauge prefabricated asphalt coated fiber reinforced pipe conduit laid in trench 635 LF 33.25 21,114 857 42.50 36,423 57,537 PAGE 22 KARLUK BULK FUEL SYSTEM KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 ADDITIVE #2 cores AIRCRAFT FILL LINE UNIT MATERIAL TOTAL MATERIAL QUANTITY UNIT RATE TOTAL HOURS RATE AND LABOR emote F e irport Continued Remove cap at tank fill line and connect 4" fill line a EA 20.00 20 2 42.50 85 105 End seals 2 EA 150.00 300 8 42.50 340 640 4"x8 5/8" elbows 7 EA 325.00 2,275 28 42.50 1,190 3,465 Cathodic protection 635 LF 2.05 1,302 24 42.50 1,020 2,322 SUBTOTAL RICWILL 25,011 1,033 41,566 66,577 Sub‘s Instructor 5 MD NA 50 50.00 2,500 2,500 SUBTOTAL RICWILL 25,011 1,083 44,066 69,077 SUBTOTAL ADDITIVE #2 ; 25,737 1,094 44,534 70,271 General Requirements 31572 % 8,161 14,122 22,283 Contingency 2.50 % 847 1,466 2,314 TOTAL ADDITIVE #2 34,745 1,094 60,122 94,868 PAGE 23 KARLUK BULK FUEL SYSTEM KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 OPTION - ALL WORK BY GENERAL CONTRACTOR PAGE 24 KARLUK BULK FUEL SYSTEM KARLUK, ALASKA 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 OPTION - ALL WORK BY GENERAL CONTRACTOR oe UNIT MATERIAL TOTAL MATERIAL QUANTITY UNIT RATE TOTAL HOURS AND LABOR asic Bid (all je as force account bor rate an meral re Direct Works . 56,081 2,557 42.50 108,673 164,754 General Requirements Mobilization/demobilization 1 LOT 1500.00 1,500 5,000 6,500 Freight 22 TONS NA 300 6,600 6,600 Equipment (backhoe, cranes, etc.) 45 DAYS NA 350 15,750 15,750 Supervision 6 WKS NA 2,000 12,000 12,000 Per diem 174 MD 65.00 11,310 NA 11,310 Clean up 6 WKS 50.00 300 100 600 900 SUBTOTAL 217,814 Bonds and insurances 2.50 % 5,445 SUBTOTAL 223,259 Contractor's fee 7.00 % 15,628 Contingency 3.50 % 8, 361 TOTAL BASIC BID (NOTE: General Requirements 45%) 247,248 PAGE 25 KARLUK BULK FUEL SYSTEM KARLUK, ALASKA - 95% SUBMITTAL CONSTRUCTION COST ESTIMATE 2/25/91 TOTAL UNIT MATERIAL TOTAL MATERIAL QUANTITY RATE TOTAL HOURS RATE AND LABOR OPTION - ALL WORK BY GENERAL CONTRACTOR Additive #1 2,000 gallon above ground tank 7,610 138 4,597 12,207 General Requirements 45.00 % 5,493 Contingency 3.50 % : 620 TOTAL ADDITIVE #1 18,320 Additive #2 Aircraft fill line 25, 737 1,094 44,534 70,271 General Requirements 45.00 % 31,622 Contingency 3.50 % 3,566 _—_—_— TOTAL ADDITIVE #2 105,459