Loading...
HomeMy WebLinkAboutCity of Galena - Resolution 2022-05I GALENA,ALASKA 2 RESOLUTION 2022-05 3 4 A RESOLUTION BY THE CITY OF GALENA, ALASKA TO APPROVE A REQUEST 5 FOR FUNDING TO THE ALASKA ENERGY AUTHORITY'S RENEWABLE ENERGY 6 FUND ROUND 14 FOR THE FINAL DESIGN AND CONSTRUCTION OF A 7 COMMUNITY SCALE SOLAR PHOTOVOLTAIC AND BATTERY SYSTEM FOR s GALENA 9 10 WHEREAS, the City of Galena, Alaska is incorporated as a First -Class city and is governed by 11 an elected City Council; and 12 13 WHEREAS, the City of Galena's electric rates of $0.596/kWh are about five times the national 14 average; and 15 16 WHEREAS, the City of Galena is currently implementing a power plant upgrade consisting of 17 new switchgear, generator replacements, and other critical power system improvements, with the 18 majority of the work funded by a $1.9 million loan; and 19 20 WHEREAS, these power plant upgrades are necessary for the implementation of a planned high 21 penetration renewable energy system, specifically solar photovoltaic (PV) and battery storage, 22 that will be able to operate in "diesel -off' mode; and 23 24 WHEREAS, high penetration solar PV and battery hybrid systems have been successfully 25 demonstrated in rural Alaska and all over the world and are a mature technology that is reducing 26 fossil fuel consumption and has the potential to increase grid reliability and reduce diesel 27 generator Operation and Maintenance costs; and 28 29 WHEREAS, the City of Galena received a USDA -Rural Utilities Service High Energy Cost 30 Grant for $1.5 million that will partially fund design and construction of a high penetration Solar 31 PV-Battery-Diesel Hybrid System that has not yet been implemented; and 32 33 WHEREAS, the City of Galena is applying to the Renewable Energy Fund Round 14 in January 34 2022 for $2.0 million to fully develop the final design and support construction of a high 35 penetration solar PV-battery system to connect to their stand-alone diesel power plant and 36 distribution system; and 37 38 WHEREAS, the City of Galena will commit to utilizing the $1.5 million dollars from the USDA 39 High Energy Cost Grant as match and will commit to $6,000 of in -kind match; and 40 41 WHEREAS, the project team has identified 3 suitable locations for the construction of the Solar 42 PV panels and will finalize the location and secure site control during the design phase of the 43 project; and 44 45 WHEREAS, if awarded, the City of Galena and all City residents will directly benefit by having 2 3 4 5 6 7 8 9 10 11 12 13 a renewable energy project that will improve energy security and reliability and also reduce fossil fuel consumption and lower electricity production costs. NOW THEREFORE BE IT RESOLVED: the City of Galena Council approves the application for the 2022 Alaska Energy Authority's Renewable Energy Fund Program for $2.0 million and authorizes the City of Galena to use the USDA High Energy Cost Grant award and City of Galena in -kind for match if the AEA REF funding request is awarded. APPROVED and SIGNED this 131" day of January, 2022. 14 ATTEST: 15 16 4X4 17 Carolyn 067,City Clerk 18 19 20 21 Edward Pitka, Mayor