Loading...
HomeMy WebLinkAboutLeve Resol A Resolution supporting the Levelock Village Council’s application to the Alaska Energy Authority Renewable Energy Fund —Round 14 for financial support to develop a Phase III Final Design and Permitting report, that will identify our renewable energy system’s configuration and specifications to guide construction, including land use, resource permits, and leases required for construction. This effort builds on Levelock’s wind resource assessment, which recommended wind-battery storage configuration with a grid-forming converter. WHEREAS, the Levelock Village Council is a federally recognized Tribal entity in the State of Alaska and is the governing body for the community of Levelock WHEREAS, the Levelock Village Council works collaboratively with our utility, Levelock Electrical Cooperative, Inc.; and WHEREAS, the Levelock Village Council is actively developing a fish processing facility, which will require substantial power; and WHEREAS, the fish processing plant will be much more profitable if additional power is not provided by diesel fue l, the Village Council is taking the lead to also develop a renewable energy system to power the; and WHEREAS, the Village Council also supports our community’s efforts to reduce its dependence on fossil fuel; and WHEREAS, the Alaska Energy Authority Renewable Energy Fund is seeking applications for eligible renewable energy projects through the Renewable Energy Fund —Round 14 to produce cost-effective renewable energy for heat and power to benefit Alaskans statewide; and WHEREAS, Levelock and its utility desire to pursue economic development projects, including renewable energy to ensure projects are as effective as possible for our community; and WHEREAS, Levelock has not previously developed renewable energy projects, for this effort it will: - Designate Alex Tallekpalek, Tribal Council President as our communities’ Point of Contact; - Rely on an experienced consultant/contractor, Intelligent Energy Systems, LLC, to serve in the role of Project Manager . The contractor’s cost quotation, team resumes and contact information is included as an attachment to our application ; Levelock Village Council P.O. Box 70/401 Main Street Levelock, AK 99625 (907) 287-3030 levelockadmin@bbna.com - Require reports from the contractor and provide them along with an oversight report to AEA to ensure all grant funds will be expended on costs directly related to the performance of the scope of work and administration and reporting of grant activitie s; - Rely on Pati Crofut, a highly experienced grants manager and rura l utility accounting consultant and trainer to ensure the project accounting is done as AEA requires ; - Rely on the contractor/consultant to provide local employment opportunities to train and collect data and obtain temporary labor services by coordinating with the local point of contact, as it has done with other communities the contractor/consultant has worked with. WHEREAS, Levelock will provide matching funds in the form of the U.S. Dept. of Energy -Tribal Energy Program’s technical assistance to develop an on-the-ground inventory and assessment of our hard assets that can be used to develop a hybrid renewable energy system, and further certifies that this match is not being used for any other State of Alaska grant. NOW THEREFORE BE IT RESOLVED the Levelock Village Council hereby supports this application to the Renewable Energy Fund —Round 14 and authorizes Alex Tallekpalek, tribal president to represent us as an applicant for our efforts to apply for, secure, and obtain funding to invest in renewable resource development. BE IT FURTHER RESOLVED THAT the Levelock Village Council is in good standing with respect to its existing credit and federal tax obligations. FURTHER RESOLVED THAT Levelock Village Council commits to provide the matching resources for the project at the match amounts indicated in the application. FURTHER RESOLVED THAT Levelock Village Council authorizes those individual(s) signing the application have the authority to commit Levelock Village Council to the obligations unde r the grant. CERTIFICATION. The following resolution was passed and approved by a duly convened meeting of the Levelock Village Council tribal council.