Loading...
HomeMy WebLinkAboutAPPLICATION - 1. NWAB Selawik Solar PV Round 15 Standard Application-signedRenewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 1 of 42 10/04/2022 Application Forms and Instructions This instruction page and the following grant application constitutes the Grant Application Form for Round 15 of the Renewable Energy Fund (REF). A separate application form is available for projects with a primary purpose of producing heat (see Request for Applications (RFA) Section 1.5). This is the standard form for all other projects, including projects that will produce heat and electricity. An electronic version of the RFA and both application forms is available online at: https://www.akenergyauthority.org/What-We-Do/Grants-Loans/Renewable-Energy-Fund/2022- REF-Application. What follows are some basic information and instructions for this application: ● If you are applying for grants for more than one project, provide separate application forms for each project. ● Multiple phases (e.g. final design, construction) for the same project may be submitted as one application. ● If you are applying for grant funding for more than one phase of a project, provide milestones and grant budget for each phase of the project (see Sections 3.1 and 3.2.2). ● In order to ensure that grants provide sufficient benefit to the public, AEA may limit recommendations for grants to preliminary development phases in accordance with 3 Alaska Administrative Code (ACC) 107.605(1). ● If some work has already been completed on your project and you are requesting funding for an advanced phase, submit information sufficient to demonstrate that the preceding phases are completed and funding for an advanced phase is warranted. Supporting documentation may include, but is not limited to, reports, conceptual or final designs, models, photos, maps, proof of site control, utility agreements, business and operation plans, power sale agreements, relevant data sets, and other materials. Please provide a list of supporting documents in Section 11 of this application and attach the documents to your application. ● If you have additional information or reports you would like the Authority to consider in reviewing your application, either provide an electronic version of the document with your submission or reference a web link where it can be downloaded or reviewed. Please provide a list of additional information; including any web links, in Section 12 of this application and attach the documents to your application. For guidance on application best practices please refer to the resource-specific Best Practices Checklists; links to the checklists can be found in the appendices list at the end of the accompanying REF Round 15 RFA. ● In the Sections below, please enter responses in the spaces provided. You may add additional rows or space to the form to provide sufficient space for the information, or attach additional sheets if needed. ● If you need assistance with your application, please contact AEA’s Grants Coordinator by email at grants@akenergyauthority.org or by phone at (907) 771-3081. Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 2 of 42 10/04/2022 REMINDER: ● AEA is subject to the Public Records Act AS 40.25, and materials submitted to AEA may be subject to disclosure requirements under the act if no statutory exemptions apply. ● All applications received will be posted on the Authority web site after final recommendations are made to the legislature. Please submit resumes as separate PDFs if the applicant would like those excluded from the web posting of this application. ● In accordance with 3 AAC 107.630 (b) Applicants may request trade secrets or proprietary company data be kept confidential subject to review and approval by AEA. If you want information to be kept confidential the applicant must: o Request the information be kept confidential. o Clearly identify the information that is the trade secret or proprietary in their application. o Receive concurrence from the Authority that the information will be kept confidential. If the Authority determines it is not confidential, it will be treated as a public record in accordance with AS 40.25 or returned to the applicant upon request. Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 3 of 42 10/04/2022 SECTION 1 – APPLICANT INFORMATION Please specify the legal grantee that will own, operate, and maintain the project upon completion. Name (Name of utility, IPP, local government, or other government entity) Northwest Arctic Borough (NAB) Tax ID # 92-0116661 Date of last financial statement audit: 6/30/21 Mailing Address: Physical Address: P.O. Box 1110 163 Lagoon St Kotzebue, AK 99752 Kotzebue, AK 99752 Telephone: Fax: Email: 907-442-2500 907-442-2930 imathiasson@nwabor.org 1.1 Applicant Point of Contact / Grants Coordinator Name: Ingemar Mathiasson Title: Energy Manager Mailing Address: P.O. Box 1110 Kotzebue, AK 99752 Telephone: Fax: Email: 907-445-2031 907-442-2930 imathiasson@nwabor.org 1.1.1 Applicant Signatory Authority Contact Information Name: Dickie Moto Title: Mayor Mailing Address: P.O. Box 1110 Kotzebue, AK 99752 Telephone: Fax: Email: 907-442-8201 dmoto@nwabor.org 1.1.2 Applicant Alternate Points of Contact Name Telephone: Fax: Email: Erin Stephens 907-442-8221 907-442-2930 EStephens@nwabor.org Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 4 of 42 10/04/2022 1.2 Applicant Minimum Requirements Please check as appropriate. If applicants do not meet the minimum requirements, the application will be rejected. 1.2.1 Applicant Type ☐ An electric utility holding a certificate of public convenience and necessity under AS 42.05 CPCN #______, or ☐ An independent power producer in accordance with 3 AAC 107.695 (a) (1) CPCN #______, or ☒ A local government, or ☐ A governmental entity (which includes tribal councils and housing authorities) Additional minimum requirements ☒ 1.2.2 Attached to this application is formal approval and endorsement for the project by the applicant’s board of directors, executive management, or other governing authority. If the applicant is a collaborative grouping, a formal approval from each participant’s governing authority is necessary. (Indicate yes by checking the box) ☒ 1.2.3 As an applicant, we have administrative and financial management systems and follow procurement standards that comply with the standards set forth in the grant agreement (Section 3 of the RFA). (Indicate yes by checking the box) ☒ 1.2.4 If awarded the grant, we can comply with all terms and conditions of the award as identified in the Standard Grant Agreement template at https://www.akenergyauthority.org/What-We-Do/Grants-Loans/Renewable-Energy- Fund/2022-REF-Application (Any exceptions should be clearly noted and submitted with the application.) (Indicate yes by checking the box) ☒ 1.2.5 We intend to own and operate any project that may be constructed with grant funds for the benefit of the general public. If no please describe the nature of the project and who will be the primary beneficiaries. (Indicate yes by checking the box) Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 5 of 42 10/04/2022 SECTION 2 – PROJECT SUMMARY 2.1 Project Title Provide a 4 to 7 word title for your project. Type in the space below. Selawik Solar PV 2.2 Project Location 2.2.1 Location of Project – Latitude and longitude (preferred), street address, or community name. Latitude and longitude coordinates may be obtained from Google Maps by finding you project’s location on the map and then right clicking with the mouse and selecting “What is here? The coordinates will be displayed in the Google search window above the map in a format as follows: 61.195676.-149.898663. If you would like assistance obtaining this information, please contact AEA’s Grants Coordinator by email at grants@akenergyauthority.org or by phone at (907) 771- 3081. Latitude 66.60088 Longitude -160.00472 The Village of Selawik is located in the Northwest Arctic Borough, at the mouth of the Selawik River, about 90 miles east of Kotzebue. Selawik falls within the arctic climate zone, characterized by seasonal extremes in temperature. Winters are long and harsh, and summers are short but warm. Temperature extremes have been recorded from -50 to 83°F. The Selawik River is navigable from early June to mid-October. 2.2.2 Community benefiting – Name(s) of the community or communities that will be the beneficiaries of the project. The community of Selawik will benefit from this project, which will complete the construction phase of the solar PV project. Upon completion, Selawik will have a more resilient energy infrastructure with the capability to supply its electricity needs with a reduced need for diesel generation. This project will reduce pollution while creating energy independence and improving community resilience in the face of climate change and extreme weather events. This project will also build capacity for local project management and O&M skills for renewable energy systems. The Alaska Village Electric Cooperative (AVEC), which is the electric utility for Selawik, will also benefit from increased clean energy generation assets, improved reliability with less outages, less fuel shipping needs, and enhanced local capacity. 2.3 Project Type Please check as appropriate. 2.3.1 Renewable Resource Type ☐ Wind ! Biomass or Biofuels (excluding heat-only) ☐ Hydro, Including Run of River ! Hydrokinetic ☐ Geothermal, Excluding Heat Pumps ! Transmission of Renewable Energy ☒ Solar Photovoltaic ! Storage of Renewable Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 6 of 42 10/04/2022 ! Other (Describe) ! Small Natural Gas 2.3.2 Proposed Grant Funded Phase(s) for this Request (Check all that apply) Pre-Construction Construction ! Reconnaissance ! Final Design and Permitting ! Feasibility and Conceptual Design ☒ Construction 2.4 Project Description Provide a brief, one-paragraph description of the proposed project. The Northwest Arctic Borough (NAB) is requesting $1,134,500 for Phase IV Construction of a high penetration distributed solar PV system for the community of Selawik. Based on Hybrid Optimization for Multiple Energy Resources (HOMER) software modeling and AEA’s B/C Ratio model, this system will displace about 27,278 gallons of imported diesel fuel annually and will result in about 193 hours of diesels-off operation, saving the community about $81,698 during the first year of operation. Lifetime savings for the project are estimated at 681,947 gallons of diesel fuel and $2,511,674. In addition to reducing the cost of electrical generation, the solar PV system, in conjunction with a related and separately funded project to construct a Battery Energy Storage System, will result in a hybrid solar PV/battery/diesel system, will dramatically increase the efficiency and resilience of the power generation system by providing spinning reserve and significantly reducing brown-outs and black-outs and associated freeze-ups of the community water system. This project will leverage the key learnings from other high penetration systems operating and in development in the Northwest Arctic Borough, including Kotzebue, Deering, Buckland, Shungnak-Kobuk, and Noatak. Upon completion of the project, this solar PV system will be transferred to ownership as an IPP by the Native Village of Selawik and sell power to the Alaska Village Electric Cooperative, similar to other projects in the region. 2.5 Scope of Work Provide a short narrative for the scope of work detailing the tasks to be performed under this funding request. This should include work paid for by grant funds and matching funds or performed as in-kind match. The project scope will include the construction of 398 kW of solar PV to provide alternative energy to the existing AVEC diesel power plant and planned Battery Energy Storage System currently under development with separate funding under another initiative to support the community water system. The project includes the following major tasks: Review Project Plan from Design-Build contractor secured under design phase of this project and issue notice to proceed once contractor satisfactorily submits schedule, submittals, and project plan documents. The second primary task will be to procure materials, to include microinverters, solar panels, fencing, foundation for the panels, and other minor components. After all major items are secured, items will be shipped by barge to Selawik and installed on site. Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 7 of 42 10/04/2022 The last major task of the construction phase of the project will be to test and commission the new Solar PV with the existing diesel power plant and battery energy storage system currently under development. This will include metering to confirm production and allow for IPP transactions 2.6 Previous REF Applications for the Project See Section 1.15 of the RFA for the maximum per project cumulative grant award amount Round Submitted Title of application Application #, if known Did you receive a grant? Y/N Amount of REF grant awarded ($) 14 Design/Permitting for Solar PV & Battery Storage for Ambler, Kiana, Noorvik, and Selawik Y $147,500* *One-fourth of total grant, representing amount allocated to Selawik SECTION 3 – Project Management, Development, and Operation 3.1 Schedule and Milestones Please fill out the schedule below (or attach a similar sheet) for the work covered by this funding request. Be sure to identify key tasks and decision points, including go/no go decisions, in your project along with estimated start and end dates for each of the milestones and tasks. Please clearly identify the beginning and ending of all phases (I. Reconnaissance, II. Feasibility and Conceptual Design, III. Final Design and Permitting, and IV. Construction) of your proposed project. See the RFA, Sections 2.3-2.6 for the recommended milestones for each phase. Add additional rows as needed. Task # Milestones Tasks Start Date End Date Deliverables 1.0 Grant agreement executed Execute related documents 7/23 8/23 Signed agreement 2.0 Notice to Proceed for Contractor Review and approve project schedule, submittals, plan, permits, and other relevant documents to previously selected design-build contractor. 9/23 10/23 Notice to Proceed 3.0 Procure Materials Procure major materials for the project 10/23 5/24 Material Take Off 3.1 Shipping Ship majority of material via first barge of the season to reach Selawik 5/24 7/24 Barge Manifest of Shipment 3.2 Site Preparation Clearing, Grubbing, and foundation for 6/24 8/24 Site Layout, Bi-Weekly Reports Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 8 of 42 10/04/2022 solar PV panels, installation of fencing 3.3 Trenching and Cabling Construct trench and complete layout of microinverters and electrical connections to power plant and battery system. 7/24 8/24 Bi Weekly Reports 3.4 Install Solar PV Install Solar photo voltaic panels and connect to microinverters and wiring 8/24 9/24 Bi Weekly Reports 4.0 Testing and Commissioning Complete testing, training, and commissioning of the systems; meter production 10/24 6/25 As-Builts, Final Inspection Report, Follow Up Field Report 5.0 Grant closeout Prepare & submit final reports 6/25 9/25 Submittal of final project report and close-out documentation 3.2 Budget 3.2.1 Funding Sources Indicate the funding sources for the phase(s) of the project applied for in this funding request. Grant funds requested in this application $1,134,500 Cash match to be provideda $251,500 In-kind match to be provideda $0 Energy efficiency match providedb $ Total costs for project phase(s) covered in application (sum of above) $1,386,000 The Northwest Arctic Borough has awarded the Native Village of Selawik funding from the Village Improvement Fund program toward this and related energy projects; $251,500 of these funds will be provided as cash matching funds for this application in order to complete construction of 400 kW of solar PV. These funds are local matching contributions and their original source is not federal or state. The funds are already secured as of October 2022 and will not cause delay for the project. Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 9 of 42 10/04/2022 a Attach documentation for proof (see Section 1.18 of the Request for Applications) b See Section 8.2 of this application and Section 1.18 of the RFA for requirements for Energy Efficiency Match. 3.2.2 Cost Overruns Describe the plan to cover potential cost increases or shortfalls in funding. NAB has 3 high penetration solar, battery, diesel hybrid systems in operation (Buckland, Deering, and Shungnak-Kobuk) and has one system in the design and construction phase (Noatak). The NAB and NANA have also contributed funds and expertise to the high penetration solar PV array in Kotzebue. Based on this experience, we are confident in our cost estimates to complete the work, however, the pandemic has complicated the supply chain for engineering services. If there is a shortfall in funding, the communities will request additional funding through the NAB’s Village Improvement Fund, and the NRC Energy Program has also committed to providing additional resources to fill any funding needs. The Village Improvement Fund is targeted for capital matching funds exclusively for NAB communities and has been successfully leveraged for all of the above projects and many others, resulting in the statewide leadership around energy initiatives in the NAB/NANA region. 3.2.3 Total Project Costs Indicate the anticipated total cost by phase of the project (including all funding sources). Use actual costs for completed phases. Indicate if the costs were actual or estimated. Reconnaissance Actual $0 Feasibility and Conceptual Design Actual $Completed at No Cost by ANTHC - see attachments Final Design and Permitting Estimated $156,000 Construction Estimated $1,386,000 Total Project Costs (sum of above) Estimated $1,542,000 Metering/Tracking Equipment [not included in project cost] Estimated $included in construction 3.2.4 Funding Subsequent Phases If subsequent phases are required beyond the phases being applied for in this application, describe the anticipated sources of funding and the likelihood of receipt of those funds. ● State and/or federal grants ● Loans, bonds, or other financing options ● Additional incentives (i.e. tax credits) ● Additional revenue streams (i.e. green tag sales or other renewable energy subsidies or programs that might be available) Not applicable; the construction phase will complete this project. 3.2.3 Budget Forms Applications MUST include a separate worksheet for each project phase that was identified in Section 2.3.2 of this application — I. Reconnaissance, II. Feasibility and Conceptual Design, III. Final Design and Permitting, and IV. Construction. Please use the tables provided below to detail your proposed project’s total budget. Be sure to use one table for each phase of your project, and delete any unnecessary tables. The milestones and tasks should match those listed in 3.1 above. Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 10 of 42 10/04/2022 If you have any question regarding how to prepare these tables or if you need assistance preparing the application please feel free to contact AEA’s Grants Coordinator by email at grants@akenergyauthority.org or by phone at (907) 771-3081. Phase 4 — Construction Milestone or Task Anticipated Completion Date RE- Fund Grant Funds Grantee Matching Funds Source of Matching Funds: Cash/In- kind/Federal Grants/Other State Grants/Other TOTALS (List milestones based on phase and type of project. See Sections 2.3 thru 2.6 of the RFA ) $ $ $ Issue RFP for Construction $ 10,000 $5,000 $ 15,000 Equipment Procurement and Shipping $675,000 $130000 $820,000 Mobilization and Site Preparation $15,000 $10,000 $25,000 Construction $400,000 $75,000 $475,000 Commissioning $20,000 $20,000 $40,000 Project Management $14,500 $8,500 $23,000 Performance Data Collection $ $1,000 $1,000 Final Reports $ $1,000 $1,000 Grant Close-Out $ $1,000 $1,000 TOTALS $1,134,500 $251,500 $1,386,000 Budget Categories: Direct Labor & Benefits $ $ $ Travel & Per Diem $ $ $ Equipment $ $ $ Materials & Supplies $ $ $ Contractual Services $1,134,500 $251,500 $1,386,000 Construction Services $ $ $ Other $ $ $ TOTALS $1,134,500 $251,500 $1,386,000 3.2.4 Cost Justification Indicate the source(s) of the cost estimates used for the project budget, including costs for future phases not included in this application. The construction costs estimate for this project was completed by the NAB project team based on recent experience from the design and installations of the high penetration projects in Deering, Buckland, Kotzebue, Shungnak, and Noatak, and with input from design and constructions partners on previous projects including Hitachi (formerly ABB) and Alaska Native Renewable Industries (ANRI). In general, the complete Cost of Construction for a solar PV field in rural Alaska is estimated at roughly $3/kW of solar PV installed. This cost is comprised of the procurement of panels, shipment of panels to the site, cost of string microinverters, site development, fencing, and assembly and construction on site. Costs for this project were based upon previous, recent, relevant experience observed on similar projects completed in the Northwest Arctic Borough. The basis of costs is as follows: Category Cost Notes Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 11 of 42 10/04/2022 Solar PV Construction $ 1,194,000 $3/Watt Construction Admin $ 35,820 3% of Construction Contingency $ 122,982 10% of Construction Costs Project Management $ 33,198 2.45% of project Total $ 1,386,000 This project is only possible to complete at these costs due to the separate funded project to complete construction of a Battery Energy Storage System for the purposes of protecting the grid and more specifically, the electrical requirements of the water and sewer system. Costs for integrating into the existing power system, which are typically significant, are not accounted for here as the power plant will already have upgraded controls and management systems due to the integration of the battery as part of the separate Battery Energy Storage System funded by the USDA, NANA, and Northwest Arctic Borough. The oversized (for energy purposes) Battery is being installed to provide extended protection during blackouts in order to reduce freeze ups of the community’s temperature sensitive water and sewer system. Northwest Arctic Borough is seeking construction funding in advance of the design as the anticipated engineering for the project will mirror recently successful projects in Shungnak and other Northwest Arctic Borough communities and because our recent experience with similar projects allows for relative cost certainty in advance of design efforts. Future phases of this project would only include expansion of the solar PV. This phase is likely to be similar in costs of construction as well as similar proportional benefits. Based upon the size of the large BESS planned for Selawik, it is anticipated that an additional 600 kW of solar PV could be added to the system cost effectively. The creation of an Independent Power Producer (IPP) selling power generated from the solar PV system to AVEC provides further economic benefits for the community. 3.3 Project Communications 3.3.1 Project Progress Reporting Describe how you plan to monitor the progress of the project and keep AEA informed of the status. Who will be responsible for tracking the progress? What tools and methods will be used to track progress? Progress will be measured based on a project charter with a timeline, milestones, and a responsibility matrix to identify deficiencies before they impact project deliverables. We will also have quarterly project meetings that include the AEA project manager to ensure tasks are being performed according to the agreed-upon timeline and budget. The NAB Project Manager will provide quarterly progress reports to NAB leadership and AEA that will detail the progress versus plan and remediation strategies as needed to address deficiencies. Our intent is to include the AEA project manager as an active member of the team to leverage their knowledge and experience in the successful project. NAB and NANA Energy Project Managers will be in regular contact with each other, the community, and AVEC, as they already have activities in all the region’s communities, and this will facilitate status monitoring. 3.3.2 Financial Reporting Describe the controls that will be utilized to ensure that only costs that are reasonable, ordinary and necessary will be allocated to this project. Also discuss the controls in place that will ensure Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 12 of 42 10/04/2022 that no expenses for overhead, or any other unallowable costs will be requested for reimbursement from the REF Grant Program. The NAB Finance Department consists of a treasurer, controller, accounting assistant, and specialized contractor. The Finance Department utilizes Caselle accounting software, which is used by over 1,200 government entities nationwide. This system is used to provide monthly financial reports to the Borough Assembly and track all expenditures and revenues. The NAB undergoes a financial statement and single audit annually. Our Finance Department will manage all financial transactions associated with the grant and will be responsible for monthly financial reporting to the NAB Mayor and Assembly and quarterly financial reporting to AEA and other project partners. Current financial statements and other financial information are available upon request. The NAB Finance Department successfully manages millions of dollars in federal and state grants every year and is very familiar with compliance and reporting requirements. In accordance with NAB policy, when a project is funded, an account and object account code is created to track all materials and time related to that project. This is organized so that grant funds as well as any matching funds are properly accounted for. The grant agreement is reviewed in detail with the accounting team at the beginning of the project to ensure that only eligible and reasonable costs are billed to the grant. From a procurement standpoint, NAB will select contractors following all NAB and federal procurement rules, including those found in 7 CFR part 1709 and 2 CFR part 200. NAB will seek contractors that have demonstrated success, expertise, and commitment to this type of project in our region as well as strong understanding of the region’s unique circumstances. SECTION 4 – QUALIFICATIONS AND EXPERIENCE 4.1 Project Team Include resumes for known key personnel and contractors, including all functions below, as an attachment to your application. In the electronic submittal, please submit resumes as separate PDFs if the applicant would like those excluded from the web posting of this application. 4.1.1 Project Manager Indicate who will be managing the project for the Grantee and include contact information. If the applicant does not have a project manager indicate how you intend to solicit project management support. If the applicant expects project management assistance from AEA or another government entity, state that in this section. Ingemar Mathiasson, NAB Energy Manager (907-445-2031,imathiasson@nwabor.org), works in the NAB’s Economic Development Department. He will be the Project Manager and oversee all aspects of the project. He has developed and managed renewable energy and energy efficiency projects in all 11 communities within the Borough and has been the Project Manager for successful solar, battery, and diesel hybrid systems in Buckland, Deering, Shungnak, and Noatak, along with a biomass construction project in Ambler. Mr. Mathiasson will also ensure community engagement and outreach in Selawik, in coordination with the Northwest Arctic Energy Steering Committee’s education and outreach efforts. 4.1.2 Project Accountant Indicate who will be performing the accounting of this project for the grantee. If the applicant does not have a project accountant indicate how you intend to solicit financial accounting support. Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 13 of 42 10/04/2022 Angie Sturm has been the NAB Treasurer since 2016. Ms. Sturm received her Bachelor of Business Administration degree in Accounting and Management from the University of Alaska Anchorage. Before accepting her position at the Borough, Angie was an Auditor for KPMG, an international accounting firm with an office in Anchorage. She will oversee all financial transactions and financial reporting associated with this project, providing appropriate information to AEA, the NAB Assembly and the Mayor. 4.1.3 Expertise and Resources Describe the project team including the applicant, partners, and contractors. For each member of the project team, indicate: ● the milestones/tasks in 3.1 they will be responsible for; ● the knowledge, skills, and experience that will be used to successfully deliver the tasks; ● how time and other resource conflicts will be managed to successfully complete the task. If contractors have not been selected to complete the work, provide reviewers with sufficient detail to understand the applicant’s capacity to successfully select contractors and manage complex contracts. Ingemar Mathiasson - NAB Energy Manager since 2009. Originally from Sweden, Mr. Mathiasson has lived in Alaska since 1987. He built and lives in an off-the-grid homestead outside of Ambler, complete with wind and solar power, batteries, and biomass for heating. He is a member of the Board of Directors of the Renewable Energy Alaska Project (REAP) and has overseen more than $15 million of renewable energy construction projects around the Borough in all 11 communities. He will be the main Technical Contact on this project and will report to the NAB Economic Development Director and the Finance Department. He will manage the subcontractors and coordinate communication with all project partners. Mr. Mathiasson will be the key contact for construction contractors. Outreach work will be coordinated with the Northwest Arctic Energy Steering Committee (NAESC) education and outreach efforts for the region. The NAESC is a regional collaborative that has been leading the development of energy plans for more than 12 years in the NAB, guided by the goals of reducing energy costs and improving energy resilience as the top priorities of the region. Sonny Adams – NANA Regional Corporation (NRC) Director of Energy Programs. Mr. Adams has been involved in all aspects of village energy development with NANA communities since 2007. He has served on the U.S. Department of Energy’s Indian Country Energy and Infrastructure Working Group and is currently managing USDA-funded solar-wind-battery-diesel integration projects in Buckland and Deering. Mr. Adams, a NANA shareholder originally from Kotzebue, has a Bachelor of Science in Metallurgical and Materials Engineering from the University of Montana. He will continue to lead NANA’s contribution to this project through collaboration with all project stakeholders, especially in relation to the IPP, training and technical assistance, community outreach and education, contractor support, and leadership within the NAESC. Brian Hirsch – DeerStone Consulting Founder and CEO. Dr. Hirsch has worked in rural Alaska and other remote locations on diesel-based renewable energy microgrids for over 25 years. Prior to founding DeerStone, he served as an elected Board Member for Homer Electric Association, the rural Electric Cooperative in his Alaska community; led the National Renewable Energy Laboratory’s Alaska Initiative for over six years; worked across Southeast Asia, Canada, lower 48 US, Mexico, and Central America; and consulted for numerous non-profits and Tribal organizations. He has a PhD in Natural Resources with a Master’s Certification in Energy Analysis and Policy from the University of Wisconsin-Madison and a bachelor’s degree in Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 14 of 42 10/04/2022 Government/Political Science with three years of Electrical Engineering coursework from Cornell University. DeerStone Consulting will continue to provide technical support to this project under NANA Regional Corporation. Project support will focus on the solar installation and building community capacity to manage projects and the IPP. Leah Olsen is a licensed Mechanical EIT, who completed her bachelor’s in Mechanical Engineering with a focus on renewable energy at the University of New Haven in Connecticut in 2019 and holds a prior bachelor’s degree in Chemistry from Williams College. At DeerStone, she has experience with microgrid controls, wind and solar production optimization, system troubleshooting, performance monitoring and verification, construction planning, telecommunications, the development of community energy action plans, and system feasibility. Leah also has experience in reliability engineering, working with asset management systems to develop and maintain maintenance records for the manufacturing facility of a multinational pharmaceutical company in Bend, Oregon. She has also worked at municipal utilities, including the City of Bend Water Department, where she worked with water plant operators to develop operational guides for the City water system. Her project management experience includes leading a team of peers to design an air-filtration system for use in NASA spaceships. She is proficient in Blue Mountain Regulatory Asset Manager (CMMS), Solidworks, and Hach WIMS. Her previous professional endeavors include commercial fishing and natural building construction. Subcontractors will be selected through a competitive procurement process and will be selected based on their experience and technical expertise with similar projects in remote Alaska. A scoring matrix will be developed during the procurement process, and the AEA project manager will be invited to participate on the selection team. 4.2 Local Workforce Describe how the project will use local labor or train a local labor workforce. As with the recent solar PV projects that have been completed in NAB, local labor and capability development will be a significant goal. The Shungnak high penetration solar and battery system was constructed with a crew made up of about 90% local and Native members. We plan on utilizing this experienced regional labor force on future construction projects and will actively train additional crews in the solar PV installation skills. Additionally, sustainability education and hands-on solar trainings will also be provided for community members for future installation of the systems, in addition to the training provided to locally hired laborers. This workforce training is already incorporated in other related projects we are implementing including the upcoming Noatak high penetration solar PV and battery system. Energy community champions have already been engaged in energy development through the NAESC, and these champions will be engaged during the construction process to expand their energy education and provide community specific feedback on the designs. We will also use this project as an opportunity to recruit new energy champions and develop our next generation of NAB energy leaders. SECTION 5 – TECHNICAL FEASIBILITY Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 15 of 42 10/04/2022 5.1 Resource Availability 5.1.1 Assessment of Proposed Energy Resource Describe the potential extent/amount of the energy resource that is available, including average resource availability on an annual basis. For pre-construction applications, describe the resource to the extent known. For design and permitting or construction projects, please provide feasibility documents, design documents, and permitting documents (if applicable) as attachments to this application (See Section 11). Likelihood of the resource being available over the life of the project. See the “Resource Assessment” section of the appropriate Best Practice Checklist for additional guidance. The following figure of Solar Insolation in Alaska was developed for the report “Solar Energy Prospecting in Remote Alaska - An Economic Analysis of Solar Photovoltaics in the Last Frontier State” by Paul Schwabe, National Renewable Energy Laboratory (2016). This report shows that the Arctic and Interior regions of Alaska could expect high solar production predominantly from March through August, with a steep dropoff in the shoulder months and little to no production in the winter. Most communities in the NAB have an estimated value of 3.4 kWh/m2/Day for solar insolation. Operating projects in Deering and Buckland, for example, are performing with a capacity factor of approximately 10.5%. The solar PV array in Kobuk is demonstrating an annual capacity factor of about 11% although this is much higher in the summer months and much lower in the winter months. The general “rule of thumb” across the Northwest Arctic is that 1 kW of solar PV produces about 1 MWh annually. Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 16 of 42 10/04/2022 5.1.2 Alternatives to Proposed Energy Resource Describe the pros and cons of your proposed energy resource vs. other alternatives that may be available for the market to be served by your project. Energy planning has been at the forefront of the NAESC’s objectives during the last 10 years of its existence. In that time, the region has installed many energy systems including heat recovery systems, heat pumps, wind turbines, behind the meter solar systems, community scale solar and battery systems, and wind, solar PV, battery, and diesel hybrid systems, along with developing the first Power Purchase Agreement with AVEC. We have also focused on feasibility studies of interties between communities and potential hydroelectric projects. The region has been very active in energy efficiency improvements. One of our key learnings is that solar PV is a good first step for a community to take on operations and maintenance of renewable energy systems. It is the easiest technology to maintain as the communities learn the requirements of operating and maintaining energy systems along with partnering with incumbent utilities. For this project, 8 different options were considered and evaluated based on our primary goals to reduce the reliance on expensive diesel fuel and the costs of generating electricity in our communities: • Option 1: Do nothing • Option 2: Do minimum, Grid-tied Solar Power (up to utility limit) Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 17 of 42 10/04/2022 • Option 3: Install a Solar Photovoltaic (PV) Array with a Battery Energy Storage System • Option 4: Energy Efficiency • Option 5: Biomass • Option 6: Powerline Interties between communities • Option 7: Wind Turbines Option 1 was eliminated because doing nothing will not reduce our reliance on diesel. Option 2 was also eliminated because of our desire to achieve significant diesel reductions and to work with our partner AVEC and the utility limit with low penetration is only a minimal amount of renewable production or fuel savings. Option 4 will continue to be a priority within our communities with a focus on energy efficiency improvements for heating systems. Most impactful and cost effective electrical energy efficiency improvements have been completed in our communities. Regarding Option 5, biomass systems have been installed in communities with good wood resources. Feasibility studies for wood heating in other NAB communities, including Selawik, have not resulted in recommended systems. Options 6 and 7 are under consideration for other communities. Wind turbines in multiple other communities, including Selawik, are not viable at this time. Option 4, a Solar PV, Battery, Diesel Hybrid System was the most logical project for Selawik community- scale renewable energy systems at this time; this application is for the solar project, with other funding secured for the battery project in order to protect and support the community grid and water/sewer system. 5.1.3 Permits Provide the following information as it may relate to permitting and how you intend to address outstanding permit issues. See the “Environmental and Permitting Risks” section of the appropriate Best Practice Checklist for additional guidance. ● List of applicable permits ● Anticipated permitting timeline ● Identify and describe potential barriers including potential permit timing issues, public opposition that may result in difficulty obtaining permits, and other permitting barriers The following permits are required for a Solar PV installation: ● NAB Title 9 Planning Permit ● FAA Glint & Glare Review if potential interference with aviation traffic ● Analysis of wetlands and floodplain avoidance ● NEC compliance/PE stamps ● Consultation with State Historical Preservation Office ● Critical Habitat avoidance The permitting consultations and applications, funded through an AEA REF Phase III Round 14 grant, will start as soon as the location of the PV array is finalized. The permitting is expected to take 6 months to complete and is being accomplished under the previous award from the AEA for the Design phase of this project. NANA also has engineering subsidiaries who can support the project, in particular with the analysis of wetlands and floodplain avoidance, as they work on similar issues for the Red Dog mine in the region. 5.2 Project Site Describe the availability of the site and its suitability for the proposed energy system. Identify potential land ownership issues, including whether site owners have agreed to the project or how you intend to approach land ownership and access issues. See the “Site control” section of the appropriate Best Practice Checklist for additional guidance. Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 18 of 42 10/04/2022 The proposed project site is vacant land located adjacent to the existing AVEC power plant. Land ownership issues are not a concern; the project site is located on a Deed of Easement to the City of Selawik. Bk 41, Pgs. 965-967 9/3/1993 Parcel 93-P-3. The City of Selawik and Native Village of Selawik have signed a joint resolution in support of this project, and the City of Selawik has produced a Letter of Support for this project confirming permission to construct on the proposed site identified above. Additionally, if siting of the project must be adjusted during the design phase of the project nearby potential property is held and managed by NANA Regional Corporation in Section 17, IC No. 552. NANA Regional Corporation. If required, NANA will provide required access as they have provided a letter of support for this project, contributed $500,000 to the associated but separate Battery Energy Storage System project, and they have been a firm advocate for renewable energy development in the region, including solar PV in Selawik. 5.3 Project Technical & Environmental Risk 5.3.1 Technical Risk Describe potential technical risks and how you would address them. ● Which tasks are expected to be most challenging? ● How will the project team reduce the risk of these tasks? ● What internal controls will be put in place to limit and deal with technical risks? See the “Common Planning Risks” section of the appropriate Best Practice Checklist for additional guidance. NAB does not foresee any major technical risks for completing the construction of this project. The main technical aspects and potential challenges are being considered in the design process and include: 1) permafrost soils supporting ground mounted racking for solar PV panels; 2) power conversion system for grid forming inverter, and system controls/dispatch; and 3) challenging logistics in a remote location. All of these issues have been addressed and resolved in similar projects in nearby communities, but each project has unique site-specific circumstances. All of the proposed equipment for this project is commercialized technology. Actual systems for consideration must be “flight proven” through successful installations, ongoing commercial performance in comparable field conditions, and covered by well established companies providing commercial warranties. To control these risks, the project team will prioritize siting location to minimize impact to permafrost and facilitate conventional helical pile installation. The team will apply lessons learned from recent similar installations and include extended commercialization technical support in vendor contracts to assure that the integration control system is optimized. The project team will address the challenging remote logistics by hiring experienced construction contractors and planning extra time in the project schedule to allow for logistical issues. Another technical risk in the past that has been successfully addressed is electrical integration of new equipment into legacy infrastructure. This has been resolved with AVEC infrastructure through upgraded switchgear, generator controls, and a proven microgrid controller. These lessons will be applied to the project proposed here. Specifically, a solar PV system recently installed in Shungnak, and one soon to be installed in Noatak, are designed to work with AVEC’s switchgear and ComAp generator controllers, and any future microgrids will be required to be compatible with this hardware and software. 5.3.2 Environmental Risk Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 19 of 42 10/04/2022 Explain whether the following environmental and land use issues apply, and if so which project team members will be involved and how the issues will be addressed. See the “Environmental and Permitting Risks” section of the appropriate Best Practice Checklist for additional guidance. ● Threatened or endangered species ● Habitat issues ● Wetlands and other protected areas ● Archaeological and historical resources ● Land development constraints ● Telecommunications interference ● Aviation considerations ● Visual, aesthetics impacts ● Identify and describe other potential barriers Threatened or endangered species: Technically, the location is considered to be within potnetial Polar Bear Habitat. https://ipac.ecosphere.fws.gov/location/4BGG65575RGA7GB5XLUQWKSX7A/resources Though polar bears have not resided in the project area or seen in Selawik in at least the past 38 years, and the community is not adjacent to the ocean or the sea ice that Polar Bears frequent for habitat and food. Nevertheless, the project will issue stop work orders and minimize impacts to endangered species should any be seen anywhere near the project site. Habitat Issues: This project does not impact significant habitat, only a small area of tundra will be impacted and there is minimal habitat present as the site is adjacent to a population center and there is minimal plant growth in the proposed project site. Wetlands: Using National Wetlands Inventory Mapper, no wetlands are anticipated to be impacted by this project. Archaeological and historical resources: No archaeological or historical resources are anticipated to be impacted; a SHPO 106 consultation will be conducted. Land development constraints: Land development is not considered to be a constraint; the project location is previously distributed from repeated snow machine use. Telecommunications interference: This project is not anticipated to impact telecommunications. No additional radio or telecommunication equipment will be installed that is expected to impact existing or future telecommunications. If anything, installation of additional fiber optics will provide enhanced telecommunication capacity. Aviation considerations: This project is not anticipated to impact aviation or airports as there are no structures extending into active airspace and the construction is sufficiently distant from the local airport. Visual, aesthetics impacts: This project will produce a small visual impact of construction of a solar field; though the construction will be generally located at ground level; there are not anticipated to be public complaints and there has been documented public support for the project in spite of these potential visual impacts. Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 20 of 42 10/04/2022 5.4 Technical Feasibility of Proposed Energy System In this section you will describe and give details of the existing and proposed systems. The information for existing system will be used as the baseline the proposal is compared to and also used to make sure that proposed system can be integrated. Only complete sections applicable to your proposal. If your proposal only generates electricity, you can remove the sections for thermal (heat) generation. 5.4.1 Basic Operation of Existing Energy System Describe the basic operation of the existing energy system including: description of control system; spinning reserve needs and variability in generation (any high loads brought on quickly); and current voltage, frequency, and outage issues across system. See the “Understanding the Existing System” section of the appropriate Best Practice Checklist for additional guidance. The existing diesel power plant in Selawik consists of three generators: a 499 kW Cummins QST, a 499 kW Cummins QSX, and 900 kW Cummins K38G4. These generators were installed in 2020, 2019, and 2014 respectively. Aggregate generator efficiency in Selawik in 2021 was 13.11 kWh/gal from the annual PCE report. The peak load in 2021 was 612 kW with an average load of 319 kW. Spinning reserve is provided by a second gen-set, and there are currently no regular voltage or current issues in Selawik. However, Selawik has occasionally suffered from power outages in the past, most notably in February 2022, causing a blackout during peak load and causing the community’s energy intensive water and sewer system to fail. The Northwest Arctic Borough has secured $1,600,000 from the USDA REPP, $500,000 from the NANA Village Economic Investment Fund, $100,000 from AVEC, and $330,000 from the Borough VIF program to construct and integrate a 1 MWh battery to address these issues and provide a minimum of 1.5 hours of battery backup at peak load. 5.4.2 Existing Energy Generation Infrastructure and Production In the following tables, only fill in areas below applicable to your project. You can remove extra tables. If you have the data below in other formats, you can attach them to the application (see Section 11). 5.4.2.1 Existing Power Generation Units Include for each unit include: resource/fuel, make/model, design capacity (kW), minimum operational load (kW), RPM, electronic/mechanical fuel injection, make/model of genset controllers, hours on genset Unit 1: CMS QST30, Diesel, 750 kW, ComAps, 47 hours Unit 2: CMS QSX15 G9, CPL 8142, 499 KW, NEW HC 1544F, 063297/01, ComAps, 75840 hours Unit 3: CMS K38G4 1800, 900 kW, CMS 1000DF JD, G960612453, ComAps, 1821 hours Unit 4: PLEASE SEE ATTACHMENT: AVEC FLEET Information, for additional detail on above generators. Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 21 of 42 10/04/2022 Unit 5/: Unit 6: Is there operational heat recovery? (Y/N) If yes estimated annual displaced heating fuel (gallons) Yes, 9,200 gal. This project is not expected to impact the heat recovery system end users, because the majority of diesel-off time will be during the summer months. This will be confirmed during the design process. 5.4.2.2 Existing Distribution System Describe the basic elements of the distribution system. Include the capacity of the step-up transformer at the powerhouse, the distribution voltage(s) across the community, any transmission voltages, and other elements that will be affected by the proposed project. Selawik generates at 496 V and steps up to 7200 V for distribution. The following information summaries the transformers: Breaker 1: 3 ea 167kVA Breaker 2: 3 ea 167kVA Breaker 3: 3 ea 75kVA, 3 ea 100 kVA at wind turbine site 5.4.2.3 Existing Thermal Generation Units (if applicable to your project) Generatio n unit Resourc e/ Fuel type Design capacity (MMBtu/h r) Make Model Average annual efficienc y Year Installe d Hours N/A 5.4.2.4 O&M and replacement costs for existing units Power Generation Thermal Generation i. Annual O&M cost for labor Postage stamp rate - $140,000 per Power Plant for labor and non-labor, per AVEC calculations N/A ii. Annual O&M cost for non-labor See above iii. Replacement schedule and cost for existing units Oil Change at 500 hrs - $140 Tune-up at 3000 hrs - $2400 Top end at 10,000 hrs - $8600 Overhaul at 20,000 hrs - $40- 55,000 Replacement at 100,000 hrs 5.4.2.5 Annual Electricity Production and Fuel Consumption (Existing System) Use most recent year. Replace the section (Type 1), (Type 2), and (Type 3) with generation sources Month Generati on (Type 1) Generati on (Type 2) Generati on (Type 3) Fuel Consumption Fuel Consumpti on Pea k Minimu m Load Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 22 of 42 10/04/2022 (kWh) (kWh) (kWh) (Diesel- Gallons) [Other] Loa d January 328,346 22,377 530 February 359,088 21,853 498 March 297,853 18,663 460 April 266,273 18,937 455 May 231,447 16,097 424 June 153,117 12,206 389 July 149,964 13,713 347 August 196,494 15,820 401 Septemb er 196,693 14,836 413 October 225,401 16,591 422 Novemb er 312,739 22,621 498 Decemb er 322,702 26,074 636 Total 3,040,11 7 219,788 636 5.4.2.6 Annual Heating Fuel Consumption (Existing System) Use most recent year. Include only if your project affects the recovered heat off the diesel genset or will include electric heat loads. Only include heat loads affected by the project. Month Diesel (Gallons) Electricity Propane (Gallons) Coal (Tons) Wood (Cords, green tons, dry tons) Other January N/A February March April May June July Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 23 of 42 10/04/2022 August September October November December Total 5.4.3 Future Trends Describe the anticipated energy demand in the community, or whatever will be affected by the project, over the life of the project. Explain how the forecast was developed and provide year by year forecasts. As appropriate, include expected changes to energy demand, peak load, seasonal variations, etc. that will affect the project. Population trends in the region have been relatively stable since the 2010 census, including for Selawik. Because of this population trend, electric usage is not expected to change significantly. High energy costs have led to a focus on energy conservation, and this is not expected to change without significant reduction in energy costs. While this project will slightly reduce rates, it is not expected to reduce rates enough to change usage behaviors. As a result, significant load growth is not expected. The NAB has been supporting the installation of heat pumps in residential and community buildings throughout the region for the last 5 years. To be cost effective for consumers, these systems must be managed so electrical usage stays within the 750 kWh per month PCE allotment. It is not expected that heat pump installations will greatly increase electrical demand in the future once they are installed. Because of the ease of operations and maintenance of solar PV systems, high penetration solar PV will continue to be the technology of choice for rural communities without large hydroelectric or wind resources. 5.4.4 Proposed System Design Provide the following information for the proposed renewable energy system: ● A description of renewable energy technology specific to project location ● The total proposed capacity and a description of how the capacity was determined ● Integration plan, including upgrades needed to existing system(s) to integrate renewable energy system: Include a description of the controls, storage, secondary loads, distribution upgrades that will be included in the project ● Civil infrastructure that will be completed as part of the project—buildings, roads, etc. ● Include what backup and/or supplemental system will be in place See the “Proposed System Design” section of the appropriate Best Practice Checklist for additional guidance. The proposed project is a high penetration distributed solar PV system that will be connected to the local village electric grid and BESS. The system will be sized to maximize the diesels-off potential during the months of highest solar availability using HOMER software. The feasibility modeling has identified a PV array size of approximately 398 kW. The core component of each system will most likely be an ABB/Hitachi or Ageto supervisory microgrid controller with power electronic inverters and controls, coupled with a lithium-ion battery, that will allow for periods of diesels-off operation when there is sufficient solar energy production Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 24 of 42 10/04/2022 and/or adequate charge in the batteries to safely run the entire grid. In our case, this will most frequently occur for hours at a time between April and August, when there is significant solar availability and the total system loads decrease because of warmer temperatures, less need for electric lighting, and the local school closes for summer. An ABB/Hitachi e-mesh PowerStore is shown below. It is a compact and integrated platform with racks that accommodate various battery manufacturers, a single temperature control, and fire suppression package to reduce overall installation costs. The system controls and optimizes among diesel generators, solar PV, batteries, and electric heat loads to minimize diesel fuel consumption. This is a sample of what could be installed subject to competitive selection. In the most recent projects in the region, instead of ABB/Hitachi hardware, we have been using Ageto ARC microgrid controller and EPC Power Conversion devices. These are conceptually very similar but appear to be easier to integrate into AVEC’s diesel gen-set controllers. Leveraging experience with similar systems within our region and elsewhere around Alaska, this equipment is specifically designed for small isolated microgrids like that found in NAB. Over the last several years, ABB/Hitachi and Ageto have provided similar “grid-forming” inverters with batteries that allow for diesels-off operation in numerous remote microgrids around Alaska and elsewhere, including in nearby Deering, Buckland and Shungnak. Kotzebue Electric Association has ABB equipment in its powerhouse and local expertise and familiarity with the equipment for regional support. Though the core power conversion technology is well proven, the supervisory controllers are continually improving their programming based on growing experience with micro- grids, especially their experience in remote locations across Alaska, Canada, and Australia. 5.4.4.1 Proposed Power Generation Units Unit # Resource / Fuel type Design capacity (kW) Make Model Expecte d capacity factor Expecte d life (years) Expected Availability 1 Solar PV 398 TBD TBD 10.8% 25 99% Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 25 of 42 10/04/2022 5.4.4.2 Proposed Thermal Generation Units (if applicable) Generation unit Resource/ Fuel type Design capacity (MMBtu/hr) Make Model Expected Average annual efficiency Expected life N/A 5.4.5 Basic Operation of Proposed Energy System ● To the best extent possible, describe how the proposed energy system will operate: When will the system operate, how will the system integrate with the existing system, how will the control systems be used, etc. ● When and how will the backup system(s) be expected to be used See the “Proposed System Design” section of the appropriate Best Practice Checklist for additional guidance. The operation of the high penetration solar system will be controlled by a microgrid system controller. The concept of “system integration” essentially means overlaying new digital technology on top of a legacy islanded diesel grid and ensuring that the diesel backbone is fully supported. This requires a supervisory controller to continually monitor the entire system load to determine the optimal combination of solar PV, diesel generation, and battery power necessary to meet the load with the least amount of diesel generation but also ensure that the diesel generator, when running, is at least 30% loaded relative to its generation capacity to provide grid stability and avoid wet stacking to protect the diesel generator. Other operating constraints include maintaining battery state-of-charge (SOC) typically between 20-80% of total capacity, considering spinning reserve requirements on the diesel generator, and trying to minimize curtailment of solar output. For example, in a community if the system load is 200 kW and the solar PV is producing 180 kW and the batteries are 20% charged, the supervisory controller would send a signal to turn on, say, a 315 kW diesel generator (the smallest in the fleet in this case) to meet the remaining 20 kW of system load but it would also need to run at higher than 20 kW output. In fact, the diesel generator would have a low-load setpoint so it could not produce power at a rate less than 94.5 kW (30% of its nameplate rating of 315 kW). The excess power, above and beyond the 20 kW required to meet the system load, would go to charge the batteries. If the system load stayed at 200 kW and the solar PV output stayed at 180 kW, once the batteries were charged to 80% of their capacity, then the supervisory controller would send a signal to turn off the diesel generator and meet the entire system load with a combination of solar PV and battery output. When the batteries dropped in charge, it would dispatch the diesel generator to meet the difference. Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 26 of 42 10/04/2022 It should be noted that the supervisory controller—the “brains” of the operation—does not directly communicate with any of these generation assets, but rather receives inputs, and sends outputs, to individual controllers for the solar inverter, the diesel powerhouse switchgear and generator controls, and the battery management system (BMS), and then these units control the generation assets. This requires digital compatibility among all parts of the system and a pathway for all of the system components to communicate digitally, which can be done through fiber, ethernet, or wirelessly, depending on the circumstances. Typically, if the assets are located near each other, fiber or ethernet is preferred, but in some cases, such as when wind turbines or solar PV arrays are relatively far from the power plant, wireless communications are necessary. AVEC is in the process of updating the diesel powerhouse switchgear and generator controls for all of their communities, which is an essential requirement for proper digital communication and system control. We have been talking closely with AVEC to ensure that their new equipment will be digitally compatible with industry leading power electronics, especially those that are already installed in the region such as SMA and SolarEdge inverters and optimizers, Woodward Easygen and ComAp diesel generator controls, Saft and BluePlanet BMS’s, and ABB/Hitachi and Ageto supervisory microgrid controllers. 5.4.3.1 Expected Capacity Factor 10.8 % to 11.2%% 5.4.5.2 Annual Electricity Production and Fuel Consumption (Proposed System) Month Generati on (Propos ed System) SOLAR (kWh) Generatio n (Type 2) (kWh) Generati on (Type 3) (kWh) Fuel Consumpt ion (Diesel- Gallons) Fuel Consumpt ion [Other] Second ary load (kWh) Stora ge (kWh) January 640 Februar y 6,700 March 26,732 April 51,491 May 63,696 June 70,924 July 66,893 August 47,580 Septem ber 28,097 October 12,023 Novemb er 2,476 Decemb er 0 Total 377,253 5.4.5.3 Annual Heating Fuel Consumption (Proposed System) Month Diesel Electricity Propane Coal Wood Other Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 27 of 42 10/04/2022 (Gallons) (Gallons) (Tons) (Cords, green tons, dry tons) January N/A February March April May June July August Septembe r October November December Total 5.4.6 Proposed System Operating and Maintenance (O&M) Costs O&M costs can be estimated in two ways for the standard application. Most proposed renewable energy projects will fall under Option 1 because the new resource will not allow for diesel generation to be turned off. Some projects may allow for diesel generation to be turned off for periods of time; these projects should choose Option 2 for estimating O&M. Option 1: Diesel generation ON For projects that do not result in shutting down diesel generation there is assumed to be no impact on the base case O&M. Please indicate the estimated annual O&M cost associated with the proposed renewable project. $ Option 2: Diesel generation OFF For projects that will result in shutting down diesel generation please estimate: 1. Annual non-fuel savings of shutting off diesel generation 2. Estimated hours that diesel generation will be off per year. 3. Annual O&M costs associated with the proposed renewable project. 1. $2,929 2. Hours diesel OFF/year: 193 3. $7,960 The O&M estimates were developed using the AEA B/C ratio model. The non-fuel savings include the O&M savings in the above table and show the savings in diesel replacement costs. This savings is calculated using the annual diesels-off hours, typical life of the AVEC gensets (100,000 hrs), and estimated gen-set replacement cost ($75,000). See the replacement cost details in the Attachments; this includes an additional $145 in cost savings identified annually for public benefit from insurance and other cost savings. Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 28 of 42 10/04/2022 The O&M Savings are pulled directly from AEA’s B/C ratio model. This application takes a slightly different approach from the estimated O&M costs from the AEA recommended rule of thumb of 2% of capital cost for Solar PV projects. This 2% is the same recommended estimate for wind projects, and experience in NAB and other regions of Alaska has shown that Solar PV O&M costs are significantly less than wind projects. Industry rule of thumb for Solar PV O&M costs including panels and inverters and associated equipment is $10-$20 per year per installed kW. We used $20 per installed kW for a conservative estimate. Please refer to the O&M Costs in the attachments for full O&M calculations. 5.4.7 Fuel Costs Estimate annual cost for all applicable fuel(s) needed to run the proposed system (Year 1 of operation) Diesel (Gallons) Electricity Propane (Gallons) Coal (Tons) Wood Other Unit cost ($) N/A Annual Units Total Annual cost ($) 5.5 Performance and O&M Reporting For construction projects only 5.5.1 Metering Equipment Please provide a short narrative, and cost estimate, identifying the metering equipment that will be used to comply with the operations reporting requirement identified in Section 3.15 of the Request for Applications. The system will be designed with metering equipment that will allow the operator to understand solar PV production, power flowing into and out of the battery, and battery system station service including HVAC and battery round-trip efficiency. This metering equipment is standard for all high penetration solar PV, battery, diesel hybrid systems. Typical meters cost about $500 each. 5.5.2 O&M reporting Please provide a short narrative about the methods that will be used to gather and store reliable operations and maintenance data, including costs, to comply with the operations reporting requirement identified in Section 3.15 of the Request for Applications Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 29 of 42 10/04/2022 The following documentation will be collected on a monthly basis by our finance department to understand the impact of the solar PV: ● kWh produced by the Solar PV ● Diesel fuel usage in the power plant ● Cost of diesel fuel ● Battery round Trip Efficiency ● Diesels-off hours ● Maintenance and Material Costs ● Additional Labor hours This information will be reported annually to AEA in the required format. SECTION 6 – ECONOMIC FEASIBILITY AND BENEFITS 6.1 Economic Feasibility 6.1.1 Economic Benefit Annual Lifetime Anticipated Diesel Fuel Displaced for Power Generation (gallons) 27,278 681,947 Anticipated Fuel Displaced for Heat (gallons) Total Fuel displaced (gallons) 27,278 681,947 Anticipated Diesel Fuel Displaced for Power Generation ($) YEAR 1: $82,421 $2,434,926 Anticipated Fuel Displaced for Heat ($) Anticipated Power Generation O&M Cost Savings $2,940 $73,502 Anticipated Thermal Generation O&M Cost Savings Total Other costs savings (taxes, insurance, etc.) $145 $3,625 Total Fuel, O&M, and Other Cost Savings $81,698 $2,511,674 6.1.2 Economic Benefit Explain the economic benefits of your project. Include direct cost savings and other economic benefits, and how the people of Alaska will benefit from the project. Note that additional revenue sources (such as tax credits or green tags) to pay for operations and/or financing, will not be included as economic benefits of the project. Where appropriate, describe the anticipated energy cost in the community, or whatever will be affected by the project, over the life of the project. Explain how the forecast was developed and provide year-by-year forecasts Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 30 of 42 10/04/2022 The economic model used by AEA is available at https://www.akenergyauthority.org/What-We- Do/Grants-Loans/Renewable-Energy-Fund/2022-REF-Application. This economic model may be used by applicants but is not required. The final benefit/cost ratio used will be derived from the AEA model to ensure a level playing field for all applicants. If used, please submit the model with the application. Capital: This project will allow for reduced cost of electrical production in Selawik. Cost savings are anticipated to be shared between AVEC, who will purchase the produced electricity at a reduced cost beneath their current cost of production, and the Native Village of Selawik, which will operate an IPP. In addition to generating revenue to support maintenance, establishing a reserve for replacement of the system, and potentially growth of the system. Any revenues generated beyond these savings will be available for operations and investment of the Native Village of Selawik. The shared benefits could reduce electricity prices, increase revenues available for government operations, and will create a single part time job for maintenance of the solar PV systems. These positive economic impacts will correspondingly reduce the cost of living in one of the highest cost of living regions in the United States, and for a community with 74.85% of households qualifying as low or moderate income per HUD. Operations: The economic modeling used for this application was the AEA B/C ratio model. Potential annual fuel displacement (gallons and dollars) over the lifetime of the evaluated renewable energy project: The project will displace 27,278 gallons of diesel fuel for electrical generation annually. The average price of fuel from the B/C ratio model was used for our estimates, and the 2024 cost in Selawik is projected to be $3.02/gallon. Based on the output of the B/C ratio model, over the 25-year lifetime of the project, the solar PV, will displace 681,947 gallons of diesel, with a lifetime cost savings of $2,511,674. In the first year of operation, the renewable energy systems are expected to save the community $81,698 that can be used toward utility operations and maintenance, a replacement reserve for equipment, and operator and technical training. The B/C ratio is .1.01 Selawik has challenging economics due to the relatively low cost of diesel. This is a challenge that many remote communities, especially AVEC communities, encounter when trying to justify the extremely high construction costs for renewable energy projects with fuel that is purchased in bulk for all their service areas and tank farms that have been subsidized and are not accounted for in fuel costs. Thankfully, because Selawik has received funding to build an oversized battery to support the electric system in order to provide freeze protection for their water and sewer system, the cost of providing solar PV in Selawik is low. Without the capital cost burden of constructing a battery and associated controls systems, the benefits of adding Solar PV are straightforward and economical. The battery energy storage system project in Selawik will happen with or without Solar PV additions to the generation mix; the opportunity to reduce fuel usage in the community, in addition to providing cost savings and emissions reductions, will provide substantial benefits to Selawik. The assumptions used in the B/C ratio analysis are: Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 31 of 42 10/04/2022 • Annual solar production and diesels off hours – values calculated in the HOMER modeling feasibility studies • Annual Renewable Energy O&M costs - Solar PV O&M costs including panels and inverters and associated equipment - $20 per year per installed kW (398 kW) • Installed PV capacities from HOMER modeling feasibility studies • Diesel Generator O&M - based on the size of the generators • Displaced schedule component replacement cost savings due to diesels off - calculated using actual AVEC genset replacement costs and typical lifetime hours • Project life of 25 years 6.1.3 Economic Risks Discuss potential issues that could make the project uneconomic to operate and how the project team will address the issues. Factors may include: ● Low prices for diesel and/or heating oil ● Other projects developed in community ● Reductions in expected energy demand: Is there a risk of an insufficient market for energy produced over the life of the project. ● Deferred and/or inadequate facility maintenance ● Other factors The economic risks of the operation of these projects are very low if the pre-construction economic analysis recommends project construction. The operating model used in NAB with an IPP operating and maintaining the Solar PV was put in place to minimize economic risks. The ease of operation of solar PV reduces the risk of operational failures due to inadequate maintenance from an IPP and the revenues generated from an IPP provide incentive and cash flows required to provide adequate maintenance. Because the renewable energy is solar PV, there is no fuel cost that can create negative savings for the communities. Low diesel costs will extend the payback of projects, but it is very unlikely that the diesel prices will drop so low that there is not positive cash flow for this project. The system sizing, which is relatively low compared to the community load for most of the year, and battery support provided by other funding sources, further reduce the economic risks of the project. 6.1.4 Public Benefit for Projects with Direct Private Sector Sales For projects that include direct sales of power to private sector businesses (sawmills, cruise ships, mines, etc.), please provide a brief description of the direct and indirect public benefits derived from the project as well as the private sector benefits and complete the table below. See Section 1.6 in the Request for Applications for more information. N/A Renewable energy resource availability (kWh per month) ~31,500 Estimated direct sales to private sector businesses (kWh) 0 Revenue for displacing diesel generation for use at private sector businesses ($) 0 Estimated sales for use by the Alaskan public (kWh) ~31,500 Revenue for displacing diesel generation for use by the Alaskan public ($) $85,491 Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 32 of 42 10/04/2022 6.2 Other Public Benefit Describe the non-economic public benefits to Alaskans over the lifetime of the project. For the purpose of evaluating this criterion, public benefits are those benefits that would be considered unique to a given project and not generic to any renewable resource. For example, decreased greenhouse gas emission, stable pricing of fuel source, won’t be considered under this category. Some examples of other public benefits include: ● The project will result in developing infrastructure (roads, trails, pipes, power lines, etc.) that can be used for other purposes ● The project will result in a direct long-term increase in jobs (operating, supplying fuel, etc.) ● The project will solve other problems for the community (waste disposal, food security, etc.) ● The project will generate useful information that could be used by the public in other parts of the state ● The project will promote or sustain long-term commercial economic development for the community The overarching purpose of this project is to benefit the community and residents of Selawik by increasing community resilience in the face of climate change and extreme weather events, improving energy security, and reducing reliance on diesel fuel, including the risks associated with long-distance marine-based fuel delivery. Further, we intend to establish an Independent Power Producer (IPP) with the Native Village of Selawik that will be managing the systems and selling power to AVEC. This will increase our local and regional capacity for the operations and maintenance of renewable energy systems and potentially support the development of a regional energy services provider in partnership with the regional stakeholders. This will ultimately result in lower costs and improved maintenance of community-owned infrastructure. Selawik residents who have expressed interest will participate in ongoing training and performance optimization for one year after construction and commissioning of the system. This work will include training for local operators, data collection and recording, troubleshooting, system performance improvement, and management of specialty engineering, mechanical and electrical contractors as needed to support each high penetration renewable energy system. The benefits of this training and education will include increased job skills for participants and long-term jobs will be created. The training and jobs will ensure local control over and increased effectiveness and efficiency of operations and maintenance. A reduced reliance on outside contractors for O&M will also lower costs over the life of the project. Additionally, future construction projects can benefit from a trained and experienced local workforce, increasing employment opportunities as well as saving on workforce mobilization costs. The addition of this solar PV system to the battery energy storage project (funded separately) will also reduce or eliminate brown-outs and black-outs, which can also lead to water system freeze- ups, and maximize the fuel efficiency of the operating diesel engines. Additional public benefits include: ● Reduced electric rates for commercial customers that could be passed to community members through lower prices. ● Reduced electric rates for commercial customers could lead to economic development such as opening a restaurant ● Improved Air Quality through reduction of diesel emissions ● Reduced Risk of fuel spills through reduced demand for diesel fuel, diesel storage, and reduced quantity of diesel transfer from delivery barges. Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 33 of 42 10/04/2022 ● Leverage opportunities for future construction with outside funding, such as federal grants, that might otherwise not be brought into the communities. ● Maintain leadership within the state for the NAB/NANA region, and ongoing recognition of state leadership within the global clean energy community focused on remote microgrids. ● Continued innovation, both technically and financially, that could ultimately be replicated at scale across Alaska. SECTION 7 – SUSTAINABILITY Describe your plan for operating the completed project so that it will be sustainable throughout its economic life. At a minimum for construction projects, a business and operations plan should be attached and the applicant should describe how it will be implemented. See Section 11. 7.1.1 Operation and Maintenance Demonstrate the capacity to provide for the long-term operation and maintenance of the proposed project for its expected life ● Provide examples of success with similar or related long-term operations ● Describe the key personnel that will be available for operating and maintaining the infrastructure. ● Describe the training plan for existing and future employees to become proficient at operating and maintaining the proposed system. ● Describe the systems that will be used to track necessary supplies ● Describe the system will be used to ensure that scheduled maintenance is performed In a previous collaborative project between NAB and AVEC in Shungnak, the solar PV system supported the establishment of a community-based Independent Power Producer that sells power to AVEC. The separate planned battery and supervisory controller are operated and maintained by AVEC because AVEC is responsible for the dispatch of the entire power generating system. The AVEC maintenance organization supports these installations and has an extensive staff of skilled mechanics and technicians. AVEC has proven over many years that they can successfully maintain complex equipment and controls. By partnering with AVEC, all parties have an ongoing interest in maintaining the system, reducing fuel use and system costs, and developing a trained workforce. Primary Operations and Maintenance requirements of the solar PV portion of the project include snow removal and cleaning of panels, replacement of panels and microcontrollers as needed. Another critical aspect of local operations and maintenance will be identification and recognition of controls issues in coordination with the local AVEC operator. In addition to construction funding for a battery energy storage system in Selawik, we have also secured funding through a connected project (funded through the USDA) to create the Northwest Arctic Renewable Energy Performance Optimization Program (REPOP), hosted by the Northwest Arctic Borough. This program will provide a .75 FTE employee at the NAB for three years to support and optimize performance of six systems in the region (including Selawik’s proposed system). The three-year timeframe will allow Selawik residents to participate in and benefit from ongoing training and performance optimization for a year after construction and commissioning of the system. This work will include coordination of training for local operators, data collection and recording, troubleshooting, system performance improvement, and management of specialty engineering, mechanical and electrical contractors as needed to support each high penetration renewable energy system. Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 34 of 42 10/04/2022 The REPOP begins with the key step of hiring or contracting the role of an optimization coordinator. This role will oversee the performance of each Tribal Renewable IPP in the region including Selawik, coordinate maintenance and optimization work, and lead training development and programs. Additionally, the Borough will begin with establishing contracting relationships with technical assistance providers such as ABB-Hitachi, DeerStone Consulting, and others to provide specialized support to the participating communities. In general, optimization work will be iterative and ongoing. These tasks will include monitoring performance of renewable energy systems and batteries in the region, assigning contractors to optimize controls, addressing outages, applying lessons learned between participant communities, training local power plant operators, and other critical functions to ensure maximum renewable energy production. An additional key early step will be to formalize and finalize the fee-for-service relationship with each IPP to establish a pattern of payment for receipt of services and to carry the program financially, especially after the three years of USDA startup grant funding expires. It is anticipated that two operator trainings will be conducted in Kotzebue to provide education for each operator, one in the first 18 months of the program, and the second a year later. The Northwest Arctic Borough will develop materials for the training and will work with Kotzebue Electric Association and Alaska Technical Center to implement the trainings in Kotzebue. Operators from each community will be flown into Kotzebue to receive training and observe performance of the KEA high penetration renewable system, meet with specialty contractors, and learn about key maintenance practices of similar systems. A business plan for the REPOP has been developed and is included in the attachments to this application. Operations and Maintenance specifics for Selawik Solar PV will developed before completion of the project in coordination wit the REPOP effort. 7.1.2 Financial Sustainability ● Describe the process used (or propose to use) to account for operational and capital costs. ● Describe how rates are determined (or will be determined). What process is required to set rates? ● Describe how you ensure that revenue is collected. ● If you will not be selling energy, explain how you will ensure that the completed project will be financially sustainable for its useful life. NRC and NAB have worked with consultants to develop a rate setting calculator that takes into account a Power Purchase Agreement (PPA) with utilities. This tool accounts for all annual operations and maintenance costs and estimates the impact to PCE reimbursements to the utilities. This tool will be used to develop rates for a PPA with AVEC to assure that the IPP, the utility, and the rate payers benefit from the project. AVEC will continue to utilize their successful revenue collection process with their rate payers, so non-payment is not an issue. All of these details are addressed in the business plan for this project. 7.1.2.1 Revenue Sources Briefly explain what if any effect your project will have on electrical rates in the proposed benefit area over the life of the project. If there is expected to be multiple rates for electricity, such as a separate rate for intermittent heat, explain what the rates will be and how they will be determined Collect sufficient revenue to cover operational and capital costs ● What is the expected cost-based rate (as consistent with RFA requirements) Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 35 of 42 10/04/2022 ● If you expect to have multiple rate classes, such as excess electricity for heat, explain what those rates are expected to be and how those rates account for the costs of delivering the energy (see AEA’s white paper on excess electricity for heat). ● Annual customer revenue sufficient to cover costs ● Additional incentives (i.e. tax credits) ● Additional revenue streams (i.e. green tag sales or other renewable energy subsidies or programs that might be available) The electrical rates will remain in the control of AVEC. However, the proposed solar and battery system here will represent a cost-based opportunity for AVEC to lower their rates and for more economic development to occur in the community through investment, job creation, and future distribution from the Tribal IPP that will be established as a result of this effort. The transaction price for the renewably generated kWh will be set in the PPA negotiations with AVEC during the finalization of the business plan, and there is commitment from all parties that the projects will not move forward to construction unless the benefits of the projects are shared between the IPP, the utility, and the rate payers. To the degree that this project directly results in reduced fuel burn from AVEC, they will be able to lower their rates to commercial customers without any loss of PCE allocation. 7.1.2.2 Power Purchase/Sale The power purchase/sale information should include the following: ● Identification of potential power buyer(s)/customer(s) ● Potential power purchase/sales price - at a minimum indicate a price range (consistent with the Section 3.16 of the RFA) Identify the potential power buyer(s)/customer(s) and anticipated power purchase/sales price range. Indicate the proposed rate of return from the grant-funded project. Include letters of support or power purchase agreement from identified customers. NAB has recently partnered with AVEC on a very similar project to what is proposed in this application. An IPP owned by the Native Villages of Shungnak and Kobuk and supported by NAB has entered into a PPA with AVEC for selling power generated from a solar PV and battery hybrid system. The IPP operates and maintains the Solar PV array, and AVEC operates and maintains the battery system. AVEC has provided a letter of support indicating that they are interested in developing PPA’s for future projects in the NAB. AVEC has also been actively involved in this application development. The potential power purchase/sales prices will be developed through the business plan process and will be based on AVEC displaced fuels costs. In general, the renewable generation will be priced at the avoided fuel cost for AVEC minus O&M costs and other system encumbrances that AVEC will need to cover as a result of the renewable asset inter-connected to AVEC’s generation and distribution system. This will ensure fairly distributed benefits to all stakeholders in the community. SECTION 8 – PROJECT READINESS Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 36 of 42 10/04/2022 8.1 Project Preparation Describe what you have done to prepare for this award and how quickly you intend to proceed with work once your grant is approved. Specifically address your progress towards or readiness to begin, at a minimum, the following: ● The phase(s) that must be completed prior to beginning the phase(s) proposed in this application ● The phase(s) proposed in this application ● Obtaining all necessary permits ● Securing land access and use for the project ● Procuring all necessary equipment and materials Refer to the RFA and/or the pre-requisite checklists for the required activities and deliverables for each project phase. Please describe below and attach any required documentation. The development of this project has followed the traditional renewable energy project development process. A solar resource assessment for Alaska was conducted by the National Renewable Energy Lab in 2016 to provide a basic framework for solar PV feasibility studies. We also have excellent solar PV production data for all communities in the NAB/NANA region, including Selawik, from a solar PV installation at the community’s water treatment plant, which was a precursor to this proposed project and other solar PV systems throughout the region. Based on this production data, we have detailed understanding of the reliability and performance of solar PV. In general, across the Northwest Arctic region, solar PV systems have been installed for almost a decade and have successfully weathered all storms and other environmental hazards, and consistently produce annually about 1 MWh for each 1 kW of installed capacity. We now also have experience with several village-scale installations in other nearby communities, so most residents have been exposed to the technology and are very interested in developing it for their own communities. The NAESC energy education process that has occurred for over a decade has also contributed to widespread community readiness. NAB and the Northwest Arctic Energy Steering Committee conducted community outreach and educational activities to support the development of regional and community energy plans. Solar PV and battery systems were high priorities. This application is an outgrowth of these efforts. A regional energy plan, recently updated and posted on the NAB’s website, further reinforces the widespread support, community readiness, and viability of these solar PV and battery systems. Feasibility studies through the Alaska Native Tribal Health Consortium (ANTHC) were conducted for Selawik, addressing optimum sizing of the solar PV array, battery and converter and performing a basic economic viability analysis. The feasibility study showed that the system could result in significant diesel savings and diesel-off operation. Lastly, design of the System is currently underway with funding from REF Round 14 allocation in concert with three other communities. The design, once completed, will provide the basis for construction and lay the groundwork for bundling multiple projects at one time for further cost reductions. We are requesting construction funding for the solar array in advance of engineering Phse III being complete in part because the costs for Solar PV development are reliable, regionally proven, and not subject to significant variation with the ongoing design. NRC has expressed commitment to providing land for the solar array, and funding for the battery installation project has already been secured and is being pursued separately for the purposes of water and sewer freeze protection. 8.2 Demand- or Supply-Side Efficiency Upgrades Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 37 of 42 10/04/2022 If you have invested in energy efficiency projects that will have a positive impact on the proposed project, and have chosen to not include them in the economic analysis, applicants should provide as much documentation as possible including: 1. Explain how it will improve the success of the RE project 2. Energy efficiency pre and post audit reports, or other appropriate analysis, 3. Invoices for work completed, 4. Photos of the work performed, and/or 5. Any other available verification such as scopes of work, technical drawings, and payroll for work completed internally. Our region, led by NAB, has been focused on energy efficiency measures since the early 2000’s. The NAB School District has completed large LED lighting upgrades throughout the local schools. The small local stores have been encouraged to carry LED bulbs in stock—a rarity in rural Alaska. AVEC has aggressively constructed heat recovery systems in all NAB utilities, including in Selawik, which has increased the heat rejection rate from some of its generators to facilitate the expansion of the heat recovery systems. All of the above demonstrate our commitment for energy sovereignty and our capability for successful project planning and implementation. Selawik’s energy efficiency work has been focused on the water and sewer system that freezes up regularly. Through the Village Energy Efficiency Program (VEEP), there has been significant progress on repairing leaks in the vacuum system, adding insulation to the above-ground piping, replacing aging and poorly sized pumps, and optimizing heat trace on the piping. Additional work is still required and ANTHC is scoping capital projects for additional major repairs. As well, throughout the region, NANA contributed about $2 million to energy efficiency initiatives through the Energy Wise program with RurAL CAP from 2010-2013 with meaningful impact, saving fuel and improving quality of life for shareholders and residents in all 11 communities. SECTION 9 – LOCAL SUPPORT AND OPPOSITION Describe local support and opposition, known or anticipated, for the project. Include letters, resolutions, or other documentation of local support from the community that would benefit from this project. Provide letters of support, memorandum of understandings, cooperative agreements between the applicant, the utility, local government and project partners. The documentation of support must be dated within one year of the RFA date of October 4, 2022. Please note that letters of support from legislators will not count toward this criterion. Because of the education and outreach work that has been completed by the NAESC over the last 12 years, communities, including Selawik, and regional entities are very engaged in the energy development process. Active participation in the NAESC and Letters of Support have been submitted by the following partners: NAB Resolution NANA Regional Corporation Alaska Village Electric Cooperative City of Selawik (includes commitment to provide land should selected site by City-owned) Native Village of Selawik Resolution This project is a high priority for the community and has not engendered any opposition that we are aware of. SECTION 10 – COMPLIANCE WITH OTHER AWARDS Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 38 of 42 10/04/2022 Identify other grants that may have been previously awarded to the Applicant by AEA for this or any other project. Describe the degree you have been able to meet the requirements of previous grants including project deadlines, reporting, and information requests. The NAB’s annual general fund appropriation is approximately $23 million, of which 80% of the revenue ($18.7 million) is derived from the PILT agreement with the Red Dog Mine. The PILT is negotiated every 5-10 years while the mine is in operation. The NAB has received numerous federal grants, all of which were successfully administered and closed out and several grants from the State of Alaska, mostly for public safety. All grants are in compliance, and reporting is conducted by the appropriate administrators and the Finance Department. As well, because of the VIF account, the NAB is in a similar position to AEA in that we administer community grants and require careful accounting from our grant recipients, and we are accountable to all the communities and Red Dog for providing the support. This has required careful financial management. Currently, the NAB is helping the City of Ambler manage their USDA HECG Biomass Facility project and we are managing a $2 million US DOE Indian Energy solar PV and battery construction grant for the community of Noatak. It is further anticipated that the NAB will be managing the USDA REPP funding for the Renewable Performance Optimization Program and the construction of the high capacity battery for Selawik. The NAB also maintains an active SAM registration. The following AEA grants have been awarded to the NAB: Grant Project Award Year Awarded REF Wind Farms for Buckland Deering and Noorvik - 2195377 $10,738,438 2009 REF Upper Kobuk Biomass - 7040028 $185,867 2012 REF Design/Permitting for Solar PV & Battery Storage for Ambler, Kiana, Noorvik, and Selawik $590,000 2022 One of the strengths of energy development in the Northwest Arctic Borough is the diverse collaboration among stakeholders within communities as well as numerous supporting organizations and service providers outside the communities. The NAB and NRC are co-sponsors of the Northwest Arctic Energy Steering Committee (NAESC), a collaboration of energy leaders representing all the communities of the NAB. This organization has been instrumental in the development of renewable energy systems in the region, resulting in an innovative and diverse portfolio of successful projects. Our experience with federal funded assistance agreements shows that our assembled project team has the breadth and depth of knowledge to successfully implement this proposed solar PV construction project. In addition to those listed above for NAB, the following table summarizes some of the many state and federal grants received by members of our project team: Recipient Grant Program Project Amount Year Awarded NAB USDA - HECG Solar PV and Battery in Shungnak $2.1 million 2020 NAB DOE – Indian Energy Noatak Solar PV and Battery $2 million 2021 NAB USDA – High Energy Cost Ambler Biomass $700,000 2019 Renewable Energy Fund Round 15 Grant Application – Standard Form AEA 23046 Page 39 of 42 10/04/2022 NANA Regional Corporation BIA: Tribal Energy Development Capacity Regional Energy Support Organization Formation $100,000 2018 NANA Regional Corporation DOE – Indian Energy Solar PV in Kotzebue, Buckland, & Deering $1 million 2017 NANA Regional Corporation USDA - HECG Battery Energy Storage in Buckland and Deering $1.6 million 2016 NANA Regional Corporation DOE – Indian Energy Regional Technical Support $500,000 2016 The NAB’s Comprehensive Economic Development Strategy and energy planning activities are encapsulated in a detailed energy plan found on our website at: Northwest Arctic Borough Comprehensive Economic Development Strategy - https://www.nwabor.org/wp- content/uploads/NWA-Energy-Plan-Feb-2016_8.pdf SECTION 11 – LIST OF SUPPORTING DOCUMENTATION FOR PRIOR PHASES In the space below, please provide a list of additional documents attached to support completion of prior phases. Please see the following documents in the Attachments: - “Reconnaissance - Solar Energy Prospecting in Remote Alaska - An Economic Analysis of Solar Photovoltaics in the Last Frontier State” by Paul Schwabe, National Renewable Energy Laboratory U.S. - Selawik Solar PV Feasibility Study and HOMER Modeling SECTION 12 – LIST OF ADDITIONAL DOCUMENTATION SUBMITTED FOR CONSIDERATION In the space below, please provide a list of additional information submitted for consideration. ● Northwest Arctic Borough Regional Energy Plan - 2022 ● AVEC Maintenance Schedule ● B/C ratio Economic models